foreword - sanedi and notices/sanedi... · 2019-03-29 · 16.1. advantages of the matrix structure...

68
SANEDI • ANNUAL PERFORMANCE PLAN 2016 1 FOREWORD The Annual Performance Plan arculates SANEDI’s targets for the 2016/17 financial year. The Annual Performance Plan corresponds directly with the SANEDI Strategic Plan, which in turn reflects the amended Department of Energy 5-year Strategic Plan, the Minister’s KPIs and the relevant Naonal polical priories. SANEDI supports the naonal commitment to curtail the levels of government spending. The scope of iniaves and delivery commitments are therefore less comprehensive than our ambion would have it, but I believe it sll presents an invaluable contribuon to the energy industry as a whole. I again encourage stakeholders and role players to embrace this plan, but also to engage with SANEDI to connue to refine and evolve SANEDI’s contribuon to be responsive to the most pressing energy challenges and priories. As execuve authority, I commit SANEDI to execung the plan and delivering the goals and objecves as arculated. MS RN MLONZI Chairperson of the SANEDI Board Execuve Authority

Upload: others

Post on 26-Mar-2020

8 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: FOREWORD - SANEDI and Notices/Sanedi... · 2019-03-29 · 16.1. Advantages of the matrix structure 16.2. Disadvantages of the matrix structure. TOC here all in capitals. Can we align

SANEDI • ANNUAL PERFORMANCE PLAN 2016 1

FOREWORDThe Annual Performance Plan articulates SANEDI’s targets for the 2016/17 financial year. The Annual Performance Plan corresponds directly with the SANEDI Strategic Plan, which in turn reflects the amended Department of Energy 5-year Strategic Plan, the Minister’s KPIs and the relevant National political priorities.

SANEDI supports the national commitment to curtail the levels of government spending. The scope of initiatives and delivery commitments are therefore less comprehensive than our ambition would have it, but I believe it still presents an invaluable contribution to the energy industry as a whole.

I again encourage stakeholders and role players to embrace this plan, but also to engage with SANEDI to continue to refine and evolve SANEDI’s contribution to be responsive to the most pressing energy challenges and priorities.

As executive authority, I commit SANEDI to executing the plan and delivering the goals and objectives as articulated.

MS RN MLONZIChairperson of the SANEDI BoardExecutive Authority

2016/17
Page 2: FOREWORD - SANEDI and Notices/Sanedi... · 2019-03-29 · 16.1. Advantages of the matrix structure 16.2. Disadvantages of the matrix structure. TOC here all in capitals. Can we align

ANNUAL PERFORMANCE PLAN 2016 • SANEDI2

OFFICIAL SIGN-OFFIt is hereby certified that this Annual Performance Plan was developed by the management of SANEDI under the guidance of the Department of Energy. It was prepared in line with the current Strategic Plan of SANEDI. It accurately reflects the performance targets which SANEDI will endeavor to achieve with its allocation for the 2016/17 financial year.

Ms Lethabo Manamela Chief Financial Officer

Signature:

Ms Deshnee Govender Signature:

Head Official responsible for Planning

Mr Kadri Nassiep Signature:

Accounting Officer

Accounting Officer

MS RN MLONZIChairperson of the SANEDI BoardExecutive Authority

Signature:

2016/17 & same for all footers throughout
Page 3: FOREWORD - SANEDI and Notices/Sanedi... · 2019-03-29 · 16.1. Advantages of the matrix structure 16.2. Disadvantages of the matrix structure. TOC here all in capitals. Can we align

SANEDI • ANNUAL PERFORMANCE PLAN 2016 3

TABLE OF CONTENTS

1. EXECUTIVE SUMMARY

2. VISION

3. MISSION

4. VALUES

5. LEGISLATIVE AND OTHER MANDATES

6. SITUATIONAL ANALYSIS

6.1. Performance environment

6.2. Organisational environment

7. OVERVIEW OF THE 2016/17 BUDGET AND MTEF ESTIMATES

8. RELATING EXPENDITURE TRENDS TO STRATEGIC OUTCOMES

8.1. Relating Programmes to Goals

9. PROGRAMME 1: CORPORATE GOVERNANCE AND ADMINISTRATION

10. PROGRAMME 2: ENERGY RESEARCH, DEVELOPMENT, DEMONSTRATION AND DEPLOYMENT PROGRAMME

10.1. SUB - PROGRAMME 1: CLEANER FOSSIL FUELS (INCLUDING CARBON CAPTURE AND STORAGE): strategic objectives

10.2. SUB- PROGRAMME 2: DATA REPOSITORY AND MANAGEMENT (CESAR): STRATEGIC OBJECTIVES

10.3. SUB- PROGRAMME 3: SMART GRIDS and network automation: STRATEGIC OBJECTIVES

10.4. SUB- PROGRAMME 4: RENEWABLE ENERGY: STRATEGIC OBJECTIVES

10.5. SUB- PROGRAMME 5: WORKING FOR ENERGY: STRATEGIC OBJECTIVES

11. PROGRAMME 3: ENERGY EFFICIENCY: STRATEGIC OBJECTIVES

12. RISKS

13. PUBLIC-PRIVATE PARTNERSHIPS AND DONOR FUNDING

14. Appendix A: Policy Context

15. Appendix A: SANEDI Matrix Structure

16.1. Advantages of the matrix structure

16.2. Disadvantages of the matrix structure

TOC here all in capitals. Can we align with format of strategic plan, please? Preferably sentence case or alternatively title case. I realize this is as it was provided to you.
Page 4: FOREWORD - SANEDI and Notices/Sanedi... · 2019-03-29 · 16.1. Advantages of the matrix structure 16.2. Disadvantages of the matrix structure. TOC here all in capitals. Can we align

ANNUAL PERFORMANCE PLAN 2016 • SANEDI4

1. EXECUTIVE SUMMARYThe SANEDI Strategic Plan defines the strategic purpose of SANEDI and sets out a compelling vision of the direction in which the Institute intends to go. It assists in establishing the priorities, identifies the long-term goals and identifies the best approach to achieve these goals.

SANEDI’s mandate is derived from the authority and obligations set out in various government policies, legislation and constitutional requirements. These include, but are not limited to, the South African Constitution, the National Energy Act, Ministerial Directives, the White Paper on Energy Policy and the Industrial Policy Action Plan (IPAP).

Sustainable energy supply is a critical component in economic growth and development. However, the challenge of providing access to clean, reliable and affordable energy in support of socio-economic developmental needs, and addressing major environmental challenges including climate change, has proven to be problematic internationally. It is generally recognised that, in order to meet the intensifying climate challenge; the global (carbon intensive) energy system must undergo a fundamental transformation.

Many developed and fast-developing countries have already commenced with the transition to a low-carbon economy as a competitive and development priority, understanding that this will require far-reaching changes in technology, finance, policy and societal behaviour. Amidst the electricity crisis, South Africa finds itself at a critical juncture faced with urgent and important energy related decisions that will have a significant impact on its future.

Two key building blocks of sustainable energy solutions, and a low carbon economy, relate to energy innovation and energy conservation, which also describe the essence of SANEDI’s composition and focus.

SANEDI has a critical role to play in ensuring that South Africa will have the necessary information and planning support (regarding, amongst others, emerging technologies, innovative practices, alternate energy solutions, advanced infrastructure, energy data) to plan for a sustainable and secure energy future that will also satisfy the country’s economic, social and environmental needs.

SANEDI also has to influence/facilitate an immediate and critical change in the country’s energy culture towards more considered and sustainable energy practices.

Within the overall Government planning context, SANEDI will primarily contribute to three of the national priority outcomes, referred to as the ‘Change Agenda’. SANEDI will be the principal partner of the Department of Energy (DOE), in its effort to attain the energy policy objectives with particular focus on those that relate to (1) achieving macro-economically efficient production and rational use of energy, (2) stimulation of renewable energy sources and of innovative energy technologies and processes, and (3) related job creation and green industry development aligned with IPAP.

The implementation approach and activities of the Strategic Plan was developed around a comprehensive scope of activities to fulfil its mandate. Delivery of the full scope will require a significant investment, but will also offer significant short and long-term economic, environmental and social benefits resulting from a transition to a lower-carbon, less energy intensive economy.

SANEDI’s programme activities and goals have been selected based on its alignment with the SANEDI focus areas described in the Business case, the outcomes that relate to the Minister of Energy’s commitments (Key Performance Indicators) and the Department of Energy priority programmes as defined in the amended 2011/12 – 2015/16 5-year Strategic Plan.

Page 5: FOREWORD - SANEDI and Notices/Sanedi... · 2019-03-29 · 16.1. Advantages of the matrix structure 16.2. Disadvantages of the matrix structure. TOC here all in capitals. Can we align

SANEDI • ANNUAL PERFORMANCE PLAN 2016 5

The primary linkages between these programmes and commitments:

SANEDI Programme

Departmental Programmes (updated 5-year Strategic Plan 2011/12 – 2015/16)

Minister’s KPIs(Government Outcomes, 27 May 2011)

Programme 2: Energy Planning and Policy1

Programme 5: Clean Energy2 OUTCOME 63 OUTCOME 104

Programme 1: Corporate Governance and Administration

Programme 2: Energy Research, Development, Demonstration and Deployment

Programme 3: Energy Efficiency

The portfolio of programmes furthermore aligns with 6 of the 17 Strategic Integrated Projects as defined by the Presidential Infrastructure Co-ordinating Commission (PICC).

Due to the significant contribution of the energy sector towards South Africa’s high carbon emissions, SANEDI Programmes together with its sub – programmes were also considered in terms of the positive contribution it would make in reducing carbon intensity and advancing clean energy. SANEDI’s priority sub -programmes therefore also directly support the mitigation plans and approaches identified in the National Climate Change Response White Paper published October 2011.

The priority mitigation options, as identified in Section 6.3 of the Climate Change Response Plan, were defined as:

Option 1: Shifting to lower carbon generation options;

Option 2: Significant upscaling of energy efficiency applications;

Option 3: Promoting transport related interventions;

Option 4: Carbon capture and storage in the synthetics fuels industry;

Option 5: Mitigating non-energy emissions in agriculture and land use; and

Option 6: Transitioning society and economy to more sustainable consumption and production patterns

SANEDI is committed to delivering the goals and objectives described in this plan, subject to the availability of funding.

footnotes does not exist. Not in the original text therefore not here either. I located the footnote text in a 2011/12 version of the strategic plan (see below). Would it be possible to add it? [1] DoE Programme 2 Energy Planning and Policy: Evidence-based planning, policy setting and investment decisions in the energy sector and improved energy regulation and competition [2] DOE Programme 5: Clean Energy: Development and implementation of clean and renewable energy and energy efficiency initiatives [3] An efficient, competitive and responsive economic infrastructure [4] Environmental assets and natural resources that are well protected and continually enhanced
Page 6: FOREWORD - SANEDI and Notices/Sanedi... · 2019-03-29 · 16.1. Advantages of the matrix structure 16.2. Disadvantages of the matrix structure. TOC here all in capitals. Can we align

ANNUAL PERFORMANCE PLAN 2016 • SANEDI6

2. VISIONTo be the leading clean energy solutions provider for a low carbon South Africa

3. MISSIONAccelerating the implementation of energy research and development, improving energy efficiency and increasing the uptake of renewable energy to the benefit of SA

4. VALUES

Innovation Refers to new ideas, new ways of doing things or even a new application technology. An example of workplace innovation is the introduction of new procedures in the company, the introduction of different processes to improve work methods or the introduction of new technologies on the technical arena.

Accountability Means being answerable for an action. Each staff member must take responsibility for their role and be accountable for their actions.

Transparency It means frankness, openness, straightforwardness, brazenness, boldness. In the workplace, straight communications should be encouraged eg: leadership being transparent in the workplace has many benefits like problem- solving, healthy working relationships, trust and ultimately improved performance. Performance is always compromised when there is no transparency.

Batho Pele Is a service delivery flagship for Government and means “People First” – putting people first before considering your own needs. The 8 principles are: consultation, service standards, access, courtesy, information, openness and transparency, redress and value for money.

Integrity /Honesty Is the quality of being honest and sincere and having strong moral principles – thinking and doing what is right at all times. Honesty expresses self -respect and respect for others. Honesty lives with openness and reliability. Where there is dishonesty, there is no respect for oneself nor others. Dishonesty seeks shade and concealment.

5. LEGISLATIVE AND OTHER MANDATESThe National Energy Act, 2008 (Act No. 34 of 2008), Section 7 (2) gave effect to SANEDI’s existence and provides for its primary mandate and specific responsibilities. The Act provides for SANEDI to direct, monitor and conduct energy research and development as well as undertake measures to promote energy efficiency throughout the economy.

Page 7: FOREWORD - SANEDI and Notices/Sanedi... · 2019-03-29 · 16.1. Advantages of the matrix structure 16.2. Disadvantages of the matrix structure. TOC here all in capitals. Can we align

SANEDI • ANNUAL PERFORMANCE PLAN 2016 7

6. SITUATIONAL ANALYSISGlobal factors affecting energy market in SA

• Volatility in oil price and uncertainty in medium-term trend

o Affects Sasol business sustainability

o Delay in establishment of shale gas market

o Delay in rapid roll-out of Plug in Hybrid Electric Vehicle technology

• International accord on greenhouse gases emission reduction

o Paris Agreement under UNFCCC (December 2015) creates a platform for emission reduction projects

o INDCs are voluntary in terms of implementation but mandatory in terms of submission

o Growing pressure on rapidly emerging economies to embrace binding targets

o South Africa’s commitment to reducing greenhouse gas emissions

• Growing Renewable Energy Market

o Some renewables have reached grid parity with grid-based fossil fueled power generation

o SA remains a favored destination for RE technologies due to climate, market conditions, demand and local content / support

o import quality and quantity of RE products and value-added services entering SA market

• International investor confidence in SA economy

o Decline in credit rating (Moody’s, Standard & Poor) for both Eskom and sovereign credit-worthiness

o Weaker exchange rate promotes exports but raises PPI and CPI/X – detrimental net impact on economy as balance of payments influenced more by oil imports than mineral / metal commodity sales

• International targets for Energy Access

o Sustainable Development Goal 7 of SE4ALL (UN)

• Local factors affecting energy market in SA

o Policy signals to market

- REIPPP Programme linked to well-publicised IRP plan

- IEP2, NDP largely ignored at present – IRP 2010 requires revision

- Energy White Paper, RE White Paper, EE Strategy require updating

- Climate Change Response Strategy will guide response measures to climate change

- Nuclear Build will complement additional cleaner fossil fuel-based and renewable energy power generation

o State of economy and projected trends

- Slower growth with possible stagflation over 5-year horizon

- Growing unemployment with reduced investment in large infrastructure projects and local manufacturing,

- Decline in municipal and utility revenue – lower sales due to growing trend in customers switching to own production and consumption, poor revenue collection, poor metering and asset management

o Energy Access in SA

- About 86% of SA has grid-based electricity – remaining 14% are targets for off-grid and distributed generation.

Page 8: FOREWORD - SANEDI and Notices/Sanedi... · 2019-03-29 · 16.1. Advantages of the matrix structure 16.2. Disadvantages of the matrix structure. TOC here all in capitals. Can we align

ANNUAL PERFORMANCE PLAN 2016 • SANEDI8

6.1. PERFORMANCE ENVIRONMENT

A PESTLE1 analysis framework was used as a basis for a comprehensive environmental analysis for SANEDI. A brief overview of the most pertinent considerations is highlighted here to contextualise the SANEDI Strategic plan.

As it takes its cue from Government priorities and policy direction, SANEDI is vulnerable to an ambiguous policy, legislative and regulatory environment. Several aspects of SANEDI’s operation are dependent on the resolution of legislative and policy decisions. Most notably is the importance of reconciliation between energy, economic development and environmental policy and resolution with respect to the anticipated Department of Energy, Energy Technology Innovation Policy.

Low electricity prices have historically been a key inhibitor for energy efficiency and contributed to a wasteful energy culture in South Africa. Rising electricity, energy and fuel prices coupled with policy signals and disincentives should however, prompt a shift towards more considered energy selection and consumption. International experience has shown that the real impact of price on consumer behaviour and choice of equipment and activities will only materialise over time. The expected delay of the impact of price elasticity should therefore be mitigated by complementary initiatives such as awareness creation, communication and education.

The global recession has negatively impacted economic activity and therefore energy related investment. Initial expectations were for full economic recovery during 2010, but the rate of recovery has been slower than anticipated with current expectations of a second slump. Delayed economic recovery is likely to curtail research and innovation investments globally. It may also increase the relative importance of short-term financial considerations in energy technology / solution selection, hence perpetuating old, carbon intensive options.

Unemployment in South Africa is high and job creation the top priority of Government. The availability of energy and electricity is a major component of economic stability and growth and therefore the economy’s ability to absorb employment and preserve existing jobs. The ‘green industry’ offers significant opportunity to bolster the South African Government’s ability to address unemployment and grow economic activity.

Independent reviews2 revealed chronic shortages of higher skills and underinvestment in research and development in the country. South Africa has in recent years seen a marked decline in national energy research capacity and investment with a significant share of previously available funding being diverted to more pressing operational priorities.

With consideration of the link between energy research and development and global competitiveness, this situation requires due attention and correcting for South Africa to support the level of innovation and technological adaptation that is aligned with the existing and growing, socioeconomic and sustainability challenges.

The benefits associated with research and technology innovation extend far beyond the obvious to include:

Dimension Public benefits of research and technology innovation

Techno-economic

Improvement of industrial competitiveness National economic growth

Reduction of the energy intensity of the national economy

SME development (e.g. ESCO, Certification entities, component manufacturing)

Technological and service exports Economic efficiency

1 Political, Economic, Socio-cultural, Technology, Legislative, Environmental.

2 National Advisory Council on Innovation, South African Science and Technology Indicators, 2009; The OECD’s Review of South Africa’s Innovation Policy, 2007; National Survey of R&D activities, undertaken by the Centre for Science, Technology and Innovation Indicators (CeSTII) of the Human Sciences Research Council (HSRC).

Page 9: FOREWORD - SANEDI and Notices/Sanedi... · 2019-03-29 · 16.1. Advantages of the matrix structure 16.2. Disadvantages of the matrix structure. TOC here all in capitals. Can we align

SANEDI • ANNUAL PERFORMANCE PLAN 2016 9

Dimension Public benefits of research and technology innovation

Environmental

Optimal use of renewable resources Biodiversity

Greenhouse gas emissions and climate change

Sustainable development

Air quality

Social

Access to energy Reduce price to consumers

Employment creation Empower consumers

Equity issues related to energy

Strategic

System reliability, loss reduction, quality of energy Security of energy supply

Regional development Improve the technological services balance of trade

Domestic technology capacity building Create industrial base for energy technology

Diversification of energy mix

6.2. ORGANISATIONAL ENVIRONMENT

SANEDI is an implementation agency of Government, specifically the Department of Energy, created for the sole purpose of assisting the State to achieve its strategic objectives as set out in the National Energy Act, 2008 (No. 34 of 2008). Such strategic objectives include:

• Ensure uninterrupted supply of energy to the Republic;

• Promote diversity of supply of energy and its sources;

• Facilitate effective management of energy demand and its conservation;

• Promote energy research;

• Promote appropriate standards and specifications for the equipment, systems and processes used for producing, supplying and consuming energy;

• Ensure collection of data and information relating to energy supply, transportation and demand;

• Provide for optimal supply, transformation, transportation, storage and demand energy that are planned, organised and implemented in accordance with a balanced consideration of security of supply, economics, consumer protection and a sustainable development;

• Provide for certain safety, health and environment matters that pertain to energy;

• Facilitate energy access for improvement of quality of life of the people the Republic;

• Commercialise energy-related technologies;

• Ensure effective planning of energy supply, transportation and consumption; and

• Contribute to sustainable development of the South African economy.

SANEDI will furthermore support the local renewable energy and Energy Efficiency and Demand Side Management (EEDSM) industries in South Africa in accordance with the Industrial Production Action Policy (IPAP) and, indirectly, also the climate change and mitigation, social and economic development and environmental sustainability priorities of the country.

As indicated earlier two key building blocks of sustainable energy solutions relate to energy innovation and energy conservation/efficiency. This is reflected in the high level organisational structure (Figure 1).

Page 10: FOREWORD - SANEDI and Notices/Sanedi... · 2019-03-29 · 16.1. Advantages of the matrix structure 16.2. Disadvantages of the matrix structure. TOC here all in capitals. Can we align

ANNUAL PERFORMANCE PLAN 2016 • SANEDI10

EXCECUTIVE AUTHORITY

CEO

COMPNY SECRETARY (OUTSOURCED)

BOARD AUDIT AND RISK COMMITTEE

REMUNERATION COMMITTEE

PROJECTS COMMITTEE

SANEDI BOARD

ADMINISTRATION

APPLIED ENERGY RESEARCH ,

DEVELOPMENT, DEPLOYMENT AND DEMONSTRATION

ENERGY EFFECIENCY

CLEANER FOSSIL FUELS RENEWABLE ENERGY

SMART GRIDS AND NETWORK AUTOMATION

KNOWLEDGE MANAGEMENT

WORKING FOR ENERGY CLEANER MOBILITY

Figure 1: SANEDI Organisational structure

In South Africa’s existing research and innovation context, SANEDI’s focus will be primarily on energy research, development, demonstration and deployment. Select activities of SANEDI Energy Efficiency and the Working for Energy Programme will also promote technology deployment, i.e. market entry and penetration of new clean energy and energy efficiency solutions.

SANEDI operating structure is a matrix one. Effectively this structure establishes a pool of people that can be utilised across the different functional areas to optimise the limited capacity and the available skills set and to allow for greater development opportunities. The complete view of all relevant areas and the matrix management model as it applies to SANEDI is attached as Appendix B.

SANEDI acknowledges that the structure introduces a higher level of internal complexity and additional management challenges, but these are considered manageable with the small permanent staff complement. As the number of employees increase, this model may be reconsidered and adjusted to suit the changing environment. Currently, most of SANEDI’s staff are on contract.

