g5 project workbook-revise in reflection 01apr2012

Upload: khmahbub

Post on 05-Apr-2018

216 views

Category:

Documents


0 download

TRANSCRIPT

  • 7/31/2019 G5 Project Workbook-Revise in Reflection 01Apr2012

    1/41

    Project Workbook

    Table of Contents

    1 Title Page with Reviewers' Comments

    Tab Name: PNX Title Page

    2 Project Partners and Contact Information

    Tab Name: PNX Contacts

    3 Outcomes Logic Model

    Tab Name: PNX OLM

    For more information, visit:

    4 Outcome Target Indicators PlanTab Name: PNX OTIP

    For more information, visit:

    5 Milestone Plan

    Tab Name: PNX Milestone Plan

    For more information, visit:

    The milestone plan focuses on the end-dates by which your activities need to be completed and outputs need to

    be delivered. It contains the project start and end date, and other important milestones. Progress reporting is

    directly made on the original milestones as defined in the milestone plan.

    This file contains spreadsheets of information submitted to the CPWF by the project team, and spreadsheets that we

    have developed to aid our review process. Please change the 'PNX' to identify your project, e.g. Ganges Project 3 would

    be G3

    This page contains main project information and the contracting and inception reviewers' comments.

    Please list all your project participants with their contact details. This information will be fed into the CPWFcontact database. Please ensure that you inform the CPWF about any changes in your team.

    The OLM is a table that describes the project's theory of change (ToC), or how the project is expected to work. It

    is a description of the projects activities, outputs, outcomes and impact and their inter-relationships. Each line

    describes an Outcome Pathway, with a short narrative description. The last row in the model is a narrative

    description of how the project predicts that the outcomes it achieves are likely to reinforce each other and

    eventually contribute to longer-term impact.

    CPWF M&E Guide- Outcome Indicators Plan

    CPWF M&E Guide- OLMs

    The Outcome Target Indicators Plan (OTIP) contains specific description(s), for each Outcome Pathway (from

    OLM), of who/ how many exactly the project expects to change (Practice and/or KAS) and by how much, by the

    end of the Project. Indicators and tools to measure them are included for each outcome target.

    CPWF M&E Guide- Milestone Plan

    CPWF Project Workbook Table of Contents Page 1 of 41

    https://sites.google.com/a/cpwf.info/m-e-guide/indicator-and-milestone-planhttps://sites.google.com/a/cpwf.info/m-e-guide/outcome-pathways-and-outcome-logic-modelhttps://sites.google.com/a/cpwf.info/m-e-guide/indicator-and-milestone-planhttps://sites.google.com/a/cpwf.info/m-e-guide/indicator-and-milestone-planhttps://sites.google.com/a/cpwf.info/m-e-guide/outcome-pathways-and-outcome-logic-modelhttps://sites.google.com/a/cpwf.info/m-e-guide/indicator-and-milestone-plan
  • 7/31/2019 G5 Project Workbook-Revise in Reflection 01Apr2012

    2/41

    6 Gantt Chart

    Tab Name: PNX Gantt Chart

    For more information, visit:

    7 Schedule of Reports and Payments = filled by CPWF Finance Officer for contracting

    Tab Name: PNX $ Schedule

    8 Budget Summary

    Tab Name: PNX $ Summary

    9 Budget Comments

    Tab Name: PNX $ Comments

    10 Staff Time Allocation and Breakdown of Personnel Costs

    Tab Name: PNX $ Time Allocation

    11 Indicative Breakdown of Budget by Outputs

    Tab Name: PNX $ By Outputs

    12 Indicative Breakdown of Budget by Institution

    Tab Name: PNX $ By Institution

    This table shows the distribution of budget by output then by institution. The overhead costs are not included in

    the distribution.

    This table shows a summary of the budget allocated to the project partner institutions (left part). The right part

    of the table could be of support to work out each project partners budget share by line item.

    This spreadsheet shows the breakdown of the project budget per line item and per year.

    The comments worksheet is where budget explanations and details are explained.

    In this worksheet the project team compositon is listed with their names, institution, expertise and contribution

    to the project (e.g., Output 1, Communication, Policy, etc.), the number of days per year, and the daily rate per

    staff.

    The Gantt Chart focuses on the activities to be carried out to complete the project. This chart contains the

    project schedule, work breakdown structure, i.e. activities with their milestones as the terminal elements, their

    start and finish dates, responsible project team member and their affiliations.

    CPWF M&E Guide- Gantt Chart

    This spreadsheet will be filled out by CPWF finance officer for contracting according to the budget details the

    project has submitted. It shows the schedule of budget release, which depends on the satisfactory submission

    and approval of the required progress reports.

    CPWF Project Workbook Table of Contents Page 2 of 41

    https://sites.google.com/a/cpwf.info/m-e-guide/gantt-charthttps://sites.google.com/a/cpwf.info/m-e-guide/gantt-chart
  • 7/31/2019 G5 Project Workbook-Revise in Reflection 01Apr2012

    3/41

    Title Page with Reviewers' Comments

    Project Leader

    Project Number

    Project Short Title

    Reporting Period

    Starting Date

    Completion Date

    Review Questions (RQ) Reviewer Remarks on status (inlcude

    date)

    Changes required to proceed

    to contracting

    Response from the Project

    Leader (include date)

    Status of changes req

    after resubmission [to

    filled in by the review

    RQ1: Are documents in order,

    provide information required,

    and is there consistency

    between them?

    Cells highlighted in yellow must be

    dealt with for contracting

    Yesocuments accor ng to tan ar

    Clauses and Procedures 3.02 and

    3.03 (see list below)

    Cells highlighted in orange must be

    dealt with by time of inception

    re ort

    Major changes in worksheets

    in blue

    Revised proposal First submission 2011.02.28 Revised document provided on2011.04.18

    Satisfactory

    Contact sheet First submission 2011.02.28 No contacts from India

    Project participants from BRAC

    are not specified. Please

    include them.

    India contacts added (initial

    points of contact via ICAR

    partner institutes). Contact

    point in BRAC added.

    2011.04.10

    For clarification: the a

    partners in the contac

    are not included in the

    'payroll'. They are not

    team members but co

    persons from other Ga

    projects.

    Gantt chart First submission 2011.02.28 Suggested few changes in red

    ink

    Changes accepted and

    incorporated. 2011.04.10

    Ok, expect some rewo

    time of Inception Repo

    Milestone plan First submission 2011.02.28 Suggested few changes in red

    inkPlease supply the dates that

    are consistent with the Gantt

    chart

    Changes accepted and

    incorporated. Dates revised forconsistency with Gantt chart.

