Yamne-I Hydro Electric Project
Report on Project Alternative Studies 1
Table of Contents
1. INTRODUCTION .................................................................................................................................................. 2
2. NEED FOR THE ALTERNATIVE STUDY.................................................................................................... 2
3. HYDROLOGY OF THE PROJECT .................................................................................................................... 3
3.1. Design Flood ..................................................................................................................................................... 3
4. ALTERNATIVE STUDIES FOR PROJECT LAYOUT ................................................................................ 3
4.1. Project Layout Alternative - I ................................................................................................................... 4
4.2. Project Layout Alternative - II .................................................................................................................. 7
4.3. Project Layout Alternative - III ................................................................................................................ 9
4.4. Conclusions andRecommendation for Project Layout .............................................................. 11
5. ALTERNATIVE STUDIES FOR OPTIMIZATION OF FRL ................................................................. 12
5.1. De-Silting Arrangement ........................................................................................................................... 13
5.2. Concrete Gravity Dam ............................................................................................................................... 12
5.3. Power Potential Study .............................................................................................................................. 15
5.4. Cost Benefit at each FRL ....................................................................................................................... 15
5.5. Conclusions and Recommendation .................................................................................................... 16
6. CONCLUSIONS ................................................................................................................................................... 16
-
7/29/2019 Final Report on Alternative Studies
2/16
Yamne-I Hydro Electric Project
Report on Project Alternative Studies 2
1. INTRODUCTIONThe Yamne - I HEP is being proposed as a Run of the River scheme across the River
Yamne, which is a left bank tributary of Siang River in Arunachal Pradesh. The
Project site is located in the upper most reaches of Yamne Basin.
The Government of Arunachal Pradesh has signed a Memorandum of Agreement
(MoA) for development of Yamne stage I project in between El. 800.0 m to El.
600.0 m with M/s Abir Construction Pvt. Ltd. (Presently known as Abir
Infrastructure Pvt. Ltd.)
As per MoA conditions SPV in name of M/s KU Yamne Energy Ventures Pvt. Ltd. was
formed which later changed name to M/s SS Yamne Energy Ventures Pvt. Ltd. for
implementation of project.
The dam site of Yamne I HEP is located downstream of the confluence of Yamne
and Yaming River. The tailrace outfall of Yamne I HEP has been proposed to be
located more than 2.0 km upstream of Yamne II submergence to have a2km free
flowing stretch of the river. The provided free stretch is such that it meets the MoEF
criteria of free flow stretch of river between two hydroelectric projects.
In this Report, the details of various alternative studies which are carried out to
finalize the project layout, optimization of FRL and selection of Diversion structure
are discussed.
2. NEED FOR THE ALTERNATIVE STUDYThe Yamne I HEP has been envisaged as Run of the River scheme and comprises of
a diversion structure, underground water conductor system, Surge Shaft and
Powerhouse. The maximum available gross head which can be harnessed in
technical and environmental sustainable manner is about 190.0m and the probable
installed capacity of the project would be about 120 150 MW.
The purpose of alternative studies is to arrive at a most cost effective and techno-
economically optimum layout which is most environment friendly. It is important to
note that cost of any hydro project is dependent upon its respective components
and to arrive at the most optimum project layout, assessment of respective costs
and energy benefits associated with any particular layout is of utmost importance.
-
7/29/2019 Final Report on Alternative Studies
3/16
Yamne-I Hydro Electric Project
Report on Project Alternative Studies 3
This report also aims at studying various possible options of project layout, their
respective costs and energy benefits.
3. APPROACH OF ALTERNATIVE STUDIESIn order to develop the most optimum layout two stage studies were conducted.
Stage I: Alternatives having same FRL but water conductor system on different
banks and surface / underground powerhouse options.
Stage II: After selecting the most optimum layout of water conductor system and
powerhouse, alternative studies for selecting the most optimum FRL for Yamne I
HEP.
