georgia ibm power user group · 2016-01-22 · georgia ibm power user group january 21, 2016 bob...
TRANSCRIPT
© 2010 IBM Corporation
IBM Power Systems
Georgia IBM POWER User Group January 21, 2016
Bob Foster ([email protected]) Senior Technical Staff Member Lab-Services
© 2010 IBM Corporation
IBM Power Systems
Agenda
Implementing Live Partition Mobility(LPM) - all the basics plus great websites to
use to get you all prepared
Using Simplified Remote Restart (SRR) – simple to implement iff LPM is working
LPM and RR Automation Tool – great tool to use for LPM and SRR.
Demo the LPM and RR Automation tool
2
© 2010 IBM Corporation
IBM Power Systems
3
Where to find Live Partition Mobility Information
What’s New in LPM – updated each release of firmware
Find the latest feature here – even before Redbook is updated https://www-01.ibm.com/support/knowledgecenter/HW4P4/p8hc3/p8hc3_whatsnew.htm
IBM PowerVM Live Partition Mobility Redbook
http://www.redbooks.ibm.com/abstracts/sg247460.html • rt/knowledgecenter/POWER8/p8hc3/p8hc3_whatsnew.htm?cp=POWER8%2F1-8-1-
3-7-0
•IBM PowerVM Live Partition Mobility Redbook
• http://www.redbooks.ibm.com/abstracts/sg247460.html
© 2010 IBM Corporation
IBM Power Systems
4
Live Partition Mobility
Rebalance processing
power across servers when
and where you need it
Reduce planned downtime by
moving workloads to another server
during system maintenance
Movement to a
different server
with no loss of
service
Virtualized SAN and Network InfrastructureVirtualized SAN and Network Infrastructure
Move a running partition from one
POWER6/POWER7/POWER8 server to another with no
application downtime
© 2010 IBM Corporation
IBM Power Systems
6
Live Partition Mobility
M Once enough memory
pages have been moved, suspend the
source system
Create shell partition on target system
Validate environment for appropriate
resources
System #2 System #1
Storage Subsystem
A
HMC
Hypervisor
VIOS
A
vscsi0
vtscsi0
vhost0
fcs0
en2 (if)
VLAN
ent2 SEA
ent0
ent1
en0 (if)
ent1
Hypervisor
VIOS fcs0
en2 (if)
VLAN
ent2 SEA
ent0
ent1
A
vscsi0
en0 (if)
ent1
vtscsi0
vhost0
Mover Service
VASI
Mover Service
VASI
Shell Partition Suspended Partition AIX Client 1 AIX Client 1 Finish the migration
and remove the original LPAR
definitions
Start migrating memory pages
Create virtual SCSI devices M M M M M M M M M M M M M M M
© 2010 IBM Corporation
IBM Power Systems
From “What’s New” website - Firmware support matrix for partition mobility
7
© 2010 IBM Corporation
IBM Power Systems
Managed System (host) Requirements
© 2010 IBM Corporation
IBM Power Systems
9
PowerVMTM Editions
Express Standard Enterprise
Maximum LPARs 1+2 / Server 10 / Core 10 / Core
Management IVM IVM, HMC IVM, HMC
Virtual I/O Server
Shared Dedicated Capacity
NPIV
Multiple Shared Processor Pools
Active Memory Sharing
Live Partition Mobility
© 2010 IBM Corporation
IBM Power Systems
10
PowerVM Enterprise Edition
Managed System (host) - Properties
© 2010 IBM Corporation
IBM Power Systems
11
Live Partition Capability Status - HMC
© 2010 IBM Corporation
IBM Power Systems
From “What’s New website” – Concurrent Migrations
Restrictions: Firmware levels 7.2 and 7.3 are restricted to eight concurrent migrations. With a 1 GB network adapter, up to four concurrent migrations are supported. From VIOS Version 2.2.2.0 or later, you must have a 10 GB network adapter to support eight concurrent migrations. From VIOS Version 2.2.2.0, or later, you must have more than one pair of VIOS partitions to support more than eight concurrent mobility operations. The Suspend/Resume feature for logical partitions is not supported on POWER8™ processor-based servers. Systems that are managed by the Integrated Virtualization Manager (IVM) support up to 8 concurrent migrations. To support the migration of up to 16 active or suspended mobile partitions from the source server to a single or multiple destination servers, the source server must have at least two VIOS partitions that are configured as mover service partitions. Each mover service partition must support up to 8 concurrent partition migration operations. If all 16 partitions are to be migrated to the same destination server, then the destination server must have at least two mover service partitions configured, and each mover service partition must support up to 8 concurrent partition migration operations.
