fast kickers tests and bellows impedance at dafne

24
FAST KICKERS TESTS AND BELLOWS IMPEDANCE AT DAFNE Fabio Marcellini, LNF- INFN LCWS08 & ILC08 Nov 16-20, 2008 University of Illinois, Chicago

Upload: imani-downs

Post on 31-Dec-2015

24 views

Category:

Documents


0 download

DESCRIPTION

FAST KICKERS TESTS AND BELLOWS IMPEDANCE AT DAFNE. Fabio Marcellini, LNF- INFN. LCWS08 & ILC08 Nov 16-20, 2008 University of Illinois, Chicago. PRESENTATION OUTLINE Design of a stripline kicker for beam injection in DAFNE storage rings. HV tests and RF measurements of the kicker. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: FAST KICKERS TESTS AND  BELLOWS IMPEDANCE AT DAFNE

FAST KICKERS TESTSAND

BELLOWS IMPEDANCE AT DAFNE

Fabio Marcellini, LNF- INFN

LCWS08 & ILC08Nov 16-20, 2008 University of Illinois, Chicago

Page 2: FAST KICKERS TESTS AND  BELLOWS IMPEDANCE AT DAFNE

PRESENTATION OUTLINE

1. Design of a stripline kicker for beam injection in

DAFNE storage rings.

2. HV tests and RF measurements of the kicker.

3. DAFNE operation with the new kickers.

4. Realization of a stripline kicker for ILC damping

ring.

5. New DAFNE shielded bellows

Page 3: FAST KICKERS TESTS AND  BELLOWS IMPEDANCE AT DAFNE

Input ports

Output ports(LOAD)

Strip ceramic supports

BEAM

1. DESIGN OF THE NEW DAFNE INJECTION KICKER

Tapered stripline

Elliptical cross section

HV feedthrough

Page 4: FAST KICKERS TESTS AND  BELLOWS IMPEDANCE AT DAFNE

The elliptical cross section:

• Minimizes the discontinuity of the beam pipe cross section between the injection region and the adjacent dipole regions

• Increases the deflection efficiency.

The tapered stripline:

• Improves the uniformity of transverse deflection as a function of the transverse position

• Reduces the contribution of the kicker to the machine impedance

• improves the reflection coefficient at high frequency (short pulses) because of smoother transition between feedthrough coax line and stripline.

Lk/2LT 3%

Field flatness by integration

Page 5: FAST KICKERS TESTS AND  BELLOWS IMPEDANCE AT DAFNE

PARAMETERS

Beam Energy E [MeV] 510

Time spacing between bunches [ns] 2.7

Deflection [mrad] 5

Total deflecting voltage VT [MV] 2.5

Total kicker length L [cm] 90

Voltage per strip [kV] 45

Input pulse length [ns] 5

Pulse length “seen” by bunches [ns] 10

Max rep rate [Hz] 10

injection kicker design parameters

Page 6: FAST KICKERS TESTS AND  BELLOWS IMPEDANCE AT DAFNE

2. HV TESTS

fastpulser (FID)

old pulser(LNF)

25 kV

250 ns

45 kV

5 ns

50 kV, 50 Ω feedthrough LNF design

Page 7: FAST KICKERS TESTS AND  BELLOWS IMPEDANCE AT DAFNE

2. RF measurements: frequency response

Special connectors needed to adapt HV connector to RF standards

Reflection at the input port

Reflections increase sensiblywith the feedthroughs

Page 8: FAST KICKERS TESTS AND  BELLOWS IMPEDANCE AT DAFNE

2. RF measurements: longitudinal impedance

0 0.5 1 1.5 2-20

-10

0

10

20

30

40

50

f [GHz]

all ports matched

mag

real

imag

Zlo

ng [

]

0 0.5 1 1.5 2-500

0

500

1000

f [GHz]

short circuit at each port

mag

real

imag

Zlo

ng [

]

