general notes and legend
TRANSCRIPT
RE
VD
AT
ED
ES
CR
IPT
ION
BY
146
0 E
HO
LT
AV
E,
PO
MO
NA
, C
A 9
1767
80
0 S
. G
AR
EY
AV
EN
UE
PO
MO
NA
, C
AL
IFO
RN
IA 9
1766
07/06/2021
RUNGSUB SU
BA SATYA
20-025
07
/06
/21
BID
SE
T
Exp.03/31/2022No.M 35815
RU
N
GSUB SUMETHA
S
OR
N
M
EC H A N I C
A
L
GE
NE
RA
L N
OT
ES
AN
D L
EG
EN
D
M0.1
ABBR.
VENT PIPING
ABBR.
V
W
W
HW
CW
HWR
POC
DESCRIPTION
HOT WATER PIPING
COLD WATER PIPING
SYMBOL
G
B.V.
U.
G.C.
TP
(E)IRR
G
TP
(E)
(E) IRR
DESCRIPTION
SDSD
V.C.P.
(E)AFSH
TWTW
OCEW
LWLW
LVLV
NOTE: THIS DOCUMENT FORMS A PART OF THE SPECIFICATIONS AND SHALL BE CONSIDERED THE SAME AS IF ATTACHED THERETO.
1. ALL WORK SHALL BE IN STRICT ACCORDANCE WITH ALL LOCAL CODES AND AUTHORITIES HAVING JURISDICTION, AND LISTED LIST
OF CALIFORNIA CODE OF REGULATIONS (C.C.R.)
2. BEFORE STARTING ANY WORK, VERIFY THE ADEQUACY, LOCATION, SIZE, AND AVAILABILITY OF ALL UTILITIES CONCERNED.
3. DRAWINGS INDICATE SIZE AND TERMINATION OF PIPING AND SUGGEST PROPER ROUTES OF PIPING TO CONFORM TO THE
STRUCTURE TO AVOID OBSTRUCTION AND TO PRESERVE CLEARANCE. IT IS NOT THE INTENT TO INDICATE ALL NECESSARY
OFFSETS AND IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO INSTALL PIPING IN SUCH A MANNER AS TO CONFORM TO
STRUCTURE, AVOID OBSTRUCTIONS, PRESERVE HEADROOM, KEEP OPENINGS AND PASSAGEWAYS CLEAR AND MAKE ALL
EQUIPMENT REQUIRING INSPECTION, MAINTENANCE AND REPAIR ACCESSIBLE WITHOUT FURTHER INSPECTIONS OR ADDITIONAL
COST.
4. THE WORK OF THIS PROJECT INVOLVES THE REPLACEMENT OF EXISTING NATURAL GAS PIPING ABOVE CANOPY ROOF AND BELOW
GROUND OUTSIDE THE BUILDINGS AS INDICATED ON THE DRAWINGS. VISIT THE JOBSITE TO DETERMINE THE EXTENT OF WORK
REQUIRED BY THE CONSTRUCTION ACTIVITIES. THE DRAWINGS FOR THESE AREAS SHOW THE CHANGES TO BE MADE REVISE,
REARRANGE, REROUTE OR REMOVE EXISTING PIPING AND AND RELATED APPURTENANCES AS REQUIRED TO ACCOMMODATE THE
CHANGES AND ADDITIONS SHOWN.
5. THE ALTERATION OF THE EXISTING NATURAL GAS PIPING ABOVE AND BELOW GROUND OUTSIDE THE BUILDING IS WORK OF A
COMPLEX NATURE WHICH WILL REQUIRE ACCURATE PLANNING, CAREFUL PREPARATION AND EXECUTION BY THE CONTRACTOR.
6. UNLESS OTHERWISE NOTED, EXISTING PIPING AND RELATED APPURTENANCES BEING REMOVED SHALL BE DISPOSED OF OFF-SITE
AT CONTRACTOR'S EXPENSE.
7. ALL WORK THAT INVOLVES "SHUT-DOWN" OF EXISTING UTILITIES OR PORTIONS THEREOF, SHALL BE DONE AT SUCH TIMES THAT
WILL CAUSE THE LEAST INCONVENIENCE TO THE DISTRICT'S ACTIVITIES. THE EXACT TIME AND LENGTH OF "SHUT-DOWN" SHALL BE
PRE-ARRANGED WITH THE DISTRICT AND SCHOOL SITE AT LEAST 72 HOURS IN ADVANCE OF THE REQUIRED SHUT-DOWN.
8. ALL PIPING SHALL BE SEISMICALLY RESTRAINED IN ACCORDANCE WITH THE REQUIREMENTS OF THE "SMACNA" GUIDELINES FOR
SEISMIC RESTRAINTS OF MECHANICAL AND PLUMBING PIPING SYSTEMS.
9. AESTHETICS ARE A VERY IMPORTANT COMPONENT OF THIS PROJECT. INSTALLATION OF PLUMBING WORK SHALL BE OF THE
HIGHEST QUALITY AND CRAFTSMANSHIP POSSIBLE.
10. REMOVE ALL (E) ABANDON PIPING THAT ARE EXPOSED OR WILL BE EXPOSED DURING THE DEMOLITION AND NEW PIPING
INSTALLATION; COORDINATE AND VERIFY (E) PIPING PRIOR TO REMOVAL.
11. ALL BRANCH PIPING THAT WILL BE REMOVED SHALL BE CAPPED TO THE NEAREST ACTIVE TEE.
12. AFTER AWARD OF CONTRACT, THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ADEQUATE PROTECTION OF ALL
EXISTING STRUCTURES (BOTH EXTERIOR AND INTERIOR) WITHIN AND ADJOINING WORK AREA. ANY EXISTING STRUCTURES AND
/OR IMPROVEMENTS DAMAGED DURING CONSTRUCTION SHALL BE REPAIRED AND/OR REPLACED WITH MATERIALS,
WORKMANSHIP, FIXTURES OR EQUIPMENT TEMPORARILY REMOVED SHALL BE RE-ERECTED OR INSTALLED IN AN APPROVED
MANNER, THE CONTRACTOR SHALL SUBMIT ALL PROPOSED PROTECTION METHODS TO THE CONSTRUCTION MANAGER FOR
REVIEW AND SHALL RECEIVE WRITTEN APPROVAL, PRIOR TO THEIR USE.
13. CUTTING, BORING, SAW CUTTING OR DRILLING THROUGH THE NEW OR EXISTING STRUCTURAL ELEMENTS TO BE DONE ONLY WHEN
SO DETAILED IN THE DRAWINGS, OR ACCEPTED BY THE ENGINEER WITH THE APPROVAL OF DISTRICT.
14. CUT FLOORS, CEILINGS AND WALLS AS REQUIRED FOR INSTALLATION OF WORK. APPROVED PENETRATION THROUGH CONCRETE
WALLS OR CEILINGS SHALL BE PROVIDED BY MEANS OF SLEEVES OR CORE DRILLING, CONTRACTOR SHALL COORDINATE WITH
DISTRICT. CONDUITS SHALL NOT PENETRATE STRUCTURAL SLAB AND WALL. ALL WORK SHALL BE PATCHED AND REPAIRED AS
DIRECTED BY DISTRICT.
15. ALL GAS PIPE WELDING SHALL BE SPECIALLY INSPECTED BY AN AWS-CWI QUALIFIED INSPECTOR APPROVED BY THE DISTRICT AND
IN COMPLIANCE WITH CBC 1704 A.3.
16. ALL BRACING OF PIPING SHALL BE INSTALLED IN ACCORDANCE WITH SMACNA GUIDELINES.
17. WHERE BRACING DETAILS ARE NOT SHOWN ON THE DRAWINGS OR IN THE GUIDELINES, THE FIELD INSTALLATION SHALL BE
SUBJECT TO THE APPROVAL OF THE DISTRICT & ENGINEER.
18. A COPY OF THE GUIDELINES PUBLISHED BY SMACNA BE PROVIDED BY THE CONTRACTOR AND KEPT ON THE JOBSITE AT ALL TIMES.
19. THE LOCATIONS OF EXISTING AND NEW UNDERGROUND UTILITIES WHERE SHOWN ON THE DRAWINGS ARE APPROXIMATE ONLY
AND HAVE NOT BEEN INDEPENDENTLY VERIFIED BY THE DISTRICT, THE ENGINEER OR THEIR REPRESENTATIVES. DETERMINE THE
EXACT LOCATION, DEPTH, INVERT ELEVATIONS, POINT OF CONNECTIONS AND PROPER SLOPES BEFORE CONNECTING WORK.
FIELD VERIFY AND COORDINATE AS REQUIRED.
20. OCCUPANTS OF THE EXISTING BUILDING SHALL NOT BE INCONVENIENCED, DUE TO CONTRACTOR'S WORK DEBRIS, ETC.
ENTRANCES AND CORRIDORS SHALL BE PROTECTED AND KEPT FREE OF OBSTRUCTIONS. THE OWNER SHALL BE NOTIFIED IN
ADVANCE OF, TIME DELIVERY OF EQUIPMENT IN ORDER TO AVOID INTERFERENCE WITH THE NORMAL ACTIVITY OF THE BUILDING.
21. UPON COMPLETION OF PROJECT, CONTRACTOR SHALL PROVIDE OWNER WITH WRITTEN CERTIFICATION THAT ALL MATERIALS
USED ON THIS PROJECT ARE ASBESTOS FREE.
