flood disaster management plan - bihodmmadhubani.bih.nic.in/presentation/disaster mgt...
TRANSCRIPT
Profile of Madhubnai district
District Boundary-
� North - Hill region of NEPAL
� South - Darbhanga District
� East - Supaul District
� West - Sithamadhi District
General Information-
� Number of Village - 1116
� Number of Panchyat - 399
� Number of C.D.Block - 21
� Number of Revenue Circle - 20
� Number of Sub-Division -05
� Number of Urban Area - 04
� Number of M.P. Constituencies - 02
� Number of M.L.A. Constituency - 011
� Number of Zila Parisad Member - 56
Threats of the District-
� Natural Disaster- Flood Zone (EntireDistrict), Seismic Zone V (High Risk), ColdWave, High Wind, Draught & Fire.
� Population Explosion– The growth rate is agrave Concern for the district.
� Volatile International Border.
� Under Developed Infrastructure.
� Low Agriculture Production.
� Illiteracy
Disaster Management- Why for Madhubani?
• What we see in Madhubani District:-
-Different Disaster
-Different Severity
- Different Dimensions
• Learning From Resent Disasters of Madhubani District:-
- Lack of disaster preparedness at all level.
- Lack of mitigation plan at all level.
- Lack of communication networking & dissemination of information among
community.
- Delayed response due to mismanagement of relief, resources, manpower & duty
delegation.
- Lack of interface & coordination with stake-holders, Administration, &
Community
Huge loss of Life & Property
Disaster ManagementIs needed to minimize the loss.
Contents of Disaster Management Plan
• Introduction
• Overview of the District
• Risk Assessment and Vulnerable Analysis
• Maps
• Capability Analysis
• Prevention, Response and Mitigation Strategies
• Coordination & Linkage
• Preparedness & Check List
• Do’s & Don’ts
• Flow Charts
Introduction
• Vision
• Objectives
• Role of District
Administration
• Strategy
�Constitution of
Circles and Zones
�Function of District
Control Room
�Wireless Stations
Strategy
�Deployment of Power Boats
�Deployment of Country Boats
�Closure of week/ Vulnerable Points
�Rain Recording and Submission of Rain fall reports
�Gauge Reading
• Weak & Vulnerable Points
– Block/Panchyat/Village
– River
– Name of the Embankment
– Location / Thereat Villages
– Criteria
– Flood Protection Measures
Risk Assessment and Vulnerable Analysis
10
BANDH SAFETY
1.Patrolling of Bandhs :- Arrangements
Total Area :-233.06 KM Embankments
- Three Flood Control Divs.
(5 Asst. Engr. ,16 J.E.,Staff deployed 24 X 7 for patrolling the Embankments)- Chowkidars deployed by COs
2.Making Available sand bags on BandhsEmpty Bags:- Five lakhs Nylon Crate:- 15 Thousand PiecesB.S. Wire :- 2 MT
3.Identification of Weak Points : 21 Identified
4.Reinforcement of Weak PointsReinforcement works in Progress at points by Deptt
5.Training of Village Volunteer/ChowkidarsBlock wise training imparted by NDRF
11
FOOD GRAINS
1.Requirement of Food Grains
- 20000 QT Wheat & Rice (Immediate)
- 111124 QT Grain Available at 14 Stock points of SFC
- Stock points at each Block= 21 Stock Points
2.Issue of Order to FCI and SFC as per relief Act
- Letter has been sent at concerned Level
3.Availablity of food grains: Panchayats /Blocks
SFC/FCI , Jainagar Stock -
12
MEDICINES AND HEALTH FACILITY
1. Meeting of Civil Surgeon to review availability of Medicines
- Meeting Held and Necessary Instructions Passed . Available Medicine
2. Availability of Bleaching Powder
- Available at all levels
( 1000 Bags @ 25 Kg )
- Order Placed for 500 Bag
3. Availability of Halogen Tablets
- Available at 05 Lakh tab.
- Order Placed for o5 Lakh Tablets
4. Medical Teams : 92 No Static & 20 No Mobile will be functional
at each Blocs & Shelter after 15th June.
RL
DNS
NS
Dextros 05%
Bleaching Powder
ORS- 10 Lakh Packet
Metrotinidazole 200Mg
Metrotinidazole 400 Mg
Spray TZ
IV Set
Mebandazole SYP
Metrotinotazole Syp
Firozoladine
13
Evacuation1. Availability of Govt. Boats
- 193 Govt.Boats Available, 07 Motor Boats are Available
- Vulnerable panchyat has been instructed to purchase boat from Panchyat fund
2. Availability of Private Boats
- 132
3. All boats to carry notice board “ State Government Boat : Free “
-Instruction passed to all COs for Compliance
4. Route map of Boats
-Made available as per flow of Water
5. Fixing of Rates for Mechanized Motor Boats/Boat
6. Boatman: Identified at all Block & 10 Home Guard Trained for Motor Boat
7. Monitoring of overloading on Private Boats-Instruction passed to COs and Police Stations
14
RESCUE
1. List of divers for rescue
- Available- 186 Home guard Trained
- 05 Person X 21 Block= 105 S/R Master Trainer Trainedwith Blocks under GOI-UNDP DRM Programme
- 05 Volunteers in each village will be Trained till June 31st
under DRM Programme.
