  • 7/30/2019 Gencor Stp Renovation

    1/3

    25.11.2012

    ABOUT SEWAGE TREATMENT PLANT

    REPAIR AND RENOVATION PROGRAMME:

    OBJECTIVE

    Purpose of the report is, justifying our proposal about existing sewage plant Overhauling, repair and

    renovation

    AIM

    The ultimate goal of this program is

    Renovate the STP and also establish a system for reuse the treated water.

    Ensure the legal compliance of TNPCB Ensure cost effective solution, easy to operate and reduce the O & M Cost.

    KEY DIAGRAM :

    As per general waste water engineering practics ,waste water treatment

    facility(Biological,Aerobic) shoud be design as per below

    BACKGROUND

    M/s. Gencor Auto Engg. Pvt.Ltd, Thirumudivakkam, Chennai-600 044 produced per day maximum

    10 KL domestic waste water from their domestic activity.

    Present system not suitable for treatment of domestic waste water.

    Not able to comply the TNPCB requirements

    OBSERVATION

    The time of our site visit, we are found and observe the following matters.

    COLLECTIONTANK

    (SEPTIC TANK)

    EQUALISATIONTANK

    AERATION TANK SETTLING TANKCLARIFIED

    WATER

    STORAGE

    SAND FILTER CARBON FILTER

    Sludge

    drying bed

  • 7/30/2019 Gencor Stp Renovation

    2/3

    EXCISTING PLANT LAYOUT

    OBSERVATION-ABOUT PRESENT SYSTEM

    COLLECTIONTANK

    AERATIONTANK

    SETTLINGTANK

    CLARIFIED

    WATERSTORAGE

    SAND FILTER

    PARAMETERS PRESENT CONDITION ACTUALY REQUIRED

    Capacity 10 KLD 10 KLD

    Treatment Type Activated sludge process without

    attached growth media

    Activated sludge process with

    attached growth media

    Collection Tank(septic Tank) Available. Capacity Data not available 2X of per day flow capacity

    Equalisation tank Not available Required .Process Requirement.

    Aeration Tank Available Aeration tank with attached

    growth media +suitable fine bubble

    membrane diffuser

    Air blower Available. But not in working condition

    (time of observation). Air volume is not

    sufficient. Air blower requires service

    or replacement

    70 m3 @ 0.5 kg/cm2 pressure

    Attached growth media Not provided 3M3

    BIO PACK MEDIA REQIRED

    Settling tank-Dosing system There is no provision observed. Flocculent chemical dosing &

    chlorine dosing system required.

    DISINFICATION SYSTEM NOT PROVIDED Required. legal compliance

    Pressure sand filter Available. But in damage condition

    Activated carbon filter Not provided Must be provided.

    Sludge Drying bed Available .Media, required piping

    system not found.

    Must be required piping system,

    media provided.

    Piping and plumping Modified. Time of renovation

    Sewage pumps conditions Not verified If any difficulty found should be

    repaired or rectified or replaced.

    Sludge

    drying bed

  • 7/30/2019 Gencor Stp Renovation

    3/3

    REASONS:

    Aeration system - blowers are not in working conditions. Present air capacity is not sufficient. High BOD inflow to the Aeration tank lankness of equalization facility Sedimentation activity is not proper and not provided flocculent chemical dosing system in the

    installed systems.

    Aeration efficiency is very poor and biological activity not happened due to, not installed attachedgrowth media.

    PROPOSED TREATMENT STRATEGY:The proposed sewage treatment plant renovation program is designed for utilizing maximum

    available facility and improve the treatment quality of the waste water( capacity of 10 KLD) through

    the installation of Aeration recirculation pump, provide PVC bio pack media with chemical

    coagulation system and improved Aeration system.

    RECOMMENDATIONS

    Improve the Aeration Efficiency Repaired or replace the excising blower and installed Aerationrecirculation pump and sufficient diffusers for nutrient removal (BOD).

    Biological activity should be developed. - inoculate beneficial bacteriaProvide attached growth install Bio pack media of 3M3

    Provide right chemical dosing with the help of dosing pumps Provide sludge recirculation system for BIOMASS (MLSS) development.

    ACTION PLAN ABSTRACT

    DESCRIPTION RECOMMENDATIONIMPLEMENTATION

    ACTIVITY .

    Attach growth media Install Bio pack media YESBeneficial bacteria Inoculate beneficial bacteria YESImprove dosing system by proper selection

    of chemicals & dosages

    Install dosing pumps YES

    IMPROVEMENT OF Aeration tank Provide Attached growth media in the aeration

    tank for good mineralization + recirculation pump YES

    Filtration system Provide MS fabricated filtration system for achieve

    treated water quality for legal compliance

    O&M COST PER MONTH

    Expected consumable cost per month Rs.2000/- without man power and power.

    CONCLUSION:

    The proposed scheme is help to produce the reclamation water and conforming to thestandards stipulated by pollution control board.