flow diagrams fluor

11
Copyright ©2007 Fluor Corporation FLOW DIAGRAMS & PIPING LISTS Lesson Objectives: Lesson Objectives Flow Diagrams Flow Diagrams

Upload: alroman

Post on 16-Oct-2015

129 views

Category:

Documents


9 download

TRANSCRIPT

  • Copyright 2007 Fluor Corporation

    FLOW DIAGRAMS & PIPING LISTS

    Lesson Objectives:

    Lesson Objectives

    Flow Diagrams

    Flow Diagrams

  • Process Flow Diagram (PFD)

    Process Flow Diagram

    28-D-7L.O. STILL

    60 I.D. X 61-0 T-T180 PSIG

    28-B-1L.O. STILLREBOILER

    379mm BTU/NR

    28-D-BL.O. STILL

    OVERHEAD ACCUMULATOR48 I.D. X 17-0 T-T

    170 PSIG 137 F

    Process Flow Diagram (PFD) (Sample)

    Process Flow Diagram (PFD) (Sample)

    PFD Symbology - Vessels

  • Process Flow Diagram (PFD) (Sample)

    PFD Symbology - Pumps

    Process Flow Diagram (PFD) (Sample)

    PFD Symbology Heat Exchangers

    Process Flow Diagram (PFD) (Sample)PFD Symbology

  • Mechanical Flow Diagram (MFD)aka Piping and Instrumentation Diagram (P&ID)

    Mechanical Flow Diagram(aka) Piping and InstrumentationDiagram (P&ID)

    Line Identification

    11 - 4A6 Ih ST (2-3/8)11 - 4A6 Ih ST (2-3/8)

    Line sizeMaterial specificationNumber of lineUnit number

    Insulation typeTracingQuantity & size of tracers

    Insulation:

  • Insulation Installation:

    Typical details for insulated sub-in or tee

    Typical details for insulated ell

    Insulation Chart:

    Personnel Protection:

  • Insulation Details:

    Typical details at support for piping with shoes:

    Typical details at support for piping without shoes:

    Commodity FlowUpstream & Downstream:

    Copyright 2007 Fluor Corporation

    LINE LIST SAMPLE

  • Pipe Line List

    Mechanical Flow Diagram Symbols:

    HORIZONTAL VESSEL VERTICAL VESSEL

    INSIDE BOTTOM

    OF VESSEL

    HEIGHT SET

    BY PROCESSH.P.F.S.

    TANGENT

    LINE

    HEIGHT SET

    BY PROCESS

    Mechanical Flow Diagram (Sample)

  • Process vs Mechanical Flow Diagrams (Exchangers)

    ProcessFlow Diagram

    Systems &Mechanical

    Flow Diagrams

    Process vs Mechanical Flow Diagrams (Exchangers)

    PROCESSFLOW DIAGRAM

    SYSTEMS & MECHANICALFLOW DIAGRAMS

    Process vs Mechanical Flow Diagrams (Exchangers, cont.)

    PROCESSFLOW DIAGRAM

    SYSTEMS & MECHANICALFLOW DIAGRAMS

  • Mechanical Flow Diagram Symbols:

    Pump Drivers

    Electric Motor Steam Turbine

    Process vs Mechanical Flow Diagrams (Pumps)

    PROCESSFLOW DIAGRAM

    SYSTEMS & MECHANICALFLOW DIAGRAMS

    CENTRIFUGALPUMP

    CENTRIFUGALIN-LINE PUMP

    VERTICAL CANCENTRIFUGAL

    PUMP

    Process vs Mechanical Flow Diagrams (Pumps, cont.)

    PROCESSFLOW DIAGRAM

    SYSTEMS & MECHANICALFLOW DIAGRAMS

    ROTARYPUMP

    RECIPROCATINGPUMP

  • Utility Flow Diagrams

    Utility Flow Diagrams

    Utility Flow Diagram:(Sample)

    Utility Flow Diagram: (Sample)

    NOTES:

    GENERAL:1. SEE DRAWINGS 00-SD-0002 THRU 00-SD-0006 FOR STANDARD SYMBOLS AND NOMENCLATURE.

