GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED DATE: September 18, 2019 DAY: WEDNESDAY TIME: 2:00 P.M. PLACE: CARL T. LANGFORD BOARD ROOM, ORLANDO INTERNATIONAL AIRPORT, ONE JEFF FUQUA BOULEVARD For individuals who conduct lobbying activities with Aviation Authority employees or Board members, registration with the Aviation Authority is required each year prior to conducting any lobbying activities. A statement of expenditures incurred in connection with those lobbying instances should also be filed prior to April 1 of each year for the preceding year. As of January 16, 2013, lobbying any Aviation Authority Staff who are members of any committee responsible for ranking Proposals, Letters of Interest, Statements of Qualifications or Bids and thereafter forwarding those recommendations to the Board and/or Board Members is prohibited from the time that a Request for Proposals, Request for Letters of Interests, Request for Qualifications or Request for Bids is released to the time that the Board makes an award. As adopted by the Board on September 19, 2012, lobbyists are now required to sign-in at the Aviation Authority offices prior to any meetings with Staff or Board members. In the event a lobbyist meets with or otherwise communicates with Staff or a Board member at a location other than the Aviation Authority offices, the lobbyist shall file a Notice of Lobbying (Form 4) detailing each instance of lobbying to the Aviation Authority within 7 calendar days of such lobbying. As of January 16, 2013, Lobbyists will also provide a notice to the Aviation Authority when meeting with the Mayor of the City of Orlando or the Mayor of Orange County at their offices. The policy, forms, and instructions are available in the Aviation Authority’s offices and the web site. Please contact the Director of Board Services with questions at (407) 825-2032. I. CALL TO ORDER II. ROLL CALL III. PLEDGE OF ALLEGIANCE IV. CONSIDERATION OF AVIATION AUTHORITY MINUTES FOR AUGUST 28, 2019 V. CONSENT AGENDA: (These items are considered routine and will be acted upon by the Authority in one motion. If discussion is requested on an item, it will be considered separately.) Items in bold indicate an amount of $1 million or greater. A. Recommendation to Accept Committee Minutes B. Recommendation for Final Adoption of the Fiscal Year 2019-2020 Aviation Authority Budget C. Recommendation to Approve Revisions to Organizational Policy, Section 120.091, Construction Finance Oversight Committee D. Recommendation of the Concessions/Procurement Committee to Authorize Two Single Source Procurement Requests for Gateways, Licenses, Telephones and Associated Professional Services from Avaya, Inc. E. Recommendation to Ratify Declaration of Emergency During Hurricane Dorian F. Recommendation to Approve a New Lease Agreement with Sky Chefs, Inc. at Orlando International Airport G. Recommendation of the Professional Services Committee to Approve an Amendment to Addendum No. 69 to the General Consulting Services Agreement with Schenkel & Shultz, Inc. for Additional Project Support Services for the Implementation Phase of W-00396, Virtual Ramp Control (VRC), at the Orlando International Airport H. Recommendation to Approve the First Amendment to Temporary License Agreement with Orlando Utilities Commission (OUC) I. Recommendation of the Professional Services Committee for Project Bid Package (BP) No. S00175, Rent-A-Car (RAC) Quick Turn-Around (QTA) Facility at the South Terminal C, at the Orlando International Airport J. Recommendation to Approve the Agreement to Relocate Pole Squares for Signage Along S.R. 436 By And Between the Greater Orlando Aviation Authority, City Of Orlando, and Central Florida Expressway Authority K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase 1 - Experiential Media Environment (EME) Content Production Company (CPC), at the Orlando International Airport L. Recommendation of the Construction Committee to Approve an Addendum to the Construction Management at Risk (CM@R) Entity Services for South Terminal C, Phase 1, Agreement with Turner-Kiewit Joint Venture, for Project BP No. S00137, South Terminal C, Phase 1 – Turner-Kiewit General Conditions for Fiscal Year (FY) 2020 (Guaranteed Maximum Price (GMP) No. 4-S.4) at the Orlando International Airport NOTE: Any person who desires to appeal any decision made at these meetings will need record of the proceedings and for that purpose may need to ensure that a verbatim record of the proceedings is made which includes the testimony and evidence upon which the appeal is to be based. Pulled

Upload: others

Post on 14-Apr-2020

8 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED

DATE: September 18, 2019 DAY: WEDNESDAY TIME: 2:00 P.M. PLACE: CARL T. LANGFORD BOARD ROOM, ORLANDO INTERNATIONAL AIRPORT, ONE JEFF FUQUA BOULEVARD For individuals who conduct lobbying activities with Aviation Authority employees or Board members, registration with the Aviation Authority is required each year prior to conducting any lobbying activities. A statement of expenditures incurred in connection with those lobbying instances should also be filed prior to April 1 of each year for the preceding year. As of January 16, 2013, lobbying any Aviation Authority Staff who are members of any committee responsible for ranking Proposals, Letters of Interest, Statements of Qualifications or Bids and thereafter forwarding those recommendations to the Board and/or Board Members is prohibited from the time that a Request for Proposals, Request for Letters of Interests, Request for Qualifications or Request for Bids is released to the time that the Board makes an award. As adopted by the Board on September 19, 2012, lobbyists are now required to sign-in at the Aviation Authority offices prior to any meetings with Staff or Board members. In the event a lobbyist meets with or otherwise communicates with Staff or a Board member at a location other than the Aviation Authority offices, the lobbyist shall file a Notice of Lobbying (Form 4) detailing each instance of lobbying to the Aviation Authority within 7 calendar days of such lobbying. As of January 16, 2013, Lobbyists will also provide a notice to the Aviation Authority when meeting with the Mayor of the City of Orlando or the Mayor of Orange County at their offices. The policy, forms, and instructions are available in the Aviation Authority’s offices and the web site. Please contact the Director of Board Services with questions at (407) 825-2032. I. CALL TO ORDER

II. ROLL CALL III. PLEDGE OF ALLEGIANCE IV. CONSIDERATION OF AVIATION AUTHORITY MINUTES FOR AUGUST 28, 2019

V. CONSENT AGENDA: (These items are considered routine and will be acted upon by the Authority in one motion. If discussion is requested on an item, it will be considered separately.) Items in bold indicate an amount of $1 million or greater.

A. Recommendation to Accept Committee Minutes B. Recommendation for Final Adoption of the Fiscal Year 2019-2020 Aviation Authority Budget C. Recommendation to Approve Revisions to Organizational Policy, Section 120.091, Construction Finance Oversight

Committee D. Recommendation of the Concessions/Procurement Committee to Authorize Two Single Source Procurement

Requests for Gateways, Licenses, Telephones and Associated Professional Services from Avaya, Inc. E. Recommendation to Ratify Declaration of Emergency During Hurricane Dorian F. Recommendation to Approve a New Lease Agreement with Sky Chefs, Inc. at Orlando International Airport G. Recommendation of the Professional Services Committee to Approve an Amendment to Addendum No. 69 to the

General Consulting Services Agreement with Schenkel & Shultz, Inc. for Additional Project Support Services for the Implementation Phase of W-00396, Virtual Ramp Control (VRC), at the Orlando International Airport

H. Recommendation to Approve the First Amendment to Temporary License Agreement with Orlando Utilities Commission (OUC)

I. Recommendation of the Professional Services Committee for Project Bid Package (BP) No. S00175, Rent-A-Car (RAC) Quick Turn-Around (QTA) Facility at the South Terminal C, at the Orlando International Airport

J. Recommendation to Approve the Agreement to Relocate Pole Squares for Signage Along S.R. 436 By And Between the Greater Orlando Aviation Authority, City Of Orlando, and Central Florida Expressway Authority

K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase 1 - Experiential Media Environment (EME) Content Production Company (CPC), at the Orlando International Airport

L. Recommendation of the Construction Committee to Approve an Addendum to the Construction Management at Risk (CM@R) Entity Services for South Terminal C, Phase 1, Agreement with Turner-Kiewit Joint Venture, for Project BP No. S00137, South Terminal C, Phase 1 – Turner-Kiewit General Conditions for Fiscal Year (FY) 2020 (Guaranteed Maximum Price (GMP) No. 4-S.4) at the Orlando International Airport

NOTE: Any person who desires to appeal any decision made at these meetings will need record of the proceedings and for that purpose may need to ensure that a verbatim record of the proceedings is made which includes the testimony and evidence upon which the appeal is to be based.

Pulled

Page 2: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

GREATER ORLANDO AVIATION AUTHORITY AGENDA FOR ITS SEPTEMBER 18, 2019, MEETING

PAGE 2

V. CONSENT AGENDA (con't):

M. Recommendation of the Construction Committee to Approve an Amendment to Addendum No. 13 to the

Construction Management at Risk (CM@R) Entity Services for South Terminal C, Phase 1, Agreement with Turner-Kiewit Joint Venture, for Project Bid Package (BP) No. S00139, South Terminal C, Phase 1, Landside Site Utilities and Balance of Sitework (Guaranteed Maximum Price (GMP) No. 5-S.2) at the Orlando International Airport

N. Recommendation of the Construction Committee to Approve an Amendment to Addendum No. 11 to the Construction Management at Risk (CM@R) Entity Services for South Terminal C, Phase 1, Agreement with Turner-Kiewit Joint Venture, for Project Bid Package (BP) No. S00141, South Terminal C, Phase 1, Landside Conveying Equipment (Guaranteed Maximum Price (GMP) No. 5-S.4) at the Orlando International Airport

O. Recommendation of the Construction Committee to Approve an Amendment to Addendum No. 9 to the Construction Management at Risk Services Agreement for the South Terminal C, Phase 1, with Turner-Kiewit Joint Venture, for Project Bid Package (BP) No. S00146, South Terminal C, Phase 1, Landside Terminal, Structure and Enclosure (Guaranteed Maximum Price (GMP) No. 7-S) at the Orlando International Airport

P. Recommendation of the Construction Committee to Approve an Amendment to Addendum No. 19 to the Construction Management at Risk (CM@R) Entity Services for South Terminal C, Phase 1, Agreement with Turner-Kiewit Joint Venture, for Project Bid Package (BP) No. S00147, South Terminal C, Phase 1 Landside Terminal, Remaining Structure and Systems (Guaranteed Maximum Price (GMP) No. 7-S.1) at the Orlando International Airport

Q. Recommendation of the Construction Committee to Approve an Addendum to the Construction Management at Risk (CM@R) Entity Services for South Terminal C, Phase 1, Agreement with Hensel Phelps Construction, for Project Bid Package (BP) No. S00166, South Terminal C, Phase 1, Hensel Phelps General Conditions for Fiscal Year (FY) 2020 (Guaranteed Maximum Price (GMP) No. 16-S.4), at the Orlando International Airport

R. Recommendation of the Construction Committee to Approve an Amendment to Addendum No. 15 to the Construction Management at Risk (CM@R) Entity Services for South Terminal C, Phase 1, Agreement with Turner-Kiewit Joint Venture, for Project Bid Package (BP) No. S00170, South Terminal C, Phase 1, Underground Electrical Distribution (Guaranteed Maximum Price (GMP) No. 5-S.6) at the Orlando International Airport

S. Recommendation of the Construction Committee to Approve an Amendment to Addendum No. 20 to the Construction Management at Risk (CM@R) Entity Services for South Terminal C, Phase 1, Agreement with Turner-Kiewit Joint Venture, for Project Bid Package (BP) No. S00173, South Terminal C, Phase 1 Landside Terminal Mechanical/Electrical/Plumbing (MEP) Systems – Florida Department of Transportation (FDOT) (Guaranteed Maximum Price (GMP) No. 7-S.3) at the Orlando International Airport

T. Recommendation of the Construction Committee to Approve an Amendment to Addendum No. 23 to the Construction Management at Risk (CM@R) Entity Services for South Terminal C, Phase 1, Agreement with Turner-Kiewit Joint Venture, for Project Bid Package (BP) No. S00178, South Terminal C, Phase 1, Airfield Civil (Guaranteed Maximum Price (GMP) No. 19-S) at the Orlando International Airport

U. Recommendation of the Construction Committee to Approve an Amendment to Addendum No. 12 to the Construction Management at Risk (CM@R) Entity Services for South Terminal C, Phase 1, Agreement with Hensel Phelps Construction to establish a revised Baseline Program Schedule for the South Terminal C, Phase 1 and Phase 1 Expansion, at the Orlando International Airport

V. Recommendation of the Construction Committee to Approve an Addendum to the Program and Project Management Services Agreement for South Terminal C, Phase 1, Program, with Cost Management, Inc. dba CMI for Change Management Owner’s Authorized Representative (OAR) Support Services for Fiscal Year (FY) 2020 for W-S00111, South Terminal C, Phase 1 – Program and Project Management Services, at the Orlando International Airport

W. Recommendation of the Construction Committee to Approve an Addendum to the Program and Project Management Services Agreement for South Terminal C, Phase 1, with Cost Management, Inc. dba CMI for Construction Phase Owner’s Authorized Representative (OAR) Technology Consulting and Support Services for Fiscal Year (FY) 2020 for W-S00111, South Terminal C, Phase 1 – Program and Project Management Services, at the Orlando International Airport

Page 3: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

GREATER ORLANDO AVIATION AUTHORITY AGENDA FOR ITS SEPTEMBER 18, 2019, MEETING

PAGE 3

VI. CONSENT AGENDA (con't): X. Recommendation of the Construction Committee to Approve an Addendum to the Program and Project

Management Services Agreement for South Terminal C, Phase 1, with CMTS Construction Management Services, LLC for Construction Phase Owner’s Authorized Representative (OAR) Support Services related to Project Management, Safety, Project Controls, Inspection and Project Coordination Services for Fiscal Year (FY) 2020 for W-S00111, South Terminal C, Phase 1 – Program and Project Management Services, at the Orlando International Airport

Y. Recommendation of the Construction Committee to Approve an Addendum to the Program and Project Management Services Agreement for South Terminal C, Phase 1, Program, with Kraus-Manning, Inc. for Construction Phase Owner’s Authorized Representative (OAR) Construction Management Support and Conceptual Estimating Services for Fiscal Year (FY) 2020 for W-S00111, South Terminal C, Phase 1 – Program and Project Management Services, at the Orlando International Airport

Z. Recommendation of the Construction Committee to Approve an Addendum to the Program and Project Management Services Agreement for South Terminal C, Phase 1, Program with Page One Consultants, Inc. for Construction Phase Owner’s Authorized Representative (OAR) Quality Assurance (QA)/Quality Control (QC) Review, Project Controls and Inspection Support Staff Services for Fiscal Year (FY) 2020 for W-S00111, South Terminal C, Phase 1 – Program and Project Management Services, at the Orlando International Airport

AA. Recommendation of the Construction Committee to Approve an Addendum to the Program and Project Management Services Agreement for South Terminal C, Phase 1, Program with Page One Consultants, Inc. for Construction Phase Airfield Testing and Inspection Owner’s Authorized Representative (OAR) Services through 2021 for W-S00111, South Terminal C, Phase 1 – Program and Project Management Services, at the Orlando International Airport

BB. Recommendation of the Construction Committee to Approve an Addendum to the Construction-Engineering-Financial Consulting Services Agreement with R. W. Block Consulting, Inc. for Staff Extension Support Services to the Airline Affairs Division through Project Completion for W-S00120, South Terminal C, Phase 1, Program - Financial Oversight Services at the Orlando International Airport

CC. Recommendation of the Construction Committee to Approve an Addendum to the Technology and Multi-Media Systems Specialty Engineer for the South Terminal C, Phase 1 Professional Services Agreement with Burns Engineering, Inc. to Produce and Direct Content Production, Programming and Integration Services for W-S00138, South Terminal C, Phase 1 - Experiential Media Environment (EME), at the Orlando International Airport

DD. Recommendation of the Construction Committee to Award Project Bid Package (BP) No. 00043, ORL Runway Incursion Mitigation and Related Improvements, at the Orlando Executive Airport, to Gibbs & Register, Inc.

EE. Recommendation of the Construction Committee to Approve an Addendum to the Runway Incursion Mitigation (RIM) and Related Improvements Professional Services Agreement with C&S Engineers, Inc. for Construction Administration Services for Project Bid Package (BP) No. 00043, ORL Runway Incursion Mitigation and Related Improvements, at the Orlando Executive Airport

FF. Recommendation of the Construction Committee to Approve an Addendum to the Continuing Program and Project Management (OAR Prime Entity) Services Agreement with A2 Group, Inc. for Construction Phase Owner’s Authorized Representative (OAR) Services for Project Bid Package (BP) No. 00043, ORL Runway Incursion Mitigation and Related Improvements, at the Orlando Executive Airport

GG. Recommendation of the Professional Services Committee to Approve Addenda to the Information Technology Consulting Services Agreement with Faith Group Consulting, LLC for Fiscal Year (FY) 2020 Information Systems Staff Augmentation Support Services at the Orlando International Airport

HH. Recommendation of the Professional Services Committee to Approve an Amendment to Addendum No. 13 to the Technology and Multi-Media Systems Specialty Engineer for the South Terminal C, Phase 1, Agreement with Burns Engineering, Inc. for Additional Specialty Consulting Services for the Implementation Phase of W-00396, Virtual Ramp Control (VRC), at the Orlando International Airport

II. Recommendation of the Professional Services Committee to Approve an Addendum to the Information Technology Consulting Services Agreement with Barich, Inc. for Fiscal Year (FY) 2020 Information Systems Staff Augmentation to the Information Technology (IT) Department for South Terminal C, Phase 1, Construction and Other IT Related Projects Support Services, at the Orlando International Airport

Page 4: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

GREATER ORLANDO AVIATION AUTHORITY AGENDA FOR ITS SEPTEMBER 18, 2019, MEETING

PAGE 4

V. CONSENT AGENDA (con't): JJ. Recommendation to Accept a Public Transportation Grant Agreement (PTGA) for Orlando International

Airport from the Florida Department of Transportation KK. Recommendation of the Construction Committee to Award Project Bid Package (BP) No. S00172, South

Employee Parking Lot, at the Orlando International Airport, to Valencia Construction Group, Inc. LL. Recommendation of the Construction Committee to Award Project Bid Package (BP) No. 00482, Gate E-50

and Checkpoint Charlie Development, at the Orlando International Airport, to Carr & Collier, Inc. MM. Recommendation of the Construction Committee to Approve an Addendum to the Continuing Low Voltage

Construction Services Agreement with Quality Cable Contractors, Inc. for Construction Services for Project L-00045, On-Call Low Voltage Services (FY20-QCC), at the Orlando International Airport

NN. Recommendation of the Construction Committee to Approve an Addendum to the Continuing Low Voltage Construction Services Agreement with Orion Management Services, LLC for Construction Services for Project L-00046, On-Call Low Voltage Services (FY20-ORION), at the Orlando International Airport

OO. Recommendation of the Construction Committee to Approve an Addendum to the Continuing Low Voltage Construction Services Agreement with Orlando Business Telephone Systems, Inc. for Construction Services for Project L-00047, On-Call Low Voltage Services (FY20-OBTS), at the Orlando International Airport

PP. Recommendation of the Construction Committee to Approve an Addendum to the Continuing Vertical Construction Services Agreement with Collage Design and Construction Group d/b/a The Collage Companies for Project V-00863, Emergency Exit Door Hardware Replacement, at the Orlando International Airport

QQ. Recommendation of the Construction Committee to Approve Change Orders to Various Contracts RR. Recommendation of the Construction Committee to Approve an Addendum to the Continuing Program and Project

Management Services (OAR Prime Entity) Agreement with AECOM Technical Services, Inc. for Fiscal Year (FY) 2020 Staff Extension Support Services for the Project Controls Department

SS. Recommendation of the Construction Committee to Approve an Addendum to the Continuing Program and Project Management Services (OAR Prime Entity) Agreement with AECOM Technical Services, Inc. for Fiscal Year (FY) 2020 Senior Project Management/Oversight Support Services related to Tenant/Concessions Projects

TT. Recommendation of the Construction Committee to Approve an Addendum to the Continuing Program and Project Management Services (OAR Prime Entity) Agreement with Geotech Consultants International, Inc. dba GCI, Inc. for Fiscal Year (FY) 2020 Small Construction Projects and Staff Extension Support Services to the Construction Department

UU. Recommendation of the Construction Committee to Approve an Addendum to the Continuing Program and Project Management Services (OAR Prime Entity) Agreement with Geotech Consultants International, Inc. dba GCI, Inc. for Fiscal Year (FY) 2020 Airport Safety Compliance Management Support Services

VV. Recommendation of the Construction Committee to Approve an Amendment to Addendum No. 96 to the Continuing Program and Project Management Services (OAR Prime Entity) Agreement with Geotech Consultants International, Inc. dba GCI, Inc. for Additional Program Management and Oversight Owner’s Authorized Representative (OAR) Services for W-360, Airsides 2 and 4 Automated People Mover (APM) Systems Update Oversight Services, at the Orlando International Airport

WW. Recommendation of the Construction Committee to Approve an Addendum to the Continuing Transportation Planning Services Agreement with HNTB Corporation, for Fiscal Year (FY) 2020 Transportation Planning and Related Tasks

XX. Recommendation of the Construction Committee to Approve an Addendum to the Professional Services Agreement for Specialty Automated People Mover (APM) and Passenger Rail Systems with Lea & Elliott, Inc. for Fiscal Year (FY) 2020 APM Operation and Maintenance (O&M) Oversight Services at the Orlando International Airport

YY. Recommendation of the Construction Committee to Approve an Amendment to Addendum No. 21 to the Professional Services Agreement for Specialty Automated People Mover (APM) and Passenger Rail Systems with Lea & Elliott, Inc. for Additional Specialty APM Consulting Services for W-360, Airsides 2 and 4 Systems Update Oversight Services, at the Orlando International Airport

ZZ. Recommendation of the Construction Committee to Approve an Addendum to the Computer Aided Drafting (CAD), Geographic Information System (GIS), Building Information Modeling (BIM) and Related Services Agreement with Montgomery Consulting Group, Inc. for Fiscal Year (FY) 2020 CAD, GIS, BIM and Related Services

Page 5: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

GREATER ORLANDO AVIATION AUTHORITY AGENDA FOR ITS SEPTEMBER 18, 2019, MEETING

PAGE 5

V. CONSENT AGENDA (con't): AAA. Recommendation of the Construction Committee to Approve an Addendum to the Continuing Program and Project

Management Agreement (OAR Prime Entity) with PSA Management, Inc. for Fiscal Year (FY) 2020 Staff Extension Support Services related to Security Oversight and Special Systems Integration

BBB. Recommendation of the Construction Committee to Approve an Addendum to the Construction-Engineering-Financial Consulting Services Agreement with R. W. Block Consulting, Inc. for Fiscal Year (FY) 2020 Financial Oversight Support Services to the Finance Department

CCC. Recommendation of the Construction Committee to Approve an Addendum to the Construction-Engineering-Financial Consulting Services Agreement with R. W. Block Consulting, Inc. for Fiscal Year (FY) 2020 Executive Management and Cost Reporting Services to the Planning, Engineering, and Construction Department

DDD. Recommendation of the Construction Committee to Approve an Addendum to the Construction-Engineering-Financial Consulting Services Agreement with R. W. Block Consulting, Inc. for Fiscal Year (FY) 2020 Oversight Committees Support Services for the Planning, Engineering and Construction Department

EEE. Recommendation of the Construction Committee to Approve an Addendum to the Construction-Engineering- Financial Consulting Services Agreement with R. W. Block Consulting, Inc. for Fiscal Year (FY) 2020 Program Compliance Services to the Finance Department

FFF. Recommendation of the Construction Committee to Approve an Addendum to the General Consulting Services Agreement with Schenkel & Shultz, Inc. for Fiscal Year (FY) 2020 Engineering and Construction Support Services

GGG. Recommendation of the Construction Committee to Approve an Addendum to the General Consulting Services Agreement with Schenkel & Shultz, Inc. for Fiscal Year (FY) 2020 On-Site Planning Support Services

VI. NEW BUSINESS:

A. Recommendation to Approve Engagement for Interim Co-General Counsel and to Modify Committee Previously Approved to Recommend Future General Counsel Services Delivery Method

VIII. INFORMATION SECTION:

(No action is required on the item(s). Board members should feel free to ask questions on the item(s).)

A. Notification of Chief Executive Officer Approvals for September Board Meeting B. Notification of Release of RFP/RFB/RFQ’s

C. Notification of the Professional Services Committee’s Approval of the Lists of Pre-Qualified Subcontractors/Suppliers for Major Trade Packages for the South Terminal C, Phase 1, Program, at the Orlando International Airport

NEXT SCHEDULED BOARD MEETING IS ON WEDNESDAY, OCTOBER 16, 2019

Page 6: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

PAGE

On WEDNESDAY, AUGUST 28, 2019, the GREATER ORLANDO AVIATION AUTHORITY met in regular

session in the Carl T. Langford Board Room of the Aviation Authority offices in the

main terminal building at the Orlando International Airport (OIA), One Jeff Fuqua

Boulevard, Orlando, Florida. Chairman Sanchez called the meeting to order at 1:00 p.m.

The meeting was posted in accordance with Florida Statutes and a quorum was present.

[Live Streaming from Orlando, FL]

Authority members present, Domingo Sanchez, Chairman

M. Carson Good, Vice Chairman

Dr. Jason Pirozzolo, Treasurer

Mayor Jerry Demings

Mayor Buddy Dyer

Randall Hunt

Ralph Martinez

Also present, Phillip N. Brown, Chief Executive Officer and

Secretary

Dayci S. Burnette-Snyder, Director of Board

Services and Assistant Secretary

Marcos Marchena, General Counsel

Yovannie Rodriguez, Deputy General Counsel

For individuals who conduct lobbying activities with Aviation Authority employees or Board members, registration with the Aviation

Authority is required each year prior to conducting any lobbying activities. A statement of expenditures incurred in connection with

those lobbying instances should also be filed prior to April 1 of each year for the preceding year. As of January 16, 2013, lobbying

any Aviation Authority Staff who are members of any committee responsible for ranking Proposals, Letters of Interest, Statements of

Qualifications or Bids and thereafter forwarding those recommendations to the Board and/or Board Members is prohibited from the

time that a Request for Proposals, Request for Letters of Interests, Request for Qualifications or Request for Bids is released to the

time that the Board makes an award. As adopted by the Board on September 19, 2012, lobbyists are now required to sign-in at the

Aviation Authority offices prior to any meetings with Staff or Board members. In the event a lobbyist meets with or otherwise

communicates with Staff or a Board member at a location other than the Aviation Authority offices, the lobbyist shall file a Notice of

Lobbying (Form 4) detailing each instance of lobbying to the Aviation Authority within 7 calendar days of such lobbying. As of

January 16, 2013, Lobbyists will also provide a notice to the Aviation Authority when meeting with the Mayor of the City of Orlando or

the Mayor of Orange County at their offices. The policy, forms, and instructions are available in the Aviation Authority’s offices and

the web site. Please contact the Director of Board Services with questions at (407) 825-2032.

MINUTES

1. Upon motion by Mr. Martinez, second by Mayor Demings, vote carried to

accept the June 19 and July 17, 2019, minutes as written.

CONSENT AGENDA

2. Vice Chairman Good requested to consider separately Items B, L, OO, QQ,

and TT. Upon motion by Mayor Dyer, second by Mr. Martinez vote carried to adopt a

resolution as follows with the exception of Items B, L, OO, QQ, and TT: It is hereby

resolved by the Greater Orlando Aviation that the following Consent Agenda items are

Page 7: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

DRAFT MINUTES OF THE AUGUST 28, 2019, MEETING OF THE GREATER ORLANDO AVIATION AUTHORITY

Page | 2

approved, accepted, and adopted and execution of all necessary documents is authorized

by the Aviation Authority's Officers or Chief Executive Officer:

A. accept for filing the following minutes – June 17, June 20 and July 1,

2019, Concessions/Procurement Committee; April 17 and May 15, 2019 Finance Committee;

May 17 and June 6, 2019, Ad Hoc Committee (PS-613); August 6, 2019, TEFRA Public

Hearing; April 12 and June 11, 2019, Ad Hoc Committee (W-360); April 2, April 9, April

16, April 23, April 30, May 7 and May 14, Construction Committee; May 28, 2019, Design

Review Committee; February 12, February 26, March 13, March 27, May 21, June 18 and

July 2, Professional Services Committee; November 6, 2018 and July 9, 2019,

Construction Finance Oversight Committee;

B. considered separately;

C. accept the recommendation to: (1) approve the proposed alternatives with

CIGNA for medical, vision, dental, life, long term disability, short term disability

advice to pay services, and flexible spending account administration; (2) approve the

continuation of the medical and/or dental opt-out program; (3) approve the proposed

alternative with CIGNA for post-65 Medicare Supplemental and Part D Prescription Drug

Plan; (4) authorize funding from previously-approved Operations and Maintenance Fund;

and (5) authorize an Aviation Authority Officer or the Chief Executive Officer to

execute the necessary documents following review by legal counsel;

D. accept the recommendation to: (1) approve the termination of the existing

Disney East Agreement on July 28, 2019; (2) approve the proposed Disney East Agreement

as presented; (3) request Orlando City Council approval of an agreement with a term in

excess of 10 years; and (4) authorize an Aviation Authority Officer or the Chief

Executive Officer to execute the necessary documents following satisfactory review by

legal counsel [FILED DOCUMENTARY NO. ];

E. accept the recommendation to: (1) adopt the Resolution approving a Plan of

Finance and the issuance of not-to-exceed $1,800,000,000 in aggregate par amount of

debt (in addition to prior approvals) to fund a portion of the costs related to

projects in the Capital Improvement Program, (2) express the Aviation Authority's

official intent to reimburse expenditures from proceeds of such debt, and (3) request

Orlando City Council approval of the Resolution [FILED DOCUMENTARY NO. ];

F. accept the recommendation of the Finance Committee to: (1) approve the

ranking of the firms for Professional Services (PS-613), Investment Advisory Services,

as follows: first – Public Trust Advisors LLC; second – Chandler Asset Management,

Inc.; and third – PFM Asset Management LLC; (2) approve a Professional Services

Agreement (PS-613) for Investment Advisory Services with the first-ranked firm, Public

Trust Advisors, LLC, for the initial 36-month term of the agreement for a total not-to-

exceed amount of $250,000, with funding from the Operations and Maintenance Fund; (3)

should negotiations with the first-ranked firm be unsuccessful then enter into

negotiations with the second and third-ranked firms respectively; and (4) authorize an

Aviation Authority Officer or the Chief Executive Officer to execute the necessary

documents following satisfactory review by legal counsel [FILED DOCUMENTARY NO. ];

G. accept the recommendation to: (1) amend the 2018-2025 Capital Improvement

Plan by authorizing the reallocation of $60 million of Airport Revenue Bonds to debt

finance the terminal rebalancing project in lieu of cash funding; (2) adopt the

attached Authorizing Resolution for the issuance by the Aviation Authority of not-to-

Page 8: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

DRAFT MINUTES OF THE AUGUST 28, 2019, MEETING OF THE GREATER ORLANDO AVIATION AUTHORITY

Page | 3

exceed $1,250,000,000 of Supplemental Airport Facilities Revenue Bonds, Series 2019A,

approving all of the financing documents and actions referred to in the Resolution; (3)

approve the cost of issuance not-to-exceed $2,750,000 to be funded from Bond Proceeds;

(4) request Orlando City Council approval of these documents and actions; and (5)

authorize the Chairman, Vice Chairman or other Authorized Officer of the Aviation

Authority and the Secretary or Assistant Secretary of the Aviation Authority to

approve, modify, execute and deliver the final form of all documents required in

connection with the issuance of such bonds, subject to satisfactory review by legal

counsel, and to take other such actions as may be necessary or helpful for the issuance

of such bonds [FILED DOCUMENTARY NO.];

H. accept the recommendation to: (1) approve the Fourth Amendment to the

Embankment Funding Agreement by and between the Aviation Authority, the City of Orlando

and Virgin Trains USA Florida LLC; (2) seek Orlando City Council approval for the

Fourth Amendment to the Embankment Funding Agreement; and (3) authorize an Aviation

Authority Officer or the Chief Executive Officer to execute all documents related to

the Fourth Amendment to the Embankment Funding Agreement, subject to satisfactory

review by legal counsel [FILED DOCUMENTARY NO.];

I. accept the recommendation to: (1) approve the Compensating Storage License

Agreement by and between the Aviation Authority and Virgin Trains USA Florida LLC; and

(2) authorize an Aviation Authority Officer or the Chief Executive Officer to execute

all documents related to the Compensating Storage License, subject to satisfactory

review by legal counsel [FILED DOCUMENTARY NO.];

J. accept the recommendation to: (1) approve the Non-Federal Limited Design

and Implementation Agreement by and between the Aviation Authority and the FAA and the

First Amendment to the Design and Construction Reimbursable Agreement with Virgin

Trains USA Florida LLC and (2) authorize an Aviation Authority Officer or the Chief

Executive Officer to execute all documents related to the Non-Federal Limited Design

and Implementation Agreement and the First Amendment to the Design and Construction

Reimbursable Agreement, subject to satisfactory review by legal counsel [FILED

DOCUMENTARY NO.];

K. accept the recommendation (1) approve the Installation, Operation,

Maintenance and Access License Agreement by and between the Greater Orlando Aviation

Authority and the Orlando Utility Commission and (2) authorize an Aviation Authority

Officer or the Chief Executive Officer to execute the Installation, Operation,

Maintenance and Access License Agreement, subject to satisfactory review by legal

counsel [FILED DOCUMENTARY NO. ];

L. considered separately;

M. accept the recommendation of the Construction Committee and approve an

Amendment to Addendum No. 13 to the Construction Management at Risk (CM@R) Entity

Services for South Terminal C, Phase 1, Agreement with Hensel Phelps Construction, for

BP No. S00144, South Terminal C, Phase 1, Airside Terminal Enclosures and Exterior

Finishes (GMP No. 6-S.2) at the Orlando International Airport, for a total negotiated

GMP Amendment amount of $24,337,157, which includes $16,739,975 for Direct Cost of

Work, $3,055,000 for Unbought Scope, $791,799 for CM@R Contingency, $2,214,669 for

Owner’s Contingency, $160,559 for Performance and Payment Bonds, and $1,375,155 for the

CM@R’s Fee (6.031%), resulting in a revised GMP amount of $137,734,879, with funding

Page 9: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

DRAFT MINUTES OF THE AUGUST 28, 2019, MEETING OF THE GREATER ORLANDO AVIATION AUTHORITY

Page | 4

from Passenger Facility Charges to the extent eligible, General Airport Revenue Bonds,

Aviation Authority Funds, and the Aviation Authority’s Line of Credit to be reimbursed

by future General Airport Revenue Bonds and future Passenger Facility Charges to the

extent eligible and authorize an Aviation Authority Officer or the Chief Executive

Officer to execute the necessary documents following satisfactory review by legal

counsel [FILED DOCUMENTARY NO.];

N. accept the recommendation of the Construction Committee and approve an

Amendment to Addendum No. 14 to the Construction Management at Risk (CM@R) Entity

Services for South Terminal C, Phase 1, Agreement with Hensel Phelps Construction, for

BP No. S00145, South Terminal C, Phase 1, Airside Terminal Early Interiors (GMP No. 6-

S.3) at the Orlando International Airport, for a total negotiated GMP Amendment amount

of $8,913,471, which includes $9,173,969 for Direct Cost of Work, $366,959 for CM@R

Contingency, a deductive amount of ($1,189,912) for Owner Contingency, $58,805 for

Performance and Payment Bonds, and $503,650 for the CM@R’s Fee (6.031%), resulting in a

revised GMP amount of $53,321,280, with funding from Passenger Facility Charges to the

extent eligible, General Airport Revenue Bonds, Aviation Authority Funds, and the

Aviation Authority’s Line of Credit to be reimbursed by future General Airport Revenue

Bonds and future Passenger Facility Charges to the extent eligible and authorize an

Aviation Authority Officer or the Chief Executive Officer to execute the necessary

documents following satisfactory review by legal counsel [FILED DOCUMENTARY NO.];

O. accept the recommendation of the Construction Committee and approve an

Amendment to Addendum No. 10 to the Construction Management at Risk (CM@R) Entity

Services for South Terminal C, Phase 1, Agreement with Hensel Phelps Construction for

BP No. S00154, South Terminal C, Phase 1, Fueling System (GMP No. 11-S) at the Orlando

International Airport, for a total negotiated GMP Amendment amount of $960,616, which

includes $900,000 for Owner Contingency, $6,337 for Performance and Payment Bonds, and

$54,279 for the CM@R’s Fee (6.031%), resulting in a revised GMP amount of $35,441,201,

with funding from General Airport Revenue Bonds; and authorize an Aviation Authority

Officer or the Chief Executive Officer to execute the necessary documents following

satisfactory review by legal counsel [FILED DOCUMENTARY NO. ];

P. accept the recommendation of the Construction Committee and approve an

Amendment to Addendum No. 16 to the Construction Management at Risk (CM@R) Entity

Services for South Terminal C, Phase 1, Agreement with Turner-Kiewit Joint Venture for

BP No. S00156, South Terminal C, Phase 1 – Central Energy Plant and EPG Building (GMP

No. 14-S), for a total negotiated deductive GMP Amendment amount of ($2,322,636), which

includes a deductive amount of ($2,758,630) for Direct Cost of Work, $545,270 for Owner

Contingency, a deductive amount of ($15,422) for Performance and Payment Bonds, and a

deductive amount of ($93,854) for the CM@R’s Fee (4.211%), resulting in a revised GMP

amount of $67,340,011, with funding from the Aviation Authority’s Line of Credit

(taxable) to be reimbursed by General Airport Revenue Bonds; and authorize an Aviation

Authority Officer or the Chief Executive Officer to execute the necessary documents

following satisfactory review by legal counsel [FILED DOCUMENTARY NO. ];

Q. accept the recommendation of the Construction Committee and approve an

Amendment to Addendum No. 16 to the Construction Management at Risk (CM@R) Entity

Services for South Terminal C, Phase 1, Agreement with Hensel Phelps Construction, for

BP No. S00168, South Terminal C, Phase 1, Airside Terminal Interiors Finishes and

Page 10: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

DRAFT MINUTES OF THE AUGUST 28, 2019, MEETING OF THE GREATER ORLANDO AVIATION AUTHORITY

Page | 5

Specialties (GMP No. 6-S.4) at the Orlando International Airport, for a total

negotiated GMP Amendment amount of $3,882,459, which includes $3,681,730 for Direct

Cost of Work, $163,480 for Unbought Scope, $153,808 for CM@R Contingency, a deductive

amount of ($361,548) for Owner Contingency, $25,613 for Performance and Payment Bonds,

and $219,376 for the CM@R’s Fee (6.031%), resulting in a revised GMP amount of

$65,826,687, with funding from Passenger Facility Charges to the extent eligible,

General Airport Revenue Bonds, Aviation Authority Funds, and the Aviation Authority’s

Line of Credit to be reimbursed by future General Airport Revenue Bonds and future

Passenger Facility Charges to the extent eligible; and authorize an Aviation Authority

Officer or the Chief Executive Officer to execute the necessary documents following

satisfactory review by legal counsel [FILED DOCUMENTARY NO. ];

R. accept the recommendation of the Construction Committee and approve an

Amendment to Addendum No. 20 to the Construction Management at Risk (CM@R) Entity

Services for South Terminal C, Phase 1, Agreement with Turner-Kiewit Joint Venture for

BP No. S00173, South Terminal C, Phase 1, Landside Terminal

Mechanical/Electrical/Plumbing (MEP) Systems – FDOT (GMP No. 7-S.3), for a total

negotiated GMP Amendment amount of $4,875,593, which includes $2,432,232 for Direct

Cost of Work, $121,612 for CM@R Contingency, $2,092,360 for Owner Contingency, $32,374

for Performance and Payment Bonds, and $197,015 for the CM@R’s fee (4.211%), resulting

in a revised GMP amount of $117,863,428, with funding from FDOT Grants to the extent

eligible, Passenger Facility Charges to the extent eligible, General Airport Revenue

Bonds, and the Aviation Authority’s Line of Credit to be reimbursed by future Passenger

Facility Charges to the extent eligible and future General Airport Revenue Bonds and

authorize an Aviation Authority Officer or the Chief Executive Officer to execute the

necessary documents following satisfactory review by legal counsel [FILED DOCUMENTARY

NO. ];

S. accept the recommendation of the Construction Committee and approve an

Amendment to Addendum No. 21 to the Construction Management at Risk (CM@R) Entity

Services for South Terminal C, Phase 1, Agreement with Turner-Kiewit Joint Venture for

Project Bid Package (BP) No. S00176, South Terminal C, Phase 1, Sitework Logistics

Relocation (GMP No. 18-S) at the Orlando International Airport, for a total negotiated

GMP Amendment amount of $1,965,228, which includes $1,872,767 for Owner Contingency,

$13,049 for Performance and Payment Bonds, and $79,412 for the CM@R’s Fee (4.211%),

resulting in a revised GMP amount of $45,209,909, with funding from the Aviation

Authority’s Line of Credit to be reimbursed by future General Airport Revenue Bonds;

and authorize an Aviation Authority Officer or the Chief Executive Officer to execute

the necessary documents following satisfactory review by legal counsel [FILED

DOCUMENTARY NO. ];

T. accept the recommendation of the Construction Committee and approve a No-

Cost Time Extension Addendum to the Construction-Engineering-Financial Consulting

Services Agreement with R.W. Block Consulting, Inc. to extend the Agreement to

September 30, 2022 and authorize an Aviation Authority Officer or the Chief Executive

Officer to execute the necessary documents following satisfactory review by legal

counsel [FILED DOCUMENTARY NO.];

U. accept the recommendation of the Construction Committee and approve an

Addendum to the Construction-Engineering-Financial Consulting Services Agreement with

Page 11: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

DRAFT MINUTES OF THE AUGUST 28, 2019, MEETING OF THE GREATER ORLANDO AVIATION AUTHORITY

Page | 6

R. W. Block Consulting, Inc. for Program Controls Services through Project Completion

for W-S00120, South Terminal C, Phase 1, Program - Financial Oversight Services for a

total amount of $18,064,773, which includes a not-to-exceed fee amount of $18,024,773

and a not-to-exceed reimbursable expense amount of $40,000, with funding from General

Airport Revenue Bonds, Customer Facility Charges and Passenger Facility Charges to the

extent eligible; and authorize an Aviation Authority Officer or the Chief Executive

Officer to execute the necessary documents following satisfactory review by legal

counsel [FILED DOCUMENTARY NO. ];

V. accept the recommendation of the Construction Committee and (1) approve an

Amendment to Addendum No. 3 to the Professional Services Agreement with Matern

Professional Engineering, Inc. for Additional Construction Administration (CA) Services

for BP No. 00459, Secured Area Access Point CCTV Improvements, for a total amount of

$37,931.50, which includes a not-to-exceed fee amount of $37,612.00 and a not-to-exceed

reimbursable expense amount of $319.50, with funding from FAA and FDOT Grants to the

extent eligible, and previously-approved Capital Expenditure Fund and Passenger

Facility Charges to the extent eligible; (2) request Orlando City Council and FAA

concurrence (as required because of FAA funding); and (3) authorize an Aviation

Authority Officer or the Chief Executive Officer to execute the necessary documents

following satisfactory review by legal counsel [FILED DOCUMENTARY NO. ];

W. accept the recommendation of the Construction Committee and (1) approve an

Amendment to Addendum No. 11 to the Continuing Program and Project Management (OAR

Prime Entity) Services Agreement with PSA Management, Inc. for Additional Construction

Phase OAR Services for BP No. 00459, Secured Area Access Point CCTV Improvements, for a

total not-to-exceed fee amount of $77,640, with funding from FAA and FDOT Grants to the

extent eligible, and previously-approved Capital Expenditure Fund and Passenger

Facility Charges to the extent eligible; (2) request Orlando City Council and FAA

concurrence (as required because of FAA funding); and, (3) authorize an Aviation

Authority Officer or the Chief Executive Officer to execute the necessary documents

following satisfactory review by legal counsel [FILED DOCUMENTARY NO. ];

X. accept the recommendation of the Construction Committee and approve an

Addendum to the Continuing Electrical Construction Services Agreement with BergElectric

Corp. d/b/a BergElectric Corp. Contractors and Engineers for Project E-00239,

Miscellaneous Light Fixtures for Parking Garages A, B and Terminal Top, at the Orlando

International Airport, for the total bid amount of $1,738,231.44 (Base Bid plus

Allowance, and Add Alternate Nos. 1 and 2), with funding from previously-approved

Capital Expenditure Fund and Discretionary Funds; and, authorize an Aviation Authority

Officer or the Chief Executive Officer to execute the necessary documents following

satisfactory review by legal counsel [FILED DOCUMENTARY NO. ];

Y. accept the recommendation of the Construction Committee to (1) approve

Change Order No. BP-00459-05 in the amount of $47,961.56 and no time extension, and

request Orlando City Council and FAA concurrence (as required because of FAA funding),

with funding as outlined in Attachment A; (2) approve Change Order No. BP-00459-06R in

the amount of $408,974.37, and a 437 calendar day time extension to Substantial

Completion and a 126 calendar day time extension to Final Completion, and request

Orlando City Council and FAA concurrence (as required because of FAA funding), with

funding as outlined in Attachment A; (3) approve Change Order No. BP-00468-02 in the

Page 12: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

DRAFT MINUTES OF THE AUGUST 28, 2019, MEETING OF THE GREATER ORLANDO AVIATION AUTHORITY

Page | 7

amount of $4,175.38 and no time extension, and request Orlando City Council and FAA

concurrence (as required because of FAA funding), with funding as outlined in

Attachment A; (4) approve Change Order No. V-00867-01 in the amount of $237,897.99 and

a 172 calendar day time extension to Substantial Completion, with funding as outlined

in Attachment A; and, (5) authorize an Aviation Authority Officer or the Chief

Executive Officer to execute the change order(s) following satisfactory review by legal

counsel [FILED DOCUMENTARY NO. ];

Z. accept the recommendation to: (1) adopt a Resolution accepting Public

Transportation Grant Agreement (PTGA) FM No. 438485-2-94-01 in the amount of $520,000

and (2) authorize the Chief Executive Officer and the Assistant Secretary to execute

the necessary documents [FILED DOCUMENTARY NO. ];

AA. accept the recommendation Construction Committee and (1) approve a No Cost

Addendum to the Continuing Vertical Construction Services Agreement with Collage Design

and Construction Group, Inc. dba The Collage Companies to exercise the first one-year

renewal option and extend the Agreement to November 21, 2020; (2) approve a No Cost

Addendum to the Continuing Vertical Construction Services Agreement with Gilbane

Building Company to exercise the first one-year renewal option and extend the Agreement

to December 9, 2020; (3) approve a No Cost Addendum to the Continuing Vertical

Construction Services Agreement with Gomez Construction Company to exercise the first

one-year renewal option and extend the Agreement to November 22, 2020; (4) approve a No

Cost Addendum to the Continuing Vertical Construction Services Agreement with H.W.

Davis Construction, Inc. to exercise the first one-year renewal option and extend the

Agreement to November 2, 2020; (5) approve a No Cost Addendum to the Continuing

Vertical Construction Services Agreement with R.L. Burns, Inc. to exercise the first

one-year renewal option and extend the Agreement to November 2, 2020; (6) approve a No

Cost Addendum to the Continuing Vertical Construction Services Agreement with T&G

Corporation dba T&G Constructors to exercise the first one-year renewal option and

extend the Agreement to November 22, 2020; and, (7) authorize an Aviation Authority

Officer or the Chief Executive Officer to execute the necessary documents following

satisfactory review by legal counsel [FILED DOCUMENTARY NO. ];

BB. accept the recommendation of the Professional Services Committee and

approve (1) Addendum No. 3 to the IT Consulting Services Agreement with Advanced IT

Concepts, Inc. for FY 2020 Purchasing Department Staff Augmentation for IT Buyer, at

the Orlando International Airport, for a total not-to-exceed fee amount of $105,336,

with funding from Operations and Maintenance Fund; (2) Addendum No. 4 for FY 2020

Information Systems Staff Augmentation Project Coordinator Support Services for a total

not-to-exceed fee amount of $149,208, with funding from Operation and Maintenance Fund;

and, (3) authorize an Aviation Authority Officer or the Chief Executive Officer to

execute the necessary documents following satisfactory review by legal counsel [FILED

DOCUMENTARY NO. ];

CC. accept the recommendation of the Professional Services Committee and

approve an Addendum to the IT Consulting Services Agreement with Technology Management

Corporation dba Technology Management Corporation – 1 Incorporated for FY 2020

Information Systems Staff Augmentation for Senior Project Manager and Application

Program/Analyst Support Services, for a total not-to-exceed fee amount of $1,065,476,

with funding from Operation and Maintenance Funds and authorize an Aviation Authority

Page 13: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

DRAFT MINUTES OF THE AUGUST 28, 2019, MEETING OF THE GREATER ORLANDO AVIATION AUTHORITY

Page | 8

Officer or the Chief Executive Officer to execute the necessary documents following

satisfactory review by legal counsel [FILED DOCUMENTARY NO. ];

DD. accept the recommendation of the Professional Services Committee and

approve an Addendum to the IT Consulting Services Agreement with Technology Management

Corporation dba Technology Management Corporation – 1 Incorporated for FY 2020

Information Systems Staff Augmentation for Senior IT Systems Specialists/IT Systems

Specialists, Telecom Engineer/Analysts, and Service Desk Representative Support

Services, for a total not-to-exceed fee amount of $1,623,232, with funding from

Operation and Maintenance Funds; and authorize an Aviation Authority Officer or the

Chief Executive Officer to execute the necessary documents following satisfactory

review by legal counsel [FILED DOCUMENTARY NO. ];

EE. accept the recommendation of the Professional Services Committee and (1)

approve the ranking of the shortlisted firms for Virtual Ramp Control Services (W396)

at the Orlando International Airport as follows: First – Saab Sensis Corporation; and,

Second – Searidge Technologies, Inc.; (2) authorize negotiations with the first-ranked

firm in accordance with Aviation Authority policy, and if those negotiations are

unsuccessful, negotiate with the second-ranked firm; and (3) upon reaching agreement

with the successful proposer, present the final agreement terms to the Aviation

Authority Board for approval; following satisfactory review by legal counsel [FILED

DOCUMENTARY NO. ];

FF. accept the recommendation of the Construction Finance Oversight Committee

and (1) approve the transfer of $700,000 of FAA AIP No. 116 Grant Funds from Fund

Balance to BP No. 00459 and (2) request Orlando City Council concurrence for this non-

budgeted expenditure [FILED DOCUMENTARY NO. ];

GG. accept the recommendation of the Construction Finance Oversight Committee

and (1) approve the transfer of $100,000 of previously-approved Discretionary Funds

from FY 2018 CIR00059 to Fund Balance; (2) approve the transfer of $70,000 of Capital

Expenditure Funds from Fund Balance to Project H-00326; and (3) request Orlando City

Council concurrence for this non-budgeted expenditure [FILED DOCUMENTARY NO. ];

HH. accept the recommendation of the Construction Finance Oversight Committee

and (1) approve the transfer of $200,000 of previously-approved Capital Expenditure

Funds from FY 2015 CIR Business Messaging on Level 2 to Project V-00927; (2) approve

the transfer of $24,899 of Capital Expenditure Funds from Unallocated Customer Service

Initiatives to Project V-00927; and, (3) request Orlando City Council concurrence for

this non-budgeted expenditure [FILED DOCUMENTARY NO. ];

II. accept the recommendation to approve a temporary suspension of GOL Linhas

Aereas’s Air Service Incentive Program (ASIP) Agreements and Amend ASIP Exhibit “A” to

address temporary suspensions [FILED DOCUMENTARY NO. ];

JJ. accept the recommendation of the Concessions/Procurement Committee to: (1)

approve Purchasing Contract with Avaya, Inc. for Data Communication Products and

Services, pursuant to State of Florida Alternate Contract Source No. 43220000-WSCA-14-

ACS for an initial three-year term and two one-year renewal terms for a total cost not-

to-exceed $2,992,072.20; (2) authorize funding from the previously-approved Operations

and Maintenance Fund in the amount not-to-exceed $2,992,072.20; and (3) authorize an

Aviation Authority Officer or the Chief Executive Officer to execute the appropriate

Page 14: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

DRAFT MINUTES OF THE AUGUST 28, 2019, MEETING OF THE GREATER ORLANDO AVIATION AUTHORITY

Page | 9

purchasing contract following satisfactory review by legal counsel [FILED DOCUMENTARY

NO. ];

KK. accept the recommendation to: (1) approve Amendment No. 14, Renewal Term

and Contract Adjustment to Sole Source Purchasing Contract No. 09-04, Automated People

Mover (APM) Maintenance Services, with Bombardier Transportation (Holdings) USA Inc.,

to exercise the existing available five-year renewal term through September 30, 2024,

and approve a contract adjustment for two additional one-year renewal terms that may be

exercised by the Aviation Authority in a total amount not-to-exceed $45,308,704.01; (2)

authorize funding from the Operations and Maintenance Fund in the total amount not-to-

exceed $45,308,704.01; and (4) authorize an Aviation Authority Officer or Chief

Executive Officer to execute the appropriate Amendment following satisfactory review by

legal counsel [FILED DOCUMENTARY NO. ];

LL. accept the recommendation of the Concessions/Procurement Committee’s to:

(1) approve Amendment No. 13 for an Increase in Value to Purchasing Contract No. 16-15,

Security Area Monitor Services, at Orlando International Airport, with HSS, Inc., in

the amount not-to-exceed $461,062.90; (2) authorize funding from the Operations and

Maintenance Fund in the amount not-to-exceed $461,062.90; and (3) authorize an Aviation

Authority Officer or the Chief Executive Officer to execute an appropriate amendment

following satisfactory review by legal counsel [FILED DOCUMENTARY NO. ];

MM. accept the recommendation to: (1) approve an amendment to the Lease

Agreement at Colonial Promenade with K&G Men’s Company, Inc. to extend the term of its

lease one year, through August 31, 2020, under the existing terms and conditions and

(2) authorize an Aviation Authority Officer or the Chief Executive Officer to execute

the appropriate amendment subject to satisfactory review by legal counsel [FILED

DOCUMENTARY NO. ];

NN. accept the recommendation of the Concessions/Procurement Committee to: (1)

award the purchase of one Commercial Mini-Pumper with capacity of 230 gallons of water

and 20 gallons of foam with a 1,500 gallon per minute pump, pursuant to Florida

Sheriff’s Contract No. FSA18-VEF13.0, to REV Technical Center powered by Hall-Mark, in

the amount not-to-exceed $272,416.68; (2) authorize funding from the previously-

approved Capital Expenditure Fund in the amount not-to-exceed $272,416.68; and (3)

authorize an Aviation Authority Officer or the Chief Executive Officer, or his

designee, to execute the necessary purchase order following satisfactory review by

legal counsel [FILED DOCUMENTARY NO. ];

OO. considered separately;

PP. accept the recommendation to: (1) approve a modification to Amendment No.

18 to the Fixed Base Operator Lease Agreement at Orlando Executive Airport with

Sheltair Orlando Air Center, Inc., to increase the leased premises by approximately

41,346 square feet to construct additional vehicle parking at the corner of Maguire

Boulevard and East Livingston and (2) authorize an Aviation Authority Officer or Chief

Executive Officer to execute the appropriate amendment following satisfactory review by

legal counsel [FILED DOCUMENTARY NO. ];

QQ. considered separately;

RR. accept the recommendation of the Concessions/Procurement Committee’s to:

(1) award Purchasing Contract 05-20, Automatic Door Repair, Maintenance, and Upgrade

Services, at Orlando International Airport, to Stanley Access Technologies for a three-

Page 15: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

DRAFT MINUTES OF THE AUGUST 28, 2019, MEETING OF THE GREATER ORLANDO AVIATION AUTHORITY

Page | 10

year term in an amount not-to-exceed $265,750; (2) authorize funding from the

Operations and Maintenance Fund, in the amount not-to-exceed $265,750; and (3)

authorize an Aviation Authority Officer or the Chief Executive Officer to execute the

appropriate Purchasing Contract following satisfactory review by legal counsel [FILED

DOCUMENTARY NO. ];

SS. accept the recommendation of the Concessions/Procurement Committee’s to:

(1) award Purchasing Contract 05-20, Automatic Door Repair, Maintenance, and Upgrade

Services, at Orlando International Airport, to Stanley Access Technologies for a three-

year term in an amount not-to-exceed $265,750; (2) authorize funding from the

Operations and Maintenance Fund, in the amount not-to-exceed $265,750; and (3)

authorize an Aviation Authority Officer or the Chief Executive Officer to execute the

appropriate Purchasing Contract following satisfactory review by legal counsel [FILED

DOCUMENTARY NO. ];

TT. considered separately;

UU. accept the recommendation of the Concessions/Procurement Committee to: (1)

approve Amendment No. 1 to Purchasing Contract No. 12-17, Vehicle Towing and Storage

Services, with Stepp’s Towing Service, Inc.; (2) authorize funding in the not-to-exceed

amount of $329,450 from the Operations and Maintenance Fund; and (3) authorize an

Aviation Authority Officer or the Chief Executive Officer to execute the necessary

documents following satisfactory review by legal counsel [FILED DOCUMENTARY NO. ];

VV. accept the recommendation to: (1) approve a new Fire Station Lease

Agreement for approximately 2.68 acres of land at the Orlando Executive Airport, as

described in the memorandum, through September 30, 2065; and (2) authorize an Aviation

Authority Officer or the Chief Executive Officer to execute the appropriate lease,

subject to satisfactory review by legal counsel [FILED DOCUMENTARY NO. ];

WW. accept the recommendation to (1) approve the hosting of the 2020 Florida

Airports Council Annual Conference and Trade Show; (2) authorize use of expenditures

not-to-exceed $150,000; and (3) authorize the Chief Executive Officer to execute all

necessary documents, subject to satisfactory review by legal counsel [FILED DOCUMENTARY

NO. ];

DISCUSSION ON TABLED ITEMS

3. Chairman Sanchez stated that discussions would begin with Consent Agenda

Item B.

(In summary:)

B. accept the recommendation of the Finance Committee to: (1) approve the

ranking of the proposers for award of Actuary Services and (2) authorize staff to

negotiate and execute the necessary documents with the first-ranked firm, Foster &

Foster, Inc., following satisfactory review by legal counsel [FILED DOCUMENTARY NO. ];

L. accept the recommendation of the Construction Committee and (1) approve an

Amendment to Addendum No. 8 to the Construction Management at Risk (CM@R) Entity

Services for South Terminal C, Phase 1, Agreement with Hensel Phelps Construction for

BP No. S00143, South Terminal C, Phase 1, Airside Terminal, Structure and Enclosure

(GMP No. 6-S.1) at the Orlando International Airport, for a total negotiated GMP

Amendment amount of $3,569,651, which includes $2,735,000 for Direct Cost of Work,

Page 16: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

DRAFT MINUTES OF THE AUGUST 28, 2019, MEETING OF THE GREATER ORLANDO AVIATION AUTHORITY

Page | 11

$54,700 for CM@R Contingency, $554,700 for Owner Contingency, $23,550 for Performance

and Payment Bonds, and $201,701 for the CM@R’s Fee (6.031%), resulting in a revised GMP

amount of $158,851,608, with funding from General Airport Revenue Bonds and Passenger

Facility Charges to the extent eligible; (2) approve an Amendment to Addendum No. 8 to

the Construction Management at Risk (CM@R) Entity Services for South Terminal C, Phase

1, Agreement with Hensel Phelps Construction for BP No. S00143, South Terminal C, Phase

1, Airside Terminal, Structure and Enclosure (GMP No. 6-S.1) at the Orlando

International Airport, for a total negotiated GMP Amendment amount of $31,178,461,

which includes $26,099,979 for Direct Cost of Work, $1,562,000 for Unbought Scope,

$1,106,479 for CM@R Contingency, $442,592 for Owner Contingency, $205,693 for

Performance and Payment Bonds, and $1,761,718 for the CM@R’s Fee (6.031%), resulting in

a revised GMP amount of $190,030,069, with funding from the Aviation Authority’s Line

of Credit to be reimbursed by future General Airport Revenue Bonds and Passenger

Facility Charges to the extent eligible; and, (3) authorize an Aviation Authority

Officer or the Chief Executive Officer to execute the necessary documents following

satisfactory review by legal counsel [FILED DOCUMENTARY NO.];

OO. accept the recommendation to: (1) award Purchasing Contract No. 01-20,

Personnel Screening Services at Orlando International Airport, to Covenant Aviation

Security, LLC; (2) authorize funding from the Operations and Maintenance Fund for the

initial three-year term of the Purchasing Contract in the not-to-exceed amount of

$23,495,300; and (3) authorize an Aviation Authority Officer or the Chief Executive

Officer to execute an appropriate agreement following satisfactory review by legal

counsel [FILED DOCUMENTARY NO. ];

QQ. accept the recommendation of the Concessions/Procurement Committee’s

recommendation to (1) approve the ranking of proposals for STC Food and Beverage

Package 3 Concession Agreement at Orlando International Airport; (2) award the STC Food

and Beverage Package 3 Concession at Orlando International Airport to Orlando

Hospitality Airport Partners, LLC; and (3) authorize an Aviation Authority Officer or

the Chief Executive Officer to execute the appropriate documents following satisfactory

review by legal counsel [FILED DOCUMENTARY NO. ];

TT. accept the recommendation to: (1) award Purchasing Contract No. 03-20,

Terminal Janitorial Maintenance at Orlando International Airport, to Flagship Airport

Services, Inc.; (2) authorize funding from the Operations and Maintenance Fund in the

not-to-exceed amount of $57,374,600; and (3) authorize an Aviation Authority Officer or

the Chief Executive Officer to execute an agreement following satisfactory review by

legal counsel [FILED DOCUMENTARY NO. ];

Vice Chairman Good stated that in follow-up to the email he sent to everyone (board

members) Sunday night and with discussions he had with senior staff and McKinsey &

Company (McKinsey) for the past 3 or 4 months. They are a great consultant for the

airport, who has fabulous world-class ideas, and loves this airport. The proposal he

submitted on Sunday, which he provided to the CEO, was to have McKinsey come in and

work with us as a team on best practices on procurement, concessions, and construction.

To read those contracts to make sure they are vetted, with four new board members, they

do this at JLL, to stimulate the discussion. Vice Chairman Good said that the motion

might be in backward order. He requested an item on the agenda several weeks ago for

Page 17: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

DRAFT MINUTES OF THE AUGUST 28, 2019, MEETING OF THE GREATER ORLANDO AVIATION AUTHORITY

Page | 12

McKinsey to perform a 30 to 60 day study, deep dive, and he felt the items pulled for

separate consideration are very much the subject of best practices. Some of these can

be vetted in the next few weeks before the next board meeting. That is his reason for

holding up on these items.

Mr. Marchena stated that if the entire decision on these items that Vice Chairman Good

pulled will turn on whether the Board proceeds with your recommended McKinsey best

practices study, then he advised Chairman Sanchez, tabling these items to later on in

the meeting when Vice Chairman Good can address the Board under New Business regarding

the McKinsey study and then depending on that action, the Board can continue the

discussion on these matters if that is the only reason for them being pulled.

Chairman Sanchez stated that he had a conversation with the McKinsey folks, since he is

a big fan, and he asked them in general about their preference on how to move forward

with this study. Frankly, they told him that considering the current movement and

retirement of Mr. Marchena, recognizing how important legal counsel is to the process,

they recommended to him to wait on the study until a new general counsel is in place or

at minimum, to move with anything like that. His point of contact was Mr. Ron Ritter.

Mayor Dyer stated that in concept or in theory, he wholeheartedly supports always

looking at best practices and how to improve procedures and processes at the airport.

Mayor Dyer mentioned that he was considerably uncomfortable in voting on major items

that are not on the agenda and that he does not have an agenda item to review. In

addressing a sole source procurement (supposedly in the ¾ million dollar range), he is

also very uncomfortable not going through a process or knowing the scope. If the

motion is to explore a study, he can be supportive, but there are many things rumbling

around and he is so uncomfortable not having items on the agenda or properly noticing

the public that this item will be discussed.

Chairman Sanchez responded that we are trying to improve on practices and procedures

but there is a time to do that. Mr. Marchena added that if Vice Chairman Good would

like to discuss this item after the Board has a discussion on the pulled items, today

or another day, you would make a motion to table these items until that time. If the

motion passes, they are tabled until that time. If the motion fails, then anyone can

make a motion to adopt the items that have been pulled from the consent agenda – as one

vote or one at a time.

Chairman Sanchez asked Mr. Brown if any of these items were mission critical to the

South Terminal buildout or construction. Mr. Brown responded that Item L

(Recommendation of the Construction Committee to Approve Amendments to Addendum No. 8

to the Construction Management at Risk (CM@R) Entity Services for South Terminal C,

Phase 1, Agreement with Hensel Phelps Construction, for Project Bid Package (BP) No.

S00143, South Terminal C, Phase 1, Airside Terminal, Structure and Enclosure

(Guaranteed Maximum Price (GMP) No. 6-S.1) at the Orlando International Airport) is an

addendum for over $30 million with two GMP’s to the Hensel Phelps contract, which will

delay the South Terminal since this is work for the airfield portion. Item B

Page 18: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

DRAFT MINUTES OF THE AUGUST 28, 2019, MEETING OF THE GREATER ORLANDO AVIATION AUTHORITY

Page | 13

(Recommendation of the Finance Committee to Accept the Recommendation of the Retirement

Benefits Committee (RBC) for Selection of an Actuary for the Defined Benefit Pension

(Plan) and Other Post-Employment Benefits Trust (OPEB Trust)) is a selection of

actuarial services that can be deferred until the next board meeting. Item OO

(Recommendation to Award Purchasing Contract No. 01-20, Personnel Screening Services at

Orlando International Airport, to Covenant Aviation Security, LLC) is for personnel

screening with the contract expiring at the end of September (corrected to October).

An option would be to extend the current fixed fee contract but the new contract is

management based and a good price has been negotiated. Item TT (Recommendation to

Award Purchasing Contract No. 03-20, Terminal Janitorial Maintenance at Orlando

International Airport, to Flagship Airport Services, Inc.) this contract has also been

negotiated as a management contract. This gives us better flexibility in assigning

cleaners and we have input into their operations. Item QQ was pulled from the agenda

last month (Recommendation of the Concessions/Procurement Committee to Approve the

Ranking of Proposals and Award of STC Food and Beverage Package 3 Concession Agreement,

at Orlando International Airport, to Orlando Hospitality Airport Partners, LLC). This

is an award for concessions in the South Terminal so it will not go into effect until

2021. It is important to award but it does not have to be today. To summarize, the

mission critical items are L, OO, and TT.

Chairman Sanchez asked if Vice Chairman Good was satisfied to table the non-mission

critical items. Vice Chairman Good responded that he would like to table the items

mentioned until the end of the meeting until the Board talks about the McKinsey study.

He has no problems with any of the items. He perceived these as good items to vet

through the study. We can discuss when we get to that point if the McKinsey study

would fit these items. If this is not what others want to do, then it is a moot point.

Vice Chairman Good reiterated that his motion stands (to table the items until the

McKinsey study is discussed.) Upon motion by Vice Chairman Good, second by Mayor Dyer,

vote carried and motion was approved.

RECOMMENDATION TO APPROVE THE SECOND AMENDED AND RESTATED RESOLUTION RELATING TO

AIRLINE RATES AND CHARGES AND AIRLINE OPERATING TERMS AND CONDITIONS FOR THE USE OF

FACILITIES AND SERVICES AT ORLANDO INTERNATIONAL AIPRORT

4. Mr. Brown began the presentation by stating that MCO is one of the few

airports that addresses airline rates and charges by Resolution. Since we are not part

of a City department, we cannot pass Ordinances like other airports. This is the first

time since 2013 that we have changed the methodology to a significant degree for when

we initialed Rates by Resolution. Part of the recommendation includes the request to

adopt a Revenue Sharing Agreement with the airlines. This type of agreement goes back

to 1978 under the original Residual Agreement. Mr. Brown stated that staff spent

approximately 18 months meeting with the airlines about how the rates would be

implemented and how revenue was going to be shared. We are proposing a new five year

agreement effective FY 2020 through FY 2024 which contemplates South Terminal

operations.

Page 19: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

DRAFT MINUTES OF THE AUGUST 28, 2019, MEETING OF THE GREATER ORLANDO AVIATION AUTHORITY

Page | 14

He reviewed the goals and objectives for the next five years (FY 2020-FY 2024) which

address facility constraints, increased traffic, service projections by airlines, and

opening of the new South Terminal. These factors necessitate a need for refined

operational standards to (1) continue to deliver the Orlando Experience®; (2) provide

opportunities for domestic and international air service expansion, but also recognize

the economics of the Orlando market place by motivating airlines to maximize gate

utilization; (3) accommodate both expanding incumbents and new entrants; and (4)

provide competitive rates for all facilities.

Mr. Brown defined the airline rate-making methodologies as follows: residual,

(referred to as a single cash register), to recover net costs after credit of non-

airline revenues; financial risk of “break even” transferred to airlines; usually

requires airline approval on capital investment decisions; and limited accumulation of

airport equity. Under compensatory, recover costs allocated to occupied facilities;

airport assumes financial risk; airlines pay for what they use; and airport keeps non-

airline revenues. Lastly, hybrids are a mixture of both methodologies; balance of risk

and facility control; carve outs of self-supporting cost centers; and net revenue-

sharing formulas (usually in return for safety nets). The legal basis is that the rate

methodology is designed to recover from the air carriers using MCO their fairly

allocated share of costs in accordance with the U. S. Department of Transportation’s

Policy Regarding Airport Rates and Charges, 61 Fed. Reg. 31994 (June 21, 1996), as

amended, and other application laws. The supporting document include a Rate

Resolution; Rate Book; Operating Permit; Letter of Authorization (LOA); Airline

Operations Procedures and the Rate and Revenue Sharing Agreement. Mr. Brown provided a

short summary of each document.

He then talked about the changes to the Rate Resolution. For starters, added

definitions for the South Terminal and related rate methodology changes. Updated

obsolete terms and provisions and provided for common use gate/hold room, ticketing

area-operating structure. Mr. Brown then spoke about the proposed changes as follows:

airlines commit to gates on an annual access basis with cost of gates equalized across

all North and South Terminal gates based on a Narrow Body Equivalent (NBE) gate

divisor. Baggage system charge is comprised of the space rental plus operation and

maintenance expense and charged based on passengers. The North Terminal costs are

calculated separately from the South Terminal. The rates on the South will not go into

effect until there is occupancy in the South (Phase 1 of expansion - 2022). The ticket

counter and bag make-up costs are charged based on the space used in the North Terminal

and on a proportional basis with other users based on gate usage in the South Terminal.

Lastly, all other airline committed premises charged based on a per square foot basis.

His presentation then moved on to mention gate access options (comparison); fee types

under the new methodology by terminal; and additional changes to the airline ratemaking

methodology. Amortization charges will include 5% imputed interest upon the opening of

the South Terminal for facilities we fund. Fifty percent of the allocable Operation

and Maintenance expense, debt service, and amortization of the South Automated People

Mover System will be included in the terminal rate base upon date of beneficial

occupancy of the South Terminal. In the event the all-in debt service coverage is

Page 20: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

DRAFT MINUTES OF THE AUGUST 28, 2019, MEETING OF THE GREATER ORLANDO AVIATION AUTHORITY

Page | 15

projected to be or turns out to be less than 1.30x, the airline rate base will include

allocable debt service coverage (25% for Senior Bonds and 10% for Subordinated

Indebtedness) for purposes of determining annual rates; however, in the event the

actual all-in coverage exceeds 1.30x, the Aviation Authority will only include the

amount necessary to achieve this level. Agreed to finance $60 million of terminal

facility improvements in lieu of cash funding (as set forth in May 15, 2019, Capital

Improvement Plan) in order to provide infrastructure related to moving airlines once

the South Terminal opens, which will be amortized over 7 years.

Mr. Brown then talked about the proposed revenue sharing with the Aviation Authority

retaining the first $55 million in net remaining revenues; zero percent of the next $10

million; and 50% of the remaining amounts. Moving along, he then listed the

eligibility requirements and disbursement of revenue sharing = sign a Rate and Revenue

Sharing Agreement provided that eligibility windows begin as of October and April 1 of

such year; agree not to challenge the Rate Methodology for the 5 year period from FY

2020 to FY 2024; commit to use at least one gate and related hold room, ticket counter,

and queue space, and baggage areas through September 30, 2024, under a Letter of

Authorization; and airline revenue sharing will continue to be allocated among the

Participating Airlines by relative Participating Operating Payments, which will include

the common use fees payable by Participating Airlines using the South Terminal common

use ticketing and bag make-up facilities, since these charges are in lieu of the per

square foot method used in the North Terminal facility, but which now only includes

payment for committed space to the extent commitments are made through September 30,

2024. He then pointed out the strong projected financial metrics to include debt

service coverage; aggregate total debt service coverage; and airline Cost per Enplaned

Passenger (CPE). Mr. Brown added that MCO’s FY 2018 CPE is below the 25th percentile

for large hubs and is expected to remain below the 50% percentile in the future.

In summary, the new agreement positions the Aviation Authority to accommodate

unprecedented growth in passenger traffic at MCO; continue to provide world class

customer experience; accommodate multiple terminal costs consistent across the

terminals (North and South) for operational flexibility; add Phase 1 Expansion to

provide additional Remain Over Night (RON) and hard stand positions for flexibility to

manage demand for growth; convert from assigning gates on a preferential use basis to

gate access and priority gate access to encourage efficient gate utilization which will

maximize the use of airport facilities mitigating the need for excessive capital

improvements, allow airlines that utilize gates efficiently to pay lower cost per

enplaned passenger, and result in additional gate availability, enabling the Aviation

Authority to accommodate additional air services.

It was respectfully requested that the Aviation Authority Board resolve to: (1)

approve the Second Amended and Restated Resolution Relating to Airline Rates and

Charges and Airline Operating Terms and Conditions for the Use of Facilities and

Services at Orlando International Airport; (2) approve the Rate Book, the Rate

Methodology described therein, and the specific Rates and Charges calculated thereunder

for the use and occupancy of the Airport beginning October 1, 2019, and authorize the

Chief Executive Officer to provide notice to the airlines operating at the Airport of

Page 21: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

DRAFT MINUTES OF THE AUGUST 28, 2019, MEETING OF THE GREATER ORLANDO AVIATION AUTHORITY

Page | 16

such Rates and Charges; (3) authorize the Chief Executive Officer to approve and

provide notice to the Airlines of Rates and Charges for future fiscal years that are

calculated in accordance with the Rate Methodology approved hereby and to deliver such

notice in the form of a Rate Book or rate schedule; (4) approve the form and concept of

the Rate and Revenue Sharing Agreement, including any changes thereto not inconsistent

with the Resolution that are deemed reasonable and appropriate by the Chief Executive

Officer after review by legal counsel; and authorize and direct the Chief Executive

Officer to execute from time to time Rate and Revenue Sharing Agreements with airlines

satisfying the conditions thereof to the extent a sufficient number of airlines, in the

Chief Executive Officer’s discretion, executes such agreements; (5) approve the forms

of Letter of Authorization and Operating Permit, including any changes thereto not

inconsistent with the Resolution that are deemed reasonable and appropriate by the

Chief Executive Officer after review by legal counsel, and authorize and direct the

Chief Executive Officer to execute from time to time Letters of Authorization and

Operating Permits and any documents serving a similar function with airlines satisfying

the conditions thereof; (6) authorize Staff to develop, adopt, amend, modify, and

implement from time to time such operational policies and procedures for the use and

occupancy of the Airport that are not inconsistent with the Resolution; and (7) amend

the 2018-2025 Capital Improvement Plan by authorizing an additional $60 million of

Airport Revenue Bonds to finance the terminal rebalancing in lieu of cash funding.

In response to Mr. Martinez’s question about the methodology, Mr. Brown responded that

the excess of revenues and expenses is shared with the airlines. If you think about it

in the concept of retained earnings or fund balance, that is the pour over for the next

year. The Aviation Authority uses its portion to perform small projects to maintain

the assets we currently have.

Upon motion by Mayor Dyer, second by Mr. Good, vote carried to approve the recommended

action.

RECOMMENDATION TO APPROVE PRELIMINARY FISCAL YEAR 2020 AVIATION AUTHORITY BUDGET

5. Ms. Kathleen Sharman, Chief Financial Officer, stated that MCO is expected

to exceed 50 million passengers by October 2019. The objective of the budget is to

provide passengers with world-class customer service; operate a terminal that has

exceeded its optimal design capacity due to unprecedented growth; and maintain an

affordable cost structure (FY 2020 CPE is below budgeted FY 2019 levels). She thanked

her staff for their efforts in this process. The Aviation Authority received the

Distinguished Budget Award for 2019. She then shared the budget timeline that begins

in February and ends in September with the final adoption by the Aviation Authority

Board.

Ms. Sharman then reviewed the cost centers, budget-to-budget comparison (airfield cost

center and terminal cost center). She reiterated from Mr. Brown’s presentation the

rates and charges comparison. She then explained how the rates were calculated. The

CPE for Participating Airline for 2020 is $5.32 and in 2019, it was $6.40. The

preliminary FY 2020 is $593,549,000 with an adopted budget in FY 2019 of $566,910,000.

Page 22: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

DRAFT MINUTES OF THE AUGUST 28, 2019, MEETING OF THE GREATER ORLANDO AVIATION AUTHORITY

Page | 17

She restated from Mr. Brown’s presentation that MCO’s CPE is below the 25th percentile

for large hubs.

She talked about the FY 2020 preliminary budgeted revenues of $593,549,000. There is

an overall increase in revenue of $26.6 million due to terminal premises, landing

revenue, concessions, FIS facility fee, other buildings and grounds, ground

transportation, and non-operating revenue. As to the FY 2020 preliminary Operation and

Maintenance Fund it is at $350,280,000 with an overall increase of $23.2 million in

expenditures to include other professional services, management contracts, janitorial

services, maintenance contracts, insurance, utilities, general consultant/legal fees,

and miscellaneous other. The FY 2020 personnel requests total 46 new positions in

Administration, Operations and Facilities, and Safety and Security. Ms. Sharman then

displayed the community partnerships that includes the organization and benefit to the

Aviation Authority.

Ms. Sharman then presented the preliminary budget FY 2020 for Orlando Executive

Airport. She talked about the budget comparisons and FY 2020 revenue and expenses to

total $4,300,310.

Mr. Good left the room at 1:54 p.m.; returning at 1:55 p.m.

In summary, the total budget for Fiscal Year 2020 is $593,549,000 for MCO and

$4,300,310 for ORL. It was respectfully requested that the Aviation Authority Board

resolve to (1) adopt the attached resolution approving the preliminary budget; (2)

request Orlando City Council to conduct a public hearing on the preliminary budget

within ten days of receipt of the budget; and (3) authorize an Aviation Authority

Officer or the Chief Executive Officer to execute any necessary documents.

In response to Mayor Demings question about the budget approval process, Mr. Brown

responded that the Orlando City Council holds a public hearing on the budget because

it’s a statutory requirement (without any approval) and it returns to the Board for

final consideration in September.

Upon motion by Mayor Demings, second by Mr. Hunt, vote carried to approve the

recommended action.

GENERAL COUNSEL

6. Chairman Sanchez stated that he wanted to thank Mr. Marchena for his many

years of service at the Aviation Authority. His role as general counsel has been

critical to the many successes of the airport. His wisdom and selflessness have served

the community well, and his work and the legacy that he leaves behind will affect

hundreds of millions if not billions of passengers in the years to come. In 1st

Corinthians, Paul writes, “Though you have 10 thousand instructors you have not many

fathers.” Marcos, you have been such a father to this airport. So, from the bottom of

his heart, thank you for your services. Thank you for being a steady hand and a father

to this airport during the last two decades. With Mr. Marchena’s decision to retire

Page 23: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

DRAFT MINUTES OF THE AUGUST 28, 2019, MEETING OF THE GREATER ORLANDO AVIATION AUTHORITY

Page | 18

from his service here at the airport, it is important that we have a smooth transition

with thoughtfulness and intention.

The airport continues to break passenger records and grow in its complexities, which

makes the general counsel role of utmost importance. During the past few months, we

have listened to and observed questions about the general counsel role both from this

Board and from the community. I know that the Mayors and the rest of the Board want

nothing more than to run this airport as we always have, with the utmost integrity and

above reproach, which means that we must look at this position comprehensively.

I recommend that we appoint a transition team to give recommendations to this Board

regarding the position of general counsel. The transition team would evaluate the

reporting structure of this role and evaluate current best practices of the role,

including but not limited to procurement and concessions as well as how legal work is

issued, reported to the staff, and the Board. I would like a report with

recommendations to be presented to the Board by the November Board meeting. After much

thought, consideration and vetting, I would like to recommend the following transition

team: Former Florida Supreme Court Justice Jim Perry and Tara Tedrow, attorney and

partner at the Lowndes, Drosdick, Doster, Kantor & Reed PA (Lowndes Drosdick) firm.

Ms. Tedrow is currently adjunct professor at the University Of Florida Levin College Of

Law. In addition, Phil Brown and Mr. Randall Hunt, as board representative, would

serve on the committee. If approved, both Justice Perry and Ms. Tedrow would fill the

role of interim general counsel, effective today. Mr. Brown handed out an overview of

Justice Perry’s and Ms. Tedrow’s qualifications for the Board’s review.

I will entertain a motion to (a) to establish a transition committee comprised of

former Justice Jim Perry, attorney Tara Tedrow, Randall Hunt, and Phil Brown to provide

a report with recommendations on the structure of general counsel for the Aviation

Authority, as well as a review of procurement and concessions procedures as directed by

me, the Chairman, and (b) to authorize Justice Perry and Ms. Tedrow to serve as interim

Co General Counsel effective with an engagement letter for up to six months. Motion

was made by Mr. Hunt, seconded by Dr. Pirozzolo for discussion.

Mayor Demings asked if the individuals would serve separately from the law firms they

are associated with. Chairman Sanchez responded that it would be their law firms.

Mayor Demings’s follow question asked if these individuals and their law firms were

engaged in any contractual relationships with the airport. Chairman Sanchez stated

that he asked the same question. There is none with the individuals or law firms. Mr.

Marchena stated that to his knowledge they are not representing (the attorneys or law

firms) any party in any capacity dealing with the airport.

Mr. Martinez asked for clarification as to the purpose of this team. Chairman Sanchez

responded that they would come in as interim general counsel, look at best practices

for procurement and concession processes, they would bring recommendations on how and

Page 24: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

DRAFT MINUTES OF THE AUGUST 28, 2019, MEETING OF THE GREATER ORLANDO AVIATION AUTHORITY

Page | 19

to whom the new general counsel will report to. For example, they can recommend that

the general counsel report to the CEO or the Board. Also, whether it is an outside

counsel or an inhouse counsel. They will review all these and come up with best

practices with a recommendation to the Board. Mr. Martinez asked if the Chairman

looked at any other options. Mr. Martinez added that one option would be for a

Committee made up of Board members to look at this as a group. He followed up his

remarks by asking Chairman Sanchez how these lawyers and law firms were selected.

Following discussion, Vice Chairman Good stated that it sounds like the interim general

counsel goes out and does best practice, exactly what he (Vice Chairman Good)

suggested, come back with a recommendation, but it precedes actually making a decision.

In response to Vice Chairman Good’s follow-up question, Chairman Sanchez responded yes,

that the interim general counsel would run the RFP process and be part of the process

as well. He has spoken to Mr. Brown and Mr. Marchena about what it would look like.

Chairman Sanchez acknowledged that it would take time for them to understand what the

processes are; do not want to stop progression of the airport or business; which is a

critical thing. That might be the time to bring in McKinsey to review this information

as well. Vice Chairman Good stated that if they are our general counsel then how could

they sit on the RFP committee while possibly also being considered for the position.

Chairman Sanchez stated that they would not look at just one process. Vice Chairman

Good interrupted by saying then come back with a recommendation for law firm “A” or

come back with a recommendation to do an RFP for general counsel. Is it the actual RFP

process? Chairman Sanchez interjected that there would be no RFP process here so we

would ask them to come through with a procedure and a recommendation of what sort of

attorney we should be hiring (in house, 3rd party, general counsel, etc.) and let them

look at best practices across the board and return to us with a recommendation. At the

time of the recommendation, the Board can decide to release an RFP on whatever it looks

like. Vice Chairman Good said so it is not actually to look at an actual RFP but to

explore various different options of how we could mix and match or come up with a good

long-term solution. If the interim general counsel decides they want to be in the RFP

process then we can select an RFP committee later. Chairman Sanchez stated that Mr.

Hunt, if he agrees to participate, would have some input.

Mayor Dyer stated that he has known Justice Perry for 30 years so he has the highest

regard for him and likewise for Ms. (Tara) Tedrow but this is an agenda item that is

supposed to be discussing whether we have the position of Chief Legal Officer and

talking about hiring people but we do not have that on the agenda. The Mayor stated

that he feels more comfortable about discussing this at the next meeting. He thought

Mr. Marchena was staying until December. Vice Chairman Good responded, referencing to

Mr. Marchena’s email, is that he would like to focus on many other things; he is

welcome and available, but Mr. Marchena, not speaking for him, would prefer to be off

the dais continuing to do a lot of work for us when he is available as long as we like

it. I think we need him for a long time. Mr. Marchena responded that when he

submitted his letter giving his resignation effective the end of December, his thinking

was that the Board would go out and hire somebody to replace him in a short amount of

time. In having independent conversations with a couple of Board members, I think

Page 25: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

DRAFT MINUTES OF THE AUGUST 28, 2019, MEETING OF THE GREATER ORLANDO AVIATION AUTHORITY

Page | 20

there are questions among board members as to which path to take. Go in house or

continue to have outside law firm. It may take longer than to the end of December to

achieve that. Thus, the suggestion by Chairman Sanchez that perhaps the Board would

consider an interim (general counsel) for six months. That would give the Board

adequate time to do that. Mr. Marchena stated that he was available to stay but he

does not want anybody to think that he is trying to hang on. When the Board says he is

done, he is ready to be done. Vice Chairman Good said that he would continue his help.

He appreciates him volunteering.

Mayor Dyer stated that it is apparent that this has been talked about for some time

because the candidates, Perry and Tedrow are in the audience, but we ought to have an

agenda item that tells the public that we are about to hire some counsel to do this and

paying them money over the next six months. We do call this a walk on item. Does it

normally have to be an emergency do have a walk on item? He does not want to get in the

habit of voting on sole sourcing items without it being agendaed.

Vice Chairman Good responded that Mr. Marchena has served for the past 20+ years and

stability is a great thing. Therefore, it is very important to go through a real

process, the right process, to think about long term, the right way, to do this. I do

not think that is possible in a week, a month, or 2 months. So he can understand the

reasoning for getting an interim general counsel. He suggested an amendment to the

motion as follows (following discussion) he would like to discuss an amendment that

Nelson Mullins be retained as one of the 2 temporary general counsel with Lowndes

Drosdick with Justice Perry, as a consultant for Lowndes Drosdick, to work through this

process, with Justice Perry involved in the selection of the next selection, and that

both work together. Mr. Marchena stated that now there is a motion to amend the

motion. The discussion should be focused on the amendment. There will be a vote on

the motion to amend and if it does not pass, we are back on the original motion. If it

passes then you are back on the main motion as amended. Chairman Sanchez asked if

there was any discussion on the amended motion. Mayor Demings stated that he has

significant concerns about the process being used today in terms of how we are moving

forward. He mentioned that he has no significant information about either firm prior

to this meeting, Mr. Marchena’s law firm being sustained until the end of the year.

Somehow that is changing, the legal services contract will be substantial, we have not

had adequate deliberation here (at the board meeting) about the clause, scope of

contract, it sounds like we are making it up on the fly. He thinks that for a contract

this size, to him it is less than the caliber of work that the Board should be engaged

in. It almost suggests that there are other conversations that have occurred that may

be inappropriate to have because it is not the way he makes decisions. He likes full

information and he does not have that today, so he is not comfortable voting for either

one of the motions. He is not sure why we have retreated from the end of the year that

would have given us certain time to have the information and deliberation going forward

to make a significant and serious decision about general counsel and how it moves

forward in the future. He is hearing sprinkled into this some concern about the award

Page 26: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

DRAFT MINUTES OF THE AUGUST 28, 2019, MEETING OF THE GREATER ORLANDO AVIATION AUTHORITY

Page | 21

of previous contracts but yet we are suggesting here, without out any process, we will

take the word of an individual board member that this company is good or that company

is good and he does not think that is the appropriate process to be used. A more

definitive process should be used to move forward. Again, he is not comfortable voting

for either motion.

Discussion ensued. Chairman Sanchez stated that it was not his intention to bring it

on fast. His intention was to create some stability during this process. He has had

conversations with Mr. Marchena and Mr. Brown about his statement today. He has worked

hard on firms that would not have conflict within the airport, having heard concerns

from this Board, about the processes. He thinks it is important to have a Committee

that he trusts with reputations to maintain. His intent is to take time, have this

Committee in place, let them come back with recommendations of which the Board could

deny or approve. They are not the final dealmakers. The Board will make those

decisions. So this is an interim Committee to do good work for us and someone we can

refer to. In a few months, if not satisfied, we can kick them out and start over. He

is trying to create a process now with this Committee to stay above the grade and do

things correctly and bring us recommendations. That is the sole purpose of this.

Mayor Dyer responded that he would like these items to come back as agenda items on the

agenda that he can review. He sees it as two separate roles. One is to replace

Marchena and Graham and the second is if we want to have an in-house counsel versus an

outside counsel and those two roles do not have to be played by the same individual.

We could have an in-house counsel and then select the other role.

Mr. Martinez stated that he would like to postpone this until next month. There are 2

to 3 options – present scenario; do something else or have input from each board

member; plan of how we replace Mr. Marchena. Chairman Sanchez interjected stating that

as he mentioned previously. Mr. Martinez interrupted stating that it is not as if

these contracts have been voted by the Board. He suggested tabling all these motions,

wait a month, add any items that the Board members may have about replacing Mr.

Marchena, and then come back. Chairman Sanchez reiterated that this Committee would

only be temporary. It would not be a decision forever. It would be a transition

Committee that would give recommendations to the Board about how to move forward. Mr.

Martinez stated the Sunshine Law and that these things have come up fast. He would

love a month to think about it. Give them (Board) a chance to think about it before

moving forward. He would move to table these motions until next month in the event

there are other items the Board would like to add. Mr. Marchena stated that the motion

on the table would have to be considered. Chairman Sanchez clarified that there is a

motion and a second to table these items (to a specific date). Mr. Marchena looked to

see if the motion to table was debatable, which it was.

Page 27: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

DRAFT MINUTES OF THE AUGUST 28, 2019, MEETING OF THE GREATER ORLANDO AVIATION AUTHORITY

Page | 22

Following discussion, Vice Chairman Good stated that in three weeks he would not be

able to tell the Board about getting an in-house general counsel, a third party general

counsel, or what the criteria should be in getting a general counsel or whether it

should be some combination. He stated that they are all good ideas. He is just

starting to think about it. There are many examples out there. He does believe that

an interim general counsel is necessary before a decision is reached. Vice Chairman

Good stated that he could vote on an interim. Mayor Dyer interjected that we (the

Board) would be voting on whether to use this process or something else suggested by

the Board members. Not knowing of this conversation today, he has not given much

thought on the process. Chairman Sanchez confirmed that the motion on the floor was to

table the discussion. Roll call vote was requested. Chairman Sanchez – nay; Vice

Chairman Good – nay; Dr. Pirozzolo – nay; Mayor Dyer – yes; Mayor Demings – yes; Mr.

Hunt – nay; Mr. Martinez – yes. The Assistant Secretary confirmed that the nay’s have

the vote (failed 4 to 3).

Chairman Sanchez stated that the amended motion is to establish a transition committee

comprised of Nelson Mullins and Lowndes Drosdick with Justice Perry (part of the

Committee for best practices and search for general counsel), Randall Hunt, and Phil

Brown to provide a report with recommendations on the structure of General Counsel for

the Aviation Authority, as well as a review of procurement and concessions procedures

as directed by him as Chairman. Vice Chairman Good stated that Nelson Mullins has been

a law firm for a long time while Lowndes Drosdick adds many fresh ideas. Mr. Martinez

confirmed that the amended motion adds Nelson Mullins to the Committee. Vice Chairman

Good stated that there are two general counsels – Nelson Mullins and Lowndes Drosdick

with Justice Perry. Justice Perry will assist with the process of best practice. Mr.

Martinez suggested adding Justice Perry to general counsel. Vice Chairman Good stated

that three general counsels were not needed. It is a different role than an advisory

Committee that goes after best practices. Discussion ensued as to the difficulty of

getting Lowndes Drosdick to hire Justice Perry. Vice Chairman Good said it would be

recommended. Roll call vote was requested. Chairman Sanchez – yes; Vice Chairman Good

– yes; Dr. Pirozzolo – yes; Mayor Dyer – no; Mayor Demings – no; Mr. Hunt – yes; Mr.

Martinez – yes. The Assistant Secretary confirmed that the yay’s have the vote.

The original motion was considered as amended. Motion was made by Mr. Hunt, seconded

by Dr. Pirozzolo. Mayor Demings asked about at what point do you talk about the cost.

It is almost as if we are writing a blank check. What are the parameters if this

passes? Chairman Sanchez responded that it would be handled by Mr. Brown as far as

executing an agreement with the firms and the airport. He would have the authority to

fully negotiate the agreement with the law firms. Vice Chairman Good asked to make a

suggestion. The general counsel will report to the Board and asked if the Chairman

should not collaborate with the CEO. Chairman Sanchez responded in the positive. Vice

Chairman Good stated that one of the main efforts of general counsel is to advice the

Board. Mayor Demings asked if anything was going to be brought back to the Board.

Chairman Sanchez responded that the Board would be giving the CEO and Chairman

Page 28: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

DRAFT MINUTES OF THE AUGUST 28, 2019, MEETING OF THE GREATER ORLANDO AVIATION AUTHORITY

Page | 23

authorization to negotiate with the law firms. The contract will be returned to the

Board for ratification. Mayor Dyer stated that this recommendation is setting a lot of

precedence. We do not hire people without giving notice to the public of the hiring.

Mayor Demings added that it seems like the Board’s authority is being circumvented.

Chairman Sanchez stated that it was not his intent. His intent was to try to move

things forward the best way possible. Mayor Demings asked why then he would not return

it back to the Board. Chairman Sanchez stated that the intent was to try to create a

Committee so that it could be reported to the Board. We have to move forward with our

general counsel and progress as a Board. He has been a part of the Board for the past

7 years and would never try to circumvent anyone or anything, especially the processes

at the airport. We all have reputations to protect and we want to do the right thing

for the airport. Mayor Demings asked if in the past 7 years the Board voted on any

contracts that did not come before the Board in which the amount is undetermined.