    2011.04.10

    Ok, expect some rewo

    time of Inception Repo

    OLM First submission 2011.02.28 Ok, expect some rewo

    time of Inception Repo

    OTIP First submission 2011.02.28 Ok, expect some rewo

    time of Inception Repo

    KM PointPerson

    Dr. Nowsher Ali sarder

    Ganges Coordination and Change Enabling

    G5

    June 01, 2011

    March 31, 2014

    CPWF Project Workbook Title Page with Reviewers' Comments

  • 7/31/2019 G5 Project Workbook-Revise in Reflection 01Apr2012

    4/41

    Review Questions (RQ) Reviewer Remarks on status (inlcude

    date)

    Changes required to proceed

    to contracting

    Response from the Project

    Leader (include date)

    Status of changes requ

    after resubmission [to

    filled in by the reviewe

    Budget First submission 2011.02.28 Budget is $70,000 over the

    proposed budget in the EOI.

    Local contract budget for

    Bangladesh-based institutions

    in 28.8% but will change.

    $70,000 reduced, now total is

    $-900K. Local Contract budget

    is 33.60%. 2011.04.10

    Satisfactory. However

    levy is already extracte

    time of fund receipt to

    and should therefore b

    reallocated in the budg

    Plan for baselining of outcome

    targets

    Required by time of In

    Report

    Signed MOUs corresponding to

    milestone plan

    Ditto

    Third party intellectual audit Ditto

    CPWF Project Workbook Title Page with Reviewers' Comments

  • 7/31/2019 G5 Project Workbook-Revise in Reflection 01Apr2012

    5/41

    Review Questions (RQ) Reviewer Remarks on status (inlcude

    date)

    Changes required to proceed

    to contracting

    Response from the Project

    Leader (include date)

    Status of changes requ

    after resubmission [to

    filled in by the reviewe

    RQ2: Have there been changes

    in budget share going to

    partners, and if so, are they

    consistent with the changes in

    responsibilities?

    Program

    Manager

    No changes in share of

    to partners.

    RQ3: Does the budget appear

    consistent with the promised

    outputs?

    Program

    Manager

    Yes - no issues

    RQ4: Looking at the people

    responsible for producing the

    outputs, do these teams contain

    people with the requisite skill

    and is team size appropriate?

    MT Point

    Person

    Boru says: Yes, pleased

    the addition of a Natio

    M&E, adaptive mmgt a

    innovation research

    RQ5: Is there a clear assignment

    of responsibility for producing

    outputs and milestones to both

    individuals and organizations?

    MT Point

    Person

    Ok, TBIs to be filled in b

    of Inception Report

    RQ6: Have reviewers'

    comments been addressed?

    MT Point

    Person

    Yes, all reviewers' com

    have been addressed

    CPWF Project Workbook Title Page with Reviewers' Comments

  • 7/31/2019 G5 Project Workbook-Revise in Reflection 01Apr2012

    6/41

    Review Questions (RQ) Reviewer Remarks on status (inlcude

    date)

    Changes required to proceed

    to contracting

    Response from the Project

    Leader (include date)

    S

    a

    f

    A

    From Standard Clauses and Procedures

    3.02 The documents required for contract signature are:

    Revised project proposal that has addressed reviewers comments in particular negotiation points and incorporates chan

    from workshops and other consultation processes.

    Revised budget reflecting changes in project proposal

    Gantt Chart

    Milestone plan developed for at least the first year of operations

    Draft Outcome Logic Model

    Any other documentation agreed to between the Project Leader and the CPWF

    3.03 The following documents are to be provided in electronic form to CPWF Basin Leader with the Inception Report:

    Outcome Logic Model agreed with partners

    Milestone plan developed for the duration of the project

    Outcome target indicators plan

    Plan for base lining of outcome targets

    Signed MOUs corresponding to milestone plan

    Third Party Intellectual Asset Audit

    Any other documentation agreed to between the Project Leader and the CPWF.

    CPWF Project Workbook Title Page with Reviewers' Comments

  • 7/31/2019 G5 Project Workbook-Revise in Reflection 01Apr2012

    7/41

    Project Partners and Contact Details

    Please remember to provide a CV for each person listed below as Annex B to your proposal. Indicate in particular who has responsibility for communications, M&

    Given Name Family Name Institution Role in the project Professional

    discipline

    Email Alternate Email Work Phone

    Nowsher Sarder WorldFish Project Leader/

    Basin Leader

    [email protected] [email protected]

    m

    00880-2-8813250

    William Collis WorldFish Principal

    Investigator (Int'l)

    Director, WorldFish

    South Asia

    [email protected] [email protected] 00880-2 8813250

    00880-2 8813250

    Ext: 301

    Charlie Crissman WorldFish Principal

    Investigator (Int'l)

    Impact assessment [email protected]

    g

    00604 -626 1606

    Ext: 192

    Direct Line: 00604-

    6202192

    Michael Phillips WorldFish Principal

    Investigator (Int'l)

    Aquaculture [email protected] [email protected]

    m

    00604- 626 1606

    Ext:160 Direct

    Line: 00604-

    6202160

    Ben Belton WorldFish Principal

    Investigator (Int'l)

    Aquaculture, social

    science

    [email protected] beltonben@google

    mail.com

    00880-2 8813250

    00880-2 8813250Ext: 305

    Fiona Chandler WorldFish Principal

    Investigator (Int'l)

    Communications F.Chandler@cgiar.

    org

    00604 626-1606

    (274)

    Nireka Weeratunga

    Starkloff

    WorldFish Principal

    Investigator (Int'l)

    Gender N.Weeratunga@c

    giar.org

    Sabina Islam WorldFish Principal

    Investigator (Nat'l)

    Gender islam.sabina@gmail.

    com

    CPWF Project Workbook Project Partners and Contact Details

    mailto:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]
  • 7/31/2019 G5 Project Workbook-Revise in Reflection 01Apr2012

    8/41

    Given Name Family Name Institution Role in the project Professional

    discipline

    Email Alternate Email Work Phone

    Benoy Kumar Barman WorldFish PrincipalInvestigator (Reg'l)

    Aquaculture [email protected] 00880-2 881325000880-2 8814624

    Ext: 201

    Emdad Hossain WorldFish Principal

    Investigator (Nat'l)

    Monitoring and

    evaluation

    md.e.hossain@cgi

    ar.org

    emdad2003@yaho

    o.com

    00880-2-8813250

    Hamid Miah Private (ex-IRRI) Consultant Agriculture [email protected] 00880-2 9898011

    00880-2 9886608

    Ext: 111

    Zahurul Karim Private (ex GOB) Consultant Agriculture policy [email protected] zaharulkarim@hotm

    ail.com

    008802-8130875

    (home)

