Next Steps The next steps in the study process will be to transform the individual segments into three viable alternative routes for the Pond Creek Corridor portion of the Louisville Loop. Metro Parks will evaluate all input received to select the these routes. Key factors that will be considered when selecting a route are: Following the segments being narrowed to the three proposed routes, a summary report will be developed that includes the following information: Proposed routing of hard surface and soft surface paths Potential locations for trailheads and other facilities (restrooms, drinking fountains) Operation and maintenance issues Development costs for each of the alternatives Preliminary environmental conflicts evaluation From the three alternative routes, a preferred alignment will be selected. This preferred alignment could be one of the three routes, or a combination of portions of the routes. The next public meeting will be held in Early Spring 2011 to aid in the determination of the preferred alternative. For more information on the Pond Creek Corridor Project or on the Louisville Loop, please contact: John Swintosky Louisville Metro Parks P.O. Box 37280 Louisville, KY 40233 [email protected] 502-456-8112 Welcome! The purpose of today’s meeting is to gather input that will aid in the development of the Preliminary Concept Plan for the Pond Creek Corridor Project. Your input will be used to identify three potential routes of the shared-use path within the Pond Creek Corridor. Last October, a public meeting was held to gather preliminary information that aided in the development of shared-use path segments (see inside pages of this handout). The Pond Creek Corridor Study Area (generally from North Turnpike Road to 7600 Watson Lane) is the south-southwest link of The Louisville Loop. This path will serve as a major recreational and transportation feature for the nearby community and region. Path uses will include walking, biking, hiking and horseback riding. As part of the Pond Creek Corridor Study, the restoration of ecosystems along Pond Creek and associated tributaries will be addressed as a way to protect and enhance the watershed. In 2005, Mayor Jerry Abramson and Metro Parks announced a multi-million dollar, multi-year initiative to add thousands of acres of park land and protected green space to Louisville Metro’s “greenprint.” As part of the Louisville Metro Parks’ City of Parks initiative, The Louisville Loop, a planned paved trail of more than 100 miles around the Louisville community, will: • Improve mobility for pedestrians, bicyclists and equestrians • Connect neighborhoods, schools, parks, workplaces and shopping areas • Encourage a wide range of users to improve their health and fitness • Celebrate the natural and cultural history of Louisville • Enrich lives with public art • Serve as a catalyst for economic development This is the second of three public meetings planned for this Project. Please see the back page of this handout for more details on the next steps following this public meeting. Several phases of public outreach and development will be utilized during the course of the study, as illustrated by the graphic below. 2010 2011 Public Input Meeting October 19, 2010 Preliminary Plan Public Input Meeting February 15, 2011 Preliminary Plan Development Fall 2010 Final Plan Development Early-Mid 2011 Final Plan Public Input Meeting Early Spring 2011 Final Plan Spring 2011 We are here Completed Completed Shared Use Path and Ecological Restoration Plan HDR Pond Creek Corridor City of Parks City of Parks Constructability Will the existing right-of-way accommodate a path? Is the topography within the Louisville Loop Standard Design Guidelines for constructing paths? Cost Considerations Will location of a path require major infrastructure improvements like bridges or utility relocation? Safety Can the path be safely traversed without major conflicts with vehicles? User Experience Does the path provide a scenic, memorable, and enjoyable experience? Connections Are there connections to schools, libraries, neighborhoods, commercial areas, and other destinations that can be taken advantage of? Right-of-Way Acquisition How many parcels of land are affected by the proposed paths? How much land, if any, would have to be acquired? February 15, 2011 February 15, 2011

Upload: others

Post on 25-Jul-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: February 1 5, 2011 Next Steps HDR Pond Creek …...2011/02/15  · Preliminary environmental conflicts evaluation From the three alternative routes, a preferred alignment will be selected

Next StepsThe next steps in the study process will be to transform the individual segments into three viable alternative routes for the Pond Creek Corridor portion of the Louisville Loop. Metro Parks will evaluate all input received to select the these routes.

Key factors that will be considered when selecting a route are:

Following the segments being narrowed to the three proposed routes, a summary report will be developed that includes the following information:

• Proposed routing of hard surface and soft surface paths• Potential locations for trailheads and other facilities (restrooms, drinking fountains)• Operation and maintenance issues• Development costs for each of the alternatives• Preliminaryenvironmentalconflictsevaluation

From the three alternative routes, a preferred alignment will be selected. This preferred alignment could be one of the three routes, or a combination of portions of the routes. The next public meeting will be held in Early Spring 2011 to aid in the determination of the preferred alternative.

