figure 7.1-7—safety automation system architecture

15
U.S. EPR FINAL SAFETY ANALYSIS REPORT Tier 2 Revision 0 Page 7.1-98 Figure 7.1-7—Safety Automation System Architecture

Upload: others

Post on 31-Jan-2022

2 views

Category:

Documents


0 download

TRANSCRIPT

U.S. EPR FINAL SAFETY ANALYSIS REPORT

Page 7.1-98

Tier 2 Revision 0

Figure 7.1-7—Safety Automation System Architecture

U.S. EPR FINAL SAFETY ANALYSIS REPORT

Page 7.1-99

re

Tier 2 Revision 0

Figure 7.1-8—Priority and Actuator Control System Architectu

U.S. EPR FINAL SAFETY ANALYSIS REPORT

Page 7.1-100

MSI

M2-

SU

SA I&

C -

SIC

S

M2-

G1

M2-

G2

CU

PACS

DCM

Note 1

EPR3040 T2

Division 4

Tier 2 Revision 0

Figure 7.1-9—Severe Accident I&C System Architecture

CU

PACS

GW 1 GW 2SU

Plant Data Network

MSI

M1-

SU

SA I&

C -

SIC

S

DCM

Note 1

M1-

G1

M1-

G2 M

1-SU

M1-

G1

M1-

G2

M2-

SU

M2-

G1

M2-

G2

Note 1 – Hardwired inputs may be from sensors or other I&C systems

CU

PACS

DCM

Note 1

CU

PACS

DCM

Note 1

Division 1 Division 2 Division 3

U.S. EPR FINAL SAFETY ANALYSIS REPORT

Page 7.1-101

rchitecture

MSI

M4-

SU

M4-

G1

M4-

G2

AU

Note 1

DU DU

CUDU

-M1

DU

-M2

CRDCS

EPR3045 T2

Division 4

Tier 2 Revision 0

Figure 7.1-10—Reactor Control, Surveillance, and Limitation System A

AU

GW 1 GW 2 SU

Plant Data Network

MSI

M1-

SU

Note 1

M1-

G1

M1-

G2

M1-

SU

M1-

G1

M1-

G2

M4-

SU

M4-

G1

M4-

G2

Note 1 – Hardwired inputs may be from sensors or other I&C systems

AU

Note 1

AU

Note 1

CU

DU DU

DU

-M1

DU

-M2

CRDCS

Division 1 Division 2 Division 3

U.S. EPR FINAL SAFETY ANALYSIS REPORT

Page 7.1-102

Subsystem)

CUB

CUA

Note 1

PAS-PACS

EPR3050 T2

Division 4

Tier 2 Revision 0

Figure 7.1-11—Process Automation System Architecture (Nuclear Island

CUB

CUA

Plant Data Network

Note 1 – Hardwired inputs may be from sensors or other I&C systems

Note 1

CUB

CUA

PAS-PACS

Note 1

CUB

CUA

Note 1

PAS-PACS

PAS-PACS

Division 1 Division 2 Division 3

U.S. EPR FINAL SAFETY ANALYSIS REPORT

Page 7.1-103

ce of Plant Subsystem)

Plant m

CUB

EPR3055 T2

Tier 2 Revision 0

Figure 7.1-12—Process Automation System Architecture (Turbine Island and Balan

Turbine Island Subsystem

Balance of Subsyste

Plant Data Network

Note 1 – Hardwired inputs may be from sensors or other I&C systems

CUB

CUA

Note 1

CUA

Note 1

U.S. EPR FINAL SAFETY ANALYSIS REPORT

Page 7.1-104

on Subsystem)