Chairman Sanchez stated that it could be remedied by giving the CEO an up to number and

just cap it. If they (firms) are not willing to do it, then we do not move forward.

He appreciates the concern. A cap can be added on the rate paid to the law firms or a

cap on the use of the firms.

Vice Chairman Good asked about the process of ratification. He verbalized that the

Chairman would negotiate the agreement with Mr. Brown and then come back for approval

of the contract to the Board. Chairman Sanchez stated that they (he and CEO) would

sign the contract so we could move forward. Following discussion, Chairman Sanchez

stated that it would be up to Mr. Hunt (the maker of the motion) to amend the motion.

Mr. Hunt responded that he has been listening to the dialogue, appreciates the

comments, and the Chairman wanting to move forward. He is o.k. with the Chairman and

CEO handling the negotiations and contract. Vice Chairman Good interpreted what Mr.

Hunt was communicating and asked if Mr. Hunt was o.k. with the Chairman bringing the

contract back to the Board for a final vote. Mr. Hunt stated that it is the Chairman

and CEO doing everything. Mayor Demings interjected that there is a Board in this

process. It is just not the Chairman and Mr. Brown. There is a Board here that is

supposed to be engaged and exercise our due diligence and fiscal affairs of this

airport. What you are suggesting is to cut the Board out of the process.

Dr. Pirozzolo left the room at 2:47 p.m.; returning at 2:49 p.m.

Dr. Pirozzolo asked if the Board passed this motion today, in the future could board

members not bring up another motion to terminate the contract. Chairman Sanchez

responded in the positive and added that it was a six-month agreement. Vice Chairman

Good stated so that at six months the contract expires and there has to be an approval

to extend. He stated that he agreed with Mayor Dyer and Mayor Demings that we need to

have, there should be an up to (amount) or return with the final financial structure.

Mayor Dyer asked if the Board was voting on a rate or a flat fee. Chairman Sanchez

Page 29: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

DRAFT MINUTES OF THE AUGUST 28, 2019, MEETING OF THE GREATER ORLANDO AVIATION AUTHORITY

Page | 24

stated that we have a few choices. Either we can place a cap on an hourly rate for

these firms or the Board can give the Chairman and CEO the authority to negotiate a

rate with the firms and return to the Board for consideration.

An amended motion was made by Mr. Hunt for the transition committee’s agreement to

return to the Board for consideration at the September board meeting. It was seconded

by Dr. Pirozzolo. Mr. Marchena clarified that the consideration in September by the

Board was not a ratification but approval of the agreement so therefore it would not go

into effect until September. Vice Chairman Good stated that he was fine if it went

into effect with an hourly basis. Chairman Sanchez said that he thought Vice Chairman

Good was not o.k. with an hourly basis. Vice Chairman Good clarified that he has no

problem with an hourly basis because not much was going to be spent in the next few

weeks and if that helps things get started, he is fine. Chairman Sanchez suggested

moving forward with the transition committee. Vice Chairman Good interrupted and

stated that it would be best if they did not start work until the contract was signed

or approved. Chairman Sanchez called the vote and asked if everyone understood the

motion. He added that we would move forward with the transition committee, the law

firms (Nelson Mullins and Lowndes Drosdick with Justice Perry), give the Chairman and

CEO the authority to negotiate a contract, and return to the Board for full approval in

September.

Mayor Dyer advised that he would be voting against the motion but not based on

substance. He stated that the attorneys mentioned are qualified to do the work but the

procedure being used is unprecedented in the time that he has been on this Board and

the Chairman knows it with the time he has been on this Board. This did not have to be

done this way. It could have been discussed and voted on in 30 days (or less). This

is dangerous work right here. Chairman Sanchez responded that is why he was trying to

have the discussion now. The Chairman stated that we are under Sunshine Law and cannot

discuss it otherwise. Mayor Dyer reiterated that the Board is voting on

unnoted/unnoticed (publicly), walked on items. Mr. Martinez asked if we vote on the

amended motion nothing happens until the next Board meeting in which the Board ratifies

the negotiations handled by the Chairman and CEO. At that time, the Board can deny it

or move forward with it. Mr. Martinez clarified that the Board, today, is simplify

authorizing the Chairman and CEO to negotiate and return to the Board for

consideration. The Chairman responded in the positive. Upon the vote, Mayor Dyer and

Mayor Demings voted nay. Motion passed with Chairman Sanchez, Vice Chairman Good, Mr.

Hunt, Mr. Martinez, and Dr. Pirozzolo voting yay. Mr. Marchena clarified that he would

continue as general counsel until September. Chairman Sanchez confirmed.

While trying to adjourn the meeting, Mr. Brown reminded the Chairman that there were

items tabled for consideration.

Page 30: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

DRAFT MINUTES OF THE AUGUST 28, 2019, MEETING OF THE GREATER ORLANDO AVIATION AUTHORITY

Page | 25

Mr. Marchena stated that the Board needs to make a decision on Vice Chairman Good’s

recommendation regarding McKinsey and then the tabled items. Vice Chairman Good began

by stating that he is not sure McKinsey is sole source because there was a prolonged

process in selecting them. His recommendation is to amend their scope of work that

they are already doing now. An RFP process was conducted. Mayor Dyer said he would be

in favor of that, but he wants to see it on the agenda to understand how the contract

would be amended and the scope of work to be performed. Vice Chairman Good said he

would be willing to do the same kind of concept. He mentioned that he sent a proposal

to Mr. Brown a few weeks ago and then he sent the email on Sunday. Vice Chairman Good

made the motion to amend McKinsey ’s contract to expand their scope of work to add a

best practice study on procurement, concessions, and contracts. Sourcing of those

procurements (RFP and process). McKinsey will meet with staff, individual board

members, and compare how it is done elsewhere (Hong Kong, Atlanta) and here at MCO.

Other staff and Board members may have other ideas. Vice Chairman Good stated that

they do this at his company (JLL) and Disney does it as well. Mayor Dyer suggested

that a board agenda item be presented for the Board’s consideration at the next

meeting. Vice Chairman Good responded about best practices and that someone has to

manage the consultants and he believes that a Board member should manage the process.

He is happy to be that Board member. He is happy if another Board member wants to do

it. He has the time to dedicate 20 hours a week to work with McKinsey to ensure they

are staying focused. No matter how you design the scope, it will be defined by their

work. He told the McKinsey folks that he does not want a report to come out that says,

for instance, your Uber lanes are messed up and it is hard for people to get their

bags. We know that. We want to get the best product and best possible production from

them. That will take a Board member leading that. He puts himself up as a volunteer.

For the record, Chairman Sanchez restated the motion: to amend McKinsey ’s contract.

Mayor Dyer asked if cost was discussed. Vice Chairman Good responded that the last

scope of work approved was $295,000. This will be approximately $250,000 each for

three concepts. Mayor Dyer said that he does not have a problem with it but it is

verbal. Vice Chairman Good asked what Mayor Dyer wanted done. Mayor Dyer responded

that he would like it written up as an agenda item, so that it is made public, the

Board will know what exactly they are voting on, with all the details. Vice Chairman

Good mentioned the email sent out. Mayor Dyer responded that it was not an agenda

item. Vice Chairman Good then questioned how the item for the attorney came up. Mayor

Dyer stated that is why he voted against that too. Mr. Martinez asked if the Board

could vote on it in principal and then have an item on the agenda at the next meeting

with specifics as requested by Mayor Dyer (cost, scope, etc.) Vice Chairman Good said

that he sent out the proposal weeks ago. Discussion ensued. Mr. Martinez seconded the

motion to negotiate with McKinsey and return to the Board with an agreement for

consideration. Mayor Dyer and Mayor Demings voted nay. Voting yes was Chairman

Sanchez, Vice Chairman Good, Mr. Hunt, Mr. Martinez, and Dr. Pirozzolo.

Vice Chairman Good asked that the items be tabled until the next board meeting. He

said he could talk to McKinsey or whoever about how mission critical these five items

are. Vice Chairman Good reiterated to Chairman Sanchez that he wanted to table B, L,

OO, QQ, and TT. Chairman Sanchez stated that he would not be supporting the motion.

He is o.k. with the other items but not the mission critical items as reviewed by Mr.

Page 31: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

DRAFT MINUTES OF THE AUGUST 28, 2019, MEETING OF THE GREATER ORLANDO AVIATION AUTHORITY

Page | 26

Brown. Discussion ensued as to the motion. Mr. Martinez seconded the motion for

discussion. Mr. Martinez stated that if they are mission critical issues then explain

why. Chairman Sanchez stated that Mr. Brown spelled out the items there were mission

critical (L, OO, and TT). Dr. Pirozzolo stated that Vice Chairman Good wanted to vote

on these in a few weeks after the McKinsey report. Is it his understanding that a full

report on processes by then. Vice Chairman Good corrected Dr. Pirozzolo by stating

that we may decide in 3 weeks to table these until the McKinsey report is done. Vice

Chairman Good clarified that his motion was to table these items for 3 weeks. His

motion does not include what to do after that. His thought was that McKinsey would

pass today, the process could begin, and these items could be vetted in a couple of

weeks. Chairman Sanchez reiterated that he would not support a motion that stalls the

mission critical items. Mr. Martinez asked if 3 weeks was mission critical. Mr. Brown

responded in the positive. Mr. Brown added that he tried to state as clearly as he can

on the Hensel Phelps amendment that it is part of an ongoing construction process

related to the South Terminal. We delay action on that we will be subject to claims

for delays. Mr. Hunt asked why Vice Chairman Good wants to table the mission critical

items. Vice Chairman Good responded that he did not believe 3 weeks makes a

difference. Following discussion, Mr. Brown clarified that two items he felt were not

mission critical – B and QQ – and restated why they were not mission critical. Vice

Chairman Good amended his motion to table Items B and QQ until the case study is

complete with McKinsey . Chairman Sanchez reiterated that he would not support the

motion. Vice Chairman Good said he has studied the items and does not believe they are

mission critical. The motion on the floor is to table Item B and QQ. The motion

failed 5 to 2. Voting nay was Chairman Sanchez, Mayor Dyer, Mayor Demings, Mr. Hunt,

and Dr. Pirozzolo. Mr. Marchena then stated that now the Board is looking for a motion

to approve those items. Upon motion by Dr. Pirozzolo, second by Chairman Sanchez, vote

carried to approve Items B and QQ.

In closing, Mr. Brown mentioned upcoming Hurricane Dorian.

ADJOURNMENT

7. There being no further business to be considered, Chairman Sanchez

adjourned the meeting at 3:01 p.m.

(Digitally signed on)

_______________________________ ____________________________________

Dayci S. Burnette-Snyder Phillip N. Brown, A.A.E.

Director of Board Services Chief Executive Officer

Page 32: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

CONSENT AGENDA ITEM - A -

GREATER ORLANDO AVIATION AUTHORITY ________________________________________________________________

Orlando International Airport One Jeff Fuqua Boulevard

Orlando, Florida 32827-4399

MEMORANDUM

TO: Members of the Aviation Authority

FROM: Dayci S. Burnette-Snyder, Director of Board Services

DATE: September 18, 2019

ITEM DESCRIPTION

Recommendation to Accept Aviation Authority Committee Minutes

BACKGROUND

The following Aviation Authority Committee meeting minutes are provided in conjunction with the agenda package for the board meeting:

1. August 5, 2019, Concessions/Procurement Committee2. May 21 and May 28, 2019, Construction Committee3. July 23, 2019, Design Review Committee4. July 23, July 30, August 6 and August 13, 2019, Professional Services Committee

The minute’s package is provided under separate cover on our website at: www.orlandoairports.net

RECOMMENDED ACTION

It is respectfully requested that the Aviation Authority Board resolve to accept these minutes for filing.

Page 33: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

CONSENT AGENDA ITEM – B –

GREATER ORLANDO AVIATION AUTHORITY

Orlando International Airport One Jeff Fuqua Boulevard

Orlando, Florida 32827-4392

MEMORANDUM

TO: Members of the Aviation Authority

FROM: Kathleen M. Sharman, Chief Financial Officer

DATE: September 18, 2019

ITEM DESCRIPTION

Recommendation for Final Adoption of the Fiscal Year 2019-2020 Aviation Authority Budget

BACKGROUND

The Aviation Authority has prepared a Fiscal Year 2019-2020 budget for Orlando International Airport (MCO) and Orlando Executive Airport (ORL).

As required by the Aviation Authority’s Enabling Act, Orlando City Council held a public hearing on September 16, 2019, on the Aviation Authority’s budget. A copy of the budget will be provided to the Board under separate cover.

ISSUES

The attached Resolution to adopt the final budget for the Fiscal Year beginning October 1, 2019, and ending September 30, 2020, requires Board approval.

ALTERNATIVES

There are no alternatives under consideration.

FISCAL IMPACT

The total budget for Fiscal Year 2019-2020 is $593,549,000 for MCO and $4,300,310 for ORL.

RECOMMENDED ACTION

It is respectfully requested that the Aviation Authority Board resolve to accept the recommendation to: (1) approve the Resolution to adopt the Aviation Authority Budget for Fiscal Year 2020 and (2) authorize the Chairman and Assistant Secretary to execute the Resolution.

Page 34: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

RESOLUTION BY THE GREATER ORLANDO AVIATION AUTHORITY CONCERNING THE

AUTHORITY'S 2019-2020 FISCAL YEAR BUDGET

WHEREAS, the City of Orlando, Florida (the "City") a municipal corporation in the

County of Orange, State of Florida, owns the Orlando International Airport and Orlando

Executive Airport (the "Airports"); and

WHEREAS, the Greater Orlando Aviation Authority (the "Authority"), pursuant to

Chapter 57-1658, Special Laws of Florida 1957, as codified and amended, The Greater

Orlando Aviation Authority Act (the “Act”) was created and established to exercise those

powers granted under the Act; and

WHEREAS, the City, pursuant to the Act and Operation and Use Agreement with the

Authority dated September 27, 1976, as amended and restated effective October 1, 2015,

transferred custody, control and management of the Airports to the Authority; and

WHEREAS, the Authority, at its meeting of August 28, 2019, considered the matter

of its proposed 2019-2020 Fiscal Year Budget; and

WHEREAS, the City Council of the City of Orlando as requested, within ten (10)

days of its receipt of the proposed Budget, conducted a public hearing on September 16,

2019, with respect thereto.

NOW, THEREFORE, BE IT RESOLVED BY THE GREATER ORLANDO AVIATION AUTHORITY:

1. That the proposed annual Budget for the fiscal year beginning October 1,

2019, and ending September 30, 2020 is necessary to provide for anticipated expenditures

of the Authority for all of its projects during the ensuing fiscal year, including

operating expenses, capital outlays, materials, labor, equipment, supplies, payments of

principal and interest on all outstanding revenue bonds and subordinated indebtedness

of the Authority, and sinking fund and reserve requirements of such bonds and other

subordinated indebtedness; and represents the judgment and intent of the Authority as

to the needs of its Departments as to their fiscal requirements for the ensuing fiscal

year.

2. That such proposed Budget provides for expenditures only to the extent of

funds legally available to the Authority for the ensuing fiscal year from established

sources, based upon past experience and reasonable projections thereof, and from new

projects or new sources of income of the Authority.

3. That said proposed annual Budget, attached hereto and made part hereof, is

hereby adopted and submitted to the City Council of the City of Orlando, Florida.

4. That a copy of the proposed Budget be filed in the Authority's documentary

files.

BE IT FURTHER RESOLVED that funds in the Budget for the fiscal year ended September

30, 2019, which have been encumbered prior to that date as a result of purchase orders

issued by the Greater Orlando Aviation Authority, are hereby reappropriated as part of

the Budget for the fiscal year commencing October 1, 2019.

Page 35: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

BE IT FURTHER RESOLVED that this resolution shall be effective immediately upon

its adoption.

PASSED AND ADOPTED this 18th day of September 2019.

GREATER ORLANDO AVIATION AUTHORITY ________________________ Domingo Sanchez, Chairman ATTEST: ___________________________________ Dayci Burnette-Snyder, Assistant Secretary

Page 36: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

Greater Orlando Aviation Authority Orlando International Airport

& Orlando Executive Airport

Adopted Budgets Fiscal Year 2019-2020

Greater Orlando Aviation Authority

Orlando, Florida

Page 37: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

GREATER ORLANDO AVIATION AUTHORITYORLANDO INTERNATIONAL AIRPORT

FISCAL BUDGET2019-2020

Budget Budget2020 2019

ANTICIPATED REVENUE

Airline Rentals, Fees and Charges 229,625,081$ 218,428,000$ Nonairline Revenues 354,748,328 341,047,000Interest Revenue 9,175,591 7,435,000

Total Revenue 593,549,000$ 566,910,000$

LESS AIRPORT EXCLUSIVE REVENUE

Rail Station Building Revenue (4,071,036) (4,071,000)

Net Anticipated Revenue 589,477,964$ 562,839,000$

APPROPRIATIONS

2009 Debt Service Fund 2,486,450$ 17,974,000$ 2010 Debt Service Fund 5,774,682 5,776,000 2011 Debt Service Fund 39,363,774 39,365,000 2012 Debt Service Fund 1,853,250 1,853,000 2013 Debt Service Fund 4,293,800 4,295,000 2015 Debt Service Fund 13,952,000 13,948,0002016 Debt Service Fund 20,960,671 46,785,000 2016 Subordinated Debt Service 10,049,885 7,555,000 Available PFC Revenues (30,930,633) (30,934,000) Operation and Maintenance Fund 350,279,960 327,074,000Operating Reserve Fund 3,867,708 3,430,000

Total Appropriations 421,951,547$ 437,121,000$

Remaining Revenues 167,526,417$ 125,718,000$

Page 38: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

GREATER ORLANDO AVIATION AUTHORITY

ORLANDO INTERNATIONAL AIRPORT

SUMMARY OF CAPITAL FUND REQUESTS

FISCAL YEAR 2019-2020

Page # Section Description Amount Fund - Component

234 Parking Revenue Control System 895,000$ 305‐501290

261 Deferred Structural Maintenance for MRO Hangar Bldg #407 3,175,990 305‐501434

261 Deferred Structural Maintenance for Catering Buildings 1,000,000 305‐501435

311 Air Service Incentive Plan (Marketing) 500,000 305‐501141311 Air Service Incentive Plan (Credits) 1,500,000 305‐501142

631 North Park Place Lighting Pole Replacements 513,900 305‐501446631 Joint Replacement 360,000 305‐501449

711 East Airfield Land Planning & Management 3,000,000 305‐501129

Grand Total  for Fund 305  10,944,890$

111 Furniture, Fixtures, and Equipment for Authority Departments 185,000$ 308‐501074

111 Facility Improvements 6,095,046 308‐501393

311 Redesign/Redevelopment of GOAA's Web Site 250,000 308‐501436

413 Passenger Boarding Bridges & BHS Equipment & PC Air Replacements 3,550,000 308‐501100

413 Terminal FIDS Replacement 1,050,000 308‐501437

415 ARFF Capital Items 45,000 308‐501081

415 ARFF Centerfield Remodel 125,000 308‐501394

415 ARFF Emergency Alert System 200,000 308‐501438

521 PC, Peripheral, and Software R&R 300,000 308‐500801

521 Systems/Server Expansion 70,000 308‐501018

521 Avaya Gateways Replacements 950,000 308‐501239

521 UPS Refresh & Replace 70,000 308‐501243

521 Avaya Aura Application/VMWare vSphere Upgrade 350,000 308‐501402

521 Network Expansion 100,000 308‐501404

521 Access Control Upgrade 500,000 308‐501439

521 Common Use Passenger Processing System 1,225,000 308‐501440

521 Comm Room Security 1,100,000 308‐501441

521 Additional IDS/IPS Sensors 30,000 308‐501442

521 Cable Management System 245,000 308‐501443

521 Desktop Notebooks for additional GOAA staff 150,000 308‐501444

631 Maintenance Tools and Equipment 100,000 308‐501025

631 Vehicles, Rolling Stock 4,775,000 308‐501027

631 Passenger Seating in Terminal 1,000,000 308‐501122

631 Flooring & Interior Finishes and Attic Stock 1,400,000 308‐501132

631 Airfield Pavement 200,000 308‐501224

631 Emergency Roof Repairs 200,000 308‐501246

631 Main Terminal Fire Sprinkler System 300,000 308‐501385

631 Airsides 1, 2, 3, & 4 Apron Rehabilitation 1,000,000 308‐501424

631 Sanitary and Storm Pipe Sanitation 1,200,000 308‐501445

631 Upgrade Paging System 2,056,300 308‐501447

631 Security Fencing for SAPM Security Improvements 213,000 308‐501448631 Airfield Single Mode Fiber Conversion 1,344,000 308‐501450

631 Landside West Side APM Station Ceiling Renovations/Rehabilitation 1,000,000 308‐501451

631 Replacement Light-Medium Trucks 320,000 308‐501452

711 Environmental Consulting Services 500,000 308‐501157

711 GASB 49 Environmental 500,000 308‐501159

711 Revolving Fund for Planning, Engineering, and Construction 200,000 308‐501163

Page 39: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

GREATER ORLANDO AVIATION AUTHORITY

ORLANDO INTERNATIONAL AIRPORT

SUMMARY OF CAPITAL FUND REQUESTS

FISCAL YEAR 2019-2020

Page # Section Description Amount Fund - Component

711 MCO Long Term Planning 250,000 308‐501408

711 Miscellaneous Signage Improvements 500,000 308‐501453

711 MCO Campus Stormwater Management & Restoration 2,000,000 308‐501454

Grand Total  for Fund 308  35,648,346$

111 STC Fund 3,796,539 310‐501433

463 Checkpoint Charlie Relocation Support Equipment 1,000,000 310‐501480

631 AS2 and 4 APM 8,000,000 310‐501481

711 East Airfield Taxiway Rebahilitation and Related Work 40,000 310‐501046

711 BP-00486, MCO Runway 18L-36R Rehabilitation and Related Work (Constr 925,578 310‐501374

711 Airfield Pavement Study 500,000 310‐501482711 Master Stormwater Planning 500,000 310‐501483

Grand Total for Fund 310 ‐ CIP  14,762,117$

991 Hotel Capital 6,408,764$ 311‐XXXXXX

Prior Year Funding  (2,000)

Grand Total  for Fund 311 ‐ Hotel 6,406,764$

Transfer to Fund 308 from Fund 401 for Environmental & Other Misc 1,200,000$

Transfer from Fund 401 from Fund 308 Previously Approved Projects (1,200,000)$

Capital Request Total   67,764,117$              

Prior Year Funding  (2,000)                        

Grand Total  67,762,117$              

Capital Items are Subject to Available Funding

Page 40: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

GREATER ORLANDO AVIATION AUTHORITY

ORLANDO INTERNATIONAL AIRPORT

HOTEL CAPITAL FUND REQUESTS

FISCAL YEAR 2019-2020

Page # Description Amount

991 Hotel General Use PC Workstations 66,510$ 991 Hotel Lease Agreements 35,000 991 Hotel Kitchen Equipment 54,521 991 Hotel Stewarding Rolling Stock 58,000 991 Hotel Furniture and Equipment Contingency 20,000 991 Hotel Digital Radio Equip./Repeaters 20,600 991 Hotel Network Laser Printer Replacement 6,750 991 Hotel Server Replacement 9,300 991 Hotel LED Lighting Replacements 10,000 991 Hotel Banquet Equipment 95,500 991 Hotel Housekeeping Equipment 21,300 991 Hotel Water Washer Recovery System 150,000 991 Hotel Uniform Conveyor System 103,000 991 Hotel Bell Carts 22,000 991 Hotel HotSOS Device Replacement 2,100 991 Hotel Fire Alarm System Upgrade/ Improvements 2,850,000 991 Hotel Motor Court Awning Replacement 200,000 991 Hotel Pool Restrooms 175,082 991 Hotel McCoy's Restaurant 127,299 991 Hotel Hot Water Storage Tanks Replacement 1st Floor 121,500 991 Hotel Associates Locker Room Upgrade 29,500 991 Hotel CCTV Project 21,000 991 Hotel PBX Office Furniture 11,800 991 Hotel Guest Elevator Rope Lighting 6,600 991 Hotel Refinishing Elevator Doors 20,000 991 Hotel Banquet Display 55,000 991 Hotel Hemisphere Equipment 38,000 991 Hotel Exterior Planter Box Plumbing Removal 25,000 991 Hotel Motor Court Upgrades 110,000 991 Hotel POS System Replacement 90,600 991 Hotel Cafeteria Furniture & Equipment 11,250 991 Hotel 4th Floor Boardrooms 6,156 991 Hotel 9th Floor Boardrooms 3,696 991 Hotel Heavy Duty Wet/Dry Vacuum 4,600 991 Hotel Wood Platform Trucks 2,000 991 Hotel Laundry Trucks 4,000 991 Hotel McCoy's Furniture & Equipment 10,550 991 Hotel Ice Machine 10,550 991 Hotel Lobby Renovation 1,800,000

Subtotal 6,408,764$ Prior year funding (2,000)

Grand Total 6,406,764$ Capital items are subject to available funding

Section

Page 41: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

Budget Budget2020 2019

ANTICIPATED REVENUEAviation Related 944,989$       835,484$     

Commercial Properties 2,781,450     2,550,390    

Other Revenue 327,561 171,758

Total Anticipated Revenue 4,054,000 3,557,632

Contribution from OEA Revenue Fund 246,310 233,548

Total Deposits 4,300,310$    3,791,180$  

APPROPRIATIONSOperations & Facilities 1,591,930     1,445,970    

Safety & Security 1,189,090     1,160,750    

Administration 645,460        600,200       

Other Expenses 403,830        384,260       

Total Appropriations Before Capital 3,830,310     3,591,180    

Capital Outlay and Improvements 470,000        200,000       

Total Appropriations 4,300,310$    3,791,180$  

GREATER ORLANDO AVIATION AUTHORITY

ORLANDO EXECUTIVE AIRPORT

FISCAL BUDGET

2019-2020

Page 42: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

Page # Description Amount

443 OEA Facilities OEA Rehabilitation of Twys G, K and F Lighting 20,000$ 443 OEA Facilities Airfield Rehabilitation 50,000 443 OEA Facilities OEA Capital Items 20,000 443 OEA Facilities CCTV Camera System Replace and Upgrade 60,000 443 OEA Facilities ORL Drainage Atlas Update 120,000 443 OEA Facilities ORL Exhibit A Property Map 50,000 443 OEA Facilities ORL Land and Transportation Planning 25,000 443 OEA Facilities Access Control and gate card reader 80,000 443 OEA Facilities Light Vehicle Replacement - Electricians Utility Truck 45,000

Grand Total  470,000$

Capital Items are Subject to Available Funding

GREATER ORLANDO AVIATION AUTHORITY

ORLANDO EXECUTIVE AIRPORT

Section

CAPITAL FUND REQUESTS

FISCAL YEAR 2019-2020

Page 43: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

CONSENT AGENDA ITEM – C –

GREATER ORLANDO AVIATION AUTHORITY

Orlando International Airport

One Jeff Fuqua Boulevard Orlando, Florida 32827-4392

MEMORANDUM TO: Members of the Aviation Authority FROM: Phillip N. Brown, Chief Executive Officer DATE: September 18, 2019 ITEM DESCRIPTION Recommendation to Approve Revisions to Organizational Policy, Section 120.091, Construction Finance Oversight Committee BACKGROUND The Construction Finance Oversight Committee monitors budgets for construction projects, reviewing and approving the funding plan for major projects with project cost of $250,000 or more. ISSUES The current membership includes the Deputy Executive Director – Business Services and Facilities, which is a title and position no longer in use since June 2015. The remaining four (4) voting members have been sufficient to conduct business since June 2015. Therefore, this voting position is recommended for deletion without a replacement. In addition, the title of Executive Director has been changed to Chief Executive Officer throughout the policy. ALTERNATIVES None. FISCAL IMPACT None. RECOMMENDED ACTION It is respectfully requested that the Aviation Authority Board accept the recommended change to the voting membership of the Construction Finance Oversight Committee, Organizational Policy, Section 120.091.

Page 44: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

Organizational Policy: Section 120.091 Construction Finance Oversight Committee Administration

GREATER ORLANDO AVIATION AUTHORITY September 20, 2017 POLICY AND PROCEDURE MANUAL Page 1 of 2

OBJECTIVE The Construction Finance Oversight Committee will provide

assurance to the Greater Orlando Aviation Authority, its Chairman, and its Chief Executive DirectorOfficer that construction projects can be accomplished within the proposed funding plan. The Committee is authorized to draw upon and utilize any Aviation Authority staff and any consultants required to accomplish its purpose.

COMPOSITION The Construction Finance Oversight Committee is composed of

the following voting members:

• Chief Financial Officer, Chair • Senior Director of Planning, Engineering, and

Construction, • Chief Operating Officer, and

• Chief Information Officer, and • Deputy Executive Director – Business Services and

Facilities Serving in an advisory capacity as non-voting members are:

• Legal Counsel, • General Consultant, and • Construction Finance Consultant

Procedure A. The Committee shall have a quorum requirement of at least a

majority of its members and can give its ratification of proposed funding plans only with the unanimous consent of all Committee members in attendance.

B. The Committee will review and approve the funding plan for

major projects (total project cost of $250,000 or more), including projects identified by the Capital Management Committee or on the Capital Improvement Program (CIP), presented in Project Start-up Packages or other appropriate formats to ensure the scope of the work is consistent with the requirements of the proposed fund source(s), and that there is sufficient balance available in each fund to meet the project

Page 45: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

Section 120.091 Organizational Policy: Administration Construction Finance Oversight Committee

September 20, 2017 GREATER ORLANDO AVIATION AUTHORITY Page 2 of 2 POLICY AND PROCEDURE MANUAL

requirements, considering all known future uses of the fund source(s) in question. This ratification can be granted following the initiation of the project at the next Committee meeting following such project initiation.

C. The Committee shall review and approve additional funding

requests for projects that require additional funds for completion. Additional funding requests shall be submitted to the Capital Management Committee for approval, and then to the Aviation Authority Board and/or City Council approvals must be obtained as specified by Authority Policy and Procedure.

D. The Committee will monitor the status of each major capital

fund and report on a monthly basis the total approved fund, the approved commitments against each fund, the anticipated uses of available fund balance, the expenditures to date, and the forecast available balance or shortfall. Such reporting shall be made to the Capital Management Committee for review prior to submission of any report to the Aviation Authority Board. Interest earnings as well as potential claims or penalties should be considered.

E. The Chief Executive DirectorOfficer is authorized to make

changes to committee memberships on an interim basis with ratification required by the Aviation Authority Board at its next regularly scheduled meeting.

Notice

In compliance with Florida Statutes governing public meetings, Committee meetings will be open to the public, reasonable notice will be given, and minutes will be taken.

Meetings The Committee will meet monthly providing there is a need for

action on project funding requirements. See Also Section 120.13, Capital Management Committee APPROVAL AND UPDATE HISTORY

Last Approval Authority Board: September 20, 2017

Executive Director: June 23, 2014 Supersedes All Previous

Page 46: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

CONSENT AGENDA ITEM – D -

GREATER ORLANDO AVIATION AUTHORITY

______________________________________________________________________________________ Orlando International Airport

One Jeff Fuqua Boulevard Orlando, Florida 32827-4392

MEMORANDUM TO: Members of the Aviation Authority FROM: Raymond D. Anderson, Esq., Chairman, Concessions/Procurement Committee DATE: September 18, 2019 ITEM DESCRIPTION Recommendation of the Concessions/Procurement Committee to Authorize Two Single Source Procurement Requests to Avaya, Inc. for Gateways, Licenses, Telephones and Associated Professional Services for Phases Two and Three of the Telephone System Technology Migration Project BACKGROUND The Telephone System Technology Migration Project (Project) replaces end-of-life (EOL) equipment and software with the most up-to-date supported versions. This Project has three phases. Phase One included the installation of the new Avaya telephonic equipment in a geographically redundant configuration to replace EOL equipment and software used to provide telephone service to 800 Aviation Authority users. The second phase of the Project will include new Avaya equipment, software and services to provide telephone services to airlines, airport tenants and public areas. The third phase of the Project will replace the existing telephone handsets with new Avaya handsets. On June 1, 2014, Avaya was awarded an Alternate Contract Source by the National Association of State Procurement Officials (NASPO). On April 30, 2019, the State of Florida entered into an agreement with NASPO for the purposes of utilizing the prices, terms and conditions under the Alternate Contract Source. The Aviation Authority’s Policy No. 450.03, Government Contract/Annual Contract, permits the procurement of items from a supplier based on a requirements contract/annual agreement with any public entity. On February 17, 2016, the Aviation Authority Board approved a Single Source Procurement with Avaya for services for Phase One of the Project for Aviation Authority users in the amount of $277,814.67. At the same meeting, the Aviation Authority approved the purchase of the hardware, software and support from Avaya for Phase One under Request for Written Quotation No. 92160-16, in the amount of $590,349.09. Subsequently, the first phase of the Project is nearing completion. On August 28, 2019, the Aviation Authority approved a Single Source Procurement with Avaya pursuant to the State of Florida Alternate Contract Source No. 43220000-WSCA-14-ACS, as the provider of equipment, maintenance and support for the Aviation Authority’s existing communications system. ISSUES Avaya is currently the maintenance and support provider for the Aviation Authority’s Avaya Communications System. Avaya is currently offering a “Loyalty2gether” program (Loyalty Program) to encourage organizations with EOL systems to upgrade sooner at discounted prices. Hardware, licenses and professional services are discounted within

Page 47: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

this program. Phases Two and Three of the Project need to be implemented to provide telephone service to the airlines, airport tenants and the public. Under the Loyalty Program program, the Aviation Authority has the ability to complete Phases Two and Three of the Project at approximately 50% less than the original estimated cost. Phases Two and Three of the Project will require the purchase of equipment and services, including the purchase of gateways, licenses and telephones, in the amount of $660,913.29. In addition, professional services associated with the installation are required in the amount of $239,082.12. Bringing in a new service provider or a substitute product to complete the Project would require a significant learning curve and is estimated at twice the cost. As a result, on August 19, 2019, the Concessions/Procurement Committee approved Staff’s recommendation for two Single Source Procurement requests to Avaya, Inc. for the purchase of gateways, licenses and telephones, and the associated professional services, for Phases Two and Three of the Project in the total amount of $899,995.41. ALTERNATIVES There are no alternatives under consideration. FISCAL IMPACT Avaya Inc.’s proposal in the amount of $899,995.41 is to be funded from the Capital Expenditure Fund. Funds expected to be spent in the current fiscal year are within budget. Funding required in subsequent fiscal years will be allocated as approved through the budget process and when funds become available. RECOMMENDED ACTION It is respectfully requested that the Aviation Authority Board resolve to approve the Concessions/Procurement Committee recommendation to (1) approve the Single Source Procurement for the purchase of gateways, licenses, telephones and associated professional services for Phases Two and Three of the Technology Migration Project with Avaya, Inc. in the total amount of $899,995.41; (2) authorize funding from the previously-approved Capital Expenditure Fund; and (3) authorize an Aviation Authority Officer or the Chief Executive Officer to execute the appropriate agreements following satisfactory review by legal counsel.

Page 48: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

CONSENT AGENDA ITEM – E -

GREATER ORLANDO AVIATION AUTHORITY

Orlando International Airport

One Jeff Fuqua Boulevard Orlando, Florida 32827-4399

MEMORANDUM TO: Members of the Aviation Authority FROM: Phillip N. Brown, Chief Executive Officer DATE: September 18, 2019 ITEM DESCRIPTION Recommendation to Ratify Declaration of Emergency During Hurricane Dorian BACKGROUND In accordance with the Aviation Authority’s Bylaws, Section 101.01, I declared a state of emergency on Tuesday, September 3, 2019, at Orlando International Airport and Orlando Executive Airport in preparation for any damages experienced at either facilities as a result of Hurricane Dorian. As required by policy, I received concurrence from the Chairman of the Aviation Authority Board, Domingo Sanchez. ISSUES A declaration of a state of emergency was necessary so that we could immediately engage contractors, consultants, and vendors to initiate emergency repairs to building roofs, enclosures, equipment, and other airport systems to restore airport operations. ALTERNATIVES None. FISCAL IMPACT No fiscal impact related to the approval of this declaration. RECOMMENDED ACTION It is respectfully requested that the Aviation Authority Board resolve to approve the ratification of the Chief Executive Officer’s declaration of a state of emergency for Hurricane Dorian.

Page 49: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

CONSENT AGENDA ITEM – F –

GREATER ORLANDO AVIATION AUTHORITY

Orlando International Airport

One Jeff Fuqua Boulevard Orlando, Florida 32827-4392

MEMORANDUM TO: Members of the Aviation Authority FROM: Raymond D. Anderson, Esq., Senior Director, Concessions and Commercial Properties DATE: September 18, 2019 ITEM DESCRIPTION Recommendation to Approve a New Lease Agreement with Sky Chefs, Inc. at Orlando International Airport BACKGROUND The Greater Orlando Aviation Authority (Aviation Authority) and Sky Chefs, Inc., as successor in interest to Marriott Corporation and Caterair Holding Corporation (Sky Chefs) are parties to that certain Lease Agreement, dated August 24, 1987, (Lease Agreement), which Lease Agreement expired on May 18, 2018. The demised premises under the Lease Agreement included 4.59 acres of land, which land was used for the construction, operation and maintenance of inflight and off-airport catering. The minimum annual rent for all Premises under the Lease Agreement was 12% of the appraised fair market value, adjusted on each fifth anniversary throughout the term of the Lease Agreement, which adjustments were capped at 25% each. In addition to the minimum annual rent, privilege fees for the right to do business at the Airport were assessed at 5% of Gross Receipts for in-flight catering and 2% of Gross Receipts for off-airport catering. Ownership of the improvements constructed on the land including approximately 71,203 square feet of building improvements and 107,855 square feet of vehicle parking, converted to the Aviation Authority upon the expiration of the Lease Agreement. Sky Chefs has continued to occupy the Premises following the conversion of ownership of the improvements and has continued to pay the appraised fair market value for the land and all improvements (Premises), plus the privilege fees. ISSUES Sky Chefs has requested to enter into a new lease agreement for the Premises, plus an additional 3.45 acres of adjoining land for vehicle parking, with an initial ten-year term and one five-year renewal term (New Lease Agreement). Sky Chefs has proposed to assume the maintenance and repair of all improvements, including all facility infrastructure. The minimum annual rent for the Expanded Premises is proposed to be set at the appraised fair market rental value for the land and all improvements, adjusted on each fifth anniversary throughout the term of the New Lease Agreement. The appraised fair market rental value obtained by Staff based on an absolute triple net lease is $0.70/SF per year for land, $5.80/SF per year for the building improvements and $0.05/SF per year for vehicle parking. In addition to the minimum annual rent, Sky Chefs is currently assessed 5% of Gross Receipts on-airport and 2% of Gross Receipts off-airport. The average privilege fees at comparable airports is 7% of Gross Receipts on-airport and 5% to 6% of Gross Receipts off-airport. The proposed privilege fees are 5% of Gross Receipts in Year 1, 5.5% in Year 2, 6% in Year 3, 6.5% in Year 4 and 7% thereafter, and 2% of Gross Receipts for off-airport catering. In that regard, Sky Chefs has requested the right to terminate the New Lease Agreement in the event of a 20% reduction in Gross Receipts after year five, subject to a 12 month prior written notice to the Aviation Authority.

Page 50: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

Finally, an assessment of the condition of the facilities was obtained by Staff that identified certain maintenance and repair required to be performed, including certain roof maintenance and repairs that are the responsibility of the Aviation Authority. In that regard, Sky Chefs has agreed to perform all maintenance and repairs identified, including the roof maintenance and repairs, during the initial term of the New Lease Agreement. In exchange for performing the roof maintenance and repairs for the Aviation Authority, Sky Chefs will receive rent credits for the actual cost incurred in an amount not-to-exceed $500,000. Staff has reviewed the terms and conditions of Sky Chefs proposed New Lease Agreement and recommends approval. ALTERNATIVES No alternatives are being considered at this time. FISCAL IMPACT The estimated minimum annual rent and annual privilege fees of the proposed New Lease Agreement is $2,103.762.46, less rental credits in an amount not-to-exceed $500,000 for roof maintenance and repairs. RECOMMENDED ACTION It is respectfully requested that the Aviation Authority Board resolve to (1) approve a new lease agreement with Sky Chefs, Inc., at Orlando International Airport, with an initial ten-year term and one five-year renewal term, for approximately 8.04 acres of land, 71,203 square feet of building improvements and 107,855 square feet of vehicle parking at the appraised fair market rental value, plus privilege fees in the amount of 5% of Gross Receipts in Year 1, 5.5% in Year 2, 6% in Year 3, 6.5% in Year 4 and 7% thereafter, and 2% of Gross Receipts for off-airport catering; (2) approve the allocation of Discretionary Funds in an amount not-to-exceed $500,000 for roofing maintenance and repairs; (3) request City Council approval of an agreement with a term in excess of ten years; and (4) authorize an Aviation Authority Officer or the Chief Executive Officer to execute the appropriate lease agreement following satisfactory review by legal counsel.

Page 51: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

CONSENT AGENDA ITEM – G –

GREATER ORLANDO AVIATION AUTHORITY

________________________________________________________________ Orlando International Airport

One Jeff Fuqua Boulevard Orlando, Florida 32827-4399

MEMORANDUM TO: Members of the Aviation Authority FROM: Stanley J. Thornton, Chair, Professional Services Committee DATE: September 18, 2019 ITEM DESCRIPTION Recommendation of the Professional Services Committee to Approve an Amendment to Addendum No. 69 to the General Consulting Services Agreement with Schenkel & Shultz, Inc. for Additional Project Support Services for the Implementation Phase of W-00396, Virtual Ramp Control (VRC), at the Orlando International Airport BACKGROUND The South Terminal C, Phase 1, Program provides for a world-class domestic and international airport terminal building, consisting of a new airside terminal with up to 24 airline gates and a landside terminal with both secure and non-secure areas, and may include, but is not limited to, all associated improvements and infrastructure required or related thereto, such as sitework, roadways, aprons, runways, taxiways, other airfield work, utilities, landscaping, lighting, walkways, pedestrian bridges, expansion of the parking garage, a new and/or expanded chiller plant, aircraft loading bridges, and all interior design, such as concessions planning, ticketing, and security improvements, and baggage handling systems. The South Terminal C, Phase 1, (STC-P1) Program will include the VRC System, up to 24 aircraft gates, and will undergo future expansions, which may expand the VRC operations up to 60 gates, including shared Multiple Aircraft Ramp System (MARS) gates and multiple remote hardstand aircraft parking positions. The VRC will enable ramp control personnel to manage aircraft movements in the non-movement area in all-weather conditions on a 24-hours-per-day, 7-days-per-week basis. On October 16, 2013, the Aviation Authority Board approved a General Consulting Services Agreement with Schenkel & Shultz, Inc. for General Consulting services. The services included advising and supporting the Aviation Authority through assessments, studies, master planning, concept development, and preparation of design-build criteria packages, extension of staff, and other efforts as assigned for the development, management, and operation of the existing and future facilities. The services may also include interfacing with the Aviation Authority’s committees and the Aviation Authority’s departments, and coordinating and providing documentation required by federal, state, and local agencies, including the Federal Aviation Administration (FAA); the Transportation Security Administration (TSA); the Florida Department of Transportation (FDOT); the Orlando Utilities Commission (OUC); the Division of Strategic Business Development; City of Orlando; Orange County, Florida; and, other agencies as required. On August 14, 2018, the Construction Committee approved Addendum No. 69 to the General Consulting Services Agreement with Schenkel & Shultz, Inc. for a total amount of $234,436, to provide Project Support Services during the Procurement Phase of the W-00396. Services included, but were not limited to, airfield/airspace planning, development of Concept of Operations Document, requirements assistance, Federal Aviation Administration (FAA) coordination and Letter of Agreement support, procurement support, and implementation planning.

Page 52: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

ISSUES A fee has been negotiated with Schenkel & Shultz, Inc. for a total amount of $342,820 for Additional Project Support Services for the Implementation Phase of W-00396, Virtual Ramp Control (VRC), at the Orlando International Airport. Services will provide project support services for the implementation phase of the W-00396, and will include, but are not limited to, program management and support, system engineering and design support, preliminary design, detailed VRC system design and development, hardware design, assembly and production test, VRC subsystems, Architectural/Engineering (A/E) design, construction and installation, VRC controller work position test environment installation, training support, and system burn-in/system acceptance. The Aviation Authority has reviewed the proposal from Schenkel & Shultz, Inc., and determined that, due to the specialized scope of the required services, Schenkel & Shultz, Inc. does not propose any MWBE/LDB/VBE participation on this Amendment. On September 5, 2019, the Professional Services Committee recommended approval of an Amendment to Addendum No. 69 to the General Consulting Services Agreement with Schenkel & Shultz, Inc., for Additional Project Support Services for the Implementation Phase of W-00396, Virtual Ramp Control (VRC), at the Orlando International Airport, as outlined in the memorandum. ALTERNATIVES None. FISCAL IMPACT The fiscal impact is $342,820. Funding is from General Airport Revenue Bonds. RECOMMENDED ACTION It is respectfully requested that the Aviation Authority Board resolve to accept the recommendation of the Professional Services Committee and approve an Amendment to Addendum No. 69 to the General Consulting Services Agreement with Schenkel & Shultz, Inc. for Additional Project Support Services for the Implementation Phase of W-00396, Virtual Ramp Control (VRC), at the Orlando International Airport, for a total not-to-exceed fee amount of $342,820, with funding from General Airport Revenue Bonds; and authorize an Aviation Authority Officer or the Chief Executive Officer to execute the necessary documents following satisfactory review by legal counsel.

Page 53: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

CONSENT AGENDA ITEM – H -

GREATER ORLANDO AVIATION AUTHORITY ________________________________________________________________

Orlando International Airport One Jeff Fuqua Boulevard

Orlando, Florida 32827-4399

MEMORANDUM TO: Members of the Aviation Authority FROM: Stanley J. Thornton, Chief Operating Officer

DATE: September 18, 2019 ITEM DESCRIPTION Recommendation to Approve the First Amendment to Temporary License Agreement with Orlando Utilities Commission (OUC) BACKGROUND OUC operates a rail road line that runs adjacent to Boggy Creek Road near the Boggy Creek Road and Wetherbee Road Intersection. The Aviation Authority, as part of the South Terminal Complex construction project, is installing an electric duct bank from Boggy Creek Road along the future Heintzelman Road alignment up to the South Terminal Complex. This duct bank is going to provide the main electrical connection to the OUC network for the South Terminal Complex. The Board approved the Temporary License Agreement at its October 10, 2018 meeting for a term of 10 months. ISSUES Due to scheduling issues and delays in permitting the necessary intersection improvements, the term is required to be extended to December 31, 2020. No other changes are proposed to the Temporary License Agreement ALTERNATIVES There are no other alternatives being considered. FISCAL IMPACT There is no fiscal impact as a result of the extension in time. RECOMMENDED ACTION It is respectfully requested that the Aviation Authority Board (1) approve the First Amendment to Temporary License Agreement by and between the Orlando Utility Commission and the Greater Orlando Aviation Authority; and (2) authorize an Aviation Authority Officer or the Chief Executive Officer to execute all documents related to the Temporary License Agreement subject to satisfactory review by legal counsel.

Page 54: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

CONSENT AGENDA ITEM – I –

GREATER ORLANDO AVIATION AUTHORITY

________________________________________________________________ Orlando International Airport

One Jeff Fuqua Boulevard Orlando, Florida 32827-4399

MEMORANDUM TO: Members of the Aviation Authority FROM: Stanley J. Thornton, Chair, Professional Services Committee DATE: September 18, 2019 ITEM DESCRIPTION Recommendation of the Professional Services Committee for Project Bid Package (BP) No. S00175, Rent-A-Car (RAC) Quick Turn-Around (QTA) Facility at the South Terminal C, at the Orlando International Airport BACKGROUND On August 27, 2018, the Capital Management Committee (CMC) authorized staff to initiate a two-step procurement process for construction services for BP No. S00175. The scope of services for BP No. S00175 consists of site excavation, grading and paving of approximately 6 acres, and the construction of separate QTA buildings, which will include car wash bays, fueling bays and building shells for future tenant build-out facilities, at the South Terminal C. On June 4, 2019, the PSC met to evaluate and rank the shortlisted firms based on the qualifications, schedule and price proposals of each firm. The PSC evaluated the Proposers and Proposals comparatively to the other Proposers and Proposals. The PSC first evaluated the Qualifications followed by the Schedule Proposals, ranking the best Qualifications and Schedule Proposals first, the second best was ranked second, and so forth. The ranking of the Qualifications and Schedule Proposals was determined prior to the opening of the Pricing Proposals. After thorough deliberations, the PSC ranked the Qualifications and Schedules in accordance with the procurement documents, as follows (in alphabetical order):

Proposer Qualifications Ranking

Schedule Ranking

Gibbs & Register, Inc. 2 3 Gomez Construction Company 1 1 McCree Design Builders, Inc. 1 1 The Middlesex Corporation 3 2

The previously-submitted Pricing Proposals, in sealed envelopes, were opened and the amounts of each Pricing Proposal were read during the PSC meeting. In accordance with the Proposal Documents, any Pricing Proposal could be deemed non-responsive if the Pricing Proposal amount was greater than the established maximum cap of $28 Million. The lowest Total Proposal Price would be ranked first, the second lowest Total Proposal Price ranked second, and so forth. The Proposer offering the lowest Total Proposal Price would not necessarily be the Proposer recommended for award. The objective would be to identify the Proposer whose qualifications, schedule and price proposal, on a best value basis, would be the most advantageous to the Aviation Authority. The Proposer with the lowest Combined Rank total would be recommended for award. Should all four Proposers submit Pricing Proposals that exceed the maximum cap of $28 Million, the PSC may, in its sole discretion, recommend to the Aviation Authority Board to authorize staff to negotiate with the entity with the lowest combined ranking for Qualifications and Schedule Proposal.

Page 55: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

The PSC opened the price proposals from each of the four shortlisted firms, as follows (in alphabetical order):

Proposer Price Proposal Amount

Gibbs & Register, Inc. $40,530,000 Gomez Construction Company $42,999,992 McCree Design Builders, Inc. $33,565,000 The Middlesex Corporation $43,458,546

In accordance with the Proposal Documents, in the event none of the Price Proposals were within budget (i.e., below the $28 Million cap), the PSC may, in its sole discretion, recommend to the Aviation Authority Board to authorize staff to negotiate with the entity with the lowest combined ranking for Qualifications and Schedule Proposal. The combined rankings for Qualifications and Schedule Proposals are as follows (in combined ranked order):

Proposer Qualifications Ranking

Schedule Ranking

Combined Ranking

Gomez Construction Company 1 1 2 McCree Design Builders, Inc. 1 1 2 The Middlesex Corporation 3 2 5 Gibbs & Register, Inc. 2 3 5

The PSC recommended, following satisfactory review of the proposals by legal counsel, staff and the Office of Small Business Development, that staff be authorized to enter into competitive negotiations with Gomez Construction Company and McCree Design Builders, Inc., the two entities with the lowest combined rankings. On June 21, 2019, the PSC met to consider the review by legal counsel, staff and the Office of Small Business Development. The review demonstrated that all proposals were responsive in accordance with the requirements of the procurement documents, with the exception of the price proposal submission by McCree Design Builders. Inc., which required further consideration. Legal counsel advised that the deviations with the price proposal form and proposal security form from McCree Design Builders, Inc. were, though sloppy, nonmaterial and did not give McCree Design Builders, Inc. an unfair competitive advantage over the other proposers. Moreover, its failure to produce a copy of its State of Florida Contractor’s license was nonmaterial, as legal counsel was able to confirm at the PSC meeting, through the State of Florida online licensing portal, that McCree Design Builders, Inc. is properly licensed in accordance with Florida law. The Aviation Authority established 15% MWBE and 5% LDB/VBE participation goals for this project. The Aviation Authority has reviewed the proposals from Gomez Construction Company and McCree Design Builders, Inc., and determined that both proposers met the established participation goals for this procurement. Staff advised that, following its review of the proposed schedule, Gomez Construction Company and McCree Design Builders, Inc. met the minimum requirements set forth in the procurement instructions. The PSC reaffirmed its recommendation from June 4, 2019, that staff be authorized to enter into competitive negotiations with Gomez Construction Company and McCree Design Builders, Inc., the two entities with the lowest combined rankings, as outlined in the memorandum. On July 17, 2019, the Aviation Authority Board authorized staff to enter into competitive negotiations with Gomez Construction Company, and McCree Design Builders, Inc., the two entities with the lowest combined rankings. ISSUES On July 18, 2019, the Aviation Authority entered into competitive negotiations with Gomez Construction Company and McCree Design Builders, Inc. The Instructions for Competitive Negotiations, Section 00 21 13 - 1.16, Basis of Award

Page 56: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

Indicates that this is a competitive negotiation. The Aviation Authority intends to select the Contractor that has proposed the best value with the most cost and time effective Negotiated Price Proposal which has been determined to be responsible and responsive, and which provides the best value to the Aviation Authority, in its sole discretion. The evaluation criteria will be considered by the Aviation Authority in its best value determination, as follows:

• Cost – Negotiated Proposal Price in accordance with Section 00 41 13.

• Schedule – Proposed contract time in accordance with the Negotiated Price Proposal Form, Section 00 41 13.

• Value of Deductive Alternates – The Aviation Authority reserves the right to select deductive alternates based upon price and other factors. The Aviation Authority specifically reserves the right, in its sole discretion, to accept or reject any deductive alternates proposed by either Contractor.

• Small Business Participation – Evaluation of goal and good faith efforts. All Bidders shall complete and submit the Schedule of Subcontractor Participation (Exhibit D) with the Bid.

On August 26, 2019, negotiated price proposals for the above-referenced project were received from both contractors as follows:

Gomez Construction Company

McCree Design Builders, Inc.

Base Negotiated Price Proposal $41,486,941.00 $31,919,248 Owner’s DRB Allowance $ 30,000.00 $ 30,000

Total Base Negotiated Price Proposal $41,516,941.00 $31,949,248 Value Engineering (VE) Deductive Alternates 1. Reduce Pavement Thickness ($ 189,852.00) ($ 219,019) 2. Refine Guardrail Limits and Types ($ 17,415.00) $ 0 3. Provide HDPE in lieu of Concrete Pipe ($ 100,180.00) ($ 7,009) 4. Provide Chain link Fence between RAC Firms ($ 26,471.00) ($ 28,240) 5. Reduce Fence Limits ($ 60,264.00) ($ 60,130) 6. Reduce Concrete Pavement Limits ($ 956,338.00) ($ 36,730) 7. Reduce Canopy Width ($ 267,813.00) ($ 207,571) 8. Fuel System Type ($ 65,241.00) ($ 34,809) 9. Preventer to PVC in lieu of Ductile Iron Pipe ($ 30,437.00) ($ 19,694) 10. Remove Strong Arm Gates ($ 218,956.00) ($ 209,299)

Subtotal VE Deductive Alternate Nos. 1 - 10 ($ 1,932,967.00) ($ 892,501) 11. Contractor VE Alternates ($ 3,866,196.16) ($ 446,582)

Grand Total $35,717,777.84 $30,610,165 Proposed Total Days (Base + Alternates) 436 days 366 days Proposed Small Business Participation (percentage calculated on base bid only)

60.07% MWBE and 7.58% LDB/VBE

28% MWBE and 12.8% LDB/VBE

On August 27, 2019, the Aviation Authority conducted Post-Bid Debrief sessions with each contractor, privately as allowed by Florida’s Sunshine Law, for questions on scope, schedule, and VE items for consideration. These sessions were recorded as required by the Sunshine Law. Evaluation of the negotiated price proposals was conducted by staff members of the Aviation Authority and the Owner’s Authorized Representative (OAR) (i.e., Geotech Consultants International, Inc. dba GCI, Inc.), the General Consultant (i.e. Schenkel & Shultz, Inc.), and the Architect of Record (i.e., HNTB Corporation), and legal counsel. Staff recommends that all ten of the VE Alternates from Gomez Construction Company be accepted, and VE Alternate Nos. 1, 3, 4, 5, 7, 8, 9 and 10 from McCree Design Builders, Inc. be accepted. Evaluation of the schedule was conducted by staff members of the Aviation Authority and the Owner’s Authorized Representative (OAR) (i.e., Geotech Consultants International, Inc. dba GCI, Inc.), the General Consultant (i.e. Schenkel & Shultz, Inc.), and the Architect of Record (i.e., HNTB Corporation), and legal counsel. It was noted that both contractors used a conventional 5-day work week schedule. McCree

Page 57: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

Design Builders, Inc. proposed the shortest project duration equating to 12 months (i.e., 366 days) and Gomez Construction Company proposed a 14.25 month (i.e., 436 days) project duration. Both contractors have confirmed its proposal was prepared in accordance with all proposal documents and addenda, and that it will be able to complete the project for the amount proposed and within the Aviation Authority’s schedule. At the request of the PSC, representatives in attendance from both contractors were asked to confirm that they could complete the work for the submitted amount, within the proposed schedule, and employ the small business subcontractors listed on the submitted proposal forms. Both contractors verified these commitments. Staff’s evaluations are as follows:

Gomez Construction Company

McCree Design Builders, Inc.

Base Negotiated Price Proposal $41,486,941.00 $31,919,248 Owner’s DRB Allowance $ 30,000.00 $ 30,000

Total Base Negotiated Price Proposal $41,516,941.00 $31,949,248 Value Engineering (VE) Deductive Alternates 1. Reduce Pavement Thickness ($ 189,852.00) ($ 219,019) 2. Refine Guardrail Limits and Types ($ 17,415.00) $ 0 3. Provide HDPE in lieu of Concrete Pipe ($ 100,180.00) ($ 7,009) 4. Provide Chain link Fence between RAC Firms ($ 26,471.00) ($ 28,240) 5. Reduce Fence Limits ($ 60,264.00) ($ 60,130) 6. Reduce Concrete Pavement Limits ($ 956,338.00) ($ 36,730) 7. Reduce Canopy Width ($ 267,813.00) ($ 207,571) 8. Fuel System Type ($ 65,241.00) ($ 34,809) 9. Preventer to PVC in lieu of Ductile Iron Pipe ($ 30,437.00) ($ 19,694) 10. Remove Strong Arm Gates ($ 218,956.00) ($ 209,299)

Subtotal VE Deductive Alternate Nos. 1 - 10 ($ 1,932,967.00) ($ 855,771) 11. Contractor VE Alternates ($ 865,706.40) ($ 499,542)

Grand Total $38,718,267.60 $30,593,935 Proposed Total Days (Base + Alternates) 436 days 366 days Proposed Small Business Participation (percentage calculated on base bid only)

60.07% MWBE and 7.58% LDB/VBE

28% MWBE and 12.8% LDB/VBE

The Aviation Authority established 15% MWBE and 5% LDB/VBE participation goals for this project. The Aviation Authority has reviewed the competitively negotiated price proposals from both contractors, and determined that both contractors have met or exceeded the established participation goals for this procurement. On September 5, 2019, the Professional Services Committee met to consider and rank the price proposals, and recommend the award of BP No. S00175, Rent-A-Car (RAC) Quick Turn-Around (QTA) Facility at the South Terminal C, at the Orlando International Airport. The PSC evaluated both contractors’ price proposals, proposed Contractor VE Alternates, proposed schedules, and proposed MWBE and LDB/VBE participation. Following comparative assessments and further deliberations, the PSC voted to rank the competitively negotiated price proposals as shown below, and to recommend the award of BP No. S00175, Rent-A-Car (RAC) Quick Turn-Around (QTA) Facility at the South Terminal C, at the Orlando International Airport, to McCree Design Builders, Inc., for the total competitively negotiated price proposal amount of $30,593,935, as outlined in the memorandum:

Proposer Price Proposal Ranking

McCree Design Builders, Inc. 1 Gomez Construction Company 2

On September 12, 2019, the Construction Finance Oversight Committee recommended approval of the transfer of $3.2 Million of uncommitted, unused or unneeded funds from other projects within the rental car programs to BP No. S00175. Approval by the Aviation Authority Board is necessary for this non-budgeted expenditure.

Page 58: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

ALTERNATIVES None. FISCAL IMPACT The fiscal impact is $30,593,935. Funding is from Customer Facility Charges. RECOMMENDED ACTION It is respectfully requested that the Aviation Authority Board resolve to accept the recommendation of the Professional Services Committee and (1) approve the ranking of the competitively negotiated price proposals for BP No. S00175, Rent-A-Car (RAC) Quick Turn-Around (QTA) Facility at the South Terminal C at the Orlando International Airport as follows: First – McCree Design Builders, Inc.; and, Second – Gomez Construction Company; (2) award BP No. S00175, Rent-A-Car (RAC) Quick Turn-Around (QTA) Facility at the South Terminal C, at the Orlando International Airport, to McCree Design Builders, Inc., for the total competitively negotiated price proposal amount of $30,593,935, with funding from Customer Facility Charges; (3) approve the transfer of not-to-exceed $3.2 Million of uncommitted, unused or unneeded funds from other projects within the rental car programs to BP No. S00175; (4) request Orlando City Council concurrence for this non-budgeted expenditure; and, (5) authorize an Aviation Authority Officer or the Chief Executive Officer to execute the necessary documents following satisfactory review by legal counsel.

Page 59: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

BP-S00175, South Terminal C, Phase 1Rent-A-Car (RAC) Quick Turn-Around (QTA) Facility

Page 60: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

CONSENT AGENDA ITEM – J -

GREATER ORLANDO AVIATION AUTHORITY Orlando International Airport

One Jeff Fuqua Boulevard Orlando, Florida 32827-4399

MEMORANDUM TO: Members of the Aviation Authority FROM: Stanley J. Thornton, Chief Operations Officer

DATE: September 18, 2019 ITEM DESCRIPTION Recommendation to Approve the Agreement to Relocate Pole Squares for Signage Along S.R. 436 By And Between the Greater Orlando Aviation Authority, City Of Orlando, and Central Florida Expressway Authority BACKGROUND The Aviation Authority and the City previously acquired eighteen (18) 10’ by 10’ squares of property (referred to as “Pole Squares”), from CFX for signage along S.R. 436 a/k/a Jeff Fuqua Boulevard (“the Signs”), subject to a right of reverter in favor of CFX. CFX intends to improve the interchange of S.R. 528 and S.R. 436, necessitating the relocation of ramps and associated signage to and from the Orlando International Airport, as part of CFX Project 528-143 (the “Project”). Six (6) of the Pole Squares and three (3) signs owned by City and the Aviation Authority will be impacted by the Project. Two (2) of the Pole Squares and the associated signage will no longer be needed by the Aviation Authority and will be removed by and revert back to CFX. The remaining four (4) Pole Squares and associated signage will be removed and relocated or replaced by CFX into easement areas within CFX’s existing right-of-way to accommodate the Project, at CFX’s sole cost and expense. ISSUES CFX desires to enter into the Agreement to set forth the terms and conditions for the removal and conveyance of the existing Pole Squares to CFX from the Aviation Authority and the City in exchange for an easement from CFX in favor of the Aviation Authority and City for the relocated Pole Squares (the “Easement”), and for the removal and reversion of the abandoned Pole Squares to CFX by the Aviation Authority and the City, all to accommodate CFX’s improvements to interchange of S.R. 528 and S.R. 436. The above transaction is subject to issuance of a letter of release from the Federal Aviation Administration. ALTERNATIVES There are no other alternatives under consideration. FISCAL IMPACT There is no fiscal impact to the Aviation Authority resulting from this item as the funding of the above transactions is being provided by CFX.

Page 61: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

RECOMMENDED ACTION It is respectfully requested that the Aviation Authority Board (1) approve the Agreement to Relocate Pole Squares for Signage Along S.R. 436 (Jeff Fuqua Blvd.) by and between the Aviation Authority, the City, and CFX; (2) seek Orlando City Council approval for the Agreement to Relocate Pole Squares for Signage Along S.R. 436 (Jeff Fuqua Blvd.); and (3) authorize the Chief Executive Officer or his designee to execute all documents related to the Agreement to Relocate Pole Squares for Signage Along S.R. 436 (Jeff Fuqua Blvd.), subject to satisfactory review by legal counsel.

Page 62: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

CONSENT AGENDA ITEM – L –

GREATER ORLANDO AVIATION AUTHORITY

________________________________________________________________ Orlando International Airport

One Jeff Fuqua Boulevard Orlando, Florida 32827-4399

MEMORANDUM TO: Members of the Aviation Authority FROM: Stanley J. Thornton, Chair, Construction Committee DATE: September 18, 2019 ITEM DESCRIPTION Recommendation of the Construction Committee to Approve an Addendum to the Construction Management at Risk (CM@R) Entity Services for South Terminal C, Phase 1, Agreement with Turner-Kiewit Joint Venture, for Project BP No. S00137, South Terminal C, Phase 1 – Turner-Kiewit General Conditions for Fiscal Year (FY) 2020 (Guaranteed Maximum Price (GMP) No. 4-S.4) at the Orlando International Airport BACKGROUND The South Terminal C, Phase 1, Program provides for a world-class domestic and international airport terminal building, consisting of a new airside terminal with up to 24 airline gates and a landside terminal with both secure and non-secure areas, and may include, but is not limited to, all associated improvements and infrastructure required or related thereto, such as site work, roadways, aprons, runways, taxiways, other airfield work, utilities, landscaping, lighting, walkways, pedestrian bridges, expansion of the parking garage, a new and/or expanded chiller plant, aircraft loading bridges, and all interior design, such as concessions planning, ticketing, and security improvements, and baggage handling systems. On May 18, 2016, the Aviation Authority Board approved the award of a Construction Management at Risk (CM@R) Entity Services for South Terminal C, Phase 1, Agreement with Turner-Kiewit Joint Venture for the South Terminal C, Phase 1, Program at the Orlando International Airport.

Under the CM@R Agreement, the CM@R is entitled to reimbursement and compensation for the following, upon acceptable performance:

• Direct cost of the work is the actual cost for the subcontractor costs, direct

labor, materials, and equipment required to construct the work, • Allowances are estimated dollar amounts that are separately identified in a GMP for

the purpose of encumbering funds to cover certain costs that are not completely defined when the GMP is approved, but may be necessary to complete the Project. An allowance means that the scope is not fully known or additional review is needed to determine whether the item is reimbursable,

• General condition expenses, such as CM@R management staff, limited to those set

forth in the CM@R Agreement, • CM@R Contingency is the negotiated amount or percentage of the Cost of the Work to

be utilized for over-budget buyout of the work and for increases in the cost due to unforeseen circumstances relating to construction of the project, except when deemed the responsibility of the Owner in accordance with the Agreement,

Page 63: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

• Owner Contingency is an amount or percentage of the Cost of the Work to be utilized by the Owner for items deemed the responsibility of the Owner in accordance with the Agreement,

• Performance and Payment Bond rate set forth in the CM@R Contract is 0.664%, and • The CM@R Fee covers the CM@R’s overhead, profit and all other costs not

reimbursable under the CM@R Contract. For Turner-Kiewit Joint Venture, the CM@R Fee is 4.211%.

Cost of allowances, contingencies and insurance will not be incurred until approved by the Aviation Authority. The scope of BP No. S00137 provides construction management staff for FY 2020. BP No. S00137 will provide staff and general conditions necessary to manage and maintain continuity through all GMPs related to the Landside Terminal and related scope under Turner-Kiewit Joint Venture’s CM@R Agreement for the South Terminal C, Phase 1, and Phase 1 Expansion, Program. ISSUES GMP No. 4-S.4 for South Terminal C, Phase 1, has been negotiated with Turner-Kiewit Joint Venture for BP No. S00137, South Terminal C, Phase 1 – Turner-Kiewit General Conditions for FY 2020 (GMP No. 4-S.4) at the Orlando International Airport, for a total GMP amount as shown below. Turner-Kiewit Joint Venture proposes these services for the following compensation:

CM@R Staff and Benefits, and General Requirements (Lump Sum) $28,467,115 MWBE/LDB Partners and Consultants (Lump Sum)* $ 8,505,913 Total GMP Addendum Cost (Lump Sum) $36,964,003

Services will be provided from October 1, 2019, through September 30, 2020. Payment for work will be for the work and services performed up to but not exceeding the total GMP amount in accordance with the CM@R Agreement. *Payment will be made in twelve equal monthly payments. For purposes of counting minority and small business participation, Turner-Kiewit Joint Venture will provide invoices or other evidence of payment of the lump sum value of $8,505,913 to be paid to the MWBE and LDB/VBE certified entities. The overall GMP proposal has been thoroughly reviewed by the Owner’s Authorized Representative (i.e., Geotech Consultants International, Inc. dba GCI, Inc.), the Aviation Authority’s Construction-Engineering-Financial Consultant (i.e., R. W. Block Consulting, Inc.), legal counsel, and staff. For this GMP No. 4-S.4, Turner-Kiewit Joint Venture proposes 20% MWBE and 3.6% LDB/VBE participation on this GMP Amendment to BP No. S00137 for Construction Management Services, and 20.9% MWBE and 0.9% LDB/VBE participation for Construction Services. Turner-Kiewit Joint Venture is committed to the established small business goals of 20% MWBE and 3% LDB participation for Construction Management Services, and 20% MWBE and 4% LDB/VBE participation for Construction Services. Currently, Turner-Kiewit Joint Venture’s estimated cumulative achievement for the overall Program is 21% MWBE and 2% LDB/VBE participation for Construction Management Services, and 19% MWBE and 4% LDB/VBE participation for Construction Services. On September 10, 2019, the Construction Committee recommended approval of an Addendum to the Construction Management at Risk (CM@R) Entity Services for South Terminal C, Phase 1, Agreement with Turner-Kiewit Joint Venture for BP No. S00137, South Terminal C, Phase 1 – Turner-Kiewit General Conditions for FY 2020 (GMP No. 4-S.4) at the Orlando International Airport, as outlined in the memorandum. ALTERNATIVES None.

Page 64: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

FISCAL IMPACT The fiscal impact is $36,964,003. Funding is from General Airport Revenue Bonds, Customer Facility Charges, and Passenger Facility Charges to the extent eligible. RECOMMENDED ACTION It is respectfully requested that the Aviation Authority Board resolve to accept the recommendation of the Construction Committee and approve an Addendum to the Construction Management at Risk (CM@R) Entity Services for South Terminal C, Phase 1, Agreement with Turner-Kiewit Joint Venture for BP No. S00137, South Terminal C, Phase 1 – Turner-Kiewit General Conditions for FY 2020 (GMP No. 4-S.4), for a total negotiated GMP amount (Lump Sum) of $36,964,003, which includes $28,467,115 for CM@R Staff and Benefits, and General Requirements (Lump Sum), and $8,505,913 for MWBE/LDB Partners and Consultants (Lump Sum), with funding from General Airport Revenue Bonds, Customer Facility Charges, and Passenger Facility Charges to the extent eligible; and authorize an Aviation Authority Officer or the Chief Executive Officer to execute the necessary documents following satisfactory review by legal counsel.

Page 65: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

CONSENT AGENDA ITEM – M –

GREATER ORLANDO AVIATION AUTHORITY

________________________________________________________________ Orlando International Airport

One Jeff Fuqua Boulevard Orlando, Florida 32827-4399

MEMORANDUM TO: Members of the Aviation Authority FROM: Stanley J. Thornton, Chair, Construction Committee DATE: September 18, 2019 ITEM DESCRIPTION Recommendation of the Construction Committee to Approve an Amendment to Addendum No. 13 to the Construction Management at Risk (CM@R) Entity Services for South Terminal C, Phase 1, Agreement with Turner-Kiewit Joint Venture, for Project Bid Package (BP) No. S00139, South Terminal C, Phase 1, Landside Site Utilities and Balance of Sitework (Guaranteed Maximum Price (GMP) No. 5-S.2) at the Orlando International Airport BACKGROUND The South Terminal C, Phase 1, Program provides for a world-class domestic and international airport terminal building, consisting of a new airside terminal with up to 24 airline gates and a landside terminal with both secure and non-secure areas, and may include, but is not limited to, all associated improvements and infrastructure required or related thereto, such as site work, roadways, aprons, runways, taxiways, other airfield work, utilities, landscaping, lighting, walkways, pedestrian bridges, expansion of the parking garage, a new and/or expanded chiller plant, aircraft loading bridges, and all interior design, such as concessions planning, ticketing, and security improvements, and baggage handling systems. On May 18, 2016, the Aviation Authority Board approved the award of a Construction Management at Risk (CM@R) Entity Services for South Terminal C, Phase 1, Agreement to Turner-Kiewit Joint Venture. Under the CM@R Agreement, the CM@R is entitled to reimbursement and compensation for the following, upon acceptable performance:

• Direct cost of the work is the actual cost for the subcontractor costs, direct

labor, materials, and equipment required to construct the work, • Allowances are estimated dollar amounts that are separately identified in a GMP for

the purpose of encumbering funds to cover certain costs that are not completely defined when the GMP is approved, but may be necessary to complete the Project. An allowance means that the scope is not fully known or additional review is needed to determine whether the item is reimbursable,

• General condition expenses, such as CM@R management staff, limited to those set

forth in the CM@R Agreement, • CM@R Contingency is the negotiated amount or percentage of the Cost of the Work to

be utilized for over-budget buyout of the work and for increases in the cost due to unforeseen circumstances relating to construction of the project, except when deemed the responsibility of the Owner in accordance with the Agreement,

• Owner Contingency is an amount or percentage of the Cost of the Work to be utilized

by the Owner for items deemed the responsibility of the Owner in accordance with the Agreement,

Page 66: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

• Performance and Payment Bond rate set forth in the CM@R Contract is 0.664%, and • The CM@R Fee covers the CM@R’s overhead, profit and all other costs not

reimbursable under the CM@R Contract. For Turner-Kiewit Joint Venture, the CM@R Fee is 4.211%.

Cost of allowances, contingencies and insurance will not be incurred until approved by the Aviation Authority. On May 16, 2018, the Aviation Authority Board approved Addendum No. 13 to the Construction Management at Risk (CM@R) Entity Services for South Terminal C, Phase 1, Agreement with Turner-Kiewit Joint Venture for Project BP No. S00139, South Terminal C, Phase 1, Landside Site Utilities and Balance of Sitework (GMP No. 5-S.2), for a total negotiated GMP amount of $37,185,724. On May 15, 2019, the Aviation Authority Board approved Amendment No. 1 to Addendum No. 13 to the Construction Management at Risk (CM@R) Entity Services for South Terminal C, Phase 1, Agreement with Turner-Kiewit Joint Venture for BP No. S00139, South Terminal C, Phase 1 – Landside Site Utilities and Balance of Sitework (GMP No. 5-S.2), at the Orlando International Airport, for a total negotiated GMP Amendment amount of $9,038,017, resulting in a revised GMP amount of $46,223,741. The scope of BP No. S00139 includes the Landside site utilities for site storm, water, sanitary and communications systems for South Terminal C, Phase 1. The sitework scope provides necessary site improvements, construction logistics support, roadways and flatwork. ISSUES This amendment funds the balance of the Landside Civil changes, including roadways, demolition, barrier wall, street lighting, concrete sidewalks, curbs, gutters, bollards, fencing and gates, for the South Terminal C, Phase 1, Expansion, scope of work. The Owner’s Authorized Representative (i.e., Geotech Consultants International, Inc. dba GCI, Inc.) and Turner-Kiewit Joint Venture have reviewed the current financial status and progress of the work in BP No. S00139, and have determined that, in accordance with the contract documents, it is appropriate at this time to increase the Direct Cost of Work, Unbought Scope, Allowances, CM@R Contingency, Owner Contingency, and Performance and Payment Bonds, including the associated CM@R fee amount, as shown below.

GMP Original GMP Budget

(A)

Current GMP Budget* (B)

Proposed GMP Amendment

(C)

Proposed Revised GMP

(D) = (B) + (C) Direct Cost of Work (DCOW) $28,018,588 $40,816,233 $12,007,108 $52,823,341 General Requirements $ 0 $ 264,437 $ 0 $ 264,437 Unbought Scope $ 1,545,314 $ 0 $ 327,075 $ 327,075 Allowances $ 3,400,000 $ 900,000 $ 1,962,709 $ 2,862,709 CM@R Contingency $ 1,648,195 $ 1,805,805 $ 714,845 $ 2,520,650 Owner’s Contingency $ 824,098 $ 262,513 $ 2,176,822 $ 2,439,335 SUBTOTAL: $35,436,195 $44,048,988 $17,188,559 $61,237,547 Perf. & Payment Bonds $ 246,913 $ 306,925 $ 119,767 $ 426,692 Fee (4.211%) $ 1,502,616 $ 1,867,828 $ 728,854 $ 2,596,682 Total GMP Addendum Cost: $37,185,724 $46,223,741 $18,037,180 $64,260,921

*The Current GMP Balance amount shown in the above table represents the current budget as a result of authorized GMP subcontract awards and other budget reallocations as a result of the GMP buyout process and the awards of CM@R’s contracts and/or purchase orders through the Budget, Buyout and Contingency Management (BBC) requests approved by the Construction Committee through August 20, 2019. The GMP buyout process results in internal cost transfers between the different GMP elements within the GMP without changing the overall GMP amount previously-approved by the Aviation Authority Board. Turner-Kiewit Joint Venture proposes 17.3% MWBE and 3.2% LDB participation on this GMP Amendment to BP No. S00139 for Construction Services. Turner-Kiewit Joint Venture is committed to the established small business goals of 20% MWBE and 4% LDB participation for Construction Services. With this GMP Amendment, Turner-Kiewit Joint Venture’s estimated participation for BP No. S00139 is 17% MWBE and 9% LDB/VBE. Currently,

Page 67: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

Turner-Kiewit Joint Venture’s estimated cumulative achievement for Construction Services is 19% MWBE and 4% LDB/VBE participation. On September 5, 2019, the Construction Committee recommended approval of an Amendment to Addendum No. 13 to the Construction Management at Risk (CM@R) Entity Services for South Terminal C, Phase 1, Agreement with Turner-Kiewit Joint Venture for BP No. S00139, South Terminal C, Phase 1 – Landside Site Utilities and Balance of Sitework (GMP No. 5-S.2) at the Orlando International Airport, as outlined in the memorandum. ALTERNATIVES None. FISCAL IMPACT The fiscal impact is $18,037,180. Funding is from General Airport Revenue Bonds, Customer Facility Charges, and the Aviation Authority’s Line of Credit to be reimbursed by future General Airport Revenue Bonds. RECOMMENDED ACTION It is respectfully requested that the Aviation Authority Board resolve to accept the recommendation of the Construction Committee and approve an Amendment to Addendum No. 13 to the Construction Management at Risk (CM@R) Entity Services for South Terminal C, Phase 1, Agreement with Turner-Kiewit Joint Venture for BP No. S00139, South Terminal C, Phase 1 – Landside Site Utilities and Balance of Sitework (GMP No. 5-S.2), at the Orlando International Airport, for a revised total negotiated GMP Amendment amount of $18,037,180, which includes $12,007,108 for Direct Cost of Work, $327,075 for Unbought Scope, $1,962,709 for Allowances, $714,845 for CM@R Contingency, $2,176,822 for Owner Contingency, $119,767 for Performance and Payment Bonds, and $728,854 for the CM@R’s Fee (4.211%), resulting in a revised GMP amount of $64,260,921, with funding from General Airport Revenue Bonds, Customer Facility Charges, and the Aviation Authority’s Line of Credit to be reimbursed by future General Airport Revenue Bonds; and authorize an Aviation Authority Officer or the Chief Executive Officer to execute the necessary documents following satisfactory review by legal counsel.

Page 68: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

CONSENT AGENDA ITEM – N –

GREATER ORLANDO AVIATION AUTHORITY

________________________________________________________________ Orlando International Airport

One Jeff Fuqua Boulevard Orlando, Florida 32827-4399

MEMORANDUM TO: Members of the Aviation Authority FROM: Stanley J. Thornton, Chair, Construction Committee DATE: September 18, 2019 ITEM DESCRIPTION Recommendation of the Construction Committee to Approve an Amendment to Addendum No. 11 to the Construction Management at Risk (CM@R) Entity Services for South Terminal C, Phase 1, Agreement with Turner-Kiewit Joint Venture, for Project Bid Package (BP) No. S00141, South Terminal C, Phase 1, Landside Conveying Equipment (Guaranteed Maximum Price (GMP) No. 5-S.4) at the Orlando International Airport BACKGROUND The South Terminal C, Phase 1, Program provides for a world-class domestic and international airport terminal building, consisting of a new airside terminal with up to 24 airline gates and a landside terminal with both secure and non-secure areas, and may include, but is not limited to, all associated improvements and infrastructure required or related thereto, such as site work, roadways, aprons, runways, taxiways, other airfield work, utilities, landscaping, lighting, walkways, pedestrian bridges, expansion of the parking garage, a new and/or expanded chiller plant, aircraft loading bridges, and all interior design, such as concessions planning, ticketing, and security improvements, and baggage handling systems. On May 18, 2016, the Aviation Authority Board approved the award of a Construction Management at Risk (CM@R) Entity Services for South Terminal C, Phase 1, Agreement with Turner-Kiewit Joint Venture for the South Terminal C, Phase 1, Program at the Orlando International Airport.

Under the CM@R Agreement, the CM@R is entitled to reimbursement and compensation for the following, upon acceptable performance:

• Direct cost of the work is the actual cost for the subcontractor costs, direct

labor, materials, and equipment required to construct the work, • Allowances are estimated dollar amounts that are separately identified in a GMP for

the purpose of encumbering funds to cover certain costs that are not completely defined when the GMP is approved, but may be necessary to complete the Project. An allowance means that the scope is not fully known or additional review is needed to determine whether the item is reimbursable,

• General condition expenses, such as CM@R management staff, limited to those set

forth in the CM@R Agreement, • CM@R Contingency is the negotiated amount or percentage of the Cost of the Work to

be utilized for over-budget buyout of the work and for increases in the cost due to unforeseen circumstances relating to construction of the project, except when deemed the responsibility of the Owner in accordance with the Agreement,

• Owner Contingency is an amount or percentage of the Cost of the Work to be utilized by the Owner for items deemed the responsibility of the Owner in accordance with the Agreement,

Page 69: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

• Performance and Payment Bond rate set forth in the CM@R Contract is 0.664%, and • The CM@R Fee covers the CM@R’s overhead, profit and all other costs not

reimbursable under the CM@R Contract. For Turner-Kiewit Joint Venture, the CM@R Fee is 4.211%.

Cost of allowances, contingencies and insurance will not be incurred until approved by the Aviation Authority. On April 18, 2018, the Aviation Authority Board approved Addendum No. 11 to the Construction Management at Risk (CM@R) Entity Services for South Terminal C, Phase 1, Agreement with Turner-Kiewit Joint Venture for BP No. S00141, South Terminal C, Phase 1, Landside Conveying Equipment (GMP No. 5-S.4), for a total negotiated GMP amount of $15,871,953. The scope of BP No. S00141 provides for the elevators and escalators for the Landside Terminal and Parking Garage C for South Terminal C. ISSUES This amendment funds the elevators and escalators for the Ground Transportation Facility (GTF), for the South Terminal C, Phase 1, and Phase 1 Expansion, scope of work. The Owner’s Authorized Representative (i.e., Geotech Consultants International, Inc. dba GCI, Inc.) and Turner-Kiewit Joint Venture have reviewed the current financial status and progress of the work in BP No. S00141, and have determined that, in accordance with the contract documents, it is appropriate at this time to increase the Direct Cost of Work, Unbought Scope, CM@R Contingency, Owner Contingency, and Performance and Payment Bonds, including the associated CM@R fee amount, as shown below.

GMP Original GMP Budget

(A)

Current GMP Budget* (B)

Proposed GMP Amendment

(C)

Proposed Revised GMP

(D) = (B) + (C) Direct Cost of Work $14,404,956 $14,240,605 $ 884,634 $15,125,239 Unbought Scope $ 0 $ 0 $ 12,000 $ 12,000 CM@R Contingency $ 576,197 $ 510,820 $ 39,203 $ 550,023 Owner Contingency $ 144,050 $ 373,778 $ 19,602 $ 393,380 SUBTOTAL: $15,125,203 $15,125,203 $ 955,439 $16,080,642 Perf. & Payment Bond $ 105,390 $ 105,390 $ 6,657 $ 112,047 Fee (4.211%) $ 641,360 $ 641,360 $ 40,514 $ 681,874 Total GMP Addendum Cost: $15,871,953 $15,871,953 $1,002,610 $16,874,563

*The Current GMP Balance amount shown in the above table represents the current budget as a result of authorized GMP subcontract awards and other budget reallocations as a result of the GMP buyout process and the awards of CM@R’s contracts and/or purchase orders through the Budget, Buyout and Contingency Management (BBC) requests approved by the Construction Committee through July 2, 2019. The GMP buyout process results in internal cost transfers between the different GMP elements within the GMP without changing the overall GMP amount previously-approved by the Aviation Authority Board. Turner-Kiewit Joint Venture proposes 0.1% LDB participation on this GMP Amendment to BP No. S00141 for Construction Services. Turner-Kiewit Joint Venture is committed to the established small business goals of 20% MWBE and 4% LDB participation for Construction Services. With this GMP Amendment, Turner-Kiewit Joint Venture’s estimated participation for BP No. S00141 is 13% MWBE and 4% LDB/VBE. Currently, Turner-Kiewit Joint Venture’s estimated cumulative achievement for Construction Services is 19% MWBE and 4% LDB/VBE participation. On September 5, 2019, the Construction Committee recommended approval of an Amendment to Addendum No. 11 to the Construction Management at Risk (CM@R) Entity Services for South Terminal C, Phase 1, Agreement with Turner-Kiewit Joint Venture, for BP No. S00141, South Terminal C, Phase 1, Landside Conveying Equipment (GMP No. 5-S.4) at the Orlando International Airport, as outlined in the memorandum. ALTERNATIVES None.

Page 70: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

FISCAL IMPACT The fiscal impact is $1,002,610. Funding is from General Airport Revenue Bonds, Customer Facility Charges, and the Aviation Authority’s Line of Credit to be reimbursed by future General Airport Revenue Bonds. RECOMMENDED ACTION It is respectfully requested that the Aviation Authority Board resolve to accept the recommendation of the Construction Committee and approve an Amendment to Addendum No. 11 to the Construction Management at Risk (CM@R) Entity Services for South Terminal C, Phase 1, Agreement with Turner-Kiewit Joint Venture, for BP No. S00141, South Terminal C, Phase 1, Landside Conveying Equipment (GMP No. 5-S.4) at the Orlando International Airport, for a total negotiated GMP amendment amount of $1,002,610, which includes $884,634 for Direct Cost of Work, $12,000 for Unbought Scope, $39,203 for CM@R Contingency, $19,602 for Owner Contingency, $6,657 for Performance and Payment Bonds, and a CM@R’s fee amount of $40,514 (4.211%), resulting in a revised GMP amount of $16,874,563, with funding from General Airport Revenue Bonds, Customer Facility Charges, and the Aviation Authority’s Line of Credit to be reimbursed by future General Airport Revenue Bonds; and authorize an Aviation Authority Officer or the Chief Executive Officer to execute the necessary documents following satisfactory review by legal counsel.

Page 71: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

CONSENT AGENDA ITEM – O –

GREATER ORLANDO AVIATION AUTHORITY

________________________________________________________________ Orlando International Airport

One Jeff Fuqua Boulevard Orlando, Florida 32827-4399

MEMORANDUM TO: Members of the Aviation Authority FROM: Stanley J. Thornton, Chair, Construction Committee DATE: September 18, 2019 ITEM DESCRIPTION Recommendation of the Construction Committee to Approve an Amendment to Addendum No. 9 to the Construction Management at Risk Services Agreement for the South Terminal C, Phase 1, with Turner-Kiewit Joint Venture, for Project Bid Package (BP) No. S00146, South Terminal C, Phase 1, Landside Terminal, Structure and Enclosure (Guaranteed Maximum Price (GMP) No. 7-S) at the Orlando International Airport BACKGROUND The South Terminal C, Phase 1, Program provides for a world-class domestic and international airport terminal building, consisting of a new airside terminal with up to 24 airline gates and a landside terminal with both secure and non-secure areas, and may include, but is not limited to, all associated improvements and infrastructure required or related thereto, such as site work, roadways, aprons, runways, taxiways, other airfield work, utilities, landscaping, lighting, walkways, pedestrian bridges, expansion of the parking garage, a new and/or expanded chiller plant, aircraft loading bridges, and all interior design, such as concessions planning, ticketing, and security improvements, and baggage handling systems. On May 18, 2016, the Aviation Authority Board approved the award of a Construction Management at Risk (CM@R) Entity Services for South Terminal C, Phase 1, Agreement with Turner-Kiewit Joint Venture for the South Terminal C, Phase 1, Program at the Orlando International Airport. Under the CM@R Agreement, the CM@R is entitled to reimbursement and compensation for the following, upon acceptable performance:

• Direct cost of the work is the actual cost for the subcontractor costs, direct

labor, materials, and equipment required to construct the work, • Allowances are estimated dollar amounts that are separately identified in a GMP for

the purpose of encumbering funds to cover certain costs that are not completely defined when the GMP is approved, but may be necessary to complete the Project. An allowance means that the scope is not fully known or additional review is needed to determine whether the item is reimbursable,

• General condition expenses, such as CM@R management staff, limited to those set

forth in the CM@R Agreement, • CM@R Contingency is the negotiated amount or percentage of the Cost of the Work to

be utilized for over-budget buyout of the work and for increases in the cost due to unforeseen circumstances relating to construction of the project, except when deemed the responsibility of the Owner in accordance with the Agreement,

Page 72: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

• Owner Contingency is an amount or percentage of the Cost of the Work to be utilized by the Owner for items deemed the responsibility of the Owner in accordance with the Agreement,

• Performance and Payment Bond rate set forth in the CM@R Contract is 0.664%, and • The CM@R Fee covers the CM@R’s overhead, profit and all other costs not

reimbursable under the CM@R Contract. For Turner-Kiewit Joint Venture, the CM@R Fee is 4.211%.

Cost of allowances, contingencies and insurance will not be incurred until approved by the Aviation Authority. On March 21, 2018, the Aviation Authority Board approved Addendum No. 9 to the Construction Management at Risk Services Agreement for the South Terminal C, Phase 1, with Turner-Kiewit Joint Venture for BP No. S00146, South Terminal C, Phase 1, Landside Terminal, Structure and Enclosure (GMP No. 7-S), for a total negotiated GMP amount of $106,397,624. On February 20, 2019, the Aviation Authority Board approved Amendment No. 1 to Addendum No. 9 to the Construction Management at Risk Services Agreement for the South Terminal C, Phase 1, with Turner-Kiewit Joint Venture for BP No. S00146, South Terminal C, Phase 1, Landside Terminal, Structure and Enclosure (GMP No. 7-S), for a total negotiated GMP amendment of $10,603,665, resulting in a revised total GMP amount of $117,001,289. The scope of BP No. S00146 includes early concrete, structural steel and curtain wall for the Landside Terminal building additions. ISSUES This amendment funds the balance of the Landside Terminal changes, including concrete, structural steel and curtain walls, for the South Terminal C, Phase 1, and Phase 1 Expansion, scope of work. The Owner’s Authorized Representative (i.e., Geotech Consultants International, Inc. dba GCI, Inc.) and Turner-Kiewit Joint Venture have reviewed the current financial status and progress of the work in BP No. S00146, and have determined that, in accordance with the contract documents, it is appropriate at this time to increase the Direct Cost of Work, Allowances, CM@R Contingency, Owner Contingency, and Performance and Payment Bonds, including the associated CM@R fee amount, as shown below. There is no impact to the GMP schedule.

GMP

Original GMP Budget (A)

Current GMP Budget* (B)

Proposed GMP Amendment

(C)

Proposed Revised GMP

(D) = (B) + (C) Direct Cost of Work (DCOW) $ 74,335,304 $101,918,182 $ 7,874,424 $109,792,606 Unbought Scope $ 19,084,716 $ 2,715,051 $ 0 $ 2,715,051 Allowances $ 897,920 $ 221,964 $ 3,453,921 $ 3,675,885 CM@R Contingency $ 4,715,897 $ 2,905,661 $ 566,417 $ 3,472,078 Owner’s Contingency $ 2,357,949 $ 3,735,708 $ 283,209 $ 4,018,917 SUBTOTAL: $101,391,786 $111,496,566 $12,177,971 $123,674,537 Perf. & Payment Bonds $ 706,480 $ 776,888 $ 84,854 $ 861,742 Fee (4.211%) $ 4,299,358 $ 4,727,835 $ 516,388 $ 5,244,223 Total GMP Addendum Cost: $106,397,624 $117,001,289 $12,779,213 $129,780,502

*The Current GMP Balance amount shown in the above table represents the current budget as a result of authorized GMP subcontract awards and other budget reallocations as a result of the GMP buyout process and the awards of CM@R’s contracts and/or purchase orders through the Budget, Buyout and Contingency Management (BBC) requests approved by the Construction Committee through August 20, 2019. The GMP buyout process results in internal cost transfers between the different GMP elements within the GMP without changing the overall GMP amount previously-approved by the Aviation Authority Board. Turner-Kiewit Joint Venture proposes 3.7% MWBE participation on this GMP Amendment to BP No. S00146 for Construction Services. Turner-Kiewit Joint Venture is committed to the established small business goals of 20% MWBE and 4% LDB participation for Construction Services. With this GMP Amendment, Turner-Kiewit Joint Venture’s estimated participation for BP No. S00146 is 12% MWBE and 3% LDB/VBE. Currently,

Page 73: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

Turner-Kiewit Joint Venture’s estimated cumulative achievement for Construction Services is 19% MWBE and 4% LDB/VBE participation. On September 5, 2019, the Construction Committee recommended approval of an Amendment to Addendum No. 9 to the Construction Management at Risk Services Agreement for the South Terminal C, Phase 1, with Turner-Kiewit Joint Venture for BP No. S00146, South Terminal C, Phase 1, Landside Terminal, Structure and Enclosure (GMP No. 7-S) at the Orlando International Airport, as outlined in the memorandum. ALTERNATIVES None. FISCAL IMPACT The fiscal impact is $12,779,213. Funding is from General Airport Revenue Bonds, Passenger Facility Charges to the extent eligible, and the Aviation Authority’s Line of Credit to be reimbursed by future General Airport Revenue Bonds. RECOMMENDED ACTION It is respectfully requested that the Aviation Authority Board resolve to accept the recommendation of the Construction Committee and approve an Amendment to Addendum No. 9 to the Construction Management at Risk Services Agreement for the South Terminal C, Phase 1, with Turner-Kiewit Joint Venture for BP No. S00146, South Terminal C, Phase 1, Landside Terminal, Structure and Enclosure (GMP No. 7-S), for a total negotiated GMP amendment amount of $12,779,213, which includes $7,874,424 for Direct Cost of Work, $3,453,921 for Allowances, $566,417 for CM@R Contingency, $283,209 for Owner Contingency, $84,854 for Performance and Payment Bonds, and $516,388 for the CM@R’s Fee (4.211%), resulting in a revised total GMP amount of $129,780,502, with funding from General Airport Revenue Bonds, Passenger Facility Charges to the extent eligible, and the Aviation Authority’s Line of Credit to be reimbursed by future General Airport Revenue Bonds; and authorize an Aviation Authority Officer or the Chief Executive Officer to execute the necessary documents following satisfactory review by legal counsel.