For more information on the Pond Creek Corridor Project or on the Louisville Loop, please contact:

John SwintoskyLouisville Metro ParksP.O. Box 37280Louisville, KY [email protected]

Welcome!The purpose of today’s meeting is to gather input that will aid in the development of the Preliminary Concept Plan for the Pond Creek Corridor Project. Your input will be used to identify three potential routes of the shared-use path within the Pond Creek Corridor. Last October, a public meeting was held to gather preliminary information that aided in the development of shared-use path segments (see inside pages of this handout).

The Pond Creek Corridor Study Area (generally from North Turnpike Road to 7600 Watson Lane) is the south-southwest link of The Louisville Loop. This path will serve as a major recreational and transportation feature for the nearby community and region. Path uses will include walking, biking, hiking and horseback riding. As part of the Pond Creek Corridor Study, the restoration of ecosystems along Pond Creek and associated tributaries will be addressed as a way to protect and enhance the watershed.

In 2005, Mayor Jerry Abramson and Metro Parks announced a multi-million dollar, multi-year initiative to add thousands of acres of park land and protected green space to Louisville Metro’s “greenprint.” As part of the Louisville Metro Parks’ City of Parks initiative, The Louisville Loop, a planned paved trail of more than 100 miles around the Louisville community, will: • Improvemobilityforpedestrians,bicyclistsandequestrians • Connectneighborhoods,schools,parks,workplacesandshoppingareas • Encourageawiderangeofuserstoimprovetheirhealthandfitness • CelebratethenaturalandculturalhistoryofLouisville • Enrichliveswithpublicart • Serveasacatalystforeconomicdevelopment

This is the second of three public meetings planned for this Project. Please see the back page of this handout for more details on the next steps following this public meeting. Several phases of public outreach and development will be utilized during the course of the study, as illustrated by the graphic below.

2010 2011

Public Input Meeting

October 19, 2010 Preliminary Plan

Public Input Meeting February 15, 2011

Preliminary Plan Development

Fall 2010

Final Plan DevelopmentEarly-Mid 2011

Final Plan Public Input Meeting

Early Spring 2011

Final PlanSpring 2011

We are here

Completed

Completed

Shared Use Path and Ecological Restoration Plan

HDR Pond Creek Corridor

City of ParksCity of Parks

Constructability Will the existing right-of-way accommodate a path? Is the topography within the Louisville Loop Standard Design Guidelines for constructing paths?

Cost Considerations Willlocationofapathrequiremajorinfrastructureimprovementslikebridgesorutilityrelocation?

Safety Canthepathbesafelytraversedwithoutmajorconflictswithvehicles?

User Experience Does the path provide a scenic, memorable, and enjoyable experience?

Connections Are there connections to schools, libraries, neighborhoods, commercial areas, and other destinations that can be taken advantage of?

Right-of-Way Acquisition

How many parcels of land are affected by the proposed paths? How much land, if any, wouldhavetobeacquired?

February 15, 2011February 15, 2011

Page 2: February 1 5, 2011 Next Steps HDR Pond Creek …...2011/02/15  · Preliminary environmental conflicts evaluation From the three alternative routes, a preferred alignment will be selected

Shared Use Path & Ecological Restoration Plan Pond Creek Corridor

Blevins Gap Rd/ Lonesome Hollow Rd intersection to proposed Fairdale round-about via Lonesome Hollow Rd, Forest property, and Mitchell Hill Rd.

Stonestreet Rd/Pond Station Rd intersection to existing MSD trail via Pond Station Rd and private property along CSX Railroad and Lamborne Blvd.

Jefferson Memorial Forest property at Blevins Gap Rd to north side of Gene Snyder Hwy via forest property. Includes crossing below highway through existing tunnel.

Pendleton Rd to Blevins Gap Rd via small stream corridor. Routing options also include Krages Ave, Meadowlawn Dr and private property along railroad corridor.

Blevins Gap Rd/ Lonesome Hollow Rd intersection to north side of Gene Snyder Hwy via existing Watsonville Rd underpass. Routing options include termination points at Pond Station Rd, existing MSD trail, and Greyling Dr.

Stonestreet Rd/Pond Station Rd to existing MSD trail via northwest side of Pond Creek.

Blevins Gap Rd/ Orell Rd intersection or Blevins Gap Rd/ Medora Rd intersection to existing Gene Snyder tunnel @ Metro Parks property (former Flynn Brothers sand quarry). Route roughly follows Pond Creek with highway crossing at CSX Railroad underpass.

