Environmental Noise Assessment Report
Site No. FN03XC064 SF Bay
1760 Solano Ave Berkeley, CA
EBI Project No. 62127837
January 10, 2013
Prepared for:
Sprint, LLC
c/o Overland Contracting, Inc.
Prepared by:
ATTACHMENT 9 ZAB 11-14-13 Page 1 of 60
Environmental Noise Assessment Report Site No. FN03XC064 EBI Project No. 62127837 1760 Solano Ave Berkeley, CA
EBI Consulting ii
TABLE OF CONTENTS
1.0 EXECUTIVE SUMMARY .................................................................................................................... 3
2.0 BACKGROUND ................................................................................................................................ 3
3.0 REGULATORY REQUIREMENTS ........................................................................................................ 5
4.0 SITE DESCRIPTION .......................................................................................................................... 7
5.0 AMBIENT SOUND LEVEL MEASUREMENTS ...................................................................................... 9
6.0 MODELED POST CONSTRUCTION NOISE LEVELS ........................................................................ 10
7.0 RESULTS AND CONCLUSIONS ...................................................................................................... 12
8.0 LIMITATIONS ................................................................................................................................. 13
9.0 REVIEWER CERTIFICATION ........................................................................................................... 13
APPENDICES
Appendix A Sound Monitoring Data & Notes Appendix B EBI – Environmental Noise Model Results Appendix C Equipment Specifications
ATTACHMENT 9 ZAB 11-14-13 Page 2 of 60
Environmental Noise Assessment Report Site No. FN03XC064 EBI Project No. 62127837 1760 Solano Ave Berkeley, CA
21 B Street Burlington, MA 01803 1.800.786.2346
1.0 EXECUTIVE SUMMARY
Sprint, currently operates an unstaffed wireless telecommunications facility at site number FN03XC064 (site nameSF Bay). This site is located in a commercial area at 1760 Solano Ave, Berkeley, CA, and is herein referred to as SF Bay. A study of the noise effects from the existing climate controlled equipment on nearby areas was performed by EBI Consulting. Existing sound levels at the site property lines were measured on December 18, 2012. Acoustic modeling was done to assess the potential change in existing sound levels and predict post construction daytime and nighttime sound levels. This report evaluates the compliance for the 1760 Solano Ave site in relation to the City of Berkeley Noise Regulation. Based on the results of this study, EBI concludes that the FN03XC064 project will be in compliance with the Berkeley Municipal Code Community Noise Regulations (as amended by Ordinance 7.122-N-S) concerning the sound level limits at all project property lines.
2.0 BACKGROUND
All sounds originate from a source. The sound energy, produced by a source, creates variations in air pressure which travel in all directions much like a wave ripples across the water. The “loudness” or intensity of a sound is a function of the sound pressure level, defined as the ratio of two pressures: the measured sound pressure from the source divided by a reference pressure (i.e. threshold of human hearing). Sould level measurements are most commonly expressed using the decibel (dB) scale. The decibel scale is logarithmic to accommodate the wide range of sound intensities the human ear is capable of responding to. On this scale, the threshold of human hearing is equal to 0 dB, while levels above 140 dB can cause immediate hearing damage. One property of the decibel scale is that the combined sound pressure level of separate sound sources is not simply the sum of the contributing sources. For example, if the sound of one source of 70 dB is added to another source of 70 dB, the total is only 73 dB, not a doubling to 140 dB. In terms of human perception of sound, a 3 dB difference is the minimum perceptible change for broadband sounds (i.e. sounds that include all frequencies). A difference of 10 dB represents a perceived halving or doubling of loudness. Environmental sound is commonly expressed in terms of the A-weighted sound level (dBA). The A-weighting is a standard filter to make measured sound levels more nearly approximate the frequency response of the human ear. Table 1 shows the adjustments made at each octave band frequency to contour un-weighted sound levels (dB) to A-weighted sound levels (dBA).
ATTACHMENT 9 ZAB 11-14-13 Page 3 of 60
Environmental Noise Assessment Report Site No. FN03XC064 EBI Project No. 62127837 1760 Solano Ave Berkeley, CA
21 B Street Burlington, MA 01803 1.800.786.2346
TABLE 1 - A-WEIGHTED OCTAVE BAND ADJUSTMENT (±dB)
Octave Band Center
Frequency (Hz)
32 64 125 250 500 1000 2000 4000 8000 16000
A-weighting Adjustment
(±dB) -39.4 -26.2 -16.1 -8.6 -3.6 0.0 +1.2 +1.0 -1.1 -6.6
Environmental sound varies depending on environmental conditions. Some sounds are sharp impulses lasting for short periods of time, while others rise and fall over longer periods of time. There are various measures (metrics) of sound pressure designed for different purposes. The Leq, or equivalent sound level, is the steady-state sound level over a period of time that has the same acoustic energy as the fluctuating sound that was measured over the same period. The Leq is commonly referred to as the average sound level and is calculated automatically by the sound level meter using methods defined in ANSI S1.4-19831.
1 American National Standards Institute, ANSI S1-4-1983, American National Standard Specification for Sound Level Meters, 1983
ATTACHMENT 9 ZAB 11-14-13 Page 4 of 60
Environmental Noise Assessment Report Site No. FN03XC064 EBI Project No. 62127837 1760 Solano Ave Berkeley, CA
EBI Consulting
3.0 REGULATORY REQUIREMENTS
Berkeley Municipal Code Community Noise Regulations (as amended by Ordinance 7.122-N-S) The city of Berkeley’s Ordinance No 7.122-N-S, describes Community Noise standards and noise level limits. These limits are applicable at the boundaries of the property where sound is produced. The table of sound level limits for each land use category has been extracted from the Ordinance and is shown in Table 2 below. Section 13.40.050 of the Ordinance specifies Exterior Noise Level Limits not to be exceeded more than 30 minutes in any hour in each zoning district. Note that the limit corresponding to the zoning district of the receiver (not the noise source) is applied.
TABLE 2 - BERKELEY NOISE COMMUNITY NOISE TABLE OF APPLICABLE EXTERNAL NOISE LIMITS
Land Use Time of DayOne Hour Average
Sound Level(decibels)
R 1, R 2, R 1A, R 2A andESR
7 a.m. to 10 p.m. 55
10 p.m. to 7 a.m. 45
R 3 and above7 a.m. to 10 p.m. 60
10 p.m. to 7 a.m. 55
Commercial7 a.m. to 10 p.m. 65
10 p.m. to 7 a.m. 60
Industry Anytime 70 In addition, the Ordinance prohibits creation of any noise which causes the sound level when measured on any other property to exceed:
a. The noise standard for that land use as specified in Table 2 for a cumulative period of more than 30 minutes in any hour; or b. The noise standard for that land use as specified in Table 2 plus 5 dBA for a cumulative period of more than 15 minutes in any hour; or c. The noise standard for that land use as specified in Table 2 plus 10 dBA for a cumulative period of more than 5 minutes in any hour; or d. The noise standard for that land use as specified in Table 2 plus 15 dBA for a cumulative period of more than 1 minute in any hour; or e. The noise standard for that land use as specified in Table 2 plus 20 dBA for any period of time.
