SUMMARY OF RESEARCH AND TECHNOLOGY DEVELOPMENT EXPERIENCE ON GASIFICATION AND HOT GAS CONDITIONING UNIQUE (7PQ-ENERGY-2007/2010-211517) AND UNIfHY (7FP-FCH-JU-2012/2015-299732) PROJECTS Seminario Energia e idrogeno Le esperienze e le strategie europee Il nuovo bando energia del 7PQ - Le iniziative in Italia 12 luglio 2012 Prof. Pier Ugo Foscolo (Univ. of Aquila) Res. Enrico Bocci (Univ. of Rome) An European project, supported by the European Commission’s 7th Framework Programme

Upload: vudang

Post on 24-Mar-2018

213 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: GASIFICATION AND HOT GAS CONDITIONING - … AND HOT GAS CONDITIONING ... University of Timisoara Instytut Energetyki ENEA ... additionally integrated with fixed bed of

SUMMARY OF RESEARCH AND TECHNOLOGYDEVELOPMENT EXPERIENCE ON

GASIFICATION AND HOT GAS CONDITIONINGUNIQUE (7PQ-ENERGY-2007/2010-211517)

ANDUNIfHY (7FP-FCH-JU-2012/2015-299732)

PROJECTS

Seminario Energia e idrogenoLe esperienze e le strategie europee

Il nuovo bando energia del 7PQ - Le iniziative in Italia12 luglio 2012

Prof. Pier Ugo Foscolo (Univ. of Aquila)Res. Enrico Bocci (Univ. of Rome)

An European project, supported by the EuropeanCommission’s 7th Framework Programme

Page 2: GASIFICATION AND HOT GAS CONDITIONING - … AND HOT GAS CONDITIONING ... University of Timisoara Instytut Energetyki ENEA ... additionally integrated with fixed bed of

University ofL’Aquila

Pall FiltersystemsGmbH WerkSchumacher

Université Louis Pasteur,Strasbourg

Forschungszentrum JülichGmbH

ViennaUniversityof Technology

“Politehnica”University of Timisoara

InstytutEnergetyki

ENEA

BiomasseKraftwerk Güssing

GmbH & Co KG

Consejo Superior deInvestigacionesCientíficas

Unique partners

10 Partners:2 Industrial companies,4 Universities4 Research organisations

7 Member States:Austria, France, Germany,Italy, Poland, Romania andSpain

3 years duration:Project start on January 1st,2008

Budget €3.7M:€2.7M EC Grant€1.0M own Partners funding

FP7 EU funded project

An European project, supported by the EuropeanCommission’s 7th Framework Programme

Universityof

L’Aquila

Page 3: GASIFICATION AND HOT GAS CONDITIONING - … AND HOT GAS CONDITIONING ... University of Timisoara Instytut Energetyki ENEA ... additionally integrated with fixed bed of

Source: T. Pröll, April 2004

State of the art of gasificationthe Güssing plant

An European project, supported by the EuropeanCommission’s 7th Framework Programme

Universityof

L’Aquila

Page 4: GASIFICATION AND HOT GAS CONDITIONING - … AND HOT GAS CONDITIONING ... University of Timisoara Instytut Energetyki ENEA ... additionally integrated with fixed bed of

• The use of a catalytic filter instead of a filterfollowed by a catalytic bed or a monolith followedby a filter saves equipment;

• Housing the whole gas conditioning system in thegasifier reduces thermal losses

Steam/Gas

Biomass

Ashes and exhaustsolid inventory

CleanSyngas

In-bed gasconditioning

Catalytically active filter elements intothe freeboard of the gasifier to obtaintar- and particle-free syngas

Catalytic primary reduction ofheavy hydrocarbons

Integration in the bed inventory of sorbent orsorbent mixtures for a drastic elimination ofH2S and other detrimental trace elements

The Unique concept

N2 Back-pulsing

An European project, supported by the EuropeanCommission’s 7th Framework Programme

Universityof

L’Aquila

Compact gasifier and gas cleaning system

Page 5: GASIFICATION AND HOT GAS CONDITIONING - … AND HOT GAS CONDITIONING ... University of Timisoara Instytut Energetyki ENEA ... additionally integrated with fixed bed of

Candle label Specifications

SiC_A

DIASHUMALITH - Silicon -Carbide porousstructure with mullite outer membrane,impregnated with Ni supported on MgO-Al2O3

SiC_B

As above, additionally integrated with fixed bed ofNi grains filled into the hollow-cylindrical spacebetween the filter element and a porous inner tube

Al2O3_A

Al2O3 based grain-sintered filter element coatedwith a mullite outer-membrane, impregnated withNi supported on MgO-Al2O3

Al2O3_BAs above, additionally integrated with a Niactivated Al2O3 based hollow-cylindrical monolith

PALL catalytic candles tested

An European project, supported by the EuropeanCommission’s 7th Framework Programme

Universityof

L’Aquila

Page 6: GASIFICATION AND HOT GAS CONDITIONING - … AND HOT GAS CONDITIONING ... University of Timisoara Instytut Energetyki ENEA ... additionally integrated with fixed bed of

