GRID-CONNECTED SOLAR PV SYSTEMSInstall and Supervise Guidelines for Accredited Installers
January 2013
(Effective 1 February 2013)
These guidelines have been developed by Clean Energy Council. They represent latest industry best practice for the design and installation
of grid-connected PV systems. © Copyright 2013
While all care has been taken to ensure these guidelines are free from omission and error, no responsibility can be taken for the use of this information in the
installation of any grid-connected power system.
GRID-CONNECTED SOLAR PV SYSTEMS
Install and Supervise Guidelines for Accredited Installers
Last update: January 2013 1 of 19
CONTENTS
1 GENERAL 2
2 DEFINITIONS 2
3 STANDARDSFORINSTALLATION 3
4 LICENSING 3
4.1 ExtraLowVoltage(ELV) 3
4.2 LowVoltage(LV) 3
5 DOCUMENTATION 4
6 RESPONSIBILITIESOFACCREDITEDPERSON 4
7 PVARRAYINSTALLATION 5
7.1 General 5
7.2 Roofmounting(notbuildingintegrated) 5
7.3 FreestandingPVarrays 6
7.4 Buildingintegrated(BIPV)installations 6
7.5 VerificationofAS1170.2 6
7.6 Attachingmodulestoarraymountingstructure 7
7.7 EarthingofarraywithaPVarray maximumvoltagegreaterthanELV 7
7.8 WiringatthePVarray 8
7.9 Stringprotection 8
7.10 PVarrayisolatoratarray 9
7.11 PVarraycablebetweenarrayandinverter 10
8 INVERTERINSTALLATION 11
8.2 PVarrayisolatornearinverter 11
8.3 ACisolatornearinverter 12
8.4 ACcableselection 12
8.5 Solarsupplymainswitchinswitchboard 12
8.6 Shutdownprocedure 12
9 METERING 13
10 SIGNAGE 13
11 COMMISSIONING 13
12 INSTALLATIONANDCOMMISSIONING 14
12.1 General 14
12.2 Insulationresistancemeasurement 14
12.3 Installationandcommissioningsample 15
ATTACHMENT1:Dangeroussituation 18
ATTACHMENT2:PVarrayroofmounting 18
ATTACHMENT3:HardwiringofPVarrays 19
GRID-CONNECTED SOLAR PV SYSTEMS
Install and Supervise Guidelines for Accredited Installers
Last update: January 2013 2 of 19
Theobjectivesoftheseguidelinesareto:
→ improvethesafety,performanceandreliabilityofsolarphotovoltaicpower systemsinstalledinthefield
→ encourageindustryBestPracticeforalldesignandinstallationworkinvolving solarphotovoltaicpowersystems
→ provideanetworkofcompetentsolarphotovoltaicpowersystemsdesignersandinstallers
→ increasetheuptakeofsolarphotovoltaicpowersystems,bygivingcustomersincreased confidenceinthedesignandinstallationwork.
Theperformanceofareliableinstallationthatfulfilscustomerexpectationsrequiresbothcarefuldesignandcorrectinstallationpractice.Compliancewithrelevantstatehealthandsafetyregulationsisalsonecessary.
ThisdocumentusesthesameterminologyasoutlinedinAS/NZS5033.Twoimportantdefinitionsare:
2.1.1 Wheretheword“shall”isused,thisindicatesthatastatementismandatory
2.1.2 Wheretheword“should”isused,thisindicatesthatastatementisarecommendation
1 GENERAL
2 DEFINITIONS
NOTE:Theseguidelinesalonedonotconstituteafullydefinitivesetofrulesand aretobereadinconjunctionwithallrelevantAustralianstandards.Where theseguidelineshaveadditionalrequirementsabovethatstatedinthe Australianstandardsthentheseguidelinesshouldbefollowed.
GRID-CONNECTED SOLAR PV SYSTEMS
Install and Supervise Guidelines for Accredited Installers
Last update: January 2013 3 of 19
Accreditedinstallersshallcomplywiththefollowingstandardswhereapplicable:
3.1.1 Thegrid-interactiveinvertershallbetestedinaccordancewiththeAS4777(parts2and3) andlistedontheCleanEnergyCouncil’sapprovedinverterlist.
3.1.2 Thesystemshallcomplywiththerelevantelectricalserviceandinstallationrulesforthe statewherethesystemisinstalled. (NOTE:thelocalelectricitydistributormayhaveadditionalrequirements.)
3.1.3 Theseguidelinessetadditionalrequirementstothestandards.Anaccreditedinstaller orsupervisorisexpectedtofollowtheseguidelinesinadditiontotherequirementswithin therelevantstandards.
3.1.4 Theseguidelineswillbecomemandatoryon1February2013
3 STANDARDSFORINSTALLATION
AS/NZS3000 WiringRules AS4777.1 Gridconnect-Installation
AS/NZS5033 InstallationofPhotovoltaic(PV)Arrays
AS/NZS1768 LightningProtection
AS/NZS4509.2 Stand-alonePowerSystems-Design
AS/NZS3008 Selectionofcables
AS1170.2 WindLoads
4.1 ExtraLowVoltage(ELV)
4.1.1 Allextralowvoltagewiringshouldbeperformedbya‘competent’person,whichis definedbytheAustralianStandardAS/NZS4509.1stand-alonepowersystemsas: “apersonwhohasacquiredthroughtraining,qualifications,experienceoracombination ofthese,knowledgeandskillenablingthatpersontocorrectlyperformthetaskrequired.”