The Ordinance also specifies how limits may be adjusted in the event that the measured ambient noise level is greater than the level permissible within any of the noise limit categories above. When this occurs, the sound level when measured on any other property shall not exceed:
ATTACHMENT 9 ZAB 11-14-13 Page 5 of 60
Environmental Noise Assessment Report Site No. FN03XC064 EBI Project No. 62127837 1760 Solano Ave Berkeley, CA
EBI Consulting
a. The ambient noise level for a cumulative period of more than 30 minutes in any hour; or b. The ambient noise level plus 5 dBA for a cumulative period of more than 15 minutes in any hour; or c. The ambient noise level plus 10 dBA for a cumulative period of more than 5 minutes in any hour; or d. The ambient noise level plus 15 dBA for a cumulative period of more than 1minute in any hour; or e. The ambient noise level plus 20 dBA for any period of time.
ATTACHMENT 9 ZAB 11-14-13 Page 6 of 60
Environmental Noise Assessment Report Site No. FN03XC064 EBI Project No. 62127837 1760 Solano Ave Berkeley, CA
EBI Consulting
4.0 SITE DESCRIPTION
The site FN03XC064 is located in a commercial area at 1760 Solano Ave, Berkeley, CA. The site is zoned as C-SO, commercial, according to the City of Berkeley zoning map2, and therefore noise generated by the installed equipment is subject to the limitations in the commercial category of Table 2. One (1) Samsung MMBS cabinet and one (1) Samsung BBU cabinet is proposed for installation on the roof of the existing building on site. Figure 1 presents the proposed equipment cabinet location, monitoring locations, property line and nearest residential property. According to aerial photographs, the nearest private residential structure is 917 Ensenada Avenue, approximately 100 feet from the equipment cabinet(s).
2 City of Berkeley Department of Information Technology, “Official Zoning Map”, March 18, 1999. Online: http://www.ci.berkeley.ca.us/gis/maproom/Zoning/zoningmap.htm
ATTACHMENT 9 ZAB 11-14-13 Page 7 of 60
Environmental Noise Assessment Report Site No. FN03XC064 EBI Project No. 62127837 1760 Solano Ave Berkeley, CA
EBI Consulting
SF Bay FN03XC064 1760 Solano Ave, Berkeley, CA Site Visit Date: December 18, 2012
FIGURE 1 – SITE SCHEMATIC AND MONITORING LOCATIONS
Loc-2
Loc-1
Property Line
Equipment Location
Nearest Residence
ATTACHMENT 9 ZAB 11-14-13 Page 8 of 60
Environmental Noise Assessment Report Site No. FN03XC064 EBI Project No. 62127837 1760 Solano Ave Berkeley, CA
EBI Consulting
5.0 AMBIENT SOUND LEVEL MEASUREMENTS
Short-term (20 minute) sound monitoring, day and night, was performed in the area surrounding the proposed location on December 18, 2012. See Figure 1. All sound level measurements were taken with a Casella CEL-633real-time octave-band sound level analyzer, which was equipped with a precision condenser microphone having an operating range of 5 dB to 140 dB, and an overall frequency range of 3.5 to 20,000 Hz. The meter meets or exceeds all requirements set forth in the American National Standards Institute (ANSI) Standards for Type 1 for quality and accuracy. Prior to and immediately following both measurement sessions, the sound analyzer was calibrated (no level adjustment was required) with an ANSI Type 1 calibrator, which has an accuracy traceable to the National Institute of Standards and Technology (NIST). All instrumentation was laboratory calibrated per ANSI recommendations. For all measurement sessions the microphone was fitted with an environmental windscreen to negate the effect of air movement and tri-pod mounted at a height of 1.3 meters above grade, and measurements were made away from any vertical reflecting surfaces in compliance with ANSI Standards S12.93. All data were downloaded to a computer following the measurement session. The sound data are shown in Appendix A and are summarized in Table 3.
TABLE 3 – AMBIENT SOUNT LEVEL MONITORING RESULTS DECEMBER 18, 2012
Location Description Time Leq
(dBA)
Loc 1 Northeast Property Line4:07 – 4:27 p.m. 61.8
2:16 – 2:36 a.m. 47.5
Loc 2 Northwest Property Line4:28 – 4:49 p.m. 59.7
2:37 – 2:57 a.m. 46.2
3 Acoustical Society of America, ANSI Standard S12.9-1992, “Quantities and Procedures for Description and Measurement of Environmental Sound”
ATTACHMENT 9 ZAB 11-14-13 Page 9 of 60
Environmental Noise Assessment Report Site No. FN03XC064 EBI Project No. 62127837 1760 Solano Ave Berkeley, CA
EBI Consulting
6.0 MODELED POST CONSTRUCTION NOISE LEVELS
Post construction sound level effects from the proposed equipment at the northwest and northeast site property lines were calculated with the EBI Consulting – Environmental Noise Model (EBI-ENM). EBI-ENM is a sophisticated spreadsheet model for sound propagation and attenuation based on International Standard ISO 96134 and other industry accepted calculation standards. Atmospheric absorption, the process by which sound energy is absorbed by the air, is calculated using the Volpe Method5 which is consistent with ANSI S1.26-19956. The absorption of sound assumes standard dry conditions and is significant at great distances. The EBI-ENM model uses the Modified Kurze-Anderson Formula7 to predict the insertion loss of any barriers intersecting the line-of-sight between the receiver and the sound source. Complete modeling output sheets from the EBI-ENM are contained in Appendix B. Table 5 summarizes the results of the acoustic modeling. Predictive post-construction noise levels were calculated for site FN03XC064 using measured existing noise levels and acoustical specifications for one (1) Samsung MMBS cabinet and one (1) Samsung BBU cabinet. Noise specifications for proposed equipment are summarized in Table 4.
4 International Standard, ISO 9613-2, Acoustics – Attenuation of Sound During Propagation Outdoors, -- Part 2 General Calculation Method. 5 Rickley, E., Fleming, G., & Roof, C. Simplified Procedure for Computing Absorption of Sound by the Atmosphere, Noise Control Engineering, US, 2007 6 American National Standards Institute, ANSI S1-26-1995, American National Standard Method for the Calculation of the Absorption of Sound by the Atmosphere, 1995 7 Menounou, P. A Correction to Maekawa’s Curve for the Insertion Loss Behind Barriers. Journal of Acoustical Society of America, Vol. 101, Issue 4, 2001
ATTACHMENT 9 ZAB 11-14-13 Page 10 of 60
Environmental Noise Assessment Report Site No. FN03XC064 EBI Project No. 62127837 1760 Solano Ave Berkeley, CA
EBI Consulting
TABLE 4 – ACOUSTIC MODELING RESULTS
Source Name DescriptionNoise Generated by Equipment (dBA)
Source Loc 1 Loc 2
Samsung MMBSCabinet
Equipment Cabinet ClimateControl Unit 65 42.5 43.9
Samsung BBU Cabinet Equipment Cabinet ClimateControl Unit 66 41.5 42.7
TABLE 5 – POST CONSTRUCTION SOUND LEVEL RESULTS
LocationExisting Condition (dBA)
Future Condition (dBA)and Increase (±dB)
w/ Proposed Equipment
Daytime Nighttime Daytime Nighttime
Loc 1Norteast Property Line 61.7 47.5 61.9
(+0.2)49.9
(+2.4)
Loc 2Northwest Property
Line59.7 46.2 59.8
(+0.1)48.7
(+2.5)
ATTACHMENT 9 ZAB 11-14-13 Page 11 of 60
Environmental Noise Assessment Report Site No. FN03XC064 EBI Project No. 62127837 1760 Solano Ave Berkeley, CA
EBI Consulting
7.0 RESULTS AND CONCLUSIONS
The equipment cabinet installation at 1760 Solano Ave will comply with the City of Berkeley Municipal Code regarding noise. The City of Berklee stipulates that noise levels in commercially zoned areas shall not exceed 65 dBA during daytime hours of 7 am to 10 pm, and 60 dBA during nighttime hours of 10 pm to 7am. As shown in Table 5, worst-case predictive modeling indicates that the equipment installation will not cause an appreciable impact (+>3 dBA), and will result in post-construction noise conditions below all applicable limits. Therefore the site will remain in compliance with the code once the proposed equipment is installed and operating.