    Salma Sultana WorldFish Consultant Communications [email protected] salma_sultana28@

    yahoo.com

    00880-2-8813250

    Manoranjan Mondal BRAC Principal

    Investigator (Nat'l)

    Agriculture and

    Food SecurityProgram Head

    manoranjan.km@br

    ac.net

    Bimal. K Bandyopadhyay Central Soil Salinity

    Research Institute

    Principal

    Investigator (Nat'l)

    Principal Scientist-

    Soil Chemistry and

    Fertilit

    [email protected]

    m

    Jitendra Kumar Sundaray Central Institute of

    Brackishwater

    A uaculture

    Principal

    Investigator (Nat'l)

    Principal Scientist-

    Aquaculture

    [email protected]

    m

    91-3210-255072

    Dr. Md Kabir Ikramul Haque BARC Principal

    Investigator (Nat'l)

    Chief Scientific

    Officer

    ikramfish@yahoo.

    com

    8802 8117110

    Basin Leader Basin/Project Leader

    M&E Manager Management of

    M&E ro ram

    Positions where persons remain to be identified

    CPWF Project Workbook Project Partners and Contact Details

    mailto:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]
  • 7/31/2019 G5 Project Workbook-Revise in Reflection 01Apr2012

    9/41

    Responsible for

    Project/Basin leader responsible for overall

    management of Project G5 (Outputs 0-6)

    WorldFish South Asia Director will provide a

    senior role in oversight of the project and

    connections/advice to major development

    actors and senior govt policy makers (Outputs

    0-6)

    Science advice on M&E, adaptive

    management systems (Output 1) andinnovation research (Output 4)

    Science support on aquaculture, reporting,

    communications related to Outputs 1,2 and 3

    Science support to M&E (Output 1) andinnovation research (Output 4). Social scientist

    input to assist in G5

    Support to development of Ganges BDC

    communications strategy

    Preparation of gender strategy and initial

    training (Output 1) and oversight in some

    follow up actions to be defined in cooperation

    with Bangladesh based research assistant

    below

    CPWF Project Workbook Project Partners and Contact Details

  • 7/31/2019 G5 Project Workbook-Revise in Reflection 01Apr2012

    10/41

    Responsible for

    Science support

    National-recruited staff to support adapative

    management and ME system (Output 1)

    Agriculture expert with excellent connections

    to senior policy makers, and will assume

    responsibility for advising program on

    strategies for influencing policy related to

    agriculture and aquaculture research outputs

    (G2 particularly) (supporting Outputs 1-4, but

    largely focussed on Output 2)

    Senior expert in government policy, and will

    advise program on opportunities for

    influencing policy and strategies across G1-G4.

    Supporting Outputs 1-4, but largely focussed

    on output 2

    Development and management of

    communications program

    resource management for rice based cropping

    systems (Bangladesh)

    rice based systems (India)

    aquaculture systems (India)

    Focal point for liaison with BARC subject to

    ongoing discussions on detailed cooperation

    arrangements (MOU)

    CPWF Project Workbook Project Partners and Contact Details

  • 7/31/2019 G5 Project Workbook-Revise in Reflection 01Apr2012

    11/41

    Outcomes Logic Model

    Project Name

    Date

    Actor(s) Desired change in actor(s)practice

    Required change in actor KASfor change to happen

    Project strategies andprototypes for bringing about

    changes

    Project outp

    Hint: How will your project contribute

    to make these changes happen?

    What areyour ideason how to

    help people change?

    Here, it may help to think what

    other projects have done before

    that has NOT worked well- what

    will your project do that is

    different? Better? Strategies can

    be the way (for example, co-

    develop instead of impose) you do

    things. Strategies are also thetiming, methods, partnerships,

    language, etc. you choose to use

    Outcome

    Pathway 1

    BDC Researchers (project G1-

    G4 teams)

    G1-G4 project teams using

    adaptive management

    systems, resulting in increased

    self-reflection, effective

    cooperation between projects,

    improved communication

    between projects and effective

    engagement with users

    Knowledge, Attitude and Skill

    for M&E and adaptive

    management within project

    teams; enhanced

    communication skills;

    willingness to engage with

    stakeholders for change

    Establish M&E system and

    develop adaptive management

    system Conduct necessary

    activities such as: (i) establish

    management team; (ii) conduct

    monthly meetings and create

    regular space for reflection by

    project teams. Support

    communication and capacity

    building events.

    High quality r

    reports and o

    produced acc

    milestones an

    established in

    and more gen

    coordinated G

    program with

    effectively w

    partners to d

    developmentimpacts

    Narrative 1 Projects G1 to G4 will use an adaptive management system that contributes to achieving positive development outcomes from research. The re

    and space to practice adaptive management. Project G5 will guide and support implementation, but responsibilities will lie with all individual pro

    convene and early meeting of G1-G5 project teams to develop the M&E and adaptive management system, and support capacity building to imp

    Coordinating and Change Enabling Project

    February 15, 2011

    Start with this question:if this

    project is successful, WHOwill

    change? What groups of people or

    organizations will be affected?Be

    realistic, andprioritizethe most

    'affected'. Then, try to be as

    specific about the actor groups as

    possible- in some actor groups as

    possible- in some cases you have

    the names or exact location of the

    actor(s)- use them here.

    A change inpractice or behavioris

    a change in the way people (in

    this case, the 'actors' in the 1st

    column)DOthings. So here, try to

    use action words- such as 'use',

    'coordinate', 'plant', 'participate

    in', 'integrate', 'implement', etc.

    To be able to 'use' something,

    people usually need to first know/

    understand it, and its advantages,

    and/ or have developed the

    skillsto use it, or at least

    tobelieve or trustthe benefits of

    using it. Look at your practice

    change, and make explicit 2-4 KAS

    changes that are key to having the

    actor groups change their

    practice.

    These come str

    road map/ res

    and/ or your c

    deliverables. W

    project's main

    to this 'line of

    PWF Project Workbook Outcomes Logic Model

  • 7/31/2019 G5 Project Workbook-Revise in Reflection 01Apr2012

    12/41

    Project Name

    Date

    Actor(s) Desired change in actor(s)

    practice

    Required change in actor KAS

    for change to happen

    Project strategies and

    prototypes for bringing about

    changes

    Project outputs

    Coordinating and Change Enabling Project

    February 15, 2011

    OutcomePathway 2

    Government, and particularlyinfluential policy makers

    Provide a policy framework andincentives for applying and

    scaling out of practices

    demonstrated through the

    CPWF Ganges BDC

    Knowledge and Attitude amongpolicy makers as required for

    policy change. Approach needs

    to be tailored to senior policy

    makers.