The implementing model that SANEDI has chosen also relies on the establishment of Centers of Research and Development (CORDs). These centers, either located within SANEDI or externally, will rely on human capital to provide for key services. It is the objective of SANEDI to leverage additional funds, from sources such as donors, DFIs, NRF, SETAs, etc. to enhance the capacity available to these CORDs. Many of the postgraduate students graduating today have little prospect of finding employment at the university itself. This is simply due to the numbers of students that graduate and the ever-present budget constraints that limit employment opportunities at these institutions. SANEDI, through its CORDs model, intends deploying some of the postgraduate students that are currently funded by SANEDI in the tertiary institution itself. In so doing, the student will continue to add to the body of knowledge and also be a research resource for SANEDI. The payment of remuneration that is more in line with market norms, will also serve to aid in staff retention.

spelling. Should be "efficiency" not effe... I recognise this is as per the original text.
very tight fit. perhaps rather warp energy onto next line
Page 11: FOREWORD - SANEDI and Notices/Sanedi... · 2019-03-29 · 16.1. Advantages of the matrix structure 16.2. Disadvantages of the matrix structure. TOC here all in capitals. Can we align

SANEDI • ANNUAL PERFORMANCE PLAN 2016 11

7. OVERVIEW OF THE 2016/17 BUDGET AND MTEF ESTIMATES

2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21

Budget Preliminary outcome

Approved budget

Budget estimate

Budget estimate

Budget estimate

Budget estimate

Budget estimate

R‘000 R‘000 R‘000 R‘000 R‘000 R‘000 R‘000 R‘000

Administration 17,110 53,480 68,952 55,807 57,896 55,552 58,607.36 61,830.76

Energy efficiency programme

24,083 9,058 2,000 2,000 - 3,000 3,165.00 3,339.08

Energy Research, Development, Demonstration and Deployment programme:

SACCCS/PCSP 182,762 8,442 139,213 119,650 129,850 180,000 266,000 68,000

Smart grids - 28,826 93,800 - - 500 527.50 556.51

Working for energy - 2,211 20,075 - - 3,000 3,165.00 3,339.08

Clean energy solutions

- 9,283 70,741 2,838 3,508 1,189 1,254.40 1,323.39

Centre for Energy systems Analysis and Research

- 1,234 2,000 3,000 1,227 - 3,000.00 3,165.00

Green transport - - - - - - 1,000.00 1,055.00

Shale gas - 817 6,769 - - - - -

Total 223,95 113,351 403,550 191,245 73,789 144,183 470,719.26 496,608.81

Current payments 223,955 86,801 301,074 191,245 73,789 144,183 152,113.07 160,479.28

Compensation of employees

43,800 39,688 45,711 48,911 52,335 56,548 59,658.14 62,939.34

Salaries and wages 43,800 39,688 45,711 48,911 52,335 56,548 59,658.14 62,939.34

Social contributions - - - - - - - -

Goods and services 179,225 42,267 251,615 136,727 19,065 86,202 90,943.11 95,944.98

Of which 1 - -

Agency and support/outsourced services

1,680 1,857 2,991 1,482 1,452 1,524 1,607.82 1,696.25

Communication - - - 1,391 - - - -

Computer services - - - - - - - -

Consultants 1,515 228 1,152 1,514 266 280 295.40 311.65

Contractors - - - - - - - -

Inventory - - - - - - - -

Lease payments 3,762 3,251 4,726 5,136 5,434 5,992 6,321.56 6,669.25

Repairs and maintenance

531 342 172 158 32 34 35.87 37.84

Research and development

152,430 20,527 231,420 118,022 6,284 72,703 76,701.67 80,920.26

Training and staff development

300 498 450 800 516 136 143.48 151.37

Travel and subsistence

5,561 5,874 6,695 3,744 1,573 3,292 3,473.06 3,664.08

Page 12: FOREWORD - SANEDI and Notices/Sanedi... · 2019-03-29 · 16.1. Advantages of the matrix structure 16.2. Disadvantages of the matrix structure. TOC here all in capitals. Can we align

ANNUAL PERFORMANCE PLAN 2016 • SANEDI12

2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21

Budget Preliminary outcome

Approved budget

Budget estimate

Budget estimate

Budget estimate

Budget estimate

Budget estimate

R‘000 R‘000 R‘000 R‘000 R‘000 R‘000 R‘000 R‘000

Other 13,446 9,690 4,008 4,480 3,508 2,243 2,366.37 2,496.52

Depreciation 930 4,846 3,748 5,607 2,389 1,433 1,511.82 1,594.96

Transfers and subsidies

- 26,550 87,000 - - - - -

Other government units

- 26,550 87,000 - - - - -

Municipalities - 26,550 87,000 - - - - -

Tax payment - - 15,476 - - - - -

Total Expenditure 223,955 113,351 403,550 191,245 73,789 144,183 622,832.32 657,088.10

ADMINISTRATIVE BUDGET

The budget allocation under this programme is aimed at enabling administrative divisions within the organization to continue to support the core divisions in the delivery and execution of the organisational mandate and the execution of the approved Strategy.

Over the 2016/17 MTEF, the administration budget linked to programme 1 will amount to R55, 807 million being a reduction of 24% from the previous period (2015/16) as a result of increased efforts to contain costs stemming from fiscal budget cuts and some of strategic positions not being filled i.e. Procurement Manager and Company Secretary . Expenditure on goods and services linked to administrative function will amount to R18, 044 million of the overall expenditure budget as we direct more efforts towards spending on applied energy research, development, demonstration and deployment as well as energy efficiency programmes..

There will be an increased focus on training and development of staff in order to ensure high calibre of staff and innovation within the organization. The training and development budget will increase by 78% from the previous financial year as SANEDI positions itself to be the leaders in energy innovation and development. Expenditure on consultants/contractors will increase by 36% as we continue with the establishment of a fully capacitated Human Resources department to ensure that the organization has a motivated and fully functional workforce.

Investments in IT infrastructure will continue during the period as the entity capacitates the Project Management Office with resources required to ensure efficiency in project design, implementation, evaluation and reporting. It is expected that an investment of R1 million will be made in improving the performance management module. This will, however, be tackled using a phased in approach.

Expenditure relating to compensation of employees will amount to R34 032 million with an estimated total staff complement of 61 employees. This is an increase of 7% in comparison to the previous year’s projections for cost of living adjustments to remuneration.

Research, development, demonstration and deployment initiatives linked to programme 2 and 3 will amount to 57% of the overall expenditure budget with expenditure being spread as follows:

Page 13: FOREWORD - SANEDI and Notices/Sanedi... · 2019-03-29 · 16.1. Advantages of the matrix structure 16.2. Disadvantages of the matrix structure. TOC here all in capitals. Can we align

SANEDI • ANNUAL PERFORMANCE PLAN 2016 13

8. RELATING EXPENDITURE TRENDS TO STRATEGIC OUTCOMES

Estimated Budget 2015/16

R‘000

Estimated Budget 2016/17

R‘000

Energy efficiency programme 2,000 2,000

Energy Research, Development, Demonstration and Deployment programme:

Cleaner Fossil Fuels (CCS) 1 139,213 127,600

Smart Grids and Network Automation 2 93,800 -

Working for Energy 3 20,075 -

Renewable Energy 4 70,741 2,838

Data Repository and Management 5 2,000 3,000

Cleaner Mobility 6 - -

Cleaner Fossil Fuels ( Shale gas ) 7 6,769 -

Total 334,598 135,438

CLEANER FOSSIL FUEL S (CARBON CAPTURE AND STORAGE)

The national development plan envisages a move towards a lower carbon intensive electricity production in the long term and greater demand side measures. The main aim of the South African National Energy Development Institute is to undertake measures to promote the development of a low carbon economy in South Africa. The focus of the institute over the medium term will be to conduct research and development related to the carbon capture utilization and storage, in particular the pilot carbon dioxide storage project. Technology used in the carbon capture and storage pilot project has the potential to take carbon dioxide from large emission sources, such as fossil fuel power plants, synfuel plants and industrial facilities, and safely store it in deep geological formations to avoid emitting it into the atmosphere, thereby mitigating climate change. The pilot project aims to demonstrate the potential viability of carbon dioxide storage in South African conditions, including in South African geology. Based on the outcomes of previous studies, 2 basins have been identified as options for the pilot project. The project is supported by an allocation of R172 million from the Department of Energy received during the preceding years and a further US$27.4 million from the World Bank to be received during 2016 and following years. Below please find an overview of the main components of the project and an estimate of the costs.

Page 14: FOREWORD - SANEDI and Notices/Sanedi... · 2019-03-29 · 16.1. Advantages of the matrix structure 16.2. Disadvantages of the matrix structure. TOC here all in capitals. Can we align

ANNUAL PERFORMANCE PLAN 2016 • SANEDI14

Project Components Project Cost (USD) IBRD or IDA Financing (USD) % Financing

1.Pilot CO2 Storage Project 50 million3 3 million 51%

a. Data Analysis and Project Planning 8.9 million 3.4 million 38%

b. Basin Exploration and Site Selection 18.5 million 17 million 92%

c. Schematic Engineering Design 1.5 million 0.5 million 33%

d. Detailed Engineering Design 2 million 1 million 50%

e. Procurement and Construction 13 million 1.4 million 11%

f. Operation 4 million 2 million 50%

g. Closure 1.5 million - 0%

h. Post-Closure 0.6 million - 0%

2. CO2 Capture Pilot Project 10 million4 2 million 20%

a. Prefeasibility and FEED Studies 2.0 million 2.0 million 100%

b. Plant Procurement, Construction and Operation 8.0 million 0%

3. Assistance with Legal and Regulatory Framework Development 0.1 million 0.1 million 100%

Total Costs 60.1 million5 27.4 million 46%

To date R15 million has been spent on the project and an additional R 33 million income raised from private sector partners and international donors in support of the programme. Progress to date (2015/16) to date includes:

1. Pilot Monitoring Project Phase I completed at Bongwana natural carbon dioxide releases;

2. Geological data inventory commenced

3. Exploration permit applied

4. Exploration plan development initiated

5. Environment and Social Impact Assessment completed and sent to World Bank

6. World Bank appointment of Pilot Carbon Dioxide Storage Project Technical Advisor has been shortlisted with SANEDI inputs and full proposals/quotations deadline 14Jan2015

7. SANEDI recipient appraisal by the World Bank completed.

8. Stakeholder engagement programme exceeded number of target interactions with thus far positive results

9. Completion of the Fourth Biennial Carbon Capture and Storage Conference that included explicitly for the first time affected persons at the local level

10. Appointment of three new specialist staff

11. Seven student bursars

12. Carbon Capture Pilot Plant ESIA documentation drafted for World Bank

3 Currently USD 39.9 million of funding has been secured for the PCSP, therefore there currently exists a funding gap of USD 10.1 million.

4 Currently USD 2 million of funding has been secured for the CCPP, therefore there currently exists a funding gap of USD 8 million.

5 Currently USD 42 million of funding has been secured, therefore there currently exists a funding gap of USD 18.1 million

Page 15: FOREWORD - SANEDI and Notices/Sanedi... · 2019-03-29 · 16.1. Advantages of the matrix structure 16.2. Disadvantages of the matrix structure. TOC here all in capitals. Can we align

SANEDI • ANNUAL PERFORMANCE PLAN 2016 15

SMART GRIDS AND NETWORK AUTOMATION (SMART GRIDS)

The European Union (EU) made available seed funding of R179.4 million to National Treasury over a two year period which was intended to accelerate South Africa’s journey towards achieving a smarter grid. This programme was formally initiated in September 2014 with the revised end date being June 2016. The Smart Grid Maturity Model (SGMM) survey and the Smart Grid through Smart meters will allow users to monitor and manage usage and can address challenges in municipalities’ capabilities for managing their electricity revenue.

The Department of Energy has identified five areas within the Electricity Distribution Industry that they would like to have policy and regulatory input from. These five areas have resulted in the selection by the DoE of 9 municipalities to participate in projects that both address burning issues within the municipality and also addresses the DoE priorities.

The five 5 priorities of the Department are as follows;

• Distributed Power Generation

• Enhanced revenue management

• Energy Efficiency Demand Side Management (EEDSM)

• Active Network Management

• Asset Management

These objectives listed above are thereafter structured into projects and deliverables by SANEDI, acting in a technical capacity to the department. At present:

• DoE IPP Project - This project was allocated R5million which is at the DoE to reallocate the budget to other areas of the programme.

• City Power (Advanced Metering Infrastructure Project) - This project is in the 4th phase of the 7 phases and on track with an allocation R10million.

• Revenue Enhancement Projects (5 municipalities) - Individual municipalities are at various stages of completion of the project. The collective allocation is R77m and R 33 million has been spent to date on these municipalities,

Depending on the stage of implementation at the end of the financial year, a proposal for phase two will be submitted to National Treasury for funding. This will take place during the 2016/17 financial year and thus no budget estimates have been provided as the funding still need to be secured.

DATA REPOSITORY AND MANAGEMENT

Centre for Energy System Analysis & Research (CESAR )

The DST has made available to SANEDI an amount of R6 million for the 2014-17 period with the following objectives:

• To develop technical know-how, knowledge, and human capacity in energy modelling and planning

• To collect and maintain an open central database of energy research and related data

• To research and develop suitable models for the South African energy system

• To provide research support and advice on government initiatives regarding energy data collection, energy modelling and planning

• To collaborate with international bodies regarding research on energy data, energy modelling, planning and policy development

duplication. Can we make this five (5) or leave the number 5 out, please?
Page 16: FOREWORD - SANEDI and Notices/Sanedi... · 2019-03-29 · 16.1. Advantages of the matrix structure 16.2. Disadvantages of the matrix structure. TOC here all in capitals. Can we align

ANNUAL PERFORMANCE PLAN 2016 • SANEDI16

• To develop the necessary skills and resources to support the following

o Energy modelling

o Planning

o Analysis

o Energy Technology innovation

• Contribute towards the development of a centralised energy planning database which is up to date and can support the requirements of multiple government institutions (national and local).

RENEWABLE ENERGY

To date 5 Projects have been contracted by SANEDI in support of the Danish RE EE Program focusing on strengthening the energy planning capabilities of DoE in the areas of Climate Change Mitigation, Energy Efficiency and Renewable Energy and to strengthen the capacity of Eskom for integration of renewable energy in the electricity supply. Several more projects are being finalised, including support for SARETEC (training materials, bursaries etc.) while under WASA Phase 2 an additional 5 wind measurement masts have been installed and are operational in the expansion of WASA to include an interim Wind Atlas and Resource map for KZN, Free State and remaining areas of the Eastern Cape provinces by 2017.

An amount of DDK25, 525 has been made available for this project through the RDP fund.

WORKING FOR ENERGY

The Working for Energy (WfE) Programme, under the Environment and Culture Sector of the Expanded Public Works Programme (EPWP) is spreading its reach to more and more communities across the country. It is focused on delivering clean energy solutions to rural and urban low income communities through labour intensive methods where possible, with special emphasis on youth, women and people with disabilities.

This sub-programme was funded through an allocation from the Department of Energy amounting to R45 million in 2009 to 2012. An amount of R26 million has been spent on the project on several demonstration projects over the previous mid-term Cycles. In the reporting cycle the following progress is reported:

• The Institute’s partnership with the Gauteng Department of Education has resulted in four schools being retrofitted with energy efficient LEDs, solar water heaters and 2 being treated with Cool Surfaces preparation to improve the ambient air quality. Anaerobic digesters will be completed by the end of the financial year.

• Together with the Department of Energy, about 100 schools have been identified for the smart meter installation programme.

The above programme will be expanded to other schools, clinics and places of care in various provinces in the next MTEF.

• The Institute’s partnership with the National Development Agency (NDA) has resulted in the Working for Energy Programme being launched by the Ministry at one of the fully greened Early Childhood Development Centre (ECDC) in Hammanskraal. These interventions entail cool surfaces, efficient lighting, rain water harvesting, solar water heating and biogas from waste.

Page 17: FOREWORD - SANEDI and Notices/Sanedi... · 2019-03-29 · 16.1. Advantages of the matrix structure 16.2. Disadvantages of the matrix structure. TOC here all in capitals. Can we align

SANEDI • ANNUAL PERFORMANCE PLAN 2016 17

• There are other similar initiatives in ECDCs in Kwa Maphumulo and Kwa Ximba (KZN) and some in the Alice / Melani in the Eastern Cape that have been completed.

The above programme will be expanded to other ECDCs in various provinces in the next MTEF.

• The biogas programme in Melani in partnership with the universities of Fort Hare and Unisa is progressing well with all the institutional arrangements being completed to roll out the balance of the 110 digesters in the greater Melani area.

• The biogas programme in Mpfuneko is at a stage of operationalising the completed digesters.

• Partnership agreement with the University of Venda is being finalised for the research and roll out of greening projects in the Limpopo province.

• The greening of the Dinaledi School of Tygerkloof in Vryburg, (North West) is underway with commencement of the hard water purification system as a necessary precondition for the installation of solar water heaters to the dormitories of the school.

The above programme will be expanded to other boarding schools in various provinces in the next MTEF. It will include other greening technologies such as biogas and rainwater harvesting systems and cool surfaces interventions. The future is to intensify these interventions and add other concomitant technologies, which brings about skills development, job creation and enterprise development among the youth, women and people with disabilities. It is also important to note the need for the maintenance and operation of these interventions once deployed for sustainability.

The biggest impediment of organic growth is the lack of sustainable funding for posterity. We have submitted a bid for R100 million for the expansion of the working for energy programme for the MTEF period which is under augmentation.

CLEANER FOSSIL FUELS (SHALE GAS)

A feasibility study into the potential for exploiting shale gas in the Karoo is currently under way. Expenditure on this project was R1.6 million at the end of March 2015. The project focuses on the technical aspects of shale gas exploitation and utilisation by developing scenarios to help quantify requirements such as the number of boreholes, water and pipeline infrastructure, waste water issues and the potential for electricity generation and the reduction of carbon dioxide emissions.

Overall the project is expected to cost in the region of R 8 million (already received from Department of Energy) and will be completed during the 2015/16 financial year at an estimated expenditure of R6.8 million in 2015/16.

ENERGY EFFICIENCY

Funded through DST funding and DoE allocation the main purpose of Energy Efficiency and Demand Side Management Hub is

• to lead EEDSM fundamental and applied research and development activities in South Africa;

• to produce state-of-the-art fundamental and applied research and innovation results;

• to promote demonstration and commercialisation of applied research and development;

• to seek market uptake and diffusion of EEDSM technologies;

Page 18: FOREWORD - SANEDI and Notices/Sanedi... · 2019-03-29 · 16.1. Advantages of the matrix structure 16.2. Disadvantages of the matrix structure. TOC here all in capitals. Can we align

ANNUAL PERFORMANCE PLAN 2016 • SANEDI18

• to integrate and transfer knowledge to better understand challenges and identify needs in EE, technology and sustainability;

• to facilitate development of products that adopt new EEDSM technologies, development of prototype projects that can be used to test and validate new technologies, and patent relevant technologies and products in the EEDSM field; and

• to provide EEDSM related services (training, technical support, consultation, measurement and verification, etc.) to governments, organisations and industries.

During the Medium term ended 31 March 2015, R11, 2 million was spent towards this programme. In the 2014/15 financial support was granted to 23 Students through this funding. Six (6) of the students being female and 17 being Previously Disadvantaged Individuals.

It is expected that over the next cycle an additional amount of R6 million would be expanded on this project.

8.1. RELATING PROGRAMMES TO GOALS

Programme and corresponding budget programme

Programme purpose Goals

Corporate Governance and Administration

To provide strategic support and management services to SANEDI’s shareholder (particularly the Energy Ministry and the Department), SANEDI’s Board, SANEDI’s most valuable assets (its people), and to all relevant stakeholders. And to ensure compliance with all statutory requirements in line with sound corporate governance practices.

Establish sound relationships between SANEDI’s management, Board, its shareholder: the Department of Energy and the goals for which SANEDI is governed. Establish a platform for accountability, sound governance, control and administration in compliance with all legal and regulatory requirements. Manage the administration of funds and ensuring economic efficiency.Manage and establishing adequate and efficient infrastructure and business support.Facilitate strong collaborative approach and strategic international collaboration.

Energy Research, Development, Demonstration and Deployment

Knowledge creation and development that can support informed energy-related planning and decision-making. The applied research programme is therefore primarily focused on developing a portfolio of confirmed viable (cost effective and low risk) and sustainable energy solutions - aligned with Government goals of energy security, energy sector transformation and diversification, economic development and environmental protection - that can confidently be incorporated into national plans and policy processes.

Energy knowledge creation (R&D): Portfolio of viable cleaner energy options.Intelligent energy systems infrastructure.Pursue strong collaborative approach and strategic international collaboration.Demonstrate cleaner energy technology opportunities.

alignment of Energy to start at the left, please
Page 19: FOREWORD - SANEDI and Notices/Sanedi... · 2019-03-29 · 16.1. Advantages of the matrix structure 16.2. Disadvantages of the matrix structure. TOC here all in capitals. Can we align

SANEDI • ANNUAL PERFORMANCE PLAN 2016 19

Programme and corresponding budget programme

Programme purpose Goals

Energy Efficiency Programme

Accelerate a move towards a resource and particularly, an energy (including gas, liquid fuels, electricity and water) efficient society.

To support the Income Tax Amendment Act section12I and 12L relating to the tax rebate for energy efficiency improvements.EEDSM Hub (Research Centre), to strengthen energy efficiency related research, human capacity development and market transformation and enterprise development initiatives.Industry support and Capacity Building, to support various energy efficiency related activities that contribute positively to the accelerated uptake of energy efficiency in South Africa.National Champion18 for Energy Efficiency, to effect a change in human behavior and energy consumption patterns, thereby contributing to the achievement of the targets prescribed in the National Energy Efficiency Strategy. National Measurement and Verification Centre to independently, accurately and consistently integrate and report on (bottom-up) progress with all energy efficiency activities across all energy carriers in the country and to cross-reference to (top-down), sectoral reporting results.

Page 20: FOREWORD - SANEDI and Notices/Sanedi... · 2019-03-29 · 16.1. Advantages of the matrix structure 16.2. Disadvantages of the matrix structure. TOC here all in capitals. Can we align

ANNUAL PERFORMANCE PLAN 2016 • SANEDI20

9. PROGRAMME 1: CORPORATE GOVERNANCE AND ADMINISTRATIONPURPOSE

The purpose of this programme is to provide strategic support and management services to SANEDI’s shareholder (particularly the Energy Ministry and the Department), SANEDI’s Board, SANEDI’s most valuable assets (its people), and to all relevant stakeholders. The purpose is furthermore in doing so to ensure compliance with all statutory requirements in line with sound corporate governance practices.

SUB-PROGRAMMES WITHIN CORPORATE GOVERNANCE AND ADMINISTRATION

The following sub programmes have been identified and are the responsibility of the indicated components:

Sub-programmes ComponentsCorporate Governance. • CEO

• Manager : Corporate Planning /Office of the CEO • CFO• Company Secretary (Acorim)

Finance • CFO / Financial Manager

Human Resources • CEO • Manager : HR

Corporate and Programme Marketing and Communication Services

• CEO• Senior Manager: Communications

SUB-PROGRAMME: CORPORATE GOVERNANCE

ID Strategic Objective (output) Strategic statement Baseline1.1 Compliance with Department of

Energy’s compliance calendar in respect of strategic plans, annual performance plans, annual reports and quarterly reports for state entities reporting to the Department

Ensure compliance with the Department of Energy’s compliance calendar in respect of strategic plans, annual performance plans , annual reports and quarterly reports for state entities reporting to the Department

Quarterly reports, strategic plans, annual performance plans and annual reports sent as per compliance calendar

SUB-PROGRAMME: CORPORATE GOVERNANCE

ID Strategic Objective (output) Strategic statement Baseline1.2 Effective Financial processes, systems

and Procedures.Ensure that 97% of all creditors are paid within 30 days after relevant documents are received.

97% of all creditors paid within 30 Days after all relevant documents are received.

should be finance not corporate governance
Page 21: FOREWORD - SANEDI and Notices/Sanedi... · 2019-03-29 · 16.1. Advantages of the matrix structure 16.2. Disadvantages of the matrix structure. TOC here all in capitals. Can we align

SANEDI • ANNUAL PERFORMANCE PLAN 2016 21

SUB-PROGRAMME: HR

ID Strategic Objective (output) Strategic statement Baseline1.3 Highly motivated team of employees

who are managed according to best practice thereby contributing optimally to the achievement of organisational goals.

SANEDI needs to have its own HR policies and procedures which will ensure that employees are managed equally and according to best practice so that each employee makes a valuable contribution to the achievement of organisational objectives

Approved policies

SUB-PROGRAMME: CORPORATE PROGRAMME MARKETING AND COMMUNICATION SERVICES

ID Strategic Objective (output) Strategic statement Baseline1.4 Corporate and Programme Marketing

and CommunicationsProvide corporate and programme marketing and communication services that will adequately support the promotion and knowledge sharing SANEDI activities both internally and externally. Ensure that the stakeholder engagement plan is place and is being implemented

Draft corporate and programme marketing and communication planDraft stakeholder engagement plan

Page 22: FOREWORD - SANEDI and Notices/Sanedi... · 2019-03-29 · 16.1. Advantages of the matrix structure 16.2. Disadvantages of the matrix structure. TOC here all in capitals. Can we align

ANNUAL PERFORMANCE PLAN 2016 • SANEDI22

CORP

ORA

TE G

OVE

RNA

NCE

AN

D A

DM

INIS

TRAT

ION

: ST

RATE

GIC

OBJ

ECTI

VES

AN

D A

NN

UA

L TA

RGET

S

Stra

tegi

c O

bjec

tive

(out

put)

Perf

orm

ance

in

dica

tor

Audi

ted

Actu

al

Perf

orm

ance

2014

/15

Estim

ated

pe

rfor

man

ce

(201

5/16

)

Med

ium

Ter

m T

arge

ts

2016

/17

2017

/18

2018

/19

1.1

Com

plia

nce

with

De

part

men

t of

Ener

gy’s

com

plia

nce

cale

ndar

in re

spec

t of

stra

tegi

c pl

ans,

an

nual

per

form

ance

pl

ans,

ann

ual r

epor

ts

and

quar

terly

repo

rts

for s

tate

enti

ties

repo

rting

to th

e De

part

men

t

Tim

ely

subm

itted

St

rate

gic

plan

s to

the

Exec

utive

Aut

horit

y

Stra

tegi

c pl

an

subm

itted

as

per t

he

corp

orat

e pl

an

Com

plia

nce

in te

rms

of D

epar

tmen

t of

Ener

gy’s

com

plia

nce

cale

ndar

in re

spec

t of

stra

tegi

c pl

ans,

an

nual

per

form

ance

pl

ans,

ann

ual r

epor

ts

and

quar

terly

re

port

s fo

r sta

te

entiti

es re

porti

ng to

th

e De

part

men

t of

Ener

gy.