Biomass feed rate [g/min] 6-8

Steam /biomass ratio 0.8-1.2

Bed Temp. [°C] 800-830

Reactor outlet Temp. [°C] 750-800a b

Gas yeld[Nm3(dry N2free)/kg daf]

1 2.1

H2 [%vol (dry gas, N2free)] 39 56

CH4 [%vol (dry gas, N2free)] 10 2

Water conversion [%] 16 42

TAR content[g/Nm3(dry N2free)]

3.7 0.15

a) Reference values – no filter candle; b) best results with Al2O3_B (20 hours on test)

UNIVAQ test conditions

An European project, supported by the EuropeanCommission’s 7th Framework Programme

Universityof

L’Aquila

Page 7: GASIFICATION AND HOT GAS CONDITIONING - … AND HOT GAS CONDITIONING ... University of Timisoara Instytut Energetyki ENEA ... additionally integrated with fixed bed of

Güssing plant tests

An European project, supported by the EuropeanCommission’s 7th Framework Programme

Universityof

L’Aquila

Comparison of hot and cold gas cleaning systems

26 hours of stable filtration were achieved. The performance of the filter candletoward tar and solid separation is a promising option for hot gas cleaning. Theoverall technical feasibility is not yet proven and the long term behaviour remains anoutstanding issue.

Page 8: GASIFICATION AND HOT GAS CONDITIONING - … AND HOT GAS CONDITIONING ... University of Timisoara Instytut Energetyki ENEA ... additionally integrated with fixed bed of

CIRPSUniversity ofRome andL’Aquila

Pall FiltersystemsGmbH WerkSchumacherEPCEngineering, Procurement& Construction

Université Louis Pasteur,Strasbourg

“Engineering forsustainablegrowth”

ALH2EAir Liquide

ENEA

Unifhy partners

7 Partners:4 Industrial companies,2 Universities1 Research organisations

4 Member States:France, Germany, Italy andNetherlands

3 years duration:Project start on September1st, 2012

Budget €3.3M:€2.2M EC Grant€1.1M own Partners funding

FP7-JTI-FCH-EU fundedproject

An European project, supported by the EuropeanCommission’s 7th Framework Programme

Universityof

L’Aquila

Page 9: GASIFICATION AND HOT GAS CONDITIONING - … AND HOT GAS CONDITIONING ... University of Timisoara Instytut Energetyki ENEA ... additionally integrated with fixed bed of

The Unifhy concept

An European project, supported by the EuropeanCommission’s 7th Framework Programme

Universityof

L’Aquila

The overall scope of UNIfHY is the integration of plant components of provenperformance and reliability and well established processes (UNIQUE coupled

gasification and hot gas cleaning and conditioning system, Water-Gas Shift, WGS,system and Pressure Swing Adsorption, PSA, system) to obtain a continuous process

for pure hydrogen production from biomass.

Page 10: GASIFICATION AND HOT GAS CONDITIONING - … AND HOT GAS CONDITIONING ... University of Timisoara Instytut Energetyki ENEA ... additionally integrated with fixed bed of

The Unifhy advantages

An European project, supported by the EuropeanCommission’s 7th Framework Programme

Universityof

L’Aquila

1. UNIfHY uses hot gas conditioning systems including catalysts, sorbentsand ceramic filters and foams in order to remove tar, contaminants,particulates and increase the hydrogen production without coolingsteps, catalyst clogging, and loss of gas chemical and thermal energy,guaranteeing the system reliability.

2. The integration of catalytic filter candles in the freeboard reducesdramatically the investment and operation costs related to theequipment (the gas conditioning system cost becomes 30% as that of astandard free-standing conditioning system) as well as the complexity ofthe plant, guaranteeing the economic viability.

3. Reforming of both tar and methane is carried out directly in thefreeboard of the gasifier, reducing all costs due to a downstreamsecondary reformer.

4. The use of a ceramic foam with a wide catalytic surface areaimpregnated with Cu and Fe for Water Gas Shift eliminates the need tooperate at high pressure in order to have high conversion efficiency.

Page 11: GASIFICATION AND HOT GAS CONDITIONING - … AND HOT GAS CONDITIONING ... University of Timisoara Instytut Energetyki ENEA ... additionally integrated with fixed bed of

The Unifhy work and objectives

An European project, supported by the EuropeanCommission’s 7th Framework Programme

Universityof

L’Aquila

The scope of work will comprise development and scale up activities onmaterials and reactors design.

1. process feasibility demonstrated using CIRPS and ENEA laboratories;2. system feasibility demonstrated using a compact small scale (100 kWth)

fluidized bed indirectly heated gasifier;3. industrial feasibility demonstrated using a 1000 kWth fluidized bed

steam/oxygen gasifier.UNIfHY will provide, with respect to the traditional thermochemical

systems for hydrogen production (e.g. cold gas conditioning):1. investment cost savings estimated to be more than 50%,2. simplified plant layout with reduction of space and components up to

50% of those normally required (a relevant logistic, managerial andoperative benefit)

3. overall efficiency greater than 50% in comparison to standard systems(70% versus 45%).

The system is expected to produce hydrogen at a cost of 2-4 €/kg (about 17€/GJ, depending on the cost of the biomass.