fiori sapphire_9-slide_revised (1)

10
Case Study Processing Gain and Loss through a SAPUI5 Application

Upload: zeeshan-shah

Post on 15-Aug-2015

24 views

Category:

Documents


0 download

TRANSCRIPT

Case Study

Processing Gain and Loss through a SAPUI5 Application

©2015 Infosys Confidential

2

Challenges & Measures

Key Drivers Solution Benefits

• Simplify the calculation, charging and reporting of mid-project Gain / Loss contingent on team performance

• Un-integrated technology with landscape leading to lot of “back and forth” between front & back office staff

• Need for systems integration, process automation and consumer grade intuitive user experience cutting across applications

• Ease of use and user interface that “Wows”

• Mobile access

• Reduce / eliminate data duplication and data entry errors

• Simulation options for smart decision making

• Visibility across entire business process

©2015 Infosys Confidential

3

Architecture

Connected Applications

Open Source Platform

Agnostic Apps

Process simplification

Best practices for development

Leverage existing architecture

• Use open source UI layer (UI5) to create platform agnostic apps (mobile, handhelds, desktop) leveraging OData services

• Create linkages between SAP, Workflow, rules engine, 3rd party applications to facilitate automation & process simplification leading to reduction in manual effort

• Leverage existing architecture and code pieces to the extent possible (technically as well as functionally)

• Follow best practice guidelines (for ex- while deploying gateway servers or using OData services)

©2015 Infosys Confidential

4

Project Overview

Nov 14 Dec 14 Jan 15 Feb 15

Roadmap Phase• Vision and Strategy• “To-be” business

capabilities• Build business case

Build Phase• Basis Installation (SAP

Gateway)• Write / modify services• Build integrations• SAP customizations• Convert master/ transaction

data if needed

Design Phase• Write User stories• Define Application architecture• Design “To be” wireframes

(using “agile” methodology)• Identify the nature of services-

• Use as-is• Use with modification• Build New

• Define Training and Support model• Hardware Sizing

Release: Testing and Deployment Phase• Unit & integration Test• Performance Test• User Acceptance

Testing • Training• Deployment

©2015 Infosys Confidential

5

• Conduct interviews• Wireframe UX• Uncover explicit & Implicit

needs• Lock Scope for app

• Demo application with integrations

• Run scenarios• Test user experience through

different devices

• Prototype user interfaces & process flow

• Iterate process & UX

Design Phase

A focus on design thinking

Discover Design Deliver

©2015 Infosys Confidential

6

Use Case

Persona- Billing Manager

ProcessStep

Underlying System

Desired Benefit

Calculation of mid-project Gain / Loss contingent on team’s performance

ECC6.0 BI7.3

Simulation options and calculation

Validation of LOB specific business rules and execution of approval workflow

3rd party rules engine3rd party workflow application

Integration of rules & workflow engine using middleware

Financial postings ECC6.0 Integration of request db and ECC

4People

7Systems

36Screens

62Clicks

Average turnaround time –

3days

2People

3Screens

1app

7Clicks

Average turnaround time –

6hours

©2015 Infosys Confidential

7

Architecture

SAPUI5 Application

Workflow Engine

Middleware

Reverse Proxy (SAP Web Dispatcher)

Rules Engine

SAP ECC

The flow diagram describes the process flow between the integrated systems

The application was deployed on the fiori Launchpad

The Launchpad hosted other applications as well as this one

©2015 Infosys Confidential

8

Landing Page

©2015 Infosys Confidential

9

• Automate e2e business process to derive maximum benefit of implementation

• Enterprise apps to cut across applications (SAP, Oracle, 3rd party cloud etc.)

• Use existing services where applicable (Web services, RFC’s, SOAP etc.)

• Analyze the possibility of UI5 development with angularjs/ other JavaScript frameworks

• Explore offline possibilities of FIORI apps

Key Takeaways

Strategic

• Data Accuracy

• Standardization & consolidation

• Process & Technology Improvement

• IT innovation

• Improved decision making

• Customer Satisfaction

Subjective Objective

• Complexity Management

• Risk Management

• Retire Legacy apps

• Operational spending

• Standardized infrastructure

Tactical & Operational

© 2014 Infosys Limited, Bangalore, India. All Rights Reserved. Infosys believes the information in this document is accurate as of its publication date; such information is subject to change without notice. Infosys acknowledges the proprietary rights of other companies to the trademarks, product names and such other intellectual property rights mentioned in this document. Except as expressly permitted, neither this documentation nor any part of it may be reproduced, stored in a retrieval system, or transmitted in any form or by any means, electronic, mechanical, printing, photocopying, recording or otherwise, without the prior permission of Infosys Limited and/ or any named intellectual property rights holders under this document.

Thank you

10