DAU

Note 1

PACS

EPR3060 T2

Division 4

Tier 2 Revision 0

Figure 7.1-13—Process Automation System Architecture (Diverse Actuati

DAU

Plant Data Network

Note 1 – Hardwired inputs may be from sensors or other I&C systems

Note 1

DAU

PACS

Note 1

DAU

Note 1

PACS PACS

Division 1 Division 2 Division 3

U.S. EPR FINAL SAFETY ANALYSIS REPORT

Page 7.1-105

2 Power Range Detectors

etectors

e Range Detectors

EPR3065 T2

Tier 2 Revision 0

Figure 7.1-14—Measuring Ranges of Excore Instrumentation

Po

we

r R

an

ge

4 x

3 Source Range D

Inte

rmedia

te R

ange

Sourc

e R

ange

100

10-1

10-2

10-3

10-4

10-5

10-6

10-7

10-8

10-9

10-10

Rela

tive R

eacto

r P

ow

er

P/P

r (P

r =

Rate

d P

ow

er)

4 Intermediat

U.S. EPR FINAL SAFETY ANALYSIS REPORT

Figure 7.1-15—Excore Instrument Detector Locations

O SRD Div 2

Ø 0° ØIRD Div 2 I IRD Div 3 PRD Div 2 I PRD Div 3

315° 45° I

I

I

I

I

I

O 270° - - - - - - - - + - - - - - - - - - 90 ° OSRD Div 1 I SRD Div 3

I

I

I

I

I

225° I 135° I

I

Ø 180° ØIRD Div 1 IRD Div 4PRD Div 1 PRD Div 4

Notes:1. PRD : Ø Power Range Detector 4 locations of 2 detectors 2. IRD : Ø Intermediate Range Detector 4 locations of 1 detector 3. SRD : O Source Range Detector 3 locations of 1 detector

EPR3070 T2

Tier 2 Revision 0 Page 7.1-106

U.S. EPR FINAL SAFETY ANALYSIS REPORT

Page 7.1-107

ement

l Processing To PS

EPR3075 T2

Tier 2 Revision 0

Figure 7.1-16—Boron Concentration Measurement System Arrang

Flow

Counter Tube

Neutron Source

TemperatureDetector

Signa

B-10

Container

U.S. EPR FINAL SAFETY ANALYSIS REPORT

Figure 7.1-17—Implementation of Defense-In-Depth

OPERATIONAL I&C FUNCTIONS

LIMITATION I&C FUNCTIONS

PREVENTIVE LINE

OF DEFENSE

MAIN LINE

OF DEFENSE

SAFETY I&C FUNCTIONS

(Mitigate DBE’s, Achieve Safe Shutdown)

RISK REDUCTION I&C FUNCTIONS

(Mitigate BDBE’s, Severe Accidents)

RISK REDUCTION

LINE OF DEFENSE

RCSL PAS TG I&C

PAS

PS SAS

SA I&C

RCSL PAS TG I&C

EPR3080 T2

Tier 2 Revision 0 Page 7.1-108

U.S. EPR FINAL SAFETY ANALYSIS REPORT

Page 7.1-109

DigitalNon-TXS

DigitalNon-TXS

PAS

PICS

CStrol ic

EPR3085 T2

Tier 2 Revision 0

Figure 7.1-18—Implementation of Diversity

Non-Digital

DigitalTXS/HW

DigitalTXS

LEVE

L 2

UN

IT S

UPE

RVI

SIO

N A

ND

CO

NTR

OL

LEVE

L 1

SYST

EM A

UTO

MA

TIO

NLE

VEL

0PR

OC

ESS

INTE

RFA

CE

PSSAS RCSL

PACS

SA I&C

SICS

A B

PlatformDiversity

PlatformDiversity

PlatformDiversity

DiverseSensors

FunctionalDiversity

Diversity in Reactor Trip Devices

Trip Breakers(UV Coils)

Trip Breakers(ST Coils)

Trip Contactors

CRDConLog

U.S. EPR FINAL SAFETY ANALYSIS REPORT

Page 7.1-110

Divisions

Tier 2 Revision 0

Figure 7.1-19—Implementation of Independence Between Redundant

U.S. EPR FINAL SAFETY ANALYSIS REPORT

Page 7.1-111

n-Safety I&C

Tier 2 Revision 0

Figure 7.1-20—Implementation of Independence Between Safety and No

U.S. EPR FINAL SAFETY ANALYSIS REPORT

Page 7.1-112

Tier 2 Revision 0

Figure 7.1-21—Levels of Defense for Cybersecurity