4.2 LowVoltage(LV)
4.2.1 Alllowvoltagework:>120VDCor>50VACshallbeperformedbyalicensedelectrician.
4.2.2 Alicensedelectricianisrequiredtoberesponsibleforthesafetyofthesystemwiring priortoconnectionofthesystemtothegrid.
4.2.2.a IfthesystemcontainsELVwiringinstalledbyanon-licensedperson,then aminimumlevelofinspectionbytheelectricianpriortoclosingthePVarray isolatorswouldinclude:anopencircuitvoltagetestoneachPVstringand onthetotalarray.
4.2.2.b AvisualinspectionofanopenPVjunctionbox(randomlyselected)and themasterarrayjunctionbox.
Theseinspections/checksshallconfirm:
→ thearrayvoltagesareasdesignedandspecified
→theappropriatecables(CSAandinsulation),junctionfittingsand enclosureshavebeenused.
Boththenon-electricianELVinstaller,aswellasthelicensedelectrician, areexpectedtocarryoutthechecksontheELVwiring.
4 LICENSING
GRID-CONNECTED SOLAR PV SYSTEMS
Install and Supervise Guidelines for Accredited Installers
Last update: January 2013 4 of 19
Allcomplexsystemsrequireausermanualforthecustomer.Grid-connectedPVsystemsarenodifferent.
ThedocumentationforsysteminstallationthatshallbeprovidedasspecifiedinAS/NZS5033is:
5.1.1 Alistofequipmentsupplied.
5.1.2 Alistofactionstobetakenintheeventofanearthfaultalarm.
5.1.3 Theshutdownandisolationprocedureforemergencyandmaintenance.
5.1.4 AbasicconnectiondiagramthatincludestheelectricalratingsofthePVarray,andtheratingsof
allovercurrentdevicesandswitchesasinstalled.
5.1.5 Systemperformanceestimate.
5.1.6 Recommendedmaintenanceforthesystem.
5.1.7 Maintenanceprocedureandtimetable.
5.1.8 Thecommissioningsheetandinstallationchecklist.
5.1.9 Arrayframeengineeringcertificateforwindandmechanicalloading.
5.1.10 Installer/designer’sdeclarationofcompliance.
5.1.11 Warrantyinformation.
5.1.12 Equipmentmanufacturer’sdocumentationandhandbooksforallequipmentsupplied.
6.1.1 Theinstallerorsupervisorshallnotsignoffonmorethanthree(3)systeminstallationsperday.
6.1.2 Asanaccreditedperson,whensigningoffonasystemyouhaveeither
6.1.2.a Undertakentheinstallationyourselfor
6.1.2.b Supervisedtheinstallationbyothers
6.1.3 Supervisionincludesvisitingthesiteat:
6.1.3.a Jobsetup
6.1.3.b Mid-installationcheck-up
6.1.3.c Testingandcommissioning.
6.1.4 Wheninstallingagridconnectbatterybackupsystemtheinstallationshallbeperformedby aperson(s)withCECgridconnectedinstallaccreditationandCECstand-aloneinstallaccreditation.
5 DOCUMENTATION
6 RESPONSIBILITIES OFACCREDITEDPERSON
GRID-CONNECTED SOLAR PV SYSTEMS
Install and Supervise Guidelines for Accredited Installers
Last update: January 2013 5 of 19
7.1 GENERAL
7.1.1 PVarraysforinstallationondomesticdwellingsshallnothavePVarraymaximum voltagesgreaterthan600V.
7.1.2 Modulesthatareelectricallyinthesamestringshallbeallinthesameorientation.
7.1.3 Aminimumtiltof10°isrecommendedtotakeadvantageofself-cleaning duringrainevents.
7.2 ROOFMOUNTING(NOTBUILDINGINTEGRATED) 7.2.1 Allarraysupports,brackets,screwsandothermetalpartsshallbeofsuitable low-corrosionmaterialssuitableforthelifetimeanddutyofthesystem,thatdonot increasetheirratesofcorrosionwhenmountedtogetherinanarray,andwhenmounted onthesurfaceoftheunderlyingstructure.Thismayincludetechniquestominimise corrosionratesappropriatetothelocalenvironment,includingbutnotrestrictedto methodssuchas:non-reactiveseparatorsbetweenmetalsurfacesandunderscrew andboltheads;andselectionofmaterialswithappropriatetypeandthicknessof anti-corrosivecoating.
7.2.2 Refertothemanufacturer’sguidelinestoensurethatthematerialsintroducedare compatiblewiththeroofing.
7.2.3 Anyroofpenetrationsshallbesuitablysealedandwaterproofedfortheexpectedlife ofthesystem.(Refertoroofingmanufacturer’sguidelines.) Ifthisisnotpossiblethenthisshallbedetailedinthesystem’sMaintenanceTimetable.