Com

plia

nce

in te

rms

of D

epar

tmen

t of

Ener

gy’s

com

plia

nce

cale

ndar

in re

spec

t of

stra

tegi

c pl

ans,

an

nual

per

form

ance

pl

ans,

ann

ual r

epor

ts

and

quar

terly

re

port

s fo

r sta

te

entiti

es re

porti

ng to

th

e De

part

men

t of

Ener

gy.

Com

plia

nce

in te

rms

of D

epar

tmen

t of

Ener

gy’s

com

plia

nce

cale

ndar

in re

spec

t of

stra

tegi

c pl

ans,

an

nual

per

form

ance

pl

ans,

ann

ual r

epor

ts

and

quar

terly

re

port

s fo

r sta

te

entiti

es re

porti

ng to

th

e De

part

men

t of

Ener

gy.

Com

plia

nce

in te

rms

of D

epar

tmen

t of

Ener

gy’s

com

plia

nce

cale

ndar

in re

spec

t of

stra

tegi

c pl

ans,

an

nual

per

form

ance

pl

ans,

ann

ual r

epor

ts

and

quar

terly

re

port

s fo

r sta

te

entiti

es re

porti

ng to

th

e De

part

men

t of

Ener

gy.

Tim

ely

subm

itted

an

nual

per

form

ance

pl

ans

to th

e Ex

ecuti

ve A

utho

rity.

Annu

al p

erfo

rman

ce

plan

sub

mitt

ed a

s pe

r the

cor

pora

te

cale

ndar

Tim

ely

subm

itted

an

nual

repo

rt to

the

Exec

utive

Aut

horit

y.

Annu

al re

port

su

bmitt

ed a

s pe

r the

co

rpor

ate

cale

ndar

Tim

ely

subm

itted

qu

arte

rly re

port

s to

the

Exec

utive

Au

thor

ity.

Qua

rter

ly re

port

s su

bmitt

ed a

s pe

r the

co

mpl

ianc

e ca

lend

ar

1.2

Effe

ctive

pay

men

ts

syst

ems

in p

lace

en

surin

g tim

ely

sett

lem

ent o

f tra

de

cred

itors

.

% o

f cre

dito

rs p

aid

with

in 3

0 da

ys

after

all

rele

vant

do

cum

enta

tion

have

be

en re

ceiv

ed.

100%

of c

redi

tors

w

ere

paid

with

in 3

0 da

ys a

fter a

ll re

leva

nt

docu

men

tatio

n w

ere

rece

ived

97%

of a

ll cr

edito

rs

paid

with

in 3

0 da

ys

after

all

rele

vant

do

cum

enta

tion

have

be

en re

ceiv

ed.

97%

of a

ll cr

edito

rs

paid

with

in 3

0 da

ys

after

all

rele

vant

do

cum

enta

tion

have

be

en re

ceiv

ed.

97%

of a

ll cr

edito

rs

paid

with

in 3

0 da

ys

after

all

rele

vant

do

cum

enta

tion

have

be

en re

ceiv

ed.

97%

of a

ll cr

edito

rs

paid

with

in 3

0 da

ys

after

all

rele

vant

do

cum

enta

tion

have

be

en re

ceiv

ed.

1.3

To h

ave

a hi

ghly

m

otiva

ted

team

of

empl

oyee

s w

ho a

re

man

aged

acc

ordi

ng

to “

best

pra

ctice

” th

ereb

y co

ntrib

uting

op

timal

ly to

the

achi

evem

ent o

f the

or

gani

satio

nal g

oals

Num

ber o

f HR

polic

ies

appr

oved

by

boar

d.

New

obj

ectiv

e De

velo

pmen

t of

the

5 ba

sic H

R po

licie

s w

hich

will

he

lp d

evel

op a

cu

lture

to a

ddre

ss

acco

unta

bilit

y an

d le

ader

ship

gap

s:

Cond

ition

s of

ser

vice

, Co

de o

f con

duct

,Pe

rfor

man

ce

Man

agem

ent p

olic

y, Re

war

ds P

hilo

soph

y Sh

ort t

erm

ince

ntive

po

licy

Deve

lopm

ent

of a

ll ot

her H

R po

licie

s w

hich

will

he

lp d

evel

op a

cu

lture

to a

ddre

ss

acco

unta

bilit

y an

d le

ader

ship

gap

s.

Driv

e a

high

pe

rfor

man

ce

cultu

re w

ith a

n in

nova

tive

min

dset

an

d di

stinc

tive

capa

biliti

es to

ac

cele

rate

gro

wth

an

d en

cour

age

inno

vatio

n w

ith a

cl

ear l

ink

to re

war

d an

d re

cogn

ition

Attra

ct a

nd

reta

in ta

lent

for

sust

aina

ble

grow

th

and

com

petiti

ve

adva

ntag

e pr

ovid

ing

valu

e ad

ded

HR

inte

rven

tions

de

signe

d to

bra

nd

SAN

EDI a

s an

em

ploy

er o

f cho

ice

Page 23: FOREWORD - SANEDI and Notices/Sanedi... · 2019-03-29 · 16.1. Advantages of the matrix structure 16.2. Disadvantages of the matrix structure. TOC here all in capitals. Can we align

SANEDI • ANNUAL PERFORMANCE PLAN 2016 23

Stra

tegi

c O

bjec

tive

(out

put)

Perf

orm

ance

in

dica

tor

Audi

ted

Actu

al

Perf

orm

ance

2014

/15

Estim

ated

pe

rfor

man

ce

(201

5/16

)

Med

ium

Ter

m T

arge

ts

2016

/17

2017

/18

2018

/19

1.4

1. E

ffecti

ve a

nd

com

preh

ensiv

e st

akeh

olde

r m

anag

emen

t, ac

hiev

ing

60%

po

sitive

feed

back

by

end

of 2

016/

17.

A st

akeh

olde

r en

gage

men

t pl

an a

nd a

n im

plem

enta

tion

plan

in p

lace

and

im

plem

ente

d

New

indi

cato

r Dr

aft S

take

hold

er

enga

gem

ent p

lan

in

plac

e.

An e

ffecti

ve a

nd

com

preh

ensiv

e st

akeh

olde

r pla

n an

d 60

% p

ositi

ve

feed

back

On-

goi

ng

stak

ehol

der

enga

gem

ent

achi

evin

g 60

%

positi

ve fe

edba

ck

At le

ast 6

0% p

ositi

ve

feed

back

from

St

akeh

olde

rs.

At le

ast 4

exh

ibiti

ons

per a

nnum

, 80%

att

enda

nce

of D

OE

even

ts, m

onth

ly

upda

ted

web

site

and

dist

ributi

on o

f qu

arte

rly n

ewsle

tter

s as

per

dist

ributi

on

list a

nd c

hann

els.

Mon

thly

new

slett

ers

wer

e no

t com

pile

d.4

quar

terly

ne

wsle

tter

s w

ere

com

pile

d 6

Com

mun

icat

ors

foru

m m

eetin

gs

wer

e att

ende

d an

d re

port

s pr

esen

ted

Annu

al re

port

co

ntrib

ution

in te

rms

of e

dito

rial a

nd

desig

n w

ere

give

n4

DoE

offici

al e

vent

s w

ere

atten

ded

At l

east

4

exhi

bitio

ns, 8

0%

atten

danc

e of

DO

E Co

mm

unic

ator

s fo

rum

, upd

ated

w

ebsit

e an

d 3

quar

terly

new

slett

ers

com

pile

d an

d di

strib

uted

.

4 Ex

hibi

tions

per

an

num

, mon

thly

up

date

d w

ebsit

e an

d 4

quar

terly

ne

wsle

tter

s co

mpi

led

and

dist

ribut

ed.

4 Ex

hibi

tions

per

an

num

, mon

thly

up

date

d w

ebsit

e an

d 4

quar

terly

ne

wsle

tter

s co

mpi

led

and

dist

ribut

ed.

4 Ex

hibi

tions

per

an

num

, mon

thly

up

date

d w

ebsit

e an

d 4

quar

terly

ne

wsle

tter

s co

mpi

led

and

dist

ribut

ed.

Page 24: FOREWORD - SANEDI and Notices/Sanedi... · 2019-03-29 · 16.1. Advantages of the matrix structure 16.2. Disadvantages of the matrix structure. TOC here all in capitals. Can we align

ANNUAL PERFORMANCE PLAN 2016 • SANEDI24

CORP

ORA

TE G

OVE

RNA

NCE

AN

D A

DM

INIS

TRAT

ION

: STR

ATEG

IC O

BJEC

TIVE

S A

ND

QU

ART

ERLY

TA

RGET

S

Stra

tegi

c O

bjec

tive

Activ

ity

Perf

orm

ance

in

dica

tor

Repo

rting

Fr

eque

ncy

Annu

al T

arge

ts

2016

/17

Qua

rter

ly ta

rget

s

1st

2nd

3rd

4th

1.1

To c

ompl

y w

ith t

he

Depa

rtm

ent o

f En

ergy

’s co

mpl

ianc

e ca

lend

ar in

resp

ect

of st

rate

gic

plan

s,

annu

al p

erfo

rman

ce

plan

s , a

nnua

l re

port

s an

d qu

arte

rly

repo

rts

for s

tate

en

tities

repo

rting

to

the

Depa

rtm

ent

Tim

ely

subm

itted

St

rate

gic

plan

s to

the

Exec

utive

Aut

horit

y

Annu

ally

Com

plia

nce

in te

rms

of D

epar

tmen

t of

Ener

gy’s

com

plia

nce

cale

ndar

in re

spec

t of

stra

tegi

c pl

ans,

an

nual

per

form

ance

pl

ans

, ann

ual

repo

rts

and

quar

terly

re

port

s fo

r sta

te

entiti

es re

porti

ng to

th

e De

part

men

t of

Ener

gy

Hos

t str

ateg

ic

plan

ning

ses

sion

by 3

0/06

/16

Draft

1 o

f str

ateg

ic

plan

sub

mitt

ed to

Do

E 31

/08/

16

Draft

2 o

f the

st

rate

gic

plan

su

bmitt

ed to

DoE

30

/11/

16

Fina

l str

ateg

ic p

lan

subm

itted

to D

oE

31/0

1/17

Tim

ely

subm

itted

an

nual

per

form

ance

pl

ans

to th

e Ex

ecuti

ve A

utho

rity

Annu

ally

Hos

t str

ateg

ic

plan

ning

ses

sion

by 3

0/06

/16

Draft

1 o

f th

e an

nual

pe

rfor

man

ce p

lan

subm

itted

to D

oE

31/0

8/16

Draft

2 o

f th

e an

nual

pe

rfor

man

ce p

lan

subm

itted

to D

oE

30/1

1/16

Fina

l ann

ual

perf

orm

ance

pla

n su

bmitt

ed to

DoE

31

/01/

17

Tim

ely

subm

itted

an

nual

repo

rt to

the

Exec

utive

Aut

horit

y

Annu

ally

Com

plet

ed A

nnua

l Re

port

with

dra

ft fin

anci

als

by

30/0

6/16

Annu

al R

epor

t su

bmitt

ed to

the

DoE

on 3

1/08

/16

Pres

ente

d to

Pa

rliam

ent

-

Tim

ely

subm

itted

qu

arte

rly re

port

s to

the

Exec

utive

Au

thor

ity

Annu

ally

4th

repo

rt

subm

itted

to D

oE

30/0

4/16

.

1st r

epor

t su

bmitt

ed to

DoE

31

/07/

16.

2nd

repo

rt

subm

itted

to D

oE

31/1

0/16

.

3rd

repo

rt

subm

itted

to D

oE

31/0

1/17

.

1.2

To h

ave

effec

tive

paym

ents

syst

ems

in

plac

e en

surin

g tim

ely

sett

lem

ent o

f tra

de

cred

itors

.

% o

f cre

dito

rs p

aid

with

in 3

0 da

ys

after

all

rele

vant

do

cum

enta

tion

have

be

en re

ceiv

ed b

y th

e Fi

nanc

e De

part

men

t.

Qua

rter

ly

97%

of a

ll cr

edito

rs

paid

with

in 3

0 da

ys

after

all

rele

vant

do

cum

enta

tion

have

be

en re

ceiv

ed b

y th

e Fi

nanc

e De

part

men

t.

97%

of a

ll cr

edito

rs p

aid

with

in 3

0 da

ys

after

all

rele

vant

do

cum

enta

tion

have

bee

n re

ceiv

ed b

y th

e Fi

nanc

e De

part

men

t.

97%

of a

ll cr

edito

rs p

aid

with

in 3

0 da

ys

after

all

rele

vant

do

cum

enta

tion

have

bee

n re

ceiv

ed b

y th

e Fi

nanc

e De

part

men

t.

97%

of a

ll cr

edito

rs p

aid

with

in 3

0 da

ys

after

all

rele

vant

do

cum

enta

tion

have

bee

n re

ceiv

ed b

y th

e Fi

nanc

e De

part

men

t.

97%

of a

ll cr

edito

rs p

aid

with

in 3

0 da

ys

after

all

rele

vant

do

cum

enta

tion

have

bee

n re

ceiv

ed b

y th

e Fi

nanc

e De

part

men

t.

1.3

To h

ave

a hi

ghly

m

otiva

ted

team

of

empl

oyee

s w

ho a

re

man

aged

acc

ordi

ng

to “

best

pra

ctice

” th

ereb

y co

ntrib

uting

op

timal

ly to

the

achi

evem

ent o

f the

or

gani

satio

nal g

oals

Num

ber o

f pol

icie

s bo

ard

appr

oved

and

im

plem

ente

d

Qua

rter

ly

Deve

lopm

ent

of a

ll ot

her H

R po

licie

s w

hich

will

he

lp d

evel

op a

cu

lture

to a

ddre

ss

acco

unta

bilit

y an

d le

ader

ship

gap

s

70%

of e

mpl

oyee

s tr

aine

d on

pol

icie

s 70

% o

f em

ploy

ees

acce

ssin

g th

e w

elln

ess

prog

ram

me

inte

rven

tions

70%

of e

mpl

oyee

s tr

aine

d on

the

Perf

orm

ance

M

anag

emen

t Fr

amew

ork

and

syst

em

6 em

ploy

ees

to

be d

evel

oped

in

term

s of

th

e le

ader

ship

pi

pelin

es

deve

lopm

ent

plan

s

quarterly
Page 25: FOREWORD - SANEDI and Notices/Sanedi... · 2019-03-29 · 16.1. Advantages of the matrix structure 16.2. Disadvantages of the matrix structure. TOC here all in capitals. Can we align

SANEDI • ANNUAL PERFORMANCE PLAN 2016 25

Stra

tegi

c O

bjec

tive

Activ

ity

Perf

orm

ance

in

dica

tor

Repo

rting

Fr

eque

ncy

Annu

al T

arge

ts

2016

/17

Qua

rter

ly ta

rget

s

1st

2nd

3rd

4th

1.4

1.

Effe

ctive

and

co

mpr

ehen

sive

stak

ehol

der

man

agem

ent,

achi

evin

g 60

%

positi

ve fe

edba

ck b

y en

d of

201

6/17

.

A bo

ard

appr

oved

st

akeh

olde

r en

gage

men

t pl

an a

nd a

n im

plem

enta

tion

plan

in p

lace

and

im

plem

ente

d

Qua

rter

ly

An e

ffecti

ve a

nd

com

preh

ensiv

e st

akeh

olde

r pla

n an

d 60

% p

ositi

ve

feed

back

Iden

tify

and

anal

yze

key

stak

ehol

ders

and

th

e iss

ues,

and

dr

aft e

ngag

emen

t ap

proa

ches

.

Und

erta

king

en

gage

men

t ac

tiviti

es.

Rev

iew

en

gage

men

t st

rate

gies

and

eff

ectiv

enes

s by

w

ay s

urve

ys

Revi

se a

nd u

pdat

e st

akeh

olde

r en

gage

men

t st

rate

gy fo

r the

ne

w fi

nanc

ial

year

. 60%

pos

itive

fe

edba

ck fr

om k

ey

stak

ehol

ders

.

At le

ast 4

exh

ibiti

ons

per a

nnum

, 80%

att

enda

nce

of D

OE

even

ts, m

onth

ly

upda

ted

web

site

and

dist

ributi

on o

f qu

arte

rly n

ewsle

tter

s as

per

dist

ributi

on

list a

nd c

hann

els.

Qua

rter

ly

At le

ast 4

Exh

ibiti

ons

per a

nnum

, mon

thly

up

date

d w

ebsit

e an

d 4

quar

terly

ne

wsle

tter

s co

mpi

led

and

dist

ribut

ed.

One

exh

ibiti

on,

parti

cipa

tion

in

DOE

even

ts a

s pe

r in

vita

tions

One

exh

ibiti

on,

parti

cipa

tion

in

DOE

even

ts a

s pe

r in

vita

tions

One

exh

ibiti

on,

parti

cipa

tion

in

DOE

even

ts a

s pe

r in

vita

tions

One

exh

ibiti

on,

parti

cipa

tion

in

DOE

even

ts a

s pe

r in

vita

tions

Upd

ated

w

ebsit

e an

d on

e ne

wsle

tter

.

Upd

ated

w

ebsit

e an

d on

e ne

wsle

tter

.

Upd

ated

w

ebsit

e an

d on

e ne

wsle

tter

.

Upd

ated

w

ebsit

e an

d on

e ne

wsle

tter

.

Page 26: FOREWORD - SANEDI and Notices/Sanedi... · 2019-03-29 · 16.1. Advantages of the matrix structure 16.2. Disadvantages of the matrix structure. TOC here all in capitals. Can we align

ANNUAL PERFORMANCE PLAN 2016 • SANEDI26

10. PROGRAMME 2: ENERGY RESEARCH, DEVELOPMENT, DEMONSTRATION AND DEPLOYMENT PROGRAMMEPURPOSE

The purpose of the energy research, development, demonstration and deployment programme is effectively knowledge creation that can support informed energy-related planning and decision-making. The research, development, demonstration and deployment programme is therefore primarily focused on developing a portfolio of confirmed viable (cost effective and low risk) and sustainable energy solutions - aligned with Government goals of energy security, energy sector transformation and diversification, economic development and environmental protection - that can confidently be incorporated into national plans and policy processes.

SUB-PROGRAMMES INCORPORATED WITHIN RESEARCH, DEVELOPMENT, DEMONSTRATION AND DEPLOYMENT

Energy research and development constitutes the first step in the energy development innovation chain that SANEDI is actively involved in. The focus is on identifying research opportunities that can be adapted and applied within the South African context and has the potential to diversify or contribute to the energy sector.

Several of SANEDI’s thematic areas have projects that contribute towards the research, development, demonstration and deployment programme. The contributions from these areas constitute the sub programmes for research, development, demonstration and deployment.

The active sub programmes are the responsibility of the indicated components:

Sub-programmes ComponentsCleaner fossil fuels (including carbon capture and storage) • CCS/shale gas/clean coal technologies

Renewable Energy • RECORD

Data Repository and Management • CESAR

Smart Grids and Network Automation • Smartgrids /SASGI

Working for Energy • Clean Energy Interventions and Solutions for Rural and Low Income Urban Communities

Cleantech Energy Development • Localised Manufacturing and skills development (unfunded)

Human Development Capital • Centre support and bursaries (unfunded)

Cleaner Mobility • Non- motorised transport, PHEV, biofuel powered and gas vehicles (unfunded)

Page 27: FOREWORD - SANEDI and Notices/Sanedi... · 2019-03-29 · 16.1. Advantages of the matrix structure 16.2. Disadvantages of the matrix structure. TOC here all in capitals. Can we align

SANEDI • ANNUAL PERFORMANCE PLAN 2016 27

10.1. SUB-PROGRAMME 1: CLEANER FOSSIL FUELS (INCLUDING CARBON CAPTURE AND STORAGE): STRATEGIC OBJECTIVES

ID Strategic Objective (output) Strategic statement Baseline1 Technical Report addressing the

implications and recommendations for the exploitation of shale gas in SA

Determination of the potential for Shale Gas in the energy economy of South Africa

Completed reports on :• CO2 as extraction agent• CO2 reduction potential• Matching supply and demand• Completed external reports:• Water requirements and waste

water• Geography and surface aspects

2 Proof of concept and capacity building for carbon dioxide storage in SA

The determination of the potential and appropriateness of geological storage of carbon dioxide in South Africa – Pilot CO2 Storage Project (PCSP)

• Atlas and further analysis thereof • Preliminary design of the PCSP• Documentation of stakeholder

concerns • International profile for PCSP to

leverage capacity building and funding

• Commitment of funding from MTEF and the World Bank

3 Determination of a business case for the commercialisation of carbon capture and storage

Oversight of the implementation of the National Carbon Capture and Storage Road Map and associated capacity building – South African Centre for Carbon Capture and Storage (SACCCS)

• National CCS Road map endorsed by Cabinet

• CCS designated as one of the flagship programmes for mitigation of greenhouse gas emissions

• Integral part of the NDP • Establishment of a bursary

programme • Support projects of the CCS • Biennial capacity building

conferences

Page 28: FOREWORD - SANEDI and Notices/Sanedi... · 2019-03-29 · 16.1. Advantages of the matrix structure 16.2. Disadvantages of the matrix structure. TOC here all in capitals. Can we align

ANNUAL PERFORMANCE PLAN 2016 • SANEDI28

CORP

ORA

TE G

OVE

RNA

NCE

AN

D A

DM

INIS

TRAT

ION

: ST

RATE

GIC

OBJ

ECTI

VES

AN

D A

NN

UA

L TA

RGET

S

Stra

tegi

c O

bjec

tive

(out

put)

Perf

orm

ance

in

dica

tor

Audi

ted

Actu

al

Perf

orm

ance

2014

/15

Estim

ated

pe

rfor

man

ce

(201

5/16

)

Med

ium

Ter

m T

arge

ts

2016

/17

2017

/18

2018

/19

1.De

term

inati

on o

f the

po

tenti

al fo

r Sha

le

Gas

in th

e en

ergy

ec

onom

y of

Sou

th

Afric

a

Com

plet

ed R

epor

ts

on:

• ca

rbon

dio

xide

as

an

extr

actio

n ag

ent

• CO

2 re

ducti

on

pote

ntial

• de

man

d an

d su

pply

mat

ch•

wat

er a

nd w

aste

iss

ues

• ris

k as

sess

men

t•

geog

raph

y an

d su

rfac

e iss

ues

Synt

hese

s Re

port

DoE

wor

kpla

n w

as

appr

oved

Co

ntra

cts

for 4

task

s w

ere

put

in p

lace

Com

plet

ed re

port

s on

inte

rnal

task

s:•

CO2

as e

xtra

ction

ag

ent

• CO

2 re

ducti

on

pote

ntial

• M

atch

ing

supp

ly

and

dem

and

Com

plet

ed e

xter

nal

repo

rts:

• W

ater

re

quire

men

ts a

nd

was

te w

ater

• Te

chni

cal,

envi

ronm

enta

l an

d ec

onom

ic ri

sk

eval

uatio

n•

Geo

grap

hy a

nd

surf

ace

aspe

cts

Synt

hesis

Rep

ort o

f pr

ogra

mm

e.Su

b Pr

ogra

mm

e co

mes

to a

n en

d

--

2Th

e de

term

inati

on

of th

e po

tenti

al a

nd

appr

opria

tene

ss o

f ge

olog

ical

stor

age

of c

arbo

n di

oxid

e in

So

uth

Afric

a –

Pilo

t CO

2 St

orag

e Pr

ojec

t (P

CSP)