ATTACHMENT 9 ZAB 11-14-13 Page 12 of 60
Environmental Noise Assessment Report Site No. FN03XC064 EBI Project No. 62127837 1760 Solano Ave Berkeley, CA
EBI Consulting
8.0 LIMITATIONS
This report was prepared for the use of Sprint and Overland Contracting. The conclusions provided by EBI are based solely on the information provided by the client. The observations in this report are valid on the date and time of the investigation. Reported noise levels contained herein are a factor of meteorological and environmental conditions present at the time of the site survey, and represent “typical” site noise levels. Measurement and calculations contained in this report should be considered accurate to within one decibel. Any additional information that becomes available concerning the site should be provided to EBI so that our conclusions may be revised and modified, if necessary. This report has been prepared in accordance with Standard Conditions for Engagement and authorized proposal, both of which are integral parts of this report and has been designed to address the Berkeley Municipal Code Community Noise Regulations.
9.0 REVIEWER CERTIFICATION
I, Cynara Cannatella, state that:
I am an employee of Envirobusiness Inc. (d/b/a EBI Consulting), which provides acoustic survey and compliance services to the wireless communications industry. I have reviewed the data collected during the site survey which is incorporated into this Site Compliance Report such that the information contained in this report is true and accurate to the best of my knowledge.
Sincerely, By EBI Consulting
Cynara Cannatella Senior Engineer
ATTACHMENT 9 ZAB 11-14-13 Page 13 of 60
Environmental Noise Assessment Report Site No. FN03XC064 EBI Project No. 62127837 1760 Solano Ave Berkeley, CA
APPENDIX A
SOUND MONITORING DATA & NOTES
ATTACHMENT 9 ZAB 11-14-13 Page 14 of 60
ID PERIODID STARTDATE OCTAVETYPE FREQ32HZ FREQ63HZ FREQ125HZ FREQ250HZ FREQ500HZ FREQ1KHZ FREQ2KHZ FREQ4KHZ FREQ8KHZ FREQ16KHZ VARLN
Day Run 1
91138040-7 09f43cdc-ff 12/17/2012 19:27 3 71.4 65.5 69.3 63.6 58.3 58.2 55.3 48.5 40.1 28 NULL120b4e76-2 91d79b34-1 12/17/2012 19:22 3 71.8 69 66.8 60.4 59.2 58.8 57.2 53.9 46.4 38.3 NULLdfca376c-fa e73e2e59-b 12/17/2012 19:17 3 71.9 69.8 66.9 59.3 58 57.5 54.6 51.9 45.6 37.6 NULLb1bf91de-2 3bade88a-2 12/17/2012 19:12 3 69.6 67 64 58 56 56.1 52.6 46.3 37.8 26.7 NULLd0a59255-a f0858319-0 12/17/2012 19:07 3 70.4 67.3 65.6 57.4 55.7 55.3 51.7 45.7 39.3 27.7 NULL
Average 71.02 67.72 66.52 59.74 57.44 57.18 54.28 49.26 41.84 31.66
Day Run 2
192874f0-08fd902798-1 12/17/2012 19:48 3 67.7 64.5 60.5 54.9 54.7 54.1 50.8 42.6 32.4 21 NULL676c7ba5-c 67c6f751-43 12/17/2012 19:43 3 75 68.3 64.7 58.4 56 55.6 52.3 46.9 37.8 26.8 NULL0afe3058-5646aefab2-6 12/17/2012 19:38 3 71.6 68.4 63 56.5 53.9 54.4 51.6 44.4 34.4 23.9 NULL940de0ec-8 dcde7ec7-b 12/17/2012 19:33 3 70.3 69.2 69.4 57.8 55.7 55.3 52.2 46.3 39.4 30.2 NULL6af90cd3-1245a63833-5 12/17/2012 19:28 3 71 70.4 67.3 59.9 57 56.6 53.8 47.6 39 31.9 NULL
Average 71.12 68.16 64.98 57.5 55.46 55.2 52.14 45.56 36.6 26.76
Night Run 1
a6628de0-d dfd835c5-c8 12/18/2012 5:36 3 58.9 54.6 48 44 44.2 41 35.9 28 22 15.9 NULLccbb49b4-4 3bf21177-3 12/18/2012 5:31 3 56.8 53.2 49.1 46.2 44.8 44.1 41.1 30.2 18.8 13.4 NULL416f3212-684b54cafe-3d 12/18/2012 5:26 3 54.9 55.4 51 48.8 48.6 51.1 47.6 38.1 27 17.3 NULLd441bff2-1bd62adf8f-a8 12/18/2012 5:21 3 54.5 52.1 48.7 43.6 42.9 37.9 29.5 25.4 20.6 14.6 NULLd235ea76-3 9f6e784a-5 12/18/2012 5:16 3 55 53.7 51 45.4 44.7 43.4 41.2 32.8 21.2 13.9 NULL
Average 56.02 53.8 49.56 45.6 45.04 43.5 39.06 30.9 21.92 15.02
Night Run 2
d01178d9-3de99a665-1 12/18/2012 5:57 3 51.9 52.7 52 47.1 44.3 38.3 38 29.8 24 15.3 NULL5e983068-1 929222f3-7 12/18/2012 5:52 3 50.9 49.4 46.6 42.7 41.4 35.3 24.1 20.2 16 13.5 NULLe4c246a3-a 4d37a946-b 12/18/2012 5:47 3 51.7 53.3 47.4 44.8 45.3 44.2 41 31.7 21.6 14.2 NULL8e75cb7f-14ab4426de-1 12/18/2012 5:42 3 51.2 50.3 47.9 44.8 44.9 47.5 43 31.4 20.9 13.9 NULLc4516fdb-61e249cad2-a 12/18/2012 5:37 3 53.6 49.8 48.5 44.1 45 44.7 39.9 29 19.5 13.6 NULL
Average 51.86 51.1 48.48 44.7 44.18 42 37.2 28.42 20.4 14.1
ATTACHMENT 9 ZAB 11-14-13 Page 15 of 60
Client Site #:EBI CONSULTING - NOISE MONITORING FIELD NOTES
EBI Project #: 62127837 FN03XC064-APerformed By: Natalie Varner
WEATHER CONDITIONS: (per http://www.erh.noaa.gov/)
MEASUREMENT MEASUREMENT LOCATION (SKETCH)Location #: 1
Location: Northeast property lineDate: Monday, December 17, 2012
Start Time/End Time: 16:07:05/16:27:21Run #: 161
Start EndTemperature: 52 51Wind Speed: 3G07 5G09
Wind Direction: W WSW
2) pedestrians 6)
Humidity: 92% 92%Sky: cloudy cloudy
SOUND SOURCES (order by most prominent)
1) traffic 5)
3) 7)
4) 8)
MONITORING NOTES (describe & note time of intrusions, changes in condition, etc.)
