Page 1: Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtraenvironmentclearance.nic.in/writereaddata/online/... · Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtra
Page 2: Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtraenvironmentclearance.nic.in/writereaddata/online/... · Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtra

Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtra 

APPENDIX I (See paragraph – 6) 

   F O R M – 1 (I)      Basic Information 

 Sr. No. 

Items  Details 

1.  Name of the project/s  “Amar Harmony”   At Ulwe, Navi Mumbai 

2.  S.No. in the schedule  8 (a)  

3.  Proposed capacity/area/length/tonnage  to  be handled/  command  area/lease  area/ number of wells to be drilled 

Total Plot Area  = 9299.640 Sq. M Built – Up Area = 13948.07 Sq. M (FSI) Built – Up Area. = 22656.49 Sq. M (Non FSI) Total Construction Area= 36604.56 Sq. M. 

4.  New / Expansion / Modernization New 

5.  Existing Capacity/ Area etc. Total Plot Area  = 9299.640 Sq. M Built – Up Area = 13948.07 Sq. M (FSI) Built – Up Area. = 22656.49 Sq. M (Non FSI) Total Construction Area= 36604.56 Sq. M. 

6.  Category of Project i.e. ‘A’ or ‘B’ Category  ‘B’7.  Does  it  attract  the  general  condition? 

If Yes, please specify. NA

8.  Does  it  attract  the  specific  condition? If Yes, please specify. 

No  

9.  Location    Plot/Survey/Khasra No. Plot No. 22, Sector ‐4  Village   Taloja  Tehsil  Raigad  District   Raigad  State   Maharashtra10.  Nearest  railway  station/airport  along 

with distance in kms. Taloja Railway Station‐ 1 Km   Mumbai Airport– 39 KM 

11.  Nearest  town,  city,  district headquarters  along  with  distance  in kms. 

Navi Mumbai Municipal Corporation

12.  Village  panchayats,  Zila  Parishad, Municipal  Corporation,  Local  body (complete  postal  addresses  with telephone nos. to be given) 

Navi Mumbai Municipal Corporation

13.  Name of the applicant  SHRI GAMI INFOTECH PVT. LTD. 14.  Registered address  C  3,  S  16,  M.G.  Complex,  Sector  –  14,  Vashi, 

Navi Mumbai. 

Page 3: Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtraenvironmentclearance.nic.in/writereaddata/online/... · Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtra

Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtra 

15.  Address for correspondence:    Name   Mr. Ambalal B. Gami   Designation (Owner/Partner/CEO)  Director   Address  C  3,  S  16,  M.G.  Complex,  Sector  – 14,  Vashi

Mumbai.   Pin Code  400705  Authorized Representative Mr. K Srinivasan  Contact No.  +919820641612  E‐mail  [email protected]   Telephone No.   Fax No. 16.  Details of Alternatives Sites examined,

if  any.  Location  of  these  sites  shouldbe shown on a Toposheet 

No  

17.  Interlinked Project  NA18.  Whether  separate  application  of

interlinked  project  has  beensubmitted? 

NA

19.  If Yes, date of Submission NA20.  If no, reason  NA21.  Whether  the  proposal  involves

approval/clearances  under:  if  yes,details of the same and their status tobe given. The Forest (Conservation) Act, 1980? The Wildlife (Protection) Act, 1972?  The C.R.Z Notification, 1991?  

No 

22.  Whether  there  is  any  GovernmentOrder /Policy relevant/ relating to thesite? 

NA

23.  Forest land involved (hectares) NA24.  Whether  there  is  any  litigation

pending  against  the  project  and/orland in which the project is propose tobe set up? Name of the court  Case No.  Orders/directions  of  the  Court,  if  anyand  its  relevance  with  the  proposedproject.  

No 

 

Page 4: Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtraenvironmentclearance.nic.in/writereaddata/online/... · Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtra

Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtra 

  (II) Activity  

 1.  Construction,  operation  or  decommissioning  of  the  Project 

involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) 

 Sr. No. 

Information/Checklist confirmation  

Yes/ No 

Details  thereof  (with approximate  quantities  /rates, wherever  possible)  with  source of information data 

1.1  Permanent or  temporary  change  in land  use,  land  cover  or  topography including  increase  in  intensity  of land use (with respect  to  local  land use plan)   

No  Basically  land  is  Barren  land.  The proposed project  site  is designated for  the  intended  purpose  and  the proposed built‐up area is 36604.56 S q. M   

1.2  Clearance  of  existing  land, vegetation and buildings? 

No  NA 

1.3  Creation of new land uses? 

No  NA 

1.4  Pre‐construction  investigations  e.g. bore houses, soil testing? 

Yes Please  refer  Ground  water  quality Analysis Report. Annexure: 6 Soil Testing Report. Annexure: 7  

1.5  Construction works?  

Yes  About 36604.56 Sq. M  will be construction work.  

1.6  Demolition works?  

No  NA  

1.7  Temporary  sites  used  for construction  works  or  housing  of construction workers? 

Yes  During  construction  total  150 nos.of workers will be on site.   

1.8  Above  ground  buildings,  structures or Earthworks  including  linear structures,  cut  and  fill  or excavations   

  Plot  area  is barren  land.  Excavated material during construction will be used  for  landscape  and  backfilling therefore there will not be any solid waste problem from the generation of construction‐excavated earth.   

1.9  Underground  works  including mining or     tunneling? 

No NA 

Page 5: Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtraenvironmentclearance.nic.in/writereaddata/online/... · Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtra

Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtra 

Sr. No. 

Information/Checklist confirmation  

Yes/ No 

Details  thereof  (with approximate  quantities  /rates, wherever  possible)  with  source of information data 

 

1.10  Reclamation works?  No NA

1.11  Dredging?  No NA

1.12  Offshore structures?  No NA

1.13  Production  and  manufacturing processes? 

No NA 

1.14  Facilities  for  storage  of  goods  or materials?  

Yes For  the  temporary  storage  of  the construction  material  on  the  one side of the plot. 

1.15  Facilities  for  treatment  or  disposal of solid waste or liquid effluents? 

Yes Solid Waste Management a) During Construction phase:  Construction debris will be used for construction  site  itself  and therefore there will not be any solid waste  problem  from  generation  of construction‐excavated earth.   Septic  tank  and  soak  pit  will  be provided  for  proper  disposal  of liquid effluent.  b) During Operation Phase:­ Total  population  of  the  residential scheme  is  1940  nos.  and Commercial scheme is 66 nos. For total 2006 nos For Residential and Commercial Quantity  of  solid  waste  –  903 kg/day i.e.0.90 T/day approx. Quantity  of  wet  waste  –      0.36 T/day  Quantity of dry waste – 0.54 T/day  Biodegradable  and  non biodegradable  waste  will  be segregated.  Dry waste  will  be  sent for recycling and wet waste will be 

Page 6: Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtraenvironmentclearance.nic.in/writereaddata/online/... · Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtra

Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtra 

Sr. No. 

Information/Checklist confirmation  

Yes/ No 

Details  thereof  (with approximate  quantities  /rates, wherever  possible)  with  source of information data 

treated  by  ‘Organic  Waste Converter’ for composting.  Liquid waste management  During construction: 50 M3/DAY Source: Tanker Water  During operation: Source: CIDCO o Total  Water  Demand  is  289.52 

M3/DAY o Domestic  Water  Demand  is 

181.53 M3/DA o Flushing water demand is 92.25 

M3/DAY o Landscape  Water  Requirement 

5.4 M3/DAY  o Total  treated  water  available 

246.4M3/DAY o 102.99  M3/DAY  treated  water 

will be reused.  

1.16  Facilities  for  long  term  housing  of operational workers? 

No NA

1.17   New road, rail or sea traffic during construction or operation? 

No NA

1.18   New  road,  rail,  air  waterborne  or other  transport  infrastructure including new or altered routes and stations, ports, airports etc? 

No NA

1.19  Closure  or  diversion  of  existing transport  routes  or  infrastructure leading  to  changes  in  traffic movements? 

No NA

1.20  New or  diverted  transmission  lines or pipelines? 

No NA

1.21  Impoundment,  damming, culverting,  realignment  or  other changes  to  the  hydrology      of watercourses or aquifers? 

No NA

Page 7: Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtraenvironmentclearance.nic.in/writereaddata/online/... · Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtra

Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtra 

Sr. No. 

Information/Checklist confirmation  

Yes/ No 

Details  thereof  (with approximate  quantities  /rates, wherever  possible)  with  source of information data 

1.22  Stream crossings?  No NA 

1.23  Abstraction  or  transfers  of  water form ground or surface waters? 

Yes  During  Construction  phase  CIDCO water  supply  /  Tanker  water  will be  used  for  the  construction purpose  

1.24  Changes in water bodies or the land surface  affecting  drainage  or  run‐off?  

No NA

1.25  Transport of personnel or materials for  construction,  operation  or decommissioning? 

Yes Only material transport. Approx. 10 trucks per day. 

1.26  Long‐term  dismantling  or decommissioning  or  restoration works? 

No NA

1.27  Ongoing  activity  during decommissioning which  could have an impact on the environment?  

No NA

1.28  Influx of people to an area in either temporarily or permanently? 

Yes Influx During construction:  150 Nos. workers & 35 Nos. Staff  Influx  during  operation: Approximately  2006  persons  are going to reside in this Residential & commercial complex.  

1.29  Introduction of alien species? No  NA

1.30  Loss  of  native  species  or  genetic diversity? 

No  NA  

1.31  Any other actions?  No  NA 

 2.   Use  of Natural  resources  for  construction  or  operation  of  the Project 

(such  as  land,  water,  materials  or  energy,  especially  any  resources which are non­renewable or in short supply): 

 

Page 8: Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtraenvironmentclearance.nic.in/writereaddata/online/... · Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtra

Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtra 

Sr. No. 

