field specs & assembly instructionsmoodle.kkc.school.nz/pluginfile.php/12172/mod_resource/... ·...

35
VEX Robotics Competition – Gateway Copyright 2011. VEX Robotics Inc. 4/4/2011 Field Specs & Assembly Instructions

Upload: others

Post on 27-Aug-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

  • VEX Robotics Competition – Gateway

    Copyright 2011. VEX Robotics Inc.

    4/4/2011

    Field Specs & Assembly Instructions

  • VEX Robotics Competition – Gateway

    Copyright 2011. VEX Robotics Inc.

    4/4/2011

    Game Field

    A Introduction

    This document will provide detailed specifications, BOM information, and assembly instructions for the Official Competition Field.

    Teams who do not need an “official” field should refer to the separate low-cost field guide for cost-reduction options. Please note: this field utilizes the VEX Competition Field Perimeter (278-1501) developed by VEX Robotics. Instructions and specifications for this field perimeter are available in a separate document, and are also important for the field assembly. This document is divided up into four sections:

    1. Field Overview 2. Field Bill of Materials 3. Field Specifications 4. Field Assembly Instructions

    There is also an accompanying SolidWorks eDrawing Viewer file, which shows the field as a 3D solid model. Designers can take dimensions directly off this model if they require an additional level of detail not provided in this document (if you don’t see a dimension on one of our drawings, measure it virtually in the CAD model). This eDrawing Viewer file is a self contained executable which will open on most computers without any CAD software. For additional game-play detail, please refer to the VEX Gateway competition manual. For more information on cutting costs on unofficial field construction, refer to the accompanying “Low Cost Field” section of this Appendix.

    A P P E N D I X

  • VEX Robotics Competition – Gateway

    Copyright 2011. VEX Robotics Inc.

    4/4/2011

    Field Overview

    The game VEX Gateway is played on a 12 ft x 12 ft foam-mat, surrounded by a sheet-metal and lexan perimeter. The field is divided into three sections by a stationary fence and two gates which are raised during match play. Attached to the fence and to the field perimeter are circular goals which robots may place game objects into. Spread around the field, and in the alliance starting positions are plastic balls and barrels. For more details and specific game-play rules, please refer to the VEX Gateway competition manual.

  • VEX Robotics Competition – Gateway

    Copyright 2011. VEX Robotics Inc.

    4/4/2011

  • VEX Robotics Competition – Gateway

    Copyright 2011. VEX Robotics Inc.

    4/4/2011

  • VEX Robotics Competition

    Game Objects & Field Bill of Materials

    Part Number Description Price

    278-1501 VRC Field Perimeter Frame & Hardware 799.99$

    278-1502 VRC Foam Field Surface - (36) Grey, (2) Red, (2) Blue Tiles 189.99$

    275-1401 VRC VEXnet Field Controller 199.99$

    Total Price 1,189.97$

    Part Number Description Price

    276-1355 ALL Official VEX Gateway Field & Game Objects 499.99$

    (1) Fence Assembly

    (2) Lifting Gate Asseblies

    (9) Circular Goals

    (1) Roll 2" Wide Red Tape

    (1) Roll 2" Wide Blue Tape

    (1) Roll 3/4" Wide White Tape

    (13) Red, (13) Blue, (2) Black, & (2) White Barrels

    (9) Red & (9) Blue Balls

    (40) Red & (40) Blue Robot Identification Flags

    Total Price 499.99$

    Part Number Description Price

    276-2102 VEX Gateway Goal & Object Kit 49.99$

    (2) Red & (2) Blue Barrels

    (2) Red & (2) Blue Balls

    (1) 30" Tall Circular Goal -- includes (2) Goal Rings & (5) 30" Posts

    Generic Field Elements - Reuseable Each Year

    Official VEX Gateway Specific Elements

    Practice Elements

    All these items are available for purchase from:

    www.VEXROBOTICS.com

  • VEX Robotics Competition – Gateway

    Copyright 2011. VEX Robotics, Inc.

