FORM.1.4 FRONT COVER PAGE TO TENDER DOCUMENTS TAMILNADU HIGHWAYS DEPARTMENT TENDER DOCUMENT NAME OF WORK : Construction of Bridge at Km0/10 of Periyakottai -Kovilur road to Kopmbaiyanpatti village road (via) kasthurinaikenpatti SERIAL NO. : - 3 NO.OF PAGES :- NO OF DRAWINGS : PRICE : 15000+ 600 ISSUED BY : DIVISIONAL ENGINEER (H) DINDIGUL DIVISION SOLD TO THIRU/ MS : DATED INITIAL OF OFFICER: SENIOR DRAUGHTING OFFICER OFFICE OF THE DIVISIONAL ENGINEER (HIGHWAYS), DINDIGUL Tenders.IndiaMart.com

Upload: others

Post on 12-Feb-2022

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: FORM.1.4 FRONT COVER PAGE TO TENDER DOCUMENTS …

FORM.1.4

FRONT COVER PAGE TO TENDER DOCUMENTSTAMILNADU HIGHWAYS DEPARTMENT

TENDER DOCUMENT

NAME OF WORK : Construction of Bridge at Km0/10 of Periyakottai -Kovilur road to Kopmbaiyanpatti village road (via) kasthurinaikenpatti

SERIAL NO. : - 3

NO.OF PAGES :-

NO OF DRAWINGS :

PRICE : 15000+ 600

ISSUED BY : DIVISIONAL ENGINEER (H)DINDIGUL DIVISION

SOLD TO THIRU/ MS :

DATED INITIAL OF OFFICER: SENIOR DRAUGHTING OFFICER OFFICE OF THE DIVISIONAL ENGINEER (HIGHWAYS), DINDIGUL

Ten

ders

.India

Mar

t.com

Page 2: FORM.1.4 FRONT COVER PAGE TO TENDER DOCUMENTS …

THIRU/TMT.

Tender Date:23.12.2009TOSUPERNDENTING ENGINEER,(HIGHWAYS)MADURAI. Sir,

I/We do hereby tender and if this Tender be accepted undertake to

execute the following work viz. OF “Construction of Bridge at Km0/10 of Periyakottai -Kovilur road to Kombaiyanpatti village road (via) kasthurinaikenpatti "as in the drawing

and described in the specifications attached with the bid documents with such variations by

way of alterations of, additions to and omissions from the said works and methods of payment

as are provided for in the conditions of contract at estimate rates/ Or at…………………………

……………………….percent below estimate rates or at………………………………………….

……….percent above estimate rates indicated in schedule-A

I/We hereby agree that when works are executed by way of alterations of, additions

to omissions and or any new items not contemplated in the bid document, rates for these

items derived as laid down in clause 110-04 of P.S.to S.S.R.B.

I/We hereby distinctly and expressly declare and acknowledge that before the

submission of my/our Tender, I/We have carefully followed the instructions in the Tender

Notice and have read Standard Specifications for roads and bridges and preliminary

specifications to standard specification for roads and bridges, the specifications for roads

and bridge works of Ministry of Surface Transport and that I/We have made such

examination of the contract documents and of the plans, specifications and quantities and of

the locations where the said work is to be done and such investigation of the work required

to be done and in regard to the materials required to be furnished as to enable me/us to

thoroughly understand the intention of the same and the requirement, covenants,

agreements, stipulations and restrictions contained in the contract and in the said plans and

specifications and distinctly agree that I/We will not hereafter make any claim or demand

upon the Government of Tamil Nadu based upon or arising out of any alleged

misunderstanding or misconception or mistake on my/our part of the said requirement,

covenants, agreements, stipulations and restriction and conditions in executing the work.

I/We shall keep the rate of progress of work as stipulated in the tender notice.

2

Page 3: FORM.1.4 FRONT COVER PAGE TO TENDER DOCUMENTS …

I/We, being a registered contractor of the Highways Department enclose the

certificate of Income Tax Verification and Sales Tax Clearance Certificate valid for the

current year.

I/we, enclose herewith a Chalan No. _________________________Dated.

____________for the payment of the sum of Rupees ______________________ as earnest

money remitted at _____________________Treasury under revenue deposit. I my/our

tender is accepted, the earnest money may be retained by the Department as security

deposit for the due fulfillment of the contract by transferring the same to the credit of the

Divisional Engineer(Highways) Dindigul Division. If upon intimation being given to me/us by

the Super tending Engineer on acceptance of my/out tender, fail to attend the said office on

the date fixed therein, or if I/We fall to make the further security/additional security deposit as

may be intimated and enter into the required agreement, then I/We agree to the forfeiture of

the earnest money not as penalty but in payment of liquidated damages sustained as a

result of such failure.

Address to which intimation/notice is to be sent.

I/We fully understand that the written agreement to be entered into between me/us

and the Government shall be the foundation of the right of both the parties and contract shall

not be deemed to be complete until the agreement has first been signed by me/us and then

by the proper officer authorized to enter into contract on behalf of Government.

I/We are professionally qualified and my/our qualifications are given below:-

Name Qualification

I/We will employ the following technical staff for supervision of the work and will see that one of them is always present at works site personally checking all items of works and paying extra attention to such works which require special attention (e-g) Reinforced concrete work etc., I/We fail to employ the technical assistants.

3

Page 4: FORM.1.4 FRONT COVER PAGE TO TENDER DOCUMENTS …

Name of the Members of Technical Staff Proposed to be Employed Qualification

SIGNATURE OF THE CONTRACTOR

Station:-

Date

4

Page 5: FORM.1.4 FRONT COVER PAGE TO TENDER DOCUMENTS …

TENDER NOTICE

1. For and behalf of the Governor of Tamil Nadu, sealed tenders on percentage basis at

estimate rates of above estimate rates or below estimate rates will be received by the

SUPERDENDING ENGINEER (HIGHWAYS) MADURAI. at his Office upto 3.00 p.m.

(Office Clock) on 23.12.2009 FOR THE WORK OF OF “Construction of Bridge at Km0/10 of Periyakottai -Kovilur road to Kombaiyanpatti village road (via) kasthurinaikenpatti”

2. The tender should be in the prescribed form obtainable from the Divisional Engineer

(Highways) Dindigul Division 3.12.2009 on all working days during the office hours.

3. The tenders will be opened by the Superintending Engineer (Highways) Madurai at

his office at 3.15 p.m. as per the Office Clock, on the same day (ie). 23.12.2009

4. The tenderer or their authorized agents are expected to be present at the time of

opening of tenders. The tender receiving officer will be opening each tender and

initial all corrections in the presence of the tenderer. The tenderer shall accept the

corrections without any questions whatsoever.

5. Tenders must be submitted in sealed covers and should be addressed to the

Superintending Engineer (Highways) Madurai. The name of the tenderer and the

name of the work shall be noted on the cover.

6. If the tender is made by an individual, it shall be signed with the full name and his

address shall be given. If it is made by a firm, it shall be signed with the co-partnership name, by a member of the firm, who shall also sign his own name and the names and addresses of each member of the firm shall be given, If the tender is made by a corporation, it shall be signed by duly authorized officer who shall produce with his tender satisfactory evidence in support of his authorization. Such tendering corporation may be required before the contract is executed, to furnish evidence of its corporate existence.