people walked to door nearby and talked
ATTACHMENT 9 ZAB 11-14-13 Page 16 of 60
Client Site #:EBI CONSULTING - NOISE MONITORING FIELD NOTES
EBI Project #: 62127837 FN03XC064-APerformed By: Natalie Varner
WEATHER CONDITIONS: (per http://www.erh.noaa.gov/)
MEASUREMENT MEASUREMENT LOCATION (SKETCH)Location #: 2
Location: Northwest property lineDate: Monday, December 17, 2012
Start Time / End Time: 16:28:50/16:49:12Run #: 162
Start EndTemperature: 51 50Wind Speed: 5G09 5G06
Wind Direction: WSW WSW
2) pedestrians 6)
Humidity: 92% 92%Sky: cloudy cloudy
SOUND SOURCES (order by most prominent)
1) traffic 5)
3) 7)
4) 8)
MONITORING NOTES (describe & note time of intrusions, changes in condition, etc.)
ATTACHMENT 9 ZAB 11-14-13 Page 17 of 60
Client Site #:EBI CONSULTING - NOISE MONITORING FIELD NOTES
EBI Project #: 62127837 FN03XC064-APerformed By: Natalie Varner
WEATHER CONDITIONS: (per http://www.erh.noaa.gov/)
MEASUREMENT MEASUREMENT LOCATION (SKETCH)Location #: 1
Location: Northeast Property LineDate: Tuesday, December 18, 2012
Start Time / End Time: 2:16:26/2:36:57Run #: 165
Start EndTemperature: 42 42Wind Speed: 6G12 5G16
Wind Direction: N S
2) occasional traffic 6)
Humidity: 80% 77%Sky: partly cloudy partly cloudy
SOUND SOURCES (order by most prominent)
1) nature sounds 5)
3) 7)
4) 8)
MONITORING NOTES (describe & note time of intrusions, changes in condition, etc.)
ATTACHMENT 9 ZAB 11-14-13 Page 18 of 60
Client Site #:EBI CONSULTING - NOISE MONITORING FIELD NOTES
EBI Project #: 62127837 FN03XC064-APerformed By: Natalie Varner
WEATHER CONDITIONS: (per http://www.erh.noaa.gov/)
MEASUREMENT MEASUREMENT LOCATION (SKETCH)Location #: (e.g. "2-N")
Location: Northwest Property LineDate: Tuesday, December 18, 2012
Start Time / End Time: 2:37:31/2:57:53Run #: 166
Start EndTemperature: 42 42Wind Speed: 5G16 9G15
Wind Direction: S NW
2) occasional traffic 6)
Humidity: 77% 74%Sky: partly cloudy partly cloudy
SOUND SOURCES (order by most prominent)
1) nature sounds 5)
3) 7)
4) 8)
MONITORING NOTES (describe & note time of intrusions, changes in condition, etc.)
ATTACHMENT 9 ZAB 11-14-13 Page 19 of 60
xy
z32
6412
525
050
01k
2k4k
8k16
kSa
msu
ngBB
UBa
tter
yC a
bin
C124
/756
3234
.37
4193
974.
4311
.00
Lp1.
572
.070
.067
.065
.062
.060
.059
.056
.053
.050
.075
.866
.0Sa
msu
ngM
MBS
Cabi
net
C224
/756
3234
.72
4193
973.
3511
.00
Lp1.
571
.069
.066
.064
.061
.059
.058
.055
.052
.049
.074
.865
.0
EBIC
onsu
lting
Envi
ronm
enta
lNoi
seM
odel
Soun
dSo
urce
Data
SFBa
y/
FN03
XC06
4
Lw/L
pO
pera
ting
Tim
eSo
urce
Loca
tion
(UTM
)(m
eter
s)So
urce
Oct
ave
Band
Soun
dLe
vel(
dB)
Broa
dban
dLe
vel(
dB)
Broa
dban
dLe
vel(
dBA)
IDSo
urce
Nam
eLp
Ref.
Dist
.(m
)
ATTACHMENT 9 ZAB 11-14-13 Page 21 of 60
xy
z32
6412
525
050
01k
2k4k
8k16
kN
orth
east
Pro p
erty
Line
1Da
yR1
D56
3221
.09
4193
984.
591.
50Le
qDa
y71
.067
.766
.559
.757
.457
.254
.349
.341
.831
.674
.061
.7N
orth
east
Prop
erty
Line
1N
ight
R1N
5632
21.0
941
9398
4.59
1.50
Leq
Nig
ht56
.053
.849
.645
.645
.043
.539
.030
.922
.015
.059
.247
.5N
orth
wes
tPro
pert
yLi
ne2
Day
R2D
5632
49.5
341
9398
7.33
1.50
Leq
Day
71.1
68.2
65.0
57.5
55.5
55.2
52.1
45.6
36.6
26.8
73.8
59.7
Nor
thw
estP
rope
rty
Line
2N
ight
R2N
5632
49.5
341
9398
7.33
1.50
Leq
Nig
ht51
.951
.148
.544
.744
.242
.037
.228
.420
.414
.156
.446
.2
Broa
dban
dLe
vel(
dBA)
L eq/
L 90
EBIC
onsu
lting
Envi
ronm
enta
lNoi
seM
odel
Rece
iver
Data
SFBa
y/
FN03
XC06
4
Rece
iver
Nam
eID
Rece
iver
Loca
tion
(UTM
)(m
eter
s)Da
y/N
ight
Rece
iver
Exis
ting
Oct
ave
Band
Soun
dLe
vel(
dB)
Broa
dban
dLe
vel(
dB)
ATTACHMENT 9 ZAB 11-14-13 Page 22 of 60
xy
z
*Men
ouno
u,P.
ACo
rrectio
nto
Maekawa'sC
urve
forthe
InsertionLossBe
hind
Barriers
.Jo
urna
lofA
cous
tical
Soci
ety
ofAm
eric
a,Vo
l.10
1,Is
sue
4.20
01,*
*Sou
ndTr
ansm
issio
nCl
ass
EBIC
onsu
lting
Envi
ronm
enta
lNoi
seM
odel
Barr
ierA
tten
uatio
nCa
lcul
atio
nM
odifi
edKu
rze
Ande
rson
Expr
essi
onof
Mae
kaw
aCu
rve*
SFBa
y/
FN03
XC06
4
Barr
ierN
ame
IDDi
stan
ce(m
)(S
ourc
eBa
rrie
r)Ba
rrie
rHe
ight
(m)
Barr
ierI
nser
tion
Poin
t(U
TM)
Flan
king
Loss
(dB)
Flan
king
Loss
(dBA
)So
urce
IDRe
ceiv
erID
Barr
ierS
TC**
(dB)
Tran
smis
sion
Loss
(dB)
Tran
smis
sion
Loss
(dBA
)
ATTACHMENT 9 ZAB 11-14-13 Page 23 of 60
3264
125
250
500
1000
2000
4000
8000
1600
0Te
mpe
ratu
re(
F/
C)68
F29
3.15
Kelv
in1.