12
© 2010 IBM Corporation
IBM Power Systems
13
Logical Memory Block (LMB) Size
ent0 fcs0 ent0
ent1
virt
ent2
SEA
en2
if
ent2
SEA
ent1
virt
System #2
(Destination System)
Storage Area Network
Ethernet Network
Shared Disk
(Storage Device)
POWER
Hypervisor
Vir
tua
l I/
O S
erv
er
HMC
AIX Client Partition 1
LUN
AIX Client Partition 1
(Mobile Partition)
POWER
Hypervisor
System #1
(Source System)
en2
if
Physical
Volume LUN
fcs0
vtscsi0
vhost0 Virtu
al I/O
Serv
er
hdiskX
Two (2) – POWER6/7 Servers
LMB size LMB size
© 2010 IBM Corporation
IBM Power Systems
14
Logical Memory Block (Memory Region Size)
Managed System - Properties
MUST match on Source / Destination Power Servers
© 2010 IBM Corporation
IBM Power Systems
Virtual I/O Server (VIOS) Requirements
© 2010 IBM Corporation
IBM Power Systems
16
Mover Service Partition (MSP)
Any VIOS can be a MSP….you just need to set the MSP bit
on that VIOS and it’s a dynamic change
Required for ACTIVE Partition Mobility only
Provides VIO Server functions:
– Asynchronously extracts, transports, installs partition
state during migrations
MSP must contain a single VASI virtual device
– Virtual asynchronous services interface (VASI)
– Provides communication between Hypervisors to gain
access to partition state
© 2010 IBM Corporation
IBM Power Systems
17
VIOS – MSP Flag set “ON” (Active Migration)
Source Server Destination Server
© 2010 IBM Corporation
IBM Power Systems
18
Live Partition Mobility (LPM) - Networking
SEA
POWER7 – Server-B POWER7 – Server-A
ENT0
Same SUBNET on Source and Destination
SEA SEA SEA
Ethernet
Controller
ENT1
© 2010 IBM Corporation
IBM Power Systems
Virtual Machine (LPAR) Requirements
© 2010 IBM Corporation
IBM Power Systems
20
Processor Architecture Compatibility
Virtual Machine – Manage Profile
Mode Supported by Destination Host
© 2010 IBM Corporation
IBM Power Systems
21
Virtual Client I/O & Services
No Physical I/O Virtual Machine Services
© 2010 IBM Corporation
IBM Power Systems
22
Virtual Client – Networking
Destination host must support Client VLAN
Virtual Ethernet Supported VLAN
© 2010 IBM Corporation
IBM Power Systems
23
NPIV Provisioned Storage
Each WWPN pair Must be zoned to same LUN
© 2010 IBM Corporation
IBM Power Systems
24
Live Partition Mobility (LPM) - NPIV
npiv
POWER7 – Server-B POWER7 – Server-A
FCS0 FCS1
World Wide Port Names Float between Servers
NPIV Capable adapter required on Destination Multi-Pathing Software
npiv npiv npiv
© 2010 IBM Corporation
IBM Power Systems
25
LPM
© 2010 IBM Corporation
IBM Power Systems
26
Live Partition Mobility (LPM) - VSCSI
POWER7 – Server-B POWER7 – Server-A
No_Reserve No_Reserve No_Reserve No_Reserve
Repeat Process for every Possible Destination MPIO
© 2010 IBM Corporation
IBM Power Systems
27
Virtual Client – Memory Restrictions
Inactive Mobility ONLY
© 2010 IBM Corporation
IBM Power Systems
28
Virtual Client – Shared Processor Pool
SPP configuration not required on Destination host
© 2010 IBM Corporation
IBM Power Systems
29
Processor & Memory Availability
Destination host must have processor / memory Resources
© 2010 IBM Corporation
IBM Power Systems
Live Partition Mobility - Migration
© 2010 IBM Corporation
IBM Power Systems
31
© 2010 IBM Corporation
IBM Power Systems
32
Virtual WWPN on source server before LPM
© 2010 IBM Corporation
IBM Power Systems
33
Virtual WWPN on source server before LPM