7. The tenders who have registered in the Highways Department under Category Class I and above are eligible to tender for this work as already notified in the tender notice.

7.1 The contractors who have reclassified as per G.O M.S No.251/ Highways (HN1) Department / Dated: 12.10.2007 are eligible to participate in the tender. The attested copy of the above should certainly be enclosed with the tender document.

8.1 Each tenderer must send a certificate of Income Tax Verification from the appropriate Income Tax authority in the form prescribed there for. This Certificate shall have validity for one year from the date of issue for all tenders submitted during the period.

8.2 Each tenderer must also send a certificate of Sales Tax Verification issued during current year from the appropriate authority.

5

Page 6: FORM.1.4 FRONT COVER PAGE TO TENDER DOCUMENTS …

8.3 In case of proprietary or partnership firm it will be necessary to produce the certificate for the proprietor or proprietors and for each of the partners as the case may be.

8.4 It the tenderer is a registered contractor in the department and if certificate for the current year had already been produced during the calendar year in which the tender is made, it will be sufficient if the particulars regarding the previous occasion in which the certificate was produced are given. However a Xerox copy of the certificates shall be furnished.

8.5 All tenders received without certificate of Income Tax Clearance and Sales Tax Clearance is liable to be rejected.

9.1 Each tenderer must pay as Earnest Money Deposit a sum of Rs.73000 /- (Rupees Seventy three thousand only) In any form of a security such as [1] National Savings Certificate pledged in favour of Divisional Engineer(Highways) Dindigul Division and not in favour of Governor etc., [2] Demand Draft from Nationalized scheduled Bank in favour of the Divisional Engineer(Highways) Dindigul Division[3] Ingra Vikas Patras which have not matured for payment along with covering letter giving numbers of those Patras and also noting the name of tenderer in the back side of Patras and enclosed with his tender (4) Kisan Vikas Patras duly pledged in favour of the Divisional Engineer (Highways) Dindigul Division subject to the condition that the short term securities obtained shall be kept valid for reasonable tenure till decision of tender is finalized. If the National Savings Scripts, Postal Scripts, Post Office Savings not pledged in favour of Divisional Engineer (Highways) Dindigul are enclosed with pledge forms signed by the contractor without actually pledging, the tender will be summarily rejected. The Earnest Money Deposit will be refunded to the unsuccessful tenderer on application after the decision on the tender is taken or at the expiration of 120 days from the date of tender whichever is earlier. This refund will be authorized by the Divisional Engineer (Highways) Dindigul Division. The Earnest Money Deposit will not be received in cash or currency notes or Cheques or bank guarantee or Prize Bonds or IPOS or Bank Drafts from non-scheduled bank. The successful tenderer should replace the E.M.D (furnished in modes other than bank guarantee wherever provided for) in the form of small savings scripts/deposits accounts etc. duly pledged in favour of the Divisional Engineer. The tenders who furnish Earnest Money Deposit in the shape of Indra Vikas Patras should note their name in the backside of the Indra Vikas Patras and also they should enclose a letter along with their tender noting the Registration Number of the Indra Vikas Patras enclosed with the tender.

9.2 Tenders not accompanied with the notified Earnest Money Deposit in the acceptable form shall be rejected.

9.3 Earnest Money Deposit will be retained in the case of successfully tenderer and will not carry any interest. It will be dealt with as provided in the tender.

10.1 The successful tender will be notified by a letter sent by registered post to the

address shown on his tender that his tender has been accepted. The tenderer shall

attend the Office of the Superintending Engineer (H) Madurai -2. on the date fixed by

written information to him. He shall, forthwith upon intimation being given to him by

the superintending Engineer (H) Madurai-2. of acceptance of his tender, sign an

6

Page 7: FORM.1.4 FRONT COVER PAGE TO TENDER DOCUMENTS …

agreement in the proper departmental form for the due fulfillment of the

contract.

A Further Security deposit of Rs.178200 /- Or such other sums as will be intimated

to him shall be furnished in the shape of small savings scripts. This Security deposit

together with the Earnest Money Deposit and the amount withheld according to the

clause 110 of the Preliminary Specification to S.S.R.B shall be retained as security

for the due fulfillment of this contract. If, upon intimation being given to the successful

Tenderer by the Superintending Engineer(Highways) Madurai-2 Circle of acceptance

of his tender, the tenderer fails to make the further security deposit and or additional

security deposit and to enter into the referred agreement, it will be considered as just

cause for the annulment of the award of contract and the said earnest money

referred in clause 9.1 of the tender notice shall be forfeited, not as a penalty but in

payment of liquidated damages sustained as a result of such failure.

10.2 The written agreement to be entered into, between the contractor and Government shall be the foundation of all rights of both the parties and the contract shall not deemed to be complete until the agreement has first been signed by the contractor and then by the proper Officer authorized to enter into contracts on behalf of the Government of Tamil Nadu.

11. The Preliminary Specifications to the standard specifications for Roads and Bridges construction shall from an inseparable condition of the contract in all agreements entered into by the contractor for execution of work for the Tamil Nadu Highways Department.

12. For items of works in buildings and structure not covered by the specifications, relevant items from Tamil Nadu Building Practice, National Building Code as amended from time to time shall apply.

13. The tenderer shall examine closely the SSRB, MORT&H and TNBP and also the Standard Preliminary Specifications to SSRB contained therein before submitting his tender which shall be for finished work in situ. He shall also carefully study the drawings and descriptive specifications supplementing Schedule-A and all documents which form part of the agreement to be entered into by the accepted tenderer. It shall not be necessary to append these Standard Specifications and codes with the bid documents and they shall be deemed to be inseparable part of bid document and agreement to be entered into.14. The tender’s attention is directed to the requirements of materials under the clause

“Materials and the Workmanship” in the Preliminary Specifications, SSRB, MORT&H confirming to the Specification, Bureau of Indian Standard and Indian Roads Congress Shall be used in the work and the tenderer shall quote his tender percentage accordingly.

15.1 Every tenderer is expected before quoting his tender percentage to inspect the site of the proposed work. He should also inspect the quarries and other sources of materials and satisfy himself about the name of quarries, Kilns etc., where from certain materials are to be obtained as given in the descriptive specification sheet.

15.2.1 The best class of materials to be obtained from the quarries and other sources designated shall be used on work. In every case the materials must comply with the relevant standard specifications. Samples of materials as called for in the Standard

7

Page 8: FORM.1.4 FRONT COVER PAGE TO TENDER DOCUMENTS …

Specifications or in the tender notice or as required by the Divisional Engineer(H) in any case shall be submitted for the Divisional Engineer’s approval before the supply to the site of work is begun.