63E
0 76.
53E
072.
49E
069.
96E
063.
99E
051.
59E
046.
38E
042.
55E
031.
02E
024.
08E
02At
mos
pher
icPr
essu
re(in
Hg/k
Pa)
30in
Hg10
1.58
kPa
Rela
tive
Hum
idity
(%)
50%
50%
4705
776.
7F r
O
3272
6.94
3F r
N
116.
5563
8h
1.63
705 9
V
Freq
uenc
yCo
nsta
nt#1
Freq
uenc
yCo
nsta
nt#2
Hum
idity
Cons
tant
Tem
pera
ture
Cons
tant
Oct
ave
Band
Atte
nuat
ion
(dB/
m)
Valu
eU
nit
EBIC
onsu
lting
Envi
ronm
enta
lNoi
seM
odel
Atm
osph
eric
Abso
rptio
nCa
lcul
atio
nVo
lpe
Met
hod*
SFBa
y/
FN03
XC06
4
Mod
elin
gCo
nditi
ons
Valu
eU
nit
*Ric
kley
,E.,
Flem
ing,
G.,a
ndRo
of,C
.Sim
plified
ProcedureforC
ompu
tingtheAb
sorptio
nof
Soun
dby
theAtmosph
ere.
Noi
seCo
ntro
lEng
inee
ring,
US.
2007
ATTACHMENT 9 ZAB 11-14-13 Page 24 of 60
C1C2
R1D
19.2
320
.06
R1N
19.2
320
.06
R2D
22.0
622
.47
R2N
22.0
622
.47
Sour
ceto
Rece
iver
Dist
ance
Calc
ulat
ion
SFBa
y/
FN03
XC06
4
Soun
dSo
urce
ID
EBIC
onsu
lting
Envi
ronm
enta
lNoi
seM
odel
Rece
iver
ID
ATTACHMENT 9 ZAB 11-14-13 Page 25 of 60
78
910
1112
1314
1516
Dist
.Ba
rrie
r(m
)ID
3264
125
250
500
1k2k
4k8k
16k
Nor
thea
stPr
oper
tyLi
ne1
Day
R1D
71.0
67.7
66.5
59.7
57.4
57.2
54.3
49.3
41.8
31.6
74.0
61.7
Sam
sung
BBU
Batt
ery
Cabi
neC1
19.2
Lp1.
549
.847
.844
.842
.839
.837
.836
.833
.830
.827
.253
.643
.9Sa
msu
ngM
MBS
Cabi
net
C220
.1Lp
1.5
48.5
46.5
43.5
41.5
38.5
36.5
35.5
32.5
29.4
25.8
52.3
42.5
PRED
ICTE
DFU
TURE
LEVE
L71
.167
.866
.659
.957
.557
.354
. 449
.542
.433
.774
.161
.9N
orth
wes
tPro
pert
yLi
ne2
DaR2
D71
.168
.265
.057
.555
.555
.252
.145
.636
.626
.873
.859
.7Sa
msu
ngBB
UBa
tter
yCa
bine
C122
.1Lp
1.5
48.7
46.7
43.7
41.7
38.7
36.7
35.7
32.6
29.6
25.9
52.5
42.7
Sam
sung
MM
BSCa
bine
tC2
22.5
Lp1.
547
.545
.542
.540
.537
.535
.534
.531
.528
.424
.751
.341
.5PR
EDIC
TED
FUTU
RELE
VEL
71.2
68.3
65.1
57.7
55.7
55.3
52.3
46.0
37.9
30.6
73.9
59.8
Broa
dban
dSP
L(d
B)Br
oadb
and
SPL
(dBA
)So
urce
Nam
e
EBIC
onsu
lting
Envi
ronm
enta
lNoi
seM
odel
Dayt
ime
Soun
dLe
velC
alcu
latio
nSF
Bay
/FN
03XC
064
Rece
iver
Nam
eID
Lp/L
wLp
Ref.
Dist
.(m
)O
ctav
eBa
ndSo
und
Pres
sure
Leve
l(SP
L)at
Rece
iver
(dB)
ATTACHMENT 9 ZAB 11-14-13 Page 26 of 60
78
910
1112
1314
1516
Dist
.Ba
rrie
r(m
)ID
3264
125
250
500
1k2k
4k8k
16k
Nor
thea
stPr
oper
tyLi
ne1
Nig
R1N
56.0
53.8
49.6
45.6
45.0
43.5
39.0
30.9
22.0
15.0
59.2
47.5
Sam
sung
BBU
Batt
ery
Cabi
neC1
19.2
Lp1.
549
.847
.844
.842
.839
.837
.836
.833
.830
.827
.253
.643
.9Sa
msu
ngM
MBS
Cabi
net
C220
.1Lp
1.5
48.5
46.5
43.5
41.5
38.5
36.5
35.5
32.5
29.4
25.8
52.3
42.5
PRED
ICTE
DFU
TURE
LEVE
L57
.555
. 451
.648
.446
.845
.242
.137
.333
.529
.760
.949
.9N
orth
wes
tPro
pert
yLi
ne2
Nig
R2N
51.9
51.1
48.5
44.7
44.2
42.0
37.2
28.4
20.4
14.1
56.4
46.2
Sam
sung
BBU
Batt
ery
Cabi
neC1
22.1
Lp1.
548
.746
.743
.741
.738
.736
.735
.732
.629
.625
.952
.542
.7Sa
msu
ngM
MBS
Cabi
net
C222
.5Lp
1.5
47.5
45.5
42.5
40.5
37.5
35.5
34.5
31.5
28.4
24.7
51.3
41.5
PRED
ICTE
DFU
TURE
LEVE
L54
.553
.250
.547
. 445
.943
.840
.735
.932
.328
.558
.748
.7
EBIC
onsu
lting
Envi
ronm
enta
lNoi
seM
odel
Nig
httim
eSo
und
Leve
lCal
cula
tion
SFBa
y/
FN03
XC06
4
Rece
iver
Nam
eSo
urce
Nam
eID
Lp/L
wLp
Ref.
Dist
.(m
)O
ctav
eBa
ndSo
und
Pres
sure
Leve
l(SP
L)at
Rece
iver
(dB)
Broa
dban
dSP
L(d
B)Br
oadb
and
SPL
(dBA
)
ATTACHMENT 9 ZAB 11-14-13 Page 27 of 60
61
Rece
iver
Sum
mar
yN
orth
east
Prop
erty
Line
1Da
yExistingNo
iseLevel
61.7
PredictedFuture
Soun
dLevel
61.9
ProjectedSoun
dLevelIncrease
+0.
2N
orth
wes
tPro
pert
yLi
ne2
Day
ExistingNo
iseLevel
59.7
PredictedFuture
Soun
dLevel
59.8
ProjectedSoun
dLevelIncrease
+0.
