INCREASING COMPLIANCIN LGA PROCUREMENT
WORKSHOP REPORT
LGA Procurement Capacity Building
Strategy Formulation Workshop
Dodoma, 11
PMO-RALG
ENHANCEMENT OF PROCUREMENT CAPACITY OF LOCAL GOVERNMENT AUTHORITIES PROJECT (EPC
INCREASING COMPLIANCE AND VALUE FOR MONEIN LGA PROCUREMENT
WORKSHOP REPORT
LGA Procurement Capacity Building
Strategy Formulation Workshop
doma, 11-13 June 2013
T OF PROCUREMENT CAPACITY OF LOCAL GOVERNMENT AUTHORITIES PROJECT (EPC
E AND VALUE FOR MONEY
WORKSHOP REPORT
LGA Procurement Capacity Building
Strategy Formulation Workshop
T OF PROCUREMENT CAPACITY OF LOCAL GOVERNMENT AUTHORITIES PROJECT (EPC-LGAP)
Workshop Report / LGA Procurement Capacity Building Strategy Formulation 1
CONTENTS
CONTENTS ............................................................................................................................. 1
ACRONYMS ............................................................................................................................ 2
EXECUTIVE SUMMARY ......................................................................................................... 4
1 INTRODUCTION ........................................................................................................ 6
2 WORKSHOP OBJECTIVES ....................................................................................... 7
3 WORKSHOP METHODOLOGY AND TOOLS ........................................................... 8
4 WORKSHOP PROCEEDINGS................................................................................. 11
4.1 Workshop Introduction (Session A) .......................................................................... 11
4.2 Workshop Opening ................................................................................................... 13
4.3 Workshop Outputs .................................................................................................... 13
4.3.1 Challenges, Root Causes and Capacity Gaps (Sessions B, C, D and E) .......... 14
4.3.2 Proposed Actions (Session F, G and H) ............................................................. 15
4.3.3 Thematic Analysis of Strategic LGA Procurement Areas (Sessions I, J and K) . 20
4.3.4 Quality Assurance of LG Procurement – Audits ................................................. 21
4.3.5 Quality Assurance of LG Procurement – Procurement MIS ............................... 23
4.3.6 Lower Local Government Procurement Capacity and Training Strategy ............ 25
4.3.7 Logical Framework (sessions L, M and N) ......................................................... 28
4.4 Emerging Issues ....................................................................................................... 32
4.4.1 Legislative and Regulatory Framework .............................................................. 32
4.4.2 Institutional Framework and Management Capacity .......................................... 32
4.4.3 Procurement Operations and Market Practices ................................................. 32
4.4.4 Integrity and Transparency of the Procurement System .................................... 33
4.5 Project Launch.......................................................................................................... 33
5 EVALUATION ........................................................................................................... 35
6 CONCLUSIONS AND WAY FORWARD ................................................................... 36
ANNEXES ............................................................................................................................. 37
Annex 1: Workshop Programme ........................................................................................ 38
Annex 2: List of Participants ............................................................................................... 41
Annex 3: Workshop Tools .................................................................................................. 44
Annex 4: Outputs of Group Work ....................................................................................... 50
Annex 5: Workshop Presentations and Workshop Materials.............................................. 58
Annex 6: Photo Gallery ...................................................................................................... 67
2 Workshop Report / LGA Procurement Capacity Building Strategy Formulation
ACRONYMS
AAS Assistant Administrative Secretary
ALAT Association of Local Authorities of Tanzania
APP Annual Procurement Plan
BLI Base Line Indicator
BLS Base Line Study
BTC Belgian Technical Cooperation
CAG Controller and Auditor General
CB Capacity Building
CPI Compliance and Performance Indicator
CSO Civil Society Organisation
CTB Council Tender Board
DAC Development Assistance Committee
D by D Decentralisation by Devolution
DC District Council
DCDO District Community Development Officer
DE District Engineer
DED District Executive Director
DEO District Education Officer
DIA District Internal Auditor
DLG District Local Government
DHRO District Human Resource Officer
DPLO District Planning Officer
DT District Treasurer
EPC-LGAP Enhancement of Procurement Capacity of Local Government Authorities Project
EPICOR Accountancy software used for Integrated Financial Management System
FC Financial Controller
GoT Government of Tanzania
GPSA Government Procurement and Supplies Agency
HLG Higher Local Government
HLGTI Hombolo Local Government Training Institute
HoD Head of Department
HRM/D Human Resource Management and Development
IA Internal Auditor
IAG Internal Auditor General
ICT Information & Communication Technology
ICT Information and Communication Technology
IFMIS Integrated Financial Management Information System
JICA Japan
JLPC Joint Local Partners Committee
KPI Key Performance Indicator
LAAC Local Authorities Audit Committee
LF Logical Framework
LGA Local Government Authority
LGAMSS Local Government Authority Management Support Section
LGFM Local Government Financial Memorandum
LG-PCBS Local Government Procurement Capacity Building Strategy
Workshop Report / LGA Procurement Capacity Building Strategy Formulation 3
LLG Lower Local Government
MDA Ministries, Departments and Agencies
M&E Monitoring and Evaluation
MKUKUTA Swahili Acronym for “Tanzania Strategy for Growth and Reduction of Poverty”
(Mkakati wa Kukuza Uchumi na Kupunguza Umaskini Tanzania)
MoF Ministry of Finance
NAO National Audit Office
NGO Non-Governmental Organization
OECD Organisation for Economic Cooperation and Development
OO Overall Objective
OPRAS Open Performance Review and Appraisal System
PC Project Coordinator
PCCB Prevention and Combating of Corruption Bureau
PE Personnel Emolument
PE Procuring Entity
PFA Public Finance Act
PIU Project Implementation Unit
PlanRep Planning and Reporting System (LGA)
PFMRP Public Financial Management Reform Programme
PMIS Procurement Management Information System
PMO-RALG Prime Minister’s Office Regional Administration and Local Government
PMU Procurement Management Unit
PPA Public Procurement Act
PPPD Public Procurement Policy Division
PPRA Public Procurement Regulatory Authority
PSO Private Sector Organisation
PSPTB Procurement Supplies Professionals and Technicians Board
QA Quality Assurance
QTP Qualified Training Provider
RAS Regional Administrative Secretary
RS Regional Secretariat
SO Specific Objective
SU Service Unit
TA Technical Assistance
TACECA Tanzania Civil Engineering Contractors Association
TE Training Entity
TEC Technical Evaluation Committee
TFF Technical and Financial File
TNA Training Needs Assessment
ToR Terms of Reference
ToC Training of Coaches
ToT Training of Trainers
VA Village Assembly
VC Village Council
VEO Village Executive Officer
VfM Value for Money
WEO Ward Executive Officer
4 Workshop Report / LGA Procurement Capacity Building Strategy Formulation
EXECUTIVE SUMMARY
As part of developing the institutional procurement capacityin Tanzania, the Prime Minister’s
Office Regional Administration and Local Government (PMO-RALG) and the Public Procurement
Regulatory Authority (PPRA) organised a participatory workshop to formulate the building blocks of
the LGA Procurement Capacity Building Strategy (LG-PCBS) with assistance of the Enhancement
of Procurement Capacity of Local Government Authorities Project (EPC-LGAP).
The EPC-LGAP has been formulated by the Government of the United Republic of Tanzania with
assistance of the Kingdom of Belgium in response to four inter-related capacity needs in the
procurement system of Local Government Authorities (LGA), namely:
i) To strengthen capacity and coordination of central-level institutions responsible for capacity
building, monitoring, quality assurance, supervision and compliance enforcement in LGA
procurement;
ii) To strengthen LGAs capacity (systems, tools, staff, skills, structures, leadership) for
compliant, transparent, efficient and effective procurement management;
iii) To improve on accountability and voice of the end-users in LGA procurement; and
iv) To inform policy makers on the outcome of LGA procurement practices to strengthen policy
dialogue, institutional reform and decision-making.
The participatory planning workshop drew 75 senior officials and representatives from:
� PMO-RALG, PPRA, HLGTI, CAG (NAO), IAG, PPPD and PSPTB;
� Eight selected districts and four regions; and
� Representatives of CSOs, media and training institutes.
During the workshop the project was officially launched by the Minister Responsible for Local
Government and the Ambassador of the Kingdom of Belgium in the presence of Chairman of the
Board of PPRA, Chairman and members of the Joint Local Partner Committee, Regional
Commissioner of Dodoma region and invited guests. The Permanent Secretary PMO-RALG opened
the workshop and closing was done by the CEO of PPRA.
Workshop participants were conversant with real challenges facing the LGA procurement
processes and outcomes, and were willing and able to propose relevant and creative interventions
to be incorporated in the procurement CB strategy (and Project Logical Framework). In order to
have full participants’ involvement and contribution the workshop sessions were parceled into
construction-objective oriented slots with group working sessions and plenary methods for group
report-back presentations and paper presentations. The groups were composed based on specific
roles and responsibilities in the LGA procurement cycle and capacity building.
The methodology used was gap analysis in relation to procurement challenges and root causes of
low LGA procurement capacity, followed by formulation of proposed actions and desired outcomes.
The analysis was placed in the perspective of international best practices in public procurement, in
particular the four OECD pillars for assessment of procurement systems.
Workshop Report / LGA Procurement Capacity Building Strategy Formulation 5
Technical papers were presented on the second day to avoid pre-emptying the participants’
analysis of the LGA procurement situation (i.e. challenges, root causes, capacity gaps and
proposed solutions). The papers included 1) Procurement monitoring and LGA capacity gaps; 2)
Procurement Quality Assurance through audits; 3) Procurement Quality Assurance through
interfaced Management Information Systems; 4) Procurement capacity of Lower Local
Governments and Training Strategy; 5) the EPC-LGAP Logical Framework
The workshop formulated a set of desired outcomes and strategic actions in the fields of 1)
Institutional, equipment and technology incentives; 2) Institutionalization of LGA procurement
Scheme of Service; Policies and regulations; 3) Supportive oversight and accountability
mechanisms; 4) Human resources and skills; 5) Education, training and coaching; and 6)
Leadership and governance.
The workshop made several recommendationsof the procurement system and its application in
LGAs related to: 1) Legislative and regulatory framework; 2) Institutional framework and
management capacity; 3) Procurement operations and market practices; and 4) Integrity and
transparency of the procurement system.
Issues to be addressed include the need to finalise PPA 2011 and its regulations; Review and
harmonization of the Local Government Finance Act and Public Procurement Act; Introduction of
procurement guideline for Lower Local Governments; introduction of LGA procurement operational
manuals; Recognition of role and place of the PMU in the LGAs; and further Professionalization of
the procurement function. Capacity building strategy is needed, which is recommended to include
introduction of procurement training manuals; training, mentoring and coaching in prioritized weak
LGA procurement areas based on procurement skills development plans; Establishment of district
trainings teams covering both higher and lower Local Governments; Explicit attention for
procurement skills at lower levels and the capacity of contractors and suppliers; as well as Effective
and coordinated internal and external quality assurance, oversight and follow-up. The issue of
understanding of Public Procurement Act (PPA), language and addressing leadership, ethics and
integrity were explicitly mentioned in this respect. Other proposals to improving the procurement
system included the need for more information, publicity and transparency in tender opportunities
and awards at all levels; Introduction of simplified version of procurement guides; Interfacing
procurement MIS with LGA Management Information Systems;Increased use of ICT to enhancing
credibility, coverage and productivity of the systems; Procurement records and reports at all
(delegated) levels from all sectors operating in the LGAs; and the National Procurement Information
System.
The outputs of the workshop process validated the intervention logic of the EPC-LGAP and
together with analysis and proposals made during this workshop, the building blocks are in place to
finalise the formulation of the proposed LGA Procurement Capacity Building Strategy.
All participants shared the mission of this strategy to be “Procurement Capacity at Local
Government Level is sustainably enhanced” to be measured by “IncreasedCompliance and Value
for Money in LGA procurement in Tanzania”.
6 Workshop Report / LGA Procurement Capacity Building Strategy Formulation
1 INTRODUCTION
This report presents the process, findings and outputs of the workshopto formulate the LGA
Procurement Capacity Building Strategy (LG-PCBS), which took place in Dodoma from 11-13 June
2013.The 2½ day workshop was co-hosted by Prime Minister’s Office Regional Administration and
Local Government (PMO-RALG) and the Public Procurement Regulatory Authority (PPRA) with
assistance of the Enhancement of Procurement Capacity of Local Government Authorities Project
(EPC-LGAP). The workshop was opened by the Permanent Secretary of PMO-RALG and closed by
the Chief Executive Officer of PPRA.
On the 3rd day of the workshop the Project was officially launched by the Honourable Minister
responsible for Local Government, Mrs Hawa Ghasia and the Ambassador of the Kingdom of
Belgium, Mr. Koenraad Adam in the presence of representatives of PMO-RALG, PPRA, Joint Local
Partner Committee members, representatives of ministries and agencies, Regional Commissioner
Dodoma, Belgian Technical Cooperation, Development partners and workshop participants.
The workshop brought together a cross-section of key stakeholders with representatives from Local
Government Authorities, Regional Secretariats, oversight bodies (PPRA; Controller and Auditor
General, CAG; Internal Auditor General, IAG), Ministries and Agencies (PMO-RALG; MoF – Public
Procurement Policy Division, PPPD; Government Procurement and Supplies Agency; GPSA;
Procurement Supplies and Technicians Board, PSPTB), training entities and civil society. The aim of
the workshop was to review and analyse procurement challenges, capacity gaps and root causes of
procurement weaknesses in Local Government Authorities (LGA) and to agree on solutions and
desired outcomes to strengthen their procurement performance. The workshop methodology was
designed to maximise contributions and sharing of participants’ knowledge and experience in
relation to procurement system and practices in Tanzania.
Participants agreed that the mission of the strategy should be to sustainably strengthen LGA
procurement capacity as measured by a Key Performance Indicator of increased compliance and
performance of LGA procurement by 2017. Participants identified several strategies to achieving this
mission, which largely coincidedwith interventions formulated for the EPC-LGAP, which were
complemented by additional strategic interventions as identified during the workshop.
This report is structured as follows. Chapter two introduces the workshop objectives, which is
followed by an overview of the workshop process, methodology and tools in chapter three. The core
of the report is chapter four, which contains the proceedings of all sessions including the outputs of
group work and conclusion of plenary sessions describing LGA procurement challenges, root
causes of identified capacity gaps, desired outcomes and proposed solutions.Three strategic areas
were in-depth analysed: 1) Quality Assurance of LGA procurement through internal and external
audits; 2) Quality Assurance of LGA procurement by increased customization and interfacing of
(Procurement) Management Information Systems (MIS) and 3) Procurement capacity in Lower
Local Governments (LLG) and Training Strategy. Chapter four concludes with a presentation of
emerging issues of the Tanzanian procurement system. Chapter five summarises the evaluation of
the workshop followed by conclusions and way forward in chapter six.
Chapter seven contains annexes including the workshop programme, list of participants, tools,
outputs of group work, workshop presentations and materials, and the photo gallery.
Workshop Report / LGA Procurement Capacity Building Strategy Formulation 7
2 WORKSHOP OBJECTIVES
The workshop objectives were summarised as bringing together a cross-section of stakeholders in
LGA procurement to:
� Analyse the desired and actual LGA procurement capacity;
� Determine LGA procurement capacity gaps;
� Analyse root causes of prioritised low capacity;
� Define and agree on strategic actions;
� Make improvements and validate the Project Logical Framework; and
� Provide building blocks i.e. strategic interventions for the proposed Local Government
Procurement Capacity Building Strategy.
