evaluation of ground water at a proposed...

76
Division of Geological & Geophysical Surveys PUBLIC-DATA FILE 94-28 EVALUATION OF GROUND WATER AT A PROPOSED WASTEWATER DISPOSAL SITE, GAMBELL, ALASKA by James A. Munter Alaska Department of Natural Resources Division of Water Alaska Hydrologic Survey in cooperation with Chuck Eggener Consulting Engineers, Department of Environmental Conservation, Village Safe Water Program, and City of Gambell February 1994 THIS REPORT HAS NOT BEEN REVIEWED FOR TECHNICAL CONTENT (EXCEPT AS NOTED IN TEXT) OR FOR CONFORMITY TO THE EDITORIAL STANDARDS OF DGGS. Released by S'I'ATE OF ALASKA DEPARTMENT OFNATURALRESOURCES Division of Geological & Geophysical Surveys 794 University Avenue, Suite 200 Fairbanks, Alaska 99709-3645

Upload: others

Post on 11-Oct-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: EVALUATION OF GROUND WATER AT A PROPOSED …dggs.alaska.gov/webpubs/dggs/pdf/text/pdf1994_028.pdfEVALUATION OF GROUND WATER AT A PROPOSED WASTEWATER DISPOSAL SITE, GAMBELL, ALASKA

Division of Geological & Geophysical Surveys

PUBLIC-DATA FILE 94-28

EVALUATION OF GROUND WATER AT A PROPOSED WASTEWATER DISPOSAL SITE, GAMBELL, ALASKA

by James A. Munter

Alaska Department of Natural Resources Division of Water

Alaska Hydrologic Survey

in cooperation with Chuck Eggener Consulting Engineers,

Department of Environmental Conservation, Village Safe Water Program,

and City of Gambell

February 1994

THIS REPORT HAS NOT BEEN REVIEWED FOR TECHNICAL CONTENT (EXCEPT AS NOTED IN TEXT) OR FOR

CONFORMITY TO THE EDITORIAL STANDARDS OF DGGS.

Released by

S'I'ATE OF ALASKA DEPARTMENT OFNATURALRESOURCES

Division of Geological & Geophysical Surveys 794 University Avenue, Suite 200 Fairbanks, Alaska 99709-3645

Page 2: EVALUATION OF GROUND WATER AT A PROPOSED …dggs.alaska.gov/webpubs/dggs/pdf/text/pdf1994_028.pdfEVALUATION OF GROUND WATER AT A PROPOSED WASTEWATER DISPOSAL SITE, GAMBELL, ALASKA
Page 3: EVALUATION OF GROUND WATER AT A PROPOSED …dggs.alaska.gov/webpubs/dggs/pdf/text/pdf1994_028.pdfEVALUATION OF GROUND WATER AT A PROPOSED WASTEWATER DISPOSAL SITE, GAMBELL, ALASKA

EVALUATION OF GROUND WATER AT A PROPOSED WASTEWATER DISPOSAL SITE, GAMBELL, ALASKA

by James A. MunterL

ABSTRACT

The 1993 construction of a piped water and sewer system for the community of Gambell, Alaska, prompted an investigation into appropriate siting and design of a wastewater lagoon. A key consideration was to avoid contaminating a nearby school well. This investigation documents a dynamic groundwater system in permeable beach gravels strongly influenced by tides and storm surges. Ground-water flow directions are shown to change up to 180 degrees over the span of a few hours. Water quality beneath the proposed lagoon site ranges from brackish to saline. A "fast-pem" lagoon design is considered to have more advantages and fewer disadvantages than an alternate "slow-perc" design, including a lower potential for contaminating the nearby school well.

INTRODUCTION

The City of Gambell, Alaska, began construction of a community-wide piped water and sewer system during the summer of 1993. A major task of the project was to design and construct a facility for disposing of wastewater from the system. One option under consideration was to construct a percolation-type sewage lagoon to receive septic tank effluent.

The main goals of this investigation were to identify ground-water flow systems and ground-water quality beneath the proposed lagoon site and determine the probable effect of the percolation lagoon on those flow systems. Two major concerns with the proposed design were: 1) to avoid contamination of a nearby school well with leachate; and 2) to maintain a 4-ft separation distance between the bottom of the lagoon and the seasonal high water table.

The school well, located less than 1000 ft from the proposed lagoon site, tapped a shallow fresh-water aquifer. A conceptual model of ground-water flow in the area identified several factors that could possibly cause effluent from the lagoon to impact the well. These factors were: 1) the presence of highly permeable beach gravels throughout the area that could result in relatively fast ground-water travel times; 2) irregular occurrences of permafrost that could influence flow directions; and 3) reports of large storm-driven fluctuations in ground-water levels that could alter ground-water flow directions. As a result of these factors, the proposed lagoon site was selected to be as close to the coast as possible and as far from the school well as possible, and this investigation was initiated to further evaluate the site.

If ground water at the site were found to be braclush, the proposed lagoon might qualify for regulation as an "ocean discharge" with waiver of the 4-ft separation requirement. This condition was not assured in advance, however.

GEOLOGIC SETTING

The City of Gambell is situated on a gravel spit on the northwest tip of St. Lawrence Island in the northern Bering Sea (figure 1). Troutman Lake, located south of the city, is separated from the Bering Sea by a narrow gravel spit. The level of the lake is about 2 ft above mean lower low water. The lake is fed by Troutman Creek, a fresh water stream at its south end. Storm surges are reported to break over the spit periodically and cause the lake water to be brackish. The lake has no surface water outlet.

'Alaska Department o f Natural Resources, Division of Water, Alaska Hydrologic Survey, PO BOX 107005, Anchorage, AK, 995 10-7005

Page 4: EVALUATION OF GROUND WATER AT A PROPOSED …dggs.alaska.gov/webpubs/dggs/pdf/text/pdf1994_028.pdfEVALUATION OF GROUND WATER AT A PROPOSED WASTEWATER DISPOSAL SITE, GAMBELL, ALASKA
Page 5: EVALUATION OF GROUND WATER AT A PROPOSED …dggs.alaska.gov/webpubs/dggs/pdf/text/pdf1994_028.pdfEVALUATION OF GROUND WATER AT A PROPOSED WASTEWATER DISPOSAL SITE, GAMBELL, ALASKA

Sevuokuk Mountain lies about 1 mi east of the city, rising to an elevation of 614 ft above sea level. The mountain is comprised predominantly of quartz monzonite, a granitic rock type. Permafrost is discontinuous throughout the area, and is commonly found at depths of 7-10 ft (RZA, Inc, 1985). Annual precipitation at Gambell is about 16 inches (Phil Johnson Engineering, 1972).

Both fresh and brackish ground water has been found by several wells drilled in Gambell (Waller, 1959; RZA, Inc., 1985). Waller (1959) suggested that Troutman Lake probably discharges via ground water to the north. Shallow ground water is variably present because of the existence of shallow permafrost in some areas.

SCOPE AND METHODS

The scope of this investigation included drilling monitoring wells and soil borings, sampling water quality, performing slug tests and grain-size analyses for permeability determinations, measuring water levels to determine the response of the ground-water flow system to tidal fluctuations and analyzing the data.

Three monitoring wells were installed using a small custom-built track-mounted auger rig with a 20 horsepower motor and 4.25 in.-inside-diameter hollow-stem augers. Six additional soil borings were made using 2.25 in.-inside- diameter auger flights. Split spoon samples were taken at selected intervals. Wells were constructed with 2 in.- diameter PVC casing with silica sand fill around the screen, bentonitechip seals, and cemented 6 in.-diameter steel surface casing and locking well cap. Detailed logs of soil borings and wells are included in Appendix A.

Wells were purged with a hand operated piston-type purge pump and disposable polyethylene bailers prior to sampling. Samples were taken with bailers and nylon twine. A quality assurance plan is included as Appendix B.

Slug tests were conducted in the monitoring wells by sudden extraction of a 1.25-in. by 6.03-ft slug and measurement of water level response with a chalked steel tape. Data were analyzed by the method of Bouwer and Rice (1976). Representative soil samples were collected and shipped to a laboratory for permeameter and grain-size analyses .

Staff gages were installed in Troutman Lake and in a nearby pond to augment the wells for water-level data. Water level data were collected approximately every two hours through one twelve hour tidal cycle as determined from published tide tables.

Well, boring and staff gage elevations were surveyed relative to a brass cap (no. 50391 FAA 1940) located in the well point concrete pad on the west edge of Troutman Lake (Chuck Eggener Consulting Engineers, written comrnun., 1994). The mean lower low water elevation of the cap is 6.1 ft.

RESULTS AND INTERPRETATIONS

HYDROGEOLOGY

Well and borehole locations relative to the proposed lagoon location are shown in figure 2. The lagoon location was generally selected to be near an area already containing landfill waste and underlain by brackish ground water. A topographic map of the site based on point-survey measurements is shown in figure 3.

Most deposits in the study area were found to be highly permeable sands and gravels, with very minor amounts of silts and clays. Ice-bound permafrost was found to be distributedirregularly beneath most of the site, with generally less permafrost encountered in the seaward direction. A hydrogeologic cross section showing the general distribution of saturated sediments and permafrost is shown in figure 4. Ground water is observed to occur under both water table and confined conditions at the site. Permafrost is an effective confining layer in places, as demonstrated by soil boring hole SL-1. This boring reached the maximum depth capability of the rig without

Page 6: EVALUATION OF GROUND WATER AT A PROPOSED …dggs.alaska.gov/webpubs/dggs/pdf/text/pdf1994_028.pdfEVALUATION OF GROUND WATER AT A PROPOSED WASTEWATER DISPOSAL SITE, GAMBELL, ALASKA
Page 7: EVALUATION OF GROUND WATER AT A PROPOSED …dggs.alaska.gov/webpubs/dggs/pdf/text/pdf1994_028.pdfEVALUATION OF GROUND WATER AT A PROPOSED WASTEWATER DISPOSAL SITE, GAMBELL, ALASKA
Page 8: EVALUATION OF GROUND WATER AT A PROPOSED …dggs.alaska.gov/webpubs/dggs/pdf/text/pdf1994_028.pdfEVALUATION OF GROUND WATER AT A PROPOSED WASTEWATER DISPOSAL SITE, GAMBELL, ALASKA
Page 9: EVALUATION OF GROUND WATER AT A PROPOSED …dggs.alaska.gov/webpubs/dggs/pdf/text/pdf1994_028.pdfEVALUATION OF GROUND WATER AT A PROPOSED WASTEWATER DISPOSAL SITE, GAMBELL, ALASKA

encountering water, even though the bottom of the hole was well below the potentiometric surface of the aquifer.

A perched water table probably forms intermittently on top of permafrost. Soils were generally found to be wet just above the permafrost, although no perched water table was identified at the time of the field investigation.

The cross section is not a reliable indicator of ground-water flow directions because the water level measurements were taken during a period of significant water-level fluctuation.

Results of grain-size analyses and permeameter tests are given in Appendix C. Laboratory permeameter tests on two samples of gravel yielded permeability values of 26,000 ftlday and 16,000 ftlday.

Appendix D contains water-level data and data from slug tests conducted on wells SL-3 and SL-4. Well SL-5 was not tested because the well was suspected to contain contaminated water. Both tested wells exhibited rapid water- level response indicative of a relatively permeable aquifer. Analysis of data from well SL-4 yielded a calculated permeability value of 40 ftlday. The rapid response of the well and the small number of data points suggest that this number has a relatively low degree of confidence. Well SL-3 responded too rapidly to the slug removal to allow any quantitative estimate of permeability. Qualitatively, the permeability of the aquifer at SL-3 is probably greater than at SL-4.

The range of permeabilities from 40 ftlday to 26,000 ftlday as described above is typical of aquifers comprised of deposits ranging from clean sands to gravels (Freeze and Cherry, 1979, p.29). Considering the high energy depositional environment of the deposits at Gambell, the presence of highly permeable zones within the aquifer is reasonably concluded to be characteristic of the aquifer.

WATER QUALITY

Results of water quality analyses conducted on monitoring well water samples are contained in appendix E. The results show that water beneath the proposed lagoon site ranges from brackish to saline. In addition, water collected from well SL-5 was noted to have an unusual odor suggestive of diesel fuel contamination. The Alaska Department of Environmental Conservation was conducting an evaluation of possible diesel fuel contamination in Gambell during the course of this investigation, and no follow-up analyses for organic constituents were performed as part of this study.

WATER LEVELS

Figure 5 shows water level data collected during the study. Water levels were observed to change significantly. Water level fluctuations in wells SL-3 and SL-4 appear to correlate with tidal cycles. This confirms that the aquifer in this area is hydraulically connected with the Bering Sea, transmitting sea level changes relatively rapidly and efficiently.

Troutman Lake levels remained relatively unchanged through the observation period. Water levels in the pond and in SL-5 rose rapidly on 6/19/93, and slowly but steadily thereafter, showing no direct effect from tidal influences.

The observed water level changes in the pond and SL-5 occurred after local winds changed intensity and direction. Prior to June 22 light winds were from the southwest. During the night of June 21-22, winds became northerly and increased their intensity. Wind-generated waves began impacting the north shore of the Gambell spit, with breakers sending sea spray approximately 30 ft into the air.