7.2.4 Itisimportanttoallowsufficientclearancetofacilitateself-cleaningoftherooftoprevent thebuildupofleavesandotherdebris(Refertoroofingmanufacturersguidelines.)
7.2.5 Ifpossumsandotherfaunaareaprobleminthevicinityoftheinstallationthen considerationshouldbegiventohowtopreventthemgainingaccessunderthearray. 7.2.6 Wheretimberisuseditshallbesuitableforlong-termexternaluseandfixedsothat trappedmoisturecannotcausecorrosionoftheroofand/orrottingofthetimber. Theexpectedreplacementtimeshouldbestatedinthesystemdocumentation. 7.2.7 Ifthemodulesusecrystallinecellsthenitispreferabletoallowsufficientspacebelow thearray(>50mm)forventilationcooling.Thiswillbesubjecttotheconstraintsofthe customerorarchitect. Insufficientventilationwillresultinhighoperatingtemperaturesforthemodules.
7.2.8 Theinstallershallfollowthearrayframesupplier/manufacturer’srecommendationswhen mountingthearraytotheroofsupportstructuretoensurethatthearraystructurestill meetsAS1170.2certification.
7 PVARRAYINSTALLATION
NOTE:ATTACHMENT2providessomeguidanceforsecuringPVarrays onroofstructures.
GRID-CONNECTED SOLAR PV SYSTEMS
Install and Supervise Guidelines for Accredited Installers
Last update: January 2013 6 of 19
7.3 FREESTANDINGPVARRAYS
7.3.1 ShallbewindratedinaccordancewithAS1170.2part2:WindLoads.
7.4 BUILDINGINTEGRATED(BIPV)INSTALLATIONS 7.4.1 Theinstallationofmodulesthatarebeingusedasbuildingmateriale.g.tiles,building walls,sun-screensshouldonlybeinstalledbyapersonqualifiedtoinstallthatparticular typeofbuildingelement.
7.5 VERIFICATIONOFAS1170.2 7.5.1 Installersshallobtainfromtheirframesupplieracopyoftheengineeringcertificatestating thatthearrayframeiscertifiedtoAS1170.2fortheirlocation. 7.5.2 Installersshallobtaininformationonhowtheframeistobemountedontheroof tomaintainthiscertification.
7.5.3 Thearrayframeshallbeinstalledtothemanufacturer’sinstructionstoensurethat thearraystructuremeetsAS1170.2certification.Theinstallershallconsiderthefollowing: 7.5.3.a spacingbetweenfixingforspecificwindloadregions 7.5.3.b areaofroofthatisapplicableforpanelstobeinstalled(somemanufacturers onlyallowtheframestobeinstalledinaspecificinternalzoneoftheroof) 7.5.3.c type,lengthandgaugeofscrewstobeused 7.5.3.d numberofscrewsrequiredperfixing 7.5.3.e sizeofbatten/purlinrequiredforfixing. 7.5.4 Theinstallationchecklistnowincludesaclausestatingthatthesystemhasbeeninstalled inaccordancewiththerecommendationsofthesupplier/manufacturer. Copiesofboththesedocumentsshallbeincludedinthemanualprovidedtothecustomer.
7 PVARRAYINSTALLATION
NOTE:Ifinstallersaremanufacturingtheirownframes,thentheyshallprovide thecertificatesandincludeinthemanual.
GRID-CONNECTED SOLAR PV SYSTEMS
Install and Supervise Guidelines for Accredited Installers
Last update: January 2013 7 of 19
7.6 ATTACHINGMODULESTOARRAYMOUNTINGSTRUCTURE
7.6.1 Solarmodulesshouldbeattachedtothearraystructureeitherusingthemountingholes providedbythemanufacturerorviaclamps.
7.6.2 Whenusingclampssolarpanelmanufacturer’sinstallationinstructionsshallbefollowed.
Theinstallershallconsiderthefollowing:
7.6.2.a amountofoverhangallowedfromclamptoendofmodule
7.6.2.b sizeofclamprequired.
7.7 EARTHINGOFARRAYWITHAPVARRAYMAXIMUMVOLTAGEGREATERTHANELV
7.7.1 Allexposedmetalmoduleframesshallbeearthed.
7.7.2 Ifallarraycablingisnotprotectedinconduitorducting,thearraymountingframes shallalsobeearthed.
7.7.3 Minimumcablesizeof4mmshallbeusedandmaybelarger.SeeAS/NZS5033 clause4.4.2.1forrequirements.
7.7.4 Earthconnectionshallbe:
7.7.4.a byapurpose-madefittingprovidingearthingorbondingconnectionsfordissimilar metalsandfittedtothemanufacturer’sinstructions,or
7.7.4.b bypurpose-madewasherswithserrationsorteethfortheconnectionbetween thePVmoduleandmountingframefittedtothemanufacturer’sinstructions,and
7.7.4.c bearrangedsothattheremovalofasinglemoduleearthconnectionwillnotaffect thecontinuityoftheearthingorbondingconnectionstoanyothermodule.
7.7.5 Self-tappingscrewsshallnotbeused.
7.7.6 AsperAS/NZS3000theearthcablecanbeinsulatedunsheathedcableexceptwhen exposedtodirectsunlight.Ifexposedtodirectsunlightthecableshallhaveaphysical barriertopreventexposuretodirectsunlight.