4. HYDROLOGY OF THE PROJECTThe Project hydrology is one of the prime parameter for planning of hydro projects.
The 10-daily water availability data of 1978 79 to 2008-09 was submitted to CEA
/ CWC on 22.02.2012 and the same has been approved vide letter no
2/ARP/34/CEA/10-PAC/1399-1401, dated 9th March 2012. The approved 10-daily
discharge series for Yamne I HEP has been considered for power potential studies
of the alternative studies.
4.1. Design FloodIn the alternative studies, concrete gravity dam has been considered as a diversion
structure for the project. Probable Maximum Flood (PMF) has been considered as
design flood for the proposed diversion structures per the recommendations made
in IS 11223-1995. The PMF for Yamne I HEP has been estimated as 5783 cumecs
and the same flood intensity has been considered in the alternative studies for the
design of Spillway.
5. ALTERNATIVE STUDIES FOR PROJECT LAYOUT (STAGE I)The alternative study for Project Layout has been carried out to select the most
Techno-Economical layout for Yamne I HEP. After the preliminary evaluation of
many layouts the following three layouts have been considered for detailed study.
The details of these layouts are tabulated in Table 1.
-
7/29/2019 Final Report on Alternative Studies
4/16
Yamne-I Hydro Electric Project
Report on Project Alternative Studies 4
Table 1 Details of Project Layout Alternative Studies
Study No: Description
Project
Layout
Alternative-I
The Layout comprises of a Concrete Gravity Dam with the FRL at
El.740.0 m, Water Conductor System with surge shaft on the right bank
of Yamne River and Surface Powerhouse located about 1.0km
downstream of SipungNala Confluence. The average River bed level at
Powerhouse location is about El.550.0m. (Refer Drawing No. Yamne I
/ Alt studies / 001).
Project
Layout
Alternative-II
The Layout comprises of a Concrete Gravity Dam with the FRL at
El.740.0 m, Water Conductor System with surge shaft on the Left Bank
of Yamne River and Surface Powerhouse located about 400.0m
upstream of Sipung Nala Confluence. The average River bed level at
Powerhouse location is about El.565.0m. (Refer Drawing No. Yamne I
/ Alt studies / 002).
Project
Layout
Alternative-
III
The Layout comprises of a Concrete Gravity Dam with the FRL at
El.740.0 m, Water Conductor System with surge shaft on the Left Bank
of Yamne River and an underground Powerhouse located about 1.30
km downstream of Sipung Nala Confluence. The average River bed
level at Powerhouse location is about El.550.0 m. (Refer Drawing No.Yamne I / Alt studies / 003).
The ground levels considered in this study are worked out based on the Survey of
India Topo sheets. The Power Potential Studies for the above three alternatives
have been given inAnnexure1
5.1. Project Layout Alternative - IThe details of the major project components considered in the Project Layout
Alternative I are shown below in Table 2,
Table 2 Details of Project Layout Alternative - I
Project
ComponentDescription
Diversion
StructureThe Concrete Gravity Dam with Sluice Spillway and Stilling basin
-
7/29/2019 Final Report on Alternative Studies
5/16
Yamne-I Hydro Electric Project
Report on Project Alternative Studies 5
arrangement has been considered as diversion structure. The FRL of
the Project is considered at El. 740.00 m. The dam axis is located about
800.0m downstream of Yamne and Yaming River confluence. The
average River Bed Level at Dam site is about El.690.0m. The height of
the dam above average River Bed level is about 53.0m.
Water
Conductor
System
A Fore bay type Power Intake structure located on right bank of Yamne
River which will feed the design discharge to the HRT of 6.50m
diameter and 12.60km long. A surge shaft also been provided to take
care of the hydraulic transients expected during plant operations.
From the surge shaft the design discharge is conveyed through a
pressure shaft of 5.0 m diameter and 956.0 m length to the surface
Powerhouse. Four numbers of construction adits have been proposedat suitable intervals along the HRT to facilitate its construction.
Surface
Powerhouse
The surface Powerhouse is located on the right bank of Yamne River at
1.0km downstream of Sipung Nala. The tail water level is considered at
El.550.0m.
