PARK RIDGE BMP FOR THE PROJECT NO. 221019-04-001 STATE LOCATION MAP VICINITY MAP SCALE: NONE SCALE: NONE REGISTERED ENGINEER STATE OF INDIANA NO. 10303127 WILLIAM J. LEBER NOVEMBER 2019 TIPPECANOE COUNTY Drawing: J:\West Lafayette\Projects\221019 W Laf Park Ridge BMP\CAD\DWG\Sheets\221019-GS.dwg | Layout: 1G1 | Plotted: 11/12/19 @ 02:39:47 | LastSavedBy: JasonW 11/12/2019 CITY OF WEST LAFAYETTE, INDIANA WEST LAFAYETTE PROJECT LOCATION 6219 South East Street Indianapolis, Indiana 46227 Phone: (317) 788-4551 - Fax: (317) 788-4553 INDIANAPOLIS www.wesslerengineering.com DRAWING INDEX SHEET NO. DESCRIPTION GENERAL 01 TITLE SHEET AND INDEX DRAWING PLAN SHEETS DETAILS 02 SITE AND EROSION CONTROL PLAN 03 EROSION CONTROL DETAILS SAGAMORE PKWY SALISBURY ST 04 MISCELLAENOUS DETAILS KENT AVE SALISBURY ST NAVAJO ST CARBERRY DR

Upload: others

Post on 17-Apr-2020

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: FOR THE CITY OF WEST LAFAYETTE, INDIANA€¦ · grading. runoff control - diversions, perimeter protection, check dams, outlet protection. runoff control practices shall be installed

PARK RIDGE BMP

FOR THE

PROJECT NO. 221019-04-001

STATE LOCATION MAP

VICINITY MAP

SCALE: NONE

SCALE: NONE

REGISTERED ENGINEER STATE OF INDIANA NO. 10303127

WILLIAM J. LEBER

NOVEMBER 2019

TIPPECANOE

COUNTY

Dra

win

g: J:\W

est L

afa

ye

tte

\P

ro

je

cts\2

21

01

9 W

L

af P

ark R

id

ge

B

MP

\C

AD

\D

WG

\S

he

ets\2

21

01

9-G

S.d

wg | L

ayo

ut: 1

G1

| P

lo

tte

d: 1

1/1

2/1

9 @

0

2:3

9:4

7 | L

astS

ave

dB

y: Ja

so

nW

1

1

/

1

2

/

2

0

1

9

CITY OF WEST LAFAYETTE, INDIANA

WEST LAFAYETTE

PROJECT LOCATION

6219 South East Street

Indianapolis, Indiana 46227

Phone: (317) 788-4551 - Fax: (317) 788-4553

INDIANAPOLIS

www.wesslerengineering.com

DRAWING INDEX

SHEET

NO.

DESCRIPTION

GENERAL

01 TITLE SHEET AND INDEX DRAWING

PLAN SHEETS

DETAILS

02 SITE AND EROSION CONTROL PLAN

03 EROSION CONTROL DETAILS

SAGAMORE PKWY

SA

LIS

BU

RY

S

T

04 MISCELLAENOUS DETAILS

KENT AVE

SA

LIS

BU

RY

S

T

NAVAJO ST

CA

RB

ER

RY

D

R

AutoCAD SHX Text
10303127
AutoCAD SHX Text
STATE OF
AutoCAD SHX Text
N
AutoCAD SHX Text
I
AutoCAD SHX Text
N
AutoCAD SHX Text
D
AutoCAD SHX Text
I
AutoCAD SHX Text
A
AutoCAD SHX Text
A
AutoCAD SHX Text
R
AutoCAD SHX Text
I
AutoCAD SHX Text
G
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
No.
AutoCAD SHX Text
T
AutoCAD SHX Text
S
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
D
Page 2: FOR THE CITY OF WEST LAFAYETTE, INDIANA€¦ · grading. runoff control - diversions, perimeter protection, check dams, outlet protection. runoff control practices shall be installed