0 0.5 1 1.5 2-30

-20

-10

0

10

20

30

f [GHz]

2 ports with short cicuits, 2 ports matched (HV real load)

Zlo

n g [

]

mag

real

imag

0 0.5 1 1.5 2-20

-10

0

10

20

30

40

f [GHz]

Zlo

ng [

]

2 ports with short circuits, 2 ports matched (ideal load)

mag

real

imag

Page 9: FAST KICKERS TESTS AND  BELLOWS IMPEDANCE AT DAFNE

New kickers installed in the DANE rings (Nov. 07)

e+ e-IP

Final version of the 45 kV FID pulsers has shown poor reliability. At present only 1 pulser of 4 is good.

FID GmbH repaired and updated several times the broken components but a reliable solution has not yet been found.

We never had the possibility to operate with the 4 pulsers working together at the same time.

We are now running with the old, long pulse system in both the rings.

In e+ ring we have succesfully tested injection with a hybrid system connecting both the old pulser and the 45kV fast pulser to each kicker.

3. DAFNE operation with the new kickers

Page 10: FAST KICKERS TESTS AND  BELLOWS IMPEDANCE AT DAFNE

Long and the fast pulses observed in sum at the scope.Taken from 2 striplines of the e+ ring kickers. Different attenuations for signals from the 2 striplines.

Injection with hybrid system

kck1 kck2

beam

fast pulse

Page 11: FAST KICKERS TESTS AND  BELLOWS IMPEDANCE AT DAFNE

DAFNE beam oscillations with fast kick

100, of 120, stored bunches with kicker pulse centered on bunch 50. bunch distance 2.7 ns.

Measured by the horizontal digital feedback system.

Page 12: FAST KICKERS TESTS AND  BELLOWS IMPEDANCE AT DAFNE

rms oscillation amplitude of 100 stored bunches with kicker pulse centered on bunch 50

DAFNE beam oscillations with fast kick

0,00

0,02

0,04

0,06

0,08

0,10

0,12

-150 -100 -50 0 50 100 150 200

Same plot with a scale in ns and amplified vertical scale

Shows a tail of ~2% above noise level

0,00

0,20

0,40

0,60

0,80

1,00

1 11 21 31 41 51 61 71 81 91 101 111

Page 13: FAST KICKERS TESTS AND  BELLOWS IMPEDANCE AT DAFNE

Experience with FID pulsers

First results of operation with FID fast pulsers have been very promising.

Routine operation with 45kV FIDs not allowed because of their very poor reliability.

After increasing ß function in the kicker region and changing the beam orbit in the septa, we tried successfully injection with a 24kV, 5ns FID.

Pulse shape is the same of the 45kV FID, just lower voltage amplitude.

We used this 24 kV FID for lab tests and never had problems up to now.

We decided to give up the 45 kV FIDs and try to go on with the 24 kV units.

It is possible to have eight 24kV pulsers at the cost of the four 45 kV FIDs. Enough for both the rings.

The 24kV FID used for lab HV tests

Page 14: FAST KICKERS TESTS AND  BELLOWS IMPEDANCE AT DAFNE

Present situation

e- ring

old pulserold pulser

old pulser old pulser

horizontalfdbk

horizontalfdbk

e+ ring

Page 15: FAST KICKERS TESTS AND  BELLOWS IMPEDANCE AT DAFNE

Short term program(maybe next week)

e- ring

old pulser

old pulser old pulser

horizontalfdbk

horizontalfdbk

e+ ring

20kV fast pulser 20kV fast pulser

old pulser

Page 16: FAST KICKERS TESTS AND  BELLOWS IMPEDANCE AT DAFNE

Longer term program

An additional stripline kck will be installed in e+ ring for the horizontal fdbk.