GROUND-WATER FLOW SYSTEMS

Figures 6-9 show water-table contour maps based on water-level measurements made during the study. The maps

Page 10: EVALUATION OF GROUND WATER AT A PROPOSED …dggs.alaska.gov/webpubs/dggs/pdf/text/pdf1994_028.pdfEVALUATION OF GROUND WATER AT A PROPOSED WASTEWATER DISPOSAL SITE, GAMBELL, ALASKA

T

WA

TER

LE

VE

L E

LEV

ATIO

N

(FT

. A

BO

VE

M

LLW

)

0

- -

N

ta w

w

C

o

cn

b cn

b u

0 V

I b

P

N - G

0

P

N 2 w

a 2 F!

N $ W P

N t a w

Page 11: EVALUATION OF GROUND WATER AT A PROPOSED …dggs.alaska.gov/webpubs/dggs/pdf/text/pdf1994_028.pdfEVALUATION OF GROUND WATER AT A PROPOSED WASTEWATER DISPOSAL SITE, GAMBELL, ALASKA
Page 12: EVALUATION OF GROUND WATER AT A PROPOSED …dggs.alaska.gov/webpubs/dggs/pdf/text/pdf1994_028.pdfEVALUATION OF GROUND WATER AT A PROPOSED WASTEWATER DISPOSAL SITE, GAMBELL, ALASKA
Page 13: EVALUATION OF GROUND WATER AT A PROPOSED …dggs.alaska.gov/webpubs/dggs/pdf/text/pdf1994_028.pdfEVALUATION OF GROUND WATER AT A PROPOSED WASTEWATER DISPOSAL SITE, GAMBELL, ALASKA
Page 14: EVALUATION OF GROUND WATER AT A PROPOSED …dggs.alaska.gov/webpubs/dggs/pdf/text/pdf1994_028.pdfEVALUATION OF GROUND WATER AT A PROPOSED WASTEWATER DISPOSAL SITE, GAMBELL, ALASKA
Page 15: EVALUATION OF GROUND WATER AT A PROPOSED …dggs.alaska.gov/webpubs/dggs/pdf/text/pdf1994_028.pdfEVALUATION OF GROUND WATER AT A PROPOSED WASTEWATER DISPOSAL SITE, GAMBELL, ALASKA

are used to infer ground-water flow direction changes in response to tidal and wind-driven sea-level changes.

Figures 6-9 are based on water level measurements made during narrow intervals of time relative to the rate of water level fluctuations. Strictly speaking, the water-table maps are not true indicators of ground-water flow directions because ground water throughout the flow field is not of uniform density. Because of the magnitude of observed gradients, however, general flow conditions described below are thought to apply. Conversion of water- level data to equivalent fresh water head data is not warranted because the monitoring wells are all screened from the water-table to a depth of less than 10 ft below the water table.

Water level contours shown in figure 6 imply a general direction of ground-water flow from south to north across the sewage lagoon site. Wind conditions at the time of these measurements were generally light.

At the time of the water level measurements shown in Figure 7, the wind had increased significantly and had shifted to the north. Large waves were impacting the north shore of St. Lawrence Island, and a significant rise in water level was evident in well SL-3. A central depression in the water table between the shore and Troutman Lake is evident. The direction of ground-water flow beneath the site is from north to south at the time of these measurements.

Figure 8 shows that the central depression of the water table has largely disappeared within the span of seven hours. A pond appeared a few hours prior to the time of the figure 8 water-table map in a formerly dry closed swale. The direction of ground-water flow at the sewage lagoon site is still generally from north to south.

Figure 9 shows that water levels fell at SL-3 and SL-4 and rose slightly at SL-5 compared to figure 8. The drop in water levels coincides with tidal fluctuations (figure 5). A residual ground-water mound is evident southeast of the lagoon site, and inferred ground-water flow directions are southwesterly, although the gradient is relatively flat.

Two ponds appeared in formerly dry swales on June 23, 1993. The north pond (figure 2) was tested to have a specific conductance of 2600 umhos/cm, which is characteristic of brackish water while the south pond had a specific conductance of 475 umhos/cm, which is characteristic of fresh water. The north pond was observed to form earlier in the day than the south pond.

The onset of strong onshore winds is interpreted to have created a water table mound near the north shore of the Gambell spit that effectively blocked the flow of fresh ground water to the sea, creating a backwater effect that caused ground-water levels to rise and the ponds to form. The source of fresh water in the south pond is inferred to be from melting snow on the west flank of Sevuokuk Mountain. Rivulets of fresh water were observed descending the flank of the mountain during the field project and infiltrating into the spit deposits at the base of the mountain. The City of Gambell has installed and test pumped a series of shallow wells near the base of the mountain tapping the freshwater aquifer.

Fresh ground water diverted by the storm-induced water-table mound from flowing northward to the sea is inferred to flow south into the City of Gambell, contributing to the sudden rise in water levels observed in the ponds and well SL-5. Water in the northern pond is a mix between sea water and fresh water.

SEASONAL FACTORS

It has been reported by local residents that the low swale near SB-4 and SB-6 fills with standing salt water as a result of fall and early winter storms. Land surface elevation in that area is about 6-8 ft above MLLW. The standing water is interpreted to be the result of a high water table condition from severe seasonal storms. Fall and winter storms reportedly cause onshore winds on the north shore much more violent than those that were observed in June. These storms probably result in high ground-water levels at the swale as high as about 10 ft above MLLW.

Page 16: EVALUATION OF GROUND WATER AT A PROPOSED …dggs.alaska.gov/webpubs/dggs/pdf/text/pdf1994_028.pdfEVALUATION OF GROUND WATER AT A PROPOSED WASTEWATER DISPOSAL SITE, GAMBELL, ALASKA

PERCOLATION LAGOON EFFECTS

Two options have been identified for percolation lagoon design: 1) a "fast-perc" lagoon which would be designed with a highly permeable bed to achieve a maximum rate of percolation; and 2) a "slow-perc" lagoon, which would have a sand filter bed to slow percolation to achieve some treatment of the effluent waters in the unsaturated zone beneath the lagoon. Selection of an option is dependent, in part, on ground-water dynamics beneath the site. The major concern was to avoid contaminating a school well located about 900 ft southeast of the site. Key lagoon- design and ground-water dynamics issues relating to each of the options is provided below.

"FAST-PERC" OITION

The "fast-perc" design option would include a 50,000 sq ft bottom area lagoon located at the north end of the study site. The lagoon would be designed such that water would not be retained. Wastewater would be discharged into an area where ambient ground-water is brackish to saline. Ground-water in the seaward direction from this site may also be contaminated by landfill or honeybucket disposal leachate.

Hydraulic conductivities reported in this report support design of a smaller lagoon. However, possible future environmental requirements and the availability of equipment prompted design and construction of a lagoon large enough for future splitting of the lagoon into separate lined and unlined cells.

"SLOW-PERC" OPTION

The "slow-perc" option would entail construction of a 70,000 sq ft bottom area lagoon. This size was selected to allow full retention of seven months accumulation of wastewater, assuming, under a worst-case scenario, that the bed of the lagoon would freeze during the winter. It was further assumed that all of the retained frozen wastewater would melt and infiltrate during a 30-day period in the spring. The lagoon would be located where the "fast-perc" lagoon was planned, except for a southward extension to provide for added bottom area and storage volume.

GROUND-WATER MODEL ANALYSIS

In order to evaluate the effects of each proposed lagoon design on ground water, an analytical ground-water model was applied to each lagoon scenario. The model was designed to estimate the height of the ground-water mound beneath infiltration basins (Hantush, 1967; Bouwer, 1978, p. 279-288). Inputs to the model are:

"Fast-perc" "Slow -vercW Model inputs Lagoon infiltration area aquifer horizontal hydraulic conductivity aquifer thickness fillable porosity arrival rate at water table of water from lagoon duration of infiltration

Model Outvuts Water-table rise at center of infiltration basin

2000 ftlday 2000 fttday 20 ft 20 ft 0.2 0.2

0.046 ftlday 0.23 ftlday 365 days 30 days

The thickness, fillableporosity, and hydraulic conductivity of the aquifer were estimated based on the hydrogeologic

Page 17: EVALUATION OF GROUND WATER AT A PROPOSED …dggs.alaska.gov/webpubs/dggs/pdf/text/pdf1994_028.pdfEVALUATION OF GROUND WATER AT A PROPOSED WASTEWATER DISPOSAL SITE, GAMBELL, ALASKA

data collected during the field investigation. The amval rate at the water table of water from the lagoon and the duration of recharge are based on probable operating scenarios for the respective lagoons.

The "fast-perc" lagoon is designed to trickle water to the water table at a relatively constant rate equal to the disposal rate of water in Gambell, which is estimated to be 17,050 gallday, or 0.046 ft?/daylsq ft of seepage area, or 0.046 ftlday.

The "slow-perc" design will result in a large volume (3.58 million gallons) of wastewater stored as ice at the end of a typical winter. Inputs to the model were specified to determine the response of the water-table after a 30 day period of ice melting and infiltration of all meltwater.

Calculated rises in the water-table beneath the center of the lagoon are 0.05 ft and 0.23 ft for the "fast-perc" and "slow-perc" options, respectively. Considering the possibility that the hydraulic conductivity estimate used in the calculations may be too high, calculations were also performed using a hydraulic conductivity of 200 ftlday, all else remaining constant. This resulted in calculated water-table rises of 0.36 ft and 1.6 ft for the "fast-perc" and "slow- perc" options, respectively.

ADVANTAGES AND DISADVANTAGES OF LAGOON DESIGNS

Detailed discussions of advantages and disadvantages of the alternate lagoon designs are given in Appendix F. To summarize, the "fast-perc" option is considered to have more advantages than the "slow-perc" option, and fewer disadvantages. Advantages of the "fast-perc" option include: efficient disposal of wastewater into an area with ground-water that is already nonpotable; relatively high flushing and dilution rates; greater distance between wastewater disposal and the school well; and less potential for migration of water from the lagoon area to the school well as a result of less ground-water mounding beneath the lagoon.

SUMMARY AND CONCLUSIONS

This study documents the presence of a dynamic ground-water flow system beneath a portion of the Gambell spit. Ground-water flows through highly permeable gravels deposited in a high energy beach environment. Probably as a result of storm events, brackish and saline ground-water occurs more than one eighth of a mile inland from the coast. Ground-water levels respond to tidal and storm stresses, resulting in highly variable ground-water flow systems and reversals of ground-water flow directions within periods of a few hours.

An analysis of different options for designing a percolation-type sewage lagoon results in the identification of several advantages of a "fast-perc" design compared to a "slow-perc" design. The primary advantage of the "fast-perc" design is a lower potential for contaminating a nearby school well, which is a key design criteria.

ACKNOWLEDGMENTS

Numerous individuals assisted with this project, including Jane Dale, Chuck Eggener, and Dave Ulvestad with Chuck Eggener Consulting Engineers, and Roger Allely with the Alaska Hydrologic Survey. Steve Eng with the Village Safe Water Program and Chuck Eggener provided helpful review comments.

REFERENCES CITED

Bouwer, H., and R. C. Rice, 1976, A slug test for determining hydraulic conductivity of unconfined aquifers with completely or partially penetrating wells: Water Resources Research, vol. 12, p. 423-428.

Bouwer, H., 1978, Ground-water hydrology: McGraw-Hill Book Company, New York, NY, 480p.

Page 18: EVALUATION OF GROUND WATER AT A PROPOSED …dggs.alaska.gov/webpubs/dggs/pdf/text/pdf1994_028.pdfEVALUATION OF GROUND WATER AT A PROPOSED WASTEWATER DISPOSAL SITE, GAMBELL, ALASKA

Hantush, M. S., 1967, Growth and decay of groundwater-mounds in response to uniform percolation: Water Resources Research, vol. 3 , p. 227-234.

Phil Johnson Engineering, 1972, The climate and weather of St. Lawrence Island, Alaska: College, Alaska, supplementary report no. 1, & Engineering Services, 1972, Gambell utilities, an alternative method approach with suggested design parameters: Anchorage, Alaska, unpublished report for Alaska Area Native Health Service, p. a-1 - a-8.

RZA, Inc. 1985, Geotechnical, geophysical, and soillgroundwater quality studies, Defense Environmental Restoration Program, Gambell, St. Lawrence Island, Alaska: Anchorage, Alaska, unpublished report for URS Engineers, Inc., Anchorage, Alaska, 22p. plus figures and appendix.

Waller, Roger, M., 1959, Water resources reconnaissance of Gamble and Savoonga villages, St. Lawrence Island, Alaska: State of Alaska Department of Health and Welfare, Hydrologic Data Report 6, 14p.