The end-product was to have a stakeholder-owned and validated Project Logical Framework ready
for implementation targeting intermediary and final beneficiaries (Local Government Authorities) and
building blocks for the proposed LGA Procurement Capacity Building Strategy.
8 Workshop Report / LGA Procurement Capacity Building Strategy Formulation
3 WORKSHOP METHODOLOGY AND TOOLS
The workshop was executed by using a participatory planning approach. There were five technical
papers prepared in advance for presentation and discussion at the workshop, which were presented
on the second day to avoid pre-emptying the participants’ analysis of the procurement situation (i.e.
challenges, root causes, capacity gaps and proposed solutions). All workshop participants were
presumed to be conversant with real challenges facing the LGA procurement processes and
outcomes, and therefore assumed to be willing and able to propose relevant and creative
interventions to be incorporated in the procurement CB strategy (and Project Logical Framework).
The methodological approach of the workshop was prepared by the facilitator (Prof Gaspar Munishi)
in close collaboration with the Project Implement Unit. In order to have full participants’ involvement
and contributionthe workshop sessions were parceled into construction-objective oriented slots or
cells (see Annex 7.1: workshop programme). The group working sessions were given identification
names with plenary method for group report-back presentations and prepared technical paper
presentations. The plenary sessions had session chairpersons and rapporteurs. The groups were
composed based on specific roles and responsibilities in the LGA procurement cycle and capacity
building.
There were methodological materials prepared for the group sessions, which included workshop
games, brainstorming and issue-focused brainstorming models (Fishbone Model, Gap Analysis and
Mind Tool). Groups were provided with group report writing and presentation formats (see Annex
7.3: workshop tools).
Workshop Methods and Tools
The workshop used tools or methods to develop diversity, creativity and activeness in a planning
workshop process. The following is a brief summary of the tools and theirexpected functions for the
workshop performance.
Letter to Myself
The purpose of this method was to put the participants in context and enable a contributory mood
during the workshop. This method was also used to review the LGA procurement situation as it was
being perceived by the participants at the time they were attending the workshop, and by identifying
experiential challenges at their work places.
Fishbone Tool
This tool was used when the system’s major problem had been identified, for example “an under-
performing LGA procurement system” which is configured as the head of the concept fish. Various
root causes were identified along the way as the ribs attached to the fish’s backbone that leads to
the undesired state of LGA’s poor procurement performance.
Brainstorming and Buzz Technique
Brainstorming and buzzing methods were used to point out the major challenges in the LGA
procurement system, in particular by creating rhythm and anxiety in the minds of the participants as
they set out to participate in the workshop process.
Workshop Report / LGA Procurement Capacity Building Strategy Formulation 9
Fishbone Technique for Cause and Effect
The Fishbone analytical technique was again applied to identify the root causes and challenges
resulting into the present (poor) state of the LGA procurement performance. The proceedings show
that some root causes such as poor state of ethics, procurement skills, financing, political
interference, poor organizational structure and over centralization, etc. were identified using this
tool. Each root cause was written on a manila card, discussed and rated during the group sessions
and presented during the plenary presentation. The tool generated many root causes, but a few
which were found to be common and prioritized were taken for further deliberation.
Gap Analysis/Mind Tool
During the group brainstorming at least five gaps were identified and each one was written on a
manila card. Once the major problems and their root causes had been identified, the participants
went into groups to discuss what was desired as “a well performing” LGA procurement system by
using “Gap analysis technique” using a Mind tool framework. For each identified gap the groups
were required to suggest activities or interventions to address the gaps. The prioritized gaps and
interventions were reported at the plenary session.
Group Guide Questions and Reporting Formats
Questions had been prepared in advance to guide the group discussions during their discussions
and brain storming sessions. Also group reporting formats were provided to harmonize and to
create consistency.
Models and Workshop Structuring
At the intersection of plenary and group discussions short explanatory power point presentations
were designed to structure and enable better focus of the participants’ group discussions and
workshop deliverables. One such presentation was a general presentation on the basic concepts of
procurement capacity development, gap analysis techniques, dimensions and a definition of
capacity assessment and the objectives of the workshop. Another one was a power point
presentation on methodology, group reporting formats, and the OECD-DAC pillars to assess
proficiency of procurement systems.
Thematic Papers
Once the problems, challenges, root causes of challenges and gaps had been identified in the
group sessions of the first day and thereafter discussed, amajor part of the second day was devoted
to presentation of thematic papers, followed by groupdiscussions.For the purpose of discussing and
reviewing the thematic presentations, the participants went into three functional groups according to
the papers presented. The paper presentations were on:
� Quality Assurance: Audits
� Quality Assurance: (Procurement) Management Information Systems (MIS)
� Lower Local Government Procurement Capacity and Training Strategy
Merging Group Work Outputs and Thematic Presentations
The groups came up with issues raised in the paper presentations following the group reporting
format accompanied by written cards. The closure of the day was completed by synthesizing what
was desired as a well performing LGA procurement system against the background of the previous
10 Workshop Report / LGA Procurement Capacity Building Strategy Formulation
day’s group, plenary discussions and the OECD-DAC Procurement Pillars. Issues, gaps, strategies
and proposed interventions appeared to be overlapping, self-validating and fact-reinforcing. It was
noted that there were similarities between what the groups had discussed and the issues raised in
the papers. This convergence did create more interest and ownership of the workshop proceedings
and resolutions on the recommended interventions. It also translates to validating the research
based thematic papers in the sensethat they addressed pertinent issues as perceived and
experienced by LGA procurement practitioners.
Project Logical Framework and Building Blocks for LGA Procurement CB Strategy
The third day was dedicated to synthesizing the group reports and the thematic paper
presentations. The EPC-LGAP Project Logical Framework was exposed to participants only to
realize that the interventions recommended by their groups found surrogates in the presented
Project Logical Framework. Therefore what had been deliberated upon during the previous
workshop sessions found relevance and tallied well into realizing the objectives of the workshop.
The interventions which had been recommended by the workshop participants were used to create
envisaged LGA Procurement strategies and possible interventions. The methodology used here
was first a plenary review of what the groups had seen as challenges and gaps (root causes),
agreeing on possible strategic interventions, which were to be factored into the construction of a
Capacity Building Strategy to improve and enhance the LGA procurement capacity.
Workshop Wrap-Up
Workshop participants were required to brainstorm and to write down at least five activities that
could form interventions to enhance procurement capacity. They were required to take into account
that what they were to recommend as possible interventions were to be informed by what they
discussed and resolved during the workshop. These were then synthesized and discussed along
with the Project Logical Frame.
Evaluation
The last exercise concerned the participants’ evaluation of the workshop and suggested actions or
activities for the way forward.
Workshop Report / LGA Procurement Capacity Building Strategy Formulation 11
4 WORKSHOP PROCEEDINGS
4.1 Workshop Introduction (Session A)
The introduction session was facilitated by Dr. Laurent Shirima (Project Coordinator), who
welcomed the participants on behalf of the organising committee. Participants were asked to
introduce themselves by mentioning their names and institutions represented. The workshop
brought together 74 representatives from various organisations, regions and districts:
ORGANISATION PARTICIPANTS MEN WOMEN
Districts 30 20 5
Regions 9 6 3
Oversight Bodies 19 13 6
Other 16 10 6
Total 74 49 20
Following the self-introductions, the facilitator, Prof Gaspar Munishi, asked participants to write “a
letter to me, the workshop participant” to jot down:
a) Three to five challenges facing the LGA procurement in their respective districts;
b) Three to five things they expected to learn from the workshop;
c) Three to five activities or actions or interventions that can be created to address the
challenges; and
d) What they envisioned the LGA procurement function to look like in three to five years given
the interventions identified.
The letters were written and collected for synthesis. A summary of the aggregate views of the
workshop participants is presented in Table 1.
Table 1: Challenges and gaps as extracted from the “Letter to me (me = the participant)”
S/N ISSUE FREQUENCY
1 Poor compliance with laws and regulations 14
2 Incomprehensible laws and regulations 13
3 Lack of / or inadequate skills 12
4 Poor Value for Money 12
5 Poor ethical practice 10
6 Poor governance attributes of accountability, transparency and ethical
behaviour 8
7 Lack of procurement skills and knowledge 8
8 Lack of legal knowledge and regulations 8
9 Poor supervision of awardees / Poor tender analysis 8
10 Lack of knowledge of market opportunity and behaviour 5
11 Poor record keeping 5
S/N ISSUE FREQUENCY
12 Poor tools and equipment 3
13 Too long and cumbersome tendering process 3
14 Inadequate number of procurement personnel 2
15 Delayed payment to service providers 2
Participants indicated in their lettersseveral other challenges that impact on procurement
performance in the LGAs, which are summarized as follows:
� Too much centralization of the procurement operations in which Higher Local Government
Authorities dominate the Lower Local Governments
� Poor linkage between the procurement planning and budget processes at the LGAs
� Rampant cheating and collusive procurement in the LGAs
� Poor procurement personnel scheme of service and poor incentive structure
� Insufficient procurement budget
� Too much political interference in the procurement processes
� A need to review and improve procurement law and regulation
� Poor understanding of the procurement law and regulations
Following the “letter-to-me” exercise, the workshop rules were discussed and participants agreed to
the following:
� Mobile phones in silent mode
� No internet connectivity during workshop sessions
� Time-keeping
After the official opening of the workshop (see next section), Mr. Frits Raijmakers (Project Co-
Coordinator) introduced the Capacity Building concepts, overview of workshop methodology and
objectives of the workshop (see chapter two).
After introducing the concepts of capacity of both organisations and individuals, capacity
assessment and capacity building strategywere defined as:
“Analysis of current capacities against desired future capacities to understand the LGAs
procurement capacity assets and needs leading to the formulation of a capacity building
strategy”
Desired Capacity
Actual Capacity
Capacity Gap
Root Causes
CB Strategy
Assumptions / Environment
Workshop Report / LGA Procurement Capacity Building Strategy Formulation 13
The facilitator further introduced the workshop programme and presented an overview of the
workshop tools.
This was followed by an introduction to the four Pillarsof the OECD Methodology of Assessment of
National Procurement Systems (MANPS) by the Manager Research and Documentation (Eng. Mary
Swai). The pillars constitute the basis of procurement monitoring and evaluation in Tanzania by the
PPRA through Base Line Indicators (BLI), which were established in 2006, and Compliance and
Performance Indicators (CPI), which are collected on an annual basis, with the objective to provide:
� A tool to formulate programme to improve national procurement system
� A Learning and capacity development opportunity for government
� Results on the level of performance of Procuring Entities
� Results on the level of performance of country procurement system in accordance with
internationally acceptable best practices
The Baseline Indicators and CPIs largely inform decision-making and response of government to
public procurement in four strategic dimensions (pillars) of the public procurement system:
Pillar I: Legislative and Regulatory Framework
Pillar II: Institutional Framework and Management Capacity
Pillar III: Procurement Operations and Market Practices
Pillar IV: Integrity and Transparency of the Public Procurement System
An overview of the OECD procurement indicators and sub-indicators is presented in Annex 7.5.
4.2 Workshop Opening
The workshop was officially opened by Mr Jumanne Sagini, Permanent Secretary PMO-RALG, in
the presence of the Director, Local Government Division (PMO-RALG), Chief Executive Officer of
PPRA, Regional Commissioner Dodoma and Regional Administrative Secretary Dodoma region.
The Guest of Honour emphasized the following in his engaging speech:
� Importance to have a strategic plan to address weaknesses in LGA procurement
� All LGAs to comply to PPA 2004, and as amended in 2011 and its regulations, guidelines
and standards
� Importance to making good use of LGA resources to achieve Value for Money in public
procurement to deliver required services
� To address unethical practices and corruption of LGA procurement
� Use the workshop as an opportunity for capacity building in LGAs and to support achieving
the project objectives
4.3 Workshop Outputs
The following sections present the main outputs from the group sessions, plenary presentations and
discussions.For sessions B-H (see the workshop programme), the participants were divided in four
groups based on type of organisation and their roles andresponsibilities in LGA procurementeither
as Procuring Entities, External Oversight Bodies, Training Providers or Suppliers
14 Workshop Report / LGA Procurement Capacity Building Strategy Formulation
Group 1: Representatives of Local Government Authorities (Mkuranga, Kasulu,
Kongwa and Lushoto)
Group 2: Representatives of Local Government Authorities (Kibaha, Kigoma, Muheza,
Kondoa)
Group 3: Representatives of Regions and Oversight Bodies (RAS of Tanga, Kigoma,
Dodoma and Coast, PPRA, CAG and IAG)
Group 4: Representatives of Other Institutions (Training Entities, Private Sector, ALAT)
The groups were introduced by the Facilitator to the principles and tools of root cause and gap
analysis (see Annex 7.3: Exhibit A) with the aim to systematically analyse LGA procurement by
identifying:
Based on their respective roles and responsibilities, the groups came with different challenges, root
causes, gaps and solutions, and in this way they complemented each other in the analysis of the
LGA procurement system.The detailed outputs of the group work are presented in Annex 7.4.
4.3.1 Challenges, Root Causes and Capacity Gaps(Sessions B, C, D and E)
The groups identified the following main challengesin the LGA procurement system:
� Record Keeping
� Accountability
� Incentive package for procurement staff
� Contract Management
� Establishment and facilities of Procurement Management Unit
� Understanding of procurement law by stakeholders
� Ethics and transparency in procurement system
� Preparation of procurement plan
� Language as a barrier
� Coverage of procurement legislation for LLGs
� Implementation of public procurement system
� Procurement Procedures
� Endemic cheating, theft and corruption in the procurement system in LGAs
Root causes related to the above challenges in the LGA procurement system were identified as:
� Low knowledge and skills
� LLGs not involved in the preparation of the legislation
� Decentralisation-by-Devolution which is yet to be fully realized
� Inadequate human and financial resources
� Weaknesses in follow-up and monitoring
� Poor compliance to procurement legislation and regulations
� Delays in decision making
Challenges Root Causes Gaps
Workshop Report / LGA Procurement Capacity Building Strategy Formulation 15
� Low use of Information and communication technology (ICT)
� Unethical conduct among procurement practitioners
� Weaknesses of the procurement system
� Attitude of selfishness and greed
� Low income of staff
� Poor living conditions
� Lack of values
� Lack of ethics and integrity values
� Inadequate use of record keepers (registry officers)
� Non-adherence to procurement staff Scheme of Service
� Poor preparation of tender documents
� Budget allocation process
Related to the identified challenges and root causes the following capacity gaps were identified:
� Limited knowledge and skills
� Procurement law not translated in Swahili
� Weaknesses in the preparation of the public procurement law / LLGs not covered
� Understaffing in PMUs
� Sensitization of allocation of budget code for PMU
� Inadequate Budget and fund allocation to PMU
� Delayed procurement process
� Bureaucracy and inefficient system, sometimes deliberately
� Unsatisfactory good governance
� Lack of ethics
� Insufficient skills and knowledge in record keeping
� Sensitization employers and policy members
� Inadequate competence of suppliers, contractors and service providers
� Non-compliance with establishment of the PMUs
� Procurement act not understood by stakeholders
� Lack of ethics and transparency in the public procurement system
� Preparation of procurement plan without involvement of stakeholders
4.3.2 Proposed Actions (Session F, G and H)
Following the identification of challenges, root causes and capacity gaps, participants continued the
analysis and identified proposed actions by using mind tools (Exhibit B) and question guide B2,
which were introduced by the Facilitator. The session aimed to link:
The initial action analysis of the groups was complemented by a plenary presentation on the
findings of annual procurement monitoring (procurement audits) by PPRA, based on the system of
CPIs as used up to FY 2011/12.
