TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: May 24, 2013 SUBJECT: FOLLOW-UP TO OMBUDSMAN’S REPORT – PROPERTY ACQUISITION MANAGEMENT PLAN ACTION ITEM At the Board meeting of April 23, 2013, Commissioner Milczyn moved referral of Report 8(c) “Follow-Up to Ombudsman’s Report – Property Acquisition Management Plan” to the May meeting to allow staff to report back on refinements to the property owner notice period referenced in Section 5.1 of the Property Acquisition Management Plan. The original report which was tabled at the April 23, 2013 meeting is attached, together with the updated TTC Construction Projects Property Acquisition Management Plan. In addition to the foregoing, TTC has received notification of satisfaction from the Office of the Ombudsman that all recommendations made in the report have been complied with and the matter is being closed. Attached as Appendix A to this report is a copy of said notification dated May 1, 2013. - - - - - - - - - - - - May 15, 2013 1-9 03-06-000104201 Attachments: 1) Appendix A: Letter from the Office of the Ombudsman dated May 1, 2013 2) April 23, 2013 Board Report 8(c) “Follow-Up to Ombudsman’s Report - Property Acquisition Management Plan” Form Revised: February 2005

Upload: others

Post on 09-Aug-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Form Revised: February 2005 TORONTO TRANSIT COMMISSION ... · Issue Date: 10/04/2013 Page 3 . 4. ROLES AND RESPONSIBILITIES . 4.1 TTC . The TTC is responsible for developing the plan

TORONTO TRANSIT COMMISSIONREPORT NO.

MEETING DATE: May 24, 2013

SUBJECT: FOLLOW-UP TO OMBUDSMAN’S REPORT – PROPERTY

ACQUISITION MANAGEMENT PLAN

ACTION ITEM

At the Board meeting of April 23, 2013, Commissioner Milczyn moved referral of Report 8(c) “Follow-Up to Ombudsman’s Report – Property Acquisition Management Plan” to the May meeting to allow staff to report back on refinements to the property owner notice period referenced in Section 5.1 of the Property Acquisition Management Plan. The original report which was tabled at the April 23, 2013 meeting is attached, together with the updated TTC Construction Projects Property Acquisition Management Plan.

In addition to the foregoing, TTC has received notification of satisfaction from the Office of the Ombudsman that all recommendations made in the report have been complied with and the matter is being closed. Attached as Appendix A to this report is a copy of said notification dated May 1, 2013.

- - - - - - - - - - - -

May 15, 2013 1-903-06-000104201

Attachments: 1) Appendix A: Letter from the Office of the Ombudsman dated May 1, 2013 2) April 23, 2013 Board Report 8(c)“Follow-Up to Ombudsman’s Report- Property Acquisition Management Plan”

Form Revised: February 2005

Page 2: Form Revised: February 2005 TORONTO TRANSIT COMMISSION ... · Issue Date: 10/04/2013 Page 3 . 4. ROLES AND RESPONSIBILITIES . 4.1 TTC . The TTC is responsible for developing the plan

Office of the

MBUDSMAN

CONFIDENTIAL

May 1,2013

Mr. Andy Byford Chief Executive Officer Toronto Transit Commission 1900 Yonge Street Toronto, ON M4S 1Z2

Dear Mr. Byford,

Re: File # 8062-8084

Appendix A

Fiona Crean, Ombudsman

375 University Avenue, SuRe 203 Toronto, Ontario M5G 2J5

Tel: 416-392-7061 TTY: 416-392-7100 [email protected] www.ombudstoronto.ca

On October 22, 2012, I provided you with my final report of the investigation into the above noted matter. Included in my report were seven recommendations for the TTC's implementation.

I am writing to confirm that I am satisfied that the TTC has complied with all of my recommendations and the file on this matter will now be closed. If you have any further updated documents you may wish to send to my office, please forward them to my attention.

Thank you again for your leadership on this file. It has been very much appreciated.

Yours sincerely,

�-Fiona Crean Ombudsman

Cc: Joseph Pennachetti, City Manager Joan Taylor, Chief of Staff, Toronto Transit Commission

IIJill.TDRDNffl

Page 3: Form Revised: February 2005 TORONTO TRANSIT COMMISSION ... · Issue Date: 10/04/2013 Page 3 . 4. ROLES AND RESPONSIBILITIES . 4.1 TTC . The TTC is responsible for developing the plan

Form Revised: February 2005

TORONTO TRANSIT COM�ISSION REPORT NO. �{C)

MEETING DATE: April 24, 2013

SUBJECT: FOLLOW-UP TO OMBUDSMAN'S REPORT - PROPERTY

ACQUISITION MANAGEMENT PLAN

ACTION ITEM

RECOMMENDATION

It is recommended that the Board endorse the attached Construction Projects Property Acquisition Management Plan.

FUNDING

There are no funding implications related to the recommendation of this report.