Information/checklist confirmation  

Yes/ No 

Details  thereof  (with  approximate quantities  /rates,  wherever possible)  with  source  of information data 

2.1  Land  especially  undeveloped  or agricultural land (ha)  

No N.A

2.2  Water  (expected  source  & competing users) unit: M3/DAY 

Yes Liquid waste management  During construction: 50 M3/DAY Source: Tanker Water 

 During operation:  Source: CIDCO o Total  Water  Demand  is  289.52 

M3/DAY o Domestic Water Demand is 181.53 

M3/DA o Flushing  water  demand  is  92.25 

M3/DAY o Landscape Water Requirement 5.4 

M3/DAY  o Total  treated  water  available 

246.4M3/DAY o 102.99 M3/DAY treated water will 

be reused. 2.3  Minerals (MT)  No NA2.4  Construction  material  – stone, 

aggregates,  sand  /  soil  (expected source – MT) 

Companies  authorized/  approved local vendor 

2.5  Forests and timber (source – MT) No NA

2.6  Energy  including  electricity  and fuels  (source,  competing  users) Unit: fuel (MT), energy (MW)  

Source:  Maharashtra  State  Electricity Distribution Company Limited. ( MSEDCL) Total  Demanded  load  For  Project  = 4775 KW.  During Construction  Source  of  Power  Supply  For  Project  ‐ D.G Sets (75 KVA , 1 nos)     During Operation Source :‐‐ MSEDCL   The proponent is proposing 4775 KVA ‐ 350 KVA‐ DG Set 

Page 9: Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtraenvironmentclearance.nic.in/writereaddata/online/... · Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtra

Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtra 

Sr. No. 

Information/checklist confirmation  

Yes/ No 

Details  thereof  (with  approximate quantities  /rates,  wherever possible)  with  source  of information data Alternative Back Up:‐ Diesel Generator (DG)  Set  for  lifts,  Common    Lighting, Water  pumps  &  other  essential services.  Capacity  of  D.G.  Set  for  Common Amenities:  281KVA  ‐  2 Nos.  320 KVA for Fire Pump With AMF & Auto Load Sharing  Panel  with  Sound  Proof Enclosure  with  dB  level  not  greater than 75 dB (A).   

2.7  Any  other  natural  resources  (use appropriate standard units) 

NA

 3.        Use,  storage,  transport,  handling  or  production  of  substances  or 

materials, which could be harmful to human health or the environment or raise concerns about   actual or perceived risks to human health. 

 Sr.  No. 

Information/Checklist confirmation 

Yes/ No 

Details  thereof  (with approximate  quantities/ rates,  wherever  possible) with  source  of  information data 

3.1  Use  of  substances  or  materials, which are hazardous  (as per MSIHC rules)  to  human  health  or  the environment (flora, fauna, and  water supplies) 

No NA

3.2  Changes  in occurrence of disease or affect  disease  vectors  (e.g.  insect  or water borne diseases) 

NoNA 

3.3  Affect  the  welfare  of  people  e.g.  by changing living conditions? 

No It  can  help  in  improving  the living standards of that area. 

3.4  Vulnerable  groups  of  people  who could  be  affected  by  the  project  e.g. hospital  patients,  children,  the elderly etc., 

No NA

3.5  Any other causes  No NA 

4.  Production  of  solid  wastes  during  construction  or  operation  or decommissioning (MT/month) 

Page 10: Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtraenvironmentclearance.nic.in/writereaddata/online/... · Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtra

Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtra 

10 

 

Sr. No. 

Information/Checklist confirmation 

Yes/ No 

Details  thereof  (with approximate quantities/rates,  wherever possible)  with  source  of information data 

4.1  Spoil, overburden or mine wastes No Excavated material will be used for back filling at the site. 

4.2  Municipal  waste  (domestic  and  or commercial        wastes) 

Yes Solid Waste Management b) During Operation Phase:­ Total  population  of  the residential  scheme  is  1940 nos.  and  Commercial  scheme is 66 nos. For total 2006 nos For  Residential  and Commercial Quantity  of  solid  waste  –  903 kg/day  i.e.0.90  T/day approx. Quantity of wet waste –     0.54 T/day  Quantity  of  dry  waste  –  0.36 T/day  Biodegradable  and  non biodegradable  waste  will  be segregated.  Dry  waste  will  be sent  for  recycling  and  wet waste  will  be  treated  by ‘Organic Waste Converter’ for composting.  

4.3  Hazardous  wastes  (as  per Hazardous Waste               Management Rules) 

No NA

4.4  Other industrial process wastes 

No NA

4.5  Surplus product  No NA

4.6  Sewage sludge or other sludge  from effluent        treatment 

YES Sludge  from  STP  will  be  used as  manure  for  Green  belt development at site. 

Page 11: Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtraenvironmentclearance.nic.in/writereaddata/online/... · Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtra

Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtra 

11 

Sr. No. 

Information/Checklist confirmation 

Yes/ No 

Details  thereof  (with approximate quantities/rates,  wherever possible)  with  source  of information data 

4.7  Construction or demolition wastes No Approx.  1000 cu.  ft  Will  be earthwork and will be used  for back filling. 

4.8  Redundant machinery or equipment No NA

4.9  Contaminated  soils  or  other materials 

No NA

4.10 Agricultural wastes  

No NA

4.11  Other solid wastes  

No NA

 

Page 12: Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtraenvironmentclearance.nic.in/writereaddata/online/... · Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtra

Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtra 

12 

  5. Release of pollutants or any hazardous, toxic or noxious substances to 

air (Kg/hr)  

  Sr.  No. 

  Information/Checklist confirmation 

  Yes/ No 

Details  thereof  (with approximate quantities/rates,  wherever possible)  with  source  of information data 

5.1  Emissions  from combustion of  fossil fuels  from  stationary  or  mobile sources 

No NA

5.2  Emissions  from  production processes  

No NA

5.3  Emissions  from  materials  handling including   storage or transport  

No NA

5.4  Emissions  from  construction activities  including  plant  and equipment  

No NA

5.5  Dust  or  odour  from  handling  of materials  including  construction materials, sewage and  waste  

Yes As per EMP

5.6  Emissions  from  incineration  of waste  

No NA

5.7  Emissions  from burning  of waste  in open  air  (e.g.  slash  materials, construction debris)  

No NA

5.8  Emissions from any other sources 

No NA

         

Page 13: Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtraenvironmentclearance.nic.in/writereaddata/online/... · Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtra

Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtra 

13 

 6. Generation of Noise and Vibration, and Emissions of  Light and Heat: 

Sr. No. 

Information/Checklist confirmation 

Yes/ No 

Details  thereof  (with approximate  quantities/ rates,  wherever  possible) with  source  of  information data  with  source  of information data 

6.1  From  operation  of  equipment  e.g. engines, ventilation plant, crushers   

Yes Sources  of  noise  Pollution during  construction  phase  are machinery  like  compressor, Compactors,  Concrete  Plant, Cranes  and  transportation materials. During operation phase DG sets will  be  provided  with  Canopy to reduce noise and vibration.  

6.2  From industrial or similar processes 

No NA

6.3  From construction or demolition Yes As per EMP

6.4  From blasting or piling 

No NA

6.5  From  construction  or  operational traffic  

Yes As per EMP

6.6  From lighting or cooling systems 

No  NA

6.7  From any other sources No NA

 7.  Risks of contamination of land or water from releases of    pollutants into 

the ground or into sewers, surface waters, groundwater, coastal waters or the sea: 

 

Sr. No. 

Information/Checklist confirmation 

Yes/ No 

Details  thereof  (with approximate  quantities/rates, wherever  possible)  with source of information data 

7.1   From  handling,  storage,  use  or spillage of hazardous materials 

No NA

7.2   From  discharge  of  sewage  or other      effluents  to  water  or  the land (expected mode and place of  discharge) 

No Sewage effluents will  be  treated and  reused  for  flushing, gardening areas.  102.99  M3/DAY  treated  water will be reused  

Page 14: Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtraenvironmentclearance.nic.in/writereaddata/online/... · Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtra

Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtra 

14 

7.3  By deposition of pollutants emitted to air into the land or into water 

No NA

7.4  From any other sources No NA

7.5  Is there a risk of long term build up of  pollutants  in  the  environment from these sources? 

No NA

 8.  Risk of accidents during construction or operation of the Project, which 

could affect human health or the environment  

Sr.  No. 

Information/Checklist confirmation 

Yes/ No 

Details  thereof  (with approximate  quantities/ rates,  wherever  possible) with  source  of  information data 

8.1  From  explosions,  spillages,  fires etc  from  storage,  handling,  use  or production  of  hazardous substances 

No  NA 

8.2  From any other causes 

Yes There  is  a  risk  of  accident during  construction  however proper  safety  measures  will be taken. 

8.3  Could  the  project  be  affected  by natural  disasters  causing environmental  damage      (e.g. floods,  earthquakes,  landslides, cloudburst etc)? 

No Floods and  landslides are not expected in the area.  Earthquake  proneness:  The area  falls  under  Zone  III  as per  IS­  1893­2002.  Hence relevant design parameters as per  zone  III  have  been considered  for  RCC  design  of the buildings.  Dynamic analysis will be done by  Response  spectrum method.  Importance  factor  1  special moment  resisting  frame  R‐5, Zone factor Z‐ 0.16. Annexure  10  (Seismic Zoning Map of India.) 

   9.  Factors which should be considered (such as consequential development) 

which could lead to environmental effects or the potential for cumulative impacts   with    other existing or planned activities in the locality 

Page 15: Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtraenvironmentclearance.nic.in/writereaddata/online/... · Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtra

Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtra 

15 

 

Sr. No. 

Information/Checklist confirmation 

Yes/ No 

Details  thereof  (with approximate  quantities /crates,  wherever  possible) with  source  of  information data 

9.1  Lead  to  development  of supporting    facilities,  ancillary development  or    development stimulated  by  the  project  which could  have  impact  on  the environment e.g.: 

 •  Supporting  infrastructure 

(roads, power supply, waste or 

waste water treatment, etc.) 