    Demonstrating value ofintegrated solutions from

    projects G1-G5 towards

    achieving progress.

    Teasing out policy implications

    and strategies from research.

    Identification of

    communication strategies,

    champions and pathways

    though which change may

    occur

    Use of adaptive management

    system to respond to share

    lessons and respond to

    opportunities

    Policy changes throand application of k

    products, policy brie

    interventions that a

    with policy makers.

    Documentation of l

    learned for wider sh

    Products that create

    project outputs to g

    and development ac

    Narrative 2 Policy adoption by government is assumed to create an enabling environment within which larger investments from development partners can achieve

    areas of the Ganges. Project G5 will play an enabling role in change processes, either by direct engagement or supporting/facilitating other projects to

    change.

    PWF Project Workbook Outcomes Logic Model

  • 7/31/2019 G5 Project Workbook-Revise in Reflection 01Apr2012

    13/41

    Project Name

    Date

    Actor(s) Desired change in actor(s)

    practice

    Required change in actor KAS

    for change to happen

    Project strategies and

    prototypes for bringing about

    changes

    Project outputs

    Coordinating and Change Enabling Project

    February 15, 2011

    OutcomePathway 3

    Development actors makinglarge scale investment in

    project areas and/or similar

    locations. These may include

    government, development

    banks, NGOs and private sector

    investors.

    Development actors pursueprograms in the Ganges basin

    using the development

    solutions arising from G1-G4

    research

    Government to providedirectives to relevant

    organizations to upscale

    validated technologies and

    management systems.

    Awareness among

    government, NGO and private

    sector of how Ganges BDC

    research can achieve outcomes

    and impacts and capacity to

    apply research findings

    CommunicationsCapacity building

    Building partnerships with

    development partners to apply

    Ganges basin research

    Assist NGOs to identify the

    training needs.

    Demonstrated apprscaling out effective

    specific conditions o

    hubs. Capacity build

    extension materials

    learned documents

    from innovation res

    activities.

    Narrative 3

    Impact Narrative

    Project G5 will use adaptive management systems and create a working environment among G1 to G5 project teams that delivers research outputs that are relevant and i

    goals. It will collaborate with development actors, primarily government, NGO and private sector in influential ways that can achieve positive development outcomes and

    research outputs from Ganges BDC projects.

    G5 will work with development partners, including civil society, international banks and donors, and private sector to encourage wider scaling out or pr

    communication of Ganges BDC research outputs and outcomes; demonstrating their relevance to the goals of development partners; and helping actopartners (BRAC) are expected to play a significant role in scaling out.

    PWF Project Workbook Outcomes Logic Model

  • 7/31/2019 G5 Project Workbook-Revise in Reflection 01Apr2012

    14/41

    Outcome Targets Indicator Plan

    Project Name

    Date

    No. ACTOR and how they will CHANGE Outcome target(s) Indicator(s) of progress towards

    Outcome Target(s)

    Tools to measure progress towards

    Outcome Target(s)

    Taken from the OLM: Actor group and

    the practice, knowledge, attitude or skills

    change

    Specific description(s) of who/ how many

    exactly the project expects to change

    (Practice and/or KAS) and by how much,

    by the end of the Project. There can be

    more than one Outcome Target per each

    Outcome line (first column- actor +

    expected final change)

    What you will observe and measure to

    know you are moving towards the

    Outcome Target (other than

    milestones)?

    What will be your instruments to observ

    and measure your progress towards the

    Outcome Target ?

    Project G1-G5 teams G1-G5 teams share a focus on

    outcomes as an important part of

    program implementation.

    A change in attituce and priorities to

    include outcomes in addition to

    outputs.

    Project reports and most significant

    change analysis

    Opportunities identified forimproving development outcomes

    and impacts from Project G1-G5 team

    work;

    Monthly and annual reflectionmeetings generate positive lessons

    and opportunities for improvement.

    Minutes and participant feedbackduring monthly and annual reflection

    meetings

    BDC stakeholders that can influence

    policy or practice at the local, regional

    or national levels

    Stakeholders are aware of policy or

    practice messages and choose to

    include them in policy, plans or other

    actions.

    Systematic engagement with the

    relevant BDC stakeholders via

    selected information pathways

    Project reports; descriptions or

    minutes of engagement

    Coordination and Change Enabling Project

    February 15, 2011

    The Outcome Target Indicators Plan (OTIP) contains specific description(s), for each Outcome Pathway (from OLM), of who/ how many exactly the project expects to change

    (Practice and/or KAS) and by how much, by the end of the Project. roject is committing to measure. THe expected output in this OTIP is a list of indicators ONLY for the Outcome

    Targets that the Indicators and tools to measure them are included for each outcome target.

    WF Project Workbook Outcome Targets Indicator Plan Pag

  • 7/31/2019 G5 Project Workbook-Revise in Reflection 01Apr2012

    15/41

    Project Name

    Date

    No. ACTOR and how they will CHANGE Outcome target(s) Indicator(s) of progress towards

    Outcome Target(s)

    Tools to measure progress towards

    Outcome Target(s)

    Coordination and Change Enabling Project

    February 15, 2011

    Development actors that can

    influence the scaling up or out of

    project outputs and outcomes

    Stakeholders are aware of policy or

    practice messages and choose to

    include them in policy, plans or otheractions.

    Systematic engagement with the

    relevant BDC stakeholders via

    selected information pathways

    Project reports; minutes of reflection

    meetings

    Development partners recoginze and

    address issues related to gender in

    their work

    Partners utilized gender analysis and

    gender sensitive practices and

    technologies in their work

    Technical and progress reports of

    development partners that contain

    reference to gender-related activities.

