Environmental Management and Monitoring Report January – December 2014 SRI: Dry Zone Urban Water and Sanitation Project Prepared by the National Water Supply And Drainage Board, Ministry of Urban Development, Water Supply And Drainage for the Asian Development Bank. This environmental management and monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. Your attention is directed to the “terms of use” section on ADB’s website.'. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area

Upload: tranlien

Post on 13-Feb-2018

214 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Environmental Management and Monitoring Report · PDF fileEnvironmental Management and Monitoring Report ... Excavation work for the foundations of aerator, ... filter and sump was

Environmental Management and Monitoring Report January – December 2014

SRI: Dry Zone Urban Water and Sanitation Project

Prepared by the National Water Supply And Drainage Board, Ministry of Urban Development, Water Supply And Drainage for the Asian Development Bank.

This environmental management and monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. Your attention is directed to the “terms of use” section on ADB’s website.'. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area

Page 2: Environmental Management and Monitoring Report · PDF fileEnvironmental Management and Monitoring Report ... Excavation work for the foundations of aerator, ... filter and sump was

ADB ASSISTED DRY ZONE URBAN WATER AND SANITATION PROJECT

Environmental Management

and Monitoring Report For the period from January to December 2014

Prepared by

SMEC International in association with Ocyana Consultants and Ceywater Consultants (Pvt) Ltd

On behalf of

Project Co-ordination Cell of the

National Water Supply And Drainage Board

Ministry of Urban Development, Water Supply And Drainage

Submitted to

Sri Lanka Residence Mission,

Asian Development Bank,

Colombo

Page 3: Environmental Management and Monitoring Report · PDF fileEnvironmental Management and Monitoring Report ... Excavation work for the foundations of aerator, ... filter and sump was

2

Contents LIST OF FIGURES & MAPS ............................................................................................................................ 3

LIST OF TABLES ............................................................................................................................................... 3

LIST OF ABBREVIATIONS .............................................................................................................................. 4

1. Introduction .................................................................................................................................................. 6

1.1. Contractors’, Supervision Consultants’ and Clients’ role in environmental safeguards

compliance ...................................................................................................................................................... 7

2. Construction activities during the period ................................................................................................. 8

Subprojects in Chilaw ........................................................................................................................................ 8

Surface water intake at Deduru Oya (SW/C/01) ........................................................................................... 8

Water treatment plant (WTP/C/04A) ........................................................................................................... 8

Distribution pipe lines (PIPES/C/08B) ........................................................................................................... 9

Ground reservoir at Bangadeniya (WTP/C/04A) ........................................................................................... 9

Septage treatment plant (SEP/C&P/06) ........................................................................................................ 9

Public toilets (PT/C/14) ................................................................................................................................. 9

Subprojects in Puttalam .................................................................................................................................... 9

Surface water intake (Eluwankulama, Achchimolai tanks and feeder canals) (SW/P/01) .......................... 9

Water treatment plant (WTP/P/04A) ........................................................................................................... 9

Distribution pipe lines (PIPES/P/09).............................................................................................................. 9

Ground reservoir at Kalladiya (WTP/P/04A) ................................................................................................. 9

Septage treatment plant (SEP/P/06) .......................................................................................................... 10

Public toilets (PT/P/15) ............................................................................................................................... 10

Subprojects in Mannar .................................................................................................................................... 10

Distribution pipe lines (PIPES/M/11) .......................................................................................................... 10

Surface storage tank (STRU/M/12) ............................................................................................................. 10

Septage treatment plant (SEP/M/07) ......................................................................................................... 10

Page 4: Environmental Management and Monitoring Report · PDF fileEnvironmental Management and Monitoring Report ... Excavation work for the foundations of aerator, ... filter and sump was

3

Public toilets (PT/M/17) .............................................................................................................................. 10

Subproject activities in Vavuniya .................................................................................................................... 10

Reservoir and surface water intake at Per Aru (SW/V/02) ......................................................................... 10

Water treatment plant (WTP/V/05) ........................................................................................................... 10

Distribution pipe lines (PIPES/V/10 & PIPES/V&M/19) .............................................................................. 11

Public toilets (PT/V/16) ............................................................................................................................... 11

3. Environmental impacts, mitigation measures taken at site and monitoring .................................... 12

4. Status of environmental licenses and permits for rock blasting and plants .................................... 37

5. Public complaints ..................................................................................................................................... 37

6. Conclusion and further actions ............................................................................................................... 37

Photo documentation of environmental safeguards compliance of each subproject .... Error! Bookmark

not defined.

