Team HandSimDroid Peter Foldes

Anar Huseynov

Justin Killian

Ishwinder Singh

Agenda

• Project Overview

• Accomplishments

• TSP Process

• Risk Management

• Quality Assurance

• CMMI Assessment

• System Architecture

• Going Forward

2

Agenda

• Project Overview

• Accomplishments

• TSP Process

• Risk Management

• Quality Assurance

• CMMI Assessment

• System Architecture

• Going Forward

3

Team HandSimDroid

4

Team Lead Process/Quality Manager

Development/ Support Manager

Planning Manager

Mentors

TSP Coach

Clients

Additional Resources

• Subject Matter Experts

▫ Eduardo – WBS & Estimation

▫ Tony – Architecture Review

▫ Phil – Architecture Review

• Team member

▫ Sergey

5

Context

• Bosch Research & Technology Center (Client)

• Bosch uses an open-source tool called Ptolemy to model and simulate embedded software

• Our project is to create an Android application that can run simulations of Ptolemy models on handheld devices.

6

Context Diagram

7

Project Goals

8

• Show simulations running on the handheld

• Enable UI customization by model and per user

• Create demos that showcase usefulness of functionality to engineers

Business Drivers

• Act as a proof of concept for ASCET tool

▫ Inspire innovation at Bosch

• Improve operations & reduce cost of calibration

▫ Running simulation on the handheld on the go

▫ Customize UI for different purposes & users

• Freely extend open source software

9

Agenda

• Project Overview

• Accomplishment

• TSP Process

• Risk Management

• Quality Assurance

• CMMI Assessment

• System Architecture

• Going Forward

10

Accomplishments Software Requirement Specification

Learned, implemented, & tailored TSP

CMMI informal assessment

Quality Plan & Fagan inspection

ACDM activities & Go decision

Architectural certainty

Two experiments & Android evaluation

WBS, Implementation Plan w/ staged releases

Development environment setup

11

Agenda

• Project Overview

• Accomplishments

• TSP Process

• Risk Management

• Quality Assurance

• CMMI Assessment

• System Architecture

• Going Forward

12

TSP – Process Improvement

7 Process Improvement Proposals (PIP) ▫ Modify role responsibilities: meeting recorder ▫ Standups ▫ Introduce scoreboard (modified TSP evaluation) ▫ Exit criteria ▫ Due dates and critical path ▫ Don’t switch tool to new version between cycles ▫ Google docs for risk tracking, not tool

13

Two more: ▫ Weekly reports, adapted as a

risk mitigation

▫ Spreadsheet with weekly tasks for transparency

TSP – Earned Value

14

0

20

4

0

60

8

0

100

1/19

/20

11

1/2

6/2

011

2/2

/20

11

2/9

/20

11

2/1

6/2

011

2/2

3/2

011

3/2

/20

11

3/9

/20

11

3/1

6/2

011

3/2

3/2

011

3/3

0/2

011

4/6

/20

11

4/1

3/2

011

4/2

0/2

011

4/2

7/2

011

5/4

/20

11

Earned Value

Ideal EV

Actual EV

Arch. Doc. & 13 hour weeks

SRS

MOSP

TSP – Effort Distribution

15

42%

33%

6%

5%

5%

3% 3% 3%

Effort by Assembly

Meeting

Architecture

Planning

Training

MOSP

Risk

Quality

EOSP

TSP – Meeting Break-down

16

35%

31%

24%

10% 0%

Meetings

Team

Client

Launch

Mentor

Standup

TSP – Scoreboard

17

Added Scoreboard questions

TSP – Scoreboard

18

Comments for the different roles

TSP – The Tool

19

• Pros ▫ Goal driven cycles ▫ Task list ▫ Time keeping (LOGT) ▫ Process improvement (PIP) ▫ Exit criteria for tasks

• Cons ▫ Scheduling ▫ No ordering ▫ Performance ▫ Dependencies ▫ Not extendable ▫ Weekly tracking

• Features not tried ▫ Quality sheets (SUMP, SUMQ, LOGD) ▫ Process Inventory

TSP - Lessons Learned

• Clear exit criteria is extremely important

• Even subjective viewpoints, such as team morale, are measurable

• Tools can increase performance significantly

• Stand-ups: Do we need them or not?