BACKGROUND

The Ombudsman's report dated October 2012 "Tunnel Vision: An Investigation into the Toronto Transit Commission Second Exit Project at Don/ands and Greenwood Stations" was considered by Toronto City Council at its meeting on October 30, 2012 and the Ombudsman, Ms. Fiona Green presented her report and findings to the TTC Board at its meeting on February 25, 2013.

The Ombudsman's report on the Donlands and Greenwood Stations Second Exits Projects includes a number of recommendations (attached) and the response of the TTC that commits to establishing a Community Relations Management Plan, Councillor Relations Policy, a Good Neighbour Policy and a Property Acquisition Management Plan. The first three of these commitments were provided to the TTC Board in February 2013 and the report noted that the Construction Projects Property Acquisition Management Plan would be submitted to the April 2013 TTC Board meeting.

DISCUSSION

The TTC Construction Projects Property Acquisition Management Plan (attached) sets out the approach for the identification of property in the project planning phase through to the acquisition and the communication with owners. It describes the role and responsibilities of the TTC and the City of Toronto Real Estate and Legal divisions to acquire the property. The Property Acquisition Management Plan sets out a number of means of communications with affected property owners, and where appropriate, tenants.

Page 4: Form Revised: February 2005 TORONTO TRANSIT COMMISSION ... · Issue Date: 10/04/2013 Page 3 . 4. ROLES AND RESPONSIBILITIES . 4.1 TTC . The TTC is responsible for developing the plan

FOLLOW-UP TO OMBUDSMAN'S REPORT -PROPERTY ACQUISITION MANAGEMENT PLAN Page 2

The approach and procedures articulated in the Property Acquisition Management Plan have been put into practice by the Engineering, Construction and Expansion Group and Property Development Department as part of modernizing the TTC.

The TIC Construction Project Property Acquisition Management Plan was prepared in consultation with the City of Toronto Real Estate Division.

CONCLUSION

The TIC Construction Projects Property Acquisition Management Plan is part of the TIC's response to the Ombudsman's report and is a component of the modernizing the TIC approach to construction projects and relations with the public.

April 24, 2013 87-02-01 03-06-000103266

Attachments: 1. TIC Construction Projects Property Acquisition Management Plan 2. Excerpt from - Tunnel Vision: An Investigation into the Toronto Transit

Commission Second Exit Projects at Donlands and Greenwood Station

Page 5: Form Revised: February 2005 TORONTO TRANSIT COMMISSION ... · Issue Date: 10/04/2013 Page 3 . 4. ROLES AND RESPONSIBILITIES . 4.1 TTC . The TTC is responsible for developing the plan

Toronto Transit Commission

03-06-000103269

Page 6: Form Revised: February 2005 TORONTO TRANSIT COMMISSION ... · Issue Date: 10/04/2013 Page 3 . 4. ROLES AND RESPONSIBILITIES . 4.1 TTC . The TTC is responsible for developing the plan

Title: Property Acquisition Management Plan Rev. 0

Issue Date: 10/04/2013 Page 1

Table of Contents

1. INTRODUCTION ....................................................................................................... 2

2. CONTEXT ................................................................................................................. 2

3. TYPES OF PROPERTY REQUIREMENTS .............................................................. 2

4. ROLES AND RESPONSIBILITIES ........................................................................... 3

4.1 TTC - Engineering, Construction and Expansion ................................................. 3 4.2 City of Toronto - Real Estate Services and Legal Services .................................. 3

5. COMMUNICATION WITH AFFECTED PROPERTY OWNERS ............................... 4

6. EXPROPRIATION – WHAT IT IS AND ISN’T? ........................................................ 5

Page 7: Form Revised: February 2005 TORONTO TRANSIT COMMISSION ... · Issue Date: 10/04/2013 Page 3 . 4. ROLES AND RESPONSIBILITIES . 4.1 TTC . The TTC is responsible for developing the plan

Title: Property Acquisition Management Plan Rev. 0

Issue Date: 10/04/2013 Page 2

1. INTRODUCTION

The TTC has an extensive capital construction program with many projects planned over the next ten years to improve customer safety, convenience and accessibility on the existing subway system. Many of these projects require additional property on a temporary or permanent basis.

This Construction Project Property Acquisition Management Plan sets out the approach and policies as well as roles and responsibilities for the acquisition of property and communication with affected property owners. This Plan should be read in conjunction with the TTC Construction Projects Community Relations Management Plan.

2. CONTEXT

TTC design of additions and improvements to existing subway stations is complex. Technical requirements of the building code, best practices for safety, and requirements of the Accessibility for Ontarians with Disabilities Act (AODA) for accessibility all impose significant requirements. In addition, the design of these projects aims to maximize value for money for taxpayers and minimize:

- the need for underground works and utility relocations; - impacts on operations and inconvenience for TTC customers through construction; - disruption for communities and adjacent properties; and - project cost to ensure other projects can proceed.

The TTC recognizes that property acquisition for transit facilities, particularly in stable residential neighbourhoods, can be controversial and difficult for the affected property owners and the community.