Page 19: EVALUATION OF GROUND WATER AT A PROPOSED …dggs.alaska.gov/webpubs/dggs/pdf/text/pdf1994_028.pdfEVALUATION OF GROUND WATER AT A PROPOSED WASTEWATER DISPOSAL SITE, GAMBELL, ALASKA

APPENDIX A

Soil boring and monitoring well logs

Page 20: EVALUATION OF GROUND WATER AT A PROPOSED …dggs.alaska.gov/webpubs/dggs/pdf/text/pdf1994_028.pdfEVALUATION OF GROUND WATER AT A PROPOSED WASTEWATER DISPOSAL SITE, GAMBELL, ALASKA

58 -1- SOIL BORING LOG CHUCK EGGENER '' 2 CONSULTING ENGINEERS

LEGEND

I 2.0" O.D. SPLIT SPOON SAMPLER

1 ' 3.0" 0.9. URDISTURBED SAMPLER

,. J GRAB SAMPLE !i!TERVAL

P SAMPLER PUSHED

,Z tLIOISTURE C O N E N T

* SAE.IPLE NOT RECOVERED

PROJECT AND LOCATION &And /> ~rrsf~. 6C /L ? c T H ~ ~ / 8d

DRILLER s ~ h v e d o o a s r d ~ u;/~ubkr i l p k m k t . DJILYNG E f i E N T & BIT St E : 54 *

'

"447~ ' 9 % *a2 PI / f / ru+hn kilS r :, a +arkq - 2 ~ 4 ~ I@*\

ELEVATION AND DATUM

DATE STARTED ' : 3cPM ( DATE FINISHE 6 // 7h3 DEPTH DRILLED

25; 2'

CASING

SCREEN SETTING

NO. SOIL SAMPLES

WATER LEVEL. a '

SOlL DESCRIPTION

BORING NO. 1

0 - r 6-4 mv4/, r~ d B e % ~#,arrs s a w ) 6 7 - S Q

c/&uw , *,'st LX/ /@~&&'

'- ' AA sly^$+ ~oon.r, J,-

8-tu 6-7 tee, i# <&.J, LmJ &,,I

$ lZ ~ - a u ' r c e ~ L ~ # ~ ~ ~ ~ , c ~ W ~

@ 1 3 ' ?at& r r 3 ~ r n s mn/We @ )Y' sf * c- .C:q r q * 9 * J

/,HA A .~,ro/;..cm*d / f -v ~4 I / * ,H H+\I/*I, r r ~ a t ) 7 ' b l * ~

/ I ( ( (0y l f t~LL sP- G P h 0 4 ~ c s

-1cr 'I~il~f V ~ ~ y r o u h ~ t r . r ' , f i ~ r ~ ~ / , q P l t A l f e

r ' aY+ d ,a1 k lIL are rm,fhe 4 ,rot, 11' Q 2 d J , h ( f 4 ~ ~ & t ~ r d f + i - ?

n, ,(( nh nL)

G P - SP 'j

<Ao&@ i ? & s ' t 3 ' - o l f = -

?r'kt q &,& #-i~d"P*/ " P Q ' qCr

&(ec /our(@ 8' @ q - rod- /qpArs

,,.seJyGsS z $ ' - z C L (0 hJW1 d ,, ,+,,q r y, s f %r 6-c r * r d e WJ

&# ;.+? bore - PL* jm 0 J '(lv4

J

MEMOD

MEAS. P T . & & - ~ mrf.cce

DEPTH

DEPTH

j Ccf#Lr Le v,;t e dd z c vo-

HYDROGEOLOGIST T w &uK+er

SIZE

SIZE

cn Z Y

Q. W N

I 4

0

V) E

DEPTH

DEPTH

STANDARD PENETRATION RESISTANCE

140 B l O W PER FOOT (GO Le. HAMMER. 30' DROP)

I 1 I I

/ t7'- Ap.* (,*.-

cr.>e--fzr

1srJ l l@nz ' / OD 2 r . 2 ~ ~ 2

Page 21: EVALUATION OF GROUND WATER AT A PROPOSED …dggs.alaska.gov/webpubs/dggs/pdf/text/pdf1994_028.pdfEVALUATION OF GROUND WATER AT A PROPOSED WASTEWATER DISPOSAL SITE, GAMBELL, ALASKA

5%-2 SOlL BORING LOG CHUCK EGGENER C\t~2 CONSULTlNG ENGINEERS

SOIL DESCRIPTION STANDARD PENETRATION RESlSTANCE

9 0.4- ti.? ,,,/bl ef - ' U k#u* C r l g r r u , / a r GPfmlc

(,-'I do.//, i,,,,,; ..,,,&,,, &+ L p

( c f wfwfi5 +cmc4 &,

LEGEND % Y A C 7 / Y - I P ~ p,(,

2 z ' * / 70' fo 6 o H d w . f p

I 2.0" O.D. SPLIT SPOON SAMPLER P SAMPLER PUSHED C ~ / ~ 76 d

d

I 3.0" O 0. UNDISTURBED SAMPLER % MOISTURE CONTENT s ' 17 s Cdcy . / / h ~ e - r \ - -+ n u GRAE SAMPLE IFJTERVAL * SXL!?LE NOT RECOVERED

+ b

Page 22: EVALUATION OF GROUND WATER AT A PROPOSED …dggs.alaska.gov/webpubs/dggs/pdf/text/pdf1994_028.pdfEVALUATION OF GROUND WATER AT A PROPOSED WASTEWATER DISPOSAL SITE, GAMBELL, ALASKA

SOIL BORING LOG CHUCK EGGENER g3- 2 (_LLM+..) CE2 CONSULTlNG ENGINEERS

PROJECT AND LOCATION k// k d # ~ buu, rff# 4 g*r/l

D I LER I '

'Ik J w d kd DRILLING EQUIPMENT & BIT SIZE

ELEVATION AND DATUM

CASING

SCREEN SETTING

DATE STARED G/ I ii

DATE flNlSHED ''zo 4 / / ~

DEPTH

DEPTH

STANDARD

IW PENETRATION RESISTANCE

BLOW PER FOOT ( 1 6 LB. HWMER. 50- DROP)

SlZE

SIZE

U) W Z -I Id

a 2 N o 4 I/l e

DEPTH (FEET)

DEPTH D R l U D 3,, L(

DEPM

DEPTH

SOlL DESCRlPTlON

BORINGNO. 2 ??c L

30 ' z 4 * 1 - 3 ~ dfcll, c / r r r ~ K 7 / Z J / ~ 2614 "

Crr I../$'/.? To-/. (1: 18.1 '-

h1 c-kct=@~o..rr'

A

NO. SOIL SAMPLES 1 , w r & ~ w b + r k v t

WATER LEVEL2 7,' 3 '

LEGEND

I 2.0" O.D. SPLIT SPOON SAMPLER F SAMPLER PUSHED

II 3.0" 5.D. UND:STLIRBED SAtdPLER % h',OlSTURE CONTENT

G GRAB Sb,lAPLE I i rTERVAi SAMPLE NOT RECOVEREG

METHOD Z ' ' f / / ' Y ~ p m

A

MEAS. PT. /*pf*'

2

/ 0.3@ $+ B(mtfR % ~ 7 . 3 3 b / w ~ J r u r ~ * < ~ / , r r

HYDROGEOLOGIST 5~ &?d~kf-

v

2 0

Page 23: EVALUATION OF GROUND WATER AT A PROPOSED …dggs.alaska.gov/webpubs/dggs/pdf/text/pdf1994_028.pdfEVALUATION OF GROUND WATER AT A PROPOSED WASTEWATER DISPOSAL SITE, GAMBELL, ALASKA

SOIL BORING LOG CHUCK EGGENER 58-3 ''2 C o N s u L n N O ENGINEERS

=.

PROJECT AND LOCATIPN J ELEVATION AND DATUM 5yRv'v6?

!4

1 EGEND

I 2.0" 5 9 SPLIT SPOON SAMPLER P SAMPLER PUSHED

I ' 3 G" \ 3 L'NDISTURBED SAMPLER % t.:OISTURE CONTENT ,-. 4 SXh? AtX?LE I;dTERVAL Sh*.q?LE NOT RECOVERED

2 1

G n r n h F ~ L ffrJh4- b r a t W l f E r d f n r r - ~ b : ~ b , f L r t a b ~ cs /

DRILLER - ~ f r v * 4 ) , / , c b

DRILLING EQUIPMENT r BIT SIZE 24':75 jdW er/5-b'b+

2'&14U3B2 L&~DSJRF&C: ~ ~ . / ~ C M L L W ) DATE STARTED 1 5 3 * 1 DATE R N I S ~ J ; ~ ~

bJt#l~ ? DEPTH DRILLED j5

I

CASING

SCREEN SErnNG

NO. SOIL SAMPLES

WATER LEVEL Z b , d r CT\

DEPTH (FEET)

METHOD A*?ec CW*;)J

V M MEAS. PT. " ~ o ~ ~ o C ~ 4'

D E P M 1

DEPTH

DRIUER~Z - u. 72 6r/d/+d & ~ v c y a u z r v a - fu&

HYDROGEOLOGIST 3. Mu*ter SIZE

SIZE

SOIL DESCRIPTION

BORING NO. 3

DEPTH

DEPTH

U) w z -J a W

N I 0 4 VI E

STANDARD PENETR ATlON RESISTANCE

I Y I BLOW PER FOOT (m LB. HAMMER, 30' DRW)

Page 24: EVALUATION OF GROUND WATER AT A PROPOSED …dggs.alaska.gov/webpubs/dggs/pdf/text/pdf1994_028.pdfEVALUATION OF GROUND WATER AT A PROPOSED WASTEWATER DISPOSAL SITE, GAMBELL, ALASKA

SOIL BORING LOG CHUCK EGGENER CE2 CONSULTING ENGINEERS

SOlL DESCRlPTlON STANDARD PENETRATION RESISTANCE

LEGEND

I 2.0" C.D. SPLIT SPOON SAMPLER P SAMPLER PUSHED

I ' 3.0" C 3. L'ND;STURBED SAMPLER % MOISTURE COPJTENT

C G R k E SAMPLE IYiTERVAL * SAMPLE NOT RECOVERED

7 b

22

Page 25: EVALUATION OF GROUND WATER AT A PROPOSED …dggs.alaska.gov/webpubs/dggs/pdf/text/pdf1994_028.pdfEVALUATION OF GROUND WATER AT A PROPOSED WASTEWATER DISPOSAL SITE, GAMBELL, ALASKA

58-5 SOIL BORING LOG - CHUCK EGGENER CE2 CONSULTING ENGINEERS

7 - I r , 1.4 sf w ; 4 Ft&jmr/

-/,,. 44 -,.* sn.4 s * d 7 * L - sub m V ~ 4 * . C I -.A+ h&t wct ~ * w e r / ~ ~ i , & c h m h w ~

IY-15 &.a. drrilS t k J ?

2.0" C.D. SPLIT SPOON SAMPLER P SAMPLER PUSHED

3.0" G . 2 . UNDISTURBED SAMPLER T, MOISTURE COPJTENT

G 2 k B SL.!nPLE INTERVAL I SAMPLE t4OT RECOVERED

Page 26: EVALUATION OF GROUND WATER AT A PROPOSED …dggs.alaska.gov/webpubs/dggs/pdf/text/pdf1994_028.pdfEVALUATION OF GROUND WATER AT A PROPOSED WASTEWATER DISPOSAL SITE, GAMBELL, ALASKA

5 6 6 SOIL BORING LOG CHUCK EGGEN ER '' 2 CONSULTING ENGINEERS

SOlL DESCRlPTlON STANDARD PENETRATION RESISTANCE

I '6'7 a" Lkj) FDUI44 d/&$~((. + 2 ' '

V.Cb /'qbq1' @ ,4q&

g p - o'/o;~" 0 I ~ Y '

0.0-.954= 7.15-

LEGEND

I 2.0" O.D. SPLIT SPOON SAMPLER P SAMPLER PUSHED

II 3.0" O.D. UNDISTURBED SAIvlPLER % MO1STURE CONTENT

G GRAB SAMPLE INTERVAL c s~.!APLE NOT RECOVERED

Page 27: EVALUATION OF GROUND WATER AT A PROPOSED …dggs.alaska.gov/webpubs/dggs/pdf/text/pdf1994_028.pdfEVALUATION OF GROUND WATER AT A PROPOSED WASTEWATER DISPOSAL SITE, GAMBELL, ALASKA

GROUND-WATER MONITORING WELL LOG

41 - 1 LOG OF WELL CHUCK EGGENER CE2 CONSULTING ENGINEERS

Page 28: EVALUATION OF GROUND WATER AT A PROPOSED …dggs.alaska.gov/webpubs/dggs/pdf/text/pdf1994_028.pdfEVALUATION OF GROUND WATER AT A PROPOSED WASTEWATER DISPOSAL SITE, GAMBELL, ALASKA

GROUND- WATER MONITORING WELL LOG LOG OF WELL SL- 2 CHUCK EGGENER'"""" CE2 CONSlJL,NG ENGINEERS

Page 29: EVALUATION OF GROUND WATER AT A PROPOSED …dggs.alaska.gov/webpubs/dggs/pdf/text/pdf1994_028.pdfEVALUATION OF GROUND WATER AT A PROPOSED WASTEWATER DISPOSAL SITE, GAMBELL, ALASKA

GROUND-WATER MONITORING WELL LOG CHUCK EGGENER

D R U N G EQUIPMENT & BIT SEE 4'1~ $p Hot\0r3 sk?470&744hk p.5" b;4

DEPTH DRILLED 2g'

CASING NO. soe SAMPUS o w~m mflZd5$/u/93

t 2 ~ ~ $ ~ / ~ ' / r t ' 0 0 - 3 *s" f i n d d J PL/L * O , I ' - / + , ~ '

?;+/ebb, DEPTH,5''54tr/-,,&' -t3.40-2.(&*

SCREEN s 3 - m J G

MEMOD

MEAS. PT. T& s*8L CA 9*/6 z t 3 . q ~ ' a / s

gx PO 51of Z ~ S ' S ~ C ~ I M ~ f-12 ~ , I I c * s a d 12-25' -r

e'fOuvtD *=+?I r ~/,qs~r(ate J' &fit& I fC

DEpm /4,4 -a5,2 L i e 0.3' JDR1u~YI L C V , ~ C ~ ~ L P M V 5 U L * I? , q3 *b/s

3 4 10015 he& e*) Bepm -1 1 k, &,(, ~b hat)

HYDROGEOLOGIST xM ~ C C

CASING DEPTH (FEET)

- - - - - - - - - - - - - - - - - - 7 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - m

- - - - - - - - - - - -

- F

REMARKS

fi v r ~ . ~ , . . ~ ' " f l t d : ~ ~ M e - it*r@: -

- - - - ~ c { f cap QU - d,,>J(=, +d.g/f - ~ P ' A @

- - -

G/fQ/73 - p l l ~ d &an+ - 4 s t f - ~ O " L H ~

- A J J - ~ 2 . 5 ' &

- s f c k up y ?VC

54-1 - - Tocd7EyP/C= -

a. 86' - - m- ~ o p g n d : - -

3. s 2

m-76/~~xlod: d;pr % 3.20 -

ce-t 4@&%. /. 5' - 4 4 :

- - - - - - - - - - - - - -

+

CONDUC- nvln

A

- -

I J

DESCRIPTION

0- 3 d - c s ad' s Y b r , s Y i Y -

r d i *a;&, we cs r c r ~

3-r c 5 ,,,/,~C-J~-~~!S~ ,j- h,-&,F-l.