Heads &
Installed
Capacity
FRL of the Project - El. 740.0 m
MDDL of the Project - El. 735.0 m
TWL of the Project - El. 550.0 m
Head Loss in WCS - 14.58 m
Gross Head - 190 m
Rated Head - 173.75 m
Design Discharge - 98.84 cumecs
Installed Capacity - 155 MW
Annual Energy - 682.41 MU
Levelised Tariff - 6.95 INR/Unit
The primary project cost has been estimated based on the preliminary drawings
and rational assumptions. The completed cost of Project layout Alternative I has
been worked out to be INR 2218 Crores and the detailed breakup of the cost
-
7/29/2019 Final Report on Alternative Studies
6/16
Yamne-I Hydro Electric Project
Report on Project Alternative Studies 6
estimation is placed atAnnexure II. The Merits and Demerits with the Project
Layout Alternative I has been pointed out below.
Merits with Project Layout Alternative I:
1. The main advantage of this alternative is that the highest possible gross head of190.0m can be harnessed.
2. The Powerhouse site on located on a large natural terrace.3. No Local disturbance and hindrance.4. No agricultural land comes into land requirement of the project.
Demerits with Project Layout Alternative I:
1. The Complete water conductor system is traversing on the right bank of YamneRiver where no access roads are available. Thus field investigation shall require
at least one extra year and during the construction stage also one more year for
construction would be required in comparison to the left bank water conductor
system. Thus the Alternative I layout would require two more years in the
total execution period as compared to the other alternatives planned on the left
bank of Yamne River.
2. These studies are carried out based on Topo sheet of Survey of India in whichthe level difference between the powerhouse locations has a level difference of
15.0 m and the same has been considered for this study. However, during the
Site Visit on 20thJune 2012, fly leveling was carried out along the river with a
total station between the Powerhouse locations of upstream and downstream of
Sipung Nala. From the survey it has been observed that the total level difference
between these locations is about 8.0m and an additional tunnel length of about
1.0 km is required to harness this head. The additional tunnel length of 1.0 km
would result in about a meter of head loss and hence additional net head of 7.0m
could be utilized if the powerhouse is located downstream of Sipung Nala. Thus
it may not be an economically feasible option to have a Powerhouse location on
downstream of Sipung Nala by extending the HRT by about 1.0 km for
harnessing 7.0 m of additional net head.
-
7/29/2019 Final Report on Alternative Studies
7/16
Yamne-I Hydro Electric Project
Report on Project Alternative Studies 7
3. About 25 km of hill roads which includes two permanent bridges have to beconstructed at dam site and Powerhouse site for crossing the River during the
construction & operation stage. Construction of roads / bridges on steeper right
bank will induce slope stability problems.
4. The temporary River diversion tunnel has to be planned on the left bank ofYamne River as the WCS of the projects placed on the right bank. At the dam
site, a large slide zone is located about 300.0 m downstream of dam axis and
hence the construction of diversion tunnel would be complex and require heavy
rock support system. In this alternative, the temporary river diversion
arrangement will be costliest.
5.2. Project Layout Alternative - IIThe details of the project components considered in the Project Layout Alternative
II is tabulated in Table 3 below,
Table 3 Details of Project Layout Alternative - II
Project
ComponentDescription
DiversionStructure
The Concrete Gravity Dam with Sluice Spillway and Stilling basin
arrangement has been considered as diversion structure. The FRL of
the Project is considered at El. 740.0 m. The dam axis is located about800.0 m downstream of Yamne and Yaming River confluence. The
average River Bed Level at Dam site is about El.690.0 m. The height of
the dam above average River Bed level is about 53.0 m.
Water
Conductor
System
A Fore bay type Power Intake structure located on left bank of Yamne
River which will feed the design discharge to the HRT of 6.50 m
diameter and 11.20 km long. A surge shaft also been provided to take
care of the hydraulic transients expected during plant operations.
From the surge shaft the design discharge conveyed through a
pressure shaft of 718.0 m long and 5.0 m diameter up to the surface
Powerhouse. Four numbers of construction adits have been proposed
at suitable intervals along the HRT to facilitate its construction
activities.
