glenn springs holdings, inc. axyrd/ra activity percent complete expected start expected completion...
TRANSCRIPT
axY
ORIQINAL
GLENN SPRINGS HOLDINGS, INC. 375 Armand Hammer Blvd., Pottstown, PA 19464
Dave Madeira Telephone (610) 327-4174 Facility Manager Facsimile (610) 327-9043
December 9, 2010
VIA OVERNIGHT COURIER
Mr. Tim GaUagher
USEPA Region III Mail CaU 3HS21 1650 Arch Street Philadelphia, Permsylvania 19103-2029
Re: Progress Report No. 183 - November 2010 Occidental Chemical Corporation Site Lower Pottsgrove Township - Montgomery County, Pennsylvania EPA Unilateral Order No. III-94-26-DC Administrative Settlement Agreement and Order on Consent CERC-03-2005-0090DC
Dear Mr. Gallagher:
This progress report is provided in accordance with Section Xlll, A of the Administrative Order for the Remedial Design/Remedial Action and the Administrative Settlement Agreement and Order on Consent for Occidental Chemical Corporation's (OxyChem's) Pottstown facility.
1.0 PROJECT SCHEDULE
Table 1 presents the schedule and percent completion of the current remedial activities.
2.0 ACTIVITIES COMPLETED
2.1 GROUNDWATER:
i) The total and average monthly flows from the individual recovery wells are
summarized monthly for 2010 in Table 2. In November 2010, the average
groundwater pumping rate was approximately 168 gpm.
ii) The groundwater system was down for computer upgrades from the morning of
November 1 to the evening of, November 5. The consolidation of all treatment
system components on one central processor is expected to further enhance the
already high reliability of the system. Treatment resumed late on the evening of the
5* with six wells on line pumping at approximately 175 gpm. The remaining three
wells, RW-8, RW-8A, and RW-C, resumed operation on the 8"̂ after completion of
their checkout .and tuning. There were several additional short duration
interruptions during the week of November 8 for additional system testing and
tuning.
An affiliate of Occidental Chemical Corporation
AR300325
iii) The spent carbon was changed in the south vapor phase bed on November 12*.
There was no downtime incurred as the system continued to operate on the second
bed.
iv) The mass removal of contaminants of concern for the Groundwater Treatment
System (GWTS) during November is presented in Table 3.
v) The recovery wells and select monitoring wells were sampled in November as part of
the 4* Quarter 2010 PMP Sampling Event. The analytical results for the recovery
wells samples during November are presented in Table 4.
vi) Attachment A presents groundwater contour maps for groimdwater level
measurements collected during November 2010 from aU bedrock wells at the site.
Wells used in the contouring for each map are noted as blue dots.
vii) The Discharge Monitoring Report (DMR) for the Groundwater Treatment System
(GWTS) (Outfall 005 in Permit #0010944) for November is presented in
Attachment B. The sample results for volatile organic compounds (VOCs) for Outfall
005 were all within the required limits.
3.0 PLANNED ACTIVITIES
3.1 GROUNDWATER:
i) GSHI will submit to EPA the Interim Recovery Well Optimization report to
document monitoring data collected during Step 2B (the shut down of RW-5).
ii) GSHI is proceeding with work to increase the size of pump and variable speed drive
for RW-A in anticipation of additional capacity that may be required upon
implementation of the next step of the Optimization Progreun.
4.0 OTHER ACTIVITIES
The voluntary pilot SVE system had limited run time during the month due to the
work related to the process computer upgrade. Operations for the year will continue
as long as favorable weather conditions exist
If you have any questions, please do not hesitate to call.
Sincerely,
David Madeira Facility Manager
certify imder penalty of law that this document and all attachments #ere prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the
2
AR300326
information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. 1 am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations.