Expl

orati

on ,

Desig

n,

Engi

neer

ing,

Co

nstr

uctio

n an

d op

erati

on o

f a p

ilot

carb

on d

ioxi

de

stor

age

plan

t

Inte

rim P

CSP

foun

datio

n do

cum

enta

tion

was

no

t ach

ieve

d

Data

Inve

ntor

y of

ex

isting

geo

logi

cal

info

rmati

on in

the

Algo

a an

d Zu

lula

nd

Basin

s

Expl

orati

on P

lan

Drill

ing

expl

orati

on

and

corin

gPC

SP s

ite

char

acte

risati

on

Dete

rmin

ation

of t

he

com

mer

cial

isatio

n fo

r car

bon

diox

ide

stor

age

in S

A

Inte

rim p

re –

fe

asib

ility

dat

a an

alys

es w

as n

ot

achi

eved

• Su

bmiss

ion

of

appl

icati

on fo

r ex

plor

ation

pe

rmit

• En

viro

nmen

tal

Impa

ct

Asse

ssm

ent

• Dr

aft e

xplo

ratio

n pl

an

Seism

ic e

xplo

ratio

n co

ntra

cted

Geo

logi

cal a

naly

ses

Inje

ction

Pla

n

Prot

ocol

s fo

r the

m

onito

ring

of c

arbo

n di

oxid

e

Inte

rim fe

asib

ility

ex

plor

ation

pla

n w

as

not a

chie

ved

Stak

ehol

der

Enga

gem

ent S

tatu

s re

port

rega

rdin

g co

ncer

ns a

nd

reso

lutio

ns

Site

sel

ectio

nPC

SP c

onst

ructi

on

plan

Page 29: FOREWORD - SANEDI and Notices/Sanedi... · 2019-03-29 · 16.1. Advantages of the matrix structure 16.2. Disadvantages of the matrix structure. TOC here all in capitals. Can we align

SANEDI • ANNUAL PERFORMANCE PLAN 2016 29

Stra

tegi

c O

bjec

tive

(out

put)

Perf

orm

ance

in

dica

tor

Audi

ted

Actu

al

Perf

orm

ance

2014

/15

Estim

ated

pe

rfor

man

ce

(201

5/16

)

Med

ium

Ter

m T

arge

ts

2016

/17

2017

/18

2018

/19

• St

akeh

olde

r en

gage

men

t pla

n fo

r 201

5/16

• En

gage

men

t with

20

stak

ehol

ders

as

add

ress

ed in

th

e St

akeh

olde

r En

gage

men

t Pla

n•

Phas

e 1

PMP

– Bo

ngw

ana

Phas

e 2

PMP

– Bo

ngw

ana

Repo

rt

of C

O2

mon

itorin

g pr

otoc

ols

Stak

ehol

der

Enga

gem

ent S

tatu

s re

port

rega

rdin

g co

ncer

ns a

nd

reso

lutio

ns

Stak

ehol

der

Enga

gem

ent S

tatu

s re

port

rega

rdin

g co

ncer

ns a

nd

reso

lutio

ns

3O

vers

ight

of t

he

impl

emen

tatio

n of

th

e N

ation

al C

arbo

n Ca

ptur

e an

d St

orag

e Ro

ad M

ap a

nd

asso

ciat

ed c

apac

ity

build

ing

– So

uth

Afric

an C

entr

e fo

r Ca

rbon

Cap

ture

and

St

orag

e (S

ACCC

S)

Burs

ary

and

non-

burs

ary

supp

ort r

epor

t on

the

num

ber o

f st

uden

ts a

nd th

eir

rese

arch

topi

cs a

nd

publ

icati

ons

6 bu

rsar

ies

wer

e aw

arde

d•

Awar

d of

bur

sary

/su

ppor

t to

thos

e w

ho p

ass

eval

uatio

n•

Gen

eral

CCS

St

akeh

olde

r en

gage

men

t st

atus

repo

rt•

Enga

gem

ent

with

rele

vant

st

akeh

olde

rs a

s ad

dres

sed

in th

e St

akeh

olde

r pla

n•

Faci

litati

on o

f CCS

10

1 w

orks

hops

fo

r the

lear

ners

• CC

S Co

nfer

ence

20

15•

Web

site

ana

lysis

Fact

she

ets

and

pros

pect

us

• Pa

rtici

patio

n Ca

reer

and

Sc

ienc

e Ex

pos

• 2

x CC

S re

sear

ch

proj

ects

initi

ated

Burs

ary

and

non-

burs

ary

supp

ort r

epor

t on

the

num

ber o

f st

uden

ts a

nd th

eir

rese

arch

topi

cs a

nd

publ

icati

ons

Burs

ary

and

non-

burs

ary

supp

ort r

epor

t on

the

num

ber o

f st

uden

ts a

nd th

eir

rese

arch

topi

cs a

nd

publ

icati

ons

Burs

ary

and

non-

burs

ary

supp

ort r

epor

t on

the

num

ber o

f st

uden

ts a

nd th

eir

rese

arch

topi

cs a

nd

publ

icati

ons

CCS

stak

ehol

der

enga

gem

ent R

epor

ts

on c

once

rns

raise

d

Stak

ehol

der

Enga

gem

ent S

tatu

s re

port

rega

rdin

g co

ncer

ns a

nd

reso

lutio

ns

Stak

ehol

der

Enga

gem

ent S

tatu

s re

port

rega

rdin

g co

ncer

ns a

nd

reso

lutio

ns

Stak

ehol

der

Enga

gem

ent S

tatu

s re

port

rega

rdin

g co

ncer

ns a

nd

reso

lutio

ns

R&D

Proj

ect

Repo

rts.

One

CCS

gen

eral

R&

D pr

ojec

t com

plet

ed –

Fi

nal R

epor

t.

One

CCS

gen

eral

R&

D pr

ojec

t com

plet

ed

– Fi

nal R

epor

t. O

ne

R&D

Proj

ect P

rogr

ess

Repo

rt.

One

R&

D pr

ojec

t com

men

ced.

One

CCS

gen

eral

R&

D pr

ojec

t com

plet

ed

– Fi

nal R

epor

t. O

ne

R&D

Proj

ect P

rogr

ess

Repo

rt.

One

R&

D pr

ojec

t com

men

ced.

One

R&

D Pr

ojec

t Pr

ogre

ss R

epor

t.

One

R&

D pr

ojec

t co

mm

ence

d.

CCS

Conf

eren

ce 2

017

Page 30: FOREWORD - SANEDI and Notices/Sanedi... · 2019-03-29 · 16.1. Advantages of the matrix structure 16.2. Disadvantages of the matrix structure. TOC here all in capitals. Can we align

ANNUAL PERFORMANCE PLAN 2016 • SANEDI30

CORP

ORA

TE G

OVE

RNA

NCE

AN

D A

DM

INIS

TRAT

ION

: STR

ATEG

IC O

BJEC

TIVE

S A

ND

QU

ART

ERLY

TA

RGET

S

Stra

tegi

c O

bjec

tive

Activ

ity

Perf

orm

ance

in

dica

tor

Repo

rting

Fr

eque

ncy

Annu

al T

arge

ts

2016

/17

Qua

rter

ly ta

rget

s

1st

2nd

3rd

4th

1De

term

inati

on o

f the

po

tenti

al fo

r Sha

le

Gas

in th

e en

ergy

ec

onom

y of

Sou

th

Afric

a.

Repo

rts

on:

• ca

rbon

dio

xide

as

an

extr

actio

n ag

ent

• CO

2 re

ducti

on

pote

ntial

• de

man

d an

d su

pply

mat

ch•

wat

er a

nd w

aste

iss

ues

• ris

k as

sess

men

t•

geog

raph

y an

d su

rfac

e iss

ues

Qua

rter

lySy

nthe

sis R

epor

t of

prog

ram

me.

• EN

D

Synt

hesis

Rep

ort

of p

rogr

amm

e.•

END

2Th

e de

term

inati

on

of th

e po

tenti

al a

nd

appr

opria

tene

ss o

f ge

olog

ical

stor

age

of c

arbo

n di

oxid

e in

So

uth

Afric

a –

Pilo

t CO

2 St

orag

e Pr

ojec

t

Expl

orati

on, D

esig

n,

Engi

neer

ing,

Co

nstr

uctio

n an

d op

erati

on o

f a p

ilot

carb

on d

ioxi

de

stor

age

plan

t

Qua

rter

lyEx

plor

ation

Pla

n Ex

plor

ation

Pla

n Dr

aftEx

plor

ation

Pla

n

Seism

ic e

xplo

ratio

n co

ntra

cted

Expl

orati

on T

erm

s of

Ref

eren

ceCa

ll fo

r Pro

posa

ls fo

r Sei

smic

sSe

ismic

con

trac

t

Dete

rmin

ation

of t

he

com

mer

cial

izatio

n fo

r car

bon

diox

ide

stor

age

in S

A

Phas

e 2

PMP

– Bo

ngw

ana

Repo

rtPh

ase

2 PM

P W

ork

Plan

dra

ftPh

ase

2 PM

P Fi

eld

Wor

kPh

ase

2 PM

P da

ta

anal

yses

PMP

draft

Fin

al

Repo

rt

Prot

ocol

s fo

r the

m

onito

ring

of c

arbo

n di

oxid

e

Stak

ehol

der

Enga

gem

ent S

tatu

s re

port

– c

once

rns

and

reso

lutio

ns

Stak

ehol

der

Enga

gem

ent

Stat

us re

port

conc

erns

and

re

solu

tions

Page 31: FOREWORD - SANEDI and Notices/Sanedi... · 2019-03-29 · 16.1. Advantages of the matrix structure 16.2. Disadvantages of the matrix structure. TOC here all in capitals. Can we align

SANEDI • ANNUAL PERFORMANCE PLAN 2016 31

Stra

tegi

c O

bjec

tive

Activ

ity

Perf

orm

ance

in

dica

tor

Repo

rting

Fr

eque

ncy

Annu

al T

arge

ts

2016

/17

Qua

rter

ly ta

rget

s

1st

2nd

3rd

4th

3O

vers

ight

of t

he

impl

emen

tatio

n of

th

e N

ation

al C

arbo

n Ca

ptur

e an

d St

orag

e Ro

ad M

ap a

nd

asso

ciat

ed c

apac

ity

build

ing

– So

uth

Afric

an C

entr

e fo

r Ca

rbon

Cap

ture

and

St

orag

e (S

ACCC

S)

Burs

ars

and

non

burs

ars

aw

ard

lett

ers

Qua

rter

lyAw

ard

of b

ursa

ry/

supp

ort t

o th

ose

who

pa

ss e

valu

ation

Call

for b

ursa

ry

prop

osal

sU

pdat

e bu

rsar

y sp

ecifi

catio

nsBu

rsar

y Pr

ogre

ss

Repo

rt

Stak

ehol

der

Enga

gem

ent S

tatu

s re

port

Stak

ehol

der

Enga

gem

ent S

tatu

s re

port

rega

rdin

g po

pula

risati

on o

f CCS

Stak

ehol

der

Enga

gem

ent

Stak

ehol

der

Enga

gem

ent

Stak

ehol

der

Enga

gem

ent

Stak

ehol

der

Enga

gem

ent

Stak

ehol

der

Enga

gem

ent

Stat

us re

port

2 x

CCS

rese

arch

pr

ojec

t con

trac

ts

initi

ated

thro

ugh

an

ince

ption

mee

ting

One

CCS

gen

eral

R&

D pr

ojec

t com

plet

ed

– Fi

nal R

epor

t. O

ne

R&D

Proj

ect P

rogr

ess

Repo

rt.

One

R&

D pr

ojec

t com

men

ced.

Fina

l Rep

ort o

ne

proj

ect

Prog

ress

Rep

ort

one

proj

ect

Initi

ate

one

proj

ect

Acce

ptan

ce o

f one

pr

ojec

t rep

ort

Acce

ptan

ce o

ne

repo

rtTe

rms

of

Refe

renc

e fo

r 2

proj

ects

Page 32: FOREWORD - SANEDI and Notices/Sanedi... · 2019-03-29 · 16.1. Advantages of the matrix structure 16.2. Disadvantages of the matrix structure. TOC here all in capitals. Can we align

ANNUAL PERFORMANCE PLAN 2016 • SANEDI32

SUB

– PR

OG

RAM

ME

2: D

ATA

REP

OSI

TORY

AN

D M

AN

AGEM

ENT

(CES

AR)

: STR

ATEG

IC O

BJEC

TIVE

S A

ND

AN

NU

AL

TARG

ETS

Stra

tegi

c O

bjec

tive

(out

put)

Perf

orm

ance

in

dica

tor

Audi

ted

Actu

al

Perf

orm

ance

2014

/15

Estim

ated

pe

rfor

man

ce

(201

5/16

)

Med

ium

Ter

m T

arge

ts

2016

/17

2017

/18

2018

/19

1To

cap

acita

te

CESA

R w

ith

the

nece

ssar

y re

sour

ces

(peo

ple

and

tool

s) to

be

able

to u

nder

take

En

ergy

Mod

ellin

g Re

sear

ch

Num

ber o

f tra

inin

g pr

ogra

mm

es in

itiat

edN

ew o

bjec

tive

and

indi

cato

r PF

T Te

rms

of

Refe

renc

e Dr

aft p

rogr

ess

repo

rt

tem

plat

es

Trai

ning

Pla

n PF

T m

eetin

g 1

Bi-a

nnua

l Pro

gres

s Re

port

1En

ergy

Mod

elle

r Tr

aini

ng P

rogr

ess

Repo

rt 2

PF

T M

eetin

g 2

2 en

ergy

trai

ning

pr

ogra

mm

esN

/AN

/A

2To

Pro

vide

ene

rgy

polic

y gu

idan

ce

thro

ugh

ener

gy

mod

ellin

g re

sear

ch.

Num

ber o

f res

earc

h re

port

s fin

alize

dN

ew o

bjec

tive

and

indi

cato

rFu

nctio

nal a

ccur

ate

inte

grat

ed a

nd u

ser

frie

ndly

dat

abas

e

3 co

mpl

eted

wor

king

pa

pers

(app

rove

d by

PF

T)•

Tran

spor

t Stu

dy•

Fue

l sw

itchi

ng•

Ren

ewab

le

Ener

gy In

tegr

ation

fo

r Dem

and

Side

M

anag

emen

t us

ing

Smar

t Lo

ads)

Ener

gy m

odel

ling

data

base

upd

ated

Data

base

fully

de

velo

ped

and

popu

late

d

Page 33: FOREWORD - SANEDI and Notices/Sanedi... · 2019-03-29 · 16.1. Advantages of the matrix structure 16.2. Disadvantages of the matrix structure. TOC here all in capitals. Can we align

SANEDI • ANNUAL PERFORMANCE PLAN 2016 33

CORP

ORA

TE G

OVE

RNA

NCE

AN

D A

DM

INIS

TRAT

ION

: STR

ATEG

IC O

BJEC

TIVE

S A

ND

QU

ART

ERLY

TA

RGET

S

Stra

tegi

c O

bjec

tive

Activ

ity

Perf

orm

ance

in

dica

tor

Repo

rting

Fr

eque

ncy

Annu

al T

arge

ts

2016

/17

Qua

rter

ly ta

rget

s

1st

2nd

3rd

4th

1To

cap

acita

te C

ESAR

w

ith th

e ne

cess

ary

reso

urce

s (p

eopl

e an

d to

ols)

to b

e ab

le

to u

nder

take

Ene

rgy

Mod

ellin

g Re

sear

ch

Num

ber

of tr

aini

ng

prog

ram

mes

in

itiat

ed

Qua

rter

ly2

ener

gy tr

aini

ng

prog

ram

mes

Ener

gy M

odel

ler

Trai

ning

Pro

gres

s Re

port

1

PFT

Mee

ting

1En

ergy

Mod

elle

r Tr

aini

ng P

rogr

ess

Repo

rt 2

PFT

Mee

ting

2

IEA

dem

and

side

trai

ning

cou

rse

Bian

nual

Tra

inin

g Pr

ogre

ss R

epor

t 1Bi

annu

al P

rogr

ess

Repo

rt

2

2To

Pro

vide

ene

rgy

polic

y gu

idan

ce

thro

ugh

ener

gy

mod

ellin

g re

sear

ch.

Num

ber o

f re

sear

ch re

port

s fin

alize

d

Qua

rter

ly3

com

plet

ed w

orki

ng

pape

rs (a

ppro

ved

by P

FT•

Phas

e 2

Tran

spor

t St

udy

• F

uel s

witc

hing

• R

enew

able

En

ergy

Inte

grati

on

for D

eman

d Si

de

Man

agem

ent

usin

g Sm

art L

oads

Rese

arch

Pro

ject

M

anag

emen

t Pla

nTr

ansp

ort S

tudy

W

orki

ng p

aper

2

com

pile

d

Data

Bas

e w

ith

proj

ectio

ns

popu

late

d &

U

pdat

edSo

uth

Afric

an

TIM

ES m

odel

up

date

d

Tran

spor

t Stu

dy W

orki

ng

Pape

r 3 c

ompi

led

Tran

spor

t Stu

dy P

roje

ct

Clos

e O

ut R

epor

t co

mpi

led

Fuel

switc

hing

/Di

strib

ution

Wor

king

Pap

er C

ompi

led

Rene

wab

le E

nerg

y In

tegr

ation

for d

eman

d sid

e m

anag

emen

t usin

g sm

art l

oads

Wor

king

Pa

per C

ompi

led

Fuel

switc

hing

/Di

strib

ution

Sta

keho

lder

W

orks

hop

Rene

wab

le E

nerg

y In

tegr

ation

for d

eman

d sid

e m

anag

emen

t usin

g sm

art l

oads

Sta

keho

lder

W

orks

hop

Fuel

Sw

itchi

ng P

roje

ct

Clos

e O

ut R

epor

t co

mpi

led

Rene

wab

le E

nerg

y In

tegr

ation

for d

eman

d sid

e m

anag

emen

t usin

g sm

art l

oads

Pro

ject

Clo

se

Out

Rep

ort c

ompi

led

Ener

gy m

odel

ling

data

base

up

date

d

Tran

spor

t stu

dy

wor

ksho

pBi

annu

al R

esea

rch

Proj

ect s

tatu

s re

port

Sout

h Af

rican

TI

MES

mod

el

upda

ted

Page 34: FOREWORD - SANEDI and Notices/Sanedi... · 2019-03-29 · 16.1. Advantages of the matrix structure 16.2. Disadvantages of the matrix structure. TOC here all in capitals. Can we align

ANNUAL PERFORMANCE PLAN 2016 • SANEDI34

10.3. SUB- PROGRAMME 3: SMART GRIDS AND NETWORK AUTOMATION: STRATEGIC OBJECTIVES

ID Strategic Objective (output) Strategic statement Baseline1 Electricity supply industry capacity

building through workshops, knowledge sharing, international and local collaboration

To Manage Industry participation and contributions in SA through local and international collaboration for the development of Smart Grid Policy recommendations and industry capacity building

Draft Smart Grid Vision document

2 EU donor funded Smart Grid Programme Demonstration projects with How to Guides , business case and policy recommendations for the following areas • Enhanced revenue management • Advanced asset management • Active network management • FBE/IBT/TOU tariff demonstrated

using AMI

To use technology as an enabler of change in the municipal environment in following areas • Enhanced revenue management • Advanced asset management • Active network management • Free Basic Electricity /Inclining

Block Tariff Demonstration

Regulation 773, Renewable strategy, Climate change strategy, NDP, IRP 2010, PICC, IEP2012, NEES, Presidential State of Nation address 2014.ADAM and the AG reports

Page 35: FOREWORD - SANEDI and Notices/Sanedi... · 2019-03-29 · 16.1. Advantages of the matrix structure 16.2. Disadvantages of the matrix structure. TOC here all in capitals. Can we align

SANEDI • ANNUAL PERFORMANCE PLAN 2016 35

SUB-

PRO

GRA

MM

E 3:

SM

ART

GRI

DS:

STR

ATEG

IC O

BJEC

TIVE

S A

ND

AN

NU

AL

TARG

ETS

Stra

tegi

c O

bjec

tive

(out

put)

Perf

orm

ance

in

dica

tor

Audi

ted

Actu

al

Perf

orm

ance

2014

/15

Estim

ated

pe

rfor

man

ce

(201

5/16

)

Med

ium

Ter

m T

arge

ts

2016

/17

2017

/18

2018

/19

1.1

SASG

I : To

Man

age

Indu

stry

par

ticip

ation

an

d co

llabo

ratio

n to

war

ds th

e su

stain

able

de

velo

pmen

t of a

Sm

art G

rid in

Sout

h Af

rica

Num

ber

of

wor

ksho

ps h

eld

with

in

dust

ry a

ssoc

iatio

ns

evid

ence

d by

repo

rts

and

min

utes

Four

mee

tings

wer

e he

ld

Two

Sess

ion

have

he

ld, t

hird

ses

sion

sche

dule

d fo

r De

cem

ber 2

nd

2015

, rep

orts

and

be

en s

hare

d w

ith

mem

bers

4 Fo

ur (4

) wor

ksho

ps

4 Fo

ur (4

) wor

ksho

ps

4 Fo

ur (4

) wor

ksho

ps

1.2

To C

olla

bora

te w

ith

the

Uni

vers

ity o

f Pr

etor

ia a

nd a

ddre

ss

the

criti

cal E

lect

ricity

In

dust

ry C

halle

nges

th

roug

h re

sear

ch

and

capa

city

de

velo

pmen

t.

Num

ber o

f Res

earc

h Br

ief’s

on

indi

vidu

al

Rese

arch

topi

cs

rece

ived

from

UP

and

appr

oved

by

the

PFT.