-
7/29/2019 Final Report on Alternative Studies
8/16
Yamne-I Hydro Electric Project
Report on Project Alternative Studies 8
Surface
Powerhouse
The surface Powerhouse is located on the left bank of Yamne River at
400.0 m upstream of Sipung Nala. The tail water level is considered at
El.565.0 m.
Heads &
Installed
Capacity
FRL of the Project - El. 740.0 m
MDDL of the Project - El. 735.0 m
TWL of the Project - El. 565.0 m
Head Loss in WCS - 14.20 m
Gross Head - 175 m
Rated Head - 159.13 m
Design Discharge - 97.48 cumecs
Installed Capacity - 140 MW
Annual Energy - 622.20 MU
Levelised Tariff - 6.00 INR/Unit
The primary project cost has been estimated based on the preliminary drawings
and rational assumptions. The completed cost of Project layout Alternative II is
worked out to be INR 1747 Crores and the detailed breakup of the cost estimation
is placed at Annexure II. The Merits and Demerits with the Project Layout
Alternative II has been pointed out in successive paragraphs.
Merits with Project Layout Alternative II:
i. The entire project layout is well connected with the existing motorable road onthe left bank.
ii. The Left bank terrain is comparatively flatter than the right bank which willprovide adequate space for muck disposal sites and other infrastructure
facilities.
iii. The temporary diversion arrangement could be planned on the right bank of theRiver.
iv. The length of the HRT is shorter about 500.0m and will save constructionperiod.
-
7/29/2019 Final Report on Alternative Studies
9/16
Yamne-I Hydro Electric Project
Report on Project Alternative Studies 9
v. The Powerhouse site is located on a large natural terrace and the geologicallybetter site for back slopes.
Demerits with Project Layout Alternative II:
i. The maximum possible head could not be harnessed.ii. Local disturbance and hindrance are expected.
5.3. Project Layout Alternative - IIIThe details of the project components considered in the Project Layout Alternative
III is tabulated in Table 4 below,
Table 4 Details of Project Layout Alternative - III
Project
Component
Description
Diversion
Structure
The Concrete Gravity Dam with Sluice Spillway and Stilling basin
arrangement has been considered as diversion structure. The FRL of
the project is at El. 740.0 m. The average River Bed Level at Dam site is
about El.690.0 m. The height of the dam above average River Bed level
is about 53.0 m.
Water
Conductor
System
A Fore bay type Power Intake structure located on left bank of Yamne
River which will feed the design discharge to the HRT of 6.50 m
diameter and 13.51 km long. A surge shaft also been provided to take
care of the hydraulic transients expected during plant operations.
From the surge shaft the design discharge conveyed through a
pressure shaft of 5.0m diameter and 809.0 m to the surface
Powerhouse. Four numbers of construction adits have been proposed
at suitable intervals along the HRT to facilitate its construction
activities.
Underground
Powerhouse
The Underground Powerhouse is located on the left bank of Yamne
River at 1.30 km downstream of Sipung Nala. The tail water level is
considered at El.550.0 m.
Heads &
Installed
Capacity
FRL of the Project - El. 740.0 m
MDDL of the Project - El. 735.0 m
-
7/29/2019 Final Report on Alternative Studies
10/16
Yamne-I Hydro Electric Project
Report on Project Alternative Studies 10
TWL of the Project - El. 550.0 m
Head Loss in WCS - 15.98 m
Gross Head - 190 m
Rated Head - 172.36 m
Design Discharge - 99.40 cumecs
Installed Capacity - 155 MW
Annual Energy - 678.45 MU
Levelised Tariff - 6.61 INR/Unit
The project cost has been estimated based on the preliminary drawings and
rational assumptions. The completed cost of Project layout Alternative III is
worked out to be INR 2100 Crores and the detailed breakup of the cost estimation
is placed atAnnexure II. The Merits and Demerits with the Project Layout
Alternative III has been pointed out in successive paragraphs.