Attachment
cc: Thomas Sheehan, PADEP Ralph Boedeker, Tetra Tech NUS John Garges, CRA George Luxbacher, GSH Richard Passmore, GSH
AR300327
TABLE 1 - PERCENT COMPLETE OF RD/RA SCHEDULED ACTIVITIES PROGRESS REPORT NO. 183 - NOVEMBER 2010
RD/RA Activity Percent
Complete Expected
Start Expected
Completion Actual
Completion
PROGRESS REPORT GROUNDWATER EPA Approval of Recovery Well (RW) Optimization Work Plan Revise O&M Manual to Add Post-Stripper Liquid Phase Carbon Treatment and Discharge Implement Step lA of RW Optimization (Shutdovm RW-04 & reduce RW-06 flow rate by 50%) Subinittal of Step lA RW Optimization Report EPA comments regarding the Step 1A RW Optimization Report Response to EPA comments EPA follow-up comments on the Step 1A Report Response to EPA conmients EPA Approval to commence Step IB of RW Optimization Implement SVE System for 2008 Implement Step IB of RW Optimization (Shutdown RW-06) RW Optimization and PMP Groundwater Sampling Event Submittal of Step IB RW Optimization Report RW Optimization and PMP Groundwater Sampling Event EPA-approval for Step 2 of RW Optimization Response to EPA comments RW Optimization and PMP Groundwater Sampling Event Implement SVE System for 2009 Implement Step 2 A of RW Optimization (Reduce RW-05 flow rate by 50%) Implement Step 2B of RW Optimization (Complete shutdown of RW-05) Subinittal of Step 2 A Interim Status Report Conduct 3'^ Quarter PMP groundwater sampling Conduct 4"' Quarter PMP groundwater sampling Submittal of Step 2 A Interim Status Report
EARTHEN LA GOONS AOC for FFS finalized EPA Approval of Final FFS Work Plan Identification of Candidate Technologies Memorandum Receipt of Approval for Disposal of PVC Material at Facility
in Quebec (USEPA and Ministry of Enviroimient Canada) Draft FFS Response to EPA Comments on FFS and Final FFS Report Submission of Remedial Design/Remedial Action Work Plan Response to EPA comments and Revised FFS Report EPA Review and Approval of FFS EPA Review and Approval of RD/RA Work Plan Remediation Receive Closure Approval from EPA Final Inspection Post-Constmction Report EPA comments on Post-Construction Report Response to EPA comments on Post-Construction Report EPA Approval of Post-Construction Report EPA Final Inspection of Earthen Lagoons
100
100
100
100 100
100 100 100 100 100 100 100 100 100 100 100 100 100 100
100
100 100 100 50
100 100 100 100
100 100 100 100 100 100 100 100 100 100 100 100 100 100
Monthly
—
—
—
—
— —
— — — — — — — .̂. — — —
—
—
— —
Nov 2010
— — ...
—.
— — —
• . . .
— „ .
... — — — — — —
...
—
...
...
•
— — — — — — — — — — — — ...
...
— —
Dec 2010
— ..'. ...
-.. — — — — — — — — — — — ...
10th of month
Mar. 27, 2007
Sept. 2007
Dec. 2007
Dec. 20, 2007 June 25, 2008
July 28, 2008 Oct. 2, 2008 Oct. 21,2008 Oct. 2, 2008 Oct. 29, 2008 Jan. 2008
Feb. 19, 2009 Apr. 2, 2009 May 2009 June 8, 2009 July 30, 2009 Nov. 2009 Dec. 2009 Feb. 2010
July 1,2010
July 2010 Aug. 2010 Nov. 2010
—
Oct. 7, 2005 Aug. 11,2006 Dec 21, 2006 Mar. 6, 2007