7 PVARRAYINSTALLATION
NOTE:Attachingasolarmoduleinsuchamanner(e.g.drilling,popriveting) thatcausesaholeintheanodisedaluminiumframeofthesolarmodule typicallyvoidsthemanufacturer’sproductwarrantywithrespectto defectsinmaterialandworkmanship.Iftheinstallerintendstoundertake aninstallationinthismanner,theyshallobtainwrittenverificationfrom themanufacturerthatitdoesnotaffectthewarranty.Thisshallbe includedinthesystemdocumentationsuppliedtothecustomer.
GRID-CONNECTED SOLAR PV SYSTEMS
Install and Supervise Guidelines for Accredited Installers
Last update: January 2013 8 of 19
7.8 WIRINGATTHEPVARRAY
7.8.1 TheelectricalinstallationofthearrayshallbeinaccordancewithAS/NZS5033.
7.8.2 AllLVwiringshallbeundertakenbyalicensedelectrician.
7.8.3 Plasticcabletiesarenottobeusedastheprimarymeansofsupport(unlesstheyhave alifetimegreaterthan15years).
7.8.4 ThePVarraywiringshallcomplywiththewiringrequirementsofAS/NZS3000.
7.8.5 Cablesshallbeprotectedfrommechanicaldamage.
7.8.6 Theinstallershallensurethatallconnectorsusedarewaterproofandconnectedsecurely toavoidthepossibilityofalooseconnection.
7.8.7 Onlyconnectorswhicharethesametype/modelfromthesamemanufacturerareallowed tobemarriedataconnectionpoint.
7.8.8 Cablesshallnotlayonroofsorfloorswithoutanenclosureorconduit.
7.8.9 CablesizetobedeterminedbyAS/NZS5033Clause4.3.6.1.
7.8.10 Itisrecommendedthatundermaximumloadconditionsthevoltagedropfromthemost remotemoduleinthearraytotheinputoftheinvertershouldnotexceed3%ofthe Vmpvoltage(atSTC)forLVPVarrays.
7.8.11 Inparticular,refertotheclauseinAS/NZS3000thatreferstofaunawhichstates:Where thepresenceoffaunaisexpectedtoconstituteahazard,eitherthewiringsystemshallbe selectedaccordingly,orspecialprotectivemeasuresshallbeadopted.
7.8.12 AllconduitsexposedtodirectsunlightshallbesuitablyUVrated.
7.9 STRINGPROTECTION
Faultsduetoshortcircuitsinmodules,junctionboxes,combinerboxes,modulewiringorearth faultsinarraywiringcanresultinovercurrentwithinaPVarray.
7.9.1 Overcurrentprotectionshallbeprovidedwhereitisrequiredbymanufacturers ofPVmodules.
7.9.2 AS/NZS5033Clause3.3.4definestheformulatocalculateifstringprotectionisrequired.
7.9.3 AS/NZS5033Clause3.3.5.1definestheratingofthefuseprotection.
7.9.4 InLVarrays,overcurrentprotectivedevices,whererequired,shallbeplacedinallcurrent carryingconductorsnotdirectlyconnectedtoearth.
7.9.5 InELVarraysovercurrentprotectivedeviceswhererequiredforstringandsub-arraycables shallbeplacedineitherthepositiveornegativeconductor(thenumberofcurrentcarrying conductorsminusone).
7 PVARRAYINSTALLATION
GRID-CONNECTED SOLAR PV SYSTEMS
Install and Supervise Guidelines for Accredited Installers
Last update: January 2013 9 of 19
7.10 PVARRAYISOLATORATARRAY
ThePVarrayisolatoratarrayshouldmeetthebelowcriteria:
7.10.1 AS/NZS5033:2012Clause4.4.1.4makesitmandatoryforanisolatortobeinstalled adjacenttothearrayforLVsystems.Thisistoenablesafedisconnectionofthearray andisolationofthePVarraycable.
7.10.2 Isolatorshallbereadilyavailable(thisisdefinedas“Capableofbeingreachedfor inspection,maintenanceorrepairswithoutnecessitatingthedismantlingofstructural parts,cupboards,benchesorthelike.”)
7.10.3 BeratedforDCuse.
7.10.4 Ratedtointerruptfullloadandprospectivefaultcurrents(ratedoperationalcurrent suitableforatemperatureofambientplus40°Cifexposedtothesun).
7.10.5 Notbepolaritysensitive.
7.10.6 Interruptallliveconductorssimultaneously.
7.10.7 AllequipmentexposedtotheoutdoorenvironmentshallbeofanappropriateIPrating inaccordancewithAS60529,andshallbeUVresistant.