Merits with Project Layout Alternative III:
i. The entire project layout is well connected with the existing motorable road andthe highest possible head of 190.0m can also be harnessed.
ii. The Left bank terrain is comparatively flatter than the right bank which willprovide adequate space for muck disposal sites and other infrastructure
facilities.
iii. The temporary diversion arrangement could be planned on the right bank of theRiver which would be comparatively cheaper than the left bank.
Demerits with Project Layout Alternative III:
i. The length of the HRT is significantly longer than the other alternatives and italso requires crossing Sipung Nala to harness the maximum head which will
require costly precautionary arrangements during construction.
ii. The cost of HRT to harness the additional net head of 7.0m could not be justifiedwith the project cost.
iii. The proposed underground Powerhouse location needs to be explored with adrift and will required one more year for the investigation works.
-
7/29/2019 Final Report on Alternative Studies
11/16
Yamne-I Hydro Electric Project
Report on Project Alternative Studies 11
iv. The tailrace tunnels, construction and access tunnels also make theUnderground Powerhouse complex become costlier than the Surface
Powerhouse options.
5.4. Conclusions and Recommendation for Project LayoutFrom the above detailed alternative studies on Project Layout the following points
may be noted,
1. The Layout on right bank (Alternative I) of Yamne River will require two moreextra years as compared to other alternative layouts in which the WCS on the
left bank and the Cost-Benefit also higher than the other two alternatives.
2. The Alternative II has a significant advantage of being Simple Layout and theEnergy benefits are quite better than other two alternatives and it has a main
advantage of being well connected to the existing road, so that accessibility
would not be a problem during construction phase of the project.
3. The Alternative III has a similar trend of cost to benefits of Alternative I andit well connected with the existing road. The main disadvantage of the
Alternative III is that it has to cross the Sipon Nala and which may cause
seepage and stability problems during construction and operation stage of the
project.
The summary of the Cost-Benefit of project layout alternative studies are presented
below in Table 5.
Table 5 Summary of Cost-Benefit of Project Layout Alternative Study
Study
No
Installed
Capacity,
MW
Annual
Energy,
MU
Total
Project
Cost (Cr.)
Cost per MW
Levelised
Tariff
(INR/Unit)
Alt - I 155 682.41 2218 14.31 6.95
Alt - II 140 622.20 1747 12.48 6.00
Alt - III 155 678.48 2100 13.55 6.61
From the above table, it can be seen that the Alternative II is the better proposal
than other two in the both technical and economical considerations. Thus it is
suggested that the Alternative II shall be considered for the Project Layout for
Yamne I HEP and the same shall be considered for further optimization studies.
The Diversion structure is one of the vital structures in Alternative II and hence it
-
7/29/2019 Final Report on Alternative Studies
12/16
Yamne-I Hydro Electric Project
Report on Project Alternative Studies 12
is also recommended to carry out comprehensive studies for optimization of FRL of
the project.
6. ALTERNATIVE STUDIES FOR OPTIMIZATION OF FRL (STAGE II)Based on the above alternative study for Project layout, the layout of Alternative IIhas been considered suitable for Yamne I HEP and the same considered for
optimization of FRL of the project.
The optimum FRL of the project is the reservoir level at which the cost of energy
generation would be minimum. In this study, Six FRLs have been considered for
optimizations which are ranging from El. 715.0m to El. 740.0m.
The de-silting arrangements and the concrete gravity dam are the two important
structures which influence the cost of the project at different FRLs, so cost of these
structures are estimated at different FRL alternative study, while the cost of
remainig project components are considered same with different FRL alternative
studies.
6.1. Concrete Gravity DamDuring the site visit on 20th July 2012, various possibilities of Dam site location for
Lower FRL have been assessed and a location at 100 m downstream of Yamne
confluence is considered for technical assessment and the following points are
evaluated,
1. The river section is narrow and hence the cost of diversion structure will beminimum and it has an adequate space for de-silting basin arrangement.
