Page 1: Evaluating multipurpose soft engineered mitigation

Evaluating multipurpose soft engineeredmitigation measures in the Belford Burn

catchment, Northumberland, UK.

Mark Wilkinson, Paul Quinn, Jennine Jonczyk,Alex Nicholson, Gareth Owen and NicholasBarber – Newcastle University

Phil Welton and Peter Kerr – EnvironmentAgency for England and Wales

Page 2: Evaluating multipurpose soft engineered mitigation

Introduction

There is great potential for agriculturalmanagement to become a major part of improvedstrategies for controlling runoff.

Page 3: Evaluating multipurpose soft engineered mitigation

Catchment Systems Engineering

“Catchment Systems Engineering aims to sustainablymanage water quantity and water quality at the catchmentscale whilst not affecting agricultural productivity using an

interventionist approach”

SLOW, STORE, FILTER --- For example, making buffer strips do more

Pond 3 Runoff AttenuationFeature (RAF)

Page 4: Evaluating multipurpose soft engineered mitigation

Belford case studyThe village of Belford, Northumberland, UK– Many flood events (6km2 catchment)

Page 5: Evaluating multipurpose soft engineered mitigation

Belford – Background

• Environment Agency looked atthe feasibility of a traditionalflood defence scheme for Belford

• High costs meant economics didnot stack up

• Alternative approach ofmanaging runoff in thecatchment put forward

• The scheme was funded by theEnvironment Agency's North EastLocal Levy, raised by theNorthumbria Regional FloodDefence Committee though LocalAuthorities

Page 6: Evaluating multipurpose soft engineered mitigation

Belford – The catchmentengineering toolkit

Page 7: Evaluating multipurpose soft engineered mitigation

Instrumentation and mitigation

Current RAF

Proposed RAF8

29

PILOT RAF: The demonstration site- Wooden bund that collects runoff and spillfrom stream- Cost more, less of impact on ground- 900 m3

Woody debris RAFs: Slowing down the flow-Sycamore trees felled and placed across river- Cross over design to avoid scour- Flood plain “roughened up”- Ecological zones

Pond 3: An example of a RAF that collects stream spill- Soil bund created in buffer zone- 600 m3- Bank lowered to allow peak flow to spill into feature

Ladys Well RAF: A RAF that collects surface runoff- Collects overland flow in steep sided field-Acts as road over low point- Pipe raised slightly to allow for sediment capture

Gathering theevidence•2 Raingauges•5 stream gauges•7 pond level gauges•6 pump samplers•1 dipwell

Page 8: Evaluating multipurpose soft engineered mitigation
Page 9: Evaluating multipurpose soft engineered mitigation

Nicholas Barber’s PHD work

Optimisation of RAFs for WQ

SLOW, STORE AND FILTER ---- An example of an in-stream intervention

Page 10: Evaluating multipurpose soft engineered mitigation

Travel time of peak

Pre-Change

Post-Change

Page 11: Evaluating multipurpose soft engineered mitigation

The community feeling

July 2007 – Before the project

After September 2008 floods – During construction

Page 12: Evaluating multipurpose soft engineered mitigation

Uptake

BELFORD

Netherton

Powburn

Dyke Head

Further sites in Northumberland taking the runoff management approach

Hepscott

NAFFERTONFARM

Page 13: Evaluating multipurpose soft engineered mitigation

Summary

• Hands on, multi-objective work is a cost effective way tocatchment management

• Different Runoff Attenuation Features (controlling fast runoffpathways, while tackling water quality and other issues) have beenimplemented in the catchment in partnership with farmers andlocal landowners

• Visual observations and preliminary data show the effectiveness ofthe features locally

• However, more data, data analysis and modelling are required toquantitatively assess the impacts of the features at the catchmentscale

Page 14: Evaluating multipurpose soft engineered mitigation

Belford Proactive Flood Solutions is an Environment AgencyProject funded by the North East Local Levy, raised by the

Northumbria Regional Flood Defence Committee though LocalAuthorities.

Questions?

Research.ncl.ac.uk/proactive/

Wilkinson ME, Quinn PF, Welton P. (2010)Runoff management during the September 2008

floods in the Belford catchment,Northumberland. Journal of Flood Risk

Management, 3(4),