1
EBIC
onsu
lting
Envi
ronm
enta
lNoi
seM
odel
Dayt
ime
Noi
seAn
alys
isSu
mm
ary
SFBa
y/
FN03
XC06
4
Com
bine
dSo
urce
Soun
dLe
vel(
dBA)
46.3
45.2
Broa
dban
dSo
und
Leve
l(dB
A)
ATTACHMENT 9 ZAB 11-14-13 Page 28 of 60
61
Rece
iver
Sum
mar
yN
orth
east
Prop
erty
Line
1N
ight
ExistingNo
iseLevel
47.5
PredictedFuture
Soun
dLevel
49.9
ProjectedSoun
dLevelIncrease
+2.
4N
orth
wes
tPro
pert
yLi
ne2
Nig
htExistingNo
iseLevel
46.2
PredictedFuture
Soun
dLevel
48.7
ProjectedSoun
dLevelIncrease
+2.
5
46.3
45.2
EBIC
onsu
lting
Envi
ronm
enta
lNoi
seM
odel
Dayt
ime
Noi
seAn
alys
isSu
mm
ary
SFBa
y/
FN03
XC06
4
Broa
dban
dSo
und
Leve
l(dB
A)Co
mbi
ned
Sour
ceSo
und
Leve
l(dB
A)
ATTACHMENT 9 ZAB 11-14-13 Page 29 of 60
Sam
sung
MM
BS
Spe
cific
atio
nS
amsu
ngM
MB
SS
peci
ficat
ion
Sam
sung
MM
BS
Spe
cific
atio
nS
amsu
ngM
MB
SS
peci
ficat
ion
© S
amsu
ng E
lect
roni
cs. A
ll R
ight
s R
eser
ved.
Con
fiden
tial a
nd P
ropr
ieta
ry.
© S
amsu
ng E
lect
roni
cs. A
ll R
ight
s R
eser
ved.
Con
fiden
tial a
nd P
ropr
ieta
ry.
ATTACHMENT 9 ZAB 11-14-13 Page 31 of 60
Sam
sung
MM
BS
Spe
cific
atio
ns
Cabling
© S
amsu
ng E
lect
roni
cs. A
ll R
ight
s R
eser
ved.
Con
fiden
tial a
nd P
ropr
ieta
ry.
Cabling
Space
ATTACHMENT 9 ZAB 11-14-13 Page 32 of 60
1.9G
Hz
RR
H[U
nit:
mm
]
227.5
[Top
Vie
w]
350
605
[Fro
nt V
iew
][R
ight
Vie
w]
[Lef
t Vie
w]
[Rea
r Vie
w]
© S
amsu
ng E
lect
roni
cs. A
ll R
ight
s R
eser
ved.
Con
fiden
tial a
nd P
ropr
ieta
ry.
[Bot
tom
Vie
w]
ATTACHMENT 9 ZAB 11-14-13 Page 33 of 60
1.9G
Hz
RR
H
AN
T 3
OP
TIC
AN
T 2
AN
T 1
AN
T 0
PO
WE
R[-4
8V]
RE
TG
roun
d
© S
amsu
ng E
lect
roni
cs. A
ll R
ight
s R
eser
ved.
Con
fiden
tial a
nd P
ropr
ieta
ry.
[Bot
tom
Vie
w]
ATTACHMENT 9 ZAB 11-14-13 Page 34 of 60
1.9G
Hz
RR
H w
ith B
rack
et
[Top
Vie
w]
95 3
286
705
[Fro
nt V
iew
][R
ight
Vie
w]
[Lef
t Vie
w]
605
7[B
otto
m V
iew
]
[Rea
r Vie
w]
© S
amsu
ng E
lect
roni
cs. A
ll R
ight
s R
eser
ved.
Con
fiden
tial a
nd P
ropr
ieta
ry.
ATTACHMENT 9 ZAB 11-14-13 Page 35 of 60
1.9G
Hz
RR
H In
stal
latio
n (P
ole)
[Uni
t:m
m]
Pol
e(Ø
76.
3~11
4.3m
m)
605
286
141.
635
8
© S
amsu
ng E
lect
roni
cs. A
ll R
ight
s R
eser
ved.
Con
fiden
tial a
nd P
ropr
ieta
ry.
ATTACHMENT 9 ZAB 11-14-13 Page 36 of 60
1.9G
Hz
RR
H S
peci
ficat
ion
Items
RFUnitS
pecification
Ope
ratin
gFreq
uency
1930
~19
95MHz
(DL),185
0~19
15MHz
(UL)
Channe
lBandw
idth
CDMA:1.25M
Hz,LTE
:1.4/3/5/10/15
/20M
Hz,
///
//
Num
bero
fCarrie
rsCD
MAon
ly:U
pto
8Carrie
rsLTEon
ly:U
pto
4Carrie
rsCD
MA+
LTE:C
onfigurable
RRU
Configuration
4T4R
Instantane
ousb
andw
idth
65MHz
RFpo
wer
160W
(40W
x4Tx)
Dimen
sion(H
xW
xD)
605(23.8”)x
350(13.8”)x
227.5(9.0”)
()
()
()
()
Weight
abou
t60lbs(abou
t27kg)
Tempe
rature
40~55
o Cwith
solarshield
Power
Consum
ption
730W
Antenn
aInterface
Analog
RF4
DIN/Fem
ale
BBUInterface
CPRI4.0
4SingleMod
e,1core
with
LCconn
ector
Grou
ndcable
Grou
nd1
2Ho
leLU
G
Power
DCpo
wer(4
8VD
C)1
2pinnakedsolder
© S
amsu
ng E
lect
roni
cs. A
ll R
ight
s R
eser
ved.
Con
fiden
tial a
nd P
ropr
ieta
ry.
ATTACHMENT 9 ZAB 11-14-13 Page 37 of 60
800M
Hz
RR
H
265
[Uni
t: m
m]
[Top
Vie
w]
383
88
457
488.
5
[Fro
nt V
iew
][L
eft V
iew
][R
ight
Vie
w]
[Rea
r Vie
w]
© S
amsu
ng E
lect
roni
cs. A
ll R
ight
s R
eser
ved.
Con
fiden
tial a
nd P
ropr
ieta
ry.
[Bot
tom
Vie
w]
ATTACHMENT 9 ZAB 11-14-13 Page 38 of 60
800M
Hz
RR
H
Gro
und
EQ
P B
to E
XT
FIB
ER
PO
WE
R[-4
8V]
RE
TO
/S
PO
WE
R
[Bot
tom
Vie
w]
AN
T A
EQ
P A
AN
T B
© S
amsu
ng E
lect
roni
cs. A
ll R
ight
s R
eser
ved.
Con
fiden
tial a
nd P
ropr
ieta
ry.
ATTACHMENT 9 ZAB 11-14-13 Page 39 of 60
800M
Hz
RR
H In
stal
latio
n (P
ole)
[�ni
t�m
m]
Pol
e(Ø
763
114
3mm
)
457
Pol
e(Ø
76.3
~114
.3m
m)
457
286.
5
141.
650
5
© S
amsu
ng E
lect
roni
cs. A
ll R
ight
s R
eser
ved.
Con
fiden
tial a
nd P
ropr
ieta
ry.
ATTACHMENT 9 ZAB 11-14-13 Page 40 of 60
800M
Hz
RR
H In
stal
latio
n(W
all)
[Uni
t: m
m]
488.