New

ind

icat

orCo

llabo

ratio

n ag

reem

ent s

igne

dTe

rms

of re

fere

nce

signe

dDr

aft o

f Res

earc

h Br

ief o

n (S

mar

t M

eter

ing

code

, and

Ad

vanc

ed M

eter

ing

Infr

astr

uctu

re

secu

rity

guid

elin

e)

Draft

the

Smar

t M

eter

ing

code

to

com

plem

ent t

he S

A G

rid c

ode

Draft

the

Adva

nced

M

eter

ing

Infr

astr

uctu

re

Secu

rity

guid

elin

e

Inve

stiga

te th

e fu

ture

Rol

e of

th

e Di

strib

ution

Sy

stem

Ope

rato

r in

rela

tions

hip

with

Ac

tive

Net

wor

k M

anag

emen

t

Faci

litat

e th

e de

velo

pmen

t of a

Sm

art G

rid m

eter

ing

lab

at th

e un

iver

sity

of P

reto

ria

Num

ber o

f stu

dent

s aw

arde

d bu

rsar

ies

New

indi

cato

r 6

Mas

ters

, 4

Hon

s an

d 1

PhD

A Sm

art M

eter

ing

code

A sm

art m

eter

ing

code

was

par

tially

ac

hiev

ed

Adva

nced

Met

erin

g In

fras

truc

ture

G

uide

line

New

indi

cato

r

AMI S

ecur

ity

guid

elin

e Th

e AM

I sec

urity

gu

idel

ine

was

pa

rtial

ly c

ompl

eted

1.3

Inte

rnati

onal

Sm

art

Grid

col

labo

ratio

n th

roug

h pa

rtici

patin

g in

the

ISG

AN

(Inte

rnati

onal

Sm

art

Grid

Acti

on N

etw

ork)

Parti

cipa

tion

in

the

bian

nual

exc

o m

eetin

g

Atten

ded

2 EX

CO

mee

tings

IS

GAN

mee

ting

to b

e att

endi

ng in

four

th

quar

ter o

f 201

5/16

2 SA

NED

I Rep

orts

on

ISG

AN E

XCO

m

eetin

gs to

be

shar

ed w

ith S

ASG

I fo

rum

2 SA

NED

I Rep

orts

on

ISG

AN E

XCO

m

eetin

gs to

be

shar

ed w

ith S

ASG

I fo

rum

2 SA

NED

I Rep

orts

on

ISG

AN E

XCO

m

eetin

gs to

be

shar

ed w

ith S

ASG

I fo

rum

Page 36: FOREWORD - SANEDI and Notices/Sanedi... · 2019-03-29 · 16.1. Advantages of the matrix structure 16.2. Disadvantages of the matrix structure. TOC here all in capitals. Can we align

ANNUAL PERFORMANCE PLAN 2016 • SANEDI36

Stra

tegi

c O

bjec

tive

(out

put)

Perf

orm

ance

in

dica

tor

Audi

ted

Actu

al

Perf

orm

ance

2014

/15

Estim

ated

pe

rfor

man

ce

(201

5/16

)

Med

ium

Ter

m T

arge

ts

2016

/17

2017

/18

2018

/19

2.1

EU D

onor

Fund

ed

prog

ram

me

: To

use

tech

nolo

gy a

s an

enab

ler o

f cha

nge

in th

e m

unici

pal

envir

onm

ent i

n

follo

win

g a

reas

Enha

nced

reve

nue

man

agem

ent

• Ad

vanc

ed a

sset

m

anag

emen

t •

Activ

e ne

twor

k m

anag

emen

t •

FBE/

IBT/

TOU

tariff

de

mon

stra

ted

usin

g AM

I

Impl

emen

tatio

n gu

idel

ines

for e

ach

of

the

4 Pr

ojec

t Are

as

and

each

of t

he 7

pr

ojec

t pha

ses

New

indi

cato

rG

uide

lines

for a

ll 4

proj

ect a

reas

in li

ne

with

our

pla

nned

sc

hedu

le h

ave

been

dev

elop

ed,

Out

stan

ding

are

4th

Q

uart

er g

uide

lines

A Co

nsol

idat

ed

Less

ons

Lear

ned

Repo

rt fo

r th

e El

ectr

icity

Di

strib

ution

Indu

stry

N/A

N/A

Cons

olid

ated

Les

son

Lear

ned

Repo

rt,

Busin

ess

case

and

, H

ow to

gui

de fo

r th

e El

ectr

icity

Di

strib

ution

In

dust

ry a

nd P

olic

y re

com

men

datio

ns

pape

r for

the

DoE

on

Stra

tegi

c pr

ioriti

es

addr

esse

d by

pr

ojec

ts

New

indi

cato

rA

Cons

olid

ated

Bu

sines

s Ca

se

for t

he E

lect

ricity

Di

strib

ution

Indu

stry

A Co

nsol

idat

ed H

ow

to G

uide

man

ual

for E

lect

ricity

Di

strib

ution

Indu

stry

Polic

y re

com

men

datio

n on

DoE

Str

ateg

ic

prio

rities

Page 37: FOREWORD - SANEDI and Notices/Sanedi... · 2019-03-29 · 16.1. Advantages of the matrix structure 16.2. Disadvantages of the matrix structure. TOC here all in capitals. Can we align

SANEDI • ANNUAL PERFORMANCE PLAN 2016 37

CORP

ORA

TE G

OVE

RNA

NCE

AN

D A

DM

INIS

TRAT

ION

: STR

ATEG

IC O

BJEC

TIVE

S A

ND

QU

ART

ERLY

TA

RGET

S

Stra

tegi

c O

bjec

tive

Prog

ram

me

perf

orm

ance

in

dica

tor

Repo

rting

Fr

eque

ncy

Annu

al T

arge

ts

2016

/17

Qua

rter

ly ta

rget

s

1st

2nd

3rd

4th

1SO

UTH

AFR

ICAN

SM

ART

GRI

DS IN

ITIA

TIVE

( SA

SGI)

11To

Man

age

Indu

stry

pa

rtici

patio

n an

d co

llabo

ratio

n to

war

ds

the

sust

aina

ble

deve

lopm

ent o

f a

Smar

t Grid

in S

outh

Af

rica

Num

ber o

f w

orks

hops

hel

d ev

iden

ced

by

min

utes

and

Re

port

s fr

om

Sess

ions

hel

d

Qua

rter

ly4

wor

ksho

ps

Wor

ksho

p Re

port

Wor

ksho

p Re

port

Wor

ksho

p R

epor

tW

orks

hop

Repo

rt

1.2

To C

olla

bora

te w

ith

the

Uni

vers

ity o

f Pr

etor

ia a

nd a

ddre

ss

the

criti

cal E

lect

ricity

In

dust

ry C

halle

nges

th

roug

h re

sear

ch

and

capa

city

de

velo

pmen

t.

Repo

rts

on:

• Sm

art

Met

erin

g Co

de

• Ad

vanc

ed

Met

erin

g In

fras

truc

ture

se

curit

y gu

idel

ine

• Ad

vanc

e M

eter

ing

Infr

astr

uctu

re

guid

elin

e•

Smar

t met

er

shor

t cou

rse

curr

icul

um

deve

lope

d•

Num

ber o

f bu

rsar

ies

awar

ded

• Sm

art

Met

erin

g la

b

Qua

rter

lyRe

port

s on

:•

Smar

t Met

erin

g Co

de

• Ad

vanc

ed

Met

erin

g In

fras

truc

ture

se

curit

y gu

idel

ine

• Ad

vanc

e M

eter

ing

Infr

astr

uctu

re

guid

elin

e•

Smar

t met

er s

hort

co

urse

cur

ricul

um•

Num

ber o

f bu

rsar

ies

awar

ded

prog

ress

- 4

hon

- 6

mas

ters

- 1

PHD

• Sm

art M

eter

ing

Lab

deve

lopm

ent

prog

ress

Firs

t Pro

gres

s Re

port

s on

:•

Rese

arch

Pr

ojec

ts•

Stud

ent

Burs

arie

s aw

arde

d•

Smar

t met

erin

g La

b•

Smar

t met

er

shor

t cou

rse

curr

icul

um

Seco

nd P

rogr

ess

Repo

rts

on :

• Re

sear

ch

Proj

ects

• St

uden

t Bu

rsar

ies

awar

ded

• Sm

art m

eter

ing

Lab

• Sm

art m

eter

sh

ort c

ours

e cu

rric

ulum

Third

Pro

gres

s Re

port

s on

:•

Rese

arch

Pr

ojec

ts•

Stud

ent

Burs

arie

s aw

arde

d•

Smar

t met

erin

g La

b•

Smar

t met

er

shor

t cou

rse

curr

icul

um

Fina

l Re

port

s on

:•

Rese

arch

Pr

ojec

ts•

Smar

t met

er

shor

t cou

rse

curr

icul

um

Prog

ress

Rep

ort

• St

uden

t Bu

rsar

ies

awar

ded

• Sm

art m

eter

ing

Lab

1.3

Inte

rnati

onal

Sm

art

Grid

col

labo

ratio

n th

roug

h pa

rtici

patin

g in

the

ISG

AN

(Inte

rnati

onal

Sm

art

Grid

Acti

on N

etw

ork)

Bian

nual

Exc

o re

port

sBi

annu

al E

xco

repo

rt

shar

ed w

ith S

ASG

IN

o ta

rget

N

o ta

rget

Ex

co re

port

Exco

repo

rt

Page 38: FOREWORD - SANEDI and Notices/Sanedi... · 2019-03-29 · 16.1. Advantages of the matrix structure 16.2. Disadvantages of the matrix structure. TOC here all in capitals. Can we align

ANNUAL PERFORMANCE PLAN 2016 • SANEDI38

Stra

tegi

c O

bjec

tive

Prog

ram

me

perf

orm

ance

in

dica

tor

Repo

rting

Fr

eque

ncy

Annu

al T

arge

ts

2016

/17

Qua

rter

ly ta

rget

s

1st

2nd

3rd

4th

2EU

DO

NO

R FU

ND

ED S

MA

RT G

RID

PRO

GRA

MM

E

2.1

To u

se te

chno

logy

as

an e

nabl

er o

f cha

nge

in th

e m

unic

ipal

en

viro

nmen

t in

fo

llow

ing

are

as

• En

hanc

ed re

venu

e m

anag

emen

t •

Adva

nced

ass

et

man

agem

ent

• Ac

tive

netw

ork

man

agem

ent

• FB

E/IB

T/TO

U ta

riff

dem

onst

rate

d us

ing

AMI

Impl

emen

tatio

n gu

idel

ines

for e

ach

of

the

4 Pr

ojec

t Are

as

and

each

of t

he 7

pr

ojec

t pha

ses

• Co

nsol

idat

ed

Less

on L

earn

ed

Repo

rtBu

sines

s ca

se a

nd,

How

to g

uide

for

the

Elec

tric

ity

Dist

ributi

on

Indu

stry

and

Pol

icy

reco

mm

enda

tions

pa

per f

or th

e Do

E on

St

rate

gic

prio

rities

ad

dres

sed

by p

roje

cts

Qua

rter

ly•

A Co

nsol

idat

ed

Less

on L

earn

ed

Repo

rt fo

r th

e El

ectr

icity

Di

strib

ution

Indu

stry

A Co

nsol

idat

ed

Busin

ess

Case

fo

r the

Ele

ctric

ity

Dist

ributi

on In

dust

ry•

A Co

nsol

idat

ed H

ow

to G

uide

man

ual

for E

lect

ricity

Di

strib

ution

Indu

stry

• Po

licy

reco

mm

enda

tion

on D

oE S

trat

egic

pr

ioriti

es

Polic

y re

com

men

datio

n on

DoE

Str

ateg

ic

prio

rities

Cons

olid

ated

Bu

sines

s Ca

se

for t

he E

lect

ricity

Di

strib

ution

In

dust

ry

Cons

olid

ated

How

to

Gui

de m

anua

l fo

r Ele

ctric

ity

Dist

ributi

on

Indu

stry

Cons

olid

ated

Le

sson

Lea

rned

Re

port

for

the

Elec

tric

ity

Dist

ributi

on

Indu

stry

Page 39: FOREWORD - SANEDI and Notices/Sanedi... · 2019-03-29 · 16.1. Advantages of the matrix structure 16.2. Disadvantages of the matrix structure. TOC here all in capitals. Can we align

SANEDI • ANNUAL PERFORMANCE PLAN 2016 39

10.4. SUB- PROGRAMME 4: RENEWABLE ENERGY: STRATEGIC OBJECTIVES

The following strategic objectives (outputs) have been identified for the Renewable Energy sub- programme

ID Strategic Objective (output) Strategic statement Baseline1 Increased deployment of renewable

energy To provide a centre that coordinates and promotes RE research, development and demonstration in SA through collaboration and funding

RECORD is operational Collaborative funding with GIZ, Eskom and UNOPS

2 Increased renewable energy and energy efficiency awareness

Provide technical and management support through tendering, contracting, payment and reporting to the Danish RE EE programme's DoE and ESKOM components

Projects in place Project procurement plan

3. Raised SA’s renewable energy R&D profile through international collaboration and capacity building

Foster international collaboration• To globalize expertise and

leverage research funding • To gain knowledge

Several IEA implementation agreement memberships Hosting the Southern Africa secretariat of REEEPParticipate in EU Horizon 2020

4. Increased wind energy integration and deployment in SA

Develop maps, database , tools and guidelines for effective wind siting and decision making for the national wind programme

Wind atlas and database

Page 40: FOREWORD - SANEDI and Notices/Sanedi... · 2019-03-29 · 16.1. Advantages of the matrix structure 16.2. Disadvantages of the matrix structure. TOC here all in capitals. Can we align

ANNUAL PERFORMANCE PLAN 2016 • SANEDI40

SUB-

PRO

GRA

MM

E 4:

REN

EWA

BLE

ENER

GY:

STR

ATEG

IC O

BJEC

TIVE

S A

ND

AN

NU

AL

TARG

ETS

Stra

tegi

c O

bjec

tive

(out

put)

Perf

orm

ance

in

dica

tor

Audi

ted

Actu

al

Perf

orm

ance

2014

/15

Estim

ated

pe

rfor

man

ce

(201

5/16

)

Med

ium

Ter

m T

arge

ts

2016

/17

2017

/18

2018

/19

1.To

pro

vide

a ce

ntre

th

at co

ordi

nate

s and

pr

omot

es R

E re

sear

ch,

deve

lopm

ent a

nd

dem

onst

ratio

n in

SA

thro

ugh

colla

bora

tion

and

fund

ing

Num

ber o

f co

llabo

rativ

e pr

ojec

ts

and

platf

orm

s w

ith

indu

stry

, gov

ernm

ent

and

gove

rnm

ent

entiti

es w

ith re

spec

t to

: •

Polic

y im

prov

emen

t •

Know

ledg

e sh

arin

g •

Advi

sory

Rese

arch

co

llabo

ratio

n

Stat

e of

ene

rgy

rese

arch

in S

A pu

blish

ed

Info

rmati

on

exch

ange

ses

sions

w

ith fu

ndin

g co

unte

rpar

ts

impl

emen

ted

Existi

ng p

roje

cts

fund

ed a

nd m

anag

ed

Alga

l bio

ener

gy

platf

orm

man

aged

In

itiat

ed “

stat

e of

w

aste

to e

nerg

y re

sear

ch in

SA”

stud

y Su

ppor

t ren

dere

d

to S

ARET

EC (S

outh

Af

rican

Ren

ewab

le

Ener

gy T

echn

olog

y Ce

ntre

) an

d pr

epar

ation

of fi

rst

clas

ses

in S

A

Gov

ernm

ent

repr

esen

tatio

n fo

r RE

sec

toria

l acti

vitie

s th

roug

h st

rate

gic

inpu

ts in

to th

e RE

se

ctor

. In

clud

ing

fulfi

lling

an

inte

r-de

part

men

tal

MO

U, i

ndus

try

enga

gem

ent,

know

ledg

e-sh

arin

g ro

le a

nd a

dviso

ry

capa

city

.

Plan

ning

and

de

velo

pmen

t of

SAN

EDI k

now

ledg

e sh

arin

g an

d ad

viso

ry

proj

ects

and

pl

atfor

ms

Plan

ning

and

de

velo

pmen

t of

SAN

EDI k

now

ledg

e sh

arin

g an

d ad

viso

ry

proj

ects

and

pl

atfor

ms

Plan

ning

and

de

velo

pmen

t of

SAN

EDI k

now

ledg

e sh

arin

g an

d ad

viso

ry

proj

ects

and

pl

atfor

ms

2.Pr

ovid

e te

chni

cal

and

man

agem

ent

supp

ort

thro

ugh

tend

erin

g,

cont

racti

ng, p

aym

ent

and

repo

rting

to

the

Dani

sh R

E EE

pro

gram

me'

s Do

E an

d ES

KOM

co

mpo

nent

s

Num

ber o

f pr

ogre

ss

and

finan

cial

rep

orts

Fr

amew

ork

for

WAS

A ph

ase

2 co

ncep

tual

ised

Bi-a

nnua

l Fin

anci

al

and

Prog

ress

Rep

orts

to

the

DoE

Bi-a

nnua

l Fin

anci

al

and

Prog

ress

Rep

orts

to

the

DoE

Conc

lude

pr

ogra

mm

e w

ith fi

nal

repo

rt a

nd a

udit.

Page 41: FOREWORD - SANEDI and Notices/Sanedi... · 2019-03-29 · 16.1. Advantages of the matrix structure 16.2. Disadvantages of the matrix structure. TOC here all in capitals. Can we align

SANEDI • ANNUAL PERFORMANCE PLAN 2016 41

Stra

tegi

c O

bjec

tive

(out

put)

Perf

orm

ance

in

dica

tor

Audi

ted

Actu

al

Perf

orm

ance

2014

/15

Estim

ated

pe

rfor

man

ce

(201

5/16

)

Med

ium

Ter

m T

arge

ts

2016

/17

2017

/18

2018

/19

3.De

velo

p m

aps,

da

taba

se ,

tool

s an

d gu

idel

ines

for

effec

tive

win

d siti

ng

and

deci

sion

mak

ing

for t

he n

ation

al w

ind

prog

ram

me

Crea

ted

an

obse

rvati

onal

win

d at

las

Pub

lish

an In

terim

W

ind

atla

s an

d da

taba

se

Publ

ish a

n ex

trem

e W

ind

atla

s an

d da

taba

se

Publ

ish fi

nal

win

d at

las,

dat

abas

e an

d re

sour

ce m

ap

4.Fo

ster

inte

rnati

onal

co

llabo

ratio

n•

To g

loba

lize

expe

rtise

and

le

vera

ge re

sear

ch

fund

ing

• To

sha

re a

nd g

ain

know

ledg

e th

at is

di

ssem

inat

ed to

th

e RE

com

mun

ity

Num

ber o

f IE

A im

plem

enta

tion

agre

emen

t m

embe

rshi

ps

Num

ber o

f joi

nt

proj

ects

und

er

Sout

hern

Afr

ica

secr

etar

iat o

f REE

EP

Existi

ng IE

A an

d RE

EEP

impl

emen

ting

agre

emen

ts

mai

ntai

ned

for

Hor

izon

2020

an

d ot

her E

U –

SA

initi

ative

s w

ith

DST

and

key

obje

ctive

s ou

tline

d in

the

agre

emen

ts

man

aged

3 m

embe

rshi

ps (O

ES,

Bioe

nerg

y, SH

C)2

join

t pro

ject

s (S

witc

h Af

rica

Gre

en

and

The

Urb

an

Wat

erw

orks

)1

H20

20 e

vent

1

Call

Anal

ysis

Repr

esen

tatio

n of

Sou

th A

fric

a in

in

tern

ation

al fo

ra to

ex

chan

ge te

chni

cal

know

ledg

e/ e

xper

tise

and

seek

rese

arch

fu

ndin

g

Repr

esen

tatio

n of

Sou

th A

fric

a in

in

tern

ation

al fo

ra to

ex

chan

ge te

chni

cal

know

ledg

e/ e

xper

tise

and

seek

rese

arch

fu

ndin

g

Repr

esen

tatio

n of

Sou

th A

fric

a in

in

tern

ation

al fo

ra to

ex

chan

ge te

chni

cal

know

ledg

e/ e

xper

tise

and

seek

rese

arch

fu

ndin

g

Page 42: FOREWORD - SANEDI and Notices/Sanedi... · 2019-03-29 · 16.1. Advantages of the matrix structure 16.2. Disadvantages of the matrix structure. TOC here all in capitals. Can we align

ANNUAL PERFORMANCE PLAN 2016 • SANEDI42

SUB-

PRO

GRA

MM

E 4:

REN

EWA

BLE

ENER

GY:

STR

ATEG

IC O

BJEC

TIVE

S A

ND

QU

ART

ERLY

TA

RGET

S

Stra

tegi

c O

bjec

tive

Prog

ram

me

perf

orm

ance

in

dica

tor

Repo

rting

Fr

eque

ncy

Annu

al T

arge

ts20

16/1

7

Qua

rter

ly ta

rget

s

1st

2nd

3rd

4th

1.To

Pro

vide

a c

entr

e th

at c

oord

inat

es a

nd

prom

otes

RE

rese

arch

an

d de

velo

pmen

t in

SA

thro

ugh

colla

bora

tion

and

fund

ing

Num

ber o

f co

llabo

rativ

e pr

ojec

ts a

nd

platf

orm

s w

ith in

dust

ry,

gove

rnm

ent a

nd

gove

rnm

ent

entiti

es w

ith

resp

ect t

o :

Polic

y im

prov

emen

t Kn

owle

dge

shar

ing

Advi

sory

Re

sear

ch

colla

bora

tion

Qua

rter

lyPl

anni

ng a

nd

deve

lopm

ent o

f SA

NED

I kno

wle

dge

shar

ing

and

advi

sory

pr

ojec

ts a

nd

platf

orm

s

Hos

t the

ann

ual

Mee

ting

for A

lgal

Bi

oene

rgy

1 X

SHW

Pla

tform

Conv

ene

mee

ting

for t

he S

WH

Pl

atfor

m1

X So

lar H

igh

Tem

pera

ture

Pl

atfor

m M

eetin

g

Conv

ene

mee

ting

for t

he S

olar

Hig

h Te

mpe

ratu

re

Platf

orm

Hos

t the

ann

ual

Mee

ting

for W

aste

to

Ene

rgy

Num

bers

of

Even

ts h

oste

d by

SA

NED

I

Qua

rter

ly

2 X

SAN

EDI c

o/

host

ed e

vent

.SA

NEA

/RER

E aw

ard

call

SAN

EA/R

ERE

awar

d ad

judi

catio

nPr

ize g

ivin

g fo

r SA

NEA

/RER

E aw

ard

SAN

EDI h

oste

d SA

REC

even

t.

Num

ber

of E

xper

t re

fere

nce

grou

p an

d St

eerin

g co

mm

ittee

m

eetin

gs

atten

ded

Qua

rter

ly

Mee

tings

att

ende

d pe

r inv

itatio

n.In

puts

into

DEA

ERG

SE

A re

port

sIn

puts

into

SAM

REF

repo

rts

Inpu

ts in

to S

AMRE

F re

port

sIn

puts

into

SAM

REF

repo

rts

Atten

d SA

RETE

C ad

vice

and

adv

isory

bo

ard

Mee

ting

Atten

d SA

RETE

C ad

vice

and

adv

isory

bo

ard

Mee

ting

Atten

d SA

RETE

C ad

vice

and

adv

isory

bo

ard

Mee

ting

Atten

d SA

RETE

C ad

vice

and

adv

isory

bo

ard

Mee

ting

Inpu

ts in

to S

ADC

RE

stat

us re

port

as w

ell

as in

puts

into

WRC

fu

ndin

g pr

opos

als

Num

ber o

f co

llabo

ratio

n ar

rang

emen

ts

ente

red

into

Qua

rter

lyCo

llabo

ratio

n ar

rang

emen

t ent

ered

in

to o

n RE

rese

arch

pr

ojec

ts

Fina

lise

ADM

IRE

Sola

r Coo

ling

stud

yAn

alys

e ou

tcom

es

of S

olar

Coo

ling

stud

y an

d de

term

ine

phas

e tw

o of

the

stud

y

Advi

se a

nd a

id

whe

re p

ossib

le in

Ec

oVes

t tra

inin

g im

plem

enta

tion

Advi

se a

nd a

id

whe

re p

ossib

le in

Ec

oVes

t tra

inin

g im

plem

enta

tion

Advi

se a

nd a

id

whe

re p

ossib

le in

Ec

oVes

t tra

inin

g im

plem

enta

tion

Advi

se a

nd a

id

whe

re p

ossib

le in

Ec

oVes

t tra

inin

g im

plem

enta

tion

Page 43: FOREWORD - SANEDI and Notices/Sanedi... · 2019-03-29 · 16.1. Advantages of the matrix structure 16.2. Disadvantages of the matrix structure. TOC here all in capitals. Can we align

SANEDI • ANNUAL PERFORMANCE PLAN 2016 43

Stra

tegi

c O

bjec

tive

Prog

ram

me

perf

orm

ance

in

dica

tor

Repo

rting

Fr

eque

ncy

Annu

al T

arge

ts20

16/1

7

Qua

rter

ly ta

rget

s

1st

2nd

3rd

4th

PV re

sear

ch s

can

in

prog

ress

PV

rese

arch

sca

n co

mpl

ete

Num

ber o

f bu

rsar

ies

awar

ded

Qua

rter

ly

2 Bu

rsar

ies

per

year

RE

Skill

s De

velo

pmen

t an

d Tr

aini

ng in

co

llabo

ratio

n w

ith

trai

ning

insti

tutio

ns

and

post

grad

uate

as

soci

ation

s

Enga

ge w

ith D

BREV

on

stud

ent b

ursa

ry

awar

d

Awar

d DB

REV

Burs

ary

Enga

ge w

ith

SARE

TEC

on st

uden

t bu

rsar

y aw

ard

Draft

Pro

posa

l to

GIZ

for c

o-su

ppor

t to

SAR

ETEC

and

dr

aft s

ubse

quen

t Pr

ojec

t Agr

eem

ent

Fina

lise

proj

ect

agre

emen

tAw

ard

SARE

TEC

Burs

ary

2 RE

pro

ject

s co

mpl

eted

Qua

rter

lyCo

llabo

ratio

n an

d Co

ordi

natio

n ac

ross

the

RE s

ecto

r fo

cusin

g on

sol

ar

and

biom

ass/

was

te

ener

gy a

s w

ell a

s en

ergy

stor

age

Build

ing

of

Was

te2E

nerg

y de

mon

stra

tion

plan

t in

prog

ress

an

d co

mm

issio

ning

co

mm

ence

s

Build

ing

and

com

miss

ioni

ng o

f pl

ant c

ompl

ete

Proc

ess

optim

isatio

n Pr

oces

s op

timisa

tion

com

plet

e an

d ha

nd

over

.

