Gold Fields Limited Agnew Gold Mine Plan showing mine infrastructure as at 31 December 2012 1 0 1 3 5 Kilometres Map Grid of Australia Co-ordinate System Agnew Mining Lease Agnew Prospecting Licence Agnew Exploration Licence Tailings/Leach Pad Open Pit Waste Dump Roads Reference

Upload: doannguyet

Post on 18-May-2018

217 views

Category:

Documents


1 download

TRANSCRIPT

Page w

idth 208 mm

Page w

idth 205 mm

Gold Fields LimitedAgnew Gold Mine

Plan showing mine infrastructure as at 31 December 20121 0 1 3 5

Kilometres

Map Grid of Australia Co-ordinate System

Agnew Mining Lease . . . . . . . . . . . . . . .

Agnew Prospecting Licence . . . . . . . . . .

Agnew Exploration Licence . . . . . . . . . .

Tailings/Leach Pad . . . . . . . . . . . . . . . . .

Open Pit . . . . . . . . . . . . . . . . . . . . . . . . .

Waste Dump . . . . . . . . . . . . . . . . . . . . . .

Roads . . . . . . . . . . . . . . . . . . . . . . . . . . .

Reference

Gold Fields LimitedSt Ives Gold Mine

Plan showing mine infrastructure as at 31 December 20120 2 4 6 8

Kilometres

Map Grid of Australia Co-ordinate System

Reference

Lease Outline . . . . . . . . . . . . .

Gold Rights only . . . . . . . . . . .

Stockpiles . . . . . . . . . . . . . . . .

Tailings/Leach Pad . . . . . . . . .

Waste Dump . . . . . . . . . . . . . .

Pits-Inactive . . . . . . . . . . . . . .

Pits-Active . . . . . . . . . . . . . . .

Pits-Proposed . . . . . . . . . . . . .

U/G Mines . . . . . . . . . . . . . . .

Towns . . . . . . . . . . . . . . . . . . .

Buildings . . . . . . . . . . . . . . . . .

Sealed Roads . . . . . . . . . . . . .

Unsealed Roads . . . . . . . . . . .

Page w

idth 208 mm

Page w

idth 205 mm

Gold Fields LimitedSouth Deep Gold MinePlan showing underground workings as at 31 December 2012

Area 4,268 hectares

1 0 500 1 000 1 500 2 000 2 500

Metres

Gauss Conform Projection. Central Meridian Lo. 27° East

Development and stoping on Ventersdorp Contact Reef . . . . . . . . . . . . . . . . . . .Development and stoping on Elsburg Individual Reefs . . . . . . . . . . . . . . . . . . . . .Development and stoping on Elsburg Massive Reefs . . . . . . . . . . . . . . . . . . . . . .Development off Reef. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Dykes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Faults . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Shafts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Borehole No. and Surface Position of Old Boreholes . . . . . . . . . . . . . . . . . . . . . .Borehole No. and Surface Position of Completed Boreholes . . . . . . . . . . . . . . . .Borehole No. and Surface Position of Boreholes in Progress . . . . . . . . . . . . . . . .Borehole No. and Surface Position of Boreholes Temporarily Stopped . . . . . . . .

Reference

Page w

idth 208 mm

Page w

idth 205 mm

Gold Fields LimitedCerro Corona Mine

Plan showing mine infrastructure as at 31 December 2012500 0 500 1 000

MetresProvisional South American datum 56

Page width 208 mm Page width 205 mm

Project Boundary . . . . . . . .Open pit . . . . . . . . . . . . . . .Tailings Dam . . . . . . . . . . . .Waste Dump . . . . . . . . . . . .Quarry . . . . . . . . . . . . . . . . .Top Soil Dump . . . . . . . . . .Blankets . . . . . . . . . . . . . . .

Reference

Oxide Stockpile . . . . . . . . .Office . . . . . . . . . . . . . . . . .Rivers . . . . . . . . . . . . . . . . .Roads . . . . . . . . . . . . . . . . .Powerline . . . . . . . . . . . . . .

Low Volume Underflow (LVU)

Gold Fields LimitedDamang Gold Mine

Plan showing mine infrastructure as at 31 December 20121 0.5 0 1 2 3 4 5

Kilometres

Ghana National Grid Co-ordinate System

Mining lease . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Mining lease Lima South . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Prospecting Licenses (PL) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Tailings Storage Facility . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Open Pit . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Waste Dump. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Roads . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

National Railway. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Exploration Sites/Projects . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Damang has the area from surface to 30m below . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Tarkwa has the area from below 30m . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Reference

Page w

idth 208 mm

Page w

idth 205 mm

Gold Fields LimitedTarkwa Gold Mine

Plan showing mine infrastructure as at 31 December 2012

Page w

idth 208 mm

Page w

idth 205 mm