5
510
286.
5
© S
amsu
ng E
lect
roni
cs. A
ll R
ight
s R
eser
ved.
Con
fiden
tial a
nd P
ropr
ieta
ry.
ATTACHMENT 9 ZAB 11-14-13 Page 41 of 60
800M
Hz
RR
H S
peci
ficat
ion
© S
amsu
ng E
lect
roni
cs. A
ll R
ight
s R
eser
ved.
Con
fiden
tial a
nd P
ropr
ieta
ry.
ATTACHMENT 9 ZAB 11-14-13 Page 42 of 60
1.6G
Hz
RR
H
*Rep
resentativeview
ofRR
H
© S
amsu
ng E
lect
roni
cs. A
ll R
ight
s R
eser
ved.
Con
fiden
tial a
nd P
ropr
ieta
ry.
ATTACHMENT 9 ZAB 11-14-13 Page 43 of 60
1.6G
Hz
RR
H S
peci
ficat
ion
Item
sR
F U
nit
Spe
cifi
cati
on
Ope
ratin
gFreq
uency
DL:152
515
59MHz
UL:162
6.5
1660
.5MHz
Channe
lBandw
idth
LTE:5/10M
Hz
Num
bero
fCarrie
rs2Carriers
maxim
umNum
bero
fCarrie
rs2Ca
rriers
maxim
um
RRU
RFCo
nfiguration
2Tx/2R
x
Instantane
ousB
W34
MHz
RFpo
wer
80W
(40W
x2Tx)
Dimen
sion(H
xW
xD)
RRH:
300(11.8”)x
550(21.6”)x
230(9.1”)
Externalfilter:
220(8.7”)x21
1(8.3”)x189
(7.4”)
2ndFilte
r:21
6(8.5”)x24
0(9.4”)x11
2(4.4”)
RRH:
abou
t59.5lbs (abou
t27kg)
Weight
(g)
Externalfilter:abou
t21
lbs(abou
t9.5kg)
2ndFilte
r:abou
t16.5lbs(abou
t7.5kg)
Tempe
rature
40~55
o Cwith
solarshield
Power
Consum
ption
MAX
500W
Antenn
aInterface
Analog
RF2
DIN/Fem
ale
BBUInterface
CPRI4.0
2SingleMod
e,1core
with
LCconn
ector
Grou
ndcable
Grou
nd1
2Ho
leLU
G
© S
amsu
ng E
lect
roni
cs. A
ll R
ight
s R
eser
ved.
Con
fiden
tial a
nd P
ropr
ieta
ry.
Power
DCpo
wer(4
8VD
C)1
2pinnakedsolder
ATTACHMENT 9 ZAB 11-14-13 Page 44 of 60
2.5G
Hz
RR
H[U
nit:
mm
]
205
[Top
Vie
w]
350
560
[Fro
nt V
iew
][R
ight
Vie
w]
[Lef
t Vie
w]
[Rea
r Vie
w]
© S
amsu
ng E
lect
roni
cs. A
ll R
ight
s R
eser
ved.
Con
fiden
tial a
nd P
ropr
ieta
ry.
[Bot
tom
Vie
w]
ATTACHMENT 9 ZAB 11-14-13 Page 45 of 60
2.5G
Hz
RR
H
© S
amsu
ng E
lect
roni
cs. A
ll R
ight
s R
eser
ved.
Con
fiden
tial a
nd P
ropr
ieta
ry.
ATTACHMENT 9 ZAB 11-14-13 Page 46 of 60
2.5G
Hz
RR
H S
peci
ficat
ion
© S
amsu
ng E
lect
roni
cs. A
ll R
ight
s R
eser
ved.
Con
fiden
tial a
nd P
ropr
ieta
ry.
ATTACHMENT 9 ZAB 11-14-13 Page 47 of 60
��
�S
Ca�
inet
���
� C
a�in
et
.� �����
����
�.�
���.
�
���.�
���.�
��ro
nt �
ie�
���
eft �
ie�
��R
ear �
ie�
�
© S
amsu
ng E
lect
roni
cs. A
ll R
ight
s R
eser
ved.
Con
fiden
tial a
nd P
ropr
ieta
ry.
ATTACHMENT 9 ZAB 11-14-13 Page 48 of 60
��
�S
Ca�
inet
��
��
�ud
room
GPSSurge
Arrestor
S66M
Block
forU
DA
T1tector
Mud
room
TProt
<Co
mseal>
Maker
:Roxtec
P/N
:Com
Seal16
/16
54
32
10
UDA
orBH
cable
GPScable
6*2”
Cond
uit
© S
amsu
ng E
lect
roni
cs. A
ll R
ight
s R
eser
ved.
Con
fiden
tial a
nd P
ropr
ieta
ry.
[Backsid
eof
theBB
Ucabine
t][M
udroom
]
ATTACHMENT 9 ZAB 11-14-13 Page 49 of 60
��
�S
Ca�
inet
��
��
layo
ut
PDP
Rectifier
DU
Reserved
area
DUDU
Aux.Eq
uip.
CablingSpace
Batterycable
ACcable
© S
amsu
ng E
lect
roni
cs. A
ll R
ight
s R
eser
ved.
Con
fiden
tial a
nd P
ropr
ieta
ry.
��ro
nt �
ie�
�
hybridcable
ATTACHMENT 9 ZAB 11-14-13 Page 50 of 60
��
�S
�at
tery
Ca�
inet
Item
Specificatio
ns
Capacity
Max.4
batterystrin
gs
Aircond
ition
er/coo
lingwith
Cooling
Aircond
ition
er/coo
lingwith
fanfore
mergencymod
e(M
cleanT20HV
AC)
Soun
dLevel
66dB
Size
71(H)x
40.25(D)
x27.6(W
)
Cabine
tWeight
44.9lbs
PerB
attery
Si
529lb
Strin
gWeight
529lbs
Battery
NAR
ADA19
0Ah
(12N
DT190)
AGM
type
(VRLA)
ACPo
wer
230V
AC,3.5Am
ptyp,
14.4Am
pstartin
g
DCPo
wer
14,000W
max
@48VD
C
© S
amsu
ng E
lect
roni
cs. A
ll R
ight
s R
eser
ved.
Con
fiden
tial a
nd P
ropr
ieta
ry.
ATTACHMENT 9 ZAB 11-14-13 Page 51 of 60
��
�S
�at
tery
Ca�
inet
���
���.
���
��.�
© S
amsu
ng E
lect
roni
cs. A
ll R
ight
s R
eser
ved.
Con
fiden
tial a
nd P
ropr
ieta
ry.
ATTACHMENT 9 ZAB 11-14-13 Page 52 of 60
��
�S
Ser
vice
Are
a��
�.�
���.
���
��.�
�ud
room
��
Sys
tem
�
���.�
���
atte
ry
�.�
�����.�
����.�
�����
���
��
���
�
© S
amsu
ng E
lect
roni
cs. A
ll R
ight
s R
eser
ved.
Con
fiden
tial a
nd P
ropr
ieta
ry.
���.
���
���.