•   housing development 

•   extractive industries 

•   supply industries 

•   other 

Yes Housing development            There are many  industries and colleges  in  the  vicinity  of  this project  site.  The  Proposed development  will  cater  the needs of the residents. 

9.2  Lead to after‐use of the site, which could  have  an  impact  on  the environment 

No NA

9.3  Set  a  precedent  for  later developments 

No NA

9.4  Have  cumulative  effects  due  to proximity  to  other  existing  or planned  projects  with  similar  effects 

No NA

       

Page 16: Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtraenvironmentclearance.nic.in/writereaddata/online/... · Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtra

Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtra 

16 

 (III)  Environmental Sensitivity  Sr. No. 

Areas  Name/ Identity 

Aerial  distance  (within 15  km.)  Proposed project  location boundary 

1  Areas  protected  under  international conventions, national or local  legislation for their ecological, landscape, cultural or other related value 

No NA

2  Areas  which  are  important  or  sensitive  for ecological reasons ‐ Wetlands, watercourses or  other  water  bodies,  coastal  zone, biospheres, mountains, forests 

Yes The  proposed  location  is approx.  at  a  distance  of 1.2  km  from  Kharghar Creek.  

3  Areas  used  by  protected,  important  or sensitive      species  of  flora  or  fauna  for breeding,  nesting,  foraging,  resting,  over wintering, migration 

No NA

4  Inland,  coastal,  marine  or  underground waters. 

No NA

5  State, National boundaries. No NA

6  Routes  or  facilities  used  by  the  public  for access to recreation or other tourist, pilgrim areas. 

No  

7  Defence installations  No NA

8  Densely populated or built‐up area Yes Census  Data  2001 Annexure: 11 

9  Areas occupied by sensitive man‐made land uses  (hospitals,  schools,  places  of  worship, community facilities) 

Yes Census Data 2001 Annexure: 11  

10  Areas containing  important, high quality or scarce  resources.  (ground  water  resources, surface  resources,  forestry,  agriculture, fisheries, tourism, minerals) 

No NA

11  Areas  already  subjected  to  pollution  or  environmental  damage.  (those  where existing  legal  environmental  standards    are exceeded) 

No NA

12  Areas  susceptible  to  natural  hazard  which could  cause  the  project  to  present environmental  problems.  (earthquakes, subsidence,  landslides,  erosion,  flooding  or extreme or adverse climatic conditions) 

No NA   

    (IV).  Proposed Terms of Reference for EIA studies         

Page 17: Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtraenvironmentclearance.nic.in/writereaddata/online/... · Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtra

Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtra 

17 

APPENDIX – II  (See paragraph 6) 

 FORM ­ 1 A (Only for construction projects listed under item 8 of the Schedule)   CHECK LIST OF ENVIRONMENTAL IMPACTS  

(Project  proponents  are  required  to  provide  full  information  and 

wherever necessary attach explanatory notes with the Form and submit 

along  with  proposed  environmental  management  plan  &  monitoring 

programme) 

       1.  LAND ENVIRONMENT       (Attach panoramic view of the project site and the vicinity)  

1.1. Will  the  existing  land­use  get  significantly  altered  from  the 

project that is not consistent with the surroundings? (Proposed land­

use must conform to the approved Master Plan / Development Plan of 

the area. Change of land­use if any and the statutory approval from the 

competent authority be  submitted).   Attach Maps of  (i)  site  location, 

(ii) surrounding features of the proposed site (within 500 meters) and 

(iii) The site (indicating levels & contours) to appropriate scales. If not 

available attach only conceptual plans.  

   The proposed land use is in conformity with the DP of the area.  

  

Annexure – 1  : Building perspective View  

Annexure – 2  : Master Plan  

Annexure – 3  : Site Location Map  

Annexure – 4   : Landscape plan 

 

Page 18: Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtraenvironmentclearance.nic.in/writereaddata/online/... · Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtra

Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtra 

18 

 

1.2. List out all  the major project requirements  in  terms of  the  land area,  built  up  area,  water  consumption,  power  requirement, connectivity, community facilities, parking needs etc.  Total Area of the Plo   :  9299.640 Sq. M Total Built‐up Area       :  36604.56 Sq. M Landscape area  :  1088.57 Sq. M Road / Pathway area  : 844.582 Sq. M. 

The overall area of the plot is 9299.640 Sq. M of which an area 36604 Sq. 

M will  be  the  built‐up  area.  Landscape  area will  be 1088.57 Sq.M.  Total 

Population will be 2006.      

 

AREA STATEMENT 

Area Statement SQ.MTS AREA OF PLOT 9299.640 Sq. M F.S.I 1.5 PERMISSIBLE B.UA. 13948.07 Sq. M TOTAL B.U.A CONSUMED 13948.07 Sq. M BALANCE B.U.A. 0.00 CONSUMED F.S.I. 1.5 BALANCE F.S.I 0.00 TOTAL COMMERCIAL UNIT 22 NOS TOTAL RESIDENTIAL UNIT 388 NOS TOTAL B.U.A. OF THE BUILDING 13948.07 Sq. M  

PARKING STATEMENT:  

 

Particular  Car  Scooter  Cycle Required  175  ‐‐‐ ‐‐‐

Proposed  175  ‐‐‐ ‐‐‐

  

(REFER ANNEXURE 5 – Parking Plan)  vi)   LANDSCAPING AND TREE PLANTATION 

The  landscape  area will  be 1088.57 Sq.M  to  keep  the  campus  green  and 

environment friendly. The list of trees to be planted is as follows‐ 

Page 19: Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtraenvironmentclearance.nic.in/writereaddata/online/... · Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtra

Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtra 

19 

In this Plot area total 95 numbers of trees will be planted. 

PLANTATION: TREES AND SHRUBS  

List of Native Trees suitable for roadside/ border side plantation / avenue:  

Tree Common Name  

Scientific Name 

Shirish  Albizia lebbeckNeem,  Azadiracta indicaMaharukh  Ailanthus excelsaNandruk,  Ficus retusaSatwin  Alstonia scholarisKaranj  Pongamia pinnataSita Ashok  Saraca asokaKatesavar  Bombax ceibaKadamb  Anthocephallus cadamba

     List of native trees suitable for beautification in garden / building premises:  

Common name  Scientific name Bahava  Cassia fistulaBakul  Mimusops elengiParijatak  Nyctanthes arbortristisTamhan  Lagerstroemia flosregineae Kunti  Murraya paniculataSita Ashok  Saraca asokaShivan  Gmelina arboreaApta,  Bauhinia racemosaNeem  Azadirachta indicaKate sawar  Bombax ceibaPangara  Erythrina indicaPalas / Flame of the forest Butea monospermaFish tail palm  Caryota urensNandruk  Ficus retusaSon chafa  Michelia champacaPutranjiva  Putranjiva roxburghiiKadamb  Anthocephallus cadambaSatwin,  Alstonia scholarisCurry leaf / kadipatta Murraya koengiiLemon  Citrus

 Shrubs Shrub / climber  Scientific name Nirgudi  Vitex negundoAdulasa  Adhatoda vasicaWhite plumbago  Plumbago zeylanica

Page 20: Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtraenvironmentclearance.nic.in/writereaddata/online/... · Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtra

Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtra 

20 

Ber  Ziziphus mauritianaStachytarpheta  Stachytarpheta spTakala,  Cassia toraTarwad  Cassia auriculataKusar / ran‐jai(Climber) ­­Sagargota  ­­Krushna kamal  Passiflora edulis

 Gallery / balcony Plants 1. Lemon grass / Gavati Chaha 2. Tulas 3. Korphad 4. Adulasa 5. Chitrak 6. Krushna kamal 7. Kadipatta 8. Wala 9. Wekhand 10. Gokarna 

  

Shrubs/small trees For Home Garden  1. Nirgudi 2. Adulasa 3. Apta 4. Piwala Kanchan 5. Kunti 6. Bahava 7. Kadipatta 8. Madhunashini (climber) 9. Wala 10. Tamhan 11. Kusar (climber) 

 

The  Project  proponents  have  proposed  a  landscape  development  plan, 

which  includes  planting  of  flowering  and  shady  trees,  shrubs  and  lawn 

within the plot. 

The  open  spaces  inside  the  plot will  be  suitably  landscaped  and  covered 

with vegetation of indigenous variety.  

 

1.3  What  are  the  likely  impacts  of  the  proposed  activity  on  the  existing facilities  adjacent  to  the  proposed  site?  (Such  as  open  spaces, community facilities, details of the existing land use and disturbance to the local ecology). 

 

Page 21: Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtraenvironmentclearance.nic.in/writereaddata/online/... · Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtra

Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtra 

21 

Although  it  is  a  construction  activity,  its  impact  on  air  quality,  water 

quality, noise and soil will not be notable. As a matter of  fact  this activity 

will have positive  impact on  socio‐economic  culture of people  residing  in 

the vicinity of the proposed area. There will not be any disturbance to the 

local ecology as the selected site for the construction is a barren land. 

 

The project  site and  the  surrounding area have  residential buildings. The 

open  area  will  be  occupied  by  vegetation,  which  will  be  helpful  in 

increasing  green  cover  of  the  area.  Proposed  project  will  require 

manpower  during  construction  phase  and  operational  phase  thereby 

creating job opportunities. Local skilled and unskilled laborers will have an 

opportunity for employment directly or indirectly.  

There will be additional employment for the poor strata of society by way 

of domestic helpers, drivers, cleaners etc. 

 

Due  to  the  proposed  project,  facilities  are  likely  to  grow  in  line with  the 

development.  As  during  the  construction  and  operational  phases  of  the 

project a workforce will be needed this will be  including both  skilled and 

unskilled  people.  The  introduction  of  workers  from  areas  outside  the 

region,  could  introduce  a  potential  effect  on  the  local  culture,  habits  and 

economics.  