    4/4/2011

    Field Specifications

    Introduction

    This section will outline the specifications which are most important to teams designing a robot to

    compete in the VEX Robotics Competition – Gateway. Though many of the critical dimensions are

    included in this section, it may be necessary to consult the separate assembly guide and 3D-CAD models

    of the field for an additional level of detail (if you can’t find a dimension in the specifications, we include a

    FULL model of the field – virtually measure whatever you need).

    Field components may vary slightly from event to event. This is to be expected; teams will need to adapt accordingly. It is good design practice to create mechanisms capable of accommodating variances in the field and game pieces.

  • 1.274 Wall Thickness

    11.3

    28W

    all H

    eigh

    tFr

    om F

    oam

    Surfa

    ce

    Foam Floor

    140.50Inside Wall - Wall

    140.

    50In

    side

    Wal

    l - W

    all

    Field Critical Dimensions:~140.5" Square Wall-Wall, Inside•11.328" Wall Height•1.27" Wall Thickness•

    VRC12-FIELD-SPECS REV1

    Field Perimeter DetailsDwg No

    2/15/2011

    Description

    ALL DIMENSIONS ARE IN INCHES.

    Competition

    Release

    VRC - Gateway Sheet 1 of 10

  • 5.00

    0

    A

    A

    6.000

    R3.0001.

    342

    SECTION A-A SCALE 1 : 36.000

    There are nine (9) barrels and five (5) balls of each color on the field, not including pre-loadsand match loads. Additionally, there are two (2) black barrels and two (2) white barrels.

    Game Object dimensions may vary by as much as 1/4".

    Each Barrel weighs approximately0.53 lbs. and each Ball weighsapproximately 0.24 lbs.

    VRC12-FIELD-SPECS REV1Dwg No

    2/15/2011

    Description

    ALL DIMENSIONS ARE IN INCHES.

    Competition

    Release

    VRC - Gateway Sheet 2 of 10

    Game Object Details

  • 11.5

    00

    1.00

    0

    1.048

    R3.912

    R5.2159.115

    72°

    VRC12-FIELD-SPECS REV1

    11.5" High Goal DetailsDwg No

    2/15/2011

    Description

    ALL DIMENSIONS ARE IN INCHES.

    Competition

    Release

    VRC - Gateway Sheet 3 of 10

  • 30.0

    00

    1.00

    0

    1.048

    11.5

    00

    R3.912

    R5.2159.115

    72°

    VRC12-FIELD-SPECS REV1

    20" High Goal DetailsDwg No

    2/15/2011

    Description

    ALL DIMENSIONS ARE IN INCHES.

    Competition

    Release

    VRC - Gateway

    Dwg No

    2/15/2011

    Description

    ALL DIMENSIONS ARE IN INCHES.

    Competition

    Release

    VRC Sheet 4 of 10

  • 20.0

    00

    1.048

    5.23

    6

    1.00

    0

    1.73

    4

    R5.215

    R3.912

    9.115

    72°

    VRC12-FIELD-SPECS REV1

    Fence Goal DetailsDwg No

    2/15/2011

    Description

    ALL DIMENSIONS ARE IN INCHES.

    Competition

    Release

    VRC - Gateway Sheet 5 of 10

  • 30.0

    00

    8.85

    4

    1.00

    0

    1.048

    R3.912

    R5.2159.115

    72°

    VRC12-FIELD-SPECS REV1

    Center Post Goal DetailsDwg No

    2/15/2011

    Description

    ALL DIMENSIONS ARE IN INCHES.

    Competition

    Release

    VRC - Gateway Sheet 6 of 10

  • 11.2

    50

    8.97

    5

    7.50

    0

    7.45

    53.

    330

    60.957

    31.832 29.125

    2.67

    8

    5.750

    71.8

    13

    61.87511.0008.000

    70.0

    53

    2.178

    4.08

    94.