Page 74: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

CONSENT AGENDA ITEM – P –

GREATER ORLANDO AVIATION AUTHORITY

________________________________________________________________ Orlando International Airport

One Jeff Fuqua Boulevard Orlando, Florida 32827-4399

MEMORANDUM TO: Members of the Aviation Authority FROM: Stanley J. Thornton, Chair, Construction Committee DATE: September 18, 2019 ITEM DESCRIPTION Recommendation of the Construction Committee to Approve an Amendment to Addendum No. 19 to the Construction Management at Risk (CM@R) Entity Services for South Terminal C, Phase 1, Agreement with Turner-Kiewit Joint Venture, for Project Bid Package (BP) No. S00147, South Terminal C, Phase 1 Landside Terminal, Remaining Structure and Systems (Guaranteed Maximum Price (GMP) No. 7-S.1) at the Orlando International Airport BACKGROUND The South Terminal C, Phase 1, Program provides for a world-class domestic and international airport terminal building, consisting of a new airside terminal with up to 24 airline gates and a landside terminal with both secure and non-secure areas, and may include, but is not limited to, all associated improvements and infrastructure required or related thereto, such as site work, roadways, aprons, runways, taxiways, other airfield work, utilities, landscaping, lighting, walkways, pedestrian bridges, expansion of the parking garage, a new and/or expanded chiller plant, aircraft loading bridges, and all interior design, such as concessions planning, ticketing, and security improvements, and baggage handling systems. On May 18, 2016, the Aviation Authority Board approved the award of a Construction Management at Risk (CM@R) Entity Services for South Terminal C, Phase 1, Agreement with Turner-Kiewit Joint Venture for the South Terminal C, Phase 1, Program at the Orlando International Airport.

Under the CM@R Agreement, the CM@R is entitled to reimbursement and compensation for the following, upon acceptable performance:

• Direct cost of the work is the actual cost for the subcontractor costs, direct

labor, materials, and equipment required to construct the work, • Allowances are estimated dollar amounts that are separately identified in a GMP for

the purpose of encumbering funds to cover certain costs that are not completely defined when the GMP is approved, but may be necessary to complete the Project. An allowance means that the scope is not fully known or additional review is needed to determine whether the item is reimbursable,

• General condition expenses, such as CM@R management staff, limited to those set

forth in the CM@R Agreement, • CM@R Contingency is the negotiated amount or percentage of the Cost of the Work to

be utilized for over-budget buyout of the work and for increases in the cost due to unforeseen circumstances relating to construction of the project, except when deemed the responsibility of the Owner in accordance with the Agreement,

• Owner Contingency is an amount or percentage of the Cost of the Work to be utilized

by the Owner for items deemed the responsibility of the Owner in accordance with the Agreement,

Page 75: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

• Performance and Payment Bond rate set forth in the CM@R Contract is 0.664%, and • The CM@R Fee covers the CM@R’s overhead, profit and all other costs not

reimbursable under the CM@R Contract. For Turner-Kiewit Joint Venture, the CM@R Fee is 4.211%.

Cost of allowances, contingencies and insurance will not be incurred until approved by the Aviation Authority. On October 10, 2018, the Aviation Authority Board approved Addendum No. 19 to the Construction Management at Risk (CM@R) Entity Services for South Terminal C, Phase 1, Agreement with Turner-Kiewit Joint Venture for BP No. S00147, South Terminal C, Phase 1, Landside Terminal, Remaining Structure and Systems (GMP No. 7-S.1), for a total negotiated GMP amount of $158,731,417. The scope of BP No. S00147 provides the remaining structure and systems for the Landside Terminal, including, but not limited to, precast, masonry, miscellaneous metals, waterproofing and caulking, roofing, applied fireproofing, skylights, interior glass and glazing, doors, frames and hardware, drywall, framing and stucco, metal wall panels, miscellaneous metals, fire protection, and low voltage. ISSUES This amendment funds the balance of the Landside Terminal changes, including precast, masonry, waterproofing/caulking, metal wall panels, roofing, applied fireproofing, skylights, doors/frames/hardware, interior glazing, drywall/framing, fire protection, and low voltage, for the South Terminal C, Phase 1, Expansion, scope of work. The Owner’s Authorized Representative (i.e., Geotech Consultants International, Inc. dba GCI, Inc.) and Turner-Kiewit Joint Venture have reviewed the current financial status and progress of the work in BP No. S00147, and have determined that, in accordance with the contract documents, it is appropriate at this time to increase the Direct Cost of Work, Unbought Scope, CM@R Contingency, Owner Contingency, and Performance and Payment Bonds, including the associated CM@R fee amount, as shown below.

GMP Original GMP

Budget (A)

Current GMP Budget* (B)

Proposed GMP Amendment

(C)

Proposed Revised GMP

(D) = (B) + (C) Direct Cost of Work $145,060,954 $139,642,182 $ 9,871,250 $149,513,432 Unbought Scope $ 1,827,324 $ 1,204,800 $ 15,000 $ 1,219,800 Allowances ($ 4,856,957) $ 1,751,350 $ 0 $ 1,751,350 CM@R Contingency $ 5,681,253 $ 5,680,042 $ 494,312 $ 6,174,354 Owner Contingency $ 3,550,783 $ 2,984,983 $ 1,562,583 $ 4,547,566 SUBTOTAL: $151,263,357 $151,263,357 $11,943,145 $163,206,502 Perf. & Payment Bond $ 1,053,977 $ 1,053,977 $ 83,218 $ 1,137,195 Fee (4.211%) $ 6,414,083 $ 6,414,083 $ 506,430 $ 6,920,513 Total GMP Addendum Cost: $158,731,417 $158,731,417 $12,532,793 $171,264,210

*The Current GMP Balance amount shown in the above table represents the current budget as a result of authorized GMP subcontract awards and other budget reallocations as a result of the GMP buyout process and the awards of CM@R’s contracts and/or purchase orders through the Budget, Buyout and Contingency Management (BBC) requests approved by the Construction Committee through August 20, 2019. The GMP buyout process results in internal cost transfers between the different GMP elements within the GMP without changing the overall GMP amount previously-approved by the Aviation Authority Board. Turner-Kiewit Joint Venture proposes 6.1% MWBE and 0.2% LDB participation on this GMP Amendment to BP No. S00147 for Construction Services. Turner-Kiewit Joint Venture is committed to the established small business goals of 20% MWBE and 4% LDB participation for Construction Services. With this GMP Amendment, Turner-Kiewit Joint Venture’s estimated participation for BP No. S00147 is 20% MWBE and 4% LDB/VBE. Currently, Turner-Kiewit Joint Venture’s estimated cumulative achievement for Construction Services is 19% MWBE and 4% LDB/VBE participation.

Page 76: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

On September 5, 2019, the Construction Committee recommended approval of an Amendment to Addendum No. 19 to the Construction Management at Risk (CM@R) Entity Services for South Terminal C, Phase 1, Agreement with Turner-Kiewit Joint Venture for BP No. S00147, South Terminal C, Phase 1 Landside Terminal, Remaining Structure and Systems (GMP No. 7-S.1) at the Orlando International Airport, as outlined in the memorandum. ALTERNATIVES None. FISCAL IMPACT The fiscal impact is $12,532,793. Funding is from General Airport Revenue Bonds, Passenger Facility Charges to the extent eligible, and the Aviation Authority’s Line of Credit to be reimbursed by future General Airport Revenue Bonds and future Passenger Facility Charges to the extent eligible. RECOMMENDED ACTION It is respectfully requested that the Aviation Authority Board resolve to accept the recommendation of the Construction Committee and approve an Amendment to Addendum No. 19 to the Construction Management at Risk (CM@R) Entity Services for South Terminal C, Phase 1, Agreement with Turner-Kiewit Joint Venture for BP No. S00147, South Terminal C, Phase 1 Landside Terminal, Remaining Structure and Systems (GMP No. 7-S.1), for a total negotiated GMP amendment amount of $12,532,793, which includes $9,871,250 for Direct Cost of Work, $15,000 for Unbought Scope, $494,312 for CM@R Contingency, $1,562,583 for Owner Contingency, $83,218 for Performance and Payment Bonds, and $506,430 for the CM@R’s fee (4.211%), resulting in a revised total GMP amount of $171,264,210, with funding from General Airport Revenue Bonds, Passenger Facility Charges to the extent eligible, and the Aviation Authority’s Line of Credit to be reimbursed by future General Airport Revenue Bonds and future Passenger Facility Charges to the extent eligible; and authorize an Aviation Authority Officer or the Chief Executive Officer to execute the necessary documents following satisfactory review by legal counsel.

Page 77: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

CONSENT AGENDA ITEM – Q –

GREATER ORLANDO AVIATION AUTHORITY

________________________________________________________________ Orlando International Airport

One Jeff Fuqua Boulevard Orlando, Florida 32827-4399

MEMORANDUM TO: Members of the Aviation Authority FROM: Stanley J. Thornton, Chair, Construction Committee DATE: September 18, 2019 ITEM DESCRIPTION Recommendation of the Construction Committee to Approve an Addendum to the Construction Management at Risk (CM@R) Entity Services for South Terminal C, Phase 1, Agreement with Hensel Phelps Construction, for Project Bid Package (BP) No. S00166, South Terminal C, Phase 1, Hensel Phelps General Conditions for Fiscal Year (FY) 2020 (Guaranteed Maximum Price (GMP) No. 16-S.4), at the Orlando International Airport BACKGROUND The South Terminal C, Phase 1, Program provides for a world-class domestic and international airport terminal building, consisting of a new airside terminal with up to 24 airline gates and a landside terminal with both secure and non-secure areas, and may include, but is not limited to, all associated improvements and infrastructure required or related thereto, such as site work, roadways, aprons, runways, taxiways, other airfield work, utilities, landscaping, lighting, walkways, pedestrian bridges, expansion of the parking garage, a new and/or expanded chiller plant, aircraft loading bridges, and all interior design, such as concessions planning, ticketing, and security improvements, and baggage handling systems. On March 19, 2017, the Aviation Authority’s Finance Committee approved the award of a Construction Management at Risk (CM@R) Entity Services for South Terminal C, Phase 1, Agreement with Hensel Phelps Construction for the South Terminal C, Phase 1, at the Orlando International Airport. Under the CM@R Agreement, the CM@R is entitled to reimbursement and compensation for the following, upon acceptable performance:

• Direct cost of the work is the actual cost for the subcontractor costs, direct

labor, materials, and equipment required to construct the work, • Allowances are estimated dollar amounts that are separately identified in a GMP for

the purpose of encumbering funds to cover certain costs that are not completely defined when the GMP is approved, but may be necessary to complete the Project. An allowance means that the scope is not fully known or additional review is needed to determine whether the item is reimbursable,

• General condition expenses, such as CM@R management staff, limited to those set

forth in the CM@R Agreement, • CM@R Contingency is the negotiated amount or percentage of the Cost of the Work to

be utilized for over-budget buyout of the work and for increases in the cost due to unforeseen circumstances relating to construction of the project, except when deemed the responsibility of the Owner in accordance with the Agreement,

Page 78: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

• Owner Contingency is an amount or percentage of the Cost of the Work to be utilizedby the Owner for items deemed the responsibility of the Owner in accordance withthe Agreement,

• Performance and Payment Bond rate set forth in the CM@R Contract is 0.66%, and

• The CM@R Fee covers the CM@R’s overhead, profit and all other costs notreimbursable under the CM@R Contract. For Hensel Phelps Construction, the CM@R Feeis 6.031%.

Cost of allowances, contingencies and insurance will not be incurred until approved by the Aviation Authority.

The scope of BP No. S00166 provides construction management staff for FY 2020. BP No. S00166 will provide staff and general conditions necessary to manage and maintain continuity through all GMPs related to the Airside Terminal and related scope under Hensel Phelps Construction’s CM@R Agreement for the South Terminal C, Phase 1, and Phase 1 Expansion, Program.

ISSUES

GMP No. 16-S.4 for South Terminal C, Phase 1, has been negotiated with Hensel Phelps Construction for BP No. S00166, Hensel Phelps General Conditions for FY 2020 (GMP No. 16-S.4) at the Orlando International Airport, for a total GMP amount as shown below. Hensel Phelps Construction proposes these services for the following compensation:

CM@R Staff/Benefits and General Requirements (Lump Sum)* $13,506,227MWBE/LDB Partners and Consultants (Lump Sum)** $ 7,841,224Total GMP Addendum Cost (Lump Sum) $21,347,451

Payment for work will be for the work and services performed up to but not exceeding the total GMP amount in accordance with the CM@R Agreement.

*The lump sum value will be billed in 12 equal monthly amounts. The full cost for thebonds may be invoiced in the first payment application, in addition to the monthly rate.

**The Aviation Authority will pay this amount based upon invoices from the MWBE and LDB/VBE certified entities, or other evidence of payment to those entities that is satisfactory to the Aviation Authority.

The overall GMP proposal has been thoroughly reviewed by the Owner’s Authorized Representative (i.e., Geotech Consultants International, Inc. dba GCI, Inc.), the Aviation Authority’s Construction-Engineering-Financial Consultant (i.e., R. W. Block Consulting, Inc.), legal counsel, and staff.

For this GMP No. 16-S.4, Hensel Phelps Construction proposes 24.1% MWBE and 6.0% LDB/VBE participation on this GMP Amendment to BP No. S00166 for Construction Management Services, and 45.1% MWBE and 8.3% LDB/VBE participation for Construction Services. Hensel Phelps Construction is committed to the established small business goals of 25% MWBE and 6% LDB participation for Construction Management Services, and 20% MWBE and 4% LDB participation for Construction Services. Currently, Hensel Phelps Construction’s estimated cumulative achievement for the overall Program is 23% MWBE and 6% LDB/VBE participation for Construction Management Services, and 25% MWBE and 4% LDB/VBE participation for Construction Services.

On September 5, 2019, the Construction Committee recommended approval of an Addendum to the Construction Management at Risk (CM@R) Entity Services for South Terminal C, Phase 1, Agreement with Hensel Phelps Construction for BP No. S00166, Hensel Phelps General Conditions for FY 2020 (GMP No. 16-S.4) at the Orlando International Airport, as outlined in the memorandum.

ALTERNATIVES

None.

Page 79: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

FISCAL IMPACT The fiscal impact is $21,347,451. Funding is from General Airport Revenue Bonds and Passenger Facility Charges to the extent eligible, and the Aviation Authority’s Line of Credit to be reimbursed by future General Airport Revenue Bonds and future Passenger Facility Charges to the extent eligible. RECOMMENDED ACTION It is respectfully requested that the Aviation Authority Board resolve to accept the recommendation of the Construction Committee and approve an Addendum to the Construction Management at Risk (CM@R) Entity Services for South Terminal C, Phase 1, Agreement with Hensel Phelps Construction for BP No. S00166, South Terminal C, Phase 1 – Hensel Phelps General Conditions for FY 2020 (GMP No. 16-S.4) at the Orlando International Airport, for a total negotiated GMP amount (Lump Sum) of $21,347,451, which includes $13,506,227 for CM@R Staff/Benefits and General Requirements (Lump Sum), and $7,841,224 for MWBE/LDB Partners and Consultants (Lump Sum), with funding from General Airport Revenue Bonds and Passenger Facility Charges to the extent eligible, and the Aviation Authority’s Line of Credit to be reimbursed by future General Airport Revenue Bonds and future Passenger Facility Charges to the extent eligible; and authorize an Aviation Authority Officer or the Chief Executive Officer to execute the necessary documents following satisfactory review by legal counsel.

Page 80: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

CONSENT AGENDA ITEM – R –

GREATER ORLANDO AVIATION AUTHORITY

________________________________________________________________ Orlando International Airport

One Jeff Fuqua Boulevard Orlando, Florida 32827-4399

MEMORANDUM TO: Members of the Aviation Authority FROM: Stanley J. Thornton, Chair, Construction Committee DATE: September 18, 2019 ITEM DESCRIPTION Recommendation of the Construction Committee to Approve an Amendment to Addendum No. 15 to the Construction Management at Risk (CM@R) Entity Services for South Terminal C, Phase 1, Agreement with Turner-Kiewit Joint Venture, for Project Bid Package (BP) No. S00170, South Terminal C, Phase 1, Underground Electrical Distribution (Guaranteed Maximum Price (GMP) No. 5-S.6) at the Orlando International Airport BACKGROUND The South Terminal C, Phase 1, Program provides for a world-class domestic and international airport terminal building, consisting of a new airside terminal with up to 24 airline gates and a landside terminal with both secure and non-secure areas, and may include, but is not limited to, all associated improvements and infrastructure required or related thereto, such as site work, roadways, aprons, runways, taxiways, other airfield work, utilities, landscaping, lighting, walkways, pedestrian bridges, expansion of the parking garage, a new and/or expanded chiller plant, aircraft loading bridges, and all interior design, such as concessions planning, ticketing, and security improvements, and baggage handling systems. On May 18, 2016, the Aviation Authority Board approved the award of a Construction Management at Risk (CM@R) Entity Services for South Terminal C, Phase 1, Agreement with Turner-Kiewit Joint Venture for the South Terminal C, Phase 1, Program at the Orlando International Airport. Under the CM@R Agreement, the CM@R is entitled to reimbursement and compensation for the following, upon acceptable performance: • Direct cost of the work is the actual cost for the subcontractor costs, direct

labor, materials, and equipment required to construct the work, • Allowances are estimated dollar amounts that are separately identified in a GMP for

the purpose of encumbering funds to cover certain costs that are not completely defined when the GMP is approved, but may be necessary to complete the Project. An allowance means that the scope is not fully known or additional review is needed to determine whether the item is reimbursable,

• General condition expenses, such as CM@R management staff, limited to those set

forth in the CM@R Agreement, • CM@R Contingency is the negotiated amount or percentage of the Cost of the Work to

be utilized for over-budget buyout of the work and for increases in the cost due to unforeseen circumstances relating to construction of the project, except when deemed the responsibility of the Owner in accordance with the Agreement,

Page 81: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

• Owner Contingency is an amount or percentage of the Cost of the Work to be utilized by the Owner for items deemed the responsibility of the Owner in accordance with the Agreement,

• Performance and Payment rate set forth in the CM@R Contract is 0.664%, and • The CM@R Fee covers the CM@R’s overhead, profit and all other costs not

reimbursable under the CM@R Contract. For Turner-Kiewit Joint Venture, the CM@R Fee is 4.211%.

Cost of allowances, contingencies and insurance will not be incurred until approved by the Aviation Authority. On June 20, 2018, the Aviation Authority Board approved Addendum No. 15 to the Construction Management at Risk (CM@R) Entity Services for South Terminal C, Phase 1, Agreement with Turner-Kiewit Joint Venture for BP No. S00170, South Terminal C, Phase 1, Underground Electrical Distribution (GMP No. 5-S.6) at the Orlando International Airport, for a total negotiated GMP amount of $40,534,012. The scope of BP No. S00170 includes primary power and emergency power distribution ductbanks and associated manholes for four main ductbanks, consisting of the Orlando Utilities Commission (OUC) ductbank, emergency generators A and B, and communications control. The south portion of the OUC power, including the OUC primary switchyard pad and OUC access roads, was bid as an alternate and is incorporated into this GMP. ISSUES This amendment funds the underground ductbank work for the South Terminal C, Phase 1, scope of work. The Owner’s Authorized Representative (i.e., Geotech Consultants International, Inc. dba GCI, Inc.) and Turner-Kiewit Joint Venture have reviewed the current financial status and progress of the work in BP No. S00170, and have determined that, in accordance with the contract documents, it is appropriate at this time to decrease the Allowances and increase the Direct Cost of Work, CM@R Contingency, Owner Contingency, and Performance and Payment Bonds, including the associated CM@R fee amount, as shown below.

GMP Original GMP Budget

(A)

Current GMP Budget* (B)

Proposed GMP Amendment

(C)

Proposed Revised GMP

(D) = (B) + (C) Direct Cost of Work (DCOW) $34,239,548 $34,642,693 $2,135,055 $36,777,748 Allowances $ 1,692,500 $ 1,692,500 ($1,387,460) $ 305,040 CM@R Contingency $ 1,796,602 $ 1,777,079 $ 122,005 $ 1,899,084 Owner’s Contingency $ 898,301 $ 514,679 $1,061,002 $ 1,575,681 SUBTOTAL: $38,626,951 $38,626,951 $1,930,602 $40,557,553 Perf. & Payment Bonds $ 269,146 $ 269,146 $ 13,452 $ 282,598 Fee (4.211%) $ 1,637,915 $ 1,637,915 $ 81,864 $ 1,719,779 Total GMP Addendum Cost: $40,534,012 $40,534,012 $2,025,918 $42,559,930

*The Current GMP Balance amount shown in the above table represents the current budget as a result of authorized GMP subcontract awards and other budget reallocations as a result of the GMP buyout process and the awards of CM@R’s contracts and/or purchase orders through the Budget, Buyout and Contingency Management (BBC) requests approved by the Construction Committee through August 13, 2019. The GMP buyout process results in internal cost transfers between the different GMP elements within the GMP without changing the overall GMP amount previously-approved by the Aviation Authority Board. The subcontractor identified and committed to participate on this GMP Amendment to BP No. S00170 is Eden Site Development, Inc. (MWBE). This GMP Amendment is comprised of an addition to the MWBE participation of $2,058,412, and a reduction to the LDB participation in the amount of ($141,953). Turner-Kiewit Joint Venture is committed to the established small business goals of 20% MWBE and 4% LDB participation for Construction Services. With this GMP Amendment, Turner-Kiewit Joint Venture’s estimated participation for BP No. S00170 is 29% MWBE and 4% LDB. Currently, Turner-Kiewit Joint Venture’s estimated cumulative achievement for Construction Services is 19% MWBE and 4% LDB participation. On September 5, 2019, the Construction Committee recommended approval of an Amendment to Addendum No. 15 to the Construction Management at Risk (CM@R) Entity Services for

Page 82: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

South Terminal C, Phase 1, Agreement with Turner-Kiewit Joint Venture, for Project Bid Package (BP) No. S00170, South Terminal C, Phase 1, Underground Electrical Distribution (Guaranteed Maximum Price (GMP) No. 5-S.6), at the Orlando International Airport, as outlined in the memorandum. ALTERNATIVES None. FISCAL IMPACT The fiscal impact is $2,025,918. Funding is from General Airport Revenue Bonds and the Aviation Authority’s Line of Credit to be reimbursed by future General Airport Revenue Bonds. RECOMMENDED ACTION It is respectfully requested that the Aviation Authority Board resolve to accept the recommendation of the Construction Committee and approve an Amendment to Addendum No. 15 to the Construction Management at Risk (CM@R) Entity Services for South Terminal C, Phase 1, Agreement with Turner-Kiewit Joint Venture for BP No. S00170, South Terminal C, Phase 1, Underground Electrical Distribution (GMP No. 5-S.6) at the Orlando International Airport, for a total negotiated GMP Amendment amount of $2,025,918, which includes $2,135,055 for Direct Cost of Work, a deductive amount of ($1,387,460) for Allowances, $122,005 for CM@R Contingency, $1,061,002 for Owner Contingency, $13,452 for Performance and Payment Bonds, and $81,864 for the CM@R’s Fee (4.211%), resulting in a revised GMP amount of $42,559,930, with funding from General Airport Revenue Bonds and the Aviation Authority’s Line of Credit to be reimbursed by future General Airport Revenue Bonds; and authorize an Aviation Authority Officer or the Chief Executive Officer to execute the necessary documents following satisfactory review by legal counsel.

Page 83: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

CONSENT AGENDA ITEM – S –

GREATER ORLANDO AVIATION AUTHORITY

________________________________________________________________ Orlando International Airport

One Jeff Fuqua Boulevard Orlando, Florida 32827-4399

MEMORANDUM TO: Members of the Aviation Authority FROM: Stanley J. Thornton, Chair, Construction Committee DATE: September 18, 2019 ITEM DESCRIPTION Recommendation of the Construction Committee to Approve an Amendment to Addendum No. 20 to the Construction Management at Risk (CM@R) Entity Services for South Terminal C, Phase 1, Agreement with Turner-Kiewit Joint Venture, for Project Bid Package (BP) No. S00173, South Terminal C, Phase 1 Landside Terminal Mechanical/Electrical/Plumbing (MEP) Systems – Florida Department of Transportation (FDOT) (Guaranteed Maximum Price (GMP) No. 7-S.3) at the Orlando International Airport BACKGROUND The South Terminal C, Phase 1, Program provides for a world-class domestic and international airport terminal building, consisting of a new airside terminal with up to 24 airline gates and a landside terminal with both secure and non-secure areas, and may include, but is not limited to, all associated improvements and infrastructure required or related thereto, such as site work, roadways, aprons, runways, taxiways, other airfield work, utilities, landscaping, lighting, walkways, pedestrian bridges, expansion of the parking garage, a new and/or expanded chiller plant, aircraft loading bridges, and all interior design, such as concessions planning, ticketing, and security improvements, and baggage handling systems. On May 18, 2016, the Aviation Authority Board approved the award of a Construction Management at Risk (CM@R) Entity Services for South Terminal C, Phase 1, Agreement with Turner-Kiewit Joint Venture for the South Terminal C, Phase 1, Program at the Orlando International Airport.

Under the CM@R Agreement, the CM@R is entitled to reimbursement and compensation for the following, upon acceptable performance:

• Direct cost of the work is the actual cost for the subcontractor costs, direct

labor, materials, and equipment required to construct the work, • Allowances are estimated dollar amounts that are separately identified in a GMP for

the purpose of encumbering funds to cover certain costs that are not completely defined when the GMP is approved, but may be necessary to complete the Project. An allowance means that the scope is not fully known or additional review is needed to determine whether the item is reimbursable,

• General condition expenses, such as CM@R management staff, limited to those set

forth in the CM@R Agreement, • CM@R Contingency is the negotiated amount or percentage of the Cost of the Work to

be utilized for over-budget buyout of the work and for increases in the cost due to unforeseen circumstances relating to construction of the project, except when deemed the responsibility of the Owner in accordance with the Agreement,

Page 84: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

• Owner Contingency is an amount or percentage of the Cost of the Work to be utilized by the Owner for items deemed the responsibility of the Owner in accordance with the Agreement,

• Performance and Payment Bond rate set forth in the CM@R Contract is 0.664%, and • The CM@R Fee covers the CM@R’s overhead, profit and all other costs not

reimbursable under the CM@R Contract. For Turner-Kiewit Joint Venture, the CM@R Fee is 4.211%.

Cost of allowances, contingencies and insurance will not be incurred until approved by the Aviation Authority. On October 10, 2018, the Aviation Authority Board approved Addendum No. 20 to the Construction Management at Risk (CM@R) Entity Services for South Terminal C, Phase 1, Agreement with Turner-Kiewit Joint Venture for BP No. S00173, South Terminal C, Phase 1 Landside Terminal Mechanical/Electrical/Plumbing (MEP) Systems – FDOT (GMP No. 7-S.3), for a total negotiated GMP amount of $112,987,835. On August 28, 2019, the Aviation Authority Board approved Amendment No. 1 to Addendum No. 20 to the Construction Management at Risk (CM@R) Entity Services for South Terminal C, Phase 1, Agreement with Turner-Kiewit Joint Venture for BP No. S00173, South Terminal C, Phase 1, Landside Terminal Mechanical/Electrical/Plumbing (MEP) Systems – FDOT (GMP No. 7-S.3), for a total negotiated GMP Amendment amount of $4,875,593, resulting in a revised GMP amount of $117,863,428. The scope of BP No. S00173 provides mechanical, electrical and plumbing systems for the Landside Terminal. ISSUES This amendment funds the balance of the Landside Terminal, including changes for mechanical, plumbing and electrical scopes for work, for the South Terminal C, Phase 1, and Phase 1 Expansion. The Owner’s Authorized Representative (i.e., Geotech Consultants International, Inc. dba GCI, Inc.) and Turner-Kiewit Joint Venture have reviewed the current financial status and progress of the work in BP No. S00173, and have determined that, in accordance with the contract documents, it is appropriate at this time to increase the Direct Cost of Work, CM@R Contingency, Owner Contingency, and Performance and Payment Bonds, including the associated CM@R fee amount, as shown below.

GMP Original GMP

Budget (A)

Current GMP Budget* (B)

Proposed GMP Amendment

(C)

Proposed Revised GMP

(D) = (B) + (C) Direct Cost of Work (DCOW) $ 55,680,412 $105,476,101 $ 4,839,901 $110,316,002 Unbought Scope $ 45,420,000 $ 0 $ 0 $ 0 CM@R Contingency $ 4,044,016 $ 2,648,618 $ 241,995 $ 2,890,613 Owner’s Contingency $ 2,527,510 $ 4,193,423 $ 5,303,234 $ 9,496,657 SUBTOTAL: $107,671,938 $112,318,142 $10,385,130 $122,703,272 Perf. & Payment Bonds $ 750,239 $ 782,613 $ 72,362 $ 854,975 Fee (4.211%) $ 4,565,658 $ 4,762,673 $ 440,365 $ 5,203,038 Total GMP Addendum Cost: $112,987,835 $117,863,428 $10,897,857 $128,761,285

*The Current GMP Balance amount shown in the above table represents the current budget as a result of authorized GMP subcontract awards and other budget reallocations as a result of the GMP buyout process and the awards of CM@R’s contracts and/or purchase orders through the Budget, Buyout and Contingency Management (BBC) requests approved by the Construction Committee through August 20, 2019. The GMP buyout process results in internal cost transfers between the different GMP elements within the GMP without changing the overall GMP amount previously-approved by the Aviation Authority Board. Turner-Kiewit Joint Venture proposed 10% DBE participation to BP No. S00173 for Construction Services, in lieu of MWBE and LDB participation goals. As such, Turner-Kiewit Joint Venture’s committed MWBE and LDB participation goals for Construction Services are not affected by this GMP Amendment. Turner-Kiewit Joint Venture proposes 4.3% DBE participation on this GMP Amendment to BP No. S00173. With this GMP Amendment, Turner-Kiewit Joint Venture’s estimated participation for BP No. S00173 is 10% DBE.

Page 85: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

On September 5, 2019, the Construction Committee recommended approval of an Amendment Addendum No. 20 to the Construction Management at Risk (CM@R) Entity Services for South Terminal C, Phase 1, Agreement with Turner-Kiewit Joint Venture for BP No. S00173, South Terminal C, Phase 1, Landside Terminal Mechanical/Electrical/Plumbing (MEP) Systems – FDOT (GMP No. 7-S.3) at the Orlando International Airport, as outlined in the memorandum. ALTERNATIVES None. FISCAL IMPACT The fiscal impact is $10,897,857. Funding is from FDOT Grants to the extent eligible, Passenger Facility Charges to the extent eligible, General Airport Revenue Bonds, and the Aviation Authority’s Line of Credit to be reimbursed by future General Airport Revenue Bonds. RECOMMENDED ACTION It is respectfully requested that the Aviation Authority Board resolve to accept the recommendation of the Construction Committee and approve an Amendment to Addendum No. 20 to the Construction Management at Risk (CM@R) Entity Services for South Terminal C, Phase 1, Agreement with Turner-Kiewit Joint Venture for BP No. S00173, South Terminal C, Phase 1, Landside Terminal Mechanical/Electrical/Plumbing (MEP) Systems – FDOT (GMP No. 7-S.3), for a total negotiated GMP Amendment amount of $10,897,857, which includes $4,839,901 for Direct Cost of Work, $241,995 for CM@R Contingency, $5,303,234 for Owner Contingency, $72,362 for Performance and Payment Bonds, and $440,365 for the CM@R’s fee (4.211%), resulting in a revised GMP amount of $128,761,285, with funding from FDOT Grants to the extent eligible, Passenger Facility Charges to the extent eligible, General Airport Revenue Bonds, and the Aviation Authority’s Line of Credit to be reimbursed by future General Airport Revenue Bonds; and authorize an Aviation Authority Officer or the Chief Executive Officer to execute the necessary documents following satisfactory review by legal counsel.

Page 86: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

CONSENT AGENDA ITEM – T –

GREATER ORLANDO AVIATION AUTHORITY

________________________________________________________________ Orlando International Airport

One Jeff Fuqua Boulevard Orlando, Florida 32827-4399

MEMORANDUM TO: Members of the Aviation Authority FROM: Stanley J. Thornton, Chair, Construction Committee DATE: September 18, 2019 ITEM DESCRIPTION Recommendation of the Construction Committee to Approve an Amendment to Addendum No. 23 to the Construction Management at Risk (CM@R) Entity Services for South Terminal C, Phase 1, Agreement with Turner-Kiewit Joint Venture, for Project Bid Package (BP) No. S00178, South Terminal C, Phase 1, Airfield Civil (Guaranteed Maximum Price (GMP) No. 19-S) at the Orlando International Airport BACKGROUND The South Terminal C, Phase 1, Program provides for a world-class domestic and international airport terminal building, consisting of a new airside terminal with up to 24 airline gates and a landside terminal with both secure and non-secure areas, and may include, but is not limited to all associated improvements and infrastructure required or related thereto, such as site work, roadways, aprons, runways, taxiways, other airfield work, utilities, landscaping, lighting, walkways, pedestrian bridges, expansion of the parking garage, a new and/or expanded chiller plant, aircraft loading bridges, and all interior design, such as concessions planning, ticketing, and security improvements, and baggage handling systems. On May 18, 2016, the Aviation Authority Board approved the award of a Construction Management at Risk (CM@R) Entity Services for South Terminal C, Phase 1, Agreement with Turner-Kiewit Joint Venture.

Under the CM@R Agreement, the CM@R is entitled to reimbursement and compensation for the following, upon acceptable performance:

• Direct cost of the work is the actual cost for the subcontractor costs, direct

labor, materials, and equipment required to construct the work, • Allowances are estimated dollar amounts that are separately identified in a GMP for

the purpose of encumbering funds to cover certain costs that are not completely defined when the GMP is approved, but may be necessary to complete the Project. An allowance means that the scope is not fully known or additional review is needed to determine whether the item is reimbursable,

• General condition expenses, such as CM@R management staff, limited to those set

forth in the CM@R Agreement, • CM@R Contingency is the negotiated amount or percentage of the Cost of the Work to

be utilized for over-budget buyout of the work and for increases in the cost due to unforeseen circumstances relating to construction of the project, except when deemed the responsibility of the Owner in accordance with the Agreement,

• Owner Contingency is an amount or percentage of the Cost of the Work to be utilized

by the Owner for items deemed the responsibility of the Owner in accordance with the Agreement,

Page 87: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

• Performance and Payment Bond rate set forth in the CM@R Contract is 0.664%, and • The CM@R Fee covers the CM@R’s overhead, profit and all other costs not

reimbursable under the CM@R Contract. For Turner-Kiewit Joint Venture, the CM@R Fee is 4.211%.

Cost of allowances, contingencies and insurance will not be incurred until approved by the Aviation Authority. On June 19, 2019, the Aviation Authority Board approved Addendum No. 23 to the Construction Management at Risk (CM@R) Entity Services for South Terminal C, Phase 1, Agreement with Turner-Kiewit Joint Venture, for BP No. S00178, South Terminal C, Phase 1, Airfield Civil (GMP No. 19-S), for a total negotiated GMP amount of $233,509,544. The scope of BP No. S00178 consists of the airfield civil work for the ramp areas, Remaining Overnight (RON) areas, taxiway extensions for Taxiways B and C, as well as newly constructed Taxiways E1, B9, B11, B12 and B13, and includes, but is not limited to, completion of the airfield civil sitework and utilities, apron and airfield paving, pavement markings, lighting, and various site logistics required for the Airside Terminal construction for South Terminal C. ISSUES This amendment funds the grease traps work for the South Terminal C, Phase 1, scope of work. The Owner’s Authorized Representative (i.e., Geotech Consultants International, Inc. dba GCI, Inc.) and Turner-Kiewit Joint Venture have reviewed the current financial status and progress of the work in BP No. S00178, and have determined that, in accordance with the contract documents, it is appropriate at this time to increase the Direct Cost of Work, CM@R Contingency, Owner Contingency, Contractor Controlled Insurance Program (CCIP) Insurance, and Performance and Payment Bonds, including the associated CM@R fee amount, as shown below.

GMP Original GMP

Budget (A)

Current GMP Budget* (B)

Proposed GMP Amendment

(C)

Proposed Revised GMP

(D) = (B) + (C) Direct Cost of Work (DCOW) $211,798,063 $211,798,063 $1,556,097 $213,354,160 Allowances $ 3,616,620 $ 3,616,620 $ 0 $ 3,616,620 CM@R Contingency $ 500,000 $ 500,000 $ 77,805 $ 577,805 Owner’s Contingency $ 500,000 $ 500,000 $2,738,902 $ 3,238,902 SUBTOTAL: $216,414,683 $216,414,683 $4,372,804 $220,787,487 Perf. & Payment Bonds $ 1,550,503 $ 1,550,503 $ 31,329 $ 1,581,832 CCIP Insurance (2.616%) $ 6,108,610 $ 6,108,610 $ 123,428 $ 6,232,038 Fee (4.211%) $ 9,435,748 $ 9,435,748 $ 190,656 $ 9,626,404 Total GMP Addendum Cost: $233,509,544 $233,509,544 $4,718,217 $238,227,761

*The Current GMP Balance amount shown in the above table represents the current budget as a result of authorized GMP subcontract awards and other budget reallocations as a result of the GMP buyout process and the awards of CM@R’s contracts and/or purchase orders through the Budget, Buyout and Contingency Management (BBC) requests approved by the Construction Committee through June 4, 2019. The GMP buyout process results in internal cost transfers between the different GMP elements within the GMP without changing the overall GMP amount previously-approved by the Aviation Authority Board. Turner-Kiewit Joint Venture does not propose any small business participation on this GMP Amendment to BP No. S00178 for Construction Services. Turner-Kiewit Joint Venture is committed to the established small business goals of 20% MWBE and 4% LDB participation for Construction Services. With this GMP Amendment, Turner-Kiewit Joint Venture’s estimated participation for BP No. S00178 is 19% MWBE and 4% LDB/VBE. Currently, Turner-Kiewit Joint Venture’s estimated cumulative achievement for Construction Services is 19% MWBE, 4.4% LDB/VBE and 12.8% DBE participation. On September 5, 2019, the Construction Committee recommended approval of an Amendment to Addendum No. 23 to the Construction Management at Risk (CM@R) Entity Services for South Terminal C, Phase 1, Agreement with Turner-Kiewit Joint Venture, for BP No. S00178, South Terminal C, Phase 1, Airfield Civil (GMP No. 19-S), at the Orlando International Airport, as outlined in the memorandum.

Page 88: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

ALTERNATIVES None. FISCAL IMPACT The fiscal impact is $4,718,217. Funding is from General Airport Revenue Bonds, Passenger Facility Charges to the extent eligible, and the Aviation Authority’s Line of Credit to be reimbursed by future General Airport Revenue Bonds and future Passenger Facility Charges to the extent eligible. RECOMMENDED ACTION It is respectfully requested that the Aviation Authority Board resolve to accept the recommendation of the Construction Committee and approve an Amendment to Addendum No. 23 to the Construction Management at Risk (CM@R) Entity Services for South Terminal C, Phase 1, Agreement with Turner-Kiewit Joint Venture, for BP No. S00178, South Terminal C, Phase 1, Airfield Civil (GMP No. 19-S), for a total negotiated GMP Amendment amount of $4,718,217, which includes $1,556,097 for Direct Cost of Work, $77,805 for CM@R Contingency, $2,738,902 for Owner Contingency, $31,329 for Performance and Payment Bonds, $123,428 for CCIP Insurance, and a CM@R’s Fee amount of $190,656 (4.211%), with funding from General Airport Revenue Bonds, Passenger Facility Charges to the extent eligible, and the Aviation Authority’s Line of Credit to be reimbursed by future General Airport Revenue Bonds and future Passenger Facility Charges to the extent eligible; and authorize an Aviation Authority Officer or the Chief Executive Officer to execute the necessary documents following satisfactory review by legal counsel.

Page 89: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

CONSENT AGENDA ITEM – U –

GREATER ORLANDO AVIATION AUTHORITY

________________________________________________________________ Orlando International Airport

One Jeff Fuqua Boulevard Orlando, Florida 32827-4399

MEMORANDUM TO: Members of the Aviation Authority FROM: Stanley J. Thornton, Chair, Construction Committee DATE: September 18, 2019 ITEM DESCRIPTION Recommendation of the Construction Committee to Approve an Amendment to Addendum No. 12 to the Construction Management at Risk (CM@R) Entity Services for South Terminal C, Phase 1, Agreement with Hensel Phelps Construction to establish a revised Baseline Program Schedule for the South Terminal C, Phase 1 and Phase 1 Expansion, at the Orlando International Airport BACKGROUND The South Terminal C, Phase 1, Program provides for a world-class domestic and international airport terminal building, consisting of a new airside terminal with up to 24 airline gates and a landside terminal with both secure and non-secure areas, and may include, but is not limited to, all associated improvements and infrastructure required or related thereto, such as site work, roadways, aprons, runways, taxiways, other airfield work, utilities, landscaping, lighting, walkways, pedestrian bridges, expansion of the parking garage, a new and/or expanded chiller plant, aircraft loading bridges, and all interior design, such as concessions planning, ticketing, and security improvements, and baggage handling systems. On March 19, 2017, the Aviation Authority’s Finance Committee approved the award of a Construction Management at Risk (CM@R) Entity Services for South Terminal C, Phase 1, Agreement with Hensel Phelps Construction for the South Terminal C, Phase 1, at the Orlando International Airport. ISSUES The Program Team, including the Owner’s Authorized Representative (i.e., Geotech Consultants International, Inc. dba GCI, Inc.) and Hensel Phelps Construction (HPC), have worked together to develop a revised Baseline Program Schedule for South Terminal C, Phase 1 (STC-P1) and Phase 1 Expansion (STC-P1X), at the Orlando International Airport. HPC submitted its list of Inter-Project Relationship (IPRs) activities that are required to be completed by each CM@R (i.e., HPC and Turner-Kiewit Joint Venture) by a specific date so as to not impact the other CM@R’s schedule. The revised Baseline Schedule is a result of design completion and the addition of the STC-P1X scope of work added to the CM@R Agreement with HPC. The revised STC-P1 and STC-P1X Baseline Program Schedule establishes the completion of the STC-P1 scope of work as May 31, 2021, and the Substantial Completion for the STC-P1X and the Program, scope of work as May 31, 2022. This revised STC-P1 and STC-P1X Baseline Program Schedule will resolve all pending Time Impact Analysis (TIAs) and removes all other Interim Milestone dates from Addendum No. 12. The amount for Liquidated Damages remains the same, as $52,000 per day, for failure to achieve Substantial Completion by May 31, 2022. The proposed Amendment to Addendum No. 12 does not have any impact on the Small Business Participation Program.

Page 90: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

On September 5, 2019, the Construction Committee recommended approval of an Amendment to Addendum No. 12 to the Construction Management at Risk (CM@R) Entity Services for South Terminal C, Phase 1, Agreement with Hensel Phelps Construction to establish a revised Baseline Program Schedule for the South Terminal C, Phase 1 and Phase 1 Expansion, at the Orlando International Airport, as outlined in the memorandum. ALTERNATIVES None. FISCAL IMPACT There is no fiscal impact. RECOMMENDED ACTION It is respectfully requested that the Aviation Authority Board resolve to accept the recommendation of the Construction Committee and approve an Amendment to Addendum No. 12 to the Construction Management at Risk (CM@R) Entity Services for South Terminal C, Phase 1, Agreement with Hensel Phelps Construction to establish a revised Baseline Program Schedule for the South Terminal C, Phase 1 and Phase 1 Expansion, Program at the Orlando International Airport, with the completion of the South Terminal C, Phase 1, scope of work as May 31, 2021, and the Substantial Completion date for the South Terminal C, Phase 1 Expansion and the Program, scope of work as May 31, 2022; and authorize an Aviation Authority Officer or the Chief Executive Officer to execute the necessary documents following satisfactory review by legal counsel.

Page 91: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

CONSENT AGENDA ITEM – V –

GREATER ORLANDO AVIATION AUTHORITY

________________________________________________________________ Orlando International Airport

One Jeff Fuqua Boulevard Orlando, Florida 32827-4399

MEMORANDUM TO: Members of the Aviation Authority FROM: Stanley J. Thornton, Chair, Construction Committee DATE: September 18, 2019 ITEM DESCRIPTION Recommendation of the Construction Committee to Approve an Addendum to the Program and Project Management Services Agreement for South Terminal C, Phase 1, Program, with Cost Management, Inc. dba CMI for Change Management Owner’s Authorized Representative (OAR) Support Services for Fiscal Year (FY) 2020 for W-S00111, South Terminal C, Phase 1 – Program and Project Management Services, at the Orlando International Airport BACKGROUND On October 21, 2015, the Aviation Authority Board approved a Program and Project Management Services Agreement for the South Terminal C, Phase 1, at the Orlando International Airport, with Cost Management, Inc. dba CMI. These Services may include, but are not limited to, any and all services necessary for the management of the various Authority contracts for the Project, the management of design from planning and conceptual design phase through detailed design, bidding and award of construction contracts; extension of staff services, development of design criteria documents, specifications review and coordination, Building Information Modeling (BIM) development and implementation and management of construction contracts, including design/build and construction management at risk; management of the construction and commissioning of projects including performing as the Owner's Authorized Representative (OAR); development and implementation of project cost controls and documents; providing material testing, quantity surveying, construction inspection, construction safety compliance inspection, and other services required to verify compliance of construction with contract documents; providing cost estimating, cost control, scheduling, progress reporting, and planning services to support both design and construction activities; negotiating contracts for project related professional and construction services required from the Authority's other consultants and contractors; coordination with the Federal Aviation Administration (FAA), the Transportation Security Administration (TSA), the Florida Department of Transportation (FDOT), and other governmental agencies on project-related issues; coordination of the activities of multiple consultants and contractors onsite; and all other related services, which may be required to accomplish the planning, funding, design, bidding and award, construction, commissioning and operation of the Project, which includes both existing and future facilities. ISSUES A fee has been negotiated with Cost Management, Inc. dba CMI for a total amount of $4,160,092 for Change Management OAR Support Services for FY 2020 for W-S00111, South Terminal C, Phase 1, at the Orlando International Airport. These services include, but are not limited to, change management and cost estimating support services. Services will be provided from October 1, 2019, through September 30, 2020.

Page 92: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

The Aviation Authority has reviewed the proposal and determined that, due to the specialized nature of the required services, Cost Management, Inc. dba CMI does not propose any MWBE/LDB/VBE participation on this addendum. On September 5, 2019, the Construction Committee recommended approval of an Addendum to the Program and Project Management Services Agreement for South Terminal C, Phase 1, Program, with Cost Management, Inc. dba CMI for Change Management OAR Support Services for FY 2020 for W-S00111, South Terminal C, Phase 1, Program, at the Orlando International Airport, as outlined in the memorandum. ALTERNATIVES None. FISCAL IMPACT The fiscal impact is $4,160,092. Funding is from Passenger Facility Charges, General Airport Revenue Bonds and Customer Facility Charges to the extent eligible. RECOMMENDED ACTION It is respectfully requested that the Aviation Authority Board resolve to accept the recommendation of the Construction Committee and approve an Addendum to the Program and Project Management Services Agreement for South Terminal C, Phase 1, Program, with Cost Management, Inc. dba CMI for Change Management OAR Support Services for FY 2020 for W-S00111, South Terminal C, Phase 1, Program, at the Orlando International Airport, for a total amount of $4,160,092, which includes a not-to-exceed fee amount of $4,127,092 and a not-to-exceed reimbursable expense amount of $33,000, with funding from Passenger Facility Charges, General Airport Revenue Bonds and Customer Facility Charges; and authorize an Aviation Authority Officer or the Chief Executive Officer to execute the necessary documents following satisfactory review by legal counsel.

Page 93: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

CONSENT AGENDA ITEM – W -

GREATER ORLANDO AVIATION AUTHORITY

________________________________________________________________ Orlando International Airport

One Jeff Fuqua Boulevard Orlando, Florida 32827-4399

MEMORANDUM TO: Members of the Aviation Authority FROM: Stanley J. Thornton, Chair, Construction Committee DATE: September 18, 2019 ITEM DESCRIPTION Recommendation of the Construction Committee to Approve an Addendum to the Program and Project Management Services Agreement for South Terminal C, Phase 1, with Cost Management, Inc. dba CMI for Construction Phase Owner’s Authorized Representative (OAR) Technology Consulting and Support Services for Fiscal Year (FY) 2020 for W-S00111, South Terminal C, Phase 1 – Program and Project Management Services, at the Orlando International Airport BACKGROUND On October 21, 2015, the Aviation Authority Board approved a Program and Project Management Services Agreement for the South Terminal C, Phase 1, at the Orlando International Airport, with Cost Management, Inc. dba CMI. These Services may include, but are not limited to, any and all services necessary for the management of the various Authority contracts for the Project, the management of design from planning and conceptual design phase through detailed design, bidding and award of construction contracts; extension of staff services, development of design criteria documents, specifications review and coordination, Building Information Modeling (BIM) development and implementation and management of construction contracts, including design/build and construction management at risk; management of the construction and commissioning of projects including performing as the Owner's Authorized Representative (OAR); development and implementation of project cost controls and documents; providing material testing, quantity surveying, construction inspection, construction safety compliance inspection, and other services required to verify compliance of construction with contract documents; providing cost estimating, cost control, scheduling, progress reporting, and planning services to support both design and construction activities; negotiating contracts for project related professional and construction services required from the Authority's other consultants and contractors; coordination with the Federal Aviation Administration (FAA), the Transportation Security Administration (TSA), the Florida Department of Transportation (FDOT), and other governmental agencies on project-related issues; coordination of the activities of multiple consultants and contractors onsite; and all other related services, which may be required to accomplish the planning, funding, design, bidding and award, construction, commissioning and operation of the Project, which includes both existing and future facilities. ISSUES A fee has been negotiated with Cost Management, Inc. dba CMI for a total amount of $2,603,644 for Construction Phase OAR Technology Consulting and Support Services for FY 2020 for W-S00111, South Terminal C, Phase 1 – Program and Project Management Services, at the Orlando International Airport. These services will include technology and Building Information Modeling (BIM) support, and may include, but are not limited to, meetings, construction oversight, Owner-Furnished Materials (OFM) documentation and process support, management of designers of technology, Information Technology (IT) and signage systems, review of design deliverables, attendance and contributions at TRT reviews, coordination of schedules and purchase of IT procurement

Page 94: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

items, provide special systems coordination with other project disciplines, provide pre-construction services, review fees and pay applications, executive staff updates, and other duties as needed. Services will be provided from October 1, 2019, through September 30, 2020. The Aviation Authority has reviewed the proposal and determined that, due to the specialized nature of the required services, Cost Management, Inc. dba CMI does not propose any MWBE/LDB/VBE participation on this addendum. On September 5, 2019, the Construction Committee recommended approval of an Addendum to the Program and Project Management Services Agreement for South Terminal C, Phase 1 with Cost Management, Inc. dba CMI for Construction Phase OAR Technology Consulting and Support Services for FY 2020 for W-S00111, South Terminal C, Phase 1 – Program and Project Management Services, at the Orlando International Airport, as outlined in the memorandum. ALTERNATIVES None. FISCAL IMPACT The fiscal impact is $2,603,644. Funding is from Passenger Facility Charges, General Airport Revenue Bonds and Customer Facility Charges to the extent eligible. RECOMMENDED ACTION It is respectfully requested that the Aviation Authority Board resolve to accept the recommendation of the Construction Committee and approve an Addendum to the Program and Project Management Services Agreement for South Terminal C, Phase 1 with Cost Management, Inc. dba CMI for Construction Phase OAR Technology Consulting and Support Services for FY 2020 for W-S00111, South Terminal C, Phase 1 – Program and Project Management Services, at the Orlando International Airport, for a total amount of $2,603,644, which includes a not-to-exceed fee amount of $2,566,155 and a not-to-exceed reimbursable expense amount of $37,500, with funding from Passenger Facility Charges, General Airport Revenue Bonds and Customer Facility Charges to the extent eligible; and, authorize an Aviation Authority Officer or the Chief Executive Officer to execute the necessary documents following satisfactory review by legal counsel.

Page 95: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

CONSENT AGENDA ITEM – X -

GREATER ORLANDO AVIATION AUTHORITY

________________________________________________________________ Orlando International Airport

One Jeff Fuqua Boulevard Orlando, Florida 32827-4399

MEMORANDUM TO: Members of the Aviation Authority FROM: Stanley J. Thornton, Chair, Construction Committee DATE: September 18, 2019 ITEM DESCRIPTION Recommendation of the Construction Committee to Approve an Addendum to the Program and Project Management Services Agreement for South Terminal C, Phase 1, with CMTS Construction Management Services, LLC for Construction Phase Owner’s Authorized Representative (OAR) Support Services related to Project Management, Safety, Project Controls, Inspection and Project Coordination Services for Fiscal Year (FY) 2020 for W-S00111, South Terminal C, Phase 1 – Program and Project Management Services, at the Orlando International Airport BACKGROUND On October 21, 2015, the Aviation Authority Board approved a Program and Project Management Services Agreement for the South Terminal C, Phase 1, at the Orlando International Airport, with CMTS Construction Management Services, LLC. These Services may include, but are not limited to, any and all services necessary for the management of the various Authority contracts for the Project, the management of design from planning and conceptual design phase through detailed design, bidding and award of construction contracts; extension of staff services, development of design criteria documents, specifications review and coordination, Building Information Modeling (BIM) development and implementation and management of construction contracts, including design/build and construction management at risk; management of the construction and commissioning of projects including performing as the Owner's Authorized Representative (OAR); development and implementation of project cost controls and documents; providing material testing, quantity surveying, construction inspection, construction safety compliance inspection, and other services required to verify compliance of construction with contract documents; providing cost estimating, cost control, scheduling, progress reporting, and planning services to support both design and construction activities; negotiating contracts for project related professional and construction services required from the Authority's other consultants and contractors; coordination with the Federal Aviation Administration (FAA), the Transportation Security Administration (TSA), the Florida Department of Transportation (FDOT), and other governmental agencies on project-related issues; coordination of the activities of multiple consultants and contractors onsite; and all other related services, which may be required to accomplish the planning, funding, design, bidding and award, construction, commissioning and operation of the Project, which includes both existing and future facilities. ISSUES A fee has been negotiated with CMTS Construction Management Services, LLC for a total amount of $1,521,152 for Construction Phase OAR Support Services related to Project Management, Safety, Project Controls, Inspection and Project Coordination Services for FY 2020 for W-S00111, South Terminal C, Phase 1 – Program and Project Management Services, at the Orlando International Airport. These services will include, but are not limited to, coordination with the Aviation Authority to ensure compliance with safety and environmental procedures, development and maintenance of program safety

Page 96: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

standards and reporting, assistance with regulatory and compliance inspections with local, state and OSHA, assistance with final completion and close-out activities, specification compliance of the contract, and coordination of program efforts for consistency with the Owner’s strategies, commitments and goals. Services will be provided from October 1, 2019, through September 30, 2020. The Aviation Authority has reviewed the proposal from CMTS Construction Management Services, LLC, and determined that, due to the specialized nature of the required services, CMTS Construction Management Services, LLC does not propose any MWBE/LDB/VBE participation on this addendum. On September 5, 2019, the Construction Committee recommended approval of an Addendum to the Program and Project Management Services Agreement for South Terminal C, Phase 1 with CMTS Construction Management Services, LLC for Construction Phase OAR Support Services related to Project Management, Safety, Project Controls, Inspection and Project Coordination Services for FY 2020, at the Orlando International Airport, as outlined in the memorandum. ALTERNATIVES None. FISCAL IMPACT The fiscal impact is $1,521,152. Funding is from Passenger Facility Charges, Customer Facility Charges, and General Airport Revenue Bonds to the extent eligible. RECOMMENDED ACTION It is respectfully requested that the Aviation Authority Board resolve to accept the recommendation of the Construction Committee and approve an Addendum to the Program and Project Management Services Agreement for South Terminal C, Phase 1, with CMTS Construction Management Services, LLC for Construction Phase OAR Support Services related to Project Management, Safety, Project Controls, Inspection and Project Coordination Services for FY 2020, at the Orlando International Airport, for a total not-to-exceed fee amount of $1,521,152, with funding from Passenger Facility Charges, Customer Facility Charges, and General Airport Revenue Bonds to the extent eligible; and, authorize an Aviation Authority Officer or the Chief Executive Officer to execute the necessary documents following satisfactory review by legal counsel.

Page 97: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

CONSENT AGENDA ITEM – Y –

GREATER ORLANDO AVIATION AUTHORITY

________________________________________________________________ Orlando International Airport

One Jeff Fuqua Boulevard Orlando, Florida 32827-4399

MEMORANDUM TO: Members of the Aviation Authority FROM: Stanley J. Thornton, Chair, Construction Committee DATE: September 18, 2019 ITEM DESCRIPTION Recommendation of the Construction Committee to Approve an Addendum to the Program and Project Management Services Agreement for South Terminal C, Phase 1, Program, with Kraus-Manning, Inc. for Construction Phase Owner’s Authorized Representative (OAR) Construction Management Support and Conceptual Estimating Services for Fiscal Year (FY) 2020 for W-S00111, South Terminal C, Phase 1 – Program and Project Management Services, at the Orlando International Airport BACKGROUND On October 21, 2015, the Aviation Authority Board approved a Program and Project Management Services Agreement for the South Terminal C, Phase 1, at the Orlando International Airport, with Kraus-Manning, Inc. These Services may include, but are not limited to, any and all services necessary for the management of the various Authority contracts for the Project, the management of design from planning and conceptual design phase through detailed design, bidding and award of construction contracts; extension of staff services, development of design criteria documents, specifications review and coordination, Building Information Modeling (BIM) development and implementation and management of construction contracts, including design/build and construction management at risk; management of the construction and commissioning of projects including performing as the Owner's Authorized Representative (OAR); development and implementation of project cost controls and documents; providing material testing, quantity surveying, construction inspection, construction safety compliance inspection, and other services required to verify compliance of construction with contract documents; providing cost estimating, cost control, scheduling, progress reporting, and planning services to support both design and construction activities; negotiating contracts for project related professional and construction services required from the Authority's other consultants and contractors; coordination with the Federal Aviation Administration (FAA), the Transportation Security Administration (TSA), the Florida Department of Transportation (FDOT), and other governmental agencies on project-related issues; coordination of the activities of multiple consultants and contractors onsite; and all other related services, which may be required to accomplish the planning, funding, design, bidding and award, construction, commissioning and operation of the Project, which includes both existing and future facilities. ISSUES A fee has been negotiated with Kraus-Manning, Inc. for a total amount of $1,544,315 for Construction Phase OAR Construction Management Support and Conceptual Estimating Services for FY 2020 for W-S00111, South Terminal C, Phase 1 – Program and Project Management Services, at the Orlando International Airport. These services will provide support services for the construction management efforts and cost estimating services, and will include, but are not limited to, assisting with early Guaranteed Maximum Price (GMP) evaluations, extended pre-construction and construction Construction Management at Risk (CM@R) support services, design production estimates,

Page 98: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

value engineering support, overall program budget, and change management pricing evaluation efforts. Services will be provided from October 1, 2019, through September 30, 2020. The Aviation Authority has reviewed the proposal from Kraus-Manning, Inc., and determined that, due to the specialized nature of the required services, Kraus-Manning, Inc. does not propose any MWBE/LDB/VBE participation on this addendum. On September 5, 2019, the Construction Committee recommended approval of an Addendum to the Program and Project Management Services Agreement for South Terminal C, Phase 1, Program, with Kraus-Manning, Inc. for Construction Phase OAR Construction Management Support and Conceptual Estimating Services for FY 2020 for W-S00111, South Terminal C, Phase 1 – Program and Project Management Services, at the Orlando International Airport, as outlined in the memorandum. ALTERNATIVES None. FISCAL IMPACT The fiscal impact is $1,544,315. Funding is from General Airport Revenue Bonds, Passenger Facility Charges, and Customer Facility Charges to the extent eligible. RECOMMENDED ACTION It is respectfully requested that the Aviation Authority Board resolve to accept the recommendation of the Construction Committee and approve an Addendum to the Program and Project Management Services Agreement for South Terminal C, Phase 1, Program, with Kraus-Manning, Inc. for Construction Phase OAR Construction Management Support and Conceptual Estimating Services for FY 2020 for W-S00111, South Terminal C, Phase 1, Program, at the Orlando International Airport, for a total not-to-exceed fee amount of $1,544,315, with funding from General Airport Revenue Bonds, Passenger Facility Charges, and Customer Facility Charges to the extent eligible; and authorize an Aviation Authority Officer or the Chief Executive Officer to execute the necessary documents following satisfactory review by legal counsel.

Page 99: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

CONSENT AGENDA ITEM – Z –

GREATER ORLANDO AVIATION AUTHORITY

________________________________________________________________ Orlando International Airport

One Jeff Fuqua Boulevard Orlando, Florida 32827-4399

MEMORANDUM TO: Members of the Aviation Authority FROM: Stanley J. Thornton, Chair, Construction Committee DATE: September 18, 2019 ITEM DESCRIPTION Recommendation of the Construction Committee to Approve an Addendum to the Program and Project Management Services Agreement for South Terminal C, Phase 1, Program with Page One Consultants, Inc. for Construction Phase Owner’s Authorized Representative (OAR) Quality Assurance (QA)/Quality Control (QC) Review, Project Controls and Inspection Support Staff Services for Fiscal Year (FY) 2020 for W-S00111, South Terminal C, Phase 1 – Program and Project Management Services, at the Orlando International Airport BACKGROUND On October 21, 2015, the Aviation Authority Board approved a Program and Project Management Services Agreement for the South Terminal C, Phase 1, at the Orlando International Airport, with Page One Consultants, Inc. These Services may include, but are not limited to, any and all services necessary for the management of the various Authority contracts for the Project, the management of design from planning and conceptual design phase through detailed design, bidding and award of construction contracts; extension of staff services, development of design criteria documents, specifications review and coordination, Building Information Modeling (BIM) development and implementation and management of construction contracts, including design/build and construction management at risk; management of the construction and commissioning of projects including performing as the Owner's Authorized Representative (OAR); development and implementation of project cost controls and documents; providing material testing, quantity surveying, construction inspection, construction safety compliance inspection, and other services required to verify compliance of construction with contract documents; providing cost estimating, cost control, scheduling, progress reporting, and planning services to support both design and construction activities; negotiating contracts for project related professional and construction services required from the Authority's other consultants and contractors; coordination with the Federal Aviation Administration (FAA), the Transportation Security Administration (TSA), the Florida Department of Transportation (FDOT), and other governmental agencies on project-related issues; coordination of the activities of multiple consultants and contractors onsite; and all other related services, which may be required to accomplish the planning, funding, design, bidding and award, construction, commissioning and operation of the Project, which includes both existing and future facilities. ISSUES A fee has been negotiated with Page One Consultants, Inc. for a total amount of $3,320,936 for Construction Phase OAR QA/QC Review, Project Controls and Inspection Support Staff Services for FY 2020 for W-S00111, South Terminal C, Phase 1 – Program and Project Management Services, at the Orlando International Airport. Services will include QA/QC review of specifications and drawings, and assistance with establishing QA/QC control procedures for the program. Services will also include, but are not limited to, attendance at OAR/Construction Management meetings, special sessions with planned subconsultants, obtaining and review of proposals, assistance with QA/QC

Page 100: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

testing and inspection services, and associated project management support services. Services will be provided from October 1, 2019, through September 30, 2020. The Aviation Authority has reviewed the proposal and determined that Page One Consultants, Inc. proposes 19.4% MWBE participation on this addendum. On September 5, 2019, the Construction Committee recommended approval of an Addendum to the Program and Project Management Services Agreement for South Terminal C, Phase 1 with Page One Consultants, Inc. for Construction Phase OAR QA/QC Review, Project Controls and Inspection Support Staff Services for FY 2020 for W-S00111, South Terminal C, Phase 1 – Program and Project Management Services, at the Orlando International Airport, as outlined in the memorandum. ALTERNATIVES None. FISCAL IMPACT The fiscal impact is $3,320,936. Funding is from General Airport Revenue Bonds, Passenger Facility Charges and Customer Facility Charges to the extent eligible. RECOMMENDED ACTION It is respectfully requested that the Aviation Authority Board resolve to accept the recommendation of the Construction Committee and approve an Addendum to the Program and Project Management Services Agreement for South Terminal C, Phase 1, with Page One Consultants, Inc. for Construction Phase OAR QA/QC Review, Project Controls and Inspection Support Staff Services for FY 2020 for W-S00111, South Terminal C, Phase 1 – Program and Project Management Services, at the Orlando International Airport, for the total not-to-exceed fee amount of $3,320,936, with funding from General Airport Revenue Bonds, Passenger Facility Charges and Customer Facility Charges to the extent eligible; and authorize an Aviation Authority Officer or the Chief Executive Officer to execute the necessary documents following satisfactory review by legal counsel.

Page 101: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

CONSENT AGENDA ITEM – AA –

GREATER ORLANDO AVIATION AUTHORITY

________________________________________________________________ Orlando International Airport

One Jeff Fuqua Boulevard Orlando, Florida 32827-4399

MEMORANDUM TO: Members of the Aviation Authority FROM: Stanley J. Thornton, Chair, Construction Committee DATE: September 18, 2019 ITEM DESCRIPTION Recommendation of the Construction Committee to Approve an Addendum to the Program and Project Management Services Agreement for South Terminal C, Phase 1, Program with Page One Consultants, Inc. for Construction Phase Airfield Testing and Inspection Owner’s Authorized Representative (OAR) Services through 2021 for W-S00111, South Terminal C, Phase 1 – Program and Project Management Services, at the Orlando International Airport BACKGROUND On October 21, 2015, the Aviation Authority Board approved a Program and Project Management Services Agreement for the South Terminal C, Phase 1, at the Orlando International Airport, with Page One Consultants, Inc. These Services may include, but are not limited to, any and all services necessary for the management of the various Authority contracts for the Project, the management of design from planning and conceptual design phase through detailed design, bidding and award of construction contracts; extension of staff services, development of design criteria documents, specifications review and coordination, Building Information Modeling (BIM) development and implementation and management of construction contracts, including design/build and construction management at risk; management of the construction and commissioning of projects including performing as the Owner's Authorized Representative (OAR); development and implementation of project cost controls and documents; providing material testing, quantity surveying, construction inspection, construction safety compliance inspection, and other services required to verify compliance of construction with contract documents; providing cost estimating, cost control, scheduling, progress reporting, and planning services to support both design and construction activities; negotiating contracts for project related professional and construction services required from the Authority's other consultants and contractors; coordination with the Federal Aviation Administration (FAA), the Transportation Security Administration (TSA), the Florida Department of Transportation (FDOT), and other governmental agencies on project-related issues; coordination of the activities of multiple consultants and contractors onsite; and all other related services, which may be required to accomplish the planning, funding, design, bidding and award, construction, commissioning and operation of the Project, which includes both existing and future facilities. ISSUES A fee has been negotiated with Page One Consultants, Inc. for a total amount of $2,625,000 for Construction Phase Airfield Testing and Inspection OAR Services through 2021 for W-S00111, South Terminal C, Phase 1 – Program and Project Management Services, at the Orlando International Airport. Services will include, but are not limited to, airfield testing such as laboratory and material testing, and inspection services. Services will be provided from October 1, 2019, through December 31, 2021. Page One Consultants, Inc. has estimated its Airfield Testing and Inspection OAR

Page 102: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

Services by fiscal year. Authorizations will be required for any fees exceeding the estimated fiscal year amounts, prior to the end of each fiscal year, or to continue beyond December 31, 2021, as follows:

Fiscal Year

Amount per Fiscal Year

2019 $ 125,000.00 2020 $1,445,312.50 2021 $ 843,750.00 Oct 2021 – Dec 2021 $ 210,937.50 Total Amount $2,625,000.00

The Aviation Authority has reviewed the proposal and determined that Page One Consultants, Inc. proposes 18% MWBE and 6% LDB participation on this addendum. On September 5, 2019, the Construction Committee recommended approval of an Addendum to the Program and Project Management Services Agreement for South Terminal C, Phase 1 with Page One Consultants, Inc. for Construction Phase Airfield Testing and Inspection OAR Services through 2021 for W-S00111, South Terminal C, Phase 1 – Program and Project Management Services, at the Orlando International Airport, as outlined in the memorandum. ALTERNATIVES None. FISCAL IMPACT The fiscal impact is $2,625,000. Funding is from General Airport Revenue Bonds and Passenger Facility Charges to the extent eligible. RECOMMENDED ACTION It is respectfully requested that the Aviation Authority Board resolve to accept the recommendation of the Construction Committee and approve an Addendum to the Program and Project Management Services Agreement for South Terminal C, Phase 1, with Page One Consultants, Inc. for Construction Phase Airfield Testing and Inspection OAR Services through 2021 for W-S00111, South Terminal C, Phase 1 – Program and Project Management Services, at the Orlando International Airport, for the total lump sum fee amount of $2,625,000, with funding from General Airport Revenue Bonds and Passenger Facility Charges to the extent eligible; and authorize an Aviation Authority Officer or the Chief Executive Officer to execute the necessary documents following satisfactory review by legal counsel.

Page 103: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

CONSENT AGENDA ITEM – BB –

GREATER ORLANDO AVIATION AUTHORITY

________________________________________________________________ Orlando International Airport

One Jeff Fuqua Boulevard Orlando, Florida 32827-4399

MEMORANDUM TO: Members of the Aviation Authority FROM: Stanley J. Thornton, Chair, Construction Committee DATE: September 18, 2019 ITEM DESCRIPTION Recommendation of the Construction Committee to Approve an Addendum to the Construction-Engineering-Financial Consulting Services Agreement with R. W. Block Consulting, Inc. for Staff Extension Support Services to the Airline Affairs Division through Project Completion for W-S00120, South Terminal C, Phase 1, Program - Financial Oversight Services at the Orlando International Airport BACKGROUND On August 10, 2016, the Aviation Authority Board approved the construction-engineering-financial consulting services agreement at the Orlando International Airport and the Orlando Executive Airport with R. W. Block Consulting, Inc. The services include, but are not limited to, review of construction contracts and change orders for eligibility for federal, state and Passenger Facility Charge (PFC) funding and for contract compliance; perform third party reviews of change orders prior to submission to the Aviation Authority’s Construction Committee; verify that change orders adequately describe the contract change and include plan revisions where applicable; verify independent cost estimates and cost recapitulation worksheets to ensure that change order pricing is aligned with the scope of work; verify funding source and availability of funds for change orders; review change order pricing for supporting documentation and appropriate mark-ups; perform labor burden analysis for change order labor rates; review scope description, verify availability of funds, review supporting documentation, and independent estimates for job order contracts; perform independent estimates; collect, maintain, analyze, and publish change order, professional fees, and labor rate databases; perform reviews for Davis-Bacon wage compliance on Airport Improvement Program (AIP) funded projects; prepare and publish a monthly the Capital Project Cost Report; review professional services fee proposals for approved billing rates, supporting documentation, proper funding source and availability of funding; ensure support of certain capital projects that includes review of pay applications, certified payrolls, construction change orders, and other analysis required to support various projects; development of monthly cost reports for all active projects; assistance in the development of Capital Improvement Program (CIP), including price escalation, evaluation of financing alternatives as it relates to eligibility for the AIP, Florida Department of Transportation (FDOT), and PFC funding; cash flow projections for capital projects based on funding sources and assist in preparation of applications for federal, state, and PFC funding; assisting the Engineering, Construction, and Finance Departments in preparation for Construction Committee and other meetings; and, perform construction audits. The services also include oversight services in support of emergency or disaster recovery efforts; assisting the construction department and legal counsel on construction claims reviews, dispute review board proceedings, and legal proceedings; and, performing such other extension of staff services necessary to support the Aviation Authority. ISSUES A fee has been negotiated with R. W. Block Consulting, Inc. for a total amount of $297,678 for Staff Extension Support Services to the Airline Affairs Division through

Page 104: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

Project Completion for W-S00120, South Terminal C, Phase 1, Program - Financial Oversight Services. Services will provide staff extension services in its efforts to accommodate increased construction activity due to ongoing South Terminal C construction programs. Services will include, but are not limited, support services for the South Terminal C Experiential Media Environment (EME) Content Support Services, Aviation Authority staff support services, and other related services as requested by the Aviation Authority’s Airline Affairs Division. Services will be provided from January 1, 2020, through Project Completion. R. W. Block Consulting, Inc. has estimated its support services by fiscal year. Authorizations will be required for any fees exceeding the estimated fiscal year amounts, prior to the end of each fiscal year, as follows:

Fiscal Year

Amount per Fiscal Year

2020 $101,503 2021 $138,901 2022 $ 57,274 Total Amount $297,678

The Aviation Authority has reviewed the proposal and determined that, due to the specific nature of the required services, R. W. Block Consulting, Inc. does not propose any MWBE/LDB/VBE participation on this addendum. On September 5, 2019, the Construction Committee recommended approval of an Addendum to the Construction-Engineering-Financial Consulting Services Agreement with R. W. Block Consulting, Inc. for Staff Extension Support Services to the Airline Affairs Division through Project Completion for W-S00120, South Terminal C, Phase 1, Program - Financial Oversight Services, as outlined above. ALTERNATIVES None. FISCAL IMPACT The fiscal impact is $297,678. Funding is from General Airport Revenue Bonds, Customer Facility Charges, and Passenger Facility Charges to the extent eligible. RECOMMENDED ACTION It is respectfully requested that the Aviation Authority Board resolve to accept the recommendation of the Construction Committee and approve an Addendum to the Construction-Engineering-Financial Consulting Services Agreement with R. W. Block Consulting, Inc. for Staff Extension Support Services to the Airline Affairs Division through Project Completion for W-S00120, South Terminal C, Phase 1, Program - Financial Oversight Services for a total not-to-exceed fee amount of $297,678, with funding from General Airport Revenue Bonds, Customer Facility Charges, and Passenger Facility Charges to the extent eligible; and authorize an Aviation Authority Officer or the Chief Executive Officer to execute the necessary documents following satisfactory review by legal counsel.

Page 105: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

CONSENT AGENDA ITEM – CC –

GREATER ORLANDO AVIATION AUTHORITY

________________________________________________________________ Orlando International Airport

One Jeff Fuqua Boulevard Orlando, Florida 32827-4399

MEMORANDUM TO: Members of the Aviation Authority FROM: Stanley J. Thornton, Chair, Construction Committee DATE: September 18, 2019 ITEM DESCRIPTION Recommendation of the Construction Committee to Approve an Addendum to the Technology and Multi-Media Systems Specialty Engineer for the South Terminal C, Phase 1 Professional Services Agreement with Burns Engineering, Inc. to Produce and Direct Content Production, Programming and Integration Services for W-S00138, South Terminal C, Phase 1 - Experiential Media Environment (EME), at the Orlando International Airport BACKGROUND The South Terminal C, Phase 1, Program provides for a world-class domestic and international airport terminal building, consisting of a new airside terminal with up to 24 airline gates and a landside terminal with both secure and non-secure areas, and may include, but is not limited to, all associated improvements and infrastructure required or related thereto, such as sitework, roadways, aprons, runways, taxiways, other airfield work, utilities, landscaping, lighting, walkways, pedestrian bridges, expansion of the parking garage, a new and/or expanded chiller plant, aircraft loading bridges, and all interior design, such as concessions planning, ticketing, and security improvements, and baggage handling systems. On August 19, 2015, the Aviation Authority Board approved the Technology and Multi-Media Systems Specialty Engineer for the South Terminal C, Phase 1, Professional Services Agreement with Burns Engineering, Inc. ISSUES A fee has been negotiated with Burns Engineering, Inc. for a total amount of $1,792,843 to produce and direct Content Production, Programming and Integration Services for W-S00138, South Terminal C, Phase 1 - Experiential Media Environment (EME), at the Orlando International Airport. Services will produce and direct the W-S00142 Content Production Company (CPC) efforts, and perform the integration and calibration for the entire content inventory for the South Terminal C EME Program. Services will include, but are not limited to, turn-over of the software media, in addition to the Content Production Manual and Guide to support future Aviation Authority production of content. The team will work closely with the Aviation Authority to understand the specific contracting requirements and create distinct content for the media features. The Aviation Authority has reviewed the proposal from Burns Engineering, Inc., and determined that, due to the specialized scope of the required services, Burns Engineering, Inc. does not propose and MWBE/LDB/VBE participation on this Addendum. On September 5, 2019, the Construction Committee recommended approval of an Addendum to the Technology and Multi-Media Systems Specialty Engineer for the South Terminal C, Phase 1 Professional Services Agreement with Burns Engineering, Inc. to produce and direct Content Production, Programming and Integration Services for W-S00138, South

Page 106: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

Terminal C, Phase 1 - Experiential Media Environment (EME), at the Orlando International Airport, as outlined in the memorandum. ALTERNATIVES None. FISCAL IMPACT The fiscal impact is $1,792,843. Funding is from General Airport Revenue Bonds. RECOMMENDED ACTION It is respectfully requested that the Aviation Authority Board resolve to accept the recommendation of the Construction Committee and approve an Addendum to the Technology and Multi-Media Systems Specialty Engineer for the South Terminal C, Phase 1 Professional Services Agreement with Burns Engineering, Inc. to produce and direct Content Production, Programming and Integration Services for W-S00138, South Terminal C, Phase 1 - Experiential Media Environment (EME), at the Orlando International Airport, for the total lump sum fee amount of $1,792,843, with funding from General Airport Revenue Bonds; and authorize an Aviation Authority Officer or the Chief Executive Officer to execute the necessary documents following satisfactory review by legal counsel.

Page 107: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

CONSENT AGENDA ITEM – DD –

GREATER ORLANDO AVIATION AUTHORITY

________________________________________________________________ Orlando International Airport

One Jeff Fuqua Boulevard Orlando, Florida 32827-4399

MEMORANDUM TO: Members of the Aviation Authority FROM: Stanley J. Thornton, Chair, Construction Committee DATE: September 18, 2019 ITEM DESCRIPTION Recommendation of the Construction Committee to Award Project Bid Package (BP) No. 00043, ORL Runway Incursion Mitigation and Related Improvements, at the Orlando Executive Airport, to Gibbs & Register, Inc. BACKGROUND BP No. 00043, ORL Runway Incursion Mitigation and Related Improvements, at the Orlando Executive Airport (ORL), is to enhance airfield safety for aircraft operations by implementing the Runway Incursion Mitigation (RIM) Program, announced in June 2015 by the Federal Aviation Administration (FAA) as a nationwide runway safety related initiative. The FAA’s RIM site for ORL is located near the intersection of Taxiway E4 and Runway 13-31. BP No. 00043 consists of the removal of existing Taxiway E4 from Runway 13-31 to the hold pad and the existing hold pad. Construction of new Taxiway Connectors and holding bays with lighting, signage and markings, and updates to the Airport Lighting Control and Monitoring System and electrical vault and the relocation of Land and Hold Short Operation (LAHSO) signs are also included in the BP No. 00043 scope of work. The project includes a base bid and two add alternates as follows:

• Base Bid: Taxiways A and A8.

• Add Alternate No. 1: Holding Bays.

• Add Alternate No. 2: Taxiway A7 Extension.

ISSUES BP No. 00043 was publically advertised on April 21 and 24, 2019. On May 21, 2019, three bids were received as follows:

Bidder Gibbs & Register, Inc.

Carr & Collier, Inc.

Prime Construction Group, Inc.

Base Bid $3,378,032.50 $2,860,861.00 $3,383,311.00 Add Alt No. 1 $ 544,511.50* $ 524,359.00 $ 600,978.00 Add Alt No. 2 $ 280,036.00* $ 287,576.50 $ 300,375.75 Total Bid $4,202,580.00* $3,672,796.50 $4,284,664.75

*Indicates minor arithmetic errors in summation on the bid forms; the corrected amounts are outlined above and do not affect the bid results. The apparent low bidder, Carr & Collier, Inc., submitted a letter on June 3, 2019, requesting that their bid be withdrawn from consideration. In the letter, Carr & Collier, Inc. indicated that, after review of its submitted bid and the calculations, mistakes and math errors were discovered in the limerock quantities, in the price for

Page 108: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

disposal of muck, in earthwork quantities, and a handful of other miscellaneous items. Carr & Collier, Inc. acknowledged the seriousness of public bidding and make every effort to insure accuracy and professionalism when submitting a bid. However, every once in a while, irrecoverable mistakes are made that could result in severe hardship, and it is in the overall best interest of all parties to allow a bidder to withdraw. Aviation Authority staff, legal counsel and the Engineer of Record met to review the request from Carr & Collier, Inc. The legal standard for letting a hard bid be withdrawn is that the request is presented in a timely manner, that the error is considered an honest mistake, and that enforcing the contract would impose a severe hardship. In this instance, by these standards, it appears that Carr & Collier, Inc. has met all of the criteria to withdraw the bid. The second apparent low bidder, Gibbs & Register, Inc., has verified that they prepared their bid in accordance with all bid documents and addenda, and will be able to complete the project for the amount bid and within the Aviation Authority’s schedule. The Aviation Authority established a 16% DBE participation goal for this project. The Aviation Authority has reviewed the bid submitted by Gibbs & Register, Inc., and determined that Gibbs & Register, Inc. proposes to achieve 16.3% DBE participation on this award. On June 25, 2019, the Construction Committee recommended (1) to accept the request from Carr & Collier, Inc. to withdraw its bid; and (2) approve the award of BP No. 00043, ORL Runway Incursion Mitigation and Related Improvements, at the Orlando Executive Airport, to Gibbs & Register, Inc., as outlined in the memorandum. On August 12, 2019, the Orlando City Council authorized the pre-acceptance of the grant offered by the FAA in the amount of $4,238,885 for BP No. 00043 on behalf of the Aviation Authority. The pre-acceptance of this FAA grant included the associated contracts. By pre-accepting the grant with pre-authorization for the Mayor and City Clerk to sign the grant, the grant can be executed immediately upon receipt from the FAA within the time frame required for acceptance. ALTERNATIVES None. FISCAL IMPACT The fiscal impact is $4,202,580. Funding is from FAA and Florida Department of Transportation (FDOT) Grants to the extent eligible, and the Aviation Authority’s Line of Credit to the reimbursed by future Capital Expenditure Fund and future General Airport Revenue Bonds. RECOMMENDED ACTION It is respectfully requested that the Aviation Authority Board resolve to accept the recommendation of the Construction Committee and (1) deem the bid submitted by Carr & Collier, Inc. as non-responsive; and (2) award BP No. 00043, ORL Runway Incursion Mitigation and Related Improvements, at the Orlando Executive Airport, to Gibbs & Register, Inc., for a total bid amount of $4,202,580 (Base Bid plus Add Alternate Nos. 1 and 2), with funding from FAA and FDOT Grants to the extent eligible, and the Aviation Authority’s Line of Credit to the reimbursed by future Capital Expenditure Fund and future General Airport Revenue Bonds (Orlando City Council concurred to pre-accept the grant and associated contracts on August 12, 2019); and authorize an Aviation Authority Officer or the Chief Executive Officer to execute the necessary documents following satisfactory review by legal counsel.

Page 109: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

© 2019 Microsoft Corporation © 2019 DigitalGlobe ©CNES (2019) Distribution Airbus DS

TAXIWAY A AND HOLD

BAY ALTERNATIVES

HOT SPOT 2

HOT

SPOT 3

A4

E

PROPOSED TAXIWAY

DIRECTIONAL SIGN

A3

RELOCATED LAND AND HOLD

SHORT OPERATION SIGNS

AND MARKINGS (REDUCED

FROM 4,150' TO 3,829'±)

PROPOSED TAXIWAY

DIRECTIONAL SIGN

HOT SPOT 1

ORLANDO EXECUTIVE AIRPORT - BP043 RUNWAY INCURSION MITIGATION AND RELATED IMPROVEMENTS

0 250' 500'

SCALE : 1" = 500'

EXHIBIT 1

MARCH 2019  GENERAL PLAN

dmckeown
Oval
dmckeown
Text Box
BP-00043, ORL Runway Incursion Mitigation (RIM) and Related Improvements
dmckeown
Line
Page 110: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase
Page 111: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

June 3, 2019

Mr. Tuan Nguyen, P.E.Manager, Civil Engineering Greater Orlando Aviation Authority 5855 Cargo Road Orlando, FL 32827

RE: BP 043 Runway Incursion MitigationNotice of Withdrawal of Bid by Carr & Collier Inc.Bid Date, May 21, 2019

Dear Mr. Nguyen,

By this letter and our 5-29-19 letter, CCI is requesting that our bid on the above reference project be withdrawn. As stated previously, GOAA is a highly favored client for whom we have completed many successful projects.

After the opening of the bids, we immediately knew that the CCI bid was about 18% lower than the other bidders. We know both of those two companies to be good competitive contractors, so we went back and looked for possible mistakes CCI may have made in order to make the CCI bid calculate so low.

After a review of our calculations, we found mistakes and math errors in lime-rock quantities, in the price for disposal of muck, in earthwork quantities, and a handful of other items, none of which went in our favor. (Some of the errors were due to keyboarding errors when making major quantity changes as was required by addendum 1.)

We understand the seriousness of public bidding and how everyone involved must do their best to insure accuracy and professionalism at each step of the process. We also know that once in a while irrecoverable mistakes are made and sometimes it is in the overall best interest of all parties for a bidder to withdraw. We know this because CCI has completed major projects for the City of Maitland and recently for the City of Port Orange on which CCI was 2nd bidder, but the low bidder withdrew on each of the projects.

It is bad for all parties involved for a company to take a job at a loss in the hopes of picking up some extra dollars through additional owner added work or increases in efficiency to

1410 Emerson St, Leesburg, FL 34748 • 352.314.3625

#CGC037504 #CUC056650

Page 112: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

f

Sb,

CARR & COLLIER INC

si

overcome estimating errors. We are instituting QC procedures to minimize the chances of this type of situation occurring in the future.So, as stated, we are requesting that our bid be withdrawn. Please contact us if you have

questions.anyJ

eyn/alds Holiman Vice President (352) 350-0989 Cell

1410 Emerson St, Leesburg, FL 34748 • 352.314.3625 #CGC037504 #CUC056650

Page 113: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

CONSENT AGENDA ITEM – EE –

GREATER ORLANDO AVIATION AUTHORITY

________________________________________________________________ Orlando International Airport

One Jeff Fuqua Boulevard Orlando, Florida 32827-4399

MEMORANDUM TO: Members of the Aviation Authority FROM: Stanley J. Thornton, Chair, Construction Committee DATE: September 18, 2019 ITEM DESCRIPTION Recommendation of the Construction Committee to Approve an Addendum to the Runway Incursion Mitigation (RIM) and Related Improvements Professional Services Agreement with C&S Engineers, Inc. for Construction Administration Services for Project Bid Package (BP) No. 00043, ORL Runway Incursion Mitigation and Related Improvements, at the Orlando Executive Airport BACKGROUND BP No. 00043, ORL Runway Incursion Mitigation and Related Improvements, at the Orlando Executive Airport (ORL), is to enhance airfield safety for aircraft operations by implementing the Runway Incursion Mitigation (RIM) Program, announced in June 2015 by the Federal Aviation Administration (FAA) as a nationwide runway safety related initiative. The FAA’s RIM site for ORL is located near the intersection of Taxiway E4 and Runway 13-31. BP No. 00043 consists of the removal of existing Taxiway E4 from Runway 13-31 to the hold pad and the existing hold pad. Construction of new Taxiway Connectors and holding bays with lighting, signage and markings, and updates to the Airport Lighting Control and Monitoring System and electrical vault and the relocation of Land and Hold Short Operation (LAHSO) signs are also included in the BP No. 00043 scope of work. The project includes a base bid and two add alternates as follows:

• Base Bid: Taxiways A and A8.

• Add Alternate No. 1: Holding Bays.

• Add Alternate No. 2: Taxiway A7 Extension. ISSUES A fee has been negotiated with C&S Engineers, Inc. for a total amount of $121,500, to provide construction administration services for BP No. 00043. The scope of services includes, but is not limited to, review and approval of shop drawings, attendance at pre-construction and job coordination meetings, responses to Requests for Information (RFI), preparation of job memorandums, review of change orders and pay applications, review of as-built drawings, preparation of record drawings, and update of Electronic Airport Layout Plan (eALP). If approved, services will be effective the date of Aviation Authority Board approval and after receipt of the Federal Aviation Administration (FAA) and Florida Department of Transportation (FDOT) Grants. The Aviation Authority has reviewed the proposal and determined that C&S Engineers, Inc. proposes to achieve 18.5% DBE participation for these services. On June 25, 2019, the Construction Committee recommended approval of an Addendum to the Runway Incursion Mitigation (RIM) and Related Improvements Professional Services Agreement with C&S Engineers, Inc. for Construction Administration Services for BP No.

Page 114: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

00043, ORL Runway Incursion Mitigation and Related Improvements, at the Orlando Executive Airport, as outlined in the memorandum. On August 12, 2019, the Orlando City Council authorized the pre-acceptance of the grant offered by the FAA in the amount of $4,238,885 for BP No. 00043 on behalf of the Aviation Authority. The pre-acceptance of this FAA grant included the associated contracts. By pre-accepting the grant with pre-authorization for the Mayor and City Clerk to sign the grant, the grant can be executed immediately upon receipt from the FAA within the time frame required for acceptance. ALTERNATIVES None. FISCAL IMPACT The fiscal impact is $121,500. Funding is from FAA and FDOT Grants to the extent eligible, and the Aviation Authority’s Line of Credit to the reimbursed by future Capital Expenditure Fund and future General Airport Revenue Bonds. RECOMMENDED ACTION It is respectfully requested that the Aviation Authority Board resolve to accept the recommendation of the Construction Committee and approve an Addendum to the Runway Incursion Mitigation (RIM) and Related Improvements Professional Services Agreement with C&S Engineers, Inc. for Construction Administration Services for BP No. 00043, ORL Runway Incursion Mitigation and Related Improvements, at the Orlando Executive Airport, for a total amount of $121,500, which includes a not-to-exceed fee amount of $120,240 and a not-to-exceed reimbursable expenses amount of $1,260, with funding from FAA and FDOT Grants to the extent eligible, and the Aviation Authority’s Line of Credit to the reimbursed by future Capital Expenditure Fund and future General Airport Revenue Bonds (Orlando City Council concurred to pre-accept the grant and associated contracts on August 12, 2019); and authorize an Aviation Authority Officer or the Chief Executive Officer to execute the necessary documents following satisfactory review by legal counsel.

Page 115: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

CONSENT AGENDA ITEM – FF –

GREATER ORLANDO AVIATION AUTHORITY ________________________________________________________________

Orlando International Airport One Jeff Fuqua Boulevard

Orlando, Florida 32827-4399

MEMORANDUM TO: Members of the Aviation Authority FROM: Stanley J. Thornton, Chair, Construction Committee DATE: September 18, 2019 ITEM DESCRIPTION Recommendation of the Construction Committee to Approve an Addendum to the Continuing Program and Project Management (OAR Prime Entity) Services Agreement with A2 Group, Inc. for Construction Phase Owner’s Authorized Representative (OAR) Services for Project Bid Package (BP) No. 00043, ORL Runway Incursion Mitigation and Related Improvements, at the Orlando Executive Airport BACKGROUND BP No. 00043, ORL Runway Incursion Mitigation and Related Improvements, at the Orlando Executive Airport (ORL), is to enhance airfield safety for aircraft operations by implementing the Runway Incursion Mitigation (RIM) Program, announced in June 2015 by the Federal Aviation Administration (FAA) as a nationwide runway safety related initiative. The FAA’s RIM site for ORL is located near the intersection of Taxiway E4 and Runway 13-31. BP No. 00043 consists of the removal of existing Taxiway E4 from Runway 13-31 to the hold pad and the existing hold pad. Construction of new Taxiway Connectors and holding bays with lighting, signage and markings, and updates to the Airport Lighting Control and Monitoring System and electrical vault and the relocation of Land and Hold Short Operation (LAHSO) signs are also included in the BP No. 00043 scope of work. The project includes a base bid and two add alternates as follows:

• Base Bid: Taxiways A and A8.

• Add Alternate No. 1: Holding Bays.

• Add Alternate No. 2: Taxiway A7 Extension. ISSUES A fee has been negotiated with A2 Group, Inc. for a total amount of $364,288 for construction phase OAR services for BP No. 00043. These services will provide, but are not limited to, construction management, oversight, inspection services and material testing for the above-referenced project. Additional assistance to the Aviation Authority in the areas of pre-construction, construction project management, project control, contract administration, construction coordination and close-out services in support of the project are also included. If approved, services will be effective the date of Aviation Authority Board approval and after receipt of the FAA and Florida Department of Transportation (FDOT) Grants. The Aviation Authority has reviewed the proposal and determined that A2 Group, Inc. proposes to achieve 10.8% DBE participation for this addendum. On June 25, 2019, the Construction Committee recommended approval of an Addendum to the Continuing Program and Project Management (OAR Prime Entity) Services Agreement with A2 Group, Inc. for Construction Phase OAR Services for BP No. 00043, ORL Runway Incursion Mitigation and Related Improvements, at the Orlando Executive Airport, as outlined in the memorandum.

Page 116: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

On August 12, 2019, the Orlando City Council authorized the pre-acceptance of the grant offered by the FAA in the amount of $4,238,885 for BP No. 00043 on behalf of the Aviation Authority. The pre-acceptance of this FAA grant included the associated contracts. By pre-accepting the grant with pre-authorization for the Mayor and City Clerk to sign the grant, the grant can be executed immediately upon receipt from the FAA within the time frame required for acceptance. ALTERNATIVES None. FISCAL IMPACT The fiscal impact is $364,288. Funding is from FAA and FDOT Grants to the extent eligible, and the Aviation Authority’s Line of Credit to the reimbursed by future Capital Expenditure Fund and future General Airport Revenue Bonds. RECOMMENDED ACTION It is respectfully requested that the Aviation Authority Board resolve to accept the recommendation of the Construction Committee and approve an Addendum to the Continuing Program and Project Management (OAR Prime Entity) Services Agreement with A2 Group, Inc. for Construction Phase OAR Services for BP No. 00043, ORL Runway Incursion Mitigation and Related Improvements, at the Orlando Executive Airport, for a total amount of $364,288, which includes a not-to-exceed fee amount of $317,564 and a not-to-exceed reimbursable expenses amount of $46,724, with funding from FAA and FDOT Grants to the extent eligible, and the Aviation Authority’s Line of Credit to the reimbursed by future Capital Expenditure Fund and future General Airport Revenue Bonds (Orlando City Council concurred to pre-accept the grant and associated contracts on August 12, 2019); and authorize an Aviation Authority Officer or the Chief Executive Officer to execute the necessary documents following satisfactory review by legal counsel.