Desired Situation Gaps Possible Actions
Table 2: Compliance and Performance Indicators
CPI INDICATOR
1. Appropriate establishment and composition of tender boards
2. Appropriate establishment and composition of PMUs
3. Independence of functions
4. Appropriate preparation and implementation of procurement plan
5. Complying to compulsory approvals
6. Appropriate advertisement of bid opportunities
7. Complying with publication of awards
8. Adequate time for preparation of bids
9. The use of appropriate methods of procurements
10. The use of standard tender documents
11. Proper keeping of procurement records
12. Availability of quality assurance and control systems
13. Appropriate contract implementation
The presentation gave an overview (see Annex
procurement, with the below table indicating
2: Compliance and Performance Indicators
COMPLIANCE DATA
Appropriate establishment and composition of Existence of a tender board in accordance with the requirements of the Act and Regulations
Appropriate establishment and composition of Existence of a PMU in accordance with the requirements of the Act and Regulations
Percentage of tenders in which there was no interference between individual functions
Appropriate preparation and implementation of Prepared and properly implemented annual procurement plan
Complying to compulsory approvals Percentage of tenders/contracts which received all compulsory approvals in various processes
Appropriate advertisement of bid opportunities Percentage of open bidding proceduadvertised
Complying with publication of awards Percentage of contract awards disclosed to the public
Adequate time for preparation of bids Percentage of tenders complying with the stipulated time in the Act and regulations
se of appropriate methods of Percentage of tenders using authorized methods of procurement in accordance with their limits of application
The use of standard tender documents Percentage of tenders using standard/ approved tender documents
Proper keeping of procurement records Percentage of tenders with complete records
Availability of quality assurance and control Percentage of tenders with adequate quality assurance and control systems
tation Percentage of contracts which have been implemented as per the terms of contract
overview (see Annex 7.5) of compliance and performance of LGA
, with the below table indicating the results for FY 2012/13:
Existence of a tender board in accordance with the requirements of the Act and Regulations
ce with the requirements of the Act and Regulations
Percentage of tenders in which there was no interference between individual functions
y implemented annual
Percentage of tenders/contracts which received all compulsory approvals in various processes
Percentage of open bidding procedures publicly
Percentage of contract awards disclosed to the
Percentage of tenders complying with the stipulated
Percentage of tenders using authorized methods of procurement in accordance with their
Percentage of tenders using standard/ approved
Percentage of tenders with complete records
Percentage of tenders with adequate quality
Percentage of contracts which have been implemented as per the terms of contract
of compliance and performance of LGA
Workshop Report / LGA Procurement Capacity Building Strategy Formulation 17
The following LGA procurement areas with persistent capacity gaps were recommended to be
addressed with high priority in the CB strategy:
Table 3: Low Capacity Areas as per Compliance and Performance Indicators
CPI INDICATOR CHALLENGES / GAPS
2 Establishment and composition of PMU in LGAs
� PMU established as a committee rather than a fully-fledged and staffed unit
� Limited knowledge on application of PPA and Regulations
� Staff of PMU lack the necessary qualifications � Inadequate office space and working tools
4 Appropriate preparation and implementation of procurement plan
� Not using appropriate APP template � Incorrect tender numbering and referencing � APP hardly followed during implementation � TB meetings not properly planned � Requirements not properly aggregated � Tender processing times not properly allocated
7 Complying with publication of awards
� Failure to disclose to the public (newspapers, notice boards) the awarded contracts
� Sometimes unsuccessful bidders are not notified � Failure to notify PPRA
11 Proper keeping of procurement records
� Lack of a comprehensive list of records for all tenders managed by PMU
� Tender records had not been systematically filed, but scattered in many different files, audit trail made difficult
� Failure to maintain a register of all awarded contracts
12 Availability of quality assurance and control systems
� Inspection and acceptance committees not appointed
� No quality assurance plan for works, consultancy and non-consultancy services
� Lack of supervision of consultancy services
13 Appropriate contract implementation
� Interim and contractual certificates not issued properly
� Variation orders issued without following proper procedures
� Extension of time granted without justifiable reasons � Most of the payments to service providers not made
on time � Payments for work not undertaken or substandard
work
The presentation also included an overview of Value for Money scores for construction projects, and
identfied weaknesses and capacity gaps. The audits give a score for Value for Money in the
procurement cycle starting with planning, followed by procurement, contract administration and the
end product i.e. quality of works. The VfM audits are integrated in the annual procurement audits of
PPRA.
18 Workshop Report / LGA Procurement Capacity Building Strategy Formulation
Table 4: Low Capacity Areas as per Procurement Value for Money Audits
PHASE VFM SCORES
MAIN WEAKNESSES AND GAPS ROADS BUILDINGS
Planning 74 70 � Poor packaging of works contract � Inadequate, incomplete and ambiguous designs � Unrealistic pre-tender estimates � inaccurate computation of quantities in the bills of quantities � Inadequate or lack of assessment of site locations � Unnecessary variations to the works increasing projects costs � Unrealistic contract period
Procurement 74 70 � Inappropriate procurement planning
� Delays in implementing PE’s plans
� Ad-hoc procurements
� Use of inappropriate procurement methods
� Excessive use of direct contracting/single source procurement
� Improperly prepared tender and contract documents
Contract
Administration
61 54 � Performance securities not submitted � No leverage in cases where contractors failed to perform � Site possessions were not given: extension of time for most of
the contracts � Delayed payments of contractors and consultants caused by
erratic cash flows � Weak monitoring of contracts: lack of project progress reports,
site management meetings project completion reports � Non-enforcement of liquidated damages � Issuing variation orders without following appropriate
procedures � Issuing extension of time without justifiable reasons and without
following appropriate procedures � Incomplete and inadequately prepared payment certificates � Poor records keeping � Variations orders not sanctioned by the appropriate Tender
Boards � Advance payments without guarantee although it was stipulated
in the contracts � Non-enforcement of performance securities and insurance
covers although they were stipulated in the contracts � Site management meetings were not held � Delays in contracts execution resulting in huge cost overrun � Final inspection reports prior to issuing practical completion
reports were not done to prepare a snag list of the works to be rectified during Defect Liability Period;
� Inadequate supervision of the consultant contracts
Quality of
Works
73 72 � Lack of/or inadequate quality control system in checking and approving the designs, drawings, specifications, bills of quantities, payment certificates, pre-tender estimates , etc; and
� Weak / Inadequate supervision � Lack of quality control tools and equipment leading to failure to
test materials and completed works � Vandalism of the road furniture i.e. road signs; � Lack of honesty/integrity among the supervising engineers and
technicians � Poor quality works observed, but most of them had already
been certified and paid
Total VfM 71 66
Workshop Report / LGA Procurement Capacity Building Strategy Formulation 19
The last part of the presentation gave an overview of a new set of Procurement and Compliance
indicators, which are introduced in the FY 2012/13, and put more weight on weak performance
areas in public procurement, notably contract administration and quality assurance.
Following this presentation, the four groups prepared a final analysis and presented desired
outcomes and possible actions by using the fishbone diagram analysis and presentation tool (see
Annex 7.3: Exhibit C).
Table 5: Synthesis of Group Outputs
DIMENSION DESIRED OUTCOME POSSIBLE ACTIONS
Institutional, Equipment and Technology Incentives
- Institutionalization of LGA procurement Scheme of Service
- Allocation of vote and budget to PMU
- Adequate use of ICT in LGA procurement
� PMO-RALG to employ enough, adequate, qualified, competent and capable procurement staff
� Training of procurement staff (CPE) and retention of trained staff
� Allot sub-vote for PMU budget and provide adequate financial resources
� Provide PMUs with working tools, computers, offices etc.
� Involve PMU in budgeting budget � M&E implementation of PMU budget � Provide working facilities specifically in procurement
unit � Establish PMU registry by 2014 � Equip PMU registry with adequate facilities � Conduct performance audit quarterly in PMU � Issue circulars on PMU incentive scheme � M&E of implementation of incentive scheme circular for
PMU staff in LGAs annually � The system should follow new technology (e-
procurement)
Policies and Regulations
- Transparent and user friendly procurement policy and regulations, which can be understood by stakeholders at all levels and in Kiswahili language
- Law related to procurement for lower local governments
- Compliance with procurement law and regulations
� Translate the procurement act and regulations into Kiswahili
� Amend the legislation (Identify and remove unnecessary procedures)
� Disseminate the translated laws and regulations and distribute copies
� Training should be done free to all stakeholders � Enforcement of the (translated) law and regulations � Disciplinary actions to violators of PPA and understood
by all stakeholders � Procurement act related to LGAs and involve
stakeholders in the process (participatory) � Make all LGAs procurement regulations available � Amend Procurement Legislation and Regulations to
cover LLGs � Dissemination of amended Legislation and Regulations � Enforce amended legislations and Regulations
Supportive Oversight and Accountability Mechanisms
- Compliance and enforcement of procurement law and regulations
� Adhere to regulations related to ethics � Better Incentive schemes � Disciplinary actions to violators of the law and
regulation � Training on ethics to all stakeholders � Capacitate and enforcement of procurement laws and
regulations � Take strict disciplinary actions against those culpable of
deliberate delays
20 Workshop Report / LGA Procurement Capacity Building Strategy Formulation
DIMENSION DESIRED OUTCOME POSSIBLE ACTIONS
Human Resources/Skills mix/levels
- Enhance capability of preparation of tender documents
� Train suppliers, contractors and service providers annually
� Issue certificates of appreciation to suppliers, contractors and service providers for good performance annually
� Enforce contract rules & regulations to suppliers, contractors and service providers timely
� Distribute PPA to contractors, suppliers and service providers regularly
Education, Training, Coaching
- Well trained (procurement) personnel in LGAs
� Train at least two staff from PMU and registry officers in procurement record keeping annually
� Train key players in procurement: o Accounting Officers o CTB members o PMU staff o TEC Personnel o HoDs o Other stakeholders
Leadership and Governance
- Capacity building on ethics in LGAs
� Involve all stakeholders in the preparation of the procurement plan
� Training on preparation of procurement plan � Define and address corruption, fraud, conflict of interest
and unethical behaviour � Procurement process shortened � Good procurement M& E framework in place and
functioning � Sensitize, introduce and use of whistle blowers � Punish the guilty mercilessly including the possibility of
loss of office � Capacity building of District Integrity Committees � Sensitize suppliers, CSOs to be socially accountable
and to refrain from unethical acts, collusion, etc � Reward good performers handsomely � Training on good governance � Sensitization on code of conduct
4.3.3 Thematic Analysis of Strategic LGA Procurement Areas (Sessions I, J and K)
Presentations were made in three strategic LGA procurement capacity areas, which were identified
and prioritised following the project Base Line Study and desk review of procurement M&E:
� Quality Assurance of LGA Procurement: Audits
� Quality Assurance of LGA Procurement: (Procurement) Management Information Systems
� Lower Local Government Procurement Capacity and LGA Procurement Training Strategy
The papers were prepared and presented by panels composed of staff from the following
institutions:
� PPRA
� PMO-RALG
� NAO (CAG)
� Hombolo LGTI
� BTC
Workshop Report / LGA Procurement Capacity Building Strategy Formulation 21
Following the plenary presentation, the participants were divided in three functional groups and
tasked to review the presentation by using Question Guide J (see Annex 7.3). The following
sections present the summary of the PPt presentations and outcome of group work.
4.3.4 Quality Assurance of LG Procurement – Audits
The paper was presented by Mr. Titus Saideya, Assistant Auditor General of the National Audit
Office (NAO). The aim of the presentation was to:
� Have an overview of the Procurement Audit capacity area
� Have a common understanding of the root causes of low capacity in this area
� Discuss the regulations and standards applicable in the capacity area
� Propose competence and skills set required to address the capacity gap
The presentation showed that there are different systems in use for external and internal quality
control of LGA procurement. Weaknesses and gaps in the various audit regimes need to be
addressed through adequate sequencing and adherence to time frames of the audits at the risk of
not achieving value for money in public procurement.
PPRA Procurement Audits:
� System: Procurement, Contract and Performance audits based on CPIs and VfM indicators
� Weights of individual indicators and scoring of PEs
� PEs not understanding the attributes of each indicator: not adequately disseminated, trained
wrong people, language, resistance
� Availability of records/PE cooperation: lack of harmonization of procedures&legal
requirements, lack of integrity, fear of the unknown
� Report formats issued, but yet quality of reports questionable: negligence, dishonesty
� Funding for audits vs. required scope and frequency
� Quality of consultancy used: necessitates counterpartstaff, inadequate skills and
competences in the market
� Procurement implementation reports not submitted as required: cumbersome, online
reporting tool?, change of staff already trained
CAG Audits:
� System: Financial audit including procurement audit; Compliance audit; Internal control; VFM
audit (not annual but based on standards – objective and impact); Special audit based on
TOR. Standards used: ISSAI;ISA IPSAS; IFRS & IAS
� Auditors not understanding the PP law, regulations, procedure: background knowledge and
skills, inadequate dissemination
� Not covering LLG (scope): NAO has limited number of auditors, currently 800, other
resources are limited
� Ambiguity in legal framework and practice: CAG vs PMO-RALG
� Appointing external auditor for LLG: Local Government Financial Memorandum (LGFM) not
reviewed and harmonized with other recent laws; increased demand
PMO-RALG Assessments:
� System: Assessment has procurement as one of its area of coverage; annually countrywide.
