  • Presented by

    ASE Confidential / SecurityASE Confidential / Security--BB

    Curtis Chen ASE GroupNov. 17, 2009

    Failure Analysis Introduction

  • 2 ASE Group. All rights reserved.ASE Group. All rights reserved.

    ASE Confidential / SecurityASE Confidential / Security--BB

    Content

    0. Key Concepts for failure analysis

    1. Necessary Data for FA Analysis

    2. Failure Analysis Flow

    3. Failure Analysis Equipments/ Functions

  • 3 ASE Group. All rights reserved.ASE Group. All rights reserved.

    ASE Confidential / SecurityASE Confidential / Security--BB

    0. Key Concepts for failure analysis

    0.1: ()

    0.2: ():////

    ///;;;-

    ---..

    0.3: ()

    0.4: (;plan)

    0.5: (; do)

    0.6: (;check)

    0.7: (co-work)

    0.8: (action)

    0.9:

  • 4 ASE Group. All rights reserved.ASE Group. All rights reserved.

    ASE Confidential / SecurityASE Confidential / Security--BB

    HTST (1) 150oC, 168hrs

    Function test (2)

    HTST (2) 150oC, 500hrs

    Function test (3)

    HTST (3) 150oC, 1000hrs

    Function test (4)

    Function test (1)

    Short failure was detected for 1 ea

    Short failure was detected for 1 ea

    Passed

    Passed

    Customer : XXX

    Package : STK TFBGA XXX L

    Failure Point: after HTST 500/ 1000hrs

    Failure Mode: gold ball short to exposed Al pad

    Evidence:

    Why it can escape twice test?

    VSS

    PIN J13

    IMC

    ASE confidential ASE Group. All rights reserved.ASE Group. All rights reserved.

  • 5 ASE Group. All rights reserved.ASE Group. All rights reserved.

    ASE Confidential / SecurityASE Confidential / Security--BB ASE confidential ASE Group. All rights reserved.ASE Group. All rights reserved.

    FIB cutting on the failed unit after HTST

    Gold ballGold ball

    Al padIMC IMC

    Continue FIB cutting,then found the IMC growth had over the edge of adjacent pad.

    The edge of Al pad

  • 6 ASE Group. All rights reserved.ASE Group. All rights reserved.

    ASE Confidential / SecurityASE Confidential / Security--BB ASE confidential ASE Group. All rights reserved.ASE Group. All rights reserved.

    There was still a gap (voids and Al oxide) between extruded Al and its adjacent Al pad, hence no short failure occurred.

    FIB cutting on the passed unit after THT

    Gap

    Gap

  • 7 ASE Group. All rights reserved.ASE Group. All rights reserved.

    ASE Confidential / SecurityASE Confidential / Security--BB

    (1) After assembly, ball shift had occurred. Al metal was extruded out, and almost connected with adjacent Al pad.

    (2) IMC growing during HTST

    (3) IMC crossed the adjacent bond pad to cause the short failure.

    Failure mechanism

    ASE confidential ASE Group. All rights reserved.ASE Group. All rights reserved.

  • 8 ASE Group. All rights reserved.ASE Group. All rights reserved.

    ASE Confidential / SecurityASE Confidential / Security--BB

    1. Necessary Data for FA Analysis

    a. Confirming the failure symptom at the beginningb. More correct history input is necessary to come out right

    conclusionc. Necessary tools for the electrical traceability during

    failure analysis

    Why we need it?

  • 9 ASE Group. All rights reserved.ASE Group. All rights reserved.

    ASE Confidential / SecurityASE Confidential / Security--BB

    Necessary Data for FA Application

    Failure mode

    Relevant data Necessary Option

    eFA application/Request form

    VBe sure to obtain approval form your manager or supervisor forurgent case. Remember to attach all the drawing files.

    Clear History V1. Failure after assembly or reliability test (what's the testcondition) or SMT (what's the reflow profile)

    B/D drawing V1.Complete and clear wire bonding drawing.2. Identify the power and ground ring.

    Substrate drawing V Complete and clear substrate drawing (autoCAD format).

    Failure pin V

    1. If you can not provide a good sample for comparison, then youmust provide failure pins.2. If the customer has provided net name of the failure pin, therequestor will need to provide netlist for comparison.

    Good sample V For comparison.

    Net list V

    1. For real die package.2. The data should include net name / finger no. or bonding padno. / solder ball no.3. Transfer the failure pin from solder ball to finger of B/Ddrawing.

    Checking PointO/S Fail

  • 10 ASE Group. All rights reserved.ASE Group. All rights reserved.