Page 117: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

CONSENT AGENDA ITEM – GG –

GREATER ORLANDO AVIATION AUTHORITY

________________________________________________________________ Orlando International Airport

One Jeff Fuqua Boulevard Orlando, Florida 32227-4399

MEMORANDUM TO: Members of the Aviation Authority FROM: Stanley J. Thornton, Chair, Professional Services Committee DATE: September 18, 2019 ITEM DESCRIPTION Recommendation of the Professional Services Committee to Approve Addenda to the Information Technology Consulting Services Agreement with Faith Group Consulting, LLC for Fiscal Year (FY) 2020 Information Systems Staff Augmentation Support Services at the Orlando International Airport BACKGROUND On June 20, 2018, the Aviation Authority Board approved the award of an Information Technology (IT) Consulting Services Agreement to Faith Group Consulting, LLC. This no-cost base agreement established the negotiated hourly rates. The consulting services include a broad range of services associated with the planning and implementation of IT projects and initiatives that are identified in the Aviation Authority’s Capital Improvement Plan (CIP), IT Master Plan (ITMP), the Aviation Authority’s annual project planning process, and other IT projects and initiatives requested by the Aviation Authority. The services may include project management; staff augmentation; research of specific technologies; research and concept development; IT business analysis; business case development; infrastructure and applications design, installation, configuration, development and testing; database management and administration; cyber and physical security; development of solicitation documents; functional, performance and interface requirements definition and documentation project planning; applications development, implementation and integration across multiple systems; operations and management of IT; assistance with IT roadmap or strategic plans; and, vendor and product evaluations and recommendations and other IT consulting services. ISSUES Per the Aviation Authority’s Policy 450.04, the Aviation Authority Board must approve all contract addenda and amendments that result in the value of any contract being increased, in the aggregate, by $250,000 or more over the contract value. The PSC recommended approval of the following addenda to the IT Consulting Services Agreement with Faith Group Consulting, LLC:

• Addendum No. 11 to the IT Consulting Services Agreement with Faith Group Consulting, LLC, for Information Systems Staff Augmentation for Senior Project Manager, Automation Software Support. Services will provide ongoing staff augmentation support to the IT Department, and include, but are not limited to, project management of multiple IT programs and projects; review of project plans, specifications and change orders; analysis and assessment of project risk issues; and, maintenance of a portfolio of business applications project schedules, resources assignments, and financials using the Aviation Authority Enterprise Project Management System (i.e., Planview), for the total not-to-exceed fee amount of $314,080, with funding from Operation and Maintenance Funds (subject to adoption of the FY 2020 Aviation Authority Budget by the Aviation Authority Board under separate item). Due to the specialized scope of

Page 118: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

the required services, Faith Group Consulting, LLC did not propose any MWBE/LDB/VBE participation on this addendum. [Reference PSC Meeting held August 13, 2019, Agenda Item No. 6].

• Addendum No. 12 to the IT Consulting Services Agreement with Faith Group

Consulting, LLC, for FY 2020 On-Call MCO Mobile Application Support and Maintenance. Services include, but are not limited to, daily operational monitoring and maintenance support services of the available MCO mobile applications, for the total not-to-exceed fee amount of $84,180, with funding from Operation and Maintenance Funds (subject to adoption of the FY 2020 Aviation Authority Budget by the Aviation Authority Board under separate item). Due to the specialized scope of the required services, Faith Group Consulting, LLC did not propose any MWBE/LDB/VBE participation on this addendum. [Reference PSC Meeting held August 27, 2019, Agenda Item No. 2].

• Addendum No. 13 to the IT Consulting Services Agreement with Faith Group Consulting, LLC, for FY 2020 Information Systems Staff Augmentation for Application Programmer/Analyst, which include but are not limited to, daily operational monitoring and maintenance support services to the Maintenance Department of the Maximo asset management environment, for the total not-to-exceed fee amount of $133,600, with funding from Operation and Maintenance Funds (subject to adoption of the FY 2020 Aviation Authority Budget by the Aviation Authority Board under separate item), and Faith Group Consulting, LLC proposes 95% MWBE participation on this addendum. [Reference PSC Meeting held August 27, 2019, Agenda Item No. 3].

As these addenda will result in an aggregate increase to the Aviation Authority’s Agreement with Faith Group Consulting, LLC exceeding $250,000, Aviation Authority Board approval is required. ALTERNATIVES None. FISCAL IMPACT The fiscal impact is $531,860. Funding is from Operation and Maintenance Funds (subject to adoption of the FY 2020 Aviation Authority Budget by the Aviation Authority Board under separate item). RECOMMENDED ACTION It is respectfully requested that the Aviation Authority Board resolve to accept the recommendation of the Professional Services Committee and (1) approve Addendum No. 11 to the IT Consulting Services Agreement with Faith Group Consulting, LLC, for FY 2020 Information Systems Staff Augmentation for Senior Project Manager, Automation Software Support, for the total not-to-exceed fee amount of $314,080, with funding from Operation and Maintenance Funds; (2) approve Addendum No. 12 to the IT Consulting Services Agreement with Faith Group Consulting, LLC for FY 2020 On-Call MCO Mobile Application Support and Maintenance, for a total not-to-exceed fee amount of $84,180, with funding from Operation and Maintenance Funds; (3) approve Addendum No. 13 to the IT Consulting Services Agreement with Faith Group Consulting, LLC for FY 2020 Information Systems Staff Augmentation for Application Programmer/Analyst, for a total not-to-exceed fee amount of $133,600, with funding from Operation and Maintenance Funds; and, (4) authorize an Aviation Authority Officer or the Chief Executive Officer to execute the necessary documents following satisfactory review by legal counsel.

Page 119: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

CONSENT AGENDA ITEM – HH –

GREATER ORLANDO AVIATION AUTHORITY

Orlando International Airport One Jeff Fuqua Boulevard

Orlando, Florida 32827-4399

MEMORANDUM TO: Members of the Aviation Authority FROM: Stanley J. Thornton, Chair, Professional Services Committee DATE: September 18, 2019 ITEM DESCRIPTION Recommendation of the Professional Services Committee to Approve an Amendment to Addendum No. 13 to the Technology and Multi-Media Systems Specialty Engineer for the South Terminal C, Phase 1, Agreement with Burns Engineering, Inc. for Additional Specialty Consulting Services for the Implementation Phase of W-00396, Virtual Ramp Control (VRC), at the Orlando International Airport BACKGROUND The South Terminal C, Phase 1, Program provides for a world-class domestic and international airport terminal building, consisting of a new airside terminal with up to 24 airline gates and a landside terminal with both secure and non-secure areas, and may include, but is not limited to, all associated improvements and infrastructure required or related thereto, such as sitework, roadways, aprons, runways, taxiways, other airfield work, utilities, landscaping, lighting, walkways, pedestrian bridges, expansion of the parking garage, a new and/or expanded chiller plant, aircraft loading bridges, and all interior design, such as concessions planning, ticketing, and security improvements, and baggage handling systems. The South Terminal C, Phase 1, (STC-P1) Program will include the VRC System, up to 24 aircraft gates, and will undergo future expansions, which may expand the VRC operations up to 60 gates, including shared Multiple Aircraft Ramp System (MARS) gates and multiple remote hardstand aircraft parking positions. The VRC will enable ramp control personnel to manage aircraft movements in the non-movement area in all-weather conditions on a 24-hours-per-day, 7-days-per-week basis. On August 19, 2015, the Aviation Authority Board approved the Technology and Multi-Media Systems Specialty Engineer for the South Terminal C, Phase 1, Agreement with Burns Engineering, Inc. On November 20, 2018, the Construction Committee approved Addendum No. 13 to the Technology and Multi-Media Systems Specialty Engineer for the South Terminal C, Phase 1, Agreement with Burns Engineering, Inc. for a total amount of $185,514, to provide Specialty Consulting Services during the Procurement Phase of the W-00396. Services included, but were not limited to, preparation of the requirements documentation, support and review of the Statements of Qualification (SOQ), and, support and review of the Proposal Criteria Package (PCP) preparation. ISSUES A fee has been negotiated with Burns Engineering, Inc. for a total amount of $558,596 for Additional Specialty Consulting Services for the Implementation Phase of W-00396, Virtual Ramp Control (VRC), at the Orlando International Airport. Services will include, but are not limited to, project management consulting services, coordination of the planning, design, and construction activities related to the Multilateation (MLAT) field equipment, and functional consulting services to review key outputs for the project.

Page 120: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

The Aviation Authority has reviewed the proposal from Burns Engineering, Inc., and determined that, due to the specialized scope of the required services, Burns Engineering, Inc. does not propose any MWBE/LDB/VBE participation on this Amendment. On September 5, 2019, the Professional Services Committee recommended approval of an Amendment to Addendum No. 13 to the Technology and Multi-Media Systems Specialty Engineer for the South Terminal C, Phase 1, Agreement with Burns Engineering, Inc. for Additional Specialty Consulting Services for the Implementation Phase of W-00396, Virtual Ramp Control (VRC), at the Orlando International Airport, as outlined in the memorandum. ALTERNATIVES None. FISCAL IMPACT The fiscal impact is $558,596. Funding is from General Airport Revenue Bonds. RECOMMENDED ACTION It is respectfully requested that the Aviation Authority Board resolve to accept the recommendation of the Professional Services Committee and approve an Amendment to Addendum No. 13 to the Technology and Multi-Media Systems Specialty Engineer for the South Terminal C, Phase 1, Agreement with Burns Engineering, Inc. for Additional Specialty Consulting Services for the Implementation Phase of W-00396, Virtual Ramp Control (VRC), at the Orlando International Airport, for the total not-to-exceed fee amount of $558,596, with funding from General Airport Revenue Bonds; and authorize an Aviation Authority Officer or the Chief Executive Officer to execute the necessary documents following satisfactory review by legal counsel.

Page 121: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

CONSENT AGENDA ITEM – II –

GREATER ORLANDO AVIATION AUTHORITY

________________________________________________________________ Orlando International Airport

One Jeff Fuqua Boulevard Orlando, Florida 32227-4399

MEMORANDUM TO: Members of the Aviation Authority FROM: Stanley J. Thornton, Chair, Professional Services Committee DATE: September 18, 2019 ITEM DESCRIPTION Recommendation of the Professional Services Committee to Approve an Addendum to the Information Technology Consulting Services Agreement with Barich, Inc. for Fiscal Year (FY) 2020 Information Systems Staff Augmentation to the Information Technology (IT) Department for South Terminal C, Phase 1, Construction and Other IT Related Projects Support Services, at the Orlando International Airport BACKGROUND On June 20, 2018, the Aviation Authority Board approved the award of an Information Technology (IT) Consulting Services Agreement to Barich, Inc. This no-cost base agreement established the negotiated hourly rates. The consulting services include a broad range of services associated with the planning and implementation of IT projects and initiatives that are identified in the Aviation Authority’s Capital Improvement Plan (CIP), IT Master Plan (ITMP), the Aviation Authority’s annual project planning process, and other IT projects and initiatives requested by the Aviation Authority. The services may include project management; staff augmentation; research of specific technologies; research and concept development; IT business analysis; business case development; infrastructure and applications design, installation, configuration, development and testing; database management and administration; cyber and physical security; development of solicitation documents; functional, performance and interface requirements definition and documentation project planning; applications development, implementation and integration across multiple systems; operations and management of IT; assistance with IT roadmap or strategic plans; and, vendor and product evaluations and recommendations and other IT consulting services. ISSUES A fee has been negotiated with Barich, Inc. for a total amount of $371,360 to provide FY 2020 Information Systems Staff Augmentation to the Information Technology Department for South Terminal C, Phase 1, Construction and Other IT Related Projects Support Services, at the Orlando International Airport. These services will provide a qualified Senior Managing Consultant in a staff augmentation role to the Chief Information Officer (CIO), and will serve as an advisor, who will discern and document IT internal and external project commitments and schedules, monitor and report the progress to fulfillment to the CIO, coordinate commitment actions among internal and external participants, and contribute to the resolution of problems. Primary assignments shall be the construction projects for the South Terminal C, Phase 1, Program, as well as any other IT-related projects. Services will be provided from October 1, 2019, through September 30, 2020. The Aviation Authority has reviewed the proposal from Barich, Inc., and determined that, due to the specialized nature of the required services, Barich, Inc. does not propose any MWBE/LDB/VBE participation on this Addendum.

Page 122: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

On August 27, 2019, the Professional Services Committee recommended approval of an Addendum to the IT Consulting Services Agreement with Barich, Inc. for FY 2020 Information Systems Staff Augmentation to the Information Technology Department for South Terminal C, Phase 1, Construction and Other IT Related Projects Support Services, at the Orlando International Airport, as outlined in the memorandum. ALTERNATIVES None. FISCAL IMPACT The fiscal impact is $371,360. Funding is from Operations and Maintenance Fund (subject to adoption of the FY 2020 Aviation Authority Budget by the Aviation Authority Board under separate item). RECOMMENDED ACTION It is respectfully requested that the Aviation Authority Board resolve to accept the recommendation of the Professional Services Committee and approve an Addendum to the IT Consulting Services Agreement with Barich, Inc. for FY 2020 Information Systems Staff Augmentation to the Information Technology Department for South Terminal C, Phase 1, Construction and Other IT Related Projects Support Services, at the Orlando International Airport, for a total not-to-exceed fee amount of $371,360, with funding from Operation and Maintenance Funds; and authorize an Aviation Authority Officer or the Chief Executive Officer to execute the necessary documents following satisfactory review by legal counsel.

Page 123: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

CONSENT AGENDA ITEM – JJ –

GREATER ORLANDO AVIATION AUTHORITY

________________________________________________________________ Orlando International Airport

One Jeff Fuqua Boulevard Orlando, Florida 32827-4399

MEMORANDUM TO: Members of the Aviation Authority FROM: Stanley J. Thornton, Chief Operating Officer DATE: September 18, 2019 ITEM DESCRIPTION Recommendation to Accept a Public Transportation Grant Agreement (PTGA) for Orlando International Airport from the Florida Department of Transportation BACKGROUND Throughout the year, the Florida Department of Transportation (FDOT) provides grants (i.e., PTGAs) to match funds with the Aviation Authority for certain projects in accordance with the Aviation Authority’s Capital Improvement Plan (CIP). ISSUES The Aviation Authority has received the following: Orlando International Airport: • Public Transportation Grant FM No. 444239-1-94-02. This PTGA in the total amount

of $4,014,919 provides $3,551,057 in 12.5% matching funding and $463,862 in 50/50 grant funding for construction phase services for Runway 18L-36R Rehabilitation and Related Work at the Orlando International Airport (MCO). The objective of this project is to provide construction for the rehabilitation of pavement areas identified in the 2016 MCO Airfield Pavement Management Program Report. This work also includes rehabilitation and widening of the runway shoulders. (i.e., Bid Package (BP) No. 486).

ALTERNATIVES None. FISCAL IMPACT The fiscal impact is the acceptance of FDOT funding in the amount of $4,014,919. The Aviation Authority’s matching funds in the amount of $4,014,919 will be from Capital Expenditure Funds and General Airport Revenue Bonds. RECOMMENDED ACTION It is respectfully requested that the Aviation Authority Board resolve to (1) adopt a Resolution accepting PTGA FM No. 444239-1-94-02 in the amount of $4,014,919; and, (2) authorize the Chief Executive Officer and the Assistant Secretary to execute the necessary documents.

Page 124: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

CONSENT AGENDA ITEM – KK –

GREATER ORLANDO AVIATION AUTHORITY ________________________________________________________________

Orlando International Airport One Jeff Fuqua Boulevard

Orlando, Florida 32827-4399

MEMORANDUM TO: Members of the Aviation Authority FROM: Stanley J. Thornton, Chair, Construction Committee DATE: September 18, 2019 ITEM DESCRIPTION Recommendation of the Construction Committee to Award Project Bid Package (BP) No. S00172, South Employee Parking Lot, at the Orlando International Airport, to Valencia Construction Group, Inc. BACKGROUND BP No. S00172, South Employee Parking Lot, at the Orlando International Airport, is to construct an employee parking lot, associated infrastructure, and related improvements within close proximity to the South Automated People Mover (APM)/Intermodal Terminal Facility (ITF) and South Terminal C facilities. The project includes a base bid and four add alternates as follows:

• Base Bid: Construct 1,028 parking spaces and associated improvements for a secured employee parking lot.

• Add Alternate No. 1: Concrete bus loop.

• Add Alternate No. 2: All fencing is to be black vinyl coated. Scope included in Base Bid per Bid Addendum No. 4.

• Add Alternate No. 3: Landscaping and irrigation.

• Add Alternate No. 4: Additional 210 parking spaces.

• Add Alternate No. 5: Additional 471 parking spaces.

Construction is scheduled to start in October 2019 and complete in July 2020. ISSUES BP No. S00172 was publicly advertised on May 12 and 15, 2019. On August 13, 2019, bids for the above-referenced project were received as follows: Bidder Base Bid

Add Alt No. 1

Add Alt No. 3

Add Alt No. 4

Add Alt No. 5

Total Bid

Valencia Construction Group, Inc.

$4,068,000 $184,000 $214,000 $790,000 $1,345,000 $6,601,000

Prime Construction Group

$4,680,000 $350,000 $200,000 $800,000 $910,000 $6,940,000

Carr & Collier, Inc.

$4,457,000 $422,000 $60,000 $973,000 $1,474,000 $7,386,000

Hubbard Construction Company

$6,217,000 $305,000 $154,000 $1,121,000 $1,872,000 $9,669,000

The Middlesex Corporation

$6,394,400 $235,000 $300,000 $1,350,000 $1,870,000 $10,149,400

Southern Development & Construction

$6,625,065 $317,200 $144,100 $994,985 $1,893,650 $9,975,000

Kiewit Infrastructure South, Inc.

$7,893,075 $292,767 $64,249 $1,040,898 $1,651,312 $10,942,301

Page 125: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

The scope of work for Add Alternate No. 4 is encompassed in Add Alternate No. 5; therefore, the two alternates are mutually exclusive. Following review by staff and legal counsel, it is recommended to award the Base Bid, Add Alternate No. 1 and Add Alternate No. 5, based on funding availability, as follows:

Bidder Base Bid

Add Alt No. 1

Add Alt No. 5

Total Bid

Valencia Construction Group, Inc.

$4,068,000 $184,000 $1,345,000 $5,597,000

Prime Construction Group

$4,680,000 $350,000 $910,000 $5,940,000

Carr & Collier, Inc.

$4,457,000 $422,000 $1,474,000 $6,353,000

Hubbard Construction Company

$6,217,000 $305,000 $1,872,000 $8,394,000

The Middlesex Corporation

$6,394,400 $235,000 $1,870,000 $8,499,400

Southern Development & Construction

$6,625,065 $317,200 $1,893,650 $8,835,915

Kiewit Infrastructure South, Inc.

$7,893,075 $292,767 $1,651,312 $9,837,154

The apparent low responsive bidder, Valencia Construction Group, Inc., has confirmed its bid was prepared in accordance with all bid documents and addenda, and that it will be able to complete the project for the amount bid and within the Aviation Authority’s schedule. The Aviation Authority established 15% MWBE and 4% LDB/VBE participation goals based only on the base bid scope of work for this project. The Aviation Authority has reviewed the bid from Valencia Construction Group, Inc. and determined that Valencia Construction Group, Inc. proposes to achieve 16% MWBE and 4.7% LDB/VBE participation only on the base bid scope of work. On August 27, 2019, the Construction Committee recommended approval of the award of BP No. S00172, South Employee Parking Lot, at the Orlando International Airport, to Valencia Construction Group, Inc., as outlined in the memorandum. The current construction budget for BP No. S00172 is $4,252,000, which is sufficient to award the Base Bid and Add Alternate No. 1. Add Alternate No. 5 was added to the project to address an immediate need of employee parking, and funding in the amount of $2,000,000 for this additional scope was requested from existing Capital Expenditure Funds to complete the design and construction of the additional 471 parking spaces, for a total number of 1,499 parking spaces. On September 12, 2019, the Construction Finance Oversight Committee recommended approval of the transfer of $2,000,000 of Capital Expenditure Fund from fund balance to BP No. S00172. Approval by the Aviation Authority Board is necessary for this non-budgeted expenditure. ALTERNATIVES None. FISCAL IMPACT The fiscal impact is $5,597,000. Funding is from Capital Expenditure Fund and General Airport Revenue Bonds. RECOMMENDED ACTION It is respectfully requested that the Aviation Authority Board resolve to accept the recommendation of the Construction Committee and (1) award BP No. S00172, South Employee Parking Lot, at the Orlando International Airport, to Valencia Construction Group, Inc., for a total bid amount of $5,597,000, with funding from Capital Expenditure Fund and General Airport Revenue Bonds; (2) approve the transfer of $2,000,000 of Capital Expenditure Fund from fund balance to BP No. S00172; (3) request Orlando City Council concurrence for this non-budgeted expenditure; and, (4) authorize an Aviation Authority Officer or the Chief Executive Officer to execute the necessary documents following satisfactory review by legal counsel.

Page 126: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

BP-S00172, SOUTH EMPLOYEE PARKING LOT

Page 127: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

CONSENT AGENDA ITEM – LL –

GREATER ORLANDO AVIATION AUTHORITY

________________________________________________________________ Orlando International Airport

One Jeff Fuqua Boulevard Orlando, Florida 32827-4399

MEMORANDUM TO: Members of the Aviation Authority FROM: Stanley J. Thornton, Chair, Construction Committee DATE: September 18, 2019 ITEM DESCRIPTION Recommendation of the Construction Committee to Award Project Bid Package (BP) No. 00482, Gate E-50 and Checkpoint Charlie Development, at the Orlando International Airport, to Carr & Collier, Inc. BACKGROUND BP No. 00482, Gate E-50 and Checkpoint Charlie Development, at the Orlando International Airport, is to develop and construct Gate E-50, Checkpoint Charlie, and other associated improvements in a permanent location just south of the intersection of Cargo Road and Casa Verde Drive. The proposed location avoids conflicts with known future improvements. The project includes a base bid and seven add alternates as follows:

• Base Bid: Construct new security checkpoint, which includes installation of security gate and fencing for both vehicle and personnel inspection stations, and other associated improvements.

• Add Alternate No. 1: Heavy duty pavement.

• Add Alternate No. 2: Furnish and install 6 Closed Circuit Television (CCTV) Cameras and associated cabling and hardware equipment, and testing.

• Add Alternate No. 3: Furnish and install 20 Closed Circuit Television (CCTV) Cameras and associated cabling and hardware equipment, and testing.

• Add Alternate No. 4: Furnish and install gate arms and associated equipment, and testing.

• Add Alternate No. 5: Install pavement to create driveway on east side of site.

• Add Alternate No. 6: Use reinforced concrete pipe for drainage system in lieu of High Density Polyethylene (HDPE).

• Add Alternate No. 7: Furnish and install under vehicle inspection system and associated cabling and hardware equipment, and testing.

Construction is scheduled to start in October 2019 and complete in May 2020. ISSUES BP No. 00482 was publicly advertised on June 9 and 12, 2019. On August 16, 2019, bids for the above-referenced project were received as follows:

Page 128: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

Bidder Carr &

Collier, Inc.

R.L. Burns, Inc.

Gomez Construction

Company

Odyssey Int’l, Inc. d/b/a

Odyssey Global

McCree Design Builders,

Inc. Base Bid $3,900,000 $4,260,912.54 $4,367,102 $4,748,000 $5,202,836 Add Alt 1 $ 68,000 $ 78,402.10 $ 77,090 $ 101,000 $ 82,875 Add Alt 2 $ 20,100 $ 20,575.74 $ 22,843 $ 31,000 $ 97,811 Add Alt 3 $ 24,800 $ 25,920.65 $ 30,643 $ 60,000 $ 144,474 Add Alt 4 $ 82,000 $ 128,129.64 $ 194,133 $ 29,000 $ 88,256 Add Alt 5 $ 44,900 $ 45,373.97 $ 44,615 $ 56,000 $ 54,971 Add Alt 6 $ 32,100 $ 24,203.58 $ 23,799 ($ 30,000) $ 25,584 Add Alt 7 $ 485,000 $ 501,587.66 $ 358,625 $ 561,000 $ 398,025 Total $4,656,900 $5,085,105.88 $5,118,850 $5,556,000 $6,094,832 The apparent low responsive bidder, Carr & Collier, Inc., has confirmed its bid was prepared in accordance with all bid documents and addenda, and that it will be able to complete the project for the amount bid and within the Aviation Authority’s schedule. The Aviation Authority established 18% MWBE and 5% LDB/VBE participation goals based only on the base bid scope of work for this project. The Aviation Authority has reviewed the bid from Carr & Collier, Inc. and determined that Carr & Collier, Inc. proposes to achieve 22.2% MWBE and 6.2% LDB/VBE participation only on the base bid scope of work. On September 5, 2019, the Construction Committee recommended approval of the award of BP No. 00482, Gate E-50 and Checkpoint Charlie Development, at the Orlando International Airport, to Carr & Collier, Inc., as outlined in the memorandum. ALTERNATIVES None. FISCAL IMPACT The fiscal impact is $4,656,900. Funding is from previously-approved Capital Expenditure Fund. RECOMMENDED ACTION It is respectfully requested that the Aviation Authority Board resolve to accept the recommendation of the Construction Committee and award BP No. 00482, Gate E-50 and Checkpoint Charlie Development, at the Orlando International Airport, to Carr & Collier, Inc., for a total bid amount of $4,656,900 (Base Bid plus Add Alternate Nos. 1 through 7), with funding from previously-approved Capital Expenditure Fund; and authorize an Aviation Authority Officer or the Chief Executive Officer to execute the necessary documents following satisfactory review by legal counsel.

Page 129: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

BP-482, GATE E-50 & CHECKPOINT CHARLIE DEVELOPMENT

Page 130: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

CONSENT AGENDA ITEM – MM –

GREATER ORLANDO AVIATION AUTHORITY ________________________________________________________________

Orlando International Airport One Jeff Fuqua Boulevard

Orlando, Florida 32827-4399

MEMORANDUM TO: Members of the Aviation Authority FROM: Stanley J. Thornton, Chair, Construction Committee DATE: September 18, 2019 ITEM DESCRIPTION Recommendation of the Construction Committee to Approve an Addendum to the Continuing Low Voltage Construction Services Agreement with Quality Cable Contractors, Inc. for Construction Services for Project L-00045, On-Call Low Voltage Services (FY20-QCC), at the Orlando International Airport BACKGROUND Project L-00045 provides for on-call low voltage cabling installation and repair services for all Aviation Authority facilities located at Orlando International Airport. Construction is scheduled to start in October 2019 and complete in September 2020. ISSUES Quality Cable Contractors, Inc. has proposed a direct-negotiated not-to-exceed amount of $350,000 for construction services for Project L-00045. The Aviation Authority has reviewed the proposal from Quality Cable Contractors, Inc. and determined that, due to the specific nature of the required services, Quality Cable Contractors, Inc. does not propose any MWBE/LDB participation. On August 27, 2019, the Construction Committee recommended approval of an Addendum to the Continuing Low Voltage Construction Services Agreement with Quality Cable Contractors, Inc. for Construction Services for Project L-00045, On-Call Low Voltage Services (FY20-QCC), at the Orlando International Airport, as outlined in the memorandum. ALTERNATIVES None. FISCAL IMPACT The fiscal impact is $350,000. Funding is from Operations and Maintenance Fund (subject to adoption of the Fiscal Year (FY) 2020 Aviation Authority Budget by the Aviation Authority Board under separate item). RECOMMENDED ACTION It is respectfully requested that the Aviation Authority Board resolve to accept the recommendation of the Construction Committee and approve an Addendum to the Continuing Low Voltage Construction Services Agreement with Quality Cable Contractors, Inc. for Construction Services for Project L-00045, On-Call Low Voltage Services (FY20-QCC), at the Orlando International Airport, for the total not-to-exceed amount of $350,000, with funding from Operation and Maintenance Funds; and authorize an Aviation Authority Officer or the Chief Executive Officer to execute the necessary documents following satisfactory review by legal counsel.

Page 131: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

CONSENT AGENDA ITEM – NN –

GREATER ORLANDO AVIATION AUTHORITY ________________________________________________________________

Orlando International Airport One Jeff Fuqua Boulevard

Orlando, Florida 32827-4399

MEMORANDUM

TO: Members of the Aviation Authority

FROM: Stanley J. Thornton, Chair, Construction Committee

DATE: September 18, 2019

ITEM DESCRIPTION

Recommendation of the Construction Committee to Approve an Addendum to the Continuing Low Voltage Construction Services Agreement with Orion Management Services, LLC for Construction Services for Project L-00046, On-Call Low Voltage Services (FY20-ORION), at the Orlando International Airport

BACKGROUND

Project L-00046 provides for on-call low voltage cabling installation and repair services for all Aviation Authority facilities located at Orlando International Airport.

Construction is scheduled to start in October 2019 and complete in September 2020.

ISSUES

Orion Management Services, LLC has proposed a direct-negotiated not-to-exceed amount of $350,000 for construction services for Project L-00046.

The Aviation Authority has reviewed the proposal from Orion Management Services, LLC and determined that, due to the specific nature of the required services, Orion Management Services, LLC does not propose any MWBE/LDB participation.

On August 27, 2019, the Construction Committee recommended approval of an Addendum to the Continuing Low Voltage Construction Services Agreement with Orion Management Services, LLC for Construction Services for Project L-00046, On-Call Low Voltage Services (FY20-ORION), at the Orlando International Airport, as outlined in the memorandum.

ALTERNATIVES

None.

FISCAL IMPACT

The fiscal impact is $350,000. Funding is from Operations and Maintenance Fund (subject to adoption of the Fiscal Year (FY) 2020 Aviation Authority Budget by the Aviation Authority Board under separate item).

RECOMMENDED ACTION

It is respectfully requested that the Aviation Authority Board resolve to accept the recommendation of the Construction Committee and approve an Addendum to the Continuing Low Voltage Construction Services Agreement with Orion Management Services, LLC for Construction Services for Project L-00046, On-Call Low Voltage Services (FY20-ORION), at the Orlando International Airport, for the total not-to-exceed amount of $350,000, with funding from Operation and Maintenance Funds; and authorize an Aviation Authority Officer or the Chief Executive Officer to execute the necessary documents following satisfactory review by legal counsel.

Page 132: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

CONSENT AGENDA ITEM – OO –

GREATER ORLANDO AVIATION AUTHORITY ________________________________________________________________

Orlando International Airport One Jeff Fuqua Boulevard

Orlando, Florida 32827-4399

MEMORANDUM

TO: Members of the Aviation Authority

FROM: Stanley J. Thornton, Chair, Construction Committee

DATE: September 18, 2019

ITEM DESCRIPTION

Recommendation of the Construction Committee to Approve an Addendum to the Continuing Low Voltage Construction Services Agreement with Orlando Business Telephone Systems, Inc. for Construction Services for Project L-00047, On-Call Low Voltage Services (FY20-OBTS), at the Orlando International Airport

BACKGROUND

Project L-00047 provides for on-call low voltage cabling installation and repair services for all Aviation Authority facilities located at Orlando International Airport.

Construction is scheduled to start in October 2019 and complete in September 2020.

ISSUES

Orlando Business Telephone Systems, Inc. has proposed a direct-negotiated not-to-exceed amount of $350,000 for construction services for Project L-00047.

The Aviation Authority has reviewed the proposal from Orlando Business Telephone Systems, Inc. and determined that, due to the specific nature of the required services, Orlando Business Telephone Systems, Inc. does not propose any MWBE/LDB participation.

On August 27, 2019, the Construction Committee recommended approval of an Addendum to the Continuing Low Voltage Construction Services Agreement with Orlando Business Telephone Systems, Inc. for Construction Services for Project L-00047, On-Call Low Voltage Services (FY20-OBTS), at the Orlando International Airport, as outlined in the memorandum.

ALTERNATIVES

None.

FISCAL IMPACT

The fiscal impact is $350,000. Funding is from Operation and Maintenance Funds (subject to adoption of the Fiscal Year (FY) 2020 Aviation Authority Budget by the Aviation Authority Board under separate item).

RECOMMENDED ACTION

It is respectfully requested that the Aviation Authority Board resolve to accept the recommendation of the Construction Committee and approve an Addendum to the Continuing Low Voltage Construction Services Agreement with Orlando Business Telephone Systems, Inc. for Construction Services for Project L-00047, On-Call Low Voltage Services (FY20-OBTS), at the Orlando International Airport, for the total not-to-exceed amount of $350,000, with funding from Operation and Maintenance Funds; and authorize an Aviation Authority Officer or the Chief Executive Officer to execute the necessary documents following satisfactory review by legal counsel.

Page 133: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

CONSENT AGENDA ITEM – PP –

GREATER ORLANDO AVIATION AUTHORITY ________________________________________________________________

Orlando International Airport One Jeff Fuqua Boulevard

Orlando, Florida 32827-4399

MEMORANDUM

TO: Members of the Aviation Authority

FROM: Stanley J. Thornton, Chair, Construction Committee

DATE: September 18, 2019

ITEM DESCRIPTION

Recommendation of the Construction Committee to Approve an Addendum to the Continuing Vertical Construction Services Agreement with Collage Design and Construction Group d/b/a The Collage Companies for Project V-00863, Emergency Exit Door Hardware Replacement, at the Orlando International Airport

BACKGROUND

Project V-00863 provides for the replacement of approximately 50 emergency door hardware sets, which have reached the end of their useful life, at various locations within the Landside and Airside Terminals at the Orlando International Airport.

Construction is scheduled to start in September 2019 and complete in January 2020.

ISSUES

Collage Design and Construction Group d/b/a The Collage Companies has proposed a direct-negotiated not-to-exceed amount of $350,575 for construction services for Project V-00863.

The Aviation Authority has reviewed the proposal from Collage Design and Construction Group d/b/a The Collage Companies, and determined that Collage Design and Construction Group d/b/a The Collage Companies proposes 1.5% MWBE participation on this addendum.

On August 27, 2019, the Construction Committee recommended approval of an Addendum to the Continuing Vertical Construction Services Agreement with Collage Design and Construction Group d/b/a The Collage Companies for Project V-00863, Emergency Exit Door Hardware Replacement, at the Orlando International Airport, as outlined in the memorandum.

ALTERNATIVES

None.

FISCAL IMPACT

The fiscal impact is $350,575. Funding is from previously-approved Capital Expenditure Fund.

RECOMMENDED ACTION

It is respectfully requested that the Aviation Authority Board resolve to accept the recommendation of the Construction Committee and approve an Addendum to the Continuing Vertical Construction Services Agreement with Collage Design and Construction Group d/b/a The Collage Companies for Project V-00863, Emergency Exit Door Hardware Replacement, at the Orlando International Airport, for the total not-to-exceed amount of $350,575, with funding from previously-approved Capital Expenditure Fund; and authorize an Aviation Authority Officer or the Chief Executive Officer to execute the necessary documents following satisfactory review by legal counsel.

Page 134: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

CONSENT AGENDA ITEM – QQ –

GREATER ORLANDO AVIATION AUTHORITY ________________________________________________________________

Orlando International Airport One Jeff Fuqua Boulevard

Orlando, Florida 32827-4399

MEMORANDUM

TO: Members of the Aviation Authority

FROM: Stanley J. Thornton, Chair, Construction Committee

DATE: September 18, 2019

ITEM DESCRIPTION

Recommendation of the Construction Committee to Approve Change Orders to Various Contracts

BACKGROUND

At its meetings on August 13, 2019, the Construction Committee recommended approval of the change orders as outlined in Attachment A.

ISSUES

The Aviation Authority reserves the right to recover premium and other costs from the responsible party, as applicable.

ALTERNATIVES

None.

FISCAL IMPACT

The funding source for each change order is outlined in Attachment A.

RECOMMENDED ACTION

It is respectfully requested that the Aviation Authority Board resolve to accept the recommendation of the Construction Committee to (1) approve Change Order No. E-00143-01 in the amount of $523.07 and a 91 calendar day time extension to Substantial Completion, with funding as outlined in Attachment A; and, (2) authorize an Aviation Authority Officer or the Chief Executive Officer to execute the change order(s) following satisfactory review by legal counsel.

Page 135: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

Attachment A (Page 1 of 2)

Change Order E-00143-01 Construction Committee: August 13, 2019 Project: Main Computer Room – Electrical Upgrades Contractor: Electric Services, Inc.

Amount This Change Order: $ 523.07 (0.06% of Original Contract Price) Original Contract Amount: $909,900.00 Previous Change Orders: $ 0.00 (0.0% of Original Contract Price) Revised Contract Amount: $910,423.07

Time Extension: 91 calendar days for Substantial Completion.

Funding Source: Previously-approved Capital Expenditure Fund.

Description of Change: 1. Reimburse the Contractor, on behalf of the Aviation Authority, for the 25% non-refundable deposit required by the City of Orlando for commercial building permit applications. (Reference Contractor’s ESI-RCO No. 1). ADD: $1,866.50; 2. Increase the Contract Time for Substantial Completion by 91 calendar days, from 180 calendar days to 271 calendar days, for work associated with this change order. NO COST; 3. Delete all work comprising Bid Alternate No. 1 (fire-rated shaft wall for Room NTLS ZCW 01 5753). (Reference Contractor’s ESI-RCO No. 2). DEDUCT: ($7,400.00); 4. Provide all labor, equipment and materials to install a new 12-inch panel extension section to the left side of Panel EXH1DPCW1 in Main Electrical Room NTLS ZCW 01 4903. Also included shall be the relocation of the existing Surge Protection Device (SPD) for Panel EXH1DPCW1 and the installation of a new 30A breaker to re-feed the existing SPD. All temporary circuiting required for the installation of the new panel extension shall be included. All equipment and/or devices not being reused shall be turned over to the Aviation Authority. (Reference Contractor’s ESI-RCO No. 3). ADD: $8,527.02; 5. Provide all labor, equipment and materials to convert the existing Men’s Restroom NTLS ZCC 02 4401 into a Women’s restroom. Also included shall be miscellaneous modifications within Electrical Room NTLS ZCC 02 4934. All changes shall be in accordance with Bulletin No. 2, dated June 12, 2019. Bulletin No. 2 changes include, but are not limited to, removal and disposal of three wall-mounted urinals; water supply lines and drains to be capped; removal of privacy panels; installation of three 24-inches by 36-inches lockable access panels; new restroom signage; and relocation of security Uninterrupted Power Supply (UPS) and Integrated Facility Switchboard (IFS). (Reference Contractor’s ESI-RCO No. 4). ADD: $4,543.76; 6. Provide all labor, equipment and materials to relocate an existing 2-1/2-inch copper water line in Room NTLS ZCC 02 4934. The water line shall be re-routed in a manner that no water lines are above the new electrical gear being installed within the space. All utility outages shall be closely coordinated with the Owner’s Authorized Representative (OAR). (Reference Contractor’s ESI-RCO No. 5). ADD: $2,985.79; and, 7. Reduce the Discovered Conditions Allowance by ($10,000.00), from $10,000.00 to $0.00. DEDUCT: ($10,000.00). This change order replaces Field Change Order No. 1. The parties negotiated this price and agree that this change order is within the scope of the original contract and does not materially alter the original contract such that a cardinal or constructive change to the original agreement has occurred.

Reason for Change: 1. Owner Requested Change: Within the Instructions to Bidders, Section 00 21 13 23.0, the Owner was to make a non-refundable deposit with the City of Orlando for the commercial building permit application associated with this project. To not delay the project, the Contractor paid this deposit. This change order reimburses the Contractor for the 25% non-refundable permit application deposit; 2. Unforeseen/Concealed Conditions: Notice to Proceed (NTP) for this project was issued on March 4, 2019. The project drawings were not submitted to the City of Orlando for permitting until March 11, 2019. After all comments from the City were addressed, the building permit for the project was available on May 24, 2019, allowing construction to start on the following business day, resulting in a delay of 81 calendar days before the Contractor could proceed with the Work. In addition, the procurement of the equipment was delayed due to design changes and longer than anticipated manufacturing and delivery time for critical equipment. This resulted in an overall delay of 91 calendar days. This change order extends, at no additional cost, the Contract Time by 91 calendar days as full compensation for these delays; 3. Owner Requested Change: Sheet A311 of the Contract Documents indicates that a shaft wall shall be installed within Communications Room NTLS ZCW 01 5753, as Bid Alternate No. 1. Bid Alternate No. 1 was included in the overall negotiated Contract Price awarded to the Contractor. It

Page 136: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

Attachment A (Page 2 of 2)

has since been determined that the shaft wall is not necessary. This change order removes all costs associated with constructing the Bid Alternate 1 shaft wall within Communications Room NTLS ZCW 01 5753; 4. Design Error: Per the Contract Documents, existing Panel EXH1DPCW1 is to be used to feed new Electrical Panel UPS-EXH2CC1. However, Panel EXH1DPCW1 has inadequate space at the top of the panel to install any additional conduits, but does have enough capacity to handle the new electrical loads. In order to mitigate this issue, a new 12-inch panel extension will be installed on the left side of Panel EXH1DPCW1. The panel’s existing Surge Protection Device (SPD) and associated disconnect switch will need to be relocated to the right side of the panel. As space is limited on the right side of the panel, the SPD disconnect will be replaced with a new breaker within Panel EXH1DPCW1. This change order compensates the Contractor for the additional work associated with the installation of a new 12-inch panel extension; 5. Owner Requested Change: Since the Project includes the conversion of the existing Level 2 Women’s restroom into an electrical room, GOAA Operations requested that the existing Men’s restroom, on the opposite end of the hall, be converted into a Women’s restroom. On May 28, 2019, the Construction Committee approved additional design services to the Designer (i.e., Matern Professional Engineering) to prepare Bulletin No. 2 to convert this existing Men’s restroom (i.e. NTLS ZCC 02 4401) into an Americans with Disabilities Act (ADA) compliant Women’s restroom. This item compensates the Contractor for all construction costs associated with the restroom conversion as defined in Bulletin No. 2; 6. Unforeseen/Concealed Conditions: At the time of bid, there was no access above the ceiling of the existing Women’s restroom (i.e., NTLS ZCC 02 4934) which was to be converted into a new electrical room. Once all demolition was completed, it was discovered that an existing 2-1/2-inch copper potable water line was installed overhead of where the new electrical equipment would be placed. In order to comply with code, the water line must be relocated. This change order compensates the Contractor for all costs associated with relocating this existing copper water line; and, 7. Owner Requested Change: An allowance of $10,000.00 was included in the project for unforeseen and discovered conditions. This item reduces the allowance from $10,000.00 to $0.00.

Page 137: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

CONSENT AGENDA ITEM – RR –

GREATER ORLANDO AVIATION AUTHORITY ________________________________________________________________

Orlando International Airport One Jeff Fuqua Boulevard

Orlando, Florida 32827-4399

MEMORANDUM

TO: Members of the Aviation Authority

FROM: Stanley J. Thornton, Chair, Construction Committee

DATE: September 18, 2019

ITEM DESCRIPTION

Recommendation of the Construction Committee to Approve an Addendum to the Continuing Program and Project Management Services (OAR Prime Entity) Agreement with AECOM Technical Services, Inc. for Fiscal Year (FY) 2020 Staff Extension Support Services for the Project Controls Department

BACKGROUND

On March 15, 2017, the Aviation Authority Board approved a Continuing Program and Project Management Services Agreement (OAR Prime Entity) with AECOM Technical Services, Inc. The services included all services necessary for the management of the design and construction of both individual projects and programs consisting of two or more individual projects, including the management of design from planning and conceptual design phase through detailed design, bidding and award of construction contracts; development of design criteria documents, and management of design/build contracts; management of the construction and commissioning of projects including performing as the Owner’s Authorized Representative (OAR); providing material testing, quantity surveying, construction inspection, construction safety compliance inspection, and other services required to verify compliance of construction with contract documents; providing cost estimating, cost control, scheduling, progress reporting, and planning services to support both design and construction activities; negotiating contracts for program and project related professional and construction services required from the Aviation Authority’s other consultants and contractors; coordination of the activities of multiple consultants and contractors onsite; and all other related services, which may be required to accomplish the planning, funding, design, bidding and award, construction, commissioning and operation of projects and programs for the Aviation Authority’s existing and future facilities.

ISSUES

A fee has been negotiated with AECOM Technical Services, Inc. for a total amount of $288,000 for FY 2020 Staff Extension Support Services for the Project Controls Department. These services include, but are not limited to, performing specialized and advanced administrative functions and public meeting assignments, and maintaining records and minutes for various Aviation Authority Sunshine Committees, such as the Construction Committee (CC), Professional Services Committee (PSC), and Design Review Committee (DRC), ensuring compliance with Aviation Authority Policies and Procedures, and Florida State Statutes. Services will be provided from October 1, 2019, through September 30, 2020.

The Aviation Authority has reviewed the proposal and determined that, due to the limited scope of the required services, AECOM Technical Services, Inc. does not propose any MWBE/LDB/VBE participation on this addendum.

On August 20, 2019, the Construction Committee recommended approval of an Addendum to the Continuing Program and Project Management Services (OAR Prime Entity) Agreement with AECOM Technical Services, Inc. for FY 2020 Staff Extension Support Services for the Project Controls Department, as outlined in the memorandum.

Page 138: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

ALTERNATIVES

None.

FISCAL IMPACT

The fiscal impact is $288,000. Funding is from Operation and Maintenance Funds (subject to adoption of the FY 2020 Aviation Authority Budget by the Aviation Authority Board under separate item).

RECOMMENDED ACTION

It is respectfully requested that the Aviation Authority Board resolve to accept the recommendation of the Construction Committee and approve an Addendum to the Continuing Program and Project Management Services (OAR Prime Entity) Agreement with AECOM Technical Services, Inc. for FY 2020 Staff Extension Support Services for the Project Controls Department, for the total not-to-exceed fee amount of $288,000, with funding from Operation and Maintenance Funds; and authorize an Aviation Authority Officer or the Chief Executive Officer to execute the necessary documents following satisfactory review by legal counsel.

Page 139: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

CONSENT AGENDA ITEM – SS –

GREATER ORLANDO AVIATION AUTHORITY ________________________________________________________________

Orlando International Airport One Jeff Fuqua Boulevard

Orlando, Florida 32827-4399

MEMORANDUM

TO: Members of the Aviation Authority

FROM: Stanley J. Thornton, Chair, Construction Committee

DATE: September 18, 2019

ITEM DESCRIPTION

Recommendation of the Construction Committee to Approve an Addendum to the Continuing Program and Project Management Services (OAR Prime Entity) Agreement with AECOM Technical Services, Inc. for Fiscal Year (FY) 2020 Senior Project Management/Oversight Support Services related to Tenant/Concessions Projects

BACKGROUND

On March 15, 2017, the Aviation Authority Board approved a Continuing Program and Project Management Services (OAR Prime Entity) Agreement with AECOM Technical Services, Inc. The services included all services necessary for the management of the design and construction of both individual projects and programs consisting of two or more individual projects, including the management of design from planning and conceptual design phase through detailed design, bidding and award of construction contracts; development of design criteria documents, and management of design/build contracts; management of the construction and commissioning of projects including performing as the Owner’s Authorized Representative (OAR); providing material testing, quantity surveying, construction inspection, construction safety compliance inspection, and other services required to verify compliance of construction with contract documents; providing cost estimating, cost control, scheduling, progress reporting, and planning services to support both design and construction activities; negotiating contracts for program and project related professional and construction services required from the Aviation Authority’s other consultants and contractors; coordination of the activities of multiple consultants and contractors onsite; and all other related services, which may be required to accomplish the planning, funding, design, bidding and award, construction, commissioning and operation of projects and programs for the Aviation Authority’s existing and future facilities.

ISSUES

A fee has been negotiated with AECOM Technical Services, Inc. for a total amount of $2,104,900 for FY 2020 Senior Project Management/Oversight Support Services related to Tenant/Concessions Projects. Coordination and oversight support services of the tenant/concessions projects are required. These senior project management services include, but are not limited to, construction project management, project control, contract administration, inspection services, review of drawings, monitoring of the tenant/concessions projects, and maintenance of project tracking progress. These services will be provided from October 1, 2019, through September 30, 2020.

The Aviation Authority has reviewed the proposal and determined that AECOM Technical Services, Inc. proposes 87.8% MWBE participation on this addendum.

On August 27, 2019, the Construction Committee recommended approval of an Addendum to the Continuing Program and Project Management Services (OAR Prime Entity) Agreement with AECOM Technical Services, Inc. for FY 2020 Senior Project Management/Oversight Support Services related to Tenant/Concessions Projects, as outlined in the memorandum.

Page 140: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

ALTERNATIVES

None.

FISCAL IMPACT

The fiscal impact is $2,104,900. Funding is from Operations and Maintenance Fund (subject to adoption of the FY 2020 Aviation Authority Budget by the Aviation Authority Board under separate item).

RECOMMENDED ACTION

It is respectfully requested that the Aviation Authority Board resolve to accept the recommendation of the Construction Committee and approve an Addendum to the Continuing Program and Project Management Services (OAR Prime Entity) Agreement with AECOM Technical Services, Inc. for FY 2020 Senior Project Management/Oversight Support Services related to Tenant/Concessions Projects, for a total not-to-exceed fee amount of $2,104,900, with funding from Operations and Maintenance Fund; and authorize an Aviation Authority Officer or the Chief Executive Officer to execute the necessary documents following satisfactory review by legal counsel.

Page 141: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

CONSENT AGENDA ITEM – TT –

GREATER ORLANDO AVIATION AUTHORITY ________________________________________________________________

Orlando International Airport One Jeff Fuqua Boulevard

Orlando, Florida 32827-4399

MEMORANDUM

TO: Members of the Aviation Authority

FROM: Stanley J. Thornton, Chair, Construction Committee

DATE: September 18, 2019

ITEM DESCRIPTION

Recommendation of the Construction Committee to Approve an Addendum to the Continuing Program and Project Management Services (OAR Prime Entity) Agreement with Geotech Consultants International, Inc. dba GCI, Inc. for Fiscal Year (FY) 2020 Small Construction Projects and Staff Extension Support Services to the Construction Department

BACKGROUND

On March 15, 2017, the Aviation Authority Board approved a Continuing Program and Project Management Services (OAR Prime Entity) Agreement with Geotech Consultants International, Inc. dba GCI, Inc. The services included all services necessary for the management of the design and construction of both individual projects and programs consisting of two or more individual projects, including the management of design from planning and conceptual design phase through detailed design, bidding and award of construction contracts; development of design criteria documents, and management of design/build contracts; management of the construction and commissioning of projects including performing as the Owner’s Authorized Representative (OAR); providing material testing, quantity surveying, construction inspection, construction safety compliance inspection, and other services required to verify compliance of construction with contract documents; providing cost estimating, cost control, scheduling, progress reporting, and planning services to support both design and construction activities; negotiating contracts for program and project related professional and construction services required from the Aviation Authority’s other consultants and contractors; coordination of the activities of multiple consultants and contractors onsite; and all other related services, which may be required to accomplish the planning, funding, design, bidding and award, construction, commissioning and operation of projects and programs for the Aviation Authority’s existing and future facilities.

ISSUES

A fee has been negotiated with Geotech Consultants International, Inc. dba GCI, Inc. for a total amount of $619,891 for FY 2020 Small Construction Projects and Staff Extension Support Services to the Construction Department. Services will include, but are not limited to, project definition and development, including the preparation of documents, review of costs for potential projects as directed by the Aviation Authority for submission to the Construction Committee for consideration, inspections of Aviation Authority facilities, definition of scope issues, contact and coordination of repairs as required to address warranty and emergency issues, and administrative support services. Services will be provided from October 1 2019, through September 30, 2020.

The Aviation Authority has reviewed the proposal and determined that Geotech Consultants International, Inc. dba GCI, Inc. proposes to achieve 23.1% MWBE participation on this addendum.

Page 142: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

On August 27, 2019, the Construction Committee recommended approval of an Addendum to the Continuing Program and Project Management Services (OAR Prime Entity) Agreement with Geotech Consultants International, Inc. dba GCI, Inc. for FY 2020 Small Construction Projects and Staff Extension Support Services to the Construction Department, as outlined in the memorandum.

ALTERNATIVES

None.

FISCAL IMPACT

The fiscal impact is $619,891. Funding is from Operations and Maintenance Fund (subject to adoption of the FY 2020 Aviation Authority Budget by the Aviation Authority Board under separate item).

RECOMMENDED ACTION

It is respectfully requested that the Aviation Authority Board resolve to accept the recommendation of the Construction Committee and approve an Addendum to the Continuing Program and Project Management Services (OAR Prime Entity) Agreement with Geotech Consultants International, Inc. dba GCI, Inc. for FY 2020 Small Construction Projects and Staff Extension Support Services to the Construction Department, for a total not-to-exceed fee amount of $619,891, with funding from Operation and Maintenance Funds; and authorize an Aviation Authority Officer or the Chief Executive Officer to execute the necessary documents following satisfactory review by legal counsel.

Page 143: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

CONSENT AGENDA ITEM – UU –

GREATER ORLANDO AVIATION AUTHORITY ________________________________________________________________

Orlando International Airport One Jeff Fuqua Boulevard

Orlando, Florida 32827-4399

MEMORANDUM

TO: Members of the Aviation Authority

FROM: Stanley J. Thornton, Chair, Construction Committee

DATE: September 18, 2019

ITEM DESCRIPTION

Recommendation of the Construction Committee to Approve an Addendum to the Continuing Program and Project Management Services (OAR Prime Entity) Agreement with Geotech Consultants International, Inc. dba GCI, Inc. for Fiscal Year (FY) 2020 Airport Safety Compliance Management Support Services

BACKGROUND

On March 15, 2017, the Aviation Authority Board approved a Continuing Program and Project Management Services (OAR Prime Entity) Agreement with Geotech Consultants International, Inc. dba GCI, Inc. The services included all services necessary for the management of the design and construction of both individual projects and programs consisting of two or more individual projects, including the management of design from planning and conceptual design phase through detailed design, bidding and award of construction contracts; development of design criteria documents, and management of design/build contracts; management of the construction and commissioning of projects including performing as the Owner’s Authorized Representative (OAR); providing material testing, quantity surveying, construction inspection, construction safety compliance inspection, and other services required to verify compliance of construction with contract documents; providing cost estimating, cost control, scheduling, progress reporting, and planning services to support both design and construction activities; negotiating contracts for program and project related professional and construction services required from the Aviation Authority’s other consultants and contractors; coordination of the activities of multiple consultants and contractors onsite; and all other related services, which may be required to accomplish the planning, funding, design, bidding and award, construction, commissioning and operation of projects and programs for the Aviation Authority’s existing and future facilities.

ISSUES

A fee has been negotiated with Geotech Consultants International, Inc. dba GCI, Inc. for a total amount of $619,261 for FY 2020 Airport Safety Compliance Management Support Services. Services will include, but are not limited to, onsite safety support services on all Aviation Authority and tenant construction projects, including airfield, maintenance activities performed by contractors, and general safety compliance inspection and reporting services to Aviation Authority staff. Services will be provided from October 1, 2019, through September 30, 2020.

The Aviation Authority has reviewed the proposal and determined that Geotech Consultants International, Inc. dba GCI, Inc. proposes 80.8% MWBE participation on this addendum.

On August 27, 2019, the Construction Committee recommended approval of an Addendum to the Continuing Program and Project Management Services (OAR Prime Entity) Agreement with Geotech Consultants International, Inc. dba GCI, Inc. for FY 2020 Airport Safety Compliance Management Support Services, as outlined in the memorandum.

Page 144: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

ALTERNATIVES

None.

FISCAL IMPACT

The fiscal impact is $619,261. Funding is from Operations and Maintenance Fund (subject to adoption of the FY 2020 Aviation Authority Budget by the Aviation Authority Board under separate item).

RECOMMENDED ACTION

It is respectfully requested that the Aviation Authority Board resolve to accept the recommendation of the Construction Committee and approve an Addendum to the Continuing Program and Project Management Services (OAR Prime Entity) Agreement with Geotech Consultants International, Inc. dba GCI, Inc. for FY 2020 Airport Safety Compliance Management Support Services, for a total amount of $619,261, which includes a not-to-exceed fee amount of $618,761 and a not-to-exceed reimbursable expense amount of $500, with funding from Operation and Maintenance Funds; and authorize an Aviation Authority Officer or the Chief Executive Officer to execute the necessary documents following satisfactory review by legal counsel.

Page 145: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

CONSENT AGENDA ITEM – VV –

GREATER ORLANDO AVIATION AUTHORITY ________________________________________________________________

Orlando International Airport One Jeff Fuqua Boulevard

Orlando, Florida 32827-4399

MEMORANDUM

TO: Members of the Aviation Authority

FROM: Stanley J. Thornton, Chair, Construction Committee

DATE: September 18, 2019

ITEM DESCRIPTION

Recommendation of the Construction Committee to Approve an Amendment to Addendum No. 96 to the Continuing Program and Project Management Services (OAR Prime Entity) Agreement with Geotech Consultants International, Inc. dba GCI, Inc. for Additional Program Management and Oversight Owner’s Authorized Representative (OAR) Services for W-00360, Airsides 2 and 4 Automated People Mover (APM) Systems Update Oversight Services, at the Orlando International Airport

BACKGROUND

On March 15, 2017, the Aviation Authority Board approved a Continuing Program and Project Management Services (OAR Prime Entity) Agreement with Geotech Consultants International, Inc. dba GCI, Inc. The services included all services necessary for the management of the design and construction of both individual projects and programs consisting of two or more individual projects, including the management of design from planning and conceptual design phase through detailed design, bidding and award of construction contracts; development of design criteria documents, and management of design/build contracts; management of the construction and commissioning of projects including performing as the Owner’s Authorized Representative (OAR); providing material testing, quantity surveying, construction inspection, construction safety compliance inspection, and other services required to verify compliance of construction with contract documents; providing cost estimating, cost control, scheduling, progress reporting, and planning services to support both design and construction activities; negotiating contracts for program and project related professional and construction services required from the Aviation Authority’s other consultants and contractors; coordination of the activities of multiple consultants and contractors onsite; and all other related services, which may be required to accomplish the planning, funding, design, bidding and award, construction, commissioning and operation of projects and programs for the Aviation Authority’s existing and future facilities.

ISSUES

A fee has been negotiated with Geotech Consultants International, Inc. dba GCI, Inc. for a total amount of $334,763 for Additional Program Management and Oversight OAR Services for W-00360, Airsides 2 and 4 APM Systems Update Oversight Services, at the Orlando International Airport. Services will include, but are not limited to, program management, project management, schedule development, review services, and project administrative support. Services will be provided from October 1, 2019, through September 30, 2020.

The Aviation Authority has reviewed the proposal and determined that Geotech Consultants International, Inc. dba GCI, Inc. proposes to achieve 60.8% MWBE participation on this addendum.

On August 27, 2019, the Construction Committee recommended approval of an Amendment to Addendum No. 96 to the Continuing Program and Project Management Services (OAR Prime

Page 146: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

Entity) Agreement with Geotech Consultants International, Inc. dba GCI, Inc. for Additional Program Management and Oversight OAR Services for W-00360, Airsides 2 and 4 APM Systems Update Oversight Services, at the Orlando International Airport, as outlined in the memorandum.

ALTERNATIVES

None.

FISCAL IMPACT

The fiscal impact is $334,763. Funding is from Capital Expenditure Fund.

RECOMMENDED ACTION

It is respectfully requested that the Aviation Authority Board resolve to accept the recommendation of the Construction Committee and approve an Amendment to Addendum No. 96 to the Continuing Program and Project Management Services (OAR Prime Entity) Agreement with Geotech Consultants International, Inc. dba GCI, Inc. for Additional Program Management and Oversight OAR Services for W-00360, Airsides 2 and 4 APM Systems Update Oversight Services, at the Orlando International Airport, for a total not-to-exceed fee amount of $334,763, which includes a not-to exceed fee amount of $325,763 and a not-to-exceed reimbursable expenses amount of $9,000, with funding from Capital Expenditure Fund; and authorize an Aviation Authority Officer or the Chief Executive Officer to execute the necessary documents following satisfactory review by legal counsel.

Page 147: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

CONSENT AGENDA ITEM – WW –

GREATER ORLANDO AVIATION AUTHORITY ________________________________________________________________

Orlando International Airport One Jeff Fuqua Boulevard

Orlando, Florida 32827-4399

MEMORANDUM

TO: Members of the Aviation Authority

FROM: Stanley J. Thornton, Chair, Construction Committee

DATE: September 18, 2019

ITEM DESCRIPTION

Recommendation of the Construction Committee to Approve an Addendum to the Continuing Transportation Planning Services Agreement with HNTB Corporation, for Fiscal Year (FY) 2020 Transportation Planning and Related Tasks

BACKGROUND

On June 15, 2016, the Aviation Authority Board approved a Continuing Transportation Planning Services Agreement with HNTB Corporation for transportation planning consulting services. These services may include the performance of transportation planning services and related professional services including, but not limited to, on-airport roadway traffic counts, multi-modal transportation facility planning, airport passenger surface access-related analyses, coordination with local, regional, state and federal transportation agencies on transportation planning issues to support the development of the Aviation Authority's existing and future facilities; assisting with strategic development planning, planning analysis of roadway opportunities and constraints, way finding and signage, and other miscellaneous transportation projects, and all other related services including coordination with the Aviation Authority, its consultants, the City of Orlando, and all agencies having jurisdiction over the Orlando International Airport and the Orlando Executive Airport.

ISSUES

A fee has been negotiated with HNTB Corporation for a total amount of $388,080 for FY 2020 Transportation Planning and Related Tasks. These services provide for extension of staff support services for transportation planning and related environmental and safety tasks, and include, but are not limited to, assistance in the management of projects and programs and the associated day-to-day tasks, participation in strategic planning for transportation and related environmental issues associated with the Aviation Authority's transportation projects, and development of planning books/scopes. Services will be provided from October 1, 2019, through September 30, 2020.

The Aviation Authority has reviewed the proposal and determined that, due to the limited scope of the required services, HNTB Corporation does not propose any MWBE/LDB/VBE participation on this addendum.

On August 20, 2019, the Construction Committee recommended approval of an Addendum to the Continuing Transportation Planning Services Agreement with HNTB Corporation for FY 2020 Transportation Planning and Related Tasks, as outlined in the memorandum.

ALTERNATIVES

None.

Page 148: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

FISCAL IMPACT

The fiscal impact is $388,080. Funding is from Operation and Maintenance Funds (subject to adoption of the FY 2020 Aviation Authority Budget by the Aviation Authority Board under separate item).

RECOMMENDED ACTION

It is respectfully requested that the Aviation Authority Board resolve to accept the recommendation of the Construction Committee and approve an Addendum to the Continuing Transportation Planning Services Agreement with HNTB Corporation, for FY 2020 Transportation Planning and Related Tasks, for a total not-to-exceed fee amount of $388,080, with funding from Operation and Maintenance Funds; and authorize an Aviation Authority Officer or the Chief Executive Officer to execute the necessary documents following satisfactory review by legal counsel.

Page 149: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

CONSENT AGENDA ITEM – XX –

GREATER ORLANDO AVIATION AUTHORITY ________________________________________________________________

Orlando International Airport One Jeff Fuqua Boulevard

Orlando, Florida 32827-4399

MEMORANDUM

TO: Members of the Aviation Authority

FROM: Stanley J. Thornton, Chair, Construction Committee

DATE: September 18, 2019

ITEM DESCRIPTION

Recommendation of the Construction Committee to Approve an Addendum to the Professional Services Agreement for Specialty Automated People Mover (APM) and Passenger Rail Systems with Lea & Elliott, Inc. for Fiscal Year (FY) 2020 APM Operation and Maintenance (O&M) Oversight Services at the Orlando International Airport

BACKGROUND

On January 16, 2013, the Aviation Authority Board approved the Specialty Automated People Mover (APM)/Passenger Rail Systems Agreement with Lea & Elliott, Inc. at the Orlando International Airport (MCO). This agreement provides services that may include, but are not limited to, planning, concept development and feasibility studies for new or modernization/expansion of existing systems; assessment of differing/alternative technologies; cost estimating; preparation of preliminary and final design documents; development of project schedules and budgets; computer modeling and simulation of systems and stations, including platform flows and passenger demand; development of interface criteria and coordination for related facilities; preparation of performance specifications; preparation and/or review of technical documents including design drawings and documents, software documentation, operating and maintenance manuals and test reports; development of procurement methodologies and contract documents, including soliciting and evaluating systems suppliers’ qualifications, technical and cost proposals, proposals for operations and maintenance; contract negotiation; design oversight and technical review, technical monitoring and test oversight during system construction and implementation; supervision/analysis of system verification and acceptance tests; post-operational assessments of system performance in terms of safety, security, and reliability, maintainability and availability; administration of and compliance with the Florida Department of Transportation (FDOT) System Safety Program Plan (SSPP); assistance with evaluation of operations, maintenance, and life cycle cost issues and development of solutions to resolve these issues; and all other related tasks including the extension or integration of APM and/or passenger rail systems into new and existing facilities and properties, including non-contiguous properties operated by the Aviation Authority, and the coordination of APM and/or passenger rail systems with other modes of ground transportation.

The services may also include, but are not limited to, civil, structural, mechanical and electrical engineering design; utilities and infrastructure design; surveying; geotechnical; evaluation and documentation of existing conditions; verification of as-built conditions including field verification of all existing above and underground utilities; cost estimating and scheduling; technical studies; preliminary and final design; permitting; bidding and award; construction administration and resident engineering; and all other related services including coordination with the Aviation Authority, its Consultants, the City for Orlando, and all agencies having jurisdiction over MCO.

Page 150: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

ISSUES

A fee has been negotiated with Lea & Elliott, Inc. for a total amount of $749,857 for FY 2020 APM O&M Oversight Services at the Orlando International Airport. Services will include, but are not limited to, auditing the operations and maintenance services being performed by Crystal Mover Services, Inc. (CMSI) and Bombardier Transportation (BT), and supporting the Aviation Authority. These O&M services performed by CMSI and BT include, but are not limited to, daily operations and maintenance of the new APMs at Airsides 1 and 3, and South Airport APM Complex, and the existing Airsides 2 and 4 APMs, which includes all vehicles and systems, facilities and capital asset management, Automatic Train Control System, and all other subsystems comprising the APM systems. Services provided by Lea & Elliott, Inc. will also include documentation of findings based on oversight/observations of the work performed by CMSI and BT, making recommendations related to said findings as appropriate, meeting with Aviation Authority staff and others as required by the Aviation Authority, providing technical expertise with regards to the APM System Availability requirements, including Service Mode Availability, Fleet Availability and Station Availability, and review of invoices for services provided by CMSI and BT. Services will be provided from October 1, 2019, through September 30, 2020.

The Aviation Authority has reviewed the proposal and determined that, due to the specialized scope of the required services, Lea & Elliott, Inc. does not propose any MWBE/LDB/VBE participation on the addendum.

On August 20, 2019, the Construction Committee recommended approval of an Addendum to the Professional Services Agreement with for Specialty APM and Passenger Rail Systems with Lea & Elliott, Inc. for FY 2020 APM Operation and Maintenance (O&M) Oversight Services, at the Orlando International Airport, as outlined in the memorandum.

ALTERNATIVES

None.

FISCAL IMPACT

The fiscal impact is $749,857. Funding is from Operation and Maintenance Funds (subject to adoption of the FY 2020 Aviation Authority Budget by the Aviation Authority Board under separate item).

RECOMMENDED ACTION

It is respectfully requested that the Aviation Authority Board resolve to accept the recommendation of the Construction Committee and approve an Addendum to the Professional Services Agreement for Specialty APM and Passenger Rail Systems with Lea & Elliott, Inc. for FY 2020 APM Operation and Maintenance (O&M) Oversight Services, at the Orlando International Airport, for the total not-to-exceed fee amount of $749,857, with funding from Operation and Maintenance Funds; and, authorize an Aviation Authority Officer or the Chief Executive Officer to execute the necessary documents following satisfactory review by legal counsel.

Page 151: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

CONSENT AGENDA ITEM – YY –

GREATER ORLANDO AVIATION AUTHORITY ________________________________________________________________

Orlando International Airport One Jeff Fuqua Boulevard

Orlando, Florida 32827-4399

MEMORANDUM

TO: Members of the Aviation Authority

FROM: Stanley J. Thornton, Chair, Construction Committee

DATE: September 18, 2019

ITEM DESCRIPTION

Recommendation of the Construction Committee to Approve an Amendment to Addendum No. 21 to the Professional Services Agreement for Specialty Automated People Mover (APM) and Passenger Rail Systems with Lea & Elliott, Inc. for Additional Specialty APM Consulting Services for W-00360, Airsides 2 and 4 Systems Update Oversight Services, at the Orlando International Airport

BACKGROUND

On January 16, 2013, the Aviation Authority Board approved the Specialty Automated People Mover (APM)/Passenger Rail Systems Agreement with Lea & Elliott, Inc. at the Orlando International Airport (MCO). This agreement provides services that may include, but are not limited to, planning, concept development and feasibility studies for new or modernization/expansion of existing systems; assessment of differing/alternative technologies; cost estimating; preparation of preliminary and final design documents; development of project schedules and budgets; computer modeling and simulation of systems and stations, including platform flows and passenger demand; development of interface criteria and coordination for related facilities; preparation of performance specifications; preparation and/or review of technical documents including design drawings and documents, software documentation, operating and maintenance manuals and test reports; development of procurement methodologies and contract documents, including soliciting and evaluating systems suppliers’ qualifications, technical and cost proposals, proposals for operations and maintenance; contract negotiation; design oversight and technical review, technical monitoring and test oversight during system construction and implementation; supervision/analysis of system verification and acceptance tests; post-operational assessments of system performance in terms of safety, security, and reliability, maintainability and availability; administration of and compliance with the Florida Department of Transportation (FDOT) System Safety Program Plan (SSPP); assistance with evaluation of operations, maintenance, and life cycle cost issues and development of solutions to resolve these issues; and all other related tasks including the extension or integration of APM and/or passenger rail systems into new and existing facilities and properties, including non-contiguous properties operated by the Aviation Authority, and the coordination of APM and/or passenger rail systems with other modes of ground transportation.

The services may also include, but are not limited to, civil, structural, mechanical and electrical engineering design; utilities and infrastructure design; surveying; geotechnical; evaluation and documentation of existing conditions; verification of as-built conditions including field verification of all existing above and underground utilities; cost estimating and scheduling; technical studies; preliminary and final design; permitting; bidding and award; construction administration and resident engineering; and all other related services including coordination with the Aviation Authority, its Consultants, the City for Orlando, and all agencies having jurisdiction over MCO.

Page 152: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

ISSUES

A fee has been negotiated with Lea & Elliott, Inc. for a total amount of $495,532 for Additional Specialty APM Consulting Services for W-00360, Airsides 2 and 4 Systems Update Oversight Services, at the Orlando International Airport. These additional services will include, but are not limited to, developing and preparing the performance-based technical requirements for both the scope of work for Bombardier Transportation and for other non-proprietary elements that can be competitively procured under a separate solicitation; participating in various meeting to include the Pre-Submittal Conference and responding to questions posed during the conference; evaluating the project bids and presenting its findings to the Aviation Authority; assisting the Aviation Authority through negotiations with the successful bidder(s); reviewing and evaluating the proposal from Bombardier Transportation, and assisting the Aviation Authority with negotiations; and as required, providing technical expertise with regards to the Airsides 2 and 4 APM systems. Services will be provided from October 1, 2019, through September 30, 2020.

The Aviation Authority has reviewed the proposal from Lea & Elliott, Inc., and determined that, due to the specialized scope of the required services, Lea & Elliott, Inc. does not propose any MWBE/LDB/VBE participation on the amendment.

On August 27, 2019, the Construction Committee recommended approval of an Amendment to Addendum No. 21 to the Professional Services Agreement for Specialty Automated People Mover (APM) and Passenger Rail Systems with Lea & Elliott, Inc. for Additional Specialty APM Consulting Services for W-00360, Airsides 2 and 4 Systems Update Oversight Services, at the Orlando International Airport, as outlined in the memorandum.

ALTERNATIVES

None.

FISCAL IMPACT

The fiscal impact is $495,532. Funding is from General Airport Revenue Bonds.

RECOMMENDED ACTION

It is respectfully requested that the Aviation Authority Board resolve to accept the recommendation of the Construction Committee and approve an Amendment to Addendum No. 21 to the Professional Services Agreement for Specialty Automated People Mover (APM) and Passenger Rail Systems with Lea & Elliott, Inc. for Additional Specialty APM Consulting Services for W-00360, Airsides 2 and 4 Systems Update Oversight Services, at the Orlando International Airport, for the total not-to-exceed fee amount of $495,532, with funding from General Airport Revenue Bonds; and, authorize an Aviation Authority Officer or the Chief Executive Officer to execute the necessary documents following satisfactory review by legal counsel.

Page 153: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

CONSENT AGENDA ITEM – ZZ –

GREATER ORLANDO AVIATION AUTHORITY ________________________________________________________________

Orlando International Airport One Jeff Fuqua Boulevard

Orlando, Florida 32827-4399

MEMORANDUM

TO: Members of the Aviation Authority

FROM: Stanley J. Thornton, Chair, Construction Committee

DATE: September 18, 2019

ITEM DESCRIPTION

Recommendation of the Construction Committee to Approve an Addendum to the Computer Aided Drafting (CAD), Geographic Information System (GIS), Building Information Modeling (BIM) and Related Services Agreement with Montgomery Consulting Group, Inc. for Fiscal Year (FY) 2020 CAD, GIS, BIM and Related Services

BACKGROUND

On February 17, 2016, the Aviation Authority Board approved the CAD, GIS, BIM, and Related Consulting Services Agreement with Montgomery Consulting Group, Inc. The services include using CAD to prepare and update the airport facility conceptual layout drawings, Airport Layout Plan (ALP) drawings, graphics, aerial photography and geospatial imagery, base maps, exhibits, floor plans, utility systems, building inventory, field measurements, and verification of the facility; using GIS to develop and manage the airport facility addressing, land use maps, property maps, easements and leasehold exhibits, facility management data layers and data attributes, and geospatial space planning systems; and, other related services that may include aerial photography and geospatial imagery (such as the use of Google-Earth Pro), graphics development and deliverable production, maintenance of File Transfer Protocol (FTP) site, updates to the ALP set drawing and airspace model, and website support; using BIM for model standards, integrating data with facility operations and maintenance, data management, file maintenance and update and export information.

ISSUES

A fee has been negotiated with Montgomery Consulting Group, Inc. for a total amount of $425,040 for FY 2020 CAD, GIS, BIM and Related Services. These services include preparation of ongoing updates of CAD drawings and GIS data sets; database consolidation planning and data integration into the Aviation Authority’s Enterprise GIS system; related GIS and CAD planning, analysis, and input as needed; and, assistance of Aviation Authority staff on various projects as requested. Services will be provided from October 1, 2019, through September 30, 2020.

The Aviation Authority has reviewed the proposal from Montgomery Consulting Group, Inc., and determined that, due to the specific nature of the required services, Montgomery Consulting Group, Inc. does not propose any MWBE/LDB/VBE participation on this addendum.

On August 27, 2019, the Construction Committee recommended approval of an Addendum to the CAD, GIS, BIM and Related Services Agreement with Montgomery Consulting Group, Inc. for FY 2020 CAD, GIS, BIM and Related Services, as outlined in the memorandum.

ALTERNATIVES

None.

FISCAL IMPACT

Page 154: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

The fiscal impact is $425,040. Funding is from Operation and Maintenance Funds (subject to adoption of the FY 2020 Aviation Authority Budget by the Aviation Authority Board under separate item).

RECOMMENDED ACTION

It is respectfully requested that the Aviation Authority Board resolve to accept the recommendation of the Construction Committee and approve an Addendum to the Computer Aided Drafting (CAD), Geographic Information System (GIS), and Building Information Modeling (BIM) Related Services Agreement with Montgomery Consulting Group, Inc. for FY 2020 CAD, GIS, BIM, and Related Services for a total not-to-exceed fee amount of $425,040, with funding from Operation and Maintenance Funds; and authorize an Aviation Authority Officer or the Chief Executive Officer to execute the necessary documents following satisfactory review by legal counsel.

Page 155: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

CONSENT AGENDA ITEM – AAA –

GREATER ORLANDO AVIATION AUTHORITY ________________________________________________________________

Orlando International Airport One Jeff Fuqua Boulevard

Orlando, Florida 32827-4399

MEMORANDUM

TO: Members of the Aviation Authority

FROM: Stanley J. Thornton, Chair, Construction Committee

DATE: September 18, 2019

ITEM DESCRIPTION

Recommendation of the Construction Committee to Approve an Addendum to the Continuing Program and Project Management Agreement (OAR Prime Entity) with PSA Management, Inc. for Fiscal Year (FY) 2020 Staff Extension Support Services related to Security Oversight and Special Systems Integration

BACKGROUND

On March 15, 2017, the Aviation Authority Board approved a Continuing Program and Project Management Services Agreement (OAR Prime Entity) with PSA Management, Inc. The services included all services necessary for the management of the design and construction of both individual projects and programs consisting of two or more individual projects, including the management of design from planning and conceptual design phase through detailed design, bidding and award of construction contracts; development of design criteria documents, and management of design/build contracts; management of the construction and commissioning of projects including performing as the Owner’s Authorized Representative (OAR); providing material testing, quantity surveying, construction inspection, construction safety compliance inspection, and other services required to verify compliance of construction with contract documents; providing cost estimating, cost control, scheduling, progress reporting, and planning services to support both design and construction activities; negotiating contracts for program and project related professional and construction services required from the Aviation Authority’s other consultants and contractors; coordination of the activities of multiple consultants and contractors onsite; and all other related services, which may be required to accomplish the planning, funding, design, bidding and award, construction, commissioning and operation of projects and programs for the Aviation Authority’s existing and future facilities.

ISSUES

A fee has been negotiated with PSA Management, Inc. for a total amount of $917,098 for FY 2020 Staff Extension Support Services related to Security Oversight and Special Systems Integration. These services include, but are not limited to, performing specialized and advanced staff extension support services related to security oversight and special systems integration activities, such as technology OAR support services, field inspection and oversight of low voltage systems activities, and schedule and purchase of Information Technology procurement items. Services will be provided from October 1, 2019, through September 30, 2020.

The Aviation Authority has reviewed the proposal from PSA Management, Inc., and determined that, due to the limited and specialized scope of the required services, PSA Management, Inc. does not propose any MWBE/LDB/VBE participation on this Addendum.

On September 5, 2019, the Construction Committee recommended approval of an Addendum to the Continuing Program and Project Management Agreement (OAR Prime Entity) with PSA Management, Inc. for FY 2020 Staff Extension Support Services related to Security Oversight and Special Systems Integration, as outlined in the memorandum.

Page 156: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

ALTERNATIVES

None.

FISCAL IMPACT

The fiscal impact is $917,098. Funding is from Operation and Maintenance Funds (subject to adoption of the FY 2020 Aviation Authority Budget by the Aviation Authority Board under separate item).

RECOMMENDED ACTION

It is respectfully requested that the Aviation Authority Board resolve to accept the recommendation of the Construction Committee and approve an Addendum to the Continuing Program and Project Management Agreement (OAR Prime Entity) with PSA Management, Inc. for FY 2020 Staff Extension Support Services related to Security Oversight and Special Systems Integration, for a total not-to-exceed fee amount of $917,098, with funding from Operation and Maintenance Funds; and authorize an Aviation Authority Officer or the Chief Executive Officer to execute the necessary documents following satisfactory review by legal counsel.

Page 157: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

CONSENT AGENDA ITEM – BBB –

GREATER ORLANDO AVIATION AUTHORITY ________________________________________________________________

Orlando International Airport One Jeff Fuqua Boulevard

Orlando, Florida 32827-4399

MEMORANDUM

TO: Members of the Aviation Authority

FROM: Stanley J. Thornton, Chair, Construction Committee

DATE: September 18, 2019

ITEM DESCRIPTION

Recommendation of the Construction Committee to Approve an Addendum to the Construction-Engineering-Financial Consulting Services Agreement with R. W. Block Consulting, Inc. for Fiscal Year (FY) 2020 Financial Oversight Support Services to the Finance Department

BACKGROUND

On August 10, 2016, the Aviation Authority Board approved the construction-engineering-financial consulting services agreement at the Orlando International Airport and the Orlando Executive Airport with R. W. Block Consulting, Inc. The services include, but are not limited to, review of construction contracts and change orders for eligibility for federal, state and Passenger Facility Charge (PFC) funding and for contract compliance; perform third party reviews of change orders prior to submission to the Aviation Authority’s Construction Committee; verify that change orders adequately describe the contract change and include plan revisions where applicable; verify independent cost estimates and cost recapitulation worksheets to ensure that change order pricing is aligned with the scope of work; verify funding source and availability of funds for change orders; review change order pricing for supporting documentation and appropriate mark-ups; perform labor burden analysis for change order labor rates; review scope description, verify availability of funds, review supporting documentation, and independent estimates for job order contracts; perform independent estimates; collect, maintain, analyze, and publish change order, professional fees, and labor rate databases; perform reviews for Davis-Bacon wage compliance on Airport Improvement Program (AIP) funded projects; prepare and publish a monthly the Capital Project Cost Report; review professional services fee proposals for approved billing rates, supporting documentation, proper funding source and availability of funding; ensure support of certain capital projects that includes review of pay applications, certified payrolls, construction change orders, and other analysis required to support various projects; development of monthly cost reports for all active projects; assistance in the development of Capital Improvement Program (CIP), including price escalation, evaluation of financing alternatives as it relates to eligibility for the AIP, Florida Department of Transportation (FDOT), and PFC funding; cash flow projections for capital projects based on funding sources and assist in preparation of applications for federal, state, and PFC funding; assisting the Engineering, Construction, and Finance Departments in preparation for Construction Committee and other meetings; and, perform construction audits. The services also include oversight services in support of emergency or disaster recovery efforts; assisting the construction department and legal counsel on construction claims reviews, dispute review board proceedings, and legal proceedings; and, performing such other extension of staff services necessary to support the Aviation Authority.

ISSUES

A fee has been negotiated with R. W. Block Consulting, Inc. for a total amount of $322,880 for FY 2020 Financial Oversight Support Services to the Finance Department. Services will include financial oversight services in support of the Aviation

Page 158: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

Authority’s active and planned CIP activities. Services will also include, but are not limited to, ongoing support to the Aviation Authority’s Finance Department, Construction Finance Oversight Committee (CFOC) support, funding eligibility reviews, cash flow and commitment forecasts for CIP, cash flow forecasts for PFC active projects, preparation of budget brief, bond support services, and other support services as directed by the Finance Department. Services will be provided from October 1, 2019, through September 30, 2020.

The Aviation Authority has reviewed the proposal and determined that, due to the specific nature of the required services, R. W. Block Consulting, Inc. does not propose any MWBE/LDB/VBE participation on this Addendum.

On August 13, 2019, the Construction Committee recommended approval of an Addendum to the Construction-Engineering-Financial Consulting Services Agreement with R. W. Block Consulting, Inc. for FY 2020 Financial Oversight Support Services to the Finance Department, as outlined in the memorandum.

ALTERNATIVES

None.

FISCAL IMPACT

The fiscal impact is $322,880. Funding is from Operation and Maintenance Funds (subject to adoption of the FY 2020 Aviation Authority Budget by the Aviation Authority Board under separate item).

RECOMMENDED ACTION

It is respectfully requested that the Aviation Authority Board resolve to accept the recommendation of the Construction Committee and approve an Addendum to the Construction-Engineering-Financial Consulting Services Agreement with R. W. Block Consulting, Inc. for FY 2020 Financial Oversight Support Services to the Finance Department, for a total not-to-exceed fee amount of $322,880, with funding from Operation and Maintenance Funds; and, authorize an Aviation Authority Officer or the Chief Executive Officer to execute the necessary documents following satisfactory review by legal counsel.

Page 159: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

CONSENT AGENDA ITEM – CCC –

GREATER ORLANDO AVIATION AUTHORITY ________________________________________________________________

Orlando International Airport One Jeff Fuqua Boulevard

Orlando, Florida 32827-4399

MEMORANDUM

TO: Members of the Aviation Authority

FROM: Stanley J. Thornton, Chair, Construction Committee

DATE: September 18, 2019

ITEM DESCRIPTION

Recommendation of the Construction Committee to Approve an Addendum to the Construction-Engineering-Financial Consulting Services Agreement with R. W. Block Consulting, Inc. for Fiscal Year (FY) 2020 Executive Management and Cost Reporting Services to the Planning, Engineering, and Construction Department

BACKGROUND

On August 10, 2016, the Aviation Authority Board approved the construction-engineering-financial consulting services agreement at the Orlando International Airport and the Orlando Executive Airport with R. W. Block Consulting, Inc. The services include, but are not limited to, review of construction contracts and change orders for eligibility for federal, state and Passenger Facility Charge (PFC) funding and for contract compliance; perform third party reviews of change orders prior to submission to the Aviation Authority’s Construction Committee; verify that change orders adequately describe the contract change and include plan revisions where applicable; verify independent cost estimates and cost recapitulation worksheets to ensure that change order pricing is aligned with the scope of work; verify funding source and availability of funds for change orders; review change order pricing for supporting documentation and appropriate mark-ups; perform labor burden analysis for change order labor rates; review scope description, verify availability of funds, review supporting documentation, and independent estimates for job order contracts; perform independent estimates; collect, maintain, analyze, and publish change order, professional fees, and labor rate databases; perform reviews for Davis-Bacon wage compliance on Airport Improvement Program (AIP) funded projects; prepare and publish a monthly the Capital Project Cost Report; review professional services fee proposals for approved billing rates, supporting documentation, proper funding source and availability of funding; ensure support of certain capital projects that includes review of pay applications, certified payrolls, construction change orders, and other analysis required to support various projects; development of monthly cost reports for all active projects; assistance in the development of Capital Improvement Program (CIP), including price escalation, evaluation of financing alternatives as it relates to eligibility for the AIP, Florida Department of Transportation (FDOT), and PFC funding; cash flow projections for capital projects based on funding sources and assist in preparation of applications for federal, state, and PFC funding; assisting the Engineering, Construction, and Finance Departments in preparation for Construction Committee and other meetings; and, perform construction audits. The services also include oversight services in support of emergency or disaster recovery efforts; assisting the construction department and legal counsel on construction claims reviews, dispute review board proceedings, and legal proceedings; and, performing such other extension of staff services necessary to support the Aviation Authority.

ISSUES

A fee has been negotiated with R. W. Block Consulting, Inc. for a total amount of $406,314 for FY 2020 Executive Management and Cost Reporting Services to the Planning, Engineering, and Construction Department. Services include, but are not limited to,

Page 160: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

tracking and reporting of project financial information for all active construction programs, analyses of project performances, preparation and updates of Key Performance Indicator (KPI) reports as well as preparation of project and program cash-flow projections, project and program contingency reports, preparation of construction cost statistics reports, tracking and trend analyses of construction change orders by reason codes, tracking of labor and material cost information for change order pricing validations, development and updates of Estimated Cost at Completion (EAC) for active capital construction projects, and other executive management reports as requested by the Senior Director of Planning, Engineering, and Construction. Services will be provided from October 1, 2019, through September 30, 2020.

The Aviation Authority has reviewed the proposal and determined that, due to the specific nature of the required services, R. W. Block Consulting, Inc. does not propose any MWBE/LDB/VBE participation on this Addendum.

On August 27, 2019, the Construction Committee recommended approval of an Addendum to the Construction-Engineering-Financial Consulting Services Agreement with R. W. Block Consulting, Inc. for FY 2020 Executive Management and Cost Reporting Services to the Planning, Engineering, and Construction Department, as outlined in the memorandum.

ALTERNATIVES

None.

FISCAL IMPACT

The fiscal impact is $406,314. Funding is from Operation and Maintenance Funds (subject to adoption of the FY 2020 Aviation Authority Budget by the Aviation Authority Board under separate item).

RECOMMENDED ACTION

It is respectfully requested that the Aviation Authority Board resolve to accept the recommendation of the Construction Committee and approve an Addendum to the Construction-Engineering-Financial Consulting Services Agreement with R. W. Block Consulting, Inc. for FY 2020 Executive Management and Cost Reporting Services to the Planning, Engineering and Construction Department, for a total not-to-exceed fee amount of $406,314, with funding from Operation and Maintenance Funds; and, authorize an Aviation Authority Officer or the Chief Executive Officer to execute the necessary documents following satisfactory review by legal counsel.

Page 161: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

CONSENT AGENDA ITEM – DDD –

GREATER ORLANDO AVIATION AUTHORITY ________________________________________________________________

Orlando International Airport One Jeff Fuqua Boulevard

Orlando, Florida 32827-4399

MEMORANDUM

TO: Members of the Aviation Authority

FROM: Stanley J. Thornton, Chair, Construction Committee

DATE: September 18, 2019

ITEM DESCRIPTION

Recommendation of the Construction Committee to Approve an Addendum to the Construction-Engineering-Financial Consulting Services Agreement with R. W. Block Consulting, Inc. for Fiscal Year (FY) 2020 Oversight Committees Support Services for the Planning, Engineering and Construction Department

BACKGROUND

On August 10, 2016, the Aviation Authority Board approved the construction-engineering-financial consulting services agreement at the Orlando International Airport and the Orlando Executive Airport with R. W. Block Consulting, Inc. The services include, but are not limited to, review of construction contracts and change orders for eligibility for federal, state and Passenger Facility Charge (PFC) funding and for contract compliance; perform third party reviews of change orders prior to submission to the Aviation Authority’s Construction Committee; verify that change orders adequately describe the contract change and include plan revisions where applicable; verify independent cost estimates and cost recapitulation worksheets to ensure that change order pricing is aligned with the scope of work; verify funding source and availability of funds for change orders; review change order pricing for supporting documentation and appropriate mark-ups; perform labor burden analysis for change order labor rates; review scope description, verify availability of funds, review supporting documentation, and independent estimates for job order contracts; perform independent estimates; collect, maintain, analyze, and publish change order, professional fees, and labor rate databases; perform reviews for Davis-Bacon wage compliance on Airport Improvement Program (AIP) funded projects; prepare and publish a monthly the Capital Project Cost Report; review professional services fee proposals for approved billing rates, supporting documentation, proper funding source and availability of funding; ensure support of certain capital projects that includes review of pay applications, certified payrolls, construction change orders, and other analysis required to support various projects; development of monthly cost reports for all active projects; assistance in the development of Capital Improvement Program (CIP), including price escalation, evaluation of financing alternatives as it relates to eligibility for the AIP, Florida Department of Transportation (FDOT), and PFC funding; cash flow projections for capital projects based on funding sources and assist in preparation of applications for federal, state, and PFC funding; assisting the Engineering, Construction, and Finance Departments in preparation for Construction Committee and other meetings; and, perform construction audits. The services also include oversight services in support of emergency or disaster recovery efforts; assisting the construction department and legal counsel on construction claims reviews, dispute review board proceedings, and legal proceedings; and, performing such other extension of staff services necessary to support the Aviation Authority.

ISSUES

A fee has been negotiated with R. W. Block Consulting, Inc., for a total amount of $863,654 for FY 2020 Oversight Committees Support Services for the Planning, Engineering and Construction Department. Services will include, but are not limited

Page 162: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

to, the review of all items prior to submission to the Aviation Authority’s Oversight Committees, including, but not limited to, the Construction Committee, Professional Services Committee, and Concessions/Procurement Committee, to include construction change orders, construction job orders, professional services fee proposals, and purchasing requests, for compliance with contract terms and conditions, and Aviation Authority Policy and Procedures, resolution of non-compliance issues, assistance in change order negotiations, and other project control and compliance services in support the Aviation Authority’s Capital Improvement Program (CIP). Services will be provided from October 1, 2019, through September 30, 2020.

The Aviation Authority has reviewed the proposal and determined that, due to the specific nature of the required services, R. W. Block Consulting, Inc. does not propose any MWBE/LDB/VBE participation, and is eligible for award of these services.

On August 20, 2019, the Construction Committee recommended approval of an Addendum to the Construction-Engineering-Financial Consulting Services Agreement with R. W. Block Consulting, Inc. for FY 2020 Oversight Committees Support Services for the Planning, Engineering and Construction Department, as outlined in the memorandum.

ALTERNATIVES

None.

FISCAL IMPACT

The fiscal impact is $863,654. Funding is from Operation and Maintenance Funds (subject to adoption of the FY 2020 Aviation Authority Budget by the Aviation Authority Board under separate item).

RECOMMENDED ACTION

It is respectfully requested that the Aviation Authority Board resolve to accept the recommendation of the Construction Committee and approve an Addendum to the Construction-Engineering-Financial Consulting Services Agreement with R. W. Block Consulting, Inc. for FY 2020 Oversight Committees Support Services for the Planning, Engineering and Construction Department, for a total not-to-exceed fee amount of $863,654, with funding from Operation and Maintenance Funds; and authorize an Aviation Authority Officer or the Chief Executive Officer to execute the necessary documents following satisfactory review by legal counsel.

Page 163: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

CONSENT AGENDA ITEM – EEE –

GREATER ORLANDO AVIATION AUTHORITY ________________________________________________________________

Orlando International Airport One Jeff Fuqua Boulevard

Orlando, Florida 32827-4399

MEMORANDUM

TO: Members of the Aviation Authority

FROM: Stanley J. Thornton, Chair, Construction Committee

DATE: September 18, 2019

ITEM DESCRIPTION

Recommendation of the Construction Committee to Approve an Addendum to the Construction-Engineering-Financial Consulting Services Agreement with R. W. Block Consulting, Inc. for Fiscal Year (FY) 2020 Program Compliance Services to the Finance Department

BACKGROUND

On August 10, 2016, the Aviation Authority Board approved the construction-engineering-financial consulting services agreement at the Orlando International Airport and the Orlando Executive Airport with R. W. Block Consulting, Inc. The services include, but are not limited to, review of construction contracts and change orders for eligibility for federal, state and Passenger Facility Charge (PFC) funding and for contract compliance; perform third party reviews of change orders prior to submission to the Aviation Authority’s Construction Committee; verify that change orders adequately describe the contract change and include plan revisions where applicable; verify independent cost estimates and cost recapitulation worksheets to ensure that change order pricing is aligned with the scope of work; verify funding source and availability of funds for change orders; review change order pricing for supporting documentation and appropriate mark-ups; perform labor burden analysis for change order labor rates; review scope description, verify availability of funds, review supporting documentation, and independent estimates for job order contracts; perform independent estimates; collect, maintain, analyze, and publish change order, professional fees, and labor rate databases; perform reviews for Davis-Bacon wage compliance on Airport Improvement Program (AIP) funded projects; prepare and publish a monthly the Capital Project Cost Report; review professional services fee proposals for approved billing rates, supporting documentation, proper funding source and availability of funding; ensure support of certain capital projects that includes review of pay applications, certified payrolls, construction change orders, and other analysis required to support various projects; development of monthly cost reports for all active projects; assistance in the development of Capital Improvement Program (CIP), including price escalation, evaluation of financing alternatives as it relates to eligibility for the AIP, Florida Department of Transportation (FDOT), and PFC funding; cash flow projections for capital projects based on funding sources and assist in preparation of applications for federal, state, and PFC funding; assisting the Engineering, Construction, and Finance Departments in preparation for Construction Committee and other meetings; and, perform construction audits. The services also include oversight services in support of emergency or disaster recovery efforts; assisting the construction department and legal counsel on construction claims reviews, dispute review board proceedings, and legal proceedings; and, performing such other extension of staff services necessary to support the Aviation Authority.