    089

    Fence

    Fence

    Gate

    Gate

    VRC12-FIELD-SPECS REV1

    Fence and Gate DetailsDwg No

    2/15/2011

    Description

    ALL DIMENSIONS ARE IN INCHES.

    Competition

    Release

    VRC - Gateway Sheet 7 of 10

  • The Balls and Barrels are placed on the field in as follows for the start of each match.

    1. There are three (3) barrels and two (2) balls of the corresponding color within each ofthe Isolation Zones.

    2. There are six (6) barrels and three (3) balls of each color assembled into a wall in thecenter of the Interaction Zone.

    3. There are four (4) balls and four (4) barrels available for match and/or preloads withinthe driver station of each alliance.

    (1)

    (2)

    Center Stack

    (3)

    Balls and Barrels are placed at the junction of Foam Field Tiles, or at the centerof tiles as shown.

    VRC12-FIELD-SPECS REV1

    Game Object LayoutDwg No

    2/15/2011

    Description

    ALL DIMENSIONS ARE IN INCHES.

    Competition

    Release

    VRC - Gateway Sheet 8 of 10

  • (1) (1)

    (3) (3)

    (4)

    (2) (1)

    The Goal are placed in nine (9) locations and are of three (3) heights.

    1. 11.5" High Goals, mounted to the field perimeter.

    2. 20" High Goals, mounted to the Fence Pipes.

    3. 30" High Goals, mounted to the field perimeter.

    4. 30" High Goal, mounted to the Center Post.

    VRC12-FIELD-SPECS REV1

    Goal LayoutDwg No

    2/15/2011

    Description

    ALL DIMENSIONS ARE IN INCHES.

    Competition

    Release

    VRC - Gateway Sheet 9 of 10

  • WHITE ELECTRICAL TAPE3/4" WIDE

    WHITE ELECTRICAL TAPE3/4" WIDE

    WHITE ELECTRICAL TAPE3/4" WIDE

    The field has nine (9) strips of 3/4" wide white electrical tape running across it, as shown below.

    VRC12-FIELD-SPECS REV1

    Tape Line LayoutDwg No

    2/15/2011

    Description

    ALL DIMENSIONS ARE IN INCHES.

    Competition

    Release

    VRC - Gateway Sheet 10 of 10

  • VEX Robotics Competition – Gateway

    Copyright 2011. VEX Robotics, Inc.

    4/4/2011

    Field Assembly

    Introduction

    Tools Required

    This section will detail the steps required to construct the competition field for the VEX Robotics Competition Gateway. The VRC Gateway field utilizes the “VEX Competition Field Perimeter” (278-1501). For specifications and instructions for assembling this frame, please refer to the separate “VEX Competition Field Perimeter” manual. Also refer to the separate low-cost field document, which provides lower cost options to teams not needing a full “official” competition field.

    The following tools are required for assembly of the official VEX Gateway field:

    • 5/32” Allen Wrench

    • 7/16” Open Ended Wrench

    • #2 Phillips Screwdriver (or drill with #2 Phillips Bit)

    • 3/32” Allen Wrench (standard VEX Allen Wrench)

    • 11/32” Open Ended Wrench (standard VEX Open Ended Wrench)

  • FOAM FLOORASSEMBLY

    VL-FIELDFIELD PERIMETER

    A

    DETAIL A SCALE 1 : 16

    Notes:Assemble the VL-FIELD Perimeter (see seperate VL-FIELD assembly instructions.)1.Position the perimeter such that one side is toward the crowd.

    Attach the Driver Station Posts as shown below (in the middle of the foam tile farthest2.from the crowd). Instructions for assembly are included with the VL-FIELD instructions.

    Assemble the Foam Floor inside the perimeter.3.Refer to Sheets 2 & 3 of this document for instructions.