2. Life Jackets: Available at District Level & Community
people are Trained to make with local resource by NDRF &Local Master Trainers.
15
SHELTER
1.Purchase of Polythene Sheets- No
- Block wise requirement Assessed
- Tender Process Completed
2.Stock position of Polythene at Block level
3.Identification of elevated places for shelter
- Block wise Identified -158 Traditional & 62 PSSK
- 18 Identified (NGO Supported)
4.Identification of place for Flood Relief Centre
-Identified in each Panchyat= 399 No. Panchayat
16
CATTLE
1. Availability of Medicine for cattle: Available & Order
Placed for more availability.
2. Arrangement of Fodder for Cattle- Block wise
3.Shelter: Identified -158 Traditional & 62 PSSK
- 18 Identified (NGO Supported)
18
MONITORING
1. Meeting of District Disaster Management Committee
- Held on 27-05-2009
2. Core Committee- Formed to Review at all levels on weekly basis.
3. Setting of Flood Management District Control Room
- Operational 24 X 7 at All Level from 15-06-2009
- District have divided into 21 Flood Zone under
the charge of 01 senior district level officer.
- 21 static Animal Medical team in addition with Mobile team.
- Each relief Shelter under the supervision of Block level Supervisor.
19
Communication
-Communication Plan ( Wireless & Mobile) - Planned: Phone No, Mobile No Also
-Road Communication - Planned
Preparedness
• Plan: VDMP/PDMP/BDMP- Planed (Community Level) to
complete till 31st June under DRM Programme.
• Trainings: For First-Aid & Search Rescue- Planed
(Community Level) to complete till 31st June under DRM Programme .
• Mock Disaster Drill – Planed (Community Level) to complete
till 31st June under DRM Programme .
20
Madhubani: Disaster Risk Management
Overview
• Disaster Risk Management- From Community to District(VDMC/PDMC/BDMP/DDMP) with strong institutional basis ofimplementation.
• Identify, assess and monitor Disaster Risks and enhanceEarly Warning System.
• Use knowledge ,education innovation to build a culture ofsafety and making community resilient
• Reduce the underlying Risk factors.
• Strengthen Disaster Preparedness for effective response& Mitigation.
21
Activities: Disaster Risk Management
• Disaster Management Planning.
• Coordination and communications.
• Awareness Generation.
• Training and capacity building.
• Mock Disaster Drill.
22
Planning
• Systematic Participatory Planning process that uses a
range of measures to ensure the highest practical
level of Disaster management.
• Planning for Community/Panchyat/Block & District
level.
• Measures of Planning: Hazard Mapping/
Risk/Vulnerability Mapping, Capacity Analysis,
Resource Mapping, Mitigation Mapping, Response
Mapping (Disaster wise), Capacity Building, Mock
Disaster Drill , Capacity Utilization & Control Rooms.
23
Coordination & Linkage
District Administration
District District Coordinating Agency
Block Coordinating Agency
NGOs / CBOs at GP & Village Levels
Village
GP
Block
24
Coordination & Communication FLOW CHART
District Emergency Operation Centre
(Disaster Management)
District Control Room
IMD/Flood Control Division State Control Room
State Flood Information
Management System
State Disaster Management Dept.
Health/ PHED
Agriculture Road/NH /REO/Building/
Electric.
Vet. FCD/
Irrigation.RTO Police/
Home Guard
DRDA/Public
Relation
Welfare Supply/Fire/Phone
Dist. Disaster Management Section
NGO Group Head Quarters
Defense /
Paramilitary Unit
NYK/ NCC/ Civil Defense/NSS/Red
Cross/Chamber of Commerce/Youth Club/
MCDA etc
Sub-Divn. Control Room
Block Control Room Panchayat Control Room
Community
The First Responder
NGO Coordination
Cell
PRIs
25
Capacity Building : Capacity Building : AtAt Various level for Govt. official Various level for Govt. official ,Villagers/ Masons /Teachers/ PRIs/NGOs & Others,Villagers/ Masons /Teachers/ PRIs/NGOs & Others
29
Mock Disaster Drill
@ Effective Response to Ensuring Safety
(Enhance the ability to Response Faster):Community to District
@ Drills Focuses on those action which are
necessary to respond to an emergency.
@ Regular Drill Excises test all the phase of
disaster Preparedness.
Element of Mock Drill• Emergency Response Plan: Explaining Intuitional response structure,
Emergency Response Functions & SOP for various Depts. & DMTs.
• Team Personnel at headquarter & field Level Trained on Their SOP
• Trained Quick Response teams in various possible operation like S/R, F/A, F/F etc.
• Update Data base of resource s, Equipments, & Manpower
• Mock-Drill Scenario &Detailed Action Plan
• Update Emergency Directory
•
• Evaluation Format
• Observer & Qualified Evaluators
30
31
Thank You
Pankaj KumarI.A.S.
District MagistrateDistrict MagistrateMadhubaniMadhubani
Ph: 06276-222217 (O)222218 (R)222209 (F)
E-mail : [email protected]@nic.in
Towards a safer Madhubani…