3. TYPES OF PROPERTY REQUIREMENTS

TTC construction projects can require the following types of property acquisitions:

- permanent full takings such as an entire property; - permanent partial takings such as a narrow strip of property or below grade requirement

that will have limited impact on the residence or business occupying the site; - temporary full property takings needed for the construction of the project; and - temporary partial takings of small portions of property required during construction that

are returned to the owner after construction.

All of these types of property acquisitions involve compensation to the property owner. All property required for TTC projects is acquired and owned by the City of Toronto and the TTC is provided with “operational management.”

On any construction project, property acquisition is a high risk activity. The required property must be identified through the design process and construction cannot start until all the property required for the project is acquired.

Page 8: Form Revised: February 2005 TORONTO TRANSIT COMMISSION ... · Issue Date: 10/04/2013 Page 3 . 4. ROLES AND RESPONSIBILITIES . 4.1 TTC . The TTC is responsible for developing the plan

Title: Property Acquisition Management Plan Rev. 0

Issue Date: 10/04/2013 Page 3

4. ROLES AND RESPONSIBILITIES

4.1 TTC

The TTC is responsible for developing the plan and design of the project and through this process identifies the property requirements.

Community consultation on various options for the design of a project may involve consideration of a number of properties. Where possible, the TTC will make every effort to use public property for projects. An important factor in the planning process is the availability of property and the willingness of a property owner to provide property.

Through the planning and design phase, the TTC is responsible for initiating contact with property owners regarding potential property requirements necessary to realize the project.

The TTC recognizes that acquisition of property for transit facilities, particularly in stable residential neighbourhoods can be difficult, often affecting long-term residents and tenants. As such, communication with property owners must be sensitive and must ensure that communication with affected owners and tenants is established prior to any public communication about the potential property requirements.

When the TTC finalizes the property requirements, staff report to the TTC Board on the final design of the project and property requirements. Following Board approval, the TTC will submit the property requirements to the City of Toronto Real Estate Services Division for the acquisition process to begin.

In order to more closely co-ordinate the property acquisition and specifically to ensure more effective communication with affected property owners, the TTC has established the Strategic Partnerships Department within the Engineering, Construction and Expansion Group. This department is responsible for co-ordinating property requirements for construction projects in consultation with the TTC’s Property Development Department and is responsible for communications with affected property owners. The TTC will lead all meetings to discuss potential acquisitions with owners when in the planning stage of projects. City Real Estate staff can be called upon for information purpose and general real estate support.

4.2 City of Toronto - Real Estate Services and Legal Services

The City of Toronto, through Real Estate Services and Legal Services, has overall responsibility for property acquisition, including negotiation, expropriation, compensation and other activities as may be required.

The City point of contact is the Director of Real Estate Services. Real Estate Services staff will involve City Legal as required.

City Real Estate Services is responsible for keeping the TTC informed about the process and progress for the acquisition of required property, the need for initiating expropriation, the costs for the property and any other requirements that the City has for the acquisition of the property.

Page 9: Form Revised: February 2005 TORONTO TRANSIT COMMISSION ... · Issue Date: 10/04/2013 Page 3 . 4. ROLES AND RESPONSIBILITIES . 4.1 TTC . The TTC is responsible for developing the plan

Title: Property Acquisition Management Plan Rev. 0

Issue Date: 10/04/2013 Page 4

City Real Estate Services will lead all negotiations about specific property acquisition requirements with owners. TTC staff will be called upon for technical support about the project.

Whenever possible, City staff will negotiate with affected owners for required property. However, there are situations that will require initiation of the expropriation process. In order to initiate expropriation, Real Estate Services must obtain authorization from City Council through Government Management Committee.

In short, the TTC determines what property is required and City Real Estate Services acquires the property at TTC’s request.

5. COMMUNICATION WITH AFFECTED PROPERTY OWNERS

Through its experience, the TTC realizes that acquiring property for projects can have a wide variety of reactions from affected property owners. Some owners are interested in selling or permitting TTC to use their property temporarily. Others, particularly residential owners, may not be willing to sell. In all cases, affected property owners do not want to be surprised by a design for a project that is communicated to the public before they have received proper notice.

Going forward, the TTC’s approach to the planning and design of projects includes the following:

1. When the TTC plans a project that involves additional private property, the TTC will approach the property owner as early as possible and not less than 2 weeks prior to any public communication of the project design even if the design is still in the option development stage.

2. When the TTC consults with communities about the design of a project, and new options are proposed by the TTC or by the community for consideration, the TTC will contact the property owner to inform them of the consideration of their property and explicitly invite them to participate in the consultation. City Real Estate staff will attend public meetings and inform the public about how the acquisition process works.

3. TTC contact with property owners of properties under consideration may include: a. Registered mail b. Courier delivered mail c. Phone calls d. Personal visits The approach to communications will be considered on a case by case basis. Although registered mail is required for some notifications, other methods of communication may be appropriate in addition to or instead of registered mail.