    CROWD VIEW

    DRIVER STATION POSTS

    IMPORTANT:It is important to assemble the field on a flat, levelsurface. Some venues may wish to installfloor protection underneath the field.

    VRC12-FIELD-ASSY REV1

    Perimeter PlacementDwg No

    2/15/2011

    Description

    ALL DIMENSIONS ARE IN INCHES.

    Competition

    Release

    VRC - Gateway

    VRC12-FIELD-ASSY REV1Dwg No

    2/15/2011

    Description

    ALL DIMENSIONS ARE IN INCHES.

    Project

    Release

    VRC12-FIELD-ASSY REV1Dwg No

    2/15/2011

    Description

    ALL DIMENSIONS ARE IN INCHES.

    Competition

    Release

    Sheet 1 of 17

  • Tabs should be easily removed with a sharpknife or razor blade. When the tiles areassembled, there should be a smooth edgearound the entire perimeter.

    Before assembling the foam tile floorsome tiles will need to be modified.

    There are 3 main types of tiles.

    Normal tiles, are unmodified. Thesewill be used on the "inside" of thefield. There should be sixteen(16) ofthese per field.

    Corner tiles have their interlockingtabs cut away on two (2) adjacent edges. These will be used in the four (4) corners of the field.

    Edge tiles have their interlockingtabs cut away on one (1) edge.These will be used along the edgesof the field. There are sixteen (16)per field.

    (16X) Normal Tiles

    (4X) Corner Tiles

    (16X) Edge Tiles

    IMPORTANT:Before modifying ANY tiles, check to ensureyour set of tiles NEEDS modification.

    VRC12-FIELD-ASSY REV1Dwg No

    2/15/2011

    Description

    ALL DIMENSIONS ARE IN INCHES.

    Competition

    Release

    VRC - Gateway Sheet 2 of 17

    Foam Tile Modification

  • N

    N N N N

    NNN

    N N N N

    NNNN

    E E E E

    E

    E

    E

    E

    EEEE

    E

    E

    E

    E

    C C

    CC

    Assemble Foam Tiles as shown above.The "smooth" side of the tiles should be up, and the textured side down.The tiles should be assembled "in-place", within the field perimeter.

    The grid-lines shown are for reference only.

    N = Normal Tile (16X)C = Corner Tile (4X)E = Edge Tile (16X)

    VRC12-FIELD-ASSY REV1

    Tile Floor AssemblyDwg No

    2/15/2011

    Description

    ALL DIMENSIONS ARE IN INCHES.

    Competition

    Release

    VRC - Gateway Sheet 3 of 17

  • 12.000

    36.000

    36.0

    00

    12.0

    00

    106.

    760

    59.760

    Once the Field Perimeter is in its final position, mark off the Driver Stations usingred and blue tape. One station should be blue, and one should be red.

    Apply the tape as shown above. Do not close the back of the driver-boxes.

    The Driver Stations should extend to the edges of its corresponding colored tiles.

    VRC12-FIELD-ASSY REV1

    Driver Station LayoutDwg No

    2/15/2011

    Description

    ALL DIMENSIONS ARE IN INCHES.Release

    VRC - Gateway

    VRC12-FIELD-ASSY REV1Dwg No

    2/15/2011

    Description

    ALL DIMENSIONS ARE IN INCHES.Release

    VRC12-FIELD-ASSY REV1Dwg No

    2/15/2011

    Description

    ALL DIMENSIONS ARE IN INCHES.

    Competition

    Release

    Sheet 4 of 17

  • WHITE ELECTRICAL TAPE3/4" WIDE

    WHITE ELECTRICAL TAPE3/4" WIDE

    WHITE ELETRICAL TAPE3/4" WIDE

    There are nine (9) lines stretching across the playing field. These lines are used for robot line following, and to indicate the Low Goals. The tape is layed out on the field as shown above. The lines are made from 3/4" wide white electrical tape.