© 2010 IBM Corporation
IBM Power Systems
34
Initiating Live Partition Mobility
Migration Activities
Migrate
Validate
Recover
© 2010 IBM Corporation
IBM Power Systems
35
Live Partition Mobility - Validation
© 2010 IBM Corporation
IBM Power Systems
36
Live Partition Mobility - Validation
Possible Results
Errors – need to fix
Warnings – can
ignore
Migration Screen
© 2010 IBM Corporation
IBM Power Systems
37
Live Partition Mobility - Migrate
© 2010 IBM Corporation
IBM Power Systems
38
Live Partition Mobility - Migrating
© 2010 IBM Corporation
IBM Power Systems
39
Live Partition Mobility – Migration Completed
© 2010 IBM Corporation
IBM Power Systems
40
Virtual WWPN on destination server after LPM
© 2010 IBM Corporation
IBM Power Systems
41
Virtual WWPN on destination server after LPM
© 2010 IBM Corporation
IBM Power Systems FLRT Tool – LPM Report
http://www-304.ibm.com/support/customercare/flrt/
© 2010 IBM Corporation
IBM Power Systems FLRT LPM Results
© 2010 IBM Corporation
IBM Power Systems
VIOS Tuning and General Code Level Recommendations for LPM
LPM performance tuning information in IBM Knowledge Center
http://www-01.ibm.com/support/knowledgecenter/POWER8/p8hc3/p8hc3_viostune_lpmperf.htm?cp=POWER8%2F1-7-1-3-7-1-1-2-3
General VIOS tuning
The following recommendations assume that the VIOS has already been tuned for good virtual I/O performance by implementing changes suggested by the VIOS Advisor: https://www.ibm.com/developerworks/community/wikis/home?lang=en#!/wiki/Power%20Systems/page/VIOS%20Advisor
CPU
For more consistent performance, disable Power Saver mode to ensure that the processor clock frequency remains constant at the nominal value.
CPU resources recommended for optimum LPM performance are in addition to the resources already assigned to the VIOS to handle existing virtual I/O requirements
If using 1GigE, or if the bandwidth of the 10GigE link(s) to be used for LPM already reaches peaks of near 100% utilization, only 1 additional POWER7/POWER7+ /POWER8 core or vCPU is recommended, regardless of the number of concurrent migrations
If using shared processors for the VIOS and increasing the number of vCPUs is required, note that the corresponding amount of additional compute capacity must be available in the shared pool
Use Case POWER7 POWER7+ POWER8
Dedicated cores or
Shared Processor vCPUs
Dedicated cores or
Shared Processor vCPUs
Dedicated cores or
Shared Processor vCPUs
Up to max concurrent migrations on 10GigE 4 3 2
1GigE, or other applications on 10GigE link(s) for LPM already consume near 100% bandwidth
1 1 1
44
© 2010 IBM Corporation
IBM Power Systems
VIOS Tuning and General Code Level Recommendations for LPM (continued)
Memory
No additional memory is required for doing LPM operations beyond what is already recommended for VIOS in general
Network
Although LPM operations can run over an SEA, for best performance use a dedicated physical adapter
To avoid conflicts over network bandwidth usage between applications and LPM operations, consider using separate network links for applications and system management
Enable large send and large receive offload (LRO) at all interfaces, e.g., physical devices and SEA
NOTE: Large send and LRO should not be enabled on SEA if using Linux LPARs
Set tcp_sendspace=524288 and tcp_recvspace=524288
Use jumbo frames, if environment supports it
