    SITE MANAGEMENT FORM

    Sub-Contractor Inaugural Meeting Document

    Form

    No:NP0001\SM\F014

    Procedure

    No:NP0001\SM

    Revision:Draft Page 1 of 4

    Contract Name:

    Contract No: Date of Meeting:

    This document should be read as a document listing only the main points for discussion at an InauguralMeeting. It will almost certainly be necessary to add, delete or amend some items when full details ofindividual contracts are known.

    AGENDA

    1. Introductions & Emergency Evacuation Procedure

    2. Contract

    Letter of intent

    Exchange of contracts

    Insurance

    Priorities (if any)

    Commencement/Completion dates

    Standards and quality

    3. Contract Management

    Personnel (Civil, building, mechanical and electrical)

    Atkins

    Contractor

    Responsibilities

    4. Health, Safety & Environmental

    Health & Safety plans

    Existing site hazards

    Communication:

    - Site Inductions

    - Co-ordination meetings

    - Tool box talks

    Client safety requirements

    Health, Safety & Environmental (continued)

    Uncontrolled when printed

    Author Creation

    Date

    Reviewer Review

    Date

    Authoriser Issue Date

    W Lawton

  • 7/30/2019 F14_SiteSubContractorInauguralMeetingDocument

    2/4

    SITE MANAGEMENT FORM

    Sub-Contractor Inaugural Meeting

    FormNo:NP0001\SM\F014

    ProcedureNo:NP0001\SM

    Revision:Draft Page 2 of 4

    Principal Contractor and Site safety Rules (including H&S disciplinary procedure)

    CDM Demarcation

    Control of visitors

    Personal Protection Equipment Standard and specialist

    First aid

    Notification of accidents/dangerous occurrences/near misses

    Site Emergency Procedure and contact of emergency services

    Site safety audits, tours and inspections

    Principal Contractor Site Safety Monitoring:-

    - Competence and training

    - Plant and machinery

    - Methods of working

    Permit-to-work system

    Statutory undertakers/O/H and U/G services

    Environmental Impact Assessment:-

    - Impacts created

    - Impact control and limiting factors

    5. Contract Administration

    Possession

    Programme

    Working hours

    Progress reports

    Site progress meetings/minutes

    Site/general correspondence

    Inspection requests

    6. Quality Plans

    Quality records

    Hold and notification points

    Vetting and control of Sub-Contractors/Suppliers

    Planning conditions

    7. Site Set-up

    Uncontrolled when printed

    Author Creation

    Date

    Reviewer Review

    Date

    Authoriser Issue Date

    W Lawton

  • 7/30/2019 F14_SiteSubContractorInauguralMeetingDocument

    3/4

    SITE MANAGEMENT FORM

    Sub-Contractor Inaugural Meeting

    FormNo:NP0001\SM\F014

    ProcedureNo:NP0001\SM

    Revision:Draft Page 3 of 4

    Access and Egress

    Security

    Temporary fencing

    Traffic management

    Offices and Welfare facilities (mess rooms, drying rooms and toilets)

    Services to offices (electricity, water, drainage and telephones)

    Storage areas (containers, laydown areas, diesel tanks etc.)

    Car Parking

    Waste Management

    8. Issue of Information

    Method statements/risk assessments. Guidance and Format

    Drawings

    Bending schedules

    Technical queries

    Piling proposalsFabrication drawings

    Materials approvals requests

    Daily attendance records

    Plant and labour returns

    9. Setting out

    Site hand-over document

    OGLS

    TBMs/temporary stations

    Instrument certification and checks

    10. Financial

    Priced BOQs

    Monthly valuations

    Dayworks/extras

    Claims

    11. Any other business

    Uncontrolled when printed

    Author Creation

    Date

    Reviewer Review

    Date

    Authoriser Issue Date

    W Lawton

  • 7/30/2019 F14_SiteSubContractorInauguralMeetingDocument

    4/4

    SITE MANAGEMENT FORM

    Sub-Contractor Inaugural Meeting

    FormNo:NP0001\SM\F014

    ProcedureNo:NP0001\SM

    Revision:Draft Page 4 of 4

    Uncontrolled when printed

    Author Creation

    Date

    Reviewer Review

    Date

    Authoriser Issue Date

    W Lawton