16. The Government will not however, after acceptance of the tender, pay and extra for lead for any other reasons in case the contractor is found later on to have misjudged the quality or quantity of materials available. Attention of the contractor is directed to the Standard Preliminary Specifications regarding payment of seignior age, tool etc.,

17.1 The Tender’s particular attention is drawn to the sections and clauses in the Standard Preliminary Specifications dealing with :

1. Test inspection and rejection of defective materials of work.

2. Carriage.

3. Construction plants.

4. Water and lighting.

5. Clearing up during progress and for delivery

6. Accidents.

7. Delays.

8. Particulars of payment.

17.2 The tenderer should closely peruse all the specification clauses Which govern the rates for which he is tendering.

18. A schedule of quantities with estimate rates accompanies the tender document. It shall be definitely understood that the Government does no accept any responsibility for the correctness or completeness of quantities in the schedule and that this schedule of quantity is liable to alterations, omissions, deductions, additions at the discretion of the Divisional Engineer (Highways) Madurai Division or as set forth the tenderer will how ever base his overall tender percentage, with reference to the departmental estimate rates indicated in Schedule-A.

19. The tenderer shall quote in the tenders the over all percentage with reference to the estimate value at which he will undertake to do the whole work subject to the conditions of contract. The tender percentage shall be written legibly and free from erasures. Over writings or conversions of figures, or corrections, where unavoidable should be made by crossing out, initialing dating and rewriting.

20. Tenders not submitted in proper from or within the due time will be rejected. Lump sum amounts for items not called for shall not be included in the tender. No alteration which is made by the tenderer in the tender or the conditions of contract, the drawing, specifications or quantities accompanying the same will be recognized and if any such alterations are made, the tender will become invalid.

21. The attention of the tenderer is drawn to the contract requirements as to the time of commencement of work. The rate of progress and the dates for completion of the whole work and the several activities shall be as indicated below. The date of

8

Page 9: FORM.1.4 FRONT COVER PAGE TO TENDER DOCUMENTS …

commencement of this program will be the date on which the site (Premises) is handed over to the Contractor. The time fixed for completion of the entire work shall be 8 Months.

PROGRAMME FOR COMPLETION OF WORK:

Sl.No.

Period (Cumulative from the date of handing over the site )

Milestone fixed for completion.

22. No part of the contract shall be sublet without written permission of the Divisional Engineer (Highways) nor shall transfer be made.

23. If any further information is required the Divisional Engineer (Highways) Dindigul Division will furnish such information but it must be clearly understood that tenders must be fully in order and according to instructions.

24. The Superintending Engineer Highways, Madurai or other competent authority reserve the right to reject any tender or all the tenders without assigning any reasons therefore.

25. The tenderer submitting a quotation which the tender accepting authority considers excessive or indicate of insufficient knowledge of current prices or definite attempt at profiteering, will render himself liable to be debarred as the accepting authority may decide. The percentage should be based on the controlled prices under the provision of clause 6 of the Hoardings and Profiteering Preventive Ordinance 1943 as amended from time to time and similar principle in regard to labor and supervision in the constructions.

26. A statement giving brief particulars of equipment and resources that will be but at the disposals in respect of the following classifications should accompany the tender.

a. Equipment ---Transport --- for--- materials- Lorries --- Concrete --- Mixer etc.,

b. Organization 1. Technical2. Unskilled

c. Methods that will be accepted to speed up the work for the entire Completion within the prescribed time.

27. No foreign exchange would be released by the Government for the Purchase of plant and machinery for the work.

28. The tenderer shall also submit the detailed working drawings with

9

Page 10: FORM.1.4 FRONT COVER PAGE TO TENDER DOCUMENTS …

Sequence of construction required for each stage of work regarding foundation, substructure and superstructures. The tenderer shall submit list of machineries, required, the source and availability.

29. The contractor’s quoted tender percentage shall be inclusive of all taxes duties, fees, tolls, insurance, contribution to labour welfare fund and others if

any which he has to pay to the Government and other bodies as the concerned laws would require.

30. The levels furnished in the plan are based upon the investigation done by this department. If there are any change in levels, water levels etc. during actual execution, the contractors, are bound to accept them and they are not eligible for any extra claim for such change in levels etc.,

31. The tenderer must submit a detailed specification of materials and tests to be Conducted to ensure the quality of materials proposed to be used in the Construction

32.1.1 The traffic will be allowed in the diversion road during execution and for which necessary provisions have been included in this tender.

32.2 The contractor should make traffic barricading providing danger lights and other such arrangements for the safety of the traffic during execution at his cost.

32.2.1 The contractor should make his own arrangements to form and maintain the diversion or approach road for the conveyance of materials to the work spot at his cost and the department will not make any payment for this item. This should be the responsibility of the contractor.

33. The validity of tender should be for 90 days from the date of Tender.

34. THE TENDERER SHOULD QUOTE THEIR TENDER PERCENTAGE BOTH IN WORDS AND FIGURES CLEARLY IN THE TENDER FORM ONLY.

SUPERINTENDING ENGINEER

(HIGHWAYS) MADURAI.

10

Page 11: FORM.1.4 FRONT COVER PAGE TO TENDER DOCUMENTS …

RATE OF PROGRESS

1. The time fixed for completion of the entire work shall be 8 months the date of commencement of this Program will be the date or which the site (Premises is handed over to the Contractor.

2. On acceptance of the tender the successful contractor shall be furnished a detailed PERT chart indicating the various activities time schedule proposed etc., for completion of the works within, the time notified in the schedule tender.

3. The Engineer in charges shall be entitled to suggest specification in the PERT chart if need be and the contractor shall comply with the suggested modifications.

4. The PERT chart after modifications if any shall be approved by the Engineer in charge and shall form part of the Agreement. The PERT chart shall have the effect of progress schedule within the meaning of clause 100-06 of PS to SSRB and form the basis for involving clause 109 of PS to SSRB.

5. The successful tenderer should make all arrangements for speedy execution of the work (i.e.) he should provide sufficient men, materials and machinery in as many numbers are required to carry out the work specified in all different places simultaneously. The machinery requirement should satisfy all the technical specifications as per M.O.R.T & H” Plant and machinery used on the work shall be of sufficient capacity and of such character to ensure the production of sufficient materials to carry out the work to completion.

Superintending Engineer (Highways) Madurai.

11

Page 12: FORM.1.4 FRONT COVER PAGE TO TENDER DOCUMENTS …

SCHEDULE – ‘A’

SCHEDULE OF RATES AND APPROXIMATE QUANTITIES

1. The quantities herein given are there upon which the estimate cost of the work is based, but they are subject to alterations, omissions, deductions or additions are provided for in the conditions of this contract and do not necessarily show the actual quantities of work to be done. The unit rates indicated will be modified after applying the tender percentage either above or below estimate rates and shall govern payment for extras or deductions for omissions according to the conditions of the contract, as set forth in the preliminary specifications of the standard specifications for roads and bridges with the M.O.S.T. specifications and other condition of specifications of this contract.

2. It is to be expressly understood that the measured work is to be taken net (notwithstanding any custom or practice to the contrary according to the actual quantities. When in place and finished according to the drawing, or as may be ordered from time to time by the Divisional Engineer and the cost calculated by measurement or weight at the respective prices, without any additional charge for any necessary or contingent work connected herewith. The rates quoted are for works in situ and complete in every respect.

3. The description given in Schedule – A are to indicate the item of work only and need not be construed as full specification. The quoted rate shall be for carrying out the item as per standards and specifications described in the relevant MORT specification. The contractor shall take no advantage of any apparent error or omission in the Schedule – A description.