5-c a.p. cjydfy c M r v ~ . t d ~ ~ ~

'. 'o c* nw(6pw;& C, MJ 9 GW - -J'S& c d ~ ~ ~ r o l / - r rulnl l rd ~5 d , , / /~

16-13- c5 1-4 5 p d14+fren( S ~ M A WAO d' I,#% fb c,- *f r . k v * - r ~ J ihud

/C-;-ZO r - , ~ - w r d - ~ ~ sd-il*?

sie ,(/ d . j k y h-z r a ,a. 1 j , .r* s . c ; v 5 d s

5wL -1.24 r /8,77 -6 .1 /= /#.3v " LJ 4t LCP -3*<;4* * 7''

' 8 &-. *rw+( IJ' cr hd, 4 *d

P L p u ~ i t d &L ~'k'ai/uc(l 6 5 l t ' 4 . y h. &r k

cr rrw& w ' f l o i 4 g r ~ ~ ~ ~ . * f ~ ~ : i 4 ~ < ~ ~

3r- t ?;I)-

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

-

ELN. (mT)

Page 30: EVALUATION OF GROUND WATER AT A PROPOSED …dggs.alaska.gov/webpubs/dggs/pdf/text/pdf1994_028.pdfEVALUATION OF GROUND WATER AT A PROPOSED WASTEWATER DISPOSAL SITE, GAMBELL, ALASKA

GROUND-WATER MONITORING WELL LOG

Page 31: EVALUATION OF GROUND WATER AT A PROPOSED …dggs.alaska.gov/webpubs/dggs/pdf/text/pdf1994_028.pdfEVALUATION OF GROUND WATER AT A PROPOSED WASTEWATER DISPOSAL SITE, GAMBELL, ALASKA

GROUND-WATER MONITORING WELL LOG LOG OF WELL SL- 4 CHUCK EGGENER CE2 CONSULTING ENGINEERS

WATER LEVEL

DESCRlPTlON

Page 32: EVALUATION OF GROUND WATER AT A PROPOSED …dggs.alaska.gov/webpubs/dggs/pdf/text/pdf1994_028.pdfEVALUATION OF GROUND WATER AT A PROPOSED WASTEWATER DISPOSAL SITE, GAMBELL, ALASKA

.h . >:a ., . ,

GROUND-WATER MONITORING WELL LOG

S I - 5 LOG OF WELL SL- i?ge .f- 4 2 CHUCK EGGENER CE2 CONSUL,NG ENGINEERS

DESCRIP'IION

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

0 - 3 Gw r a v e l , ' p ,I( &4? fro=. c, 3 grx, &a, --;t-w,i + n e e v< fLu4

,.I , _ , ,,I w g 3 J cf- 5< +t-ocr 44 9

-4. $44 g"r,"';'. '-'0 FW~,+,(, GPbm, LJ~( Sd*'

U I I , & , i r - d , p.s.~lL I c 7 r 06 7-la,- .+&*f, tL.idd IIHL h a* CIA;<, ~.~Jru#sf$~ 4- c s

16 -16, >' 9. A

10 F- LI* f'-e 4-* .Tor j p f ) - I2 - 5dfkr

1, . - ,', - ,..A / I t =

1q.lQ.r $#fL ,a r - /C i.&&-'

Pct//tA' h IO.C@ ( / ~ ' l b * - ~ , ~ y 541/ d27 - dt. pcL$ ',,r / *&-*#A t"

15'- 20 0 * '"7' r e $ fc t /we@ (6

5 . f k t7-n e.p,,~t i r ~ d * d w ~ l 4&r ,C &- dp-sp .. . k-th wt

2 0 - 2 ~ v t t 7 n , , , h - ~ * j L t i e ? o r ~ypFw,d d*4vs ryrh*(/j Lk ~ d d l f r - r- /;a I

1 b & k = f - ' e w nd-/r~@+r' t.dt . 2 s i g . at,+,$d . (Y - ,.Jd,/ uJ n!drhnmx 4~,m

2 ~ - 30 11.7 ~ 4 ~ g . j - r*bbCs ' 1 '-" t , , , c""'Y '*, J0yhy

2- 7 r ;, hIwiHt',. t >. H 4 *J but* /"@ ?'li

r e m C O A ~ ' ~ c i l fh f

, ' LJ.C

/ 5 6 $ 2 ~ ' - 7 . 5 " PC 9 .'., " - 9 " . -?& ,, r , r .

, ? . I " , - ,,

.Y. I?,!? 21 . ( ! I l f

~LJ

- * ' r .

*

31 -- f b I

- - - - - - - - 7 - - - - - - - - - - - - - - - - - - - 7 - - - - - - - - - - - - - - - - - - - - - - - - - - - - m

- - - - -

- - - - - - - - - - - - -

-

- C

- -

181 8

- - - - - -

*>? - - - - - - - -

- r r

I

P ~ / / J O . <?..; a 3 -

- - - - - - - - - - - - - - - - - - - - - - - - -

m

Page 33: EVALUATION OF GROUND WATER AT A PROPOSED …dggs.alaska.gov/webpubs/dggs/pdf/text/pdf1994_028.pdfEVALUATION OF GROUND WATER AT A PROPOSED WASTEWATER DISPOSAL SITE, GAMBELL, ALASKA

GROUND-WATER MONITORING WELL LOG CHUCK. EGGENER CE2 CONS"LTI,G ENG,NEER,

PROJECT AND LOCATION 9 A M k 1 1 L SfklAW5 ~ ~ ~ c W / r l n , r n d l ~ m f . w r f

r

DRILLER ffevf ~ ~ O A S ~ ~ I L

DRILLING EQUIPMENT & BIT SIZE 4 h " ~ i ) f f a h ~ S / r k

CASING

A

ELEVATION AND DATUM

DATE 6 / 2 1 I DATE flNlSHED '"* Cbrrt ,*JIB &/

DEPTH DRILLED 2 7.6

DEPTH + 4.0 - ff.3 ' 2"m stL I(C r 207- / . 7 z ' f o p c c f )

SCREEN SErnNG

NO. SOIL SAMPLES METHOD

DEPTH r ~ " z b / l ' % & ~ r h / r ~ j +2.f0- 3 . Z 4 I WATER LEVEL 2'* pf I

MEAS. PT. %f "Jd CaSrq

DEPTH (FEET3

- - - - - - - - - 1 - - - - - - - - - - - -

- -

- -

- - - - - - - - - - - - - - - - -

SIZE.020 "a 1 0 ' * 0 . 3 ' b f ~ . t r r , r , u r ~ ~ ~ ~ z 7 r D m T H

SKE G n ~ t , r a , J ~ ~ ~ c L u r r bc*t-. c k e b ~ 2 bar 2 ' - t'f'

Em. (FEET)

J /7.3'-27,6' I D ~ ~ m " i t r d l # O ~ C I V C

EPul J

DESCRIPTION

o:fol drd l r 9- - C I L U I ~ ?,/of b/t

2 5 . 7 7 6 vr.7 s/ru.rs+, ?&&C.J O;t. z 7 . r

2"Pvc CAP

HYDROGEOLOGIST -J- ,,f unlrr

- - - - - - - - - - - - - - - - - - - - - - - - - -

- -

CASINC REMARKS

Af l#v J ~ 4 - f ~ rdd+ - ouffi& bXcss, j 9 - - ?./'*4. r'&"&, - Zb L- -

- T ~ ~ - ~ p , u e u t % 3 .1~ ' - P - I 9 I mc - zf PVC. /.9g' - rc - 9 &d= 2.7jL - - - - -

- - - - - - - - - - - - - - - - - - -

- - -

- - - - - - - - - - - - - - - - - - - - - - - - - - - -

- -

CONDUC- Tlvlrf

10'

1

DEPTH (FEET) ,

- - - - - - - - - - - - - - - 7' - - - - - - - - - -

- - - i -

.

t ,0.3'!

. . ._ . .. . . . . .. '

. . .' ., . . .. . . . .. . . . . . . - . & / I

,.

=. - - - _ .- -. ,:-.: = '._._ - ..* . - . :- - -. - . _ - - - _- - -: . - = - - - - . - - - - .

. - - - . 7

. . . . . . . . ... '.' . .. ... .C

- . . .. 6 . . . .. . .. ..' . --. . ..

~7 - . .. .. ,. .

Page 34: EVALUATION OF GROUND WATER AT A PROPOSED …dggs.alaska.gov/webpubs/dggs/pdf/text/pdf1994_028.pdfEVALUATION OF GROUND WATER AT A PROPOSED WASTEWATER DISPOSAL SITE, GAMBELL, ALASKA

APPENDIX B Quality assurance plan

Page 35: EVALUATION OF GROUND WATER AT A PROPOSED …dggs.alaska.gov/webpubs/dggs/pdf/text/pdf1994_028.pdfEVALUATION OF GROUND WATER AT A PROPOSED WASTEWATER DISPOSAL SITE, GAMBELL, ALASKA

A Quality Assurance Project Plan for Gambell Sewage Lagoon Groundwater Dynamics Investigation

Principal Investigator:

James A. Munter Hydrogeologist

Alaska Hydrologic Survey Division of Water

Department of Natural Resources State of Alaska

hignature Date

Page 36: EVALUATION OF GROUND WATER AT A PROPOSED …dggs.alaska.gov/webpubs/dggs/pdf/text/pdf1994_028.pdfEVALUATION OF GROUND WATER AT A PROPOSED WASTEWATER DISPOSAL SITE, GAMBELL, ALASKA

PROJECT DESCRIPTION

Site History

The proposed site of the Gambell Sewage Lagoon is near the City of Gambell on St. Lawrence Island, Alaska. The location of the site is latitude 63 degrees, 47 minutes, 1 second north, longitude 171 degrees, 45 minutes, 53 seconds west. Although the site is currently undeveloped and has no known prior site history, the proposed lagoon site is adjacent to an area that has historically been used as a landfill by the city of Gambell. A scope of work for the project is available from the author of this report upon request.

Proiect Obiectives

The goal of the project is to evaluate the suitability of the site for hosting a percolating-type sewage lagoon. In addition to evaluating the suitability of the soils and aquifer to physically accommodate the expected influx of fluids, an objective of the study is to determine whether or not existing ground- waters at the site are naturally potable. The proximity of the site to the coast suggests that water may be brackish as a result of periodic storm surges. An additional objective is to document the pre- development nitrate concentrations in groundwater at the site. Water will be sampled and on site measurements of temperature and specific conductance will be made. Water samples will be sent to a laboratory for analysis of nitrate, chloride and total dissolved solids.

A suite of three samples will be collected from four wells shown on figure 1. Wells will be constructed according to specifications shown in figure 2. The wells will be constructed according to the specifications shown in the drilling contract (Appendix A). Each well will be purged with a hand operated piston-type pump for one hour or until sediment-free water is obtained, whichever occurs first. Samples will be obtained with a disposable polyethylene bailer after purging at least 4 casing volumes of water. Samples will be preserved according to USEPA (1 983) and packed and shipped via Alaska Airlines Goldstreak courier service to the Alaska Division of Water laboratory in Fairbanks, Alaska, where all analyses will be conducted. A field data form (figure 3) will be filled out for each suite of samples.

PROJECT ORGANIZATION AND RESPONSlBlLlTlES

As a result of the relatively small scope of this project, only a few personnel are involved. Their roles are shown below.

James A. Munter Project Manager, QA officer, Field Supervisor and Sampler

Jim Vohden Lab Director, analyst

Howard Grey Associates Drilling Contractor

Name 1 Name 2 Drillers I

Page 37: EVALUATION OF GROUND WATER AT A PROPOSED …dggs.alaska.gov/webpubs/dggs/pdf/text/pdf1994_028.pdfEVALUATION OF GROUND WATER AT A PROPOSED WASTEWATER DISPOSAL SITE, GAMBELL, ALASKA

QUALITY ASSURANCE OBJECTIVES AND CRITERIA FOR DETERMINING PRECISION, ACCURACY, COMPLETENESS, REPRESENTATIVENESS AND COMPARABILITY OF DATA

Quality assurance requirements for analyses are shown in Table 1 below.