CDG and CBG, LG contribution to the Grant
22 Workshop Report / LGA Procurement Capacity Building Strategy Formulation
� All PMO-RALG divisions are involved: assessing the country in two months using its own
staff: 2-3 days per LGA not adequate; shortage of staff and other resources
� Expertise of staff involved in the areas of assessment inadequate: not adequately
knowledgeable and skilled in procurement issues
� Limited to HLG as no information can be obtained at LLG level: capacity to prepare, avail
information
� Lack of clarity in legal frameworks with respect to LLG: multiplicity of legal frameworks
RAS Monitoring:
� System: Assistant Administrative Secretary (AAS) responsible for Local Government and IA
responsible for LG assess the LGAs; Council Internal Auditor – the only QA for LLG; VEO
relationship with LLG Council Chair and Councillor (Chair of Ward Development Committee);
VEO and WEO employed by HLG
� Low capacity to handle tasks: knowledge and skills
� Different perceptions on issues of LGA autonomy, extra-jurisdiction with respect to roles,
responsibilities and accountability: Legal framework, attitude and mind-set
HLG Systems:
� System: Based on LG related laws and PMO-RALG guidelines; Council Committees,
Internal Audit procedures
� Multiple procedures: multiple sources, channels of funding, multiple accounts
� Lack of Human Resource at LLGA: poor working conditions, hardships, low pay
� Perceived lack of autonomy: capacity, skills, competences, lack of understanding
� Capacity of internal audit of HLGA on procurement issues relating to LLGA: knowledge,
skills, independence
� Capacity of LLGA to use tools developed for procurement at their level: level of education,
user friendliness of the tools
The desired outcomesin this area - while recognising the importance to identify ‘Enablers’ and
‘Barriers’ and taking into account the various dimensions of accountability –were proposed as
follows:
1) To improve procurement performance and compliance:
o Review quality assurance processes and procedures &methodology for LGA
procurement (PPRA & PMO-RALG)
o Develop new Quality Assurance tools (PPRA,NAO & PMO-RALG)
o Disseminate Quality Assurance tools (HLGTI &LGA)
o Sensitize LG procurement Stakeholders on the importance of Quality Assurance (PPRA
& PMO-RALG)
o Explore the potential of single audit concept (PPRA,NAO & PPRA)
2) To improve transparency and accountability:
o Engaged Civil society and media in advocacy and monitoring of LG procurement (PPRA)
o Develop tools for record keeping and reporting at LLG (PPRA,PMO-RALG)
o Disseminate the tools for record keeping and reporting at LLG
3) Improve effectiveness of procurement quality assurance:
o Develop tools for quality assurance practitioners (PPRA,NAO,HLGTI &PMO-RALG)
Workshop Report / LGA Procurement Capacity Building Strategy Formulation 23
o Trained quality assurance practitioners on quality assurance tool (HLGTI)
o Monitoring and evaluation of quality assurance practitioners (PMO-RALG)
o Stakeholders’ opinion/ survey on quality assurance tools (PPRA & PMO-RALG)
o Develop appropriate structures for procurement governance at LLG level (PPRA &
PMO-RALG)
4) Harmonized legal and institutional frameworks:
o Review legal framework to identify areas, gaps and overlap (PPRA,NAO &PMO-RALG)
o Review institutional setup in LG procurement (PPRA & PMO-RALG)
o Conduct stakeholders workshop (PMO-RALG)
The participants were in agreement with the analysis, desired outcomes and proposed actions with
additional proposals to be spearheaded by PPRA with contributions by PMO-RALG, NAO, IA, RS,
PCCB and HLGTI including:
� Address the situation with many oversight bodies on LGA procurement quality assurance
with different performance indicators
� Important to have common standards in procurement audits
� Need for an oversight body for supervising the performance indicators
� There should be an oversight body to monitor the performance indicators, regulations to
ensure audit quality
4.3.5 Quality Assurance of LG Procurement – Procurement MIS
The paper was presented by Mr. Bernard Ntelya, Manager Systems Support & Administration at
PPRA. The presentation 1) analysed the identified gaps in the tools for monitoring and quality
assurance of LGA procurement in particular PlanRep, Epicor and PMIS and 2) made proposals on
way forward on how best to interface these tools in order to strengthen LGA procurement
monitoring.
� PlanRep: The local government Planning and Reporting Database (e.g. PlanRep2 and
PlanRep3) is a database designed to assist local authorities in planning, budgeting,
projecting revenue from all sources, and tracking funds received, physical implementation
and expenditure
� EPICOR: is a computerized Financial Management Information System (FMIS) that has
been implemented in the country since 1999/2000 in various versions and stages. The
current version Epicor 9.05 is operating in all councils under centralized web-based
infrastructure, where the main server is installed at PMORALG and all councils will access
the system centrally
� PPRA-MIS: a web based application, menu driven developed for the computerization of
Checking and Monitoring of procurement in the public sector (procuring entities) by PPRA.
PMIS is used in collecting, storing and sharing of procurement information between the
Authority and all stakeholders of public procurement. The system rolling out exercise started
and is progressing to all Government Procuring Entities
Several issues were identified in the (Procurement) MIS of Local Governments including:
24 Workshop Report / LGA Procurement Capacity Building Strategy Formulation
� No systematic linkages between the systems: PlanRep, Epicor, PMIS
� Knowledge gap: inadequate IT skills; some users such as HoD, PMU, Accountants, IA do not
have required training in Epicor, PlanRep, PMIS
� DIAs rely on printed reports from Finance.
� Infrastructure: inadequate equipment, Internet Link to some LGAs
� Ownership of source codes and licencing barriers
� Legislation integration (PFA and PPA)
� Connectivity (bandwidth and speed)
The root causes for low capacity in the Procurement MIS were identified as follows:
� Different developers of systems
� Different purpose of the systems
� Different set up and customization
� Different governing laws (PFA 2001, PPA 2004) which are not integrated
� PMIS is based on procurement process while Epicor is Financial based.
� Procurement processes are not included in Financial Management System.
� Inadequate equipment in some of the LGA
� No clear link between LGA and LLGA in sharing of procurement information
The paper proposed the desired outcome as:
� Harmonized MIS and reports.
� Improved skills on use of systems
� Improved working tools to users of system (computers and internet link)
Strategic interventions in this field involving PMO-RALG, PPRA, MoF, E-government agency and
software developers were identified, including:
� Main actors meeting to discuss harmonization and integration of systems
� Stakeholder meeting to discuss improvement of flow of information from LLGA
� Proper procurement planning that shows clearly procurements for LGAand LLGA
� Remove duplication of effort in the usage of systems (Epicor, PlanRep and PMIS) by
interfacing
� Implement procurement system integration (Epicor, Plan Rep, PMIS)
� Training of DIA and PMU on usage of systems
� Equipping users with adequate working tools (computers and internet link
� Enforcement mechanisms for compliance
The group dealing with this area largely agreed with the analysis and added the following proposals:
� Root causes: include inadequate ICT skills and knowledge, user-friendly systems, different
governing laws (PFA 2001, PPA 2004), which are not integrated, and insufficient information
and record keeping
� Desired outcome: include improved productivity of information systems (MIS)
� Key interventions: implement Procurement Systems Integration (PlanRep, Epicor, PMIS)
Workshop Report / LGA Procurement Capacity Building Strategy Formulation 25
4.3.6 Lower Local Government Procurement Capacity and Training Strategy
The paper was presented by Mr. Johnson John, Principal Legal Officer in PMO-RALG and focused
on challenges, root causes and proposed actions to address capacity gaps leading to inadequate
procurement management practices in Lower Local Governments.
Institutional and Regulatory Issues:
� Low compliance to PPA and poor use of basic procurement principles at LLG level
� No clear division of roles & responsibilities between various actors in LLG procurement
� Many different systems used by LLGs in procurement process (selection, approvals,
evaluation, awards, accountability, etc)
� Absence of standard procurement implementation tools (contracts, tender documents)
� Multiple procurement procedures and processes depending on sector, type of project, and
financier
� LGA Financial Memorandum: not fully harmonized with PPA; LLGs adequately covered
Governance Issues:
� Cases of low transparency, conflicts, inadequate accountability related to procurement in
LLGs
� Roles and responsibilities in governance in LLG procurement not well-defined i.e. oversight;
accountability, delegation levels, quality assurance in line with recommended practices
� Civil Society Organisations in regions and districts: low public procurement knowledge, often
lack of interest
Procurement Management Issues:
� Scope is wide, there are around 15,000 LLGA (villages; mitaa)
� Inadequate human resource with required skills to implement LLG procurement compliant to
PPA
� Many VEOs have low academic qualifications (> 60% Std 7)
� Recruitment new VEOs by PO-PSM with qualifications: Form IV + basic certificate in LG
administration
� Members of Village Councils elected every 5 years with mixed education background
� Low awareness in LLGs on thresholds, procurement methods and procurement principles
(publicity, competition, evaluation, awards, implementation, etc)
� Procurement to service units and committees: adequately delegated and formalised?
� Procurement of sector Grants and service units not well captured in procurement reports
� Procurement competences of actors not well described: VEO, Village Council, committees
� VEO is multi-tasked: able to do all work efficiently?
� Not all project committees, Community Management Committees adequately prepared and
often low understanding of drawing, specifications and M&E tools
� HLG level: work in progress with increased level of qualifications of (new) LGA procurement
staff; many procurement graduates on the market; on-going professionalization (required
registration with PSPTB, Continuous Professional Development, etc)
� LGAs cover many sectors (agriculture, education, health, works, water, etc) and have
several different procurement chains which require specific skills (unit vis-à-vis committee)
� Weak LGA procurement areas include Preparation of Annual Procurement Plan, Contract
Management, Procurement record keeping, Publication of awards, Low use of PMIS, and
26 Workshop Report / LGA Procurement Capacity Building Strategy Formulation
aggregation of common goods and supplies (reluctance and low understanding to use of
call-off orders for Common Use Items & Services by using Framework Contracts
Market issues:
� Local fundis: low understanding of drawings, specifications, material requirements
� Often long distances to markets and suppliers
� Low understanding of providers of procurement requirements
� Inadequate capacity / ability to analyse the market
Education, training and skills:
� Enhancing procurement competences and skills has a low priority in the LGAs
� Training needs are mainly derived from OPRAS and Departments, but procurement is not
often captured, which is partly related to the current situation in which PMUs have no sub-
vote (yet) and therefore a challenge to get procurement training on the agenda, let alone
funding
� No structured approach to training for VEOs, Village Councils and Service Units in
procurement
� Inadequate funding of LGA Capacity Building Plans
� Staff put higher value to individual training needs and less on capacity development
objectives of LGAs as organisation
� RAS/LGAMSS is taking up new role in follow-up, monitoring and advising LGAs, but have
inadequate capacity in procurement
� HLGTI provides pre/in-service certificate and diploma courses in LG Administration, Finance
& Accounting for VEOs & WEOs, which include procurement as subject, but 60% of VEOS
having STD VII are not eligible for this training
� PPRA provides on request procurement tailor-made training, which are funded by the
Procuring Entity i.e. LGAs, but coverage is still low and mainly used as response to
procurement audit results
The paper proposes the following strategic intervention framework:
Table 6: Strategic Intervention Framework LLG Capacity Building
Strategic Objective Strategic Interventions
Strengthened
procurement capacity
in LLGs
� Procurement Guidelines for LLGs developed & disseminated � Competences and skills of LLG procurement actors enhanced � Professionalization of the LGA procurement function strengthened � Procurement management tools and systems introduced and applied in LLGs � LGA procurement training strategy developed and operational
Standardized and
harmonized LLG
procurement
guidelines developed
and introduced
� Set the regulatory & institutional framework for procurement in LLGs (roles &responsibilities in procurement process i.e. preparation, invitation, receiving, evaluation, approvals, award, contract management)
� Support achieving increased compliance to PPA and value for money � Set framework for addressing legal issues and conflicts by defining roles &
responsibilities in oversight, accountability, delegation and Quality Assurance � Development of a customized LLG procurement operational manual � Importance of simple language (and use of Swahili) commensurate with the
target group � Continued collaboration required between PPRA and PMO-RALG in all
procurement matters
Workshop Report / LGA Procurement Capacity Building Strategy Formulation 27
Strategic Objective Strategic Interventions
Competence and
skills of actors with
main responsibilities
in LLG procurement
increased
� Describe procurement competences and skills of VEOs, members VCs, Service Unit Committees and Project Committees
� Update Scheme of Service of VEOs and ‘job descriptions’ of members of committees
� Reflect well the differences in training needs of Village, Mtaa and District Councils
� Ensure procurement skills are adequately covered in the basic LG Administration certificate courses (in-service; new LLG staff)
� Existing VEOs: see training strategy
Capacitated and
professional
procurement cadre in
LGAs
� Clarify PMU structure: define PMU establishment (type of LGA; volume of procurement); adequate remuneration levels (to retain staff); use of PMU sub-vote (502E); responsibilities PMU for procurement at LLG and service unit level
� Define competences of procurement professionals and technicians (new areas: e-procurement, ICT, end-user satisfaction, research, legal; update Scheme of Service
� Clarify the position of procurement/supplies technicians in other LGA departments (stores officers, hospitals, etc)
� Update LG Financial Memorandum in areas needed
Adequate
procurement systems
and tools in place
and used in LLGs
� Develop and introduce a simplified, standard LLG procurement operational manual as per guideline
� Develop tools and systems for procurement (bid documents incl. contracts, evaluation guidelines, receiving/issuing of materials, etc), contract management, record keeping, quality assurance and reporting (also linked to HLG MIS: APP, EPICOR, PlanRep)
� Consider the same for Service Units procurement � Facilitate availability of adequate equipment and working tools in LLGs
Adequate
procurement systems
and tools in place
and used in LGAs
� Development and introduction of LGA procurement manual (guide) � Development and introduction of manual for own-source revenue collection
services � Improve knowledge and skills in preparation, updating and implementing of
Annual Procurement Plan � Improve systems, classification, tools for procurement & contracts management
and records keeping � Follow-up support to use of PMIS in LGAs including connectivity of PMU to LGA
MIS & ICT � Improve quality, completeness and credibility of LGA procurement reports
LGA Procurement
Training Strategy
� Systematically and effectively identify and address LGA procurement training needs and monitor and evaluate impact on performance
� LGAs take their responsibility to ensure adequate procurement skills officials (LLG; HLG) and Council members as identified and/or recommended in M&E and audit reports
� Formulation of LGA specific procurement skills development plans based on Training Needs Assessments
� Establish and capacitate District Training Teams for ToT/ToC at all levels � District Training Teams to train ward ToT (WEO, CDO) for training/coaching of
VEOs & Village Councils members to 1) change mind-sets & attitudes, and 2) increasing knowledge and practical procurement skills
� Initial training to focus on weak procurement capacity areas as identified in procurement audits, DIA and CAG reports (Record keeping, Contract administration, Quality assurance, Preparation and implementation of procurement plans, Governance and reducing procurement risks, Leadership skills
� Tailor-made short courses for VEOs with Std VII in procurement and other related areas (accounts, management, records keeping) based on demand and needs
� Capacitate RAS/LGAMSS to coach, advice, follow-up LGAs in procurement (assuming there will be a procurement expert in LGAMSS)
28 Workshop Report / LGA Procurement Capacity Building Strategy Formulation
Strategic Objective Strategic Interventions
� Capacitate PPRA Zonal Offices to provide training and advice to procurement staff from regions and LGAs
� Review, updating and dissemination procurement manuals � Review and/or development of quality LGA procurement training m Introduce
adequate M&E of procurement training to monitor use of acquired skills and evaluate impact
� Ensure that Training Providers (QTPs; Individual Trainers) are fully conversant with training methodology & materials
� Make procurement guides (operational manuals) and training manuals available through ICT and e-learning
� Design an adequate coaching and mentoring concept that can work within LGAs, between LGAs, and between RAS/LGAMSS vis-à-vis LGAs
� Introduce action research to PMUs in identified weak procurement areas as a learning model for organisational development
The group dealing with this area largely agreed with the analysis and made the following additional
proposals:
� Capacity Gap: include inadequate procurement information at LLG level
� Root causes: include Insufficient funds and low prioritization for procurement infrastructure
� Desired outcome: improved procurement management and practices in LLGs
� Key interventions: include employment of qualified staff and effective dissemination of
information
� Driver: Accounting Officer with contributors PMO-RALG, PPRA, Trainers, RS, CSOs, Donors
and ALAT
� Other comments:
o Reflect the current institutional setting of the RAS Office which has three Assistant
Administrative Secretaries (Local Government; Planning; and Education), whereby the
AAS Local Government is assisted by the Auditor (LG) and Finance Management Officer
(LG)
o Incentives following procurement audits: include rewarding the good performers (LGAs)
and mediocre performers could be ‘shamed’
o Enhance contractor monitoring and recognise good performing contractors annually
4.3.7 Logical Framework (sessions L, M and N)
The Logical Framework of the project (see Annex 7.5) was presented by Mr. Frits Raijmakers,
Project Co-Coordinator. The presentation included overall objective (vision), specific objective
(mission), results, key interventions and monitoring indicators.In the plenary discussions on the
Logical Framework the following issues were raised:
� Vision: indicate better the strategies of the project to have corruption-free procurement;
reference was made to the four OECD pillars and it was suggested to include integrity
indicators better in the monitoring framework
� Indicators: ICT use, publicity and advertising of LGA tenders and awards to be included
� Assumptions and risks: not included in the presentation, but available and part of the Log
Frame; they tally with the outcome of the workshop and will provided in CB strategy
Workshop Report / LGA Procurement Capacity Building Strategy Formulation 29
� Key activities:
o IAG is preparing a procurement audit manual for use by DIAs and undertakes training of
DIAs i.e. assumption for the project, but part of CB strategy
o Publicity and advertising requirements to be duly covered in the operational procurement
manuals and tools
o PPRA undertakes various other initiatives for information dissemination funder by other
sources i.e. assumption for the project, but part of CB strategy
o Need to explain better the importance and reasons for gender sensitive action research
o Capacitation of PMUs: clearly define what this means, who has responsibility, funding
sources and relate to critical procurement areas (i.e. pre-award, award, post award)
o Harmonization of audits: this does not remove the mandate and specific roles of PPRA,
CAG and DIA (IAG), but reliability and resource efficiency of audits need to be taken into
account, as well as purpose, timing and sequence
o DIA report on procurement: does PPRA need a copy (currently not foreseen)of regular
and/or specific IA assignments?
o Action research is a promising approach, but this will need more clarification on
methodology, duration and process
o The issue of language (Swahili) to be indicated better
o This year’s budget of RAS is already passed, so resources for procurement oversight,
audits and coaching to be part of budget FY 2014/15
o Review the place of ‘Improved Outreach Capacity of PPRA’ in Result 2 or in Result 4
o The RAS is included, but under AAS/LGAMSS
o Has PMU of RAS a role in the project? PPRA has preference for a procurement expert in
the LGAMSS and collaboration between the PPRA Zonal Offices and LGAMSS
o Important to include the role of the Legal Officer (and capacity)
In the synthesizing exercise to review the final outcome of group work in relation to the intervention
logic it was observed that many challenges, root causes, capacity gaps and proposed actions are
covered by the project intervention. However, some interventions need to be integrated in the final
LGA Procurement CB strategy. The strategic interventions and performance indicators of the project
Logical Framework are summarised in Table 7.