 

1.4  Will  there  be  any  significant  land  disturbance  resulting  in  erosion, subsidence  &  instability?  (Details  of  soil  type,  slope  analysis, vulnerability to subsidence, seismicity, etc may be given).  A.  Details of Soil quality and slope 

The  texture  of  all  the  soil  samples was  dominated by  “Loam”. Hence,  the soil at  project area is “loamy soil”. The texture of all the soil samples in the project area   was varied   from  loam,  sandy  loam,  clay  loam,  sandy  clay loam, loamy sand, silt   loam to clay. A soil   dominated by one  or  two of the three particle size groups   behaves like loam. Samples  were collected within a radius of 10 Km in the study area.   Soil  samples collected  and  were  analyzed  for  pH,  moisture  content,  water  holding   capacity,  organic  matter,  ammonia  nitrogen,  potassium, 

Page 22: Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtraenvironmentclearance.nic.in/writereaddata/online/... · Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtra

Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtra 

22 

phosphorous, Magnesium as Mg,   Chlorides as Cl‐, Sulphates as SO4‐‐ using standard methods of Association of Official Agricultural Chemist.   (REFER ANNEXURE 7 – Soil Analysis Report) The geological formations of the entire study area consist of dark coloured volcanic lava flows, basaltic in composition.   Basaltic rocks: The lava flows were poured out of long and narrow fissures in  the earth’s  crust, during  the Upper Cretaceous  to Lower Eocene period approximately,  80  to  100 million  years  ago.  These  are  spread  out  in  the form of horizontal   sheets  or beds and   constitute the innumerable spurs, hills and hill ranges, bold flat   topped ridged, lofty peaks   and plateaus with impressive cliffs.  A characteristic   feature  of  these  flows  is their horizontal   disposition and considerable lateral   extent  with almost incredible uniformity in their composition and appearance. Kamothe is situated at latitude of 19o 00’ N and longitude 73005’ E.  

B.  Vulnerability to Seismicity and precautions: 

As  per  the  Seismic  Zoning  Map  of  India  (given  in  Enclosures)  Mumbai 

region falls under Zone‐ 4. Stability Certificate, as per prevalent IS Code will 

be  obtained  for  these  buildings  from  registered  Consulting  Structural 

Engineer considering the seismic forces and wind forces etc. 

(REFER ANNEXURE 10 – Seismic Zoning Map) 

C.  Vulnerability to Subsidence 

Ground level of the plot is plain land. Backfilling in the vicinity of site is not 

included in the project plan. Hence, subsidence is not expected. 

  

1.5 Will  the  proposal  involve  alteration  of  natural  drainage  systems? (Give details on a contour map showing the natural drainage near the proposed project site)  

  Not Applicable.  

1.6. What  are  the  quantities  of  earthwork  involved  in  the  construction activity­cutting, filling, reclamation etc. (Give details of the quantities of earthwork involved, transport of fill materials from outside the site etc.)  During construction total earthwork involved 1000 Cu Ft. This will be used for backfilling purpose onsite  

Page 23: Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtraenvironmentclearance.nic.in/writereaddata/online/... · Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtra

Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtra 

23 

1.7.  Give  details  regarding  water  supply,  waste  handling  etc  during  the construction period. 

 CONSTRUCTION PHASE: 

Total  water  requirement  during  construction  phase  shall  be  100  cum/day approximately  for  construction  as  well  as  domestic  use  for  the  workers working on the site and also for the construction purpose. This water will be made available from Tanker water. Toilet block will be provided with Septic tank and Soak pit.   The Biodegradable waste will  be  composted  at  site  and non‐biodegradable solid waste will  be  sent  recycling.  The  construction debris will  be used  for development of Landscape. All  required  sanitary  and  hygienic  measures  should  be  in  place  before starting  construction  activities  and  to  be  maintained  throughout  the construction phase.  

CONSTRUCTION PHASE: 

1.8.   Will the low lying areas & wetlands get altered? (Provide details of how low  lying  and  wetlands  are  getting  modified  from  the  proposed activity) 

 Not Applicable 

 1.9.   Whether construction debris & waste during construction cause health 

hazard?   (Give quantities of various types of wastes generated during construction  including  the  construction  labour  and  the  means  of disposal)  Construction  debris  and  waste  during  construction  will  not  cause  health hazard. Temporary housing will be provided at  the site  for 60 workers  in the form of Labour camp within the site. Construction debris generated will be  used  for  development  of  landscape.  All  the  waste  generates  will  be properly  treated  and  taken  care  of,  therefore  will  not  create  any  health hazard.  

2. WATER ENVIRONMENT  2.1.   Give the total quantity of water requirement for the proposed project 

with the breakup of requirements for various uses. How will the water requirement met? State the sources & quantities and  furnish a water balance statement.  The proposed source of water will be CIDCO  

Page 24: Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtraenvironmentclearance.nic.in/writereaddata/online/... · Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtra

Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtra 

24 

It  is  proposed  that  water  will  be  available  from  the  CIDCO.  The  under ground  tank (UGT) be provided  for  the  filtered water storage  tank. Water may be pumped from proposed UGT to the overhead tanks on all buildings through a hydro pneumatic tank filling system. It will be then distributed to Overhead tank on terrace building.  During construction: 50 M3/DAY Source: Tanker Water  During operation:  1.  Source: CIDCO 

o Total Water Demand is 289.52 M3/DAY o Domestic Water Demand is 181.53 M3/DA o Flushing water demand is 92.25 M3/DAY o Landscape Water Requirement 5.4 M3/DAY  o Total treated water available 246.4M3/DAY o 102.99 M3/DAY treated water will be reused. 

 2.2. What is the capacity (dependable flow or yield) of the proposed source 

of     water? 2.3.  

WATER BALANCE STATEMENT FOR RESIDENTIAL & SHOPS

Total population = 2006

Description Water Loss 20%

Sewage Water use m3/day

requirement generation

m3/day m3/day m3/day Fresh Recycled

Domestic for residence(@ 90 LPCD )1940 population

180.54 18.05 162.49 180.54 0

Flushing for residence(@ 45 LPCD ) 1940 population

90.27 9.03 81.24 0 90.27

Domestic for shops (@ 15 LPCD ) 66 population

0.99 0.10 0.89 0.99 0

Flushing for shops (@ 30 LPCD ) 66 population

1.98 0.20 1.78 0 1.98

Landscaping 6.8 6.8 0 0 6.8

Swimming pool make up 5.00 5.00 0.0 5.0 0.0

Car wash@ 15 liters 3.94 3.94 0 0 3.94 TOTAL 289.52 43.12 246.4 186.89 102.99 Out of 246.4 sewage generated 102.99 will be recycled for flushing & landscaping and remaining 186.89 water will be discharged into Municipal sewer line of Navi Mumbai Municipal Corporation.

 The proposed source of water during operation is CIDCO.     

 

Page 25: Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtraenvironmentclearance.nic.in/writereaddata/online/... · Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtra

Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtra 

25 

2.3.   What is the quality of water required, in case, the supply is not from a municipal  source?  (Provide  physical,  chemical,  biological characteristics with class of water quality)  The water will be available from Tanker and CIDCO, which will accomplish the water requirement for this residential complex. 

            (REFER ANNEXURE: 6­ BASELINE STATUS OF WATER QUALITY)  2.4.   How much of the water requirement can be met from the recycling of 

treated wastewater? (Give the details of quantities, sources and usage)  

About 102.99 CUM of water will be recycled for Landscape and Flushing at residential building, club house & Gym.  

  

2.5.   Will there be diversion of water from other users? (Please assess the impacts  of  the  project  on  other  existing  uses  and  quantities  of consumption) 

 Not Applicable. 

2.6.   What  is  the  incremental  pollution  load  from wastewater  generated from  the  proposed  activity?  (Give  details  of  the  quantities  and composition of wastewater generated from the proposed activity)  The quantity of sewage is about 90% of domestic water consumption. The wastewater‐generated  from  the  proposed  activity  shall  be  domestic.  The sewage will be collected from 388 tenements & 22 Commercial Shops.                    

Page 26: Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtraenvironmentclearance.nic.in/writereaddata/online/... · Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtra

Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtra 

26 

2.7. Give  details  of  the water  requirements met  from water  harvesting? Furnish details of the facilities created.  

  Runoff calculation No of recharge pits­03  

2.8.   What would be the impact of the land use changes occurring due to the proposed project on the runoff characteristics (quantitative as well as qualitative) of the area in the post construction phase on a long term basis? Would it aggravate the problems of flooding or water logging in any way?  The proposed land use is in conformity with the DP so there will not be any land use change. The runoff from the project site will be used for recharging the aquifers.   The  Storm water  drains  of  the  area  are  proposed  to  be  connected  to  the future drain line which is future development along the project. 

 

ITEMS

AREA SQ.M (A)

RUN-OFF COEFIECIENT

©

RAIN WATER

INTENCITY M/HR (I)

DISCHARGE (Q)M3/HR

GROUND FLOOR LEVEL AREA LAND SCAPE (AS PER DRAWING AT GROUND FLOOR) 0 0.3 0.1 0.0AREA LAND SCAPE (AS PER DRAWING AT PODIUM) 600 0.95 0.1 57AREA ROAD AND PAVING (AS PER DRAWING) 2460 0.7 0.1 172.2AREA OF ROOF (AS PER DRAWING) 2520 0.95 0.1 239.4TOTAL 5580 468.6 GRAND TOTAL IN CUM./HR. 468.6GRAND TOTAL IN CUM/S 0.130GRAND TOTAL IN LPS 130.2 WIDTH OF TRENCH IN MTRS. 0.45ASSUME DEPTH OF THE TRENCH IN MTRS. 0.45

Page 27: Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtraenvironmentclearance.nic.in/writereaddata/online/... · Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtra

Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtra 

27 

2.9.   What are the impacts of the proposal on the ground water? (Will there be  tapping  of  ground water;  give  the  details  of  ground water  table, recharging  capacity,  and  approvals  obtained  from  competent authority, if any) 

 Source  of  water  supply  will  be  from  CIDCO  and  Tanker  water  existing within the project site. The overall ground water level shall rise due to the proposed  rainwater  harvesting measures.  No  tapping  of  ground  water  is proposed in the operative phase of the project, except during emergency. 