    ASE Confidential / SecurityASE Confidential / Security--BB

    B/D Drawing Substrate Drawing

  • 11 ASE Group. All rights reserved.ASE Group. All rights reserved.

    ASE Confidential / SecurityASE Confidential / Security--BB

    Note: 1. If the package is daisy chain design, pls mark it in the request form.

    2. If the wafer is CUP (circle under pad) design, pls mark it in the request form.

    3. If the failure pin is provide by customer/test house, pls provide a file that can be used to transfer thefailure location from test name to solder ball/finger no.4. Please feel free to contact us if you have any question while you apply a FA case, June Shyu (83773),Jetter Tseng (83754)

    Failure mode

    Relevant data Necessary Option

    Daisy chain designwithin the package

    V For daisy chain design package, confirm the daisy chain layout.

    electrical testcriteria

    V For comparison.

    Bare substrate V for TDR

    Please refer to SPEC no. 62-21-0000-0026 Failure analysis guidline

    Checking PointO/S Fail

    Necessary Data for FA Application

  • 12 ASE Group. All rights reserved.ASE Group. All rights reserved.

    ASE Confidential / SecurityASE Confidential / Security--BB

    2. Failure Analysis Flow

    Failure analysis entrust

    Data correct/failure confirm?

    Failure analysis

    Failure mode identification

    Result/Report issue

    Yes

    No

    No

    Yes

    Improvement (own by CQE)

    Non-destructive analysis

    Destructive analysis

  • 13 ASE Group. All rights reserved.ASE Group. All rights reserved.

    ASE Confidential / SecurityASE Confidential / Security--BB

    Non-destructive analysis items are aimed to collect as much information as possible prior to any destructive actions and are applied where appropriate analysis method is defined as item below:

    Non-destructive analysis

    a. External visual inspection

    b. Electrical verification

    c. SAT inspection

    d. X-ray inspection

    e. SEM inspection

  • 14 ASE Group. All rights reserved.ASE Group. All rights reserved.

    ASE Confidential / SecurityASE Confidential / Security--BB

    External visual inspectionThe exterior features of the samples shall be checked under low power/ high power optical microscope for any visual defects.

    Electrical verificationThe sample shall be subjected to electrical verification to confirm electrical failure.

    SAT inspectionThe sample shall be subjected to SAT inspection to check for any possible delamination cracking or voiding problems.

  • 15 ASE Group. All rights reserved.ASE Group. All rights reserved.

    ASE Confidential / SecurityASE Confidential / Security--BB

    X-ray inspection

    The sample shall be subjected to x-ray inspection to check for any obvious defect within the package.

    SEM inspection and EDS analysis

    In order to detect smaller defect mode, SEM/EDS were used to get higher resolution images and composition analysis to get more solid evidences for failure modes identification.

  • 16 ASE Group. All rights reserved.ASE Group. All rights reserved.

    ASE Confidential / SecurityASE Confidential / Security--BB

    Destructive analysis items are aimed to collect as much hard evidence as possible to support the final conclusionAnd are applied where appropriate analysis method is defined as item below:

    Destructive analysis

    a. Isolation test

    b. Chemical de-capsulation

    c. Horizontal cross-section

    d. Vertical cross-section

    e. Dry or Wet etching

  • 17 ASE Group. All rights reserved.ASE Group. All rights reserved.

    ASE Confidential / SecurityASE Confidential / Security--BB

    Isolation test

    This process involved techniques that allow the identification of the electrical failure location. Based on substrate and wire bonding information, substrate copper trace or gold wires can be sectioned to isolate whether the failure is located on the die side or the substrate/lead frame side.

    Chemical de-capsulationThis process removes the portion of compound covering the wire-bonding and die area for all wire-bonding packages using fuming nitric acid and/or sulfuric acid.

  • 18 ASE Group. All rights reserved.ASE Group. All rights reserved.

    ASE Confidential / SecurityASE Confidential / Security--BB

    Horizontal cross-sectionIn-plane cross-sectional techniques that is useful to check for copper traces and solder extrusion types of failures.

    Vertical cross-sectionCross-section that is performed perpendicular to the package. Useful to check for gold balls, wires, stitch bonds, substrate via/through holes, solder bumps, and layer structure types of failure inside package.

    Dry or Wet etchingThese techniques include passivation removal, solder mask removal, compound removal, underfill removal, cratering test, solder bump/ solder ball etching, metal materials etching, etc.

  • 19 ASE Group. All rights reserved.ASE Group. All rights reserved.

    ASE Confidential / SecurityASE Confidential / Security--BB

    3. Failure Analysis Equipments/ Functions

    Item Analysis item Function

    1 Optical microscopeThe