22. PROVIDE PROPER SLEEVING AND CAULKING TO ALL NEW WATER PIPING PASSING THROUGH SLAB ON GRADE AND WALLS
23. CONTRACTOR SHALL PROVIDE THE DISTRICT WITH A WRITTEN SCHEDULE OF WORK WHICH IS TO BE COORDINATED AND
APPROVED BY THE DISTRICT PROJECT MANAGER, PRIOR TO THE START OF CONSTRUCTION.
24. CONTRACTOR TO COMPLY WITH ALL APPLICABLE SAFETY LAWS (OSHA, CAL OSHA ETC.).
25. WHEN CONTRACTOR HAS BEEN AWARDED THE CONTRACT, IT IS HIS RESPONSIBILITY TO SECURE THE AREAS SO NO
UNAUTHORIZED PERSONNEL OR STUDENTS GAIN ACCESS TO THE PROJECT AREA OR THE CONTRACTORS STAGING AREA.
26. THE CONTRACTOR SHALL COOPERATE WITH THE DISTRICT TO THE FULLEST EXTENT IN PROVIDING TRAFFIC CONTROL DURING
COURSE OF CONSTRUCTION SO AS TO PROVIDE A MAXIMUM PROTECTION FOR STUDENTS AND DISTRICT PERSONNEL. ALL
EMPLOYEES ON THE PROJECT WORK SHALL PARK THEIR PRIVATE VEHICLES IN THE AREA DESIGNATED BY THE OWNER.
27. THE CONTRACTOR SHALL EXERCISE MAXIMUM DUST AND NOISE CONTROL EFFORTS TO KEEP AT A MINIMUM THE NUISANCE OF
DUST AND CONSTRUCTION NOISE FROM THE CONSTRUCTION.
28. THE DISTRICT SHALL BE NOTIFIED IN ADVANCE OF TIMES OF EQUIPMENT OR MATERIALS DELIVERY IN ORDER TO AVOID
INTERFERENCE WITH THE NORMAL ACTIVITY ON THE SCHOOL PREMISES
29. THE WORK AREA SHALL BE CLEANED DAILY AND ALL CONSTRUCTION DEBRIS SHALL BE DISPOSED OF BY THE CONTRACTOR AT
LEGAL DUMP. AT CONCLUSION OF PROJECT CONTRACTOR SHALL LEAVE WORK AREA AND SITE, BROOM CLEAN AND GENERALLY IN
SAME CONDITION AS PRIOR TO THIS CONSTRUCTION WORK.
30. PROTECT-IN PLACE AND CARE FOR LAWNS SHRUBS, ETC, IN THE CONSTRUCTION AREAS DURING CONSTRUCTION PERIOD.
REPLACE ALL DAMAGED ITEMS AT NO COST TO DISTRICT.
31. AT NO TIME DURING THE WORK UNDER THE CONTRACT SHALL THE CONTRACTOR PLACE, OR CAUSE TO BE PLACED, ANY MATERIAL
OR EQUIPMENT ETC, AT A LOCATION THAT WOULD IMPEDE OR IMPAIR ACCESS TO OR FROM THE PRESENT FACILITIES.
32. IF ASBESTOS/LEAD IS ENCOUNTERED IT SHALL BE IMMEDIATELY REPORTED TO THE DISTRICT. CONTRACTOR SHALL NOT
CONTINUE THEIR WORK WHERE ANY HAZARDOUS MATERIALS ARE ENCOUNTERED DURING CONSTRUCTION. REMOVAL AND
ABATEMENT OF SUCH ENCOUNTERED SHALL BE PROVIDED BY DISTRICT. DISTRICT SHALL PROVIDE SPOT ABATEMENT WHERE
IDENTIFIED BY CONTRACTOR.
33. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROTECTION OF ALL EXISTING STRUCTURES AT THE WORK AREA FROM
WEATHER AND OTHER INCLEMENT CONDITIONS. ANY DAMAGE INCURRED DUE TO FAILURE BY THE CONTRACTOR TO PROPERLY
PROTECT SUCH WORK SHALL BE REPAIRED AT CONTRACTOR'S EXPENSE.
34. THE CONTRACTOR SHALL DISPOSE OF ALL REMOVED AND OR DEMOLISHED MATERIAL, WASTE AND DEBRIS CAUSED BY THE NEW
WORK. THIS MATERIAL SHALL BE REMOVED FROM THE SCHOOL PROPERTY AND TAKEN TO A LEGALLY OPERATED DISPOSAL SITE.
SEE NOTE NO.36.
35. THE SEISMIC ANCHORAGE OF MECHANICAL AND ELECTRICAL EQUIPMENT SHALL CONFORM TO ASCE 7-05 SECTION 13.3.1 AND
TABLE 13.6-1. ANCHORAGE DETAILS FOR ROOF/FLOOR MOUNTED EQUIPMENT SHALL BE SHOWN ON PLANS.
36. ALL BRACING OF DUCTS AND PIPING SHALL BE INSTALLED IN ACCORDANCE WITH SMACNA GUIDELINES AS APPROVED BY DISTRICT.
WHERE BRACING DETAILS ARE NOT SHOWN ON DRAWINGS OR IN THE GUIDELINES, THE FIELD INSTALLATION SHALL BE SUBJECTED
TO THE APPROVAL OF ARCHITECT, STRUCTURAL ENGINEER AND DISTRICT FIELD ENGINEER.
37. A COPY OF OF THE GUIDELINES PUBLISHED BY SMACNA AND APPROVED BY DISTRICT SHALL BE PROVIDED BY CONTRACTOR AND
KEPT ON JOB SITE AT ALL TIMES.
APPLICABLE CODES AS OF JANUARY 1, 2020
TITLE 24 C.C.R., PART1 2019 CALIFORNIA BUILDING STANDARDS ADMINISTRATIVE CODE.
TITLE 24 C.C.R., PART2 2019 CALIFORNIA BUILDING CODE (CBC)
(2018 INTERNATIONAL BUILDING CODE OF THE INTERNATIONAL CODE COUNCIL, WITH CALIFORNIA AMENDMENTS)
TITLE 24 C.C.R., PART3 2019 CALIFORNIA ELECTRICAL CODE (CEC)
(2017 NATIONAL ELECTRICAL CODE OF THE NATIONAL FIRE PROTECTION ASSOCIATION, NFPA)
TITLE 24 C.C.R., PART4 2019 CALIFORNIA MECHANICAL CODE (CMC)
(2018 UNIFORM MECHANICAL CODE OF THE INTERNATIONAL ASSOCIATION OF PLUMBING AND MECHANICAL OFFICIALS, IAPMO)
TITLE 24 C.C.R., PART5 2019 CALIFORNIA PLUMBING CODE (CPC)
(2018 UNIFORM PLUMBING CODE OF THE INTERNATIONAL ASSOCIATION OF PLUMBING AND MECHANICAL OFFICIALS, IAPMO)
TITLE 24 C.C.R., PART6 2019 CALIFORNIA ENERGY CODE
TITLE 24 C.C.R., PART7 (NO LONGER PUBLISHED IN TITLE 24. SEE TITLE 8, CCR)
TITLE 24 C.C.R., PART8 2019 CALIFORNIA HISTORICAL BUILDING CODE
TITLE 24 C.C.R., PART9 2019 CALIFORNIA FIRE CODE (CFC)
(2018 INTERNATIONAL FIRE CODE OF THE INTERNATIONAL CODE COUNCIL)
TITLE 24 C.C.R., PART10 2019 CALIFORNIA EXISTING BUILDING CODE
(2018 INTERNATIONAL EXISTING BUILDING CODE OF THE INTERNATIONAL CODE COUNCIL, WITH AMENDMENTS)
TITLE 24 C.C.R., PART11 2019 CALIFORNIA GREEN BUILDING STANDARDS CODE (CALGREEN CODE)
TITLE 24 C.C.R., PART12 2019 CALIFORNIA REFERENCED STANDARDS CODE
TITLE 19 C.C.R., PUBLIC SAFETY, STATE FIRE MARSHAL REGULATIONS.
2019 CALIFORNIA BUILDING CODE (FOR SFM) REFERENCED STANDARDS CHAPTER 35
NFPA 13 SPRINKLER SYSTEMS 2019 EDITION
NFPA 14 STANDPIPE AND HOSE SYSTEMS 2019 EDITION
NFPA 17 DRY CHEMICAL EXTINGUISHING SYSTEMS 2017 EDITION
NFPA 17A WET CHEMICAL EXTINGUISHING SYSTEMS 2017 EDITION
NFPA 20 STATIONARY PUMPS FOR FIRE PROTECTION 2019 EDITION
NFPA 22 WATER TANKS OF PRIVATE FIRE PROTECTION 2018 EDITION
NFPA 24 PRIVATE FIRE SERVICE MAINS AND THEIR APPURTENANCES 2019 EDITION
NFPA 70 NATIONAL ELECTRICAL CODE 2017 EDITION
NFPA 72 NATIONAL FIRE ALARM AND SIGNALING CODE 2019 EDITION
NFPA 80 FIRE DOORS AND OTHER OPENING PROTECTIVES 2019 EDITION
NFPA 92 SMOKE CONTROL SYSTEMS 2018 EDITION
NFPA 101 LIFE SAFETY CODE 2018 EDITION
NFPA 2001 CLEAN AGENT FIRE EXTINGUISHING SYSTEMS 2018 EDITION
ICC 300 BLEACHERS, FOLDING AND TELESCOPIC SEATING, AND GRAND STANDS 2017 EDITION
UL 300 FIRE TESTING OF FIRE EXTINGUISHING SYSTEMS FOR PROTECTION 2019 EDITION
UL 464 AUDIBLE SIGNALING DEVICES FOR FIRE ALARM AND SIGNALING SYSTEMS 2016 EDITION
UL 521 HEAT DETECTORS FOR FIRE PROTECTIVE SIGNALING SYSTEMS 1999 EDITION
NUMBERED NOTE FOR SHEET WHERE SHOWN
GENERAL SYMBOLS1A
EXISTING CONDITIONS
1. THE INFORMATION ON THESE DRAWINGS WAS OBTAINED FROM THE BEST SOURCES AVAILABLE BUT IT IS NOT TO BE ASSUMED CORRECT IN ALL ASPECTS.