7.10.8 Shallnothaveexposedlivepartsinconnectedordisconnectedstate.
7.10.9 ShallcomplywiththerequirementsofIEC60947(series).
7.10.10 HaveautilizationcategoryatleastDC21B.
7.10.11 IsolatorvoltageratedasperAS/NZS5033:2012AppendixB:
7.10.11.afornon-functionallyearthedsystems,isolatedinverter(transformerbased): voltageratingofbothpolestogetheroftheswitch-disconnectorshallbeatleast thePVarraymaximumvoltage(VocArrayadjustforlowestambienttemperature ofsite)
7.10.11.bnon-isolatedinverter(transformerlessbased):voltageratingofeachpoleofthe isolator/switchdisconnectorshallbeatleastthePVarraymaximumvoltage. (VocArrayadjustforlowestambienttemperatureofsite)
7.10.12 Functionallyearthedarraypresentsspecificissues.Thevoltageratingofisolatorsforthese systemsaredetailedinAS/NZS5033:2012AppendixB.
7.10.13 Labelled“PVARRAYD.C.ISOLATOR”.
7.10.14 Manufacturer’sinstallationinstructionsforisolatorsshallbefollowedregardingmounting orientationtoensuretheIPratingismaintained.
7.10.15 Theroofmountedisolatorshouldbemountedsuchthattheswitchisinasidewaysposition (seeFigures1aand1b).
7.10.16 Theconduitentrypointsshouldbeonthelowerendoftheenclosure-eitherunderneath orfacingdowntheroof.
7.10.17 Itisrecommendedthatjunctionboxesaremountedsothattheaccesstothejunctionbox ismadeonthesideofthejunctionboxandnotonasidefacingup.
7.10.18 Allscrewcovercapsthataresuppliedwiththeisolatorboxorjunctionboxshallbeinstalled.
7.10.19 Allmountingholesshouldbesiliconefilled.
7.10.20 Ifthesolararrayistobehardwiredthentherecommendedprocedureisprovided inAttachment3.
7 PVARRAYINSTALLATION
GRID-CONNECTED SOLAR PV SYSTEMS
Install and Supervise Guidelines for Accredited Installers
Last update: January 2013 10 of 19
Figure1aRooftopisolator Figure1bRooftopisolator
7 PVARRAYINSTALLATION
NOTE:Ensurethattheswitchdoesnotshadethearray.
7.11 PVARRAYCABLEBETWEENARRAYANDINVERTER
7.11.1 PVarraycableswithinbuildingsshallbeenclosedinheavy-dutyinsulating conduittoAS/NZS2053.1.
7.11.2 Doubleinsulationofeachconductorshallbemaintainedwithinwiringenclosures (e.g.conduit).
7.11.3 Thewiringenclosureshallbelabelled‘SOLAR’ontheexteriorsurfaceoftheenclosure ateachendoftheenclosureandateachchangeindirection.
NOTE:Adangeroussituationcanoccurwhenthepersoninstallingthesystemis abletocomeincontactwiththepositiveandnegativeoutputsofthesolar arrayorsub-arraywhentheoutputvoltageis120VDCorabove. SeeAttachment1formoredetails.
GRID-CONNECTED SOLAR PV SYSTEMS
Install and Supervise Guidelines for Accredited Installers
Last update: January 2013 11 of 19
8.1.1 THEINVERTERSHALLBEINSTALLEDASTOTHEMANUFACTURER’SINSTRUCTIONS.
Theinstallershalldothefollowing:
8.1.1.a ensurethelocationisappropriatedfortheIPRatingoftheinverter.Wherethisisnot possiblethentheinverter/sshouldeitherbeinanappropriateweatherproofenclosure
8.1.1.b complywithspecificenvironmentalrequirementse.g.notindirectsunlight,directrain,etc
8.1.1.c ensuremountingstructureisabletosupportinverterweight
8.1.1.d ensuremountingstructurematerialisappropriatefortheinverter
8.1.1.e recommendedclearancesshallbefollowed.
8.1.2 Theinverterheatsinkshallbeclearofanyobstaclestofacilitatecoolingoftheinverter.
8.1.3 Cablesconnectedtotheinvertershallbemechanicallysecuredinsuchamannerthatthey cannotbeinadvertentlyunpluggedfromtheinverter.Thiscanbeachievedby:
8.1.3.a havingtheinverterhousedinanenclosure(withcablessuitablysupported)
8.1.3.b theuseofaninverterwhichhasthecableconnectionareaofinvertercoveredby aremovableenclosure/coverwhichprotectsthesupportedcablessothatthereare noexposed,unsupportedcableloops
8.1.3.c theuseofconduitandsecurewallfixings.
8.1.4 Theinstallershallensurethatthegridparametersoftheinverteraresettothe utilitiesrequirements.
8.2 PVARRAYISOLATORNEARINVERTER
8.2.1 WheretheinverterinLVsystemsisnotinsightofthearrayormorethan3mfromthearray,
PVarrayswitch-disconnector/sshallalsobeinstalledadjacenttotheinverter.
8.2.2 AllPVarrayswitch-disconnectorsshallbereadilyavailable(seesection7.10.2).
8.2.3 Forinverterswithanintegratedswitch-disconnector:aseparateswitch-disconnectoris notrequiredattheinverteriftheswitch-disconnectorismechanicallyinterlockedwitha replaceablemoduleofthePCEandallowsthemoduletoberemovedfromthesection containingtheswitch-disconnectorwithoutriskofelectricalhazards.