ISSUES

A fee has been negotiated with R. W. Block Consulting, Inc. for a total amount of $788,827 for FY 2020 Program Compliance Services to the Finance Department. Services will include, but are not limited to, contract, cost, and funding compliance reviews

Page 164: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

of the design and construction related billings in support of the capital projects, excluding South Terminal C billings, and other support services as directed by the Aviation Authority’s Finance Department. Services will be provided from October 1, 2019, through September 30, 2020.

The Aviation Authority has reviewed the proposal and determined that R. W. Block Consulting, Inc. proposes 25.8% MWBE participation on this Addendum.

On August 13, 2019, the Construction Committee recommended approval of an Addendum to the Construction-Engineering-Financial Consulting Services Agreement with R. W. Block Consulting, Inc. for FY 2020 Program Compliance Services to the Finance Department, as outlined in the memorandum.

ALTERNATIVES

None.

FISCAL IMPACT

The fiscal impact is $788,827. Funding is from General Airport Revenue Bonds, Passenger Facility Charges to the extent eligible, and Operation and Maintenance Funds (subject to adoption of the FY 2020 Aviation Authority Budget by the Aviation Authority Board under separate item).

RECOMMENDED ACTION

It is respectfully requested that the Aviation Authority Board revolve to accept the recommendation of the Construction Committee and approve an Addendum to the Construction-Engineering-Financial Consulting Services Agreement with R. W. Block Consulting, Inc. for FY 2020 Program Compliance Services to the Finance Department, for a total not-to-exceed fee amount of $788,827, with funding from General Airport Revenue Bonds, Passenger Facility Charges to the extent eligible, and Operation and Maintenance Funds; and, authorize an Aviation Authority Officer or the Chief Executive Officer to execute the necessary documents following satisfactory review by legal counsel.

Page 165: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

CONSENT AGENDA ITEM – FFF –

GREATER ORLANDO AVIATION AUTHORITY ________________________________________________________________

Orlando International Airport One Jeff Fuqua Boulevard

Orlando, Florida 32827-4399

MEMORANDUM

TO: Members of the Aviation Authority

FROM: Stanley J. Thornton, Chair, Construction Committee

DATE: September 18, 2019

ITEM DESCRIPTION

Recommendation of the Construction Committee to Approve an Addendum to the General Consulting Services Agreement with Schenkel & Shultz, Inc. for Fiscal Year (FY) 2020 Engineering and Construction Support Services

BACKGROUND

On October 16, 2013, the Aviation Authority Board approved a General Consulting Services Agreement with Schenkel & Shultz, Inc. for General Consulting services. The services included advising and supporting the Aviation Authority through assessments, studies, master planning, concept development, and preparation of design-build criteria packages, extension of staff, and other efforts as assigned for the development, management, and operation of the existing and future facilities. The services may also include interfacing with the Aviation Authority’s committees and the Aviation Authority’s departments, and coordinating and providing documentation required by federal, state, and local agencies, including the Federal Aviation Administration (FAA); the Transportation Security Administration (TSA); the Florida Department of Transportation (FDOT); the Orlando Utilities Commission (OUC); the Division of Strategic Business Development; City of Orlando; Orange County, Florida; and, other agencies as required.

ISSUES

A fee has been negotiated with Schenkel & Shultz, Inc. for a total amount of $903,960 for FY 2020 Engineering and Construction Support Services. These general consulting services include, but are not limited to, on-site staff support, project management, code analysis, project specifications, defining project scopes of work, construction administration support, and other related support services. Services will be provided from October 1, 2019, through September 30, 2020.

The Aviation Authority has reviewed the proposal and determined that, due to the limited scope of the required services, Schenkel & Shultz, Inc. does not propose any MWBE/LDB/VBE participation on this addendum.

On August 13, 2019, the Construction Committee recommended approval of an Addendum to the General Consulting Services Agreement with Schenkel & Shultz, Inc., for FY 2020 Engineering and Construction Support Services, as outlined in the memorandum.

ALTERNATIVES

None.

FISCAL IMPACT

The fiscal impact is $903,960. Funding is from Operation and Maintenance Funds (subject to adoption of the FY 2020 Aviation Authority Budget by the Aviation Authority Board under separate item).

Page 166: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

RECOMMENDED ACTION

It is respectfully requested that the Aviation Authority Board resolve to accept the recommendation of the Construction Committee and approve an Addendum to the General Consulting Services Agreement with Schenkel & Shultz, Inc. for FY 2020 Engineering and Construction Support Services, for a total not-to-exceed fee amount of $903,960, with funding from Operation and Maintenance Funds; and authorize an Aviation Authority Officer or the Chief Executive Officer to execute the necessary documents following satisfactory review by legal counsel.

Page 167: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

CONSENT AGENDA ITEM – GGG –

GREATER ORLANDO AVIATION AUTHORITY ________________________________________________________________

Orlando International Airport One Jeff Fuqua Boulevard

Orlando, Florida 32827-4399

MEMORANDUM

TO: Members of the Aviation Authority

FROM: Stanley J. Thornton, Chair, Construction Committee

DATE: September 18, 2019

ITEM DESCRIPTION

Recommendation of the Construction Committee to Approve an Addendum to the General Consulting Services Agreement with Schenkel & Shultz, Inc. for Fiscal Year (FY) 2020 On-Site Planning Support Services

BACKGROUND

On October 16, 2013, the Aviation Authority Board approved a General Consulting Services Agreement with Schenkel & Shultz, Inc. for General Consulting services. The services included advising and supporting the Aviation Authority through assessments, studies, master planning, concept development, and preparation of design-build criteria packages, extension of staff, and other efforts as assigned for the development, management, and operation of the existing and future facilities. The services may also include interfacing with the Aviation Authority’s committees and the Aviation Authority’s departments, and coordinating and providing documentation required by federal, state, and local agencies, including the Federal Aviation Administration (FAA); the Transportation Security Administration (TSA); the Florida Department of Transportation (FDOT); the Orlando Utilities Commission (OUC); the Division of Strategic Business Development; City of Orlando; Orange County, Florida; and, other agencies as required.

ISSUES

A fee has been negotiated with Schenkel & Shultz, Inc. for a total amount of $504,264, for FY 2020 On-Site Planning Support Services. These general consulting services include, but are not limited to, on-site staff support, land use analyses, assistance with projects, programs and other associated day-to-day project support tasks. Services will be provided from October 1, 2019, through September 30, 2020.

The Aviation Authority has reviewed the proposal and determined that Schenkel & Shultz, Inc. proposes 99.7% MWBE participation on this addendum.

On September 5, 2019, the Construction Committee recommended approval of an Addendum to the General Consulting Services Agreement with Schenkel & Shultz, Inc., for FY 2020 On-Site Planning Support Services, as outlined in the memorandum.

ALTERNATIVES

None.

FISCAL IMPACT

The fiscal impact is $504,264. Funding is from Operation and Maintenance Funds (subject to adoption of the FY 2020 Aviation Authority Budget by the Aviation Authority Board under separate item).

Page 168: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

RECOMMENDED ACTION

It is respectfully requested that the Aviation Authority Board resolve to accept the recommendation of the Construction Committee and approve an Addendum to the General Consulting Services Agreement with Schenkel & Shultz, Inc. for FY 2020 On-Site Planning Support Services, for a total not-to-exceed fee amount of $504,264, with funding from Operation and Maintenance Funds; and authorize an Aviation Authority Officer or the Chief Executive Officer to execute the necessary documents following satisfactory review by legal counsel.

Page 169: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

GREATER ORLANDO AVIATION AUTHORITY

Orlando International Airport

One Jeff Fuqua Boulevard Orlando, Florida 32827-4399

MEMORANDUM TO: Members of the Aviation Authority FROM: Domingo Sanchez, Chairman DATE: September 18, 2019 ITEM DESCRIPTION Recommendation to Approve Engagement for Interim Co-General Counsel and to Modify Committee Previously Approved to Recommend Future General Counsel Services Delivery Method BACKGROUND Last month, the Board authorized Mr. Brown and me to negotiate engagement letters with Lowndes, Drosdick, Doster, Kantor & Reed and Nelson Mullins Riley & Scarborough to provide interim co-general counsel services for a period of up to six (6) months. The Board also approved a committee to recommend to the Board the best delivery method for general counsel services. ISSUES Mr. Brown and I have negotiated a limited scope of services for interim co-general counsel with Lowndes Drosdick and Nelson Mullins using the currently approved legal services rates. These fees range from $200 to $315 per hour. We have also negotiated a maximum monthly amount of $15,000 per firm dedicated to the general counsel services. Nelson Mullins will continue to provide services as special counsel through separate engagement letters. In the event the general counsel services to be provided by either general counsel will exceed $15,000 per month, due to additional or extraordinary services, it will require the prior approval of Mr. Brown and me, and we will report the excess amount to the Board at the following board meeting. Mr. Brown and I also negotiated a modified scope of services for Marchena and Graham, P.A. to provide special counsel services in areas where the firm has extensive knowledge and where migrating services from one firm to another would not be cost effective for the Aviation Authority. Mr. Brown and I recommend that these engagements go into effect with the new fiscal year that commences October 1, 2019. In further analyzing the committee and considering the board members comments at the last meeting, I recommend that the Board prohibit any attorney or law firm who participates in the committee from being eligible to be selected as permanent general counsel following the interim period in order to ensure an objective and thoroughly transparent recommendation. Lowndes Drosdick has indicated they do not wish to participate on the committee, but wish to limit their services to advising the committee and to provide services as co-general counsel. Therefore, I recommend that the committee membership be modified to delete Tara Tedrow. Additionally, Mr. Brown has indicated to me that, because he has previously recommended how general counsel services should be delivered to the Aviation Authority, it would be inappropriate for him to serve on the committee. He would rather instead staff the committee and provide information. I believe the committee would be well served by adding two board members who are also attorneys.

NEW BUSINESS – ITEM A -

Page 170: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

Therefore, the recommendation for the transition committee is the following: Mayor Buddy Dyer, Chairman

Randall Hunt Ralph Martinez Justice James E.C.Perry

Attorney from Nelson Mullins ALTERNATIVES The Board may direct Mr. Brown and me to modify the co-general counsel engagements and/or modify the composition of the transition committee to recommend the delivery method for general counsel services. FISCAL IMPACT The co-general counsel services will commence on October 1, 2019, with funding from the Aviation Authority’s Fiscal Year 2020 Operations and Maintenance Fund and will be approximately $30,000 per month for up to six (6) months. RECOMMENDED ACTION It is respectfully requested that the Aviation Authority Board resolve to approve the following:

1. Engagement letter with Lowndes Drosdick to serve as interim co-general counsel for up to six (6) months under the terms set forth above.

2. Engagement letter with Nelson Mullins to serve as interim co-general counsel for a period of up to six (6) months as set forth above.

3. Modified special counsel engagement for Marchena and Graham, P.A. under the current rates for a modified limited scope.

4. Modified transition committee to recommend a delivery method for general counsel services to the Board comprised of the members set forth above.

5. Authorize the Chairman or the Chief Executive Officer to execute the engagement letters and such other documents as may be necessary to effectuate these actions.

Page 171: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

INFORMATION ITEM – A –

GREATER ORLANDO AVIATION AUTHORITY ________________________________________________________________

Orlando International Airport One Jeff Fuqua Boulevard

Orlando, Florida 32827-4399

MEMORANDUM

TO: Members of the Aviation Authority

FROM: Phillip N. Brown, Chief Executive Officer

DATE: September 18, 2019

ITEM DESCRIPTION

Notification of Chief Executive Officer Approvals for September 2019 Board Meeting

BACKGROUND

The attached list represents contracts executed by the Chief Executive Officer requiring notification to the Board.

The following list represents contracts recommended by the Professional Services Committee (PSC) to be executed by the Chief Executive Officer requiring notification to the Aviation Authority Board:

• Approval of Addendum No. 9 to the Information Technology Consulting ServicesAgreement with Barich, Inc. for Fiscal Year (FY) 2020 On-Call InformationTechnology Airport Integrated Data Broker (AIDB) Support Services, at theOrlando International Airport, for a total not-to-exceed fee amount of $30,000,with funding from Operation and Maintenance Funds (subject to adoption of theFY 2020 Aviation Authority Budget by the Aviation Authority Board underseparate item). These services will provide on-call tasks in support of theAIDB environment and its components, as related to sustaining operationssupport, subject matter expertise which may require product research, conceptdevelopment or business analysis prior to project start-up. The AviationAuthority did not establish MWBE/LDB/VBE goals because of the specializednature of the services to be provided. [Reference PSC meeting held August 6,2019, Agenda Item No. 4.]

Page 172: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

1

Action Competition VendorCommittee Approval

Cost Funding Description of Goods or Service TermDate

SignedAward RFQ 92788-19 Uniform Wizard CPC

8/5/19 $ 123,977.75 O & M Funds Purchase of Promotional Trades and

Flame Resistant Apparel for Maintenance Dept personnel on an as needed basis.

Term:8/16/19 - 7/31/20

8/16/19

Award RFQ 92861-19 Rexel CPC 8/5/19

$ 163,830.00 O & M Funds Purchase of 4,700 various LED Lamps products.

One Time Order

8/16/19

Award Single SourceSG-00005

Shelters Cleaning LLC NA $ 5,011.72 Project Funds Extend Contract 16-18 for Janitorial Service for South Terminal Trailers through March 31, 2019.

Remainder of Contract - January 2019 - March 31, 2019

2/1/19

Award Single SourceSG-00038

Robert Half Management Services

CPC 8/5/19

$ 75,000.00 O & M Funds Temporary staff extension of a Treasury Manager for Finance Dept. This is temporary requirement to fill a vacant positon that will end when the position is filled.

4 Month period - 7/1/19 - 10/30/19

6/26/19

Award Single SourceSG-00041

CLX Engineering NA $ 18,000.00 O & M Funds To modify, upgrade and install software to run on existing CLX server to integrate BHS Baggage Information Display System software with the AIDB system.

One Time Order

7/18/19

Award Single SourceSG-00042

GCR Inc NA $ 33,041.00 Capital Exp. Funds ASOCS software upgrade (used for tracking daily activities including FAR139 inspections, risk mgt reports and other operational reports), onsite training and post upgrade support.

One Time Order

8/7/19

Award Single SourceSG-00043

ESRI Inc. NA 20,000.00$ O & M Funds Purchase ArcGIS Enterprise standard software and Licenses to create map services to support Maximo.

One Time Order

8/7/19

Award Emergency Purchase#EP-00004

Johnson Controls Inc NA 5,174.50$ O & M Funds Repair the central AC system for Centerfield ARFF bunk room.

One Time Order

10/24/18

Award Emergency Purchase#EP-00033

Fire & Life Safety America Inc

NA 61,488.88$ Capital Exp. Funds Emergency repairs to fix the leaking fire valves and pipes throughout the main terminal area.

One Time Order

5/21/19

Award Emergency Purchase#EP-00044

Imaxx Plumbing Systems Inc

NA 4,500.00$ O & M Funds Replace and install new mop sink and pipe in the Flagship laundry area.

One Time Order

6/24/19

Award Emergency Purchase #EP-00052

S R Plumbing LLC NA 3,750.00$ O & M Funds Unclog and replace the plumbing vent stack and fittings for American Airlines ramp Men's Restroom.

One Time Order

7/18/19

PURCHASING SUBMITTALS FOR BOARD NOTIFICATION -SEPTEMBER 2019

Page 173: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

2

Award Professional Services#PS-00006

Karen Dunn CPA NA 6,480.00$ O & M Funds Supplemental Auditing & Attestation Services - Bid 13-15A Increase In Value # 1 - to complete SharePoint data organization and include a SharePoint file maintenance procedure for Commercial Properties.

One Time Order

7/22/19

Award Professional Services#PS-00008

Top Talent Staffing NA 7,983.36$ O & M Funds Utilize Temporary Staffing to assist Construction Finance with entering budgets and commitments for projects & assembling the weekly Construction Committee books.

Remainder of F/Y - August 2019 - Sept 2019

8/7/19

Amendment No. 7Increase in Value

GOAA Bid#01-11

Convergint Technologies LLC

PM6/4/19

$ 97,241.32 O & M Funds Fire Alarm Systems Testing, Certification & Repair- Increase the number on-site Technician labor hours and material costs to replace obsolete quick start fire alarm panel and install beam smoke defectors.

Remainder of Term: 4/1/19-9/31/19

8/6/19

Amendment No. 1Contract Adjustment

GOAA Bid#PS-542

Linda George CPA PM2/20/19

$ - NA Financial Consulting Services -Reduce Professional Liability Insurance from 3M - 1M for the term of the Agreement.

Contract Term: 1/2/19 - 1/1/21

7/19/19

Amendment No. 5Renewal Option

GOAA Bid#PS-393

Great-West Life & Annuity Insurance Company

RBC5/2/19

$ - NA Bundled Administrative Services - Renewal Option 2.

Contract Term:7/6/19-7/5/20

6/21/19

Amendment No. 23Renewal Option

GOAA Bid #97-42

Motorola Solutions Inc. CPC6/17/19

$ 56,744.28 O & M Funds Radio Equipment Maintenance- Renewal Option 20.

Contract Term:81/19 -7/31/20

8/6/19

Amendment No. 1Contract Adjustment

GOAA Bid#AG-578

UCF Athletics Association Inc

PM 4/18/19 $ - NA Marketing Support and Advertising Opportunities - Revise the agreement installment billing schedule.

Contract Term:9/1/18-6/30/23

6/7/19

Page 174: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

INFORMATION ITEM – B –

GREATER ORLANDO AVIATION AUTHORITY

Orlando International Airport One Jeff Fuqua Boulevard

Orlando, Florida 32827-4392

MEMORANDUM

TO: Members of the Aviation Authority

FROM: Phillip N. Brown, Chief Executive Officer

DATE: September 18, 2019

ITEM DESCRIPTION

Notification of Release of RFP/RFB/RFQ’S

BACKGROUND

The attached list represents the release of documents for different services at the Aviation Authority.

Page 175: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

NOTIFICATION OF RELEASE OF RFP/IFB/RFQ and Committee Dates for Sept. 2019

TYPE OF RELEASE

SERVICE/TYPE RELEASE DATE

Committee and Date

AWARD DATE

SCOPE/SERVICE VALUE/TERM REASON

IFB Customer Service Ambassador Services

Sept. 2019

CPC November

Nov/Dec 2019

Customer Service Ambassador Services

$12,000,000 3 years w/2 one year renewals

Current Contract Expiring

IFB Specialized Commercial Cleaning Services

Sept. 2019

CPC November

Nov/Dec 2019

Specialized Commercial Cleaning Services (high rise glass and pressure washing)

$1,800,000 3 years w/2 one year renewals

Current Contract Expiring

RFCP Banking Services Sept. 2019

Finance Nov.

Nov/Dec 2019

Banking Services No Cost 5 years w/2 one year options

Current Contract expiring

Page 176: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

INFORMATION ITEM – C –

GREATER ORLANDO AVIATION AUTHORITY ________________________________________________________________

Orlando International Airport One Jeff Fuqua Boulevard

Orlando, Florida 32827-4399

MEMORANDUM

TO: Members of the Aviation Authority

FROM: Stanley J. Thornton, Chair, Professional Services Committee

DATE: September 18, 2019

ITEM DESCRIPTION

Notification of the Professional Services Committee’s Approval of the Lists of Pre-Qualified Subcontractors/Suppliers for Major Trade Packages for the South Terminal C, Phase 1, Program, at the Orlando International Airport

BACKGROUND

In accordance with the Construction Manager at Risk (CM@R) Agreements for the South Terminal C, Phase 1, Program, and the Aviation Authority’s Policies and Procedures 120.10 (Professional Services Committee) and 130.03 (Construction Management Contracts), the CM@Rs’ proposed lists of prequalified subcontractors/suppliers for each major trade package must be approved by the Professional Services Committee.

Attached is the updated cumulative report for CM@Rs’ pre-qualified subcontractors/ suppliers approved by the Professional Services Committee through August 31, 2019.

Page 177: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

Prequalified Subcontractors(STC-P1)

30%

70%

TK Prequalified Subcontractors

MWBE/LDB/SDVOBE/DBE Non MWBE/LDB/SDVOBE/DBE

27%

73%

HP Prequalified Subcontractors

MWBE/LDB/SDVOBE/DBE Non MWBE/LDB/SDVOBE/DBE

Turner-Kiewit

MWBE LDB / DBE Participation

Classification Classification Count Total Firms Prequalified Percentage

MWBE/LDB/SDVOBE/DBE* 182 611 29.79%

Non MWBE/LDB/SDVOBE/DBE 429 611 70.21%

* 191 Firms have DBE classification

Turner-Kiewit

Hensel Phelps

MWBE LDB / DBE Participation

Classification Classification Count Total Firms Prequalified Percentage

MWBE/LDB/SDVOBE/DBE* 161 602 26.74%

Non MWBE/LDB/SDVOBE/DBE 441 602 73.26%

* 101 Firms have DBE classification

Program Goals MWBE LDB DBE

TK Construction 20% 4% 13%

TK CM 20% 3% -

HP Construction 20% 4% -

HP CM 25% 6% -

Page 178: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

GMP # Description CMAR Board Approval Date Awarded Value

1-S EARLY SITEWORK AND STRUCTURES PCL AWARDED $5,967,637

3-S VOID VOID VOID $0

4-S TK JV GENERAL CONDITIONS TK AWARDED $4,085,999

4S.1 TK JV GENERAL CONDITIONS, FY2018 PART 1 TK AWARDED $3,245,759

4S.2 TK JV GENERAL CONDITIONS, FY2018 PART 2 TK AWARDED $7,430,864

4S.3 TK JV GENERAL CONDITIONS, FY2019 TK AWARDED $37,457,840

5-S LANDSIDE CLEAR/GRUB/EARTHWORK/GRADING TK AWARDED $7,311,316

5S.1 LANDSIDE DEEP FOUNDATIONS TK AWARDED $9,342,581

5S.2 LANDSIDE UTILITIES & BALANCES OF SITEWORK TK AWARDED $46,223,741

5S.3ENPLANE/DEPLANE BRIDGE & ROADWAYS – FDOT

TK AWARDED $19,867,655

5S.4 LANDSIDE CONVEYING EQUIPMENT JOINT PROCUREMENT WITH HP TK AWARDED $15,871,953

5S.5 ENPLANE/DEPLANE BRIDGE & ROADWAYS – BALANCE OF WORK – FDOT TK AWARDED $72,705,289

5S.6 UNDERGROUND ELECTRICAL DISTRIBUTION TK AWARDED $40,534,012

7-S LANDSIDE TERMINAL, STRUCTURE, & ENCLOSURE TK AWARDED $117,001,289

7S.1 LANDSIDE TERMINAL, REMAINING STRUCTURE & SYSTEMS TK AWARDED $158,731,417

7S.2 LANDSIDE TERMINAL FINISHES TK AWARDED 91,336,056

7S.3 LANDSIDE TERMINAL, MEP SYSTEMS - FDOT TK AWARDED $112,987,835

9-S PARKING GARAGE TK AWARDED $43,574,432

9S.1 PARKING FACILITY – PHASE II TK AWARDED $12,852,377

14-S CENTRAL ENERGY PLANT & EPG BUILDING TK AWARDED $69,662,647

17-S CHECKPOINT DELTA TK AWARDED $3,622,174

18-S SITE LOGISTICS RELOCATION TK AWARDED $43,244,681

19-S AIRFIELD CIVIL TK AWARDED $233,509,544

PCL Awarded:$5,967,637

TK Awarded:$1,150,599,461

HP Awarded:$563,141,089

Prequalified Subcontractors(STC-P1)

Page 179: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

GMP # Description CMAR Board Approval Date Awarded Value

2-S MASS CLEARING, GRUBBING AND LAKE GILLOOLY HP AWARDED $35,839,985

2S.1 AIRSIDE SITE UTILITIES & BALANCE OF SITEWORK HP AWARDED $31,568,234

6-S AIRSIDE TERMINAL FOUNDATIONS HP AWARDED $22,674,576

6S.1 AIRSIDE TERMINAL, STRUCTURE, & ENCLOSURE HP AWARDED $158,851,608

6S.2 AIRSIDE ENCLOSURE & EXTERIOR FINISHES HP AWARDED $113,397,722

6S.3 AIRSIDE EARLY INTERIORS HP AWARDED $44,407,809

6S.4 AIRSIDE INTERIOR FINISHES & SPECIALTIES HP AWARDED $61,944,228

6S.5 AIRSIDE EXPERIENTIAL MEDIA ENVIRONMENT (EME) HP AWARDED $11,463,235

10-S APRON PAVEMENT HP AWARDED $7,665,705

11-SFUELING SYSTEM

HP AWARDED $34,480,585

16-S HP GENERAL CONDITIONS, FY2018 PART 1 HP AWARDED $3,861,131

16S.1 HP GENERAL CONDITIONS, FY2018 PART 2 HP AWARDED $1,942,581

16S.2 HP GENERAL CONDITIONS, FY2018 PART 3 HP AWARDED $6,717,275

16S.3 HP GENERAL CONDITIONS, FY 2019 HP AWARDED $28,326,415

PCL Awarded:$5,967,637

TK Awarded:$1,150,599,461

HP Awarded:$563,141,089

Prequalified Subcontractors(STC-P1)

Page 180: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

Company Name MWBE LDB VBE DBE Trades Address City Contact Email Phone State

X NetPlanner Systems, Inc. Low Voltage Systems 3145 Northwoods Pkwy, Suite 800 Peachtree Corners Mike Dycus [email protected] 770-662-5482 GA

X Liberty Conshor, LLC Concrete 4480 Eagle Falls Place Tampa Toby Johnson [email protected] 239-910-7801 FL

2 0 0 0 0

South Terminal C - Phase 1

Total Prequalified Subs/Suppliers: 602

MWBE Certified: 140 23%

LDB Certified: 53 9%

VBE Certified: 5 1%

DBE Certified: 101 17%

Prequalified Subcontractors/Suppliers Summary

NOTE: Today's recommendations are assumed approved for the

purpose of this summary and included in these totals.

Hensel Phelps

Firms Recommended for PSC Approval

South Terminal C Phase 1 Airside/Concourse

PREQUALIFIED SUBCONTRACTORS/SUPPLIERS20-Aug-19

Page 181: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

Company Name MWBE LDB VBE DBE Trades Address City Contact Email Phone State

21st Century Safety Corp Construction Logistics 5019 Winwood Way, Orlando Isabel Perry [email protected] 321-287-7771 FL

X 21st Century Safety Corp Architect and Engineer Services 5019 Winwood Way, Orlando Isabel Perry [email protected] 321-287-7771 FL

A & A Electric Services, Inc. X Duct Bank 4409 N Thatcher Ave Tampa Frank Carpenter [email protected] 813-872-8597 FL

A & A Electric Services, Inc. X Electrical 4409 N Thatcher Ave Tampa Frank Carpenter [email protected] 813-872-8597 FL

X A & A Electric Services, Inc. X Site Lighting 4409 N Thatcher Ave Tampa Frank Carpenter [email protected] 813-872-8597 FL

A.C.Dellovade, Inc. Glazing 108 Cavasina Dr Canonsburg Wade Stull [email protected] 724-873-8190 PA

A.C.Dellovade, Inc. Metal Panels 108 Cavasina Dr Canonsburg Wade Stull [email protected] 724-873-8190 PA

A.C.Dellovade, Inc. Miscellaneous Metals 108 Cavasina Dr Canonsburg Wade Stull [email protected] 724-873-8190 PA

A.C.Dellovade, Inc. Roofing 108 Cavasina Dr Canonsburg Wade Stull [email protected] 724-873-8190 PA

X A.C.Dellovade, Inc. Structural Steel 108 Cavasina Dr Canonsburg Wade Stull [email protected] 724-873-8190 PA

Aabot Fence LLC Construction Logistics 3001 Old Winter Garden Rd Orlando Valerie Hamil [email protected] 407-207-4401 FL

X Aabot Fence LLC Site Improvements 3001 Old Winter Garden Rd Orlando Valerie Hamil [email protected] 407-207-4401 FL

X ABG Caulking Contractors, Inc. Waterproofing and Caulking 4511 South Orange Blossom Trail Kissimmee Wesley Greene [email protected] 615-859-4935 FL

Above All Caulking & Waterproofing Fireproofing 4150 114th Terrace North Clearwater Ben Odom [email protected] 727-573-9771 FL

X Above All Caulking & Waterproofing Waterproofing and Caulking 4150 114th Terrace North Clearwater Ben Odom [email protected] 727-573-9771 FL

Above the Sill X Window Treatments 745 Shamrock Blvd Venice Phillip Barone [email protected] (941) 492-3101 FL

X Above the Sill X Furnishings and Fixtures 745 Shamrock Blvd Venice Phillip Barone [email protected] (941) 492-3101 FL

X AC Signs LLC X X X Signage 10201 Rocket Ct., Suite 100 Orlando [email protected] 407-857-5564 FL

X Ace Applications, LLC X X X Electrical 3259 Progress Drive, Suite 152 Orlando Courtney Powell [email protected] 877-499-2231 FL

X Ace Staffing Inc X X X Construction Logistics 6304 Old Cheney Hwy, Orlando Viren Patel [email protected] 407-702-45 FL

X Ackerman Plumbing, Inc. Plumbing 2011 Whitfield Park Loop Sarasota Eric Ackerman [email protected] 941-755-7448 FL

X ACM Construction Management, LLC Construction Logistics 5581 Canal Road Cleveland Laura Pirosko [email protected] 216-447-0814 OH

Acousti Doors & Specialties, LLC Operable Partitions 3400 Town Point DR NW Suite 110 Kennesaw Kristian Roskaft [email protected] 404-355-1331 GA

Acousti Doors & Specialties, LLC Coiling Grilles and Doors 3400 Town Point DR NW Suite 110 Kennesaw Kristian Roskaft [email protected] 404-355-1331 GA

X Acousti Doors & Specialties, LLC Door Frames and Hardware 3400 Town Point DR NW Suite 110 Kennesaw Kristian Roskaft [email protected] 404-355-1331 GA

Acousti Engineering Co. Flooring 4656 34th St SW Orlando Carlos Velasco [email protected] 407-425-3467 FL

Acousti Engineering Co. Gypsum Drywall and Ceilings 4656 34th St SW Orlando Carlos Velasco [email protected] 407-425-3467 FL

Acousti Engineering Co. Metal Panels 4657 34th St SW Orlando Carlos Velasco [email protected] 407-425-3467 FL

X Acousti Engineering Co. Tile / Terrazzo 4656 34th St SW Orlando Carlos Velasco [email protected] 407-425-3467 FL

X Action Spray On Systems of Mid Florida Inc Fireproofing 4053 Forrestal Ave #8 Orlando Todd Griffin [email protected] 407-888-2898 FL

X Acurlite Structural Skylights, Inc. Skylights 1017 N Vine St Berwick Ron Palombo [email protected] 570-759-6882 PA

ACY Contractors, LLC X X X General Contracting 6160 Edgewater Drive, Suite C Orlando Michael Young [email protected] 407-792-2709 FL

ACY Contractors, LLC X X X Construction Logistics 6160 Edgewater Drive, Suite C Orlando Michael Young [email protected] 407-792-2709 FL

ACY Contractors, LLC X X X Doors & Hardware 6160 Edgewater Drive, Suite C Orlando Michael Young [email protected] 407-792-2709 FL

ACY Contractors, LLC X X X Gypsum Drywall and Ceilings 6160 Edgewater Drive, Suite C Orlando Michael Young [email protected] 407-792-2709 FL

X ACY Contractors, LLC X X X Rough Carpentry 6160 Edgewater Drive, Suite C Orlando Michael Young [email protected] 407-792-2709 FL

X Adams Group Millwork 2221 Murphy Court, Norht Point Ethan Adams [email protected] 941-639-7188 FL

ADF International Inc. Miscellaneous Metals 1925 NW 15th St Pompano Beach Eric Ducharme [email protected] 954-340-8854 FL

X ADF International Inc. Structural Steel 1925 NW 15th St Pompano Beach Eric Ducharme [email protected] 954-340-8854 FL

X Advanced Disposal Construction Logistics 5722 N. Pine Hills Rd. Orlando Richard Kneeland [email protected] 407-464-0664 FL

Advanced Drainage Systems, Inc. Site Utilities 2424 Ridgewind Way Windermere Ted Bickert [email protected] 813-895-6856 FL

X Advanced Drainage Systems, Inc. Mechanical 2424 Ridgewind Way Windermere Ted Bickert [email protected] 813-895-6856 FL

Advanced Environmental Technologies LLC Architect and Engineer Services 4265 New Tampa Hwy, Suite 1 Lakeland Kim McGowan [email protected] 863 614 0693 FL

Advanced Environmental Technologies LLC Construction Logistics 4265 New Tampa Hwy, Suite 1 Lakeland Kim McGowan [email protected] 863 614 0693 FL

Advanced Environmental Technologies LLC Earthwork Improvements 4265 New Tampa Hwy, Suite 1 Lakeland Kim McGowan [email protected] 863 614 0693 FL

Advanced Environmental Technologies LLC Demolition 4265 New Tampa Hwy, Suite 1 Lakeland Kim McGowan [email protected] 863 614 0693 FL

Advanced Environmental Technologies LLC Drilling 4265 New Tampa Hwy, Suite 1 Lakeland Kim McGowan [email protected] 863 614 0693 FL

Advanced Environmental Technologies LLC Pest Control 4265 New Tampa Hwy, Suite 1 Lakeland Kim McGowan [email protected] 863 614 0693 FL

Advanced Environmental Technologies LLC Site Utilities 4265 New Tampa Hwy, Suite 1 Lakeland Kim McGowan [email protected] 863 614 0693 FL

Advanced Environmental Technologies LLC Special Construction 4265 New Tampa Hwy, Suite 1 Lakeland Kim McGowan [email protected] 863 614 0693 FL

X Advanced Environmental Technologies LLC Fuel Systems 4265 New Tampa Hwy, Suite 1 Lakeland Kim McGowan [email protected] 863 614 0693 FL

Advanced IT Concepts, Inc. X X Architect and Engineer Services 1351 Sundial Point Winter Springs Carmen Lamothe [email protected] 407-914-2484 FL

Advanced IT Concepts, Inc. X X Building Equipment 1351 Sundial Point Winter Springs Carmen Lamothe [email protected] 407-914-2484 FL

X Advanced IT Concepts, Inc. X X Low Voltage Systems 1351 Sundial Point Winter Springs Carmen Lamothe [email protected] 407-914-2484 FL

Hensel Phelps

South Terminal C Phase 1 Airside/Concourse

PREQUALIFIED SUBCONTRACTORS/SUPPLIERS

Firms Approved by PSC

Page 182: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

Company Name MWBE LDB VBE DBE Trades Address City Contact Email Phone State

Hensel Phelps

South Terminal C Phase 1 Airside/Concourse

PREQUALIFIED SUBCONTRACTORS/SUPPLIERS

Firms Approved by PSC

X Advanced Millwork Millwork 2645 Regent Avenue Orlando Jessica Greathouse [email protected] 407-294-1927 FL

X Advanced Roofing, Inc. Roofing 1950 NW 22nd Street Fort Lauderdale Debbie Giuliani [email protected] 954-522-6868 FL

X Aerial Innovations, Inc. X X Construction Logistics 3703 West Azeele Street Tampa Colette Eddy [email protected] 813-254-7339 FL

X Aero Bridgeworks, Inc. Conveying Systems 2700 Delk Rd SE, 100 Marietta Michael Madlock [email protected] 770-234-4200 GA

X AG Mauro Co. Doors & Hardware 1221 Bernard Dr Baltimore [email protected] 410-233-2500 MD

Aireko Energy Solutions US, LLC Electrical 2415 W Sand Lake Rd Orlando Fernando Francia [email protected] 407-706-2800 FL

Aireko Energy Solutions US, LLC Low Voltage Systems 2415 W Sand Lake Rd Orlando Fernando Francia [email protected] 407-706-2800 FL

X Aireko Energy Solutions US, LLC Architect and Engineer Services 2415 W Sand Lake Rd Orlando Fernando Francia [email protected] 407-706-2800 FL

X Ajax Paving Industries, Inc. Paving 1957 Crooks Rd, Suite A Troy Samuel Joiner [email protected] (248) 244-3300 MI

All Weather Contractors, Inc. General Contracting 7749 Normandy Blvd. 145-347, Jacksonville David Daly [email protected] 904-781-7060 FL

X All Weather Contractors, Inc. Mechanical 7749 Normandy Blvd. 145-347, Jacksonville David Daly [email protected] 904-781-7060 FL

X Allegiance Global Construction, LLC X General Contracting 2255 Glades Rd, Suite 324A Boca Raton Brandon Allen [email protected] (888) 312-0048 FL

X Alliance Design & Construction, Inc. X Architect and Engineer Services P.O. Box 1296 Winter Park Doug Sangster [email protected] 407-467-8833 FL

Allied Door & Hardware Co Inc DBA Overhead Door Co of Brevard Coiling Grilles and Doors 1465 Cox Rd Cocoa Estimating Department [email protected] 321-639-6372 FL

X Allied Door & Hardware Co Inc DBA Overhead Door Co of Brevard Doors Frames and Hardware 1465 Cox Rd Cocoa Estimating Department [email protected] 321-639-6372 FL

All-Rite Fence Co. Construction Logistics 5115 Old Winter Garden Rd Orlando Amy Fry [email protected] 407-295-7093 FL

X All-Rite Fence Co. Site Improvements 5115 Old Winter Garden Rd Orlando Amy Fry [email protected] 407-295-7093 FL

X Alpha Cladding, LLC Glazing 3403 NW 82nd Ave, 300 Doral Juan Alpizar [email protected] 786-615-4245 FL

Alpha Insulation & Waterproofing Inc Fireproofing 955 Charles St, Unit 101A Longwood Kory Besaw [email protected] 407-379-9300 FL

Alpha Insulation & Waterproofing Inc Traffic Topping / Sealer 955 Charles St, Unit 101A Longwood Kory Besaw [email protected] 407-379-9300 FL

X Alpha Insulation & Waterproofing Inc Waterproofing and Caulking 955 Charles St, Unit 101A Longwood Kory Besaw [email protected] 407-379-9300 FL

X Altair Enviromental Group Site Utilities 710 S Milwee St Longwood Kevin Dalgarno [email protected] 407-339-7134 FL

Altamonte Glass & Mirror, Inc. X Glazing 6001 Cinderlane Pkwy Orlando Brian Fitzgerald [email protected] 407-770-1400 FL

X Altamonte Glass & Mirror, Inc. X Skylights 6001 Cinderlane Pkwy Orlando Brian Fitzgerald [email protected] 407-770-1400 FL

X AM Commercial & Residential Cleaning Construction Logistics 6710 Bougainvilla Ave S St. Petersburg Michelle Gisler [email protected] 813-508-0275 FL

X Ambient Technologies, Inc. X X Survey 4610 Central Ave, Suite A St. Petersburg Albert F Rodriguez [email protected] 727-328-0268 FL

X Ameribridge LLC Conveying Systems 5425 Poindexter Dr, Indianapolis James Duchan [email protected] 317-826-2000 IN

American Blueprinting & Supply, Inc. dba American Graphix Solutions X Architect and Engineer Services 750 Clay St Orlando Nick Spence [email protected] 407-644-5366 FL*

American Blueprinting & Supply, Inc. dba American Graphix Solutions X Signage 750 Clay St Orlando Nick Spence [email protected] 407-644-5366 FL*

X American Blueprinting & Supply, Inc. dba American Graphix Solutions X Construction Logistics 750 Clay St Orlando Nick Spence [email protected] 407-644-5366 FL*

X American Direct Procurement, Inc. Doors & Hardware 11000 Lakeview Ave, Lenexa Estimating Dept [email protected] 913-677-5588 KS

X American Eagle Veteran Contracting, LLC Cast In Place Concrete 126 Dirksen Dr Debary Estimating Dept [email protected] 386-753-1776 FL

American Platinum Builders Inc Carpentry 1966 W New Hampshire St, Suite E Orlando Theresa Brush [email protected] (407) 674-7045 FL

American Platinum Builders Inc Gypsum Drywall and Ceilings 1966 W New Hampshire St, Suite E Orlando Theresa Brush [email protected] (407) 674-7045 FL

X American Platinum Builders Inc Painting 1966 W New Hampshire St, Suite E Orlando Theresa Brush [email protected] (407) 674-7045 FL

X Anthony Allega Cement Contractors Inc. General Contracting 5585 Canal Rd Cleveland Gary Thomas [email protected] (216) 867-1345 OH

X Apex Security and Covention Services, Inc. X Construction Logistics 3700 Commerce Blvd, Kissimmee John Murphy [email protected] 407-846-1435 FL

X Arazoza Brothers Corporation X Landscaping 15901 SW 242 St Homestead Vanessa Ygualada [email protected] 305-246-3223 FL

Archer Western Construction, LLC Cast In Place Concrete 4343 Anchor Plaza Pkwy, Suite 155 Tampa Billy Jones [email protected] 813-849-7500 FL

Archer Western Construction, LLC Earthwork Improvements 4343 Anchor Plaza Pkwy, Suite 155 Tampa Billy Jones [email protected] 813-849-7500 FL

Archer Western Construction, LLC General Contracting 4343 Anchor Plaza Pkwy, Suite 155 Tampa Billy Jones [email protected] 813-849-7500 FL

Archer Western Construction, LLC Paving 4343 Anchor Plaza Pkwy, Suite 155 Tampa Billy Jones [email protected] 813-849-7500 FL

Archer Western Construction, LLC Precast 4343 Anchor Plaza Pkwy, Suite 155 Tampa Billy Jones [email protected] 813-849-7500 FL

Archer Western Construction, LLC Site Improvements 4343 Anchor Plaza Pkwy, Suite 155 Tampa Billy Jones [email protected] 813-849-7500 FL

Archer Western Construction, LLC Site Structures 4343 Anchor Plaza Pkwy, Suite 155 Tampa Billy Jones [email protected] 813-849-7500 FL

Archer Western Construction, LLC Site Utilities 4343 Anchor Plaza Pkwy, Suite 155 Tampa Billy Jones [email protected] 813-849-7500 FL

X Archer Western Construction, LLC Structural Steel 4343 Anchor Plaza Pkwy, Suite 155 Tampa Billy Jones [email protected] 813-849-7500 FL

X Architectural Graphics, Inc. Signage 396 Alhambra Cir #500 Coral Gables William Clark [email protected] 800-877-7868 FL

Ardaman & Associates, Inc. Architect and Engineer Services 8008 South Orange Ave Orlando D Vance [email protected] 407-855-3860 FL

X Ardaman & Associates, Inc. Testing And Inspection 8008 South Orange Ave Orlando D Vance [email protected] 407-855-3860 FL

X Argos Building Materials 5109 Carder Rd, Orlando Orlando Kevin McCoy [email protected] 407-467-9672 FL

X Artistic Surfaces Tile / Terrazzo 1591 N Powerline Rd Pompano Beach Bruce Carney [email protected] 954-968-1700 FL

Aspen Services, Inc. Paving 16445 County Rd 455, Unit 2 Montverde John Wood [email protected] (407) 892-1411 FL

X Aspen Services, Inc. Site Improvements 16445 County Rd 455, Unit 2 Montverde John Wood [email protected] (407) 892-1411 FL

Page 183: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

Company Name MWBE LDB VBE DBE Trades Address City Contact Email Phone State

Hensel Phelps

South Terminal C Phase 1 Airside/Concourse

PREQUALIFIED SUBCONTRACTORS/SUPPLIERS

Firms Approved by PSC

Associated Cost Engineers, Inc. of Delaware X X X Cast In Place Concrete 801 North Pine Hills Road Orlando Jaja Wade [email protected] 321-689-2680 FL

X Associated Cost Engineers, Inc. of Delaware X X X Pile Foundations 801 North Pine Hills Road Orlando Jaja Wade [email protected] 321-689-2680 FL

X Atlantic Concrete Washout, Inc Construction Logistics 1945 County Rd 419, Suite 1141-206 Oviedo Kyle Swyear [email protected] 407-737-1140 FL

X Attaway Services, Inc. Site Utilities 801 SE 28th St Fort Lauderdale Troy Brown [email protected] 954-462-2920 FL

X ATW Communications X Low Voltage Systems 6649 Amory Ct, Suite 12 Winter Park Omar Hernandez [email protected] 407-673-9393 FL

Automatic Systems, Inc. (ASI) Vertical Transportation 9230 East 47th St Kansas City Phillip Nguyen [email protected] (816) 356-0660 MO

X Automatic Systems, Inc. (ASI) Special Construction 9230 East 47th St Kansas City Phillip Nguyen [email protected] (816) 356-0660 MO

B & I Contractors, Inc. Electrical 2701 Prince St Fort Myers Jason Grabowski [email protected] 239-332-4646 FL

B & I Contractors, Inc. Mechanical 2701 Prince St Fort Myers Jason Grabowski [email protected] 239-332-4646 FL

X B & I Contractors, Inc. Plumbing 2701 Prince St Fort Myers Jason Grabowski [email protected] 239-332-4646 FL

B&M Masonry, Inc. Cast in Place Concrete 123939 Carlington Ln Riverview [email protected] 877-280-0927 FL

X B&M Masonry, Inc. Masonry 123939 Carlington Ln Riverview [email protected] 877-280-0927 FL

Baker Concrete Construction, Incorporated Cast in Place Concrete 1540 Aber Rd Orlando Joe Orr [email protected] 407-736-9900 FL

X Baker Concrete Construction, Incorporated Hoisting 1540 Aber Rd Orlando Joe Orr [email protected] 407-736-9900 FL

X Bandit Wildlife Management/Avian Flyaway Inc Bird Control 5 Geiger Road Key West Lloyd Rutschman [email protected] 972-771-6679 FL

Banker Steel Company, LLC Miscellaneous Metals 1619 Wythe Rd Lynchburg John Omran [email protected] 434-847-4575 VA

X Banker Steel Company, LLC Structural Steel 1619 Wythe Rd Lynchburg John Omran [email protected] 434-847-4575 VA

X Baron Sign X X Signage 900 W 13th St West Palm Beach Sandra Foland [email protected] 561-863-7446 FL

X Barton Malow Company Hoisting 5337 Millenia Lakes Blvd, Suite 235 Orlando [email protected] 407-325-8880 FL

X Bauer Foundations Corp. Pile Foundations 13203 Byrd Legg Dr Odessa Russell Cooper [email protected] 727-531-2577 FL

X Bauwerk Safety Systems, LLC Building Equipment 394 W Main St, Suite B-11 Hendersonville Mark Knuebel [email protected] 615-992-1136 TN

X Bay to Bay Balancing, Inc. Test And Balance 14819 N 12th St Lutz Debbie Long [email protected] 321-363-0727 FL

BC Industries Glazing 5008 Tampa West Blvd. Tampa Javier Mestres [email protected] 813-886-0240 FL

X BC Industries Skylights 5008 Tampa West Blvd. Tampa Javier Mestres [email protected] 813-886-0240 FL

X Beck Steel Inc. Structural Steel 401 N Loop 289 Lubbock Elda Hernandez [email protected] 806-762-3255 TX

Bergelectric Corp. Duct Bank 121 S Orange Ave, Suite 1500 Orlando Zach Frye [email protected] 407-832-1152 FL

Bergelectric Corp. Electrical 121 S Orange Ave, Suite 1500 Orlando Zach Frye [email protected] 407-832-1152 FL

Bergelectric Corp. Low Voltage Systems 121 S Orange Ave, Suite 1500 Orlando Zach Frye [email protected] 407-832-1152 FL

X Bergelectric Corp. Site Specialties 121 S Orange Ave, Suite 1500 Orlando Zach Frye [email protected] 407-832-1152 FL

Berkel & Company Contractors, Inc. Pile Foundations 3702 Rogers Industrial Park Rd Okahumpka Chris Chinopulos [email protected] 352-365-4308 FL

X Berkel & Company Contractors, Inc. Pressure Grout Soil Improvements 3702 Rogers Industrial Park Rd Okahumpka Chris Chinopulos [email protected] 352-365-4308 FL

X Best Rolling MFG Coiling Grilles and Doors 9780 NW 79th Ave Hialeah Gardens Fredy Lopez [email protected] 305-821-6607 FL

Birdair, Inc. Miscellaneous Metals 65 Lawrence Bell Dr, Suite 100 Amherst [email protected] 800-622-2246 NY

Birdair, Inc. Structural Steel 65 Lawrence Bell Dr, Suite 100 Amherst [email protected] 800-622-2246 NY

X Birdair, Inc. Tensile Fabric Canopies 65 Lawrence Bell Dr, Suite 100 Amherst [email protected] 800-622-2246 NY

Black & Son Remodeling LLC dba Black & Son LLC X X X Cast In Place Concrete 519 Royal Palm Drive Kissimmee Zaheer Black [email protected] 321-438-4653 FL

Black & Son Remodeling LLC dba Black & Son LLC X X X Construction Logistics 519 Royal Palm Drive Kissimmee Zaheer Black [email protected] 321-438-4653 FL

Black & Son Remodeling LLC dba Black & Son LLC X X X Doors & Hardware 519 Royal Palm Drive Kissimmee Zaheer Black [email protected] 321-438-4653 FL

Black & Son Remodeling LLC dba Black & Son LLC X X X Guard Rails & Barriers 519 Royal Palm Drive Kissimmee Zaheer Black [email protected] 321-438-4653 FL

Black & Son Remodeling LLC dba Black & Son LLC X X X Gypsum Drywall and Ceilings 519 Royal Palm Drive Kissimmee Zaheer Black [email protected] 321-438-4653 FL

Black & Son Remodeling LLC dba Black & Son LLC X X X Paving 519 Royal Palm Drive Kissimmee Zaheer Black [email protected] 321-438-4653 FL

Black & Son Remodeling LLC dba Black & Son LLC X X X Rough Carpentry 519 Royal Palm Drive Kissimmee Zaheer Black [email protected] 321-438-4653 FL

Black & Son Remodeling LLC dba Black & Son LLC X X X Site Specialties 519 Royal Palm Drive Kissimmee Zaheer Black [email protected] 321-438-4653 FL

Black & Son Remodeling LLC dba Black & Son LLC X X X Tile / Terrazzo 519 Royal Palm Drive Kissimmee Zaheer Black [email protected] 321-438-4653 FL

Black & Son Remodeling LLC dba Black & Son LLC X X X Waterproofing and Caulking 519 Royal Palm Drive Kissimmee Zaheer Black [email protected] 321-438-4653 FL

X Black & Son Remodeling LLC dba Black & Son LLC X X X Cementious Siding 519 Royal Palm Drive Kissimmee Zaheer Black [email protected] 321-438-4653 FL

X Blu Site Solutions of North Florida, Inc. Construction Logistics 2815 Powers Ave Jacksonville Carlos Guadelupe [email protected] 800-682-7023 FL*

X Blue Cord Design and Construction, LLC X General Contracting 1837 Edgewater Drive Orlando [email protected] 407-425-1390 FL

X Bob's Barricades, Inc Site Specialties 2020 Diversified Way Orlando John Baldwin [email protected] (407) 855-7186 FL

X Bolt Construction Fuel Systems PO Box 5470 Youngstown Robert Frommell [email protected] 330-549-0349 OH

X Bormon Construction, Inc. Masonry 981 U.S. 98, Destin Reno Montoya [email protected] 205-223-1951 FL

Bradleigh Applications, Inc Cementious Siding 2144 Priest Bridge Ct, Suite 6 Crofton Jeff Kemp [email protected] 410-489-7503 MD

X Bradleigh Applications, Inc Gypsum Drywall and Ceilings 2144 Priest Bridge Ct, Suite 6 Crofton Jeff Kemp [email protected] 410-489-7503 MD

Brasfield & Gorrie, LLC Cast In Place Concrete 941 W Morse Blvd, Suite 200 Winter Park Michelle Carpenter [email protected] 407-562-4500 FL

Page 184: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

Company Name MWBE LDB VBE DBE Trades Address City Contact Email Phone State

Hensel Phelps

South Terminal C Phase 1 Airside/Concourse

PREQUALIFIED SUBCONTRACTORS/SUPPLIERS

Firms Approved by PSC

Brasfield & Gorrie, LLC General Contracting 941 W Morse Blvd, Suite 200 Winter Park Michelle Carpenter [email protected] 407-562-4500 FL

Brasfield & Gorrie, LLC Hoisting 941 W Morse Blvd, Suite 200 Winter Park Michelle Carpenter [email protected] 407-562-4500 FL

X Brasfield & Gorrie, LLC Site Utilities 941 W Morse Blvd, Suite 200 Winter Park Michelle Carpenter [email protected] 407-562-4500 FL

Brevard Concrete Paving, Inc. Cast In Place Concrete 133 Ocean Garden Ln Cape Canaveral Jerod Lawrimore [email protected] (321) 543-0607 FL

X Brevard Concrete Paving, Inc. Paving 133 Ocean Garden Ln Cape Canaveral Jerod Lawrimore [email protected] (321) 543-0607 FL

X Bright Future Electric, LLC Electrical 630 Maguire Rd Ocoee Andrew Heintzelman [email protected] 407-654-0155 FL

BrightView Landscapes, LLC Landscaping 320 North Mission Road Orlando Jake Statham [email protected] 407-296-7100 FL

X BrightView Landscapes, LLC Site Improvements 320 North Mission Road Orlando Melissa Pelleymounter [email protected] 407-296-7100 FL

X Brundage-Bone Concrete Pumping, Inc. Hoisting 15520 Capital Port San Antonio Katie Norton [email protected] 404-762-9633 TX

Builder Services Group, Inc DBA Santa Rosa Insulation and Fireproofing Fireproofing 6130 NW 74th Ave Miami Mike Dominguez [email protected] 305-592-5249 FL

X Builder Services Group, Inc DBA Santa Rosa Insulation and Fireproofing Insulation 6130 NW 74th Ave Miami Mike Dominguez [email protected] 305-592-5249 FL

X Building It Green Consulting X LEED Consultant 463688 FL-200, Suite 1-148 Yulee Ashley Powell [email protected] 904-310-0798 FL

X Busto Plumbing Services, Inc. X Plumbing 1702 West Saint Louis St Tampa David Crosby [email protected] (813) 251-1061 FL

X C.T. Windows d.b.a. Architectural Aluminum Techniques X Glazing 9195 Boggy Creek Rd, Ste 1 Orlando Frank D'Aprile [email protected] 407-857-9237 FL

X CAD Concepts of Ohio, Inc. dba Cad Concepts, Inc. X X Construction Logistics 4767 New Broad St, Orlando Jack Ray [email protected] 407-276-4246 FL

Campolong Enterprises, Inc. dba DH Striping Co. Paving 750 Clark St Oviedo Bruce Hess [email protected] 407-359-1172 FL

Campolong Enterprises, Inc. dba DH Striping Co. Striping 750 Clark St Oviedo Bruce Hess [email protected] 407-359-1172 FL

X Campolong Enterprises, Inc. dba DH Striping Co. Traffic Topping / Sealer 750 Clark St Oviedo Bruce Hess [email protected] 407-359-1172 FL

Candela Controls, Inc Electrical 751 Business Park Blvd, Suite 101 Winter Garden Bill Ellis [email protected] 407-654-2420 FL

X Candela Controls, Inc Building Equipment 751 Business Park Blvd, Suite 101 Winter Garden Bill Ellis [email protected] 407-654-2420 FL

Cape Enviromental Management Inc Earthwork Improvements 500 Pinnacle Ct, Suite 100 Norcross Monica Cooper [email protected] 210-377-2008 GA

Cape Enviromental Management Inc Fuel Systems 500 Pinnacle Ct, Suite 100 Norcross Monica Cooper [email protected] 210-377-2008 GA

Cape Enviromental Management Inc Painting 500 Pinnacle Ct, Suite 100 Norcross Monica Cooper [email protected] 210-377-2008 GA

Cape Enviromental Management Inc Site Structures 500 Pinnacle Ct, Suite 100 Norcross Monica Cooper [email protected] 210-377-2008 GA

Cape Enviromental Management Inc Site Utilities 500 Pinnacle Ct, Suite 100 Norcross Monica Cooper [email protected] 210-377-2008 GA

X Cape Enviromental Management Inc Waterproofing and Caulking 500 Pinnacle Ct, Suite 100 Norcross Monica Cooper [email protected] 210-377-2008 GA

X Carnahan, Proctor and Cross, Inc. Architect and Engineer Services 3525 N Courtenay Pkwy Merrit Island Donna Hagedorn [email protected] 321-229-6821 FL

Carros Metal Concepts, Inc Miscellaneous Metals 2525 Richardson Rd Villa Rica Chris [email protected] 770-577-9301 GA

X Carros Metal Concepts, Inc Metal Panels 2525 Richardson Rd Villa Rica Chris [email protected] 770-577-9301 GA

Carter Electric Electrical 2455 West Orange Blossom Trail Apopka Travis Bumgarner [email protected] 407-814-2677 FL

X Carter Electric Low Voltage Systems 2455 West Orange Blossom Trail Apopka Travis Bumgarner [email protected] 407-814-2677 FL

Case Atlantic Company Pile Foundations 4585 140th Ave North, Suite 1012 Clearwater Lisa Biglin [email protected] 727-572-7740 FL

X Case Atlantic Company Pressure Grout Soil Improvements 4585 140th Ave North, Suite 1012 Clearwater Lisa Biglin [email protected] 727-572-7740 FL

Castle Constructors Company X X X Cast in Place Concrete 5850 T.G. Lee Blvd, Suite 205 Orlando Rey Lorenzo [email protected] 407-888-1195 FL

Castle Constructors Company X X X Hoisting 5850 T.G. Lee Blvd, Suite 205 Orlando Rey Lorenzo [email protected] 407-888-1195 FL

Castle Constructors Company X X X Masonry 5850 T.G. Lee Blvd, Suite 205 Orlando Rey Lorenzo [email protected] 407-888-1195 FL

X Castle Constructors Company X X X Paving 5850 T.G. Lee Blvd, Suite 205 Orlando Rey Lorenzo [email protected] 407-888-1195 FL

X Castle Group Construction Inc. Cementious Siding 719 Brookhaven Dr Orlando Jennifer Finely [email protected] 407-413-5845 FL*

Castone Corporation Precast 1511 Old Columbus Rd Opelika Barry Foate [email protected] 334-745-3571 AL

X Castone Corporation Precast 1511 Old Columbus Rd Opelika Barry Foate [email protected] 334-745-3571 AL

X Cat & I, LLC Demolition 4981 Enterprise Dr Kissimmee Daniel DeBra [email protected] 407-654-7574 FL

Cavotec Inet US inc. Conveying Systems 5665 Corporate Ave Cypress Patricia Cabarcos [email protected] 305-240-0952 CA

Cavotec Inet US inc. Electrical 5665 Corporate Ave Cypress Patricia Cabarcos [email protected] 305-240-0952 CA

Cavotec Inet US inc. Fuel Systems 5665 Corporate Ave Cypress Patricia Cabarcos [email protected] 305-240-0952 CA

Cavotec Inet US inc. HVAC Equipment 5665 Corporate Ave Cypress Patricia Cabarcos [email protected] 305-240-0952 CA

X Cavotec Inet US inc. Mechanical 5665 Corporate Ave Cypress Patricia Cabarcos [email protected] 305-240-0952 CA

CCK Construction Services, Inc. Cast in Place Concrete 6250 Hazeltine National Dr, Suite 106 Orlando Jason Grafton [email protected] 407-472-9700 FL

X CCK Construction Services, Inc. Hoisting 6250 Hazeltine National Dr, Suite 106 Orlando Jason Grafton [email protected] 407-472-9700 FL

X CDPW Inc. Dewatering 710 West Park Ave Edgewater Rob Roberts [email protected] 386-426-1345 FL

Ceco Concrete Construction, LLC Cast in Place Concrete 3218 Parkside Center Circle Tampa Chad Anast [email protected] 813-622-8080 FL

X Ceco Concrete Construction, LLC Hoisting 3218 Parkside Center Circle Tampa Chad Anast [email protected] 813-622-8080 FL

X Cellec Games, Inc. bda CG SolutionsGroup X X X IT Support 4046 N Goldenrod Rd #271, Winter Park Gerard Merritt [email protected] 407-476-3590 FL

Cemex Building Materials 3626 Quadrangle Blvd, Orlando David Nabavi [email protected] 407-243-5300 FL

Page 185: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

Company Name MWBE LDB VBE DBE Trades Address City Contact Email Phone State

Hensel Phelps

South Terminal C Phase 1 Airside/Concourse

PREQUALIFIED SUBCONTRACTORS/SUPPLIERS

Firms Approved by PSC

X Cemex Ready Mix Concrete 3626 Quadrangle Blvd, Orlando David Nabavi [email protected] 407-243-5300 FL

Central Florida Construction Walls, Inc. X X Cast In Place Concrete PO Box 620815 Orlando Manuel Quilli [email protected] (407) 377-7170 FL

Central Florida Construction Walls, Inc. X X Masonry PO Box 620815 Orlando Manuel Quilli [email protected] (407) 377-7170 FL

X Central Florida Construction Walls, Inc. X X Cementious Siding PO Box 620815 Orlando Manuel Quilli [email protected] (407) 377-7170 FL

Certified Finishes Inc Access Flooring 4455 Dardanelle Dr Orlando DOMICIANO PEREZ [email protected] 407-335-5171 FL

Certified Finishes Inc Flooring 4455 Dardanelle Dr Orlando DOMICIANO PEREZ [email protected] 407-335-5171 FL

X Certified Finishes Inc Tile / Terrazzo 4455 Dardanelle Dr Orlando DOMICIANO PEREZ [email protected] 407-335-5171 FL

Certified Network Professionals, Inc. X IT Support 15757 Pines Blvd, 273 Penbroke Pines Orlando Suero [email protected] 954-610-0443 FL

X Certified Network Professionals, Inc. X Low Voltage Systems 15757 Pines Blvd, 273 Penbroke Pines Orlando Suero [email protected] 954-610-0443 FL

Champion Painting Specialty Services Corp. X X Painting 130 SW 22nd St Fort Lauderdale Kyle Hough [email protected] 954-462-9079 FL

X Champion Painting Specialty Services Corp. X X Traffic Topping / Sealer 130 SW 22nd St Fort Lauderdale Kyle Hough [email protected] 954-462-9079 FL

X Chandler Signs, LP, LLP Signage 2584 Sand Hill Point Circle Davenport [email protected] 863-420-1100 FL

Cherokee Enterprises, Inc. X X Cast In Place Concrete 14474 Commerce Way Miami Lakes Amanuel Worku [email protected] 305-828-3353 FL

Cherokee Enterprises, Inc. X X Concrete Finishing 14474 Commerce Way Miami Lakes Amanuel Worku [email protected] 305-828-3353 FL

Cherokee Enterprises, Inc. X X Earthwork Improvements 14474 Commerce Way Miami Lakes Amanuel Worku [email protected] 305-828-3353 FL

Cherokee Enterprises, Inc. X X Fuel Systems 14474 Commerce Way Miami Lakes Amanuel Worku [email protected] 305-828-3353 FL

Cherokee Enterprises, Inc. X X Mechanical 14474 Commerce Way Miami Lakes Amanuel Worku [email protected] 305-828-3353 FL

Cherokee Enterprises, Inc. X X Paving 14474 Commerce Way Miami Lakes Amanuel Worku [email protected] 305-828-3353 FL

X Cherokee Enterprises, Inc. X X Site Utilities 14474 Commerce Way Miami Lakes Amanuel Worku [email protected] 305-828-3353 FL

Chewning & Wilmer Electrical 2508 Mechanicsville Turnpike Richmond Michael Stone [email protected] 804-231-7373 VA

X Chewning & Wilmer Low Voltage Systems 2508 Mechanicsville Turnpike Richmond Michael Stone [email protected] 804-231-7373 VA

Cives Steel Company Miscellaneous Metals 102 Airport Road Thomasville Bill Hales [email protected] 229-228-9780 GA

X Cives Steel Company Structural Steel 102 Airport Road Thomasville Bill Hales [email protected] 229-228-9780 GA

X CKB Cleaning Service LLC Construction Logistics 1815 4th St NW, Winter Haven Darrell Chapper [email protected] 863-709-4810 FL

Cladding Systems, Inc. X Metal Panels 3218 E 4th Ave Tampa Chad McCollough [email protected] 813-250-0786 FL

X Cladding Systems, Inc. X Miscellaneous Metals 3218 E 4th Ave Tampa Chad McCollough [email protected] 813-250-0786 FL

X CleanAbel National Shine, LLC Construction Logistics 30606 Double Dr Wesley Chapel Katie Abel [email protected] 813-479-8014 FL

Clear Horizon Ventures Company dba Petersen Metals Guard Rails & Barriers 9410 Eden Ave Hudson Tyler Kelshaw [email protected] 727-372-1100 FL

X Clear Horizon Ventures Company dba Petersen Metals Miscellaneous Metals 9410 Eden Ave Hudson Tyler Kelshaw [email protected] 727-372-1100 FL

Cleveland Construction, Inc. of Nevada dba Cleveland Construction, Inc. Cementious Siding 1650 Southeast 17th Street Suite 212 Ft. Laurderdale Neal Keller [email protected] 954-533-3672 FL

X Cleveland Construction, Inc. of Nevada dba Cleveland Construction, Inc. Gypsum Drywall and Ceilings 1650 Southeast 17th Street Suite 212 Ft. Laurderdale Neal Keller [email protected] 954-533-3672 FL

X Cleveland Electric Co. Electrical 1281 Fulton Industrial Blvd NW Atlanta Vann Cleveland [email protected] 404-696-4550 GA

Coastal Mechanical Services, LLC Mechanical 394 East Drive Melbourne Keith Kunkel [email protected] 321-725-3061 FL

X Coastal Mechanical Services, LLC Plumbing 394 East Drive Melbourne Keith Kunkel [email protected] 321-725-3061 FL

X Collage Design and Construction Group General Contracting 585 Technology Park Lake Mary Rob Maphis [email protected] 407-973-6970 FL

Collis Roofing, Inc. Roofing 485 Commerce Way Longwood [email protected] 321-441-2300 FL

X Collis Roofing, Inc. Skylights 485 Commerce Way Longwood [email protected] 321-441-2300 FL

Comelco, Inc. X X Electrical 410 North St, Suite 130 Longwood [email protected] 407-830-5884 FL

X Comelco, Inc. X X Site Lighting 410 North St, Suite 130 Longwood [email protected] 407-830-5884 FL

X Commercial Fence Contractors, Inc. Site Improvements 1610 N Goldenrod Rd Orlando Scott Savage [email protected] 407-277-8734 FL

X ComNet Communications, LLC Low Voltage Systems 10475 Fortune Pkwy #101 Jacksonville Will Petrelli [email protected] 904-504-4180 FL

X Competitive Edge Partners X X X Construction Logistics 618 Wymore Rd Winter Park Debbie Rodriquez [email protected] 407-271-2704 FL

X Complete Dewatering Pumps & Wellpoints, Inc. Earthwork Improvements 710 West Park Ave Edgewater Amy Fletcher [email protected] 386-426-1345 FL

Comprehensive Energy Services, Inc. X Mechanical 777 Bennett Dr Longwood Kimberly Lee [email protected] 407-682-1313 FL

X Comprehensive Energy Services, Inc. X Plumbing 777 Bennett Dr Longwood Kimberly Lee [email protected] 407-682-1313 FL

X Concrete Services Cast In Place Concrete 10527 100th St S, Boynton Beach Rick Kontos [email protected] 772-370-0974 FL

X Condor Construction, Corp. Pest Control 1800 Pembrook Dr #300 Orlando Luis Pinzon [email protected] 407-895-2568 FL

X Contech Construction Company Building Materials 8615 Commodity Cir, Suite 5 Orlando Peter Gallo [email protected] 813-294-5913 FL

ConTech Construction, LLC X Cast In Place Concrete 701 West Plant Street Winter Garden Ken Breeding [email protected] 407-905-8001 FL

ConTech Construction, LLC X Concrete Finishing 700 West Plant Street Winter Garden Ken Breeding [email protected] 407-905-8000 FL

ConTech Construction, LLC X Construction Logistics 700 West Plant Street Winter Garden Ken Breeding [email protected] 407-905-8000 FL

ConTech Construction, LLC X Hoisting 700 West Plant Street Winter Garden Ken Breeding [email protected] 407-905-8000 FL

X ConTech Construction, LLC X Retaining Walls 700 West Plant Street Winter Garden Ken Breeding [email protected] 407-905-8000 FL

Conti Enterprises, Inc. Asphalt Pavement 1507 Live Oak Street, Suite B Beaufort [email protected] 732-520-5000 NC

Page 186: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

Company Name MWBE LDB VBE DBE Trades Address City Contact Email Phone State

Hensel Phelps

South Terminal C Phase 1 Airside/Concourse

PREQUALIFIED SUBCONTRACTORS/SUPPLIERS

Firms Approved by PSC

Conti Enterprises, Inc. Cast in Place Concrete 1507 Live Oak Street, Suite B Beaufort [email protected] 732-520-5000 NC

Conti Enterprises, Inc. Clearing, Grading, & Earthwork 1507 Live Oak Street, Suite B Beaufort [email protected] 732-520-5000 NC

Conti Enterprises, Inc. Construction Logistics 1507 Live Oak Street, Suite B Beaufort [email protected] 732-520-5000 NC

Conti Enterprises, Inc. Dewatering 1507 Live Oak Street, Suite B Beaufort [email protected] 732-520-5000 NC

Conti Enterprises, Inc. Duct Bank 1507 Live Oak Street, Suite B Beaufort [email protected] 732-520-5000 NC

Conti Enterprises, Inc. Earthwork Improvements 1507 Live Oak Street, Suite B Beaufort [email protected] 732-520-5000 NC

Conti Enterprises, Inc. Electrical 1507 Live Oak Street, Suite B Beaufort [email protected] 732-520-5000 NC

Conti Enterprises, Inc. Erosion Control/SWPPP 1507 Live Oak Street, Suite B Beaufort [email protected] 732-520-5000 NC

Conti Enterprises, Inc. Paving 1507 Live Oak Street, Suite B Beaufort [email protected] 732-520-5000 NC

Conti Enterprises, Inc. Pile Foundations 1507 Live Oak Street, Suite B Beaufort [email protected] 732-520-5000 NC

Conti Enterprises, Inc. Precast 1507 Live Oak Street, Suite B Beaufort [email protected] 732-520-5000 NC

Conti Enterprises, Inc. Site Specialties 1507 Live Oak Street, Suite B Beaufort [email protected] 732-520-5000 NC

Conti Enterprises, Inc. Site Utilities 1507 Live Oak Street, Suite B Beaufort [email protected] 732-520-5000 NC

X Conti Enterprises, Inc. Structural Steel 1507 Live Oak Street, Suite B Beaufort [email protected] 732-520-5000 NC

Cook & Boardman LLC dba Pinnacle Door & Hardware Door Frames and Hardware 2165 Sunnydale Blvd Clearwater Emilio Bendever [email protected] 727-447-7300 FL

Cook & Boardman LLC dba Pinnacle Door & Hardware Building Specialties 2165 Sunnydale Blvd Clearwater Emilio Bendever [email protected] 727-447-7300 FL

X Cook & Boardman LLC dba Pinnacle Door & Hardware Toilet Accessories 2165 Sunnydale Blvd Clearwater Emilio Bendever [email protected] 727-447-7300 FL

Coreslab Structures, Inc. Precast 11041 Rocket Blvd Orlando [email protected] 407-855-3190 FL

X Coreslab Structures, Inc. Precast 11041 Rocket Blvd Orlando [email protected] 407-855-3190 FL

X Cornerstone Barricades Inc X X Heavy Highway 3712 NW 84th Dr Gainesville Seyi Falade [email protected] 352-373-8001 FL

Cornerstone Construction Services, Inc. X X Cast in Place Concrete 4205 Edgewater Drive Orlando Amadita Stone [email protected] 407-299-3299 FL

Cornerstone Construction Services, Inc. X X Hoisting 4205 Edgewater Drive Orlando Amadita Stone [email protected] 407-299-3299 FL

Cornerstone Construction Services, Inc. X X Paving 4205 Edgewater Drive Orlando Amadita Stone [email protected] 407-299-3299 FL

Cornerstone Construction Services, Inc. X X Precast 4205 Edgewater Drive Orlando Amadita Stone [email protected] 407-299-3299 FL

X Cornerstone Construction Services, Inc. X X Retaining Walls 4205 Edgewater Drive Orlando Amadita Stone [email protected] 407-299-3299 FL

Corrpro Companies, Inc. Special Construction 4101 Bloomfield Hwy Farmington John Wallace [email protected] 470 539 3495 NM

X Corrpro Companies, Inc. Site Utilities 4101 Bloomfield Hwy Farmington John Wallace [email protected] 470 539 3495 NM

X Creative Management Technology, Inc X X X General Contracting 5380 Hoffner Ave Orlando Michael McKenzie [email protected] (321) 799-4022 FL

X Creative Sign Designs LLC Signage 830 S Ronald Reagan Blvd, Suite 252 Longwood Bryan Vaughn [email protected] 407-508-3066 FL

X Creative Terrazzo Systems, Inc. Tile / Terrazzo 3300 SW 3rd Ave Fort Laurderdale Candace Norville [email protected] 954-767-6372 FL

X Cross Construction Services, Inc. Demolition 25221 Wesley Chapel Blvd Lutz Tyler Lillibridge [email protected] 813-907-1013 FL

Crown Corr, Inc Metal Panels 1255 Terminus Dr, Suite 100 Lithia Springs Dave Pellar [email protected] 219-949-8080 FL

Crown Corr, Inc Glazing 1255 Terminus Dr, Suite 100 Lithia Springs Dave Pellar [email protected] 219-949-8080 FL

X Crown Corr, Inc Column Covers 1255 Terminus Dr, Suite 100 Lithia Springs Dave Pellar [email protected] 219-949-8080 FL

X Cube Care Company X X Window Treatments 6043 NW 167th St, Suite A-23 Hialeah Susana Robledo [email protected] 305-556-8700 FL

X Curry Cabinetry Millwork 4831 E Broadway Ave Tampa Bryan Curry [email protected] 813-321-3650 FL

D&A Construction Group, Inc. X X X Cast In Place Concrete 983 Explorer Cove Altamonte Springs Heather McCandless [email protected] 407-960-4032 FL

D&A Construction Group, Inc. X X X Construction Logistics 983 Explorer Cove Altamonte Springs Heather McCandless [email protected] 407-960-4032 FL

D&A Construction Group, Inc. X X X Gypsum Drywall and Ceilings 983 Explorer Cove Altamonte Springs Heather McCandless [email protected] 407-960-4032 FL

D&A Construction Group, Inc. X X X Masonry 983 Explorer Cove Altamonte Springs Heather McCandless [email protected] 407-960-4032 FL

D&A Construction Group, Inc. X X X Miscellaneous Metals 983 Explorer Cove Altamonte Springs Heather McCandless [email protected] 407-960-4032 FL

D&A Construction Group, Inc. X X X Painting 983 Explorer Cove Altamonte Springs Heather McCandless [email protected] 407-960-4032 FL

D&A Construction Group, Inc. X X X Paving 983 Explorer Cove Altamonte Springs Heather McCandless [email protected] 407-960-4032 FL

D&A Construction Group, Inc. X X X Rough Carpentry 983 Explorer Cove Altamonte Springs Heather McCandless [email protected] 407-960-4032 FL

D&A Construction Group, Inc. X X X General Contracting 983 Explorer Cove Altamonte Springs Heather McCandless [email protected] 407-960-4033 FL

X D&A Construction Group, Inc. X X X Waterproofing and Caulking 983 Explorer Cove Altamonte Springs Heather McCandless [email protected] 407-960-4032 FL

X D&A Window Cleaning Services, Inc. X Construction Logistics 321 Georgia Ave, Longwood Rudy Perez [email protected] 407-831-5388 FL

X D.H. Pace Company, Inc. dba D.H. Pace Door Services Coiling Grilles and Doors 3839 St Valentine Way, Orlando Robert Rosser [email protected] 407-563-3668 FL

Dannix Painting, LLC X Painting 11562 Old Highway 61 North Robinsonville [email protected] 314-535-6600 MS

X Dannix Painting, LLC X Traffic Topping / Sealer 11562 Old Highway 61 North Robinsonville [email protected] 314-535-6600 MS

X Dant Clayton Corportation Miscellaneous Metals 1500 Bernheim Lane Louisville Alex Tuttle [email protected] (502) 634-3626 KY

David Allen Company Flooring 150 Rush St Raleigh Shane Wycuff [email protected] 919-821-7100 NC

X David Allen Company Tile / Terrazzo 151 Rush St Raleigh Shane Wycuff [email protected] 919-821-7101 NC

X Dayton Superior Corporation Cast in Place Concrete 11176 Boggy Creek Road Orlando Eric Erikson [email protected] 407-854-6193 FL

Page 187: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

Company Name MWBE LDB VBE DBE Trades Address City Contact Email Phone State

Hensel Phelps

South Terminal C Phase 1 Airside/Concourse

PREQUALIFIED SUBCONTRACTORS/SUPPLIERS

Firms Approved by PSC

Deatrick Engineering Associates, Inc. Architect and Engineer Services 9425 Tradeport Drive Orlando Warren Deatrick [email protected] 407-851-9776 FL

X Deatrick Engineering Associates, Inc. Testing And Inspection 9425 Tradeport Drive Orlando Warren Deatrick [email protected] 407-851-9776 FL

X Del-Air Mechanical 531 Codisco Way Sanford Jeff Carter [email protected] 407-775-0331 FL

X Delaware Elevator of Florida, Inc. Conveying Systems 100 NW 28th St, Bldg #C-6 Boca Raton [email protected] 407-832-4197 FL

Demetrius Shack's Painting Service, Inc. X Flooring 11154 Losco Junction Dr South Jacksonville Demetrius Shack [email protected] (904) 910-7589 FL

Demetrius Shack's Painting Service, Inc. X Painting 11154 Losco Junction Dr South Jacksonville Demetrius Shack [email protected] (904) 910-7589 FL

X Demetrius Shack's Painting Service, Inc. X Waterproofing and Caulking 11154 Losco Junction Dr South Jacksonville Demetrius Shack [email protected] (904) 910-7589 FL

Designers West Interiors, Inc. X X X Flooring 5609 South Orange Ave. Orlando Kristin Becker [email protected] 321-258-1208 FL

X Designers West Interiors, Inc. X X X Tile / Terrazzo 5609 South Orange Ave. Orlando Kristin Becker [email protected] 321-258-1208 FL

X Detail Dynamic of Florida. Inc. X X X Construction Logistics P.O. Box 470249 Lake Monroe Pam Olson [email protected] 407-322-7911 FL

X DFI Bridge Corporation General Contracting 5055 Babcock St., N.E., Suite 4 Palm Bay Dan Hughes [email protected] 321-727-7100 FL

X DH Griffin Demolition 14135 W Colonial Dr Winter Garden Brad Douglas [email protected] 334-664-0401 FL

X Diebold, Incorporated (Security Systems) Electrical 5995 Mayfair Rd North Canton [email protected] 386-527-4504 OH

X Divi10n Ten Specialties Inc Building Specialties 947 Josiane Ct, 1010, Altamonte Springs Dave Riley [email protected] 407-539-1303 FL

Division 7 Fireproofing 2773 B M Montgomery St Birmingham Tom Champagne [email protected] 205-803-1007 AL

X Division 7 Waterproofing and Caulking 2773 B M Montgomery St Birmingham Tom Champagne [email protected] 205-803-1007 AL

X Don Bell Signs, LLC Signage 365 Oak Place Port Orange Mandy Moore [email protected] 386-788-8084 FL

X Doyle Dickerson Terrazzo Tile / Terrazzo 1709 University Commercial Place Charlotte Stan Cociug [email protected] 704-921-4940 FL

X DPT Construction, Inc. X Painting 3112 Great Oaks Blvd Kissimmee Hector Espitia [email protected] (321) 229-1671 FL

X DuraServ Corp Coiling Grilles and Doors 11431 Ferrell Dr, Suite200 Farmers Branch Mark Gibson [email protected] 214-217-2952 TX

X Dusoul Company Inc Technical Services Audio Visual Low Voltage Systems 775 Barber St Athens Lisa Smith [email protected] 706-613-8759 GA

E&H Steel Corporation Miscellaneous Metals 3635 Highway 134 Midland City Jed Henderson [email protected] 334-983-5636 AL

X E&H Steel Corporation Structural Steel 3635 Highway 134 Midland City Jed Henderson [email protected] 334-983-5636 AL

X EAC Cleaning Services X X X Construction Logistics 7130 S Orange Blossom Trail, Suite 126 Orlando Ella R Drummer [email protected] 407-490-1881 FL

Earth Tech, Inc Earthwork Improvements 2620 Hunt Road Land O Lakes Dan Coxe [email protected] 813-909-800 FL

X Earth Tech, Inc Pressure Grout Soil Improvements 2620 Hunt Road Land O Lakes Dan Coxe [email protected] 813-909-800 FL

East Coast Metal Structures Miscellaneous Metals 635 Gator Dr. Lantana Tami Allmon [email protected] 561-766-2479 FL

X East Coast Metal Structures Structural Steel 635 Gator Dr. Lantana Tami Allmon [email protected] 561-766-2479 FL

X Echo Ues, Inc. X X Architect and Engineer Services 1511 E State Rd 434, Ste. 2001, #252 Winter Springs Carlo Pilia [email protected] 407-388-8269 FL

ECS Limited Architect and Engineer Services 2815 Directors Row, Suite 500 Orlando Rich Haffner [email protected] 407-859-8378 FL

X ECS Limited Testing And Inspection 2815 Directors Row, Suite 500 Orlando Rich Haffner [email protected] 407-859-8378 FL

X Ed Waters and Sons Contracting Company Pile Foundations 3375 Agricultural Center Dr St. Augustine Wayne Waters [email protected] 904-823-8817 FL

Eden Site Development Inc. X Construction Logistics 115 West Pine Ave Longwood Jerry Sell [email protected] 407-265-1113 FL

Eden Site Development Inc. X Dewatering 115 West Pine Ave Longwood Jerry Sell [email protected] 407-265-1113 FL

Eden Site Development Inc. X Earthwork Improvements 115 West Pine Ave Longwood Jerry Sell [email protected] 407-265-1113 FL

Eden Site Development Inc. X Erosion Control/SWPPP 115 West Pine Ave Longwood Jerry Sell [email protected] 407-265-1113 FL

Eden Site Development Inc. X Paving 115 West Pine Ave Longwood Jerry Sell [email protected] 407-265-1113 FL

Eden Site Development Inc. X Site Improvements 115 West Pine Ave Longwood Jerry Sell [email protected] 407-265-1113 FL

Eden Site Development Inc. X Site Utilities 115 West Pine Ave Longwood Jerry Sell [email protected] 407-265-1113 FL

X Eden Site Development Inc. X Striping 115 West Pine Ave Longwood Jerry Sell [email protected] 407-265-1113 FL

X Eidolon Analytic dba Unisource Graphics & Signs X Signage 5711 Halifax Ave Fort Myers [email protected] 239-288-6951 FL

EJ USA, Inc Cementious Siding 301 Spring Street East Jordan Michael Heer [email protected] 800 874 4100 MI

EJ USA, Inc Grating 301 Spring Street East Jordan Michael Heer [email protected] 800 874 4100 MI

X EJ USA, Inc Site Utilities 301 Spring Street East Jordan Michael Heer [email protected] 800 874 4100 MI

X El Big Man LLC X X Hauling 7454 Hollow Ridge Cir Orlando Eliander Salvador [email protected] 407-967-9194 FL

Electric Services, Inc. Duct Bank 1746 US Hwy 441 Leesburg Wood Brazill [email protected] 352-787-1322 FL

Electric Services, Inc. Electrical 1746 US Hwy 441 Leesburg Wood Brazill [email protected] 352-787-1322 FL

X Electric Services, Inc. Site Lighting 1746 US Hwy 441 Leesburg Wood Brazill [email protected] 352-787-1322 FL

X Elite Flooring & Design Inc. Flooring 3480 Green Pointe Parkway Norcross Thomas Zivitz [email protected] (678) 328-2225 GA

Empire Office Flooring 110 Hillcrest St Orlando David Obryan [email protected] 407 509 5656 FL

Empire Office Furnishings and Fixtures 110 Hillcrest St Orlando David Obryan [email protected] 407 509 5656 FL

X Empire Office Tile / Terrazzo 110 Hillcrest St Orlando David Obryan [email protected] 407 509 5656 FL

Enclos Corp Column Covers 10733 Sunset Office Dr, Suite 420 St Louis Rick Hamlin [email protected] 314-596-0004 MO

Enclos Corp Metal Panels 10733 Sunset Office Dr, Suite 420 St Louis Rick Hamlin [email protected] 314-596-0004 MO

Page 188: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

Company Name MWBE LDB VBE DBE Trades Address City Contact Email Phone State

Hensel Phelps

South Terminal C Phase 1 Airside/Concourse

PREQUALIFIED SUBCONTRACTORS/SUPPLIERS

Firms Approved by PSC

Enclos Corp Glazing 10733 Sunset Office Dr, Suite 420 St Louis Rick Hamlin [email protected] 314-596-0004 MO

X Enclos Corp Miscellaneous Metals 10733 Sunset Office Dr, Suite 420 St Louis Rick Hamlin [email protected] 314-596-0004 MO

Endurance Communications & Electrical, LLC X X Demolition 10524 Moss Park Rd, 204-346 Orlando [email protected] 407-930-3736 FL

Endurance Communications & Electrical, LLC X X Electrical 10524 Moss Park Rd, 204-346 Orlando [email protected] 407-930-3736 FL

Endurance Communications & Electrical, LLC X X Site Lighting 10524 Moss Park Rd, 204-346 Orlando [email protected] 407-930-3736 FL

X Endurance Communications & Electrical, LLC X X Site Utilities 10524 Moss Park Rd, 204-346 Orlando [email protected] 407-930-3736 FL

X Energy Air, Inc. Mechanical 5401 Energy Air Ct Orlando David Bridenbaugh [email protected] 407-886-3729 FL

X Environmental Construction, Inc. (ECI) Demolition 5428 56th Commerce Park Blvd Tampa Shaundra Permenter [email protected] 813-621-5400 FL

Environmental Interiors, Inc. Glazing 400 Amherst St, 200 Nashua [email protected] 646-216-1601 NH

Environmental Interiors, Inc. Gypsum Drywall and Ceilings 400 Amherst St, 200 Nashua [email protected] 646-216-1601 NH

X Environmental Interiors, Inc. Special Construction 400 Amherst St, 200 Nashua [email protected] 646-216-1601 NH

Enviro-Tech Systems Inc Architect and Engineer Services 2308 South Parrott Ave Okeechobee Michelle Yates [email protected] 863-763-3143 FL

Enviro-Tech Systems Inc Earthwork Inprovements 2308 South Parrott Ave Okeechobee Michelle Yates [email protected] 863-763-3143 FL

X Enviro-Tech Systems Inc Site Utilities 2308 South Parrott Ave Okeechobee Michelle Yates [email protected] 863-763-3143 FL

Ewing Waterproofing Systems, Inc. Waterproofing and Caulking 2521 NW 74th Pl Gainesville Damon Watson [email protected] (352) 258-3243 FL

X Ewing Waterproofing Systems, Inc. Traffic Topping / Sealer 2521 NW 74th Pl Gainesville Damon Watson [email protected] (352) 258-3243 FL

X Expedition Security Solutions Group, Inc. X Construction Logistics 10524 Moss Park Rd, Suite 204-157, Orlando Stuart Chaffin [email protected] 704-652-8552 FL

F L Crane & Sons Inc Metal Panels 508 S Spring St Fulton Chad Martin [email protected] 662-862-2172 MS

F L Crane & Sons Inc Cementious Siding 508 S Spring St Fulton Chad Martin [email protected] 662-862-2172 MS

F L Crane & Sons Inc Fireproofing 508 S Spring St Fulton Chad Martin [email protected] 662-862-2172 MS

F L Crane & Sons Inc Waterproofing and Caulking 508 S Spring St Fulton Chad Martin [email protected] 662-862-2172 MS

F L Crane & Sons Inc Gypsum Drywall and Ceilings 508 S Spring St Fulton Chad Martin [email protected] 662-862-2172 MS

F L Crane & Sons Inc Insulation 508 S Spring St Fulton Chad Martin [email protected] 662-862-2172 MS

F L Crane & Sons Inc Flooring 508 S Spring St Fulton Chad Martin [email protected] 662-862-2172 MS

X F L Crane & Sons Inc Painting 508 S Spring St Fulton Chad Martin [email protected] 662-862-2172 MS

X FabArc Steel Supply Inc Structural Steel 111 Meadow Lane Oxford Shawn Evans [email protected] 256-831-8770 AL

X FabriTec Structures, LLC Tensile Fabric Canopies 1011 Regal Row Dallas [email protected] 877-887-4233 TX

Fairborn Equipment Company Coiling Grilles and Doors 332 Ponde De Leon Pl Orlando Vincent Buffone [email protected] 888-851-5529 FL

X Fairborn Equipment Company Building Equipment 332 Ponde De Leon Pl Orlando Vincent Buffone [email protected] 888-851-5529 FL

X Fausnight Stripe & Line, Inc. Paving 910 Charles St Longwood Cris [email protected] 407-261-5446 FL

X Ferguson Cabling Low Voltage Systems 203 Orange St, Palm Harbor John Primrose [email protected] 727-470-2802 FL

X Fidelity Security Agency, LLC X X Construction Logistics 618 E South St, Suite 500 Orlando Michael Williams [email protected] 407-791-6113 FL

X Fine Tune Enterprises, Inc. X X X Construction Logistics 639 West Lancaster Road Fort Myers Elvis Diaz [email protected] 407-271-4088 FL

X Fire & Life Safety America, Inc. Fire Protection 2280 Old Lake Mary Rd Sanford [email protected] 407-688-1949 FL

X Fire Safety, Inc. Fire Protection 2721 Old Roosevelt Blvd Clearwater Mina Bayood [email protected] 727-523-1843 FL

Fire Stop Systems, Inc. Fireproofing 4173 Arnold Ave Naples Yanyslet Cruz [email protected] 239-774-3343 FL

X Fire Stop Systems, Inc. Waterproofing and Caulking 4173 Arnold Ave Naples Yanyslet Cruz [email protected] 239-774-3343 FL

X Fire-Seal, LLC. Fireproofing 167 S State St, 250, Westerville Tina Bagnoli [email protected] 614-454-4440 OH

First American Steel Erectors Corporation X X X Miscellaneous Metals 194 S 4th S Lake Mary Kevin Doxtater [email protected] 407-687-1528 FL*

X First American Steel Erectors Corporation Structural Steel 194 S 4th S Lake Mary Kevin Doxtater [email protected] 407-687-1528 FL*

X Fish Construction, Inc. Millwork 9820 Cash Road, Stafford Adam Fish [email protected] 713-206-0227 TX

Five Arrows, Inc., dba Service Painting Corp. Painting 1423 W Long St Orlando Todd Monroe [email protected] 407-872-7555 FL

Five Arrows, Inc., dba Service Painting Corp. Traffic Topping / Sealer 1423 W Long St Orlando Todd Monroe [email protected] 407-872-7555 FL

X Five Arrows, Inc., dba Service Painting Corp. Waterproofing and Caulking 1423 W Long St Orlando Todd Monroe [email protected] 407-872-7555 FL

X Flexible Lifeline Systems Inc Building Equipment 2437 Peyton Rd Houston Jeff Barnum [email protected] 832-448-2900 TX

X Florida CG Solutions, Inc. X X IT Support 4046 N Goldenrod Rd #271, Winter Park Gerard Merritt [email protected] 407-476-3590 FL

X Florida Contract Automated Shading, LLC Window Treatments 14927 W Newberry Rd Newberry Megan Molyneux [email protected] (352) 682-4018 FL

X Florida Detention Systems, Inc Construction Logistics 1296 Southeast 31st Street Melrose Joe Castelvecchi [email protected] 352-256-8405 FL

Florida Door Solutions, Inc. Doors & Hardware 777 South Park Ave Apopka Kent Horsley [email protected] 407-884-5955 FL

X Florida Door Solutions, Inc. Coiling Grilles and Doors 777 South Park Ave Apopka Kent Horsley [email protected] 407-884-5955 FL

X Florida GC Solutions X General Contracting 4980 E 10th Ct Hialeah Edwin Gaitan [email protected] 305-687-9877 FL

Florida Structural Steel Miscellaneous Metals 2710 East 5th Ave Tampa Kevin Sig [email protected] 813-241-4261 FL

X Florida Structural Steel Structural Steel 2710 East 5th Ave Tampa Kevin Sig [email protected] 813-241-4261 FL

X Ford Audio Video Low Voltage Systems 7901 E Riverside Drive, Suite 125 Austin Will Tindle [email protected] 512-447-1103 TX

Page 189: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

Company Name MWBE LDB VBE DBE Trades Address City Contact Email Phone State

Hensel Phelps

South Terminal C Phase 1 Airside/Concourse

PREQUALIFIED SUBCONTRACTORS/SUPPLIERS

Firms Approved by PSC

X G & C Welding Specialist, LLC X X X Miscellaneous Metals 5441 S Bryant Ave Sanford Cory Hunt [email protected] 407-878-2723 FL

G.C. Zarnas & Co, Inc Flooring 850 Jennings St Bethlehem Greg Hoyer [email protected] 610-866-0923 PA

X G.C. Zarnas & Co, Inc Painting 851 Jennings St Bethlehem Greg Hoyer [email protected] 610-866-0924 PA

G.J.P. Enterprises, Inc. Building Materials 4510 E 71st St, Suite #5 Cleveland Joe Conte [email protected] 216-341-2222 OH

X G.J.P. Enterprises, Inc. Gypsum Drywall and Ceilings 4510 E 71st St, Suite #5 Cleveland Joe Conte [email protected] 216-341-2222 OH

Gate Precast Company Precast 810 Sawdust Trl Kissimmee Brian Griffis [email protected] 904-813-6525 FL