20

Agenda

• Project Overview

• Accomplishments

• TSP Process

• Risk Management

• Quality Assurance

• CMMI Assessment

• System Architecture

• Going Forward

21

Managing Risks – Top 5 # Condition Consequence P I

9 Even with critical path, resource leveling, and deadlines, scheduled tasks are not being completed at the appropriate time

we might not implement all "high“ and "medium“ requirements defined in the SRS

VL CA

16 Some team member's Ptolemy domain knowledge is lacking

some members might not be able to contribute to the architecture enough or understand it

VL CA

17 We do not have an estimate of the development effort

we might not be able to meet all the requirements with in our available time for development in summer

VL CA

10 Not every team member is actively involved in the architectural design and decision-making

we might not have a common understanding about how the final solution will be built

VL CR

14 We don't have an implementation plan ready

we might start the summer semester slow and wasteful

VL CR

22

P – Probability VL – Very Likely I – Impact CA – Catastrophic CR – Critical

Very Likely > Likely > Unlikely Catastrophic > Critical > Marginal > Negligible

Agenda

• Project Overview

• Accomplishments

• TSP Process

• Risk Management

• Quality Assurance

• CMMI Assessment

• System Architecture

• Going Forward

23

Quality Assurance

• In preparation for Summer:

▫ Coding Standards

▫ Quality Guidelines

▫ Review Checklists

▫ Structure for Design and Code Reviews

• Tools for Spring/Summer:

▫ FindBugs – static analysis on Ptolemy

▫ Lattix – dependency analysis on Ptolemy

▫ Bugzilla – bug reporting & tracking

▫ Hudson/Team City – continuous integration

24

Quality Assurance - Fagan Inspection

25

Schnabel C R U M CM

Peter 49 0 49 0 0

Anar 33 18 15 49 1617

Ishwinder 17 11 6 64 1088

SUM 29 70 2705

N 93.27

St. Dev. 17.96

Number of defects found

Estimated total number of defects

Agenda

• Project Overview

• Accomplishments

• TSP Process

• Risk Management

• Quality Assurance

• CMMI Assessment

• System Architecture

• Going Forward

26

CMMI Assessment

• Results ▫ Communication has been the biggest issue,

particularly where artifacts of each type should be stored

▫ Carve time out to actively re-evaluate metrics being collected

▫ Define better exit criteria on tasks know what others are doing know what's expected from you know when you've taken too long and need help

• Reflection ▫ Insightful (even as team members), but time

consuming (~12-14 engineer hours)

27

Agenda

• Project Overview

• Accomplishments

• TSP Process

• Risk Management

• Quality Assurance

• CMMI Assessment

• System Architecture

• Going Forward

28

System Architecture – ACDM Approach

• Ranking quality attributes by difficulty helped in justifying and prioritizing experiments

• Steps help guide the process (pre and post conditions)

• Objective measure for go/no-go decision

• List of outstanding issues

• Didn’t apply it to the fullest

▫ TSP and ACDM was hard to implement at the same time

• Added too many roles next to TSP

29

Context Diagram

30

Quality Attributes QA Priority Difficulty Scenario

Performance High Difficult Latency between capturing sensor data from a source and processing it on server is no more than 2 seconds per source Latency between completion of the data processing on the server and piping it into a sink is no more than 2 seconds per sink

Extensibility High Difficult A new graphical actor or source sensor is incorporated in UI designer and operational in the Android application within 2 person/weeks

Reliability High Difficult In case of network issues, simulation errors or runtime exceptions, system must display error message, reset to default state and log the error and gracefully end simulation on the client and server.

Usability Medium Challenging The UI of a model looks conceptually the same as it was shown in the desktop preview.

31

Constraints

• Technical Constraints

▫ Must work within confines of Ptolemy architecture

▫ Must run on Android

▫ Must run on handhelds

• Business Constraints

▫ Must not use GPL code

▫ Must use Ptolemy simulation engine

▫ Only have 4 engineers

▫ Must follow the fixed schedule

32

Dynamic Perspective – Initialization* 33

Ptolemy Model Loaded and Initialized

* Mixed with physical perspective

Sources & Sinks must run on handheld Performance:

Heavy Processing on Server

Dynamic Perspective - Running Simulation* 34

* Mixed with physical perspective

1

2

3

4 5

6

Performance: Queues to handle concurrency

& manage latency

Reliability: Last Will & Testament

7

8

Performance: Mean arrival rate

to the queue

Reliability: Ping / Echo

Experiments

• Experiment 1

▫ Push live sound from server to client

▫ Check if Ptolemy engine works on client

▫ Check if it’s possible to dynamically replace actors

▫ Measure latency

• Experiment 2

▫ Analyze impact on latency when number of sources, the length of the queues and number of sources/sinks change

▫ Two-way communication

35

Experiment 2 Results

• Latency highly depends on mean arrival of tokens to queues ▫ Length of period between

sending the batch

▫ Number of tokens per period

▫ Must be user configurable (i.e. using a slider)

▫ Queues can be unstable if generation rate is not managed

• Knowledge of queuing theory helped in communicating the problems ▫ The concept has not been yet

fully applied

36

Experiment 2 Results Cont.

