SITE MANAGEMENT FORM
Sub-Contractor Inaugural Meeting Document
Form
No:NP0001\SM\F014
Procedure
No:NP0001\SM
Revision:Draft Page 1 of 4
Contract Name:
Contract No: Date of Meeting:
This document should be read as a document listing only the main points for discussion at an InauguralMeeting. It will almost certainly be necessary to add, delete or amend some items when full details ofindividual contracts are known.
AGENDA
1. Introductions & Emergency Evacuation Procedure
2. Contract
Letter of intent
Exchange of contracts
Insurance
Priorities (if any)
Commencement/Completion dates
Standards and quality
3. Contract Management
Personnel (Civil, building, mechanical and electrical)
Atkins
Contractor
Responsibilities
4. Health, Safety & Environmental
Health & Safety plans
Existing site hazards
Communication:
- Site Inductions
- Co-ordination meetings
- Tool box talks
Client safety requirements
Health, Safety & Environmental (continued)
Uncontrolled when printed
Author Creation
Date
Reviewer Review
Date
Authoriser Issue Date
W Lawton
-
7/30/2019 F14_SiteSubContractorInauguralMeetingDocument
2/4
SITE MANAGEMENT FORM
Sub-Contractor Inaugural Meeting
FormNo:NP0001\SM\F014
ProcedureNo:NP0001\SM
Revision:Draft Page 2 of 4
Principal Contractor and Site safety Rules (including H&S disciplinary procedure)
CDM Demarcation
Control of visitors
Personal Protection Equipment Standard and specialist
First aid
Notification of accidents/dangerous occurrences/near misses
Site Emergency Procedure and contact of emergency services
Site safety audits, tours and inspections
Principal Contractor Site Safety Monitoring:-
- Competence and training
- Plant and machinery
- Methods of working
Permit-to-work system
Statutory undertakers/O/H and U/G services
Environmental Impact Assessment:-
- Impacts created
- Impact control and limiting factors
5. Contract Administration
Possession
Programme
Working hours
Progress reports
Site progress meetings/minutes
Site/general correspondence
Inspection requests
6. Quality Plans
Quality records
Hold and notification points
Vetting and control of Sub-Contractors/Suppliers
Planning conditions
7. Site Set-up
Uncontrolled when printed
Author Creation
Date
Reviewer Review
Date
Authoriser Issue Date
W Lawton
-
7/30/2019 F14_SiteSubContractorInauguralMeetingDocument
3/4
SITE MANAGEMENT FORM
Sub-Contractor Inaugural Meeting
FormNo:NP0001\SM\F014
ProcedureNo:NP0001\SM
Revision:Draft Page 3 of 4
Access and Egress
Security
Temporary fencing
Traffic management
Offices and Welfare facilities (mess rooms, drying rooms and toilets)
Services to offices (electricity, water, drainage and telephones)
Storage areas (containers, laydown areas, diesel tanks etc.)
Car Parking
Waste Management
8. Issue of Information
Method statements/risk assessments. Guidance and Format
Drawings
Bending schedules
Technical queries
Piling proposalsFabrication drawings
Materials approvals requests
Daily attendance records
Plant and labour returns
9. Setting out
Site hand-over document
OGLS
TBMs/temporary stations
Instrument certification and checks
10. Financial
Priced BOQs
Monthly valuations
Dayworks/extras
Claims
11. Any other business
Uncontrolled when printed
Author Creation
Date
Reviewer Review
Date
Authoriser Issue Date
W Lawton
-
7/30/2019 F14_SiteSubContractorInauguralMeetingDocument
4/4
SITE MANAGEMENT FORM
Sub-Contractor Inaugural Meeting
FormNo:NP0001\SM\F014
ProcedureNo:NP0001\SM
Revision:Draft Page 4 of 4
Uncontrolled when printed
Author Creation
Date
Reviewer Review
Date
Authoriser Issue Date
W Lawton