Detailed Facility Study Template

FRONT PAGE<Please demonstrate your artistic talent>

Instructions: ESCOs are required to follow the formatting outlined in the following document for the DFS report. Any information highlighted in yellow must be provided in this report. Sections that are formatted in the red are notes or instructions which should be removed before submission to the agency.

Where tables are required, some tables have been provided in the excel file “DFS Excel Template”. However, ESCOs are free to develop their own as long as the order/headings are kept the same. Examples and templates have been provided in the MVP section as a guide. DTF have approved these methodologies and it is highly recommended that ESCOs use this or apply a similar methodology. However, ESCOs are not strictly required to use these methodologies but will be required to justify and provide detailed explanations if another approach is used.

Page 2: Executive Summary - Home | Victorian Government ... · Web viewSections that are formatted in the red are notes or instructions which should be removed before submission to the agency.Where

This page has been left blank intentionally.

Page 3: Executive Summary - Home | Victorian Government ... · Web viewSections that are formatted in the red are notes or instructions which should be removed before submission to the agency.Where

COMPANY DETAILSName of Tenderer andaddress of registered office:

<ESCO>

Address of Registered Office:<Address Line 1><Suburb><State> <Postcode>

Australian Company Number: <XXX XXX XXX>

Australian Business Number: <XX XXX XXX XXX>

Principal office in Victoria(if any):

<Address>

Telephone: <(XX) XXXX XXXX>

Facsimile: <XXXX XXX XXX>

Email: [email protected]

Name and title of Tenderer’s authorised agent:

<Name><Position>

Signature:

Date: <date month year>

Page 4: Executive Summary - Home | Victorian Government ... · Web viewSections that are formatted in the red are notes or instructions which should be removed before submission to the agency.Where

This page has been left blank intentionally.

Page 5: Executive Summary - Home | Victorian Government ... · Web viewSections that are formatted in the red are notes or instructions which should be removed before submission to the agency.Where

CONTENTS1 Executive Summary........................................................................................................................ 7

1.1 Background......................................................................................................................7

1.2 Project Summary.............................................................................................................8

1.3 Risks & Dependencies....................................................................................................10

2 Technical Details...........................................................................................................................11

2.1 <Site 1>..........................................................................................................................11

2.2 <Site X>..........................................................................................................................12

3 Measurement & Verification Plan................................................................................................15

3.1 Overview........................................................................................................................15

3.2 Guaranteed savings.......................................................................................................15

3.3 Formatting.....................................................................................................................16

3.4 Agreed Utility Rates.......................................................................................................17

3.6 <L1 proforma – Lighting replacement>..........................................................................21

3.7 <L2 proforma - Lighting controls>..................................................................................25

3.8 <L3 proforma - Lighting replacement and controls>......................................................29

3.9 <CHP1 proforma - Cogeneration>..................................................................................33

3.10 <PV1 proforma – Solar Photovoltaic System>...............................................................38

3.11 <CH1 proforma – Chiller Replacement>........................................................................40

3.12 <Option C proforma – site level verification>................................................................44

3.13 <W1 proforma> – Water fittings flow control...............................................................50

3.14 Provision of information (consolidated)........................................................................53

3.15 Reporting by ESCO (consolidated).................................................................................54

4 Project management plan............................................................................................................55

4.1 Project Governance.......................................................................................................55

4.2 Communication Plan......................................................................................................55

5 Financial Summary........................................................................................................................56

5.1 Summary of financial details..........................................................................................56

6 Appendices................................................................................................................................... 58

Page 6: Executive Summary - Home | Victorian Government ... · Web viewSections that are formatted in the red are notes or instructions which should be removed before submission to the agency.Where

This page has been left blank intentionally.

Page 7: Executive Summary - Home | Victorian Government ... · Web viewSections that are formatted in the red are notes or instructions which should be removed before submission to the agency.Where

1 EXECUTIVE SUMMARY1.1 BACKGROUNDThe Victorian Department of Treasury and Finance has administered a program known as the Greener Government Buildings (GGB) which aims to reduce energy and water consumption of existing government buildings such as <Agency>, via energy efficiency projects.

Under the GGB program, <Agency> must utilise a mandatory procurement process known as the Energy Performance Contract (EPC). As part of the EPC process, three Engineering Services Companies (ESCOs) out of a prequalified panel of <16 depending on time of tender>, were invited to tender for the project. During this competitive tendering process, site-by-site audits equivalent to a level 2 energy audit were individually conducted by the three ESCOs and energy efficiency measures were proposed. Subsequently, <ESCO> had proposed the largest amount of savings and was chosen to proceed to the Detailed Facility Study (DFS) stage.

The scope for the DFS includes the following sites: <Site 1> <Site 2> <Site 3> <Site 4> <Site 5> <Site 6> <Site 7> <Site 8> <Site 9> <Site 10> <Site 11> <Site 12> <Site 13> <Site 14> <Site X>

<ESCO> has completed the DFS in consultation with key <Agency> staff and the following report sets out the existing energy and operational characteristics of the facilities, and the energy and water efficiency measures proposed to reduce energy and water consumption, as well as operational and maintenance costs.