2. THE CONTRACTOR SHALL VERIFY IN THE FIELD All EXISTING CONDITIONS. INFORM THE ARCHITECT AND DISTRICT'S REPRESENTATIVE OF ANY DISCREPANCIES
OR CONFLICTS PRIOR TO COMMENCING WORK. DO NOT PROCEED WITHOUT APPROVAL BY THE DISTRICT'S REPRESENTATIVE, FOR ANY CHANGES, IF REQUIRED.
3. PLEASE BE ADVISED THAT THIS IS AN ALTERATION TO AN EXISTING STRUCTURE AND IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTING
CONDITIONS.
4. CONTRACTOR SHALL VISIT THE SITE PRIOR TO SUBMITTAL OF BID & FAMILIARIZE HIMSELF W/ EXISTING CONDITIONS. SUBMITTAL OF BID SHALL BE ONLY AFTER
THE CONTRACTOR HAS VISITED THE SITE. CONTRACTOR SHALL IDENTIFY ALL DISCREPANCIES FOUND AND INDICATE ON HIS BID THE CORRESPONDING COST
IMPLICATIONS, IF ANY.
1. CONTRACTOR SHALL PROV1DE COMPLETE SEISMIC ANCHORAGE AND BRACING FOR ALL PLUMBING AND REQUIRED PIPING.
2. CONTRACTOR SHALL COMPLY WITH THE SUPPORT AND ANCHORAGE OF HVAC EQUIPMENT AS SHOWN ON DRAWINGS. IF THERE IS
NO ANCHORAGE DETAIL SHOWN ON THE DRAWINGS, SUBMIT SHOPDRAWINGS IF THE FOLLOWING APPLY:
A. THE EQUIPMENT HAS AN OPERATING WEIGHT OVER 40D POUNDS AND IS MOUNTED DIRECTLY ON THE FLOOR OR ROOF.
B. THE EQUIPMENT HAS AN OPERATING WEIGHT OVER 20 POUNDS AND IS SUSPENDED FROM THE ROOF, FLOOR, OR WALL OR IS
SUPPORTED BY SPRING ISOLATION DEVICES.
C. THE CONTRACTOR SHALL SUBMIT THE ANCHORAGE DETAILS AND CALCULATIONS FOR ITEMS NOT SHOWN ON THE DRAWINGS AND
FOR ALL SUBSTITUTED EQUIPMENT THAT IS GREATER IN WEIGHT OR VARIES MORE THAN 10% IN LENGTH.
3. THE CALCULATIONS AND DETAIL SUBMITTALS SHALL BE SEALED AND SIGNED BY A STRUCTURAL ENGINEER REGISTERED IN THE
STATE OF CALIFORNIA. THE CALCULATIONS SHALL DEMONSTRATE THE FOLLOWING:
A. THE ADEQUACY OF ANCHORAGE UNDER ALL APPLICABLE LOAD CONDITIONS PRESCRIBED BY THE UNIFORM BUILDING CODE.
B. THE STRUCTURAL ELEMENTS, WHICH ARE RESISTING THE ANCHORAGE LOADS; SUCH AS CONCRETE FILL ON METAL DECK AND/OR
STEEL BEAMS, ARE NOT STRESSED BEYOND ITS ACCEPTABLE VALUE.
4. FOR ALL VIBRATION ISOLATORS AND THEIR ANCHORAGES, THE CONTRACTOR SHILL PROVIDE CALCULATIONS, DETAILS AND TEST
DATA TO SUBSTANTIATE THE ISOLATOR'S CAPACITY FOR VERTICAL AND LATERAL LOADS. CALCULATIONS MUST ALSO BE
SUBMITTED TO SUBSTANTIATE THE SIZE, QUANTITY, LOCATION AND CONNECTION TO STRUCTURE. THE DRAWINGS MUST BE MADE
CONSISTENT WITH THE CALCULATIONS. THE MANUFACTURER, EQUIPMENT AND STRUCTURAL ATTACHMENT PROCEDURE MUST BE
CLEARLY SPECIFIED. ISOLATORS WHICH SUPPORT A COMPONENT INSIDE THE ACTUAL UNIT WILL NOT BE REVIEWED.
5. WHERE CONCRETE AND MASONRY EXPANSION OR ADHESIVE TYPE ANCHORS ARE USED, THE ANCHORAGE DETAILS AND
CALCULATIONS SHALL INDICATE THE MANUFACTURER, ICBO REPORT NO., TYPE, DIAMETER, MINIMUM EMBEDMENT, CONCRETE
TYPE AND STRENGTH.
6. WHEN INSTALLING DRILLED-IN ANCHORS IN EXISTING NON-PRESTRESSED REINFORCED CONCRETE, USE CARE AND CAUTION TO
AVOID CUTTING DR DAMAGING THE EXISTING REINFORCING BARS. LOCATE REINFORCEMENT BY USING A NON-DESTRUCTIVE
METHOD PRIOR TO INSTILLATION. MAINTAIN A MINIMUM CLEARANCE OF ONE INCH BETWEEN THE R8NFORCEMENT AND THE
DRILILED-IN ANCHOR AND/OR PIN.
7. NO POWER DRIVEN FASTENERS AND/OR SHOT PINS ARE ALLOWED FOR HANGING EQUIPMENT, DUCTWORK AND PIPING SYSTEMS.
8. ALL EXPANSION ANCHORS SHALL HAVE 50% OF THE BOLTS TESTED. IF ANY ANCHOR F~LS TESTING, TEST ALL ANCHORS OF THE~E
CATEGORY NOT PREV10USLY TESTED UNTIL 20 CONSEQUENT PASS, THEN RESUME THE MINIMAL TESTING FREQUENCY. TESTING
SHALL OCCUR 24 HOURS MINIMUM AFTER INSTALLATION OF THE SUBJECT ANCHORS, IN ACCORDANCE WITH IR19-1.
9. FOR ANCHORAGE USE RED HEAD THRU BOLTS ICC ESR-2427 OR HILTI KI'!K BOLT 3 WEDGE ANCHORS ICC ESR-13BS.
10. THE SEISMIC ANCHORAGE OF MECHANICAL EQUIPMENT SHALL CONFORM TO 2019 CBC SECTIONS 1615A.1.21 AND 1616A.1.22.
M0.1 GENERAL NOTES NOTES AND LEGEND
M0.2 MECHANICAL EQUIPMENT SCHEDULES
M1.1 MECHANICAL FLOOR PLANS
M2.1 MECHANICAL ENLARGED PLANS
M2.2 MECHANICAL ROOF PLAN
M3.1 SCHEMATIC DIAGRAMS
M4.1 MECHANICAL DETAILS
M4.2 MECHANICAL DETAILS
LIEBERT
MCL110E1YD
PUMPED REFRIGERANT ECONOMIZER
172172 11.0 1750
CRAC-1
1. COMPLETE W/ FACTORY-FURNISHED DISC. SWITCH, R410A REFRIGERANT, REFRIGERATION CIRCUIT AND HOT GAS MUFFLERS, WATER LEAK DETECTION, FACTORY
INSTALLED DUAL FLOAT CONDENSATE PUMP W/ UNIT ALARM INDICATION AND UNIT SHUT DOWN UP ON HIGH WATER LEVEL RATED 100GPH AT 20 FT. HEAD.
2. PROVIDE INFRARED HUMIDIFIER W/ AUTOMATIC FLUSH CYCLE & 1/4" MAKE UP TUBING, 4" FILTERS, MERV 11 RATING.
3. UNIT-2-UNIT TEAMWORK STANDARD WITH LIEBERT ICOM; PROVIDE ETHERNET CABLE BETWEEN UNITS FOR COMMUNICATION.
4. UNITS SHALL BE INTERLOCKED TOGETHER AND PROGRAMMED TO OPERATE IN DUTY-STANDBY SEQUENCE.
5. PROVIDE COMMUNICATION CABLES AND INTERLOCK WIRING TO CONNECT TO ACC UNITS; DO NOT RUN IN THE SAME RACEWAY/CONDUIT AS HIGH VOLTAGE WIRING.
6. PROVIDE 18" HIGH SEISMIC FLOOR STANDS (CALDYN LW-CH SERIES).
7. PROVIDE SIX REMOTE 2T RACK INLET SENSORS.
11.0 150 175094.7 MERV 1180.4208/3/60
208-3-60 11.4 15 3/4 21 975CRAC-1
208-3-60 3/4 21 975CRAC-2
1. PROVIDE FACTORY-SUPPLIED 60" HIGH SUPPORT LEGS.
2. PROVIDE EQUIPMENT BASE RAILS FOR PITCHED ROOF.
3. EXTEND REFRIGERANT PIPING TO CRAC AND PRE UNITS; LIQUID LINES FROM ACC
RECEIVER OUTLETS SHALL SLOPE (2"/10FT) DOWN TOWARDS PRE.