    WF Project Workbook Outcome Targets Indicator Plan Page 15

  • 7/31/2019 G5 Project Workbook-Revise in Reflection 01Apr2012

    16/41

    Milestone Plan For Rep

    roject Name

    Date

    To be rep

    TeamNo. Milestones = your progress markers Deadline Responsible

    Partner

    Institution

    Responsible

    Staff Project

    Member

    Outputs

    required by

    other projects

    Means of verification Status rep

    milestone

    Description of deliverable required to achieve change,

    from Gantt

    For delivery of

    Milestone,

    format: yy-mm-

    For delivery of

    Milestone, can

    only be one

    For delivery of

    Milestone, can

    only be one

    Yes or no? If yes,

    please specify

    What the project will deliver to

    the CPWF as evidence of

    completion of the Milestone

    Report on d

    changes to

    Plan must b

    0

    .a Contract signing 2011/04/01 CPWF No Not relevant

    .b Inception workshop 2011/10/31 WFC BL Yes (G1-G4) Inception report Launching

    2011; Ince

    Oct to 01

    .c Inception report submitted 2011/12/15 WFC BL Yes (G1-G4) Inception report 20 Nov su

    .d Annual report submitted 2012-03-31

    2012-12-30

    2013-12-30

    WFC BL Yes (G1-G4) Annual report Report su

    week of M

    .e Final report submitted 2014/03/31 WFC BL Yes (G1-G4) Annual report

    .a Adaptive management system completed 2012/03/30 WFC CC/EH Yes (G1-G4) Adaptive management

    guidelines

    The guide

    submitted

    2012

    .a Gender guidance document/strategy released for

    CWFP Ganges researchers/partners

    2012/03/31 WFC Consultant Yes (G1-G4) Gender strategy document Gender gu

    and subm

    .a Communication strategy completed 2012/06/30 WFC SS Yes (G1-G4) Communications strategy

    document

    Prepared

    HQ/CPWF

    Coordination and Change Enabling Project

    April 12, 2011

    o be filled by PLs and Project Teams

    Project Management and Implementation

    PWF Project Workbook Milestone Plan

  • 7/31/2019 G5 Project Workbook-Revise in Reflection 01Apr2012

    17/41

    roject Name

    ate

    To be report

    Team

    o. Milestones = your progress markers Deadline Responsible

    Partner

    Institution

    Responsible

    Staff Project

    Member

    Outputs

    required by

    other projects

    Means of verification Status repor

    milestones

    Coordination and Change Enabling Project

    April 12, 2011

    o be filled by PLs and Project Teams

    .b Web site launched (Private wiki, public Ganges BDC

    component of CPWF/links to other relevant sites)

    2012/03/31 WFC SS Yes (G1-G4) Web site Launched wi

    .a Initial visioning and planning for policy change with

    partners and other Ganges BDC projects

    2012/03/30 WFC BL/consultant Yes (G1-G4) Report Prepared and

    HQ/CPWF on

    .b Interim evaluation 2013/03/31 WFC BL/EH Yes (G1-G4) Evaluation report

    .c Policy lessons prepared 2014/03/31 WFC BL/Consultant No Science papers, evaluation

    report

    .a Initial visioning and planning for engaging with

    development actors

    2012/03/30 WFC BL/Consultant Yes (G1-G4) Report Prepared and

    HQ/CPWF on

    .b Interim evaluation 2013/03/31 WFC BL/EH Yes (G1-G4) Evaluation report

    .c Lessons prepared 2014/03/31 WFC BL No Science papers, evaluation

    report

    .a Research plan completed 2012/06/30 WFC CC/EH Yes (G1-G4) Concept Note

    .b Outputs as defined in final Innovation Research plan 2013/06/30 -

    2014/03/31

    WFC EH No Report, science papers

    .c Final synthesised output on Innvovation Research

    (science paper, lessons learned synthesis document)

    2014/03/31 WFC CC/EH No Science papers, policy briefs

    PWF Project Workbook Milestone Plan

  • 7/31/2019 G5 Project Workbook-Revise in Reflection 01Apr2012

    18/41

    roject Name

    Date

    To be repo

    Team

    No. Milestones = your progress markers Deadline Responsible

    Partner

    Institution

    Responsible

    Staff Project

    Member

    Outputs

    required by

    other projects

    Means of verification Status repo

    milestones

    Coordination and Change Enabling Project

    April 12, 2011

    o be filled by PLs and Project Teams

    PWF Project Workbook Milestone Plan

  • 7/31/2019 G5 Project Workbook-Revise in Reflection 01Apr2012

    19/41

    or review by BL For review by CPWF

    eview of evidence of delivery of

    milestone and of research quality

    nd relevance

    Review of evidence of delivery of

    milestone and quality check of BLs

    review

    o be assessed by Basin Leader To be assessed by CPWF

    5 organized two workshops one

    s launching and another as

    nception instead of one.

    articipation was appreciable from

    overnment, research and other Grojects

    oth reports submitted

    ubmitted to MT on due date (16

    pril 2012)

    PWF Project Workbook Milestone Plan

  • 7/31/2019 G5 Project Workbook-Revise in Reflection 01Apr2012

    20/41

    or review by BL For review by CPWF

    eview of evidence of delivery of

    milestone and of research quality

    nd relevance

    Review of evidence of delivery of

    milestone and quality check of BLs

    review

    aunched wiki and it is in

    peration

    repared and submitted to

    Q/CPWF on 31 Mar 2012

    repared and submitted to

    Q/CPWF on 31 Mar 2012

    PWF Project Workbook Milestone Plan

  • 7/31/2019 G5 Project Workbook-Revise in Reflection 01Apr2012

    21/41

    or review by BL For review by CPWF

    eview of evidence of delivery of

    milestone and of research quality

    nd relevance

    Review of evidence of delivery of

    milestone and quality check of BLs

    review

    PWF Project Workbook Milestone Plan

  • 7/31/2019 G5 Project Workbook-Revise in Reflection 01Apr2012

    22/41

    PWF Project Workbook Milestone Plan

  • 7/31/2019 G5 Project Workbook-Revise in Reflection 01Apr2012

    23/41

    PWF Project Workbook Milestone Plan

  • 7/31/2019 G5 Project Workbook-Revise in Reflection 01Apr2012

    24/41

    PWF Project Workbook Milestone Plan

  • 7/31/2019 G5 Project Workbook-Revise in Reflection 01Apr2012

    25/41

    PWF Project Workbook Milestone Plan

  • 7/31/2019 G5 Project Workbook-Revise in Reflection 01Apr2012

    26/41

    PWF Project Workbook Milestone Plan

  • 7/31/2019 G5 Project Workbook-Revise in Reflection 01Apr2012

    27/41

    PWF Project Workbook Milestone Plan

  • 7/31/2019 G5 Project Workbook-Revise in Reflection 01Apr2012

    28/41

    Gantt Chart

    Project Name

    Date

    No. Activity/ MilestoneQ1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2

    Output 0: Project management systems in place, resulting in a well coordinated research program delivering high quality research o