G

G

G

G

GG

GG

G

G

G

G

G G

UG

FU

GF

UG

FU

GF

UG

FU

GF

UG

FU

GF

WW

WW

WW

W

W

W

W

W

W

DR

IV

E

CO

NC

SID

EW

ALK

ST

EP

S

D

S

D

CP

CP 2

MV

WV

MV

G

M

M

WV

M

G

M

MV

SIDEWALK

SIDEWALK

GR

AS

S

1

2

" R

C

P

24" RCP

18" R

CP

1

2

" R

C

P

18" R

CP

18" & 24" RCP

8" V

CP

40' E

XIS

T. R

/W

EXIST. R/W

CO

NC

EXIST. R/W

AS

PH

ALT

O

VE

R C

ON

C. (T

YP

)

4" ROOF DRAIN

4" ROOF DRAIN

24" RCP

PARK RIDGE DR

24" RCP

2632

TC 720.75

24" RCP IE (E) 708.14

12" RCP IE (W) 715.15

2368

TC 720.35

8" SDR-35 PVC IE (S) 709.89

8" SDR-35 PVC IE (N) 709.89

6" SDR-35 PVC IE (N) 710.29

6" SDR-35 PVC IE (N) 710.19

SA

LIS

BU

RY

S

T

STM. MH. 2758

TC 720.09

24" RCP IE (W) 708.14

24" RCP IE (N) 710.24

24" RCP IE (E) 708.14

18" RCP IE (S) 717.21

ST

EP

S

DR

IV

E

CO

NC

Dra

win

g: J:\W

est L

afa

ye

tte

\P

ro

je

cts\2

21

01

9 W

L

af P

ark R

id

ge

B

MP

\C

AD

\D

WG

\S

he

ets\2

21

01

9-S

I.d

wg

| L

ayo

ut: 0

1 | P

lo

tte

d: 1

1/1

2/1

9 @

0

2:3

9:5

1 | L

astS

ave

dB

y: Ja

so

nW

SHEET NO.

NO. DATE REVISION DESCRIPTIONSINITIALS

CHECKED BY

APPROVED BY

ISSUE DATE

PROJECT NUMBER

DRAWN BYPARK RIDGE BMP

CITY OF WEST LAFAYETTE, INDIANA

1

1

/

1

2

/

2

0

1

9

SCALE VERIFICATION

BAR IS ONE INCH LONG ON

ORIGINAL DRAWING

NOVEMBER 2019

221019-04-001

TOTAL SHEETS

04

02

SITE AND EROSION CONTROL PLAN

JRW

KNM

WJL

SITE AND EROSION CONTROL PLAN

SCALE: 1" = 20'

0 10 20 40 FT1"=20'

RICHARD SCOTT HOSLER &

HEATHER M. HOSLER

531 PARK RIDGE DR.

VINCENT J. MARTIN &

LORI L. MARTIN

532 PARK RIDGE DR.

EX. INLET 2757

TC 718.42

IE (NW) 716.42

DOWNSTREAM DEFENDER - 8 FT DIA.

IE (W) 705.97

IE (E) 707.97

INLET PROTECTION

24 LF O

F

24" RC

P 9.0

0%

CONNECT TO

EXISTING

REMOVE 32 LF OF 24" RCP

61 SYS OF

PAVEMENT REPAIR

Page 3: FOR THE CITY OF WEST LAFAYETTE, INDIANA€¦ · grading. runoff control - diversions, perimeter protection, check dams, outlet protection. runoff control practices shall be installed

Dra

win

g: J:\W

est L

afa

ye

tte

\P

ro

je

cts\2

21

01

9 W

L

af P

ark R

id

ge

B

MP

\C

AD

\D

WG

\S

he

ets\2

21

01

9-M

S.d

wg

| L

ayo

ut: 0

1 | P

lo

tte

d: 1

1/1

2/1

9 @

0

2:3

9:5

2 | L

astS

ave

dB

y: Ja

so

nW

SHEET NO.