LIST OF FIGURES

Figure 1 Location of each subproject in Chilaw, Puttalam, Mannar and Vavuniya

LIST OF TABLES

Table 1.1. Subprojects under DZUWSP with contract No. and date of commencement of

construction

Table 3.1. Activities carried out in each subproject, their impacts to environment, mitigation

measures, effectiveness and any further action needed

Page 5: Environmental Management and Monitoring Report · PDF fileEnvironmental Management and Monitoring Report ... Excavation work for the foundations of aerator, ... filter and sump was

4

LIST OF ABBREVIATIONS

ADB Asian Development Bank

CTB Ceylon Tourist Board

DPR Daily Progress Report

DZUWSP Dry Zone Urban Water & Sanitation Project

EA Environmental Assessment

EIA Environmental Impact Assessment

EMS Environmental Method Statement

EMP Environmental Management Plan

EMoP Environmental Monitoring Plan

ES Environmental Specialist

EPL Environmental Protection License

GRC Grievance Redress Committee

IEE Initial Environmental Examination

IEER Initial Environmental Examination Report

MSW Municipal Solid Waste

PPE Personal Protection Equipment

PPTA Project Preparatory Technical Assistance

SC Supervision Consultant

Page 6: Environmental Management and Monitoring Report · PDF fileEnvironmental Management and Monitoring Report ... Excavation work for the foundations of aerator, ... filter and sump was

F

igure

1. Location o

f each

subpro

ject

in C

hila

w,

Putt

ala

m,

Mannar

and V

avu

niy

a

Page 7: Environmental Management and Monitoring Report · PDF fileEnvironmental Management and Monitoring Report ... Excavation work for the foundations of aerator, ... filter and sump was

Environmental Management and Monitoring Report

January to December 2014

1. Introduction

The Dry Zone Urban Water and Sanitation Project (DZUWSP) is funded by the Asian Development

Bank (ADB) through loan 2477 and 2977. The project aims at rehabilitation, expansion and

development of water and sanitation infrastructure (including septage treatment) for major towns in

north and north western dry zone of the country. Urban and peri-urban towns of Chilaw, Puttalam,

Manner and Vavuniya will be benefited through the project. Institutional reforms and capacity

development of water sector institutions in Sri Lanka will also be carried out by the project. The

project will implemented from June 2009 to June 2016 with a total project cost of US $ 163 million.

Ministry of Urban Development, Water Supply and Drainage is the executing agency for the project,

while National Water Supply and Drainage Board (NWS & DB) is the project implementing agency.

Subprojects under DZUWSP are listed below with their contract number and date of

commencement.

Table 1.1. Subprojects under DZUWSP with contract No. and date of commencement of

construction

Subproject

area

Subproject Contract No. Date of

Commencement

Chilaw Surface water intake at Deduruoya SW/C/01 July, 2014

Water treatment plant WTP/C/04A June, 2014

Distribution pipe lines PIPES/C/08B January, 2013

Ground reservoir at Bangadeniya WTP/C/04A June, 2014

Septage treatment plant SEP/C&P/06 April, 2013

Public toilets (at Chilaw fish market

and Bus park)

PT/C/14 March, 2013

Puttalam Surface water intake (Achchimolai

reservoir)

SW/P/01 March, 2014

Water treatment plant WTP/P/04A August, 2014

Distribution pipe lines PIPES/P/09 November, 2013

Reservoir at Kalladiya WTP/P/04A June, 2014

Septage treatment plant SEP/P/06 April, 2013

Public toilets (at Puttalam Sunday

Market)

PT/P/15 March, 2013

Mannar Distribution pipe lines PIPES/M/11 April, 2013

Surface storage tank STRU/M/12 December, 2013

Septage treatment plant SEP/M/07 August, 2013

Public toilets (at Papamoddai) PT/M/17 May, 2013

Page 8: Environmental Management and Monitoring Report · PDF fileEnvironmental Management and Monitoring Report ... Excavation work for the foundations of aerator, ... filter and sump was

7

Subproject

area

Subproject Contract No. Date of

Commencement

Vavuniya Surface water intake (Per Aru

reservoir)

SW/V/02 July, 2013

Water treatment plant WTP/V/05 April, 2014

Distribution pipe lines PIPES/V/10 October, 2013

PIPES/V&M/19 January, 2014

Public toilets (at Cycle park and

near Horowpatana road)

PT/V/16 May, 2013

Environmental Assessments (EAs) have been carried out during the Project Preparatory Technical

Assistance (PPTA) stage for each project component. The EAs included an Environmental Impact

Assessment (EIA) for the Per Aru reservoir and surface water intake, Initial Environmental

Examinations (IEE) for all other water supply and sanitation projects in Chilaw, Puttalam, Mannar

and Vavuniya.

The impacts identified and mitigation measures suggested under the sections “Screening of

Potential Impacts” and “Mitigation Measures” of each EA report (IEER) were summarized in to an

Environmental Management Plan (EMP). An Environmental Monitoring Plan (EMoP) was also

prepared for each subproject that includes information on environmental parameters to be

monitored, Location, time and frequency, cost for sampling and stage of subproject on which the

monitoring should be conducted. The EMoP is considered to be a useful tool to monitor the

implementation of mitigation measures and EMP.

1.1. Contractors’, Supervision Consultants’ and Clients’ role in

environmental safeguards compliance

As indicated above NSW & DB is the project implementing agency and the Project Co-ordination

Cell (PCC) headed by the Project Director has the overall responsibility in monitoring the

implementation of EMP and EMoP by each contractor. The Supervision Consultant/ Engineer {(SC),

SMEC International in association with Ocyana Consultants and Ceywater Consultants (Pvt) Ltd}

working under the PCC will directly supervise/ monitor the contractor in implementing the EMP.