8.2.4 Wheremultipledisconnectiondevicesarerequiredtoisolatepowerconversionequipment theyshallbegroupedsothattheyalloperatesimultaneously,ortheyshallallbegroupedin acommonlocationandhavewarningsignsindicatingtheneedtoisolatemultiplesupplies toisolatetheequipment.
8.2.5 PVarrayisolatorsshallmeettherequirementsof7.10.3to7.10.16.
8 INVERTERINSTALLATION
NOTE:WheretheinverterrequiresDCconnectorstobeused,amaximum allowabledistanceofnomorethan200mmofunprotectedDCcableshall bepermittedbetweenconnectorsandconduitprovidedthelocationisnot subjecttomechanicaldamage.
GRID-CONNECTED SOLAR PV SYSTEMS
Install and Supervise Guidelines for Accredited Installers
Last update: January 2013 12 of 19
8.3 ACISOLATORNEARINVERTER
8.3.1 Wheretheinverterisnotadjacenttotheswitchboardtowhichitisconnected,anisolator shallbeprovidedattheinvertersothatapersonoperatingtheswitchhasaclearviewof anypersonworkingontheinverter-refertoAS/NZS30007.3.4.
8.3.2 ConnectionofACandDCcomponentsinthesameenclosureshouldbesegregated (AS3000defineseffectivesegregationas“maybeachievedbytheuseofindependently sheathedcables,barriersoffire-resistingmaterialorbydistance”).
8.4 ACCABLESELECTION
8.4.1 ACcablesshallcomplywiththewiringrequirementsofAS/NZS3000.
8.4.2 Itisrecommendedthatthevoltagedropbetweentheinverterandthepointof connectionofsupplyshouldbekeptassmallaspossible(recommended<1%)tominimise voltagerisewithintheinstallation.Thiswilllimitinverterdisconnectioninareaswherethe gridvoltagemaybehigh,todecreaseincidentsofovervoltagetripsforinverters.
8.4.3 Theinvertershallbeconnectedbyfixedwiringtoadedicatedcircuitonaswitchboard.
8.4.4 ACcablesbetweentheinverterandanyswitchboardandallthecablesbetweenany distributionboardsandamainswitchboardwhichcarrycurrentfromtheinvertershall beratedforatleastthefulloutputcurrentoftheinverterenergysystem.
8.4.5 AllcablingshallbesizedinaccordancewithAS/NZS3000andAS/NZS3008.
8.5 SOLARSUPPLYMAINSWITCHINSWITCHBOARD
8.5.1 Theinvertershouldbeconnecteddirectlytothemainswitchboard.
8.5.2 Wherethisisnotpossibleornotdesirable,theinverterenergysystemshouldbe connectedtothedistributionboardlocatedphysicallynearesttotheinverter,andthe mainswitchboard.Allintermediatedistributionboardsshallbeappropriatelylabelled
8.5.3 Themainswitchfortheswitchboard,towhichtheinverterisconnected,shallbe alockableswitch.
8.5.4 AnRCDisnottobeplacedbetweentheconsumer’smainsandtheinverter.
8.5.5 InaccordancewithAS/NZS3000,thecablebetweentheswitchboardandinverterrequires protectionsoitisrecommendedthattheisolatorisasuitablyratedcircuitbreaker.
8.6 SHUTDOWNPROCEDURE
Ashutdownprocedureisrequiredtoensuresafede-energisationofthesystem.
8.6.1 Centralinvertersystems(shallbeinstalledadjacenttotheinverter)
Anexampleshutdownprocedurewouldbe:
→TurnoffthemainswitchsolarsupplyattheACswitchboardandthenthe
ACisolatorattheinverter(whereinstalled)then
→TurnoffthePVarrayisolatorattheinverter.
WARNING:PVarrayDCisolatorsdonotde-energisethePVarrayandarraycabling.
8.6.2 Microinvertersystems(shallbeinstalledattheswitchboardtowhichtheinverter
isconnected)
Anexampleshutdownprocedurewouldbe:
→TurnoffthemainswitchsolarsupplyattheACswitchboard
ThiswillisolatethePVarray.
8 INVERTERINSTALLATION
GRID-CONNECTED SOLAR PV SYSTEMS
Install and Supervise Guidelines for Accredited Installers
Last update: January 2013 13 of 19
9.1.1 Theinstallershallnotifythecustomerofthemeteringprocesses.
10.1.1 Allsignageonswitches,isolatorsandwithindistributionboardsandswitchboardsshallbe inaccordancewithAS4777andAS/NZS5033and/or
10.1.2 therelevantelectricalserviceandinstallationrulesforthestatewherethesystemisinstalled.
11.1.1 Thecommissioningsheetsprovidedwiththeseguidelines(orsimilardocument)shallbecompleted bytheaccreditedinstallerortheaccreditedsupervisor(withsuitablylicensedperson).
11.1.2 Acopyshallbeprovidedtothecustomerinthesystemdocumentationandacopyretained bytheaccreditedperson.
9 METERING
10 SIGNAGE
11 COMMISSIONING
GRID-CONNECTED SOLAR PV SYSTEMS
Install and Supervise Guidelines for Accredited Installers
Last update: January 2013 14 of 19
12.1 GENERAL
12.2 INSULATIONRESISTANCEMEASUREMENT
12 INSTALLATIONANDCOMMISSIONING
WARNING:Whereshortcircuitcurrentsarerequired,followAS/NZS5033 AppendixDforthestepsthatshallbeundertakentomeasurethe shortcircuitcurrentsafely.