12

Page 13: FORM.1.4 FRONT COVER PAGE TO TENDER DOCUMENTS …
Page 14: FORM.1.4 FRONT COVER PAGE TO TENDER DOCUMENTS …

SCHEDULE ‘A’ TO ACCOMPANY THE TENDER SCHEDULE FOR THE WORK OF Construction of Bridge at Km 0/10 of Periyakottai – Kovilur road to Kombaiyanpatti village Road (via) Kasthurinaickenpatti.

S

l.No

Probable quantity Description of items MORT &HRates in

Words FiguresUnit Amount

1 2 3 4 5 6 7 8

1 Dismantling the salvaging and removal and depositiing of resulting materials and back filling the resulting trenches and pits etc., for Stone masonry.

111,112, 202

25.00Cubic Metre a. Stone Masonry in Cement Mortar

Rupees Sixty Six

only

Rs 66.00

One Cubic metre

Rs 1,650.00

54.00Cubic Metre b. Reinforced Cement Concrete

Rupees One hundred and thirteen and paise fifty

only

Rs 113.50

One Cubic metre

Rs 6,129.00

CONTRACTOR

Page 15: FORM.1.4 FRONT COVER PAGE TO TENDER DOCUMENTS …

2 891.00Cubic Metre

Earth work excavation in all classes of soil except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling our water, providing and maintaining necessary cofferdams, sheeting, shoring and bracing and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, trimming of bottom of excavation back filling, clearing up the site and disposal of all surplus materials etc., complete as per standard specification for dressing the bed upto sill level

304

Rupees Thirty Eight and paise Seventy Five only

38.75 One

Cubic metre

34,303.50

3 1513.00 Cubic Metre

Earth work excavation in all classes of soil except soft disintegrated rock not requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour, equipments and all incidental charges such as baling our water, providing and maintaining necessary cofferdams, sheeting, shoring and bracing and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, trimming of bottom of excavation back filling, clearing up the site and disposal of all surplus materials etc., complete as per standard specification for Foundation of ABUTMENTS, PIERS AND WINGS.

304

Rupees one hundred and seven and paise fifty

only.

Rs 107.50

One Cubic metre

162,647.50

CONTRACTOR

Page 16: FORM.1.4 FRONT COVER PAGE TO TENDER DOCUMENTS …

4 1238.40 Cubic Metre

Vibrated Cement concrete M15 Grade using 40mm ISS HBG metal including cost and conveyance of all materials to site, including cost and labour charges for formwork and centering, labour charges, compacting, curing and all incidental charges etc., complete for ABUTMENT, WINGS AND PIER BELOW SILL LEVEL

10001500170021002200

Rupees two thousand

nine hundred and twenty two and paise seventy

only.

2,922.70 One

Cubic metre

3,619,471.68

5 533.00 Cubic Metre

Vibrated Cement concrete M15 Grade using 40mm ISS HBG metal including cost and conveyance of all materials to site, including cost and labour charges for formwork and centering, labour charges, compacting, curing and all incidental charges etc., complete for ABUTMENT, WINGS AND PIER ABOVE SILL LEVEL

10001500170021002200

Rupees three

thousand one hundred

and forty Only

3,140.00 One

Cubic metre

1673620.00

6 24.00 Cubic Metre

Vibrated Reinforced Cement concrete design mix M25 Grade using 20mm and below ISS size HBG graded crushed stone including cost and conveyance of all materials to site but excluding cost and fabrication of steel but including cost and labour charges for formwork and centering, labour charges, compacting, finishing and curing including all incidental charges etc., complete for DIRT WALL CUM BED BLOCK OVER ABUTMENTS AND BED BLOCK OVER PIERS.

1000 1500 1700 2200 1600

Rupees four thousand

eight hundred and

forty one only

4,841.00 One

Cubic metre

116,184.00

CONTRACTOR

Page 17: FORM.1.4 FRONT COVER PAGE TO TENDER DOCUMENTS …

7 154.00Numbers

Providing and fixing 100mm dia PVC SEEPAGE PIPES of required length for abutment and wing, retaining wall including cost and conveyance of all materials to worksite, cost and labour for semi special backfill arrangements with 100 size broken granite stones at the periphery and labour charges for fixing etc., complete to drain the backfill as per standard specification

2700 Rupees Ninty Only 90.00 Numbers 13,860.

00

8 74.00Square Metre

Providing and fixing KRAFT PAPER for full width of seating of deck slab and including cost and conveyance to worksite labour for fixing the same in correct position and all other incidental charges etc., complete

2600 Rupees Thirty Only 30.00

One Square metre

2,220.00

9 610.00 Cubic Metre

Vibrated Reinforced Cement Concrete M25 Design mix using 20mm and below ISS graded granite crushed stone including cost and conveyance of all materials to site but excluding cost and fabrication of steel but including cost and labour charges for formwork and centering labour charges for laying, compacting concrete curing including all incidental charges etc., complete for DECK SLAB

10001500160017002300

Rupees four thousand and ninety eight only

4,098.00 One

Cubic metre

2499780.00

10 76.368 Cubic Metre

Providing filter media behind abutments and returns with clean graded materials 53mm to 5.6mm and well compacted and layers with smaller size towards wall including cost and conveyance to work site including hire charges for tools and plants employed etc., for filter media as per MORT specification for roads and bridges III revision etc., complete

305.4.4309.3.2.13

Rupees Six Hundred

and eighty six and

Paise eighty Only

686.80 One

Cubic metre

52,449.54

CONTRACTOR

Page 18: FORM.1.4 FRONT COVER PAGE TO TENDER DOCUMENTS …

11 430.00 Cubic Metre

GRAVEL FILLING BEHIND THE ABUTMENTS AND WINGS with clean good gritty gravel including cost and conveyance to site including labour charges for filling in layers, watering tamping under optimum moisture content to get the maximum density all incidental charges etc., complete

304

Rupees One

Hundred and Thirty and Paise Fifty Only

130.50 One

Cubic metre

56,115.00

12 8.00Set

PROVIDING AND FIXING PVC EXPANSION JOINTS including cost and conveyance of expansion joints, Shalimar pad and joint sealants and fixing them in position etc., complete in DECK SLAB OVER ABUTMENT AND PIER.

2600

Rupees Three

Thousand Only

3,000.00 Set

24,000.00

13 53.90Metric Tones

Supply and fabrication of Steel Grade S-415/Steel required for all RCC items of works involved in the schedule including cost of steel, cost of fabrication, labour charges for cleaning the bars straightening, cutting bending, typing grills, hoisting and placing the reinforcement in position as specified in the drawings including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc., complete as per standard specification.

10001600

Rupees Thirty Nine Thousand

Four Hundred

and Ninety Five Only

39,495.00 One

Metric Tones

2128780.50

14 22.50 Cubic Metre

Vibrated Cement concrete M15 Grade using 40mm ISS HBG metal including cost and conveyance of all materials to site, including cost and labour charges for formwork and centering, labour charges, compacting, curing and all incidental charges etc., complete for base course below approach slab.

1000 1500 1700

Rupees two thousand six hundred and seventy one

only.