  Rain water entering  into  the stilt &  lower ground floor through ramps etc shall  be  collected  by  Provision  of  channel  drain  with  pre  cast  RCC  /  CI gratings discharging by gravity in to  the nearest external storm drain. 

 2.10.   What precautions/measures are  taken  to prevent  the  run­off  from 

construction  activities  polluting  land  &  aquifers?  (Give  details  of quantities and the measures taken to avoid the adverse impacts) 

 The general ground level of the project site will not be elevated. The run off  from  the  site will be  filtered mechanically  through  recharge pits  and then  will  reach  aquifers  thereby  preventing  direct  pollution  of  land  or aquifers. 

 2.11.   How  is  the  storm  water  from  within  the  site managed?(State  the 

provisions made to avoid flooding of the area, details of the drainage facilities provided along with a site layout indication contour levels)  

 The  storm water  from  the  site will  be  used  for  recharging  the  aquifers. Recharge pits will be created on site.  

  2.12.   Will  the  deployment  of  construction  laborers  particularly  in  the 

peak  period  lead  to  unsanitary  conditions  around  the  project  site (Justify with proper explanation)  

   

During  construction  phase  number  of  workers  will  be  150.  Municipal solid  waste  generated  during  construction  will  be  composted  at  site. Septic  Tank  and  soak  pits  are  provided  for  the  construction  labours.  So activity will not lead to unsanitary conditions at the site. 

 2.13.   What on­site  facilities are provided  for  the  collection,  treatment & 

safe disposal of sewage? (Give details of the quantities of wastewater generation,  treatment  capacities  with  technology  &  facilities  for recycling and disposal) 

  The  sewage  will  be  collected  from  410  tenements.  The  quantity  of sewage  is  about  90% of  domestic water  consumption.  The wastewater‐generated  from  the  proposed  activity  shall  be  domestic.  Sewage  will 

Page 28: Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtraenvironmentclearance.nic.in/writereaddata/online/... · Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtra

Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtra 

28 

treated  in  the  Sewage  Treatment  Plant  of  for  residential/commercial  270 CUM. The treated sewage will be partly recycled for flushing & partly connected to Municipal sewer line.   SEWAGE TREATMENT BY SAFF Process – PROCESS DETAILS 

 The  waste  water  to  be  let  into  the  bar  screen  chamber  before  letting  to  the collection tank. The waste water from the kitchen and the toilets to be let to the oil and grease separator before letting to the collection tank. 

 The waste water goes through the following processes: 

  BRIEF WRITE UP ON THE STP PROCESS  

 The  scheme  proposed  for  the  treatment  of  sewage  is  a  compact  and  effective Sewage  Treatment  Plant  of  for  residential  residential/commercial  150  CUM capacity  /  day  using  the  revolutionary  “Moving  Bed  Bio  Reactor  (MBBR)” technology.  The  concept  underlining  the  Moving  Bed  bioreactor  is  to  provide continuously  operating  bio‐film  reactor,  which  is  non‐cloggable,  does  not require  backwashing  and  has  a  very  low  pressure  drop.  This  is  achieved  by growing the bio‐film on smaller carrier elements that move along with the waste water  in  the  reactor.  The  air  stream  constantly  keeps  the  bio  media  is  in suspension and at the same time provides the required oxygen to the biomass.   The  system  uses  specially  designed  bio‐media, which  provides  a  large  surface area for biological growth. The bio‐media is made of plastic material, which has a very long life. The media is cylindrical in shape and provides a large surface area in the given volume. The media provides about 800m2 effective area for growth of the bio film per m3 of volume.   

 The proposed system will consist of the following major stages: 

1. Sewage Collection and Pumping System 

2. Manual Bar Screen and Grit Chamber 

3. Aeration Tank and Tube‐deck Settlers 

4. Filtration System 

5. Disinfection System 

 1.  Sewage Collection and Pumping System : 

 Raw sewage will enter the raw sewage sump. Raw sewage transfer pumps will pump the sewage to the STP through the screen and grit removing stages. One   Pump will be on duty and the other stand by.  

 2.   Manual Bar Screen and Grit Chamber: 

Page 29: Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtraenvironmentclearance.nic.in/writereaddata/online/... · Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtra

Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtra 

29 

 A combination of coarse and fine screens will be provided for removal of floating debris from the sewage.  The coarse screen will have spacing of 10 mm and will be periodically cleaned. The fine screen will have a spacing of 5 mm and will also be  periodically  cleaned.    The  outlet  from  the  Screen  Chamber  is  let  into  the sewage treatment system. 

    3.    Sewage Treatment System: 

 SEWAGE TREATMENT BY SAFF PROCESS – PROCESS DETAILS  Bar Screen – Coarse­         Raw sewage  from the source  is usually received  into  the bar screen chamber by gravity. Screen provided will remove all floating and big size matter such as plastic bottles,  polythene  bags,  glasses,  stones,  etc.,  which  may  otherwise  choke  the pipeline and pumps.  Oil and Grease Trap   If  the  sewage  generated  includes maximum  quantity  from  kitchen  and  canteen, there is a possibility of higher concentrations of oil and grease in the raw sewage.  It  needs  to  be  removed  before  biological  treatment  as  it  otherwise  may  cause problems  for biological  treatment. Usually,  a  small  civil  construction  tank with a baffle wall and slotted oil pipe skimmer is provided. The oil and grease removed by gravity floats to the surface, which is removed by the oil skimmer.  Equalization Tank   Usually,  sewage  generation  is  more  during  morning  hours  and  evening  hours. Visually no sewage is generated during night hours. Any biological system needs constant  feed  for  bacteria  to  work  efficiently.  Hence,  it  is  important  to  put  an equalization tank to collect the excess flow during peak hours and feed sewage in lean hours. A  typical equalization  tank has a capacity of 6 hours of average  flow rate. The tank is generally of civil construction by client.   Provision of air grid is to be made for thoroughly mixing the sewage to make it of homogenous quality and to keep the suspended matter in suspension and to avoid septic conditions. 

Page 30: Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtraenvironmentclearance.nic.in/writereaddata/online/... · Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtra

Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtra 

30 

 SAFF REACTOR  The  various  toilet  streams  from  the  Shops  and  Residential  into  Septic  tank,  the 

overflow  seepage  of  septic  tank  is  pumped  into  the  Skid mounted Package  type 

Sewage treatment Plant for biological oxidation of organic impurities in presence 

of activated (biomass) bacterial sludge.  

The  aeration  is  imparted  by  Diffused  type  aerators  installed  in  the  tank.  The 

biological treatment method followed is of Submerged Aeration Fixed Film( SAFF 

). The air is induced in the tank from bottom and it moves upward through  Media. 

Media  ensures  full  utilization  of  oxygen  in  the  air  before  it  reaches  top.  The 

bacteria's  which  form  film  on  the  Media  utilizes  this  oxygen  and  degrades  the 

substrate  coming  from  the  sewage  water.  Increased  surface  area  increases  the 

quantum of the biomass to great extent and thus can sustain shock loads.  

The  film of bacteria's falls down as soon as its thickness increases beyond certain 

limit. The anaerobic growth at the bottom most  layers makes  it  loose and it  falls 

down. This makes the maintenance of biomass fully automatic. The sludge settled 

at bottom is drained out, by Sludge transfer pump into filter press or centrifuge. 

The overflow of Aeration tank is allowed to pass through a Tube Settler.  Tube settler The  sloughed  biomass  must  be  removed  before  the  treated  sewage  can  be disposed off. Hence a secondary clarifier (tube settler) is provided. The secondary clarifier  is  equipment  in  which  the  Bio‐mass  removed  &  suspended  solids  are settled under action of gravity.   Disinfection The treated sewage is then added with chlorine to kill the pathogens / E‐Coli coli forms, so that it becomes fit for disposal in the lake / water ways. Chlorine being a very strong oxidizing agent, a small dose of 6 mg /l  is enough  to achieve desired levels of dis‐infection. Small  residual  chlorine  (of  the order  of 0.2 – 0.25 mg /  l) also ensures that  there  is no re‐growth of E‐coli,  till  the  final disposal point. The treated  sewage,  now  substantially  free  from  organic  contamination,  free  from coliform bacteria can be safely disposed off in the river, or in other water bodies. This water is fit for using for gardening and flushing purpose.  Tertiary Treatment    

Page 31: Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtraenvironmentclearance.nic.in/writereaddata/online/... · Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtra

Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtra 

31 

          

Treated  sewage  after  disinfection  is  passed  through  Dual  Media  Filter  and Activated Carbon Filter for further polishing. 

Treated Water Collection Tank: The treated water collection tank can be of civil construction by client.   Sludge Handling: The sludge from the FAB and Tube settler tank is removed from the bottom of the tank and  Collected into the intermediated sludge holding tank and then transferred into the sludge  Holding tank and finally into the batch type centrifuge for dewatering of sludge.   