30 Workshop Report / LGA Procurement Capacity Building Strategy Formulation
Table 7: Strategic Interventions and Performance Indicators as per EPC-LGAP Logical Framework
STRATEGY DESCRIPTION MEASURED BY:
Overall Objective (Vision)
Ensuring systems and structures of governance uphold the rule of law and are democratic, effective, accountable, predictable, transparent, inclusive and corruption free at all levels
Specific Objective (Mission)
Procurement capacity at local government level sustainably enhanced
Increased Compliance and Value for Money in LGA Procurement
LGA procurement performance strengthened
� Review, update and introduction of LLG procurement guideline
� Competences and skills-levels of LGA procurement professionals and practitioners developed and applied in training curricula
� Development of LGA procurement skills-development plans � Capacitation of PMUs in critical procurement areas � Development and refinement of LGA procurement manuals
and guides � Dissemination updated procurement guides and manuals to
LGAs - RAS/LGAMS � Establishment of procurement Training Teams (ToT/ToC) for
training and coaching at HLG and LLG levels � Support to LGA procurement training in identified areas � Development of higher skills level professional procurement
courses
� Competences and skills-levels of LGA procurement professionals and practitioners developed and applied in training curricula
� LGA Procurement capacity defined, PMU established and capacitated
� HLGA and LLGA procurement guides & Manuals prepared, updated, disseminated and used in trainings
� Procurement skills development plans defined � Procurement Training Teams established, ToT/ToC trained and
functional in selected LGAs � Procurement record keeping at HLG and LLG levels improved
in selected LGAs � Procurement planning, implementation and reporting improved
in selected LGAs � QTP list for procurement training updated and QTPs
conversant with training materials
Systems for monitoring and quality assurance LGA procurement strengthened
� Harmonizing systems and indicators for monitoring LGA procurement compliance & performance
� Strengthening capacity of Regional Secretariat to provide oversight, monitoring, coaching and follow-up support to LGAs on procurement
� Support for customization and interfacing of Procurement MIS � Support for training of District Internal Auditors in procurement
audits and quality assurance
� Concurrence DIA reports on LGA procurement and contract management/implementation with CAG and PPRA audits increased
� Use of customized and interfaced Procurement MIS in selected LGAs increased
� Procurement monitoring of PPRA, CAG and PMO-RALG increasingly based on similar agreed indicators
� Concurrence PMO-RALG procurement monitoring reports with PPRA procurement audits increased
� Adequate follow-up, coaching and advice by RAS/LGAMS to procurement monitoring provide in selected LGAs
� Adequate action to weak areas by selected LGAs as agreed in procurement audit follow-up
Workshop Report / LGA Procurement Capacity Building Strategy Formulation 31
STRATEGY DESCRIPTION MEASURED BY:
Community members better informed and able to monitor Local Government procurement performance
� Providing guidance and materials to CSOs to increasing skills in tracking, analysing and reporting on LGA procurement
� Providing guidance and materials to media (radio, TV, local newspapers) to increasing skills in tracking, analysing and reporting on LGA procurement
� PPRA engages with Local Authorities Accounts Committee to increase skills in LGA procurement issues, compliance and follow-up
� Community awareness on LGA procurement issues in selected LGAs increased
� Ability of CSOs to monitor LGA procurement in selected districts and regions increased
� Media coverage of LGA procurement issues in selected regions and LGAs increased
� Skills of LAAC and PPRA on LGA procurement issues, compliance and follow-up increased
Capacity to provide long-term support to improved LGA procurement performance strengthened
� Formulation and monitoring of LGA Procurement Capacity Building Strategy
� Strengthening PPRA outreach capacity to LGAs (zonal offices)
� Increasing appropriateness and coverage of LGA procurement audits by PPRA, DIA and CAG
� Provision of Technical Assistance � Strengthening quality assurance and coordination of LGA
procurement training � Engaging all stakeholders in dialogue on how to improve LGA
procurement performance
� Outreach capacity of PPRA and RAS/LGAMS to LGAs increased in procurement matters
� Coverage and appropriateness of LGA procurement audits increased in selected LGAs
� Capacity of DIA and CAG to assure quality of procurement audits increased
� Policy dialogue on LGA procurement strengthened � All stakeholders increasingly engaged in dialogue on how to
improve LGA procurement performance � Quality assurance and coordination of LGA procurement
training improved
Action research on LGA procurement practices, incentives and organizational structures conducted
� Conducting action research (gender sensitive) on LGA procurement practices, incentives and organizational structures
� Inform program design for follow-up, dialogue, recommendations on policy reform
� Assessing methodology, results and impact � Establish and maintain LGA procurement capacity database
� Action research findings and recommendations reflected in project design and reviews
� Policy recommendations based on (gender sensitive) action research prepared, targeted and communicated
� LGA procurement capacity data base established and maintained
32 Workshop Report / LGA Procurement Capacity Building Strategy Formulation
4.4 Emerging Issues
During the workshop several emerging issues were raised in relation to the public procurement
system in Tanzania and its application in the Local Governments. Several of the issues are
integrated in the project Logical Framework whereas others will need to be included in proposed
LGA procurement capacity building strategy.
4.4.1 Legislative and Regulatory Framework
a) There is need to finalise the regulations of PPA 2011 and required updates of
procurement guides, tender documents, templates and dissemination to stakeholders;
b) There is need to review and harmonize the LG Financial Memorandum with the PPA
2004 and as amended in2011;
c) There is need to develop, approve and disseminate the procurement guideline for
Lower Local Governments;
d) Procurement operational manuals for LGAs and LLGs need to be developed, approved
and disseminated; and
e) Need to prepare an operational manual for procurement of LGArevenue collection
services.
4.4.2 Institutional Framework and Management Capacity
a) To strengthen capacity, systems and tools to prepare and implement the LGA Annual
Procurement Plan (APP) with involvement of all LGA departments and levels;
b) The APP needs to be interfaced with IFMIS and the national Procurement Management
Information System (PMIS)for credible procurement reporting and increased productivity
of the systems;
c) Need for systematic completion reports for certification of budget execution,
reconciliation of deliveries, controls and democratic oversight (Councils; Assemblies);
d) MoF to ensure timely and reliable fund releases to LGAs, which are published through
press and websites;
e) LGAs to provide timely and accurate procurement information to the PPRA (tender/RfP
invitations, awards) for dissemination and information purposes and maintaining
adequate procurement statistics;
f) Importance to finalise the LGA Procurement CB strategy to build procurement capacity
in the public and private sector; and
g) Need to strengthen internal quality assurance of LGA procurement in particular Internal
Audits, contract administration and supervision and harmonizing to the extent possible
external and internal audit systems.
4.4.3 Procurement Operations and Market Practices
a) Further professionalization of the LGA procurement function by duly recognising the
PMUs in the LGA organisation (vote, budget, training), describing procurement
competences and skills, updating Scheme of Service of PMUs and job descriptions of
LGA staff with procurement tasks, and adequate procurement staffing commensurate
with volume spent and complexity of LGA as organisation (sectors, levels);
Workshop Report / LGA Procurement Capacity Building Strategy Formulation 33
b) Need of systematic reach-out to private sector operators and communities by targeted
information dissemination and training (contracts, use of tender documents, standards),
contractor monitoring, recognition of good performers, etcetera; and
c) LLGs are not recognised as Procuring Entities and there is need for adequate
provisions for delegation of authority to Lower Local Governments and Wards covering
management, oversight, evaluations, approvals and administrative/financial
accountability aspects.
4.4.4 Integrity and Transparency of the Procurement System
a) Need of simplified versions of procurement guides for wider distribution to Councils and
stakeholders;
b) Need of LGAs to provide required procurement information to PPRA for dissemination
to wider public through ICT and other media;
c) Need for more information at LLG and community level on LGA procurement;
d) Continued efforts to make the procurement audit and follow-up system more effectiveby
better coordination of external oversight bodies at all levels (CAG, IAG, RAS, PPRA);
e) Integrate integrity and requirements of ethical behaviour in LGA procurement in all
dissemination and training programmes;
f) Strengthening the scope and effectiveness of internal audits in LGAs; and
g) Enforcement of action to follow-up of procurement audits including clear regime of
sanctions and recovery of losses.
4.5 Project Launch
During the workshop the project was officially launched by the Honourable Minister Responsible for
Local Government, Ms Hawa Ghasia and the Ambassador of the Kingdom of Belgium, Mr.
Koenraad Adam.
The Ambassador in his speech emphasized:
� The partnership between Belgium with the Public Procurement Regulatory Authority with
the Prime Minister’s Office Regional administration and Local Government and with
Hombolo Local Government Training Institute to upgrade the capacity in a selected number
of LGAs to adhere to the strictest possible procurement proceduresin order to making a
difference on the ground and to address systemic issues like procurement capacity at local
level
� The importance to do better at local level with the ultimate objective to improve the service
deliveryto the population at large, especially in the countryside, which has not yet met the
standards of governmentas demonstrated by statistics that show that the high growth
figures have not yet impacted sufficiently in bringing down poverty
� Deficient performance, which can be tracked down to an inadequate implementation or
monitoring of procurement procedures; this is the consequence of lack of appropriate skills
and capabilities to tackle more complex procurement procedures, and, procurement is often
a source of widespread corruption
� Procurement as a particular vulnerable area for corruption and congratulatedGovernment
for clear language as reported by the press that more should indeed be done to uphold and
strengthen the internal control and auditing of Local Administrations, especially in
34 Workshop Report / LGA Procurement Capacity Building Strategy Formulation
procurement, in a collective effort to make sure every single Tanzanian shilling spent by
local authorities is accounted for
� The importance that civil servants and local politicians should in the first place demonstrate
full accountability to their own constituencies, never mind foreign donor, with procurement
compliance, value for money, improving transparency, involvement of the citizens and
accountability to taxpayers being key guiding principles in this endeavour
� Belgium’s commitment to make the project a success for the simple reason that its ultimate
purpose, achieving better and more efficient service delivery at local level through
increased accountability, is too important to fail
� He thanked the project team and the implementing agencies and encouraged them to
coordinate effectively and to adopt an approach that allows measurable results, on which
can be built later on
The Honourable Minister in her speech:
� Referred to the increasing budget of LGAs which is spent at all levels in the procurement
process and the need to having adequate procurement systems in place with reference to
Local Government Finance Act and Public Procurement Act
� Thanked to Kingdom of Belgium for the support to the EPC-LGAP, which is implemented
through PPRA in collaboration with PMO-RALG and Hombolo LGTI and the importance to
build capacity to implement, monitor and supervise LGA procurement to increase
compliance and Value for Money
� Reminded the participants about the challenges and gaps in LGA procurement that have
been established through procurement monitoring, organisation assessment and Base Line
Study that will be addressed through the project and the strategy to build procurement
capacity in LGAs
� Expressed her expectation that through the project and strategy in particular improvement
will be realised in the preparation and implementation of Annual Procurement Plans, correct
application and use of tender guidelines and templates, transparency in awards, efficient and
correct tender evaluations, effective contract implementation and independent internal audit
in terms of reports and advice
� That she would in future not have to attend many meetings again to speak about the need to
increase compliance and performance in procurement in the Local Governments
� Through this workshop the project to enhance procurement capacity in the Local
Government Authorities was officially opened and launched
Workshop Report / LGA Procurement Capacity Building Strategy Formulation 35
5 EVALUATION
At the end of the workshop the participants were required to write down three to five important key
messages or lessons learned from the workshop. Each key lessons or message was required to be
rated on a scale of poorly delivered (1-4), just adequately (4-5), very good (6-7) and excellently
delivered (8-10). The responses were aggregated and averages were taken on the major lessons
learned. The key messages or lessons learned (in an order of participants’ rating) include:
1. Value for Money Audit Results in LGAs.
2. How to undertake procurement with adherence to indicators.
3. How to systematically collect qualitative data from workshop participants.
4. Local Government Authorities’ challenges.
5. The value of linking a procurement planning into the budgeting process.
6. Realizing the size of the government budget that goes into the procurement function.
7. Use of gap analysis technique in procurement planning process.
8. How low the procurement performance level is in the LGAs.
9. How to undertake procurement with adherence to indicators.
10. The state of the present procurement performance in the LGAs.
11. How to do procurement with “value-for-money” in mind.
12. A better understanding of the OECD procurement pillars.
13. Procurement Information Management Systems (PMIS, EPICOR and PLANREP).
The participants identified the following weaknesses:
Technical:
1. The three (procurement) information systems were rather confusing and they need to be
harmonized.
2. Regulations governing the PMIS, EPICOR and PLANREP are unknown and they need to be
clarified.
Organisational:
1. The time allocated for the subject matter intended to be covered was inadequate (as
evidenced by some group work been done outside planned timetable, and even during the
night.
2. The Local Government Authorities did not get adequate time and opportunity to give their
individual views in the project construction process.
3. The public address system was not functioning well as there wasecho sounding.
4. Improvement in the pre-workshop arrangements is required on matters of invitation and
logistical information.
5. There were interruptions in the workshop process which made it difficult to follow the
provided timetable.
6. Use of two languages (instead of one) was sometimes confusing.
7. Poor financing of the participants subsistence allowance.
36 Workshop Report / LGA Procurement Capacity Building Strategy Formulation
6 CONCLUSIONS AND WAY FORWARD
At the end of the workshop the participants were required to do a buzz discussion on the way
forward following the workshop. The identified activities are listed in an order of priority according to
the workshop participants’ resolutions.