2,671.00 One

Cubic metre

60,097.50

CONTRACTOR

Page 19: FORM.1.4 FRONT COVER PAGE TO TENDER DOCUMENTS …

15 18.38 Cubic Metre

Vibrated Reinforced Cement Concrete M-30Design mix) using crushed ISS, HBG graded metal of 20mm and below including cost and conveyance of all materials to site but excluding cost and fabrication of steel but including cost and labour charges for formwork and centering labour charges for laying, compacting, curing including all incidental charges etc., complete for APPROACH SLAB

10001500160017002704

Rupees four thousand

three hundred

and eighty six and

paise fifty only

4,386.50 One

Cubic metre

80,623.87

16 546.00Square Metre

Vibrated Cement Concrete M-30 using 25mm, 12mm and 6mm IRC sized hard granite metal including cost and conveyance of all materials to site cost of premoulded expansion joints and fixing the same in position including cost and labour charges for formwork, labour charges for laying compacting, curing, including all incidental charges etc., complete for WEARING COAT 75MM UNIFORM THICKNESS OVER DECK SLAB.

1000150017002702

Rupees Three

Hundred and Paise

twenty Only

300.20 One

Square Metre

163,909.20

17 132.00Running Metre

Vibrated Reinforced Cement concrete design mix M25 (Design Mix) Grade using ISS size HBG graded crushed stone including cost and conveyance of all materials to site but excluding cost and fabrication of steel but including cost and labour charges for formwork and centering, labour charges, compacting, finishing and curing including all incidental charges etc., complete for RCC CRASH BARRIERS OVER DECK SLAB

1000 1500 1700 2700 1600

Rupees one thousand

five hundred and seventy

six and paise ten

only.

1,576.10 One

Running Metre

208,045.20

CONTRACTOR

Page 20: FORM.1.4 FRONT COVER PAGE TO TENDER DOCUMENTS …

18 132.00Running Metre

Vibrated Reinforced Cement concrete design mix M25(Design Mix) Grade using ISS size HBG graded crushed stone including cost and conveyance of all materials to site but excluding cost and fabrication of steel but including cost and labour charges for formwork and centering, labour charges, compacting, finishing and curing including all incidental charges etc., complete for HAND RAILS AND POSTS OVER SLAB

10001500170027001600

Rupees five Hundred and forty five and

Paise fifty Only

545.50 One

Running Metre

72,006.00

19 7.00Cubic Metre

Vibrated Cement Concrete M15 grade mix using 40mm ISS HBG metal including cost and conveyance of all materials to site, complying to the required standard and specifications including cost of formwork, mixing, laying, watering, curing and compacting using vibrator charges and all other incidental charges etc., Crash Barrier type Parapet.

1000150017002100

Rupees four thousand

one hundred and thirty two and

paise sixty only.

4,132.60 One

Cubic Metre

28,928.20

20 28.00Numbers

Providing and fixing of G.I DRAINAGE SPOUTS OF 100mm dia as per G.O.I. Drawing No.SD/205 with grating arrangements at top as shown in the drawing using 12mm x 25mm flats for grating arrangements and 100mm dia drainage spouts projecting atleast 300mm beyond the bottom of deck slab including cost and conveyance of all materials to site and fixing them in position as directed by the departmental officers etc., complete

2705

Rupees one thousand and Two Hundred

Only

1,200.00 Each 33,600.00

CONTRACTOR

Page 21: FORM.1.4 FRONT COVER PAGE TO TENDER DOCUMENTS …

21 92.00Cubic Metre

Vibrated Cement concrete M15 Grade using 20mm ISS HBG metal including cost and conveyance of all materials to site, including cost and labour charges for formwork and centering, labour charges, compacting, curing and all incidental charges etc., complete for Solid Fill for Foot-Path.

1000150017002100

Rupees two thousand

eight hundred and eighty one

only.

2,881.00 One

Cubic Metre

265,052.00

22 437.00 Running Metre

Supply and fixing of HIGH Quality of PVC pipes of 150mm dia.. Including cost and conveyance of pipes to the site and fixing in position to proper grade and level, including labour charges for fixing and including all other incidental charges etc complete., for proving utility services in footpaths.

2700

Rupees Three

hundred and Fifty Only

350.00 One

Running Metre

152,950.00

23 271.00 Cubic Metre

GRANITE ROUGH STONE DRY PACKING 225mm THICK FOR REVETMENT using good size hard broken granite rough stone with proper wedging with quarry spalls including cost and conveyance of all materials to worksite and stacking the same to departmental gauge for premeasurement including labour charges for placing the stones in correct positing and ann incidental charges etc., complete.Km 3/2 Minor Bridge.

2500

Rupees six hundred and twenty two and paise thirty Only

622.30 One

Cubic Metre

168,643.30

24 903.00 Square Metre

Grouting the apron to 225mm deep with CC 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to work site including pointing with CC 1:2 and cost and covneyance of all materials to work site including cost of cement which will be procured by the contractor including handling charges for the same and other incidental charges. etc. Km 3/2 Minor Bridge.

2500

Rupees one hundred and ninety and paise Fifty

Only

190.50 One

Square Metre

172,021.50

CONTRACTOR

Page 22: FORM.1.4 FRONT COVER PAGE TO TENDER DOCUMENTS …

25 37.50 Running Metre

Supply of RCC NP3 ISI class pipes and collars of 900 mm dia of standard length and cut lengths including cost and conveyance to the worksite and all other incidental charges etc., complete

2900

Rupees One

Thousand Eight

hundred Only

1,800.00 One

Running Metre

67,500.00

26 37.50 Running Metre

Hoisting and fixing of 1000 mm dia pipes and collars to proper gradient including all labour charges and all other incidental charges etc.,

2905 2906

Rupees Fifty Eight & Paise Thirty

Only

58.30 One

Running Metre

2,186.25

27

Excavation including removal and satisfactory disposal of all materials necessary for the construction of road way and side drains in accordance with the specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer using Carted Earth with a lead of 1km for formation of Approach Road Diversion Road

a 5249.00 Cubic Metre

97% compaction

b 1263.00 Cubic Metre

100% compaction

111 112 202 301 302 303 305 900

Rupees Forty six & Paise ten

Only

46.10 One

Cubic metre

241,978.90

Rupees Forty four & Paise sixty one Only

44.61 One

Cubic metre

56,342.43

CONTRACTOR

Page 23: FORM.1.4 FRONT COVER PAGE TO TENDER DOCUMENTS …

28 253.20 Cubic Metre

Providing laying and compacting well graded material on prepared sub-grade in accordance with the requirements of the specifications. The material shall be laid in one or more layers as sub-base or lower sub-base and upper sub-base as necessary according to lines, grades and cross sections shown in the drawings or as directed by the Engineer for DIVERSION Road & Approach Road (Gravel Solling)

111 112 401 900

Rupees Hundred

and Twenty five and Paise

Ninety five only

125.95 One

Cubic metre

31,890.54

29 135.00 Cubic Metre

Providing and laying water bound macadam Grading-II consisting of clean, crushed aggregates mechanically interlocked by rolling and bonding together with screening binding material and finished in accordance with the requirements of the specifications and thickness as per approved plans or as directed by the Engineer for Diversion and Approach road

