gencor stp renovation
TRANSCRIPT
-
7/30/2019 Gencor Stp Renovation
1/3
25.11.2012
ABOUT SEWAGE TREATMENT PLANT
REPAIR AND RENOVATION PROGRAMME:
OBJECTIVE
Purpose of the report is, justifying our proposal about existing sewage plant Overhauling, repair and
renovation
AIM
The ultimate goal of this program is
Renovate the STP and also establish a system for reuse the treated water.
Ensure the legal compliance of TNPCB Ensure cost effective solution, easy to operate and reduce the O & M Cost.
KEY DIAGRAM :
As per general waste water engineering practics ,waste water treatment
facility(Biological,Aerobic) shoud be design as per below
BACKGROUND
M/s. Gencor Auto Engg. Pvt.Ltd, Thirumudivakkam, Chennai-600 044 produced per day maximum
10 KL domestic waste water from their domestic activity.
Present system not suitable for treatment of domestic waste water.
Not able to comply the TNPCB requirements
OBSERVATION
The time of our site visit, we are found and observe the following matters.
COLLECTIONTANK
(SEPTIC TANK)
EQUALISATIONTANK
AERATION TANK SETTLING TANKCLARIFIED
WATER
STORAGE
SAND FILTER CARBON FILTER
Sludge
drying bed
-
7/30/2019 Gencor Stp Renovation
2/3
EXCISTING PLANT LAYOUT
OBSERVATION-ABOUT PRESENT SYSTEM
COLLECTIONTANK
AERATIONTANK
SETTLINGTANK
CLARIFIED
WATERSTORAGE
SAND FILTER
PARAMETERS PRESENT CONDITION ACTUALY REQUIRED
Capacity 10 KLD 10 KLD
Treatment Type Activated sludge process without
attached growth media
Activated sludge process with
attached growth media
Collection Tank(septic Tank) Available. Capacity Data not available 2X of per day flow capacity
Equalisation tank Not available Required .Process Requirement.
Aeration Tank Available Aeration tank with attached
growth media +suitable fine bubble
membrane diffuser
Air blower Available. But not in working condition
(time of observation). Air volume is not
sufficient. Air blower requires service
or replacement
70 m3 @ 0.5 kg/cm2 pressure
Attached growth media Not provided 3M3
BIO PACK MEDIA REQIRED
Settling tank-Dosing system There is no provision observed. Flocculent chemical dosing &
chlorine dosing system required.
DISINFICATION SYSTEM NOT PROVIDED Required. legal compliance
Pressure sand filter Available. But in damage condition
Activated carbon filter Not provided Must be provided.
Sludge Drying bed Available .Media, required piping
system not found.
Must be required piping system,
media provided.
Piping and plumping Modified. Time of renovation
Sewage pumps conditions Not verified If any difficulty found should be
repaired or rectified or replaced.
Sludge
drying bed
-
7/30/2019 Gencor Stp Renovation
3/3
REASONS:
Aeration system - blowers are not in working conditions. Present air capacity is not sufficient. High BOD inflow to the Aeration tank lankness of equalization facility Sedimentation activity is not proper and not provided flocculent chemical dosing system in the
installed systems.
Aeration efficiency is very poor and biological activity not happened due to, not installed attachedgrowth media.
PROPOSED TREATMENT STRATEGY:The proposed sewage treatment plant renovation program is designed for utilizing maximum
available facility and improve the treatment quality of the waste water( capacity of 10 KLD) through
the installation of Aeration recirculation pump, provide PVC bio pack media with chemical
coagulation system and improved Aeration system.
RECOMMENDATIONS
Improve the Aeration Efficiency Repaired or replace the excising blower and installed Aerationrecirculation pump and sufficient diffusers for nutrient removal (BOD).
Biological activity should be developed. - inoculate beneficial bacteriaProvide attached growth install Bio pack media of 3M3
Provide right chemical dosing with the help of dosing pumps Provide sludge recirculation system for BIOMASS (MLSS) development.
ACTION PLAN ABSTRACT
DESCRIPTION RECOMMENDATIONIMPLEMENTATION
ACTIVITY .
Attach growth media Install Bio pack media YESBeneficial bacteria Inoculate beneficial bacteria YESImprove dosing system by proper selection
of chemicals & dosages
Install dosing pumps YES
IMPROVEMENT OF Aeration tank Provide Attached growth media in the aeration
tank for good mineralization + recirculation pump YES
Filtration system Provide MS fabricated filtration system for achieve
treated water quality for legal compliance
O&M COST PER MONTH
Expected consumable cost per month Rs.2000/- without man power and power.
CONCLUSION:
The proposed scheme is help to produce the reclamation water and conforming to thestandards stipulated by pollution control board.
Ensure cost effectiveness, easy to operate and reduce the O & M Cost.