Mar. 30, 2007 May 25, 2007 Nov. 6, 2007 Feb. 20, 2008 Mar. 2008 June 2008
Sept. 26, 2008 Sept. 26, 2008 Nov. 24, 2008 Feb. 13,2009 Mar. 5, 2009 April 21, 2009 May 19, 2009 June 19, 2009
AR300328
TABLE 2 AVERAGE GROUNDWATER PUMPING RATES PROGRESS REPORT 183 - NOVEMBER 2010
Recovery Wells
Zone A
RW-A
RW-B
RW-C RW-4
RW-5
RW-8A
Subtotal, Zone A
Recoverv Wells Zone B
RW-8
RW-9A
RW-lOA
Subtotal, Zone B
Recoverv Wells
Zone C
RW-6
RW-9
Subtotal, Zone C
Total Recovery Wells
Plant Production Wells
RW-1
RW-1R
Total Production Wells
Recoverv & Production Wells
January-10
Total Gallons (X 1,000)
251
264
494
880 1,767
281
3,937
1,112
830
2,170
4,112
13
661
674
8,722
--
-
8,722
Average (gpm)
6
6
11
20
40
6
88
25
19
49
92
0
15
15
195
0
0
0
195
February-10
Total Gallons (X 1,000)
159.426 569.771
352.303
1,167.340
1,554.209
260.719 4,064
947.436
670.848
1,820.500
3,439
10.708
583.735
594.443
8.097
--
-
8,097
Average (gpm)
4
14
9
29
39
6
101
23
17
45
85
0
14
15
201
0
0
0
201
March-10
Total Gallons (X 1,000)
294
762
697
2,467
1,699
126
6,046
1,085 907
2,063
4,055
15
637
653
10,754
--
-
10,754
Average (gpm)
7
17
16
55
38
3
135
24
20
46
91
0
14
15
241
0
0
0
241
April-10
Total Gallons (X 1,000)
297
646
530
2,460
1,640
223 5,797
1,046
830
1,963
3,840
9 621
630
10,267
--
-
10,267
Average (gpm)
7
15
12
57
38
5
134
24
19
45
89
0 14
15
238
0
0
0
238
May-10
Total Gallons (X 1,000)
175
525
419
2,530 1,742
264
5,656
935
721
2,125
3,781
3
540
544
9,980
--
-
9,980
Average (gpm)
4
12
9
57
39
6
127
21
16
48
85
0
12
12
224
0
0
0
224
June-10 1
Total Gallons (X 1,000)
132
470
379
2,388
1,713
280
5,363
1,050
732
2,066
3,848
5
642
646
9,858
--
-
9,858
Average (gpm)
3
11
9
55
40
6
124
24
17
48
89
0
15
15
228
0
0
0
228
9904-05-PRGRPT-183-Table 2 page 1 of 2
AR300329
TABLE 2 AVERAGE GROUNDWATER PUMPING RATES PROGRESS REPORT 183 - NOVEMBER 2010
Recovery Wells
Zone A
RW-A
RW-B
RW-C
RW-4
RW-5
RW-8A
Subtotal, Zone A
Recovery Wells
Zone B
RW-8
RW-9A
RW-lOA
Subtotal, Zone B
Recovery Wells
Zone 0
RW-6
RW-9
Subtotal, Zone C
ro te /Recovery We/te
Plant Product ion Wells
RW-1
RW-1R
Total Product ion Wells
Recovery & Production Wells
July-10
Total Gallons (X 1,000)
210
555
437
2,655
6
304
4,167
1,080
745
2,125
3,950
9
. 647
657
8,773
--
8,773
Average
(gpm)
5
12
10
59
0
7
93
24
17
48
88
0
15
15
197
0
0
0
197
August-10
Total Gallons (X 1,000)
250
523
410
2,636
2
308
4,128
1,098
730
2,062
3,890
6
659
665
8,683
.
8,683
Average
(gpm)
6
12
9
59
0
7
92
25
16
46
87
0
15
15
195
0
0
0
195
September-10
Total Gallons (x 1,000)
168
468
373
2,463
5
311
3,788
1,326
693
1,922
3,942
5
616
621
8,351
--
.
8,351
Average
(gpm)
4
11
9
57
0
7
88
31
16
44
91
0
14
14
193
0
0
0
193
October-10
Total Gallons (X 1,000)
302
770
541
2,636
10
261
4,520
1,166
953
2,122
4,241
8
660
668
9,429
--
.
9,429
Average
(gpm)
7
17
12
59
0
6
101
26
21
48
95
0
15
15
211
0
0
0
211
November-IO
Total Gallons (X 1,000)
205
524
378
2,093
2
180
3,383
806
802
1,736
3,344
4
525
529
7,256
--
.