    engagement with development partners

    Activities 0.10 Contract Signed

    0.20 Complete staff recruitment

    0.30 Prepare Project Inception Workshop and Launch Event

    0.40 Host Inception Workshop and Launch Event (May 2011)

    0.50 Submission of Inception Report

    0.60 Host Bi-monthly Project Meetings

    0.70 Prepare and Host Annual Project Meeting and Reflection event

    0.80 Participate in International Forum on Water and Food (3,4)

    0.90 Prepare annual project progress reports0.10 Prepare and Host Final Project Meeting/Event

    0.11 Final report

    Milestones 0.a Contract signing 0.a

    0.b Inception workshop 0.b 0.b

    0.c Inception report submitted 0.c 0.c

    0.d Annual report submitted 0.d 0.d 0.d

    0.e Final report submitted

    Output 1: Adaptive management system

    Activities 1.1 Prepare plan and develop adaptive management system

    including M&E/learning for innovation

    1.2 Complete documentation on adaptive management system

    1.3 Provide support to G1-G4 team as needed to implement

    1.4 Bi-monthly meetings of Dhaka team leaders

    1.5 Bi-annual team leaders and reflection events

    Milestones 1.a Adaptive management system completed 1.a 1.a

    Coordination and Change-Enabling Project

    April 12, 2011

    2011 2012

    PWF Project Workbook Gantt Chart

  • 7/31/2019 G5 Project Workbook-Revise in Reflection 01Apr2012

    29/41

    Project Name

    Date

    No. Activity/ Milestone

    Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2

    Coordination and Change-Enabling Project

    April 12, 2011

    2011 2012

    Output 2: Gender strategy

    Activities 2.1 Develop a gender guidance document/strategy based on CSIA

    and CRP1.3 strategy

    2.2 Hold training and awareness raising actions to support teams

    (G2 and G3 in particular) to implement gender strategy in their

    Milestones 2.a Gender guidance document/strategy released for CWFP

    Ganges researchers/partners

    2.a

    Output 3: Communication strategy

    Activities 3.1 Engage with G1-G4 partners and CPWF management to

    develop strategy

    3.2 Complete communication strategy inc. data management

    among other Ganges projects

    3.2 Establish internal communications systems/web

    3.4 Implement communications strategy/engagement with

    Milestones 3.a Communication strategy completed 3.a 3.a

    3.b Web site launched (Private wiki, public Ganges BDC component

    of CPWF/links to other relevant sites)

    3.b

    Output 4: Policy products and processes derived from research outputs, supporting wider scaling up and out of Ganges research out

    Activities 4.1 Conduct program baseline survey (community, institutions,

    relevant development actors, using tools such as netmap)

    4.2 Policy dialogue engagement strategy prepared

    4.3 Policy communication materials released4.4 Evaluation of lessons learned (via reflection events, and M&E

    processes)

    Milestones 4.a Initial visioning and planning for policy change with partners

    and other Ganges BDC projects

    4.a 4.a 4.a

    4.b Interim evaluation 4.b 4.b

    4.c Policy lessons prepared

    CPWF Project Workbook Gantt Chart

  • 7/31/2019 G5 Project Workbook-Revise in Reflection 01Apr2012

    30/41

    Project Name

    Date

    No. Activity/ Milestone

    Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2

    Coordination and Change-Enabling Project

    April 12, 2011

    2011 2012

    Output 5: Development actors (government, NGO, private sector) effectively engaged with a range of knowledge and capacity build

    that support translation of research outputs to development outcomes and impacts

    Activities 5.1 Conduct program baseline survey (with 2.1)

    5.2 Development partner engagement strategy prepared (with 2.2)

    5.3 Communication materials released, training activities

    5.4 Evaluation of lessons learned

    Milestones 5.a Initial visioning and planning for engaging with development 5.a 5.a 5.a

    5.b Interim evaluation 5.b

    5.c Lessons prepared

    Output 6: Innovation research that contributes to increased understanding of ways of creating development outcomes and impacts

    Activities 6.1 Prepare research plan for Innovation for Learning Research

    6.2 Consult with CPWF and Learning to Innovate TWG for inputs to

    research plan, and prepare concepts for any complementary

    research required

    6.3 Identify/obtain complementart funds for Innovation research

    6.4 Implement Innovation Research

    6.5 Sharing of outputs and experiences

    Milestones 6.a Research plan completed 6.a 6.a

    6.b Outputs as defined in final Innovation Research plan 6.b

    6.c Final synthesised output on Innvovation Research (science

    paper, lessons learned synthesis document)

    CPWF Project Workbook Gantt Chart

  • 7/31/2019 G5 Project Workbook-Revise in Reflection 01Apr2012

    31/41

    Schedule of Reports and Payments

    Project Name

    Date

    No. Amount (US$) Comment Due Date

    1Paid on return of the signed Award Letter. These funds are to cover

    the first six months activities of the Project

    2Paid following satisfactory assessment of progress of the first 6

    months of project implementation.

    3Paid following satisfactory assessment of progress of the first 12

    months of project implementation.

    4Paid following satisfactory assessment of progress of the 18 months

    of project implementation.

    5

    Paid following satisfactory assessment of progress of the 24 months

    of project implementation. The milestone plan for the following two

    years of project activities must also be approved.

    6Paid following satisfactory assessment of progress of 30 months of

    project implementation.

    7

    Paid following satisfactory assessment of progress of 36 months of

    project implementation. A review may also be undertaken at this

    point at the discretion of the CPWF.

    8Paid on acceptance of the Project Completion Report and an external

    audit report.

    This worksheet will be filled by CPWF Finance Officer for contracting

    Coordination and Change Enabling Project (G5)

    April 12, 2011

    CPWF Project Workbook Schedule of Reports and Payments Page 31 of 41

  • 7/31/2019 G5 Project Workbook-Revise in Reflection 01Apr2012

    32/41

    Budget Summary(Before working on the Personnel budget cells, complete the other spreadsheet named PNXX $ Time Allocation)

    Project Name

    Date

    2011 2012 2013 2014 TOTAL

    1 PERSONNEL REMUNERATION, TRAVEL AND ACCOMMODATION

    1.1 PERSONNEL

    1.1.1 Project Leader 16,758 31,026 33,508 12,063 93,356

    1.1.2 Principal Investigators (Int'l ) 32,725 26,636 15,835 11,768 86,964

    1.1.3 Principal Investigators (Nat'l) 17,133 39,654 40,843 4,792 102,422

    1.1.4 Consultants- national contracts 20,592 37,862 38,179 1,500 98,132

    1.1.5 Support Staff - - - - -

    1.1.6 Other Project Participants -

    1.2 TRAVEL AND ACCOMMODATION

    1.2.1 Project Leader 3,000 5,000 5,000 1,500 14,5001.2.2 Principal Investigators (Int'L & Reg'l) 3,000 5,000 5,000 2,500 15,500

    1.2.3 Principal Investigators & other Science

    staffs(National)