    1. LOCATED AT UNIT BATTERY LIMITS.

    2. LINE SIZES ARE PRELIMINARY.

    EO/EG UNIT UTILITIES UNIT

    WAS

    TE

    WAT

    ER

    TRE

    ATM

    ENT

    MAI

    N

    FLA

    RE

    ETHYLENE UNIT

    UT

    ILIT

    IES

    UNIT

    BUILDING AREA

    ET

    HYLE

    NE

    UN

    IT

    C2/

    C3

    STO

    RAG

    E

    C2=/C3=FLARE METERING

    LAO

    STO

    RAG

    E

    GLY

    CO

    L S

    TOR

    AGE

    COOLING WATER / SEAWATER UNIT LAO UNIT

    VCM UNIT PVC UNIT PE UNIT

    TRU

    CK

    LOA

    DING

    REV DATE PIPPROCESSCTRL SYS EICS PROJ

    B A

    REFERENCE DRAWING TITLE

    B 80-SD-300880-SD-3008.igr

    C. HOLLOWELL06/27/01None

    INSTRUMENT AIR / PLANT AIRINTERCONNECTING PIPING / PIPE RACKS

    UTILITIES AND OFFSITESPIPING AND INSTRUMENT DIAGRAM

    ISSUED FOR IN-HOUSE REVIEW B ISSUED FOR IN-HOUSE REVIEW A

    2. ALL INSTRUMENT NUMBERS AND PIPING SPECIALTY ITEMS ON THIS P&ID ARE PREFIXED BY WBS NUMBER " " UNLESS OTHERWISE NOTED.80

    6" 3" 6" 6" 6" 3"

    1 1 1

    80 - AR - ____ - 12CS1T01 - 2"

    80 - AI - ____ - 12CG0T85 - 2"

    80

    -

    AI

    -

    ___

    _

    -

    12C

    G0T

    85 -

    4"

    80 - AR_ - ____ - 12CS1T01 - 12"

    80 -

    AR

    -

    ___

    _

    -

    12CS

    1T01

    -

    8"

    80 -

    AI -

    ____

    -

    12C

    G0T

    85 -

    10"

    80 -

    AR

    -

    ___

    _

    -

    12CS

    1T01

    -

    3"

    80

    -

    AI

    -

    ___

    _

    -

    12C

    G0T

    85 -

    3"

    80 - AI - ____ - 12CG0T85 - 3

    80

    -

    AR

    -

    __

    __

    -

    12CS

    1T01

    -

    3"

    80 - AI

    - __

    __ - 12

    CG0T

    85 - 4"

    80 - AR

    - ___

    _ - 12

    CS1

    T01

    - 2"

    80 - AI

    - ___

    _ - 12

    CG

    0T85

    - 2"

    80 - AI - ____ - 12CG0T85 - 2"

    80 - AR - ____ - 12CS1T01 - 2"

    80 - AR - ____ - 12CS1T01 - 2"

    80 - AI - ____ - 12CG0T85 - 2"

    80 - AR - ____ - 12CS1T01 - 2"

    80 - A I - ____ - 12CG0T85 - 2"

    80 - A

    I - ____

    - 12

    CG

    0T85

    - 3"

    80 - AR

    - ____

    - 12

    CS1

    T01

    - 3"

    INST

    RUM

    ENT

    AIR

    86

    -S

    D-__

    __

    TO BU

    ILD

    ING

    S

    80 - AR - ____ - 12CS1T01 - 6"

    80 - AR - ____ - 12CS1T01 - 3"

    10" x 6"