Dixie Hwy/Pendleton Rd intersection to Medora Rd via Pendleton Rd.

Old New Cut Rd/Manslick Rd intersection New Cut Rd/Brown Austin intersection following private property along Gene Snyder Hwy and New Cut Rd R/W.

North side of existing Gene Snyder tunnel to Stonestreet Rd following edge of Gene Snyder R/W and Pond Creek.

Blevins Gap Rd/Orell Rd intersection to Jefferson Memorial Forest property at Blevins Gap Rd.

Dixie Hwy to Pendleton Rd/Pond Creek intersection. Options include railroad crossings at Lewis Rd or at a private drive and routes roughly following Pond Creek.

Existing MSD trail along north side of Pond Creek from Yarmouth Ct to Manslick Rd.

Medora Rd/Pendleton Rd intersection to Blevins Gap Rd. Routing options include Medora Rd and private property along CSX Railroad and Crane Run Creek.

LG&E Plant at Watson Ln to Dixie Hwy. Routing options include Watson Ln, Frost Middle School and Shipley Ln.

Blevins Gap/ Lonesome Hollow Rd intersection to Greyling Dr/Penile Rd intersection via Blevins Gap Rd.

Greyling Dr/Penile Rd Intersection to Penile Rd/Manslick Rd intersection. Routing options include following Penile Rd and Gene Snyder Hwy.

New Cut Rd/ Brown Austin Rd intersection to Fairdale Rd/National Turnpike intersection. Routing options include New Cut Rd, Fairdale Rd, and drainage easements behind high school.

W

GW

MD

BG

GS

H

PSPC

JMF MSD

F

NC

P

WV

B

MH

PN

R

Manslick Rd (at terminus of existing MSD trail) to Old New Cut Rd/Manslick Rd intersection following Manslick Rd R/W.M

PROJECT OVERVIEW

PROJECT DESCRIPTION

PROJECT OBJECTIVES Provide connectivity to neighborhoods, schools, parks, workplaces, and commercial districts.Achieve proper balance between path user experience, cost, and land acquisition.Minimize disturbance to environmentally sensitive areas.

Plan a route for a 12’ wide paved shared use path beginning at the LG&E plant entrance on Watson Lane and terminating at the National Turnpike/Fairdale Road intersection.

1.

2.

3.

F2

F1

F

MHMH1

MH4

MH2

MH3

H

PS

WV1

MSD

WV

P

P1G

WV2 WV3

NCM

B

PC2PC

PC1

JMF

GS

W3

W4W

W1

W1bW1a

W2

Wa

GW1

GW

Wb

MD1

BG1

BGR3

R4

MD MD3MD2

R2

RR1

PN

LEVE

E TR

AIL

UN

DER

CO

NST

RUCT

ION

BULLITT COUNTY

INDIANA

O H

I O

R

I V

E R

St. Andrews Cemetery

Waverly Park

Je�ersonMemorial

Forest

Bethany Cemetery

Sun Valley Park

Riverside,The Farnsley

Moremen Landing

DIXIE

HIG

HWAY

WATSON LANE

PENDLETON ROAD

BLEVINS G

AP ROAD

GENE SNYDER HIGHWAY

BLEV

INS

GA

P RO

AD

PENILE ROAD

NEW CUT ROAD

OUTER LOOP

NATIO

NA

L TURN

PIKE

FAIRDALE ROAD

MIT

CHEL

L H

ILL

ROA

D

3rd STREET ROAD

STONESTREET ROAD

VALLEY STATION ROAD

DIX

IE H

IGH

WAY

MOORMAN ROAD

DEE

RIN

G R

OA

D

GR

EEN

BEL

T H

IGH

WAY

JEFFERSON COUNTY

EXISTING

OH

IO RIVER LEVEE TRA

IL

Scotts Gap

Moreman’sHill

Tom Wallace

Paul Yost

65

LEGEND

Trail Segments (Typ.)

Parks, Golf Courses, and Cemeteries

Waterways

0 miles 1/4 mile 1/2 mile 3/4 mile

SEG

MEN

T MAP

: PEN

ILE R

D. TO

FAI

RDAL

E RD

.Sh

ared

Use

Pat

h &

Eco

logi

cal R

esto

ratio

n Pl

anon

d Cr

eek

Trai

lP

railroad

railr

oad

railroad

rail

road

railroad

national turnpike

medo

ra r

oad

lg & e