7,256
Average
(gpm)
5
12
9
48
0
4
78
19
19
40
77
0
12
12
168
0
0
0
168
December-10 |
Total Gallons (X 1,000)
.
-
. .
.
--
.
0
Average
(gpm)
• 0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
9904-05-PRGRPT-183-Table 2 page 2 of 2
AR300330
TABLE 3
RECOVERY WELL PUMPING RATES AND COC MASS RECOVERY
NOVEMBER 2010
Occidental Chemical Corporation Pottstown, Pennsylvania
Recovery Well
Volume Pumped
(thousand gallons)
Average Total COC* Cone.
(mg/L)
COC Mass Removed
(lbs) RW-A RW-B RW-C RW-4 RW-5 RW-6 RW-8
RW-8A RW-9
RW-9A RW-lOA
205 524 378
2,093 2 4
806 180 525 802
1,736
4.667 1.128 0.026 0.004 0.003 0.003 0.011 0.003 0.004 0.027 0.010
7.991 4.928 0.081 0.065 0.000 0.000 0.074 0.005 0.016 0.183 0.151
Total 7,256 13.50
m O i n CD 00 < 00 < <
o
cc CC cc cc cc cc cc cc cc cc cc
3 Q
> o E 0) cc M o o o
10
? 7
5 -
3 --
2 -
* COCs include: trans-l,2-DCE; ethylbenzene; styrene; TCE; vinyl chloride; and cis 1,2-DCE. Concentrations of COCs that were non-detects were assumed to be one-half of the detection limit.
9904-05-PRGRPT-183 -Table 3
AR300331
TABLE 4 Page 1 of 3
ANALYTICAL RESULTS SUMMARY MONTHLY RECOVERY WELLS
GLENN SPRINGS HOLDINGS, INC. POTTSTOWN
NOVEMBER 2010
Sample Location:
Sample ID:
Sample Date:
Parameters
Volatile Organic Compounds
cis-l,2-DicMoroethene
Ethylbenzene
Styrene
Tetrachloroethene
trans-l,2-Dichloroethene
Trichloroethene
Vinyl chloride
Notes:
J - Estimated value.
Units
u g / L
u g / L
u g / L u g / L
u g / L u g / L
u g / L
Maximum
Contaminant
U v e l
70
700
100
5
100
5
2
U - Analyte was analyzed but not detected.
Boxed results exceed applicable MCL. |
BR-1
GW.990i-111210-EP-
028
1VIV2O10
5.4
l.OU
l.OU
l.OU
l.OU
1.3
0.68 J
BR-13
GW-9904-111110-EP-
005
1V11/2010
4.4
l.OU
l.OU
l.OU
l.OU
11.2
l.OU
BR-14
GW-9904-111110-EP-
004
1V11/2010
4.1
l .OU
l.OU
l.OU
l.OU
11.2
l.OU
BR-15
GW-9904-l i n i O - E P -
009
11A2/2O10
l.OU
l.OU
l.OU
l.OU
l.OU
l.OU
l.OU
BR-16
GW-9904-111110-EP-
010
11AV2O10
0.57 J
l.OU
l.OU
l.OU
l.OU
1.1
l.OU
RW-4
GW-9904-
111110-011
11A1/2010
0.77 J
l.OU
l.OU
7.3
l.OU
0.98 J
l.OU
RW-5
GW-9904-111110-012
11A1/2010
l.OU
l.OU
l.OU
l.OU
l.OU
0.70 J
l.OU
RW-6
GW-990i-111110-013
IVIIAOIO
l.OU
l.OU
l.OU
l.OU
l.OU
l.OU
l.OU
RW-8
GW-9904-111110-014
llAIAOflO
5.8
l.OU
l.OU
l.OU
l.OU
2.9
0.84 J
RW-8A
GW-9904-
l in iO-015
11/11/2010
0.68 J
l.OU
l.OU
l.OU
l.OU
0.75 J
l.OU
RW-8A
GW-9904-
nino-016 11A1/2010
RW-9
GW-9904-
nnio-oi? 1V11/2O10
(Duplicate)
0.57 J
l.OU
l.OU
l.OU
l.OU
0.63 J
l.OU
1.1
l.OU
l.OU
l.OU
l.OU
l.OU
l.OU
RW-9A
GW.9904-
111110-018
lVl l /2010
15.5
l.OU
l.OU
l.OU
l.OU 9.7
0.69 J
9904-05-PRGRPT-183-Table 4 AR300332
TABLE 4 Page 2 of 3
ANALYTICAL RESULTS SUMMARY MONTHLY RECOVERY WELLS
GLENN SPRINGS HOLDINGS, INC. POTTSTOWN
NOVEMBER 2010
Sample Location:
Sample ID: Sample Date:
Parameters
Volatile Organic Compound cis-l,2-I3ichloroethene Ethylbenzene Styrene Tetrachloroethene trans-l,2-Dichloroethene Trichloroethene Vinyl chloride
Notes: J - Estimated value.