The EMPs and EMoPs have incorporated into respective bid documents, and each contractor has

submitted an Environmental Method Statement (EMS) which has been reviewed and approved by

the engineer.

Execution of mitigation measures to minimise environmental impacts during construction period is a

responsibility of the contractor/s. The SC shall also direct the contractor to rectify any non-

compliance situation arising in construction sites.

Page 9: Environmental Management and Monitoring Report · PDF fileEnvironmental Management and Monitoring Report ... Excavation work for the foundations of aerator, ... filter and sump was

8

Critical construction activities are monitored on a daily basis by SC and any non-compliance

situations and rectification measures/ instructions to contractor are recoded in Daily Progress

Reports (DPRs), engineers’ log books and monitoring checklists.

Monitoring of air quality, water quality, noise and vibration levels are done on a quarterly basis by

the contractor, while compliance indicators such as availability of Vehicle Emission Test certificates

are monitored by the SC at a lesser frequency. A public complaint register is also maintained by the

contractor/s under the supervision of SC. Any complaint received from public is attended by the

contractor with instructions from SC.

An Environmental Specialist (ES) has been appointed by the SC on an intermittent basis, to look into

the environmental safeguards aspects of the overall project. A mechanism has been developed to

communicate between Team Leader, Deputy Team leaders and Resident Engineers of SC to assist

them in resolving any environmental issue arising in each subproject. However the ES conducts site

visits at least once a month to record the level of compliance by the contractor and instructions are

given to improve on any non-compliance situation/s.

This report presents the status of environmental safeguards compliance with respect to each sub

project, for the period from January to December, 2014. The report is based on actual filed

observations, DPRs, engineers’ log books, monitoring checklists and other available records/

approvals at site.

2. Construction activities during the period Critical construction activities that were carried out in each subproject during the reporting period are

listed below.

Subprojects in Chilaw

Surface water intake at Deduru Oya (SW/C/01)

Contractor has mobilized at site by constructing the site office, yard and worker camps. An access

road has been cut to the site. About 90 perches of land area have been cleared for these activities.

Vegetation along the banks of stream diversion was removed for the construction of retaining

structures including gabion walls as a means of stream bank protection.

Water treatment plant (WTP/C/04A)

Contractor has mobilized at site and the access road to the site was improved by the contractor. A

land area of about 2.02 Ha has been cleared to establish the water treatment facility, site office,

yards and worker camps. Excavation work for the foundations of aerator, flocculation tank,

sedimentation tanks, sedimentation tanks, filter and sump was carried out during this period.

Construction of structures commenced after the excavation works.

Page 10: Environmental Management and Monitoring Report · PDF fileEnvironmental Management and Monitoring Report ... Excavation work for the foundations of aerator, ... filter and sump was

9

Distribution pipe lines (PIPES/C/08B)

Excavation of trenches to lay water distribution pipe lines was carried out during this period. The

trenches were back filled after laying of different types of pipes including DI, HDPE and PVC pipes.

Overall a length of 10,425 m pipes was layed during the reporting period.

Ground reservoir at Bangadeniya (WTP/C/04A)

With mobilization of contractor at site the access road to the site was improved by the contactor. Site

preparation activities including soil excavation works were carried out in a land area of about 0.2 Ha,

to construct the water storage tank. Structural work related to the storage tanks also commenced

during this period.

Septage treatment plant (SEP/C&P/06)

Site clearing activities were carried out in order to establish the site office, yards and for foundation

works of septage treatment plant. An area of about 1.6 Ha was cleared from the land belonging to

National Livestock Development Board (NLDB) and fenced off. Foundation works and construction

of different treatment ponds commenced at site after clearing of land.

Public toilets (PT/C/14)

Site preparation activities including soil excavation for septic tanks had been completed. All

construction works were completed during the reporting period and the facility was handed over to

the local authority in February, 2014.

Subprojects in Puttalam

Surface water intake (Eluwankulama, Achchimolai tanks and feeder canals) (SW/P/01)

The contractor mobilized at site during the month of March, 2014. Site clearing works and

excavation works were limited to Eluwankulama tank during the reporting period.

Water treatment plant (WTP/P/04A)

A land previously used as a burrow pit adjacent to Puttalam – Mannar road has been selected to

establish the water treatment plant. Contractor has mobilized at site. Excavation work for the

foundations of aerator, flocculation tank, Backwash Recovery Tank and Clear Water Tank was

carried out during this period. Construction of structures commenced after the excavation works. A

total of 2.405 Ha of land was cleared for these activities.

Distribution pipe lines (PIPES/P/09)

Excavation works for trenches for laying of water distribution lines was a key activity carried out

during this period. A total length of 54.8 km of pipe lines were layed and back filled.

Ground reservoir at Kalladiya (WTP/P/04A)

An area of about 0.4 Ha was cleared for the construction works. Structural works commenced after

excavation for the foundation of storage tank. An electric fence was placed in the periphery of the

site for protection from elephants.