WARNING:PVarraydccircuitsareliveduringdaylightand,unlikeaconventional accircuit,cannotbeisolatedbeforeperformingthistest. FollowAS/NZS5033AppendixD4forthestepsthatshallbe undertakentomeasuretheinsulationresistancesafely.
NOTE:Someprojectsrequirethatshortcircuitcurrentsarerecordedaspartof thecontractualcommissioning;otherwisearecordoftheactualoperating currentofeachstringissufficient.Thiscouldbedonebyusingthemeter ontheinverterorbyusingaclampmeterwhenthesystemisoperational.
Table12.2.1Minimuminsulationresistance
SYSTEM VOLTAGE(V X1.25)
TEST VOLTAGE MINIMUM INSULATION RESISTANCE, MΩ
<120 250 0.5
120-500 500 1
>500 1000 1
GRID-CONNECTED SOLAR PV SYSTEMS
Install and Supervise Guidelines for Accredited Installers
Last update: January 2013 15 of 19
12 INSTALLATIONANDCOMMISSIONING
INSTALLATION DETAILSAddressofinstallation:
PVmodulemanufacturerandmodelnumber:
Numberofmodulesinseriesinastring:
NumberofstringsinparallelinPVarray:
Invertermanufacturerandmodelnumber:
Numberofinverters: NumberofMPPTs:
PV ARRAYPVarraytilt ..........……………………° PVarrayorientation ..........……………………°
ArrayframeiscertifiedtoAS1170.2forinstallationlocation
Arrayframeisinstalledtomanufacturer’sinstructions
Roofpenetrationsaresuitablysealedandweatherproofed
Nogalvanicallydissimilarmetalsareincontactwiththearrayframesorsupports
WherePVarraycomprisesmultiplestrings-stringprotectionhasbeenprovided
PVwiringlossesarelessthan3%atthemaximumcurrentoutputofthearray
WeatherproofPVarrayisolatormountedadjacenttothearray
(Rating:………………………………..Vdc,…………….Adc)
Wiringisprotectedfrommechanicaldamageandisappropriatelysupported
LV DC and AC INSTALLATIONAlllowvoltagewiringhasbeeninstalledbyalicensedelectricaltradesperson
Allwiringhasbeentestedandapprovedbyqualifiedelectricaltradesperson
INVERTERPVarrayisolatormountedadjacenttotheinverter
(Rating:………………………………..Vdc,…………….Adc)
Isolatorismountedonoutputoftheinverter(whererequired)
LockableACcircuitbreakermountedwithintheswitchboardtoactastheinvertermainswitchforthePV/invertersystem(Rating………..A)
Inverterisinstalledaspermanufacturer’sspecification
InverterceasessupplyingpowerwithintwosecondsofalossofACmains
Inverterdoesnotresumesupplyingpoweruntilmainshavebeenpresentformorethan60seconds.
GRID-CONNECTED SOLAR PV SYSTEMS
Install and Supervise Guidelines for Accredited Installers
Last update: January 2013 16 of 19
12 INSTALLATIONANDCOMMISSIONING
CONTINUITY CHECKCircuitchecked(recordadescriptionofthecircuitcheckedinthiscolumn)
Continuityofallstring,sub-arrayandarraycables
Continuityofallearthconnections(includingmoduleframe)
SYSTEM CHECKWARNING:→ IFASTRINGISREVERSEDANDCONNECTEDTOOTHERS,FIREMAYRESULT.→ IFPOLARITYISREVERSEDATTHEINVERTERDAMAGEMAYOCCURTOTHEINVERTER.