4. In many cases, the property under consideration may be owned by an individual that does not occupy the premises. Tenants also have a right to know if the property they occupy is being considered for a project. It is recognized however that the acquisition of the property is between the City and the owner. The TTC will make every effort to ensure that tenants in properties under consideration are informed of the TTC planning that is underway.

Page 10: Form Revised: February 2005 TORONTO TRANSIT COMMISSION ... · Issue Date: 10/04/2013 Page 3 . 4. ROLES AND RESPONSIBILITIES . 4.1 TTC . The TTC is responsible for developing the plan

Title: Property Acquisition Management Plan Rev. 0

Issue Date: 10/04/2013 Page 5

5. In cases where the City pursues property acquisition for the TTC and relocation of tenants is required, the TTC will rely on the City’s direction for compensation.

6. EXPROPRIATION – WHAT IT IS AND ISN’T?

Expropriation is a legal mechanism that permits a public body to acquire property without the consent of the owner for a public use. The owner is provided with an offer of compensation for the property based on a number of factors, including market value. The City of Toronto through the approval authority of City Council can and does use expropriation where necessary.

The expropriation process can take up to about 14 months. Because the process is so lengthy, often the City will initiate the expropriation process, but will make every effort to negotiate with the property owner to come to a mutually agreeable arrangement.

More information about expropriation and the City’s process is available at: www.toronto.ca/realestate/expropriations.htm.

Page 11: Form Revised: February 2005 TORONTO TRANSIT COMMISSION ... · Issue Date: 10/04/2013 Page 3 . 4. ROLES AND RESPONSIBILITIES . 4.1 TTC . The TTC is responsible for developing the plan

Excerpt from the City of Toronto Ombudsman's Report "Tunnel Vision: An

Investigation into the Toronto Transit Commission Second Exit Projects

at Donlands and Greenwood Station" - October 2012

03-06-000100716

Ombudsman Recommendations

Taking into account all the evidence gathered in this investigation, I recommend the following:

1. That the TTC develop a process/procedure by December 31, 2012, for notifying Councillors of new construction projects that are scheduled to take place in their wards.

2. That a communication policy and process be created by February 1, 2013, for notifying property owners of construction projects, and include but not be limited to the following:

i. Residents should be informed as early as possible about construction projects.

ii. Flyers should be distributed in appropriately marked envelopes. iii. Information in the notice should clearly describe the nature of the

project, its objectives and potential impact. iv. A link to the TTC's website for additional information should be

included and kept up to date. v. Public consultation information, including a copy of or access to

TTC's relevant policies and procedures.

3. That a documented process be developed by February 1, 2013, specifically for property owners facing potential acquisition. Such a process must include, but not be limited to:

i. Letters by registered mail to property owners directly affected by construction projects as early as possible.

ii. Those letters should be sent before general public notification about the project.

iii. The TTC should follow-up with each property owner within one week, to ensure that letters were received and understood.

iv. The TTC should inform property owners as early as possible about the procedures and expectations for using temporary easements on selected properties during the construction phase.

v. The opportunity to meet face-to-face with TTC staff before general public notification about the project.

vi. Access to relevant TTC's policies and procedures (eg. property acquisition and public consultation.)

67

Page 12: Form Revised: February 2005 TORONTO TRANSIT COMMISSION ... · Issue Date: 10/04/2013 Page 3 . 4. ROLES AND RESPONSIBILITIES . 4.1 TTC . The TTC is responsible for developing the plan

4. That a public consultation policy and process be developed by December 31, 2012, to include, but not be limited to:

i. Ongoing information posts on the TTC website. ii. Accessible information and regularly posted and updated on the

website including: presentations, meetings notes, related reports or studies, status updates and any other information that may be relevant.

iii. If there is a lead representative for the community, it is the TTC's onus to communicate information to this representative.

iv. Opportunities for the public to provide feedback and participate in the decision making process.

5. That training be conducted by December 31, 2012, with relevant TTC staff to ensure they have the appropriate consultation and communication skills.

6. That communication/notice be sent from the CEO or a senior executive by November 30, 2013, regarding the current status of the Donlands and Greenwood Projects and next steps to be implemented along with timelines.

7. That directives be established by February 1, 2013, documenting the responsibilities of the TTC and the City's Real Estate Division to minimize role confusion and improve communication to the public.

12.0 City and TTC Responses

398. Before issuing my final report, I notified the TTC and the City Manager of my tentative findings and recommendations and provided them with an opportunity to make representations, pursuant to section 172(2) of the City of Toronto Act, 2006.

399. The City and the TTC provided points of clarification, which I considered and are reflected in my final report.

400. The TTC and City are in agreement with my seven recommendations and their associated timelines.

401. In its response, the City Manager outlined Real Estate's role in capital projects that require the acquisition of properties and explained that its involvement begins only after 30% of the design work has been completed and the final option has been selected. The City Manager outlined Real Estate's expropriation process in the event that acquisition is not successful. He clarified that while it is Real Estate's role to communicate details about construction projects to directly affected property owners in

68

Page 13: Form Revised: February 2005 TORONTO TRANSIT COMMISSION ... · Issue Date: 10/04/2013 Page 3 . 4. ROLES AND RESPONSIBILITIES . 4.1 TTC . The TTC is responsible for developing the plan

relation to real estate matters, it is not Real Estate's role to communicate projects as a whole.