4. PROVIDE SEPARATE POWER TO ACC UNITS.
5. PROVIDE COMMUNICATION CABLES AND INTERLOCK WIRING TO CONNECT TO PRE AND
CRAC UNITS; DO NOT RUN IN THE SAME RACEWAY/CONDUIT AS HIGH VOLTAGE WIRING.
LIEBERT
ECONOPHASE
PR050AY6SDH
ROOF CRAC-1/ACC-1
CRAC-2 208/3/60
LIEBERT
MCL110E1YD
12.8
11.4 1512.8
208-3-60
LIEBERT
ECONOPHASE
PR050AY6SDH
ROOF CRAC-2/ACC-2 208-3-60
LIEBERT
DSE SERIES
DA050DP1CD
15533 0.75" 3.770.795 61.666.8
70.795
2.28
2.28
105 300
105 300 15533 0.75" 3.7
ROOF
ROOF
DOWNFLOWSERVER
ROOM
DOWNFLOWSERVER
ROOM
240.6
240.6
105
105
21859
21859
2 3/4
2 3/4
R410
R410
1. PROVIDE EQUIPMENT BASE RAILS FOR PITCHED ROOF.
2. EXTEND REFRIGERANT PIPING TO CRAC AND ACC UNITS; LIQUID LINES FROM ACC RECEIVER OUTLET SHALL SLOPE
(2"/10FT) DOWN TOWARDS PRE.
3. PROVIDE SEPARATE POWER TO PRE UNITS.
4. PROVIDE COMMUNICATION CABLES TO CONNECT TO ACC UNITS; DO NOT RUN COMMUNICATION CABLES IN THE SAME
RACEWAY/CONDUIT AS HIGH VOLTAGE WIRING.
15094.780.4INFRARED
INFRARED
FAN SCHEDULE
UNIT TAG SERVICE LOCATION MAKE MODEL NUMBER TYPE CFM
ESP
(IN.
W.C.)RPM HP VOLT/PH/HZ
SPEED
CONTROL
OPERATING
WEIGHT
(LBS.)
MIN. ROOF
OPENING
SOUND
LEVEL
(dBA)
PEF-1 PURGE EXHAUST FAN ROOF LOREN COOK 150 ACSCROOF MOUNTED,
BELT DRIVE2000 0.25 1120 1/2 120/1/60 YES 200 19"x19" 64
1. ROOF MOUNTED, UL LISTED FOR SMOKE CONTROL, FAN SHALL BE PROVIDED WITH ROOF CURBS.
2. PROVIDE "LED" FS SERIES TA-123PP PURGE PANEL CONTROLLER; INTERLOCK W/ FM-200 CONTROL PANEL, PEF-1, DAMPERS MVD-2A, 2B, 3A, 3B; PROVIDE RELAYS, CONTACTORS, SWITCHES AS REQUIRED.
RE
VD
AT
ED
ES
CR
IPT
ION
BY
146
0 E
HO
LT
AV
E,
PO
MO
NA
, C
A 9
1767
80
0 S
. G
AR
EY
AV
EN
UE
PO
MO
NA
, C
AL
IFO
RN
IA 9
1766
07/06/2021
RUNGSUB SU
BA SATYA
20-025
07
/06
/21
BID
SE
T
Exp.03/31/2022No.M 35815
RU
N
GSUB SUMETHA
S
OR
N
M
EC H A N I C
A
L
ME
CH
AN
ICA
L
EQ
UIP
ME
NT
SC
HE
DU
LE
S
M0.2
REMARKS
COMPUTER ROOM AIR CONDITIONING
LIEBERT
DSE SERIES
DA050DP1CD
172172
AIR-COOLED CONDENSER
MERV 11
SUPPLY REGISTER AND CEILING DIFFUSER SCHEDULE
TAG TYPE SERVICE NECK SIZE / CFM NC
S1
24x24
SQUARE
CEILING
DIFFUSER
SUPPLY
SIZE 8 x 8 10 x 10 12 x 12 14 x 14 16 x 16
0.10 20
SQUARE T-BAR CEILING DIFFUSER SHALL BE
KRUEGER MODEL 51240P FRAME 23 (WITH
FOUR REMOVABLE/ADJUSTABLE MODULAR
CORES AND 24x24 PERFORATED FACE) OR
EQUAL; WHITE OR COLOR SHALL MATCH
ADJACENT CEILING; COORDINATE AND FIELD
VERIFY.
CFM 0 - 200 201 - 300 301 - 500 501 - 600 601 - 700
S2
SQUARE
CEILING
DIFFUSER
SUPPLY
SIZE 8 x 8 10 x 10 12 x 12 14 x 14 16 x 16
0.10 20
SQUARE CEILING DIFFUSER SHALL BE
KRUEGER MODEL 51240 FRAME 22 (WITH
FOUR REMOVABLE/ADJUSTABLE MODULAR
CORES) OR EQUAL FOR FULL LID CEILING;
WHITE OR COLOR SHALL MATCH ADJACENT
CEILING; COORDINATE & FIELD VERIFY.CFM 0 - 200 201 - 300 301 - 500 501 - 700 701 - 850
S3 SIDEWALL SUPPLY
SIZE 12 x 6 18 x 6 18 x 10 24 x 10
0.10 20
DOUBLE DEFLECTION SUPPLY REGISTER
SHALL BE KRUEGER MODEL 5880 SERIES (W/
OBD) OR EQUAL; WHITE OR COLOR SHALL
MATCH (E) ADJACENT SURFACE (WALL AND
CEILING) FINISH WHERE APPLICABLE;
COORDINATE & FIELD VERIFY.CFM 0 - 200 201 - 350 351 - 500 501 - 800
R/E/T1
24X24
SQUARE
PERFORATED
CEILING
PANEL
RETURN,
EXHAUST OR
TRANSFER
SIZE 8 x 8 10 x 10 12 x 12 15 x 15 18 x 18
0.10 20
SQUARE PERFORATED RETURN PANEL
SHALL BE KRUEGER 56490 (OR EQUAL) FOR
24X24 T-BAR CEILING APPLICATION; WHITE
OR COLOR SHALL BE MATCH CEILING;
COORDINATE & FIELD VERIFY.CFM 0 - 200 201 - 300 301 - 500 501 - 700 701 - 850
R/E/T2
RECTANGULAR
FIXED
DEFLECTION
GRILLE
RETURN,
EXHAUST OR
TRANSFER
SIZE 10 x 6 18 x 6 24 x 10 24 x 12 24 x 16
0.10 20
RECTANGULAR FIXED DEFLECTION RETURN
GRILLE SHALL BE KRUEGER S580 (OR EQUAL)
FOR WALL OR FULL LID CEILING APPLICATION
WHITE OR COLOR SHALL MATCH CEILING OR
WALL; COORDINATE & FIELD VERIFY.CFM 0 - 170 171 - 320 321 - 700 701 - 900 901 - 1200
R/E/T3
SQUARE
FIXED
DEFLECTION
GRILLE
RETURN,
EXHAUST OR
TRANSFER
SIZE 10 x 10 12 x 12 14 x 14 16 x 16 18 x 18
0.10 20
SQUARE FIXED DEFLECTION RETURN GRILLE
SHALL BE KRUEGER S580 (OR EQUAL) FOR
WALL OR FULL LID CEILING APPLICATION;
WHITE OR COLOR SHALL MATCH ADJACENT
SURFACE (CEILING OR WALL); COORDINATE
& FIELD VERIFY.CFM 151 - 300 301 - 450 451 - 650 651 - 800 801 - 1000
61.666.8
(X)
(X)
(X)
(X)
(X)
(X)
(X)
(X)
(X)
(X)
(X)
(X)
(X)
(X)
(X)
(X)
(X)
(X)
(X)
(X)
(X)
(X)
(X)
(X)
(X)
(X)
(X)
(X)
(X)
(X)
(X)
(X)
(X)
(X)
(X)
(X)
(X)
(X)
(X)
(X)
(X)
(X)
(X)
(X)
(X)
(X)
(X)
(X)
(X)
(X)
(X)
(X)
(X)
(X)
(X)
(X)
(X)
(X)
(X)
(X)
(X)(X)(X)(X)(X)(X)
(X)(X)(X)(X)(X)(X)
(X)(X)(X)(X)(X)(X)
(X)(X)(X)(X)(X)(X)
(X)(X)(X)(X)(X)(X)
(X)(X)(X)(X)(X)(X)
(X)(X)(X)(X)(X)(X)
(X)(X)(X)(X)(X)(X)
(X)(X)(X)(X)(X)(X)
(X)(X)(X)(X)(X)(X)
(X)(X)(X)(X)(X)(X)
(X)
(X)
(X)
(X)
(X)
(X)
(X)
(X)
(X)
(X)
(X)
(X)
(X)
(X)
(X)
(X)
(X)
(X)
(X)
(X)
(X)
(X)
(X)
(X)
(X)
(X)
(X)
(X)
(X)
(X)
(X)
(X)
(X)
(X)
(X)
(X)
(X) (X) (X) (X) (X)
(X) (X) (X) (X) (X)
(X) (X) (X) (X) (X)
(X) (X) (X) (X) (X)
(X) (X) (X) (X) (X)
(X) (X) (X) (X) (X)
(X) (X) (X) (X) (X)
(X) (X) (X) (X) (X)
(X) (X) (X) (X) (X)
(X) (X) (X) (X) (X)
(X) (X) (X) (X) (X)
(X) (X) (X) (X) (X)
(X) (X) (X) (X) (X)
(X) (X) (X) (X) (X)
(X)
(X)
(X) (X) (X) (X) (X) (X)
(X) (X) (X) (X)
(X) (X) (X) (X)
(X) (X) (X) (X)
(X)
(X) (X
)
(X)
(X)
(X)
(X)
(X) (X) (X) (X) (X) (X)
(X)
(X)
(X)
(X)
(X)
(X)
(X)
(X)
(X)
(X)
(X)
(X)
(X)
(X)
(X)
(X)
(X)
(X) (X
)
(E)18"Ø
(E)1
2"Ø
(E)1
6"Ø
(E)10"Ø
(E)10"Ø
(E)1
0"Ø
(E)1
6"Ø
(E)8
"Ø(E
)8"Ø
(E)R600
LOUNGE
STORAGE
STORAGESTORAGE
CONFERENCE
ROOM
CORRIDOR
OFFICE
JAN.