Miscellaneous
If at VIOS level 2.2.3.4 or above, and not using Secure LPM, set the auto_tunnel attribute as follows in order to avoid overhead in checking for IPsec tunnel setup: chdev –l vioslpm0 –a auto_tunnel =0
Set the value for max_virtual_slots for the VIOS partitions to 4000 or less, unless a higher number is required to support a large number of virtual devices
Code levels
Recommended code levels for doing LPM operations to POWER8 systems are listed here: http://www.ibm.com/support/customercare/flrt/
Refer to Fix Central for the latest firmware level recommended for your system:
https://www-933.ibm.com/support/fixcentral/
LPM environment setup and preparation checklists, including PowerHA
Setup checklist: http://www.redbooks.ibm.com/abstracts/tips1184.html?Open&cm_sp=MTE29888
Preparation checklist: http://www.redbooks.ibm.com/abstracts/tips1185.html?Open&cm_sp=MTE29889
PowerHA environments:
http://www-01.ibm.com/support/knowledgecenter/SSPHQG_7.1.0/com.ibm.powerha.admngd/ha_admin_live_partition.htm
45
© 2010 IBM Corporation
IBM Power Systems
46
Oracle
http://www-01.ibm.com/common/ssi/cgi-
bin/ssialias?infotype=PM&subtype=SP&htmlfid=ORS03012USEN#loaded
http://www.oracle.com/technetwork/database/virtualizationmatrix-172995.html
http://www-03.ibm.com/support/techdocs/atsmastr.nsf/WebIndex/WP102094
DB2
http://www.redbooks.ibm.com/redbooks/pdfs/sg247805.pdf
PowerHA
http://www-
01.ibm.com/support/knowledgecenter/SSPHQG_7.1.0/com.ibm.powerha.admngd/ha_admin_live_partition.ht
m
Websphere Cloudburst
http://www.redbooks.ibm.com/redbooks/pdfs/sg247806.pdf
Cognos
http://www.redbooks.ibm.com/redbooks/pdfs/sg247842.pdf
SAP
http://www.redbooks.ibm.com/redbooks/pdfs/sg247564.pdf
LPM Websites for Software Vendors
© 2010 IBM Corporation
IBM Power Systems PowerHA Recommendations
http://www-
01.ibm.com/support/knowledgecenter/SSPHQG_7.1.0/com.ibm.powerha.admngd/ha
_admin_live_partition.htm
© 2010 IBM Corporation
IBM Power Systems
LPM Considerations
Show Stoppers (configurations that do not support LPM) Different Logical Memory Block sizes on source/target systems Different Processor Compatibility Modes on source/target systems (p6, p5+, p5)
Non-virtual resources these include physical adapters logical ports from IVE non-default virtual serial adapters virtual adapters mapped to non-shared resources (CD-ROM, internal disks, etc.)
Large Factors affecting speed of migration Amount of memory in the LPAR being moved Network bandwidth and speed between source and destination Mover Service Partitions (MSP) Amount of paging space being used on LPAR being moved Amount of memory pages being changed on LPAR
Smaller Factors affecting speed of migration Maximum memory value for partition being moved (increased max showed increase time for move) Amount of free memory in the target MSP
Application license considerations DB2 support for LPM http://public.dhe.ibm.com/partnerworld/pub/whitepaper/1a67a.pdf http://publib.boulder.ibm.com/infocenter/db2luw/v9r5/topic/com.ibm.db2.luw.wn.doc/doc/c0053410.html
Oracle 10gR2, 11gR1 and 11gR2 certification of LPM support http://www-03.ibm.com/support/techdocs/atsmastr.nsf/WebIndex/FLASH10686
© 2010 IBM Corporation
IBM Power Systems
WHEW….are we done yet…..Uncle Julio’s time
Nope…time to look at Simplified Remote Restart and the LPM and Remote
Restart Automation tool.