2. The main concern with this location is that the life of the reservoir will beless as the dam site is located just downstream of confluence and the
reservoir area is not adequate enough to hold the sediment load on higher
reaches.
3. It also been noticed during the visit that the Yamne river carries lots ofsediment load during monsoon season which necessitates for de-silting
arrangement for the project.
-
7/29/2019 Final Report on Alternative Studies
13/16
Yamne-I Hydro Electric Project
Report on Project Alternative Studies 13
Hence the earlier proposed location (i.e. 800 m downstream of Confluence) of dam
site is considered preferable for locating the diversion structure for Yamne HEP and
the same is considered in this study.
The Concrete Gravity Dam with Stilling Basin arrangement is considered as
diversion structure in all FRL studies. The foundation of the dam has been
considered 30.0m below the average River bed level (i.e. El. 660.0 m). In all the
study a free board of 2.0 m has been provided above the FRL.
The features of Concrete Dam considered with different FRLs are tabulated below
in Table 6.
Table 6 Details of Concrete Gravity Dam at various FRLs
FRL Crest Levelof Spillway
Number ofGates
Size of
Spillway Gates(W X H) m
Length ofDam at Top
El. 740.0m El. 705.0 m 4 8.35 X 12.0 238.35 m
El. 735.0m El. 705.0m 4 9.15 X 12.0 220.36 m
El. 730.0m El. 705.0m 4 10.3 X 12.0 197.36 m
El. 725.0m El. 705.0m 4 12.0 X 12.0 171.09 m
El. 720.0m El. 705.0m 5 12.10 X 15.0 152.55 m
El. 715.0m El. 700.0 m 5 12.20 X 15.0 127.96 m
The detailed hydraulic calculations for design of spillways and energy dissipation
arrangements and corresponding engineering drawings are placed atAnnexure
III andAnnexure IV respectively.
6.2. De-Silting ArrangementAs different FRLs have been considered in this study, the requirement of De-Silting
chamber has been justified for each FRL and the cost of De-Silting arrangement also
been included in the project cost.
The requirement of De-Silting arrangement has been evaluated based on the level
difference between invert of HRT and Spillway crest level and the gross storage
capacity of the Reservoir.
-
7/29/2019 Final Report on Alternative Studies
14/16
Yamne-I Hydro Electric Project
Report on Project Alternative Studies 14
The De-Silting arrangement may not be required, if adequate level difference is
provided between spillway crest and intake and the reservoir would act as natural
De-Silting basin, if the gross storage capacity is good enough to settle the suspended
particles in the River water.
Based on the experience and provisions made in similar projects, the following
limits have been considered in this study for eliminating the de-silting
arrangements in the water conductor system of the project,
With the above criteria for De-Silting arrangement, the details of each FRL study has
been tabulated below in Table 7,
Table 7 Limits to Eliminate De-silting Arrangements
Description
Limit to avoid De-Silting
Arrangement
Level Difference between Spillway Crest
and Inver level of HRT> 15.0 m
Length of the Reservoir > 4000 m
Table 8 Details of Elevations and Reservoir Capacity
FRL (m) El. 740.0 El. 735.0 El. 730.0 El. 725.0 El. 720.0 El. 715.0
MDDL (m) El. 735.00 El. 730.00 El. 725.00 El. 720.00 El. 715.00 El. 713.00
Submergenceabove Overt (m)
3.25 3.25 3.25 3.25 3.25 3.25
Overt Level
of HRT (m)El. 731.75 El. 726.75 El.721.75 El.716.75 El.711.75 El.706.75
Centre Line
of Intake (m)El. 728.50 El. 723.50 El. 718.50 El. 713.50 El. 708.50 El. 703.50
Invert level
of HRT (m)El. 725.25 El. 720.25 El. 715.25 El. 710.25 El. 705.25 El. 700.25
Spillway Crest (m) El. 705.00 El. 705.00 El. 705.00 El. 705.00 El. 705.00 El. 700.00
River bed
Elevation (m)El. 690.00 El. 690.00 El. 690.00 El. 690.00 El. 690.00 El. 690.00
Level Diff between
Spillway Crest &Invert of HRT (m)
20.25 15.25 10.25 5.25 0.25 0.25
Gross Storage
at FRL (MCM)55.72 45.25 35.57 26.58 18.16 10.54
Length of
Reservoir
(m)
Yamne 4337.12 4043.02 3750.0 3472.44 3190.50 2847.36
Yaming 4166.88 4037.08 3904.04 3775.92 3650.39 3151.37
De-Silting
RequirementNo No Yes Yes Yes Yes
-
7/29/2019 Final Report on Alternative Studies
15/16
Yamne-I Hydro Electric Project
Report on Project Alternative Studies 15
From the above table it can be seen that the length of reservoir is greater than 4.0
km at FRL 740.0m and 735.0m which is substantial and at these FRLs the De-silting
arrangement have not been considered.