1. Create specific capacity building interventions to improve the LGA procurement capacity.
2. Retooling and improving the working environment of the procurement staff.
3. More training in procurement skills is required.
4. Participative procurement planning workshops need to be done more often.
5. Translate the relevant procurement law and regulations into Swahili.
6. Improve procurement record keeping.
7. Train in and improve procurement contract management skills.
8. Close the existing gap between the HLGAs and the LLGAs and embark on procurement
decentralization to lower level of Local Government.
9. Workshops of this nature should also include service providers.
10. Build capacity in Management Information Systems.
11. There should be a procurement monitoring and assurance authority.
12. LGA Procurement Management Units should be promoted to departments under the LGAs.
13. The project should be involving people more than those attending the workshop.
It wasconcluded that the workshop has largely fulfilled its objectives. Due to time constraints not all
groups managed to completely finalise their analysis and presentations by using all tools and
formats. However, the generated outputs are of sufficient quality and can be put together and
proceed as follows:
� Finalise the workshop report by the end of June (PIU)
� Distribution of the report and workshop materials to participants and stakeholders (July by
PIU)
� Proceed with preparation of the draft LGA Procurement CB Strategy (by PIU) including:
o Updating Log Frame with workshop contributions
o Indicating time frame of the interventions: Short Term, Medium Term
o Finalise drivers and supportive actor
o Update the M&E Framework
o Prepare costing & funding
� Validation of the draft Strategywith stakeholder (PMO-RALG and PPRA); and
� Approval of the final Strategy
Workshop Report / LGA Procurement Capacity Building Strategy Formulation 37
ANNEXES
Annex 1: Workshop Programme
WORKSHOP PROGRAMME
LG Procurement Capacity Building Strategy Formulation WorkshopSt Gaspar
DAY 1:
Time Topic
8.00 - 8.30
8.30 - 9.00 Session A: Introduction
to workshop
9.00 - 10.00 Opening Session
10.00 - 10.30
10.30 - 11.00 Session A: Introduction
to the Workshop
11.00 - 12.30 Session B: Analysis of
LGA procurement
performance
12.30 - 13.30 Session C: Presentation
LGA procurement
performance
13.30 - 14.15
14.15 - 15.15 Session D: Identifying
actionable strategies
15.15 - 16.00 Session E: Identifying
actionable strategies
16.00 - 16.20
16.20 - 17.15 Session F: Procurement,
Monitoring and
Evaluation
PMO-RALG
ENHANCEMENT OF PROCUREMENT CAPACITY OF LOCAL GOVERNMENT AUTHORITIES PROJECT (EPC
Workshop Programme
WORKSHOP PROGRAMME
LG Procurement Capacity Building Strategy Formulation WorkshopSt Gaspar – Dodoma, 11-13 June 2013
Details Methodology Responsible
Registration Secretariat
Session A: Introduction � Introductions
� Participant’s
expectation
� Workshop rules
Plenary Facilitator
� Welcome remarks
� Official Opening
� Group picture
Plenary
PPRA
PMO
PS PMO
HEALTH BREAK
Session A: Introduction � Workshop Objectives
� Key concepts &
methodology
Plenary Facilitator
Project Co
Manager
� Brief presentation on
procurement system
� Group work
OECD Pillar
Gap analysis
PIU
Facilitator
Session C: Presentation � Gap analysis Plenary
presentations
Session Chair
Groups /
Facilitator
LUNCH
� Designing actionable
strategies
Group work
Key Questions
Panels /
Facilitator
� Action analysis Plenary
presentations
Session Chair
Groups /
Facilitator
HEALTH BREAK
Session F: Procurement, � Paper 1 on LGA
Procurement
Performance
PPt
presentation
PIU
ENHANCEMENT OF PROCUREMENT CAPACITY OF MENT AUTHORITIES PROJECT (EPC-
LG Procurement Capacity Building Strategy Formulation Workshop
Responsible
Secretariat
Facilitator
PPRA
PMO-RALG
PS PMO-RALG
Facilitator
Project Co
Manager
Facilitator
Session Chair
Groups /
Facilitator
Panels /
Facilitator
Session Chair
Groups /
Facilitator
PIU
ENHANCEMENT OF PROCUREMENT CAPACITY OF -LGAP)
Workshop Report / LGA Procurement Capacity Building Strategy Formulation 39
DAY 2:
Time Topic Details Methodology Responsible
8.00 - 8.30 Recap Day 1 Plenary Facilitator
8.30 - 9.30 Session G: Review of
Group Analysis in view
of procurement M&E
� Combined gap and
action analysis
Group work
Key Questions
Groups
9.30 - 10.30 Session H: Review of
Group Analysis in view
of procurement M&E
� Action analysis Plenary
presentations
Session Chair
Groups /
Facilitator
10.30 - 11.00 HEALTH BREAK
11.00 - 12.00 Session I: Thematic
analysis in selected
strategic areas
� Paper 2: Procurement
Quality Assurance -
Audits
� Paper 3: Procurement
Quality Assurance –
MIS
� Paper 4: LLG
procurement capacity
& training strategy
PPt
presentations
Session Chair
Panels
12.00 - 13.30 Session J: Thematic
analysis in selected
strategic areas
� Thematic analysis Group work
Key Questions
Groups / Panels
13.30 - 14.30 Lunch
14.30 - 15.30 Session K: Thematic
analysis in selected
strategic areas
� Thematic analysis Plenary
presentations
Synthesizing
Session Chair
Groups
Facilitator
15.30 - 16.30 Session L: Agreeing on
desired outcomes
� Synthesizing exercise Plenary Facilitator
16.30 - 17.00 HEALTH BREAK
17.00 ���� SOCIAL INTERACTIONS
DAY 3:
Time Topic Details Methodology Responsible
8.00 – 8.15 Recap Day 2 Plenary Facilitator
8.15 – 9.00 Session M: Outline CB
Strategy
Paper 5: Logical
Framework & Draft CB
strategy
PPt Presentation
PIU
9.00 – 10.30 Project Launch � Official Launch of the
Project
� Group picture
Plenary Session Chair
- Hon Minister
Responsible for
LG
- Ambassador
Kingdom of
Belgium
10.30 – 11.00 HEALTH BREAK
10.30 – 12.00 Session N: Outline CB
Strategy
� Key Questions
� Preparation of Group
Reports
Selected Groups Groups /
Facilitator
40 Workshop Report / LGA Procurement Capacity Building Strategy Formulation
Time Topic Details Methodology Responsible
12.00 – 13.30 Outline CB Strategy � Presentation of
Group Reports
� Synthesizing
All Groups Session Chair
Groups /
Facilitator
13.30 – 14.15 LUNCH
14.15 – 15.00 Wrap-up
� Final conclusions
� Way forward
� Evaluation
Plenary Session Chair
PIU / Facilitator
15.00 – 15.30 Closing � Official closing
� Words of thanks
�
CEO PPRA
15.30 –> HEALTH BREAK / DEPARTURE
Workshop Report / LGA Procurement Capacity Building Strategy Formulation 41
Annex 2: List of Participants
No. Name Organization Title Email Phone
AGENCIES
1. Clement Mworia TACECA Executive Director [email protected] 0713620232
2. Dr.Gustav Kunkuta Mzumbe University Lecturer of LG [email protected] 0655224339
3. Constatine Mashoko Ministry of Finance Asst. Internal Auditor General [email protected] 0754443438
4. Eliakundi Semanya Hombolo LGTI Bursar [email protected] 0754847493
5. Titus Saideya National Audit Office Ast. Auditor General [email protected] 0754311374
6. Clemence Tesha PSPTB Executive Director [email protected] 2862138
7. Dr. R.Mlinga PPRA Chief Executive Officer [email protected] 0754999943
8. Bernald Ntelya PPRA Manager Systems Support &Administration [email protected] 0754296083
9. Kenneth Sijaona PPRA Manager System Development Maintenance [email protected] 0754502757
10. James Kitainda PPRA Procurement Officer [email protected] 0763243352
11. Cranmer Chiduo BTC For: Resident Representative [email protected] 0754384712
12. Mwambeja J.S. GPSA Chief Executive Officer [email protected] 0784317193
13. Charles Mwiza GPSA Regional Manager Dodoma [email protected] 0767605345
14. Prof. Valence Ndesendo St. John’s University Ag. Dean [email protected] 0754262263
15. Erika Fukushi JICA/LGTI Chief Advisor [email protected] 0786286707
16. Tomoka Komura JICA/LGTI Project Coordinator [email protected] 0782401287
17. Magdalena Katunzi Hombolo LGTI Tutorial Assistant [email protected] 0782845116
18. Rose Likangaga Hombolo LGTI Assistant Lecturer [email protected] 0784505491
19. Muhsin Danga Hombolo LGTI Assistant Lecturer [email protected] 0713689555
20. E.Mchome PMO-RALG Ag.Director Local Government [email protected] 0754293075
21. Tunganege Alex PMO-RALG Supplies Officer [email protected] 0767440375
21. Mtani Yangwe PMO-RALG PCSA [email protected] 0753180678
22. Johnson John PMO-RALG Principal Legal Officer [email protected] 0713610789
23. Zahara Msangi PMO-RALG CDO [email protected] 0755443326
24. Mustafa Yusuf PMO-RALG Senior Accountant [email protected] 0713477073
25. Stella Stewart PMO-RALG Ag.Director LG Finance [email protected] 0713343692
26. Michael Kahuluda PMO-RALG Accountant [email protected] 0713533550
27. Fred Kibano PMO-RALG IO [email protected] 0754675636
42 Workshop Report / LGA Procurement Capacity Building Strategy Formulation
No. Name Organization Title Email Phone
28. Felista Ngua PMO-RALG Human Resource Officer [email protected] 0755258772
29. Theresia Linuma ALAT Procurement Officer [email protected] 0754478547
30 Dr. F. A. Mwakibinga MoF/PPPD Commissioner Procurement [email protected], 0222129450
RAS
31. Madenge RS RAS Dodoma RAS Dodoma [email protected] 0784424686
32. B.P.Kisaka RAS Dodoma Ag Regional Internal Auditor [email protected] 0713065850
33. Emmanuel Kimboja RAS Dodoma Asst. Administrative Secretary [email protected] 0758424220
34. MaggieA.Chande RAS Tanga Asst. Administrative Secretary LGM [email protected] 0757498801
35. David M.Saire RAS Tanga Auditor-LGM [email protected] 0753195622
36. Taris Njojoli RAS Kigoma Principal Local Government Officer [email protected] 0756967862
37. Togoleni Yohana RAS Kigoma Internal Auditor LG [email protected] 0754657718
38. Rashid Baghdellah RAS Coast LG Auditor [email protected] 0655378411
39. Ritha Kamala RAS Coast For Assistant Administrative Secretary LG [email protected] 0762312181
Districts
40. John Titu Lushoto Ag District Executive Director [email protected] 0787765242
41. Justin T.Njuu Lushoto District Human Resource Officer [email protected] 0784895894
42. Ntedio Shelukindo Lushoto District District Engineer [email protected] 0786728232
43. Juma Shekilango Lushoto District District Internal Auditor [email protected] 0784900644
44. Dorothy Rwiza Kasulu District District Executive Director [email protected] 0754837180
45. Erasto Andrew Kasulu District District Internal Auditor [email protected] 0763312933
46. Aristarco Nteye Kasulu District Ag Head Procurement Management Unit [email protected] 0753195622
47. Eng.Shilungu Shija Kasulu District District Engineer [email protected] 0755860072
48. Ignas Sanga Kibaha District Ag.District Executive Director [email protected] 0717343340
49. Doris Hugo Kibaha District District Internal Auditor [email protected] 0713210241
50. Esther Rweyemamu Kibaha District Head Procurement Management Unit [email protected] 0762501260
51. Obindi Wembe Mkurunga District For District Executive Director [email protected] 0784299780
52. Hosea Kibakaya Mkurunga District District Internal Auditor [email protected] 0784726196
53. Amina Maundu Mkurunga District Head Procurement Management Unit ---------- 0763928304
54. Aisha Mhando Muheza District For District Executive Director [email protected] 0652815126
55. Eng.Athuman Ahungu Muheza District District Engineer [email protected] 0715311372
56. Peter Shao Muheza District Ag.Head Procurement Management Unit [email protected] 0787620232
Workshop Report / LGA Procurement Capacity Building Strategy Formulation 43
No. Name Organization Title Email Phone
57. Abdallah Ngodu Kondoa District District Executive Director [email protected] 0784514245
58. Isidory Kilonga Kondoa District District Internal Auditor [email protected] 0784919899
59. Emmanuel Sulo Kondoa District Head Procurement Management Unit [email protected] 0757190432
60. Naftael Ahungu Kondoa District Ag.District Engineer ------ 0786284264
61. Miriam Mmbaga Kigoma District District Executive Director [email protected] 0754289283
62. Juma Mwanga Kigoma District District Engineer [email protected] 0689405780
63. Filbert Muhamba Kigoma District District Internal Auditor [email protected] 0752656787
64. Bernard Ezekiel Kigoma District Planning Officer [email protected] 0753469102
65. F.M.Ngotonie Kongwa District Ag District Executive Director [email protected] 0754822237
66. Kilatu FB Kongwa District District Internal Auditor [email protected] 0757601121
67. Fabian Massawe Kongwa District District Treasurer [email protected] 0713474951
68. Ganja S.K Kongwa District District Planning Officer [email protected] 0754384712
69. Isaac M.Gwalugano Kongwa District District Human resource Officer [email protected] 0784851659
70. Fridolin Matembo Kongwa District District Planning Officer [email protected] 0713135667
PIU
71. Dr. L. M. Shirima PPRA Project Manager [email protected] 0754466014
72. Frits Raijmakers BTC Project Co Manager [email protected] 0685890453
73. Eng. Mary Swai PPRA Action Research Expert [email protected] 0784312450
74. Robert Kitalala PPRA Head Procurement Management Unit [email protected] 0755393251
75. Emmanuel Mmbaga BTC Financial Controller [email protected] 0754245559
Support Staff
76. Emilius Tatala BTC Project Accountant [email protected] 0753045197
77. Mhija Ng’wanakilala BTC Administrative Assistant [email protected] 0719393504
78. Shukuru Stansilaus PPRA Secretary [email protected] 0753581601
44 Workshop Report / LGA Procurement Capacity Building Strategy Formulation
Annex 3: Workshop Tools
- Exhibit A: Gap Analysis by Cause-and-Effect Method
- Exhibit B: Mind Tools for Gap Analysis (Brain storming) and Possible Actions
- Exhibit C: Fishbone Diagram Analysis Tool: Combined Gap and Action Analysis
- Question Guides for Sessions
Workshop Report / LGA Procurement Capacity Building Strategy Formulation 45
Characteristic or Effects
Characteristic or Effects
Characteristics or Effect
STEP A: Write a characteristic to be improved
Cause Cause
Cause Cause
STEP B: Add main factor branches to the cause
Minor Causes
Causes Causes
Cause Cause Cause
Minor Causes
STEP C: Add the detailed cause factors as twigs
Exhibit A: Gap Analysis by Cause-and-Effect Method
46 Workshop Report / LGA Procurement Capacity Building Strategy Formulation
Exhibit B: Mind Tools for Gap Analysis (Brain Storming) and Possible Actions
Desired state/situation
GAPS Possible Actions
Gap 1 Gap 2 Gap 3 Gap 4 Gap 5
Workshop Report / LGA Procurement Capacity Building Strategy Formulation 47
Exhibit C:Fishbone Diagram Analysis Tool: Combined Gap and Action Analysis
1. Review your group work in view of the procurement M&E presentation and place 1-2 additional proposed possible actions in the below dimensions (A, B, C, D, E, F):
A. Institutional, Equipment and Technology Incentives
B. Policies and Regulations
C. Supportive Oversight and Accountability Mechanisms
DESIRED
STATE
D. Human Resources/ Skills mix/levels
E. Education, Training, Coaching
F Leadership and Governance
48 Workshop Report / LGA Procurement Capacity Building Strategy Formulation
Question Guide B2 Question 1: Select the five most important challenges (weak points) in LGA procurement, analyse root causes that according to you cause the challenges and the related capacity gaps Method: Group work (1.0 – 1.5 hours)
- Identify challenges in LGA procurement and select the five most important one’s - Discuss and agree on the root causes - Identify relevant capacity gaps
Output Format: Group …………….: Main Challenges, Root Causes and Capacity Gaps Challenge Root Causes
Capacity Gaps
1. “
“
2. “
3. “
4. “
5. “
Workshop Report / LGA Procurement Capacity Building Strategy Formulation 49
QUESTION GUIDE J Method: Presentation (1.0 hours) o Procurement Quality Assurance: Audits
o Procurement Quality Assurance: Procurement MIS
o LLG procurement capacity & training Strategy
Group work: Task: Review and analyse the assigned thematic presentation and summarise in the following format Output Format: Group XXXX: Thematic Analysis of xxxxxxxxxxx Problem Statement
Capacity Gap
Root Causes of Low Capacity
Desired Outcome
Key Interventions
Driver
Contributor(s)
