Gaz-System S.A. Transmission System Operator. Gdynia , 26.06.2009. AGENDA. 1. G AZ -S YSTEM S.A. Transmission system - Facts & Figures. 2. Disruption of supply 2009. System development. 3. 4. Activities. National gas transmission system operator (TSO) - PowerPoint PPT PresentationTRANSCRIPT
Gaz-System S.A.Transmission System
Operator
Gdynia, 26.06.2009
AGENDA
1
2
3
4
GAZ-SYSTEM S.A. Transmission system - Facts & Figures
Disruption of supply 2009
System development
Activities
GAZ-SYSTEM S.A. Facts&Figures
National gas transmission system operator (TSO)
Established on the basis of the Directive of the European Parliament and the European Council 2003/55/EC
Formed in April 2004, unbundled from PGNiG S.A.
Joint-Stock Company, owned by the State Treasury as the only shareholder
•Company-owned transmission assets worth over 3 billion PLN
•Near 2 000 employees across Poland.
•6 Regional Branches: •Gdańsk, •Poznań,•Rembelszczyzna, •Świerklany, •Tarnów, •Wrocław.
GAZ-SYSTEM S.A. Facts&Figures
Transmission system elements
(2009):9 800 km pipelines14 compressor stations57 gas nodes970 exit points
Main Characteristics:Polish gas system is connected with the European Gas Network system but only along the East-West direction. Gas imports mainly from Eastern direction.Gas Imports amounting to 70% of total national consumption .The remaining 30% is covered by national production.Transmnission of 14.7 bcm/year
Transmission System Overview
TRANSMISSION SYSTEM Network
U ND E RC O N S T R UCTI ON
Underground Gas Storages Cooperation with Transmission System
Operational capacity UGS
mln m3
Technical transport capacity
to supply the system
(UGS withdrawal)mln m3/day
Technical transport capacity to
injection UGS
mln m3/day
HUSÓW 400 5,7 2,4
SWARZÓW 90 1,0 0,7
BRZEŹNICA 65 0,9 0,8
STRACHOCINA 150 1,2 1,4
WIERZCHOWICE 575 4,8 3,6
MOGILNO 380 18,0 9,6
TOTAL 1660 31,6 18,5
DEMAND AND SUPPLY2008
0,0
10,0
20,0
30,0
40,0
50,0
60,0
70,0
mln m3/day
UGS INJECTION UGS WITHDRAWL
SUPPLAY WITHOUT UGS
CUSTOMERDEMAND
Supply 2008
0,0
5,0
10,0
15,0
20,0
25,0
30,0
35,0
40,0
45,0
50,0
55,0
60,0
65,0
mln m3/day
NATIONAL PRODUCTION - GAS MINES NATIONAL PRODUCTION - ODOLANÓW IMPORT
SUPPYL WITH UGS SUPPLY WTITHOUT UGS
Demand 2008
0,0
10,0
20,0
30,0
40,0
50,0
60,0
mln m3/day
CUSTOMERS DEMAND WITHOUT UGS EXIT TO NITROGEN - MATHANE SYSTEM
INDUSTRIAL CUSTOMERS (NOPROTECTED CUSTOMERS) THE OTHER CUSTOMERS
Supply and pressure - Drozdowicze01-02 2009
0,0
0,5
1,0
1,5
2,0
2,5
3,0
3,5
4,0
4,5
0,0
100,0
200,0
300,0
400,0
500,0
600,0
700,0
MPa1000 m3/h
day/hourDrozdowicze - Supply Drozdowicze - pressure
Supply and flowsPeak day 2009
Supply and flowsPeak day 2006
AVAILABLE CAPACITIES AND CONGESTIONS
Hermanowice-Strachocina
Szczecin-Gdańsk
Świnoujście- Szczecin
Włocławek-Gdynia
Szczecin-Lwówek
Gustorzyn-Odolanów
Rembelszczyzna-Gustorzyn
Jeleniów-Dziwiszów
Zdzieszowice-Ołtaszyn
Skoczów-Komorowice-Oświęcim
Strachocina- Wygoda
Baltic Pipe
LNG Terminal
Network expansion
Development of Interconnections
Poland- Czech Rep. Connection
New connection integrating the gas systems of both countries which will diversify and ensure stable gas supplies to end customersIncrease of safety of systems operations Project developed in cooperation with Czech TSOCommencement of operations: 2010/2011
Enhancing Poland-Germany Connection
Development of existing interconnection between the gas systems of both countriesIncrease of safety of systems operations Possibility of increased flows from western direction in case of crisisCapacity increase: 0,5 bcm p.a.Commencement of operations: 2011
LNG Terminal will be located in the Port of ŚwinoujścieProject developed by SPV Polskie LNG (PLNG) owned by GAZ-SYSTEM S.A. One jetty for LNG tankersLNG Terminal’s regas capacity:
Phase I/II: 2.5-5.0 bcm / 1,85-3,7 Mt LNG/yearPhase III: 7.5 bcm / 5,6 Mt LNG/year
LNG storage capacity:2 tanks 160 000 m3 LNG each
LNG loading infrastructure for trucks.Open season procedure - start 23 of June 2009 – end expected January 2010
documents available at www.polskielng.pl
LNG TerminalŚwinoujście
Interconections - Conclusions
LNG
Baltic Pipe
PL-CZ
PL-DE
2009 2010 2011 2012 2013 2014 2015 2016
OPEN SEASON
• Applied in the case of constructing new elements of the gas system in order to adjust the parameters of the planned investment to market expectations.
• Procedure implemented pursuant to ERGEG guidelines.
•The procedure is conducted in strict cooperation with the Polish Energy Regulatory Office in order to ensure the Investor applies non-discriminative access policies to the network.
NEW PROJECTS – OPEN SEASON
Tietierowka
Wysokoje
Drozdowicze
Lasów
Szczecin
Płoty
Lwówek
Włocławek
GAZ-SYSTEM on Transparency Platform
• GAZ-SYSTEM is active on the Transparency Platform from its launch on 17th November 2008.
• The TSO-related information and Capacity & tariff information have been published
• On 17 march GAZ-SYSTEM switched display of its capacity data from Nm3/d to kWh/d.
• On 2 April GAZ-SYSTEM added to Transparency Platform data on its capacity allocation mechanism and on its balancing model, balancing tolerances applied and other static balancing information.
• GAZ-SYSTEM constantly uploads data files to the Transparency Platform.
• Actually GAZ-SYSTEM is working on its automatic upload of nominations, re-nominations and allocations for its respective interconnection points.
Interconnection Points Agreements• GAZ-SYSTEM has signed IPA with all TSOs
connected to our system:– Biełtransgaz (Belarus)– ONTRAS (Germany)– UKRTRANSGAZ (Ukraine)
• Due to geographic position we are like transition area between two arts of gas market
– Eastern: • quantity - volume by 20 C,• energy day 8/8, • allocation based on seller decisions• No balancing market
– Western• Quantity – energy • Energy day 6/6• OBA• Market based balancing
– Middle (PL)• Quantity – volume by 0 C• Energy day 10pm/10pm• Regulated market
• But all discrepancies are covered in practice