    Apply the tape lines as shown. They should lay on top of the foam tile's seams or centers.

    IMPORTANT:Apply tape carefully and slowly for best result.Smooth out all bubbles.Do not "stretch" the tape as it is applied!

    VRC12-FIELD-ASSY REV1

    Tape Line LayoutDwg No

    2/15/2011

    Description

    ALL DIMENSIONS ARE IN INCHES.Release

    VRC - Gateway

    VRC12-FIELD-ASSY REV1Dwg No

    2/15/2011

    Description

    ALL DIMENSIONS ARE IN INCHES.Release

    VRC12-FIELD-ASSY REV1Dwg No

    2/15/2011

    Description

    ALL DIMENSIONS ARE IN INCHES.

    Competition

    Release

    Sheet 5 of 17

  • WALL BRACKET

    FENCE PIPE

    PLACEMENT OF WALL BRACKET

    STEP 1

    STEP 2

    1. Install one (1) Wall Bracket tothe VL-FIELD perimeter in thelocations shown above using four (4) 1/4-20 x 5/8" boltsand four (4) 1/4-20 wingnuts.

    2. Slide two (2) black Fence Pipesinto the Wall Bracket andinsert two (2) 1/4" x 2-1/2" ClevisPins into the rear holes of theWall Bracket and through theFence Pipe. It is critical thatthe small holes near the centerof the Black Wall Pipe are closestto the field's center!

    VRC12-FIELD-ASSY REV1

    Fence AssemblyDwg No

    2/15/2011

    Description

    ALL DIMENSIONS ARE IN INCHES.

    Competition

    Release

    VRC - Gateway Sheet 6 of 17

  • D

    DETAIL D SCALE 1 : 4

    GATE BRACKET

    CENTER POST

    STEP 3

    STEP 4

    3. Insert two (2) Hairpins into the 1/4-20Clevis Pins.

    4. Assemble the Center Post separatelyfrom the wall. Begin by installing one(1) 1/4-20 x 1/2" bolt into the lower holeof the Gate Bracket and through thelower hole of the Center Post with one(1) 1/4-20 Keps nut. Next, insert one(1) 2-1/2" Standoff between the upperholes of the Center Post and GateBracket. Install using two (2) 8-32 x 1/2"bolts.

    VRC12-FIELD-ASSY REV1

    Fence AssemblyDwg No

    2/15/2011

    Description

    ALL DIMENSIONS ARE IN INCHES.

    Competition

    Release

    VRC - Gateway Sheet 7 of 17

  • F

    DETAIL F SCALE 1 : 10

    PLACEMENT OF CENTERPOST

    G

    DETAIL G SCALE 1 : 6

    STUDS

    STEP 5

    5. Place the Center Post in thelocation indicated abovewith the Gate Bracket facingaway from the Driver Stations.

    IMPORTANT:It is critical that the studs on the Center Postfit into the seams of the tiles as indicated.

    VRC12-FIELD-ASSY REV1

    Fence AssemblyDwg No

    2/15/2011

    Description

    ALL DIMENSIONS ARE IN INCHES.

    Competition

    Release

    VRC - Gateway Sheet 8 of 17

  • STEP 6

    6. With the Center Post in position,slide the black Fence Pipes intothe Gate Bracket. Insert two (2)1/4" Clevis Pins into the middlehole in the Gate Bracket andthrough the black Fence Pipes.

    STEP 7

    7. Insert two (2) Hairpins into the1/4-20 Clevis Pins.

    VRC12-FIELD-ASSY REV1

    Fence AssemblyDwg No

    2/15/2011

    Description

    ALL DIMENSIONS ARE IN INCHES.

    Competition

    Release

    VRC - Gateway Sheet 9 of 17

  • As in STEP 1 of the Fence Assembly,1. install the Wall Brackets in the locations indicated above.