50 Workshop Report / LGA Procurement Capacity Building Strategy Formulation
Annex 4: Outputs of Group Work
Group One – LGAs Gap and Action Analysis
Dimension Desired Outcome Gaps Root Causes Proposed Actions A. Institutional,
Equipment and Technology Incentives
Non-compliance with establishment of the PMUs
1. PMO-RALG should employ enough and competent procurement experts
2. Provide the PMUs with working tools- computers, offices etc. PMUs should be provided with budget and sub-vote
3. Formalization of scheme of service of procurement officers to make it a separate department)
4. PMU should be provided with working tools.
5. Training on IT B. Policies and
Regulations 1. Transparent, user
friendly and which can be understood by stakeholders at all levels and in Kiswahili language Kiswahili
2. Lack of law related to procurement for local governments as the case of the finance act No. 9 of 1982
Procurement act is not understood by stakeholders
Good policy involves the LGAs Regulations should be understood to all stakeholders
1. Translate the procurement act into Kiswahili
2. Procurement act should be participatory 3. Dissemination of the PPA and distribution
of copies of the law 4. Training should be done free to all
stakeholders 5. Disciplinary actions to violators of PPA
and they should be understood to all stakeholders
6. There should be a procurement act related to LGAs and involve stakeholders in the process
7. Regulations related to LGAs procurement should also be made available
C. Supportive Oversight and Accountability Mechanisms
Lack of ethics and transparency in the public procurement system
1. Regulations related ethics should be adhered to
2. Better Incentive schemes 3. Disciplinary actions to violators of the law
and regulation
Workshop Report / LGA Procurement Capacity Building Strategy Formulation 51
Dimension Desired Outcome Gaps Root Causes Proposed Actions 4. Training on ethics to all stakeholders 5. An oversight body on procurement should
be established for LGAs as the case of Internal Auditors
6. PMU should report direct to DEDs D. Human Resources/ Skills mix/levels
1. There should be enough staff in PMU as per the law
E. Education, Training, Coaching
1. Capacity Building on procurement management
F. Leadership and Governance
Preparation of procurement plan which does not involve the stakeholders
1. Involve all stakeholders in the preparation of the procurement plan
2. Training on preparation of procurement plan
3. Training on good governance
52 Workshop Report / LGA Procurement Capacity Building Strategy Formulation
Group Two – LGAs Gap and Action Analysis
S/n Challenge Root Causes Capacity Gap Actions and Time Frame Desired Outcomes
1. Record Keeping Inadequate use of record keepers (registry officers
Insufficient skills and knowledge in record keeping
- Train at least two staff from PMU and registry officers in procurement record keeping annually
- Provide working facilities specifically in procurement unit
- Establish PMU registry by 2014 - Equip PMU registry with adequate facilities
Well trained personnel
2. Accountability Lack of Integrity Lack of Ethics - Define and address corruption, fraud, conflict of interest and unethical behaviour by 2014
- Train key players in procurement: o Accounting Officer o CTB members o PMU staff o TEC Personnel o HoDs o Legal Officer o Other stakeholders
Capacity building on ethics in LGAs
3. Incentive package for procurement staff
Non-adherence to procurement staff Scheme of Service
Sensitization employers and policy members
- Conduct performance audit quarterly in PMU - Issue circulars on PMU incentive scheme by 201 - M&E of implementation of incentive scheme
circular for PMU staff in LGAs annually
Institutionalization of procurement Scheme of Service
4 Contract Management
Poor preparation of tender documents
Inadequate competence of suppliers, contractors and service providers
- Train suppliers, contractors and service providers annually
- Issue certificates of appreciation to suppliers, contractors and service providers for good performance annually
- Enforce contract rules & regulations to suppliers, contractors and service providers timely
- Distribute PPA to contractors, suppliers and service providers regularly
Enhance capability of preparation of tender documents
5 Inadequate facilities for Procurement Unit
Budget allocation
Sensitization of allocation budget code for Procurement Unit
- Allot sub-vote for PMU budget - Provide working facilities specifically in
procurement unit - Involve PMU in budgeting budget - M&E implementation of PMU budget
Allocate budget to PMU
Workshop Report / LGA Procurement Capacity Building Strategy Formulation 53
Group Three: Oversight Bodies Gap and Action Analysis
Dimension Desired Outcome Challenges Gaps Root Causes Proposed Actions
A. Institutional, Equipment and Technology Incentives
Improved procurement management and practices in LLG
Inadequate procurement management and practices in LLG
Insufficient knowledge and skills in procurement (2)
Low level of education in LLG level
• Training of procurement actors at LLG levels
• Employment of qualified staff
B. Policies and Regulations
Inadequate information in procurement
• Effective dissemination of information
• Involvement of CSOs in promoting community awareness
C. Supportive Oversight and Accountability Mechanisms
Lack of /inadequate infrastructure in LLG, e.g. computer, procurement guidelines
Insufficient funds
• PMUS to be provided with office accommodation, furniture, transport, computer with internet connectivity
D. Human Resources/ Skills mix/levels
Low prioritization for procurement infrastructure
• Lower level PEs should be given priority
E. Education, Training, Coaching
• PMUs to be established as a fully-fledged unit
• PMU to be staffed as per the requirement of the law
• Scheme of service should be reviewed
• IT policy to be in place
• LGAs should inform PPRA on the appointment of tender board members
• Complaint register to be in place
• Awarded contracts to be published F. Leadership and
Governance
54 Workshop Report / LGA Procurement Capacity Building Strategy Formulation
Group Four Others Institution Gap and Action Analysis
S/n Desired Outcome
Challenges Root Causes Gaps Proposed Action Time Frame
1. Compliance with law and Regulations
Language as a barrier
Limited knowledge and skills
Limited knowledge and skills
• Translate the laws and Regulations into Swahili
• Disseminate the translated laws and regulation
• Enforcement of the translated laws and Regulations
• Translated the laws and Regulations into Swahili by 2015
• Dissemination of the translated laws and regulation by 2016
• Enforcement of the translated laws and Regulations by 2017
2. Procurement Legislation do not cover LLGs
• LLG were not involved in the preparation of the legislation
• D by D
• Weaknesses in the preparation of the public procurement law
• Amend Procurement Legislation and Regulations to cover LLGs
• 2.1.1 Amended Legislations and regulations available by 2015
• Dissemination of amended Legislation and Regulations by 2016
• Enforce amended legislations and Regulations by 2017
3. Implementation of public procurement system
• Inadequate human and financial resources
• Weaknesses in follow ups/ monitoring
• Understaffing in PMU
• Inadequate Budget and fund allocation to PMU
• Employ adequate qualified and capable staff
• PMU to be given sub-vote
• Regular follow ups/monitoring
• Training (CPE) and retention of trained staff
• Provide adequate financial resources i.e. retooling
• Adequate, qualified and capable staff available
• Staff trained and retained
• Adequate financial resources provided
4. Procurement Procedure
• Compliance to the legislation
• Limited knowledge and skills
• Delays in decision making
• Lack of technology (ICT)
Delayed procurement process(-Bureaucracy -inefficient system -deliberately)
• Amend the legislation (Identify and remove unnecessary procedures)
• The system should follow new technology (e-procurement)
• Procurement process shortened
• M& E framework in place and functioning
• Disciplinary action taken against culpable staff
Workshop Report / LGA Procurement Capacity Building Strategy Formulation 55
S/n Desired Outcome
Challenges Root Causes Gaps Proposed Action Time Frame
• Unethical conduct among procurement practitioners
• Capacitate& enforcement of laws and regulations
• Take strict disciplinary actions against those culpable of deliberate delays
5. Endemic cheating, theft and corruption in the procurement system in LGAs
• Weaknesses of the system
• Low income
• Difficult living conditions
• Private interests
• Lack of ethics
• Unsatisfactory good governance
• Limited knowledge and skills
• Lack of ethics
• Introduce & use of whistle blowers
• 2 Improve M& E of the procurement process.
• Punish the guilty mercilessly including the possibility of loss of office
• Capacity building of District integrity committees
• sensitize suppliers, CSOs to be socially accountable-they refrain from unethical acts/collusion etc
• Reward good performers handsomely
• Training on good governance
• Sensitization on code of conduct
• Sensitization on code of conduct
• Whistle blowers system in place
• M&E framework available and well-functioning
• Disciplinary action taken against culpable staff
• District integrity Committee capacitated
• Suppliers, CSOs and other stakeholders are socially accountable
• Good performers handsomely rewarded.
56 Workshop Report / LGA Procurement Capacity Building Strategy Formulation
Comments on papers – Group for Quality Assurance Audits
1. Oversight bodies on quality assurance are so many with different performance indicators
2. Lack of common standards
3. Lack of oversight body for supervising the performance indicators
4. Improved procurement quality assurance
5. There should be an oversight body to monitor the performance indicators/regulations to audit quality
6. Driver: Public Procurement Regulation Authority
7. Contributors: PMO-RALG, NAO, IA, RS, PCCB and HLGTI
Comments on papers – Group for Procurement MIS
Capacity Gap: − Inadequate ICT skills and knowledge
− No links between the systems (PlanRep, EPICOR and PMIS
− Not user friendly Root Causes of low capacity: − Different developers of systems
− Different purpose of systems
− Different governing laws (PFA 2001, PPA 2004) which are not integrated
− Insufficient information and record keeping Desired Outcome: − Harmonized MIS and reports
− Improved productivity in information systems (MIS) Key Interventions: − Implement Procurement Systems Integration (PlanRep, Epicor, PMIS)
− Training and equipping users with adequate working tools
− Improved working tools to use systems (computers, internet)
− Main actors meeting to discuss harmonization and integration of systems Drivers and main actors: − PMO-RALG, PPRA, MoF, RS
− UCC, Soft Tech Contributors − CSOs, NGOs
− Development Partners
− Other Stakeholders
Workshop Report / LGA Procurement Capacity Building Strategy Formulation 57
Comments on papers – Group for LLG Procurement Capacity and Training Strategy
Problem Statement: − Inadequate procurement management and practices in LLGs Capacity Gap: − Insufficient knowledge and skills in procurement
− Inadequate information in procurement
− Inadequate infrastructure at LLG level (computers, procurement guideline)
Root Causes of low capacity: − Low level of education in LLG level
− Insufficient funds
− Low prioritization for procurement infrastructure
Desired Outcome: − Improved procurement management and practices in LLGs
Key Interventions: − Training of procurement actors at LLG level
− Employment of qualified staff
− Effective dissemination of information
− Give priority to lower level procuring entities
Drivers: − LGA Accounting Officers Contributors: − PMO-RALG, PPRA, HLGTI, Trainers, RS, CSOs, Donors, ALAT
58 Workshop Report / LGA Procurement Capacity Building Strategy Formulation
Annex 5: Workshop Presentations and Workshop Materials
- Workshop Objective, Concepts and Process
- Presentation 1: Results and Findings of Procurement Audits
- Presentation 2: Quality Assurance: Audits
- Presentation 3: Quality Assurance: Procurement MIS
- Presentation 4: LLG Procurement Capacity and Training Strategy
- Presentation 5: Project Logical Framework
- Hand out: Project Logical Framework and M&E Framework
- OECD/DAC Methodology for Assessment of National Procurement Systems
- OECD Indicators and Sub-Indicators
Workshop Report / LGA Procurement Capacity Building Strategy Formulation 59
Procurement capacity at local government level sustainably enhanced
Ensuring systems and structures of governance uphold the rule of law and are democratic, effective, accountable, predictable, transparent, and inclusive and corruption free at all levels
LGA procurement performance strengthened
Systems for monitoring and quality assurance LGA
procurement strengthened
Community members better informed and able to monitor Local Government
procurement performance
Strengthened capacity to provide long-term support to improved LGA procurement
performance
Action research on LGA procurement practices, incentives and organizational structures conducted
1. Review, update and introduction of LLG procurement guidelines
2. Development of LGA procurement skills-development plans
3. Capacitation of PMUs in critical procurement areas
4. Development and refinement of LGA procurement guides
5. Development and refinement of LGA procurement manuals
6. Dissemination updated procurement guides and manuals to LGAs - RAS/LGAMS
7. Establishment of procurement Training Teams (ToT/ToC) for training and coaching at HLG and LLG levels
8. Support to LGA procurement training in identified areas
9. Development of higher skills level professional procurement courses
1. Harmonizing systems and indicators for monitoring LGA procurement compliance &performance
2. Strengthening capacity of Regional Secretariat to provide oversight, monitoring, coaching and follow-up support to LGAs on procurement
3. Support for customization and interfacing of Procurement MIS
4. Support for training of District Internal Auditors in procurement audits and quality assurance
1. Providing guidance and materials to CSOs to increasing skills in tracking, analysing and reporting on LGA procurement
2. Providing guidance and materials to media (radio, TV, local newspapers) to increasing skills in tracking, analysing and reporting on LGA procurement
3. PPRA engages with Local Authorities Accounts Committee to increase skills in LGA procurement issues, compliance and follow-up
1. Formulation and monitoring of LGA Procurement Capacity Building Strategy
2. Strengthening PPRA outreach capacity to LGAs (zonal offices)
3. Increasing appropriateness and coverage of LGA procurement audits by PPRA, DIA and CAG
4. Provision of Technical Assistance
5. Strengthening quality assurance and coordination of LGA procurement training
6. Engaging all stakeholders in dialogue on how to improve LGA procurement performance
1. Conducting action research (gender sensitive) on LGA procurement practices, incentives and organizational structures
2. Inform program design for follow-up, dialogue, recommendations on policy reform
3. Assessing methodology, results and impact
4. Establish and maintain LGA procurement capacity database
LOGICAL FRAMEWORK – ENHANCEMENT OF PROCUREMENT CAPACITY OF LOCAL GOVERNMENT AUTHORITIES PROJECT
OO =
Vision
SO =
Mission
Results =
Outputs =
Strategies
Key Activities