Page 11: Environmental Management and Monitoring Report · PDF fileEnvironmental Management and Monitoring Report ... Excavation work for the foundations of aerator, ... filter and sump was

10

Septage treatment plant (SEP/P/06)

With mobilization of contractor a land area of about 1.06 Ha was cleared to establish the treatment

plant. Soil excavation works related to foundation works were completed. Structural works at site

also commenced during this period. The project area was fenced off from the adjoining lands.

Public toilets (PT/P/15)

Site preparation works at the site (Puttalam Sunday market) were carried out the contractor. Soil

excavation works to construct the septic tanks and soakage tanks were completed and structural

works of the toilets were also completed & handed over on 31st March 2014.

Subprojects in Mannar

Distribution pipe lines (PIPES/M/11)

Contractor commenced excavation works to lay the water supply distribution pipe lines. The

trenches were back filled once the pipe lines were placed inside the trenches. A total of 98,766 m

(93%) has been laid during the period from January to December 2014.

Surface storage tank (STRU/M/12)

Contractor has commenced major structural works at site. Of that, 75% of ground water sump wall

concreting at Murunkan and 25% at Eluthoor has been finished. Conical base concrete for elevated

tower at Eluthoor has been poured. All other related civil works have been in progress, giving a 34%

overall progress.

Septage treatment plant (SEP/M/07)

Contractor completed all works under the contract and cleared all debris /waste materials to the

satisfaction. Arrangement has been taken to hand over the site to Urban Council – Mannar after

completing installation of renewable energy system to provide electricity to the site.

Public toilets (PT/M/17)

All the sites had been handed over to relevant Local authorities on 06-01-2014 and now functioning.

Subproject activities in Vavuniya

Reservoir and surface water intake at Per Aru (SW/V/02)

Contractor mobilized at site by establishing the office, camps, yards and material stores at a location

close to the dam site. An area of about 1.2 Ha has been cleared to establish the above facilities.

Clearing off the vegetation along the dam axis also commenced during this period. The biodiversity

rescue operations were also carried out during the month of February, 2014. Earth excavation,

construction of earth bund and structural works of spill and intake are the key activities related to the

Per Aru reservoir and intake.

Water treatment plant (WTP/V/05)

Clearing of about 2 Ha was done to establish the water treatment facility. The construction site was

fenced off from nearby lands. Earth excavation works for the treatment plant facilities were carried

out. Foundation and structural works commenced once the excavation works were completed.

Page 12: Environmental Management and Monitoring Report · PDF fileEnvironmental Management and Monitoring Report ... Excavation work for the foundations of aerator, ... filter and sump was

11

Distribution pipe lines (PIPES/V/10 & PIPES/V&M/19)

A total length of 171 km of pipes was layed after cutting trenches. All these trenches were back filled

with suitable filling material.

Public toilets (PT/V/16)

All construction activities have been completed by January, 2014 and the sites have been handed

over to the client in July, 2014.

Page 13: Environmental Management and Monitoring Report · PDF fileEnvironmental Management and Monitoring Report ... Excavation work for the foundations of aerator, ... filter and sump was

12

3.

En

vir

on

men

tal im

pacts

, m

itig

ati

on

measu

res t

aken

at

sit

e a

nd

mo

nit

ori

ng

K

ey

activitie

s d

iscussed u

nder

sect

ion 2

have

been c

arr

ied o

ut

in e

ach s

ubpro

ject

during

the r

eport

ing

period.

These a

ctiv

itie

s i

n

genera

l have

im

pacts

on phys

ica

l, ecolo

gic

al

and socia

l en

viro

nm

ents

fo

r w

hic

h m

itig

ation m

easure

s have

been ta

ken by th

e

contr

act

or

under

the s

uperv

isio

n o

f S

C.

The e

ffective

ness o

f m

itig

ation m

easure

s h

ave

been m

onitore

d a

nd r

ecord

ed b

y th

e S

C.

In

cases w

here

furt

her

actio

ns w

ere

needed

the S

C h

as a

dvi

sed t

he c

ontr

acto

r. T

able

3.1

belo

w s

um

marize

the a

ctivi

ties c

arr

ied o

ut

in

each s

ubpro

ject, t

heir im

pacts

to t

he e

nvi

ronm

ent, m

itig

ation m

easure

s t

aken t

o a

void

/ m

inim

ize t

he a

dve

rse im

pacts

, eff

ective

ness

of

the m

itig

ation m

easure

adopte

d a

nd a

ny

furt

her

act

ion n

eeded.

Table

3.1

. A

ctivi

ties c

arr

ied o

ut

in e

ach s

ubpro

ject

, th

eir im

pact

s t

o e

nvi

ronm

ent, m

itig

ation m

easure

s,

eff

ective

ness a

nd a

ny

furt

her

action n

eeded

Co

nstr

ucti

on

acti

vit

y

En

vir

on

men

tal Im

pact

Mit

igati

on

M

easu

re/s

A

do

pte

d

Mo

nit

ori

ng

in

dic

ato

r M

on

ito

rin

g

freq

uen

cy

Eff

ecti

ven

ess

&

furt

her

acti

on

s

need

ed

Su

bp

roje

cts

in

Ch

ilaw

Su

rfac

e w

ate

r in

tak

e a

t D

ed

uru

Oya (

SW

/C/0

1)

Cle

ari

ng

of

lan

d a

nd

str

eam

bank

for

gab

ion/

reta

inin

g w

all

constr

uction.