Polarity Voltage ShortCircuit OperatingCurrent
String 1 V A A
String 2 V A A
String 3 V A A
String 4 V A A
Sub-arrays where required V A A
PV array at PV array switch-disconnector
V A A
Irradiance at time of recording the current
W/m2 W/m2
INSULATION RESISTANCE MEASUREMENTS (see table 12.3.1 for minimum values of insulation resistance) Arraypositivetoearth MΩ
Arraynegativetoearth MΩ
INSTALLER INFORMATIONCECAccreditedinstaller’sname:
CECAccreditationnumber:
I verify that the above system has been installed to all relevant standards
Signed: Date:
CECAccreditedDesigner’sname:
Licensedelectrician’sname:(whereapplicable,e.g.LVwork)
Electrician’slicencenumber:
Signed: Date:
GRID-CONNECTED SOLAR PV SYSTEMS
Install and Supervise Guidelines for Accredited Installers
Last update: January 2013 17 of 19
INSTALLER INFORMATIONOnswitchboardtowhichinverterisdirectlyconnected
ispermanentlyfixedatthemainswitch
ispermanentlyfixedatthesolarmainswitch
Ifthesolarsystemisconnectedtoadistributionboard,thenasignislocatedonthemainswitchboardandallintermediatedistributionboardsprovidinginformationonwhichdistributionboardthesolarsupplyisconnectedto
Informationshouldbeprovidedatthemainswitchboardonwheretheinverter(andthedistributionboardtowhichitisconnected,ifitisnotthemainswitchboard)islocated,unlessitisadjacenttothemainswitchboard
SIGNAGE (AS/NZS 5033)Ispermanentlyfixedonarrayjunctionboxes(blackonyellow)
Fireemergencyinformationispermanentlyfixedonthemainswitchboardand/ormeterbox(ifnotinstalledtogether)
PVDCisolationisclearlyidentifiedonallDCisolators
Isplacedadjacenttotheinverterwhenmultipleisolation/disconnectiondevicesareusedthatarenotgangedtogether
SOLARExteriorsurfaceofwiringenclosureslabelled‘SOLAR’
Shutdownprocedureispermanentlyfixedatinverterand/oronmainswitchboard
Anyothersignageasrequiredbythelocalelectricitydistributor
12 INSTALLATIONANDCOMMISSIONING
GRID-CONNECTED SOLAR PV SYSTEMS
Install and Supervise Guidelines for Accredited Installers
Last update: January 2013 18 of 19
ATTACHMENT1:DANGEROUSSITUATION
ATTACHMENT2:PVARRAYROOFMOUNTING
Adangeroussituationcanoccurifthepersoninstallingthesystemcomesintocontactwiththepositiveandnegativeoutputsofthesolararrayorsub-arraywhentheoutputvoltageis120VDCorabove.
Mostgrid-connectedsystemsuseapprovedsolarmoduleswhichareconnectedusingdoubleinsulatedleadswithpolarisedshroudedplugandsocketconnections.
Adangeroussituationisonlylikelytooccurat:
→ thePVarrayisolatorbeforetheinverter→ theroof-topisolator→ thesub-arrayandarrayjunctionboxes(ifused).
Topreventthepossibilityofaninstallercomingincontactwithlivewires,itisrecommendedpracticethatoneoftheinterconnectcablesinthemiddleofeachstring(asshowninFigure2)isleftdisconnecteduntilallthewiringiscompletedbetweenthearrayandtheinverter.Onlyafterallisolatorsandotherhardwiredconnectionsarecompleted,shouldtheinterconnectioninthemiddleofthearraybeconnected.
RefertoAS/NZS1170.2Structuraldesignactions-Windactions(andAustralianWindRegionsmap,FigureA3below.)
PVarrayframesshallbewindratedforthesite.Consultthemanufacturer’sspecifications(somemodulesarenotsuitableforuseincyclonezones).
Careshallbetakenwithrooffixingsystems.Considerationshallbegiventofactorssuchas:
→ winddirection→ terraincategory(suburban,city/industrial)→ locationtopography→ heightofstructure.
Asanexample,wherethePVarrayiswithin1metreofroofedges,windloadingcanbedoubled.Additionalfixingmayberequiredbasedonthewindregion.WindregionsCandDbelow(Figure4)arecyclonicareasandhavespecialroofandPVmoduleattachmentrequirements.ConsultthePVmodulestructuralandmountingspecificationsforhighwindareas.
Figure3Australian wind regions
Figure2Disconnect
DISCONNECT
Figure 2
GRID-CONNECTED SOLAR PV SYSTEMS
Install and Supervise Guidelines for Accredited Installers
Last update: January 2013 19 of 19
ATTACHMENT3:HARDWIRINGOFPVARRAYSThemethodoutlinedinthisprocedureistobefollowediftheinterconnectionbetweenthesolarmoduleswillbehardwired.IthasbeenwrittentopreventapersonbeingabletotouchthetwolivearrayLVoutputcableseitherwithin:
→ amodulejunctionboxor→ theisolatorlocatednearthearray.
Usingthismethod,thejunctionboxesonthemoduleswillonlyhavealiveELVsupply.
PleasereadthisprocedureinconjunctionwithFigureA4:
a)Thepositivecablefromtheisolatingswitchorbreaker isconnectedtothesolarmodulejunctionboxwhichis designatedasthepositiveconnection.Thiscableis double-insulatedandtherearenootherelectrical connectionsbetweentheisolatingswitchandthe arraypositivejunctionbox.
b)Thenegativecablefromtheisolatingswitchorbreaker isconnectedtothesolarmodulejunctionboxwhichis designatedasthenegativeconnection.Thiscableis double-insulatedandtherearenootherelectrical connectionsbetweentheisolatingswitchandthe arraypositivejunctionbox.c)Toensurethattheinstallerdoesnotworkonlive positiveandnegativecablesincloseproximityto theisolationswitch:
either:thepositiveandnegativecablesareelectrically connectedtothedoublepoleisolatingswitchor breakerpriortoelectricallyterminatingthecables withinthearrayjunctionboxes
and/or:thereisa‘multi-contact’styleinsulatedplug andsocketconnectioninthemiddleofthearraywhich isconnectedafterthearrayiswiredandthecables areconnectedintheisolationswitch.
Figure4Double Pole Isolator
‘MultiContact’styleinsulatedplugandsocketconnector
Doubleinsulatedpositiveandnegativecables