Page 8: Executive Summary - Home | Victorian Government ... · Web viewSections that are formatted in the red are notes or instructions which should be removed before submission to the agency.Where

1.2 PROJECT SUMMARY

Table 1 - Project Summary

Total Project Cost -Capital Cost for installations -Total M&V (over 7 years) -DFS Fee -Other Costs -

Total Annual Project Savings -Electricity Savings - kWhGas Savings - GJWater Savings - kLContract Demand Reduction - kVAO&M Savings - -O&M Additional Costs - -Other Savings - -

Payback Period (years) -Greenhouse Gas Savings t

-

1

1

Figure 2 - Total GHG Emission Comparison (tonnes)

-

1

1

Figure 2 - Total GHG Emission Comparison (tonnes)

Page 9: Executive Summary - Home | Victorian Government ... · Web viewSections that are formatted in the red are notes or instructions which should be removed before submission to the agency.Where

Table 2 - Site Summary

Solution

ProjectCost

Payback Period

Annual Project Savings

Annual GHG

SavingsAnnual Electricity Savings

Annual Gas Savings

Annual Water Savings

Demand Savings

O&M Savings

Other Savings

M&V Option

($) (yrs) ($) (t) ($)Peak

(kWh)Off-Peak

(kWh)($) (GJ) ($) (kL) ($) (kVA) ($) ($)

Site 1 - - - - - - - - - - - - - - - -

Site 2 - - - - - - - - - - - - - - - -Site 3 - - - - - - - - - - - - - - - -

Site 4 - - - - - - - - - - - - - - - -Site 5 - - - - - - - - - - - - - - - -

Site 6 - - - - - - - - - - - - - - - -

Site 7 - - - - - - - - - - - - - - - -

Site 8 - - - - - - - - - - - - - - - -

Site 1 Site 2 Site 3 Site 4 Site 5 Site 6 Site 7 Site 8-

1

1

Figure 2 - GHG Emission Comparison by Site (tonnes)

Site 1 Site 2 Site 3 Site 4 Site 5 Site 6 Site 7 Site 8-

1

1

Figure 3 - Utility Consumtpion Comparison by Site ($)

Page 10: Executive Summary - Home | Victorian Government ... · Web viewSections that are formatted in the red are notes or instructions which should be removed before submission to the agency.Where

Table 3 - Solution SummarySolution Category Project Costs Project Savings Payback (yrs)HVAC - - -Lighting - - -BMS & Controls - - -Water - - -Cogen/Trigen - - -Solar - - -Other Generation - - -Other - - -

HVAC

Lighting

BMS & Contro

lsWate

r

Cogen/Tr

igen

Solar

Other Gen

eration

Other $ -

$ 1

$ 1

0 yrs

1 yrs

1 yrs

Figure 2 - Solution Summary

1.3 RISKS & DEPENDENCIES<Please outline any major risks or dependencies associated with this project>

Page 11: Executive Summary - Home | Victorian Government ... · Web viewSections that are formatted in the red are notes or instructions which should be removed before submission to the agency.Where

2 TECHNICAL DETAILS<Remove after noted: Please complete the following table for each site followed by the solution details table (on the next page) for each solution within the relevant site>

2.1 <SITE 1>

2.1.1 Solution Summary

Site 1 GHG (t)Electricity Gas Water

Peak (kWh)

Off-Peak (kWh)

($) (GJ) ($) (kL)

Baseline Consumption - - - - - - -

Solution

ProjectCost

Payback Period

Annual Project Savings

Annual GHG

SavingsAnnual Electricity Savings

Annual Gas Savings

Annual Water Savings

Demand SavingsO&M

SavingsOther

SavingsM&V

Option

($) (yrs) ($) (t) ($)Peak

(kWh)Off-Peak

(kWh)($) (GJ) ($) (kL) ($) (kVA) ($) ($)

Solution 1 - - - - -

Solution 2 - - - - -

Solution 3 - - - - -

Solution 4 - - - - -

Solution 5 - - - - -

Solution 6 - - - - -

Solution 7 - - - - -

Solution 8 - - - - -

Solution 9 - - - - -

Solution 10 - - - - -

TOTAL - - - - - - - - - - - - - - - -

% of Baseline - - - -

Page 12: Executive Summary - Home | Victorian Government ... · Web viewSections that are formatted in the red are notes or instructions which should be removed before submission to the agency.Where

2.1.2 Solution Details

2.1.2.1 <Solution 1>

Solution Overview <Provide solution description>

Annual Energy Savings Electricity: Gas: Water:

<$X><$X><$X>

<X kWh><X GJ><X kL>

Demand Savings <$X> <X kVA>

Annual O&M Savings <$X>

GHG Reduction <X t CO2-e>

Other Potential Benefits<Provide details of any other potential benefits not outlined above, e.g. financial, environmental, social, etc.>