Dam

age

to

vegeta

tio

n

cove

r in

clu

din

g

riverin

e

veg

eta

tio

n.

Induce

d w

ash o

ff o

f rive

r bank.

Cle

ari

ng

of

lan

d l

imited

to

the a

rea r

equire

d f

or

the s

ite o

ffic

e,

yard

an

d

cam

ps.

Veg

eta

tio

n

cle

arin

g

alo

ng s

tream

bank d

one

durin

g d

ry f

low

peri

od o

f D

eduru

O

ya

&

constr

uction o

f re

tain

ing

str

uctu

res.

Exte

nt

of

land

are

a

cle

are

d

be

yond

th

e

pro

ject site b

ou

ndary

.

Leng

th

of

river

ba

nk

ero

de

d a

long t

he s

tream

div

ers

ion s

ectio

n.

Month

ly

Weekly

The

contr

acto

r has

fenced

off

th

e

pro

ject

site b

ound

ary

and l

and

cle

ari

ng

has

no

t g

one

be

yond

th

is

bo

und

ary

. A

ll tr

ees t

o b

e r

em

ove

d

have

be

en

mark

ed

at

site.

These t

rees a

re c

ut

and r

em

ove

d b

y T

imber

Corp

ora

tion

.

Contr

acto

r h

as

cle

are

d

the

rive

rine

vege

tation

durin

g

dry

flo

w

and

re

tain

ing w

all

str

uctu

res

are

un

der

constr

uction.

Page 14: Environmental Management and Monitoring Report · PDF fileEnvironmental Management and Monitoring Report ... Excavation work for the foundations of aerator, ... filter and sump was

13

Co

nstr

ucti

on

acti

vit

y

En

vir

on

men

tal Im

pact

Mit

igati

on

M

easu

re/s

A

do

pte

d

Mo

nit

ori

ng

in

dic

ato

r M

on

ito

rin

g

freq

uen

cy

Eff

ecti

ven

ess

&

furt

her

acti

on

s

need

ed

Esta

blis

hm

ent

of

site

off

ice,

yard

a

nd

la

bour

cam

ps.

Accum

ula

tion

an

d

dis

posa

l of

Munic

ipa

l S

olid

Waste

(M

SW

).

Ris

k

of

acc

idents

an

d

hea

lth

ha

zard

s

to

work

ers

.

Colle

ction

of

MS

W

in

bin

s

and

dis

posal

at

sites a

ppro

ved b

y lo

ca

l auth

ority

. W

ork

ers

are

pro

vide

d

with

pro

per

accom

modation

w

ith

sanitary

fa

cili

ties

an

d

Pers

ona

l P

rote

ctio

n

Equ

ipm

ent (P

PE

) D

ispla

y of

safe

ty

an

d

warn

ing sig

n board

s at

site

Open

waste

d

um

ps

at

site.

No. of

work

ers

per

bill

et

Availa

bili

ty

of

pota

ble

w

ate

r at

site

N

o.

of

train

ings g

iven t

o

work

ers

on

health

and

safe

ty

No. of

accid

ents

at site

Weekly

M

onth

ly

Weekly

M

onth

ly

Month

ly

Contr

acto

r has s

up

plie

d

waste

b

ins

and

the

w

ork

ers

have

b

een

in

str

ucte

d

to

dum

p

waste

on

ly t

o th

e bin

s.

Colle

cte

d

MS

W

dis

pose

d

on

ly

at

appro

ved locations.

No b

illet

was observ

ed

w

ith

overc

row

ded

w

ork

ers

. A

ll w

ork

ers

have b

een s

up

plie

d w

ith

m

osquito

nets

and

pota

ble

w

ate

r is

ava

ilab

le.

Month

ly

aw

are

ness

train

ings a

re c

ond

ucte

d

by

the c

ontr

acto

r’s s

taff

.

Safe

ty

and

warn

ing

sig

nb

oard

s

have

been

dis

pla

yed

at

site.

No

fa

tal

accid

ents

w

ere

re

cord

ed

durin

g

the

re

port

ing p

erio

d.

Wate

r tr

eatm

en

t p

lan

t (W

TP

/C/0

4A

)

Cle

ari

ng

of

lan

d a

nd

soil

excava

tio

n.

Dam

age

and

loss

of

veg

eta

tio

n c

over.

A

ccum

ula

tion

of

Cle

ari

ng

of

lan

d l

imited

to

are

a r

equ

ired f

or

the

w

ate

r tr

ea

tment

pla

nt,

site

off

ice,

yard

an

d

work

er

cam

ps.