Precision Accuracy Parameter Method (RPD) 1% recovervl

Chloride 300.0 +I-20% 80-1 20

Nitrate + nitrite 353.2 +/-20% 80-1 20

Total Dissolved Solids 160.1 +/-20% 80-1 20

Percent Recovery (%R) is calculated as follows:

where: SSR = spiked sample amount SR = sample amount SA = amount of spike added

Relative Percent Difference (RPD) is calculated as follows:

where: D, = first sample result D, = second sample result

SAMPLING PROCEDURES

Sampling procedures used will follow general guidelines contained in Nielsen (1 991 1.

SAMPLE CUSTODY

Sample containers obtained from the lab will be transported using common carriers to the field and back to the lab. Shipping and receiving documents will be kept with project files.

CALIBRATION PROCEDURES AND FREQUENCY AND TRACEABILITY OF STANDARDS

The field specific conductance meter will be calibrated in accordance with manufacturer specifications. Laboratory equipment is calibrated according to standard operating procedures described in USEPA (1 9831.

Page 38: EVALUATION OF GROUND WATER AT A PROPOSED …dggs.alaska.gov/webpubs/dggs/pdf/text/pdf1994_028.pdfEVALUATION OF GROUND WATER AT A PROPOSED WASTEWATER DISPOSAL SITE, GAMBELL, ALASKA

ANALYTICAL PROCEDURES

Analytical procedures are shown in Table 1.

DATA REDUCTION, VALIDATION AND REPORTING

Standard operating procedures described by APHA (1 989) regarding data reduction, validation and reporting will be followed.

INTERNAL QUALITY CONTROL CHECKS

One set of field blanks will be collected using standard sampling equipment and deionized water. One set of field duplicates will be collected.

PERFORMANCE AND SYSTEM AUDITS

The Alaska Division of Water laboratory participates in performance evaluations conducted by the US Environmental Protection Agency and the US Geological Survey. These consist of the lab analyzing blind samples for certain chemical constituents and is conducted on a biannual basis.

PREVENTIVE MAINTENANCE

Maintenance of field and laboratory equipment generally follows manufacturers suggestions.

SPECIFIC STANDARD OPERATING PROCEDURES USED TO ASSESS DATA PRECISION, ACCURACY, REPRESENTATIVENESS AND COMPARABILITY

Data precision and accuracy will be determined using the equations described previously. Data completeness will be calculated as a percent of useable data of all possible data. Data representativeness and comparability will be evaluated by determining whether or not total dissolved solids for any specific sample is within the range given by the following relationship Hem (1 985, p.67):

0.55 x specific conductance r TDS 5 0.75 x specific conductance

Also, chloride concentration will be compared t o TDS concentration t o ensure that it is less.

CORRECTIVE ACTION FOR OUT-OF-CONTROL SITUATIONS

The project manager will be notified in writing of any measurement system found t o be out-of-control, and will initiate corrective action. Appropriate corrective actions may include remeasuring, reanalyzing or recollecting a sample. If this is not feasible, the results will be discarded or used wi th cautionary statements.

QUALITY ASSURANCE REPORTING

Any quality assurance evaluations will be reported in writing t o the project manager.

Page 39: EVALUATION OF GROUND WATER AT A PROPOSED …dggs.alaska.gov/webpubs/dggs/pdf/text/pdf1994_028.pdfEVALUATION OF GROUND WATER AT A PROPOSED WASTEWATER DISPOSAL SITE, GAMBELL, ALASKA

REFERENCES CITED

American Public Health Association, American Water Works Association, Water Pollution Control Federation, 1989, Standard methods for the Examination of Water and Wastewater, 17th edition: APHA, AWWA, WPCF, Washington, D.C.

Hem, J.D., 1985, Study and interpretation of the chemical characteristics of natural water, Third Edition: U.S. Geological Survey Water-Supply Paper 2254, 263 p.

Nielsen, David M., editor, 1991, Practical Handbook of Ground-water Monitoring: Chelsea, Michigan, Lewis Publishers, Inc. 71 7 p.

USEPA, 1983, Methods for chemical analysis of water and wastewater: Cincinnati Ohio, U.S. Environmental Protection Agency.

Page 40: EVALUATION OF GROUND WATER AT A PROPOSED …dggs.alaska.gov/webpubs/dggs/pdf/text/pdf1994_028.pdfEVALUATION OF GROUND WATER AT A PROPOSED WASTEWATER DISPOSAL SITE, GAMBELL, ALASKA

TROUTMAN LAKE

SCALES 1 ~ ~ 1 5 7 5 ' NOTE: BASE MAP IS 7-19-80 AERfAL PHO

,

Page 41: EVALUATION OF GROUND WATER AT A PROPOSED …dggs.alaska.gov/webpubs/dggs/pdf/text/pdf1994_028.pdfEVALUATION OF GROUND WATER AT A PROPOSED WASTEWATER DISPOSAL SITE, GAMBELL, ALASKA

8" FABRICATED STEEL CAP

SLOPE NATIVE SOILS AROUND CASING

2" SCH 40 PVC (THRO)

2* SCH 4 0 PVC SCREEN (20' LONG 0.020 SLOT)

.?'I SUMP (THREADED PLASTIC END CAP)

NOTE: PLASTIC MATERIAL-S TO BE THREADED/ FLUSH

I IN ACCORDANCE WITH ASTM F 480-88.

LAGOON SITE GROUNDWATER MONITORING WELLS

NO SCALE

i SHEET I VF .2

Figure 2. Proposed monitoring well construction detail.

Page 42: EVALUATION OF GROUND WATER AT A PROPOSED …dggs.alaska.gov/webpubs/dggs/pdf/text/pdf1994_028.pdfEVALUATION OF GROUND WATER AT A PROPOSED WASTEWATER DISPOSAL SITE, GAMBELL, ALASKA

Figure 2. Proposed monitoring well construction detail (cont.).

-

f

I

FA'ABRICATED CAPS SCH 20 STEEL WITH 1/8" CIRCULAR PLATE WELDED TO TOP

LOCK PIN (SEE BELOW)

LOCK

SCH 40 STEEL PIPE

1

NOTE : C A P CASING SLOTTEO TO ACCOMMODATE LOCK PIN

LOCKING COVER DETAIL

"

i, I

r I -

0 4 ;

NOTE: FABRICATE LOCK PINS FROM 1/4"$ 1 1/2" STEEL STRAP.

ll'x 3/4" LOCK SLOT

LOCK PIN DETAIL

IC,

LAGOON SITE MONlTORlNG WELL DETAIL

NO SCALE ,

SHEET 2 OF 2

Page 43: EVALUATION OF GROUND WATER AT A PROPOSED …dggs.alaska.gov/webpubs/dggs/pdf/text/pdf1994_028.pdfEVALUATION OF GROUND WATER AT A PROPOSED WASTEWATER DISPOSAL SITE, GAMBELL, ALASKA

Page - of-

STATE OF ALASKA - DEPARTMENT OF NATURAL RESOURCES DIVISION OF GEOLOGICAL & GEOPHYSICAL SURVEYS

PO BOX 772116, EAGLE RIVER AK 99577-2116 (907) 696-0070

WATER QUALITY FIELD NOTES - GROUND WATER

Location/Project: Date:

Col lected by:

We1 1 Owner: Weather Conditions:

Use o f Well :

Sanpl ing Equipment ( f o r measuring water level , purging, sampling and f i l e t e r i n g . Include model if

appropriate):

Well Name: Pipe top e levat ion (MSL) Reference e levat ion i f d i f f e r e n t Time sample withdrawn Measured depth t o water ( f t ) F i e l d temperature (OC)/time Correct ion F i e l d conduct iv i ty (uncorrected ) / t ime Tota l depth t o water ( f t ) F i e l d conduct iv i ty (slope corrected) Water e levat ion (MSL) F i e l d pH (std. units)/ t i rne Depth t o bottom o f we1 1 ( f t ) Color (Y/N) Volume H-0 i n wel l (ga l ) Odor (Y/N) Volume t 6 be purged (4Xvol.in we l l ) Turb id i t y (Y/N) Time purging begun Sample F i e l d f i l t e r e d ? (Y/N) Time purging completed Well cap and lock replaced? (Y/N) Purged dry? (Y/N)

A l k a l i n i t y : Samplesize m1;HSO ( f a c t o r ) Instruments 2 4-

T i t e r added ( d i g i t s ) pH Calculat ions

Analysis:

Bo t t le : volume (ml): preservat ive:

COMMENTS :

Figure 3. Water quality field note form

I

unf i l tered, well-mixed

I

f i e l d - f i l t e r e d , unac id i f i ed

unf i l tered, a c i d i f i e d

f i e l d - f i l t e r e d , a c i d f f f e d

Page 44: EVALUATION OF GROUND WATER AT A PROPOSED …dggs.alaska.gov/webpubs/dggs/pdf/text/pdf1994_028.pdfEVALUATION OF GROUND WATER AT A PROPOSED WASTEWATER DISPOSAL SITE, GAMBELL, ALASKA

APPENDIX B - 1

Drilling Contract

Page 45: EVALUATION OF GROUND WATER AT A PROPOSED …dggs.alaska.gov/webpubs/dggs/pdf/text/pdf1994_028.pdfEVALUATION OF GROUND WATER AT A PROPOSED WASTEWATER DISPOSAL SITE, GAMBELL, ALASKA

CITY OF GAMBELL

IEQUE3T FOR QUOTATION

The City of Gambe:ll is requesting qr~otations r'rorn qualified geotcchnical drillir~g companies to provide a drill :rig operated to perform the t'nllowing tasks for the City of Gambelt.

1. Install four each 2" groundwater monitoring wells to a maximum depth of 30 feet * /a f -7 K c c o d

~ , c , & ~ Z - TA IBLZ a 3,2Sh 1.D. hollow stem auger to

a maximum clepth of 50 feet. Holes must be sampled at 5-foot intervals to a maximum depth of 30 LP, using 1 .2SW T.D. split s p n sampler.

r 5 ~ 1 / ~ mud i ) U W m * All holes will be drillied on tltc west side of the coi~lint~nity within 1/2 mile of the center 78?dG

of town. The work will be performed under the direction of the city's consultant hydrogeologist during late June 1993. A lrcccnt drill log froin a nearby I-tole is attacl~ed. The Owner wiil furnish the materials listed la~ter in this solicitation. All other ~nateria!~ strall be furnished by the Contractor. The Owner sh;dl transport the Contractor's drill rig, tools and appurtenances to Gambcll on its chartered D(3-6 at no cost to the Contractor. All equipment offered under this solicitation must fit through the side cirga door of a DC-6. The Owner anticipates the DC-6 will depart from the Palmer airport. Equipment must be to delivered to the freight carrier by June. 11, 1993. Drilling i~iust begin by June IS, 1993.

Jf a skid-mounted drill rig is provided, the Owner shall help the driller move and set up the rig at the various drill sites.

Thc Owner will also provide rooln nt~d board for a ~naxi~num of two personrlci from the drilling company and a four-wheeler and trailer for their use.

Fuel is avsiilable for purchase rrorn the Gamtwll Native Score.

The Contr~ctor shall be wid under four bid ilerns:

Mohilimtion/Den~ohili7atiott, which shall jnclude transporting the rig, drill stcrrt, tools a ~ d appw-tenalms, a i d the Owner-fiirnished ~naterials (to be picked up by the Contractor at a amaxinium of two sites in Anchorage) to the Paltrier airport. In addition, ~~~ahili~tianldcrnobiliation shall include transporting drilling pcrsonncl to and from Garl~bcll and gctting thc drill rig and appurlenances out of GambelI at the end of the drilling program. The Owner will load the drill rig onto a con~ll~ercial carrier at the Coniractor's direction. hlobilization/ dert~obilization shall be paid lir~np sum.

Page 1 511 1/93

Page 46: EVALUATION OF GROUND WATER AT A PROPOSED …dggs.alaska.gov/webpubs/dggs/pdf/text/pdf1994_028.pdfEVALUATION OF GROUND WATER AT A PROPOSED WASTEWATER DISPOSAL SITE, GAMBELL, ALASKA

2. hlocitoring Wells. All labor, eqt~ipment and f~iel required to instail the monitoring wells irl acmrclancr: with ttie ;attach4 plans and s~wificalions shall be paid for per-lineal-foot of PVC casing installed below the ground surface. The anticipated depth is 30 feet.

3. Geotechnicai Drilling, Geotecltnical drillir,g shall he paid pera hour, Geotechriical drilling shall iilclude titile logged ~novitrg tile rig between holes, boring, soil mmplitlg and perforrllir~g other drill services directed by the hydrogeologist. Drilling will be paid from the time the auger bites soil on the first gcotcchnical boring to the time tools are withdrawn from the final boring. Breakdown tinre will not bc paid for. For purposcs of paymctit, time will bc rout~dcd to tire r~carcst 1 /2 hour.

4. Standby Tinle. Staf~dby tittle shall be paid hourly when the equipment, materials and personnel are prepred to drill or move the rig hut are not directed to do so for the convenience of the hydrogeologist. Standby time sllall not bc paid when driller's equipment is not operational.

4 ea. 8 a. 4 ea. 6 ea, 4 ea. 2 ea.