Page 32: Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtraenvironmentclearance.nic.in/writereaddata/online/... · Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtra

Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtra 

32 

 

4. PROCESS BLOCK DIAGRAM  

      

BAR SCREEN (SEWAGE) 

OIL & GREASE TRAP 

EQUALISATION TANK 

SAFF REACTOR 1  

TUBE SETTLER 

DUAL MEDIA FILTER 

ACTIVATED CARBON FILTER 

TREATED WATER TANK 

AERATION SYSTEM 

INT. SLUDGE HOLDING TANK 

SAFF REACTOR  2 

SOFTNER 

CHLORINE CONTACT TANK 

FILTRATE 

SLUDGE HOLDING TANK 

BATCH TYPE CENTRIFUGE 

DRY SLUDGE  

Page 33: Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtraenvironmentclearance.nic.in/writereaddata/online/... · Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtra

Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtra 

33 

 4.   Filtration System:  

 This  consists  of  a  Pressure  Multimedia  Filter  that  removes  any  remaining suspended solids  in the treated water so as to ensure its total conformance with the  discharge  standards  set  by  the  regulatory  authorities.  The  Filter  is  to  be backwashed at pre‐set intervals with water from the Treated Water tank. 

 5. Disinfection System: 

 The Disinfection System, which  comprises of  a dosing  system,  ensures  complete      removal of any remaining harmful organisms in the water. The water flowing into     the Polishing Filter Feed Tank is dosed with an oxidant above and then allowed to     remain in the tank for a predetermined time so that there is enough contact time for     the oxidant to totally disinfect the water.   

  SLUDGE  The excess sludge is pumped to the sludge tank from where de‐sludging is to be 

done once      every 3  – 6 months  (depending on  load  factors) by pumping out  to 

tankers and disposal engaging corporation private agencies. 

                                           WASTE WATER CHARACTERISTICS  

PARAMETER  UNITS  IN  OUT      Nature  of  Waste water 

Domestic  Sewage and Kitchen Waste 

 

Avg daily flow  246  KL/day   PH  ‐‐‐ 6 – 8.5 7 – 7.5 Suspended Solids  PPM 200 – 300 mg/lt < 30 BOD 5  PPM 200 – 350 mg/lit < 5 

COD  PPM 500 – 700 mg/lit < 15 Odour  ‐‐‐ Medium  to 

Strong  NIL 

Colour  ‐‐‐ Grace Brown Colorless Oil & Grease  ‐‐‐ Up to 50 mg/lit < 5 mg/lit  

2.14. Give details of dual plumbing system  if treated waste used  is used  for flushing of toilets or any other use. 

 The sewage will be collected from 410 tenements. The quantity of sewage is  about  90% of  domestic water  consumption.  The wastewater‐generated from the proposed activity shall be domestic. Sewage will be treated in the 

Page 34: Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtraenvironmentclearance.nic.in/writereaddata/online/... · Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtra

Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtra 

34 

Sewage Treatment Plant for residential/ commercial 270 CUM. The treated sewage will be recycled for flushing.  

3.  VEGETATION    3.1.   Is  there  any  threat  of  the  project  to  the  biodiversity?  (Give  a 

description of the local ecosystem with it’s unique features, if any)   There will not be any threat of the project to the biodiversity. The selected site  for  project  is  barren  land.  The  Project  proponents  have  proposed  a landscape  development  plan,  which  includes  planting  of  flowering  and shady trees, shrubs and lawn within the plot. Flowering  plants,  shrubbery  and  lawns  shall  be  planted.  So,  Biodiversity will in turn increase. 

 3.2.   Will  the  construction  involve  extensive  clearing  or modification  of 

vegetation?        (Provide  a detailed  account  of  the  trees &  vegetation affected by the project)  

 Selected  site  is  barren  land.  However,  the  project  site  will  cover  the flowering plants, shrubs and lawns. The open spaces inside the plot will be suitably landscaped and covered with vegetation of indigenous variety.  

 3.3. What are  the measures proposed  to be  taken  to minimize  the  likely 

impacts on  important  site  features  (Give details of proposal  for  tree plantation,  landscaping,  creation  of  water  bodies  etc  along  with  a layout plan to an appropriate scale)  The site presently is Barren land. There is no important site feature so as to cause any impact on important site features.   

LANDSCAPING AND TREE PLANTATION 

The area 1088.57 Sq.M. will be covered by  tree plantation &  landscaping so  as  to  give  rest  of  the  area  massive  to  keep  the  campus  green  and environment friendly.   The  Project  proponents  have  proposed  a  landscape  development  plan, which  includes  planting  of  flowering  and  shady  trees,  shrubs  and  lawn within the plot.  The  open  spaces  inside  the  plot will  be  suitably  landscaped  and  covered with vegetation of indigenous variety.     

Page 35: Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtraenvironmentclearance.nic.in/writereaddata/online/... · Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtra

Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtra 

35 

 4. FAUNA  4.1.   There  likely  to  be  any  displacement  of  fauna­  both  terrestrial  and 

aquatic  or  creation  of  barriers  for  their  movement?  Provide  the details. 

 The  floristic  component  of  the  area  does  not  include  any  rare  or endangered species. Thus, impact on rare and endangered species of flora is nil.  There  are  no  potential  sources  of  impacts  on  terrestrial  biological environment during operation phase of residential complex.  

4.2 Any direct  or  indirect  impacts  on  the  avifauna  of  the  area? Provide details.  Biological Environment:  The project site and the surrounding area have plain land. The whole area will be occupied by vegetation. The plantations, which would be grown in the  residential  area, will  be helpful  in  increasing green cover  in  the  area. This would also increase avifauna in the area.  

4.3. Prescribe  measures  such  as  corridors,  fish  ladders  etc  to  mitigate adverse impacts on fauna.  The  proposed  project  will  not  have  any  adverse  impact  on  the  flora  or fauna.  

      

Page 36: Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtraenvironmentclearance.nic.in/writereaddata/online/... · Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtra

Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtra 

36 

 5.   AIR ENVIRONMENT  5.1.   Will the project increase atmospheric concentration of gases & result 

in  heat  islands?  (Give  details  of  background  air  quality  levels with predicted values based on dispersion models taking  into account the increased traffic generation as a result of the proposed constructions)  

   As this will be a Residential complex, air pollution  is not expected to be a 

major  concern.  There will  not  be  notable  increase  in  pollution  therefore dispersion model  calculations  are  not  done.  But  the  data  on Ambient Air Quality have been collected during the study period. 

   In view of the revision of national Ambient Air Quality Standards by Central 

Pollution  Control  Board  ambient  air  quality  stations  were  identified  and monitored.  The sampling locations are Project site and buffer zone.  

 (REFER ANNEXURE 8: BASELINE STATUS OF AIR QUALITY) 

5.2. What are the impacts on generation of dust, smoke, odorous fumes or other  hazardous  gases?  Give  details  in  relation  to  all  the meteorological parameters. 

   During  construction  phase,  PM  ‐  2.5,  PM‐10  will  be  the  main  pollutant, 

which could be generated from site development activities. Concentration of  SO2,  NO2  and  CO  may  rise  a  little  due  to  traffic.  Proper  upkeep  and maintenance of vehicles, sprinkling of water on roads and construction site and providing sufficient vegetation all around the plant site are some of the measures that would reduce the impact during construction phase. 

       It is generally observed that PM‐2.5, PM‐10 levels are higher in dry weather i.e. during summer and winter seasons. Pollutant load of the atmosphere is generally  low during monsoon  as  the  gaseous pollutants  tend  to  dissolve and particulate pollutants get adsorbed forming aerosols.  

        Fog  formation  aggravates  the problem  as  rate  of  dispersion  of  pollutants reduces. High wind velocity  is helpful  for dispersion of pollutants. Higher temperature  and  pressure  in  the  troposphere  is  helpful  for  better dispersion of pollutants. In general, effective dispersion of pollutants in the atmosphere depends primarily on the degree of stability of the atmosphere and on its turbulent structure. 

 5.3.  Will  the  proposal  create  shortage  of  parking  space  for  vehicles? 

Furnish  details  of  the  present  level  of  transport  infrastructure  and measures  proposed  for  improvement  including  the  traffic management at the entry & exit to the project site.  

 The  proponents  will  provide  a  total  number  of  175  for  four‐wheelers parking as per the CIDCO norms.  

Page 37: Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtraenvironmentclearance.nic.in/writereaddata/online/... · Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtra

Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtra 

37 

Measures proposed  for  improvement  including  traffic management  at  the entry and exit to the project site are:  

• Maintaining flow of traffic for approach roads • Entry  and Exit  points  carefully  placed  so  as  not  to  disturb  this 

flow • One way traffic inside the complex for comfortable movement of 

vehicles and reduction in possibility of congestion. • There will  be  one  entry  and  exit  gate provided  to  enter within 

campus and vehicles will be park accordingly with the building.   5.4.  Provide details of the movement patterns with internal roads, bicycle 

tracks,  pedestrian  pathways,  footpaths  etc.,  with  areas  under  each category. 

 About 844.582 sq. m will be the area under roads.    

5.5.  Will  there  be  significant  increase  in  traffic  noise &  vibrations? Give details of the sources and the measures proposed for mitigation of the above.   The  proposed  activity  being  of  Residential  type  will  not  cause  a  notable increase in the noise and vibration during operation. However, use of heavy machinery is inevitable during construction phase of the project. Sources of noise Pollution during construction phase are machinery like Earthmoving Machinery  Mini  Hoist  Crane,  Hoist  Crane,  Concrete  mini  mixer,  Weigh batcher, Compressors and transportation materials.  Incremental  increase  in  baseline  noise  levels  due  to  this  Residential complex  will  not  exceed  55  dB  (A).  The  post  project  noise  levels  at  the nearest habitation will be less than the stipulated standards of CPCB.   Noise has various adverse effects on workers and their activities. The first and foremost effect of noise on workers exposed to high noise level over a long period of severe impulsive noise of short duration is ‘Loss of Hearing’. This effect is either temporary or permanent in nature depending upon the length and severity of noise exposure.  Other effects of noise are such as blood pressure, cardiovascular problems and  ulcers.  Some  studies  also  point  to  noise  related  learning  difficulties, reduced work efficiency,  irritation,  fatigue,  increased accidents and errors and socially undesirable behavior.  