NO. DATE REVISION DESCRIPTIONSINITIALS

CHECKED BY

APPROVED BY

ISSUE DATE

PROJECT NUMBER

DRAWN BYPARK RIDGE BMP

CITY OF WEST LAFAYETTE, INDIANA

1

1

/

1

2

/

2

0

1

9

SCALE VERIFICATION

BAR IS ONE INCH LONG ON

ORIGINAL DRAWING

NOVEMBER 2019

221019-04-001

TOTAL SHEETS

04

03

EROSION CONTROL DETAILS

JRW

KNM

WJL

EROSION CONTROL NOTES:

1. INLET PROTECTION SHALL BE INSTALLED ON ALL INLETS AS SHOWN ON THE PLANS.

2. WATER FROM TRENCH DEWATERING SHALL BE FILTERED OR DISCHARGED TO A FLAT GRASS COVERED

AREA AND NOT DIRECTLY DISCHARGED TO ANY DITCH, STREAM, WETLAND, OR STORM WATER

CONVEYANCE.

3. MATERIAL FROM TRENCH EXCAVATION SHALL BE PLACED AWAY FROM ANY STREAM, WATERWAY, DITCH,

WETLAND, OR STORM WATER CONVEYANCE. MATERIAL NOT USED FOR BACKFILL SHALL BE DISPOSED OF

PROPERLY.

4. STREETS SHALL BE SWEPT AND CLEANED ON A DAILY BASIS AT A MINIMUM AND MORE FREQUENTLY AS

SEDIMENT IS TRACKED ONTO ROADWAYS ACCORDING TO THE SEDIMENT TRACKING SPECIFICATION.

5. DIRECTLY FOLLOWING INSTALLATION OF STORM SEWERS, DISTURBED SOILS MUST BE TEMPORARILY OR

PERMANENTLY SEEDED.

6. IN NO INSTANCE SHALL CONSTRUCTION MATERIAL, FILL, OR DEBRIS BE PLACED IN A DITCH, STREAM,

WETLAND, OR WATERWAY.

7. INSTALL AND UTILIZE CONCRETE WASHOUT AREA PER DETAIL OR UTILIZE A PLASTIC LINED ROLL OFF

CONTAINER FOR CONCRETE WASHOUT AT AREAS WHERE SIDEWALKS, AND CURB REPLACEMENT WILL BE

INSTALLED UNLESS OTHERWISE APPROVED BY THE ENGINEER.

EROSION CONTROL SCHEDULE

CONSTRUCTION ACTIVITY SCHEDULE CONSIDERATION

CONSTRUCTION ACCESS - ENTRANCE TO SITE,

CONSTRUCTION ROUTES, AREAS DESIGNATED FOR

EQUIPMENT PARKING OR MATERIAL STAGING.

THIS IS THE FIRST LAND-DISTURBING ACTIVITY. AS

SOON AS CONSTRUCTION BEGINS, STABILIZE ANY

BARE AREAS WITH GRAVEL AND TEMPORARY

VEGETATION.

SEDIMENT TRAPS AND BARRIERS - BASIN TRAPS,

SILT FENCE.

AFTER CONSTRUCTION IS ACCESSED, BASINS

SHALL BE INSTALLED, WITH THE ADDITION OF MORE

TRAPS AND BARRIERS AS NEEDED DURING

GRADING.

RUNOFF CONTROL - DIVERSIONS, PERIMETER

PROTECTION, CHECK DAMS, OUTLET PROTECTION.

RUNOFF CONTROL PRACTICES SHALL BE INSTALLED

AFTER THE INSTALLATION OF SEDIMENT TRAPS

AND BEFORE LAND GRADING. ADDITIONAL RUNOFF

CONTROL MEASURES MAY BE INSTALLED DURING

GRADING.

RUNOFF CONVEYANCE SYSTEM - STABILIZE

STREAM BANKS, STORM DRAINS, CHANNELS, INLET

AND OUTLET PROTECTION, SLOPE DRAINS.

AS NECESSARY, STABILIZE STREAM BANKS AND

SIDE SLOPES OF RUNOFF SYSTEMS AS SOON AS

POSSIBLE. USE EROSION CONTROL BLANKETS OR

SLOPE DRAINS TO PREVENT EROSION. INSTALL

INLET PROTECTION TO PREVENT SEDIMENTS FROM

ENTERING STORM DRAINAGE SYSTEMS. PROTECT

STORM OUTLETS TO PREVENT EROSION.