Seek

fund

ing

for

Sola

r Tur

tle ro

ll ou

t

2.Pr

ovid

e su

ppor

t th

roug

h te

nder

ing,

co

ntra

cting

, pay

men

t an

d re

porti

ng to

the

Dani

sh re

new

able

pr

ogra

mm

e's

DoE

and

ESKO

M

com

pone

nts

A re

port

on

stat

us, p

rogr

ess

and

audi

t of

prog

ram

me

to

date

Qua

rter

lyU

pdat

e of

pr

ocur

emen

t pla

n,

issue

tend

ers,

sig

n co

ntra

cts a

nd

faci

litat

e pa

ymen

ts a

s pe

r pro

cure

men

t pla

n

Upd

ate

of

Proc

urem

ent p

lans

fo

r all

ToRs

.

Upd

ate

proc

urem

ent s

heet

sFa

cilit

ate

the

proc

urem

ent o

f se

rvic

es fo

r ToR

s ap

prov

ed b

y th

e Ad

viso

ry b

oard

Faci

litat

e pa

ymen

t re

quisi

tions

for

serv

ice

prov

ider

in

voic

es a

ppro

ved

for p

aym

ent b

y Do

E, E

skom

Bi-a

nnua

llyBi

-ann

ual F

inan

cial

an

d Pr

ogre

ss R

epor

ts

to th

e Do

E.

Faci

litat

e th

e pr

ocur

emen

t of

serv

ices

for T

oRs

appr

oved

by

the

Advi

sory

boa

rd

Faci

litat

e pa

ymen

t re

quisi

tions

for

serv

ice

prov

ider

in

voic

es a

ppro

ved

for p

aym

ent b

y Do

E,

Esko

m

Prep

are

bi-a

nnua

l Fi

nanc

ial a

nd

Prog

ress

Rep

orts

to

the

DoE

Qua

rter

lyCo

nclu

de p

rogr

amm

e w

ith fi

nal r

epor

t and

au

dit.

Faci

litat

e pa

ymen

t re

quisi

tions

for

serv

ice

prov

ider

in

voic

es a

ppro

ved

for p

aym

ent b

y Do

E, E

skom

2015

/16

Annu

al

audi

t rep

ort

subm

itted

to D

anish

em

bass

y

Impl

emen

ting

Part

ners

Fin

al

Repo

rt su

bmitt

ed to

Da

nish

Em

bass

y

Page 44: FOREWORD - SANEDI and Notices/Sanedi... · 2019-03-29 · 16.1. Advantages of the matrix structure 16.2. Disadvantages of the matrix structure. TOC here all in capitals. Can we align

ANNUAL PERFORMANCE PLAN 2016 • SANEDI44

Stra

tegi

c O

bjec

tive

Prog

ram

me

perf

orm

ance

in

dica

tor

Repo

rting

Fr

eque

ncy

Annu

al T

arge

ts20

16/1

7

Qua

rter

ly ta

rget

s

1st

2nd

3rd

4th

Prep

are

bi-a

nnua

l Fi

nanc

ial a

nd

Prog

ress

Rep

orts

to

the

DoE.

Fina

l aud

it re

port

(2

016)

with

Cl

osur

e of

acc

ount

su

bmitt

ed to

Dan

ish

Emba

ssy

3.Im

plem

ent,

man

age

& C

oord

inat

e th

e W

ASA

phas

e II

Prog

ram

as

per

resp

ectiv

ely

the

Dani

sh R

E EE

Pr

ogra

m D

oE,

SAN

EDI,

Esko

m a

nd

WAS

A II

SAN

EDI,

Impl

emen

tatio

n Pa

rtne

rs A

gree

men

t an

d ap

prov

ed w

ork

plan

.

Repo

rts

on

stat

us, p

rogr

ess

of p

rogr

amm

e to

da

te.

Qua

rter

ly4

x Q

uart

erly

re

port

on

WAS

A II

impl

emen

tatio

n to

Da

nish

Em

bass

y to

da

te w

ith m

inut

es

of m

eetin

gs a

nd

atten

danc

e re

gist

ers

4th

PIU

mee

ting

min

utes

and

acti

on

plan

upda

ting

of W

ASA

II da

ta c

olle

ction

, w

ebsit

e di

spla

y &

da

ta d

ownl

oad

5th

PIU

mee

ting

min

utes

and

acti

on

plan

Qua

rter

ly re

port

su

bmitt

ed to

Dan

ish

Emba

ssy

upda

ting

of W

ASA

II da

ta c

olle

ction

, w

ebsit

e di

spla

y &

da

ta d

ownl

oad

Qua

rter

ly re

port

su

bmitt

ed to

Dan

ish

Emba

ssy

upda

ting

of W

ASA

II da

ta c

olle

ction

, w

ebsit

e di

spla

y &

da

ta d

ownl

oad

upda

ting

of W

ASA

II da

ta c

olle

ction

, w

ebsit

e di

spla

y &

da

ta d

ownl

oad

WAS

A II

Prog

ress

an

d fin

anci

al re

port

su

bmitt

ed to

DoE

Qua

rter

ly re

port

su

bmitt

ed to

Dan

ish

Emba

ssy

Obs

erva

tiona

l Win

d At

las

for 1

st 1

2 m

onth

s pu

blish

ed

Qua

rter

ly re

port

su

bmitt

ed to

Dan

ish

Emba

ssy

WAS

A II

2017

/18

Bus

Plan

and

bu

dget

sub

mitt

ed

WAS

A II

Prog

ress

an

d fin

anci

al re

port

su

bmitt

ed to

DoE

4.Fo

ster

inte

rnati

onal

co

llabo

ratio

n in

or

der t

o gl

obal

ize

know

ledg

e an

d gr

ow p

oten

tial

fund

ing

pool

, th

roug

h co

ntra

ctua

l ag

reem

ents

be

twee

n SA

NED

I an

d in

tern

ation

al

part

ners

.

Repr

esen

tatio

ns

of S

outh

Afr

ica

in in

tern

ation

al

fora

to e

xcha

nge

tech

nica

l kn

owle

dge/

ex

perti

se a

nd

seek

rese

arch

fu

ndin

g

Qua

rter

ly4

Inte

rnati

onal

m

eetin

gs a

tten

ded

Parti

cipa

te in

at

leas

t 1 IE

A Ex

Co

(Bio

, SH

C an

d O

ES)

Atten

d Da

nish

RE

pro

gram

me

advi

sory

boa

rd

mee

ting

(rep

ort)

Parti

cipa

te in

at

leas

t 2 IE

A Ex

Co

(Bio

, SH

C an

d O

ES)

Sign

H20

20 c

ontr

act

with

DST

and

su

bmit

busin

ess

Atten

d H

2020

Info

an

d br

oker

age

Days

an

d di

ssem

inat

e ca

ll in

form

ation

to

rese

arch

ers t

hrou

gh

netw

ork

Subm

it fin

al re

port

on

H20

20 a

ctivi

ties

to D

ST

At le

ast 2

join

t pr

ojec

ts w

ith R

EEEP

Draft

and

sub

mit

pr

ojec

t pro

posa

lsSi

gnin

g of

con

trac

ts

for p

ropo

sals

acce

pted

Proj

ect

impl

emen

tatio

n as

pe

r mile

ston

es in

th

e co

ntra

ct

Proj

ect

impl

emen

tatio

n as

pe

r mile

ston

es in

th

e co

ntra

ct

Page 45: FOREWORD - SANEDI and Notices/Sanedi... · 2019-03-29 · 16.1. Advantages of the matrix structure 16.2. Disadvantages of the matrix structure. TOC here all in capitals. Can we align

SANEDI • ANNUAL PERFORMANCE PLAN 2016 45

10.5. SUB- PROGRAMME 5: WORKING FOR ENERGY: STRATEGIC OBJECTIVES

The initial focus of the Working for Energy programme was to execute applied research, demonstrate and implement clean energy solutions for the benefit of the rural and low income urban areas, with special emphasis on sustainable job creation, the empowerment of women, youth and people with disabilities under the Expanded Public Works Programme.

The Programme has implemented a number of Greening projects in various areas and a number of gaps to achieve sustainability have been identified namely, project/programme partnerships with consistence of funding, maintenance and operation of projects, enterprise development in the sector, access to the markets for the products and services rendered, revenue generation of projects, training of beneficiaries, volume work amongst others.

ID Strategic Objective (output) Strategic statement Baseline1. To research essential aspects

of Clean Energy relating to the provision clean energy solutions to rural and low income communities

Undertake various Research Studies to advance sustainable access and use of clean energy solutions by rural and low income communities

Two (2) Research Projects

2. To Implement Clean Energy technologies and services to low income communities

Undertake selected clean energy projects to demonstrate the use of various renewable energy applications in low income rural and urban communities for possible national roll out.as alternative mode of energy provision in various applications.

Eighty (80) beneficiary establishments (schools, ECDC, Primary Schools, High Schools, community facilities, productive facilities)

3. On the Job Training To Enhance the Capability of selected Practitioners to Implement Clean Energy Solutions

Three (3) on the job Biogas Digester Training Programmes implemented,

Page 46: FOREWORD - SANEDI and Notices/Sanedi... · 2019-03-29 · 16.1. Advantages of the matrix structure 16.2. Disadvantages of the matrix structure. TOC here all in capitals. Can we align

ANNUAL PERFORMANCE PLAN 2016 • SANEDI46

WO

RKIN

G F

OR

ENER

GY:

STR

ATEG

IC O

BJEC

TIVE

S A

ND

AN

NU

AL

TARG

ETS

Stra

tegi

c O

bjec

tive

(out

put)

Perf

orm

ance

in

dica

tor

Audi

ted

Actu

al

Perf

orm

ance

2014

/15

Estim

ated

pe

rfor

man

ce

(201

5/16

)

Med

ium

Ter

m T

arge

ts

2016

/17

2017

/18

2018

/19

1.To

rese

arch

ess

entia

l as

pect

s of

Cle

an

Ener

gy re

latin

g to

th

e pr

ovisi

on c

lean

en

ergy

sol

ution

s to

ru

ral a

nd lo

w in

com

e co

mm

uniti

es.

Und

erta

ke v

ario

us

Rese

arch

Stu

dies

to

adva

nce

sust

aina

ble

acce

ss a

nd u

se

of c

lean

ene

rgy

solu

tions

by

rura

l an

d lo

w in

com

e co

mm

uniti

es

New

obj

ectiv

e an

d in

dica

tor

1 Co

mpl

eted

Re

sear

ch p

roje

ct1

Com

plet

ed

Rese

arch

pro

ject

2.To

Impl

emen

t Cle

an

Ener

gy te

chno

logi

es

and

serv

ices

to lo

w

inco

me

com

mun

ities

Und

erta

ke s

elec

ted

clea

n en

ergy

pro

ject

s to

dem

onst

rate

th

e us

e of

var

ious

re

new

able

ene

rgy

appl

icati

ons

in lo

w

inco

me

rura

l and

ur

ban

com

mun

ities

fo

r pos

sible

nati

onal

ro

ll ou

t.as

alte

rnati

ve

mod

e of

ene

rgy

prov

ision

in v

ario

us

appl

icati

ons.

47 x

Bio

gas

Dige

ster

s/ G

reen

ing

Proj

ects

Con

stru

cted

90xB

ioga

s Di

gest

ers/

G

reen

ing

Proj

ects

Co

nstr

ucte

d

1x T

orre

ficati

on

Proj

ects

Con

stru

cted

15x

Biog

as D

iges

ters

/ G

reen

ing

Proj

ects

Co

nstr

ucte

d

1xG

asifi

catio

n Pr

ojec

t Co

nstr

ucte

d

3.O

n th

e Jo

b Tr

aini

ngTo

enh

ance

the

capa

bilit

y of

sel

ecte

d Pr

actiti

oner

s to

Im

plem

ent C

lean

En

ergy

Sol

ution

s

1xTr

aini

ng

Prog

ram

me

Impl

emen

ted

1xTr

aini

ng

Prog

ram

me

Impl

emen

ted

1xTr

aini

ng

Prog

ram

me

Impl

emen

ted

1xTr

aini

ng

Prog

ram

me

Impl

emen

ted

Page 47: FOREWORD - SANEDI and Notices/Sanedi... · 2019-03-29 · 16.1. Advantages of the matrix structure 16.2. Disadvantages of the matrix structure. TOC here all in capitals. Can we align

SANEDI • ANNUAL PERFORMANCE PLAN 2016 47

SUB-

PRO

GRA

MM

E 4:

REN

EWA

BLE

ENER

GY:

STR

ATEG

IC O

BJEC

TIVE

S A

ND

QU

ART

ERLY

TA

RGET

S

Stra

tegi

c O

bjec

tive

Prog

ram

me

perf

orm

ance

in

dica

tor

Repo

rting

Fr

eque

ncy

Annu

al T

arge

ts20

16/1

7

Qua

rter

ly ta

rget

s

1st

2nd

3rd

4th

1.To

rese

arch

ess

entia

l as

pect

s of

Cle

an

Ener

gy re

latin

g to

th

e pr

ovisi

on c

lean

en

ergy

sol

ution

s to

ru

ral a

nd lo

w in

com

e co

mm

uniti

es.

Und

erta

ke

vario

us R

esea

rch

Stud

ies

to

adva

nce

sust

aina

ble

acce

ss a

nd u

se

of c

lean

ene

rgy

solu

tions

by

rura

l an

d lo

w in

com

e co

mm

uniti

es

Qua

rter

ly

1xCo

mpl

eted

Re

sear

ch p

roje

ct1

Draft

Res

earc

h Re

port

2 C

ompl

eted

Draft

Res

earc

h Re

port

3 C

ompl

eted

Draft

Res

earc

h Re

port

4 C

ompl

eted

Fina

l Res

earc

h

Repo

rt C

ompl

eted

2.To

Impl

emen

t Cle

an

Ener

gy te

chno

logi

es

and

serv

ices

to lo

w

inco

me

com

mun

ities

Und

erta

ke

sele

cted

cl

ean

ener

gy

proj

ects

to

dem

onst

rate

the

use

of v

ario

us

rene

wab

le

ener

gy

appl

icati

ons

in lo

w in

com

e ru

ral a

nd u

rban

co

mm

uniti

es

for p

ossib

le

natio

nal r

oll o

ut.

as a

ltern

ative

m

ode

of e

nerg

y pr

ovisi

on

in v

ario

us

appl

icati

ons.

Qua

rter

ly

90x

Biog

as D

iges

ter/

G

reen

ing

Proj

ects

Co

nstr

ucte

d.

20x

Dige

ster

/ G

reen

ing

Proj

ects

Co

nstr

ucte

d.

20x

Dige

ster

/ G

reen

ing

Proj

ects

Co

nstr

ucte

d

25x

Dige

ster

/ G

reen

ing

Proj

ects

Co

nstr

ucte

d

25x

Dige

ster

/ G

reen

ing

Proj

ects

Co

nstr

ucte

d

3.O

n th

e Jo

b Tr

aini

ngTo

Enh

ance

th

e Ca

pabi

lity

of s

elec

ted

Prac

tition

ers

to

Impl

emen

t Cle

an

Ener

gy S

oluti

ons

Qua

rter

ly

2x T

rain

ing

Prog

ram

mes

Im

plem

ente

d

1x O

nsite

Tra

inin

g Pr

ogra

mm

e Im

plem

ente

d

1x O

nsite

Tra

inin

g Pr

ogra

mm

e Im

plem

ente

d

Page 48: FOREWORD - SANEDI and Notices/Sanedi... · 2019-03-29 · 16.1. Advantages of the matrix structure 16.2. Disadvantages of the matrix structure. TOC here all in capitals. Can we align

ANNUAL PERFORMANCE PLAN 2016 • SANEDI48

11. PROGRAMME 3: ENERGY EFFICIENCY: STRATEGIC OBJECTIVES Low electricity prices have historically been a key inhibitor for energy efficiency and contributed to a wasteful energy culture in South Africa. Unfortunately, these energy habits threaten the sustainability of the environment, natural resources and our planet for future generations. It also means that South Africa’s energy productivity is comparatively low. Resource saving and greater utilisation efficiency is therefore of utmost importance.

Globally communities will have to prioritise the conservation of energy, water, materials and land, the comprehensive utilisation of resources and the development of a recycling economy, establishing energy-efficient modes of production, consumption and of urban and rural construction. Energy is intrinsically linked to and interweaved into this list.

The purpose of SANEDI’s Energy Efficiency programme is to accelerate a move towards a resource and particularly, an energy (including gas, liquid fuels, electricity and water) efficient society. The National Energy Efficiency Strategy creates the primary context and direction for energy efficiency in South Africa. This strategy is currently under review (presented to Cabinet on 7 November 2012 and gazetted on 29 November 2012 for public comment6) and indications are that SANEDI’s role will be expected to align with and support the revised strategy and industry structure once approved.

Strategic Objective (output) Strategic statement Baseline1 Provide assurance to SARS on energy

savings claims, in line with published regulations, and perform a reporting function to key stakeholders (DoE, National Treasury, SARS (through National Treasury), and DTI) by :issuing Energy Efficiency tax certificates for approved and compliant applications and copying them to the Revenue Service.

Provide an energy efficiency support function for the certification of energy savings for tax reduction claims and monitoring impacts and benefits.

Section 12 I: A review (conducted for the 2011/12 implementation year), of the evaluation process and service provided, confirmed that SANEDI successfully supported the first year of implementation of Section 12I tax incentive and a second review has been conducted in 2015/ 2016.Section 12 L: In terms of Clause 3 of the Regulations promulgated to support Section 12L of the Income Tax Act, 1962, on the Allowance for Energy Efficiency Savings, SANEDI is specifically mandated with the role of implementing these incentives on behalf of the South African Revenue Service (SARS) and National Treasury. This Regulation remains in force until 1 January 2020 and in order to effectively implement this activity, SANEDI is required in terms of 3(1) of the Regulation, ‘to appoint suitably qualified persons to consider reports submitted by a person claiming the allowance’.

6 Statement on Cabinet meeting of 7 November 2012, available from http://www.gcis.gov.za/content/newsroom/media-releases/cabstatements/7Nov2012 November 2012. The draft strategy was gazetted on 29 November 2012 as document 1000 of 2012. Opportunity for comments close on 30 January 2013.

Page 49: FOREWORD - SANEDI and Notices/Sanedi... · 2019-03-29 · 16.1. Advantages of the matrix structure 16.2. Disadvantages of the matrix structure. TOC here all in capitals. Can we align

SANEDI • ANNUAL PERFORMANCE PLAN 2016 49

Strategic Objective (output) Strategic statement Baseline2. To support and provide capability

building through designed programmes in the area of energy efficiency

Continue the Energy Efficiency Hub initiative to strengthen energy related research, human capacity development, and market transformation and enterprise development initiatives that will be tracked against a comprehensive existing set of KPIs.

Comprehensive set of KPIs with baseline performance for 2014/2015, as follows: Number of journal publications: 8; Number of conference papers: 15; Number of registered students: 50; Number of Graduates: 10; Number of modules/short courses offered: 45; Number of externally funded projects: 30; Female student ratio: 18%; PDI ratio: 45%.

3. To fulfil the role of a national energy efficiency champion through collaborative activities with industry partners aimed at the promotion of new technologies thereby increasing the uptake of energy efficient technologies

Support industry stakeholders and the DoE, towards achieving improved energy efficiency in collaboration with local and international partners, by various initiatives.

Initial contracted data collection for bigEE database has been completed and published on the website. The current number of SANAS-accredited bodies is six (6) and this is insufficient to meet the growing demand for the Energy Efficiency tax incentives.SANEDI has conducted the initial feasibility of this activity in South Africa, through limited pilot activities and engagement with potential suppliers of the required products and the USA – DoE.

Page 50: FOREWORD - SANEDI and Notices/Sanedi... · 2019-03-29 · 16.1. Advantages of the matrix structure 16.2. Disadvantages of the matrix structure. TOC here all in capitals. Can we align

ANNUAL PERFORMANCE PLAN 2016 • SANEDI50

WO

RKIN

G F

OR

ENER

GY:

STR

ATEG

IC O

BJEC

TIVE

S A

ND

AN

NU

AL

TARG

ETS

Stra

tegi

c O

bjec

tive

(o

utpu

t)Pe

rfor

man

ce

indi

cato

rAu

dite

d Ac

tual

Per

form

ance

2014

/15

Estim

ated

pe

rfor

man

ce

(201

5/16

)

Med

ium

Ter

m T

arge

ts

2016

/17

2017

/18

2018

/19

1.Pr

ovid

e as

sura

nce

to S

ARS

on e

nerg

y sa

ving

s cl

aim

s, in

lin

e w

ith p

ublis

hed

regu

latio

ns, a

nd p

erfo

rm

a re

porti

ng fu

nctio

n to

key

stak

ehol

ders

(D

oE, N

ation

al T

reas

ury,

SARS

(thr

ough

Nati

onal

Tr

easu

ry),

and

DTI)

by :

issui

ng E

nerg

y Effi

cien

cy

tax

certi

ficat

es fo

r ap

prov

ed a

nd c

ompl

iant

ap

plic

ation

s an

d co

pyin

g th

em to

the

Reve

nue

Serv

ice.

Proc

essin

g of

ap

plic

ation

s w

ithin

6

wee

ks o

f rec

eipt

Laun

ched

and

impl

emen

ted

an o

nlin

e sy

stem

to a

ccur

atel

y pr

oces

s 12

L ap

plic

ation

s Fo

ur 1

2I a

pplic

ation

s w

ere

eval

uate

d an

d se

ven

12L

appl

icati

ons

wer

e pr

oces

sed

Revi

ew a

nd is

sue

a te

nder

to im

prov

e/

upgr

ade

the

curr

ent

onlin

e pr

oces

sing

syst

em, t

o en

sure

co

mpl

ianc

e w

ith th

e le

gisla

tion

Proc

ess

all

appl

icati

ons

with

in 6

wee

ks o

f re

ceip

t

Proc

ess

all

appl

icati

ons

with

in 6

wee

ks o

f re

ceip

t

Proc

ess

all

appl

icati

ons

with

in 6

wee

ks o

f re

ceip

t

Num

ber o

f rep

orts

su

bmitt

ed to

ke

y st

akeh

olde

rs

as re

quire

d by

le

gisla

tion

The

seco

nd a

nnua

l rev

iew

/re

port

was

com

plet

ed fo

r 12L

but

w

as n

ot p

ublis

hed

Qua

rter

ly 1

2L

repo

rts

to D

oE

and

Nati

onal

Tr

easu

ry

Qua

rter

ly 1

2L

repo

rts

to D

oE

and

Nati

onal

Tr

easu

ry

Qua

rter

ly 1

2L

repo

rts

to D

oE

and

Nati

onal

Tr

easu

ry

Annu

al 1

2I d

raft

repo

rt s

ubm

itted

to

Dti

for

com

men

ts

Annu

al 1

2I d

raft

repo

rt s

ubm

itted

to

Dti

for

com

men

ts

Annu

al 1

2I d

raft

repo

rt s

ubm

itted

to

Dti

for

com

men

ts

2.To

sup

port

and

pro

vide

ca

pabi

lity

build

ing

thro

ugh

desig

ned

prog

ram

mes

in

the

area

of

ene

rgy

effici

ency

Num

ber o

f en

ergy

effi

cien

cy

capa

city

bui

ldin

g pr

ogra

mm

es

unde

rtak

en

15 jo

urna

l pub

licati

ons

24 c

onfe

renc

e pa

pers

10

0 re

gist

ered

stud

ents

23

gra

duat

es

45 m

odul

es a

nd s

hort

cou

rses

37 e

xter

nally

fund

ed p

roje

cts

R2.5

m e

xter

nal f

undi

ng re

ceiv

ed

19%

fem

ale

staff

ratio

35%

PDI

ratio

Fund

s tr

ansf

erre

d to

the

Hub

as

per c

ontr

actu

al

agre

emen

ts

3 x

repo

rts

subm

itted

to

DST

2 En

ergy

Effi

cien

cy

capa

city

bui

ldin

g pr

ogra

mm

es

unde

rtak

en

2 En

ergy

Effi

cien

cy

capa

city

bui

ldin

g pr

ogra

mm

es

unde

rtak

en

2 En

ergy

Effi

cien

cy

capa

city

bui

ldin

g pr

ogra

mm

es

unde

rtak

en

Page 51: FOREWORD - SANEDI and Notices/Sanedi... · 2019-03-29 · 16.1. Advantages of the matrix structure 16.2. Disadvantages of the matrix structure. TOC here all in capitals. Can we align

SANEDI • ANNUAL PERFORMANCE PLAN 2016 51

Stra

tegi

c O

bjec

tive

(o

utpu

t)Pe

rfor

man

ce

indi

cato

rAu

dite

d Ac

tual

Per

form

ance

2014

/15

Estim

ated

pe

rfor

man

ce

(201

5/16

)

Med

ium

Ter

m T

arge

ts

2016

/17

2017

/18

2018

/19

3.To

fulfi

l the

role

of

a na

tiona

l ene

rgy

effici

ency

cha

mpi

on

thro

ugh

colla

bora

tive

activ

ities

with

indu

stry

pa

rtne

rs a

imed

at

the

prom

otion

of n

ew

tech

nolo

gies

ther

eby

incr

easin

g th

e up

take

of

ene

rgy

effici

ent

tech

nolo

gies

Num

ber o

f pro

ject

s un

dert

aken

BigE

E pr

ojec

t com

plet

ed

succ

essf

ully

Th

e ap

plia

nces

asp

ect o

f the

bes

t av

aila

ble

tech

nolo

gies

and

non

-be

st a

vaila

ble

tech

nolo

gies

has

be

en c

ompl

eted

and

upl

oade

d on

th

e w

ebsit

e.