THIS STUFF WILL BE MUCH EASIER….I promise…
49
© 2010 IBM Corporation
IBM Power Systems
© Copyright IBM Corporation 2014
What is Remote/Restart
High Availability function on POWER VM Enterprise Edition
A mechanism to relocate and restart a partition on another server when its
original host server (PHYP) fails. Live Partition Mobility (either active or inactive)
isn’t a possible solution as the VIOS and Hypervisor are no longer running.
The partition is created similar to a LPM-capable partition such that all its I/O
requirements (SAN and LAN) are done with the Virtual I/O Server (VIOS).
The partition is also marked as “remote restartable” on the HMC GUI.
Currently the only way to do R/R on the HMC is via the HMC Command Line
Interface (CLI)
© 2010 IBM Corporation
IBM Power Systems
© Copyright IBM Corporation 2014
Types of Remote/Restart
There are 2 types of Remote/Restart (R/R)
Partition Simplified Remote Restart- enabled in Power8 on 820
Firmware and HMC V8R8.1….WE LOVE THIS This removed the need for a Reserved Storage Device so much easier to
configure and allowed to change a partition to/from remote restartable
Partition Remote Restart – DON’T USE THIS VERSION….this is here for
hysterical purposes
This was more complicated to configure as it required a Reserved Storage Device (in
the SAN) to be configured in the VIOS so that LPAR information could be saved there.
This Reserved Device has to be accessible by the VIOS on the other servers where a
partition might be remote restarted on.
This Reserved Device also had to be the size of the partitions maximum memory
setting. So if you had a 40 Gbyte partition but its maximum memory setting in the
HMC’s profile was 80 Gbytes, the Reserved Device needed to be a LUN with 80
Gbytes.
One Reserved Device was needed for each partition that was enabled a remote
restarable
© 2010 IBM Corporation
IBM Power Systems
Partition Simplified Remote Restart (820 release)
Note: Partition should contain virtual IO only, similar to LPM restrictions
© 2010 IBM Corporation
IBM Power Systems
Platform Requirements
Partition Simplified Remote Restart minimum requirements – LOVE IT • PowerVM Enterprise Edition
• HMC Version V8R8.2
• VIOS level of 2.2.3.4
• System Firmware Level 820
Partition Remote Restart minimum requirements – DON’T USE THIS
VERSION….this is here for hysterical purposes
• PowerVM® Enterprise Edition
• HMC Version V8R8.1
• VIOS level of 2.2.0.11
• System Firmware level 760
© 2010 IBM Corporation
IBM Power Systems
Partition Simplified R/R Capability
Ignore these,
outdated
This is P8 SRR
© 2010 IBM Corporation
IBM Power Systems
Partition Simplified RR LPAR Creation
This option is only shown on the Create Partition wizard If you don’t set it now, you will have to change it via
HMC CLI then reboot the LPAR
© 2010 IBM Corporation
IBM Power Systems
Remote Restart Flow
Source System Destination System
PHYP failed Operating
“FSP still running”
(Source System state is “Error” or “Error – Dump In Progress” or “Power Off”)
User initiates remote restart (rrstartlpar –o restart)
HMC performs validation on target server
Do remote restart on the target- create LPAR, do VIOS mappings, activate LPAR
Mark the LPAR on source system as remote restarted (it can no longer be activated on source)
User initiates cleanup, after source system state is back to Operating (rrstlartlpar –o cleanup)
Step 1 – HMC removes the LPAR on the source server
HMC(s)
© 2010 IBM Corporation
IBM Power Systems
© Copyright IBM Corporation 2014
My suggestion for any P8 or future P8 customers!
Power8’s Simplified Remote Restart is SIGNIFICANTLY easier
to use (just set a bit on the LPAR) and you need to ADOPT this
immediately.