X Gate Precast Company Precast 810 Sawdust Trl Kissimmee Brian Griffis [email protected] 904-813-6525 FL

X GE Investigations, Inc. dba GE Protection X X X Construction Logistics 2204 Pinyon Rd Apopka Juan Carlos Robinson [email protected] 407-703-2626 FL

Gem Industries, Inc. X Structural Steel 370 Cox Rd Cocoa Will Ratliff [email protected] 321 631 3977 FL

X Gem Industries, Inc. X Miscellaneous Metals 370 Cox Rd Cocoa Will Ratliff [email protected] 321 631 3977 FL

X General Dynamics Information Technology, Inc Low Voltage Systems 3211 Jermantown Rd Fairfax Matthew Davies [email protected] 405-680-6972 VA

Gibbs & Register, Inc. Cast In Place Concrete 232 South Dillard St Winter Garden Matt Karash [email protected] 407-654-6133 FL

Gibbs & Register, Inc. Concrete Finishing 232 South Dillard St Winter Garden Matt Karash [email protected] 407-654-6133 FL

Gibbs & Register, Inc. Earthwork Improvements 232 South Dillard St Winter Garden Matt Karash [email protected] 407-654-6133 FL

Gibbs & Register, Inc. Paving 232 South Dillard St Winter Garden Matt Karash [email protected] 407-654-6133 FL

Gibbs & Register, Inc. Pile Foundations 232 South Dillard St Winter Garden Matt Karash [email protected] 407-654-6133 FL

Gibbs & Register, Inc. Precast 232 South Dillard St Winter Garden Matt Karash [email protected] 407-654-6133 FL

Gibbs & Register, Inc. Retaining Walls 232 South Dillard St Winter Garden Matt Karash [email protected] 407-654-6133 FL

Gibbs & Register, Inc. Site Improvements 232 South Dillard St Winter Garden Matt Karash [email protected] 407-654-6133 FL

Gibbs & Register, Inc. Site Specialties 232 South Dillard St Winter Garden Matt Karash [email protected] 407-654-6133 FL

Gibbs & Register, Inc. Site Structures 232 South Dillard St Winter Garden Matt Karash [email protected] 407-654-6133 FL

X Gibbs & Register, Inc. Site Utilities 232 South Dillard St Winter Garden Matt Karash [email protected] 407-654-6133 FL

GLF Construction Corporation Cast in Place Concrete 7648 Southland Blvd #100 Orlando David Ammon [email protected] 407-888-8481 FL

GLF Construction Corporation Earthwork Improvements 7648 Southland Blvd #100 Orlando David Ammon [email protected] 407-888-8481 FL

GLF Construction Corporation Hoisting 7648 Southland Blvd #100 Orlando David Ammon [email protected] 407-888-8481 FL

GLF Construction Corporation Paving 7648 Southland Blvd #100 Orlando David Ammon [email protected] 407-888-8481 FL

GLF Construction Corporation Pile Foundations 7648 Southland Blvd #100 Orlando David Ammon [email protected] 407-888-8481 FL

GLF Construction Corporation Retaining Walls 7648 Southland Blvd #100 Orlando David Ammon [email protected] 407-888-8481 FL

X GLF Construction Corporation Site Specialties 7648 Southland Blvd #100 Orlando David Ammon [email protected] 407-888-8481 FL

X Glidepath LLC Conveying Systems 2241 S Watson Rd, Suite 151 Arlington Philip Heacock [email protected] 682-248-3700 TX

X Glomaco, LLC X Building Materials 37 N Orange Ave, Orlando Carlos Bajana [email protected] 407-507-6380 FL

GMF Construction, LLC Miscellaneous Metals 4600 Drane Field Rd Lakeland Jason Hall [email protected] 863-577-0210 FL

X GMF Construction, LLC Structural Steel 4600 Drane Field Rd Lakeland Jason Hall [email protected] 863-577-0210 FL

Gomez Construction Company X Construction Logistics 750 Jackson Ave Winter Park Robert Lacey [email protected] 407-628-4353 FL

Gomez Construction Company X Demolition 750 Jackson Ave Winter Park Robert Lacey [email protected] 407-628-4353 FL

Gomez Construction Company X Doors & Hardware 750 Jackson Ave Winter Park Robert Lacey [email protected] 407-628-4353 FL

Gomez Construction Company X General Contracting 750 Jackson Ave Winter Park Robert Lacey [email protected] 407-628-4353 FL

Gomez Construction Company X Gypsum Drywall and Ceilings 750 Jackson Ave Winter Park Robert Lacey [email protected] 407-628-4353 FL

Gomez Construction Company X Landscaping 750 Jackson Ave Winter Park Robert Lacey [email protected] 407-628-4353 FL

X Gomez Construction Company X Tile / Terrazzo 750 Jackson Ave Winter Park Robert Lacey [email protected] 407-628-4353 FL

X Gordon Sales, Inc. Building Materials 5023 Hazel Jones Rd Bossier City Mason Bowen [email protected] 318-747-8954 LA

Gosalia Concrete Constructors Inc X Cast in Place Concrete 4607 N 56th St Tampa Estimating [email protected] (813) 443-0984 FL

Gosalia Concrete Constructors Inc X Concrete Finishing 4607 N 56th St Tampa Estimating [email protected] (813) 443-0984 FL

Gosalia Concrete Constructors Inc X Concrete Materials 4607 N 56th St Tampa Estimating [email protected] (813) 443-0984 FL

Gosalia Concrete Constructors Inc X Concrete Pavement 4607 N 56th St Tampa Estimating [email protected] (813) 443-0984 FL

Gosalia Concrete Constructors Inc X Paving 4607 N 56th St Tampa Estimating [email protected] (813) 443-0984 FL

Gosalia Concrete Constructors Inc X Pile Foundations 4607 N 56th St Tampa Estimating [email protected] (813) 443-0984 FL

Gosalia Concrete Constructors Inc X Site Improvements 4607 N 56th St Tampa Estimating [email protected] (813) 443-0984 FL

X Gosalia Concrete Constructors Inc X Site Structures 4607 N 56th St Tampa Estimating [email protected] (813) 443-0984 FL

X Granite Telecommunications, LLC Low Voltage Systems 3504 Lake Lynda Dr Orlando James Evans [email protected] 678-322-3978 FL

X Greenery Productions, Inc X Landscaping 1751 Directors Row Orlando Matt Grier [email protected] 407-363-9151 FL

X Griffin Dewatering Corp. Earthwork Improvements 3805 Investment Ln West Palm Beach Dave Handy [email protected] 561-881-5377 FL

X Grunau Company, Inc. Fire Protection 11300 Space Blvd, Suite 4 Orlando [email protected] 407-857-1800 FL

Gulf Mechanical Contractors LLC Mechanical 31643 Executive Boulevard Leesburg Pat Comitz [email protected] 352-460-4176 FL

Page 190: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

Company Name MWBE LDB VBE DBE Trades Address City Contact Email Phone State

Hensel Phelps

South Terminal C Phase 1 Airside/Concourse

PREQUALIFIED SUBCONTRACTORS/SUPPLIERS

Firms Approved by PSC

X Gulf Mechanical Contractors LLC Plumbing 31643 Executive Boulevard Leesburg Pat Comitz [email protected] 352-460-4176 FL

H.L. Pruitt Corp. Electrical 501 Wade St Winter Springs [email protected] 407-327-3848 FL

H.L. Pruitt Corp. Site Lighting 501 Wade St Winter Springs [email protected] 407-327-3848 FL

H.L. Pruitt Corp. Site Utilities 501 Wade St Winter Springs [email protected] 407-327-3848 FL

H.L. Pruitt Corp. Duct Bank 501 Wade St Winter Springs [email protected] 407-327-3848 FL

X H.L. Pruitt Corp. Pile Foundations 501 Wade St Winter Springs [email protected] 407-327-3848 FL

Hamilton Roofing, Inc. Roofing 4000 Old Dixie Hwy Malabar [email protected] 321-729-0548 FL

X Hamilton Roofing, Inc. Rough Carpentry 4000 Old Dixie Hwy Malabar [email protected] 321-729-0548 FL

X Harbinger Sign Signage 5300 Shad Rd, Jacksonville, Jacksonville Larry Meece [email protected] 904-268-4681 FL

X Harmon Inc. Glazing 3361 NW 55th St Fort Lauderdale Mike Moore [email protected] 954-809-6500 FL

Harper Limbach Mechanical 5102 W Laurel St, Suite 800 Tampa [email protected] 813-207-0057 FL

X Harper Limbach Plumbing 5102 W Laurel St, Suite 800 Tampa [email protected] 813-207-0057 FL

X Harris Ventures Inc. dba Staff Zone Survey 2650 Holcomb Bridge Rd, Suite 630 Alpharetta Amanda Albert [email protected] 770-645-6134 FL

Hayward Baker, Inc. Earthwork Improvements 5461 W Waters Ave, Suite 900 Tampa Curtis Cook [email protected] 813-884-3441 FL

Hayward Baker, Inc. Pile Foundations 5461 W Waters Ave, Suite 900 Tampa Curtis Cook [email protected] 813-884-3441 FL

Hayward Baker, Inc. Pressure Grout Soil Improvements 5461 W Waters Ave, Suite 900 Tampa Curtis Cook [email protected] 813-884-3441 FL

X Hayward Baker, Inc. Site Specialties 5461 W Waters Ave, Suite 900 Tampa Curtis Cook [email protected] 813-884-3441 FL

X HD Supply Construction Supply, LTD Building Specialties 501 W Church St Orlando Joseph Ridenhour [email protected] 407-298-7083 FL

Heath & Lineback Engineers, Inc. Architect and Engineer Services 2390 Canton Road Marietta Patti Zachary [email protected] 770 424 1668 GA

Heath & Lineback Engineers, Inc. Construction Logistics 2390 Canton Road Marietta Patti Zachary [email protected] 770 424 1668 GA

X Heath & Lineback Engineers, Inc. Public Information 2390 Canton Road Marietta Patti Zachary [email protected] 770 424 1668 GA

X Heavenly Hearts Cleaning Services, Inc. X X X Construction Logistics 173 Dahlia Village Circle Orlando Regina Rush-Kemper [email protected] 407-399-9729 FL

Henry Incorporated Wire Mesh Partitions 2285 Park Central Boulevard Decatur Jeff Briant [email protected] 770-593-1234 GA

Henry Incorporated Window Treatments 2285 Park Central Boulevard Decatur Jeff Briant [email protected] 770-593-1234 GA

Henry Incorporated Metal Panels 2285 Park Central Boulevard Decatur Jeff Briant [email protected] 770-593-1234 GA

X Henry Incorporated Miscellaneous Metals 2285 Park Central Boulevard Decatur Jeff Briant [email protected] 770-593-1234 GA

Heron Electric, Inc. X X Electrical 4708 W. Concord Avenue Orlando [email protected] 407-296-2550 FL

X Heron Electric, Inc. X X Site Lighting 4708 W. Concord Avenue Orlando [email protected] 407-296-2550 FL

X Hiles Curtain Specialties Inc Window Treatments 2701 Success Dr Odessa Clayton Hile [email protected] 305-556-8700 FL

X Hi-Lite Airfield Services Paving 18249 Hi-Lite Dr Adams Center Dennis Haefner [email protected] 315-583-6111 NY

Hirschfeld Industries Miscellaneous Metals 1901 Gateway Dr, Suite 260 Irving Hokan Amnetag [email protected] 972-518-2173 TX

X Hirschfeld Industries Structural Steel 1901 Gateway Dr, Suite 260 Irving Hokan Amnetag [email protected] 972-518-2173 TX

Hi-Way Paving, Inc Cast In Place Concrete 4343 Weaver Ct Hilliard John Romaine [email protected] 813-967-2956 OH

Hi-Way Paving, Inc Earthwork Improvements 4343 Weaver Ct Hilliard John Romaine [email protected] 813-967-2956 OH

Hi-Way Paving, Inc Paving 4343 Weaver Ct Hilliard John Romaine [email protected] 813-967-2956 OH

Hi-Way Paving, Inc Site Improvements 4343 Weaver Ct Hilliard John Romaine [email protected] 813-967-2956 OH

X Hi-Way Paving, Inc Site Structures 4343 Weaver Ct Hilliard John Romaine [email protected] 813-967-2956 OH

HJ Foundation Company Pile Foundations 8275 NW 80 St Miami [email protected] 305-592-8181 FL

X HJ Foundation Company Pressure Grout Soil Improvements 8275 NW 80 St Miami Mike Smith [email protected] 305-592-8181 FL

X HMB Enterprises LLC X X X Low Voltage Systems 5401 S Kirkman Rd Suite 310 Orlando Harry Bailey [email protected] 678-887-7670 FL

HMB Steel Corp X Miscellaneous Metals 4080 Pines Industrial Ave Rockledge [email protected] 321-636-6511 FL

X HMB Steel Corp X Structural Steel 4080 Pines Industrial Ave Rockledge [email protected] 321-636-6511 FL

X Hollow Metal Specialists Doors & Hardware 740 Apex Road Sarasota Iva Prokajova [email protected] 941-379-1970 FL

X Holman, Inc X X Building Equipment 1855 Cassat Ave Suite #8 Jacksonville Sales Team [email protected] 904-781-4531 FL

Hommes Masonry Inc dba Toltec Construction X X X Cast In Place Concrete 334 E Bay St, Winter Garden Homar Jaimes [email protected] 407-654-2648 FL

X Hommes Masonry Inc dba Toltec Construction X X X Masonry 334 E Bay St, Winter Garden Homar Jaimes [email protected] 407-654-2648 FL

X Honeywell International Inc Low Voltage Systems 3657 Maguire Blvd Orlando Jim Schneider [email protected] 843-735-8892 FL

Hub Steel Miscellaneous Metals 7500 Republic Dr Groveland John Meacham [email protected] 407-581-0665 FL

X Hub Steel Structural Steel 7500 Republic Dr Groveland John Meacham [email protected] 407-581-0665 FL

Hubbard Construction Co Earthwork Improvements 1936 Lee Road Winter Park Jon Ritchey [email protected] 407-645-5500 FL

Hubbard Construction Co Paving 1936 Lee Road Winter Park Jon Ritchey [email protected] 407-645-5500 FL

Hubbard Construction Co Site Improvements 1936 Lee Road Winter Park Jon Ritchey [email protected] 407-645-5500 FL

Hubbard Construction Co Site Structures 1936 Lee Road Winter Park Jon Ritchey [email protected] 407-645-5500 FL

X Hubbard Construction Co Site Utilities 1936 Lee Road Winter Park Jon Ritchey [email protected] 407-645-5500 FL

Page 191: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

Company Name MWBE LDB VBE DBE Trades Address City Contact Email Phone State

Hensel Phelps

South Terminal C Phase 1 Airside/Concourse

PREQUALIFIED SUBCONTRACTORS/SUPPLIERS

Firms Approved by PSC

X Hufcor Inc Operable Partitions 1301 Central Park Dr Sanford Diana Campbell [email protected] 407-302-2286 FL

X HW Davis Construction, Inc. General Contracting 1212 29th St Orlando Jim Beusse [email protected] 407-849-1212 FL

Hypower Inc Electrical 5913 Northwest 31st Avenue Fort Laurderdale Bernard Paul-Hus [email protected] 954-917-1412 FL

Hypower Inc Low Voltage Systems 5913 Northwest 31st Avenue Fort Laurderdale Bernard Paul-Hus [email protected] 954-917-1412 FL

Hypower Inc Site Lighting 5913 Northwest 31st Avenue Fort Laurderdale Bernard Paul-Hus [email protected] 954-917-1412 FL

Hypower Inc Site Specialties 5913 Northwest 31st Avenue Fort Laurderdale Bernard Paul-Hus [email protected] 954-917-1412 FL

X Hypower Inc Site Utilities 5913 Northwest 31st Avenue Fort Laurderdale Bernard Paul-Hus [email protected] 954-917-1412 FL

X Hy-Safe Technology Building Equipment 960 Commerce Dr Union Grove Frank Elmi [email protected] 262-752-2400 WI

Industrial Steel, Inc. Miscellaneous Metals 3561 Industrial Rd Titusville [email protected] 321-267-2341 FL

X Industrial Steel, Inc. Structural Steel 3561 Industrial Rd Titusville [email protected] 321-267-2341 FL

X Infinity Protection Service, Inc X Construction Logistics 121 South Orange Ave #1500 Orlando Adrian Ellis [email protected] (321) 217-6823 FL

Infrastructure Engineers, Inc. Architect and Engineer Services 2121 Old Hickory Tree Rd St Cloud Kerri Ingham [email protected] 817-928-4896 FL

X Infrastructure Engineers, Inc. Construction Logistics 2121 Old Hickory Tree Rd St Cloud Kerri Ingham [email protected] 817-928-4896 FL

Inland Construction and Engineering, Inc. Roofing 309 E 11th St, Panama Kyle Vandergrift [email protected] 850-872-2129 FL

Inland Construction and Engineering, Inc. Waterproofing and Caulking 309 E 11th St, Panama Kyle Vandergrift [email protected] 850-872-2129 FL

Inland Construction and Engineering, Inc. Metal Panels 309 E 11th St, Panama Kyle Vandergrift [email protected] 850-872-2129 FL

X Inland Construction and Engineering, Inc. Miscellaneous Metals 309 E 11th St, Panama Kyle Vandergrift [email protected] 850-872-2129 FL

Inpro Fabrication Corner Guards 5111 E California Pkwy, Fort Worth Matt Gehrke [email protected] 817-926-5050 TX

X Inpro Fabrication Expansion Joint Covers 5111 E California Pkwy, Fort Worth Matt Gehrke [email protected] 817-926-5050 TX

X Integrated Door Systems, Inc. Doors & Hardware 1602 E. Alsobrook St Plant City Emily Schafer [email protected] 813-759-4300 FL

X Intelligent Infrastructure Solutions, LLC Low Voltage Systems 7676 Jean Blvd Fort Myers Thomas Esch [email protected] 239-288-7965 FL

Interior Specialties Inc Wire Mesh Partitions 947 Josiane Ct Altamonte Springs Dave Riley [email protected] 407-539-1303 FL

Interior Specialties Inc Toilet Accessories 947 Josiane Ct Altamonte Springs Dave Riley [email protected] 407-539-1303 FL

Interior Specialties Inc Fire Extinguishers 947 Josiane Ct Altamonte Springs Dave Riley [email protected] 407-539-1303 FL

Interior Specialties Inc Corner Guards 947 Josiane Ct Altamonte Springs Dave Riley [email protected] 407-539-1303 FL

X Interior Specialties Inc Window Treatments 947 Josiane Ct Altamonte Springs Dave Riley [email protected] 407-539-1303 FL

International Flooring, Inc. Flooring 2825 Mercy Dr Orlando Angela Wiley [email protected] 407-296-7465 FL

International Flooring, Inc. Floor Grilles 2825 Mercy Dr Orlando Angela Wiley [email protected] 407-296-7465 FL

X International Flooring, Inc. Tile / Terrazzo 2825 Mercy Dr Orlando Angela Wiley [email protected] 407-296-7465 FL

International Greenscapes LLC Furnishings and Fixtures 180 Vallecitos De Oro San Marcos Nichole Macedo [email protected] 760-631-6789 CA

X International Greenscapes LLC Site Improvements 180 Vallecitos De Oro San Marcos Nichole Macedo [email protected] 760-631-6789 CA

Interstate Sealant & Concrete, Inc. X X Concrete Materials S40 W24211 Rockwood Way Waukesha Sean Leppert [email protected] (262) 547-6316 WI

Interstate Sealant & Concrete, Inc. X X Paving S40 W24211 Rockwood Way Waukesha Sean Leppert [email protected] (262) 547-6316 WI

X Interstate Sealant & Concrete, Inc. X X Waterproofing and Caulking S40 W24211 Rockwood Way Waukesha Sean Leppert [email protected] (262) 547-6316 WI

ION Electric, LLC Electrical 2001 N Andrews Ave, Pompano Sunil Amin [email protected] 954-734-7432 FL

X ION Electric, LLC Low Voltage Systems 2001 N Andrews Ave, Pompano Sunil Amin [email protected] 954-734-7432 FL

ISEC, Inc. Building Equipment 5907 Breckenridge Pkwy, Suite C Tampa Nicholas Reaume [email protected] 813-422-5100 FL

ISEC, Inc. Column Covers 5907 Breckenridge Pkwy, Suite C Tampa Nicholas Reaume [email protected] 813-422-5100 FL

ISEC, Inc. Toilet Accessories 5907 Breckenridge Pkwy, Suite C Tampa Nicholas Reaume [email protected] 813-422-5100 FL

ISEC, Inc. Fire Extinguishers 5907 Breckenridge Pkwy, Suite C Tampa Nicholas Reaume [email protected] 813-422-5100 FL

ISEC, Inc. Corner Guards 5907 Breckenridge Pkwy, Suite C Tampa Nicholas Reaume [email protected] 813-422-5100 FL

ISEC, Inc. Doors & Hardware 5907 Breckenridge Pkwy, Suite C Tampa Nicholas Reaume [email protected] 813-422-5100 FL

ISEC, Inc. Furnishings and Fixtures 5907 Breckenridge Pkwy, Suite C Tampa Nicholas Reaume [email protected] 813-422-5100 FL

ISEC, Inc. Millwork 5907 Breckenridge Pkwy, Suite C Tampa Nicholas Reaume [email protected] 813-422-5100 FL

ISEC, Inc. Miscellaneous Metals 5907 Breckenridge Pkwy, Suite C Tampa Nicholas Reaume [email protected] 813-422-5100 FL

X ISEC, Inc. Metal Panels 5907 Breckenridge Pkwy, Suite C Tampa Nicholas Reaume [email protected] 813-422-5100 FL

Ivey Construction Inc. Miscellaneous Metals 4060 N Courtenay Pkwy Merritt Island Jessica Fratrik [email protected] 321-453-3812 FL

X Ivey Construction Inc. Structural Steel 4060 N Courtenay Pkwy Merritt Island Jessica Fratrik [email protected] 321-453-3812 FL

IWR North America, LLC Glazing 1054 Central Industrial Dr St. Louis Dennis Papke [email protected] (314) 633-4958 MO

IWR North America, LLC Metal Panels 1054 Central Industrial Dr St. Louis Dennis Papke [email protected] (314) 633-4958 MO

IWR North America, LLC Roofing 1054 Central Industrial Dr St. Louis Dennis Papke [email protected] (314) 633-4958 MO

X IWR North America, LLC Skylights 1054 Central Industrial Dr St. Louis Dennis Papke [email protected] (314) 633-4958 MO

J. Costa Group LLC X X X Flooring 2750 Taylor Ave, Suite 206 Orlando Jose Costa [email protected] 407-467-8758 FL

J. Costa Group LLC X X X Building Specialties 2750 Taylor Ave, Suite 206 Orlando Jose Costa [email protected] 407-467-8758 FL

Page 192: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

Company Name MWBE LDB VBE DBE Trades Address City Contact Email Phone State

Hensel Phelps

South Terminal C Phase 1 Airside/Concourse

PREQUALIFIED SUBCONTRACTORS/SUPPLIERS

Firms Approved by PSC

X J. Costa Group LLC X X X Doors & Hardware 2750 Taylor Ave, Suite 206 Orlando Jose Costa [email protected] 407-467-8758 FL

J. Mori Painting, Inc. X Painting 2561 W 80th St Hialeah [email protected] 305-825-7144 FL

X J. Mori Painting, Inc. X Traffic Topping / Sealer 2561 W 80th St Hialeah [email protected] 305-825-7144 FL

X JBS Engineering Technical Services, Inc. X X Testing and Inspection 15 Windsormere Way #200 Oviedo Jelinda Boles [email protected] 407-947-4196 FL

X JBT Airway Services Conveying Systems 1805 2550 South Street Ogden Tony Torres [email protected] 801-627-6600 UT

JCB Construction, Inc. X X Construction Logistics 800 West Gore St Orlando Gratten White [email protected] 407-425-9880 FL

JCB Construction, Inc. X X Dewatering 800 West Gore St Orlando Gratten White [email protected] 407-425-9880 FL

JCB Construction, Inc. X X Earthwork Improvements 800 West Gore St Orlando Gratten White [email protected] 407-425-9880 FL

JCB Construction, Inc. X X Erosion Control/SWPPP 800 West Gore St Orlando Gratten White [email protected] 407-425-9880 FL

JCB Construction, Inc. X X General Contracting 800 West Gore St Orlando Gratten White [email protected] 407-425-9880 FL

JCB Construction, Inc. X X Pond Liners 800 West Gore St Orlando Gratten White [email protected] 407-425-9880 FL

JCB Construction, Inc. X X Site Specialties 800 West Gore St Orlando Gratten White [email protected] 407-425-9880 FL

X JCB Construction, Inc. X X Site Utilities 800 West Gore St Orlando Gratten White [email protected] 407-425-9880 FL

X JK2 Construction & Scenic Millwork 541 Live Pine Circle Apopka Tim Bartell [email protected] 407-703-8997 FL

X JMR Surveying Group Architect and Engineer Services 345 Meadow Green Dr Davenport Jerry Rinnert [email protected] 863-420-9617 FL

X John B Webb & Associates, Inc. X X X Survey 925 S. Denning Drive Winter Park Jacqueline Webb [email protected] 407-622-9322 FL

Johnson Bros. Corporation, a Southland Company Cast In Place Concrete 2462 W Sand Lake Rd Orlando Joe Coleman [email protected] 407-248-9208 FL

Johnson Bros. Corporation, a Southland Company Earthwork Improvements 2462 W Sand Lake Rd Orlando Joe Coleman [email protected] 407-248-9208 FL

Johnson Bros. Corporation, a Southland Company General Contracting 2462 W Sand Lake Rd Orlando Joe Coleman [email protected] 407-248-9208 FL

Johnson Bros. Corporation, a Southland Company Precast 2462 W Sand Lake Rd Orlando Joe Coleman [email protected] 407-248-9208 FL

Johnson Bros. Corporation, a Southland Company Retaining Walls 2462 W Sand Lake Rd Orlando Joe Coleman [email protected] 407-248-9208 FL

Johnson Bros. Corporation, a Southland Company Site Utilities 2462 W Sand Lake Rd Orlando Joe Coleman [email protected] 407-248-9208 FL

X Johnson Bros. Corporation, a Southland Company Structural Steel 2462 W Sand Lake Rd Orlando Joe Coleman [email protected] 407-248-9208 FL

X Johnson Controls Low Voltage Systems 1025 S Crystal Lake Dr Orlando Matthew Musheno [email protected] 770-241-3286 FL

Johnson-Laux Construction, LLC X X Building Specialties 8100 Chancellor Dr, Suite 165 Orlando Kevin Johnson [email protected] 407-770-2180 FL

Johnson-Laux Construction, LLC X X Cast In Place Concrete 8100 Chancellor Dr, Suite 165 Orlando Kevin Johnson [email protected] 407-770-2180 FL

Johnson-Laux Construction, LLC X X Construction Logistics 8100 Chancellor Dr, Suite 165 Orlando Kevin Johnson [email protected] 407-770-2180 FL

Johnson-Laux Construction, LLC X X Dewatering 8100 Chancellor Dr, Suite 165 Orlando Kevin Johnson [email protected] 407-770-2180 FL

Johnson-Laux Construction, LLC X X Doors & Hardware 8100 Chancellor Dr, Suite 165 Orlando Kevin Johnson [email protected] 407-770-2180 FL

Johnson-Laux Construction, LLC X X Earthwork Improvements 8100 Chancellor Dr, Suite 165 Orlando Kevin Johnson [email protected] 407-770-2180 FL

Johnson-Laux Construction, LLC X X Electrical 8100 Chancellor Dr, Suite 165 Orlando Kevin Johnson [email protected] 407-770-2180 FL

Johnson-Laux Construction, LLC X X Erosion Control/SWPPP 8100 Chancellor Dr, Suite 165 Orlando Kevin Johnson [email protected] 407-770-2180 FL

Johnson-Laux Construction, LLC X X Fire Protection 8100 Chancellor Dr, Suite 165 Orlando Kevin Johnson [email protected] 407-770-2180 FL

Johnson-Laux Construction, LLC X X Flooring 8100 Chancellor Dr, Suite 165 Orlando Kevin Johnson [email protected] 407-770-2180 FL

Johnson-Laux Construction, LLC X X Glazing 8100 Chancellor Dr, Suite 165 Orlando Kevin Johnson [email protected] 407-770-2180 FL

Johnson-Laux Construction, LLC X X Guard Rails & Barriers 8100 Chancellor Dr, Suite 165 Orlando Kevin Johnson [email protected] 407-770-2180 FL

Johnson-Laux Construction, LLC X X Gypsum Drywall and Ceilings 8100 Chancellor Dr, Suite 165 Orlando Kevin Johnson [email protected] 407-770-2180 FL

Johnson-Laux Construction, LLC X X Landscaping 8100 Chancellor Dr, Suite 165 Orlando Kevin Johnson [email protected] 407-770-2180 FL

Johnson-Laux Construction, LLC X X Masonry 8100 Chancellor Dr, Suite 165 Orlando Kevin Johnson [email protected] 407-770-2180 FL

Johnson-Laux Construction, LLC X X Mechanical 8100 Chancellor Dr, Suite 165 Orlando Kevin Johnson [email protected] 407-770-2180 FL

Johnson-Laux Construction, LLC X X Miscellaneous Metals 8100 Chancellor Dr, Suite 165 Orlando Kevin Johnson [email protected] 407-770-2180 FL

Johnson-Laux Construction, LLC X X Painting 8100 Chancellor Dr, Suite 165 Orlando Kevin Johnson [email protected] 407-770-2180 FL

Johnson-Laux Construction, LLC X X Paving 8100 Chancellor Dr, Suite 165 Orlando Kevin Johnson [email protected] 407-770-2180 FL

Johnson-Laux Construction, LLC X X Plumbing 8100 Chancellor Dr, Suite 165 Orlando Kevin Johnson [email protected] 407-770-2180 FL

Johnson-Laux Construction, LLC X X Precast 8100 Chancellor Dr, Suite 165 Orlando Kevin Johnson [email protected] 407-770-2180 FL

Johnson-Laux Construction, LLC X X Roofing 8100 Chancellor Dr, Suite 165 Orlando Kevin Johnson [email protected] 407-770-2180 FL

Johnson-Laux Construction, LLC X X Rough Carpentry 8100 Chancellor Dr, Suite 165 Orlando Kevin Johnson [email protected] 407-770-2180 FL

Johnson-Laux Construction, LLC X X Site Lighting 8100 Chancellor Dr, Suite 165 Orlando Kevin Johnson [email protected] 407-770-2180 FL

Johnson-Laux Construction, LLC X X Site Specialties 8100 Chancellor Dr, Suite 165 Orlando Kevin Johnson [email protected] 407-770-2180 FL

Johnson-Laux Construction, LLC X X Site Utilities 8100 Chancellor Dr, Suite 165 Orlando Kevin Johnson [email protected] 407-770-2180 FL

Johnson-Laux Construction, LLC X X Skylights 8100 Chancellor Dr, Suite 165 Orlando Kevin Johnson [email protected] 407-770-2180 FL

Johnson-Laux Construction, LLC X X Striping 8100 Chancellor Dr, Suite 165 Orlando Kevin Johnson [email protected] 407-770-2180 FL

Johnson-Laux Construction, LLC X X Structural Steel 8100 Chancellor Dr, Suite 165 Orlando Kevin Johnson [email protected] 407-770-2180 FL

Johnson-Laux Construction, LLC X X Survey 8100 Chancellor Dr, Suite 165 Orlando Kevin Johnson [email protected] 407-770-2180 FL

Page 193: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

Company Name MWBE LDB VBE DBE Trades Address City Contact Email Phone State

Hensel Phelps

South Terminal C Phase 1 Airside/Concourse

PREQUALIFIED SUBCONTRACTORS/SUPPLIERS

Firms Approved by PSC

Johnson-Laux Construction, LLC X X Tensile Fabric Canopies 8100 Chancellor Dr, Suite 165 Orlando Kevin Johnson [email protected] 407-770-2180 FL

Johnson-Laux Construction, LLC X X Tile / Terrazzo 8100 Chancellor Dr, Suite 165 Orlando Kevin Johnson [email protected] 407-770-2180 FL

Johnson-Laux Construction, LLC X X Traffic Topping / Sealer 8100 Chancellor Dr, Suite 165 Orlando Kevin Johnson [email protected] 407-770-2180 FL

X Johnson-Laux Construction, LLC X X Waterproofing and Caulking 8100 Chancellor Dr, Suite 165 Orlando Kevin Johnson [email protected] 407-770-2180 FL

Jordan Brothers Construction d/b/a Jordan Companies Cast In Place Concrete 189 South Orange Ave Suite 1550-S Orlando Dan Shaffer [email protected] 407-226-8840 FL

Jordan Brothers Construction d/b/a Jordan Companies Construction Logistics 189 South Orange Ave Suite 1550-S Orlando Dan Shaffer [email protected] 407-226-8840 FL

Jordan Brothers Construction d/b/a Jordan Companies Earthwork Improvements 189 South Orange Ave Suite 1550-S Orlando Dan Shaffer [email protected] 407-226-8840 FL

Jordan Brothers Construction d/b/a Jordan Companies Paving 189 South Orange Ave Suite 1550-S Orlando Dan Shaffer [email protected] 407-226-8840 FL

Jordan Brothers Construction d/b/a Jordan Companies Precast 189 South Orange Ave Suite 1550-S Orlando Dan Shaffer [email protected] 407-226-8840 FL

Jordan Brothers Construction d/b/a Jordan Companies Site Improvements 189 South Orange Ave Suite 1550-S Orlando Dan Shaffer [email protected] 407-226-8840 FL

Jordan Brothers Construction d/b/a Jordan Companies Site Specialties 189 South Orange Ave Suite 1550-S Orlando Dan Shaffer [email protected] 407-226-8840 FL

Jordan Brothers Construction d/b/a Jordan Companies Site Structures 189 South Orange Ave Suite 1550-S Orlando Dan Shaffer [email protected] 407-226-8840 FL

X Jordan Brothers Construction d/b/a Jordan Companies Site Utilities 189 South Orange Ave Suite 1550-S Orlando Dan Shaffer [email protected] 407-226-8840 FL

Jr. Davis Construction Company, Inc. Dewatering 210 S Hoagland Blvd Kissimmee Tyson Snyder [email protected] 407-870-0066 FL

Jr. Davis Construction Company, Inc. Earthwork Improvements 210 S Hoagland Blvd Kissimmee Tyson Snyder [email protected] 407-870-0066 FL

Jr. Davis Construction Company, Inc. Electrical 210 S Hoagland Blvd Kissimmee Tyson Snyder [email protected] 407-870-0066 FL

Jr. Davis Construction Company, Inc. Erosion Control/SWPPP 210 S Hoagland Blvd Kissimmee Tyson Snyder [email protected] 407-870-0066 FL

Jr. Davis Construction Company, Inc. Paving 210 S Hoagland Blvd Kissimmee Tyson Snyder [email protected] 407-870-0066 FL

Jr. Davis Construction Company, Inc. Site Utilities 210 S Hoagland Blvd Kissimmee Tyson Snyder [email protected] 407-870-0066 FL

X Jr. Davis Construction Company, Inc. Striping 210 S Hoagland Blvd Kissimmee Tyson Snyder [email protected] 407-870-0066 FL

X JSC Systems Low Voltage Systems 1985 Corporate Square Orlando Patrick Swihart [email protected] 904-737-3511 FL

Juve Construction Inc Carpentry 910 Lewis Pl Longwood Juventino Leos [email protected] (407) 304-9838 FL

Juve Construction Inc Concrete Materials 910 Lewis Pl Longwood Juventino Leos [email protected] (407) 304-9838 FL

Juve Construction Inc Construction Logistics 910 Lewis Pl Longwood Juventino Leos [email protected] (407) 304-9838 FL

X Juve Construction Inc Gypsum Drywall and Ceilings 910 Lewis Pl Longwood Juventino Leos [email protected] (407) 304-9838 FL

JWP Iron and Fence, LLC X X X Miscellaneous Metals 629 Carpenter Road Orlando [email protected] 917-991-9052 FL

X JWP Iron and Fence, LLC X X X Site Specialties 629 Carpenter Road Orlando [email protected] 917-991-9052 FL

K & M Electrics1 Inc. X X X Electrical 6415 Undine Way, Orlando Mike Donastorg [email protected] 407-468-2550 FL

X K & M Electrics1 Inc. X X X Low Voltage Systems 6415 Undine Way, Orlando Mike Donastorg [email protected] 407-468-2550 FL

KBC Construction, LLC X X X Earthwork Improvements 6220 S. Orange Blossom Trail, Suite 171 Orlando Bijay Panigrahi [email protected] 407-506-4015 FL

KBC Construction, LLC X X X Site Improvements 6220 S. Orange Blossom Trail, Suite 171 Orlando Bijay Panigrahi [email protected] 407-506-4015 FL

KBC Construction, LLC X X X Site Structures 6220 S. Orange Blossom Trail, Suite 171 Orlando Bijay Panigrahi [email protected] 407-506-4015 FL

X KBC Construction, LLC X X X Site Utilities 6220 S. Orange Blossom Trail, Suite 171 Orlando Bijay Panigrahi [email protected] 407-506-4015 FL

X KBI Staffing Solutions LLC X X X Construction Logistics PO Box 950297 Lake Mary Tiffany Hughes [email protected] 407-506-4015 FL

KEAR Civil Corporation Fuel Systems 18 Commerce Dr Danbury Matt Smith [email protected] 623-742-2322 CT

KEAR Civil Corporation Paving 18 Commerce Dr Danbury Matt Smith [email protected] 623-742-2322 CT

X KEAR Civil Corporation Site Utilities 18 Commerce Dr Danbury Matt Smith [email protected] 623-742-2322 CT

Keenan Hopkins Schmidt & Stowell Contractors, Inc Cementious Siding 5422 Bay Center Dr Tampa Neal Harris [email protected] 407-425-5550 FL

X Keenan Hopkins Schmidt & Stowell Contractors, Inc Gypsum Drywall and Ceilings 5422 Bay Center Dr Tampa Neal Harris [email protected] 407-425-5550 FL

Kenpat Central Florida, LLC Gypsum Drywall and Ceilings 516 Cooper Commerce Dr Apopka Philip Klote [email protected] 407-464-7070 FL

X Kenpat Central Florida, LLC Fireproofing 516 Cooper Commerce Dr Apopka Philip Klote [email protected] 407-464-7070 FL

X Kenpat Fireproofing, LLC Fire Protection 516 Cooper Commerce Dr Apopka Philip Klote [email protected] 407-464-7070 FL

Kiewit Infrastructures South Co. Cast In Place Concrete 1580 Sawgrass Corporate Pwy, Ste 300 Sunrise Tom Thorn [email protected] 954-835-2228 FL

Kiewit Infrastructures South Co. Construction Logistics 1580 Sawgrass Corporate Pwy, Ste 300 Sunrise Tom Thorn [email protected] 954-835-2228 FL

Kiewit Infrastructures South Co. Dewatering 1580 Sawgrass Corporate Pwy, Ste 300 Sunrise Tom Thorn [email protected] 954-835-2228 FL

Kiewit Infrastructures South Co. Earthwork Improvements 1580 Sawgrass Corporate Pwy, Ste 300 Sunrise Tom Thorn [email protected] 954-835-2228 FL

Kiewit Infrastructures South Co. Electrical 1580 Sawgrass Corporate Pwy, Ste 300 Sunrise Tom Thorn [email protected] 954-835-2228 FL

Kiewit Infrastructures South Co. Erosion Control/SWPPP 1580 Sawgrass Corporate Pwy, Ste 300 Sunrise Tom Thorn [email protected] 954-835-2228 FL

Kiewit Infrastructures South Co. General Contracting 1580 Sawgrass Corporate Pwy, Ste 300 Sunrise Tom Thorn [email protected] 954-835-2228 FL

Kiewit Infrastructures South Co. Guard Rails & Barriers 1580 Sawgrass Corporate Pwy, Ste 300 Sunrise Tom Thorn [email protected] 954-835-2228 FL

Kiewit Infrastructures South Co. Paving 1580 Sawgrass Corporate Pwy, Ste 300 Sunrise Tom Thorn [email protected] 954-835-2228 FL

Kiewit Infrastructures South Co. Pile Foundations 1580 Sawgrass Corporate Pwy, Ste 300 Sunrise Tom Thorn [email protected] 954-835-2228 FL

Kiewit Infrastructures South Co. Pond Liners 1580 Sawgrass Corporate Pwy, Ste 300 Sunrise Tom Thorn [email protected] 954-835-2228 FL

Kiewit Infrastructures South Co. Precast 1580 Sawgrass Corporate Pwy, Ste 300 Sunrise Tom Thorn [email protected] 954-835-2228 FL

Page 194: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

Company Name MWBE LDB VBE DBE Trades Address City Contact Email Phone State

Hensel Phelps

South Terminal C Phase 1 Airside/Concourse

PREQUALIFIED SUBCONTRACTORS/SUPPLIERS

Firms Approved by PSC

Kiewit Infrastructures South Co. Precast 1580 Sawgrass Corporate Pwy, Ste 300 Sunrise Tom Thorn [email protected] 954-835-2228 FL

Kiewit Infrastructures South Co. Site Specialties 1580 Sawgrass Corporate Pwy, Ste 300 Sunrise Tom Thorn [email protected] 954-835-2228 FL

Kiewit Infrastructures South Co. Site Structures 1580 Sawgrass Corporate Pwy, Ste 300 Sunrise Tom Thorn [email protected] 954-835-2228 FL

Kiewit Infrastructures South Co. Site Utilities 1580 Sawgrass Corporate Pwy, Ste 300 Sunrise Tom Thorn [email protected] 954-835-2228 FL

Kiewit Infrastructures South Co. Structural Steel 1580 Sawgrass Corporate Pwy, Ste 300 Sunrise Tom Thorn [email protected] 954-835-2228 FL

X Kiewit Infrastructures South Co. Tensile Fabric Canopies 1580 Sawgrass Corporate Pwy, Ste 300 Sunrise Tom Thorn [email protected] 954-835-2228 FL

X King Construction and Energy Management X General Contracting 4174 Lake Ned Village Cir Cypress Gardens Bob Garrett [email protected] 407-300-9832 FL

X King Intelligence and Security Services, Inc. X Construction Logistics 2880 W Oakland Park Blvd, 211, Oakland Park Kaola King [email protected] 954-302-2600 FL

X Kinley Construction System Fuel Systems 7301 Commercial Blvd E Arlington Lawrence Crisafulli [email protected] 817-461-2100 TX

X Kirby Rentals LLC Construction Logistics 411 Hames Ave Orlando Rebecca Boaz [email protected] 407-422-1000 FL

Kirlin Florida, LLC Mechanical 3125 West Commercial Blvd, Suite 200 Fort Lauderdale [email protected] 954-739-8100 FL

Kirlin Florida, LLC Plumbing 3125 West Commercial Blvd, Suite 200 Fort Lauderdale [email protected] 954-739-8100 FL

X Kirlin Florida, LLC Fire Protection 3125 West Commercial Blvd, Suite 200 Fort Lauderdale [email protected] 954-739-8100 FL

Kistler McDougall Corporation Metal Panels 310 Creekstone Ridge Woodstock Angie Monroe [email protected] 770-928-3830 GA

X Kistler McDougall Corporation Miscellaneous Metals 310 Creekstone Ridge Woodstock Angie Monroe [email protected] 770-928-3830 GA

Kobo Utility Construction Corp. Electrical 4 Victory Dr Sandwich Rebecca Curtis [email protected] (508) 888-2255 MA

Kobo Utility Construction Corp. Low Voltage Systems 4 Victory Dr Sandwich Rebecca Curtis [email protected] (508) 888-2255 MA

Kobo Utility Construction Corp. Site Lighting 4 Victory Dr Sandwich Rebecca Curtis [email protected] (508) 888-2255 MA

X Kobo Utility Construction Corp. Special Construction 4 Victory Dr Sandwich Rebecca Curtis [email protected] (508) 888-2255 MA

X KONE, Inc. Conveying Systems 10003 Satellite Blvd, Suite 203 Orlando Taylor Vaughan [email protected] 407-812-8033 FL

X Kratos Public Safety & Security Solutions, Inc Low Voltage Systems 8601 Transport Dr Orlando Marcia Jackson [email protected] 407-364-4817 FL

Krueger International, Inc. Metal Panels 1330 Bellevue St Green Bay Richard Resch [email protected] (920) 468-8100 WI

Krueger International, Inc. Glazing 1330 Bellevue St Green Bay Richard Resch [email protected] (920) 468-8100 WI

X Krueger International, Inc. Furnishings and Fixtures 1330 Bellevue St Green Bay Richard Resch [email protected] (920) 468-8100 WI

L&H Signs, Inc. Site Improvements 425 North 3rd St Reading Quinten Heinly [email protected] 610-750-3639 PA

L&H Signs, Inc. Metal Panels 425 North 3rd St Reading Quinten Heinly [email protected] 610-750-3639 PA

L&H Signs, Inc. Miscellaneous Metals 425 North 3rd St Reading Quinten Heinly [email protected] 610-750-3639 PA

X L&H Signs, Inc. Signage 425 North 3rd St Reading Quinten Heinly [email protected] 610-750-3639 PA

L&S Diversified, LLC X X X Architect and Engineer Services 405 Lake Howell Rd Maitland Sherry Manor [email protected] 407-681-3836 FL

L&S Diversified, LLC X X X Construction Logistics 405 Lake Howell Rd Maitland Sherry Manor [email protected] 407-681-3836 FL

L&S Diversified, LLC X X X Testing And Inspection 405 Lake Howell Rd Maitland Sherry Manor [email protected] 407-681-3836 FL

X L&S Diversified, LLC X X X Survey 405 Lake Howell Rd Maitland Sherry Manor [email protected] 407-681-3836 FL

X L.R.E. Ground Services, Inc. Pressure Grout Soil Improvements 1115 S Main St, Brooksville Dan Stanley [email protected] 352-796-0229 FL

X Labor For Hire Construction Logistics 2345 W Sand Lake Rd, 150 A & B Orlando Marion Lamb [email protected] 407-930-5858 FL

Lake Mechanical Contractors, Inc. Mechanical 343 N Bay St Eustis [email protected] 352-357-3136 FL

X Lake Mechanical Contractors, Inc. Plumbing 343 N Bay St Eustis [email protected] 352-357-3136 FL

X Larry Simmons, Inc. X X X Millwork 249 N Ivey Ln, Suite A Orlando Larry Simmons [email protected] (407) 423-8143 FL

Lavi Industries Corporation Construction Logistics 3034 Cascade Dr Clearwater Juan Baeza [email protected] (661) 219-3132 FL

Lavi Industries Corporation Furnishings and Fixtures 3034 Cascade Dr Clearwater Juan Baeza [email protected] (661) 219-3132 FL

Lavi Industries Corporation Signage 3034 Cascade Dr Clearwater Juan Baeza [email protected] (661) 219-3132 FL

X Lavi Industries Corporation Metal Panels 3034 Cascade Dr Clearwater Juan Baeza [email protected] (661) 219-3132 FL

X LB Transportation Consulting, Inc, X Architect and Engineer Services 130 Barrow St, 418 New York Lena Bansal [email protected] 646-453-9595 NY

Lead Engineering Contractors, LLC X Earthwork Improvements 5201 Blue Lagoon Dr Miami Joanna Flores [email protected] 305-615-3272 FL

X Lead Engineering Contractors, LLC X General Contracting 5201 Blue Lagoon Dr Miami Joanna Flores [email protected] 305-615-3272 FL

Leesburg Concrete Company, Inc Miscellaneous Metals 1335 Thomas Avenue Leesburg George Wilson [email protected] 352-787-4177 FL

X Leesburg Concrete Company, Inc Precast 1335 Thomas Avenue Leesburg George Wilson [email protected] 352-787-4177 FL

Leo's Construction Services, Inc. Doors & Hardware 1146 N Scenic Hwy Lake Wales [email protected] 863-676-3399 FL

Leo's Construction Services, Inc. Gypsum Drywall and Ceilings 1146 N Scenic Hwy Lake Wales [email protected] 863-676-3399 FL

Leo's Construction Services, Inc. Painting 1146 N Scenic Hwy Lake Wales [email protected] 863-676-3399 FL

X Leo's Construction Services, Inc. Rough Carpentry 1146 N Scenic Hwy Lake Wales [email protected] 863-676-3399 FL

Lexicon, Inc d/b/a Prospect Steel Company Miscellaneous Metals 8900 Fourche Dam Pike Little Rock Gary Whitmer [email protected] 501-490-2300 AR

X Lexicon, Inc d/b/a Prospect Steel Company Structural Steel 8900 Fourche Dam Pike Little Rock Gary Whitmer [email protected] 501-490-2300 AR

X Liberty Services Waterproofing and Caulking 722 Sybilwood Cir Winter Springs John Churilla [email protected] FL

Linel A Division of Mestek Inc Metal Panels 101 Linel Dr Mooresville George Petzen [email protected] 317-584-0513 IN

Page 195: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

Company Name MWBE LDB VBE DBE Trades Address City Contact Email Phone State

Hensel Phelps

South Terminal C Phase 1 Airside/Concourse

PREQUALIFIED SUBCONTRACTORS/SUPPLIERS

Firms Approved by PSC

Linel A Division of Mestek Inc Miscellaneous Metals 101 Linel Dr Mooresville George Petzen [email protected] 317-584-0513 IN

X Linel A Division of Mestek Inc Skylights 101 Linel Dr Mooresville George Petzen [email protected] 317-584-0513 IN

X Lotspeich Company, Inc. Gypsum Drywall and Ceilings 16101 NW 54th Ave Miami [email protected] 305-624-7777 FL

Loyal Waterproofing Construction Inc X X Waterproofing and Caulking Hernado Evelyn D'Amato [email protected] 352-601-7747 FL

X Loyal Waterproofing Construction Inc X X Traffic Topping / Sealer Hernado Evelyn D'Amato [email protected] 352-601-7747 FL

Lutron Electronics Co., Inc. Electrical 130 Calle Cuervo San Clemente Jeremy McCavera [email protected] 610-282-3800 CA

Lutron Electronics Co., Inc. Window Treatments 130 Calle Cuervo San Clemente Jeremy McCavera [email protected] 610-282-3800 CA

X Lutron Electronics Co., Inc. Furnishings and Fixtures 130 Calle Cuervo San Clemente Jeremy McCavera [email protected] 610-282-3800 CA

M&M Electric of Central Florida, Inc. X X X Electrical 6100 Canal Rd Lot 26 Orlando Walt Phelan [email protected] 407-982-4464 FL

X M&M Electric of Central Florida, Inc. X X X Site Lighting 6100 Canal Rd Lot 26 Orlando Walt Phelan [email protected] 407-982-4464 FL

M.C.O. Construction and Services, Inc X X Architect and Engineer Services 6600 NW 27th Ave Miami Ann McNeill [email protected] (305) 693-4344 FL

X M.C.O. Construction and Services, Inc X X Special Construction 6600 NW 27th Ave Miami Ann McNeill [email protected] (305) 693-4344 FL

M.E. Jackson Group, Inc. dba Weld Solutions Technology X Conveying Systems 4600 Old Lucerne Park Rd Unit 5 Winter Haven Gregory Jackson [email protected] 863-651-9628 FL*

M.E. Jackson Group, Inc. dba Weld Solutions Technology X Miscellaneous Metals 4600 Old Lucerne Park Rd Unit 5 Winter Haven Gregory Jackson [email protected] 863-651-9628 FL*

X M.E. Jackson Group, Inc. dba Weld Solutions Technology X Structural Steel 4600 Old Lucerne Park Rd Unit 5 Winter Haven Gregory Jackson [email protected] 863-651-9628 FL*

X Maintenance Team Solutions Construction Logistics 4248 Town Center Blvd #1 Orlando Milagros Soto [email protected] 407-668-2803 FL

Malcom Drilling Company, Inc. Dewatering 6426 NW 5th Way Fort Lauderdale Paulina Jaworski [email protected] 954-947-3644 FL

Malcom Drilling Company, Inc. Pile Foundations 6426 NW 5th Way Fort Lauderdale Paulina Jaworski [email protected] 954-947-3644 FL

X Malcom Drilling Company, Inc. Pressure Grout Soil Improvements 6426 NW 5th Way Fort Lauderdale Paulina Jaworski [email protected] 954-947-3644 FL

Mammoth Constructors, LLC Drilling 390 Golden Gem Dr Umatilla Estimating Department [email protected] 352-771-5634 FL

X Mammoth Constructors, LLC Pile Foundations 390 Golden Gem Dr Umatilla Estimating Department [email protected] 352-771-5634 FL

X Master Consulting Engineers, Inc. X X Architect and Engineer Services 5950 Lakehurst Dr, Suite 183 Orlando Armando Castellon [email protected] 813-287-3600 FL

Matcon Construction Services, Inc. X X Cast in Place Concrete 1717 E Busch Blvd Tampa Derek Mateos [email protected] 813-600-5555 FL

Matcon Construction Services, Inc. X X General Contracting 1717 E Busch Blvd Tampa Derek Mateos [email protected] 813-600-5555 FL

Matcon Construction Services, Inc. X X Masonry 1717 E Busch Blvd Tampa Derek Mateos [email protected] 813-600-5555 FL

Matcon Construction Services, Inc. X X Pile Foundations 1717 E Busch Blvd Tampa Derek Mateos [email protected] 813-600-5555 FL

X Matcon Construction Services, Inc. X X Pressure Grout Soil Improvements 1717 E Busch Blvd Tampa Derek Mateos [email protected] 813-600-5555 FL

X Maverick Constructors, LLC X X Miscellaneous Metals 5324 Van Dyke Rd Lutz Carlos Rodriguez [email protected] 813-964-5220 FL

X Maxim Crane Works, L.P. Hoisting 170 N Goldenrod Rd Orlando Sean Spence [email protected] 407-277-5000 FL

MC Dean, Inc. Electrical 400 Martin Luther King Ave Clearwater Matt Kilpatrick [email protected] 703-483-1732 FL

MC Dean, Inc. Low Voltage Systems 400 Martin Luther King Ave Clearwater Matt Kilpatrick [email protected] 703-483-1732 FL

MC Dean, Inc. Site Lighting 400 Martin Luther King Ave Clearwater Matt Kilpatrick [email protected] 703-483-1732 FL

X MC Dean, Inc. Site Utilities 400 Martin Luther King Ave Clearwater Matt Kilpatrick [email protected] 703-483-1732 FL

MC2, Inc. Building Specialties 2290 West Airport Blvd Sanford Russ Escamilla [email protected] 407-859-6802 FL

MC2, Inc. Electrical 2290 West Airport Blvd Sanford Russ Escamilla [email protected] 407-859-6802 FL

MC2, Inc. Fire Protection 2290 West Airport Blvd Sanford Russ Escamilla [email protected] 407-859-6802 FL

MC2, Inc. Mechanical 2290 West Airport Blvd Sanford Russ Escamilla [email protected] 407-859-6802 FL

X MC2, Inc. Low Voltage Systems 2290 West Airport Blvd Sanford Russ Escamilla [email protected] 407-859-6802 FL

X MCC Mechanical Mechanical 531 Cooper Industrial Pkwy, Suite A Apopka [email protected] 225-706-9280 FL

X McCarthy Improvement Company General Contracting 5401 Victoria Ave Davenport Michael Boyle [email protected] 864-918-6126 IA

X McCree Inc General Contractor 500 E Princeton St Orlando Richard McCree [email protected] 407-898-4821 FL

Mcgilvray Mechanical, LLC Fire Protection 2001 N Andrews Ave Pompano Beach Felicia Layuno [email protected] 305-592-5910 FL

Mcgilvray Mechanical, LLC Mechanical 2001 N Andrews Ave Pompano Beach Felicia Layuno [email protected] 305-592-5910 FL

X Mcgilvray Mechanical, LLC Plumbing 2001 N Andrews Ave Pompano Beach Felicia Layuno [email protected] 305-592-5910 FL

X McGrath Rent Corp. DBA Mobile Modular Management Corp. Construction Logistics 1100 Hwy 559 Auburndale Carolyn Prescott [email protected] 863-965-3700 FL

X McNeill Palm, LLC Window Treatments 1191 Eglin Pkwy, Suite C Shalimar Brenda Hamrick [email protected] 850-613-6228 FL

X MDM Services, Inc. X General Contracting 1055 Kathleen Rd Lakeland Dhivy Sathianathan [email protected] (863) 559-8260 FL

Mercon Construction Company Earthwork Improvements 5703 Red Bug Lake Road, #332 Winter Springs Mehrdad Moradi [email protected] 407-260-6710 FL

Mercon Construction Company Paving 5703 Red Bug Lake Road, #332 Winter Springs Mehrdad Moradi [email protected] 407-260-6710 FL

X Mercon Construction Company Site Utilities 5703 Red Bug Lake Road, #332 Winter Springs Mehrdad Moradi [email protected] 407-260-6710 FL

Merit Fasteners Corporation X X Construction Logistics 5416 56th Commerce Park Blvd Tampa Donna Young [email protected] 407-331-4815 FL

Merit Fasteners Corporation X X Miscellaneous Metals 5416 56th Commerce Park Blvd Tampa Donna Young [email protected] 407-331-4815 FL

Merit Fasteners Corporation X X Structural Steel 5416 56th Commerce Park Blvd Tampa Donna Young [email protected] 407-331-4815 FL

X Merit Fasteners Corporation X X Waterproofing and Caulking 5416 56th Commerce Park Blvd Tampa Donna Young [email protected] 407-331-4815 FL

Page 196: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

Company Name MWBE LDB VBE DBE Trades Address City Contact Email Phone State

Hensel Phelps

South Terminal C Phase 1 Airside/Concourse

PREQUALIFIED SUBCONTRACTORS/SUPPLIERS

Firms Approved by PSC

Meryman Environmental, Inc. X Erosion Control/SWPPP 10408 Bloomingdale Ave Riverview Dale Meryman [email protected] 888-626-9551 FL

X Meryman Environmental, Inc. X Landscaping 10408 Bloomingdale Ave Riverview Dale Meryman [email protected] 888-626-9551 FL

Met-Con Miscellaneous Metals 465 Canaveral Groves Blvd Cocoa Hiranand Katari [email protected] 321-632-4880 FL

X Met-Con Structural Steel 465 Canaveral Groves Blvd Cocoa Hiranand Katari [email protected] 321-632-4880 FL

Metromont Corporation Precast 4151 US Hwy 17 S Bartow Eric Scherden [email protected] 863-440-5491 FL

X Metromont Corporation Precast 4151 US Hwy 17 S Bartow Eric Scherden [email protected] 863-440-5491 FL

Mettron Contracting, Inc. X X Earthwork Improvements 6160 Edgewater Drive, Suite I Orlando Caleb Hannah [email protected] 407-313-0757 FL

Mettron Contracting, Inc. X X Fire Protection 6160 Edgewater Drive, Suite I Orlando Caleb Hannah [email protected] 407-313-0757 FL

Mettron Contracting, Inc. X X Plumbing 6160 Edgewater Drive, Suite I Orlando Caleb Hannah [email protected] 407-313-0757 FL

X Mettron Contracting, Inc. X X Site Utilities 6160 Edgewater Drive, Suite I Orlando Caleb Hannah [email protected] 407-313-0757 FL

Midwest Steel, Inc. Miscellaneous Metals 6250 Hazeltine National Dr, Suite 100 Orlando [email protected] 407-473-0283 FL

Midwest Steel, Inc. Precast 6250 Hazeltine National Dr, Suite 100 Orlando [email protected] 407-473-0283 FL

X Midwest Steel, Inc. Structural Steel 6250 Hazeltine National Dr, Suite 100 Orlando [email protected] 407-473-0283 FL

Miller Paneling Metal Panels Fiddlesticks Blvd, #202-312 Ft. Myers Hector Alicea [email protected] 239-247-2812 FL

Miller Paneling Painting Fiddlesticks Blvd, #202-312 Ft. Myers Hector Alicea [email protected] 239-247-2812 FL

Miller Paneling Special Wall Panels Fiddlesticks Blvd, #202-312 Ft. Myers Hector Alicea [email protected] 239-247-2812 FL

X Miller Paneling Cementious Siding Fiddlesticks Blvd, #202-312 Ft. Myers Hector Alicea [email protected] 239-247-2812 FL

X Mills & Nebaraska Doors & Hardware 2721 Regent Ave, Orlando, Orlando BRIDGET PULSIFER [email protected] 407-896-0333 FL

Milton J Wood Fire Protection Fire Protection 3805 Faye Rd Jacksonville Glenn Painter [email protected] 904-353-4055 FL

X Milton J Wood Fire Protection Guard Rails & Barriers 3805 Faye Rd Jacksonville Glenn Painter [email protected] 904-353-4055 FL

X Modern Plumbing Inc. Plumbing 255 Old Sanford Oviedo Rd Winter Springs Doug Patterson [email protected] 407-327-6000 FL

X Modular Building Systems International, LLC X X X Construction Logistics 614 E Highway 50, Suite 326 Clermont Patricia Berk [email protected] 407-905-9951 FL

X Modular Space Corporation dba ModSpace Construction Logistics 1200 Swedesford Rd Berwyn Jimmy Kelley [email protected] 412-584-3586 PA

Moretrench Environmental Services Pile Foundations 189 Jamaica Ln Orlando [email protected] 407-897-8562 FL

Moretrench Environmental Services Pressure Grout Soil Improvements 189 Jamaica Ln Orlando [email protected] 407-897-8562 FL

X Moretrench Environmental Services Site Specialties 189 Jamaica Ln Orlando [email protected] 407-897-8562 FL

Morgan Air Conditioning, LLC X HVAC 14807 N 12th St Lutz Brainard Morgan [email protected] 813 406 1723 FL

Morgan Air Conditioning, LLC X Test And Balance 14807 N 12th St Lutz Brainard Morgan [email protected] 813 406 1723 FL

X Morgan Air Conditioning, LLC X Glazing 14807 N 12th St Lutz Brainard Morgan [email protected] 813 406 1723 FL

Morris-Shea Bridge Co, Inc Pile Foundations 609 20th St S Irondale David Rogers [email protected] 205-956-9518 AL

X Morris-Shea Bridge Co, Inc Pressure Grout Soil Improvements 609 20th St S Irondale David Rogers [email protected] 205-956-9518 AL

Morse Group Electrical 500 W. South St Freeport Sam Myers [email protected] 702-218-1638 IL

X Morse Group Low Voltage Systems 500 W. South St Freeport Sam Myers [email protected] 702-218-1638 IL

Morton Electric, Inc. Electrical 3625 W 1st St Sanford John Armstrong [email protected] 407-830-1000 FL

X Morton Electric, Inc. Site Lighting 3625 W 1st St Sanford John Armstrong [email protected] 407-830-1000 FL

X Mr. Davids Flooring International Flooring St Augustine St Augustine Paul Winter [email protected] 847-250-4700 FL

X MSE Group, LLC X X Architect and Engineer Services 5858 S Semoran Blvd Orlando Paulina Bruck [email protected] (407) 629-8180 FL

MSE2 Inc dba Mader Southeast Gypsum Drywall and Ceilings 2300 E Landstreet Rd Orlando Karl Pearson [email protected] 407-877-8818 FL

X MSE2 Inc dba Mader Southeast Rough Carpentry 2300 E Landstreet Rd Orlando Karl Pearson [email protected] 407-877-8818 FL

X MULE Engineering, Inc. X X X General Contracting 13019 Shadow Bend Ct Winter Garden Michael Ulekowski [email protected] 407-543-6414 FL

Munilla Construction Management, LLC Cast in Place Concrete 6201 SW 70th St, 2nd Floor South Miami Eugenio Jaramillo [email protected] 305-970-1211 FL

Munilla Construction Management, LLC Earthwork Improvements 6201 SW 70th St, 2nd Floor South Miami Eugenio Jaramillo [email protected] 305-970-1211 FL

Munilla Construction Management, LLC General Contracting 6201 SW 70th St, 2nd Floor South Miami Eugenio Jaramillo [email protected] 305-970-1211 FL

Munilla Construction Management, LLC Site Improvements 6201 SW 70th St, 2nd Floor South Miami Eugenio Jaramillo [email protected] 305-970-1211 FL

X Munilla Construction Management, LLC Site Utilities 6201 SW 70th St, 2nd Floor South Miami Eugenio Jaramillo [email protected] 305-970-1211 FL

Musco Sports Lighting, LLC Building Materials 2107 Stewart Rd, Muscatine Trey Rowland [email protected] 641-676-2184 IA

Musco Sports Lighting, LLC Electrical 2107 Stewart Rd, Muscatine Trey Rowland [email protected] 641-676-2184 IA

X Musco Sports Lighting, LLC Site Lighting 2107 Stewart Rd, Muscatine Trey Rowland [email protected] 641-676-2184 IA

Nadic Engineering Services, Inc. X X X Construction Logistics 601 N. Hart Blvd. Orlando Godwin Nnadi [email protected] 407-521-4771 FL

X Nadic Engineering Services, Inc. X X X Architect and Engineer Services 601 N. Hart Blvd. Orlando Godwin Nnadi [email protected] 407-521-4771 FL

X Naej Security Inc X X X Construction Logistics 4700 Millenia Blvd, 175, Orlando Bobby Powell [email protected] 407-509-8907 FL

Nash Plumbing and Mechanical, LLC Mechanical PO Box 98 Coleman John Gallico [email protected] 352-748-1454 FL

X Nash Plumbing and Mechanical, LLC Plumbing PO Box 98 Coleman John Gallico [email protected] 352-748-1454 FL

X National Business Liquidators, Inc. dba Common Sense Office Furniture Services, Inc. Building Materials 390 N. Orange Ave. Suite 150 Orlando Carolyn Carney [email protected] 407-206-5040 FL*

Page 197: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

Company Name MWBE LDB VBE DBE Trades Address City Contact Email Phone State

Hensel Phelps

South Terminal C Phase 1 Airside/Concourse

PREQUALIFIED SUBCONTRACTORS/SUPPLIERS

Firms Approved by PSC

X National Engineering & Repair Corp Flooring 11705 Boyette Rd Riverview Scott Heinzen [email protected] 813-319-3985 FL

X National Plant Lease Corp Landscaping 3093 Caruso Ct, Suite 10 Orlando Harris Lear [email protected] 407-423-5050 FL

X National Surface, Inc. Construction Logistics 5 Papago Circle, Pensacola Trevor Pant [email protected] 850-341-2324 FL*

X Nations Roof Roofing 1313 East Landstreet Road Orlando Rich Nugent [email protected] 678-279-2466 FL

X New Energy Service, Inc. Electrical 3050 S Hopkins Ave Titusville [email protected] 321-269-1124 FL

X Next Generation Scaffold Services, Inc. Construction Logistics 710 Mooney St, Bartow Chelsey Cooper [email protected] 863-578-4174 FL*

X Nicholson Construction Company Pile Foundations 17535 Darby Ln Lutz [email protected] 727-223-5979 FL

X Nortex Modular Leasing and Construction Co. Construction Logistics 555 Jubilee Lane #A Lewisville [email protected] 850-559-4494 TX

North Alabama Fabricating Company, Inc Miscellaneous Metals 4632 Richard Arrington Jr Blvd N Birmingham John Harris [email protected] 205-591-5554 AL

X North Alabama Fabricating Company, Inc Structural Steel 4632 Richard Arrington Jr Blvd N Birmingham John Harris [email protected] 205-591-5554 AL

North American Roofing Services, Inc. Roofing 14205 Riveredge Dr, Suite 600 Tampa Austin Perez [email protected] (800) 551-5602 FL

X North American Roofing Services, Inc. Waterproofing and Caulking 14205 Riveredge Dr, Suite 600 Tampa Austin Perez [email protected] (800) 551-5602 FL

Northern Electric, Inc Electrical 12789 Emerson St Thornton Joshua Williford [email protected] 303-428-6969 CO

X Northern Electric, Inc Low Voltage Systems 12790 Emerson St Thornton Joshua Williford [email protected] 303-428-6970 CO

NOVA Engineering & Environmental LLC Architect and Engineer Services 7999 Mercantile St #14 North Fort Myers Melissa Greczy [email protected] FL

X NOVA Engineering & Environmental LLC Construction Logistics 7999 Mercantile St #14 North Fort Myers Melissa Greczy [email protected] FL

N-RG Cladding, LLC Building Specialties 516 Cooper Commerce Dr Apopka [email protected] 407-410-6002 FL

X N-RG Cladding, LLC Metal Panels 516 Cooper Commerce Dr Apopka [email protected] 407-410-6002 FL

X NSM Florida Enterprises, LLC dba Natural Stone Motif X Millwork 1050 Central Park Dr Sanford Stephen Fiumara [email protected] 407-446-2200 FL

X NW Sign Industries, Inc. Signage 1170 109th Street Grand Praire Suzanne Costanza [email protected] 856-802-1677 TX

X OAI Corporation Building Specialties 4545 W Hillsborough Ave Tampa Shamyl Dicristanziano [email protected] 813-888-8796 FL*

Odyssey Global Cast In Place Concrete Orlando Carl Leneis [email protected] 407-777-6620 FL

X Odyssey Global General Contracting Orlando Carl Leneis [email protected] 407-777-6620 FL

X OHC Environmental Engineering, Inc. X X Architect and Engineer Services 101 S Hoover Blvd, Suite 101 Tampa James Rizk [email protected] 813-626-8156 FL

OLP Construction, Inc. X X Cast in Place Concrete 11189 S Orange Blossom Tr, Ste 105 Orlando Orlando Lorenzo [email protected] 407-384-8377 FL

OLP Construction, Inc. X X Hoisting 11189 S Orange Blossom Tr, Ste 105 Orlando Orlando Lorenzo [email protected] 407-384-8377 FL

X OLP Construction, Inc. X X Paving 11189 S Orange Blossom Tr, Ste 105 Orlando Orlando Lorenzo [email protected] 407-384-8377 FL

X OM Engineering Services, Inc. X X Architect and Engineer Services 621 E Washington St, 8, Orlando Dawn Horn [email protected] 407-704-7815 FL

Orion Management, LLC X Electrical 3245 N Courtenay Pkwy, Suite 17 Merritt Island Jeremy Higginbotham [email protected] 321-453-4668 FL

Orion Management, LLC X Fire Protection 3245 N Courtenay Pkwy, Suite 17 Merritt Island Jeremy Higginbotham [email protected] 321-453-4668 FL

X Orion Management, LLC X Low Voltage Systems 3245 N Courtenay Pkwy, Suite 17 Merritt Island Jeremy Higginbotham [email protected] 321-453-4668 FL

Ortiz Engineered Products Architect and Engineer Services 314 Main St, Suite B Sugarloaf Renee Baran [email protected] 570-501-3780 PA

Ortiz Engineered Products Miscellaneous Metals 314 Main St, Suite B Sugarloaf Renee Baran [email protected] 570-501-3780 PA

X Ortiz Engineered Products Structural Steel 314 Main St, Suite B Sugarloaf Renee Baran [email protected] 570-501-3780 PA

X OTIS Elevator Company Vertical Transportation 55 West Pineloch Ave Orlando Tim Hawthorne [email protected] 407-438-3633 FL

X Owen Electric Electrical 1755 Lakeside Ave St Augustine Ryan Owen [email protected] 904-824-9940 FL

Owen Steel Company, Inc. Miscellaneous Metals 727 Mauney Dr Columbia Scott McCoy [email protected] 803-251-7680 SC

X Owen Steel Company, Inc. Structural Steel 727 Mauney Dr Columbia Scott McCoy [email protected] 803-251-7680 SC

X Owens, Renz & Lee Co., Inc. d/b/a O, R & L Facility Services Construction Logistics 1646 33rd St, Suite 301 Orlando Sheri Valaitis [email protected] (407) 681-2000 FL

P & A Roofing and Sheet Metal, Inc. Miscellaneous Metals 4495 35th St Orlando John Manzella [email protected] 407-650-9541 FL

P & A Roofing and Sheet Metal, Inc. Roofing 4495 35th St Orlando John Manzella [email protected] 407-650-9541 FL

X P & A Roofing and Sheet Metal, Inc. Waterproofing and Caulking 4495 35th St Orlando John Manzella [email protected] 407-650-9541 FL

Pace Electric Inc Electrical 402 Bif Court Orlando Darwin J Yovaish Jr [email protected] 407-855-3200 FL

X Pace Electric Inc Low Voltage Systems 402 Bif Court Orlando Darwin J Yovaish Jr [email protected] 407-855-3200 FL

PAL Environmental Services Demolition 11-02 Queens Plaza South Long Island City Salvatore DiLorenzo [email protected] 718-349-0900 NY

X PAL Environmental Services Fireproofing 11-02 Queens Plaza South Long Island City Salvatore DiLorenzo [email protected] 718-349-0900 NY

X Peachtree Telecommunications International, LLC Electrical 11465 Johns Creek Pkwy, Suite 350 Johns Creek [email protected] 770-242-1970 GA

X Pece of Mind Environmental, Inc. Demolition 1575 Aber Rd Orlando Steve Pece [email protected] 407-568-3456 FL

Percopo Coatings Company, LLC Painting 1608 Cherrywood Ln Longwood Alyssa Davenport [email protected] 407-331-3805 FL

Percopo Coatings Company, LLC Traffic Topping / Sealer 1608 Cherrywood Ln Longwood Alyssa Davenport [email protected] 407-331-3805 FL

X Percopo Coatings Company, LLC Waterproofing and Caulking 1608 Cherrywood Ln Longwood Alyssa Davenport [email protected] 407-331-3805 FL

X Performance Contracting Group Metal Panels 3810 Drane Field Road Lakeland Kimberly Hatley [email protected] 863-644-4738 FL

Phillips and Jordan, Incorporated Dewatering 8940 Gall Blvd Zephyrhills Art Phelps [email protected] 813-783-1132 FL

Phillips and Jordan, Incorporated Earthwork Improvements 8940 Gall Blvd Zephyrhills Art Phelps [email protected] 813-783-1132 FL

Page 198: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

Company Name MWBE LDB VBE DBE Trades Address City Contact Email Phone State

Hensel Phelps

South Terminal C Phase 1 Airside/Concourse

PREQUALIFIED SUBCONTRACTORS/SUPPLIERS

Firms Approved by PSC

Phillips and Jordan, Incorporated Erosion Control/SWPPP 8940 Gall Blvd Zephyrhills Art Phelps [email protected] 813-783-1132 FL

Phillips and Jordan, Incorporated Paving 8940 Gall Blvd Zephyrhills Art Phelps [email protected] 813-783-1132 FL

Phillips and Jordan, Incorporated Pond Liners 8940 Gall Blvd Zephyrhills Art Phelps [email protected] 813-783-1132 FL

Phillips and Jordan, Incorporated Site Utilities 8940 Gall Blvd Zephyrhills Art Phelps [email protected] 813-783-1132 FL

Phillips and Jordan, Incorporated Striping 8940 Gall Blvd Zephyrhills Art Phelps [email protected] 813-783-1132 FL

X Phillips and Jordan, Incorporated Survey 8940 Gall Blvd Zephyrhills Art Phelps [email protected] 813-783-1132 FL

X Physical Security Glazing 8549 SW Sea Captain Dr Stuart Rudi Prusa [email protected] 205-425-4072 FL

X Polaris Fire Protection Fire Protection 4009 SW 7th St Plantation Ari Glass [email protected] 651-755-0426 FL

X Power Engineering Group, Inc. X X X Electrical 6635 Narcoosee Rd Orlando Mary Doorhy [email protected] (407) 277-3150 FL

X PPC Professional Services Painting 2619 E Michigan S Orlando Jesse Patino [email protected] 407-203-0617 FL

Praise Contracting LLC X X X Gypsum Drywall and Ceilings PO Box 781789 Orlando Antonio Jackson [email protected] 407-864-5481 FL

Praise Contracting LLC X X X Flooring PO Box 781789 Orlando Antonio Jackson [email protected] 407-864-5481 FL

Praise Contracting LLC X X X Cementious Siding PO Box 781789 Orlando Antonio Jackson [email protected] 407-864-5481 FL

Praise Contracting LLC X X X Building Specialties PO Box 781789 Orlando Antonio Jackson [email protected] 407-864-5481 FL

Praise Contracting LLC X X X Waterproofing and Caulking PO Box 781789 Orlando Antonio Jackson [email protected] 407-864-5481 FL

Praise Contracting LLC X X X Carpentry PO Box 781789 Orlando Antonio Jackson [email protected] 407-864-5481 FL

Praise Contracting LLC X X X Miscellaneous Metals PO Box 781789 Orlando Antonio Jackson [email protected] 407-864-5481 FL

Praise Contracting LLC X X X Masonry PO Box 781789 Orlando Antonio Jackson [email protected] 407-864-5481 FL

Praise Contracting LLC X X X Cast in Place Concrete PO Box 781789 Orlando Antonio Jackson [email protected] 407-864-5481 FL

X Praise Contracting LLC X X X Painting PO Box 781789 Orlando Antonio Jackson [email protected] 407-864-5481 FL

X Precast Piling Technology, Inc. Pile Foundations PO Box 16612 Tampa William David Harper [email protected] 813-984-7453 FL

Precision Mechanical, Inc. Mechanical 3975 E Railroad Ave Cocoa Lisa Durette [email protected] 321-635-2000 FL

X Precision Mechanical, Inc. Plumbing 3975 E Railroad Ave Cocoa Lisa Durette [email protected] 321-635-2000 FL

X Premier Drone Productions LLC Construction Logistics PO Box 541 Gotha Robert McChesney [email protected] 407-744-1163 FL

Prime Construction Group, Inc. Earthwork Improvements 1000 Jetstream Dr Orlando [email protected] 407-856-8180 FL

Prime Construction Group, Inc. Erosion Control/SWPPP 1000 Jetstream Dr Orlando [email protected] 407-856-8180 FL

Prime Construction Group, Inc. Paving 1000 Jetstream Dr Orlando [email protected] 407-856-8180 FL

Prime Construction Group, Inc. Site Improvements 1000 Jetstream Dr Orlando [email protected] 407-856-8180 FL

Prime Construction Group, Inc. Site Specialties 1000 Jetstream Dr Orlando [email protected] 407-856-8180 FL

X Prime Construction Group, Inc. Site Utilities 1000 Jetstream Dr Orlando [email protected] 407-856-8180 FL

Prime Electrical Services, Inc. X X X Electrical 550 Holts Lake Ct, Suite 101 Apopka Camell Williams [email protected] 407-574-5177 FL

X Prime Electrical Services, Inc. X X X Low Voltage Systems 550 Holts Lake Ct, Suite 101 Apopka Camell Williams [email protected] 407-574-5177 FL

Prince Contracting Earthwork Improvements 7081 Grand National Dr, Suite 108 Orlando David Metheny [email protected] 813-699-5915 FL

Prince Contracting Paving 7081 Grand National Dr, Suite 108 Orlando David Metheny [email protected] 813-699-5915 FL

Prince Contracting Site Improvements 7081 Grand National Dr, Suite 108 Orlando David Metheny [email protected] 813-699-5915 FL

Prince Contracting Site Structures 7081 Grand National Dr, Suite 108 Orlando David Metheny [email protected] 813-699-5915 FL

X Prince Contracting Site Utilities 7081 Grand National Dr, Suite 108 Orlando David Metheny [email protected] 813-699-5915 FL

X Pro Sound, Inc. Low Voltage Systems 1717 Diplomacy Row Orlando Rick Scharmann [email protected] 305-891-1000 FL

X Pro-Bel Enterprises Limited Building Equipment 1638 Anita Place NE Atlanta Jennifer Gould [email protected] 954-917-1680 GA

X Progressive Plumbing, Inc. Plumbing 1064 FL-50 Clermont [email protected] 352-394-7171 FL

X Protect Video Inc X Low Voltage Systems 3483 High Ridge Rd Boyton Beach Shad Dimaria [email protected] 561-622-5880 FL

X Provision Construction and Development X X X Construction Logistics 3401 Lake Breeze Dr Building 601 Suite A Orlando Michael Arrington [email protected] 407-926-2442 FL

Proxy Management Group LLC dba Veatic X Signage 2450 Smith St, Ste P Kissimmee Jon Andreasson [email protected] 888-474-2999 FL

Proxy Management Group LLC dba Veatic X Column Covers 2450 Smith St, Ste P Kissimmee Jon Andreasson [email protected] 888-474-2999 FL

Proxy Management Group LLC dba Veatic X Wire Mesh Partitions 2450 Smith St, Ste P Kissimmee Jon Andreasson [email protected] 888-474-2999 FL

Proxy Management Group LLC dba Veatic X Trash Receptacles 2450 Smith St, Ste P Kissimmee Jon Andreasson [email protected] 888-474-2999 FL

Proxy Management Group LLC dba Veatic X Metal Panels 2450 Smith St, Ste P Kissimmee Jon Andreasson [email protected] 888-474-2999 FL

Proxy Management Group LLC dba Veatic X Millwork 2450 Smith St, Ste P Kissimmee Jon Andreasson [email protected] 888-474-2999 FL

Proxy Management Group LLC dba Veatic X Miscellaneous Metals 2450 Smith St, Ste P Kissimmee Jon Andreasson [email protected] 888-474-2999 FL

Proxy Management Group LLC dba Veatic X Site Specialties 2450 Smith St, Ste P Kissimmee Jon Andreasson [email protected] 888-474-2999 FL

Proxy Management Group LLC dba Veatic X Site Structures 2450 Smith St, Ste P Kissimmee Jon Andreasson [email protected] 888-474-2999 FL

X Proxy Management Group LLC dba Veatic X Special Wall Panels 2450 Smith St, Ste P Kissimmee Jon Andreasson [email protected] 888-474-2999 FL

X Pyramid Masonry Contractors, Inc Masonry 405 Zell Drive Orlando Nathan Parsons [email protected] 407-816-5740 FL

X Quality Cable Contractors, Inc. X X X Low Voltage Systems 207 N Goldenrod Rd, Suite 600 Orlando Alain Gonzalez [email protected] 407-246-0606 FL

Page 199: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

Company Name MWBE LDB VBE DBE Trades Address City Contact Email Phone State

Hensel Phelps

South Terminal C Phase 1 Airside/Concourse

PREQUALIFIED SUBCONTRACTORS/SUPPLIERS

Firms Approved by PSC

Quantum Electric LLC X X X Electrical 1237 N Pine Hills Rd, Orlando Damian Smith [email protected] 407-203-3388 FL

X Quantum Electric LLC X X X Low Voltage Systems 1237 N Pine Hills Rd, Orlando Damian Smith [email protected] 407-203-3388 FL

X Qypsys, LLC Low Voltage Systems 5425 Beaumont Center Blvd, Suite 918 Tampa Alan Bertsch [email protected] 407-558-8208 FL

R L Burns Inc. X X Construction Logistics 1203 W Gore St Orlando Bob Burns [email protected] 407-839-1131 FL

X R L Burns Inc. X X General Contracting 1203 W Gore St Orlando Bob Burns [email protected] 407-839-1131 FL

X RAKS Fire Sprinkler, LLC X Fire Protection 215 Mobile St Hattiesburg Romero Ali [email protected] 334-202-0322 FL

X RAM Construction Services Waterproofing and Caulking 13800 Eckles Road Livonia Tony Szabo [email protected] 734-464-3800 MI

X Randall Architectural Ironworks, Inc. Miscellaneous Metals 3307 Clarcona Rd, Apopka Dennis Sutherlin [email protected] 407-464-7776 FL

Randall Mechanical, Inc. Fuel Systems 3307 Clarcona Rd Apopka Matt Reinders [email protected] 407-408-6792 FL

Randall Mechanical, Inc. Mechanical 3307 Clarcona Rd Apopka Matt Reinders [email protected] 407-408-6792 FL

Randall Mechanical, Inc. Plumbing 3307 Clarcona Rd Apopka Matt Reinders [email protected] 407-408-6792 FL

Randall Mechanical, Inc. Site Utilities 3307 Clarcona Rd Apopka Matt Reinders [email protected] 407-408-6792 FL

X Randall Mechanical, Inc. Fire Protection 3307 Clarcona Rd Apopka Matt Reinders [email protected] 407-408-6792 FL

Ranger Construction Industries, Inc. Earthwork Improvements 1200 Elboc Way Winter Garden Estimating [email protected] 407-656-9255 FL

Ranger Construction Industries, Inc. Paving 1200 Elboc Way Winter Garden Estimating [email protected] 407-656-9255 FL

Ranger Construction Industries, Inc. Site Improvements 1200 Elboc Way Winter Garden Estimating [email protected] 407-656-9255 FL

Ranger Construction Industries, Inc. Site Structures 1200 Elboc Way Winter Garden Estimating [email protected] 407-656-9255 FL

X Ranger Construction Industries, Inc. Site Utilities 1200 Elboc Way Winter Garden Estimating [email protected] 407-656-9255 FL

RCS Construction Company of Central Florida, Inc. dba RCS Construction Company, Inc. Earthwork Improvements 295 E Hwy 50, Suite 1, Clermont Pedro Baldaguez [email protected] 352-394-1716 FL*

X RCS Construction Company of Central Florida, Inc. dba RCS Construction Company, Inc. Site Utilities 295 E Hwy 50, Suite 1, Clermont Pedro Baldaguez [email protected] 352-394-1716 FL*

Rebah Fabrication X X Miscellaneous Metals 11422 Satellite Blvd. Orlando [email protected] 407-857-3232 FL

X Rebah Fabrication Structural Steel 11422 Satellite Blvd. Orlando [email protected] 407-857-3232 FL

X Redcon Solutions Group LLC X Construction Logistics 3218 E Colonial Dr, Ste G Orlando Kyle Evans [email protected] 407-601-0567 FL

Reliable Constructors Inc Drilling 22435 SR 46 Mt Dora Roger Rehfeldt [email protected] 352-383-3159 FL

X Reliable Constructors Inc Pile Foundations 22436 SR 46 Mt Dora Roger Rehfeldt [email protected] 352-383-3160 FL

X Rentokil North America, Inc dba Heron Pest Control Inc Bird Control 2114 S Orange Blossom Trl Apopka Brian Fistler [email protected] 407-478-6200 FL

Reyco Contracting Solutions LLC X X Signage 99 S Alcaniz St, Pensacola Virna Reynoso [email protected] 919-673-0171 FL

Reyco Contracting Solutions LLC X X Wire Mesh Partitions 99 S Alcaniz St, Pensacola Virna Reynoso [email protected] 919-673-0171 FL

Reyco Contracting Solutions LLC X X Toilet Accessories 99 S Alcaniz St, Pensacola Virna Reynoso [email protected] 919-673-0171 FL

Reyco Contracting Solutions LLC X X Fire Extinguishers 99 S Alcaniz St, Pensacola Virna Reynoso [email protected] 919-673-0171 FL

Reyco Contracting Solutions LLC X X Corner Guards 99 S Alcaniz St, Pensacola Virna Reynoso [email protected] 919-673-0171 FL

Reyco Contracting Solutions LLC X X Floor Grilles 99 S Alcaniz St, Pensacola Virna Reynoso [email protected] 919-673-0171 FL

Reyco Contracting Solutions LLC X X Trash Receptacles 99 S Alcaniz St, Pensacola Virna Reynoso [email protected] 919-673-0171 FL

X Reyco Contracting Solutions LLC X X Masonry 99 S Alcaniz St, Pensacola Virna Reynoso [email protected] 919-673-0171 FL

Rite Hite Company, LLC Coiling Grilles and Doors 7060 W State Rd 84 #7 Davie Heather Mazzillo [email protected] 800-833-1636 FL

X Rite Hite Company, LLC Building Equipment 7060 W State Rd 84 #7 Davie Heather Mazzillo [email protected] 800-833-1636 FL

Rivera Tile and Stone, Inc. X Tile / Terrazzo 801 S. Chickasaw Tr. Orlando Rebecca Rivera [email protected] 407-275-0571 FL

X Rivera Tile and Stone, Inc. X Flooring 801 S. Chickasaw Tr. Orlando Rebecca Rivera [email protected] 407-275-0571 FL

X Roberts Consulting Services, Inc X Architect and Engineer Services 117 Quailwood Dr Winter Haven Estimating [email protected] (863) 224-6280 FL

X Rock & Roll Trucking Inc. X Construction Logistics 150 Bel Aire Dr Merritt Island Ruben Diaz [email protected] 321-458-3042 FL

X Rolling Plains Construction, Inc. Fireproofing 5 South Roosevelt Avenue Chandler Kaitlin Sidwa [email protected] 480-895-8813 AZ

X Ron Kendall Masonry, Inc Masonry 2641 Hammondville Rd Pompano Beach M Henry [email protected] 561-793-5924 FL

S.I. Goldman Company, Inc. Mechanical 799 Bennett Dr Longwood [email protected] 407-830-5000 FL

X S.I. Goldman Company, Inc. Plumbing 799 Bennett Dr Longwood [email protected] 407-830-5000 FL

X Safeguard US Inc Building Equipment 7055 Speedway Blvd Las Vegas Paul Betts [email protected] 403-236-0752 NV

Safway Services Construction Logistics 11208 Boggy Creek Rd Orlando Matt Breuer [email protected] 615-872-0811 FL

Safway Services Fireproofing 11208 Boggy Creek Rd Orlando Matt Breuer [email protected] 615-872-0811 FL

X Safway Services Painting 11208 Boggy Creek Rd Orlando Matt Breuer [email protected] 615-872-0811 FL

X Satellite Shelters, Inc. Construction Logistics 2530 Xenium Lane North, Ste 150 Minneapolis Lynne Ellis [email protected] 800-453-1299 MN

X Schindler Elevator Corporation Conveying Systems 7100 TPC Dr, Suite 300 Orlando Lindsay Anastas-King [email protected] 407-235-1222 FL

X Seal Distributors Building Materials 200 Tech Dr, Sanford Mike Gallagher [email protected] 407-330-0301 FL

X Secured Global LLC Building Equipment 4524 36th St Orlando Eilana Hernandez [email protected] 407-472-4860 FL

SEMA Construction, Inc. Cast In Place Concrete 6200 Hazeltine National Dr, Suite 100 Orlando Shane Cox [email protected] 407-563-7900 FL

SEMA Construction, Inc. Dewatering 6200 Hazeltine National Dr, Suite 100 Orlando Shane Cox [email protected] 407-563-7900 FL

Page 200: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

Company Name MWBE LDB VBE DBE Trades Address City Contact Email Phone State

Hensel Phelps

South Terminal C Phase 1 Airside/Concourse

PREQUALIFIED SUBCONTRACTORS/SUPPLIERS

Firms Approved by PSC

SEMA Construction, Inc. Earthwork Improvements 6200 Hazeltine National Dr, Suite 100 Orlando Shane Cox [email protected] 407-563-7900 FL

SEMA Construction, Inc. Erosion Control/SWPPP 6200 Hazeltine National Dr, Suite 100 Orlando Shane Cox [email protected] 407-563-7900 FL

SEMA Construction, Inc. Guard Rails & Barriers 6200 Hazeltine National Dr, Suite 100 Orlando Shane Cox [email protected] 407-563-7900 FL

SEMA Construction, Inc. Paving 6200 Hazeltine National Dr, Suite 100 Orlando Shane Cox [email protected] 407-563-7900 FL

SEMA Construction, Inc. Pile Foundations 6200 Hazeltine National Dr, Suite 100 Orlando Shane Cox [email protected] 407-563-7900 FL

SEMA Construction, Inc. Precast 6200 Hazeltine National Dr, Suite 100 Orlando Shane Cox [email protected] 407-563-7900 FL

X SEMA Construction, Inc. Survey 6200 Hazeltine National Dr, Suite 100 Orlando Shane Cox [email protected] 407-563-7900 FL

Seminole Masonry, LLC Hoisting 3850 E Lake Mary Blvd Sanford [email protected] 407-278-4694 FL

X Seminole Masonry, LLC Masonry 3850 E Lake Mary Blvd Sanford [email protected] 407-278-4694 FL

X Serenity Cleaning Solutions Construction Logistics PO box 235 Jacksonville Art Samuels [email protected] 904-783-0540 FL

X SeriGraphics Sign Systems Building Specialties 2401 Nevada Ave North Minneapolis Melissa Dodge [email protected] 763-277-7774 MN

X Service Complete Electric Electrical 2781 Wrights Road Suite 1201 Oviedo Beau Bergeron [email protected] 407-679-3500 FL

X Shaw Contract Flooring Services, Inc. d/b/a Spectra Contract Flooring Flooring 425 Florida Central Parkway Longwood Jonathan Vice [email protected] 407-475-1144 FL

X Shelters Cleaning LLC X X X Construction Logistics 5733 Five Flags Blvd 1037 Orlando Sharon Shelters [email protected] 407-373-4241 FL*

X Siemens Low Voltage Systems 4122 Metric Dr, Suite 100 Winter Park Michael Palumbo [email protected] 401-732-4787 FL

X Sigma Marble & Granite - Florida, Inc. Tile / Terrazzo 5675 New Tampa Hwy #12 Lakeland Tony Birchard [email protected] 571-926-4784 FL

X Signs of Tampa Bay, LLC X Signage 1917 Passero Avenue Lutz David West [email protected] 813-994-0101 FL

Sky Climber Access Solutions, LLC Construction Logistics 1800 Pittsburgh Dr Delaware Ed Weinhardt [email protected] 727-434-6078 OH

X Sky Climber Access Solutions, LLC Building Equipment 1800 Pittsburgh Dr Delaware Ed Weinhardt [email protected] 727-434-6078 OH

SkyBuilders USA, LLC X X X Construction Logistics 40 W Crystal Lake St, 200 Orlando Juan Velez [email protected] 407-362-1870 FL

X SkyBuilders USA, LLC X X X General Contracting 40 W Crystal Lake St, 200 Orlando Juan Velez [email protected] 407-362-1870 FL

X SMI Cabinetry Inc Millwork 2715 N Orange Blossom Trl Orlando Michelle Hull [email protected] 407-841-0292 FL

Smith Fence Construction Logistics 4699 110th Avenue North Clearwaterr Dave Warrington [email protected] 727-573-5440 FL

X Smith Fence Site Improvements 4699 110th Avenue North Clearwaterr Dave Warrington [email protected] 727-573-5440 FL

X Smith, Broomfield & Howard Construction and Restoration LLC X X General Contracting 2700 Bonnett Creek Road Lake Buena Vista Shawn Howard [email protected] (407) 828-8761 FL

X Southeastern Surfaces & Equipment X Operable Partitions 569 Canal St New Smyrna Beach Kelli Morris [email protected] 386-428-8875 FL

X Southeastern Surveying and Mapping Corporation Survey 6500 All American Blvd Orlando William Rowe [email protected] 407-292-8580 FL

X Southern Aquatics, Inc. Fountains 150 Hilden Road Ponte Vedra Jackie Frey [email protected] 904-824-1110 FL

X Southern Fire Protection of Orlando, Inc. Fire Protection 3801 East State Road 46 Sanford Kevin Rodebaugh [email protected] 407-323-4200 FL