The

data

with

rega

rds

to b

uild

ings

ha

s be

en c

olle

cted

, ana

lyse

d an

d ad

opte

d.Th

e en

ergy

effi

cien

cy p

olic

ies

whi

ch c

over

bot

h ap

plia

nces

and

bu

ildin

gs w

ere

com

plet

ed.

The

clim

atic

zone

map

was

de

velo

ped

and

is be

ing

upda

ted

by C

SIR.

The

TAF

func

tion

was

car

ried

out

succ

essf

ully

as

per t

he c

ontr

acte

d ou

tput

s.Th

e N

ation

al M

&V

pape

r was

co

mpl

eted

but

was

not

upl

oade

d on

the

inte

rnati

onal

pla

tform

.Th

e co

nsol

idati

on

X4 s

econ

dary

dat

a su

bmiss

ions

to

Wup

pert

hal

4 w

orks

hops

hel

d du

ring

the

year

1

cool

roof

s w

orks

hop

host

ed in

SA

X4 s

imul

ation

s pe

r an

num

for c

ool r

oofs

3 en

ergy

effi

cien

cy

proj

ects

un

dert

aken

to

cham

pion

ene

rgy

effici

ency

3 en

ergy

effi

cien

cy

proj

ects

un

dert

aken

to

cham

pion

ene

rgy

effici

ency

3 en

ergy

effi

cien

cy

proj

ects

un

dert

aken

to

cham

pion

ene

rgy

effici

ency

Page 52: FOREWORD - SANEDI and Notices/Sanedi... · 2019-03-29 · 16.1. Advantages of the matrix structure 16.2. Disadvantages of the matrix structure. TOC here all in capitals. Can we align

ANNUAL PERFORMANCE PLAN 2016 • SANEDI52

PRO

GRA

MM

E 3:

EN

ERG

Y EF

FICI

ENCY

: STR

ATEG

IC O

BJEC

TIVE

S A

ND

QU

ART

ERLY

TA

RGET

S

Stra

tegi

c O

bjec

tive

Prog

ram

me

perf

orm

ance

in

dica

tor

Repo

rting

Fr

eque

ncy

Annu

al T

arge

ts20

16/1

7

Qua

rter

ly ta

rget

s

1st

2nd

3rd

4th

Prov

ide

assu

ranc

e to

SAR

S on

ene

rgy

savi

ngs

clai

ms,

in

line

with

pub

lishe

d re

gula

tions

, and

per

form

a

repo

rting

func

tion

to k

ey st

akeh

olde

rs

(DoE

, Nati

onal

Tre

asur

y, SA

RS (t

hrou

gh N

ation

al

Trea

sury

), an

d DT

I) by

:iss

uing

Ene

rgy

Effici

ency

ta

x ce

rtific

ates

for

appr

oved

and

com

plia

nt

appl

icati

ons

and

copy

ing

them

to th

e Re

venu

e Se

rvic

e.

Proc

essin

g of

ap

plic

ation

s w

ithin

6

wee

ks o

f re

ceip

t

Qua

rter

ly

Proc

ess

all

appl

icati

ons

with

in

6 w

eeks

of r

ecei

pt

Proc

ess

all

appl

icati

ons

with

in 6

w

eeks

of r

ecei

pt

Proc

ess

all

appl

icati

ons

with

in 6

w

eeks

of r

ecei

pt

Proc

ess

all

appl

icati

ons

with

in 6

w

eeks

of r

ecei

pt

Proc

ess

all

appl

icati

ons

with

in 6

w

eeks

of r

ecei

pt

Num

ber

of re

port

s su

bmitt

ed

to k

ey

stak

ehol

ders

as

requ

ired

by

legi

slatio

n

Qua

rter

lyQ

uart

erly

12L

re

port

s to

DoE

and

N

ation

al T

reas

ury

4th

quar

terly

repo

rt

for 1

5/16

1st q

uart

erly

repo

rt

for 1

6/17

2nd

qua

rter

ly re

port

fo

r 16/

173r

d qu

arte

rly re

port

fo

r 16/

17

Annu

al 1

2I d

raft

repo

rt s

ubm

itted

to

Dti

for

com

men

ts

Annu

al 1

2I d

raft

repo

rt s

ubm

itted

to

Dti fo

r com

men

ts

To s

uppo

rt a

nd p

rovi

de

capa

bilit

y bu

ildin

g th

roug

h de

signe

d pr

ogra

mm

es

in th

e ar

ea o

f ene

rgy

effici

ency

Num

ber

of e

nerg

y effi

cien

cy

capa

city

bu

ildin

g pr

ogra

mm

es

unde

rtak

en

Qua

rter

ly2

Ener

gy E

ffici

ency

ca

paci

ty b

uild

ing

prog

ram

mes

un

dert

aken

4th

quar

terly

re

port

on

the

Hub

’s pe

rfor

man

ce

subm

itted

to th

e DS

T

1st q

uart

erly

re

port

on

the

Hub

’s pe

rfor

man

ce

subm

itted

to th

e DS

T

2nd

quar

terly

re

port

on

the

Hub

’s pe

rfor

man

ce

subm

itted

to th

e DS

TFu

nds

tran

sfer

red

to

the

EEDS

M H

ub

3rd

quar

terly

re

port

on

the

Hub

’s pe

rfor

man

ce

subm

itted

to th

e DS

T

Com

men

ce tr

aini

ng

of M

&V

prof

essio

nals

Accr

edita

tion

with

SA

NAS

Acc

redi

tatio

n w

ith

SAN

ASCe

rtific

ation

of M

&V

prof

essio

nals

To fu

lfil t

he ro

le o

f a

natio

nal e

nerg

y effi

cien

cy

cham

pion

thro

ugh

colla

bora

tive

activ

ities

w

ith in

dust

ry p

artn

ers

ai

med

at t

he p

rom

otion

of

new

tech

nolo

gies

th

ereb

y in

crea

sing

the

upta

ke o

f ene

rgy

effici

ent

tech

nolo

gies

Num

ber

of p

roje

cts

unde

rtak

en

Qua

rter

ly3

ener

gy

effici

ency

pro

ject

s un

dert

aken

to

cham

pion

ene

rgy

effici

ency

Qua

rter

ly

man

agem

ent o

f the

So

uth

Afric

an B

igEE

da

taba

se

Qua

rter

ly

man

agem

ent o

f the

So

uth

Afric

an B

igEE

da

taba

se

Qua

rter

ly

man

agem

ent o

f the

So

uth

Afric

an B

igEE

da

taba

se

Qua

rter

ly

man

agem

ent o

f the

So

uth

Afric

an B

igEE

da

taba

se

Trai

ning

of

appl

icat

ors

in c

ools

roof

tech

nolo

gy

Com

men

ce w

ith

dem

onst

ratio

n of

co

ol ro

ofs

proj

ect

Mon

itorin

g an

d re

porti

ng

dem

onst

ratio

n pr

ojec

t

Know

ledg

e sh

arin

g ar

ound

the

effec

tiven

ess

of th

e co

ol ro

ofs

tech

nolo

gy

Sign

col

labo

rativ

e ag

reem

ents

for n

ew

proj

ects

Fina

lise

and

com

men

ce

impl

emen

tatio

n of

th

e pr

ojec

t pla

n

Impl

emen

tatio

n of

pr

ojec

t pla

nIm

plem

enta

tion

of

proj

ect p

lan

Page 53: FOREWORD - SANEDI and Notices/Sanedi... · 2019-03-29 · 16.1. Advantages of the matrix structure 16.2. Disadvantages of the matrix structure. TOC here all in capitals. Can we align

SANEDI • ANNUAL PERFORMANCE PLAN 2016 53

12. RISKSA number of risk exposures, that may affect the realisation of the strategic objectives have been identified. Mitigation strategies required to mitigate risk exposure will be implemented, monitored and evaluated on a quarterly basis to determine the effectiveness thereof. Out of the identified risk exposures in the global risk register, SANEDI has priorities and focused on the following top 7 risks.

Strategic Objective Risk description Controls in placeLink to strategic objective

1.1 Inadequate funding at institutional level.

Insufficient funds to support its objectives.

Ensure plans on strategies are aligned to government priorities Leverage additional fundingStakeholder management.

Corporate Governance and Administration.Applied Energy Research Programme. Energy Efficiency.

1.2 Company exposure to project risk.

The risk that projects may not be successful and delivered within time, cost and quality.

Project design to avoid pitfalls Indemnity insurance. Compliance with legislation and regulations.Contractor monitoring and evaluation.

Applied Energy Research Programme. Energy Efficiency.

1.3 Inability to recruit and retain key skills.

The inability to recruit and retain the key skills to deliver on its mandate.

Internship programme. Skills development and retention plan. Mentorship programmeEstablish and strengthen in – house HR capacity

Corporate Governance and Administration.Applied Energy Research Programme. Energy Efficiency.

1.4 Loss of institutional memory. Risk that institutional memory may be lost

Succession planning policy Mentorship programme.

Succession planning policy Mentorship programme.Corporate Governance and AdministrationApplied Energy Research Programme Energy Efficiency.

1.5 Mandate sustainability. Sustainability of the organisation is at risk.

Excellent project deliveryContinuous stakeholder engagement. Establishing joint collaboration projects. Marketing and communication.

Corporate Governance and Administration.Applied Energy Research Programme. Energy Efficiency.

Business Continuity Risk. Inadequate Business Continuity.

Disaster Recovery Plan /Business Continuity Succession Planning policy

Corporate Governance and AdministrationApplied Energy Research Programme Energy Efficiency.

Page 54: FOREWORD - SANEDI and Notices/Sanedi... · 2019-03-29 · 16.1. Advantages of the matrix structure 16.2. Disadvantages of the matrix structure. TOC here all in capitals. Can we align

ANNUAL PERFORMANCE PLAN 2016 • SANEDI54

The Department of Energy is not directly responsible for energy sector infrastructure development and as such SANEDI does not link into a long-term infrastructure plan.

The Department do however link to Eskom, Municipal and industry infrastructure plans, but none of those identified in the current Strategic Plan are of specific relevance to SANEDI’s areas of activity.

SANEDI is not currently part of any formal Public Private Partnerships as defined by South African law. SANEDI does, however, intend pursuing the establishment of such partnerships, particularly with metropolitan councils and municipalities involvement. In such a case, a Public Private Partnership model will be explored to allow the local government institution to provide a concession to SANEDI to develop key projects in their jurisdiction. Working for Energy projects are good examples of projects involving possible Public Public Partnerships. In the case where a private management company is required to operate a facility allocated to SANEDI on a concessional basis, SANEDI intends establishing a Public Private Partnership to manage such a relationship. SANEDI will also pursue the leveraging of funds from local and international partners and donors to implement key projects. SANEDI currently manages the following strategic partnerships with private entities and global organisations:

Donor Project Name Period of Commitment

Audited outcome

Estimated Outcome

Medium-term Expenditure Estimate

2014/15‘000

2015/16‘000

2016/17‘000

2017/18‘000

2018/19‘000

Danish Danish Commercial building project

18 months 40 - - - -

Europena Union European Union Project (COCATE)

36 months 98 114 - - -

DST FP7 36 months 100 100 100 100 -

Danish Danish RE EE program

48 months 13,545 32,160 2,838 3,508 -

BHP Billiton, Anglo Operations, Optimum COAL, Green Road, Shanduka, Eskom, SASOL, EXXARO, SANEDI, SACSP

SA Road Map, Carbon capture and storage

12 months (with possible extension)

3,000 1,000 - - -

SDC SDC EE Monitoring and Implementation Project

Until terminated by mutual agreement

2,667 2,865 - - -

Europena Union (Through RDP fund)

Smart Grids Project 24 months 28,036 107,000 - - -

GIZ SAIREC 12 months - 26,740 - - -

WORLD BANK PCSP Not concluded - 400,000 - -

REEEP REEEP Secretariat 12 months - 130 - - -

REEEP REEEP Switch 24 months 914 914 - -

13. PUBLIC-PRIVATE PARTNERSHIPS AND DONOR FUNDING

Page 55: FOREWORD - SANEDI and Notices/Sanedi... · 2019-03-29 · 16.1. Advantages of the matrix structure 16.2. Disadvantages of the matrix structure. TOC here all in capitals. Can we align

SANEDI • ANNUAL PERFORMANCE PLAN 2016 55

14. APPENDIX A: POLICY CONTEXT A comprehensive list of relevant legislation and policy that shapes the context for SANEDI’s activities and focus is listed below - alphabetically and not order of importance.

Legislation/Policy Description of focus Stated or derived SANEDI mandate

2011 Budget Vote Speech by the Deputy Minister of Energy, Ms. Barbara Thompson, MP E249, National Assembly, Parliament, Cape Town 26th May 2011.

Budget Vote Speech. In terms of SANEDI’s role, it is expected that they will become the repository of all energy efficiency programmes. This requires them to oversee energy efficiency initiatives, in particular, to assist with the certification of energy savings achieved by those companies that seek to claim tax deductions under the Income Tax Amendment Act. We have secured the concurrence of the Minister of Finance for energy efficiency incentives under the Standard Offer and Energy Efficiency Tax Incentive Scheme, which will be in place this year.

2011 National Council of Provinces (NCOP) Budget Vote speech by the Minister of Energy, Ms Dipuo Peters, MP, Old Assembly Chamber, Parliament, Cape Town.

Budget Vote Speech. Last year we committed to establishing the South African National Energy Development Institution (SANEDI), and this was duly done. SANEDI will, amongst others, be the champion for Energy Efficiency in the country, which will not only save energy but reduce the burden on households. In addition SANEDI will house South Africa’s carbon Capture and Storage research and development as well as other energy research programmes. He refers to the different programmes and progress made.

Biofuels Industrial Strategy 2007. A significant change to the draft Strategy is to adopt a short term focus (5 year pilot) to achieve a 2% penetration level of biofuels in the national liquid fuel supply, or 400 million litres pa. The target has been revised down from the 4.5% target that was initially proposed in the draft Strategy document. The following crops are proposed for the production of biofuels in the country: for Bioethanol, sugar cane and sugar beet and for Biodiesel sunflower, canola and soya beans. The exclusion of other crops and plants such as maize and Jatropha is based on the food security concerns. Further research is still needed to test usability of these in the country.

R&D platform will allow for the strengthening of local capacity and also leverage on international R&D work. The DST together with relevant stakeholders within the National Systems of Innovation (NSI) will facilitate the development and coordination of this work through a biofuels R&D plan that will focus on the total value chain. The research focus areas will include the investigation of alternative feedstock, development of energy crops (i.e. drought tolerance, high yield per ha, energy efficiency etc.) and improvement of known technologies whilst further developing, supporting and piloting the second generation technologies.

Page 56: FOREWORD - SANEDI and Notices/Sanedi... · 2019-03-29 · 16.1. Advantages of the matrix structure 16.2. Disadvantages of the matrix structure. TOC here all in capitals. Can we align

ANNUAL PERFORMANCE PLAN 2016 • SANEDI56

Legislation/Policy Description of focus Stated or derived SANEDI mandate

DOE strategic plan. The Department’s strategic plan seeks to deliver results along eight strategic objectives that include promoting energy security through reliable, clean, and affordable sources; universal access to energy sources, transformation of the energy sector, and strengthening the operations and management of the Department.

Centre for Carbon Capture and Storage under SANERI1.Clean Coal Technologies1.

DST 10 year innovation plan. The grand challenge areas are:The Farmer to Pharma value chain to strengthen the bio-economy;Space science and technology;Energy security - the race is on for safe, clean, affordable and reliable energy supply, and South Africa must meet its medium-term energy supply requirements while innovating for the long term in clean coal technologies, nuclear energy, renewable energy and the promise of the “hydrogen economy”;Global-change science with a focus on climate change; andHuman and social dynamics.

From an R&D perspective, it makes sense to position Saneri, Eskom, Sasol and various CEF subsidiaries to work together to advance clean coal technologies. For the long term, South Africa needs to strengthen the innovation chain in nuclear energy science. R&D to support conventional reactors in materials, safety, waste, reactor physics and so on must be planned and coordinated.

Energy Efficiency Policy & Strategy, DME 2004.

The vision of the strategy is to contribute to affordable energy for all, and to minimise the effects of energy usage on health & the environment. It is implemented through sector programmes.

Renewable Energy; Clean Fuels Programme, Energy Audits, Energy Management - The National Energy Research Institute will be funded to carry out a dedicated R&D programme for energy efficiency.

National Energy Efficiency Strategy of the RSA.

This Strategy allows for the immediate implementation of low-cost and no-cost interventions, as well as those higher-cost measures with short payback periods. These will be followed by medium-term and longer-term investment opportunities in energy efficiency. The Strategy acknowledges that there exists significant potential for energy efficiency improvements across all sectors of our national economy.

The South African National Energy Research Institute will be funded to carry out a dedicated programme of research and development for energy efficiency. The Strategy will support appropriate research and the possible adaptation of internationally available technologies and processes.

Energy Security Master Plan, DME. The Master Plan is premised on achieving certain goals that have been set for the electricity sector. Due to the uncertainty over the planning horizon, some assumptions are made regarding demand projections and the economic outlook. After consideration of the Energy White Paper and the regulatory policy framework, the current electricity generation, transmission and distribution sectors are appraised, in terms of the challenges confronting these sectors.

Focused research and development will enable meeting technical performance and capacity expansion objectives. Electricity/energy-based technology development and innovation is imperative to productivity and growth of the country.

Page 57: FOREWORD - SANEDI and Notices/Sanedi... · 2019-03-29 · 16.1. Advantages of the matrix structure 16.2. Disadvantages of the matrix structure. TOC here all in capitals. Can we align

SANEDI • ANNUAL PERFORMANCE PLAN 2016 57

Legislation/Policy Description of focus Stated or derived SANEDI mandate

Gauteng Integrated Energy Strategy. It aims to improve Gauteng’s environment, reduce its contribution to climate change and tackle energy poverty, whilst promoting economic development.

Green Paper on Climate Change Response Strategy.

climate change response objective of –making a fair contribution to the global effort to achieve the stabilisation of greenhouse gas concentrations in the atmosphere at a level that prevents dangerous anthropogenic interference with the climate system; andeffectively adapt to and manage unavoidable and potential damaging climate change impacts through interventions that build and sustain South Africa’s social, economic and environmental resilience and emergency response capacity.

Carbon capture and storage (research, development and demonstration programmes).

Industrial Policy Action Plan (IPAP) 2010/11 – 2012/13, published Feb 2010.

13.3 Geen industriesSWH;Wind;Photovoltaic power;Concentrated Solar Thermal power;Industrial Energy Efficiency;Water efficiency;Waste Management;Biomass and waste management; andEnergy-efficient vehicles.

Integrated Resource Plan for Energy, 2010.

This Policy-Adjusted IRP is recommended for adoption by Cabinet and for subsequent promulgation as the final IRP. This proposal is a confirmation of the RBS in that it ensures security of supply. It is a major step towards building local industry clusters and assists in fulfilling South Africa’s commitments to mitigating climate change as expressed at the Copenhagen climate change summit. The Policy-Adjusted IRP includes the same amount of coal and nuclear new builds as the RBS, while reflecting recent developments with respect to prices for renewables. In addition to all existing and committed power plants (including 10 GW committed coal), the plan includes 9,6 GW of nuclear; 6,3 GW of coal; 17,8 GW of renewables; and 8,9 GW of other generation sources.

Section 7 - Research Agenda for Next IRP Distributed generation, smart grids and off-grid generation

Harnessing South Africa’s coal resourceDecommissioning and waste managementTechnology options

Small hydro;Regional hydro options (specifically IngaBiomass (including municipal solid waste and bagasse);Storage; andEnergy efficiency demand side management.

Vision for 2050.Uncertainty & Risk factors.

Page 58: FOREWORD - SANEDI and Notices/Sanedi... · 2019-03-29 · 16.1. Advantages of the matrix structure 16.2. Disadvantages of the matrix structure. TOC here all in capitals. Can we align

ANNUAL PERFORMANCE PLAN 2016 • SANEDI58

Legislation/Policy Description of focus Stated or derived SANEDI mandate

Integrated Energy Plan, 2003. The Integrated Energy Plan outlines the direction and steps to be taken by South Africa to meet energy needs. The plan declares South Africa’s continued reliance on coal, but also uses modeling to forecast which energy sources can be used most effectively to meet demand under four different scenarios. The plan advocates diversification of energy sources, including renewables, as well as fuel switching to improve energy efficiency.

Long-Term Mitigation Scenarios, DEAT, October 2007.

Develops scenarios to mitigate greenhouse gas emission and forms the basis of South Africa’s national mitigation policy direction.

The LTMS recognizes the importance of a low carbon future and provides an indication of the effort that has to be extended into changing the energy mix and economic activity of South Africa to achieve the required reduction in carbon.

Measurement and Verification Guideline for Energy Efficiency Certificates (DRAFT).

The SA Government intends to introduce tax incentives for companies that can prove energy efficiency savings. One of the primary requirements for companies to benefit from this tax incentive is that they need to make use of independent and registered Measurement and Verification (M&V) professionals that are certified by the Council of Measurement and Verification Professionals of South Africa (CMVPSA).

This Measurement and Verification Guideline for Energy Efficiency Certificates aim to provide background with regards to the M&V requirements surrounding the energy efficiency tax incentive scheme. It also provides a high-level M&V approach that should be followed by registered M&V professionals to issue the required supporting documentation that will be used by SANEDI to issue Energy Efficiency Certificates.

National Energy Act, 2008. To ensure that diverse energy resources are available, in sustainable quantities and at affordable prices, to the South African economy in support of economic growth and poverty alleviation, taking into account environmental management requirements, international commitments and obligations and interactions amongst economic sectors; to establish institutions to be responsible for promotion of efficient generation and consumption of energy, energy modelling and planning, increased generation and consumption of renewable energies, energy research, contingency energy supply, holding of strategic energy minerals, adequate investment in, appropriate upkeep of and equitable access to energy infrastructure; to provide measures for the furnishing of certain data and information regarding energy demand, supply and generation; and to provide for matters connected therewith.

Chapter 4 focuses on the establishment of SANEDI. The institute is intended to:Promote energy efficiency in the economy;Increase the gdp per unit of energy consumed;Ensure energy resources used in optimal manner;Promote energy research and technology innovation;Increase players in the energy field; andFacilitate effective management of energy demand and its conservation.

Page 59: FOREWORD - SANEDI and Notices/Sanedi... · 2019-03-29 · 16.1. Advantages of the matrix structure 16.2. Disadvantages of the matrix structure. TOC here all in capitals. Can we align

SANEDI • ANNUAL PERFORMANCE PLAN 2016 59

Legislation/Policy Description of focus Stated or derived SANEDI mandate

National Research & Development Strategy - Aug 2002.

The objective of this strategy is to address these weaknesses in a profound but practical way. In particular, the approach is to apply internationally well-tested principles and systems that are adjusted to local realities and requirements. The strategy must be able to give expression to our national goals of economic development and improvement of quality of life for all citizens.

National Energy Research, Development and Innovation Strategy (developed by DME, DST and stakeholders).