37

Analysis of Queues 38

Size of queue Rate of token

generation

Can turn into unstable queue

Decision: User configurable parameters

Decision: Queue stability monitoring

system

Dynamic Perspective mixed with Physical

FSP Model

• Deadlock in initial design • Did not consider all timeouts and exception handling

• Client/Server process • Focused on error handling

▫ Time out ▫ Deadlock ▫ Exception propagations

• Very useful for our project ▫ Multi threaded environment ▫ Queues that can cause starvation and deadlocks ▫ Modeling of communication protocol ▫ Complex exception handling ▫ Hard to test and debug client/server processes

39

UI Designer Static Perspective 40

Currently Actors depend directly on Desktop Java [Lattix]

Extensibility: Abstract Factory - Easy to add new Actor for Android

Usability – one to one mapping from preview to the UI

Agenda

• Project Overview

• Accomplishments

• TSP Process

• Risk Management

• Quality Assurance

• CMMI Assessment

• System Architecture

• Going Forward

41

Work Breakdown Structure

42

WBS – Implementation

43

Release Schedule

44

2011 Spring (720 hours) 2011 Summer (2304 hours)

Feb. March April May June July Aug.

Detailed Design

SRS Tool Setup

Design Proposals

Training

R1 6/3

R2 6/18

R4 7/12

System &

Acceptance

Testing

Implementation

High level Design

Experiments

EOSP EOSP

R3 7/4

Most Likely Dates

Implementation

Plan

Release Schedule

45

• Release #1

▫ End-to-end simulation

• Release #2

▫ Graphical actors on Android

• Release #3

▫ Customizable User Interface

• Release #4

▫ User and developer guides

The “Takeaways”

46

• Improve and tailor your processes continuously, use postmortems

• Identify and track risks, especially with greenfield projects

• Make sure that quality attributes are architecturally relevant, but keep the original (raw) QAs.

• Learn to use statistical methods for data analysis

• Be careful integrating additional resources into the project.

• Don’t do experiments without clear design and exit criteria.

Can’t assume everyone is on the same page.

Questions?

47

The “Takeaways” - Tools

48

Tool name Evaluation

Findbugs • Static analysis tool • Helped point to true positive faults in the Ptolemy core code • Decided to use it for our project too.

Lattix • Static dependency analysis • Showed a possible violation of dependencies in the Ptolemy

architecture. • Could simulate adding a new package and verify the

feasibility of our modification • Berkeley team removed the violation for the next version

WBS Pro • Work breakdown structure creation tool • Helped to create and manage the WBS and estimations • Provides a highly customizable interface • Decided to keep using it

Understand • Static dependency analysis • It was hard to track relations and was too complex to be

useful in the short term

Backups

49

Implementation Plan

• Defines development environment ▫ Server and individual hardware and software setups

• Defines strategies and techniques used during

implementation ▫ Development ▫ Testing ▫ Continuous integration ▫ Working hours and common times ▫ Techniques that we want to try

• Defines major tasks, WBS, releases, and release

functionalities

• Lists hardware and software inventory used, including vendors, model numbers, and versions.

50

Managing Risks – Lessons learned

51

• Pros

▫ Drove experiments and architecture

▫ Shows when risk mitigation itself turns into a risk

▫ Awareness of possible problems

▫ Helped identify lack of domain knowledge (training and quiz)

• Cons

▫ SEI method takes a lot of time

▫ Reluctance to report team or personnel risks individually, SRE worked better

TSP – Lessons Learned

52

Lesson learned Rationale

Clear exit criteria is important

Realized the importance when we couldn’t decide what the end result is for one of the experiments

Even subjective viewpoints are measurable

Adapted scoreboards to measure the teams morale and overall contributions. It was recreated once as scoreboard became stale

Tools can help increase performance significantly

Even with all the troubles coming from the tool, it provided a good medium to measure time spent and define tasks

Standups: Do we need them or not?

Worked during Fall (Scrum), varied during Spring as tasks were more decoupled. Common times and design meetings were enough.

CMMI Assessment

• What?

▫ Performed an informal CMMI assessment

▫ Targeted level 2 & 3 process areas of staged model

• Why?

▫ Wanted to learn how to conduct individual interviews

▫ Wanted to identify process improvement areas

53

TSP - Weekly Form

54

TSP – Cycle Goals

55

TSP – Cycle Task List

56

TSP – Improvement Proposals

57

TSP – Task Transparency

58

Managing Risks

59

Approximately 25 risks identified

Tracking top 5 risks

Mitigated many technical risks, and a few process risks

Made some concerns transparent to the team.

Switched from tracking in Google Docs to TSP Tool and back to Google Docs.