X Southern Foam Insulation, Inc. Fireproofing 880 Maguire Rd, Suite C Ocoee Rick Tellier [email protected] 407-654-1251 FL

X Southern Industrial Sales, Inc Coiling Grilles and Doors 105 Yeager Circle, Pelham Corey Scott [email protected] 205-995-2100 AL

Southland Construction Group X Concrete Finishing 3100 US Hwy 41 North Palmetto Michael Reddy [email protected] 941-286-4296 FL

X Southland Construction Group X Precast 3100 US Hwy 41 North Palmetto Michael Reddy [email protected] 941-286-4296 FL

Southland Construction, Inc. Cast In Place Concrete 172 West Fourth St Apopka Ben White [email protected] 407-889-9844 FL

Southland Construction, Inc. Construction Logistics 172 West Fourth St Apopka Ben White [email protected] 407-889-9844 FL

Southland Construction, Inc. Dewatering 172 West Fourth St Apopka Ben White [email protected] 407-889-9844 FL

Southland Construction, Inc. Earthwork Improvements 172 West Fourth St Apopka Ben White [email protected] 407-889-9844 FL

Southland Construction, Inc. Erosion Control/SWPPP 172 West Fourth St Apopka Ben White [email protected] 407-889-9844 FL

Southland Construction, Inc. Hoisting 172 West Fourth St Apopka Ben White [email protected] 407-889-9844 FL

Southland Construction, Inc. Landscaping 172 West Fourth St Apopka Ben White [email protected] 407-889-9844 FL

Southland Construction, Inc. Painting 172 West Fourth St Apopka Ben White [email protected] 407-889-9844 FL

Southland Construction, Inc. Paving 172 West Fourth St Apopka Ben White [email protected] 407-889-9844 FL

Southland Construction, Inc. Pile Foundations 172 West Fourth St Apopka Ben White [email protected] 407-889-9844 FL

Southland Construction, Inc. Site Lighting 172 West Fourth St Apopka Ben White [email protected] 407-889-9844 FL

Southland Construction, Inc. Site Utilities 172 West Fourth St Apopka Ben White [email protected] 407-889-9844 FL

Southland Construction, Inc. Survey 172 West Fourth St Apopka Ben White [email protected] 407-889-9844 FL

X Southland Construction, Inc. Waterproofing and Caulking 172 West Fourth St Apopka Ben White [email protected] 407-889-9844 FL

X Southstar Fire Protection Company dba Northstar Fire Protection Fire Protection 4616 W Howard Ln, Bldg 2 Ste #400 Austin Nick Rosinski [email protected] 512-833-0800 TX

Southwest Progressive Enterprises, Inc Cementious Siding 10920 Alder Circle Dallas Charlie Peters [email protected] 972-424-8280 TX

X Southwest Progressive Enterprises, Inc Gypsum Drywall and Ceilings 10920 Alder Circle Dallas Charlie Peters [email protected] 972-424-8280 TX

X Space Coast Fire and Safety, Inc. Fire Protection 420 Manor Dr Merritt Island [email protected] 321-783-1040 FL

Span Systems, Inc. Structural Steel 90 Pine St Manchester [email protected] 800-558-3003 NH

X Span Systems, Inc. Tensile Fabric Canopies 90 Pine St Manchester [email protected] 800-558-3003 NH

X Sparkle At Me, LLC X Construction Logistics 1413 E Harding St Orlando Lori Parks [email protected] (407) 242-1694 FL

Page 201: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

Company Name MWBE LDB VBE DBE Trades Address City Contact Email Phone State

Hensel Phelps

South Terminal C Phase 1 Airside/Concourse

PREQUALIFIED SUBCONTRACTORS/SUPPLIERS

Firms Approved by PSC

X Specco Environmental, Inc. dba Rainbow International of Orlando X X X Earthwork Improvements 1720 N Goldenrod Rd, Suite 3 Orlando Emily Dominicci [email protected] 321-418-8994 FL

X Specified Architectural Systems Inc Operable Partitions 9942 Currie Davis Drive Tampa Jon Thornton [email protected] 813-915-6100 FL

X SRP Consulting Services, LLC Architect and Engineering Services 900 Marble Drive Ft Collins Scott Pandy [email protected] 970-301-6619 CO

X STABIL Concrete Products, LLC Precast 7080 28th St Court East Sarasota [email protected] 941-739-7823 FL

Stainless Fabricators Inc. Guard Rails & Barriers 11107 Challenger Ave Odessa Scott Binney [email protected] 813-926-7113 FL

X Stainless Fabricators Inc. Miscellaneous Metals 11107 Challenger Ave Odessa Scott Binney [email protected] 813-926-7113 FL

X Star Asset Security, LLC Construction Logistics 1411 Edgewater Dr, Suite 203, Orlando Sage Hirschy [email protected] 407-353-4819 FL

X State Line Products of South Florida Inc Fireproofing 3021 NW 25th Ave Pompano Beach Robert Becker [email protected] 954-971-0791 FL

X Steel Fabricators, LLC Structural Steel 5401 S Kirkman Rd, Suite 310 Orlando [email protected] 407-926-0241 FL

Steel Service Miscellaneous Metals 2260 Flowood Dr Flowood Jim Souza [email protected] 601-939-9222 MS

X Steel Service Structural Steel 2260 Flowood Dr Flowood Jim Souza [email protected] 601-939-9222 MS

Steel, LLC Miscellaneous Metals 405 N Clarendon Ave Scottdale Gabe Tilley [email protected] 404-704-1624 GA

X Steel, LLC Structural Steel 405 N Clarendon Ave Scottdale Gabe Tilley [email protected] 404-704-1624 GA

SteelFab Miscellaneous Metals 902 Smith Street Dublin Josh Kelly [email protected] 478-275-9777 GA

X SteelFab Structural Steel 902 Smith Street Dublin Josh Kelly [email protected] 478-275-9777 GA

Stein Steel & Supply Company Miscellaneous Metals 933 Kirkwood Ave Atlanta [email protected] 404-523-2711 GA

X Stein Steel & Supply Company Structural Steel 933 Kirkwood Ave Atlanta [email protected] 404-523-2711 GA

X Sterling Building Services, Inc X X X Construction Logistics 776 Bennett Dr Suite 105 Longwood R Crunckleton [email protected] 407-830-9352 FL

Sterling Enterprises, L.L.C. Construction Logistics P.O. Box 714 Lake Helen Ryan Wilkins [email protected] 386-532-2100 FL

X Sterling Enterprises, L.L.C. Site Improvements P.O. Box 714 Lake Helen Ryan Wilkins [email protected] 386-532-2100 FL

X Sterling Silver Scape & Sod, Inc. X Landscaping 2201 Partin Settlement Rd Kissimmee [email protected] 407-846-3225 FL

Steve Ward & Associates Inc Millwork 8175 Bellow St Orlando Tommy Bolles [email protected] 407-575-4719 FL

X Steve Ward & Associates Inc Metal Panels 8175 Bellow St Orlando Tommy Bolles [email protected] 407-575-4719 FL

X Stonhard Flooring 1000 East Park Avenue, Maple Shade Mike Oneill [email protected] 800-257-7953

X Structured Cabling Solutions, Inc. X X Low Voltage Systems 185 Drennen Rd #307 Orlando Syed Shah [email protected] (407) 557-8998 FL

Summa Metal Miscellaneous Metals 7950 NW 53rd Street, Suite 337 Miami Lucia Brandeiro [email protected] 514-600-0946 FL

X Summa Metal Structural Steel 7950 NW 53rd Street, Suite 337 Miami Lucia Brandeiro [email protected] 514-600-0946 FL

X Sunbelt Metals & Manufacturing, Inc. Miscellaneous Metals 920 South Bradshaw Road Apopka Karen Eckles [email protected] 407-889-8960 FL

X Super Sky Skylights 702 Keeneland Pike Lake Mary Larry Grassmann [email protected] 262-242-2000 FL

X Supreme Works Corp. d/b/a AAA Ceiling X Gypsum Drywall and Ceilings 2431 Aloma Ave #160 Winter Park Estimating [email protected] (407) 947-0439 FL

X Sutter Roofing Company of Florida Roofing 2661 Old Winter Garden Rd Orlando Tom York [email protected] 407-367-4500 FL

T & T Construction of Central Florida, Inc. Cast in Place Concrete 340 Oleander Way Casselberry [email protected] 407-831-5506 FL

T & T Construction of Central Florida, Inc. Hoisting 340 Oleander Way Casselberry [email protected] 407-831-5506 FL

T & T Construction of Central Florida, Inc. Pile Foundations 340 Oleander Way Casselberry [email protected] 407-831-5506 FL

T & T Construction of Central Florida, Inc. Retaining Walls 340 Oleander Way Casselberry [email protected] 407-831-5506 FL

X T & T Construction of Central Florida, Inc. Site Specialties 340 Oleander Way Casselberry [email protected] 407-831-5506 FL

X T&G Corporation dba T&G Constructors X General Contracting 8623 Commodity Circle Orlando Mark Knott [email protected] 407-352-4443 FL

X Taurus Chutes Inc Building Equipment 639 West Oakland Park Blvd 104D Ft Lauderdale Jose Calderon [email protected] 954-445-0146 FL

X Taylor Cotton & Ridley Doors & Hardware 1904 Brengle Ave Orlando LynDea Drury [email protected] 407-298-5114 FL

TDR Systems Inc d/b/a Chutes International Building Equipment 33 Industrial Park Dr Waldorf Hadi Boustani [email protected] 240-448-5000 MD

X TDR Systems Inc d/b/a Chutes International Building Specialties 33 Industrial Park Dr Waldorf Hadi Boustani [email protected] 240-448-5000 MD

X Tech Ready Mix, Inc. X Ready Mix Concrete 5000 Crayton Ave, Cleveland Janice Knight [email protected] 216-376-7556 OH

X Technique Concrete Construction, LLC X X Ready Mix Concrete 3556 Calumet Road, Decatur Billy Freeman [email protected] 678-949-9476 GA

X Techniquex, Inc Flooring 9035 E. Pima Center Parkway Suite 7 Scottsdale Baron Adelmann [email protected] 602-370-3500 AZ

Teer Engineering LLC Low Voltage Systems 1814 S Division Ave Orlando Jason Harlow [email protected] 321-206-2492 FL

X Teer Engineering LLC Electrical 1814 S Division Ave Orlando Jason Harlow [email protected] 321-206-2492 FL

X Tek Hauling Inc X X X Earthwork Improvements 720 Belle Terre Ct, Winter Garden Emma Surujlall [email protected] 407-307-7829 FL*

X Terracon Construction Logistics 1675 Lee Rd Winter Park Ozzie Quezada [email protected] 407-740-6110 FL

X Terrell Materials Corporation X Ready Mix Concrete 10600 W Higgins Rd, Suite 300, Rosemont Pat Terrrell [email protected] 847-635-8530 IL

X Terry's Electric, Inc. Electrical 600 North Thacker Ave, Suite A Kissimmee [email protected] 407-572-2100 FL

X Tharp Plumbing Systems, Inc. Plumbing 625 Wilmer Ave Orlando [email protected] 407-295-2370 FL

X The G-S Company Wire Mesh Partitions 7920 Stansbury Rd Dunkirk Justine Hancock [email protected] 410-284-9549 MD

The Haskell Company Structural Steel Fabrication Division Miscellaneous Metals 111 Riverside Ave Jacksonville [email protected] 904-357-4230 FL

X The Haskell Company Structural Steel Fabrication Division Structural Steel 111 Riverside Ave Jacksonville [email protected] 904-357-4230 FL

Page 202: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

Company Name MWBE LDB VBE DBE Trades Address City Contact Email Phone State

Hensel Phelps

South Terminal C Phase 1 Airside/Concourse

PREQUALIFIED SUBCONTRACTORS/SUPPLIERS

Firms Approved by PSC

The Jones Company X X Earthwork Improvements 3754 NW 16th St Ft Lauderdale Angela Jones [email protected] 954-214-4812 FL

The Jones Company X X Paving 3754 NW 16th St Ft Lauderdale Angela Jones [email protected] 954-214-4812 FL

The Jones Company X X Site Improvements 3754 NW 16th St Ft Lauderdale Angela Jones [email protected] 954-214-4812 FL

The Jones Company X X Site Structures 3754 NW 16th St Ft Lauderdale Angela Jones [email protected] 954-214-4812 FL

X The Jones Company X X Site Utilities 3754 NW 16th St Ft Lauderdale Angela Jones [email protected] 954-214-4812 FL

The Lane Construction Group Cast In Place Concrete 2601 Maitland Center Pkwy Maitland Katie Brancheau [email protected] 407-331-3100 FL

The Lane Construction Group Earthwork Improvements 2601 Maitland Center Pkwy Maitland Katie Brancheau [email protected] 407-331-3100 FL

The Lane Construction Group Paving 2601 Maitland Center Pkwy Maitland Katie Brancheau [email protected] 407-331-3100 FL

The Lane Construction Group Pile Foundations 2601 Maitland Center Pkwy Maitland Katie Brancheau [email protected] 407-331-3100 FL

The Lane Construction Group Precast 2601 Maitland Center Pkwy Maitland Katie Brancheau [email protected] 407-331-3100 FL

X The Lane Construction Group Retaining Walls 2601 Maitland Center Pkwy Maitland Katie Brancheau [email protected] 407-331-3100 FL

The Middlesex Corporation Cast In Place Concrete One Spectacle Pond Road Littleton Taylor Cox [email protected] 978-742-4400 FL

The Middlesex Corporation Dewatering One Spectacle Pond Road Littleton Taylor Cox [email protected] 978-742-4400 FL

The Middlesex Corporation Earthwork Improvements One Spectacle Pond Road Littleton Taylor Cox [email protected] 978-742-4400 FL

The Middlesex Corporation Electrical One Spectacle Pond Road Littleton Taylor Cox [email protected] 978-742-4400 FL

The Middlesex Corporation Erosion Control/SWPPP One Spectacle Pond Road Littleton Taylor Cox [email protected] 978-742-4400 FL

The Middlesex Corporation General Contracting One Spectacle Pond Road Littleton Taylor Cox [email protected] 978-742-4400 FL

The Middlesex Corporation Paving One Spectacle Pond Road Littleton Taylor Cox [email protected] 978-742-4400 FL

The Middlesex Corporation Pile Foundations One Spectacle Pond Road Littleton Taylor Cox [email protected] 978-742-4400 FL

The Middlesex Corporation Precast One Spectacle Pond Road Littleton Taylor Cox [email protected] 978-742-4400 FL

X The Middlesex Corporation Site Utilities One Spectacle Pond Road Littleton Taylor Cox [email protected] 978-742-4400 FL

X The New Florida Industrial Electric, Inc. Electrical 291 Specialty Point Sanford [email protected] 407-331-1551 FL

The Plummer Painting Company Painting 660 Jackson Ave Winter Park Richard Thomas [email protected] 407-585-0210 FL

The Plummer Painting Company Traffic Topping / Sealer 660 Jackson Ave Winter Park Richard Thomas [email protected] 407-585-0210 FL

X The Plummer Painting Company Waterproofing and Caulking 660 Jackson Ave Winter Park Richard Thomas [email protected] 407-585-0210 FL

The Redland Company, Inc. Earthwork Improvements 48 NE 15th St Homestead [email protected] 305-247-3226 FL

The Redland Company, Inc. Site Improvements 48 NE 15th St Homestead [email protected] 305-247-3226 FL

The Redland Company, Inc. Site Utilities 48 NE 15th St Homestead [email protected] 305-247-3226 FL

The Redland Company, Inc. Site Structures 48 NE 15th St Homestead [email protected] 305-247-3226 FL

X The Redland Company, Inc. Paving 48 NE 15th St Homestead [email protected] 305-247-3226 FL

X The RJ Company, Construction & Design, LLC X X X General Contracting 8010 Sunport Dr, #115 Orlando Roderick Jimenez [email protected] 407-251-0071 FL

X The Rolle Group Architect and Engineer Services 6802 Windstream Terrace Orlando Corey Rolle [email protected] (407) 929-9951 FL

The Wilsten Group Building Specialties 650 Nicolet Ave Winter Park Jamie Klute [email protected] 407-920-9636 FL

The Wilsten Group Flooring 650 Nicolet Ave Winter Park Jamie Klute [email protected] 407-920-9636 FL

The Wilsten Group General Contracting 650 Nicolet Ave Winter Park Jamie Klute [email protected] 407-920-9636 FL

X The Wilsten Group Rough Carpentry 650 Nicolet Ave Winter Park Jamie Klute [email protected] 407-920-9636 FL

X Thorguard, Inc. Electrical 1193 Sawgrass Corporate Pkwy Sunrise Jason Wolk [email protected] 954-835-0900 FL

Thyssen Krupp Conveying Systems 3201 N Sylvania Ave, Suite 117 Fort Worth Ashley Hamm [email protected] 817-210-5012 TX

X Thyssen Krupp Vertical Transportation 3201 N Sylvania Ave, Suite 117 Fort Worth Ashley Hamm [email protected] 817-210-5012 TX

X Tierra South Flordia, Inc. X X Testing and Inspection 2765 Vista Parkway, Suite 10 West Palm Beach Francois Thomas [email protected] 561-687-8536 FL

X Tierra, Inc X Testing And Inspection 591 Susan B Britt Ct Winter Garden James Gibbs [email protected] 407-877-1354 FL

X Timmons Group, Inc. Architect and Engineer Services 1001 Boulders Parkway, Suite 300 Richmond Michael Patey [email protected] 804-200-6500 VA

X Tindall Concrete Corporation of South Carolina dba Tindall Corporation Precast 1212 Ronds Pointe Drive East, Tallahasee Andy Harrill [email protected] 864-590-2399 FL

X Titan Florida, LLC Ready Mix Concrete 349 Thorpe Road, Orlando Michelle Johnson [email protected] 407-793-2688 FL

Toebe Construction LLC Cast In Place Concrete 28990 S Wixom Rd Wixom Jeff Stover [email protected] (248) 349-7500 MI

X Toebe Construction LLC Paving 28990 S Wixom Rd Wixom Jeff Stover [email protected] (248) 349-7500 MI

Transportations Systems, Inc Electrical 7742 Lower Gateway Loop, #1533 Orlando Eric Lesso [email protected] 407-525-9940 FL

Transportations Systems, Inc Low Voltage Systems 7742 Lower Gateway Loop, 1533 Orlando Eric Lesso [email protected] 470-525-9940 FL

Transportations Systems, Inc Site Utilities 7742 Lower Gateway Loop, 1533 Orlando Eric Lesso [email protected] 470-525-9940 FL

X Transportations Systems, Inc Site Lighting 7742 Lower Gateway Loop, 1533 Orlando Eric Lesso [email protected] 470-525-9940 FL

Trex Commercial Products Inc. Miscellaneous Metals 7008 Northland Dr N Minneapolis Estimating Department [email protected] 763-231-7135 MN

X Trex Commercial Products Inc. Railings 7008 Northland Dr N Minneapolis Estimating Department [email protected] 763-231-7135 MN

X Triad Cleaning Solutions Construction Logistics 3140 W Kennedy Blvd #100 Tampa Fred Carlson [email protected] 678-358-5567 FL

X Tri-City Electrical Contractors, Inc. Electrical 430 West Drive Altamonte Springs [email protected] 407-788-3500 FL

Page 203: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

Company Name MWBE LDB VBE DBE Trades Address City Contact Email Phone State

Hensel Phelps

South Terminal C Phase 1 Airside/Concourse

PREQUALIFIED SUBCONTRACTORS/SUPPLIERS

Firms Approved by PSC

X Trinity Highway Rentals Inc Construction Logistics 1963 W McNab Rd Pompano Beach Steve Hayes [email protected] FL

X Tritech Fall Protection Building Equipment 4071 LB McLeod Rd Orlando Chris Moemke [email protected] 407-835-9777 FL

X Triton Supply, Inc. X Building Materials 6012 Campus Cir Dr W, #188, Irving Rachel Mendoza [email protected] 214-382-4662 TX

X Trutech LLC Bird Control 155 Woolco Dr Marietta Russell Bennett [email protected] 800-842-7296 GA

X Tucker Construction & Engineering Roofing 3535 Lake Alfred Rd Winter Haven Gannon Olmert [email protected] 863-299-4444 FL

Tucker Paving, Inc. Earthwork Improvements 3545 Lake Alfred Rd Winter Haven Rick Allen [email protected] 863-299-2262 FL

Tucker Paving, Inc. Erosion Control/SWPPP 3545 Lake Alfred Rd Winter Haven Rick Allen [email protected] 863-299-2262 FL

Tucker Paving, Inc. Paving 3545 Lake Alfred Rd Winter Haven Rick Allen [email protected] 863-299-2262 FL

Tucker Paving, Inc. Site Utilities 3545 Lake Alfred Rd Winter Haven Rick Allen [email protected] 863-299-2262 FL

X Tucker Paving, Inc. Striping 3545 Lake Alfred Rd Winter Haven Rick Allen [email protected] 863-299-2262 FL

X Twist Inc HVAC 47 S Limestone St Jamestown Kali Ables [email protected] 937-675-9581 OH

X Two Buffalo Construction Supplies Inc. X X Roofing 8051 N Tamiami Trail Sarasota Larry Knudsen [email protected] 612-432-0057 FL

Two Trails, Inc. Architect and Engineer Services 8955 US-301, #386 Parrish Peter Killeen [email protected] 941-776-8680 FL

Two Trails, Inc. Construction Logistics 8955 US-301, #386 Parrish Peter Killeen [email protected] 941-776-8680 FL

Two Trails, Inc. Testing and Inspection 8955 US-301, #386 Parrish Peter Killeen [email protected] 941-776-8680 FL

X Two Trails, Inc. LEED Consultant 8955 US-301, #386 Parrish Peter Killeen [email protected] 941-776-8680 FL

UCC Group Inc. Hoisting 7380 Sand Lake Rd, Suite 500 Orlando Graham Duthie [email protected] 407-248-0989 FL

UCC Group Inc. Landscaping 7380 Sand Lake Rd, Suite 500 Orlando Graham Duthie [email protected] 407-248-0989 FL

UCC Group Inc. Paving 7380 Sand Lake Rd, Suite 500 Orlando Graham Duthie [email protected] 407-248-0989 FL

X UCC Group Inc. Retaining Walls 7380 Sand Lake Rd, Suite 500 Orlando Graham Duthie [email protected] 407-248-0989 FL

X Underground Construction Co., Inc.Fuel Systems 222 S. 52nd Street Tempe Tim Richards [email protected]

707-751-2112

AZ

United Advantage Signs, Inc dba United Sign Systems Building Specialties 206 Tower Dr Oldsmar Steven Higger [email protected] (813) 448-2978 FL

X United Advantage Signs, Inc dba United Sign Systems Miscellaneous Metals 206 Tower Dr Oldsmar Steven Higger [email protected] (813) 448-2978 FL

X United Forming Cast in Place Concrete 651 Danville Dr Orlando Doug Royce [email protected] 407-536-5413 FL

United Grading and Excavating Dewatering 199-A Fairburn Industrial Blvd Fairburn [email protected] 770-376-6000 GA

United Grading and Excavating Earthwork Improvements 199-A Fairburn Industrial Blvd Fairburn [email protected] 770-376-6000 GA

United Grading and Excavating Electrical 199-A Fairburn Industrial Blvd Fairburn [email protected] 770-376-6000 GA

United Grading and Excavating Erosion Control/SWPPP 199-A Fairburn Industrial Blvd Fairburn [email protected] 770-376-6000 GA

United Grading and Excavating Guard Rails & Barriers 199-A Fairburn Industrial Blvd Fairburn [email protected] 770-376-6000 GA

United Grading and Excavating Paving 199-A Fairburn Industrial Blvd Fairburn [email protected] 770-376-6000 GA

United Grading and Excavating Pond Liners 199-A Fairburn Industrial Blvd Fairburn [email protected] 770-376-6000 GA

United Grading and Excavating Site Utilities 199-A Fairburn Industrial Blvd Fairburn [email protected] 770-376-6000 GA

United Grading and Excavating Striping 199-A Fairburn Industrial Blvd Fairburn [email protected] 770-376-6000 GA

United Grading and Excavating Survey 199-A Fairburn Industrial Blvd Fairburn [email protected] 770-376-6000 GA

X United Grading and Excavating Traffic Topping / Sealer 199-A Fairburn Industrial Blvd Fairburn [email protected] 770-376-6000 GA

United Infrastructure Group, Inc. Cast In Place Concrete 1980 Cameron Ave Sanford Vince Gammage [email protected] 407-377-0550 FL

United Infrastructure Group, Inc. Earthwork Improvements 1980 Cameron Ave Sanford Vince Gammage [email protected] 407-377-0550 FL

United Infrastructure Group, Inc. Guard Rails & Barriers 1980 Cameron Ave Sanford Vince Gammage [email protected] 407-377-0550 FL

United Infrastructure Group, Inc. Paving 1980 Cameron Ave Sanford Vince Gammage [email protected] 407-377-0550 FL

United Infrastructure Group, Inc. Pile Foundations 1980 Cameron Ave Sanford Vince Gammage [email protected] 407-377-0550 FL

United Infrastructure Group, Inc. Precast 1980 Cameron Ave Sanford Vince Gammage [email protected] 407-377-0550 FL

United Infrastructure Group, Inc. Site Improvements 1980 Cameron Ave Sanford Vince Gammage [email protected] 407-377-0550 FL

X United Infrastructure Group, Inc. Site Utilities 1980 Cameron Ave Sanford Vince Gammage [email protected] 407-377-0550 FL

X United Rentals, Inc. Building Materials 9375 Boggy Creek Road Orlando Mark Stuckie [email protected] 407-466-5814 FL

X United Skys, LLC Skylights 702 Magna Dr, Round Lake Beau Crandal [email protected] 847-546-7776 IL

United Visual Branding, LLC Signage 206 Tower Dr Oldsmar Anne-Marie Thomas [email protected] 813-448-5330 FL

X United Visual Branding, LLC Building Specialties 206 Tower Dr Oldsmar Anne-Marie Thomas [email protected] 813-448-5330 FL

X Universal Forest Products, Inc. Building Materials 105 Progress Rd Auburndale Sam Huffstutter [email protected] 901-268-9188 FL

X Universal Sign Systems, Inc Signage 5001 Falcon View Ave SE, Kentwood Nate Zevenbergen [email protected] 616-554-9999 MI

Unlimited Welding, Inc. X Miscellaneous Metals 235 Old Sanford Oviedo Rd Winter Springs [email protected] 407-327-3333 FL

X Unlimited Welding, Inc. X Structural Steel 235 Old Sanford Oviedo Rd Winter Springs [email protected] 407-327-3333 FL

X Upholstery & Wood Creations, Inc. X Furnishings and Fixtures 4351 35th St, 200 Orlando Maria Elena Pereira [email protected] 407-826-3516 FL

X Valencia Construction Group, Inc. X General Contracting 348 Country Cottage Lane Winter Garden Vishaan Lutchman [email protected] 407-614-5870 FL

Page 204: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

Company Name MWBE LDB VBE DBE Trades Address City Contact Email Phone State

Hensel Phelps

South Terminal C Phase 1 Airside/Concourse

PREQUALIFIED SUBCONTRACTORS/SUPPLIERS

Firms Approved by PSC

X Valiant Products Inc Building Equipment 939 Quincy St Lakeland Emily Eakins [email protected] 863-688-7998 FL

Vanderlande Industries Inc Vertical Transportation 1975 West Oak Circle Marietta Art Masri [email protected] 770-250-2800 GA

X Vanderlande Industries Inc Conveying Systems 1975 West Oak Circle Marietta Art Masri [email protected] 770-250-2800 GA

X Verde Construction Managers, LLC X General Contracting 976 Lake Baldwin Ln #201 Orlando Alexander Rey [email protected] (407) 281-6666 FL

Ver-Tex Construction Specialties, Inc. Window Treatments 19591 NE 10th Ave, Bay D North Miami Beach Fred Jennings [email protected] 305-424-8525 FL

X Ver-Tex Construction Specialties, Inc. Building Specialties 19592 NE 10th Ave, Bay D North Miami Beach Fred Jennings [email protected] 305-424-8525 FL

X Vertical Blind Manufacturers X X Window Coverings 416 Commerce Way Londwood Melissa Hawes [email protected] 407-339-7600 FL

X Vivid Consulting Group LLC X X Construction Logistics 2902 W Lutz Lake Fern Rd Lutz Mario Parra [email protected] 813-988-8100 FL

VMG Construction Inc X Cast in Place Concrete 43 1st St Winter Garden Adolfo Galvan [email protected] 407-347-9536 FL

X VMG Construction Inc X Concrete Finishing 43 1st St Winter Garden Adolfo Galvan [email protected] 407-347-9536 FL

Votum Construction LLC X X X Construction Logistics 711 W. Amelia Street Orlando Teska Dillard [email protected] 407-704-2854 FL

X Votum Construction LLC X X X General Contracting 711 W. Amelia Street Orlando Teska Dillard [email protected] 407-704-2854 FL

X VSC Fire & Security, Inc. Fire Protection 2401 Lynx Ln #2 Orlando Sam Logue [email protected] 407-679-3332 FL

W.W. Gay Mechanical Contractor, Inc. Mechanical 3220 W 39th Street Orlando [email protected] 407-708-3331 FL

X W.W. Gay Mechanical Contractor, Inc. Plumbing 3220 W 39th Street Orlando [email protected] 407-708-3331 FL

Wal-Mark Contracting Group LLC Cementious Siding 3630 Silver Star Rd Orlando Jeff Shepherd [email protected] 407-294-5051 FL

Wal-Mark Contracting Group LLC Fireproofing 3630 Silver Star Rd Orlando Jeff Shepherd [email protected] 407-294-5051 FL

Wal-Mark Contracting Group LLC Gypsum Drywall and Ceilings 3630 Silver Star Rd Orlando Jeff Shepherd [email protected] 407-294-5051 FL

X Wal-Mark Contracting Group LLC Metal Panels 3630 Silver Star Rd Orlando Jeff Shepherd [email protected] 407-294-5051 FL

X Waste Pro of Florida Construction Logistics 2101 W State Rd 434 #315 Longwood Rachelle Belanger [email protected] 321-377-5391 FL

Waterproofing Specialists, Inc. X Fireproofing 5744 Rockwood Ave Orlando Steve Vanderlinde [email protected] 407-402-1540 FL

Waterproofing Specialists, Inc. X Traffic Topping / Sealer 5744 Rockwood Ave Orlando Steve Vanderlinde [email protected] 407-402-1540 FL

X Waterproofing Specialists, Inc. X Waterproofing and Caulking 5744 Rockwood Ave Orlando Steve Vanderlinde [email protected] 407-402-1540 FL

Watson Civil Construction, Inc d/b/a Watson Civil Earthwork Improvements 319 W Town Place, Suite 25 St Augustine Roger Bailey [email protected] (904) 297-1800 FL

X Watson Civil Construction, Inc d/b/a Watson Civil Site Utilities 319 W Town Place, Suite 25 St Augustine Roger Bailey [email protected] (904) 297-1800 FL

X WBA Associates LLC Painting 29 Coddington Ct, Belle Mead Joseph Barnes [email protected] 888-682-0588 NJ

X Webb Builders Hardware, Inc. dba WBH Industries Doors & Hardware 3016 Avenue E East Arlington [email protected] 817-701-3418 TX

X Well Kept Windows L.L.C. Furnishings and Fixtures 15763 Bermuda St Orlando Kevin Houghton [email protected] 407-408-5253 FL

X Wendt Productions, Inc. X X Fire Extinguishers Odessa Susan Wednt [email protected] 813-920-5000 FL

Western Industrial Contractors, Inc Vertical Transportation 14805 East Moncrieff Place Aurora John Eddy [email protected] 303-371-3714 CO

Western Industrial Contractors, Inc Structural Steel 14805 East Moncrieff Place Aurora John Eddy [email protected] 303-371-3714 CO

X Western Industrial Contractors, Inc Miscellaneous Metals 14805 East Moncrieff Place Aurora John Eddy [email protected] 303-371-3714 CO

X White Sign Company, LLC Signage 909 S Charles Richard Beall Blvd, Suite A, Debary Joel White [email protected] 407342-7887 FL

Whitlock Group, LLC Signage 1075 Florida Central Pkwy, Suite 2150, Longwood Sara Cooper [email protected] 727-389-9022 FL

X Whitlock Group, LLC Low Voltage Systems 1075 Florida Central Pkwy, Suite 2150, Longwood Sara Cooper [email protected] 727-389-9022 FL

X Wholesale Electric Caribe, Inc X X Electrical 10250 NW 89th Ave #5 Medley Miguel Barrios [email protected] (305) 885-1260 FL

X WI Holdings, Inc. dba Window Interior, Inc. Building Specialties 947 Josiane Ct, Suite 1010 Altamonte Springs Dave Riley [email protected] 407-539-1303 FL

Wilkinson Hi-Rise Building Equipment 3001 Greene St Hollywood Jennifer Garcia [email protected] 954-342-4400 FL

X Wilkinson Hi-Rise HVAC 3001 Greene St Hollywood Jennifer Garcia [email protected] 954-342-4400 FL

Williams Earthwork, Inc. X Construction Logistics 601 E 25th St, Sanford Shantle Williams [email protected] 407-915-6079 FL*

Williams Earthwork, Inc. X Earthwork Improvements 601 E 25th St, Sanford Shantle Williams [email protected] 407-915-6079 FL*

Williams Earthwork, Inc. X Site Improvements 601 E 25th St, Sanford Shantle Williams [email protected] 407-915-6079 FL*

Williams Earthwork, Inc. X Site Structures 601 E 25th St, Sanford Shantle Williams [email protected] 407-915-6079 FL*

X Williams Earthwork, Inc. X Site Utilities 601 E 25th St, Sanford Shantle Williams [email protected] 407-915-6079 FL*

X Williams Scotsman, Inc. Construction Logistics 901 S Bond Street, Suite 600 Baltimore Jerry Flanigan [email protected] 800-782-1500 MD

X Window Interiors Furnishings and Fixtures 947 Josiane Court Altamonte Springss Bob Robinson [email protected] 407-539-1303 FL

X WP Underground Utilities X Site Utilities 2475 Palm Bay Rd N.E., Suite 225 Palm Bay Warren Patten [email protected] 321-473-8317 FL

York International Electrical 10003 Satellite Blvd, Suite 208 Orlando Emily Harrison [email protected] 407-850-0147 FL

X York International Mechanical 10003 Satellite Blvd, Suite 208 Orlando Emily Harrison [email protected] 407-850-0147 FL

600 140 53 5 101

Page 205: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

Turner/Kiewit Joint Venture

Company Name MWBE LDB DBE VBE Trades Address1 City Contact Email Phone State

BIOFOAM Spray Foam Roofing 3627 W Harrison St. Chicago [email protected] 866-356-3626 IL

Randall Fire Protection Fie Protection 3307 Clarcona Rd. Apopka [email protected] 407-464-7776 FL

Sachs Electric Electrical 1572 Larkin Williams Road St. Louis [email protected] 636-532-2000 MO

Superior Rigging and Erecting Co. Millwrighting 11244 Boggy Creek Road Orlando 407-730-8886 FL

Superior Rigging and Erecting Co. Rental 11244 Boggy Creek Road Orlando 407-730-8886 FL

Superior Rigging and Erecting Co. Specialized Rigging 11244 Boggy Creek Road Orlando 407-730-8886 FL

Superior Rigging and Erecting Co. Heavy Transport 11244 Boggy Creek Road Orlando 407-730-8886 FL

Superior Rigging and Erecting Co. Steel Erecting 11244 Boggy Creek Road Orlando 407-730-8886 FL

Terrazzo USA and Associates, Inc ü Terrazzo 9532 Towry Court Oklahoma City Sherry Hill [email protected] 405-964-3547 OK

WonDoor Corporaton Fire Doors 1865 South 3480 West Salt Lake City Ted Decker [email protected] 801-973-7500 UTFirms Recommended for Approval: 6 0 0 1 0

South Terminal C - Phase 1 *Prequalified Subcontractors/Suppliers Summary

Total Prequalified Subs/Suppliers: 611

MWBE Certified: 196 32%

LDB Certified: 95 16%

SDVOBE Certified: 4 1%

DBE Certified: 191 31%

* Today's recommendations are assumed approved for the purpose of this summary and included in these totals.

Firms Recommended for PSC Approval

Rev. 7/30/2019

Page 206: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

PREQUALIFIED SUBCONTRACTORS/SUPPLIERS

Previously PSC Approved

Company Name MWBE LDB DBE SDVOBE Trades Address1 City Contact Email Phone State PSC Date

1 A.C. Dellovade, Inc. Metal Panels & Column Covers 108 Cavasina Dr., Canonsburg, PA 15317 Canonsburg Jason Majeski [email protected] 724.873.8190 PA 1/31/2017

A.C. Dellovade, Inc. Metal Roofing System 108 Cavasina Dr., Canonsburg, PA 15317 Canonsburg Jason Majeski [email protected] 724.873.8190 PA 1/31/2017

2 Aabot Fence, LLC Barricades and Signage 653 N. Goldenrod Rd., Orlando, FL 32807 Orlando Gary Musselwhite [email protected] 407.207.4401 FL 1/31/2017

3 Above the Sill Sunshades/Louvers 745 C. Shamrock Blvd., Venice, FL 34243 Venice Phil Barone [email protected] 941.492.3101 FL 1/31/2017

4 Abrams Architectural Products, Inc. Metal Panels 7260 Delta Circle Austell Terry Cole [email protected] 770-745-8728 GA 5/22/2018

5 AC Signs, LLC Signage 10201 Rocket Ct. #100, Orlando, FL 32824 Orlando Rob Jarvis [email protected] 407.857.5564 FL 1/31/2017

6 Access Floor Solutions Access Flooring 12792 West Colonial Drive Winter Garden Ed Patti [email protected] 407-877-2379 FL 11/13/2018

7 Ace Staffing, Inc. Work Force Badging 6304 Old Cheney Hwy., Orlando, FL 32807 Orlando Viren Patel [email protected] 407.702.4573 FL 1/31/2017

8 Ackerman Plumbing Plumbing 2011 Whitfield Park Loop Sarasota Eric Ackerman [email protected] 941.755.7448 FL 6/27/2017

9 Acme Barricades, L.C. Barricades and Signage 9800 Normandy Blvd., Jacksonville, FL 32221 Jacksonville Robin Gellhause [email protected] 407.253.4337 FL 1/31/2017

10 Acousti Doors & Specialties Overhead Doors 3506 St Valentine Way Unit #2 Orlando Kristian Roskaft [email protected] 386-789-1000 FL 11/13/2018

11 Acousti Engineering Company of Florida Drywall, ACT, Specialties 4656 Southwest 34th Street Orlando Randy Keller [email protected] 407.425.3467 FL 10/31/2017

12 Action Chutes, Inc. Trash Chutes 20 Jon Barrett Rd Patterson Steve Hebert [email protected] 845-225-4507 NY 11/13/2018

13 Acurlite Structural Skylights, Inc. Skylight 1017 North Vine St., Berwick, PA 18603 Berwick Sharleen Roberts [email protected] 570.759.6882 PA 1/31/2017

14 ACY Contractors, LLC Acoustical Ceilings 6160 Edgewater Drive #C, Orlando, FL 32810 Orlando Michael Young [email protected] 407.792.2707 FL 1/31/2017

ACY Contractors, LLC Coiling Doors 6160 Edgewater Drive #C, Orlando, FL 32810 Orlando Michael Young [email protected] 407.792.2709 FL 1/31/2017

ACY Contractors, LLC

Concrete Flatwork (SOG, Sidewalks, Misc Pads,

C&G) 6160 Edgewater Drive #C, Orlando, FL 32810 Orlando Michael Young [email protected] 407.792.2709 FL 1/31/2017

ACY Contractors, LLC Drywall 6160 Edgewater Drive #C, Orlando, FL 32810 Orlando Michael Young [email protected] 407.792.2708 FL 1/31/2017

ACY Contractors, LLC Masonry 6160 Edgewater Drive #C, Orlando, FL 32810 Orlando Michael Young [email protected] 407.792.2709 FL 1/31/2017

ACY Contractors, LLC Millwork 6160 Edgewater Drive #C, Orlando, FL 32810 Orlando Michael Young [email protected] 407.792.2709 FL 1/31/2017

15 Adams Brothers Cabinetry d/b/a Adams Group Millwork 2221 Murphy Ct., North Port, FL 34289 Port Joe West [email protected] 941.639.7188 FL 1/31/2017

16 ADF International, Inc. Steel 1619 Wythe Rd., Lynchburg, VA 24501 Lynchburg Alexis Giroux [email protected] 305.621.0001 VA 1/31/2017

ADF International, Inc. Structural Steel & Misc. Metals 1321 8th Ave. North, Great Falls, MT 59401 North Great Falls Alexis Giroux [email protected] 305.621.0001 MT 1/31/2017

17 Advanced Cable Connection, Inc. Telecom 13654 N. 12th St., Suite 1, Tampa, FL 33613 Tampa Ronald Schemitsch [email protected] 813.978.0101 FL 1/31/2017

18 Advanced Disposal Services, Inc. Waste Hauler 90 Fort Wade Road, Suite 200 Ponte Vedra Richard Kneeland [email protected] FL 1/23/2018

19 Advanced Masonry Systems Masonry 5403 Ashton Ct. Sarasota Ron Karp [email protected] 941-926-3155 FL 5/22/2018

20 Advanced Millwork, Inc. Millwork 2645 Regent Avenue, Orlando, FL 32804 Orlando Ashley Coleman [email protected] 407.244.1927 FL 1/31/2017

21 Advanced Overhead Systems Equipment Cranes 3510 Craftsman Blvd Lakeland John Haney [email protected] 863-667-3757 FL 11/13/2018

22 AED Inc. Electrical, HVAC, Mech Louvers, Plumbing 6525 Belcrest Rd., Ste. 426, Hyattsville, MD 20782 Hyattsville Reginald [email protected] 407.645.5522 MD 1/31/2017

AED Inc. HVAC/Mech Louvers 6525 Belcrest Rd., Ste. 426, Hyattsville, MD 20782 Hyattsville Reginald [email protected] 407.645.5522 MD 1/31/2017

AED Inc. Plumbing 6525 Belcrest Rd., Ste. 426, Hyattsville, MD 20782 Hyattsville Reginald [email protected] 407.645.5522 MD 1/31/2017

23 Aerial Innovations, Inc. Progress Photos 3703 W. Azeele St., Tampa, FL 33609 Tampa Colette Eddy [email protected] 813.254.7339 FL 1/31/2017

24 Aireko Energy Solutions US, LLC Electrical 2415 W. Sand Lake Rd., Suite E Orlando Hector Rivera [email protected] 407.885.8767 FL 1/23/2018

25 Airport Equipment Specialists Inc. Overhead Doors 13957 Ketch Cove Pl, 403 Jacksonville Chris Flemming [email protected] 904-608-8815 FL 1/15/2019

26 Aleut Management Services Electrical 5775 Mark Dabling Blvd Suite 105 Colorado Springs Steve Luker [email protected] 7192908292 CO 7/10/2018

27 All Flooring USA Flooring 12919 E Colonial Dr Orlando Hector L Torres [email protected] (407) 243-1911 FL 11/13/2018

28 Allied Barton Security Services Security 11 S. Bumby Ave., Orlando, FL 32803 Orlando Taylor McDonald 954.415.7419 FL 1/31/2017

29 Allied Door & Hardware Co., Inc. Overhead Doors 1465 Cox Rd Cocoa Ed Harding [email protected] 321-639-6372 FL 11/13/2018

30 All-Rite Fence Services, Inc. Barricades and Signage 5115 Old Winter Garden Rd., Orlando, FL 32811 Orlando Donna 407.295.7093 FL 1/31/2017

31 Allstate Steel Company Inc of Jacksonville Structural Steel & Ornamental Metals 130 Jackson Avenue South Jacksonville Eddy Barrera [email protected] 904-694-0674 FL 5/22/2018

32 Alpha Insulation & Waterproofing Co.

Fireproofing/Waterproofing 669 Village Trace NE, Bldg. 19C, Marietta, GA 30067 Marietta Kristi Giles [email protected] 678.325.2959 GA 1/31/2017

Alpha Insulation & Waterproofing Co.

Waterproofing/Joint Sealants/Foundation

Waterproofing 670 Village Trace NE, Bldg. 19C, Marietta, GA 30067 Marietta Kristi Giles [email protected] 678.325.2960 GA 1/31/2017

33 Altamonte Glass & Mirror, Inc. Glazing/Curtainwall Systems & Skylights 6001 Cinderlane Parkway, Orlando, FL 32810 Orlando Brian Fitzgerald [email protected] 407.770.1400 FL 1/31/2017

Altamonte Glass & Mirror, Inc. Interior Glazing 6000 Cinderlane Parkway, Orlando, FL 32810 Orlando Brian Fitzgerald [email protected] 407.770.1399 FL 1/31/2017

Altamonte Glass & Mirror, Inc. Skylight 6001 Cinderlane Parkway, Orlando, FL 32810 Orlando Brian Fitzgerald [email protected] 407.770.1400 FL 1/31/2017

34 Altel Systems Group, Inc. Audio Visual

2856 Broadway Center Blvd., Unit A4, Brandon, FL

33510 Brandon Anja Vitale [email protected] 813.628.6100 FL 1/31/2017

35 Alumiglass LLC Glazing/Curtainwall Systems & Skylights 3402 Quantum Blvd., Boynton Beach, FL 33431 Boynton Beach Bob Mulligan [email protected] 561.750.2300 FL 1/31/2017

36 Ambient Technologies, Inc. Quality Control/Materials Testing 4610 Central Ave., St. Petersburg, FL 33711 St. Petersburg Albert Rodriguez [email protected] 813.300.5995 FL 1/31/2017

37 American Backflow & Fire Services, LLC

Fire Protection 1230 Oakley Seaver Dr., Ste. 302, Clermont FL 34711 Clermont Gary Gamache [email protected] 877.393.5544 FL 1/31/2017

American Backflow & Fire Services, LLC Plumbing 1229 Oakley Seaver Dr,. Clermont FL 34711 Clermont Gary Gamache [email protected] 877.393.5543 FL 1/31/2017

38 American Chutes Trash Chutes 600 Twin Rail Dr Minooka Frank Stephens [email protected] 815-723-7632 IL 11/13/2018

39 American Davit LLC Window Washing Equipment 3807 Charlotte Ave Nashville Dennis Pease [email protected] 615-414-1874 TN 11/13/2018

40 American Eagle Concrete Sawing & Drilling Inc. Concrete Cutting 1705 S. Division Ave., Orlando, FL 32805 Orlando Jodi Kelzer [email protected] 407.654.3632 FL 1/31/2017

41 American Janitorial Maintenance, Inc. Cleaning 600 N. Thacker Ave., Suite D47 Kissimmee Rose-Marie Aveloo [email protected] 407-334-8803 FL 10/17/2017

42 American Roll Up Door Co. Coiling Doors 10501 Rocket Blvd., Orlando, FL 32824 Orlando Thomas Miller [email protected] 407.857.2427 FL 1/31/2017

43 Anning-Johnson Company Gypsum/ACT 1959 Anson Drive Melrose Park Jim Kasella [email protected] 708.514.6890 IL 1/23/2018

44 Anthony Allega Cement Contractor, Inc. Concrete, Earthwork, GR's 5585 Canal Rd. Valley View Laura Fiorello [email protected] 216.867.1345 OH 10/17/2017

45 APG Electric Inc. Electrical 4825 140th Ave. North Clearwater Chris Johnson [email protected] 727-530-0077 FL 5/22/2018

46 Arazoza Brothers Corp. Interior Landscape Plants & Accessories 15901 SW 242nd St Homestead Melissa Diaz [email protected] 305-246-3223 FL 11/13/2018

47 Archis Inc. Low Voltage 350 E Crown Point Rd. Winter Garden Lidharry Jiawan [email protected] 407-383-5628 FL 5/22/2018

48 Architectural Graphics, Inc. Signage 2655 International Pkwy., Virginia Beach, VA 23452 Virginia Beach William Clark michael@asmFLcom 757.427.1900 VA 1/31/2017

49 Architectural Sheet Metal, Inc. Metal Panels & Column Covers 9101 Parkers Landing, Ste. 100, Orlando, FL 32824 Orlando Michael Leonard michael@asmFLcom 407.855.7183 FL 1/31/2017

Architectural Sheet Metal, Inc. Metal Roofing System 9100 Parkers Landing, Ste. 100, Orlando, FL 32824 Orlando Michael Leonard michael@asmFLcom 407.855.7182 FL 1/31/2017

50 Architectural Systems, Inc. Acoustical & Metal Ceilings 2310 Mercator Dr Orlando Karina Cantor [email protected] 212-206-1730 FL 11/13/2018

51 Ardaman & Associates, Inc. Quality Control/Materials Testing 8008 S. Orange Ave., Orlando, FL 32809 Orlando Jason Parker [email protected] 407.855.3860 FL 1/31/2017

52 Armstrong Fence Company Site Furnishings & Fencing 3226 Talleyrand Ave Jacksonville Don Miller [email protected] 904-356-2333 FL 11/13/2018

53 Associated Building Specialties, Inc. Div10 Specialties/Toilet Accessories 6070 Twin Lakes Dr., Oviedo, FL 32765 Oviedo Kathleen Singer ksinger@absFLnet 407.339.2284 FL 1/31/2017

54 Associated Cost Engineers, Inc. of Delaware dba ACE Rebar & Construction

Structural Concrete (Columns/Walls/Stairs/SOD) 801 N. Pine Hills Rd., Orlando, FL 32808 Orlando Jaja Wade [email protected] FL 1/31/2017

Associated Cost Engineers, Inc. of Delaware dba ACE Rebar & Construction

Structural Steel & Misc. Metals 801 N. Pine Hills Rd., Orlando, FL 32808 Orlando Jaja Wade [email protected] FL 1/31/2017

55 Atlantic Central Enterprises, Inc. Metals 336 LPGA Blvd. Holly Hill Steve Traulsen [email protected] 386-871-7174 FL 5/22/2018

56 Attaway Services, Inc. Manholes, Water Utilities 801 S.E. 28th St. Ft. Lauderdale Troy Brown [email protected] 954.462.2920 FL 6/27/2017

Page 2 of 12

Rev. 7/30/2019

Page 207: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

PREQUALIFIED SUBCONTRACTORS/SUPPLIERS

Previously PSC Approved

Company Name MWBE LDB DBE SDVOBE Trades Address1 City Contact Email Phone State PSC Date

57 Audio Fidelity Communications Corporation d/b/a Whitlock Audio Visual

12820 West Creek Parkway, Suite M, Richmond, VA

23238 Richmond Mark Wilson [email protected] 813.498.0399 VA 1/31/2017

Audio Fidelity Communications Corporation d/b/a Whitlock Public Address

12820 West Creek Parkway, Suite M, Richmond, VA

23238 Richmond Mark Wilson [email protected] 813.498.0399 VA 1/31/2017

58 Audio Visual Innovations, Inc. Audio Visual 6301 Benjamin Road, Suite 101, Tampa, FL 33634 Tampa Jim Englemann [email protected] 813.884.7168 FL 1/31/2017

Audio Visual Innovations, Inc. Public Address 6301 Benjamin Road, Suite 101, Tampa, FL 33634 Tampa Jim Englemann [email protected] 813.884.7168 FL 1/31/2017

59 AWK Consulting Engineers, Inc. Access Roads/Storage Yards 6457 Hazeltine National Dr., Orlando, FL 32822 Orlando Rachel Andre [email protected] 407.666.8098 FL 1/31/2017

60 Axios Construction Services, LLC Acoustical Ceilings 2905 Lakeview Dr., Casselberry, FL 32730 Casselberry Rami [email protected] 321.352.6825 FL 1/31/2017

61 B & I Contractors, Inc. Mechanical/Plumbing 2701 Prince Street Fort Myers Gary Griffin [email protected] 239.332.4646 FL 6/27/2017

B & I Contractors, Inc. Ceramic Tile 2902 Lakeview Dr., Casselberry, FL 32730 Casselberry Rami [email protected] 321.352.6826 FL 1/31/2017

B & I Contractors, Inc.

Concrete Flatwork (SOG, Sidewalks, Misc Pads,

C&G) 2905 Lakeview Dr., Casselberry, FL 32730 Casselberry Rami [email protected] 321.352.6829 FL 1/31/2017

B & I Contractors, Inc. Drywall 2903 Lakeview Dr., Casselberry, FL 32730 Casselberry Rami [email protected] 321.352.6827 FL 1/31/2017

B & I Contractors, Inc. Paint/Special Coatings 2904 Lakeview Dr., Casselberry, FL 32730 Casselberry Rami [email protected] 321.352.6828 FL 1/31/2017

B & I Contractors, Inc. Telecom 2905 Lakeview Dr., Casselberry, FL 32730 Casselberry Rami [email protected] 321.352.6829 FL 1/31/2017

62 B & M Masonry, Inc. Masonry 104 Gann Rd. Marietta Jeff Turner [email protected] 813.936.4016 GA 10/31/2017

63 B.R. McMillan & Associates Specialties 4030 Old Highway 31 West Cottontown Nick Hassell [email protected] 615-672-2996 TN 11/13/2018

64 Baker Concrete Construction, Inc. Architectural Precast 1540 Aber Rd., Orlando FL 32807 Orlando Ben Goodin [email protected] 407.952.9111 FL 1/31/2017

Baker Concrete Construction, Inc. Concrete Foundations & Earthwork 1540 Aber Rd., Orlando FL 32807 Orlando Ben Goodin [email protected] 407.952.9112 FL 1/31/2017

Baker Concrete Construction, Inc. Precast Platforms 1540 Aber Rd., Orlando FL 32807 Orlando Ben Goodin [email protected] 407.952.9109 FL 1/31/2017

Baker Concrete Construction, Inc. Structural Concrete (Columns/Walls/Stairs/SOD) 1540 Aber Rd., Orlando FL 32807 Orlando Ben Goodin [email protected] 407.952.9112 FL 1/31/2017

Baker Concrete Construction, Inc. Structural Concrete (Columns/Walls/Stairs/SOD) 1540 Aber Rd., Orlando FL 32807 Orlando Ben Goodin [email protected] 407.952.9110 FL 1/31/2017

65 Baker Interactive Services, LLC d/b/a Baker Audio Visual Audio Visual 2195 N. Norcross Tucker Rd., Norcross, GA 30071 Norcross Kasie Barnett [email protected] 770.441.2000 GA 1/31/2017

Baker Interactive Services, LLC d/b/a Baker Audio Visual Public Address 2195 N. Norcross Tucker Rd., Norcross, GA 30071 Norcross Kasie Barnett [email protected] 770.441.2000 GA 1/31/2017

66 Banker Steel Co., LLC Structural Steel & Misc. Metals 6635 Edgewater Dr., Orlando FL 32810 Orlando John Omran [email protected] 813.352.0207 FL 1/31/2017

67 Barber & Associates, Inc. Waterproofing 5755 Macy Avenue Jacksonville John W. Barber III [email protected] 904.759.2796 FL 1/23/2018

68 Bauer Foundation Corp. Auger Cast Piles 13203 Byrd Legg Dr., Odessa, FL 33556 Odessa Michael Germana [email protected] 727.536.4747 FL 1/31/2017

69 Bay Carpets, Inc. Carpet & Resilient Flooring 680 West 18th St Hialeah Jay Perez [email protected] 305-889-0617 FL 11/13/2018

70 Bay to Bay Balancing, Inc. Test and Balance 933 Lee Rd., Suite 405, Orlando, FL 32810 Orlando Deborah Long [email protected] 407.704.8768 FL 1/31/2017

71 BCI Incorporated Curtainwall 5008 Tampa West Blvd. Tampa Jim Hatton [email protected] 813.785.9863 FL 1/23/2018

72 Becker Communications, Inc. d/b/a BCI Integrated Solutions CCTV 3506 Saint Valentine Way, Suite 5, Orlando, FL 32811 Orlando Thomas Garner tgarner@bciFLnet 813.480.8916 FL 1/31/2017

Becker Communications, Inc. d/b/a BCI Integrated Solutions Fire Alarm 3505 Saint Valentine Way Suite 5, Orlando, FL 32811 Orlando Thomas Garner tgarner@bciFLnet 813.480.8915 FL 1/31/2017

Becker Communications, Inc. d/b/a BCI Integrated Solutions Security 3506 Saint Valentine Way Suite 5, Orlando, FL 32811 Orlando Thomas Garner tgarner@bciFLnet 813.480.8916 FL 1/31/2017

73 Bell Architectural Specialties, Inc. Specialties 6619 South 78th Street Riverview Donald Bell [email protected] 813-927-5226 FL 11/13/2018

74 Berg Electric Electrical 404 Sunport Lane Orlando William Sorber [email protected] 760.746.1003 FL 6/27/2017

75 Bergen Sign Company, Inc. Signage 4100 Powerline Rd Pompano Beach Rich Walker [email protected] 973-742-7755 FL 11/13/2018

76 Berkel & Company, Contractors, Inc. Access Roads/Storage Yards 3702 Rogers Industrial Park Rd., Okahumpka, FL 34762 Okahumpka Chris Chinopulos 352.365.4308 FL 1/31/2017

77 Best Rolling Doors, Inc. Overhead Doors 9780 NW 79th Ave Hialeah Gardens Edwing Meter [email protected] 605-206-8842 FL 11/13/2018

78 Bettinger West Interiors Access Flooring 7079 Brookdale Drive Elkridge Gary Parsons [email protected] 410-799-8286 MD 11/13/2018

79 Big Bird LLC DBA Sign Source of Charleston Signage 944 Suite D Rochelle Ave. Charleston LeeAnn Rawson [email protected] 843.801.0821 SC 10/17/2017

80 Big Stuff Incorporated Trash Chutes 1301 Ritchie Rd Capital Heights Josh Bortnick [email protected] 301-499-3700 MD 11/13/2018

81 Birdair, Inc. Aluminum Walkway 65 Lawrence Bell Dr., Amherst, NY 14221 Amherst Tom Connell [email protected] 716.633.9500 NY 1/31/2017

82 Black & Son Remodeling LLC Concrete 519 Royal Palm Dr., Kissimmee, FL 34743 Kissimmee Zheer Black [email protected] 407.334.1873 FL 1/31/2017

Black & Son Remodeling LLC Rough Carpentry 519 Royal Palm Dr., Kissimmee, FL 34743 Kissimmee Zheer Black [email protected] 407.334.1873 FL 1/31/2017

Black & Son Remodeling LLC Doors/Frames/Hardware 520 Royal Palm Dr., Kissimmee, FL 34743 Kissimmee Zheer Black [email protected] 407.334.1874 FL 1/31/2017

Black & Son Remodeling LLC Flooring 521 Royal Palm Dr., Kissimmee, FL 34743 Kissimmee Zheer Black [email protected] 407.334.1875 FL 1/31/2017

Black & Son Remodeling LLC Drywall 521 Royal Palm Dr., Kissimmee, FL 34743 Kissimmee Zheer Black [email protected] 407.334.1875 FL 1/31/2017

83 Black Rock Industrial Terrazzo Flooring 6699 NE 2nd Ave Miami Rocco Musumeci [email protected] 833-255-7625 FL 11/13/2018

84 Blue Marlin Engineering, LLC Quality Control/Materials Testing 102 Drennen Rd., Ste. B-10, Orlando, FL 32806 Orlando Ozzie Plaza [email protected] 407.217.4464 FL 1/31/2017

85 Bright Future Electrical 630 South Kissimmee Avenue Ocoee Skip Brown [email protected] 407.654.0155 FL 6/27/2017

86 BrightView Landscapes Interior Landscape Plants & Accessories 320 North Mission Road Orlando Jake Statham [email protected] 407-587-6909 FL 11/13/2018

87 Builder Services Group, Inc DBA Santa Rosa Insulation and Fireproofing Fire Proofing & Insulation 6130 NW 74th Ave Miami Raul Puig [email protected] 305-592-5249 FL 11/13/2018

88 C National Security LLC dba Comp Security Site Security 1402 West 16 St. Sanford Charlie Lewis [email protected] 321-377-9439 FL 5/22/2018

89 C&K United Sheet Metal and Mechanical Inc. Glazing/Curtainwall Systems & Skylights PO Box 16095, Evansville, IN 47716 Evansville Maurice Coates [email protected] 812.423.5090 IN 1/31/2017

C&K United Sheet Metal and Mechanical Inc.

Waterproofing/Joint Sealants/Foundation

Waterproofing PO Box 16095, Evansville, IN 47716 Evansville Maurice Coates [email protected] 812.423.5090 IN 1/31/2017

90 Cabinets by Design Millwork & Countertops 2883 Pleasant Hill Rd Duluth Fari Vakili [email protected] 770-418-1200 GA 11/13/2018

91 CAD Concepts, Inc. dba CCI Engineering Services BIM/VDC Engineer 2323 West 5th Ave. Columbus Joyce Johnson [email protected] 614.485.0670 OH 8/1/2017

92 Cajun Installation and Distributing, Inc. D/F/H 1020 Ocoee Apopka Rd. #100 Apopka Jim Sabella [email protected] 407-886-7533 FL 5/22/2018

93 California Neon Products d/b/a CNP Signs & Graphics Signage 4530 Mission Gorge Place, San Diego, CA 92120 San Diego Rob Fought [email protected] 619.283.2191 CA 1/31/2017

94 Capform, Inc. Concrete 1455 Halsey Way Carrollton Anthony Bellissimo [email protected] 972.245.7292 TX 6/27/2017

95 Capri Contractors, Inc. Acoustical Ceilings 1218 Mt. Vernon St., Orlando, FL 32803 Orlando Rafael Prieto [email protected] 407.228.4645 FL 1/31/2017

96 Carnahan Proctor and Cross, Inc. Surveying 604 Courtland St., Suite 101 Orlando Donna Hagedon [email protected] 407.960.5980 FL 6/27/2017

97 Carter Electric, Inc. Electrical 2455 W. Orange Blossom Tr., Apopka, FL 32712 Apopka Travis Bumgarner [email protected] 407.814.2677 FL 1/31/2017

98 Case Atlantic Company Precast Driven Piles & Earthwork 4585 140th Ave. North, Clearwater, FL 33762 Clearwater Brian Moritz [email protected] 727.572.7740 FL 1/31/2017

99 Castle Constructors Company

Concrete Flatwork (SOG, Sidewalks, Misc Pads,

C&G) 5850 TG Lee Blvd., Ste. 205, Orlando, FL 32822 Orlando Rey Lorenzo [email protected] 407.888.1195 FL 1/31/2017

Castle Constructors Company Masonry 5850 TG Lee Blvd. Ste. 205 Orlando, FL 32822 Orlando Rey Lorenzo [email protected] 407.888.1195 FL 1/31/2017

100 CCK Construction Services, Inc. Concrete 6250 Hazeltine National Drive Orlando Anthony Colasanti [email protected] 407.472.9700 FL 8/1/2017

101 CE Electrical Contractors, Inc Electrical 1 Hartford Square Suite C10 New Britain Wall Martinez [email protected] 860.356.0679 CT 10/17/2017

102 Certified Finishes Carpet & Resilient Flooring 4455 Dardanelle Dr Orlando Joey Perez [email protected] 407-335-5171 FL 11/13/2018

103 Champion Painting Specialty Services Corp. Drywall 130 SW 22 St., Ft. Lauderdale, FL 33315 Ft. Lauderdale Carlos Hernandez [email protected] 954.462.9073 FL 1/31/2017

Champion Painting Specialty Services Corp. Paint/Special Coatings 130 SW 22 St., Ft. Lauderdale, FL 33315 Ft. Lauderdale Carlos Hernandez [email protected] 954.462.9074 FL 1/31/2017

104 Cherokee Enterprises, Inc. Electrical 14474 Commerce Way, Miami Lakes, FL 33016 Miami Lakes Amanuel Worku [email protected] 305.828.3353 FL 1/31/2017

105 Cherrylake, Inc. d/b/a Legacyscapes Landscaping 7836 Cherry Lake Rd., Groveland, FL 34736 Groveland Aaron Morse [email protected] 888.529.5550 FL 1/31/2017

106 Chroma Building Corp. Door Frames/Hardware 84 West Park Place St., 5th Floor, Stamford, CT 06901 Stamford Paul DePhillips [email protected] 203.602.8838 CT 1/31/2017

107 Chrome Electric, LLC Electrical 500 S. Park Ave. Titusville William Butcher [email protected] 321-267-0990 FL 10/17/2017

Page 3 of 12

Rev. 7/30/2019

Page 208: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

PREQUALIFIED SUBCONTRACTORS/SUPPLIERS

Previously PSC Approved

Company Name MWBE LDB DBE SDVOBE Trades Address1 City Contact Email Phone State PSC Date

108 Chutes International Trash Chutes Industrial Park Dr Waldorf Bob Loughlin [email protected] 410-365-9046 MD 11/13/2018

109 Cirsco, Commercial Industrial Roof Services Company Metal Roofing System 311 S. Falkenburg Rd., Tampa, FL 33619 Tampa Hig Dillinger [email protected] 813.655.8079 FL 1/31/2017

Cirsco, Commercial Industrial Roof Services Company Mod. Bit. Roofing 311 S. Falkenburg Rd., Tampa, FL 33619 Tampa Hig Dillinger [email protected] 813.655.8080 FL 1/31/2017

110 Cives Steel Company, Southern Division Metal Panels & Column Covers Old Alabama Rd. #200, Roswell, GA 30076 Roswell Bill Hales [email protected] 229.228.9780 GA 1/31/2017

Cives Steel Company, Southern Division Structural Steel & Misc. Metals Old Alabama Rd. #200, Roswell, GA 30076 Roswell Bill Hales [email protected] 229.228.9780 GA 1/31/2017

111 Cladding Systems, Inc. Aluminum Walkway 3218 E. 4th Ave., Tampa, FL 33605 Tampa Suzie Frazer [email protected] 813.250.0785 FL 1/31/2017

Cladding Systems, Inc. Metal Panels & Column Covers 3218 E. 4th Ave., Tampa, FL 33605 Tampa Suzie Frazer [email protected] 813.250.0786 FL 1/31/2017

112 Clayco Inc. dba Skyline Elevators Elevators 11306 Bay Lake Road Groveland Marcia Bell [email protected] 352.429.7688 FL 6/27/2017

113 Clear Horizon Ventures Company d/b/a Petersen Metals Metal Panels & Column Covers 9410 Eden Ave., Hudson, FL 34667 Hudson Paul Schottelkotte [email protected] 727.372.1100 FL 1/31/2017

114 Cleveland Construction, Inc. Drywall, stucco, insulation 5390 Courseview Drive Mason David Kurilko [email protected] 513-623-4469 OH 7/31/2018

115 Cleveland Electric Company Electrical 1281 Fulton Industrial Blvd. Atlanta Rodney Shultz [email protected] 404.505.4334 GA 10/17/2017

116 Coastal Mechanical Services, LLC HVAC/Mech Louvers 394 East Dr., Melbourne, FL 32904 Melbourne J. Stewart [email protected] 321.392.4399 FL 1/31/2017

Coastal Mechanical Services, LLC Plumbing/HVAC 394 East Dr., Melbourne, FL 32904 Melbourne Joanne Stewart [email protected] 321.392.4399 FL 1/31/2017

117 Collis Roofing, Inc. Roofing 485 Commerce Way Longwood Wallace Fulton [email protected] 321-441-2300 FL 10/31/2017

118 Comfort Aircon Inc. HVAC 2730 Treymore Drive Orlando Paula Patel [email protected] 407.306.0906 FL 1/23/2018

119 Comfort House, Inc. Temporary Toilets 2450 Titan Row, Orlando, FL 32809 Orlando Becky Thomas 407.647.2002 FL 1/31/2017

120 Comfort Systems USA, Inc. Mechanical 799 Bennett Dr. Longwood Manny Toro [email protected] FL 5/22/2018

121 Commercial Fabricators, Inc. Misc Metals 2045 Industrial Drive, Newton, NC, 28658 Newton Bryan Oxentine [email protected] 828-465-1010 NC 4/30/2019

122 Commercial Millworks, Inc. Millwork 1120 S. Hughey Ave., Suite A, Orlando, FL 32806 Orlando Gayle King [email protected] 407.648.2787 FL 1/31/2017

123 Commercial Systems Group, Inc. Fire Alarm 151 Semoran Commerce Pl. Ste. C, Apopka, FL 32703 Apopka Dino DeRose [email protected] 407.814.0225 FL 1/31/2017

124 Communications Service Co. of Daytona, Inc. d/b/a Radio One Jobsite Radios 7041 Grand National Dr., Suite 116, Orlando, FL 32819 Orlando Greg Parker 407.352.9242 FL 1/31/2017

125 Competitive Edge Partners & Consulting, LLC Work Force Badging, Labor 3515 McCormick Woods Dr., Ocoee, FL 34761 Ocoee Patti Gibson [email protected] 321.228.6166 FL 1/31/2017

126 Comprehensive Energy Services, Inc. HVAC/Mech Louvers 777 Bennett Dr., Longwood, FL 32750 Longwood Todd Morgan [email protected] 407.682.1313 FL 1/31/2017

Comprehensive Energy Services, Inc. Plumbing/HVAC 777 Bennett Dr., Longwood, FL 32750 Longwood Todd Morgan [email protected] 407.682.1313 FL 1/31/2017

127 Condor Construction Group Site Work 1800 Pembrook Dr., Suite 313 Orlando Luis Pinzon [email protected] 321.377.7610 FL 10/17/2017

128 Construction Recruiters America Staffing, Inc. Work Force Badging 5220 S. University Dr., Suite C208, Davie, FL 33328 Davie Diane Dalman 520.270.9923 FL 1/31/2017

129 Construction Specialty Services, Inc. Painting 1530 Celebration Blvd., Suite 403 Celebration Elba Keitt [email protected] 321.939.1464 FL 6/27/2017

130 ConTech Construction, LLC Concrete 700 W. Plant Street Winter Garden Alan Haughey [email protected] 407.905.8006 FL 8/1/2017

131 Contech of Puerto Rico, Inc. Terrazzo Flooring P.O. BOX 19270 Santurce Franco Ferraiuoli [email protected] 787-722-1020 PR 1/15/2019

132 Conti Corporation Electrical 6417 Center Drive Sterling Heights Thomas Landa [email protected] MI 5/22/2018

133 Control Engineering Group Automated Control Devices 175 Semoran Commerce Pl. Apopka Sandy Lance [email protected] 407.889.2432 FL 1/23/2018

134 Cook & Boardman, LLC Doors, Frames, Hardware 3916 Westpoint Blvd. Winston-Salem Joseph White [email protected] 336.769.7902 NC 10/31/2017

135 Copeland Architectural Millwork Cabinets Acoustical & Metal Ceilings 5836 Industrial Cir Bossier City Michael Copeland [email protected] 318-470-1723 LA 11/13/2018

136 Copeland Architectural Systems Acoustical & Metal Ceilings 3225 South MacDill Ave Tampa Stacey Gimson [email protected] 813-831-3344 FL 11/13/2018

137 Cornerstone Construction Services, Inc. Structural Concrete (Columns/Walls/Stairs/SOD) 4205 Edgewater Dr., Orlando, FL 32804 Orlando Amadita Stone [email protected] 407.299.3299 FL 1/31/2017

138 Cox Fire Protection, Inc. Fire Protection 7910 Professional Place Tampa Shane Rushlo [email protected] 813-781-2807 FL 5/22/2018

139 Crawford Tracey Group Glazing/Curtainwall Systems & Skylights 3301 SW 13th Dr., Deerfield Beach, FL 33442 Deerfield Beach Keira De Armas [email protected] 954.246.1890 FL 1/31/2017

140 Creative Mailbox Designs d/b/a Creative Sign Designs, LLC Signage 12801 Commodity Place, Tampa, FL 33626 Tampa Luke [email protected] 407.466.5301 FL 1/31/2017

141 Creative Management Technology, Inc. HVAC 5380 Hoffner Ave. Orlando Trox Austell [email protected] 321.799.4022 FL 8/1/2017

142 Creative Terrazzo Systems, Inc. Terrazzo 3300 SW 3rd Ave. Ste. N, Ft. Lauderdale, FL 33315 Ft. Lauderdale Dan Beaucage [email protected] 954.245.8990 FL 1/31/2017

143 Creative Walls & Landscaping Interior Landscape Plants & Accessories 26714 Oak Shadow Ln Mount Dora Corey Warner [email protected] FL 11/13/2018

144 Crisdel Group, Inc. Earthworks 240 Ryan St., South Plainfield, NJ 07080 South Plainfield Frank Crisola [email protected] 908.561.7550 NJ 1/31/2017

145 Crown Corr, Inc. Curtainwall/Glazing 7100 W. 21st Avenue, Gary, IN 46406 Gary Tyrone Tice [email protected] 317.201.5750 IN 1/31/2017

Crown Corr, Inc. Interior Glazing 7100 W. 21st St. Gary, IN 46406 Gary Tyrone Tice [email protected] 317.201.5750 IN 1/31/2017

Crown Corr, Inc. Metal Roofing System 7100 W. 21st St. Gary, IN 46406 Gary Tyrone Tice [email protected] 317.201.5750 IN 1/31/2017

146 Crown Roofing LLC Roofing 4696 Elevation Way Ft. Myers Christopher Copeland [email protected] 855.276.9655 FL 10/31/2017

147 Crowther Roofing and Sheet Metal of Florida, Inc. Roofing 2543 Rockfill Rd. Ft. Myers John Highfill [email protected] 239.337.1300 FL 10/31/2017

148 CT Windows, LLC d/b/a Architectural Aluminum Techniques Glazing/Curtainwall Systems & Skylights 9195 Boggy Creek Rd., Suite 1, Orlando, FL 32824 Orlando Sunil Tarneja [email protected] 407.857.9237 FL 1/31/2017

CT Windows, LLC d/b/a Architectural Aluminum Techniques Interior Glazing 9195 Boggy Creek Rd., Suite 1, Orlando, FL 32824 Orlando Sunil Tarneja [email protected] 407.857.9236 FL 1/31/2017

149 Cube Care Company Roller Window Shades 6043 NW 167th St, Suite A-23 Hialeah Susana Robledo [email protected] 305-556-8700 FL 11/13/2018

150 Cubix, Inc. Carpeting 6450 Kingspointe Pkwy., Suite 10 Orlando Travis Owens [email protected] 407.928.1004 FL 1/23/2018

151 Custom Welding by Law Misc. Metals 1800 S Division Ave Orlando Dan Ohlhues [email protected] 407-843-0061 FL 11/13/2018

152 D & A Building Services Inc. Cleaning 321 Georgia Ave. Longwood Rudy Perez [email protected] 404.831.5388 FL 10/31/2017

153 D&A Construction Group, Inc. Door Frames/Hardware 983 Explorer Cove, Altamonte Springs, FL 32701 Altamonte Springs Heather McCandless [email protected] 407.960.4032 FL 1/31/2017

D&A Construction Group, Inc. Drywall 983 Explorer Cove, Altamonte Springs, FL 32701 Altamonte Springs Heather McCandless [email protected] 407.960.4032 FL 1/31/2017

D&A Construction Group, Inc. Final Cleaning 981 Explorer Cove, Altamonte Springs, FL 32701 Altamonte Springs Heather McCandless [email protected] 407.960.4030 FL 1/31/2017

D&A Construction Group, Inc. Masonry 983 Explorer Cove, Altamonte Springs, FL 32701 Altamonte Springs Heather McCandless [email protected] 407.960.4032 FL 1/31/2017

D&A Construction Group, Inc. Office Cleaning 982 Explorer Cove, Altamonte Springs, FL 32701 Altamonte Springs Heather McCandless [email protected] 407.960.4031 FL 1/31/2017

D&A Construction Group, Inc. Paint/Special Coatings 983 Explorer Cove, Altamonte Springs, FL 32701 Altamonte Springs Heather McCandless [email protected] 407.960.4032 FL 1/31/2017

D&A Construction Group, Inc. Resilient Flooring/Carpet 983 Explorer Cove, Altamonte Springs, FL 32701 Altamonte Springs Heather McCandless [email protected] 407.960.4032 FL 1/31/2017

D&A Construction Group, Inc.

Waterproofing/Joint Sealants/Foundation

Waterproofing 983 Explorer Cove, Altamonte Springs, FL 32701 Altamonte Springs Heather McCandless [email protected] 407.960.4032 FL 1/31/2017

154 D10 Spec, Inc. Specialties 921 Lexington Pkwy. #25 Apopka Angela Highland [email protected] 407.253.3449 FL 10/31/2017

155 David Allen Tile Company Inc. Ceramic Tile 150 Rush St., Raleigh, NC 27603 Raleigh Ann Pope [email protected] 919.821.7100 NC 1/31/2017

David Allen Tile Company Inc. Terrazzo 150 Rush St., Raleigh, NC 27603 Raleigh Ann Pope [email protected] 919.821.7100 NC 1/31/2017

156 Decktight Roofing Services, Inc. Roofing 6680 NW 17th Ave. Fort Lauderdale Richard Spreen [email protected] 954-970-8565 FL 5/22/2018

157 Delta Fire Protection Systems, Inc. Fire Protection 1916 Tucker Industrial Rd. West Monroe Greg Fullerton [email protected] 318-325-7522 LA 5/22/2018

158 Demetrius Shack's Painting Service, Inc.

Paint/Special Coatings 11154 Losco Junction Dr. South, Jacksonville, FL 32257 Jacksonville Sandra Shack [email protected] 904.710.7589 FL 1/31/2017

159 Design Communications Specialties 25 Drydock Avenue Boston Harvey Whiteway [email protected] 617.542.9620 MA 6/27/2017

160 Design Communications Ltd. Signage / Specialties 10611 Satellite Blvd Orlando Jeff Eubinag [email protected] 321-206-4449 FL 1/15/2019

161 Designers West Interiors, Inc. Div10 Specialties/Toilet Accessories 6399 S. Orange Ave., Orlando, FL 32809 Orlando Kristin Becker [email protected] 407.420.9021 FL 1/31/2017

Designers West Interiors, Inc. Resilient Flooring/Carpet 6400 S. Orange Ave., Orlando, FL 32809 Orlando Kristin Becker [email protected] 407.420.9022 FL 1/31/2017

162 DG Investment Immediate Holdings 3 Inc d/b/a Convergint Tech. LLC CCTV 8351 Parkline Blvd., Ste. 400, Orlando, FL 32809 Orlando Richard Kuhn [email protected] 407.595.7109 FL 1/31/2017

DG Investment Immediate Holdings 3 Inc d/b/a Convergint Tech. LLC Security 8351 Parkline Blvd., Ste. 400, Orlando, FL 32809 Orlando Richard Kuhn [email protected] 407.595.7109 FL 1/31/2017

163 DH Pace Company, Inc. Doors and Frames, Specialties 3839 St. Valentine Way Orlando Robert Rosser [email protected] 407.563.3668 FL 8/1/2017

164 Diebold Enterprise Security Systems, Inc. Audio Visual 3 Westchester Plaza, Elmsford, NY 10523 Elmsford Marco Agramonte [email protected] 407.488.3302 NY 1/31/2017

Diebold Enterprise Security Systems, Inc. Electrical 3 Westchester Plaza, Elmsford, NY 10523 Elmsford Marco Agramonte [email protected] 407.488.3303 NY 1/31/2017

Page 4 of 12

Rev. 7/30/2019

Page 209: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

PREQUALIFIED SUBCONTRACTORS/SUPPLIERS

Previously PSC Approved

Company Name MWBE LDB DBE SDVOBE Trades Address1 City Contact Email Phone State PSC Date

Diebold Enterprise Security Systems, Inc. Public Address 2 Westchester Plaza, Elmsford, NY 10523 Elmsford Marco Agramonte [email protected] 407.488.3302 NY 1/31/2017

Diebold Enterprise Security Systems, Inc. Security 3 Westchester Plaza, Elmsford, NY 10523 Elmsford Marco Agramonte [email protected] 407.488.3303 NY 1/31/2017

165 Diversified Supply, Inc.

HVAC/Mech Louvers 6923 Narcoossee Rd., Suite 609, Orlando, FL 32822 Orlando George Urquiola [email protected] 407.277.7000 FL 1/31/2017

166 Division 7 Fire Safing 3000 Old Canoe Creek Rd St Cloud Pedro Nunez [email protected] 321-228-4349 FL 11/13/2018

167 Division 7 Spray Fireproofing 2773 B M Montgomery St. Birmingham Tom Champagne [email protected] 205-803-1007 AL 5/22/2018

168 Dixie Metal Products, Inc. Structural Steel & Misc. Metals 442 Southwest 54th Court, Ocala, FL 34474 Ocala Philip [email protected] 352.873.2554 FL 1/31/2017

169 Don Bell Signs LLC Signage 365 Oak Pl Port Orange Craig Trover [email protected] 386-547-6391 FL 11/13/2018

170 Door Control Inc. D/F/H 10330 Chedoak Ct. Jacksonville Michael Bradberry [email protected] 904-237-7941 FL 5/22/2018

171 Doyle Dickerson Terrazzo, Inc. Terrazzo 6914 Orr Rd., Charlotte, NC 28213 Charlotte Anthony Sanders [email protected] 704.921.4940 NC 1/31/2017

172 Drapery Control Systems Inc. d/b/a Brambiers Windows & Walls Div 10 Specialties/Toilet Accessories

1616 Northeast 205th Terrace, N. Miami Beach, FL

33179 Miami Beach Lyle Brambier [email protected] 386.756.0101 FL 1/31/2017

173 Dura Floor Inc. DBA Dura Bond Co. Terrazzo Flooring 142 Northwest 29th Street Miami Arek Lesniewski [email protected] 305-986-5274 FL 11/13/2018

174 Dusoul Company, Inc. dba TSAV Low Voltage 775 Barber St. Athens Pete Dugas [email protected] 706-613-8759 GA 5/22/2018

175 Eagle 6 Technical Services, LLC Low Voltage 3218 East Colonial Drive, Suite G Orlando John Burns [email protected] 407.730.0331 FL 6/27/2017

176 Earth Tech, LLC Piles/Foundations 2620 Hunt Rd. Land O Lakes Dan Coxe [email protected] 813.909.8000 FL 10/17/2017

177 East Coast Metals, Inc. Interior Wall Panels 625 Distribution Road Triadelphia Bob Nixon [email protected] 304-909-4220 WV 11/13/2018

178 Eastern Corporation Interior Wall Panels 4274 Shackleford Road Norcross Brock West [email protected] 678-355-9010 GA 11/13/2018

179 Eco Construction and Maintenance Management, LLC Signage 39 Skyline Dr., Suite 1017 Lake Mary Donna Barstow [email protected] 407.478.3258 FL 1/31/2017

180 Eden Landscaping - Orlando Interior Landscape Plants & Accessories 612 Eden Park Rd Altamonte Springs Jessica Nelson [email protected] 407-274-5033 FL 11/13/2018

181 Eden Site Development, Inc Sitework 115 W Pine Ave. Longwood Stephanie Nutting [email protected] 407.265.1113 FL 10/17/2017

182 EGM Services, Inc. (fka Ebony Glass) Glass/Glazing 4251 East Side Drive Decatur Craig Nelson [email protected] 404.288.9521 GA 6/27/2017

183 Eidolon Analytic inc. Dba Unisource Sign Connection Signage 5711 Halifax Ave Suite #1 Fort Myers crystal Schaefer [email protected] 239.288.6951 FL 1/31/2017

184 Electrical Services, Inc. Electrical 7501 Currency Drive, Orlando, FL 32809 Orlando Wood Brazill [email protected] 352.787.1322 FL 1/31/2017

185 Electrocomp International Inc. LED Lighting 214 Live Oaks Blvd., Casselberry, FL 32707 Casselberry Maggie Patel 407.657.5757 FL 1/31/2017

186 Electrosonic Inc. Audio Visual 4501 Vineland Rd. Suite 105 Orlando Philip DiPaula [email protected] 407.472.7583 FL 6/27/2017

187 Elevated Design and Construction LLC General Contracting 8209 SW 1st Place Gainesville Michael Beard [email protected] 352-872-5994 FL 1/15/2019

188 Elite Flooring, Inc. Carpet & Resilient Flooring 5142 Joanne Kearney Blvd Norcross Thomas Zivitz [email protected] 949-648-1221 GA 11/13/2018

189 Enclos Corp. Glazing/Curtainwall Systems & Skylights 2770 Blue Water Road, Eagan, MN 55121 Eagan Darijo Babic d/b/[email protected] 404.217.4742 MN 1/31/2017

190 Energy Air, Inc. HVAC/Mech Louvers 5401 Energy Air Ct., Orlando, FL 32810 Orlando Heath Kerr [email protected] 407.886.3729 FL 1/31/2017

191 ER Brownell & Associates, Inc. Survey and Layout SW 27th Ave. #100, Miami, FL 33133 Miami Angel Lopez 305.860.3866 FL 1/31/2017

192 Erie Metal Specialties, Inc.

Waterproofing/Joint Sealants/Foundation

Waterproofing 13311 Main Rd., Akron, NY 14001 Akron Suzanne Phillips [email protected] 716.542.3991 NY 1/31/2017

193 Evans Consoles Incorporated d/b/a Evans Airport Services Access Flooring 1577 Spring Hill Rd., Suite 450, Vienna, VA 22182 Vienna Adam Barringer [email protected] 303.895.0006 VA 1/31/2017

Evans Consoles Incorporated d/b/a Evans Airport Services Millwork 1577 Spring Hill Rd., Suite 450, Vienna, VA 22182 Vienna Adam Barringer [email protected] 303.895.0006 VA 1/31/2017

194 Exam Plus FL, Corp.

Work Force Badging

1511 E. State Rd. 434, Suite 2001, Winter Springs, FL

32708 Winter Springs Jose Batista 407.238.5336 FL 1/31/2017

195 Exterior Walls Inc. (EWI) Stucco 5558 Force Four Parkway Orlando Ivan Moreno [email protected] 407-854-7726 FL 5/22/2018

196 F. L. Crane and Sons, Inc. Gypsum/Finishes 508 South Spring Street Fulton Mike Herring [email protected] 662.862.2172 MS 1/23/2018

197 FabArc Steel Supply, Inc. Structural Steel & Misc. Metals

8910 Astronaut Blvd,. Suite 304, Cape Canaveral, FL

32920 Cape Canaveral Tom Adams [email protected] 256.241.1670 FL 1/31/2017

198 Fabco Metal Products Misc. Metals 1490 Frances Drive Daytona Beach Tom Emert [email protected] 386-846-1951 FL 11/13/2018

199 Fairborn Equipment Company, Inc. Coiling Doors PO Box 123 Upper, Sandusky, OH 43351 Sandusky LouAnne Holman [email protected] 419.209.0760 OH 1/31/2017

200 Fidelity Security Agency, LLC

Security 1511 E. SR 434, Suite 2001, Winter Springs, FL 32708 Winter Springs Michael Williams [email protected] 407.791.6113 FL 1/31/2017

201 Fine Tune Enterprises, Inc. Final Cleaning 2526 JR Street, Orlando, FL 32839 Orlando Elvis Diaz [email protected] 407.271.4088 FL 1/31/2017

202 Finishing Systems of Florida, Inc. Paint/Special Coatings 160 Dog Track Road, Longwood, FL 32750 Longwood Brenda [email protected] 407.834.6280 FL 1/31/2017

203 Fire Stop Systems, Inc Fireproofing 410 N. Dillard St. #103, Winter Garden, FL Winter Garden Michael Pedone [email protected] 239.774.3343 FL 1/31/2017

204 First American Steel Erectors Steel 194 S. 4th St. Lake Mary Kevin Doxtater [email protected] 407.687.1528 FL 6/27/2017

205 Fish Construction Millwork & Countertops 9820 Cash Rd Stafford Adam Fish [email protected] 713-206-0227 TX 11/13/2018

206 Fisk Electric Company Electrical 10855 Westview Dr. Houston Wayne McDonald [email protected] 713.868.6111 FL 10/31/2017

207 Five Arrows, Inc. d/b/a Service Painting Corporation Paint/Special Coatings 1423 W. Long Street, Orlando, FL 32805 Orlando Todd Monroe [email protected] 407.872.7555 FL 1/31/2017

208 Five T CO Metal Panels & Column Covers 15 Paradise Plaza, Suite 200, Sarasota, FL 34239 Sarasota Chasun Stevens [email protected] 941.371.7500 FL 1/31/2017

209 Florida Door Solutions Inc. Coiling Doors 777 South Park Ave., Apopka, FL 32703 Apopka Nicole May [email protected] 407.884.5955 FL 1/31/2017

210 Florida Epoxy Floors Ceramic Tile & Stone Miami [email protected] 407-705-3525 FL 11/13/2018

211 Florida GC Solutions, Inc. Division 9 4980 E 10th Ct. Hialeah Edwin Gaitan [email protected] 305.687.9877 FL 10/17/2017

212 Florida Geodynamics, Inc. Div10 Specialties/Toilet Accessories 6128 Old Pasco Road, Wesley Chapel, FL 33544 Wesley Chapel Allison Willmeng [email protected] 813.610.2236 FL 1/31/2017

213 Florida Roofing Solutions, Inc. Metal Roofing System 4980 E. 10th Ct., Hialeah, FL 33013 Hialeah Edwin Gaitan [email protected] 305.687.9877 FL 1/31/2017

214 Florida Structural Steel & Construction, Inc. Structural Steel & Misc. Metals 2710 E. 5th Ave., Tampa, FL 33605 Tampa Kevin Sigl [email protected] 813.241.4261 FL 1/31/2017

215 Funa International Audio Visual 7680 Universal Blvd., Orlando, FL 32819 Orlando Ken Kalish [email protected] 407.801.7978 FL 1/31/2017

Funa International Public Address 7680 Universal Blvd. Orlando, FL 32819 Orlando Ken Kalish [email protected] 407.801.7978 FL 1/31/2017

216 G&C Welding Specialist LLC Structural Steel & Misc. Metals 1417 Dolgner Place, Sanford, FL 32771 Sanford Regina Cromer-Halls [email protected] FL 1/31/2017

217 G. C. Zamas & Company, Inc. Fireproofing, specialty coatings, paint 850 Jennings Street Bethlehem Dean Zarnas [email protected] 610-866-0923 PA 5/22/2018

218 G.R.A. Properties, LLC d/b/a Bay Janitorial Service Final Cleaning 2595 Tampa Rd. Suite Q, Palm Harbor, FL 34684 Palm Harbor Brittany Mazurek [email protected] 727.781.9231 FL 1/31/2017

219 Gable Signs & Graphics, Inc. Signage 7440 Fort Smallwood Rd., Baltimore, MD 21226 Baltimore David Chapman [email protected] 410.255.6400 MD 1/31/2017

220 Garrard Framing & Drywall, Inc Acoustical Ceilings 5578 Commercial Blvd., Winter Haven, FL 33880 Winter Haven Julie Garrard [email protected] 863.967.3992 FL 1/31/2017

Garrard Framing & Drywall, Inc Door Frames/Hardware 5578 Commercial Blvd., Winter Haven, FL 33880 Winter Haven Julie Garrard [email protected] 863.967.3992 FL 1/31/2017

Garrard Framing & Drywall, Inc Resilient Flooring/Carpet 5578 Commercial Blvd., Winter Haven, FL 33880 Winter Haven Julie Garrard [email protected] 863.967.3992 FL 1/31/2017

221 Gate Precast Company Architectural Precast 810 Sawdust Trail, Kissimmee, FL 34744 Kissimmee Brian Griffis [email protected] 904.813.6525 FL 1/31/2017

Gate Precast Company Precast Platforms 811 Sawdust Trail, Kissimmee, FL 34744 Kissimmee Brian Griffis [email protected] 904.813.6524 FL 1/31/2017

222 Gaylor Electrical 420 20th Street North Suite 2200 Birmingham Vance Fulkerson [email protected] 205.994.5466 AL 6/27/2017

223 GCJ Construction Inc. General Contractors 4623 Bridgeton Lane Orlando Johan Hernandez [email protected] 321.689.5208 FL 10/31/2017

224 GEM Industries Inc. Misc Metals 370 Cox Rd. Cocoa Will Ratliff [email protected] 321.631.3977 FL 10/17/2017

225 General Caulking and Coatings Co., Inc. Waterproofing / Caulking / Stucco 101 NW 176 Street Miami Todd Ranistras [email protected] 407-718-4997 FL 5/22/2018

226 Genesis VII, Inc. General Contractor 1605 White Dr., Titusville, FL 32780 Titusville Robert Jordan 321.383.4813 FL 1/31/2017

227 George's Welding Services, Inc. Steel 11400 Northwest 134th St. Miami Luz Amador [email protected] 305.822.2445 FL 6/27/2017

228 Geotechnical Foundation Systems, Inc. Precast Driven Piles & Earthwork 8008 Apopka Blvd., Apopka, FL 32703 Apopka Phil [email protected] 407.644.4600 FL 1/31/2017

229 GFA International Testing & Inspections 1215 Wallace Dr. Delray Beach Travis Merrick [email protected] 239.489.2443 FL 6/27/2017

230 GJP Enterprises, Inc. d/b/a American Decorative Ceilings Acoustical Ceilings 4510 E 71st St. #5, Cleveland, OH 44105 Cleveland Joseph Conte [email protected] 216.341.2222 FL 1/31/2017

231 Glenco Industries LLC dba Glenco Industries Millwork, Countertops, Metal Panels 6515 Anno Ave. Orlando Chuck Read [email protected] 407.888.0651 FL 10/17/2017

232 Glenn Reider, Inc. Millwork & Countertops 3420 W Capitol Dr Milwaukee Dan Carey [email protected] 414-617-2352 WI 11/13/2018

233 Glidepath LLC d/b/a Beumer Glidepath Baggage Handling 2241 S. Watson Rd., Ste 151, Arlington, TX 76010 Arlington John Gude [email protected] 682.248.3700 TX 1/31/2017

Page 5 of 12

Rev. 7/30/2019

Page 210: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

PREQUALIFIED SUBCONTRACTORS/SUPPLIERS

Previously PSC Approved

Company Name MWBE LDB DBE SDVOBE Trades Address1 City Contact Email Phone State PSC Date

234 Global One Networks, LLC Communications 526 Cocoa Lane Orlando Valerie Mundy [email protected] 407.312.3199 FL 6/27/2017

235 Globiser Inc. Final Cleaning 455 Randon Terrace, Lake Mary, FL 32746 Lake Mary Catalina Hoyes-Nipe [email protected] 407.341.7651 FL 1/31/2017

236 GLOMACO Security 37 N. Orange Ave. Orlando Carlos Bajana Jr. [email protected] 407.501.6360 FL 8/1/2017

237 GM&P Consulting and Glazing Contractors Inc Curtainwall 3550 NW 49th Street Miami Giovanni Monti [email protected] 305.216.9138 FL 1/23/2018

238 GMF Construction, LLC Structural Steel & Ornamental Metals 4600 Drane Field Rd. Lakeland Jason Hall [email protected] 863-577-0210 FL 5/22/2018