LAND CLEARING AND GRADING - SITE

PREPARATION (CUTTING, FILLING, AND GRADING,

SEDIMENT TRAPS, BARRIERS, DIVERSIONS, DRAINS,

SURFACE ROUGHENING).

IMPLEMENT CLEARING AND GRADING AFTER

INSTALLATION OF SEDIMENT TRAPS AND RUNOFF

CONTROL MEASURES, AND INSTALL ADDITIONAL

CONTROL MEASURES AS GRADING CONTINUES.

CLEAR BORROW AND DISPOSAL AREAS AS NEEDED,

AND MARK TREES AND BUFFER AREAS FOR

PRESERVATION.

SURFACE STABILIZATION - TEMPORARY AND

PERMANENT SEEDING, MULCHING, SODDING,

RIPRAP, EROSION CONTROL BLANKET.

TEMPORARY OR PERMANENT STABILIZING

MEASURES SHALL BE APPLIED IMMEDIATELY TO

ANY DISTURBED AREAS WHERE WORK HAS BEEN

EITHER COMPLETED OR DELAYED.

CONSTRUCTION - STRUCTURES, UTILITIES, PAVING DURING CONSTRUCTION, INSTALL ANY EROSION

AND SEDIMENTATION CONTROL MEASURES THAT

ARE NEEDED.

LANDSCAPING AND FINAL STABILIZATION -

TOPSOILING TREES AND SHRUBS, PERMANENT

SEEDING, MULCHING, SODDING, RIPRAP.

THIS IS THE LAST CONSTRUCTION PHASE.

STABILIZE ALL DISTURBED AREAS, INCLUDING

BORROW AND SPOIL AREAS, AND REMOVE ALL

TEMPORARY CONTROL MEASURES. A UNIFORM

DENSITY OF 70% VEGETATED COVER IS REQUIRED

PUMPING BAG

SCALE: NONE

FLOW

PLANSIDE VIEW

MAINTENANCE:

1. DURING THE ACTIVE DEWATERING PROCESS, INSPECTION OF THE PUMPING BAG SHOULD BE REVIEWED

FREQUENTLY. SPECIAL ATTENTION SHOULD BE PAID TO THE BUFFER AREA FOR ANY SIGN OF EROSION AND

CONCENTRATION OF FLOW. OBSERVE WHERE POSSIBLE THE VISUAL QUALITY OF THE EFFLUENT AND

DETERMINE IF ADDITIONAL TREATMENT CAN BE PROVIDED.

2. DISPOSE OF ACCUMULATED SEDIMENT REMOVED DURING PUMPING OPERATIONS IN CONFORMANCE WITH

THE SPECIFICATIONS.

3. REPLACE THE BAG OR DISPOSE OF SILT WHEN HALF FULL OF SEDIMENT OR WHEN SEDIMENT HAS REDUCED

THE FLOW RATE TO AN IMPRACTICAL RATE.

SOURCE:

KRISTAR

DANDY DEWATERING BAG

SEDCATCH

MECHANICAL PROPERTIES TEST METHOD UNITS INDUSTRY STANDARD

GRAB TENSILE STRENGTH ASTM D4632kN (LB) 0.9 (205) X 0.9 (205)

GRAB TENSILE ELONGATION ASTM D4632 % 50 X 50

PUNCTURE STRENGTH ASTM D4833kN (LB) 0.58 (130)

MULLEN BURST STRENGTH ASTM D3786kPa (PSI) 2618 (380)

TRAPEZOID TEAR STRENGTH ASTM D4533kN (LB) 0.36 (80) X 0.36 (80)

UV RESISTANCE ASTM D4355 % 70

APPARENT OPENING SIZE ASTM D4751Mm (US STD SIEVE) 0.180 (80)

FLOW RATE ASTM D4491 1/MIN/M² (GAL/MIN/FT²) 3866 (95)

PERMITTIVITY ASTM D4491 1.2

PUMP DISCHARGE HOSE

TIE DOWN

STRAP

SEWN IN SPOUT

WATER

PUMP

DEWATERING

BAG

FILTERED

WATER

AGGREGATE OR STRAW

UNDERLAY (FOR ADDED

FLOW)