Units
ug/L ug/L ug/L ug/L ug/L ug/L ug/L
RW-lOA
GW-9904-111110-019 lVll/2010
4.7 l.OU l.OU l.OU l.OU 3.7
l.OU
U - Aimlyte was analyzed but not detei Boxed results exceed applicable MCL. |
RW-A
GW-990i-111110-020 11AV2010
2760 124 37,1 10 U 10.8 1730 10 U
RW-B
GW-9904-111110-021 llAl/2010
90.5 353 593
l.OU l.OU 90.1 1.1
RW-C
GW-9904-111110-022 11A1/2O10
rB-2
GW-9904-111210-EP-
025 11A2/2010
11.7 l.OU l.OU l.OU l.OU 12.1 l.OU
l.OU l.OU l.OU l.OU l.OU l.OU l.OU
TBA
GW-9904-111210-EP-
026 11A2/2O10
l.OU l.OU l.OU l.OU l.OU l.OU l.OU
TB-5
GW-9904-inilO-EP-
001 11AV2010
35.7 l.OU l.OU l.OU 0.73 J 16.8 2.9
TB-5A
GW-9904-111110-EP-
002 11/11/2010
43.2 l.OU l.OU 0.66 J l.OU 25.9
0.49 J
rB-5A
GW-9904-111110-EP-
003 llAl/2010 (Duplicate)
42.0 l.OU l.OU 0.68 J l.OU 25.7
0.53 J
rB-7
GlV-9904-n n i o - £ P -
006
11A1/2010
0.72]
l.OU
l.OU
l.OU
l.OU
0.88 J
l.OU
TB-7A
GW-9904-111110-EP-
007
11AV2O10
0.99 J
l.OU
l.OU
l.OU
l.OU
0,79 J
l.OU
TB-8
GW-9904-IIUIO-EP-
024
11/12/2010
l.OU
l.OU
l.OU
l.OU
l.OU
l.OU
l.OU
T B - n
GW-9904-111210-EP-
023
11A2/2010
'"
l.OU
l.OU
l.OU
l.OU
l.OU
l.OU
l.OU
9904-05-PRGRPT-183-Table 4 AR300333
TABLE 4 Page 3 of 3
ANALYTICAL RESULTS SUMMARY MONTHLY RECOVERY WELLS
GLENN SPRINGS HOLDINGS, INC. POTTSTOWN
NOVEMBER 2010
Sample Location:
Sample ID: Sample Date:
Parameters
Volatile Organic Compounds cis-l,2-Dichloroethene Ethylljenzene Styrene Tetrachloroethene trans-l,2-Dichloroethene Trichloroethene Vinyl chloride
Notes: J - Estimated value.
Units
ug/L ug/L ug/L ug/L ug/L ug/L ug/L
TB-12
GW-9904. 111210-EP-027
rB-13
GW-9904-111110-EP-008
11A2/201011AV2O10
l.OU l.OU l.OU l.OU l.OU l.OU l.OU
U - Analyte was analyzed but not dete< Boxed results exceed applicable MCL. |
l.OU l.OU l.OU l.OU l.OU l.OU l.OU
9904-05-PRGRPT-183-Table 4 AR300334
ATTACHMENT A
GROUNDWATER CONTOUR MAPS NOVEMBER 2010
AR300335
13 gpm.