239 Gomez Construction General Contractor 750 Jackson Ave Winter Park Dawn Moss [email protected] 407-628-4353 FL 11/13/2018

240 Goodman Decorating Co., Inc. Painting 3400 Atlanta Industrial Parkway Northwest Atlanta Richard Diamond [email protected] 404-965-2538 GA 11/13/2018

241 Gracicarl's Service, Inc. d/b/a G.S. Construction & Management Solutions

Ceramic Tile 537 Loyola Circle #29104, Orlando, FL 32828 Orlando Graciliana Estrada [email protected] 407.446.5477 FL 1/31/2017

Gracicarl's Service, Inc. d/b/a G.S. Construction & Management Solutions

Concrete Flatwork (SOG, Sidewalks, Misc Pads,

C&G) 537 Loyola Circle, #29104 Orlando, FL 32828 Orlando Graciliana Estrada [email protected] 407.446.5477 FL 1/31/2017

Gracicarl's Service, Inc. d/b/a G.S. Construction & Management Solutions

Door Frames/Hardware 537 Loyola Circle, #29104 Orlando, FL 32828 Orlando Graciliana Estrada [email protected] 407.446.5477 FL 1/31/2017

Gracicarl's Service, Inc. d/b/a G.S. Construction & Management Solutions

Drywall 536 Loyola Circle, #29104 Orlando, FL 32828 Orlando Graciliana Estrada [email protected] 407.446.5476 FL 1/31/2017

Gracicarl's Service, Inc. d/b/a G.S. Construction & Management Solutions

Final Cleaning 535 Loyola Circle, #29104 Orlando, FL 32828 Orlando Graciliana Estrada [email protected] 407.446.5475 FL 1/31/2017

Gracicarl's Service, Inc. d/b/a G.S. Construction & Management Solutions

Masonry 537 Loyola Circle, #29104 Orlando, FL 32828 Orlando Graciliana Estrada [email protected] 407.446.5477 FL 1/31/2017

Gracicarl's Service, Inc. d/b/a G.S. Construction & Management Solutions

Office Cleaning 536 Loyola Circle, #29104 Orlando, FL 32828 Orlando Graciliana Estrada [email protected] 407.446.5476 FL 1/31/2017

Gracicarl's Service, Inc. d/b/a G.S. Construction & Management Solutions

Paint/Special Coatings 538 Loyola Circle, #29104 Orlando, FL 32828 Orlando Graciliana Estrada [email protected] 407.446.5478 FL 1/31/2017

Gracicarl's Service, Inc. d/b/a G.S. Construction & Management Solutions

Waterproofing/Joint Sealants/Foundation

Waterproofing 536 Loyola Circle, #29104 Orlando, FL 32828 Orlando Graciliana Estrada [email protected] 407.446.5476 FL 1/31/2017

242 Granite Construction Company Civil 585 West Beach Street Santa Cruz Mike Heddinger [email protected] 760-444-1993 CA 5/22/2018

243 Greene Street Communications, LLC Signage 100 Luna Park Drive #219 Alexandria Shana Kemp [email protected] 240.338.7056 VA 6/27/2017

244 Greenery Productions, Inc. Interior Foliage Plant Sales 1751 Directors Row Orlando Linda Grier [email protected] 407-363-9151 FL 3/5/2019

Greenery Productions, Inc. Rental 1751 Directors Row Orlando Linda Grier [email protected] 407-363-9151 FL 3/5/2019

Greenery Productions, Inc. Maintenance 1751 Directors Row Orlando Linda Grier [email protected] 407-363-9151 FL 3/5/2019

Greenery Productions, Inc. Exterior Landscaping 1751 Directors Row Orlando Linda Grier [email protected] 407-363-9151 FL 3/5/2019

245 Greenway Electrical Services, LLC Electrical 2718 Pemberton Dr., Apopka, FL 32703 Apopka Curtis Duffield [email protected] 407.532.2778 FL 1/31/2017

246 Greer Tile Company Ceramic Tile 3020 Eunice Ave., Orlando, FL 32808 Orlando Gaya Venugopal [email protected] 407.296.4599 FL 1/31/2017

Greer Tile Company Resinous Flooring 3020 Eunice Ave., Orlando, FL 32808 Orlando Gaya Venugopal [email protected] 407.296.4600 FL 1/31/2017

247 Grunau Company Fire Protection 11300 Space Blvd. Oak Creek Army Lendian [email protected] 407-857-1800 WI 5/22/2018

248 Guernsey Architectural Solutions Inc. Metal Panels 1701 Airport Terminal Dr. #100 Suite 100-A-1 DeLand Joshua Gray [email protected] 386-734-5573 FL 5/22/2018

249 Gulf Mechanical Contractors, LLC HVAC/Mech Louvers 31643 Executive Blvd., Leesburg, FL 34748 Leesburg Thomas Sherman [email protected] 352.460.4176 FL 1/31/2017

Gulf Mechanical Contractors, LLC Plumbing/HVAC 31643 Executive Blvd., Leesburg, FL 34748 Leesburg Thomas Sherman [email protected] 352.460.4176 FL 1/31/2017

250 H.L. Pruitt Corp. Electrical 501 Wade St., Winter Springs, FL 32708 Winter Springs Frank Pruitt [email protected] 407.327.3848 FL 1/31/2017

251 H3 CompuVision Inc. Technology Support 15279 Harrowgate Way, Winter Garden, FL 34787 Winter Garden James Hurst III 407.694.6642 FL 1/31/2017

252 Harmon, Inc. Glazing/Curtainwall Systems & Skylights 1933 W. New Hampshire St., Orlando, FL 32804 Orlando Frank D'Aprile [email protected] 407.522.3007 FL 1/31/2017

Harmon, Inc. Interior Glazing 1933 W. New Hampshire St., Orlando, FL 32804 Orlando Frank D'Aprile [email protected] 407.522.3007 FL 1/31/2017

253 Harper Limbach LLC HVAC/Mech Louvers 940 Williston Park Point, Lake Mary, FL 32746 Lake Mary Michelle Barnett [email protected] 813.207.0057 FL 1/31/2017

Harper Limbach LLC Plumbing/HVAC 941 Williston Park Point, Lake Mary, FL 32746 Lake Mary Michelle Barnett [email protected] 813.207.0057 FL 1/31/2017

254 Harris Ventures Inc. d/b/a Staff Zone Work Force Badging

2650 Holcomb Bridge Rd., Suite 630, Alpharetta, GA

30022 Alpharetta Costa DeLuca [email protected] 770.645.6134 GA 1/31/2017

255 Hartford South, LLC Metal Roofing System 7326 S. Orange Ave., Orlando, FL 32809 Orlando Jay Rintelmann [email protected] 407.857.9392 FL 1/31/2017

Hartford South, LLC Mod. Bit. Roofing 7326 S. Orange Ave., Orlando, FL 32809 Orlando Jay Rintelmann [email protected] 407.857.9392 FL 1/31/2017

256 Harty Tractor Services, Inc. Earthworks 924 E. Rhode Island Ave., Orange City, FL 32763 Orange City Thaine Harty [email protected] 386.775.1005 FL 1/31/2017

Harty Tractor Services, Inc. Abutments & MSE Walls 924 E. Rhode Island Ave., Orange City, FL 32763 Orange City Thaine Harty [email protected] 386.775.1005 FL 1/31/2017

Harty Tractor Services, Inc. Access Roads/Storage Yards 924 E. Rhode Island Ave., Orange City, FL 32763 Orange City Thaine Harty [email protected] 386.775.1005 FL 1/31/2017

257 Heavenly Hearts Cleaning Services, Inc. Office Cleaning 173 Dahlia Village Cir., Orlando, FL 32807 Orlando Regina [email protected] 407.399.9729 FL 1/31/2017

258 Heron Electric, Inc. Electrical 4708 W. Concord Ave., Orlando, FL 32808 Orlando Derrick Heron [email protected] 407.296.2550 FL 1/31/2017

259 Hile's Curtain Specialties, Inc. Roller Window Shades 2701 Success Dr Odessa Charles Hile [email protected] 727-753-0600 FL 11/13/2018

260 Hire Quest, L.L.C. d/b/a Trojan Labor Work Force Badging 4560 Great Oak Dr., Charleston, SC 29418 Charleston Jarrett Lindon [email protected] 843.723.7400 SC 1/31/2017

261 Hirschfeld Steel Group LP Structural Steel 1901 Gateway Drive, Suite 260 Irving Shannon Whalen [email protected] 325.486.4781 TX 1/23/2018

262 HJ Foundation Company Auger Cast Piles 8275 NW 80th St., Miami, FL 33166 Miami FL 1/31/2017

263 HMB Enterprises LLC Low Voltage 5401 S. Kirkman Rd. Suite 310 Orlando Harry Bailey [email protected] 678.887.7670 FL 10/17/2017

264 HMB Steel Corporation Structural Steel & Misc. Metals 4080 Pines Industrial Ave., Rockledge, FL 32955 Rockledge Forrest Brewton [email protected] 321.636.6511 FL 1/31/2017

265 Hollywood Woodwork, INC. Millwork & Countertops 2951 Pembroke Road Hollywood Bob Hacker [email protected] 954-266-5411 FL 11/13/2018

266 Home From Rome, Inc. Decorative Handrails 1024 W Pine St Orlando Maureen McQuillan [email protected] 407-234-0120 FL 11/13/2018

267 Hommes Masonry, Inc. d/b/a Toltec Construction

Concrete Flatwork (SOG, Sidewalks, Misc Pads,

C&G) 334 E. Bay St., Winter Garden, FL 34787 Winter Garden Yasmin Jaimes [email protected] 407.654.2648 FL 1/31/2017

Hommes Masonry, Inc. d/b/a Toltec Construction Masonry 334 E. Bay St., Winter Garden, FL 34787 Winter Garden Yasmin Jaimes [email protected] 407.654.2648 FL 1/31/2017

268 Honeywell Low Voltage 5 Dakota Drive Lake Success David Ortiz [email protected] 518.248.9226 NY 8/1/2017

269 Horizon Surface Systems Terrazzo Flooring 310 Scarlet Blvd Oldsmar Dan Carnegie [email protected] FL 11/13/2018

270 Hubbard Construction Company Earthworks 1936 Lee Road, Winter Park, FL 32789 Winter Park Frederick O'Dea Jr. [email protected] 407.645.5500 FL 1/31/2017

Hubbard Construction Company Abutments & MSE Walls 1936 Lee Road, Winter Park, FL 32789 Winter Park Frederick O'Dea Jr. [email protected] 407.645.5500 FL 1/31/2017

Hubbard Construction Company Access Roads/Storage Yards 1936 Lee Road, Winter Park, FL 32789 Winter Park Frederick O'Dea Jr. [email protected] 407.645.5500 FL 1/31/2017

Hubbard Construction Company Asphalt Pavement & Markings 1936 Lee Road, Winter Park, FL 32789 Winter Park Frederick O'Dea Jr. [email protected] 407.645.5500 FL 1/31/2017

271 Hymon's Property Maintenance Inc. Paint/Special Coatings 122 S. Shadow Bay Dr., Orlando, FL 32825 Orlando Patricia Hymon [email protected] 407.247.5661 FL 1/31/2017

272 Hypower Inc. Electrical 5913 NW 31st Avenue Ft. Lauderdale John Zoerhof [email protected] 954-978-9300 FL 5/22/2018

273 I.B. Glazing Incorporated d/b/a International Blowe Glazing

Interior Glazing 2182 NW 18th Ave., Ste. 10, Pompano Beach, FL 33069 Pompano Beach Anthony Blowe [email protected] 954.979.8999 FL 1/31/2017

274 I.T. Consortium, Inc. Telecom 11701 Orpington St., Suite A, Orlando, FL 32817 Orlando Jeffrey Strobach [email protected] 407.439.2530 FL 1/31/2017

275 Industrial Steel, Inc. Structural Steel & Misc. Metals 3561 Industrial Rd., Titusville, FL 32796 Titusville Gary Hood [email protected] 321.267.2341 FL 1/31/2017

276 Innovative Shading, Inc. Roller Window Shades 1070 Shadick Dr, UNIT N Orange City Peter Rosario [email protected] 386-216-7958 FL 11/13/2018

277 Integrated Door Systems, Inc. Door Frames/Hardware 1602 E. Alsobrook St., Plant City, FL 33563 Plant City Emilio Bendever [email protected] 813.759.4300 FL 1/31/2017

278 Interior Logic Group / Interior Specialists, Inc. Specialties 1000 Northbrook Pkwy Suwanee Kevin Vogel [email protected] 303-883-2101 FL 11/13/2018

279 Interior Specialties, INC. Roller Window Shades 947 Josiane Court Altamonte Springs Dave Riley [email protected] 407-496-6031 FL 11/13/2018

280 International Flooring, Inc. Resilient Flooring/Carpet 2825 Mercy Dr., Orlando, FL 32808 Orlando Joey Perez [email protected] 407.296.7464 FL 1/31/2017

Page 6 of 12

Rev. 7/30/2019

Page 211: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

PREQUALIFIED SUBCONTRACTORS/SUPPLIERS

Previously PSC Approved

Company Name MWBE LDB DBE SDVOBE Trades Address1 City Contact Email Phone State PSC Date

International Flooring, Inc. Resinous Flooring 2825 Mercy Dr., Orlando, FL 32808 Orlando Joey Perez [email protected] 407.296.7465 FL 1/31/2017

International Flooring, Inc. Terrazzo 2825 Mercy Dr., Orlando, FL 32808 Orlando Joey Perez [email protected] 407.296.7465 FL 1/31/2017

281 Interstate Painting Painting 7200 Monetary Dr Orlando Mani Rezaei [email protected] 407-601-4985 FL 11/13/2018

282 Ion Electric Electrical 2001 N. Andrews Ave. Pompano Sunil Amin [email protected] 954-434-7432 FL 5/22/2018

283 Irvine Access Floors, Inc. Access Flooring 2150 Premier Row Orlando Trellis Calhoun [email protected] 407-851-7479 FL 11/13/2018

284 ISEC, Incorporated Millwork 5907 Breckenridge Parkway, Suite C, Tampa, FL 33610 Tampa Calder Sagen [email protected] 813.422.5099 FL 1/31/2017

ISEC, Incorporated Resilient Flooring/Carpet 5908 Breckenridge Parkway, Suite C Tampa, FL 33610 Tampa Calder Sagen [email protected] 813.422.5100 FL 1/31/2017

ISEC, Incorporated Structural Steel & Misc. Metals 5909 Breckenridge Parkway, Suite C Tampa, FL 33610 Tampa Calder Sagen [email protected] 813.422.5100 FL 1/31/2017

285 Ivey Mechanical Company, LLC HVAC 134 W. Washington Street Kosciusko Denny Terrell [email protected] 662.289.3713 MS 1/23/2018

286 J P and Concepts, Co. Structural Steel & Misc. Metals 9060 Paseo De Valencia St., Fort Myers, FL 33908 Ft. Myers JoAnn Forance [email protected] 239.437.3108 FL 1/31/2017

287 J. Herbert Corporation Equipment Cranes 1751 S John Young Pkwy Kissimmee John Selbach [email protected] 407-973-6842 FL 11/13/2018

288 J.B. Matthews Overhead Doors 2459 Clark St Apopka Paul Hunt [email protected] 407-948-5357 FL 11/13/2018

289 Jacob Erecting & Construction, LLC Concrete Foundations & Earthwork 33409 West Palm Beach Don Perry [email protected] 561.741.1818 FL 1/31/2017

Jacob Erecting & Construction, LLC Masonry

1509 N. Military Trail, Suite 200, West Palm Beach, FL

33409 West Palm Beach Don Perry [email protected] 561.741.1818 FL 1/31/2017

290 Jamestown Painting & Decorating, Inc. Painting 10060 Bavaria Rd Fort Myers Chris Beatson [email protected] 239-482-4647 FL 11/13/2018

291 JBS Engineering Technical Services, Inc. Construction Engineering Inspection 15 Windsormere Way, Ste. 200, Oviedo, FL 32765 Oviedo Angie Kolin 407.359.6437 FL 1/31/2017

292 JCB Construction, Inc. Earthworks 800 W. Gore St., Orlando, FL 32805 Orlando Gratten White [email protected] 407.425.9880 FL 1/31/2017

JCB Construction, Inc. Access Roads/Storage Yards 801 W. Gore St., Orlando FL 32805 Orlando Gratten White [email protected] 407.425.9880 FL 1/31/2017

JCB Construction, Inc. Asphalt Pavement & Markings 802 W. Gore St., Orlando FL 32805 Orlando Gratten White [email protected] 407.425.9880 FL 1/31/2017

293 Jervis B. Webb Company Baggage Handling 34375 W. Twelve Mile Rd., Farmington Hills, MI 48331 Farmington Hills Christopher Lutz [email protected] 248-553-6930 MI 1/31/2017

294 JJAG Group Inc. d/b/a All Team Staffing Work Force Badging 6401 S. Kirkman #326, Orlando, FL 32819 Orlando Dave Lieberman 855.857.2740 FL 1/31/2017

295 John B. Webb & Associates, Inc. Survey and Layout 925 S. Denning Dr. #3, Winter Park, FL 32789 Winter Park Jacqueline Webb 407.622.9322 FL 1/31/2017

296 Johnson Controls, Inc (JCI) Audio Visual 41 Skyline Dr. #1025, Lake Mary, FL 32746 Lake Mary Bryan Mehaffey [email protected] 239.272.0198 FL 1/31/2017

Johnson Controls, Inc (JCI) HVAC/Mech Louvers 42 Skyline Dr. #1025, Lake Mary, FL 32746 Lake Mary Bryan Mehaffey [email protected] 239.272.0199 FL 1/31/2017

Johnson Controls, Inc (JCI) Public Address 43 Skyline Dr. #1025, Lake Mary, FL 32746 Lake Mary Bryan Mehaffey [email protected] 239.272.0198 FL 1/31/2017

297 Johnson-Lancaster and Associates, Inc. Food Service Equipment 13031 US HWY 19 N., Clearwater, FL 33764 Clearwater Denise Wilson [email protected] 727.796.5622 FL 1/31/2017

298 Johnson-Laux Construction, LLC

Concrete Flatwork (SOG, Sidewalks, Misc Pads,

C&G) 8100 Chancellor Dr. #165, Orlando, FL 32809 Orlando Kevin Johnson [email protected] 407.770.2180 FL 1/31/2017

Johnson-Laux Construction, LLC Masonry 8101 Chancellor Dr. #165, Orlando, FL 32809 Orlando Kevin Johnson [email protected] 407.770.2180 FL 1/31/2017

Johnson-Laux Construction, LLC Precast Platforms 8102 Chancellor Dr. #165, Orlando, FL 32809 Orlando Kevin Johnson [email protected] 407.770.2180 FL 1/31/2017

Johnson-Laux Construction, LLC Signage 8103 Chancellor Dr. #165, Orlando, FL 32809 Orlando Kevin Johnson [email protected] 407.770.2179 FL 1/31/2017

299 Jones Sign Co., Inc. Signage 1711 Scheuring Rd., De Pere, WI 54115 De Pere Larry Newton [email protected] 480.266.0011 WI 1/31/2017

300 Jr. Davis Construction Company, Inc. Earthworks 210 S. Hoagland Blvd., Kissimmee, FL 34741 Kissimmee Kristy Kelley [email protected] 407.870.0066 FL 1/31/2017

Jr. Davis Construction Company, Inc. Access Roads/Storage Yards 211 S. Hoagland Blvd., Kissimmee, FL 34741 Kissimmee Kristy Kelley [email protected] 407.870.0066 FL 1/31/2017

301 JSC Systems, Inc. d/b/a Jacksonville Sound & Communication Audio Visual 1985 Corporate Square, Longwood, FL 32750 Longwood Mickey Rudd [email protected] 407.332.1985 FL 1/31/2017

JSC Systems, Inc. d/b/a Jacksonville Sound & Communication CCTV 1985 Corporate Square, Longwood, FL 32750 Longwood Mickey Rudd [email protected] 407.332.1985 FL 1/31/2017

JSC Systems, Inc. d/b/a Jacksonville Sound & Communication Fire Alarm 1985 Corporate Square, Longwood, FL 32750 Longwood Mickey Rudd [email protected] 407.332.1985 FL 1/31/2017

302 Julina Management Services, LLC d/b/a Handymen for All Ceramic Tile 2710 Alt 19 N. Ste. 301 #122, Palm Harbor, FL 34683 Palm Harbor Julie Daniels [email protected] 727.489.5900 FL 1/31/2017

Julina Management Services, LLC d/b/a Handymen for All Drywall 2710 Alt 19 N. Ste. 301 #122, Palm Harbor, FL 34683 Palm Harbor Julie Daniels [email protected] 727.489.5900 FL 1/31/2017

303 JWP Iron and Fence, LLC Structural Steel & Misc. Metals 629 Carpenter Road, Orlando, FL 32833 Orlando Joseph Padre [email protected] 407.625.4934 FL 1/31/2017

304 Kaba ADS Americas Exit Lane Breach Control 7101 Presidents Dr, Suite 250 Orlando Bill Seibert [email protected] 704-774-7368 FL 11/13/2018

305 Kadee Industries, Inc. Entrance Floor Grilles 7160 Krick Rd Cleveland Marie Behra [email protected] 800-321-3827 x30 OH 11/13/2018

306 Kalkreuth Roofing and Sheet Metal, Inc. Roofing & Metal Panels 53 14th Street. Suite 100 Wheeling Jim Brinsky [email protected] 304.281.2277 WV 1/23/2018

307 Kane Innovations, Inc. Railings 2250 Powell Ave. Erie Jim Roman [email protected] 813.215.1332 PA 10/17/2017

308 Kansas City Structural Steel Misc Metals 3801 Raytown Road, Kansas City, MO,64129 Kansas City Tab White [email protected] 816-924-0977 MO 4/30/2019

Kansas City Structural Steel Ornamental Metals 3801 Raytown Road, Kansas City, MO,64129 Kansas City Tab White [email protected] 816-924-0977 MO 4/30/2019

309 Kaye Acoustics Acoustical & Metal Ceilings 6649 Amory Court Winter Park Darren Kaye [email protected] 407-679-1499 FL 11/13/2018

310 KBI Staffing Solutions LLC Staffing 4201 Stonebrook Dr. Sanford Kenneth Hughes [email protected] 786.387.7532 FL 10/17/2017

311 Keanes Custom Cabinets Millwork & Countertops 98 SE 7th St Deerfield Beach Walter Villegas [email protected] 561-699-8388 FL 11/13/2018

312

Keenan Hopkins Schmidt and Stowell Contractors, Inc. d/b/a KHS&S

Contractors Drywall 4390 35th St., Orlando, FL 32811 Orlando Neal Harris [email protected] 407.425.5550 FL 1/31/2017

313 Kenpat (Central Florida), LLC Drywall 516 Cooper Commerce Dr., Apopka, FL 32703 Apopka Phil Klote [email protected] 407.464.7070 FL 1/31/2017

Kenpat (Central Florida), LLC Rolling Plains, Alpha, Fire Stop Systems 516 Cooper Commerce Dr., Apopka, FL 32703 Apopka Phil Klote [email protected] 407.464.7070 FL 1/31/2017

314 Kiewit /Turner Self Perform Earthwork/Exterior Improvements/Utilities 135 W. Central Blvd., Suite 950, Orlando FL Orlando Nick Sosa [email protected] 954.835.2228 FL 1/31/2017

315 Kiewit Infrastructure South Co. Earthwork/Exterior Improvements/Utilities 1580 Sawgrass Corporate Parkway Sunrise Nick Sosa [email protected] 954.835.2228 FL 1/31/2017

316 Kinetic Multimedia Systems Telecom

6750 N. Andrews Ave., Suite 200, Ft. Lauderdale, FL

33309 Ft. Lauderdale Jaya Milam [email protected] 954.370.0566 FL 1/31/2017

317 King Intelligence and Security Services, Inc. Security 545 Northeast 125 Street North Miami Kaola King [email protected] 954.624.2040 FL 6/27/2017

318 Kirlin Florida, LLC HVAC/Mech Louvers 3102 Cherry Palm Dr. #140, Tampa FL Tampa John Buhler [email protected] 954.739.8100 FL 1/31/2017

Kirlin Florida, LLC Plumbing/HVAC 3103 Cherry Palm Dr. #140, Tampa FL Tampa John Buhler [email protected] 954.739.8100 FL 1/31/2017

319 Kistler-McDougall Corp. Interior Glazing 310 Creekstone Ridge, Woodstock GA 30188 Woodstock Angie Monroe [email protected] 770.928.3830 GA 1/31/2017

Kistler-McDougall Corp. Metal Panels & Column Covers 311 Creekstone Ridge, Woodstock GA Woodstock Angie Monroe [email protected] 770.928.3830 GA 1/31/2017

320 Kone, Inc. Conveying Equipment One KONE Court Moline Tim Disher [email protected] 770.331.0855 IL 1/23/2018

321 L&S Diversified, LLC Survey and Layout 405 Lake Howell Rd., #1001, Maitland, FL 32751 Maitland Sherry Manor 407.681.3836 FL 1/31/2017

322 Laboratory Testing of Central Florida, Inc. d/b/a ARCpoint Work Force Badging 709 E Michigan St., Orlando, FL 32806 Orlando Dee Carlson 407.951.7575 FL 1/31/2017

323 Lake Conroy Landscaping Interior Landscape Plants & Accessories 1227 28th Street Orlando Ryan Mahanna [email protected] 407-730-3026 FL 11/13/2018

324 Lake Glass & Mirror, Inc. Glass & Glazing 3391 West Main St. Leesburg Paul Rogers [email protected] 352-787-4700 FL 5/22/2018

325 Larry Simmons, Inc. DBA Creative Oak Furniture, Mfg. Furniture 249 N. Ivey Lane, Ste. A Orlando Larry Simmons [email protected] 407.423.8413 FL 10/31/2017

326 Latite Roofing & Sheetmetal LLC Roofing 2280 W. Copane Rd. Pompano Beach Jim Lessig [email protected] 954-772-3446 FL 5/22/2018

327 Lavender Lady Plumbing Plumbing PO Box 841, Apopka, FL 32704 Apopka Lisa Smith-Nissen [email protected] 407.464.0510 FL 1/31/2017

328 LB Transportation Consulting, Inc. Special Construction, Communications 130 Barrow St., Suite 418 New York Lena Bansal [email protected] 646.453.9595 NY 8/1/2017

329 LEAD Engineering Contractors LLC Sitework 5201 Blue Lagoon Dr., Suite 590 Miami Mauricio Gonzalez [email protected] 305.965.8182 FL 1/23/2018

330 Leading Edge Land Services, Inc. Survey and Layout 8802 Exchange Dr., Orlando, FL 32809 Orlando Paul Jackson [email protected] 407.351.6730 FL 1/31/2017

331 Leesburg Concrete Company, Incorporated Architectural Precast 1335 Thomas Ave., Leesburg, FL 34748 Leesburg Kirk Rouse [email protected] 352.787.4177 FL 1/31/2017

332 Lenard Bell Painting Inc. Painting 16746 Sugar Berry Ln. Montverde Lenard Bell [email protected] 407.947.4825 FL 10/17/2017

Page 7 of 12

Rev. 7/30/2019

Page 212: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

PREQUALIFIED SUBCONTRACTORS/SUPPLIERS

Previously PSC Approved

Company Name MWBE LDB DBE SDVOBE Trades Address1 City Contact Email Phone State PSC Date

333 Lexicon, Inc. d/b/a Prospect Steel Company Structural Steel 8900 Fourche Dam Pike Little Rock Gary Whitmer [email protected] 816.501.8671 AR 6/27/2017

334 Linel A Division of Mestek (AWV- American Warming Ventilating) Skylights 260 North Elm Street Westfield Jeff Burgardt [email protected] 317-584-0510 MA 6/12/2018

335 Livers Bronze Co. Ornamental Metals/Decorative Handrails 4621 E 75th Ter Kansas City Al Livers [email protected] 816-300-0864 MO 11/13/2018

336 Lotspeich Contracting Inc. General Trades 2738 Broadway Center Blvd. Brandon Ryan Dusnik [email protected] 813-626-1748 FL 5/22/2018

337 Loyal Waterproofing Construction, Inc.

Waterproofing/Joint Sealants/Foundation

Waterproofing 383 E. Samuel Ct., Hernando, FL 34442 Hernando Evelyn D'Amaton [email protected] 352.601.7747 FL 1/31/2017

338 Lyndan, Inc. Millwork 5402 E. Hanna Ave., Tampa FL 33610 Tampa Dana Guy [email protected] 813.977.6683 FL 1/31/2017

339 M & M Electric of Central Florida, Inc. Electrical 6100 Canal Rd., Lot 26, Orlando, FL 32827 Orlando Misael Gomez misael@mmelectriccFLcom 407.982.4464 FL 1/31/2017

340 M&J Steel, LLC Structural Steel & Misc. Metals 7561 Gadsden Hwy., Trussville, AL 35173 Trussville Michael Spence [email protected] 205.655.7451 AL 4/30/2019

341 M.C. Dean, Inc. Audio Visual

Loudoun Gateway IV, 22980 Indian Creek Drive,

Dulles, VA 20165 Dulles Bryan Thomas [email protected] 571.262.8369 VA 1/31/2017

M.C. Dean, Inc. Electrical

Loudoun Gateway IV, 22980 Indian Creek Drive,

Dulles, VA 20166 Dulles Bryan Thomas [email protected] 571.262.8369 VA 1/31/2017

M.C. Dean, Inc. HVAC/Mech Louvers

Loudoun Gateway IV, 22980 Indian Creek Drive,

Dulles, VA 20166 Dulles Bryan Thomas [email protected] 571.262.8369 VA 1/31/2017

M.C. Dean, Inc. Public Address

Loudoun Gateway IV, 22980 Indian Creek Drive,

Dulles, VA 20165 Dulles Bryan Thomas [email protected] 571.262.8368 VA 1/31/2017

M.C. Dean, Inc. Telecom

Loudoun Gateway IV, 22980 Indian Creek Drive,

Dulles, VA 20166 Dulles Bryan Thomas [email protected] 571.262.8369 VA 1/31/2017

342 M & J Steel LLC Misc Metals 7561 Gadsden Highway, Trussville, AL, 35173 Trussville Eddie Box [email protected] 205-655-7451 Al 4/30/2019

343 Mack Contracting LLC Site Work/Underground Utilities 1721 Murdock Blvd. Orlando Lawrence [email protected] 352.816.0111 FL 10/17/2017

344 Madrid Engineering Group, Inc. Quality Control/Materials Testing 2030 SR 60 East, Bartow, FL 33830 Bartow Brian Murphy [email protected] 863.533.9007 FL 1/31/2017

345 Mainstream IP Solutions, Inc. Telecom 6905 El Dorado Dr., Tampa, FL 33615 Tampa Steven Brown [email protected] 813.327.6062 FL 1/31/2017

346 Malak Corporation Mechanical 4366 LB McLeod Rd. Orlando Emmanuel Ortiz [email protected] 407.250.5806 FL 6/27/2017

347 Malcolm Drilling Company, Inc. Auger Cast Piles 92 Natoma Street, Suite 400, San Francisco, CA 94105 San Francisco Desiree Blanco [email protected] 866.509.5232 CA 1/31/2017

348 Manzi Metals, Inc. Structural Steel & Misc. Metals 15293 Flight Path Dr., Brooksville, FL 34604 Brooksville Monty Caraballo [email protected] 352.799.8211 FL 1/31/2017

349 Mardale Specialties Direct, Inc. Specialties 4101 Northwest 124th Ave. Coral Springs Paula Montoya [email protected] 954.510.7700 FL 10/31/2017

350 Mark Master, Inc. Signage 11111 N. 46th St., Tampa, FL 33617 Tampa Susan Acebo 800.441.6275 FL 1/31/2017

351 Marks Landscaping, Inc. Interior Landscape Plants & Accessories 1055 Oklahoma Street Oviedo Mark Williams [email protected] 407-366-7305 FL 11/13/2018

352 Martin King Waterproofing, Inc.

Paint/Special Coatings

13750 W. Colonial Dr., Suite 350-363, Winter Garden,

FL 34787 Winter Garden Martin King [email protected] 321.945.5187 FL 1/31/2017

Martin King Waterproofing, Inc.

Waterproofing/Joint Sealants/Foundation

Waterproofing

13750 W. Colonial Dr., Suite 350-363 Winter Garden,

FL 34787 Winter Garden Martin King [email protected] 321.945.5187 FL 1/31/2017

353 Maser Consulting P.A. Quality Control/Materials Testing 405 N. Reo St., Suite 105, Tampa, FL 33609 Tampa Chad Boggs [email protected] 813.207.1061 FL 1/31/2017

354 Matcon Construction Services Inc. Concrete & Masonry 1717 E. Busch Blvd., Ste. 601 Tampa Derek Mateos [email protected] 813.600.5555 FL 10/31/2017

355 Maverick Constructors, LLC Millwork 18932 N. Dale Mabry Hwy. #101, Lutz, FL 33548 Lutz Carlos Rodriguez [email protected] 813.949.5660 FL 1/31/2017

356 MC2 Inc. CCTV 2290 W. Airport Blvd., Sanford, FL 32771 Sanford Russ Escamilla [email protected] 321.229.6958 FL 1/31/2017

357 McDade Woodcock Inc. Electric, Communications 2404 Claremont Ave., NE Albuquerque Sharon Pedroncelli [email protected] 505-507-1277 NM 5/22/2018

358 McGrath Rent Corp. d/b/a Mobile Modular Management Corp. Office Trailers 5700 Las Positas Rd., Livermore, CA 94551 Livermore Carolyn Prescott [email protected] 863.965.3700 CA 1/31/2017

359 McKenzie Contracting, LLC

Earthwork 3604 E. Martin Luther King, Jr. Blvd., Tampa, FL 33610 Tampa 813.395.0348 FL 1/31/2017

McKenzie Contracting, LLC Underground Utilities 3604 E. Martin Luther King, Jr. Blvd., Tampa, FL 33610 Tampa 813.395.0348 FL 1/31/2017

360 McKenzie's Cleaning Inc. Final Cleaning 3600 S. State Rd. 7, Ste. 232, Miramar, FL 33023 Miramar Terriann McKenzie [email protected] 305.249.5911 FL 1/31/2017

361 MCS of Tampa, Inc. Audio Visual 8510 Sunstate St., Tampa, FL 33634 Tampa Robyn Huber [email protected] 813.447.1732 FL 1/31/2017

MCS of Tampa, Inc. Security 8510 Sunstate St., Tampa, FL 33634 Tampa Robyn Huber [email protected] 813.447.1732 FL 1/31/2017

MCS of Tampa, Inc. Telecom 8510 Sunstate St., Tampa, FL 33634 Tampa Robyn Huber [email protected] 813.447.1732 FL 1/31/2017

362 MDM Services Inc. Fueling 1055 Kathleen Rd. Lakeland Dhivy Sathianathan [email protected] 863.646.9130 FL 10/17/2017

363 Mechanical Services of Central FL Inc. Mechanical/Plumbing 9820 Satellite Boulevard Orlando Bernard Horne [email protected] 407.857.3510 FL 6/27/2017

364 Merit Fasteners Corp.

Masonry 2510 N. Ronald Reagan Blvd., Longwood, FL 32750 Longwood Donna Best [email protected] 407.331.4815 FL 1/31/2017

Merit Fasteners Corp. Construction Material Supplier 2511 N. Ronald Reagan Blvd., Longwood, FL 32750 Longwood Donna Best [email protected] 407.331.4815 FL 1/31/2017

365 Met-Con Inc. Structural Steel 465 Canaveral Groves Blvd. Cocoa Hiranand Katari [email protected] 321.632.4880 FL 10/17/2017

366 Metromont Corporation Precast 2802 White Horse Road Greenville John Wenkel [email protected] 770.294.6514 SC 1/23/2018

367 Mettron Contracting, Inc. Underground Utilities P.O. Box 680705, Orlando, FL 32868 Orlando Sharen Hannah [email protected] 407.313.0757 FL 1/31/2017

368 Midstate Caulking & Construction Services, LLC Waterproofing / Caulking / Stucco 1600 Kelley Ave. Kissimmee Brenda Clement [email protected] 407-530-5773 FL 5/22/2018

369 Mid-State Metals, LLC Misc. Metals 2536 Hansrob Rd Orlando Tyler Pelleymounter [email protected] 407-295-3864 FL 7/31/2018

370 Midwest Steel Structural Steel & Misc. Metals

8910 Astronaut Blvd. Suite 304, Cape Canaveral, FL

32920 Cape Canaveral Pamela Drazich [email protected] 321.783.7001 FL 1/31/2017

371 Miller Electric Company Electrical 2251 Rosselle St., Jacksonville, FL 32204 Jacksonville Jason Shinneman [email protected] 813.623.3984 FL 1/31/2017

Miller Electric Company Telecom 2251 Rosselle St., Jacksonville, FL 32204 Jacksonville Jason Shinneman [email protected] 813.623.3984 FL 1/31/2017

372 Miller Paneling Specialties Interior Wall Panels 3500 W King St #4 Cocoa Brandy Huyskens [email protected] 321-806-4822 FL 11/13/2018

373 Mill-Rite Woodworking Company, Inc. Millwork, Countertops, Metal Panels 6401 47th Street Pinellas Park Greg Marrocco [email protected] 757.527.7808 FL 10/17/2017

374 Mitsubishi Electric Elevators/Escalators 8/1/2017

375 Modern Plumbing Industries, Inc. Plumbing 255 Old Sanford Oviedo Rd., Winter Springs, FL Winter Springs 321.926.4489 FL 1/31/2017

376 Modular Building Systems International, LLC Office Trailers 13340 W. Colonial Dr. #250, Winter Garden, FL Winter Garden Patricia Berk [email protected] 407.905.9951 FL 1/31/2017

377 Modular Space d/b/a Modspace Office Trailers 5001 Zell Dr., Orlando, FL 32824 Orlando 407.859.7925 FL 1/31/2017

378 Mohawk Carpet Distribution, Inc. Resinous Flooring 160 S. Industrial Blvd., Calhoun, GA 30701 Calhoun Phil Santella [email protected] 407.205.6985 GA 1/31/2017

379 Moretrench Environmental Services, Inc. Auger Cast Piles 189 Jamaica Ln., Orlando, FL 32809 Orlando 407.897.8562 FL 1/31/2017

Moretrench Environmental Services, Inc. Precast Driven Piles & Earthwork 189 Jamaica Ln., Orlando, FL 32809 Orlando 407.897.8562 FL 1/31/2017

380 Morgan Air Conditioning LLC HVAC 14807 N. 12th Street Hillsborough Brainard Morgan [email protected] 813.500.7765 FL 8/1/2017

381 Morris Allen & Associates, Inc.

Consultant 1140 Capital Circle S.E., Suite 3, Tallahassee, FL 32301 Tallahassee Dr. Davis 850.421.7770 FL 1/31/2017

382 Morris-Shea Bridge Company, Inc. Foundations 609 South 20th St., Irondale, AL 35210 Irondale Tony Smith [email protected] 205.956.9518 AL 6/27/2017

383 Morton Electric, Inc. Electrical 3625 W. 1st St., Sanford, FL 32771 Orlando 407.830.1000 FL 1/31/2017

Morton Electric, Inc. Fire Alarm 3625 W. 1st St., Sanford, FL 32771 Orlando 407.830.1000 FL 1/31/2017

384 Mountain Top d/b/a Saratoga Roofing Mod. Bit. Roofing 4700 Millenia Blvd. #175, Orlando, FL 32839 Orlando 407.442.3102 FL 1/31/2017

385 Mr. David's Flooring Carpet & Resilient Flooring 88 Riberia Street St. Augustine Laura Dellbrugge [email protected] 904-629-7779 FL 11/13/2018

Page 8 of 12

Rev. 7/30/2019

Page 213: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

PREQUALIFIED SUBCONTRACTORS/SUPPLIERS

Previously PSC Approved

Company Name MWBE LDB DBE SDVOBE Trades Address1 City Contact Email Phone State PSC Date

386 MSE², Inc. d/b/a Mader Southeast Acoustical Ceilings 2299 E. Landstreet Rd., Orlando, FL 32824 Orlando Adam Eckelbarger [email protected] 407.822.8817 FL 1/31/2017

MSE², Inc. d/b/a Mader Southeast Drywall 2300 E. Landstreet Rd., Orlando, FL 32824 Orlando Adam Eckelbarger [email protected] 407.822.8818 FL 1/31/2017

MSE², Inc. d/b/a Mader Southeast Structural Concrete (Columns/Walls/Stairs/SOD) 1/31/2017

387 Mule Engineering and Construction, Inc. Demo, Carpentry, Finishes, HVAC, GR 13019 Shadow Bend Ct. Winter Garden Mike Ulekowski [email protected] 407.543.6414 FL 10/17/2017

388 Munilla Construction Management LLC dba MCM General Contractor 6201 SW 70th St. Miami Eugenio Jaramillo [email protected] 305.541.0000 FL 10/17/2017

389 Nadic Engineering Services Incorporated Consultant 601 N. Hart Blvd., Orlando, FL 32818 Orlando 407.521.4771 FL 1/31/2017

390 National Fire Protection, LLC Fire Supression 515 Dover Road Rockville James Walter [email protected] 301.370.5030 MD 1/23/2018

391 Nations Roof of Florida LLC Roofing 1313 E. Landstreet Road Orlando Jake Hyatt [email protected] 407-649-1333 FL 5/22/2018

392 NEFF Rentals Equipment Rental 3750 NW 87th Ave. Miami Ryan Purdy [email protected] 407.402.9995 FL 10/17/2017

393 New Age Reprographics LLC Printing and Document Management 3642 W. Kennedy Blvd., Tampa, FL 33609 Tampa Alex Prieto [email protected] 813.426.3272 FL 1/31/2017

394 New Horizon Construction Services, LLC (NHCS) Ceramic Tile 3430 N. Orange Blossom Trail, Orlando, FL 32804 Orlando Dion Long [email protected] 407.574.2164 FL 1/31/2017

New Horizon Construction Services, LLC (NHCS) Door Frames/Hardware 3431 N. Orange Blossom Trail, Orlando, FL 32804 Orlando Dion Long [email protected] 407.574.2164 FL 1/31/2017

New Horizon Construction Services, LLC (NHCS) Interior Glazing 3432 N. Orange Blossom Trail, Orlando, FL 32804 Orlando Dion Long [email protected] 407.574.2164 FL 1/31/2017

New Horizon Construction Services, LLC (NHCS) Millwork 3433 N. Orange Blossom Trail, Orlando, FL 32804 Orlando Dion Long [email protected] 407.574.2164 FL 1/31/2017

395 Nicholson Construction Co. Access Roads/Storage Yards 17535 Darby Lane, Lutz, FL 33558 Lutz Martin Hoegg 727.223.5979 FL 1/31/2017

Nicholson Construction Co. Jet Grouting 17536 Darby Lane, Lutz FL 33558 Lutz Martin Hoegg 727.223.5980 FL 1/31/2017

Nicholson Construction Co. Auger Cast Piles 17537 Darby Lane, Lutz FL 33558 Lutz Martin Hoegg 727.223.5981 FL 1/31/2017

Nicholson Construction Co. Soil Mixing 17538 Darby Lane, Lutz FL 33558 Lutz Martin Hoegg 727.223.5982 FL 1/31/2017

396 North Alabama Fabricating Company, Inc. Structural Steel & Misc. Metals

4632 Richard Arrington Jr. Blvd., North Birmingham,

AL 35212 Birmingham John Harris [email protected] 205.591.5554 AL 1/31/2017

397 Northern Electric, Inc. Electrical 12789 Emerson Street Thornton Al Fisher [email protected] 303.428.6969 CO 1/23/2018

398 Nosal Industries General Trades 21 Meadow Road Clinton David Gionfriddo [email protected] 203-641-0914 CT 5/22/2018

399 Nova Engineering & Environmental LLC Testing & Inspections 3640 Kennesaw N Industrial Parkway NW Suite Kennesaw David Miller [email protected] 770.425.0777 GA 10/17/2017

400 N-RG Cladding, LLC Metal Panels & Column Covers 516 Cooper Commerce Dr., Apopka, FL 32703 Apopka Phil Klote 407.464.7070 FL 1/31/2017

401 NV5, Inc. Material Testing 200 South Park Rd. Hollywood Barry Goldstein [email protected] 305.901.2039 FL 8/1/2017

402 Odyssey International, Inc. dba Odyssey Global Concrete 1225 Opportunity Ave. Chambersburg Carl Leneis [email protected] 407.777.6620 PA 8/1/2017

403 Oldcastle Building Envelope, Inc. Glazing/Curtainwall Systems & Skylights 803 Airport Rd., Terrell, TX 75160 Terrell Ned Mohammad [email protected] 972.551.6100 TX 1/31/2017

404 Oldcastle Precast, Inc. Precast 175 Semoran Commerce Place Apopka Daniel Nyce [email protected] 407.889.2432 FL 1/23/2018

405 OLP Construction

Concrete Flatwork (SOG, Sidewalks, Misc Pads,

C&G) 5511 Curry Ford Rd., Orlando FL 32822 Orlando 407.384.8375 FL 1/31/2017

OLP Construction Concrete Foundations & Earthwork 5512 Curry Ford Rd., Orlando FL 32822 Orlando 407.384.8376 FL 1/31/2017

OLP Construction Masonry 5513 Curry Ford Rd., Orlando FL 32822 Orlando 407.384.8377 FL 1/31/2017

406 One Source Roofing, Inc Mod. Bit. Roofing 894 Kennedy Blvd., Orlando, FL 32810 Orlando Alice [email protected] 407.660.8552 FL 1/31/2017

407 Onopa Services, LLC Demolition 541 N. Palmetto Ave. #104, Sanford, FL 32771 Sanford David Bermudez 407.323.2214 FL 1/31/2017

408 Orion Management, LLC Electrical

3245 N. Courtenay Pky., Suite 17, Merritt Island, FL

32953 Merritt Island James Buck [email protected] 321.609.0973 FL 1/31/2017

409 Orlacon General, Inc. Door Frames/Hardware PO Box 547338, Orlando, FL 32804 Orlando Chris Edson [email protected] 321.231.8757 FL 1/31/2017

Orlacon General, Inc. Masonry PO Box 547338, Orlando, FL 32804 Orlando Chris Edson [email protected] 321.231.8757 FL 1/31/2017

Orlacon General, Inc. Mod. Bit. Roofing PO Box 547338, Orlando, FL 32804 Orlando Chris Edson [email protected] 321.231.8757 FL 1/31/2017

410 Orlando Color Factory Painting, Inc. Painting 1350 S Hiawassee Rd #162 Orlando Randy Wheeler [email protected] 407-715-7336 FL 11/13/2018

411 OTIS Elevator Company Elevator/ Escalator 5500 Village Blvd., Suite 101 West Palm Beach Jeff Zielinski [email protected] 813.380.6986 FL 8/1/2017

412 Overhead Door Co. of Orlando Overhead Doors 1351 Bennett Dr Longwood Carl Stevens [email protected] 407-830-5600 FL 11/13/2018

413 Overhead Door Mid Florida Commercial Overhead Doors 777 South Park Avenue Apopka Darrel Wilkie [email protected] 407-884-5955 FL 11/13/2018

414 Owen Steel Company Inc. Structural Steel & Misc. Metals 727 Mauney Dr., Colombia, S. Carolina 29201 Colombia Scott McCoy [email protected] 803.251.7510 SC 1/31/2017

415 P & A Roofing and Sheet Metal, Inc. Metal Roofing System (Project Wide) 4495 35th St., Orlando, FL 32811 Orlando 407.650.9541 FL 1/31/2017

P & A Roofing and Sheet Metal, Inc.

Waterproofing/Joint Sealants/Foundation

Waterproofing 4496 35th St., Orlando, FL 32811 Orlando 407.650.9542 FL 1/31/2017

416 P Jackson Enterprises d/b/a The Jackson-Flayler Co. General Contractor 2804 South Osceola Ave Orlando Pam Jackson [email protected] 407-872-7003 FL 11/13/2018

417 Pace Electric, Inc Electrical 402 Bif Ct. Orlando Ed Lewis [email protected] 407.855.3200 FL 8/1/2017

418 Page One Consultants, Inc. Quality Control/Materials Testing 5780 Hoffner Ave., #401, Orlando FL 32822 Orlando 407.275.5120 FL 1/31/2017

419 Painters on Demand Painting 3201 North Florida Avenue Tampa Frank Nieves [email protected] 813-880-0001 FL 11/13/2018

420 Paintsmart USA, Inc.

Paint/Special Coatings 5036 Dr. Phillips Blvd., Suite 318,Orlando, FL 32819 Orlando Andre Smart [email protected] 407.427.0960 FL 1/31/2017

421 Paradise Awnings Corp. Metal Panels/ Canopies 4310 NW 36th Ave. Miami Ralph Gainer [email protected] 954-791-0781 FL 5/22/2018

422 Pars Construction Services, LLC

Roadways/Paving

7643 Gate Parkway, Suite 104-82, Jacksonville, FL

32256 Jacksonville Ali Hakimi [email protected] 904.642.6144 FL 1/31/2017

423 Peachtree Telecommunications International LLC

Signage

11555 Medlock Bridge Rd. #100, Johns Creek, GA

30097 Johns Creek 770.242.1970 GA 1/31/2017

Peachtree Telecommunications International LLC

Telecom

11555 Medlock Bridge Rd. #100, Johns Creek, GA

30097 Johns Creek 770.242.1970 GA 1/31/2017

424 Peak Fall Protection, Inc. Window Washing Equipment 1230 Perry Rd Apex Travis Nelson [email protected] 919-422-0683 NC 11/13/2018

425 Percopo Coatings Company LLC Paint/Special Coatings 751 Fleet Financial Ct., Longwood, FL 32750 Longwood 407.331.3805 FL 1/31/2017

Percopo Coatings Company LLC

Waterproofing/Joint Sealants/Foundation

Waterproofing 751 Fleet Financial Ct., Longwood, FL 32750 Longwood 407.331.3805 FL 1/31/2017

426 Performance Contracting, Inc., of Kansas Metal Panels/Drywall 11145 Thompson Avenue Lenexa Steve Kerber [email protected] 863-6693963 KS 5/22/2018

427 Performance Door & Hardware D/F/H 3710 W. Royal Lane, Ste. 185 Irving Michael Dion [email protected] 407-932-2115 TX 5/22/2018

428 Performance Painting Contractors, Inc. Painting 6375 Harney Rd Tampa Bennett Carnes [email protected] 904-703-0618 FL 11/13/2018

429 Permasteelisa Cladding Technologies, Ltd. Corp. Curtainwall/Glazing 703 NW 62nd Ave., Suite 950, Miami, FL 33126 Miami Roberto Bicciarelli [email protected] 305.592.1212 FL 1/31/2017

430 Petersen Dean Roofing and Solar Systems Mod bit roofing 565 Henderson Road Jacksonville Michela Munroe [email protected] (352) 454-4442 FL 7/31/2018

431 Petroleum Equipment, Inc. of Kansas City (PEI) Diesel Fuel Transfer & Storage Systems 1401 E. 9th St. Kansas City Stuart Mears [email protected] 816-421-0044 MO 5/22/2018

432 Phillips and Jordan, Incorporated Earthworks 8940 Gall Blvd., Zephyrhills, FL 33541 Zephyrhills Art Phelps [email protected] 813.783.1132 FL 1/31/2017

Phillips and Jordan, Incorporated Abutments & MSE Walls 8940 Gall Blvd., Zephyrhills, FL 33541 Zephyrhills Art Phelps [email protected] 813.783.1132 FL 1/31/2017

Phillips and Jordan, Incorporated Access Roads/Storage Yards 8940 Gall Blvd., Zephyrhills, FL 33541 Zephyrhills Art Phelps [email protected] 813.783.1132 FL 1/31/2017

433 Physical Security, LLC Curtainwall/Glazing 600 Belview St., Bessemer AL 35020 Bessemer Rudi Prusa [email protected] 517.819.7510 AL 1/31/2017

Physical Security, LLC Interior Glazing 600 Belview St., Bessemer AL 35020 Bessemer Rudi Prusa [email protected] 517.819.7510 AL 1/31/2017

434 Piney Branch Motors Inc. d/b/a Allied Trailers Sales & Rentals Office Trailers 335 Central Florida Parkway, Orlando, FL 32824 Orlando Elizabeth Barron 407.240.1119 FL 1/31/2017

435 Pipeline Mechanical, Inc. HVAC/Mech Louvers 30901 Suneagle Dr., Mount Dora, FL 32757 Mt. Dora Ammaurys Sosa asosa@pmiFLcom 352.385.0195 FL 1/31/2017

436 Piper Fire Protection Fire Suppression 13075 US HWY 19 N Clearwater Chris Johnson [email protected] 727.581.9339 FL 6/27/2017

437 Plateau Excavation, Inc. Civil 375 Lee Industrial Blvd. Austell David Shewchuk [email protected] 404-317-4181 GA 5/22/2018

438 Plummer Painting and Waterproofing, Inc. Paint/Special Coatings 660 Jackson Ave. #103, Winter Park, FL 32789 Winter Park Jessica [email protected] 407.585.0210 FL 1/31/2017

Page 9 of 12

Rev. 7/30/2019

Page 214: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

PREQUALIFIED SUBCONTRACTORS/SUPPLIERS

Previously PSC Approved

Company Name MWBE LDB DBE SDVOBE Trades Address1 City Contact Email Phone State PSC Date

Plummer Painting and Waterproofing, Inc.

Waterproofing/Joint Sealants/Foundation

Waterproofing 660 Jackson Ave. # 103, Winter Park, FL 32789 Winter Park Jessica [email protected] 407.585.0209 FL 1/31/2017

439 Potential Electric LLC Electrical 4629 36th St., Suite 200 Orlando Val Chu [email protected] 407.648.4433 FL 6/27/2017

440 Power Engineering Group, Inc. Audio Visual 6635 Narcoossee Rd., Orlando, FL 32822 Orlando 407.277.3150 FL 1/31/2017

Power Engineering Group, Inc. Electrical 6635 Narcoossee Rd., Orlando, FL 32822 Orlando 407.277.3150 FL 1/31/2017

Power Engineering Group, Inc. Public Address 6635 Narcoossee Rd., Orlando, FL 32822 Orlando 407.277.3150 FL 1/31/2017

Power Engineering Group, Inc. Security 6635 Narcoossee Rd., Orlando, FL 32822 Orlando 407.277.3150 FL 1/31/2017

441 PPI Epoxy Coating Epoxy Flooring 9535 Satellite Blvd, suite 100 Orlando Maritza Sanchez [email protected] 937-524-7292 FL 1/15/2019

442 Praise Contracting LLC. Acoustical Ceilings 10859 Arbor View Rd., Orlando, FL 32825 Orlando Antonia Jackson [email protected] 407.864.5477 FL 1/31/2017

Praise Contracting LLC. Ceramic Tile 10863 Arbor View Rd., Orlando, FL 32825 Orlando Antonia Jackson [email protected] 407.864.5481 FL 1/31/2017

Praise Contracting LLC. Drywall 10862 Arbor View Rd., Orlando, FL 32825 Orlando Antonia Jackson [email protected] 407.864.5480 FL 1/31/2017

Praise Contracting LLC. Millwork 10860 Arbor View Rd., Orlando, FL 32825 Orlando Antonia Jackson [email protected] 407.864.5478 FL 1/31/2017

Praise Contracting LLC. Paint/Special Coatings 10863 Arbor View Rd., Orlando, FL 32825 Orlando Antonia Jackson [email protected] 407.864.5481 FL 1/31/2017

Praise Contracting LLC. Resilient Flooring/Carpet 10861 Arbor View Rd., Orlando, FL 32825 Orlando Antonia Jackson [email protected] 407.864.5479 FL 1/31/2017

443 PRC Precast LLC Architectural Precast 46 Donkle Rd., Greenville, SC 29609 Greenville Forde Davis [email protected] 864.244.8211 SC 1/31/2017

444 Precision 2000, Inc.

Structural Concrete

(Columns/Walls/Stairs/SOD) 2215 Lawson Way, Atlanta, GA 30341 Atlanta Carlos Sanchez [email protected] 770.455.6142 GA 1/31/2017

445 Precision Balance, Inc.

HVAC/Mech Louvers 8815 Conroy Windermere Rd. #319, Orlando, FL 32835 Orlando Tracy Maloney [email protected] 407.876.4112 FL 1/31/2017

446 Precision Contracting Services, Inc. Communications 15834 Guild Court Jupiter Laura Fix [email protected] 561.743.9737 FL 6/27/2017

447 Precision Painting Group Painting 918 E Busch Blvd Tampa George Gaffney [email protected] 813-935-5868 FL 11/13/2018

448 PremUS of Orlando, Inc. Terrazzo Flooring 16403 Myers Ct Clermont Gary Rader [email protected] 407-509-4726 FL 11/13/2018

449 Prentiss II Industries LLC Resilient Flooring/Carpet 20850 S. Buckhill Rd., Clermont, FL 34715 Clermont Prentiss Wright 407.448.9038 FL 1/31/2017

450 Prime Electrical Services, Inc. Electrical 550 Holts Lake Ct. #101, Apopka, FL 32703 Apopka Camell Willliams [email protected] 407.574.5177 FL 1/31/2017

451 Prince Contracting, LLC Earthworks 10210 Highland Manor Dr., Suite 110, Tampa, FL Tampa Jack Calandros [email protected] 813.699.5900 FL 1/31/2017

452 Pro-Bel Enterprises Limited (Pro-Bel Group Limited) Window Washing Equipment 1638 Anita Place Northeast Atlanta John Lyons [email protected] 404-874-5559 GA 11/13/2018

453 Progressive Plumbing, Inc. Plumbing 1064 Fl-50, Clermont, FL 34711 Clermont 352.394.7171 FL 1/31/2017

454 Protect Video, Inc. Security 3483 High Ridge Rd., Boynton Beach, FL 33426 Boynton Beach Shad DiMaria [email protected] 561.622.5880 FL 1/31/2017

Protect Video, Inc. Telecom 3483 High Ridge Rd. Boynton Beach, FL 33426 Boynton Beach Shad DiMaria [email protected] 561.622.5880 FL 1/31/2017

455 Provisions Construction and Development, Inc. General Contractor 3401 Lake Breeze Dr Orlando Michael Arrington [email protected] 407-985-2442 FL 11/13/2018

456 Proxy Management Group, LLC dba Veatic Signage 2450 Smith St. Kissimmee Frank Rodriguez [email protected] 888.747.2999 FL 6/27/2017

457 Ptah Entertainment Inc d/b/a Sunfire Technology Security 11 E. Falls Rd., Memphis, TN 38109 Memphis Jerome Hightower [email protected] 901.237.9724 TN 1/31/2017

Ptah Entertainment Inc d/b/a Sunfire Technology Telecom 11 E. Falls Rd. Memphis, TN 38109 Memphis Jerome Hightower [email protected] 901.237.9724 TN 1/31/2017

458 PTE Systems International, LLC Steel/Concrete/Engineering 1950 West 8th Ave. Hialeah Rick Kaiser [email protected] 305.863.3409 FL 8/1/2017

459 Pyramid Masonry Contractors, Inc. Masonry 2330 Mellon Ct. Decatur Bill Parsons [email protected] 407.816.5740 GA 10/31/2017

460 Quality Cable Contractors, Inc.

Electrical 207 N. Goldenrod Rd., Suite 600, Orlando, FL 32807 Orlando Gabriel Del Rio [email protected] 407.246.0606 FL 1/31/2017

461 Quantum Electric LLC Electrical 1237 North Pine Hills Rd. Orlando Damian Smith [email protected] 407.485.4333 FL 1/23/2018

462 R. W. Harris, Inc. Foundations 12300 44th St N., Clearwater, FL 33762 Clearwater Shawn 727.572.9200 FL 1/31/2017

463 R.F. Knox Decorative Handrails 4865 Martin Court Smyrna Jack Knox [email protected] 770-434-7401 GA 11/13/2018

464 RAKS Fire Sprinkler, LLC Fire Protection 215 Mobile St., Hattiesburg, MS 39401 Hattiesburg Romero Ali [email protected] 334.202.0322 MS 1/31/2017

465 Ramcon, LLC Roofing 5902 Breckenridge Parkway Tampa Kyle Burdine [email protected] 813-663-9667 FL 5/22/2018

466 Randall Mechanical, Inc. HVAC/Mech Louvers 3307 S. Clarcona Rd., Apopka, FL 32703 Apopka Matthew Reinders [email protected] 407.408.6792 FL 1/31/2017

Randall Mechanical, Inc. Plumbing/HVAC 3307 S. Clarcona Rd. Apopka, FL 32703 Apopka Matthew Reinders [email protected] 407.408.6792 FL 1/31/2017

Randall Mechanical, Inc. Structural Concrete (Columns/Walls/Stairs/SOD) 3307 S. Clarcona Rd. Apopka, FL 32703 Apopka Matthew Reinders [email protected] 407.408.6792 FL 1/31/2017

467 Ranger Construction Industries, Inc. Access Roads/Storage Yards 1200 Elboc Way, Winter Garden, FL 34787 Winter Garden 407.656.9255 FL 1/31/2017

468 RCDC Incorporated Painting 6810 Luana Lane Seffner Johnny Giunta [email protected] 813-478-5084 FL 11/13/2018

469 RCS Civil, Inc. Fabric Formed RipRap 297 E. Hwy. 50, Suite 3, Clermont, FL 34711 Clermont Pedro Baldaguez [email protected] 352.394.1716 FL 1/31/2017

470 RCS Millwork, L.C. Millwork & Countertops 25 Funston Road Kansas City Dustin Hecht [email protected] 913-281-7373 KS 11/13/2018

471 Rebah Fabrication, Inc. Structural Steel & Misc. Metals 11422 Satellite Blvd., Orlando, FL 32837 Orlando 407.857.3232 FL 1/31/2017

472 Record Automatic Doors, Inc. Exit Lane Breach Control 4324 Phil Hargett Ct Monroe David Pickers [email protected] 704-315-7392 NC 11/13/2018

473 Republic Services Trash Removal 11224 Rocket Blvd., Orlando, FL 32824 Orlando Erika Montanez [email protected] 321.287.9124 FL 1/31/2017

474 Richard Flanders Enterprises, Inc. Test and Balance 3800 Inverrary Blvd., #110, Lauderhill, FL 33319 Lauderhill Harlan Rosenberg [email protected] 407.592.1932 FL 1/31/2017

475 Rightway Acoustics, LLC ACT 720 SW River Bend Circle Stuart Alex Mullen [email protected] 772.341.6291 FL 1/23/2018

476 Rigsby Construction, Inc. dba Artisan Design and Construction General Contractor 6278 N. Federal Hwy #304 Ft. Lauderdale Patricia Rigsby [email protected] 954.448.3300 FL 8/1/2017

477 Rivera Tile & Stone Carpet & Resilient Flooring 801 S Chicksaw Trail Orlando Nemo Rivera [email protected] 407-443-7622 FL 11/13/2018

478 RL Burns Inc. Coiling Doors, Door Frames, Drywall, Paint 1203 W. Gore St., Orlando, FL 32805 Orlando April Dixon [email protected] 407.839.1128 FL 1/31/2017

RL Burns Inc. Door Frames/Hardware 1203 W. Gore St. Orlando, FL 32805 Orlando April Dixon [email protected] 407.839.1131 FL 1/31/2017

RL Burns Inc. Drywall 1204 W. Gore St. Orlando, FL 32805 Orlando April Dixon [email protected] 407.839.1132 FL 1/31/2017

RL Burns Inc. Paint/Special Coatings 1202 W. Gore St. Orlando, FL 32805 Orlando April Dixon [email protected] 407.839.1130 FL 1/31/2017

RL Burns Inc. Resilient Flooring/Carpet 1203 W. Gore St. Orlando, FL 32805 Orlando April Dixon [email protected] 407.839.1131 FL 1/31/2017

RL Burns Inc. Signage (Int & Ext) 1201 W. Gore St. Orlando, FL 32805 Orlando April Dixon [email protected] 407.839.1129 FL 1/31/2017

479 Rolling Plains Construction Fireproofing 5 S. Roosevelt Ave., Chandler AZ Chandler Kaitlin Sidwa [email protected] 480.895.8813 AZ 1/31/2017

480 S M I Cabinetry, Inc. Millwork 2715 N. Orange Blossom Tr., Orlando, FL 32804 Orlando Michelle Hull [email protected] 407.841.0292 FL 1/31/2017

481 S.I. Goldman Company, Inc. HVAC/Mech Louvers 799 Bennett Dr., Longwood, FL 32750 Longwood Manny Toro [email protected] 407.830.5000 FL 1/31/2017

S.I. Goldman Company, Inc. Plumbing 799 Bennett Dr, Longwood FL 32750 Longwood Manny Toro [email protected] 407.830.5000 FL 1/31/2017

482 Safety Plus International, LLC

Safety Equipment Supplier

111 E. Monument Ave., Ste. 401-17 Kissimmee, FL

34741 Kissimmee Cesar [email protected] 407.957.1900 FL 1/31/2017

483 Safway Services, LLC Scaffolding 11208 Boggy Creek Rd., Orlando, FL Orlando Greg Tolley [email protected] 407.859.2060 FL 1/31/2017

484 Sandra Leppert and Associates, Inc. Millwork PO Box 271893, Tampa, FL 33688 Tampa Sandra Jo Leppert [email protected] 813.962.8890 FL 1/31/2017

485 Sauer Group, Inc. Mechanical 1801 Lone Eagle Street Pittsburgh Michael Ruzinsky [email protected] PA 5/22/2018

486 Schedule 10 Specialists, Inc. Specialties 3521 Northwest 99th Avenue Coral Springs Rena Blankenship [email protected] 954-340-8986 FL 11/13/2018

487 Schindler Elevator Corporation Elevators/Escalators 7100 TPC Drive, #300, Orlando, FL 32827 Orlando 407.235.1200 FL 1/31/2017

488 Schuff Steel Company Structural Steel & Misc. Metals 6701 W. 64th St., Suite 200, Overland Park, KS 66202 Overland Park Jay Allen [email protected] 602.332.9541 KS 1/31/2017

489 SECO Architectural Systems, Inc. Metal Panels 3685 Hewatt Ct. SW, Ste. B Snellville Joe Creighton [email protected] GA 5/22/2018

490 Secom, LLC Survey and Layout P.O. Box 1747, Orlando, FL 32802 Orlando Beverly Jones 407.352.7181 FL 1/31/2017

491 Secured Global LLC Window Washing Equipment 4524 36th St Orlando Eilana [email protected] 407-472-4860 FL 11/13/2018

492 SEMA Construction, Inc. Access Roads/Storage Yards 6200 Hazeltine National Dr., #100, Orlando, FL 32825 Orlando Shane Cox [email protected] 407.563.7900 FL 1/31/2017

SEMA Construction, Inc. Structural Concrete (Columns/Walls/Stairs/SOD) 6200 Hazeltine National Dr # 100 Orlando, FL Orlando Shane Cox [email protected] 407.563.7899 FL 1/31/2017

Page 10 of 12

Rev. 7/30/2019

Page 215: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

PREQUALIFIED SUBCONTRACTORS/SUPPLIERS

Previously PSC Approved

Company Name MWBE LDB DBE SDVOBE Trades Address1 City Contact Email Phone State PSC Date

493 Seminole Masonry, LLC Architectural Precast 3850 E. Lake Mary Blvd., Sanford, FL 32773 Sanford Blake Roden 407.278.4980 FL 1/31/2017

Seminole Masonry, LLC Masonry 3850 E. Lake Mary Blvd Sanford FL Sanford Blake Roden 407.278.4980 FL 1/31/2017

494 Sharon Shelters d/b/a Shelters Cleaning LLC Final Cleaning PO Box 721924, Orlando, FL 32872 Orlando Sharon Shelters [email protected] 407.373.4241 FL 1/31/2017

495 Siemens Postal, Parcel & Airport Logistics LLC Baggage Handling 2700 Esters Blvd., Suite 200B, Dallas, TX 75261 Dallas Andrew Savage [email protected] 972.947.7100 TX 1/31/2017

496 Sigma Marble & Granite, Inc. Ceramic Tile 8222 Chancellor Row, Dallas TX 75247 Dallas 214.637.5200 TX 1/31/2017

497 Signal Perfection Ltd., Inc Telecom 9160 Rumsey Rd., Suite B12, Colombia, MD 21045 Colombia Philip diPaula 407.334.9966 MD 1/31/2017

498 SimplexGrinnell LP Audio Visual 6829 Shadowridge Dr., Suite 211, Orlando, FL 32812 Orlando Drue Nadrowski [email protected] 321.558.0928 FL 1/31/2017

SimplexGrinnell LP CCTV 6829 Shadowridge Dr., Suite 211, Orlando, FL 32812 Orlando Drue Nadrowski [email protected] 321.558.0928 FL 1/31/2017

SimplexGrinnell LP Fire Protection 6830 Shadowridge Dr., Suite 211, Orlando, FL 32812 Orlando Drue Nadrowski [email protected] 321.558.0929 FL 1/31/2017

SimplexGrinnell LP Public Address 6829 Shadowridge Dr., Suite 211, Orlando, FL 32812 Orlando Drue Nadrowski [email protected] 321.558.0928 FL 1/31/2017

SimplexGrinnell LP Security 6829 Shadowridge Dr., Suite 211, Orlando, FL 32812 Orlando Drue Nadrowski [email protected] 321.558.0928 FL 1/31/2017

499 Sky Builders USA Drywall 62 W. Illiana St. Orlando Juan Velez [email protected] 407.362.1870 FL 8/1/2017

500 Smith Industries Inc. d/b/a Smith Fence Company Barricades and Signage 4699 110th Ave. North, St. Petersburg, FL 33762 St. Petersburg Tommy Smith 727.573.5440 FL 1/31/2017

501 Smith, Broomfield & Howard Construction and Restoration General Contractors 321 W. Alfred St. Tavares Lamar Smith [email protected] 407.828.8761 FL 10/31/2017

502 Southeastern Surveying and Mapping Corporation Survey and Layout 6500 All American Blvd., Orlando, FL 32810 Orlando 407.292.8580 FL 1/31/2017

503 Southern Fire Protection of Orlando, Inc. Fire Protection (Project Wide) 3801 East SR 46, Sanford, FL 32771 Sanford Jim Lucas [email protected] 407.323.4200 FL 1/31/2017

504 Southern Foam Insulation, Inc. Insulation PO Box 783788, Winter Garden, FL 34778 Winter Garden Terri Brown [email protected] 407.654.1251 FL 1/31/2017

505 Southland Rowe Roofing, Inc. Mod. Bit. Roofing 1843 Commerce Blvd., Midway, FL 32343 Midway 850.386.7663 FL 1/31/2017

506 Southmost Drywall, Inc. Acoustical & Metal Ceilings 605 N Broad St Fremont Charlotte Juett [email protected] 402-993-6678 NE 11/13/2018

507 Southstar Fire Protection DBA Northstar Fire Protection Company Fire Protection 5001 S University Dr. Suite B Fort Lauderdale Nick Rosinski [email protected] 954-495-0474 FL 5/22/2018

508 Space Coast Fire and Safety, Inc. Fire Protection 420 Manor Dr., Merritt Island, FL 32952 Merritt Island James Gaffney [email protected] 321.783.1040 FL 1/31/2017

509 Span Systems, Inc. Aluminum Walkway 90 Pine St., Manchester, NH 03103 Manchester Brett Schmidtchen [email protected] 603.621.4090 NH 1/31/2017

510 Specco Environmental, Inc

Environmental Engineer

1073 Willa Springs Drive, Suite 2045, Winter Springs,

FL 32708 Winter Springs Justino Hopgood 321.418.8994 FL 1/31/2017

511 Specialty Spray Systems Spray Fireproofing 975 Cobb Place Blvd, Suite 209 Kennesaw M. Scott Sellers [email protected] GA 6/12/2018

512 Spectra Contract Flooring Resilient Flooring 925 Florida Central Pkwy Longwood Jon Van Horn [email protected] 407-509-8171 FL 7/31/2018

513 SPR Services, Inc. Paint/Special Coatings 1730 S. Bumby Ave., Orlando, FL 32806 Orlando Gregg Saxonis [email protected] 407.834.0031 FL 1/31/2017

514 Spring Precast Precast 3782 US Highway 280E Cobb Han C Wu [email protected] 229-591-7009 GA 6/12/2018

515 Square 10 Source Specialties 7211 Anderson Rd. Tampa Steven Cook 813-425-5868 FL 3/5/2019

Square 10 Source Entrance Floor Grills 7211 Anderson Rd. Tampa Steven Cook 813-425-5868 FL 3/5/2019

516 SSE & Associates, Inc. dba Southeastern Surfaces & Equipment

Misc. Specialties 569 Canal Street Volusia Sonya Eggerton [email protected] 386.428.8875 FL 10/17/2017

517 STABIL Concrete Products, LLC Precast Platforms 4451 8th Ave. South, St. Petersburg, FL 33711 St. Petersburg Alex Guthrie [email protected] 228.365.3419 FL 1/31/2017

STABIL Concrete Products, LLC Architectural Precast 4450 8th Ave. South St. Petersburg, FL 33711 St. Petersburg Alex Guthrie [email protected] 228.365.3418 FL 1/31/2017

518 Stainless Fabricators, Inc. Structural Steel & Misc. Metals 11107 Challenger Ave., Odessa, FL 33556 Odessa Scott Binney [email protected] 813.926.7113 FL 1/31/2017

519 Stanley Convergent Security Solutions Alarm Systems 6955 Golden Ring Rd. Rosedale John Bellistri [email protected] 301.252.1948 MD 6/27/2017

520 State-Line Products of South Florida, Inc. Firestopping 3021 NW 25th Ave. Pompano Beach Hank Vogel [email protected] 954.971.0791 FL 6/27/2017

521 Steel Fab Inc. Structural Steel & Misc. Metals 8623 Old Dowd Rd., Charlotte, NC 28214 Charlotte Sam Boykin [email protected] 404.867.6865 NC 1/31/2017

522 Steel Fabricators, L.L.C. (Fabsouth) Structural Steel & Misc. Metals 721 NE 44th St., Ft. Lauderdale, FL 33334 Ft. Lauderdale Sidney Blaauw [email protected] 954.658.0929 FL 1/31/2017

523 Steel Service Corporation Steel 2260 Flowood Dr. Flowood James Souza [email protected] 601.939.9222 FL 6/27/2017

524 Step Up Design Printing Services 2751 Absher Rd. St. Cloud Troy Downs [email protected] 954.782.0527 FL 6/27/2017

525 Sterling Silver Scape & Sod, Inc. Interior Landscape Plants & Accessories 2201 Partin Settlement Road Kissimmee Debbie Dyer [email protected] 407-846-3225 FL 11/13/2018

526 Stonhard, Division of StonCor Group, Inc. Access Flooring 1000 East Park Avenue, Maple Shade, NJ 08052 Maple Shade Frank Sales [email protected] 407.461.7940 NJ 1/31/2017

Stonhard, Division of StonCor Group, Inc. Resilient Flooring/Carpet 1000 East Park Avenue, Maple Shade NJ 08052 Maple Shade Frank Sales [email protected] 407.461.7940 NJ 1/31/2017

527 Structured Cabling Solutions, Inc. Audio Visual 185 Drennen Rd. #307, Orlando, FL 32806 Orlando Alain Gonzalez [email protected] 407.557.8995 FL 1/31/2017

Structured Cabling Solutions, Inc. CCTV 185 Drennen Rd. #307 Orlando, FL 32806 Orlando Alain Gonzalez [email protected] 407.557.8995 FL 1/31/2017

Structured Cabling Solutions, Inc. Security 185 Drennen Rd. #307 Orlando, FL 32806 Orlando Alain Gonzalez [email protected] 407.557.8995 FL 1/31/2017

Structured Cabling Solutions, Inc. Telecom 185 Drennen Rd. #307 Orlando, FL 32806 Orlando Alain Gonzalez [email protected] 407.557.8995 FL 1/31/2017

528 Structurflex, LLC Aluminum Walkway 140 Walnut Street, Suite 201, Kansas City, MO 64106 Kansas City Bart Dreiling [email protected] 816.889.9000 MO 1/31/2017

529 Sunbelt Metals & Manufacturing, Inc. Structural Steel & Misc. Metals 920 S. Bradshaw Rd., Apopka, FL 32703 Apopka 407-889-8960 FL 1/31/2017

530 Sunbelt Rentals, Inc. Scaffolding 4180 N. Orange Blossom Trail, Orlando, FL 32804 Orlando Scott Scruby 407.467.0504 FL 1/31/2017

Sunbelt Rentals, Inc. Equipment rental 4180 N Orange Blossom Trail, Orlando FL 32804 Orlando Scott Scruby 407.467.0504 FL 1/31/2017

531 Sunshine Crane Rental Corporation Equipment rental 2093 Apopka Blvd., Apopka, FL 32703 Apopka David Hall [email protected] 407.358.6268 FL 1/31/2017

532 Super Sky Products Enterprises, LLC Skylight 10301 N. Enterprise Dr., Mequon, WI 53092 Mequon Rod Kivioja [email protected] 262.242.2000 WI 1/31/2017

533 Sutter Roofing Company of Florida Metal Roofing System, Mod Bit Roofing 4085-B LB McCleod Rd., Orlando, FL 32811 Orlando John Kenney [email protected] 407.367.4500 FL 1/31/2017

534 T & G Corporation d/b/a T & G Constructors General Contractor 8348 NW 56th St Doral Justin McCullough [email protected] 407-392-2231 FL 11/13/2018

535 T & T Construction of Central Fla., Inc. Concrete Foundations & Earthwork 340 Oleander Way, Casselberry, FL 32707 Casselberry Danny Headrick danny.headrick@ttcFLcom 407.831.5506 FL 1/31/2017

T & T Construction of Central Fla., Inc. Masonry 340 Oleander Way, Casselberry, FL 32707 Casselberry Danny Headrick danny.headrick@ttcFLcom 407.831.5506 FL 1/31/2017

T & T Construction of Central Fla., Inc. Structural Concrete (Columns/Walls/Stairs/SOD) 340 Oleander Way, Casselberry, FL 32707 Casselberry Danny Headrick danny.headrick@ttcFLcom 407.831.5506 FL 1/31/2017

536 Tagarelli Construction, Inc.

Waterproofing/Joint Sealants/Foundation

Waterproofing 53 W. Tarpon Ave., Tarpon Springs, FL 34689 Tarpon Springs Les Mouzon [email protected] 727.937.6171 FL 1/31/2017

537 Tarten-X, Inc. d/b/a McLean Lightning Protection Electrical 18735 E. Colonial Dr. #116, Orlando, FL 32820 Orlando Janie Bachman [email protected] 407.568.2782 FL 1/31/2017

538 Tate Ornamental, Inc. MISC. Metals 411 Industrial Drive White House Charlie James [email protected] 615-672-0348 TN 5/22/2018

539 Taylor-Cotton-Ridley, Inc. Door Frames/Hardware 1904 Brengle Ave., Orlando, FL 32808 Orlando Lyndea Drury [email protected] 407.298.5114 FL 1/31/2017

540 Tech Ready Mix, Inc. Concrete 5000 Crayton Ave. Cleveland Mark Perkins [email protected] 216.361.5000 OH 7/25/2017

541 Tendon Systems, LLC Steel, Grouting, Concrete, Railings 1255 Highway 23 Northwest Suite 204 Suwanee Carla Ramo [email protected] 678.835.1100 GA 8/1/2017

542 Terracon Consultants, Inc. Quality Control/Materials Testing 1675 Lee Rd., Winter Park, FL 32789 Winter Park Leila Nodarse [email protected] 407.740.6110 FL 1/31/2017

543 Tharp Plumbing Systems Plumbing 625 Wilmer Ave., Orlando, FL 32808 Orlando 407.295.2370 FL 1/31/2017

544 The Goettle Co. Auger Cast Piles 12071 Hamilton Avenue, Cincinnati, OH 45231 Cincinnati Brian Heck [email protected] 513.825.8100 OH 1/31/2017

545 The Lane Construction Corporation Earthworks 995 N. Goldenrod Rd., #A, Orlando, FL 32807 Orlando Thomas Larson [email protected] 203.235.2351 FL 1/31/2017

The Lane Construction Corporation Access Roads/Storage Yards 995 N. Goldenrod RD #A, Orlando, FL 32807 Orlando Thomas Larson [email protected] 203.235.2351 FL 1/31/2017

The Lane Construction Corporation Structural Concrete (Columns/Walls/Stairs/SOD) 995 N. Goldenrod RD #A, Orlando, FL 32807 Orlando Thomas Larson [email protected] 203.235.2351 FL 1/31/2017

546 The Middlesex Corporation Earthworks 10801 Cosmonaut Blvd., Orlando, FL 32824 Orlando Taylor Cox [email protected] 978.742.4400 FL 1/31/2017

The Middlesex Corporation Abutments & MSE Walls 10802 Cosmonaut Blvd. Orlando FL 32824 Orlando Taylor Cox [email protected] 978.742.4401 FL 1/31/2017

The Middlesex Corporation Access Roads/Storage Yards 10803 Cosmonaut Blvd. Orlando FL 32824 Orlando Taylor Cox [email protected] 978.742.4402 FL 1/31/2017

The Middlesex Corporation Asphalt Pavement & Markings 10805 Cosmonaut Blvd. Orlando FL 32824 Orlando Taylor Cox [email protected] 978.742.4404 FL 1/31/2017

Page 11 of 12

Rev. 7/30/2019

Page 216: GREATER ORLANDO AVIATION AUTHORITY AGENDA REVISED · K. Recommendation of the Professional Services Committee to Rank the Firms Shortlisted Project W-S00142, South Terminal C, Phase

PREQUALIFIED SUBCONTRACTORS/SUPPLIERS

Previously PSC Approved

Company Name MWBE LDB DBE SDVOBE Trades Address1 City Contact Email Phone State PSC Date

The Middlesex Corporation Precast Driven Piles & Earthwork 10806 Cosmonaut Blvd. Orlando FL 32824 Orlando Taylor Cox [email protected] 978.742.4405 FL 1/31/2017

The Middlesex Corporation Structural Concrete (Columns/Walls/Stairs/SOD) 10807 Cosmonaut Blvd. Orlando FL 32824 Orlando Taylor Cox [email protected] 978.742.4406 FL 1/31/2017

547 The Miller-Clapperton Partnership, Inc. Five T Co, NRG Cladding, Miller Clapperton 7948 Second Flag Dr., Austell, GA 30168 Austell Natasha Cordell [email protected] 770.405.1087 GA 1/31/2017

548 The Namm Group, Inc. d/b/a Artistic Surfaces Terrazzo

1591 N. Powerline Rd., Suite D, Pompano Beach, FL

33069 Pompano Beach Bruce Carney [email protected] 954.968.1700 FL 1/31/2017

549 The New Florida Industrial Electric, Inc. Electrical 291 Specialty Point, Sanford, FL 32771 Sanford 407.331.1551 FL 1/31/2017

550 The Polote Corporation Structural Concrete (Columns/Walls/Stairs/SOD) 2 E Bryan St., Suite 400, Savannah, GA 31401 Savannah Benjamin Polote Sr. [email protected] 912.232.1188 GA 1/31/2017

551 The Precision Companies (PMI) Mechanical 3975 E Railroad ave. Cocoa Lisa Durette [email protected] 321-394-2829 FL 5/22/2018

552 The Shepherd Company LLC General Contractor 312 Marshal Avenue Laurel Akin Ajuwon [email protected] MD 1/23/2018

553 The Stowell Company Ceramic Tile & Stone 1814 North 15th Street Tampa Bill Shumaker [email protected] 407-466-6659 FL 11/13/2018

554 Thomas Sign and Awning Company, Inc. Signage (Int & Ext) 4590 118th Ave. N., Clearwater, FL 33762 Clearwater Stephanie McKenzie [email protected] 800.526.3325 FL 1/31/2017

555 Thyssenkrupp Elevators/Escalators 2456 Commerce Park Dr., #450, Orlando, FL 32819 Orlando 407.370.0546 FL 1/31/2017

556 Titan Reinforcing Structural Concrete (Columns/Walls/Stairs/SOD) 1540 Aber Road, Orlando, FL 32807 Orlando [email protected] 513.539.4163 1/31/2017

557 Titus Construction Group Acoustical Ceilings 121 S. Orange Ave., Suite 1500, Orlando, FL 32801 Orlando Chris Melecio [email protected] 407.796.8289 FL 1/31/2017

Titus Construction Group Drywall 120 S. Orange Ave. Suite 1500 Orlando, FL 32801 Orlando Chris Melecio [email protected] 407.796.8288 FL 1/31/2017

Titus Construction Group Metal Panels & Column Covers 121 S. Orange Ave. Suite 1500 Orlando, FL 32801 Orlando Chris Melecio [email protected] 407.796.8289 FL 1/31/2017

558 Toole Industrial Supply dba Toole Floor Coating Co. Epoxy Flooring 2709 Upland Court Albany William Leblanc [email protected] 407-417-1735 GA 1/15/2019

559 Torres Total Flooring, Inc. Carpet & Resilient Flooring 6509 North Himes Avenue Tampa William Flemming [email protected] 813-512-7357 FL 1/15/2019

560 Transcrete Services, Inc. Flooring 2805 Summerfield Rd. Winter Park Johanna Lixey [email protected] 407.488.0742 FL 10/17/2017

561 Trex Commercial Products Ornamental Metals 7008 Northland Dr N Minneapolis Brian Elliott [email protected] 763-231-7134 MN 11/13/2018

562 Tri-City Electrical Contractors, Inc. Electrical 430 West Drive

Altamonte

Springs Jack Olmstead [email protected] 407.788.3500 FL 10/31/2017

563 Trinity Construction Management, LLC Overhead Doors 2246 Destiny Way Odessa Alex Vazquez [email protected] 727-645-6901 FL 11/13/2018

564 Trinity Eco Energy Solutions LLC Fuel Delivery 1746 E. Silver Star Rd., Ocoee, FL 34761 Ocoee Kevin Davis 407.844.2769 FL 1/31/2017

565 TruTeam Fire Proofing/ Stopping 260 Jimmy Ann Dr Daytona Matthew Mckenzie [email protected] 770-294-7772 FL 11/13/2018

566 Turner - Huntsville SPO Misc Metals 336 James Record Rd SW Huntsville Mark Joseph [email protected] 256-503-1010 AL 1/15/2019

567 Tuttle A Dant Clayton Division Ornamental Metals 120 Shadowlawn Dr Fishers Alex Tuttle [email protected] 317-842-2420 IN 11/13/2018

568 TWS Fabricators Structural Steel & Misc. Metals 3535 SW 50th Ave., Davie, FL 33314 Davie 954.983.9749 FL 1/31/2017

569 UCC Group, Inc. Interior Landscape Plants & Accessories 500 West Sand Lake Road Orlando Graham Duthie [email protected] 321-689-2667 FL 11/13/2018

570 Unified Services of Texas, Inc. Diesel Fuel Transfer & Storage Systems 2110 Greenbriar Dr. Southlake James Robinett [email protected] 816-888-5000 TX 5/22/2018

571 United Forming Concrete 470 RIVERSIDE PARKWAY AUSTELL Michael Jordan [email protected] 407.536.5400 GA 6/27/2017

572 United Skys, Inc. Skylight 702 Magna Dr., Round Lake, IL 60073 Round Lake Beau Crandall [email protected] 847.546.7776 IL 1/31/2017

573 United Visual Branding Signage 206 Tower Dr Oldsmar Glenn Ramanauskas [email protected] 9178310364 FL 7/10/2018

574 United Wall Systems Acoustical & Metal Ceilings 1165 E. Plant St., Suite 9 Winter Garden Jeff Albright [email protected] 407-493-2254 FL 11/13/2018

575 Universal Engineering Sciences, Inc. Quality Control/Materials Testing 3532 Maggie Boulevard, Orlando, FL 32811 Orlando Christiane Nelson [email protected] 407.423.0504 FL 1/31/2017

576 Universal Sign, Inc. Signage (Int & Ext) 5001 Falcon View SE, Grand Rapids, MI 49512 Grand Rapids Nate Zevenbergen [email protected] 616.554.9999 MI 1/31/2017

577 V&R Enterprise of Jacksonville, Inc. General Contractor 1240 N. Pine Hills Rd. Orlando Valentina Williams [email protected] 904.383.5290 FL 10/17/2017

578 Valiant Products, Inc. Trash Chutes 939 Quincy St Lakeland Byron English [email protected] 863-266-7998 FL 11/13/2018

579 Vanderlande Industries Baggage Handling 1975 West Oak Circle, Marietta, GA 30062 Marietta Don Keel [email protected] 770.250.2780 GA 1/31/2017

580 Verde Construction Managers, LLC General Contractor 976 Lake Baldwin Lane, Suite 102 Orlando Alexander Rey [email protected] 407.590.4789 FL 1/23/2018

581 Ver-Tex Construction Specialties Roller Window Shades 45 Dan Rd, 350 Canton Jon Harrington [email protected] 305-424-8525 MA 11/13/2018

582 Veteran Scapes, Inc. Interior Landscape Plants & Accessories 4022 Rex Dr Winter Garden Bert Mejias [email protected] 407-492-7391 FL 11/13/2018

583 Vigneaux Corporation Overhead Doors 5863 W Beaver St Jacksonville Joseph Cangialosi [email protected] 732-266-3170 FL 11/13/2018

584 Vintage Painting, Inc. Paint/Special Coatings 413 Oak Place, Suite 4-I, Port Orange, FL 32127 Port Orange Norman Turner [email protected] 386.760.0611 FL 1/31/2017

585 Vital Signs of Orlando, Inc. Signage 7806 North Orange Blossom Trail Orlando David New [email protected] 407-297-0680 FL 11/13/2018

586 Viva Railings Decorative Metal Railings 1454 Halsey Wat Carrollton Huzefa Tinwala [email protected] 972.353.8482 TX 6/27/2017

587 VMG Construction Inc. Concrete & Misc. GC 43 1st Street Winter Garden Adolfo Galvan [email protected] 407-683-3346 FL 5/22/2018

588 Votum Construction LLC General Contractor 711 W Amelia St, Suite 1 Orlando Vernice [email protected] 407-704-1743 FL 11/13/2018

589 VSC Fire & Security Fire Protection 6852 Hanging Moss Rd., Orlando, FL 32807 Orlando Samuel Logue [email protected] 407.679.3332 FL 1/31/2017

590 W.W. Gay Mechanical Contractor Inc. Mechanical/Plumbing 524 Stockton Street Jacksonville Scott Bohn [email protected] 904.388.2696 FL 6/27/2017

591 Wal-Mark Contracting Group, LLC Drywall 3629 Silver Star Rd., Orlando, FL 32808 Orlando Vicki Yonke [email protected] 813.347.4710 FL 1/31/2017

Wal-Mark Contracting Group, LLC Acoustical Ceilings 3630 Silver Star Rd. Orlando, FL 32808 Orlando Vicki Yonke [email protected] 813.347.4711 FL 1/31/2017

592 Walt Dittmer & Sons, Inc. d/b/a Dittmer Arch. Aluminum Metal Panels & Column Covers 1006 Shepard Road, Winter Springs, FL 32703 Winter Springs Denise [email protected] 407.699.1755 FL 1/31/2017

593 Walton Signage Ltd. Signage 10101 Reunion Place, Suite 500 San Antonio Craig Beach [email protected] 267-254-4721 TX 5/22/2018

594 Waste Management, Inc. Trash Removal 3310 Rio Vista Ave., Orlando, FL 32805 Orlando Rick Stevens [email protected] 407.922.1506 FL 1/31/2017

595 Waterproofing Specialists, Inc. Waterproofing / Caulking / Stucco 3142 Lenox Avenue Jacksonville Michael Dickins [email protected] 904-389-7261 FL 5/22/2018

596 Wendt Productions, Inc. d/b/a Wendt Pro Div10 Specialties/Toilet Accessories 17300 Solie Road, Odessa, FL 33556 Odessa Susan Wendt [email protected] 813.920.4999 FL 1/31/2017

Wendt Productions, Inc. d/b/a Wendt Pro Safety Equipment Supplier 17301 Solie Road, Odessa, FL 33556 Odessa Susan Wendt [email protected] 813.920.5000 FL 1/31/2017

597 Westbrook Service Corporation Commercial HVAC Services 1411 S. Orange Blossom Trail Orlando Brian King [email protected] 407-841-3310 FL 7/23/2019

Westbrook Service Corporation Commercial Electrician 1411 S. Orange Blossom Trail Orlando Brian King [email protected] 407-841-3310 FL 7/23/2019

Westbrook Service Corporation Commercial Plumbing Services 1411 S. Orange Blossom Trail Orlando Brian King [email protected] 407-841-3310 FL 7/23/2019

Westbrook Service Corporation Gas Services 1411 S. Orange Blossom Trail Orlando Brian King [email protected] 407-841-3310 FL 7/23/2019

Westbrook Service Corporation HVAC Construction Services 1411 S. Orange Blossom Trail Orlando Brian King [email protected] 407-841-3310 FL 7/23/2019

598 West Tampa Glass Company Glazing/Curtainwall Systems & Skylights 2705 N. 35th St., Tampa, FL 33605 Tampa Roger Campla [email protected] 813.247.5528 FL 1/31/2017

West Tampa Glass Company Interior Glazing 2705 N. 35th St. Tampa, FL 33605 Tampa Roger Campla [email protected] 813.247.5528 FL 1/31/2017

599 Wheels to Wings Transport d/b/a NextGen Dev. Group General Contractor 7010 Lake Nona Blvd., Suite 354 Orlando Michael McKenzie [email protected] 321.229.7794 FL 1/23/2018

600 White Sign Company, LLC Signage 909 S. Charles Richard Beall Blvd., Suite A Debary Joel White [email protected] 386.320.0623 FL 10/17/2017

601 WI Holdings, Inc. dba Window Interiors

Window Treatments 947 Josiane Court, Suite 1010

Altamonte

Springs Sandra Saft [email protected] 407.539.1303 FL 6/27/2017

602 Wiginton Fire Systems Fire Protection 699 Aero Lane Sanford Ron Theison [email protected] 407-585-3255 FL 5/22/2018

603 Williams Scotsman, Inc. Office Trailers 801 Jetstream Drive, Orlando, FL 32824 Orlando Jerry [email protected] 800.782.1500 FL 1/31/2017

604 WP Underground Utilities LLC

Abutments & MSE Walls 2475 Palm Bay Rd., Suite 145 #14, Palm Bay, FL 32905 Palm Bay Henry Patten Jr. 321.473.8317 FL 1/31/2017

605 Wurster Engineering & Construction Inc. Shotcrete, Micropile, Auger Cast 34 Carrie Dr. Greenville Daryl Wurster [email protected] 864.627.7751 SC 8/1/2017

196 95 190 4

Page 12 of 12

Rev. 7/30/2019