20 ea. 4 4%.

4 a. 4 ea,

The Work

2" female botlotn plug, Sch. 40 2" x 5' 0.020 screen PVC, Sch. 40 2" x 10' 0.020 screen PVC, Sch. 40 2" x 10' blank PVC pipe, Sch. 40 2" slip-on top cap, Scli, 40 50# sack Bentonite grout 1 ~ c k of 8/ 12 silica sand casings-7'-6" long, 6" diameter, caps-8" diameter, 4" height lock pins

The drilling contractor shall provide all labor, materials (other than those listed above), equipment, supervision, and expertise to constnict the wells in accordance with the ififormation provided in this solicitation. Worknunship shall conform to industry starldards for quality construction of permanent monitoring wells. Wells and geotechllical borings shall be drilled straight and casing installed plumb. The wells and geotechnical borings will be installed by boring wit11 a 11ollow stern auger, The monitoring well casing and sandpack will be placed inside the hollow stem. Additional sand will be added to the annular space betweell the plastic screzn and the sten1 of the aligcr as the auger is removed. After the screen pack is placed, the annular space between the drill hole and the casing shall be backfilled with 3/4" rninils granular cuttings placed in a manner which will prevent againat future settlement of the colurnn.

Page 2 5/1fi93

Page 47: EVALUATION OF GROUND WATER AT A PROPOSED …dggs.alaska.gov/webpubs/dggs/pdf/text/pdf1994_028.pdfEVALUATION OF GROUND WATER AT A PROPOSED WASTEWATER DISPOSAL SITE, GAMBELL, ALASKA

The 2" wcli casing sliall be ctntered inside. the 6" steel surface protective casing as sho~vt~ c n the drawings. Bentonite rtntl slurry shall be hantllal and inshl ld in ac.cordance with ti75 rnanufactilrer's r~~cornnlaidations.

.4rlp r:latcrials ncded for the constn~ciion which are not identified above, with the euceptioz of the locks, shall he h~rnisled hy the contractor at 110 aciditional cost to the Owner.

Oar intent is to construct quality wells which will prove to be serviceable for several decades. Bidders must provide. details on their equiplnent and the construction methods they propose to use.

Quotes will be received by Jane Dale, CE2 Engineer utltil 5 : 0 0 p,rn,, May 20, 1993.

Paynlcnt will bc made within fourteen (ISj days of zomplctiotl of the work and receipt of a properly doc~~mesited billing.

Cotltractors arc rc1;lindc.d that Alaska Deparlmetll of Labor wage rates apply to ivork done under this solicitation.

Tlre City of Garnbcli will pay fur any storage fees at the Palmer airport. All other fees shall be included in the bid.

Reiection of Bids

The City of Gamhell reselves the right to bccept or reject a i y atld all bids, md to waive any and all technicalities i t deems appropriate, arid to rebid as it dccrns necessary and proper.

The bidder's firin price shall be constn~ed as its offer, pursuant to the bid document to he accepted by the City of Gamkll. The City of Gainbell's acceptance of the bidder's offer shal! be by issuance of purchase order. The Uniform Comtnercial Code as adopted by the State of Alasb shall control, The laws of the Smte of Alaska sl~all go\ferli the rights and obligations of all parties.

Page 3

Page 48: EVALUATION OF GROUND WATER AT A PROPOSED …dggs.alaska.gov/webpubs/dggs/pdf/text/pdf1994_028.pdfEVALUATION OF GROUND WATER AT A PROPOSED WASTEWATER DISPOSAL SITE, GAMBELL, ALASKA

Bid Dellvw Date

All bids shall be faxed to the office of Cl~uck Eggener Consulting Engineers (fax number (907) 349-1015) no later than 5:M p.m. May 20, 1993, with a follow-up cgpy to be mailed to:

Chuck Eggctler Csnsulting EngilteersfCily of Gambell P.O. Box 232946

Anchorage, AK 99523-2946

Page 4

- I 4 - %

Page 49: EVALUATION OF GROUND WATER AT A PROPOSED …dggs.alaska.gov/webpubs/dggs/pdf/text/pdf1994_028.pdfEVALUATION OF GROUND WATER AT A PROPOSED WASTEWATER DISPOSAL SITE, GAMBELL, ALASKA

APPENDIX C Grain-size analyses and permeameter test results

Page 50: EVALUATION OF GROUND WATER AT A PROPOSED …dggs.alaska.gov/webpubs/dggs/pdf/text/pdf1994_028.pdfEVALUATION OF GROUND WATER AT A PROPOSED WASTEWATER DISPOSAL SITE, GAMBELL, ALASKA

ALAS T E S T L A B

Chuck Eggatler Corlsulting Engineers P,O, Box 232946 Anchorage, Alaska 99523-2936

ALASKA'S ONLY AASHTO ACCREDITED

CONSTRUCTION

'CV,O,#A3,5618 June 30,1993

Attention: Ms. Jane Dale

Subject: Particle,-Size Analysis Ganzbell Water Project

Dew Ms, Dale:

The particle-size distribution of your soil was measured ill the laboratory. The published neth hods for this test are:

ASTM C 1117, "hfatedal F~ner Than 75-pm (Nu. 200) Sicvc in hfintrd Aggregates by Washing:" ASTM C 136, "Sieve Atlalysis of Fine and Coarse Aggregatzs;" ASTM D 122, "Particle Size-Analysis c)f Soils;" AASHTO T- 11, "hlatcrial Finer Tllali 75-pm Sieve in Pvlinerd Aggregates;" AASHTO T-27, "Sieve Anal.gsis of Fine and Coarse Aggregates;" AASHTO T-30, "Mech:~nical Analysis of Extracted Aggregate;" AASHTO T -88, "Particle Size Atlalysis of Soils;" and AK DOTJPF ATbf T-7, "Sieve Andysis of Fine and Coarse Aggregates."

Alaska Testlab's staudard procedure is in confornlzu~ce with these standards, with the following descriptions: + Tlle co3lse fractian OX non-exuacted soils is not ~ a s h c d unless thc cclirrsc part~clcs nppcar to bc significantly coated

witli fines; The fine fraction of the so11 is alivay~ washed: Tl~e plus 3-inch fraction is not lnutinely included it) he test due to the Iwge sample tnsss required f ~ r a representative satnple; The estln~ated ptrcentage of plus 3 inch rnatsrlal in the satllple is shown on the test report: and The mass of the coxsc and fine test fractions are reported.

The soil is classified in ~ccordance with ASTM D 2487, "Classification of Soils for Engineering Furposes (Unified Soil C.lassification System)," The frost classification is identified i.n ilcc~rdancc with Corps of Engineers and &lunicip;dity of Ancfiorage (hl0A) procedures.

The pelllltability of your soil was determined in accordance with ASTM D2434, "Permeability of Granular Soils."

The test results are attached. Xf you have any questions regarding the tcst. procedures or the results, please call.

ALASKA TESTLAB

& x h ~ B 9 - - h o w n r d K. Weston, P.E, / -

Technical Director

Page 51: EVALUATION OF GROUND WATER AT A PROPOSED …dggs.alaska.gov/webpubs/dggs/pdf/text/pdf1994_028.pdfEVALUATION OF GROUND WATER AT A PROPOSED WASTEWATER DISPOSAL SITE, GAMBELL, ALASKA
Page 52: EVALUATION OF GROUND WATER AT A PROPOSED …dggs.alaska.gov/webpubs/dggs/pdf/text/pdf1994_028.pdfEVALUATION OF GROUND WATER AT A PROPOSED WASTEWATER DISPOSAL SITE, GAMBELL, ALASKA
Page 53: EVALUATION OF GROUND WATER AT A PROPOSED …dggs.alaska.gov/webpubs/dggs/pdf/text/pdf1994_028.pdfEVALUATION OF GROUND WATER AT A PROPOSED WASTEWATER DISPOSAL SITE, GAMBELL, ALASKA
Page 54: EVALUATION OF GROUND WATER AT A PROPOSED …dggs.alaska.gov/webpubs/dggs/pdf/text/pdf1994_028.pdfEVALUATION OF GROUND WATER AT A PROPOSED WASTEWATER DISPOSAL SITE, GAMBELL, ALASKA
Page 55: EVALUATION OF GROUND WATER AT A PROPOSED …dggs.alaska.gov/webpubs/dggs/pdf/text/pdf1994_028.pdfEVALUATION OF GROUND WATER AT A PROPOSED WASTEWATER DISPOSAL SITE, GAMBELL, ALASKA

I-,

8 '1

U

Page 56: EVALUATION OF GROUND WATER AT A PROPOSED …dggs.alaska.gov/webpubs/dggs/pdf/text/pdf1994_028.pdfEVALUATION OF GROUND WATER AT A PROPOSED WASTEWATER DISPOSAL SITE, GAMBELL, ALASKA
Page 57: EVALUATION OF GROUND WATER AT A PROPOSED …dggs.alaska.gov/webpubs/dggs/pdf/text/pdf1994_028.pdfEVALUATION OF GROUND WATER AT A PROPOSED WASTEWATER DISPOSAL SITE, GAMBELL, ALASKA

APPENDIX D

Water-level and slug test data

Page 58: EVALUATION OF GROUND WATER AT A PROPOSED …dggs.alaska.gov/webpubs/dggs/pdf/text/pdf1994_028.pdfEVALUATION OF GROUND WATER AT A PROPOSED WASTEWATER DISPOSAL SITE, GAMBELL, ALASKA

WATER LEVEL DATA

Monitoring well SL-3

Location -- NW of F.A.A./SW of IandfillICity of Gambell

Measuring point 4m.p.) -- top of steel casing

Measuring point elevation (mllw') - - 21.89 feet

Height of measuring point above land surface -- 3.40 feet

Measuring equipment -- steel tape.

Depth to water below m.p.

Date Time Elevation of water level (from mllw)

'Mean lower low water datum

Page 59: EVALUATION OF GROUND WATER AT A PROPOSED …dggs.alaska.gov/webpubs/dggs/pdf/text/pdf1994_028.pdfEVALUATION OF GROUND WATER AT A PROPOSED WASTEWATER DISPOSAL SITE, GAMBELL, ALASKA

WATER LEVEL DATA

Monitoring well SL-4

Location -- NE corner of sewage lagoon near large barrel dump/City of Gambell

Measuring point (m.p.1 -- top of steel casing

Measuring point elevation (mllw') - - 11.35 feet

Height of measuring point above land surface -- 2.6 feet

Measuring equipment -- steel tape.

Depth to water below m.p.

Date Time Elevation of water level (from mllw)

'Mean lower low water datum

Page 60: EVALUATION OF GROUND WATER AT A PROPOSED …dggs.alaska.gov/webpubs/dggs/pdf/text/pdf1994_028.pdfEVALUATION OF GROUND WATER AT A PROPOSED WASTEWATER DISPOSAL SITE, GAMBELL, ALASKA

WATER LEVEL DATA

Monitoring well SL-5

Location -- Southeast of Lagoon site near V.S.W. officelcity of Gambell

Measuring point (rn.p.1 -- top of steel casing

Measuring point elevation (mllwl) - - 23.25 feet

Height of measuring point above land surface -- 2.95 feet

Measuring equipment -- steel tape.

Depth to water

below m.p.

Date Time Elevation of Comments water level (from mllw)

poor measurement good measurement poor measurement v, good reading

'Mean lower low water datum

Page 61: EVALUATION OF GROUND WATER AT A PROPOSED …dggs.alaska.gov/webpubs/dggs/pdf/text/pdf1994_028.pdfEVALUATION OF GROUND WATER AT A PROPOSED WASTEWATER DISPOSAL SITE, GAMBELL, ALASKA

WATER LEVEL DATA

South PondICity of Gambell

Location -- Southernmost swale between VSW office and red and white communication tower

Survey point -- top of steel rebar

Survey point elevation (mllw') - - 3.70 feet

Staff gauge "0" elevation (mllw) -- 1.39 feet

Measuring equipment -- yardstick fastened to rebar driven into pond bottom

Time Date Staff Elevation of Conditions Comments gauge water surface

reading (from mllw (inches) in feet)

14:45 06/23/93 14.50 2.60 slight ripple First noticed water in swale 15:40 06/23/93 14.69 2.61 )I ,, either 1 130 or 1330 hrs

17:36 06/23/93 15.00 2.64 19:26 06/23/93 15.38 2.67 21 :33 06/23/93 15.75 2.70 18:13 06/24/93 17.00 2.81

'Mean lower low water datum

Page 62: EVALUATION OF GROUND WATER AT A PROPOSED …dggs.alaska.gov/webpubs/dggs/pdf/text/pdf1994_028.pdfEVALUATION OF GROUND WATER AT A PROPOSED WASTEWATER DISPOSAL SITE, GAMBELL, ALASKA

WATER LEVEL DATA

Troutman Lake

Gauge Location -- 100 feet east of brackish water well and 10 feet offshore at north end of Troutman Lake

Survey point -- top of rebar, which is 0.96 f t below top of yardstick staff gauge

Survey point elevation (mllw') - - 2.90 feet

Staff gauge "On elevation (sea level datum) -- 0.86 feet

Measuring equipment -- yardstick fastened to rebar driven into lake bottom

Time Date Staff gauge

reading (inches)

Elevation of water surface

(from mllw in feet)