402. The City Manager articulated two factors that impeded efficient communication with the residents of Greenwood and Donlands. The first related to inadequate staffing due to a hiring freeze at the City, and the second was that the TTC contacted property owners before Council had fully approved the Project. In ensuring that this does not happen again, City Real Estate will work with the TTC to "establish roles and responsibilities to minimize role confusion and miscommunication."

403. The TTC's response acknowledged that in relation to the Greenwood and Donlands Projects, it did not adequately communicate or consult with the public.

404. On behalf of the TTC, the Chief Executive Officer (CEO) explained that TTC staff failed to properly communicate to the public technical information and engineering principles on which the Project was premised.

405. The CEO advised that prior to the release of my report, "the TTC recognized t_he need for significant changes in how we communicate with the public and their local councillors on construction projects and how we coordinate with City Real Estate and Legal Divisions regarding property acquisition."

406. The TTC has established an internal communications unit, "Strategic Partnerships" which "will be responsible for managing external interactions with the TTC including communications, community relations and property acquisition." This function, headed by a director, has already begun implementing my recommendations and is in the midst of developing a consultation program and protocol for communicating with Councillors on construction projects.

407. Strategic Partnerships will also liaise with City Real Estate and is "developing protocols and processes to ensure that affected property owners are well informed and that there is a clear delineation of roles and responsibilities and effective coordination between the TTC and the City of Toronto." The TTC will provide additional training in communications to "ensure staff increase and enhance their expertise and stay abreast of new innovations and best practices."

408. . The TTC is revising public consultation practices to provide the public with an earlier opportunity to meaningfully participate with the TTC when new construction projects are proposed.

69

Page 14: Form Revised: February 2005 TORONTO TRANSIT COMMISSION ... · Issue Date: 10/04/2013 Page 3 . 4. ROLES AND RESPONSIBILITIES . 4.1 TTC . The TTC is responsible for developing the plan

409. "Communication tools and procedures" are being developed to ensure that the public is "well informed of TTC construction projects." The CEO advised that the TTC will be providing information in plain language and will provide more access to information through its revamped website.

410. The CEO advised that all my recommendations will be addressed through its plans, policies, procedures and protocols, including: TTC Construction Projects Property Acquisition Management Plan, TTC Construction Projects Community Relations and Communications Management Plan, TTC Construction Projects Property Acquisition Management and TTC Protocol Regarding Communicating with Councillors on Construction Projects.

411. In recognizing the work that lies ahead in developing a new approach to "communications and community relations", the TTC is committed to strengthening and developing "better relationships with communities" to address my recommendations and to "excel at community consultation and engagement."

(Original signed)

Fiona Crean Ombudsman October 23, 2012

70

Page 15: Form Revised: February 2005 TORONTO TRANSIT COMMISSION ... · Issue Date: 10/04/2013 Page 3 . 4. ROLES AND RESPONSIBILITIES . 4.1 TTC . The TTC is responsible for developing the plan

APPENDIX J - TTC Response

TORONTO TRANSIT COMMISSION

�-",R[N �Tl�Cl /TtAm

GLlM, O!: UAL!!E.\\-'IE ,;[R \dC[ 0t H,\:P ANrr, f1\rnu:

(·Hllf t,,:•.· ... f V! {)lfl( rJZ

1-\Ah'I/, ilI.ICl.•,l�/,'I 1-'.:\"'J.\(J•,.:ul.'df.> j(l'IIC!>t.·1 r'(T:_1< :"'.-l�Lt.:ZYt"-� JOI !I� PARKI �

October 19. 20'12

t1.1:;. Fiona Crean Ombuds1nc1n C:itv c>f Toronto 375 UnivA1sit Avenu•:-. Suit& 203 y Toronli:•, Ontario M!.:,G 2.J5

D-"•c11 !v1s. Creon:

Re:. Ombudsman Repor1

Tl,,:i1d.: \'<°lU tor th1� oppon:unity to revieV'J your ,h;=;fl report on ··The lnvest1qstion i11to the Tor:)nt,:• T1;msit C,)rnn-,1ssic,n Secc,nd Exit Projects and Donland:c: and G,�.,,ri•.,vood Srntil11-,(, ... lvh· ex:::cun-_ c tearn ctt•d I opf_,,eci<'ttb ti.a rfw1ou�1h in,:t=:St{1.:1t1c,n intf e· bc·th thr.: t chn1cr.1I a,·,d pro, .. :ess i:,::Ut':f, ot Tht:Si:: pro1e•::;ts.

