Y. Unno 10/9/98 1 of 3 Experience in the Module Assembling at KEK T. Kohriki, Y. Unno, S. Terada, T. Kondo Physics, IPNS, KEK and SCT collaborators in Japan The process of the module assembling was tried using the prototype module assembly jigs of KEK to make the full Electrical Module. The process is described with the photos of the jigs. Experience from the trial is summarized.

Upload: others

Post on 23-Jan-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Experience in the Module Assembling at KEKjsdhp1.kek.jp/~unno/notes/Sep98SCTweek/Experience980909.pdf · 1 of 3 Experience in the Module Assembling at KEK T. Kohriki, Y . Unno, S

Y. Unno 10/9/98

1 of 3

Experience in the Module Assembling at KEK

T. Kohriki, Y. Unno, S. Terada, T. Kondo

Physics, IPNS, KEK

and SCT collaborators in Japan

The process of the module assembling was tried using the prototype module assembly jigs of KEK to make the full Electrical Module. The process is described with the photos of the jigs. Experience from the trial is summarized.

Page 2: Experience in the Module Assembling at KEKjsdhp1.kek.jp/~unno/notes/Sep98SCTweek/Experience980909.pdf · 1 of 3 Experience in the Module Assembling at KEK T. Kohriki, Y . Unno, S

Y. Unno 10/9/98

2 of 3

Introduction

• Module assembling jigs being proposed by KEK were prototyped

• The jigs were used for assembling the full double-sided Electrical Module for a demonstration

• Lessons learnt from the trial is summarized in this report

Page 3: Experience in the Module Assembling at KEKjsdhp1.kek.jp/~unno/notes/Sep98SCTweek/Experience980909.pdf · 1 of 3 Experience in the Module Assembling at KEK T. Kohriki, Y . Unno, S

Japan clusterModule assembly system

for centre-tap module04 May,1998

T.Kohriki

Video microscope Microscope stand

XYR stage

XY stage

XYR stage XYR stage and stands

XYR stage, stands and XY stage

Page 4: Experience in the Module Assembling at KEKjsdhp1.kek.jp/~unno/notes/Sep98SCTweek/Experience980909.pdf · 1 of 3 Experience in the Module Assembling at KEK T. Kohriki, Y . Unno, S
Page 5: Experience in the Module Assembling at KEKjsdhp1.kek.jp/~unno/notes/Sep98SCTweek/Experience980909.pdf · 1 of 3 Experience in the Module Assembling at KEK T. Kohriki, Y . Unno, S

Y. Unno 10/9/98

1 of 1

Metrology machine (at KEK)

T. Kohriki

Physics, IPNS, KEK

• Manufacturer Mitsutoyo

• Model MF-1030TH-special

• Stage size (XY) 500x250

(Measuring range 300x100)

• Z motion 150 mm

• Resolution (X, Y, Z) 0.5 µm

• Linear accuracy (X, Y, Z) 3+0.02xL µm

(L=length in mm)

• Calibration N/A

• Reproducibility N/A

• Optics/display 1/2” CCD

Page 6: Experience in the Module Assembling at KEKjsdhp1.kek.jp/~unno/notes/Sep98SCTweek/Experience980909.pdf · 1 of 3 Experience in the Module Assembling at KEK T. Kohriki, Y . Unno, S

3D pictures of XYR stages and standsT. Kohriki, KEK May 1998

Page 7: Experience in the Module Assembling at KEKjsdhp1.kek.jp/~unno/notes/Sep98SCTweek/Experience980909.pdf · 1 of 3 Experience in the Module Assembling at KEK T. Kohriki, Y . Unno, S
Page 8: Experience in the Module Assembling at KEKjsdhp1.kek.jp/~unno/notes/Sep98SCTweek/Experience980909.pdf · 1 of 3 Experience in the Module Assembling at KEK T. Kohriki, Y . Unno, S
Page 9: Experience in the Module Assembling at KEKjsdhp1.kek.jp/~unno/notes/Sep98SCTweek/Experience980909.pdf · 1 of 3 Experience in the Module Assembling at KEK T. Kohriki, Y . Unno, S
Page 10: Experience in the Module Assembling at KEKjsdhp1.kek.jp/~unno/notes/Sep98SCTweek/Experience980909.pdf · 1 of 3 Experience in the Module Assembling at KEK T. Kohriki, Y . Unno, S
Page 11: Experience in the Module Assembling at KEKjsdhp1.kek.jp/~unno/notes/Sep98SCTweek/Experience980909.pdf · 1 of 3 Experience in the Module Assembling at KEK T. Kohriki, Y . Unno, S

Pickup Plate A (PP-A)

Linear bearing with flange

Linear bearing

Silicon detector

Alignment pin

Vacuum chuck A (VC-A)