Comments

slight ripples, wind from N (offshore) slight ripples, wind from N (offshore) calm -- light rain calm, light rain, wind from north slight ripples -- wind more easterly

wind from east -- light to moderate wind from east -- slight ripples light wind from east

'Mean lower low water datum

Page 63: EVALUATION OF GROUND WATER AT A PROPOSED …dggs.alaska.gov/webpubs/dggs/pdf/text/pdf1994_028.pdfEVALUATION OF GROUND WATER AT A PROPOSED WASTEWATER DISPOSAL SITE, GAMBELL, ALASKA

rage 2 or(

STATE OF ALASKA - DEPARTMENT OF NATURAL RESOURCES DIVISION OF GEOLOGICAL & GEOPHYSICAL SURVEYS

PO BOX 772116, EAGLE RIVER AK 99577-2116

(907) 696-0070

SLUG 7 7 ~ ~ r s i t e 5 L - 4 RECOVERY RATE TEST Date 6-22-93

Well Number

Water leve l before evacuation (nearest 0.1 f t below top o f casing)

We1 1 1 ocation

Weather condit ions

nq: T,M M ~ / ~ ~ c T

I n i t i a l : pH (un i ts) Recharged: pH (un i ts) Z ~ I A A A U L ~ Conductance (umhos/cm*) Conductance (umhos/cm*)

Temperature (OC) Temperature (OC)

Time from evacua t io i Water leve l (nr. 0.1 f t ) Calculated recharge ra te (volume/time) _duLc el ' l .4 /s 69 9 - / . zY-+ 7 7G ~ ~ L J A ~ U M P G-4%

I I

The t es t i s f in ished when the water leve l has recovered t o i t s pre-evacuation leve l .

f l l a n r e r p r 5 . c : * Conductance should be temperature-corrected t o 2S°C

t ci sJ,J d l -

Page 64: EVALUATION OF GROUND WATER AT A PROPOSED …dggs.alaska.gov/webpubs/dggs/pdf/text/pdf1994_028.pdfEVALUATION OF GROUND WATER AT A PROPOSED WASTEWATER DISPOSAL SITE, GAMBELL, ALASKA

Page r o f 2

STATE OF ALASKA - DEPARTMENT OF NATURAL RESOURCES DIVISION OF GEOLOGICAL & GEOPHYSICAL SURVEYS

PO BOX 772116, EAGLE RIVER AK 99577-2116

(907) 696-0070

s i t e GALLA~ELL - Q ~ ~ f & a ) c / RECOVERY RATE TEST Date 6- 2 Y -73

We1 1 Number SL -. 3

Water leve l before evacuation (nearest 0.1 f t below top o f casing)

Weather condit ions ~ 5 ~ ' dtu . /t d k d r ; d s ~ K ! S;U NdrCkr

I n i t i a l : pH (un i t s ) Recharged: pH (un i t s ) Dkue c t i u e s ~ d

Conductance (umhos/&) Conductance (umhos/cm*)

Temperature (OC) Temperature ( O C )

The t es t i s f in ished when the water leve l has recovered t o i t s pre-evacuation level.

/ q # 39

19.. 9'7

r 57:43 / f - - 45

z/= 50 2/- 56 @

* Conductance should be temperature-corrected t o 2S°C

I

Time from evacuation Water leve l (nr. 0.1 f t )

/ /~~~ /w++-z I~ZQL.ZS U.(-O.S~ 2/. oz 2b- 7 7

u.e- 0.92 = - z g - o . p / -

-af* ivnl-)

Zu.9'5

Zo.76

hd ( o ~ d ~ 0 . O ( r e ~ B , + - u

za.9' 2 o . Y /

r 9

f:qj$c E-M~E

F-riPf ;#

2 Z ~ L r//

Page 65: EVALUATION OF GROUND WATER AT A PROPOSED …dggs.alaska.gov/webpubs/dggs/pdf/text/pdf1994_028.pdfEVALUATION OF GROUND WATER AT A PROPOSED WASTEWATER DISPOSAL SITE, GAMBELL, ALASKA

APPENDIX E Water quality analyses

Explanation of sample codes

GW-1 Well SL-5 GW-2 Well SL-4 GW-3 field blank GW-4 Well SL-3 GW-5 Well SL-3 (field duplicate)

Page 66: EVALUATION OF GROUND WATER AT A PROPOSED …dggs.alaska.gov/webpubs/dggs/pdf/text/pdf1994_028.pdfEVALUATION OF GROUND WATER AT A PROPOSED WASTEWATER DISPOSAL SITE, GAMBELL, ALASKA

Client: DNRIDOW - Eagle River

Submitted By: Jim Munter

Date Submitted: 26 June 93

I Sample Date Time TDS Nitrate + Nitrite Chloride 1 GWI 21 June 93 17:48 3600 0.05 2120 GW2 22 June 93 13: 12 6000 0.74 3530 GW3 23 June93 14:30 <DL <DL <DL GW4 24 June 93 1051 15000 4.46 7030 GW5 24 June 93 1051 15400 4.49 6940

Units EPA Method

Detection L i t Date of Analysis

RPD % Recavexy

m a mg/L as N m& 160.1 353.2 300.0 0.1 0.02 0.01

28 June 93 16 July 93 17 July 93 4.6 2.7 0.0 - 106 107

Approved By Date 27 5aLfl 3

Jim Vohden, Chemist

64

Page 67: EVALUATION OF GROUND WATER AT A PROPOSED …dggs.alaska.gov/webpubs/dggs/pdf/text/pdf1994_028.pdfEVALUATION OF GROUND WATER AT A PROPOSED WASTEWATER DISPOSAL SITE, GAMBELL, ALASKA

rage r o r 1

STATE OF ALASKA - DEPARTMENT OF NATURAL RESOURCES DIVISION OF GEOLOGICAL & GEOPHYSICAL SURVEYS

PO BOX 772116, EAGLE RIVER AK 99577-2116 (907) 696-0070

WATER QUALITY FIELD NOTES - CROWD WATER

Location/Pro ject: Gad kj,/ ham Date: 6/24/93 Collected by: Xrn M.*-*f ~ e l l ~ w n e r : Ctgv /7C~dlu6d/ Weather ~ond; ti ons: /f r a ; ~ / d r y c q ~ ' ~ r A /v

r

Use o f Well : oyl l forr~9 WC(/

4 Sampl i ng Equipment ( f o r measuring water level, purging, santpl i n g and fJ le ter ing. Include model if

I ' I appropriate): / $ ' 30" p0frr&k*c c/,jppl& h*c/crc my/# f c ~ / ~ e * c 0 - z 3 4 4 , , Well Name: fie/d 3up [ 4 5f -3) Pipe top elevat ion (MSL) Reference elevat ion i f d i f fe ren t ;;fbc Time sample withdrawn / C x j Measured depth t o water ( f t ) 21. UO- 0 . 4 3 : &,57 F ie l d temperature (OC)/time 3, f4tz Q /,oq Correction F ie ld conduct iv i ty (uncorrected)/time 2 T 3 4 p p&,& Total depth t o water ( f t ) F i e l d conduct iv i ty (slope corrected) ZZ. O00srb5, Water e leva t i on (MSL) F i e l d pH (std. uni ts)/ t ime ' /cw Depth t o bottom of wel l ( f t ) ZP. 6 Color (Y/&

Volune H-0 i n we1 1 (gal ) I. r 9 d Odor (Y@ Volume t 6 be purged (4Xvol . in we1 1 ) ,& Turb id i ty (Y& Time purging begun i d 4 krs ZG dL+ ( r r f Sample F i e l d f i 1 tered? ( Y ~ J

A lka l in i t y : Samplesize m1;HSO (factor-) Instruments 2 4-

Time purging completed / b 4 TAr5 Well cap and lock rep laced?/q/~) Purged dry? (Y& V

/&*3J ZW-SB L u l - ~ b (6 33) Gu-ZC C W , )

T i t e r added ( d i g i t s ) pH Calculations

Analysis:

Bott le: volume (ml ): preservative:

COMMENTS :

70 S unf i l tered,

we1 1 -mixed

AD& r c ~

d,frdt~d,h k unf i l tered, ac i d i f fed

2 5 , p . 1

Aow IuLn.c &td

f i a

cLJo~,'&

704

I N a n & I

Page 68: EVALUATION OF GROUND WATER AT A PROPOSED …dggs.alaska.gov/webpubs/dggs/pdf/text/pdf1994_028.pdfEVALUATION OF GROUND WATER AT A PROPOSED WASTEWATER DISPOSAL SITE, GAMBELL, ALASKA

rage ot(

Location/Pro jec t

STATE OF ALASKA - DEPARTMENT OF NATURAL RESOURCES DIVISION OF GEOLOGICAL b GEOPHYSICAL SURVEYS

PO BOX 772116, EAGLE RIVER AK 99577-2116 (907) 696-0070

WATER QUALITY FIELD NOTES - GROUND WATER

Date

Col lected by: lAk r well owner: f,& 4 4 / ; & r ~ b ( ( / Weather Conditions: /k &

I

Use o f well: MOA\&r;tq I

J Sampling Equipment ( f o r measuring water level, purging, sampling and f j l e te r ing . Include model if

I ' 8

appropriate) : I 1 L 30 " ~ I < ~ P # # 23dYefL* ]LC* &tleC .I Y \ ~ ~ O ~ cerd! /0,23 q& c&;,&\ I 1 I I

Well Name: SL'3 Pipe top elevat ion (mL) 6 / 2 3 / 9 3 ;?tfeft. 2 Reference e levat ion i f d i f f e ren t , Time sample ni t h d r s n / d ~ f -/d/Z/ = V u l ~

Measured depth t o water (ft)llcr,. b.43 = 20.00 F i e l d temperature (OC)/time 3. ire p / / 7 4 q Correction W. / 7 F ie l d conduct iv i ty (uncorrected)/time 23 306 C 33-7 Total depth t o water ( f t ) I F i e l d conduct iv i ty (slope corrected) Z' .~BC~LL?!

Water elevat ion (MSL) I F i e l d pH (std. units)/t ime cw

Depth t o bottan of we1 1 (ft)(%&) 28.6 ' co lor (Y& Vol me H-0 i n we1 1 (gal ) 1. !F9& Odor (Y@ Volume t 6 be purqed (4Xvol. i n we1 1 ) 6 'in/ Turb id i t y (Y&) - Time purging begun / d / h 25 b , Sample F i e l d f i 1 tered? (Y[@ Time purging completed / d 4 / r Well cap and lock replaced? (*N) Purged dry? (Y&

"

1 4 ~ 2 ) ~ 6 ~ 9 D G w -q ~.(6%) GU -445 (631) Analysis: I 7 0 s 1 ~ j , hpJC t& 64 I 1 &or;& 1

I unfi l tered,l unfiltered,lffeld-filtered,Ifield-filtered, I

Alka l in i ty : SampleSize ml;HSO ( f a c t o r ) lnstrunents 2 4-

Bott le: volume (ml): preservative:

T i t e r added ( d i g i t s ) pH Calculations

m l l n i x e d 9% d l done

ac id i f i ed 2*m/

Sd&tL

ac id i f i ed unac id i f ied I 5DQk((

I d o e

Page 69: EVALUATION OF GROUND WATER AT A PROPOSED …dggs.alaska.gov/webpubs/dggs/pdf/text/pdf1994_028.pdfEVALUATION OF GROUND WATER AT A PROPOSED WASTEWATER DISPOSAL SITE, GAMBELL, ALASKA

Page > o f 1

STATE OF ALASKA - DEPARTMENT OF NATURAL RESOURCES DIVISION OF GEOLOGICAL 6 GEOPHYSICAL SURVEYS

PO BOX 772116, EAGLE RIVER AK 99577-2116 (907) 696-0070

WATER QUALITY FIELD NOTES - GROUND WATER

~ o c a t i o n / ~ r o j e c t : G h t ~ f ~ f SWfi6C / &/d dlaH1: oate: ~ Z J Y ~

Col 1 ected by: %w IV\rl,,.k~

We1 1 Owner: Weather Conditions: 5a0 GJ,& fl C-

Use o f We1 1 :

Sampling Equipment ( f o r measuring water level, purging, sampling and t i l e t e r i ng . Include model if

appropriate) : 2 9 u/od, p&/.r* b a ; l r r ( d r s N ~ I . ) r*dw c*&

We1 1 Name: cUh;+&, cr /r ql/ Pipe top elevat ion (6L) ./ Reference elevat ion i f d i f f e ren t Time sample withdrawn 1'130 b Measured depth t o water ( f t ) F i e l d temperature (OC)/time I q . C * c Correction F ie ld conductf v i t y (uncorrected)/time jq,~+&V/.~ ( L k

Total depth t o water (ft) F ie ld conduct iv i ty (slope corrected) ~ J c )

Water elevat ion (MSL) F ie ld pH (std. uni ts)/ t ime

Depth t o bottom o f we1 1 ( f t ) Color(Y/N) )-I Volune H-0 i n well (gal) Odor (Y/N) hl

Volume t 6 be purged (4Xvol . in wel l ) Turbidi ty (Y/N) Time purging begun Sample F i e l d f i 1 tered? (Y/&B - Time purging completed Well cap and lock replaced? (Y/N)