111112404900

Rupees nine

Hundred and seventy

one and Paise thirty

two only

971.32 One

Cubic metre

131,128.20

30 81.60 Cubic Metre

Providing and laying water bound macadam Grading-III consisting of clean, crushed aggregates mechanically interlocked by rolling and bonding together with screening binding material and finished in accordance with the requirements of the specifications and thickness as per approved plans or as directed by the Engineer for diversion and approach road

111112404900

Rupees One

Thousand one hundred and fifty nine

and paise ninety six

Only

1,159.96 One

Cubic metre

94,652.74

31 713.00 Square Metre

Providing and laying Prime coat using emulsion bitumen at the rate of 6kg. per 10sqm. For prime coat over WBM surface preparatory to another bituminous construction over it etc., for Approach

111 112 502 900

Rupees thirty and

paise fourteen

only

30.14 One

Square Metre

21,489.82

CONTRACTOR

Page 24: FORM.1.4 FRONT COVER PAGE TO TENDER DOCUMENTS …

32 713.00 Square Metre

Providing and laying tack coat using emulsion bitumen at the rate of 2.5kg. per 10sqm. For prime coat over WBM surface preparatory to another bituminous construction over it etc., for Approach

111 112 502 900

Rupees ten and paise

eighty seven only.

10.87 One

Square Metre

7,750.31

33 713.00 Square Metre

Providing laying and compacting open graded premix carpet 20mm thick with a liquid seal coat which shall consist of open graded carpet of 20mm thickness in a single course composed of suitable small sized aggregates premixed with bituminous binder with application of liquid seal coat for sealing the voids in a bituminous surface conforming to the specifications for diversion road

111 112 501 511 513 900

Rupees one Hundred and thirty

eight and Paise sixty

five only

138.65 One

Square Metre

98,857.45

Rupees one crore twenty five lakhs fifty thousand Eight hundred and Sixty Four only.

Rs 12,550,864.13 Rs 12,550864.00

CONTRACTOR

Page 25: FORM.1.4 FRONT COVER PAGE TO TENDER DOCUMENTS …

DESCRIPTIVE SOURCE OF MATERIALS AND LEAD STATEMENT

Sl.No.

Description materials Sources Km.3/10 Km. Km. Km. KM

a.

90,63,53,45,26.5,22.4mm metal, 13.2, 11.2, 6.7, 2.5mm IRC HBG metal

1/6 of Reddiyarchathiram salaiyur road

27

b. Sand

30/4 of dindugul natham

singampunari thiruppathur devakottai rastha road

37

CONTRACTOR

Page 26: FORM.1.4 FRONT COVER PAGE TO TENDER DOCUMENTS …

SCHEDULE – C

1) DESCRIPTIVE SPECIFICATION REPORT

2) DESCRIPTIVE SOURCE OF MATERIALS AND LEAD STATEMENT

3) SPECIAL CONDITION FOR CONTRACT

CONTRACTOR

Page 27: FORM.1.4 FRONT COVER PAGE TO TENDER DOCUMENTS …

DESCRIPTIVE SPECIFICATION REPORT

NAME OF WORK : Construction of Bridge at Km 0/10 of Periyakottai – Kovilur road to Kombaiyanpatti village Road (via) Kasthurinaickenpatti.

This road is an Important ODR in Natham (H) Sub Division jurisdiction. It is proposed to reconstruct the above bridge for which the following provision has been made.

1. Number of span : 72. Clear span : 8.60m

3. Type of superstructure : RCC Solid Deck slab

4. Road width : 12.00m5. Carriage way : 7.50m (Two lane)

6. Foot path : 1.50m wide provided

7. Sill level : 95.3008. Vertical clearance : 1.2m

9. Wearing coat : 75mm10. Road level : 100.50011. MFL : RL 97.50012. Afflux : 0.150m13. Bottom of deck : RL 99.605

The centre lines of piers and face of the abutment are fixed based on the site plan. However these locations shall be verified during execution and suitably fixed to suit the site requirements and flow pattern.

The work will be executed as per SSRB, MORT&H and other relevant specification and other instructions issued from Higher Officials then and there.

SUPERINTENDING ENGINEER (HIGHWAYS) MADURAI.

CONTRACTOR

Page 28: FORM.1.4 FRONT COVER PAGE TO TENDER DOCUMENTS …

SPECIAL CONDITIONS OF CONTRACT

The special conditions described hereunder shall have the meaning and intent out

lined in clause 107-05 of P.S.to S.S.R.B. The Contractor’s Quoted rate shall be

inclusive of all the elements and costs required to comply with them. The special

conditions comprise of two parts viz I) Technical specification and II) Commercial

conditions.

I. TECHNICAL SPECIFICATION :

General

The entire works, as described in scope of work (“General Conditions of contract) shall be done in accordance with the specifications for road and bridge works Fourth revision-2001 and the corrigendum published at New Delhi by Indian roads congress on behalf of Government of India Ministry of Road Transport and Highways and shall be deemed to be bound into this document and becomes part and parcel of the agreement.

In the absence of any definite provisions on any particular issued in the aforesaid specification, reference may be made to the latest IRC CODES of practice; IS Specifications and S.S.R.B in that order wherever there are silent the construction and completion of the work shall confirm to sound engineering practice and in case of any dispute arising out of the interpretation of the above.‘the decision of the Engineer-in-charge shall be final and binding on the contractor. These shall be deemed to be bound to this document and becomes part and parcel of the agreement.

PART II - Supplementary Specifications

Part-II Shall comprise various substitute. Modified and Additional Clauses to the “Specification for Road and Bridge works” referred to in Part I(to cover specific aspects of the particular works not covered by the same) and accordingly, the said specification so amended shall form part of the contract.

A substitute clause as indicated by the suffix “S” is an amendment of a clause in Part-I-General Specification and supersedes the whole of that clause. Then any reference to the superseded clause shall be deemed to refer to the substitute clause.

A modified clause as indicated by the Suffix ‘M’ shall be read as a partial amendment to the cited clause in Part-I – General Specifications. Any provision in the said modified clause conflicting with those of Part-I-General Specification shall be deemed to supersede the relevant portion of Part-I – General Specification. Any other non-conflicting provisions shall apply and NOT deemed as substitute.

An additional clause, as indicated by the suffix ‘A’ shall bear additional clause numbers not cited in Part-I –General Specification and shall include provisions supplementing those of Part-I-General Specification.

CONTRACTOR

Page 29: FORM.1.4 FRONT COVER PAGE TO TENDER DOCUMENTS …

In so far as any substitute, modified and additional clause may conflict or be inconsistent with any of the provisions of Part-I-General Specification under reference, the substitute, modified and additional clause shall always prevail. words like ‘ Contract’, ‘Contractor’, ‘Drawing’ ‘Works’, ‘Site’, ‘Provisional Sum’ used in the above mentioned specification shall be deemed to have the same meaning as under stood from the definition of these terms in and as included in the General Conditions of Contract.

In the absence of any definite provisions on any particular issued in the aforesaid specification, reference may be made to the latest IRC Codes of practice, I.S. Specifications and SSRB, in that order. Where even these are silent, the construction and completion of the works shall conform to sound engineering practice and, in case of any dispute arising out of the interpretation of the above, the decision of the Engineer-in-charge shall be final and binding on the contractor. These shall be deemed to be bound to this document and becomes part and parcel of the agreement.