    8,000 11,000 10,000 4,000 33,000

    1.2.4 Consultants -

    1.2.5 Support Staff -

    1.2.6 Other Project Participants -

    2 RESEARCH OPERATION

    2.1 EQUIPMENT

    2.1.1 Office equipment 6,500 6,500

    2.1.2 Laboratory equipment -

    2.1.3 Field equipment -

    2.2 CONSUMABLES

    2.2.1 General communication expenses 2,520 3,600 3,600 1,200 10,920

    2.2.2 Office supplies 2,200 4,000 4,000 1,200 11,400

    2.2.3 Laboratory supplies -

    2.2.4 Field research supplies 1,000 2,000 2,000 500 5,500

    2.2.5 Other support services (IT services, public

    areas, facilities, rent, utilities)

    1,600 2,400 2,400 800 7,200

    2.3 COMMUNICATIONS

    2.3.1 Communications products 6,000 8,000 8,000 1,000 23,000

    2.3.2 Bi-monthly team meetings 1,200 2,000 2,000 600 5,800

    2.3.3 Team/partner training events 3,000 3,000 3,000 500 9,500

    2.3.4Participation in Reflection WorkshopsNational Contract 8,000 8,000 8,000 5,500 29,500

    2.3.5 Participation in IFWF3 and IFWF4 10,000 10,000 20,000

    3 LUMP SUM CONTRACT AGREEMENTS FOR SPECIFIC DELIVERABLES

    3.1 BRAC sub-contract 25,000 50,000 50,000 20,000 145,000

    3.2 Training sub-contract 10,000 20,000 20,000 7,500 57,500

    Coordination and Change Enabling Project (G5)

    April 12, 2011

    CPWF Project Workbook Budget Summary Pa

  • 7/31/2019 G5 Project Workbook-Revise in Reflection 01Apr2012

    33/41

    4 MISCELLANEOUS

    4.1 CONTINGENCY (% OF BUDGET) -

    4.2 OVERHEADS 29,964 41,241 41,661 11,439 124,306

    [WorldFish (19.21% - direct cost 27,514 36,341 36,761 9,494 110,111

    [WorldFish (7% on totalsubcontrcat] 2,450 4,900 4,900 1,945 14,195

    [INSTITUTION (% ] -

    [INSTITUTION (% ] -

    [INSTITUTION (% ] -

    TOTAL REQUESTED FROM CPWF 208,192 300,420 303,026 88,362 900,000

    CPWF Project Workbook Budget Summary Page

  • 7/31/2019 G5 Project Workbook-Revise in Reflection 01Apr2012

    34/41

    Budget CommentsPlease provide as much information as possible to enable a good understanding of the key expenditures required.

    Project Name Coordination and Change Enabling Project

    Date April 12, 2011

    COMMENTS

    MATCHING FUND (if any) US$225,454

    1 PERSONNEL REMUNERATION, TRAVEL AND

    ACCOMMODATION

    1.1 PERSONNEL

    1.1.1 Project Leader

    1.1.2 Principal Investigators (Int'L & Reg'l) Includes budget for "Senior coordinator" (William Collis,

    Director WorldFish South Asia) who will support the Basin

    leader and complementary high level and change-enabling

    support; and necessary international staff responsible for

    certain project activities. Costing are based on WorldFishnorms, but without service charges which is provided by

    WorldFish as a matching fund. Some partial support to the

    Coordination role of William Collis is also provided by CSISA

    1.1.3 Principal Investigators (Nat'l) Includes budget for several national staff supporting the

    project in various roles. Costing are based on WorldFish norms,

    but without service charges which is provided by WorldFish as

    a matching fund.

    1.1.4 Consultants Several Bangladesh consultants are included. They have been

    identified because of their ability to advise on policy influence

    within government, adding considerable value to the work of

    Project G5

    1.1.5 Support Staff

    1.1.6 Other Project Participants

    1.2 TRAVEL AND ACCOMMODATION

    1.2.1 Project Leader Domestic travel for project leader, covering field visit travel,

    rent a car/petrol as needed, living allowance, accomodation

    and related expenses.

    1.2.2 Principal Investigators (Int'L & Reg'l) Domestic and international travel, living allowances and

    accomodation for project staff.

    1.2.3 Principal Investigators & other Science

    staffs(National)

    Domestic travel for project staff, covering field visit travel, car

    rent as necessary or petrol for WorldFish vehicle depending onneeds, living allowances, costs of accomodation. This travel

    cost is necessary for proper and effective management of the

    project. Costs will follow WorldFish norms.

    1.2.4 Consultants

    1.2.5 Support Staff

    1.2.6 Other Project Participants

    CPWF Project Workbook Budget Comments Page 34 of 41

  • 7/31/2019 G5 Project Workbook-Revise in Reflection 01Apr2012

    35/41

    2 RESEARCH OPERATION

    2.1 EQUIPMENT

    2.1.1 Office equipment Computers,printers and other minor furniture items required

    for projects staff.

    2.1.2 Laboratory equipment

    2.1.3 Field equipment

    CPWF Project Workbook Budget Comments Page 35 of 41

  • 7/31/2019 G5 Project Workbook-Revise in Reflection 01Apr2012

    36/41

    2.2 CONSUMABLES

    2.2.1 General communication expenses Telephone, internet and mobile phone allownace for project

    related staff. This budget is exclusively for project staffs.

    2.2.2 Office supplies Contribution to stationery, office supplies, cleaning materials,

    computer printing supplies and others.

    2.2.3 Laboratory supplies

    2.2.4 Field research supplies Field research activities such as data collection and relatedpurposes.

    2.2.5 Other support services (IT services, public

    areas, facilities)

    Hub office rent, electricity, water, gas, office facility

    maintenance, and others IT services.

    2.3 COMMUNICATIONS

    2.3.1 Communications products Various items (publications, policy briefs, posters, etc

    depending on needs)

    2.3.2 Bi-monthly team meetings Minor expenses associated with organisation of bi-monthly

    meetings

    2.3.3 Team/partner training events Costs associated with training events and meetings for project

    participants and partners.2.3.4 Participation in Reflection Workshops National contract will be provided for organisation of reflection

    workshops

    2.3.5 Participation in IFWF3 and IFWF4 Participation in IFWF3 and IFWF4

    3 LUMP SUM CONTRACT AGREEMENTS FOR

    SPECIFIC DELIVERABLES

    3.1 BRAC sub-contract Lump sum contract will be provided to the Bangladesh Rural

    Advancement Committee (BRAC) for deliverables associated

    with largely with Output 3 (75%) and advisory service related

    to the remaining Outputs (25%)

    3.2 Training sub-contract This budget is for a training subcontract(s) to a Bangladesh-

    based organisation. Discussion are being held with a

    Bangladesh agency named "Programme Support Professionals

    Limited" with experience in developing training tools, and

    delivering training to government, donor projects and NGOs.