45gpm
108.88
91.65
Recovery well in RW-06 pumped interval and daily average pumping rate (red >MCL, blue <=MCL)
Recovery well not in RW-06 pumped interval and daily average pumping rate (not color coded)
Monitoring well in RW-06 pumped interval and groundwater elevation (red >MCL, blue <=MCL)
Monitoring well not in RW-06 pumped interval and groundwater elevation (not color coded)
RW-06 Pumped Interval Subcrop
Groundwater Elevation Contour (ft msl)
Notes: • River elevations at subcrops are estimated based
on an approximate river gradient. • Analytical data average of 2010 sampling events.
River -110.9
O X Y Glenn Springs Holdings
figure A. 1
POTENTIOMETRIC SURFACE FOR THE RW-06 PUMPED INTERVAL: 11/09/2010 PROGRESS REPORT
GSH, Pottstown, Pennsylvania
AR300336
45 gpmt
6.4 gpm
105.69
91.65
Recovery well in RW-08 pumped interval and daily average pumping rate (red >MCL, blue <=MCL)
Recovery well not in RW-08 pumped interval and daily average pumping rate (not color coded)
Monitoring well in RW-08 pumped interval and groundwater elevation (red >MCL, blue <=MCL)
Monitoring well not in RW-08 pumped interval and groundwater elevation (not color coded)
RW-08 pumped interval subcrop area
Groundwater Elevation Contour (ft msl)
Notes: • River elevations at subcrops are estimated based
on an approximate river gradient. • Analytical data average of 2010 sampling events.
River -110.7
O X Y Glenn Springs Holdings
figure A.2
POTENTIOMETRIC SURFACE FOR THE RW-08 PUMPED INTERVAL: 11/09/2010 PROGRESS REPORT
GSH, Pottstown, Pennsylvania
AR300337
13 gpm J
45 gpm
91.65
110.16
0 200 400 600 800
Recovery well in RW-ABC pumped interval and daily average pumping rate (red >MCL, blue <=MCL)
Recovery well not in RW-ABC pumped interval and daily average pumping rate (not color coded)
Monitoring well in RW-ABC pumped interval and groundwater elevation (red >MCL, blue <=MCL)
Monitoring well not in RW-ABC pumped interval and groundwater elevation (not color coded)
RW-ABC Pumped Interval Subcrop
Groundwater Elevation Contour (ft msl)
Notes: • River elevations at subcrops are estimated based on an
approximate river gradient. • Analytical data average of 2010 sampling events.
O X Y Glenn Springs Holdings
figure A.3
POTENTIOMETRIC SURFACE FOR THE RW-ABC PUMPED INTERVAL: 11/09/2010 PROGRESS REPORT
GSH, Pottstown, Pennsylvania
AR300338
ATTACHMENT B
DISCHARGE MONITORING REPORTS NOVEMBER 2010
AR300339
PERMTITEE NAME ADDRESS (include NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) Facility Name / Location ifdiffcrent) DISCHARGE MOrflTORING REPORT (DMR)
PRIMARY FACILITY: OCCmENTAL CHEMICAL GROUNDWATER REMEDUTION SITE
CLIENT: GLENN SPRINGS HOLDINGS, INC.