Operation with hybrid solution also possible. More flexible in case of failure of FID pulsers.

e- / e+ ring

20kV fast pulser

20kV fast pulser 20kV fast pulser

20kV fast pulser

Page 17: FAST KICKERS TESTS AND  BELLOWS IMPEDANCE AT DAFNE

4. A KICKER FOR ATF

ATF PRESENT KICKER

ATF TAPERED STRIPLINE KICKER

Both the structures have been simulated with HFSS

Deflecting field along the longitudinal structure axis

Blue: straight section striplineRed: tapered stripline

Page 18: FAST KICKERS TESTS AND  BELLOWS IMPEDANCE AT DAFNE

deflecting voltage on the vertical axis

deflecting voltage on the horizontal axis

SIMULATION RESULT COMPARISON

Input port reflections

Transfer impedances

Longitudinal coupling impedance

Page 19: FAST KICKERS TESTS AND  BELLOWS IMPEDANCE AT DAFNE

Mechanical drawing of the kicker ready. Fabrication starting soon.

Kicker is made in stainless steel, 320 mm long.

Feedthroughs are commercial available HN-type connectors (CERAMTEC).

Page 20: FAST KICKERS TESTS AND  BELLOWS IMPEDANCE AT DAFNE

5. The new DAFNE bellows

For the DAFNE upgrade, vacuum chamber modifications have concerned:

1. new interaction regions,

2. new stripline injection kickers,

3. all ion clearing electrodes removed in the electron ring.

4. new bellows

Low impedance design of the new vacuum chamber components

0 1 2 3 40

0.004

0.008

0.012

frequency [GHz]

Co

up

ling

Im

p [

Oh

m]

Bellows beam coupling impedanceobtained by HFSS

Page 21: FAST KICKERS TESTS AND  BELLOWS IMPEDANCE AT DAFNE

Bunch length as a function of bunch current in the electron ring.(left)

Bunch charge distribution (@ ~30mA) in the electron ring.(right)

Bunch lengthening in:positron ring (left) electron ring (right)

few ion clearing electrodes still remainingin the e- ring.

coupling impedance has been decreased by about 50% in the positron ring and 70% in the electron ring.

Page 22: FAST KICKERS TESTS AND  BELLOWS IMPEDANCE AT DAFNE

gold coated strip (a), supporting Al ring (b), bellows assembly (c).

The shield is composed of:• 2 cylindrical pipes, welded

at the bellows ends, give continuity to the beam pipes except for the gap between them.

• 20 Ω shaped, gold-coated, Be-Cu strips, shielding this gap.

• A floating thick aluminium ring where the 20 strips are bolted.

DRAWING OF THE NEW DAFNE BELLOWS

THE RF SHIELD CAN FIT DIFFERENT BEAM PIPE CROSS SECTIONS

Designed for a circular cross section (ø 88 mm) chamber.

Page 23: FAST KICKERS TESTS AND  BELLOWS IMPEDANCE AT DAFNE

Tangential magnetic field (current distribution) on the strip surfaces.

A cooled version of the bellows has been also considered for possible application on different machines.

The bellows convolutions were split in two and an external cooling serpentine is brazed around the supporting ring.

See also: EPAC ’08 proceedings TUPP051 and TUPP074

Due to the high thermal capacity of the supporting ring, the RF shield has a high thermal strength.

No specific devices to dissipate the power released by the DAFNE beam on the structure.

Page 24: FAST KICKERS TESTS AND  BELLOWS IMPEDANCE AT DAFNE

CONCLUSIONS

• The new DAFNE injection kickers, installed one year ago, work well and are very versatile devices. Used with both FID and old DAFNE pulsers and even as a feedback kicker!

• Reliability problems of the fast pulse generators by FID remain to be solved, we hope with the 24kV units.

• A tapered stripline kicker has been designed for ATF, mechanical drawings already done. Ready to be realized.

• A new shielded bellows designed for the DAFNE upgrade as well. It could be easily readapted to different chamber cross sections and a version with cooling is also available.

• Together with the new injection kicker, it contributed to lower the machine impedance, as bunch length measurements have shown.