Supplementary Specifications for Structures

The following list shows the clauses of Part-I which are either substituted for modified or added:

Substituted claused 112.1, 112.2, 112.3, 1006, 1009.3, 2901 to 2905, 2908 to 2911.

Modified Clauses 112.4, 112.5, 112.6, 1009.3, 1010, 1209, 1716.2.5(a), 2005.1, 2005.2, 2602(c).

Added clauses 103, 109.8, 120.7, 304.3.7, 305.2.2.2, 305.3, 1012.1, 1507, 1710, 1712, 1714, 1716, 1802.1, 1802.2, 1807, 1809.5, 2005.1, 2501.2.3, 2600.

New Clauses 1816,2211, 2912.

CONTRACTOR

Page 30: FORM.1.4 FRONT COVER PAGE TO TENDER DOCUMENTS …

COMMERCIAL CONDITIONS

1.1 Steel and Cement will not be supplied by the department. The contractors have to procure the same and use it on the work.

1.2 Steel conforming to standards and specifications shall be procured.1.3 The cement should be procured in lot from the authorized Dealers and should not be purchased locally in piecemeal.

1.4 The contractors have to produce the Test certificate confirming to I.S. and other accepted Codes and standards in support of the quality of materials procured. If the materials are found to be substandard or not confirming to the prescribed test standards, the same will be rejected without any claim for damages whenever.

1.5 The quoted rate shall be inclusive of cost of steel and cement conveyance, handling and storage charges and other requisites as contained in clause 103-04 of P.S. to S.S.R.B.

2.1 The bitumen and bitumen emulsion required for use in the work will not be supplied by the department.

2.2 The contractor has to procure the bitumen of appropriate grade and emulsion as per specification required for the items of work as per Standard Specification and use it on the work.

2.3 The quoted rate shall be inclusive of cost of bitumen, bitumen emulsion conveyance and handling and storage charges and other requisites as contained in clause 103-04 of PS to SSRB.

2.4 All the requisite tests to ensure quality of bitumen have to be carried out before acceptance and certified.

2.5 RCC Pipes conforming to IS 458 has to be procured by the contractor and used on the work. The quoted rates shall be inclusive of cost of pipes, conveyance handling and storage charges and other requisites as contained in cl 103-04 of PS to S.S.R.B.

2.6 The contractor has to produce inspection and test certificate by the director General of Supplies and Disposals for the standard and quality of pipes. Otherwise, pipes will be rejected.

3. All the provisions contained in Cl.106 and 107 of P.S. to S.S.R.B. in regard to quality of materials and control of work shall be applicable and enforced.

CONTRACTOR

Page 31: FORM.1.4 FRONT COVER PAGE TO TENDER DOCUMENTS …

4.1 The contractor shall be responsible to make good and remedy at his own cost any defect which may develop or may be noticed and intimation of which has been sent to the contractor by a letter sent by hand delivery or by registered post before the expiry of a period of 36 (thirty six) months (hereinafter referred to as defects liability period) from the completion of whole of the work, for major works like

Formation of road including metalling and black topping.

4.2 In case of work like resurfacing of the existing roads and black topping, the defect liability period shall be 6 (six) months.

4.3 In the event of the contractor failing to rectify the defect or damages within the period specified by the Engineer-in-charge in his notice aforesaid, the Engineer- in-charge may rectify or remove and re-execute the work and/or remove and replace with other materials or articles complained of, as the case may be, by or other means at the risk and expense of the contractor.

4.4.1 At the time of making final payment for major works like formation of road including metalling and black topping 2.1/2% of the total value of work done shall be retained by the department. This amount will be refunded to the contractor on the expiry of one year reckoned from the date of completion of work provided that the contractor execute and indemnity bond for a further period of two years indemnifying the Government against any loss or expenditure incurred to rectify any defect noticed due to faculty workmanship by the contractor or substandard materials used by the contractor.

4.4.2 In case of works like resurfacing of the existing roads and black topping, the amount will be refunded to the contractor on the expiry of six months from the date of completion of work.

4.4.3. At the time of making final payment for minor/major Bridge works, 2.1/2% of the total value of work done shall be retained by the department. This amount will be refunded to the contractor on the expiry of two years reckoned from the date of completion of work provided that the contractor execute an indemnity bond for a further period of three years indemnifying the Government against any loss or expenditure incurred to rectify any defect noticed due to faulty workmanship by the contractor as substandard materials used by the contractor.

4.5 Making final payment shall not discharge or release the contractor from his responsibilities and liabilities under the contract.

5. In case, when the departmental tools and plant are hired to the contractors in places of work where the standard schedule of rates of Public Works Department allow extra special tract percentage, the hire charges will be enhanced by the corresponding extra percentage and recovered from the contractor.

6. Without limiting his obligations and responsibilities under the contract, the

contractor shall insure in the joint name of the Government and the contractor

against all loss damages from whatever cause (other than the excepted risks) for

which he is responsible under the terms of contract and in such a manner that the

CONTRACTOR

Page 32: FORM.1.4 FRONT COVER PAGE TO TENDER DOCUMENTS …

Government and the contractor are covered during the period of construction of

the works and defects liability period for

i) The works and temporary works to the full value of such works executed

from time to time.

ii) The materials, constructional plant and other things brought to site by the

contractor to the full value of such materials, constructional plants and

other things.

7. Any amount due from the contractor which he has failed to remit after the notice from

the Engineer shall be caused to be recovered under TamilNadu Revenue Recovery

Act as if it was an arrear of land revenue.

8. The Tenderer who are themselves not professionally qualified shall undertake to

employ qualified Technical men at their cost to look after the work according to the

scale indicated below. In case, the tenderer is professionally qualified, he must

employ technical men to meet the norms besides himself. The tenderers should state

in clear terms whether they are professionally qualified or whether they under take to

employ Technical Assistants required by the department as specified in the schedule

below for the work. In case the selected tenderer is professionally qualified or has

undertaken to employee technically qualified personnel under him, he shall see that

one of the Technically qualified men is always present at the site of the work while

the work is in progress personally checking all the items of works and paying extra

attention to such works as may demand special attention (ie) bituminous courses

R.C.C. etc.,

Above Rs.50.00 Lakhs

Upto Rs.2.00 Crores

Three B.E. Civil plus three Diploma in Civil Engineer with three years experience.

If the tenderer fails to employ the Technical men as indicated above for the works, penalty shall be levied during the period of such non employment of technical men.

A penalty of Rs.5000/- per month for Diploma holder and Rs.10000/- Per month for degree holder be levied in case of default on the part of the contractor in following the norms mentioned above.

Notes :-In case, the contractor who is professionally qualified is not a position to remain always at the site of the work for checking of all items of works and paying extra attention to such works as may demand extra special attention (i.e.) bituminous courses, reinforced concrete work etc., he should employ technically qualified men (as prescribed)for the work.

CONTRACTOR

Page 33: FORM.1.4 FRONT COVER PAGE TO TENDER DOCUMENTS …

It will not be incumbent on the part of the contractor to employ Technical Assistant / Assistants when the work is kept in abeyance due to valid reasons and if during such period in the opinion of the Divisional Engineer(H) the employment of Technical Assistant / Assistants is not required for the due fulfillment of the contract.