ADDRESS: 5005 LBJ FREEWAY, STE 1350
DALLAS, TX 7S244
SITE ADDRESS: 375 ARMAND HAMMER BOULEVARD
MUNICIPALrrY: LOWER POTTSGROVE TOWNSHIP
COUNTY: MONTGOMERY
Parameter
FLOW
pH
TETRACHLOROETHENE
TRANS-1,2-DICHLORETHENE
C I S - U -DICHLOROETHENE
CHLOROFORM
TRICHLOROETHENE (TCE)
ETHYLBENZENE
Sample Measunanent
Pennit Rcquiiement
Sample Measurement
Permit Requiiemoit
Sample Measuremem
Sample Measurement
Peimit Requirement
Sample •Measurement
Pemiit Requirement
Sample Measurement
Permit Reouiiement
Sample Measurement
Peimit Requirement
Sample Measurement
P Req
NAMEftmjE PUNCffAL EXECUTIVE omcE»
GEORGE LUXBACHER VPOPERATIONS-GSHI
TYPE OR PRINT
eimit uiiement
PA0010944
PERMIT NUMBER " 005
DISCHARGE NUMBER
MONITORING PERIOD
YEAR
2010
MO
a DAY
m QUANTOY OR LOADING
MONTHLY AVERAGE
0 : 2 4 ^
MONrrOR/RETORT
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
DAILY MAXIMUM
0-3370
MONTIOR/XEPORT
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
UNrrs
mgd
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
TO YEAR
2&TO
MO
m DAY
3(1 NOTE: Read
QuALrrv OR CoNcirmiATioN
INST. MINIMUM
XXXX
XXXX
xm. f>.fi
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
MONTHLY AVERAGE
XXXX
XXXX
XXXX
XXXX
«a):oo4 NON-DETECT
SOiOOl
NONJ)ETECT
<0.001
0.00275
•< 04)01
NON-DETECT
<0.00I
0.00445
<0.007
NON-DETECT
INST. MAXIMUM
XXXX
XXXX
•f2». INST. MAX
9.0
•?».004
NON-DETECT
sAOai;
NON-DETECT
JsOWI
0.0041
<;o:oo); NON-DETECT
so;(>Dt 0.0070
<{aoo7.
NON-DETECT
1 CERTIFY UNDER PENALTY OF LAW THAT I HAVE PERSONALLY EXAMINED AND AM FAMILIAR WTTH 7KE INFORMATION SUBMnTED HEREIN AND BASED ON MY. \ y INQUIRY OF THOSE INDIVIDUALS IMMEDHTELY RESPONSIBLE FOR OBTAINING^ ^ i / j , _ ^ j y } y l j f / THE INFORMATION. 1 BEUEVE THE SUBMTrTED INFORMATION IS TOUE.Jft' u J ^ l Y ^ / / L & i r : U / l l e : l ACCURATE AND COMPLETE. 1 AM AWARE THAT THERE ARE SIGNfflCAl^ ' v i 4 r t e ( I A \ / fc«t««'<^a. PENALTIES FOR SUBMrrrlNO FALSE INFORMATION. INCLUDING THE POSSIBILtTY ( / OF FINE AND IMPRISONMENT SEE 18 U.S.C SlOOl AND 33 U.S.C. SI319. (Penalties under these stanites may include fines up to $10,000 and or SlGNATl«E OF PRINCIPAL EXECUTIVE maximum imprisonment of between 6 months and 5 vcan) OFFICER OR AUTHORIZED AGENT
UNrrs
XXXX
STD UNITS
MOfl,
MG/L
MG/L
MGA.
MC/L
MCA.
I
NO. EX
Q
0
0
0
0
0
0
0
lOUtheast Region
'acsimile
nns befon ciimpletiiis ll>i> fom
FREQUENCY
OF
ANALYSIS
DAILY
DAILY
1/MONTH
1/MONTH
1/MONTH
1/MONTH
1/MONTH
l/MOOTH
I/MONTH
1/MONTH
1/MONTH
1/MONTH
1/MONTH
1/MONTH
1/MONTH
1/MONTH
TELEPH0^4E
610-327^174
AREA CODE NUMBER
20.10
YEAR
SAMPLE TYPE
RECORDED
RECORDED
CRAB
CRAB
GRAB
GRAB
GRAB
GRAB
GRAB
GRAB
GRAB
GRAB
GRAB
GRAB
CRAB
CRAB
DATE
12
MO
01
DAY
COMMENT AND EXPLANATION OF ANY VIOLATIONS (Reference all attachments here) PERMTT EXPIRES August 31.2014 . SUBMIT RENEWAL BY Febnary 28.2014
EPA FORM 3320-1 (Rev 9 - 88) previous edition may be used Re 30 (GJE09)226-8
(REPLACES EPA FORM T ̂ 0 WHICH MAY NOT BE USED) ; l o f 2
AR300340
P t K M i r i i i b NAME ADDRESS (mclude NAllUNAL PULLU1 ANl UlSCHAKUE ELIMINAIION S Y S l t M (NPDES)
Facility Name/Location ifdiffcrent) DISCHARGE MONITORING REPORT (DMR)
PRIMARY FACILITY: OCCIDENTAL CHEMICAL GROUNDWATER REMEDUTION SrTE
CLIENT: GLENN SPRINGS HOLDINGS, INC.