A lka l in i t y : Samplesize m1;HSO (factor-) Instruments 2 4-

T i t e r added (d i g i t s ) pH Calculations

Page 70: EVALUATION OF GROUND WATER AT A PROPOSED …dggs.alaska.gov/webpubs/dggs/pdf/text/pdf1994_028.pdfEVALUATION OF GROUND WATER AT A PROPOSED WASTEWATER DISPOSAL SITE, GAMBELL, ALASKA

rage of_L

STATE OF AIASKA - DEPARTMENT OF NATURAL RESOURCES DIVISION OF GEOLOGICAL 4 GEOPHYSICAL SURVEYS

PO BOX 772116, EAGLE RIVER AK 99577-2116 (907) 696-0070

WATER QUALITY FIELD NOTES - GROUND WATER

Location/Project: 6-A~BELL S F U ~ A ~ C & b ~ l / d ~ a f * ~ f dt Date: 6 - u - 9 3

Collected by: xM d,,,.hr Well Owner: LA oC / ~ ~ - h 1 Weather Conditi ons: d,,J, . p. T u a , 45-n*

I g q I Use of Well : M - ~ b t u ~

4 Sampl ing Equipment ( f o r measuring water level, purging, sampling and f i le ter ing. Include model if

appropriate): /Lh r .,LPC,L,~ 1 A.;L (-2s *~ob.,;~r\) M * ' / ~ V l ~ s P , ~ A*/- ~ d ~ h w e # + *wpk 1

We1 1 Name: $L - '-/ Pipe top elevation (HSL) O . S ~ ; T D L - ~ ~ ~ V C / ~ . G ' T u ~ -9rd \ * I / Z . ~ ' ~ L -rq M V ~

Reference elevation i f different 2, g/ - T i ) ~ - [ ~ ~ ~ k T i l a e sample withdrawn ( 1 3 ~ ~ -faY) 1 31 2 hes Measured depth to water ( f t ) F ie ld temperature ('C)/time 4 . * / 328 bAc&Lld

L - . -

Correctj on Field conductivity (uncorrected)/tfme 10/Q (loro-/#g)

*J ) Total depth t o water ( f t ) q& - 0.71 = 8.29 Ck,2y$~,sField conductivity (slope corrected) 9.- 5i Water elevation (MSL) . 7 . 3 Field pH (std. units)/t ime

Depth t o bottom of well ( f t ) 17.6 (r,+c)L Color (Y& JM her Volune H-0 i n well (gal) / . ST&. Odor (Y/N) Vo1 m e t; be purged (4Xvol. i n we1 1 ) 6 c,,\ Turbidity (Y& IM dckr Tfmepurgingbegun 125Qbr . 3 i & i / p n & l / S a m p l e F i e l d f i l t e r e d ? ( Y / N ) d Time purging completed 1309 Well cap and lock replaced? @N)

Alkal ini ty: Samplesize m1;HSO (factor-) lnstrunents 2 4-

Ti ter added (d ig i ts ) pH Ca l& ions

Page 71: EVALUATION OF GROUND WATER AT A PROPOSED …dggs.alaska.gov/webpubs/dggs/pdf/text/pdf1994_028.pdfEVALUATION OF GROUND WATER AT A PROPOSED WASTEWATER DISPOSAL SITE, GAMBELL, ALASKA

rage J- of_L

STATE OF ALASKA - DEPARTMENT OF NATURAL RESOURCES DIVISION OF GEOLOGICAL & GEOPHYSICAL SURVEYS

PO BOX 772116, EAGLE RIVER AK 99577-2116 (907) 696-0070

WATER QUALITY FIELD NOTES - GROUND WATER

Loca tion/Pro ject : G A V W ~ L T ~ L Y ~ M . F L A G C W ~ Date: 6 - Z i - 4 3

Collected by: sw r/l,,&r well owner: c,+y 04 G o d i d ! Weather Conditions: SWAY 9 L fk /b

8

Use of Well: &l*ibr,-tq f

I J

Sampling Equipment ( for measuring water level, purging, sampling and f i l e te r ing . Include model i f

appropriate): d.rdn(hl / / J Q J M B B C ~ t ~ ~ n - t y p c ~ v m e p-. , o ~ ( u ~ K J ~ * 4 1 e r d l r Ur*e I ' / / /

We1 1 Name: SL ~ v / w Pipe top elevatCon (HSL) Reference elevat ion i f d i f f e ren t Time sample withdrawn 17'f d - / 7 ~ q Measured depth t o water ( f t ) (m\ zI. 86 ' F ie l d temperature (*C)/time Y.8- / 7 V J 558 ":2Pe Correction Ff e l d conduct iv i ty (uncorrected )/t ime 7?;9rr, Total depth t o water ( f t ) 21 j&' F ie l d conduct iv i ty ( s l ope corrected) 13G%)iu&/ Water elevat ion (MSL) F i e l d pH (std. uni ts)/ t ime

LH,

Depth t o bottom o f we1 1 ( f t ) 31.5 ( lac) Color (Y/N) sl,,lf e b d w Volune H-0 i n wel l (gal 1 1.6 q& Odor (Y/N) Y - 'msrtdc s?&' QJP&JO/;.C~J &-f Volume t 6 be purged (4Xvol. i n wel l ) 6 . 5 Turb id i ty (Y/N) qt$

Alka l in i t y : Sample Size ml ; H SO (factor-) lns t rments 2 4-

T i te r added (d i g i t s ) pH Calculations

hl'xrcr COMMENTS: &* ~ t v / > c Ootevo ,

Page 72: EVALUATION OF GROUND WATER AT A PROPOSED …dggs.alaska.gov/webpubs/dggs/pdf/text/pdf1994_028.pdfEVALUATION OF GROUND WATER AT A PROPOSED WASTEWATER DISPOSAL SITE, GAMBELL, ALASKA

APPENDIX F Advantages and disadvantages of sewage lagoon options

Page 73: EVALUATION OF GROUND WATER AT A PROPOSED …dggs.alaska.gov/webpubs/dggs/pdf/text/pdf1994_028.pdfEVALUATION OF GROUND WATER AT A PROPOSED WASTEWATER DISPOSAL SITE, GAMBELL, ALASKA

WALTER J. HICKEL, GOVERNOR

I

i P.O. Box 7 7 2 1 1 6

DEPAIETbIENT OF NATURAL RESOURCES Eagle River, Alaska 9 9 5 7 7 - 2 1 1 6 Phone: ( 9 0 7 ) 696 -0070 Fax: ( 9 0 7 ) 696 -0078

DIVISION OF WATER

ALASKA HYDROLOGIC SURVEY

July 8, 1993

Jane Dale, Engineer Chuck Eggener Consulting Engineers PO BOX 232946 ANCHORAGE AK 99523-2946

Dear Ms. Dale:

As you have requested, I am providing you a summary of the advantages and disadvantages of the various sewage lagoon options for Gambell wi th respect t o ground-water impacts only. Obviously, other factors affect siting that are not considered here. M y comments are based on our recent field investigations and must be considered preliminary pending preparation of the final project report.

The options considered in this analysis are:

1. Construction of a "slow-perc" wastewater lagoon at the top of the hill between the VSW office in Gambell and the FAA towers extending northward into the swale near the old landfill. This lagoon would be designed wi th a 70,000 sq f t bottom area and be capable of retaining 7 months of wastewater during subfreezing conditions;

2. Construction of a "fast-perc" lagoon at the bottom of the hill close t o the old landfill. This option would be constructed w i th a 50,000 sq f t bottom area and designed t o not retain water;

3. Construction of a lined retention lagoon wi th periodic pumping out to sea;

All options described above would be designed t o accommodate wastewater from a septic tank used to achieve primary treatment and separation of septic wastes.

First, I would like t o review some key findings of our investigation. Full explanation and documentation of these findings is beyond the scope of this letter.

1. Ground water through out the area is found in highly permeable aquifers consisting of sand and gravel from old beach deposits. In the southern part of the "slow perc" lagoon site, permafrost confines the main aquifer. A secondary perched aquifer may form locally and perhaps only seasonally on top of

Page 74: EVALUATION OF GROUND WATER AT A PROPOSED …dggs.alaska.gov/webpubs/dggs/pdf/text/pdf1994_028.pdfEVALUATION OF GROUND WATER AT A PROPOSED WASTEWATER DISPOSAL SITE, GAMBELL, ALASKA

Page 2 Letter to Dale 7/8/93

permafrost. .Under the swale near the old landfill, permafrost is mostly or totally absent, and does not materially affect ground-water flow.

2. Ground-water flow directions are influenced greatly by -large coastal ground- water level changes caused by wind-driven surf action. Annual water level fluctuations of 9-1 1 f t are expected beneath the "fast-percn site, from a high of approximately 9-1 0 f t above MLLW t o a low near MLLW. Ground-water beneath the swale also responds dynamically to tides, however these are lower- magnitude effects;

3. The specific conductance of water in the vicinity of Gambell and the lagoon sites varies from 460-23,000 micromhos/cm, indicating water quality varies from fresh t o saline. Most water beneath the lagoon sites appears t o be brackish, and may be contaminated wi th diesel fuel.

The advantages and disadvantages of. the three options are described below.

OPTION 1 - "SLOW PERC" LAGOON

Advantaaes

1. Compared to option 2, this option would provide superior treatment of the wastewater in the unsaturated zone before the water contacts ground water, thereby reducing the potential for ground-water contamination;

2. Compared t o option 3, this option may not result in significant impairment of ground water because ground water beneath the site is already non-potable.

Disadvantaaes

1. Compared to option 2, this option increases the risk that wastewater will f low southeastward into the community of Gambell because wastewater percolation would occur closer t o the community and over a larger area. Wastewater could contaminate the school well or nearby ponds that occasionally form. The actual risk of this occurring is difficult t o assess. Brackish ground water in the vicinity of well .SL-5 does not appear t o travel to the school well on a regular

, . basis because the school well is fresh most of the time.

Compared t o option 2, this option is more likely to have a large slug of thawing wastewater enter the aquifer'in the spring. This slug slightly increases the possibility of contaminated ground water affecting the school well. After 3 0 days of melting and infiltrating a seven-month accumulation of frozen wastewater and drifted snow, a water table mound 0.2-1.5 f t high is calculated to form beneath the site. Superimposed on a flat water table which is expected t o occur intermittently beneath the site in the spring, this creates the potential for flow towards the school well.

Page 75: EVALUATION OF GROUND WATER AT A PROPOSED …dggs.alaska.gov/webpubs/dggs/pdf/text/pdf1994_028.pdfEVALUATION OF GROUND WATER AT A PROPOSED WASTEWATER DISPOSAL SITE, GAMBELL, ALASKA

Page 3 Letter to Dale 7/8/93

3. Compared t o option 3, this option will probably require fill in the swale under the north end of the site to approximately the 10 f t elevation contour. This is expected to be above the fall high water level caused by storm-induced high water levels. The purpose of the fill would be to keep all potentially contaminated ground-water below the local land surface.

4. This option will require more extensive destruction of permafrost compared t o option 2. This increases uncertainty in the prediction of ground-water responses and could lead t o unexpected results. Unexpected results could be adverse, such as creation of a perched.water table flowing towards the City of Gambell, or positive, such as creation of an effective permafrost barrier against ground-water flow towards the City. Effective monitoring of ground-water response t o wastewater loading will be much more difficult as a result.

OPTION 2 - "FAST PERC" LAGOON

Advantaaes

1 . This option would most efficiently dispose of the wastewater into an area wi th brackish to saline ground water. Ground water in the predominant downgradient direction, towards the coast, may already be contaminated by landfill or honeybucket disposal leachate.

2. High permeabilities of soils in this area and strongly fluctuating gradients result in relatively high dilution and flushing rates. Flushing and dilution rates are likely t o be highest nearest the coast.

3. The fluctuating water table beneath this site wil l result in regular wetting of the vadose zone with ground water mixed wi th wastewater. This may help aerate the water and further promote subsurface degradation of waste products.

4. Being farther from the school well; this option is less likely to contaminate that well than option 1.

5. The potential for the spread of contamination into the City is reduced by minimizing the volume of thawing wastewater in the spring, such as is inherent in the design of this option. Continuous disposal of wastewater from the lagoon for 1 yr is estimated t o create a water table mound less than 0.1 f t high.

Disadvantaqes

1. Water influent to the aquifer may contain unacceptably high concentrations of constituents typical of domestic wastewater. Applicable wastewater disposal regulations should be consulted to evaluate this factor.

2. Compared t o option 3, this option has a slight probability to contaminate the school well and nearby ponds. As a result of the distances and gradients

Page 76: EVALUATION OF GROUND WATER AT A PROPOSED …dggs.alaska.gov/webpubs/dggs/pdf/text/pdf1994_028.pdfEVALUATION OF GROUND WATER AT A PROPOSED WASTEWATER DISPOSAL SITE, GAMBELL, ALASKA

Page 4 Letter to Dale 7/8/93

involved and the preferred orientation of beach ridges and probably also the aquifer transmissivity in the area, contamination of the school well is not considered likely.

3. Compared t o option 3, this option will probably require fill in the swale under the north end of the site to approximately the 10 f t elevation contour. This is expected t o be above the fall high water level caused by storm-induced high water levels. The purpose of the fill would be to keep all potentially contaminated ground-water below the local land surface.

OPTION 3 - RETENTION LAGOON

1. Properly constructed and maintained, this option should not result in significant risks to local ground-water resources.

Disadvantaaes

1. Any leaks in the liner could result in uncontrolled ground-water contamination.

Please let me know i f you would like further information.

Sincerely, D

Hydrogeologist