    STEP 2

    STEP 3

    2. Slide the Gate Pipes into the Wall Bracket and insert the 1/4" Clevis Pins into the Wall Bracket and through the Gate Pipes. The top pipe installs into the rear hole, and the lower pipe installs into the front hole.

    3. Slide the Gate Bracket into place and insert the 1/4" Clevis Pins into the Wall Bracket and through the Gate Pipes. The top pipe installs into the front hole, and the lower pipe installs into the rear hole.

    GATE PIPE

    PLACEMENT OF GATE WALL BRACKETS

    VRC12-FIELD-ASSY REV1

    Gate AssemblyDwg No

    2/15/2011

    Description

    ALL DIMENSIONS ARE IN INCHES.

    Competition

    Release

    VRC - Gateway Sheet 10 of 17

  • 12.0008.000

    VELCRO STRAP

    STEP 4

    STEP 5

    4. Add two tape rings to the lower Gate Pipe at the dimensions specified on the field perimeter side.

    6. Repeat STEPS 1-5 for the second gate.

    5. Place the 14" length of one-wrap Velcro near the gate bracket. During gameplay, the Velcro should be used in the manner as shown to secure the gate from falling down.

    VRC12-FIELD-ASSY REV1

    Gate AssemblyDwg No

    2/15/2011

    Description

    ALL DIMENSIONS ARE IN INCHES.

    Competition

    Release

    VRC - Gateway Sheet 11 of 17

  • STEP 1

    1. Install a Goal Ring to the topblack Fence Pipe by screwing two (2)#10 x 1/2" Sheet Metal Screwsinto the small holes located nearthe center of the black Fence Pipe.GOAL RING

    STEP 2

    2. Insert two 20" High Goal Pipes intothe rear holes of the Goal Ring.Continue to insert them into a secondring prior to its mounting. This ensuresconcentric goals.

    IMPORTANT:Support the Goal Rings while insertingpipes to prevent breaking of the rings!Insert the pipes using a twisting motionfor the easiest installation.

    20" HIGH GOAL PIPE

    VRC12-FIELD-ASSY REV1

    Fence Goal AssemblyDwg No

    2/15/2011

    Description

    ALL DIMENSIONS ARE IN INCHES.

    Competition

    Release

    VRC - Gateway Sheet 12 of 17

  • STEP 3

    3. Finish installing the second ring with two(2) #10 x 1/2" Sheet Metal Screws.

    4. Insert the remaining three (3) 20"High Goal Pipes into the Goal Rings.

    IMPORTANT:Support the Goal Rings while insertingpipes to prevent breaking of the rings!Insert the pipes using a twisting motionfor the easiest installation.

    STEP 4

    CORRECTLY ASSEMBLEDGOAL

    5. Repeat STEPS 1-4 for the opposite sideof the black Fence Pipes.

    VRC12-FIELD-ASSY REV1

    Fence Goal AssemblyDwg No

    2/15/2011

    Description

    ALL DIMENSIONS ARE IN INCHES.

    Competition

    Release

    VRC - Gateway Sheet 13 of 17

  • STEP 2

    STEP 1

    CORRECTLY ASSEMBLEDGOAL

    1. Install two (2) Goal Rings to theCenter Post with four (4) 1/4-20x 1/2" bolts and four (4) 1/4-20Keps nuts.

    2. Insert five (5) 30" HighGoal Pipes into the GoalRings.

    IMPORTANT:Support the Goal Rings whileinserting pipes to preventbreaking of the rings! Insert thepipes using a twisting motion forthe easiest installation.

    VRC12-FIELD-ASSY REV1

    Center Post Goal AssemblyDwg No

    2/15/2011

    Description

    ALL DIMENSIONS ARE IN INCHES.

    Competition

    Release

    VRC - Gateway Sheet 14 of 17

  • PLACEMENT OF11.5" HIGH GOALS

    STEP 1

    STEP 2

    IMPORTANT:Support the Goal Rings while insertingpipes to prevent breaking of the rings!Insert the pipes using a twisting motionfor the easiest installation.