    INST

    RUM

    ENT

    AIR

    10

    -S

    D-__

    __

    TP ET

    HYL

    ENE

    U

    NIT

    PLANT AIR 10-SD-____

    TO ETHYLENE UNIT

    PLANT AIR 70-SD-2016

    FROM UTILITIES

    PLA

    NT AI

    R

    72-SD

    -20

    16FR

    OM

    U

    TILI

    TIES

    INST

    RUM

    ENT

    AIR

    72

    -SD

    -20

    16FR

    OM

    U

    TILI

    TIES

    PLAN

    T AI

    R

    20-S

    D-__

    __

    TO E

    O / E

    G U

    NIT

    INST

    RUM

    ENT

    AIR

    20

    -S

    D-__

    __

    TO E

    O / E

    G U

    NIT

    PLANT AIR 77-SD-____

    TO WASTE WATER TREATMENT

    INSTRUMENT AIR 77-SD-____

    TO WASTE WATER TREATMENT

    80 - A I - ____ - 12CG0T85 - 3"

    80 - AR - ____ - 12CS1T01 - 3"

    80 - AR - ____ - 12CS1T01 - 2"

    INSTRUMENT AIR 79-SD-____

    TO LAO GRO UND FLARE

    PLANT AIR 79-SD-____

    TO LAO GRO UND FLARE

    INSTRUMENT AIR FLARE 79-SD-____

    TO ETHYLENE GRO UND FLARE

    PLANT AIR 79-SD-____

    TO ETHYLENE GROUND

    80 - AR - ____ - 12CS1T01 - 2"

    80 - AI - ____ - 12CG0T85 - 2"

    80 - AR - ____ - 12CS1T01 - 2"

    80 - AI - ____ - 12CG0T85 - 2"

    PLA

    NT A

    IR

    78-SD

    -_

    __

    __

    TO CO

    OLI

    NG

    W

    ATER

    AR

    EA

    INST

    RUM

    ENT

    AIR

    78

    -SD

    -_

    __

    __

    TO CO

    OLI

    NG

    W

    ATER

    AR

    EA

    PLANT AIR 75-SD-_____

    TO GLYCOL TANKING

    INSTRUMENT AIR 75-SD-_____

    TO GLYCOL STORAGE

    PLANT AIR 75-SD-____

    TO LAO TANKAGE

    INSTRUMENT AIR 75-SD-____

    TO LAO TANKAGE

    PLANT AIR 75-SD-____

    TO C2/C3 STORAGE

    INSTRUMENT AIR 75-SD-____

    TO C2/C3 STORAGE

    80 - AR - ____ - 12CS1T01 - 2"

    80 - AI - ____ - 12CG0T85 - 2"

    6" x 3"

    INST

    RUM

    ENT

    AIR

    93

    -S

    D-__

    __

    TO M

    ETER

    ING

    ST

    ATIO

    N

    PLAN

    T AI

    R

    93-S

    D-__

    __

    TO M

    ETER

    ING

    ST

    ATIO

    N

    8" x 6"

    PLAN

    T AI

    R

    79-S

    D-__

    __

    TO C

    2 / C

    3 FL

    ARE

    INST

    RUM

    ENT

    AIR

    79

    -S

    D-__

    __

    TO C

    2 / C

    3 FL

    ARE

    PALN

    T AI

    R

    30-S

    D-___

    _

    TO LA

    O U

    NIT

    INST

    RUM

    ENT

    AIR

    30

    -S

    D-___

    _

    TO LA

    O U

    NIT

    80 - AR - ____ - 12CS1T01 - 6"

    PLAN

    T AI

    R

    86-S

    D-__

    __

    TO BU

    ILD

    ING

    S

    80 - AR

    - ___

    _ - 12

    CS1T

    01 - 2"

    80 - AI

    - ___

    _ - 12

    CG

    0T85

    - 2"

    80 - AI - ____ - 12CG0T01 - 2"

    8O - AR - ____ - 12CG0T01 - 2"

    PLANT AIR 75-SD-____

    TO TRUCK LOADING

    INSTRUMENT AIR 75-SD-_____

    TO TRUCK LOADING

    80 - AR - ____ - 12CS1T01 - 2"

    80 - A I - ____ - 12CG0T85 - 2"

    8" x 6"

    10" x 6"

    6" x 3"

    6" x 3"

    3" x

    2"

    3" x

    2"

  • Questions??