S

-1

SEASONAL SOIL PROTECTION CHART

DECNOVOCTSEPAUGJULJUNMAYAPRMARFEBJAN

A

B

C D

E

F

G

B

STABILIZATION

PRACTICE

PERMANENT

SEEDING

DORMANT

SEEDING

TEMPORARY

SEEDING

SODDING

MULCHING

E

NOTES:

1. IRRIGATION NEEDED DURING MAY THROUGH SEPTEMBER.

2. IRRIGATION NEEDED FOR 2 TO 3 WEEKS AFTER APPLYING SOD.

3. ANCHORED MULCH IS REQUIRED FOR PERMANENT, DORMANT AND TEMPORARY SEEDING.

4. OPTIMUM SEEDING DATES PROVIDED. DATES MAY BE EXTENDED OR SHORTENED BASED ON PROJECT

LOCATION.

5. SEED MIXTURES PROVIDED FOR LAWNS AND HIGH MAINTENANCE AREAS.

MAINTENANCE:

1. INSPECT WITHIN 24 HOURS OF EACH RAIN EVENT AND AT LEAST ONCE EVERY 7 CALENDAR DAYS.

2. CHECK FOR EROSION AND MOVEMENT OF MULCH AND REPAIR IMMEDIATELY.

3. MONITOR FOR EROSION DAMAGE AND ADEQUATE COVER (70% DENSITY).

4. RESEED, FERTILIZE OR APPLY MULCH WHERE NECESSARY.

A. = KENTUCKY BLUEGRASS 40 LB/ACRE

B. = KENTUCKY BLUEGRASS 210 LB/ACRE

C. = SPRING OATS 100 LB/ACRE (1" PLANTING DEPTH)

D. = WHEAT OR RYE 150 LB/ACRE (1" - 1.5" PLANTING DEPTH)

E. = ANNUAL RYEGRASS 40 LB/ACRE (1/4" PLANTING DEPTH)

F. = SOD

G. = ANCHORED STRAW/HAY (2 TONS/ACRE) OR WOOD FIBER/CELLULOSE (1 TON/ACRE)

INLET PROTECTION

SCALE: NONE

INLET FILTER SPECIFICATIONS

MATERIAL PROPERTY TEST METHOD VALUE (AVG)

GRAB TENSILE ASTM D4632 255 X 275

PUNCTURE STRENGTH ASTM D4833 135 LB

TRAPEZOIDAL TEAR ASTM D4533 75 LB

UV RESISTANCE ASTM D4355 90%

APP OPEN SIZE (AOS)ASTM D4751 NO. 20 SIEVE

PERMITTIVITY ASTM D4491

WATER FLOW RATE ASTM D4491 200 GPM/SQFT

SEDIMENT REMOVAL

EFFICIENCY (8% MIX)

ASTM D7351 82%

REAR CURB

GUARD

FLAP WITH

MAGNETIC

TIE-DOWNS

LIFT HANDLES

11 GAUGE STEEL

SUSPENSION

SYSTEM

STAINLESS STEEL

CLAMPING BAND

REPLACEABLE SEDIMENT BAGS

WITH GEOTEXTILE FILTER FABRIC

STANDARD 2"

OVERFLOW AREA

CURB BOX

INLET FILTER

FLAT/RECTANGULAR

/ROLLED CURB INLET FILTER

ROUND

INLET FILTER

INSTALLATION:

1. REMOVE THE GRATE FROM THE DRAINAGE

STRUCTURE.

2. CLEAN THE LEDGE DRAINAGE STRUCTURE

TO ENSURE IT IS FREE OF STONE AND DIRT.

3. DROP IN THE INLET FILTER THROUGH THE

CLEAR OPENING AND BE SURE THE

SUSPENSION HANGERS REST FIRMLY ON

THE INSIDE LEDGE.

4. REPLACE THE GRATE.

5. FOR CURB BOX INLET FILTERS: INSERT

INLET FILTER AS DESCRIBED ABOVE IN

COMBINATION WITH THE CURB BOX FLAP IN

ACCORDANCE WITH THE MANUFACTURER’S

RECOMMENDATIONS.