Sto

ck

pili

ng

exca

vate

d

Exte

nt

of

land

are

a

cle

are

d

be

yond

th

e

pro

ject site b

ou

ndary

. N

o.

of

excava

ted

so

il

Month

ly

Weekly

The

Contr

acto

r has

fenced

off

th

e

pro

ject

site

and

la

nd

cle

ari

ng

has

no

t g

one

b

eyo

nd

th

is b

oun

dary

. A

ll tr

ees

to

be

rem

ove

d

has

been

mark

ed

and

hand

ed

ove

r to

tim

ber

Corp

ora

tion

. N

o

tem

pora

ry

sto

ck

Page 15: Environmental Management and Monitoring Report · PDF fileEnvironmental Management and Monitoring Report ... Excavation work for the foundations of aerator, ... filter and sump was

14

Co

nstr

ucti

on

acti

vit

y

En

vir

on

men

tal Im

pact

Mit

igati

on

M

easu

re/s

A

do

pte

d

Mo

nit

ori

ng

in

dic

ato

r M

on

ito

rin

g

freq

uen

cy

Eff

ecti

ven

ess

&

furt

her

acti

on

s

need

ed

excava

ted

so

il at

site

causin

g s

oil

ero

sio

n a

nd

sedim

enta

tion

durin

g

rain

y seaso

ns.

Genera

tion o

f dust.

N

uis

ance

of

no

ise

an

d

vibra

tion t

o p

ublic

.

soil

aw

ay

from

th

e

nearb

y can

al and

road

. R

euse

of

excava

ted

m

ate

rial.

Dis

posa

l of

unsuitable

m

ate

rial

only

at

appro

ved

sites

by

the

lo

cal auth

ori

ty.

Tim

ing

of

excava

tio

n

work

to

be

com

ple

ted

durin

g d

ry s

eason o

f th

e

year.

P

lacin

g of

a te

mpora

ry

toe w

all

alo

ng t

he s

tock

pile

s

and

guid

ing

the

sto

rm w

ate

r a

wa

y fr

om

th

e s

tock p

iles.

Constr

uction

an

d

main

tenance

of

a

silt

tr

ap

at

the

fina

l dra

in

poin

t of

the

site

1.

Spra

ying o

f w

ate

r a

lon

g

the

access

road

and

w

ith

in t

he s

ite.

Regu

lar

serv

ices

an

d

inspection

of

constr

uction

veh

icle

s

pile

s

left

clo

se

to

the

ro

ad a

nd n

earb

y ca

nal.

No.

of

sto

ck

pile

s

with

out

toe

wa

ll pro

tection.

Esta

blis

hm

ent

of

the s

ilt

trap a

nd m

ain

tena

nce o

f th

e s

ilt tra

p.

In

spection

of

serv

ice

and

main

tenance

re

cord

s

of

all

constr

uction v

ehic

les.

Daily

ru

nnin

g

ch

art

of

the w

ate

r b

ow

ser.

N

o.

of

pub

lic c

om

pla

ints

on d

ust.

Weekly

W

eekly

W

eekly

W

eekly

O

nce

in

3

month

s

pile

s w

ere

p

lace

d ne

ar

the

road

or

can

al.

Ho

we

ver

the c

ontr

acto

r w

as

instr

ucte

d

to

imm

edia

tely

d

ispose

an

y excava

ted m

ate

rial

that ca

nnot

be r

eused.

Contr

acto

r w

as

instr

ucte

d

to

pla

ce

toe

w

alls

aro

und s

tock p

iles

durin

g t

he i

nitia

l m

onth

s

of

this

report

ing

peri

od.

Contr

acto

r esta

blis

hed

th

e s

ilt t

rap t

ow

ard

s t

he

end

of

the

report

ing

perio

d.

Ho

we

ver,

contr

acto

r w

as a

dvis

ed

to

im

pro

ve th

e silt

tr

ap

b

y in

cre

asin

g

its’

capacity.

N

o

com

pla

ints

w

ere

re

ceiv

ed d

ue t

o d

ust.

C

onstr

uction

vehic

les

are

serv

ice

d at

serv

ice

sta

tio

ns

outs

ide

the

1 T

he

to

po

gra

ph

y o

f th

e s

ite

is

such

th

at

the

re i

s o

ne

pro

min

en

t d

rain

po

int

tow

ard

s th

e s

ou

the

rn b

ou

nd

ary

of

the

pro

ject

sit

e.

Page 16: Environmental Management and Monitoring Report · PDF fileEnvironmental Management and Monitoring Report ... Excavation work for the foundations of aerator, ... filter and sump was

15

Co

nstr

ucti

on

acti

vit

y

En

vir

on

men

tal Im

pact

Mit

igati

on

M

easu

re/s

A

do

pte

d

Mo

nit

ori

ng

in

dic

ato

r M

on

ito

rin

g

freq

uen

cy

Eff

ecti

ven

ess

&

furt

her

acti

on

s

need

ed

and m

achin

ery

. A

void

ing

hea

vy

constr

uction

work

s durin

g d

ays

of

relig

ious

import

ance.

Pub

lic

com

pla

ints

on

nois

e

and

vib

ration

in

cid

ents

.

Weekly

pro

ject site.

No

com

pla

int

was

receiv

ed

durin

g

the

re

port

ing p

erio

d.

E

sta

blis

hm

ent

of

site

off

ice,

yard

a

nd

la

bour

cam

ps.