MEN'SRESTROOM
(E)S300
(E)S300
(E)S150
(E)R1100
(E)S275
(E)S275
(E)S275
(E)S275
(E)1
6"Ø
(E)1
2"Ø
(E)10"Ø
(E)10"Ø
(E)2
0"Ø
(E)2
0"Ø
(E)1
8"Ø
(E)1
8"Ø
(E)SFD
(E)SFD(E)S150
(E)S100
(E)R100
(E)R190
(E)S190
(E)R780
(E)S390
(E)S390
(E)S390
(E)S390
(E)R780
(E)1
4"Ø
(E)1
4"Ø
(E)12"Ø
(E)12"Ø
(E)14"Ø
(E)8"Ø
(E)S600
(E)R1200
(E)S600
(E)S400
(E)S400
(E)R800
(E)22"Ø
(E)22"Ø
(E)1
4"Ø
(E)1
6"Ø
(E)1
2"Ø
(E)1
6"Ø
(E)1
2"Ø
(E)1
4"Ø
(E)1
2"Ø
(E)S150
T
(XR)
(E)18"Ø
(E)1
2"Ø
(E)1
6"Ø
(E)10"Ø
(E)10"Ø
(E)1
0"Ø
(E)1
6"Ø
S1300
S1300
S1300
S1300
10"Ø 10"Ø
(E)S200
(E)8
"Ø(E
)8"Ø
R1600
14
"Ø
20
"Ø
20
"Ø
SERVER ROOM
STAGINGAREA
CORRIDOR
OFFICE
JAN.
MEN'SRESTROOM
DATA CENTERSTORAGE
ELECTRICAL
ROOM
(E)1
8"Ø
(E)1
8"Ø
(E)SFD(E)S200
S1450
S1450
(E)R650
(E)1
4"Ø
(E)1
4"Ø
(E)12"Ø
(E)14"Ø
(E)8"Ø
(E)S200
R21200
S2600
R1200
12
"Ø
(E)R650
(E)12"Ø
16
"Ø
8"Ø
(E)14"Ø
S1450
(E)12"Ø
12"Ø
(E)S600
(E)S400
(E)S400
(E)R800
(E)22"Ø
(E)22"Ø
(E)1
4"Ø
(E)1
6"Ø
(E)1
2"Ø
(E)1
4"Ø
(E)1
2"Ø
T
(E)S200
R1600
T
T
RE
VD
AT
ED
ES
CR
IPT
ION
BY
146
0 E
HO
LT
AV
E,
PO
MO
NA
, C
A 9
1767
80
0 S
. G
AR
EY
AV
EN
UE
PO
MO
NA
, C
AL
IFO
RN
IA 9
1766
07/06/2021
RUNGSUB SU
BA SATYA
20-025
07
/06
/21
BID
SE
T
Exp.03/31/2022No.M 35815
RU
N
GSUB SUMETHA
S
OR
N
M
EC H A N I C
A
L
ME
CH
AN
ICA
L
FL
OO
R P
LA
NS
M1.1
GENERAL NOTES
MECHANICAL PLAN
REFERENCE NOTES
MODIFY (E) SUPPLY AND RETURN DUCTS; RAISE BOTTOM OF (E) DUCTS TOACCOMMODATE INSTALLATION OF (N) RETURN DUCTS ABOVE CEILING IN SERVER
ROOM.
REMOVE AND DISPOSE OF (E) DUCTS (HATCHED) TO SHOWN.
PROVIDE (N) SUPPLY AND RETURN RIGID SHEET METAL DUCTS AT HIGHER
ELEVATION TO ACCOMMODATE INSTALLATION OF (N) CEILING; WRAP DUCT IN
FIRE RATED INSULATION 3M FIRE BARRIER DUCT WRAP 615+ ENTIRE LENGTH OFDUCT ABOVE SERVER ROOM CEILING.
INSULATED 1"CD PIPE TO CRAC-1 AND CRAC-2 UNITS W/ 1% SLOPE TOWARDS (E)
MOP SINK.
3/4"ICW TO RPBP IN JAN. ROOM.
CONNECT 3/4"CW TO (E) 2"CW INSIDE JAN. ROOM.
REDUCED-PRESSURE BACKFLOW PREVENTER FEBCO FF825Y, 3/4", W/ Y-STRAINER
AND BALL VALVES; MOUNT AT 6' AFF AND EXTEND DRAIN PIPE TO SPILL OVER (E)
MOP SINK.
REFRIGERANT PIPES UP THRU ROOF.
REFER TO SHEET M2.1 FOR CONTINUATION OF PIPING IN SERVER ROOM.
CONNECT TO (E) SUPPLY AND RETURN DUCTS; PROVIDE DUCT TRANSITION AS
REQUIRED.
TEST, ADJUST AND BALANCE ENTIRE AIR DISTRIBUTION SYSTEM AS REQUIRED TO
ACHIEVE INDICATED CFM.
RELOCATE (E) THERMOSTAT AS INDICATED.
(E) THERMOSTAT TO REMAIN.
DISCONNECT AND RELOCATED EXISTING WALL SUPPLY/RETURN AIR DUCT WITHDIFFUSER TO NEW CEILING SUPPLY/RETURN AIR DIFFUSER. AIR DUCT/DIFFUSER
SIZE SHALL BE MATCHED WITH EXISTING. PATCH & PAINT AS REQUIRED WHEN
NEW WORK IS PERFORMED AT EXISTING WALL/CEILING TO MATCH ADJACENTFINISHES.
1. CONTRACTOR SHALL FIELD VERIFY SIZES/LOCATION OF EXISTING DUCT PRIOR TO
DEMOLITION AND CONSTRUCTION.
2. CONTRACTOR SHALL FIELD VERIFY EXACT LOCATIONS OF PIPE POINT OFCONNECTIONS.
3. COORDINATE SCHEDULE OF UTILITY SHUTDOWN AND AREA CLOSURE WITH
DISTRICT'S REPRESENTATIVE PRIOR TO DEMOLITION AND CONSTRUCTION.4. VERIFY AND COORDINATE WITH DISTRICT'S REPRESENTATIVE AREAS THAT MAY
BE AFFECTED PRIOR TO CUTTING OF ANY PIPES.
5. MECHANICAL CONTRACTOR MUST PERFORM DUCT CLEANING AND REPAIR, SEAL
DUCT LEAKS AND ADDRESS NEW DUCT LINERS, SEE SPECIFICATIONS. ALLEXISTING DUCTS SHALL BE CLEANED.
6. CONTRACTOR SHALL PERFORM TESTING, ADJUSTING AND AIR BALANCING OF ALL
SUPPLY AND EXHAUST REGISTERS WITHIN THE AREA. SUBMIT TAB REPORT TO
DISTRICT'S REPRESENTATIVE FOR APPROVAL.7. ALL NEW DUCTWORK SHALL BE RIGID GALVANIZED STEEL.
8. BOTH CRAC UNITS SHALL SHUT DOWN UPON DETECTION OF DUCT SMOKE
DETECTORS IN SERVER ROOM. DUCT SMOKE DETECTORS SHALL ACTIVATE
SHUNT TRIP BREAKER FOR CRAC UNITS. SMOKE DETECTORS SHALL BEINSTALLED BY MECHANICAL CONTRACTORS AND CONNECTED BY ELECTRICAL
CONTRACTORS.
MECHANICAL DEMOLITION PLAN
1
2
REFER TO SHEET M2.1 FOR DUCT
LAYOUT SERVER ROOM
1
1
2(TYP.)
