Page 1: Extraordinary NSA Meeting - government.bg...Extraordinary NSA Meeting Lille, the 29th of July 2009. 29/07/2009 2 29th of June at 11.49 p.m. train n. 50325 of Trenitalia S.p.A. Loco

Extraordinary NSA Meeting

Lille, the 29th of July 2009

Page 2: Extraordinary NSA Meeting - government.bg...Extraordinary NSA Meeting Lille, the 29th of July 2009. 29/07/2009 2 29th of June at 11.49 p.m. train n. 50325 of Trenitalia S.p.A. Loco

29/07/2009 2

29th of June at 11.49 p.m.

train n. 50325 of Trenitalia S.p.A.

Loco E655 + 14 tank wagons

Liquefied Petroleum Gas (LPG)

Description of the event

Trecate

Gricignano

Viareggio

Page 3: Extraordinary NSA Meeting - government.bg...Extraordinary NSA Meeting Lille, the 29th of July 2009. 29/07/2009 2 29th of June at 11.49 p.m. train n. 50325 of Trenitalia S.p.A. Loco

29/07/2009 3

1st wagon

(service n° 33 80 7818210 6)

GATX Rail, registered by the public

railway infrastructure DB

Description of the event

Page 4: Extraordinary NSA Meeting - government.bg...Extraordinary NSA Meeting Lille, the 29th of July 2009. 29/07/2009 2 29th of June at 11.49 p.m. train n. 50325 of Trenitalia S.p.A. Loco

29/07/2009 4

Description of the event

Page 5: Extraordinary NSA Meeting - government.bg...Extraordinary NSA Meeting Lille, the 29th of July 2009. 29/07/2009 2 29th of June at 11.49 p.m. train n. 50325 of Trenitalia S.p.A. Loco

29/07/2009 5

Description of the event

Page 6: Extraordinary NSA Meeting - government.bg...Extraordinary NSA Meeting Lille, the 29th of July 2009. 29/07/2009 2 29th of June at 11.49 p.m. train n. 50325 of Trenitalia S.p.A. Loco

29/07/2009 6

Description of the event

Page 7: Extraordinary NSA Meeting - government.bg...Extraordinary NSA Meeting Lille, the 29th of July 2009. 29/07/2009 2 29th of June at 11.49 p.m. train n. 50325 of Trenitalia S.p.A. Loco

29/07/2009 7

Description of the event

Page 8: Extraordinary NSA Meeting - government.bg...Extraordinary NSA Meeting Lille, the 29th of July 2009. 29/07/2009 2 29th of June at 11.49 p.m. train n. 50325 of Trenitalia S.p.A. Loco

29/07/2009 8

Description of the event

Page 9: Extraordinary NSA Meeting - government.bg...Extraordinary NSA Meeting Lille, the 29th of July 2009. 29/07/2009 2 29th of June at 11.49 p.m. train n. 50325 of Trenitalia S.p.A. Loco

29/07/2009 9

•Visit on the Viareggio station, immediately after the

accident;

•1st and 2nd July visit in the maintenance workshop “Cima

Riparazioni” where it has been made the last maintenance

operation on the tank wagon;

•8th July meeting with EBA representatives and visit in themaintenance workshop “ Jungenthal Waggon Gmbh

(Hannover)”

ANSF Activities

Page 10: Extraordinary NSA Meeting - government.bg...Extraordinary NSA Meeting Lille, the 29th of July 2009. 29/07/2009 2 29th of June at 11.49 p.m. train n. 50325 of Trenitalia S.p.A. Loco

29/07/2009 10

The first axle of the first tank

wagon of the train hasbroken near to the

connection section between

the wheel and the axle.

Previous crack which brought

the resistant section to

remarkably decrease, until,

finally, giving way.

First finding on the causes

Page 11: Extraordinary NSA Meeting - government.bg...Extraordinary NSA Meeting Lille, the 29th of July 2009. 29/07/2009 2 29th of June at 11.49 p.m. train n. 50325 of Trenitalia S.p.A. Loco

29/07/2009 11

Identifying code of the

axle, present on the

head of the spindle

Axle built in 1974,

comply with UIC 811,

3rd version

First finding on the causes

Page 12: Extraordinary NSA Meeting - government.bg...Extraordinary NSA Meeting Lille, the 29th of July 2009. 29/07/2009 2 29th of June at 11.49 p.m. train n. 50325 of Trenitalia S.p.A. Loco

29/07/2009 12

In the first months of 2009 (Jan-Mar), “Cima Riparazioni”

maintenance workshop (certified by Railion Deutschland AG)

carried out the maintenance to the tank wagon service n°

338078182106 according the RID expiries.