6.3. Power Potential StudyThe Power Potential Studies have been carried out at each FRL and the summary is
shown in Table 9 below and the detailed computations of each study are placed at
Annexure V.
Table 9 - Summary of Power Potential Study at Different FRL
FRL MDDL
Head
loss,
m
Rated
Head, m
Installed
Capacity,
MW
Annual
Energy,
MU
Annual
Load
Factor
Lean
Season
Factor
Design
Discharge,
cumecs
740 735 14.20 159.132 140 622.20 50.7% 13.9% 90.52
735 730 14.08 154.256 135 602.10 50.9% 14.0% 93.38
730 725 15.04 148.289 135 585.73 49.5% 13.5% 97.14
725 720 14.94 143.395 130 565.73 49.7% 13.5% 92.72
720 715 14.82 138.511 125 545.76 49.8% 13.6% 99.99
715 713 14.47 134.859 120 529.28 50.4% 13.8% 94.48
6.4. Cost Benefit at each FRLThe costs of the Project at each FRL have been estimated and it compared with the
energy benefits to conclude the most optimum FRL of Yamne I HEP. The summary
of the Cost-Benefit at each FRL is shown below in Table 10.
Table 10 - The Summary of Cost Benefit at Different FRL
FRL
Installed
Capacity,MW
Annual
Energy,MU
Total
ProjectCost (Cr.)
Levelised
Tariff (INR /Unit)
740 140 622.20 1747 6.00
735 135 602.10 1662 5.90
730 135 585.73 1794 6.54
725 130 565.73 1678 6.34
720 125 545.76 1613 6.32
715 120 529.28 1552 6.27
The details of Project cost at each FRL have been placed atAnnexure VI.
-
7/29/2019 Final Report on Alternative Studies
16/16
Yamne-I Hydro Electric Project
Report on Project Alternative Studies 16
6.5. Conclusions and RecommendationFrom the study of FRL optimization, the following observations could be made,
1. The De-Silting arrangement is required when the FRL kept below El. 735.0mand will significantly increase the project cost.
2. From Table 10, it can be seen that the project cost variation between the FRLsof El. 740.0 m and El. 735.0 m is -4.90%, but the energy loss will be 3.23% and
the same way the variation in Project cost and energy loss between the FRLs El.
740.0m and El. 730.0 would be +2.65% (increased due to de-Silting
Arrangement) and5.86% respectively. Hence the Project cost to benefit ratio is
better at FRL El. 735.0m and it shall be considered as FRL of Yamne I HEP and
it can also be seen that the levelised tariff is minimum at FRL 735.0m. Thus the
FRl 735.0m shall be considered most economical than other FRLs.
7. CONCLUSIONSFrom this alternative study the following conclusions are derived,
The project layout shall be planned on the left bank of Yamne River as the studies
showing the Alternative II as the most preferable option from techno-economic
angle in both technical and economical directions.
The FRL of the project shall be considered at El. 735.0m as it gives the best tariff
compared to other options.
This alternative study report is submitted to M/s SS Yamne Energy Ventures Pvt.
Ltd for their review and approval, so that the preparation of PFR for Yamne I HEP
with new parameters evaluated from this study shall be commenced.