;:., ·� :1 qen,::ral ,_::off1ment -,,..,.e agr6e 1.ivith, a1u:I supp,)tt. the n=:c,)1Y1mcnd<ttions in •,'Olli rep,-.,n. �J $Tl,,� TTC 1e,_'.,) 11izi:;s 1h.-1t thi:, Donlancls and Greenwi:,od Stations ,:,cond Exit projects were

,,c,t hi:H)d!r'?cl pri)!)6tl'✓ frorn the perspective of coff,n,Lmitv relations, public i::onsullntion, ,·:on ,,n, ,nicaiioris 'Nith affectacl proper1y 0 1:,:ners and t;Gnlmu,,icatic,n r.:;q;,rclinq the rationale :,nu tei.:h1 ,r._:c1I issues. Altho1.J 1Jh this pn;·clated my appointrnEent. I tak0: responsihilitv tor rhts ;n.-J I am cc,mmittecl to �nsu1int,) tf-h�t this dot?.s r,ot happen agair1.

The TTC has develop,:H:I the Stcond Exit proqrarn pr1:lff1ise-d on teGlmical infonn<11ion and i-::11ui1,-➔erin�1 1Ainciples. Vv'e maint;;-11n thal our desigt) .::rirer i,:1 and prin.�iples are approprioti;;. H..:•1o'c•::'✓ i::c1. './-'8 ck, rr:-(:(•gnizi=: :cis arri,:-:ulnted in vow rep(,ri thar thB TTC rdiled to pmperiy .-:r,ir,1-i-,unicate .,vith rhe public. ThE- TTC' �, construction is �J(,vernecl bv hifJl,ly tecl,nical and ,letail>:",J :'-lh11darcb, 1�ri1,�ri.:1 z,nd p1· joco::'.;ses. V.Je mus1 do ;1 b�tte, (,1) of 10:xplaining re the public in an understandable tonri, how Jnd whv our projects are designed tht: way they

E•1er. prior t•) '/(JI.II r,3pc,rt, the TTC 1eco9nizecl the l"H::F.d for si '.:Jnific,,nt Ghange�-: in how \"Je ,�·,_in-,1nunii::,➔ t2. 1.1,:ith tlil', 1)ubl1c .:1nd their local cnunGillo1::: on constrt,oion proJects and hovv v.t1.:: c1:ir,rdi11::.=it>:c wiUi City R8ol Es1r,te a1·,d Laqal D1v,,;,ic1 ns re9arclin9 prop,;,rty acquisition.

EEady ,n 2012, th>:: reor92mizat1,:•n of thr:: n9i118erinu, Constn 1ction ancl Expansion Grou1:, iv.1::1:.:; 1n Liat8d and includ,�d th,:1 ,:.;::,rribli::;hmenl ot a separate dedicalt;d depanrncmt, Strate91c

Pt11tner2h1ps. This ne·,v dapann,ent v,.,ill he l'-:iSpori:3ibl.=: tor 1Yl,'.�na�1inq external interaction::; ·,,:itl, tile TTC inclw:Jin9 c,)1T11T1unications, cornm1.mitv rela1ic,ns. and properry acquisition. Tl·,,·: cJ;:,p�;rtinent sv.,rted 'NOrhin9 ,;:,,-1 TTC coristrur::tio:l proj.::ci:� in the spri1i9 of 2()'12 a1,d ,n Jui 11� v./;'.ls tullv established with a staff uf 1 ·1, e;<pected rn in,.:r&,3Se tc; 1 5 by early 20 · 31 . I

! •.H)t Y11,1gr: ):n:,/t. t._,_•1.:::.iltt.>, C,u·,.Jdd l\.-·.-1� I// Trtq :i1t,1.1 fl.--1q t�•UIOI) \V; oh )i'.�.• . ._ .• ,,"�\�.·llf.1.d

Page 16: Form Revised: February 2005 TORONTO TRANSIT COMMISSION ... · Issue Date: 10/04/2013 Page 3 . 4. ROLES AND RESPONSIBILITIES . 4.1 TTC . The TTC is responsible for developing the plan

- 2 -

.1 1 n pl8c::::.i::d to 1t:1p,)rt rh0t all ot vour recornmtndations arf.! ah t:�➔i:l y- bei, ·,u acldrf:lsstld th r c;u0l 1 the n 1cJ 1 1 ,:'iLJernbnt 1)lr1n�: . polir:ies , p1 ocedures and protocols that are in cleveloprnent .

Thf- TTC is 1niriarinq a pro9rarn that in volv e s , over the course of a '(F.:or an update to � l1Ch ,_�ou1, ,:: i l l(,r on TTC project s pla nned in his/ht';r w ,71rd ov6r thr;- next tive vea rs . V..Je have ,.1 lre�1dy starti::-d this program. The TTC is aL:;o i:: 1 1nently clevelopin�1 .-1 progra1Y1 ot ,: , , nsultat ion ,.'1nd upd;1tes ro councillo rs on active construct ion prujeGls . The TTC P,otocol Pegardinr;- Conimvnic,"lting with Counci/lo, s on Construction P,-o/ects will be con,pleted by 01� 1� (=: rn l)er :3 1 , 20 1 2 .