MAINTENANCE:

1. INSPECT THE INLET FILTER DAILY AND

AFTER EACH STORM EVENT AND EMPTY IF

THE SEDIMENT BAG IS MORE THAN HALF

FILLED WITH SEDIMENT AND DEBRIS, OR AS

DIRECTED BY THE ENGINEER.

2. REMOVE THE GRATE AND LIFT THE INLET

FILTER FROM THE DRAINAGE STRUCTURE.

DISPOSE OF ACCUMULATED SEDIMENTS

AND DEBRIS PROPERLY. MATERIAL SHALL

NOT BE DISCHARGED TO THE STORM

SEWER SYSTEM.

3. REMOVE ANY CAKED ON SILT FROM THE

SEDIMENT BAG AND REVERSE FLUSH THE

BAG FOR OPTIMAL FILTRATION.

4. REPLACE THE BAG IF THE INNER FILTER

MEMBRANE IS TORN.

SOURCE: FLEX STORM INLET FILTER

WOVEN GEOTEXTILE SEDIMENT BAG SPECS (2 FT VOL)

1.5 S

-1

CONCRETE WASHOUT

SCALE: NONE

PLAN

L = INSIDE LENGTH

W = INSIDE WIDTH

W=MINIMUM

10'

L=MINIMUM

10'

WOOD OR METAL STAKES TO

SECURE STRAW BALES

(2 PER STRAW BALE)

METAL PINS OR STAPLES TO SECURE

THE POLYETHYLENE LINING TO THE

STRAW BALES

STRAW BALE (ALTERNATE MATERIALS OR

PRODUCTS MAY BE USED TO PROVIDE

STRUCTURAL CONTAINMENT), ALTERNATE

MATERIALS OR PRODUCTS WILL REQUIRE

DESIGN MODIFICATION

POLYETHYLENE LINING (10 MILS),

EXTEND OVER STRAW BALES

MINIMUM 3'

COMPACTED SOIL

MATERIAL

METAL PINS OR STAPLES TO SECURE

THE POLYETHYLENE LINING TO THE

STRAW BALES POLYETHYLENE LINING (10 MILS),

EXTEND OVER STRAW BALES

GRADE

STRAW BALES ENTRENCHED

4" INTO THE SOIL

NOTES:

1. LOCATE WASHOUTS AT LEAST 50' FROM ANY CREEKS, WETLANDS, DITCHES, KARST FEATURES, OR STORM

DRAIN/CONVEYANCES.

WASHOUT PROCEDURES:

1. DO NOT LEAVE EXCESS MUD IN THE CHUTES OR HOPPER AFTER POURING CONCRETE. MAKE EVERY

EFFORT TO EMPTY THE CHUTE AND HOPPER AT THE POUR. THE LESS MATERIAL LEFT IN THE CHUTES

AND HOPPER, THE QUICKER AND EASIER THE CLEANOUT. SMALL AMOUNTS OF EXCESS CONCRETE (NOT

WASHOUT WATER) MAY BE DISPOSED OF IN AREAS THAT WILL NOT FLOW TO AN AREA THAT IS TO BE

PROTECTED.

2. SCRAPE AS MUCH MATERIAL FROM THE CHUTES AS POSSIBLE BEFORE WASHING THEM. USE NON-WATER

CLEANING METHODS TO MINIMIZE THE CHANCE FOR WASTE TO FLOW OFF SITE.

3. STOP WASHING OUT IN AN AREA IF YOU OBSERVE WATER RUNNING OFF THE DESIGNATED AREA OR IF

THE WATER IS NOT BEING CONTAINED WITHIN THE WASHOUT AREA.

4. DO NOT BACK FLUSH EQUIPMENT AT THE PROJECT SITE.

5. DO NOT USE ADDITIVES WITH WASH WATER.

6. DO NOT WASH OUT OR DRAIN WASTE WATERS TO STORM DRAINS, WETLANDS, STREAMS, RIVERS,

CREEKS, DITCHES OR STREETS.