    3.3

    4 MISCELLANEOUS

    4.1 CONTINGENCY (% OF BUDGET)

    4.2 OVERHEADS WorldFish audited overhead costs are appliedOVERHEADS Partners amount - 7% OH has been calculated (though

    WorldFish overhead rate is 19.21%)

    [INSTITUTION (% ]

    [INSTITUTION (% ]

    [INSTITUTION (% ]

    [INSTITUTION (% ]

    CPWF Project Workbook Budget Comments Page 36 of 41

  • 7/31/2019 G5 Project Workbook-Revise in Reflection 01Apr2012

    37/41

    Staff Time Allocation and Breakdown of Personnel Costs

    Project NameDate

    1.1.1 Basin Leader Dr. Nowsher Ali Sarder WorldFish CGIAR Project/Basin leader responsible for overall

    management of Project G5 (Outputs 0-6)

    1.1.2 PI (Int'l) William J Collis WorldFish CGIAR WorldFish South Asia Director will provide a sen

    role in oversight of the project and

    connections/advice to major development acto

    senior govt policy makers (Outputs 0-6). Additio18 days over the period of the project will be co

    by CRP1.3.

    PI (Int'l) Charlie Crissman WorldFish CGIAR Science advice on establishing M&E/adaptive

    management systems (Output 1) and innovation

    research (Output 6)

    PI (Int'l) Michael Phillips WorldFish CGIAR Science support on reporting, communications

    related to Outputs 3,4 and 5

    PI (Int'l) Ben Belton WorldFish CGIAR Science support to M&E (Output 1) and in-basin

    coordination of innovation research (Output 4).

    Additional 18 days for Innovation Researhc over

    period of the project will be covered by CRP1.3.

    PI (Int'l) Fiona Chandler WorldFish CGIAR Support to development of communications

    strategy, and synergies with WorldFish/CRPcommunications systems. Participation support

    WorldFish

    PI (Int'l) Nireka Weeratunge-Starkloff WorldFish CGIAR Advice on gender strategy and initial training (O

    2) and oversight in some follow up actions in

    cooperation with Bangladesh based research

    assistant below

    1.1.2 PI (Reg'l)

    1.1.3 PI (Nat'l) Benoy Kumar Barman WorldFish CGIAR Science support

    PI (Nat'l) Sabina Islam WorldFish CGIAR Gender strategy development and Gangese G5implementation support (inputs - 10% of time) p

    for by CSISA

    PI (Nat'l) Md. Emdad Hossain WorldFish CGIAR National-recruited staff to support adapative

    management and M&E system and Innovation

    Research (Output 1, and contributions to 4-6)

    PI (Nat'l)

    PI (Nat'l) TBD WorldFish CGIAR National-recruited staff for support through Out

    4-6 according to need

    PI (Nat'l) TBD WorldFish CGIAR National-recruited staff for support through Out

    4-6 according to need

    1.1.4 Consultants Hamid Miah Consultant Private Agriculture expert with excellent understandingpolicy processes, and connections to senior

    agriculture policy makers, and will assume

    responsibility for advising program on strategies

    influencing policy related to agriculture and

    aquaculture research outputs (G2 particularly)

    No. Personnel Name Institution

    April 12, 2011

    Type of

    Institution

    Brief Description of Contribution to Project, as desc

    in G5 Contacts (Project Workbook)

    Coordination and Change Enabling Project (G5)

  • 7/31/2019 G5 Project Workbook-Revise in Reflection 01Apr2012

    38/41

    Date

    No. Personnel Name Institution

    April 12, 2011

    Type ofInstitution

    Brief Description of Contribution to Projecin G5 Contacts (Project Workbo

  • 7/31/2019 G5 Project Workbook-Revise in Reflection 01Apr2012

    39/41

    Indicative Breakdown of Budget by Output

    Project Name

    Date

    Output Institution $ value of the budget

    WorldFish (10%) 59,937

    BRAC (1%) 1,450

    Local consultants (4%) 6,225

    Total for Output 1 67,612

    WorldFish (10%) 59,937

    BRAC (1%) 1,450

    Local consultants (4%) 6,225

    Total for Output 2 67,612

    WorldFish (10%) 59,937

    BRAC (1%) 1,450

    Local consultants (4%) 6,225

    Total for Output 3 67,612

    WorldFish (10%) 59,937BRAC (2%) 2,900

    Local consultants (4%) 6,225

    Total for Output 4 69,062

    WorldFish (25%) 149,842

    BRAC (15%) 21,750

    Local consultants (65%) 101,161

    Total for Output 4 272,753

    WorldFish (25%) 149,842

    BRAC (75%) 108,750

    Local consultants (15%) 23,345

    Total for Output 4 281,937

    WorldFish (10%) 59,937

    BRAC (5%) 7,250

    Local consultants (4%) 6,225

    Total for Output 4 73,412

    TOTAL 900,000

    Output No. 5: Development actors

    engaged

    Output No. 6: Innovation research

    Output No. 3: Communications strategy

    April 12, 2011

    Ganges Coordination and Change Enabling Project

    Output 0: Project management systems

    in place

    Output No. 1: Adaptive management

    system

    Output No. 2: Gender strategy

    Output No. 4: Policy products

    CPWF Project Workbook Indicative Breakdown of Budget by Output Page 39 of 41

  • 7/31/2019 G5 Project Workbook-Revise in Reflection 01Apr2012

    40/41

    % share of the budget

    7%

    0%

    1%

    8%

    7%

    0%

    1%

    8%

    7%

    0%

    1%

    8%

    7%0%

    1%

    8%

    17%

    2%

    11%

    30%

    17%

    12%

    3%

    31%

    7%

    1%

    1%

    8%

    100%

    CPWF Project Workbook Indicative Breakdown of Budget by Output Page 40 of 41

  • 7/31/2019 G5 Project Workbook-Revise in Reflection 01Apr2012

    41/41

    Indicative Breakdown of Budget by Institution

    Project Name

    Date

    Institution Total $ value Total % share Comments

    WorldFish Center 599,367 66.6%

    BRAC 145,000 16.1%

    Local consultants for provision of

    expert advice, sub-contracts for

    communications and partner

    organizations for conduct of training

    activities

    155,632 17.3%

    TOTAL 900,000 100.0%

    Ganges Coordination and Change Enabling Project (G5)

    April 12, 2011

    Note: the local (Bangladesh) direct contracts

    are 33.40% of total budget; the proportion willhowever increase during implementation

    through sub-contract for reflection events,

    communication products and training activities

    . Beside sub contrcat we have separate budget