T h,2 TTC is clevi::'lc1 pin9 cornmunicat ions tools and procedures to en�;ure cornmunir.ies 1 (is idents , businesses .::;nd in ::; t itut ions a re welt infonnbd of TTC construction projects. T11e.St, i:;:,rnrnunici:t t i r: 1 1)::,. toc, ls �ind procedunc�s include ,::onsultat1on in the earl v design phases . outre;:i ch to inform the public re9ard ing the impli,; a tions of const l'uction in ndvance uf t he consrn1ct iur, ,,t ,:1n, c lose cont;:1ct 1.Nith residents vvho will be dire,::; Lly affec1ed by con stru,:t ic-n �1djdcenl to their proper tv , and deploy1))1::nt (it consuuct,on liaison staff to ·.vork ;:is the i1dv0,�nte to r the community throughout the course of the project. Fo, e verv TTC co1 , �t 1 1. 1 ,.:1 i 1,n prr,jt:ic t that has irnplic ations tor the cornrnun ity . a communii;ations plan .1 1 I I t,,;; devi:: lo psrl w 9u 1de the public consultation , cornrrnmitv re lat ions . com11,1w1icat ions .1r,(J i::r'• 1 · 1 s t 1 w�ti.:,n l i;=i , ��i'") through the phases of the project .

T l -.r: TTC i::, ;:d::;,) c .:,mrnitted to prov iding infonnat ic..n in c lear lnn9ua9e . T e,.::h,1 icnl i1 i f -:_1 rmati,_·,n 1-1: i l l 1_;;:; 1 : n r1veved in l;:mo, 1,19€: :1nrl g raphics to f n surn t li ,H i hE: relevc:1nt is,:;;ues ,H•': uride1 st ,:,c•i:l b >' ti 1E- publ k .

T lv:- TTC i s ,_: u 111::1 1tl v U)nduc tin9 f.1 r1:: V 1f� vv i:i f i l S v.12bsilE: T o im1:, rove T h 2 infr,nnat i :_:,n and • 1 :>1h i l rT ·t n� ::J:il .:linq ,:; (,n ::;truct ion prnject.:.; .

T h •:" TT C h,1 :::, r,? �>::;;; rc hi::'d b e s t p rac tice;3 i (q· 1�omr11uni ty inform,'it Jr;n and ourre.:=ir::h , a n d is i rn 1:il �n , -'· 1 , 1 1 11 i;1 nt:'7 N -"ipprc-.:, ch ,.::s to provicl inq inforrnat,or, about ,.;on suucti , 1 1 , pwi1::cts to 1h1, r>uL!i,_ L)&Se.( l ..:,n •:: un8t , t li<:!::,t i:.,1 aci: ices .

Th,:,; ,TC (:onstrunion P10/ects Comnwnav .Rela rions ,mcl C'omrnunic8rions l'i,1anag&me:1 r rl:Jn v\• ill ir, ,.::o rporate tli1::se init iati',.16s and i� � xpected to bf; (;C1mpleted by Dect'.:1nber 3 1 . �J) 1 2 .

Thi=: Cirv ot T0ro rn,:; acqu ires the property 1 equi 1 ed by the TTC 1 0 1 constniction proiects. The TTC l 1ri ::; rer::enrlv 11-::flssioned inrern::il responsibil ity fc,, courdi1 1at ion 1A pro1 •1:H1 \' r,:;q1., i rernen ts fo r ,..:onstruction projects r:1nd l iaison vvitll the C ity ,.1f Toronto Real Estate Div isicn to the Strate oic Partnerst1 ips Departrn€:nt vvithin Engineering, C c1nst nict ion and Exp;:1n .sicn. The TTC is currently developing p rotocols .. ,nd processes to ensuri:- that ,:t ffocrf,d property os,,v ners arc well i nformed and tha1 there i ::. ;:i clf r"lr del ineation of r018s ;_:1}"ld 1 !:: spi:rnsih i l i t ie::: .=ind e ffective coordinat ion bet\veen tt-ie TTC and the C itv uf Tot0n�

91

Page 17: Form Revised: February 2005 TORONTO TRANSIT COMMISSION ... · Issue Date: 10/04/2013 Page 3 . 4. ROLES AND RESPONSIBILITIES . 4.1 TTC . The TTC is responsible for developing the plan

3

.Y o11r r,-·!r:: ommencl ,:inor,s '/': i l l be ackl ressed in th8 TTC Consrruction P11..•iects P, operl',' A c(1ufsinou !'v1trm-igernent Plan expected 10 be .:offipl&ted by lhe ,:,nd of Feb, ua ry 20 ·1 :3.