ADDRESS: 5005 LBJ FREEWAY, STE 1350
DALLAS, TX 7S244
SFTE ADDRESS: 375 ARMAND HAMMER BOULEVARD
MUNICIPALITY: LOWER POTTSGROVE TOWNSHIP
COUNTY: MONTGOMERY
Parameter
STYRENE
PHENOLS. TOTAL
VINYL CHLORIDE
Sample Measurement
Peimit Requirement
Sample Measurement
Peimit Requirement
Sample Measurement
Peimit Requirement
Sample Measurement
Permit Requirement
Sample Measurement
Pennit Requirement
Sample Measurement
Pennit Requirement
Sample Measurement
Peimit Requirement
Sample Measurement
Pemiit Requirement
NAME/TITLE PRINCIPAL EXECUTIVE OFFICER
GEORGE LUXBACHER, V P O P E R A T I O N S - G S H I
TYPE OR PRINT
PA0010944
PERMIT NUMBER
005
DISCHARGE NUMBER
MONrrORING PERIOD
YEAR
2®0 MO
m DAY
Oil
QUANTTTY O R LOADING
M O N T H L Y
A V E R A G E
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
DAILY
MAXIMUM
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
UNITS
XXXX
XXXX
XXXX
TO YEAR
%m MO
M DAY
30
QuALrrv OR CONCENTRATION
INST
MINIMUM
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
1 CERTIFY UNDER PENALTY OF LAW THAT I HAVE PERSONALLY EXAMINED AND AM FAMILIAR WPTH THE INFORMATION SUBMITTED HEREIN AND BASED ON MY INQUIRY OF THOSE INDIVIDUALS IMMEDIATELY RESPONSIBLE FOR OBTAININO THE INFORMATION, I BELIEVE THE SUBMrPTED INFORMATION IS TRUE, ACCURATE ANJ>' COMPLETE. I AM AWARE THAT THERE ARE SIGNmCANT PENALTIES F M ' SUBMmtNO FALSE INFORMATION, INCLUDING THE POSSIBILTTY OF FINE AND IMPRISONMENT SEE 18 US.C. SlOOl AND 33 U.S.C. S1319. (Penalties under these stanites may include fmes up to SIO.OOO and or maximum imprisonmem of between 6 months and 5 vears)
M O N T H L Y
A V E R A G E
ieO'Ooi
NON-DETECT
SiO.OlO
MONITOR/REPORT
•<fD;002
NON-DETECT
INST.
MAXIMUM
acgooi NON-DETECT
<::0-.OIO
MONirOR^EPORT
<*Q02
NON-DEIECT
SlONATVRE OF PRINCIPAL EXECtmvE OFFICER O R AUTHORIZED AGENT
Southeas t Region
Facsimile
NOTE: Read imtfiKdoitt before complctiogttiis fonn
UNITS
MG/L
MC/L
M G C .
NO.
EX
0
0
0
FREQUENCY
OF
ANALYSIS
I/MONTH
I/MONTH
1/MONTH
I/MONTH
1/MONTH
l/MONTH
TELEPHONE
610-327^174
AREA CODE NUMBER
2010
YEAR
SAMPLE
TYPE
GRAB
GRAB
CRAB
GRAB
CRAB
CRAB
DATE
12
MO
01
DAY
COMMENT AND EXPLANATION OF ANY VIOLATIONS (Reference all
attachments here) PERMITEXPIRES August 31,2014 SUBMIT RENEWAL BY February 28,2014
EPA FORM 3320-1 (Rev 9 - 88) previous edition may be used
Re 30 (GJE09)226-8A
(REPLACES EPA FORM T -40 WHICH MAY NOT BE USED) Page 2 of 2
AR300341