1
11
3
4
4
5
6
7
RPBP
5
6
8
7
8
9
9
10
9
1010
10
10
11
11
11
11
12
12
13
13
13
14
14
14
DOWN
SL
OP
E
1:1
2
COLD AISLE
SERVER ROOM
COLD AISLE
RS
DATA CENTER
STORAGE
BA
TT
ER
YC
AB
INE
T
UP
S
BY
PA
SS
1
RS
2
RS
2
RS
1
RS
1
RS
2
RS
1
RS
2
RS
1
RS
2
FUTURE
CRAC
60
"x18"
72
"x12"
48"x20"
SERVER ROOM
DATA CENTER
STORAGE
RE
VD
AT
ED
ES
CR
IPT
ION
BY
146
0 E
HO
LT
AV
E,
PO
MO
NA
, C
A 9
1767
80
0 S
. G
AR
EY
AV
EN
UE
PO
MO
NA
, C
AL
IFO
RN
IA 9
1766
07/06/2021
RUNGSUB SU
BA SATYA
20-025
07
/06
/21
BID
SE
T
Exp.03/31/2022No.M 35815
RU
N
GSUB SUMETHA
S
OR
N
M
EC H A N I C
A
L
ME
CH
AN
ICA
L
EN
LA
RG
ED
PLA
NS
M2.1
GENERAL NOTES
MECHANICAL RAISED-FLOOR ENLARGED PLAN
REFERENCE NOTES
1. CONTRACTOR SHALL FIELD VERIFY SIZES/LOCATION OF EXISTING DUCT PRIOR TODEMOLITION AND CONSTRUCTION.
2. CONTRACTOR SHALL FIELD VERIFY EXACT LOCATIONS OF PIPE POINT OF
CONNECTIONS.
3. COORDINATE SCHEDULE OF UTILITY SHUTDOWN AND AREA CLOSURE WITHDISTRICT'S REPRESENTATIVE PRIOR TO DEMOLITION AND CONSTRUCTION.
4. VERIFY AND COORDINATE WITH DISTRICT'S REPRESENTATIVE AREAS THAT MAY
BE AFFECTED PRIOR TO CUTTING OF ANY PIPES.
5. MECHANICAL CONTRACTOR MUST PERFORM DUCT CLEANING AND REPAIR, SEALDUCT LEAKS AND ADDRESS NEW DUCT LINERS, SEE SPECIFICATIONS. ALL
EXISTING DUCTS SHALL BE CLEANED.
6. CONTRACTOR SHALL PERFORM TESTING, ADJUSTING AND AIR BALANCING OF ALL
SUPPLY AND EXHAUST REGISTERS WITHIN THE AREA. SUBMIT TAB REPORT TODISTRICT'S REPRESENTATIVE FOR APPROVAL.
7. ALL NEW DUCTWORK SHALL BE RIGID GALVANIZED STEEL.
8. BOTH CRAC UNITS SHALL SHUT DOWN UPON DETECTION OF DUCT SMOKE
DETECTORS IN SERVER ROOM. DUCT SMOKE DETECTORS SHALL ACTIVATESHUNT TRIP BREAKER FOR CRAC UNITS. SMOKE DETECTORS SHALL BE
INSTALLED BY MECHANICAL CONTRACTORS AND CONNECTED BY ELECTRICAL
CONTRACTORS.
9. LOCATIONS OF SERVER RACKS, UPS, ELEC PANELS. BATTERY, ETC. ARE FORREFERENCE ONLY; REFER TO ARCH AND ELEC DRAWINGS FOR EXACT
LOCATIONS.
MECHANICAL CEILING LEVEL ENLARGED PLAN
PROVIDE AND INSTALL NEW COMPUTER ROOM AIR CONDITIONING UNITS
(CRAC-1) AND CRAC-2) WITH ALL RELATED PIPING, FITTINGS, ACCESSORIES
AND VIBRATION ISOLATION STAND COMPLETE PER SCHEDULE AND DETAILS.
ZONE LEAK DETECTION SENSOR WITH CABLE "LIEBERT" LIQUI-TECT LT460;
FIELD VERIFY EXACT ROUTING.
FM200 CONTROL PANEL; INTERLOCK PANEL W/ CRAC-1 AND CRAC-2 FOR
SHUTDOWN AND WITH PURGE FAN CONTROL PANEL TO ENABLE FAN PEF-1.
HOT AISLE CONTAINMENT DUAL SLIDING DOOR; VERIFY EXACT LOCATION INTHE FIELD.
FUTURE LOCATION OF HOT AISLE CONTAINMENT SLIDING DOOR.
SEAL ALL PERIMETER WALLS AND FLOOR UNDER RAISED FLOOR.
RAISED FLOOR SUPPLY PERFORATED PANELS W/ VOLUME DAMPER SET AT290 CFM.
ABOVE RACK HOT AISLE CONTAINMENT PANELS FOR REFERENCE ONLY;VERIFY EXACT LAYOUT IN THE FIELD.
FULL SIZE RETURN DUCT DOWN THRU CEILING AND CONNECT TO CRACUNITS W/ FLEX CONNECTORS.
18"x18" OUTSIDE AIR DUCT UP THRU ROOF CURB W/ INTAKE HOOD;
TRANSITION TO 20"x20" TO CONNECT TO TWO 16"Ø BRANCH DUCTS.
FUTURE CRAC UNIT.
PROVIDE (10) 2T RACK INLET SENSORS AND RUN CONTROL WIRING TO CRAC
UNITS; CONNECT "1" SENSORS TO CRAC-1 UNIT AND "2" SENSORS TOCRAC-2 UNIT.
3/4"ICW PIPE FOR HUMIDIFIER TO REDUCED-PRESSURE BACKFLOWPREVENTER IN JANITOR'S CLOSET; SEE SHT. M1.1 FOR CONTINUATION.
INSULATED 1"CD PIPE FROM CRAC UNIT W/ 1% SLOPE TOWARDS (E) MOPSINK IN JANITOR'S CLOSET; SEE SHT. M1.1 FOR CONTINUATION.
18"x18" EXHAUST AIR DUCT UP THRU ROOF CURB TO PEF-1 ON ROOF;
TRANSITION TO 20"x20" TO CONNECT TO TWO 16"Ø BRANCH DUCTS.
OUTSIDE AIR NORMALLY CLOSED ULTRA LOW LEAK MOTORIZED DAMPER;DAMPER TO OPEN WHENEVER CRAC-1 OR CRAC-2 IS IN OPERATION;
DAMPER TO CLOSE UPON LOSS OF POWER OR SHUTDOWN OF CRAC-1
AND/OR CRAC-2 UNITS.
EXHAUST AIR NORMALLY CLOSED ULTRA LOW LEAK MOTORIZED DAMPERS;
DAMPERS TO OPEN UPON ACTIVATION OF PURGE EXHAUST FAN PEF-1.
MAKE-UP AIR NORMALLY CLOSED ULTRA LOW LEAK MOTORIZED DAMPERS;
DAMPERS TO OPEN UPON ACTIVATION OF PURGE EXHAUST FAN PEF-1.
PURGE FAN CONTROL PANEL.
INSULATED REFRIGERANT PIPING BETWEEN CRAC, ACC AND PRE UNITS;
COORDINATE AND VERIFY EXACT ROUTING IN THE FIELD.
REF. PIPES, ICW AND CD PIPES DOWN TO CRAC UNITS; PROVIDE BALL
VALVES ON ICW PIPES TO HUMIDIFIER CONNECTIONS.
ROUTE ICW PIPE AWAY FROM RACKS.
RETURN GRILLE KRUEGER ECG10, 22"x22", T-BAR CEILING FRAME, SET AT1740 CFM EACH; EXTEND 20" DUCT UP TO RETURN PLENUM/DUCT ABOVE.
MAKE-UP AIR GRILLE KRUEGER ECG10, 22"x22", T-BAR CEILING FRAME, 1000
CFM; EXTEND INSULATED 16" DUCT UP TO MAKE-UP AIR DUCT ABOVE.
16"Ø MAKE-UP AIR DUCT OPENING INTO THE ATTIC.
EXHAUST GRILLE KRUEGER ECG10, 22"x22", T-BAR CEILING FRAME, 1000
CFM; EXTEND INSULATED 16" DUCT UP TO EXHAUST DUCT ABOVE.
16"Ø EXHAUST DUCT OPENING INTO THE ATTIC.
INSULATE 3/4"CD PIPE ABOVE CEILING AND SLOPE 1% TOWARDS MOP SINK.
1
2
3
4
5
6
7
1
1
4
6
6
6
7
8
8
5
9
9
9
7
10
11
12
11
(TYP.)
(TYP.)
REFER TO SHEET M1.1 FOR DUCT
LAYOUT IN THIS ROOM
REFER TO SHEET M1.1 FOR DUCT
LAYOUT IN THIS ROOM
13
14
14 13
10
16"Ø
16"Ø
12"Ø
16
"Ø
16
"Ø
MVD-1
MVD-2A
MVD-3A
MVD-2B
MVD-3B
15
15
16
17
18
19
20
18
17
16
18
17
12 (TYP.)
3
19
2
2
2
2
3/4"CD
3/4"ICW
3/4"ICW
1"CD
3/4"CD
3/4"ICW
20
20
20
21
21
21
22
22
2323 (TYP)
24
24
26
25
26
27
25
27
27
27
(E)
18"x16"
(E)
18"x16"
(E)
HVAC [126A]
(E)
18"x16"
(E)
18"x16"
(E)
HVAC [126B]
(E)
18"x16"
(E)
18"x16"
(E)
HVAC [124A]
(E)
18"x16"
(E)
18"x16"
(E)
HVAC [124B]
(E)
HVAC
(E)
HVAC
SLOPE
DOWN
SLOPE
DOWN
FUTURE
ACC-3
FUTURE
PRE-3
RE
VD
AT
ED
ES
CR
IPT
ION
BY
146
0 E
HO
LT
AV
E,
PO
MO
NA
, C
A 9
1767
80
0 S
. G
AR
EY
AV
EN
UE
PO
MO
NA
, C
AL
IFO
RN
IA 9
1766
07/06/2021
RUNGSUB SU
BA SATYA
20-025
07
/06
/21
BID
SE
T
Exp.03/31/2022No.M 35815
RU
N
GSUB SUMETHA
S
OR
N
M
EC H A N I C
A
L
ME
CH
AN
ICA
L
RO
OF
PL
AN
M2.2
GENERAL NOTES
MECHANICAL ROOF PLAN
REFERENCE NOTES
OUTSIDE AIR INTAKE HOOD LOREN COOK 24TR W/ RCG SLOPED ROOF CURB.