In i:,, r: l ,:, 1 to iHOv icl;::; th� public w ith nK>re c.pport1. 1 1i itv fu r 1rH::,:1ri in9ful in put into TTC projects, ,:,, e are rev is in9 t i 1e, pi ,'lc t ici::s for p1.1 b l1r c.:onsu lt;:,t1 .:.,n bv enga9ing r.he p11b. l ic eM·l ie1 in rhe d.=:ve lop1.-,ei-1t of 3 project ' �. concept anrl d8si9n. The TTC ic comrn i tted to p1 ovidin9 fu ll info nnatii:, n :::i l,out a ll c,)nstruction pro1ects on the TTC we bs ite f:ii"1d we are rev1e\111 in9 ,1 1 ld n::v�m,pin9 ti 1e ·-.vebsite t o make it e,'isie !' tor the pu blic to f ind the 1 e levant intorrnation . and 1.u p;1n ic ip:H,": w, the con sultatioi) proc!:!SS on- l ine or throu9h other socia l 1r1ed ia. The TTC C�ons rruc:(J·on Projecrs C o1nmuniry Relarions and Cormnunic;1rii:111s 1I:tanagen)ent Plan ·11:i l l ;pr�c i t ica l ly add re s ::; r:,ub l i c •.::onsultat ior1 . The TT C i ::; a lso prep a r ino a p lain lanouage c:u1rn nt11 i i ,: i'l t io1 ·, plan ;-1bout the Second Ex it and eithe r s i rn i lar proqr,:ims such as -Che Easie r A i:: c ,:.-S '.'., Pi ogr:im .

The St r t·H1::9i r� P;11 i.i11:, 1:ship:; st21tt responsib le for .:: 1:,rnmunic;ations z1ncJ community re lations are tr21 i r1(:-d cc-rnrnun ications sped:dists vvith extensive experien,::;e . The TTC wil l pro v ide adcl it inn:-i l tra in1n9 to ensure staff in,: rease and �nh;:,ni:e their expenise and stav ,=i6reast oi n1:: \"✓ inn o v ati;_,ns a 1 id t,�sl proi.:tices .

The TTC 1 · ·:::; n , 1Y1 1Tl t=: l°I 1 0 pro ·.1 icl inq ,:.ornmunications 1 0 the c on1munit1es in thE- v ic inirv o f r 1 ·1,:: [i ;Jn l ;:in..- 1 �; a 1 1d G r -:-17, r, ,Ncu)d S rat ir>ns to provide them vv i th a proji:;, : t status . 1nr ludin9 I H: >- 1 s reps . A t::orr, 1nurncat1on$ 1.:, 1,:in w il l be d�'.1elop0Ci tc,1 the projects t lmAt�Jh th'=' de::; iun .�1 1 ·,cJ ,: ,:•1 1 •_.;f 1 U (: ik;n [ : • I ; ,1 �,r:: ::: .

/, s pi:'i r t r:, t r t 1"" TTC Cons rrucrion Pro/ects Propenv A,:quis1tion ,1·1anaqernen r the TTC v.1 i l l v,. ork, \S ith 1he, C i t y ;i f Tn rr:,n ro Rt:•,:11 Estate D iv is ion to dea1 iv de t i ,·1e rok-:s an(! rP.-'. pOn'.;il :, i l , 1 1e s .

\�J ,� ;:q)t)1·,0; ,: iMi:: 1 l-1 3t ·.-·:':! vv era ;.:;b le to meet V'l ith you ai 'ie.l vcu r tean , to d i�cu s:� t l u� repo rt . Th i:'; TTC r,::: 1 ." ', Cmiz (:: s t lvir ir has si9n ifo::t1 1 1 l ·.•.;ork alit-:od h) docurni:: ,n :-md ful tv 1 1 1 1p lement i ts I·1t:: v1 appr ,:,ach tc • ,::01 nn1 1. 1 1 1 iu1t ion :::. ,:ind conirnun itv ri:; lat ic•n!:: , .�r,cl to develop bette r 1P. 1 ."t 1. ion shir•:'• ,:,; 1 th ..: 01l'lmun11 ies t o addr+:'!SS your i"<":C(>n·1n1enclatk)ns. \Ne assure you thm vvt': �� r •i fully -J,r1 1 1 r, 1 U t-':d r 1:; t h,:' :i E: ,-: hange s :,,s t l ,'='Y a1 !:' v.1 1 t of ;)u1 vi :; ic1n (•f n-,oi:Je rn iz ing t h-:: TTC: . :c, r,d thCt �,HE C(t1 , s isl-:<nt ,.·v i t l , 1ny detP.rrnmation that frorn ,,, ,:, v,, un , i he TTC vv i l l exce l ._; l c ,)m1 1 1 1.1 1 1 i 1 v 1:unsu l1.ar ion r,nd ,�n9agen1i:;1it .

Si , 11J'-!1 dy,. /

/. t' ' \ J i .· • (· / . .' : '.· t·/.· '1 ·· ... ! I I ! ; ' ·' ! /

,l \/i J ' , \.i_:,t:<'l _./ .,. • .,\.,,- ..... \.I" .. ,_,."

' ··-

; /

A ndv Bvfvrd Chief E ::-: e. !_; utivr": Utt ict:': I

92