Page 38: Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtraenvironmentclearance.nic.in/writereaddata/online/... · Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtra

Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtra 

38 

 MITIGATIVE MEASURES: 

 The  project  proponents  have  agreed  to  take  precautions  to  control  noise pollution as mentioned under: 

Use of equipment generating noise of not greater than 90 dB (A). 

High noise generating construction activities would be carried out 

only  during  daytime.  Also,  adequate  parking  space  will  be 

provided to avoid crowding and noise pollution 

Installation, use and maintenance of mufflers on equipment. 

Workers working near high noise  construction machinery would 

be supplied with ear muffs/ear plugs. 

(Refer Annex –14 for EMP) 

 5.6. What will be the impact of DG sets & other equipment on noise levels & 

vibration  in &  ambient  air  quality  around  the  project  site?  Provide details. 

 DURING CONSTRUCTION PHASE: 

Sources  of  noise  Pollution  during  construction  phase  are machinery  like Earthmoving Machinery, Mini  Hoist  Crane,  Concrete Mixer,  Lift  lade,  JCB, Dumpers, Compressors and transportation materials.  

DURING OPERATION 

     These Machineries will be used only during daytime Canopies will be provided to these mechanical devices to reduce noise and vibration.  There  will  not  be  any  considerable  impact  on  the  ambient  air quality  around  the  project  site  as  CPCB  approved  DG  sets  along  with acoustic room will be developed and plantations will be provided.  

6.   AESTHETICS   6.1.    Will the proposed constructions in any way result in the obstruction of 

a view, scenic amenity or landscapes? Are these considerations taken into account by the proponents?  

     Proposed  construction  will  not  result  in  obstruction  of  a  view,  scenic 

amenity  or  landscapes.  The  open  spaces  have  been  picturesquely landscaped to capture the variety of flowers and plants. 

 

Page 39: Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtraenvironmentclearance.nic.in/writereaddata/online/... · Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtra

Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtra 

39 

6.2.    Will  there  be  any  adverse  impacts  from  new  constructions  on  the existing structures?   What are the considerations taken into account? 

         Not Applicable 

  6.3.   Whether  there  are  any  local  considerations  of  urban  form &  urban 

design  influencing  the  design  criteria?  They may  be  explicitly  spelt out. 

   No  

6.4.    Are  there  any  anthropological  or  archaeological  sites  or  artefacts nearby?  State  if  any  other  significant  features  in  the  vicinity  of  the proposed site have been considered. 

   No  

 7. SOCIO­ECONOMIC ASPECTS   7.1.   Will the proposal result in any changes to the demographic structure 

of    local population?  Provide the details.   

It could be seen that the overall impact on Socio‐Economic Environment is 

positive  and  permanent  in  nature.  The  impacts  on  socio‐economic 

environment due to the proposed project are listed below: 

• Proposed project will require manpower during construction phase and      

operational phase thereby creating job opportunities. Local skilled and 

unskilled laborers will have an opportunity for employment directly or 

indirectly. 

• There will  be  additional  employment  for  the  poor  strata  of  society  by 

way of helpers, drivers, cleaners etc. 

• Due to the proposed project, facilities are likely to grow in line with the 

development. 

• As  during  the  construction  and  operational  phases  of  the  project  a 

workforce  will  be  needed  this  will  be  including  both  skilled  and 

unskilled  people.  The  introduction  of  workers  from  areas  outside  the 

region, could introduce a potential effect on the local culture, habits and 

Page 40: Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtraenvironmentclearance.nic.in/writereaddata/online/... · Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtra

Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtra 

40 

economics. Those effects have both positive and negative elements and 

will  be  managed  by  the  project  proponents  and  developers.  The 

construction  phase  induces  employment  opportunities  for  the  local 

people. About 300 persons will be employed during peak period. 

 

(REFER ANNEXURE 11: CENSUS DATA & SOCIOECONOMIC ASPECTS OF 

PROJECT AREA) 

7.2.  Give  details  of  the  existing  social  infrastructure  around  the  proposed project.  Shagun  Realty  proposed  to  establish  Residential  cum  commercial  complex  at 

Ulwe, Navi Mumbai. It is a residential area in the vicinity of Navi Mumbai city.  This 

area is rapidly developing and near to Uran and Enroute to JNPT. Development of 

this residential complex will cater to the needs of residents in this area. 

 7.3. Will the project cause adverse effects on local communities, disturbance to sacred sites or other cultural values? What are the safeguards proposed?  

 

It  could  be  seen  that  the  overall  impact  on  Socio‐Economic  Environment  is 

positive  and  permanent  in  nature.  The  impacts  on  socio‐economic  environment 

due to the proposed project are listed below: 

 

Positive Aspects of the Projects are as follows 

• Improvement in transport, communication facilities. 

• Improvement in lifestyle and social status, etc. 

• Increase in revenue generation. 

• Due to the proposed project, facilities are likely to grow in line with the 

development. 

• Possible  sources  of  income  for  this  community  are  direct  like 

Construction and various job works in Residential complex.  

•    As  during  the  construction  phases  of  the  project  a  workforce  will  be 

needed which will be  including both skilled and unskilled people. The 

introduction of workers from areas outside the region, could introduce 

a  potential  effect  on  the  local  culture,  habits  and  economics.  Those 

Page 41: Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtraenvironmentclearance.nic.in/writereaddata/online/... · Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtra

Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtra 

41 

effects have both positive and negative elements and will be managed 

by  the  project  proponents  and  developers.  The  construction  phase 

induces  employment  opportunities  for  the  local  people.  About  300 

persons will be employed during peak period.  

 

The  open  spaces  have  been  picturesquely  landscaped  to  capture  the  true  lavish 

ambience  of  a  vacation  resort  replete with  palms, water  bodies,  fountains  and  a 

variety of flowers and plants. 

 8. BUILDING MATERIALS  8.1.     May involve the use of building materials with high­embodied energy. 

Are  the  construction      materials  produced  with  energy  efficient processes?  (Give  details  of  energy  conservation  measures  in  the selection of building materials and their energy efficiency) 

 ECBC  (Energy  Conservation  Building  Code`)  norms  will  become applicable  for  all  buildings  as  per  Energy  Conservation  Act  2001.  These norms will be recommended and included in design.   Following are some of the application to get compatible to ECBC Norms.   1)  Timer based automatic lighting control in parking with Motion Sensor.  2) External lighting with Astronomical time switch/ Photo Sensors which capable of automatic operation of External Lighting.   

 3)  LPD to be maintained as per recommendation tables.       Parking ‐3.2 W/ Sq Mtr       Facade – 2W/ Sq Mtr.  

 4)  Solar Water heating.  

 8.2. Transport and handling of materials during construction may result in 

pollution,  noise  &  public  nuisance.  What  measures  are  taken  to minimize the impacts? 

 During  construction  phase,  sources  of  noise  pollution  will  be  due  to 

operation  of  machinery  like  Earthmoving  Machinery,  Mini  Hoist  Crane, 

Hoist  Crane,  Concrete  mini  mixer,  Weigh  batcher,  Compressors  and 

transportation materials as well as transportation vehicles. This will cause 

nuisance to the occupants of the nearby area. The project proponents have 

agreed to take precautions to control noise pollution as mentioned under: 

   Use of equipment generating noise of not greater than 90 dB (A). 

Page 42: Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtraenvironmentclearance.nic.in/writereaddata/online/... · Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtra

Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtra 

42 

High noise generating construction activities would be carried out only 

during daytime. 

Installation, use and maintenance of mufflers on equipment. 

Workers  working  near  high  noise  construction  machinery  would  be 

supplied with ear muffs/ear plugs. 

(REFER ANNEXURE 9 ­ BASELINE STATUS OF NOISE QUALITY) 

 8.3. Are recycled materials used in roads and structures? State the extent of 

savings achieved?  

Solid waste that would be generated due to excavation will be in the form of 

rubble  and  soil.  This  soil  and  rubble  would  be  used  for  development  of 

Landscape. Construction debris will be reused  for backfilling of  roads and 

other construction. 

 8.4. Give details of the methods of collection, segregation & disposal of the 

garbage generated during the operation phases of the project.  

Solid waste will be generated in the campus is domestic type having source 

separated dry  and wet  components. As  far  as possible  the dry waste  like 

paper,  cardboard  boxes,  thermocol  packing,  plastics  etc.  shall  be  sent  for 

recycling  purpose.  However,  wet  waste,  which  is  biodegradable,  shall  be 

converted  to  bio‐compost  by  adopting  following  aerobic  composting 

method.  The  quantity  of  biodegradable  waste  generated  is  about  0.306 

Tons per day. The  ‘Organic Waste Converter’ will be used for composting 

of solid waste. 

 

Total Solid waste management 

Total population of  the  residential  scheme  is 1940 nos.  and Commercial scheme is 66 nos. For total 2006 nos  For Residential and commercial Quantity of solid waste – 903 kg/day i.e.0.90 T/day approx.  Quantity of wet waste –   0.54 T/day considering  

 

Page 43: Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtraenvironmentclearance.nic.in/writereaddata/online/... · Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtra

Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtra 

43 

Quantity of dry waste – 0.36 T/day  

Biodegradable and non biodegradable waste will be segregated. Dry waste 

will be sent for recycling and wet waste will be treated by  ‘Organic Waste 

Converter’ for composting. 

           

(REFER ANNEXURE 13: Organic Waste Converter) 

 

9. ENERGY CONSERVATION  

9.1.  Give  details  of  the  power  requirements,  source  of  supply,  backup source etc. What is the energy consumption assumed per square foot of  built­up  area?  How  have  you  tried  to  minimize  energy consumption?  

 Source:  Maharashtra State Electricity Distribution Company Limited. (MSCEDCL)  

  During Construction    Total Demanded load For Project = KW.   Source of Power Supply For Project ‐ D.G Sets (75 KVA, 1 nos)       During Operation                Total Load: 4775 KW   Source: ‐‐ MSCEDCL     The proponent is proposing  

  Alternative  Back  Up:‐  Diesel  Generator  (DG)  Set  for  lifts,  Common  Lighting, Water pumps & other essential services. 