Medium- to long-term energy-related research themes that would guide the management of Saneri to appropriately position the company in terms of national priorities:Energy infrastructure optimisation;Energy efficiency and demand-side management;The impact of energy use on the environment;The use of energy to stimulate socio-economic development;Cleaner fossil fuel use, including clean coal;Renewable energy;Alternative energy sources, including fuel cells and hydrogen;Energy planning and modelling; andEnergy policy research.

NERSA Consultation Paper - Revision of Regulatory Rules for Energy Efficiency Demand Side Management (EEDSM) including Standard Offer Programme (SOP) June 2010.

Policy to support the Energy Efficiency and Demand Side Management Program for the Electricity Sector through the Standard Offer Incentive Scheme . Energy Efficiency & Demand-Side Rules incl Standard Offer Proåram.

No specific reference in the document.

White paper on energy policy. This White Paper has been written so as to clarify Government policy regarding the supply and consumption of energy for the next decade. The policy strengthens existing energy systems in certain areas, calls for the development of underdeveloped systems and demonstrates a resolve to bring about extensive change in a number of areas. It addresses international trade and co-operation, capacity building, and the collection of adequate information. The document is comprehensive, addressing all elements of the energy sector as practically as it can.

Government will consider the development of a system to prioritise national research funding into the three main research categories in order to address the medium to long-term research needs in the energy sector. This will consist of an integrated, multi-year, national, needs-driven, energy research strategy, developed from time to time by an experienced team of experts appointed by the Minister. This strategy will identify medium and long-term priority programmes and themes.

Page 60: FOREWORD - SANEDI and Notices/Sanedi... · 2019-03-29 · 16.1. Advantages of the matrix structure 16.2. Disadvantages of the matrix structure. TOC here all in capitals. Can we align

ANNUAL PERFORMANCE PLAN 2016 • SANEDI60

Legislation/Policy Description of focus Stated or derived SANEDI mandate

White Paper on Renewable Energy Policy, Aug 2002.

Formerly known as the White Paper on the Promotion of Renewable Energy and Clean Energy Development, this paper aims at informing the public and the international community of the Government’s goals and objectives for the optimal use of renewable energy. Recognizing the importance of reducing the damage done to the environment by South Africa’s reliance on electricity from coal and the need for diversification of energy resources, it commits the Government to a number of actions to ensure that renewable energy becomes a significant part of South Africa’s energy portfolio over the next ten years. These measures include fiscal mechanisms, regulatory instruments, and standards to promote R&D and investment in renewables and educational programs to raise public awareness.

White Paper on Renewable Energy, November 2003.

The main aim of this White Paper is to create the conditions for the development and commercial implementation of renewable technologies. Government will use a phased, managed and partnership approach to renewable energy projects that are well conceived and show the potential to provide acceptable social, environmental and financial returns for all investors and stakeholders. This will lessen the strain on fiscal resources and hold greater potential for successful implementation. The focus will be on delivery. An appropriate enabling environment towards full commerciality will nurture the technologies that are proven to best meet Government’s policy objectives. Through this policy document Government is venturing into an entirely new area.

Mechanisms will be investigated to extend the operational support available from the Central Energy Fund to renewable energy programmes.

Electricity Regulation Act (412006): Electricity Regulations for Compulsory norms and Standards for Reticulation Services.

To establish a national regulatory framework for the electricity supply industry; to make the National Energy Regulator the custodian and enforcer of the national electricity regulatory framework; to provide for licences and registration as the manner in which generation, transmission, distribution, trading and the import and export of electricity are regulated; and to provide for matters connected therewith.

National Climate Change Response White paper – Department of Environmental Affairs

The White Paper addresses response strategies to the mitigation of greenhouse gases as well as adaption to climate change.

Four of the eight national flagship projects pertain to the work of SANEDI – in particular the technical development of Carbon Capture and Storage Flagship Project is 100% the responsibility of SANEDI.

Page 61: FOREWORD - SANEDI and Notices/Sanedi... · 2019-03-29 · 16.1. Advantages of the matrix structure 16.2. Disadvantages of the matrix structure. TOC here all in capitals. Can we align

SANEDI • ANNUAL PERFORMANCE PLAN 2016 61

14. APPENDIX A: POLICY CONTEXT To give effect to the strategic plan and meet the delivery objectives of the annual performance plan SANEDI has to structure itself in an effective and efficient manner so as to optimise its operations. The matrix structure is targeted for this purpose as it offers a dynamic structure that provides benefits specific to SANEDI’s requirements, including:

• greater flexibility that allows employee movement across current functional / departmental boundaries;

• improved access to a diverse range of skills and perspectives;

• improved communication, coordination and information sharing across functional boundaries; and

• allows for broader experience and hence offers improved opportunities for professional development and career progression to employees.

In the matrix structure, the personnel and other resources that a project manager requires are not permanently assigned to the project, but are obtained from a pool controlled and monitored by a functional manager. Personnel required to perform specific functions in a particular project are detailed for the period necessary, and are then returned to the control of the functional manager for reassignment.

The table below shows the matrix structure in detail. The matrix is broken into SANEDI Operational functions and SANEDI programme areas. A detailed functions list is presented under each SANEDI support area.

Page 62: FOREWORD - SANEDI and Notices/Sanedi... · 2019-03-29 · 16.1. Advantages of the matrix structure 16.2. Disadvantages of the matrix structure. TOC here all in capitals. Can we align

ANNUAL PERFORMANCE PLAN 2016 • SANEDI62

Prog

ram

me

Activ

ity

Lead

er

Ener

gy E

ffici

ency

Sm

art G

rids

& N

etw

ork

Auto

mati

on

Data

Rep

osito

ry

and

Man

agem

ent

(CES

AR)

Clea

ner F

ossi

l Fue

ls

(inc

SACC

CS)

Clea

ner M

obili

ty

Rene

wab

le E

nerg

y W

orki

ng fo

r Ene

rgy

Fina

nce

Corp

orat

e Pl

anni

ng

/Offi

ce o

f CE

OPr

ocur

emen

t HR

IT

Dr M

Bip

ath.

Re

sear

ch

requ

irem

ents

Smar

t Grid

in

tegr

ation

. Sm

art G

rid lo

cal

indu

stry

dat

a pr

ovisi

on.

IEP

inte

grati

on

aspe

cts.

Da

ta M

anag

emen

t Sm

art G

rid

inte

grati

on.

Smar

t Grid

in

tegr

ation

.Bu

dgeti

ng fo

r cos

t ce

ntre

;

Fore

casti

ng; a

nd

Resp

ondi

ng to

au

dit q

uerie

s.

Inpu

ts fo

r pol

icie

s

Inpu

ts fo

r str

ateg

ic

plan

, APP

, qu

arte

rly re

port

s,

Annu

al R

epor

t, Ri

sk M

anag

emen

t

Inpu

ts fo

r pol

icie

s

Perf

orm

ance

Re

porti

ng

Proc

urem

ent

of g

oods

and

se

rvic

es;

Cont

ract

M

anag

emen

t; an

d

Obt

ain

prog

ram

me

fund

ing.

Inpu

ts fo

r pol

icie

s

Plan

ning

HR

for

portf

olio

Inte

rvie

ws

Perf

orm

ance

As

sess

men

ts

Disc

iplin

e

Moti

vatio

n

Insti

lling

val

ues

of c

orpo

rate

go

vern

ance

Inpu

ts fo

r pol

icie

s

IT n

eeds

Inpu

ts fo

r po

licie

s

B Br

eden

kam

p.N

EE

impl

emen

tatio

n;

and

Cust

odia

n of

EE

Cent

re a

nd H

ub.

EE P

rogr

amm

e im

plem

enta

tion.

EE

dat

abas

e cu

stod

ian.

EE

dat

abas

e cu

stod

ian

EE d

atab

ase

cust

odia

nSy

nerg

istic

prog

ram

me

Deve

lopm

ent.

Ener

gy e

ffici

ency

pr

ogra

mm

e

Deve

lopm

ent.

Budg

eting

for c

ost

cent

re;

Fore

casti

ng; a

nd

Resp

ondi

ng to

au

dit q

uerie

s.

Inpu

ts fo

r pol

icie

s

Inpu

ts fo

r str

ateg

ic

plan

, APP

, qu

arte

rly re

port

s,

Annu

al R

epor

t, Ri

sk M

anag

emen

t

Inpu

ts fo

r pol

icie

s

Perf

orm

ance

Re

porti

ng

Proc

urem

ent

of g

oods

and

se

rvic

es;

Cont

ract

M

anag

emen

t; an

d

Obt

ain

prog

ram

me

fund

ing.

Inpu

ts fo

r pol

icie

s

Plan

ning

HR

for

portf

olio

Inte

rvie

ws

Perf

orm

ance

As

sess

men

ts

Disc

iplin

e

Moti

vatio

n

Insti

lling

val

ues

of c

orpo

rate

go

vern

ance

Inpu

ts fo

r pol

icie

s

T ne

eds

Inpu

ts fo

r po

licie

s

Care

l Sny

man

Cl

eane

r Mob

ility

Cl

eane

r Mob

ility

Cl

eane

r Mob

ility

IEP

inte

grati

on

aspe

cts.

Clea

ner M

obili

tyCl

eane

r Mob

ility

Clea

ner M

obili

tyBu

dgeti

ng fo

r cos

t ce

ntre

;

Fore

casti

ng; a

nd

Resp

ondi

ng to

au

dit q

uerie

s.

Inpu

ts fo

r pol

icie

s

Inpu

ts fo

r str

ateg

ic

plan

, APP

, qu

arte

rly re

port

s,

Annu

al R

epor

t, Ri

sk M

anag

emen

t Pe

rfor

man

ce

Repo

rting

Inpu

ts fo

r pol

icie

s

Proc

urem

ent

Plan

ning

HR

for

portf

olio

Inte

rvie

ws

Perf

orm

ance

As

sess

men

ts

Disc

iplin

e

Moti

vatio

n

Insti

lling

val

ues

of c

orpo

rate

go

vern

ance

Inpu

ts fo

r pol

icie

s

IT n

eeds

Inpu

ts fo

r po

licie

s

Dr T

Mal

i.Re

new

able

Ene

rgy

Alte

rnati

ve fu

els

– cl

ean

ener

gy.

Clea

n en

ergy

dat

a pr

ovisi

on.

Rene

wab

le E

nerg

y Cu

stod

ian

of

RECO

RD, R

EEEP

an

d ot

her

prog

ram

mes

.

Clea

n En

ergy

Pr

ogra

mm

e De

velo

pmen

t.

Budg

eting

for c

ost

cent

re;

Fore

casti

ng; a

nd

Resp

ondi

ng to

au

dit q

uerie

s.

Inpu

ts fo

r pol

icie

s

Inpu

ts fo

r str

ateg

ic

plan

, APP

, qu

arte

rly re

port

s,

Annu

al R

epor

t, Ri

sk M

anag

emen

t.

Inpu

ts fo

r pol

icie

s

Proc

urem

ent

of g

oods

and

se

rvic

es;

Cont

ract

M

anag

emen

t;

Plan

ning

HR

for

portf

olio

Inte

rvie

ws

Perf

orm

ance

As

sess

men

ts

Disc

iplin

e

Moti

vatio

n

Insti

lling

val

ues

of c

orpo

rate

go

vern

ance

Inpu

ts fo

r pol

icie

s

IT n

eeds

Inpu

ts fo

r po

licie

s

Page 63: FOREWORD - SANEDI and Notices/Sanedi... · 2019-03-29 · 16.1. Advantages of the matrix structure 16.2. Disadvantages of the matrix structure. TOC here all in capitals. Can we align

SANEDI • ANNUAL PERFORMANCE PLAN 2016 63

Prog

ram

me

Activ

ity

Lead

er

Ener

gy E

ffici

ency

Sm

art G

rids

& N

etw

ork

Auto

mati

on

Data

Rep

osito

ry

and

Man

agem

ent

(CES

AR)

Clea

ner F

ossi

l Fue

ls

(inc

SACC

CS)

Clea

ner M

obili

ty

Rene

wab

le E

nerg

y W

orki

ng fo

r Ene

rgy

Fina

nce

Corp

orat

e Pl

anni

ng

/Offi

ce o

f CE

OPr

ocur

emen

t HR

IT

Dr A

D Su

rrid

ge.

CCS,

Coa

l , G

as

data

pro

visio

n.

Cust

odia

n of

CCS

Ce

ntre

. Bu

dgeti

ng fo

r cos

t ce

ntre

;

Fore

casti

ng; a

nd

Resp

ondi

ng to

au

dit q

uerie

s.

Inpu

ts fo

r pol

icie

s

Inpu

ts fo

r str

ateg

ic

plan

, APP

, qu

arte

rly re

port

s,

Annu

al R

epor

t, Ri

sk M

anag

emen

t

Perf

orm

ance

Re

porti

ng

Inpu

ts fo

r pol

icie

s

Proc

urem

ent

of g

oods

and

se

rvic

es;

Cont

ract

M

anag

emen

t’

Plan

ning

HR

for

portf

olio

Inte

rvie

ws

Perf

orm

ance

As

sess

men

ts

Disc

iplin

e

Moti

vatio

n

Insti

lling

val

ues

of c

orpo

rate

go

vern

ance

Inpu

ts fo

r pol

icie

s

IT n

eeds

Inpu

ts fo

r po

licie

s

D M

ahum

a.

Inte

grati

on in

to

WFE

pro

gram

me.

W

FE d

ata

prov

ision

. In

tegr

ation

into

W

FE p

rogr

amm

e.

Cust

odia

n of

WFE

pr

ogra

mm

e.

Budg

eting

for c

ost

cent

re;

Fore

casti

ng; a

nd

Resp

ondi

ng to

au

dit q

uerie

s.

Inpu

ts fo

r pol

icie

s

Inpu

ts fo

r str

ateg

ic

plan

, APP

, qu

arte

rly re

port

s,

Annu

al R

epor

t, Ri

sk M

anag

emen

t

Inpu

ts fo

r pol

icie

s

Proc

urem

ent

of g

oods

and

se

rvic

es ;

Cont

ract

M

anag

emen

t;

Plan

ning

HR

for

portf

olio

Inte

rvie

ws

Perf

orm

ance

As

sess

men

ts

Disc

iplin

e

Moti

vatio

n

Insti

lling

val

ues

of c

orpo

rate

go

vern

ance

Inpu

ts fo

r pol

icie

s

IT n

eeds

Inpu

ts fo

r po

licie

s

C Sn

yman

. Tr

ansp

ort

Ener

gy E

ffici

ency

(R

esea

rch

and

need

s an

alys

is).

Cust

odia

n of

Cl

eane

r Mob

ility

Tr

ansp

ort d

ata

prov

ision

. U

ptak

e of

cle

aner

fu

els.

Tr

ansp

ort R

elat

ed

prog

ram

me

deve

lopm

ent.

Budg

eting

for c

ost

cent

re;

Fore

casti

ng; a

nd

Resp

ondi

ng to

au

dit q

uerie

s.

Inpu

ts fo

r str

ateg

ic

plan

, APP

, qu

arte

rly re

port

s,

Annu

al R

epor

t, Ri

sk M

anag

emen

t Pe

ople

M

anag

emen

t.

Proc

urem

ent

of g

oods

and

se

rvic

es ;

Cont

ract

M

anag

emen

t; an

d

Obt

ain

prog

ram

me

fund

ing.

Plan

ning

HR

for

portf

olio

Inte

rvie

ws

Perf

orm

ance

As

sess

men

ts

Disc

iplin

e

Moti

vatio

n

Insti

lling

val

ues

of c

orpo

rate

go

vern

ance

Inpu

ts fo

r pol

icie

s

IT n

eeds

Inpu

ts fo

r po

licie

s

L M

anam

ela.

Fi

nanc

e su

ppor

t. Fi

nanc

e su

ppor

t. Fi

nanc

e Su

ppor

t. Fi

nanc

e su

ppor

t. Fi

nanc

e su

ppor

t. Fi

nanc

e su

ppor

t.AF

S

Man

agem

ent

acco

unts

Fina

ncia

l Re

porti

ng

Budg

eting

Fore

casti

ng

Resp

ondi

ng to

au

dit q

uerie

s

ENE

Fina

ncia

l M

onito

ring

and

Eval

uatio

n

Fina

ncia

l pol

icie

s an

d co

ntro

l.

Inpu

ts fo

r str

ateg

ic

plan

, APP

, qu

arte

rly re

port

s,

Annu

al R

epor

t, Ri

sk M

anag

emen

t

Inpu

ts to

pol

icie

s

Proc

urem

ent

Chai

r.Pl

anni

ng H

R fo

r po

rtfol

io

Inte

rvie

ws

Perf

orm

ance

As

sess

men

ts

Disc

iplin

e

Moti

vatio

n

Insti

lling

val

ues

of c

orpo

rate

go

vern

ance

Inpu

ts fo

r pol

icie

s

IT n

eeds

Inpu

ts fo

r po

licie

s

Page 64: FOREWORD - SANEDI and Notices/Sanedi... · 2019-03-29 · 16.1. Advantages of the matrix structure 16.2. Disadvantages of the matrix structure. TOC here all in capitals. Can we align

ANNUAL PERFORMANCE PLAN 2016 • SANEDI64

Prog

ram

me

Activ

ity

Lead

er

Ener

gy E

ffici

ency

Sm

art G

rids

& N

etw

ork

Auto

mati

on

Data

Rep

osito

ry

and

Man

agem

ent

(CES

AR)

Clea

ner F

ossi

l Fue

ls

(inc

SACC

CS)

Clea

ner M

obili

ty

Rene

wab

le E

nerg

y W

orki

ng fo

r Ene

rgy

Fina

nce

Corp

orat

e Pl

anni

ng

/Offi

ce o

f CE

OPr

ocur

emen

t HR

IT

D G

oven

der.

Corp

orat

e Su

ppor

t. Co

rpor

ate

Supp

ort.

Corp

orat

e Su

ppor

t.Co

rpor

ate

Supp

ort.

Corp

orat

e Su

ppor

t.Co

rpor

ate

Supp

ort.

Corp

orat

e Su

ppor

t.Bu

dgeti

ng fo

r cos

t ce

ntre

;

Fore

casti

ng;

and

Resp

ondi

ng to

au

dit q

uerie

s.

Stra

tegi

c pl

an

APP,

Per

form

ance

M

anag

emen

t /re

porti

ng A

nnua

l Re

port

, Ri

sk

Man

agem

ent

Peop

le

Man

agem

ent,

Resp

ondi

ng

to a

udit

quer

ies,

Boa

rd/

BARC

inpu

ts,

Proc

urem

ent

of g

oods

and

se

rvic

es.

Proc

urem

ent

Com

mitt

ee.

Plan

ning

HR

for

portf

olio

Inte

rvie

ws

Perf

orm

ance

As

sess

men

ts

Disc

iplin

e

Moti

vatio

n

Insti

lling

val

ues

of c

orpo

rate

go

vern

ance

Inpu

ts fo

r pol

icie

s

IT n

eeds

Inpu

ts fo

r po

licie

s

B Br

eden

kam

p.Co

mm

unic

ation

s an

d M

arke

ting.

Com

mun

icati

ons

and

Mar

ketin

g.Co

mm

unic

ation

s an

d M

arke

ting.

Com

mun

icati

ons

and

Mar

ketin

g.Co

mm

unic

ation

s an

d M

arke

ting.

Com

mun

icati

ons

and

Mar

ketin

g.Co

mm

unic

ation

s an

d M

arke

ting.

Budg

eting

for

cost

cen

tre;

Fore

casti

ng; a

nd

Resp

ondi

ng to

au

dit q

uerie

s.

Inpu

ts to

pol

icie

s

Inpu

ts fo

r st

rate

gic

plan

, AP

P, q

uart

erly

re

port

s, A

nnua

l Re

port

, Risk

M

anag

emen

t

Inpu

ts to

pol

icie

s

Proc

urem

ent o

f go

ods

and

serv

ices

.

Plan

ning

HR

for

portf

olio

Inte

rvie

ws

Perf

orm

ance

As

sess

men

ts

Disc

iplin

e

Moti

vatio

n

Insti

lling

val

ues

of c

orpo

rate

go

vern

ance

Inpu

ts fo

r pol

icie

s

IT n

eeds

Inpu

ts fo

r po

licie

s

Dr M

Bip

ath

(CIO

)IT

sup

port

softw

are

and

hard

war

e

IT s

uppo

rt –

so

ftwar

e an

d ha

rdw

are

IT s

uppo

rt –

so

ftwar

e an

d ha

rdw

are

IT s

uppo

rt –

so

ftwar

e an

d ha

rdw

are

IT s

uppo

rt –

so

ftwar

e an

d ha

rdw

are

IT s

uppo

rt –

so

ftwar

e an

d ha

rdw

are

IT s

uppo

rt –

so

ftwar

e an

d ha

rdw

are

IT s

uppo

rt –

so

ftwar

e an

d ha

rdw

are

Budg

eting

for

cost

cen

tre;

Fore

casti

ng; a

nd

Resp

ondi

ng to

au

dit q

uerie

s

IT s

uppo

rt –

so

ftwar

e an

d ha

rdw

are

Inpu

ts fo

r st

rate

gic

plan

, AP

P, q

uart

erly

re

port

s, A

nnua

l Re

port

, Risk

M

anag

emen

t Pe

ople

M

anag

emen

t.

IT s

uppo

rt –

so

ftwar

e an

d ha

rdw

are

Proc

urem

ent o

f IT

har

dwar

e an

d so

ftwar

e

Plan

ning

HR

for

portf

olio

Inte

rvie

ws

Perf

orm

ance

As

sess

men

ts

Disc

iplin

e

Moti

vatio

n

Insti

lling

val

ues

of c

orpo

rate

go

vern

ance

Inpu

ts fo

r po

liciie

s

IT n

eeds

Inpu

ts fo

r po

licie

s

Man

agem

ent

of IT

staff

Page 65: FOREWORD - SANEDI and Notices/Sanedi... · 2019-03-29 · 16.1. Advantages of the matrix structure 16.2. Disadvantages of the matrix structure. TOC here all in capitals. Can we align

SANEDI • ANNUAL PERFORMANCE PLAN 2016 65

16.1. ADVANTAGES OF THE MATRIX STRUCTURE

The matrix arrangement attempts to retain the benefits of both structures (functional organisation and project team structure). It coordinates resources in a way that applies them effectively to different projects. Staff can still retain membership on teams and their functional department colleagues.

Efficient Information Exchange

The matrix arrangement can lead to an efficient exchange of information. Departments work closely together and communicate with each other frequently to solve issues. Efficient lines of communication enhance productivity and allow for quick decision-making. The specialized information exchange allows managers to respond quickly to the needs of clients and the organisation.

Increased Motivation

In an ideal situation, the matrix structure encourages a democratic leadership style. This style incorporates the input of team members before managers make decisions. The ability to contribute valuable information before decisions are made leads to employee satisfaction and increased motivation. In a matrix structure, each employee brings his expertise to the table. Managers are involved in the day-to-day operations, which allow them to make decisions through the viewpoint of employees.

16.2. DISADVANTAGES OF THE MATRIX STRUCTURE

Internal Complexity

A disadvantage of the matrix structure is that it can result in internal complexity that needs to be managed effectively. Some employees may become confused as to who their direct supervisor is. The dual or multiple authority and communication problems may cause division among employees and managers. Miscommunication and ineffective managing can result in employee dissatisfaction and low morale. Prolonged issues may cause an organisation to experience high employee turnover.

Page 66: FOREWORD - SANEDI and Notices/Sanedi... · 2019-03-29 · 16.1. Advantages of the matrix structure 16.2. Disadvantages of the matrix structure. TOC here all in capitals. Can we align

ANNUAL PERFORMANCE PLAN 2016 • SANEDI66

NOTES

Page 67: FOREWORD - SANEDI and Notices/Sanedi... · 2019-03-29 · 16.1. Advantages of the matrix structure 16.2. Disadvantages of the matrix structure. TOC here all in capitals. Can we align

SANEDI • ANNUAL PERFORMANCE PLAN 2016 67

Page 68: FOREWORD - SANEDI and Notices/Sanedi... · 2019-03-29 · 16.1. Advantages of the matrix structure 16.2. Disadvantages of the matrix structure. TOC here all in capitals. Can we align

ANNUAL PERFORMANCE PLAN 2016 • SANEDI68

NOTES