Accum

ula

tion

an

d

dis

posa

l of

MS

W.

Colle

ction

of

MS

W

in

bin

s

and

dis

posal

at

sites a

ppro

ved b

y lo

ca

l auth

ority

. W

ork

ers

are

pro

vide

d

with

pro

per

accom

modation

w

ith

sanitary

facili

ties a

nd

Pers

ona

l P

rote

ctio

n

Equ

ipm

ent (P

PE

).

Dis

pla

y of

safe

ty

an

d

warn

ing sig

n board

s at

site.

Open

waste

d

um

ps

at

site.

No. of

work

ers

per

bill

et.

A

vaila

bili

ty

of

pota

ble

w

ate

r at

site.

No.

of

train

ings g

iven t

o

work

ers

on

health

and

safe

ty.

No. of

accid

ents

at site.

Weekly

M

onth

ly

Weekly

M

onth

ly

Month

ly

Contr

acto

r h

as c

ut

a p

it

to

colle

ct

all

MS

W.

Ho

we

ver

the contr

acto

r w

as i

nstr

ucte

d t

o p

lace

w

aste

bin

s

at

eve

ry

bill

et

an

d kitchen

are

a.

Als

o i

t w

as i

nstr

ucte

d t

o

fence

off

th

e

waste

colle

ction

p

it

to

avoid

an

y w

ild

and

dom

estic

anim

als

attra

ction

to

the

M

SW

. N

o bill

et

was observ

ed

w

ith

overc

row

ded

w

ork

ers

. M

onth

ly

aw

are

ness

train

ings a

re c

ond

ucte

d

by

the c

ontr

acto

r’s s

taff

.

Safe

ty

and

warn

ing

sig

nb

oard

s

have

been

dis

pla

yed

at

site.

No

fa

tal

accid

ents

w

ere

re

cord

ed

durin

g

the

re

port

ing p

erio

d.

Found

ation

and

str

uctu

ral w

ork

s

Genera

tion o

f nois

e.

Constr

uction w

ork

s t

hat

cre

ate

nois

e

nuis

ance

are

sto

ppe

d d

uri

ng d

ays

of

relig

ious

import

ance

and a

t n

igh

t tim

e.

Pub

lic

com

pla

ints

on

nois

e.

Weekly

The p

roje

ct

site i

s c

lose

to

the

ancie

nt

tem

ple

but

separa

ted

with

the

buff

er

zone (

jung

le).

No

com

pla

ints

on

nois

e

Page 17: Environmental Management and Monitoring Report · PDF fileEnvironmental Management and Monitoring Report ... Excavation work for the foundations of aerator, ... filter and sump was

16

Co

nstr

ucti

on

acti

vit

y

En

vir

on

men

tal Im

pact

Mit

igati

on

M

easu

re/s

A

do

pte

d

Mo

nit

ori

ng

in

dic

ato

r M

on

ito

rin

g

freq

uen

cy

Eff

ecti

ven

ess

&

furt

her

acti

on

s

need

ed

Accid

en

ts to w

ork

ers

.

All

work

ers

have

bee

n

pro

vid

ed w

ith P

PE

an

d

are

m

ade to

use th

em

at site

. A

firs

t aid

ro

om

is

ava

ilab

le a

t site

.

No.

of

tool b

ox m

eetings

at site

. N

o. of

accid

ents

at site.

Month

ly

Month

ly

were

re

ceiv

ed

duri

ng

th

e r

ep

ort

ing p

erio

d.

Contr

acto

r h

as

carr

ied

out

at

least

on

e t

oo

l b

ox

meeting p

er

month

. N

o.

serious

accid

ent

was r

ecord

ed a

t site.

Dis

trib

uti

on

pip

e l

ine (

PIP

ES

/C/0

8B

)

Excava

tio

n

of

trenches

Tem

pora

ry

loss

of

access to p

ub

lic.

Ris

k

of

accid

ents

to

pub

lic,

work

ers

and

anim

als

.

Pro

vid

e

tem

pora

ry

cove

r sla

bs

ove

r tr

anches.

Back f

ill t

he t

renches a

s

soon a

s t

he p

ipe l

ayi

ng

is

com

ple

ted.

Pla

cin

g

of

barr

icad

e

tape

an

d

sig

nb

oard

s

alo

ng t

he tre

nches.

No.

of

pub

lic c

om

pla

ints

re

late

d

to

loss

of

access.

No.

of

accid

ents

re

cord

ed

du

e

to

open

tr

enches.

Once a

month

O

nce a

month

Contr

acto

r has p

rovi

ded

te

mpora

ry

cover

pla

nts

as

means

of

pro

vid

ing

access.

No

public

com

pla

int

was r

eceiv

ed

durin

g

the

report

ing

perio

d.

No

accid

en

t w

as

record

ed

durin

g

the

re

port

ing peri

od due to

open

tre

nch

es.

Rem

ova

l and

dam

age t

o

veg

eta

tio

n

Mark

ing

of

trees

that

need

to

be

rem

ove

d

and

rem

ovi

ng

thro

ug

h

Tim

ber

Corp

ora

tion.