As declared by CIMA, according with the maintenance

handbook VPI, some irregularities have been found in two

wheelsets. Consequently Cima Riparazioni asked GATX for

two certified wheelsets to replace the wheelsets withirregularities.

On behalf of GATX, Cima Riparazioni received these revised

wheelsets by Jungenthal-Waggon GmbH, maintenance

workshop certified by Railion Deutschland AG.

Results of Cima Workshop audit

Page 13: Extraordinary NSA Meeting - government.bg...Extraordinary NSA Meeting Lille, the 29th of July 2009. 29/07/2009 2 29th of June at 11.49 p.m. train n. 50325 of Trenitalia S.p.A. Loco

29/07/2009 13

The wagon derailed has been declared compliant with aprototype (wagon n. 3380781484-2) homologated by EBA in2003.

The tank has a separated authorization issued by EBA.

The prototype has been homologated with boogies typeY25Cs and axles type belonged to the type A list.

EBA imposed a load restriction (from 21 tons to 20 tons) to thewheel set “type A” (Fiche UIC 510.1), in which is installed thebroken axle, after an accident happened in Austria, wherethere was a broken of this type axle in the middle section.

Results of the meeting with EBA

Page 14: Extraordinary NSA Meeting - government.bg...Extraordinary NSA Meeting Lille, the 29th of July 2009. 29/07/2009 2 29th of June at 11.49 p.m. train n. 50325 of Trenitalia S.p.A. Loco

29/07/2009 14

Extraordinary non destructive tests on all the axles of thewheel-sets of the wagons circulating at the present on theItalian network, for which it is applicable one of the followingconditions :

•axles subjected to the last non destructive testing in the German workshop Jungenthal - Waggon GmbH - Am Hafen 29 – 30629 Hannover, certified by Railion Deutschland AG (certificate nr. 104),

•axles originated from the cast nr. 67156, November 1974 by the manufacturer identified by the code LKM,

•axles utilized in the wheel-sets type VRS belonging to the group of exchange 75.2 (n° of axle design 03801Z2/00020006-02.12).

measures adopted by ANSF immediately after theaccident

Page 15: Extraordinary NSA Meeting - government.bg...Extraordinary NSA Meeting Lille, the 29th of July 2009. 29/07/2009 2 29th of June at 11.49 p.m. train n. 50325 of Trenitalia S.p.A. Loco

29/07/2009 15

•Wagon maintenance regime depends on the matriculation

country, not on the country where is utilised

•Several types of axles are designed to have not limit life but

the frequency of non destructive control is not determinate

•The data, the figure and the document about non

destructive test are not completely stored

•Specific infrastructures constituents could have played a

role in the seriousness of the accident consequences

The accident happened in Italy but the problem and itssolution are European (at least)

Main feedback from the accidents

Page 16: Extraordinary NSA Meeting - government.bg...Extraordinary NSA Meeting Lille, the 29th of July 2009. 29/07/2009 2 29th of June at 11.49 p.m. train n. 50325 of Trenitalia S.p.A. Loco

29/07/2009 16

1. strong remind to railway undertakings to manage

adequately in their SMS of the risks coming from wagons

keepers activities

2. request for extraordinary checks, in short period (less than

2 years), on all wagons, giving priority to wagons carrying

dangerous goods

short terms measures - ANSF proposal

Page 17: Extraordinary NSA Meeting - government.bg...Extraordinary NSA Meeting Lille, the 29th of July 2009. 29/07/2009 2 29th of June at 11.49 p.m. train n. 50325 of Trenitalia S.p.A. Loco

29/07/2009 17

1. verify the accuracy of design requirements for dangerous goodstanks (shocks and general design conditions of strength);

2. adopt specific infrastructure requirements (removing sharpobjects close to the gauge) taking into account the dangerousgoods tank wagons requirements

3. specific EN norm concerning the non destructive tests on theaxles and their efficient cycles, methods to storage the data ofthe tests, identify the “axles life cycle”

4. Verify the traceability of production and maintenance activitieson safety related equipments and verify the opportunity onvehicles carrying dangerous goods to inhibit the use of not newspare part and to reduce the maintenance intervals

5. provide guidelines to the RUs and Keepers for a restrictive reviewof existing wagons maintenance file and to define a commonmaintenance file for each vehicle;

6. feedback on the use of derailment detectors for on the tracksdangerous goods wagons,

Long terms measures - ANSF proposal