 Capacity of D.G. Set for Common Amenities: 400 KVA ‐ 2 Nos. and 400 KVA‐ 1 No. for Fire Pump With AMF & Auto Load Sharing Panel with Sound Proof Enclosure with dB level not greater than 75 dB (A).        

 

Page 44: Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtraenvironmentclearance.nic.in/writereaddata/online/... · Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtra

Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtra 

44 

 9.2.   What type of, and capacity of, power back­up to you plan to provide?  

 

Alternative Back Up: ‐  

Capacity of D.G. Set  for Common Amenities: 400 KVA ‐ 2 Nos. 400 KVA‐ 1 No. for Fire Pump. With AMF & Auto Load Sharing Panel with Sound Proof Enclosure with dB level not greater than 75 dB (A).            

9.3. What  are  the  characteristics  of  the  glass  you  plan  to  use?  Provide 

specifications of its characteristics related to both short wave and long 

wave radiation? 

 Normal 6 mm clear float glass is used. The glass will allow short as well as 

long  wave  radiations  to  pass  through.  However,  use  of  sunscreens  on 

window panes will reduce heating inside the buildings.  

 

9.4.  What  passive  solar  architectural  features  are  being  used  in  the 

building? Illustrate the applications made in the proposed project. 

The external walls exposed to high solar exposure are double walls/cavity 

walls. Most of the openings are with appropriate sunshades to cast shadow 

inside  the  room. Most  of  the  external  facades  are  double  height  terraces, 

which help in reducing direct exposure to solar heat. 

 

Top  terrace  that  is  exposed directly  to  sun  is  covered by pergolas, which 

serve  dual  purpose.  It  helps  in  reducing  the  direct  exposure  to  sun  as 

pergolas cast shadow on the floor. 

   

ARCHITECTURAL DESIGN 

Maximum ground  is  covered by green patches  to  reduce reflection 

of heat from ground surface. 

Shade giving trees are proposed around the condominium especially 

on South and west side to cast shadow on the ground and building. 

By  accommodating  maximum  parking  areas  are  covered  parking, 

heat generation due to vehicle is compressed below the building. 

Page 45: Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtraenvironmentclearance.nic.in/writereaddata/online/... · Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtra

Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtra 

45 

Thermal  Paint  application  is  proposed  for  external  walls  which 

reduce  and  reflect  heat.  Direct  exposure  to  sun  is  reduced  by 

proposing  double  height  terraces  and  double  wall  external  walls. 

Adequate sunshades are proposed. 

 9.5.     Does the layout of streets & buildings maximize the potential for solar 

energy  devices?  Have  you  considered  the  use  of  street  lighting, 

emergency lighting and solar hot water systems for use in the building 

complex? Substantiate with details. 

Street  lighting will  be  considered within  the  complex.  For  the  emergency 

lighting proper provision will make by  considering  available  stocks.  Solar 

hot water system will be not used within complex.  

The appurtenant  spaces where common  lighting  is  required are proposed 

to use unconventional energy. 

  9.6.  Is  shading  effectively  used  to  reduce  cooling/heating  loads? What principles  have  been  used  to maximize  the  shading  of Walls  on  the East and  the West and  the Roof?   How much energy saving has been effected?  

The  construction  is  designed  in  order  to  assure maximum  of  the  natural 

light and ventilation in the structure.  

Thermal Paint application is proposed for external walls which reduce and 

reflect heat. Direct exposure to sun is reduced by proposing double height 

terraces and double wall external walls. Adequate sunshades are proposed. 

 

 9.7. Do  the  structures  use  energy­efficient  space  conditioning,  lighting and mechanical systems? Provide technical details. Provide details of the  transformers  and motor  efficiencies,  lighting  intensity  and  air­conditioning  load  assumptions?  Are  you  using  CFC  and  HCFC  free chillers? Provide specifications.  As  it  is  a  residential  complex with no  in built  provision  for  space  cooling. 

Energy efficiency in lighting and mechanical systems will be achieved by: 

Purchase of energy efficient appliances 

Page 46: Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtraenvironmentclearance.nic.in/writereaddata/online/... · Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtra

Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtra 

46 

Adjusting  the  settings  and  illumination  levels  to  ensure 

minimum energy used for desired comfort levels 

Installing programmable on/off timers and sensors for low  

      Occupancy areas 

Use of solar energy for street lights  

Use of compact fluorescent lamps and low voltage lighting. 

  9.8. What are the likely effects of the building activity in altering the micro­

climates?  Provide  a  self  assessment  on  the  likely  impacts  of  the 

proposed construction on creation of heat island & inversion effects?    

  

The  proposed  project  is  of  Residential  type  and  will  not  have  space 

conditioners or glass walls. Alteration of microclimate is not notable in this 

case. The glass will be used  in a way  just  to provide optimal  lights  inside. 

Also the glass used will be energy efficient to reduce the heat gain inside the 

building.  

             Systematic  design  of  buildings  in  order  to  assure  maximum  natural 

ventilation and  light will  be  considered  to  reduce  the  effect  of  creation of 

heat island.  

 

9.9. What are the thermal characteristics of the building envelope? (a) roof; 

(b)  external walls;  and  (c)  fenestration? Give details of  the material 

used and the U­values or the R values of the individual components.  

Wall: 1] 13 mm Cement Plaster + 200 mm Concrete Block + 13 mm Cement  

Plaster: U Value – 0.309 BT/Hr. / SqFt °F 

 2] 13 mm Cement Plaster + 200 mm Concrete Block + Air Space + 200 

mm  Concrete Block + 13 mm Cement Plaster  U Value – 0.162 BTU / 

Hr. / SqFt °F          

  Exposed Roof:  1]  13 mm  Gypsum  Board  +  Air  Space  +  75 mm  Concrete 

Block+13mm Tile +50 mm EPS Insulation U Value – 0.094 BTU/ Hr./ SqFt °F 

  Windows: 1] DGU – SKN754 Blue U Value – 0.264 BTU / Hr. / SqFt °F Shade  

Coefficient – 0.23 

Page 47: Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtraenvironmentclearance.nic.in/writereaddata/online/... · Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtra

Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtra 

47 

Thermal Characteristics of the building envelope:  

• Terraces will be treated with a layer of brick bat coba for reduction in heat 

gain through roof. 

• Overhang  projections  and  horizontal  and  vertical  elevation  band  of  0.3m 

will be provided around the windows which will be reducing solar heat gain 

but will assure maximum natural light and ventilation in the buildings. 

• External shading is prominently used in the complex it intercepts solar heat 

before it reaches the glass/ wall. 

• External walls  are  150 mm with  10 mm plaster  on  both  the  sides  [cavity 

wall], double height terraces are provided to reduce direct exposure to sun. 

The external walls of the buildings will be coloured with light slightly tinted 

colours to reduce solar heat gain and will reflect heat. 

 

9.10. What precautions & safety measures are proposed against fire hazards? 

Furnish details of emergency plans. 

The project proponents shall  follow all  the safety rules and regulations as 

prescribed by regulatory authority 

 

9.11.  If  you  are  using  glass  as  wall  material  provides  details  and 

specifications including emissivity and thermal characteristics. 

The  entire building  is  designed with  appropriate  openings  to  reduce heat 

energy inside the building. No use of glass as wall material. 

 

9.12. What is the rate of air infiltration into the building? Provide details of 

how you are mitigating the effects of infiltration. 

        The  ground  surfaces  are  covered with  green  patches  to  have  dust  control. 

These Openings too habitable spaces are adequate just to be functional. The 

openings are covered with dust proof, air and water light aluminum glazing. 

 

 

Page 48: Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtraenvironmentclearance.nic.in/writereaddata/online/... · Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtra

Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtra 

48 

9.13. To what extent  the non­conventional energy  technologies are utilized 

in  the overall energy consumption? Provide details of  the renewable 

energy technologies used.  

 

N.A 

 

10.   Environment Management Plan 

The Environment Management Plan  (EMP) would consist of all mitigation 

measures  for  each  item  wise  activity  to  be  undertaken  during  the 

construction,  operation  and  the  entire  life  cycle  to  minimize  adverse 

environmental  impacts as a  result of  the activities of  the project.  It would 

also delineate the environmental monitoring plan for compliance of various 

environmental  regulations.  It  will  state  the  steps  to  be  taken  in  case  of 

emergency such as accidents at the site including fire.  

(Please Refer Annexure ­ 14 for EMP)   

Page 49: Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtraenvironmentclearance.nic.in/writereaddata/online/... · Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtra

Form 1 & 1A – Amar Harmony at Taloja, Navi Mumbai, Maharashtra 

49 

LIST OF ANNEXURES                       

 “I hereby given undertaking that the data and information given in the application and enclosures are  true  to  the best of my knowledge and belief  and  I am aware that  if  any  part  of  the  data  and  information  submitted  is  found  to  be  false  or misleading at any stage,  the project will be rejected and clearance give,  if any to the project will be revoked at our risk and cost.   Date: 24.11.2014  Place: Navi Mumbai 

For Shri Gami Infotech Pvt. Ltd.  

  Director 

                        Shri Ambalal Gami               101, Real Tech Park,  

1st Floor, Plot no. 39/2, Sector 30A,  Vashi, Navi Mumbai‐ 400703. 

SR. NO.  DESCRIPTION 

1.   Building Perspective View

2.   Master Plan

3.   Site Location

4.   Landscape Plan

5.   Parking Plan

6.   Baseline Status of Water Quality

7.   Soil testing Report

8.   Baseline Status of Air Quality

9.   Baseline Status of  Noise Quality

10.   Seismic Zoning Map

11.   Census Data and Socioeconomic Aspects of Project area 

12.   STP Flow Diagram

13.   Solid Waste Management ‐  Flow diagram