Constraint –
An SRR partition cannot be LPM’d to a Power7. So if you plan on running in P7
processor mode and LPMing back and forth between P7 and P8…you can’t use
this.
Otherwise, you should use this on all P8s at FW820 and above!
Here is the HMC command line to set this –
chsyscfg -r lpar -m managed-system -i "name=partition
name, simplified_remote_restart_capable=1”
© 2010 IBM Corporation
IBM Power Systems
Can we go now Bob….
No! Almost there.
58
© 2010 IBM Corporation
IBM Power Systems
Agenda
Very Quick overview of Live Partition Mobility for Power Systems Learn the capabilities of the PowerVM LPM Automation Tool
– How to evacuate an entire server with LPM to one or to many servers – Moving a subset of partitions with LPM to one or many servers – Controlling how partitions are moved and determining configuration settings – Returning partitions to their original server and maintaining original server
configurations – Creating plans in advance of LPM operations and deploying those plans during a
service window – Ability to change plans outside of the tool and reading in the changed plans – How to configure the tool and users for your environment
Learn the new features/enhancements of Version 3.0.1 More concurrency during LPM Ability to specify NPIV slots and mappings via Excel Plans New
Feature Much faster Export of plans Revalidate enhancements
Enhancement LPM Validation Exporting of results
Support Remote Restart on both Power 7 and Power 8
© 2010 IBM Corporation
IBM Power Systems LPM Automation Tool Introduction
Current use of LPM – Customers are using LPM more and more as part of their daily tasks
(workload balancing) and planned maintenance procedures
– The HMC GUI only allows a single partition to be selected at at time
– Some customers are writing scripts to move many partitions at a time
– Imagine having to move 100 partitions from a server (esp using the GUI)
Automated use of LPM – This tool was developed to allow a customer to quickly evacuate an entire
server using LPM (or a subset of partitions) to other servers
– It can also return the partitions back to the original server with the
original mappings (HBA/virtual slot id)
– You can build a plan(s) in advance and execute the plans during
maintenance windows
60
© 2010 IBM Corporation
IBM Power Systems
Tool History and Feedback
• This tool was released in 4Q2014. Over 80 WorldWide customers have
already adopted it.
• One our original customers has done more than 3000 LPMs with the tool. They
constantly balance WL and do firmware updates/VIOS updates and using GUI or
writing CLI for took hours each night….now its 20 minutes and let the tool do the
rest of the work.
• Another customer adopted the tool and commented “This tool is too easy to
use”….not sure if that was a compliment or a disappointment
• One customer has nicknamed us the “google guy”, IBM just came in and
customer downloaded it and installed it in minutes and the tool just worked! We
normally see the IBM person there for many days getting some new
technology/tool up and running
© 2010 IBM Corporation
IBM Power Systems
Home Screen
This icon gets you to this screen
© 2010 IBM Corporation
IBM Power Systems
LPM Away – Choose servers
One click will select all the
partitions or select/deselect
individual partitions Can choose one or many
destination servers
This icon gets you to this screen
© 2010 IBM Corporation
IBM Power Systems
LPM Away – Validate Complete
Notice how each partition was validated to both possible
destination servers.
Revalidate Errors only
Save results to XLS
© 2010 IBM Corporation
IBM Power Systems
LPM Away – Placement
Change dest server
As dest server is
changed, the
Remaining values
change
© 2010 IBM Corporation
IBM Power Systems
LPM Away – MSP and Shared Proc Pool
APPLY will only change this one
partition’s LPM, APPLY TO ALL will
use these value for all partitions (MSP
only)
© 2010 IBM Corporation
IBM Power Systems
Ability to change partition LPM order
Click and drag a partition name up or down. 1 goes first, then 2, etc
© 2010 IBM Corporation
IBM Power Systems
LPM Away – migration in progress
The STOP Action is problematic…only use if really necessary
© 2010 IBM Corporation
IBM Power Systems
LPM Return – return partitions back to original server
This screen will show servers with partitions that haven’t
been returned to their source server. If the partitions were
moved to multiple servers, this operation will bring them back
from all the servers.