9. Income Tax at 2% of the bill amount will be recovered from all interim bills and final bill of the contractor or at such rates which the Government may by notification fix from time to time.

10. Recovery of Value added Tax at the rate of 2% of the total contract value of the Civil works contract as per section 13(1) of TNVAT Act 2006.(Gezette notification dt 15.12.2006). for civil maintenance works contract and as well as civil works contract

11 In case of any dispute or difference between the parties to the contract either during the progress or after the completion of the work or after the determination / abandonment of the contract or any matter arising there under and if the claims value exceeds Rs.2.00 Lakhs (Rupees Two Lakhs Only) the same shall be settled by filling a civil suit before a Civil Court having jurisdiction for decision. If the claims monetary value is less than Rs.2.00 Lakhs (Rupees Two Lakhs only) the dispute shall be referred for arbitration to a sole Arbitrator. The Special Chief Engineer(Highways) Salem Circle or his successor in his office shall be the Arbitrator for this purpose. The arbitration proceedings will be governed by Arbitration and Conciliation Act 1996.

12 In the event of the work being transferred to any other Division or Circle. The Divisional Engineer or Special Chief Engineer who will be in charge of the Division / Cirlcle having jurisdiction over the work shall be competent to exercise all the powers and privileges reserved in favour of the Government.

13. The Contractor should not engage child labour (below the age of 16 years )in the execution of work, if the contractor engaged child labour the work contract assigned to him shall be cancelled and such contractor shall be block listed for 3 years.

14. The contractor should arrange to insure the work as risk insurance of their cost

against any losses due to damage of nature calamities like unprecedented floods,

cyclone, fire, lighting, earth quakes, volcanic eruption and other convulsion of

nature.

14.1 The Government will not be responsible for such losses and the Government is not

liable to pay any compensation towards such losses sustained by the contractor.

15 From commencement to completion and upto the expiry of observation period, the

work shall be under the charge and care of the contractor and the contractor shall

take full responsibility for the care thereof and for taking precautions to prevent loss

CONTRACTOR

Page 34: FORM.1.4 FRONT COVER PAGE TO TENDER DOCUMENTS …

or damage and shall be liable for any damage or loss that may happen to the works

or any part including the departmental tools and plant thereof from any cause

whatsoever and shall at his own cost repair and make good the same so that at

completion and expiry of observation period, the work shall be in good condition and

in conformity in every respect with the requirements of the contract and instructions

of Engineer.

16. The contractor has to get the design mix approved to give the designated CBR

without any extra cost for granular subbase.

17. Price adjustment clause will be applicable for which value of work put to tender

costing Rupees hundred lakhs and above as per GO MS No. 101 public works /

G2/Department dt.10.06.2009 or any subsequent orders which the government may

by notification issued from time to time.

CONTRACTOR

Page 35: FORM.1.4 FRONT COVER PAGE TO TENDER DOCUMENTS …

SCHEDULED – D

Applicable to all cases of works where a minimum of fifty workers are employed.

Rules for the provisions of health and sanitary arrangements for workers.

The contractor’s special attention is invited to clause 108-11 of the P.S. to S.S.R.B. and he is requested to provide at his own expenses the following amenities to the satisfaction of Divisional Engineer.

1.FIRST AID :-

At the worksite, there shall be maintained at an accessible place first aid appliances and medicines including adequate supply of sterilized dressing and sterilized cotton wool. The appliances shall be kept in good order. They shall be placed under the charge of responsible person who shall be readily available during working hours.

2. DRINKING WATER :-

A. water of Good quality fit for drinking purposes shall be provided for the

workers on the scale of not less than 3 gallons per head per day.

B. Where drinking water is obtained from an intermittent public water

each work site shall be provided with storage tank where such drinking

water shall be stored.

C. Every water supply storage shall be at a distance of not less than 50m from

any latrine drain or other sources of pollutions where water has to be drawn

from an existing well, which is within such proximity of any latrine drain or

other sources of pollutions. The well shall be properly chlorinated before

water is drawn form it for drinking. All such wells shall be entirely closed and

provided with a trap door which shall be dust and water proof.

D. A reliable pump shall be fitted to each inner well. The trap door shall be kept

locked and opened duly for inspection and cleaning which shall be done at

least once a month.

3. WASHING AND BATHING PLACES :-

CONTRACTOR

Page 36: FORM.1.4 FRONT COVER PAGE TO TENDER DOCUMENTS …

Adequate washing and bathing places shall be provided separately for men and women. Such places shall be kept clean and well drained. Bathing and washings should not be allowed nearby any drinking water well.

1. LATRINES AND URINALS :-

There shall be provided within the premises of every worksite, latrines and urinals in accessible places and the accommodation separately for each of them shall be on the following scale or on the scale directed by the Divisional Engineer in any particular case.

A. Where the No. of persons employed does not : 2 Seats Exceeds 50.

B. Where the No. of persons employed exceed : 3 Seats 50 but does not exceed 100.

C. For every additional hundred : 3 Seats

If women are employed separately, latrine and urinals screened from those for man shall be provided on the same scales. Except in worksite provided with water flushed latrines connected with a water borne sewage system, all latrines shall be provided with receptacle on dry earth system which shall be cleaned at least four times four times daily and at least twice during working hours and kept in a strictly Sanitary condition, the excreta from the latrines shall be disposed off at the contractor’s expenses in out work pits approved by the local public Health authority. The contractor shall also employ adequate number of scavengers and conservancy staff to keep the latrines and urinals in a clean condition.

2. SHELTERS DURING REST :-

At the worksite there shall be provided free of cost two suitable sheds one for meals and other for rest for the use of workers.

3. CRECHES :-At every worksite at which 50 or more women workers are ordinarily employed there shall be provided two huts of suitable size for the use of children under the age of five years belonging to each women (one hut shall be used for infants, games and play and the other as their bed room). The huts shall not be constructed on a standard not lower than the following.

i) Thatched roofs (ii) Mud floors and walls (iii) planks spread over the mud floor and covered with matting. The use of the huts shall be restricted to Children their attendants and mothers of the children.

CONTRACTOR

Page 37: FORM.1.4 FRONT COVER PAGE TO TENDER DOCUMENTS …

4. CANTEENS :

A cooked food canteen on moderate scale shall be provided for the benefit of workers if it is considered expedient.

5. SHEDS FOR WORKERS :-

The Contractor should provide at his own expenses sheds for housing the workers. The shed shall be on a standard not less than cheap shelter type to live in which the workers in the locality are accustomed. A floor area at about 6’ X 5’ for two person shall be provided. The sheds are to be in row with 5’ clear space between sheds and 50’ clear space between rows if condition permit. The workers camp shall be laid but in units of 400 persons each unit of area clear space of 40; on each side. On completion of the work the contractor should dismantle the temporary hut ments and remove the same at his cost and no labour or huts allowed to continue.

SUPERINTENDING ENGINEER

(HIGHWAYS),MADURAI.

//True Copy//

SENIOR DRAUGHTING OFFICER

CONTRACTOR