(E) ROOFTOP AC UNIT HP-4 TO REMAIN; ADJUST DAMPER AND FAN/MOTOR/BELT
SPEED AS REQUIRED TO ACHIEVE CFM INDICATED ON SHEET M2.1 - SUPPLY 1600
CFM, RETURN 1200 CFM, OUTSIDE AIR 400 CFM; TEST, ADJUST AND BALANCE AS
REQUIRED TO ACHIEVE INDICATED CFM.
PROVIDE PITCHED BASE RAILS (CANTED) FOR BOTH AIR-COOLED CONDENSERS
(ACC) AND PUMP REFRIGERANT ECONOMIZER (PRE); REFER TO DETAIL #4/M4.1.
ANCHOR ACC AND PRE TO BASE RAILS.
EXTEND REFRIGERANT PIPES BETWEEN ACC, PRE AND CRAC UNITS AS REQUIRED;
RUN PIPES AND CONDUITS THRU ROOF CURB.
REFRIGERANT PIPES DOWN THROUGH 12"x12" SHEET METAL ROOF JACK ON
CURB; REFER TO DETAIL #5/M4.1.
MAINTAIN EQUIPMENT SERVICE ACCESS PER MFR REQUIREMENTS.
ROOFTOP AC UNIT HP-2 TO REMAIN; ADJUST DAMPER AND FAN/MOTOR/BELT
SPEED AS REQUIRED TO ACHIEVE CFM INDICATED ON SHEET M2.1 - SUPPLY 1750
CFM, RETURN 1500 CFM, OUTSIDE AIR 250 CFM; TEST, ADJUST AND BALANCE AS
REQUIRED TO ACHIEVE INDICATED CFM.
INSULATE AND WRAP WITH ALUMINUM JACKET ENTIRE REFRIGERANT PIPES ON
ROOF.
1. PROVIDE ALL ROOF PENETRATIONS REQUIRED FOR MECHANICAL, PLUMBING AND
ELECTRICAL SCOPE OF WORK. PROVIDE EQUIPMENT CURBS, FLASHING, & SEAL
OFF'S REQUIRED FOR INSTALLED EQUIPMENT. ALL ROOF
REPAIR/REPLACEMENT/PATCHING WILL BE PROVIDED BY DISTRICT UNDER
SEPARATE CONTRACT. COORDINATE WITH DISTRICT & ROOFING CONTRACTOR.
(TYP.)
1
2
3
4
5
6
7
3
6
4 5
4 5
2
8
3
3
7
3
6
1
HP-2
HP-4
HP-3
HP-5
8
9
9
9
AIRFLOW SCHEMATIC DIAGRAMS
RE
VD
AT
ED
ES
CR
IPT
ION
BY
146
0 E
HO
LT
AV
E,
PO
MO
NA
, C
A 9
1767
80
0 S
. G
AR
EY
AV
EN
UE
PO
MO
NA
, C
AL
IFO
RN
IA 9
1766
07/06/2021
RUNGSUB SU
BA SATYA
20-025
07
/06
/21
BID
SE
T
Exp.03/31/2022No.M 35815
RU
N
GSUB SUMETHA
S
OR
N
M
EC H A N I C
A
L
SC
HE
MA
TIC
DIA
GR
AM
S
M3.1
REFRIGERANT PIPING DIAGRAM
RACKSRACKS HOT
AISLE
COLD
AISLE
COLD
AISLE
SUPPLY AIR PLENUM
RAISED FLOOR
CEILING
RETURN
AIR
RETURN AIRRETURN AIR
OUTSIDE AIR
MVD-2B
(CLOSED)
MVD-3B
(CLOSED)
MVD-1
(OPEN)
MVD-2A
(CLOSED)
MVD-3A
(CLOSED)
PURGE FAN
(OFF)
GRAVITY
VENT
RACKSRACKS HOT
AISLE
COLD
AISLE
COLD
AISLE
SUPPLY AIR PLENUM
RAISED FLOOR
CEILING
MAKE-UP
AIR
EXHAUST
AIR
EXHAUST
AIR
MAKE-UP
AIR
RETURN AIRRETURN AIR
OUTSIDE AIR
MVD-2B
(OPEN)
MVD-3B
(OPEN)
MVD-1
(CLOSED)
MVD-2A
(OPEN)
MVD-3A
(OPEN)
GRAVITY
VENT
NORMAL MODEEMERGENCY PURGE MODE
PURGE FAN
(ON)
ROOFROOF
ROOF
FLOOR
NOTES:
1. THE OUTLET OF THE RECEIVER MUST BE HIGHER THAN THE ELEVATION
OF THE EEV INSIDE THE CRAC UNIT; THE VERTICAL HEIGHT MUST NOT
EXCEED 60 FT; VERIFY EXACT HEIGHT OF EEV IN THE FIELD.
2. FOR PROPER PUMP FUNCTION, A MINIMUM ELEVATION DIFFERENCE OF 60
IN. MUST BE MAINTAINED BETWEEN THE BOTTOM OF CONDENSER COIL
TO THE BOTTOM OF PRE UNIT.
3. THE MAXIMUM EQUIVALENT PIPING BETWEEN ACC AND PRE UNIT IS 25 FT;
PRE UNIT MUST BE MOUNTED OUTDOOR FOR PROPER OPERATION.
4. UNIT MUST BE TRAPPED AT THE BOTTOM OF RISER WITH ANY RISE OVER
5 FT HIGH; IF RISE EXCEEDS 25 FT, THEN A TRAP IS REQUIRED IN 20 FT
INCREMENTS OR EVENLY DIVIDED.
5. PITCH HORIZONTAL HOT GAS PIPING AT A MINIMUM OF 1/2" PER 10 FT SO
THAT GRAVITY WILL AID IN MOVING OIL IN THE DIRECTION OF
REFRIGERANT FLOW.
6. UNIT PIPING ENTRANCE VARIES BY UNIT AND MAY BE THROUGH THE TOP
OF THE UNIT.
7. ALL INDOOR AND OUTDOOR FIELD REFRIGERANT PIPING MUST BE
INSULATED, 1" MINIMUM; ALL OUTDOOR INSULATION MUST BE UV AND
OZONE RESISTANT; ALL OUTDOOR PIPING MUST BE WRAPPED W/
ALUMINUM JACKET.
8. LIQUID LINE FROM RECEIVER TO PRE UNIT 1-3/8" MINIMUM; DO NOT TRAP
THIS LINE; SLOPE 2" PER 10 FT DOWN TOWARDS PRE UNIT.
9. CONSULT FACTORY FOR ANY EXCEPTIONS TO THE ABOVE GUIDELINES.
10. REFER TO MANUFACTURER'S INSTRUCTION FOR PROPER PIPING
INSTALLATION.
RECEIVER
4
4
3
60" LEG STAND
8
HOT GAS
DISCHARGE LINE,
1-3/8"
LIQUID LINE, 1-1/8"
CRAC UNIT SEISMIC FLOOR STANDTYPICAL EQUIPMENT BASE RAIL
ROOF INTAKE HOOD ON CURB
PURGE FAN CONTROL WIRING DIAGRAM
CONDENSATE DRAIN TRAP
-
-
-
RE
VD
AT
ED
ES
CR
IPT
ION
BY
146
0 E
HO
LT
AV
E,
PO
MO
NA
, C
A 9
1767
80
0 S
. G
AR
EY
AV
EN
UE
PO
MO
NA
, C
AL
IFO
RN
IA 9
1766
07/06/2021
RUNGSUB SU
BA SATYA
20-025
07
/06
/21
BID
SE
T
Exp.03/31/2022No.M 35815
RU
N
GSUB SUMETHA
S
OR
N
M
EC H A N I C
A
L
ME
CH
AN
ICA
L
DE
TA
ILS
M4.1
NOTE:
1. CRAC UNIT FLOOR STAND SHALL BE CALDYN LWSERIES SEISMIC FLOOR STAND W/ RETAINING CLIPS
AND TURNING VANES. HEIGHT SHALL BE FOR 18"
RAISED FLOOR INSTALLATION.
2. CRAC-1/2: STAND HEIGHT 18" (RAISED FLOOR)3. STANDS SHALL MATCH UNIT WIDTH AND DEPTH.
FULLY WELDED PITCHED SEISMIC
EQUIPMENT BASE RAIL (INTERNALLY
REINFORCED) W/ WELDED NAILERBRACKET
CHEMICALLY TREATED WOOD NAILER
SHEET METAL CAP/FLASHING
ANCHOR TO ROOF PER STRUCTURALDRAWINGS
SUPPORTS/BLOCKINGS PER
STRUCTURAL DRAWINGS
ROOF SHEATING/STRUCTURE
ROOF MEMBRANE
EXTEND ROOF MEMBRANE TO TOP OF
BASE RAIL
PIPE ROOF JACK ON CURB
FILL ALL GAPS ANDVOIDS W/
POLYURETHANE FOAM
SEALANT
SHT METAL SCREW W/ EPDM
WASHER AT 6" O.C.