Pillar

3D pictures for steps 1 to 4T. Kohriki, KEK May 1998

XYR stage withstepping motors

Stand

Page 12: Experience in the Module Assembling at KEKjsdhp1.kek.jp/~unno/notes/Sep98SCTweek/Experience980909.pdf · 1 of 3 Experience in the Module Assembling at KEK T. Kohriki, Y . Unno, S
Page 13: Experience in the Module Assembling at KEKjsdhp1.kek.jp/~unno/notes/Sep98SCTweek/Experience980909.pdf · 1 of 3 Experience in the Module Assembling at KEK T. Kohriki, Y . Unno, S
Page 14: Experience in the Module Assembling at KEKjsdhp1.kek.jp/~unno/notes/Sep98SCTweek/Experience980909.pdf · 1 of 3 Experience in the Module Assembling at KEK T. Kohriki, Y . Unno, S

3D pictures for steps 8 and 11T. Kohriki, KEK May 1998

3D pictures for step 4

Page 15: Experience in the Module Assembling at KEKjsdhp1.kek.jp/~unno/notes/Sep98SCTweek/Experience980909.pdf · 1 of 3 Experience in the Module Assembling at KEK T. Kohriki, Y . Unno, S
Page 16: Experience in the Module Assembling at KEKjsdhp1.kek.jp/~unno/notes/Sep98SCTweek/Experience980909.pdf · 1 of 3 Experience in the Module Assembling at KEK T. Kohriki, Y . Unno, S

T. Kohriki, KEK May 1998

PP-A

PP-B

PP-B

PP-A

3D picture for step-8

Page 17: Experience in the Module Assembling at KEKjsdhp1.kek.jp/~unno/notes/Sep98SCTweek/Experience980909.pdf · 1 of 3 Experience in the Module Assembling at KEK T. Kohriki, Y . Unno, S

step-5

980604T.Kohriki@KEK

Assembly of ATLAS-SCT barrel modules 2X

•Apply adhesive onto baseboard.

•Both sides.

The Japan cluster

PP-A

step- 6

step- 7 D2

D1

Spacer1.170

•Place detectors onto VC-A.

•Repeat steps-1 to 3 and place detectors on PP-C.

D3D4

PP-C

•Set baseboard with dowel pins on PP-A.

•Attach spacers of 1.170 mm onto PP-A.

•Mount pillars.

•Place PP-C onto PP-A.

•Cure adhesive at room temperature.

•Place modules onto PP-A with vacuum.

D4D3

PP-APP-A

PP-C

•Hybrid gluing•Wire-bonding•Post cure 50ºC/12houres.•Burn-in. •Electrical check.

PP-A

Page 18: Experience in the Module Assembling at KEKjsdhp1.kek.jp/~unno/notes/Sep98SCTweek/Experience980909.pdf · 1 of 3 Experience in the Module Assembling at KEK T. Kohriki, Y . Unno, S
Page 19: Experience in the Module Assembling at KEKjsdhp1.kek.jp/~unno/notes/Sep98SCTweek/Experience980909.pdf · 1 of 3 Experience in the Module Assembling at KEK T. Kohriki, Y . Unno, S
Page 20: Experience in the Module Assembling at KEKjsdhp1.kek.jp/~unno/notes/Sep98SCTweek/Experience980909.pdf · 1 of 3 Experience in the Module Assembling at KEK T. Kohriki, Y . Unno, S

T. Kohriki, KEK May 1998

PP-A

PP-C

PP-C

PP-A

3D picture for step-11

Page 21: Experience in the Module Assembling at KEKjsdhp1.kek.jp/~unno/notes/Sep98SCTweek/Experience980909.pdf · 1 of 3 Experience in the Module Assembling at KEK T. Kohriki, Y . Unno, S
Page 22: Experience in the Module Assembling at KEKjsdhp1.kek.jp/~unno/notes/Sep98SCTweek/Experience980909.pdf · 1 of 3 Experience in the Module Assembling at KEK T. Kohriki, Y . Unno, S

Y. Unno 10/9/98

3 of 3

Lessons learned

• Usage of two “linear-bushes” was no trouble

• Movement of detector was ≤5 µm when it was transferred to the vacuum chuck, plausibly due to the movement of the bottom stage, not due to the flying detector

• There was problem in the “one-step” gluing of the double-side detectors simultaneously:

- Use of “Masking sheet” method

- Time lag of application of glues on two sides of the baseboard

- Difference in the viscosity of the glues in two sides introduced the thickness difference: one side of the glue was thicker than the other, by 10 ~ 30 µm

- In case of “two step gluing”, we need a glue-dispensing method

• Baseboard was positioned by using “dowel pins”. Since the tolerance of the holes and the pins were tight, a caution was required to remove the detector-baseboard assembly from the pins -- easily break the “neck” between the facing and the detector

• In sum, KEK prefers to go “two step gluing”