= Interven-tions
60 Workshop Report / LGA Procurement Capacity Building Strategy Formulation
EPC-LGAP MONITORING & EVALUATION FRAMEWORK 2013-2017
DRIVER
Result
Others PERFORMANCE INDICATOR DATA SOURCE METHODS FREQUENCY DRIVER
M&E
TARGETS
Baseline 2017
SPECIFIC OBJECTIVE: Procurement capacity at local government level sustainably enhanced
KPI 1 Overall LGA CPI score increased PPRA Report Document review Annual PPRA 57%
Fair
> 80%
Good
KPI 2 Overall LGA CPI score in selected LGAs increased PPRA Report Document review Annual PPRA 49%
Poor
> 80%
Good
KPI 3 LGA VfM score Roads contracts improved PPRA Report Document review Annual PPRA 71%
Fair
>80%
Good
KPI 4 LGA VfM score Building contracts Improved PPRA Report Document review Annual PPRA 68%
Fair
> 80%
Good
RESULT 1: LGA procurement performance strengthened
PPPD
PPRA
HLGTI
PSPTB
I-1.1 Competences and skills-levels of LGA procurement professionals and
practitioners developed and applied in training curricula
PSPTB Reports
Curricula Document review Annual PPPD/PIU Absent
Defined and
used
PMO-
RALG PPRA I-1.2 LGA Procurement capacity defined, PMUs established and capacitated
PMO-RALG
Reports Document review Annual PMO-RALG/PIU Absent
Defined
Capacitated
> 80%
21 districts
PPRA
HLGTI PMO-RALG
I-1.3 HLGA and LLGA procurement guides & manuals updated,
disseminated and used in trainings
Guides
T/Manuals
T/Reports
Document review Annual HLGTI/PIU Poor manuals Adequate
Manuals
PMO-
RALG
PPRA
HLGTI
I-1.4 Procurement skills development plans defined, Procurement
Training Teams established, ToT/ToC trained and functional in selected
LGAs
Plans
T/Reports Document review Annual PMO-RALG/PIU Absent
Functional in
21 districts
PMO-
RALG PPRA
I-1.5 Procurement record keeping at HLG and LLG levels improved in
selected LGAs PPRA Reports Document review Annual PPRA/PIU 30%
> 80%
21 districts
PMO-
RALG PPRA
I-1.6 Procurement planning, implementation and reporting improved in
selected LGAs PPRA Reports Document review Annual PPRA/PIU 35%
> 80%
21 districts
RESULT 2: Systems for monitoring and quality assurance LGA procurement strengthened
PPRA PMO-RALG,
CAG, IAG
I-2.1 Concurrence DIA reports on LGA procurement and contract
implementation with CAG and PPRA audits increased
CAG, DIA, IAG,
PPRA Reports Document review Annual IAG/PIU
Largely
different
Largely
concurrent
21 districts
PPRA PMO-RALG
MoF
I-2.2 Use of customized and interfaced Procurement MIS in selected LGAs
increased PMIS Reports Document review Annual PPRA/PIU 0%
> 80%
21 districts
PPRA PMO-RALG,
CAG
I-2.3 Procurement monitoring of PPRA, CAG and PMO-RALG increasingly
based on similar agreed indicators
CAG, PPRA &
PMO-RALG M&E Document review Annual
PPRA, PMO-
RALG/PIU Differ Largely concur
Workshop Report / LGA Procurement Capacity Building Strategy Formulation 61
DRIVER
Result
Others PERFORMANCE INDICATOR DATA SOURCE METHODS FREQUENCY DRIVER
M&E
TARGETS
Baseline 2017
Reports
PMO-
RALG PPRA
I-2.3 Concurrence PMO-RALG procurement monitoring reports with PPRA
procurement audits increased
PPRA & PMO-
RALG M&E
Reports Document review Annual
PPRA, PMO-
RALG/PIU Differ Largely concur
RAS/RS PMO-RALG
PPRA
I-2.4 Adequate follow-up, coaching and advice by RAS/LGAMS to
procurement monitoring in selected LGAs
IAG and
RAS/LGAMSS
Reports Document review Annual PPRA/PIU
No adequate
Action
100% follow-
up
4 regions
21 districts
LGAs
RAS/LGAMS
PPRA
PMO-RALG
I-2.5 Adequate action as agreed in procurement audit follow-up to weak
areas by selected LGAs
CAG, PPRA and
PMO-RALG/RS
Reports
Document review Annual LGMAS/PIU No adequate
Action
100% follow-
up
21 districts
- RESULT 3: Community members better informed and able to monitor LGA procurement performance
PPRA CSOs I-3.1 Community awareness on LGA procurement issues in selected LGAs
increased Council Reports Document review Annual CSO/PIU Low
Majority
aware
PPRA CSOs
LGAs
I-3.2 Ability of CSOs to monitor LGA procurement in selected districts and
regions increased
Council Reports
CSO Reports Document review Annual CSO/PIU None tbd
PPRA Media I-3.3 Media coverage of LGA procurement issues in selected regions and
LGAs increased Media reports,
articles, etc Document review Annual Media/PPRA Low Regular
PPRA LAAC I-3.4 Skills of LAAC and PPRA on LGA procurement issues, compliance and
follow-up increased LAAC reports Document review Annual PPRA/PIU Absent In place
RESULT 4: Capacity to provide long-term support to improved LGA procurement performance strengthened
PPRA RAS/LGAMS I-4.1 Outreach capacity of PPRA to LGAs and RAS/LGAMS increased PPRA Reports Document review Annual PPRA/PIU Moderate Good
PPRA IAG I-4.2 Coverage and appropriateness of LGA procurement audits increased
PPRA and IAG,
DIA Reports Document review Annual PPRA/PIU 1/3 p.a. 2/3 p.a.
PPRA IAG, DIAs I-4.3 Capacity of DIA and CAG to assure quality of procurement audits
increased
DIA, IAG and
CAG reports Document review Annual IAG, CAG/PIU Moderate Good
PPRA PMO-RALG I-4.4 Policy dialogue on LGA procurement strengthened Sector reports Document review Annual PPPD/PIU Low Adequate
PPRA PMO-RALG I-4.5 All stakeholders increasingly engaged in dialogue on how to improve
LGA procurement performance Sector reports Document review Annual PPPD/PIU Fair Good
HLGTI PPRA, PMO-
RALG
I-4.6 Quality assurance and coordination of LGA procurement training
improved HLGTI Reports Document review Annual HLGTI/PIU Low Adequate
PPRA
PMO-RALG I-4.7 LGA procurement capacity building strategy formulated & monitored CB strategy Document review Annual
PMO-RALG,
PPRA/PIU - In place
RESULT 5: Action research on LGA procurement practices, incentives and organizational structures conducted
PPRA JLPC I-5.1 Action research findings and recommendations reflected in project
design and reviews
AR Reports,
JLPC minutes Document review Annual PPRA/PIU - In place
JLPC PPRA I-5.2 Policy recommendations based on (gender sensitive) action research AR Reports, Document review Annual PPRA/PIU - In place
62 Workshop Report / LGA Procurement Capacity Building Strategy Formulation
DRIVER
Result
Others PERFORMANCE INDICATOR DATA SOURCE METHODS FREQUENCY DRIVER
M&E
TARGETS
Baseline 2017
PMO-RALG
PPPD
prepared, targeted and communicated JLPC minutes
PPRA PMO-RALG
HLGTI I-5.3 LGA procurement capacity data base established and maintained
LGA database &
reports Document review Semi-Annual PPRA/PIU - In place
Workshop Report / LGA Procurement Capacity Building Strategy Formulation 63
OECD METHODOLOGY FOR ASSESSING PROCUREMENT SYSTEMS (MAPS) - 2010
PILLAR INDICATOR SUB INDICATORS
PILLAR I: LEGISLATIVE AND
REGULATORY FRAMEWORK
Indicator 1. Public procurement legislative
and regulatory framework achieves the
agreed standards and complies with
applicable obligations.
Sub-indicator 1(a) – Scope of application and coverage of the legislative
and regulatory framework.
Sub-indicator 1(b) – Procurement Methods
Sub-indicator 1(c) – Advertising rules and time limits
Sub-indicator 1(d) – Rules on participation
Sub-indicator 1(e) – Tender documentation and technical specifications
Sub-indicator 1(f) – Tender evaluation and award criteria
Sub-indicator 1(g) – Submission, receipt and opening of tenders
Sub-indicator 1(h) – Complaints
Indicator 2. Existence of Implementing
Regulations and Documentation
Sub-indicator 2(a) – Implementing regulation that provide defined
processes and procedures not included in higher-level legislation
Sub-indicator 2(b) – Model tender documents for goods, works, and
services
Sub-indicator 2(c) – Procedures for pre-qualification
Sub-indicator 2(d) – Procedures suitable for contracting for services or
other requirements in which technical capacity is a key criterion.
Sub-indicator 2(e) – User’s guide or manual for contracting entities
Sub-indicator 2(f) – General Conditions of Contracts (GCC) for public
sector contracts covering goods, works and services consistent with
national requirements and, when applicable, international requirements
PILLAR II: INSTITUTIONAL
FRAMEWORK AND
MANAGEMENT CAPACITY
Indicator 3. The public procurement system
is mainstreamed and well integrated into
the public sector governance system
Sub-indicator 3(a) – Procurement planning and associated expenditures
are part of the budget formulation process and contribute to multiyear
planning
Sub-indicator 3(b) – Budget law and financial procedures support timely
procurement, contract execution, and payment.
Sub-indicator 3(c) – No initiation of procurement actions without existing
budget appropriations.
Sub-indicator 3(d) – Systematic completion reports are prepared for
certification of budget execution and for reconciliation of delivery with
budget programming.
64 Workshop Report / LGA Procurement Capacity Building Strategy Formulation
Indicator 4. The country has a functional
normative/regulatory body
Sub-indicator 4(a) – The status and basis for the normative/regulatory
body is covered in the legislative and regulatory framework
Sub-indicator 4(b) – The body has a defined set of responsibilities that
include but are not limited to the following:
Sub-indicator 4(c) – The body’s organization, funding, staffing, and level
of independence and authority (formal power) to exercise its duties
should be sufficient and consistent with the responsibilities
Sub-indicator 4(d) – The responsibilities should also provide for
separation and clarity so as to avoid conflict of interest and direct
involvement in the execution of procurement transactions
Indicator 5. Existence of institutional
development capacity
Sub indicator 5(a) – The country has a system for collecting and
disseminating procurement information, including tender invitations,
requests for proposals, and contract award information
Sub-indicator 5(b) – The country has systems and procedures for
collecting and monitoring national procurement statistics
Sub-indicator 5(c) – A sustainable strategy and training capacity exists to
provide training, advice and assistance to develop the capacity of
government and private sector participants to understand the rules and
regulations and how they should be implemented
Sub-indicator 5(d) – Quality control standards are disseminated and used
to evaluate staff performance and address capacity development issues
PILLAR III: PROCUREMENT
OPERATIONS AND MARKET
PRACTICES
Indicator 6. The country’s procurement
operations and practices are efficient.
Sub-indicator 6(a) – The level of procurement competence among
government officials within the entity is consistent with their
procurement responsibilities
Sub-indicator 6(b) – The procurement training and information programs
for government officials and for private sector participants are consistent
with demand.
Sub-indicator 6(c) – There are established norms for the safekeeping of
records and documents related to transactions and contract
management
Sub-indicator 6(d) – There are provisions for delegating authority to
others who have the capacity to exercise responsibilities.
Indicator 7. Functionality of the public
procurement market
Sub-indicator 7(a) – There are effective mechanisms for partnerships
between the public and private sector.
Workshop Report / LGA Procurement Capacity Building Strategy Formulation 65
Sub-indicator 7(b) – Private sector institutions are well organized and
able to facilitate access to the market.
Sub-indicator 7(c) – There are no major systemic constraints (e.g.
inadequate access to credit, contracting practices, etc.) inhibiting the
private sector’s capacity to access the procurement market
Indicator 8. Existence of contract
administration and dispute resolution
provisions
Sub-indicator 8(a) – Procedures are clearly defined for undertaking
contract administration responsibilities that include inspection and
acceptance procedures, quality control procedures, and methods to
review and issue contract amendments in a timely manner
Sub-indicator 8(b) – Contracts include dispute resolution procedures that
provide for an efficient and fair process to resolve disputes arising during
the performance of the contract.
Sub-indicator 8(c) – Procedures exist to enforce the outcome of the
dispute resolution process.
PILLAR IV: INTEGRITY AND
TRANSPARENCY OF THE PUBLIC
PROCUREMENT SYSTEM
Indicator 9. The country has effective
control and audit systems
Sub-indicator 9(a) – A legal framework, organization, policy, and
procedures for internal and external control and audit of public
procurement operations are in place to provide a functioning control
framework.
Sub-indicator 9(b) – Enforcement and follow-up on findings and
recommendations of the control framework provide an environment that
fosters compliance
Sub-indicator 9(c) – The internal control system provides timely
information on compliance to enable management action.
Sub-indicator 9(d) – The internal control systems are sufficiently defined
to allow performance audits to be conducted.
Sub-indicator 9(e) – Auditors are sufficiently informed about
procurement requirements and control systems to conduct quality audits
that contribute to compliance.
Indicator 10. Efficiency of appeals
mechanism
Sub-indicator 10(a) – Decisions are deliberated on the basis of available
information, and the final decision can be reviewed and ruled upon by a
body (or authority) with enforcement capacity under the law.
Sub-indicator 10(b) – The complaint review system has the capacity to
handle complaints efficiently and a means to enforce the remedy
imposed
66 Workshop Report / LGA Procurement Capacity Building Strategy Formulation
Sub-indicator 10(c) – The system operates in a fair manner, with
outcomes of decisions balanced and justified on the basis of available
information.
Sub-indicator 10(d) – Decisions are published and made available to all
interested parties and to the public
Sub-indicator 10(e) – The system ensures that the complaint review body
has full authority and independence for resolution of complaints.
Indicator 11. Degree of access to
information
Sub-indicator 11(a) – Information is published and distributed through
available media with support from information technology when feasible
Indicator 12. The country has ethics and
anticorruption measures in place.
Sub-indicator 12(a) – The legal and regulatory framework for
procurement, including tender and contract documents, includes
provisions addressing corruption, fraud, conflict of interest, and unethical
behaviour and sets out (either directly or by reference to other laws) the
actions that can be taken with regard to such behaviour
Sub-indicator 12(b) – The legal system defines responsibilities,
accountabilities, and penalties for individuals and firms found to have
engaged in fraudulent or corrupt practices
Sub-indicator 12(c) – Evidence of enforcement of rulings and penalties
exists
Sub-indicator 12(d) – Special measures exist to prevent and detect fraud
and corruption in public procurement
Sub-indicator 12(e) – Stakeholders (private sector, civil society, and
ultimate beneficiaries of procurement/end-users) support the creation of
a procurement market known for its integrity and ethical behaviours
Sub-criteria 12(f) – The country should have in place a secure mechanism
for reporting fraudulent, corrupt, or unethical behaviour.
Sub-criteria 12(g) – Existence of Codes of Conduct/Codes of Ethics for
participants that are involved in aspects of the public financial
management systems that also provide for disclosure for those in
decision making positions
Workshop Report / LGA Procurement Capacity Building Strategy Formulation 67
Annex 6: Photo Gallery