If multiple plans were used to move partitions off of this
server, you have 2 options. Let the tool bring all the
partitions back at once or you can import the plans one by
one to restore the server.
When moving the partitions back to the original managed system, the tool will restore the virtual adapter
numbers and shared proc pools and HBA mappings that were originally being used before the managed system
was evacuated
© 2010 IBM Corporation
IBM Power Systems
LPM Return – choose which partitions you want to return
You don’t have to return all partitions at once. Default is ALL partitions.
In fact, you don’t ever have to return them as in the case of a permanent migration.,
just delete them with the Delete button
Don’t return
this LPAR
ever
© 2010 IBM Corporation
IBM Power Systems
LPM Return Validate Panel
Revalidate Errors only
Save results to XLS
© 2010 IBM Corporation
IBM Power Systems
LPM Return – Options screen
Same functionality as LPM Away – MSP/Shared Proc Pool/LPM Order
© 2010 IBM Corporation
IBM Power Systems
Exporting/Importing Plans
The tool is designed so that a customer can create plans, MODIFY
them outside of the tool, and import those changed plans into the tool.
The plan is an Excel spreadsheet where many of the fields can be
modified and imported back into the tool.
The plan includes both the LPM Away functionality and the LPM
Return functionality on a different worksheet.
You can import plans on either the LPM Away GUI or the LPM Return
GUI. It will read the appropriate worksheet (“LPM Away” or “LPM
Return”) and load that into the tool.
Can now specify Destination LPAR ID and Destination VFC slot
numbers and mappings on LPM Away
Much faster Export function
© 2010 IBM Corporation
IBM Power Systems
Advantages of LPM Plans
The customer can build stages of plans. For example, they want to do some moves on Monday (one set of application LPARs) and then Tuesday (another set of application LPARs), etc. They build a plan for each day and can import those plans the following week.
Since each plan can stand on its own, you can execute them in any order.
You can make many changes in the plan with Excel and then import those changes back into the tool.
The HMC Command Line (CL) that is executed for each LPM operation is shown in the plan.
– This can be useful if someone wants to extract the HMC CL and build their own scripts.
– It can also be used to perform the moves in the unlikely event the tool fails. The customer can save the plan. Then if there is a problem, can manually execute those commands on the HMC console.
When you import a plan, the LPM validation is done with the specific parameters/values you specified in the plan (i.e. slot numbers, msps, etc)
© 2010 IBM Corporation
IBM Power Systems
LPM Away Excel worksheet
Yellow Columns can be changed and be imported into tool
© 2010 IBM Corporation
IBM Power Systems
LPM Away command syntax
HMC Command Line syntax…could use in scripts
© 2010 IBM Corporation
IBM Power Systems
LPM Return Excel worksheet
These columns can be changed
© 2010 IBM Corporation
IBM Power Systems
LPM Return command syntax
© 2010 IBM Corporation
IBM Power Systems
Support for Power Enterprise Pools
What are Power Enterprise Pools Mobile processor and memory activations may be re-allocated to any system within
a defined pool
– Systems with different clock speeds can coexist in the same pool
– Activation assignment and resource movement is controlled by the HMC
POWER8 systems may interoperate in the same pool with POWER7 systems
– High-end pool for POWER7+ 780, Power 795 & Power E880 systems
– Midrange pool for POWER7+ 770 systems & Power E870
Activations can be moved within a pool at any time, without contacting IBM
– No limit to the number of times activations can be moved
Movement of activations is instant, dynamic and non-disruptive
– Ideal for workload balancing and optimizing application availability
The tool can do placement based on Power Enterprise Pools and also
move the mobile CoD processors and memory as part of the LPM
operations.
© 2010 IBM Corporation
IBM Power Systems
PowerVM LPM and R/R Automation Tool
Version 3.0.1 of the LPM Automation Tool will now include Remote Restart
capabilities.