Managing Risks – Identified & Analyzed

60

Managing Risks – Exposure & Multi-Voting

61

Managing Risks – Mitigation Strategies

62

Ptolemy Desktop Application

Model

Output

63

Quality Assurance - Fagan Inspection

64

Dependency Matrix

65

Violation was fixed after we

reported it

High Priority, 30 Medium Priority,

25

Low Priority, 5

High Priority

Medium Priority

Low Priority

Priority Requirement Document

66

CMMI Assessment

• Distribute a weekly email with statistics to force people to look at them

• Have an established process where in progress and stabilized artifacts go

• Document type of estimation bias

• Establish baseline level of quality that is acceptable

• Establish standard set of practices for artifact review

67

Scoreboard Questions • Before

• Team Spirit • Overall effectiveness • Rewarding Experience • Team Productivity • Process quality • Is TSP working for us? • Satisfaction with what we are

learning

• After

• How much do you enjoy the project?

• Has your work in the past week interested you?

• Do you feel that the project is on track?

• Do you feel that your personal goals align with the team goals?

• Was help available from other team members when you need it?

• How well was each role performed (w/ comment)?

• Does the team, including yourself, contribute equally? ▫ Please explain, with role

names, your rating from the previous question

68

Workload Considerations

69

• Kept track of changing assignments

• Estimated overall effect on the plan based on # of people affected and approximated weight.

Ptolemy Architecture – Pipe-and-Filter

Entities (actors or filters), links, and the pipe‐and-filter architecture within Ptolemy. The entities are linked and can only communicate through existing links connected with relations

70

Element Responsibility

Entity Entities are the filters in the supported pipe-and-filter architecture. They are responsible for computation within the system. An entity can contain any number of ports.

Port Port is a point of connection for the entity. It can serve both as output and input, and knows if there’s a token waiting for processing.

Relation The relation is responsible to keep track of links. It controls the creation and termination of links

Token An encapsulation of a data message. Token serves to identify the message type, size and data boundaries

Link A link defines an association between an entity's port and a relation.

Ptolemy Architecture – Pipe-and-Filter

A sample communication flow of the Ptolemy pipe-and-filter architecture based model. The model uses immutable objects called tokens to transfer any kind of data.

71

Element Responsibility

Entity Entities are the filters in the supported pipe-and-filter architecture. They are responsible for computation within the system. An entity can contain any number of ports.

Port Port is a point of connection for the entity. It can serve both as output and input, and knows if there’s a token waiting for processing.

Relation The relation is responsible to keep track of links. It controls the creation and termination of links

Token An encapsulation of a data message. Token serves to identify the message type, size and data boundaries

Link A link defines an association between an entity's port and a relation.

Simulation Static View

72

Physical Perspective

73

Independent Layer Static View

UI Package

Android JavaSE

createInstance(Modules[] modules)static Injector getInjector()T getInstance(Class<T> type)

PlatformInjector

configureAndroidUIModule

Container

ContainerImpl

AndroidContainer JavaSEContainer

<<bind>>

configureJavaSEUIModule

<<bind>><<bind>>

<<bind>><<bind>>

mainMain

<<bind>>

<<bind>><<bind>>

T getInstance(Class<T> type)Injector

<<bind>>

74

Token Handler

75

ACDM List of Outstanding Issues • Reliability - how do we address that?

▫ Action: 2, 3 ▫ Comments: Address time out, runtime exceptions and deadlocks. Look at unstable queues

• We didn’t look at how Ptolemy implemented Corba or other communication protocols. This might be more elegant. ▫ Receivers ▫ Ports ▫ Action: 3

• We didn’t look at the attribute widget. ▫ SharedAttribute might be a problem. ▫ Action: 2, 3 ▫ Comments: If SharedAttribute is used on both client and server. We need to synchronize values each

time, it changes. Possibly pausing simulation in between. • Experiment 2 results are not captured and analyzed

▫ Action: 2 ▫ Comments: Capture the data and plot the latency

• Plotter might be painful using the platform ind. layer ▫ Action: 3 ▫ Comments: in worst case we reimplement it for Android

• We did not consider the case of server supporting multiple clients ▫ Action: 2, 3 ▫ Comments: Decide how to assign different topic names to different clients and kill simulation

instances once client disconnects (last will and testament feature should help)

76

Quality Attributes

77

Quality Attributes

78

Quality Attributes

79

Quality Attributes

80

Quality Attributes

81

Quality Attributes

82

Quality Attributes

83

Quality Attributes

84

Quality Attributes

85

Quality Attributes

86

Quality Attributes

87

Quality Attributes

88

Quality Attributes

89

Quality Attributes

90

Other Experiments

• Complete port of Ptolemy

• Code Generation

• TCP/IP protocol communication

• Netbeans UI Designer

91

Alternatives

• Simulation Engine ▫ Code Generation ▫ Compile Ptolemy on Android

• UI Designer

▫ Eclipse ▫ Built-in tool ▫ Netbeans

• Communication Interface ▫ TCP/IP ▫ MQTT ▫ XMPP

92

Estimation Metrics

93

Under Right On Over

Count 33.000 2.000 59.000

Average % 62.701 39.711

Std Dev 70.255