Current State<Provide details of current state of relevant environment / equipment>

Implementation Process <Provide details of implementation process>

Risks & Operational Impact<Provide details of the operational impact & the risks the agency might face>

Dependencies <Provide details of any dependencies with the proposed solution>

ESCO Capability<Provide details of any experience with this solution. Proven technology?>

Life of Equipment <X years / hours>

Upgrade Requirements<If applicable, please provide details of expected $X and expected time of upgrade>

O&M Requirements<Provide details of any O&M requirements, highlighting any significant changes or additional O&M required by the agency>

Training <Please provide details of any training required / provided>

Other Details<Please insert any other details. If required, refer to any attachments in the Appendix>

2.1.3 <Solution X><Complete the Solution Details table above for each site within the relevant site>

2.2 <SITE X>2.2.1 Solution Summary<Complete Site Specific Solution Summary Table>

Page 13: Executive Summary - Home | Victorian Government ... · Web viewSections that are formatted in the red are notes or instructions which should be removed before submission to the agency.Where

2.2.2 Solution Details

2.2.2.1 <Solution X><Complete the Solution Details table for each solution within the relevant site>

Page 14: Executive Summary - Home | Victorian Government ... · Web viewSections that are formatted in the red are notes or instructions which should be removed before submission to the agency.Where

This page has been left blank intentionally.

Page 15: Executive Summary - Home | Victorian Government ... · Web viewSections that are formatted in the red are notes or instructions which should be removed before submission to the agency.Where

3 MEASUREMENT & VERIFICATION<ESCO> will measure and verify the proposed savings according to the Measurement and Verification Plan (MVP) attached in Appendix A. <ESCO> will use the template provided by the DTF which is based on the International Performance Measurement and Verification Protocol (IPMVP).

The intention of the MVP is for it to be a stand-alone document which can be referred to by both the client and ESCO to ensure the measurement and verification process has been undertaken correctly. To further ensure the credibility of the process, <ESCO> will appoint a Certified Measurement and Verification Professional (CMVP) to undertake the review.

Page 16: Executive Summary - Home | Victorian Government ... · Web viewSections that are formatted in the red are notes or instructions which should be removed before submission to the agency.Where

4 PROJECT MANAGEMENT PLAN4.1 PROJECT GOVERNANCE<Please provide a governance structure with the names of the:

Project manager or main point of contact Lead / senior engineers for the relevant teams (e.g. mechanical, lighting, HVAC, etc.) Any other employee / contractors working on the project

Example below>

4.2 COMMUNICATION PLAN<Please outline the processes and systems in place for communication between ESCO and Agency>

Page 17: Executive Summary - Home | Victorian Government ... · Web viewSections that are formatted in the red are notes or instructions which should be removed before submission to the agency.Where

5 FINANCIAL SUMMARY5.1 SUMMARY OF FINANCIAL DETAILS

5.1.1 Details of Average Applied Gross MarginThe average gross margin applied for this proposal is <X%.>

5.1.2 Confirmation of Correct Use of Utility Rates and CO2 Emission Rates<ESCO> confirms that it has correctly applied and calculated the savings using the utility rates provided>

5.1.3 Confirmation of Consultation with <Agency> for Operational & Maintenance Savings<ESCO> confirms that it has consulted with <Agency> in calculating all the operational & maintenance savings associated with this proposal.

5.1.4 Total Project CostThe total project cost is <$X>.

5.1.5 DFS FeeThe DFS fee for this project is <$X>.

5.1.6 Measurement & Verification FeeThe proposed fee for the Measurement & Verification is <$X>

5.1.7 Other Known or Expected Costs<Provide details of any known or expected costs>

5.1.8 Length of ContractThe proposed length of this contract is <X> years.

5.1.9 Relevant InsurancesWorkers

CompensationPublic and Product

LiabilityProfessionalIndemnity

Name of InsuranceCompany

Policy Numbers

Expiry Date

Limit of Liability

Page 18: Executive Summary - Home | Victorian Government ... · Web viewSections that are formatted in the red are notes or instructions which should be removed before submission to the agency.Where

6 APPENDIX A – MEASUREMENT & VERIFICATION PLAN<The Measurement & Verification Plan (MVP) template can be found on the GGB website:http://www.procurement.vic.gov.au/State-Purchase-Contracts/Energy-Performance-Contracting>

Page 19: Executive Summary - Home | Victorian Government ... · Web viewSections that are formatted in the red are notes or instructions which should be removed before submission to the agency.Where

7 APPENDIX B – OTHER APPENDICES<Data and engineering calculationsWhere appropriate, include data used to establish baseline conditions (e.g. electricity, gas, and water consumption) or used to calculate savings (e.g. table listing various site operating hours for lighting calculations, regression analysis for M&V Option D, etc.)

Other Relevant InformationInclude any other relevant information referred to within, or supplementing the proposal. (e.g. insurance certificates, equipment specifications, etc.>