A customer can now use the GUI-based tool to do the remote restart validation
process (which you would want to do way in advance of an outage to make sure
you are properly configured) and then later do the actual Remote/Restart of the
partition from a server that has an outage.
The easy to use GUI of the tool gives the user multiple options to determine a
placement plan and to modify it easily
The tool will also give the user the ability to do the “cleanup” step after the
repaired server is back online.
© 2010 IBM Corporation
IBM Power Systems
Home Screen of the LPM and R/R Automation Tool
This icon gets you to this screen
© 2010 IBM Corporation
IBM Power Systems
Remote/Restart – Choose servers
One click will select all
the partitions or
select/deselect
individual partitions
Can choose one or
many destination
servers
This icon gets you to this screen
© 2010 IBM Corporation
IBM Power Systems
Remote/Restart – Validate Complete
Notice how each partition was validated to both possible
destination servers.
Revalidate Errors only
Save results to XLS
© 2010 IBM Corporation
IBM Power Systems
Remote/Restart – Placement
Change dest server with
Drop down
As dest server is
changed, the
Remaining
values change
© 2010 IBM Corporation
IBM Power Systems
Ability to change partition remote/restart order – same as LPM
Click and drag a partition name up or down. 1 goes first, then 2, etc
© 2010 IBM Corporation
IBM Power Systems
Remote Restart Completed
© 2010 IBM Corporation
IBM Power Systems
Delete Restart LPAR from the Failed Server (aka CLEANUP)
First try to do a Delete and if that doesn’t work, use Force Delete
© 2010 IBM Corporation
IBM Power Systems
LPM and RR Automation Tool requirements
The tool can be installed on AIX and Windows and Linux platforms. It is
packaged as a zip file and contains all the code/packages needed to run.
Your HMC must be at level V7R760 or higher.
The tool only communicates to the HMCs in your environment via ssh issuing
HMC CLI commands. There is no need for agents or access to the VIOS or client
partitions. It only needs an HMC userid and its password.
© 2010 IBM Corporation
IBM Power Systems
© Copyright IBM Corporation 2014
New version releasing very soon – new features
Added Scheduler so that LPMis can be performed unattended Added Quick Validate support for LPM Away plans and for LPM Return (both with and
without plans) Added support for unlimited number of Virtual Fibre Channel adapters and Virtual SCSI
adapters to Excel spreadsheet plans P8 Simplified support was enhanced to allow validation of plans while the partition is up
and running Add a new user role that does Validates only. Its like a Read-only role, it cannot do any
operations that will change the systems. History panel now includes duration of the operation and the export of the History
includes all the columns Support of HTTPS Added Percentile setting so user can control how packed a destination server is HMC password can be edited in the tool…no need to remove/add HMC There is a global variable that specifies how many CPUs and Memory you want added to
the servers when using PEP. Password encrypted enabled
© 2010 IBM Corporation
IBM Power Systems
Getting support and updates
This tool is delivered as-is. You can email me for any problems/enhancements
you would like.
The goal is to fix any issues as quick as possible but depending on our
availability, it may take some time.
However, with the Excel Plans, even if the tool is broken, you should be able to
complete a maintenance window by using the HMC commands in the Excel
spreadsheet.
The tool will be loaded into Resource Link which IBM customers have access to.
Updates to the tool will be loaded into Resource Link
The customer can subscribe to updates on the web site.
The customer has unlimited use of the tool throughout their
enterprise without maintenance or license fees
© 2010 IBM Corporation
IBM Power Systems
Videos on youtube.com
© 2010 IBM Corporation
IBM Power Systems
PowerCare Program (eligible for 770/780/795/870/880)
Deal Closer Program
Direct Lab Services Statement of Work (SOW)
Business Partner Contract Attachment (CA)
For further questions on funding approach, please contact:
•Talk to Victor at Uncle Julios…..
Engaging with Lab Services Options for obtaining these tools
© 2010 IBM Corporation
IBM Power Systems
End of Presentation