�
ATTACHMENT 9 ZAB 11-14-13 Page 53 of 60
��
�S
Ca�
inet
s �S
enso
rs
�ire
Sen
sor
�oo
r S�
itch
Ser
vice
�ig
ht
�ire
Sen
sor
�oo
r S�
itch
Ser
vice
�ig
ht
Res
erve
d ar
ea
gg
Au�
iliary
Au�
iliary
E�ui
pmen
t
�loo
d se
nsor
�loo
d se
nsor
© S
amsu
ng E
lect
roni
cs. A
ll R
ight
s R
eser
ved.
Con
fiden
tial a
nd P
ropr
ieta
ry.
���
Ca�
inet
���
atte
ry C
a�in
et�
ATTACHMENT 9 ZAB 11-14-13 Page 54 of 60
��
�S
Ca�
inet
�S
ingl
e C
a�in
et
Load
Breakers(18)
BatteryBreakers(2)
Samsung
DU
Rectifier
Shelf
ACMainBreaker
ACSPD
GPSSplitter
UserS
pace
Samsung
DU
Samsung
DUEA
IU
Battery1strin
g
CablingSpace
6*2”
cond
uit
12*DC
SPDforR
RH
© S
amsu
ng E
lect
roni
cs. A
ll R
ight
s R
eser
ved.
Con
fiden
tial a
nd P
ropr
ieta
ry.
ATTACHMENT 9 ZAB 11-14-13 Page 55 of 60
��
�S
Ca�
inet
Spe
cific
atio
nIte
ms
Spec
ifica
tion
Syst
em T
ype
��
�S
�ut
door
Freq
uenc
y ��
���
�� �
.��
���
�.�
��
�� �
.��
��
� R
R�
Sect
or�
a�. �
RR
�� s
ecto
r ��
otal
��
RR
� m
a��
IBW
(MH
z)��
��
����
���
���
���
�.��
�� ��
��
���.
����
���
���
�.��
���
��
� C
a�in
et �
���
�g �
�o �
� s
helf
Wei
ght
g��
� �g
�ith
� �
� s
helf
�at
tery
Ca�
inet
� ��
� �g
��o
�at
tery
����
�g
�ith
�at
tery
Soun
dLe
vel
�ee
ts �
R��
���C
ore
���
d�A
at a
hei
ght o
f �.�
m a
nd d
ista
nce
f��
�So
und
Leve
lof
�.�
m�
Net
wor
k In
terf
ace
�� o
r ���
or o
ptic
Phys
ical
Dim
ensi
ons
(HxW
xD)
����
����
����
����
�� m
m �
��.�
in �
��.
�in
� ��
.���
�.��
in
Pow
er C
onsu
mpt
ion
����
AC
��A
�ma�
� �
�o �
atte
ry��
nly
C�
�A
����
AC
��A
�ma�
� �
�o �
atte
ry�C
��
A��
�E��
i�A
���
��A
C �
�A�m
a� �
�ith
�at
tery
��nl
yC
��
A ��
��A
C �
�A�m
a� �
�ith
�at
tery
�C�
�A
���E
��i�
A�
DU
RU
It
fC
PR
ifiti
ti
© S
amsu
ng E
lect
roni
cs. A
ll R
ight
s R
eser
ved.
Con
fiden
tial a
nd P
ropr
ieta
ry.
DU
-RU
Inte
rfac
eC
PR
��.�
spe
cific
atio
n��
ptic
�
ATTACHMENT 9 ZAB 11-14-13 Page 56 of 60
��
�S
�at
tery
© S
amsu
ng E
lect
roni
cs. A
ll R
ight
s R
eser
ved.
Con
fiden
tial a
nd P
ropr
ieta
ry.
ATTACHMENT 9 ZAB 11-14-13 Page 57 of 60
�y�
rid C
a�le
© S
amsu
ng E
lect
roni
cs. A
ll R
ight
s R
eser
ved.
Con
fiden
tial a
nd P
ropr
ieta
ry.
ATTACHMENT 9 ZAB 11-14-13 Page 58 of 60
�y�
rid C
a�le
�yp
esType
1Type
2Type
3Type
4Type
5
TotalLen
gth
~40m
~60m
~75m
~90m
~110m
HbidP
AWG10
1i
AWG81
iAW
G61
iAW
G61
iAW
G41
iHy
bridPo
wer
Cable
configuration
AWG10,1
pair,
AWG12,3
pair
AWG8,1pair,
AWG10,3
pair
AWG6,1pair,
AWG8,1pair,
AWG10,2
pair
AWG6,1pair,
AWG8,3pair
AWG4,1pair,
AWG6,1pair
AWG8,1pair
Cablediam
eter
25mm
27mm
30mm
30/32m
m1)
32mm
Bend
ingradius
300m
m330m
m390m
m450m
m450m
m
Opticcable
LC/PCto
LC/PC,
Singlemod
e
DUcabine
t2pairpo
wer
andop
ticcableWith
PEpipe
DUcabine
t(pow
ercable
term
inalmax
size
AWG4)
2pairpo
wer
andop
ticcableWith
PEpipe
RRUPo
wer
cableSpec
AWG8,15
.7mm
AWG10,12.2m
m
Non
usePo
wer
andop
ticcable
2pairpo
wer
and
optic
cableWith
2pairpo
wer
andop
ticcable
2pairpo
wer
and
optic
cableWith
PE2pairpo
wer
and
optic
cableWith
PE
© S
amsu
ng E
lect
roni
cs. A
ll R
ight
s R
eser
ved.
Con
fiden
tial a
nd P
ropr
ieta
ry.
pprotectio
np
PEpipe
pWith
PEpipe
ppipe
ppipe
ATTACHMENT 9 ZAB 11-14-13 Page 59 of 60
�y�
rid C
a�le
�ei
ghts
�y
Sup
plie
r
Type
(ft)
(kg)
(lbs)
(kg)
(lbs)
(kg)
(lbs)
(kg)
(lbs)
6013
280.
20.
519
410.
30.
7
Type
175
1635
0.2
0.5
2249
0.3
0.7
9019
420.
20.
526
570.
30.
7
105
3066
0.3
0.6
2965
0.3
0.7
120
3475
0.3
0.6
3373
0.3
0.7
Type
213
538
850.
30.
646
101
0.3
0.7
150
4394
0.3
0.6
5111
20.
30.
7
165
4710
40.
30.
655
122
0.3
0.7
Type
3
180
6915
10.
40.
872
160
0.3
0.7
195
7516
40
40
878
173
03
07
Type
319
575
164
0.4
0.8
7817
30.
30.
7
210
8017
70.
40.
885
187
0.3
0.7
Type
4
225
8919
60.
40.
910
222
40.
30.
7
240
9520
90.
40.
910
923
90.
30.
7
255
101
222
04
09
115
254
03
07
255
101
222
0.4
0.9
115
254
0.3
0.7
Type
5
270
133
293
0.5
1.1
122
270
0.3
0.7
285
141
310
0.5
1.1
152
335
0.3
0.7
300
148
326
0.5
1.1
160
353
0.3
0.7
315
155
342
0.5
1.1
168
371
0.3
0.7
© S
amsu
ng E
lect
roni
cs. A
ll R
ight
s R
eser
ved.
Con
fiden
tial a
nd P
ropr
ieta
ry.
330
163
359
0.5
1.1
176
388
0.3
0.7
ATTACHMENT 9 ZAB 11-14-13 Page 60 of 60