MAINTENANCE:

1. MAINTENANCE REQUIREMENTS PROVIDED IN SPECIFICATIONS.

TYPICAL SECTION

AutoCAD SHX Text
10303127
AutoCAD SHX Text
STATE OF
AutoCAD SHX Text
N
AutoCAD SHX Text
I
AutoCAD SHX Text
N
AutoCAD SHX Text
D
AutoCAD SHX Text
I
AutoCAD SHX Text
A
AutoCAD SHX Text
A
AutoCAD SHX Text
R
AutoCAD SHX Text
I
AutoCAD SHX Text
G
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
No.
AutoCAD SHX Text
T
AutoCAD SHX Text
S
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
D
Page 4: FOR THE CITY OF WEST LAFAYETTE, INDIANA€¦ · grading. runoff control - diversions, perimeter protection, check dams, outlet protection. runoff control practices shall be installed

Dra

win

g: J:\W

est L

afa

ye

tte

\P

ro

je

cts\2

21

01

9 W

L

af P

ark R

id

ge

B

MP

\C

AD

\D

WG

\S

he

ets\2

21

01

9-M

S.d

wg

| L

ayo

ut: 0

2 | P

lo

tte

d: 1

1/1

2/1

9 @

0

3:3

5:5

1 | L

astS

ave

dB

y: Ja

so

nW

SHEET NO.

NO. DATE REVISION DESCRIPTIONSINITIALS

CHECKED BY

APPROVED BY

ISSUE DATE

PROJECT NUMBER

DRAWN BYPARK RIDGE BMP

CITY OF WEST LAFAYETTE, INDIANA

1

1

/

1

2

/

2

0

1

9

SCALE VERIFICATION

BAR IS ONE INCH LONG ON

ORIGINAL DRAWING

NOVEMBER 2019

221019-04-001

TOTAL SHEETS

04

04

MISCELLAENOUS DETAILS

JRW

KNM

WJL

BEDDING AND 1/6 OD

HAUNCHING AREA

CLASS I OR CLASS II

MATERIAL

BEDDING BELOW

THE PIPE BARREL

BEDDING BELOW

THE PIPE BARREL

SOIL FOUNDATION

ROCK FOUNDATION

OD / 24

MIN = 3"

OD / 12

MIN = 6"

O

D

MINIMUM WIDTH =

1.25(OD) + 12"

EX GRADE

SURFACE

RESTORATION

UNDISTURBED EARTH

3" MINIMUM BELOW THE

BARREL, BELL HOLE

EXCAVATED

(SEE TABLE ABOVE)

1/6 OD

1/2 OD

HAUNCHING AND INITIAL

AND FINAL BACKFILL

EXCAVATED MATERIAL

OUTSIDE PAVEMENT

LOADING ZONE,

CLASS I OR CLASS II

MATERIAL INSIDE

PAVEMENT

LOADING ZONE

REINFORCED CONCRETE

PIPE (RCP) TRENCH

SCALE: NONE

PAVEMENT REPAIR

SCALE: NONE

440 LB/SYD HMA

INTERMEDIATE, TYPE B

COMPACTED

BACKFILL PER

TRENCH DETAIL

ASPHALT PAVEMENTCONCRETE PAVEMENT

VARIESVARIES

880 LB/SYD HMA

BASE, TYPE B

6" CONCRETE

COMPACTED

BACKFILL PER

TRENCH DETAIL

SAWCUT IN

STRAIGHT LINE

PARALLEL

TO TRENCH

6" COMPACTED

AGGREGATE, NO. 53

12"12"

SAWCUT IN

STRAIGHT LINE

PARALLEL

TO TRENCH

AutoCAD SHX Text
10303127
AutoCAD SHX Text
STATE OF
AutoCAD SHX Text
N
AutoCAD SHX Text
I
AutoCAD SHX Text
N
AutoCAD SHX Text
D
AutoCAD SHX Text
I
AutoCAD SHX Text
A
AutoCAD SHX Text
A
AutoCAD SHX Text
R
AutoCAD SHX Text
I
AutoCAD SHX Text
G
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
No.
AutoCAD SHX Text
T
AutoCAD SHX Text
S
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
D