    CORRECTLY ASSEMBLEDGOAL

    1. Install two (2) Goal Rings to the VL-FIELD perimeter in thelocations indicated above withfour (4) 1/4-20 x 5/8" bolts andfour (4) 1/4-20 wing nuts.

    2. Insert five (5) 11.5" High GoalPipes into the Goal Rings.

    VRC12-FIELD-ASSY REV1

    11.5" High Goal AssemblyDwg No

    2/15/2011

    Description

    ALL DIMENSIONS ARE IN INCHES.

    Competition

    Release

    VRC - Gateway Sheet 15 of 17

  • PLACEMENT OF30" HIGH GOALS

    STEP 1

    STEP 2

    CORRECTLY ASSEMBLEDGOAL

    1. Install two (2) Goal Rings to the VL-FIELD perimeter in thelocations indicated above usingfour (4) 1/4-20 x 5/8" bolts andfour (4) 1/4-20 wing nuts.

    2. Insert five (5) 30" High GoalPipes into the Goal Rings.

    IMPORTANT:Support the Goal Rings whileinserting pipes to preventbreaking of the rings! Insert thepipes using a twisting motion forthe easiest installation.

    VRC12-FIELD-ASSY REV1

    30" High Goal AssemblyDwg No

    2/15/2011

    Description

    ALL DIMENSIONS ARE IN INCHES.

    Competition

    Release

    VRC - Gateway Sheet 16 of 17

  • Place the balls and barrels on the field in the locations shown.

    Refer to the VRC Gateway Game Manual for more details including all official rules and regulations.

    Use the 3D CAD model of the VRC Gateway field for additional details not shown in the Field Drawings.

    CENTER STACK

    VRC12-FIELD-ASSY REV1

    Game Object LayoutDwg No

    2/15/2011

    Description

    ALL DIMENSIONS ARE IN INCHES.

    Competition

    Release

    VRC - Gateway Sheet 17 of 17

    01-VEX Gateway-DRAWINGS-INTRODUCTION02-VEX Gateway FIELD BOM03-VEX Gateway-Field-Specs-Intro04-VRC12-FIELD-SPECS REV1Sheet1Detail View B (1 : 4)Drawing View27

    Sheet2Drawing View29Drawing View30Section View A-ADrawing View34Drawing View36

    Sheet3Drawing View35Drawing View37Drawing View38

    Sheet4Drawing View39Drawing View40Drawing View41

    Sheet5Drawing View42Drawing View44Drawing View56

    Sheet6Drawing View45Drawing View46Drawing View47

    Sheet7Drawing View48Drawing View49Drawing View50Drawing View51

    Sheet8Drawing View52Drawing View55

    Sheet9Drawing View53

    Sheet10Drawing View54

    05-VEX Gateway-Field-Assy-Intro06-VRC12-FIELD-ASSY REV1Sheet1Drawing View34Drawing View35Detail View A (1 : 16)

    Sheet2Sheet3Drawing View28

    Sheet4Drawing View38

    Sheet5Drawing View39

    Sheet6Drawing View45Drawing View46Drawing View47

    Sheet7Drawing View48Detail View D (1 : 4)Drawing View52

    Sheet8Drawing View55Detail View F (1 : 10)Drawing View57Drawing View58Detail View G (1 : 6)

    Sheet9Drawing View60Drawing View61

    Sheet10Drawing View62Drawing View84Drawing View85

    Sheet11Drawing View88Drawing View89

    Sheet12Drawing View63Drawing View64

    Sheet13Drawing View66Drawing View67Drawing View68

    Sheet14Drawing View69Drawing View70Drawing View72

    Sheet15Drawing View73Drawing View74Drawing View75Drawing View76

    Sheet16Drawing View77Drawing View78Drawing View79Drawing View81

    Sheet17Drawing View40Drawing View41Drawing View43