SHT METAL REMOVABLE
TOP COVER, TOP
CROSSBREAK OR SLOPEFOR DRAINAGE
SHT METAL REMOVABLE
TOP COVER,CROSSBREAK OR SLOPE
THE TOP
SEE STRUCTURAL DWGS
FOR BLOCKING (TYP.)
SHT METAL SCREW W/ EPDM
WASHER AT 6" O.C.
INSULATED
REFRIGERANT PIPES
CANTED ROOF CURB
SHT METAL ROOF JACK
W/ REMOVABLE TOP
COVER
ROOF
SHEATING/STRUCTURE
CRAC/ACC/PRE CONTROL WIRING
ACC-1PRE-1
CRAC-1
ACC-2 PRE-2
CRAC-2
B B
A
CBCB
ROOF
A ETHERNET CABLE UNIT-TO-UNIT NETWORK COMMUNICATION
CANBUS COMM CABLE
HEAT REJECTION INTERLOCK WIRING
ETHERNET CABLE TO SNMP
POWER SUPPLY 208V/3P
2T RACK TEMPERATURE SENSORS
UNIT SHUTDOWN TO FM200 CONTROL PANEL/FIRE ALARM
LEAK-DETECTION SYSTEM LT460
OUTSIDE AIR DAMPER (NORMALLY CLOSED)
B
C
E E E E
D
E
NOTES:1. FOLLOW MANUFACTURER'S INSTALLATION INSTRUCTION FOR TYPE OF WIRING AND PROPER CONNECTIONS.
2. DO NOT RUN CONTROL AND COMMUNICATION WIRING IN THE SAME RACEWAY/CONDUITS AS HIGH VOLTAGE
WIRING.3. REFER TO ELECTRICAL DRAWINGS FOR POWER WIRING REQUIREMENTS.
4. PROVIDE RELAYS, SWITCHES, CONTACTORS, TRANSFORMERS, ETC. AS REQUIRED.
D
E
D
E
EXTEND ROOF MEMBRANETO TOP OF CURB
F
F
F F F FF F F F F
G
G
G
NOTE: ROOF MEMBRANE INSTALLATION SHALL BE DONE
UNDER RE-ROOFING PROJECT BY THE DISTRICT.COORDINATE EXACT REQUIREMENT WITH THE DISTRICT.
NOTE: ROOF MEMBRANE INSTALLATION SHALL BE DONE
UNDER RE-ROOFING PROJECT BY THE DISTRICT.COORDINATE EXACT REQUIREMENT WITH THE DISTRICT.
NOTE: ROOF MEMBRANE INSTALLATION SHALL BE DONE
UNDER RE-ROOFING PROJECT BY THE DISTRICT.
COORDINATE EXACT REQUIREMENT WITH THE DISTRICT.
H
H
H
PURGE FANCONTROLLER
(LED FS SERIES
TA-123PP)
PURGE FANPEF-1
FM-200
CONTROLPANEL
I
I
GRAVITY VENT
GV-1
OSA DUCT
ROOF
CEILING
MVD-1
EXHAUST/PURGEAIR
MAKE-UPAIR
EXHAIR
MAKE-UPAIRMVD-2A
MVD-3A
MVD-3B
MVD-2B
POWER120V
120V/1P
NOTES:
1. FOLLOW MANUFACTURER'S INSTALLATION INSTRUCTION FOR TYPE OF WIRING AND PROPER CONNECTIONS.2. DO NOT RUN CONTROL AND COMMUNICATION WIRING IN THE SAME RACEWAY/CONDUITS AS LINE VOLTAGE
WIRING.
3. REFER TO ELECTRICAL DRAWINGS FOR POWER WIRING REQUIREMENTS.
4. PROVIDE RELAYS, SWITCHES, CONTACTORS, TRANSFORMERS, ETC. AS REQUIRED.5. ACTUATORS FOR DAMPERS SHALL BE BELIMO FAIL-SAFE, SPRING RETURN, NORMALLY CLOSED W/ AUX
SWITCH.
A 24VDC POWER FROM FM-200 CONTROL PANEL
24VDC TRIGGER CONTACT
24VDC OUTPUT TO REMOTE RELAYS (FAN AND DAMPERS)
B
C
A
B
C
120V
CRAC-1 & CRAC-2
SIMPSON WEDGE ANCHOR
3/8" Ø x 2.875" EMBED
INTO EXISTING CONCRETESLAB ON GRADE.
ICC ES ESR 3037, INSPECTION REQ'D
(TOTAL 12 ANCHORS)
18"
CRAC WITH 18"H FLOOR STAND77"W x 76"H x 35"D
Weight: 1750lbs (Operating Weight)
35"
76"
77"
ACC ROOF MOUNTED ON EQPT BASE RAIL
55-1/2"W x 110-1/2"L x 73-5/8" (13-5/8"+Leg height 60")"H
Weight: 975lbs (Operating Weight)
AIR-COOLED CONDENSER
60" HIGH UNIT LEG
BY MANUFACTURER
(TYP.)
ANCHOR TO BASE RAIL
12 TOTAL, 2 PER LEG
NEOPRENE PAD
(N) 3/4" PLYWOOD T&G
W/10d @ 6",12"
(N) 22GA
METAL SHEET COVER
(N) PITCHED BASE RAIL,
ANCHORE TO ROOF WITH
(N) 3/8" Ø x 4" LONG LAG
SCREW @ 12" O.C. GALV
(N) (2) 4"x6" DOUGLAS FIR
LARCH #1 (TOTAL 4) AND
#2 2"x6" JOIST @ 16" O.C.6" MIN
(N) 2"SILL PL
PRESSURE TREATED
BEYOND
(N) 4"x12" BLOCKING AT
BASE RAIL WITH
SIMPSON "U" HANGER
(E) 2" x12" ROOF
RAFTER @ 18" O.C.
(N) 2"x4" STUDS @ 16" O.C.
WALL HT VARIES
MIN 6" ABOVE (E) ROOF
13.625"
60.0"
6"MIN
110.5"
(N) 30d @ 6" O.C.
TO (N) 4"x BLOCKING
AND AT (E) 2"x12" ROOF
RAFTER
PRE ROOF MOUNTED ON EQPT BASE RAIL
36 3/16"W x 40 1/8"H x 42 1/8"D
Weight: 325lbs (Operating Weight)
18 GA SIMPSON A35
FRAMING ANGLE @16"O.C.
PUMP REFRIGERANT
ECONOMIZER (PRE)
40.125"
6"MIN
42.125"
ATTACH UNIT TO UNISTRUT/
CHANNEL AT 4 LOCATIONS
WITH 1/2" Ø THRU BOLT. GALV
NEOPRENE PAD
(N) 3/4" PLYWOOD T&G
W/10 d @ 6",12"
L ANCHOR TO BASE RAIL
PITCHED BASE RAIL,
BY MANUFACTURER
18 GA SIMPSON A35
FRAMING ANGLE @16"O.C.
(N) (2) 4"x6" DOUGLASS FIR
LARCH #1 AT EACH PITCH
BASE RAIL (TOTAL 4) AND
#2 2"x6" JOIST @ 16" O.C.6" MIN
(E)ROOF LINE
(N) 30d @ 6" O.C.
TO (N) 4"x BLOCKING
AND AT (E) 2"x12" ROOF
RAFTER(E) 2" x12" ROOF
RAFTER @ 18" O.C.
(N) 4"x12" BLOCKING AT
BASE RAIL WITH
SIMPSON "U" HANGER
(E)ROOF LINE
(N)1/2" PLYWOOD CDX
W/8d @ 6", 12"
ALL AROUND RAISE UP
WOOD PLATFORM
(N) 22GA
METAL SHEET COVER
(N) 2"x4" STUDS @ 16" O.C.
WALL HT VARIES
MIN 6" ABOVE (E) ROOF
(N)1/2" PLYWOOD CDX
W/8d @ 6", 12"
ALL AROUND RAISE UP
WOOD PLATFORM
(N) 2"SILL PL
PRESSURE TREATED
BEYOND
(N) PITCHED BASE RAIL TO 4x6 BM,
ANCHOR TO ROOF WITH
(N) 3/8" Ø x 4" LONG LAG SCREW
@ 12" O.C. GALV
UNISTRUT P1283
WITH 1/2" Ø THRU BOLT. GALV
1/2" Ø x 4" LONG LAG SCREW GALV
(N) SHEET METAL
FLASHING
(N) SHEET METAL FLASHING
CEILING DIFFUSER INSTALLATION
RECTANGULAR DUCT SUPPORT
ROUND DUCT SUPPORT
RECTANGULAR BRANCHDUCT
REC-TO-ROUND BRANCHDUCT
ROUND DUCT CONICAL CONNECTIONROUND DAMPER LARGER THAN 14"Ø
ROUND DAMPER UP TO 14"Ø
ROUND DUCT LATERAL TAP
-
-
DUCT OBSTRUCTION OFFSET
RE
VD
AT
ED
ES
CR
IPT
ION
BY
146
0 E
HO
LT
AV
E,
PO
MO
NA
, C
A 9
1767
80
0 S
. G
AR
EY
AV
EN
UE
PO
MO
NA
, C
AL
IFO
RN
IA 9
1766
07/06/2021
RUNGSUB SU
BA SATYA
20-025
07
/06
/21
BID
SE
T
Exp.03/31/2022No.M 35815
RU
N
GSUB SUMETHA
S
OR
N
M
EC H A N I C
A
L
ME
CH
AN
ICA
L
DE
TA
ILS
M4.2
A A