No.

of

tre

es c

ut

without

mark

ing

Weekly

O

nly

th

e

mark

ed

trees

have

be

en

rem

ove

d

from

the s

ite.

Gro

un

d R

ese

rvo

ir a

t B

an

gad

en

iya (

WT

P/C

/04A

)

Site

cle

arin

g,

excava

tion

work

s and

transp

ort

of

mate

rial.

Nuis

ance

of

dust

an

d

nois

e.

Spra

ying

of

wa

ter

aro

un

d t

he c

onstr

uctio

n

site.

Lim

itin

g site excava

tio

n

and l

eve

ling w

ork

s o

nly

to

da

y tim

e.

No.

of

pub

lic c

om

pla

ints

re

gard

ing

dust

and

nois

e.

Weekly

No

pu

blic

com

pla

ints

w

ere

re

ceiv

ed

during

th

e r

eport

ing p

eri

od,

but

the

contr

acto

r w

as

advis

ed t

o c

om

ple

te t

he

site

cle

ari

ng

work

s w

ith

in

a

min

imum

possib

le t

ime p

eriod.

Page 18: Environmental Management and Monitoring Report · PDF fileEnvironmental Management and Monitoring Report ... Excavation work for the foundations of aerator, ... filter and sump was

17

Co

nstr

ucti

on

acti

vit

y

En

vir

on

men

tal Im

pact

Mit

igati

on

M

easu

re/s

A

do

pte

d

Mo

nit

ori

ng

in

dic

ato

r M

on

ito

rin

g

freq

uen

cy

Eff

ecti

ven

ess

&

furt

her

acti

on

s

need

ed

Use o

f pro

perl

y serv

ice

d

and

main

tain

ed

equ

ipm

ent and

vehic

les.

Enfo

rcin

g

sp

ee

d

limits

to

all

constr

uctio

n

veh

icle

s m

ovi

ng o

n t

he

pub

lic access ro

ad (1

0

km

ph)

Inspection

of

serv

ice

and

main

tenance

re

cord

s

of

all

constr

uction v

ehic

les.

Once

in

3

month

s A

ll equ

ipm

ent

and

m

achin

ery

ha

ve

been

serv

iced

at

serv

ice

sta

tio

ns

outs

ide

th

e

pro

ject site.

Dam

age

to

the

access

road t

hat

is u

sed

by

the

re

sid

ents

Main

tain

ing t

he r

oad t

o

a

moto

rable

conditio

n

by

levelin

g a

nd s

pra

yin

g

wate

r to

suppre

ss d

ust.

No.

of

pub

lic c

om

pla

ints

re

ceiv

ed

on

poor

road

conditio

n.

Month

ly

Few

com

pla

ints

ha

ve

been

re

ceiv

ed

by

the

contr

acto

r.

Rectification

m

easure

s

have

b

een

carr

ied

out

by

the

contr

acto

r.

Esta

blis

hm

ent

of

site

off

ice,

yard

a

nd

la

bour

cam

p.

Accum

ula

tion

an

d

dis

posa

l of

Munic

ipa

l S

olid

Waste

(M

SW

).

Ris

k

of

acc

idents

an

d

hea

lth

ha

zard

s

to

work

ers

.

Colle

ction

of

MS

W

in

bin

s

and

dis

posal

at

sites a

ppro

ved b

y lo

ca

l auth

ority

. W

ork

ers

are

pro

vide

d

with

pro

per

accom

modation

w

ith

sanitary

fa

cili

ties

an

d

Pers

ona

l P

rote

ctio

n

Equ

ipm

ent (P

PE

) D

ispla

y of

safe

ty

an

d

warn

ing sig

n board

s at

Open

waste

d

um

ps

at

site.

No. of

work

ers

per

bill

et

Availa

bili

ty

of

pota

ble

w

ate

r at

site

N

o.

of

train

ings g

iven t

o

work

ers

on

health

and

safe

ty

No. of

accid

ents

at site

Weekly

M

onth

ly

Weekly

M

onth

ly

Month

ly

Contr

acto

r has s

up

plie

d

waste

b

ins

and

the

w

ork

ers

have

b

een

in

str

ucte

d

to

dum

p

waste

on

ly t

o th

e bin

s.

Colle

cte

d

MS

W

dis

pose

d

on

ly

at

appro

ved locations.

No b

illet

was observ

ed

w

ith

overc

row

ded

w

ork

ers

. A

ll w

ork

ers

have b

een s

up

plie

d w

ith

m

osquito

nets

and

pota

ble

w

ate

r is

ava

ilab

le.

Month

ly

aw

are

ness

train

ings a

re c

ond

ucte

d

by

the c

ontr

acto

r’s s

taff

.

Safe

ty

and

warn

ing

sig

nb

oard

s

have

been

Page 19: Environmental Management and Monitoring Report · PDF fileEnvironmental Management and Monitoring Report ... Excavation work for the foundations of aerator, ... filter and sump was

18

Co

nstr

ucti

on

acti

vit

y

En

vir

on

men

tal Im

pact

Mit

igati

on

M

easu

re/s

A

do

pte

d

Mo

nit

ori

ng

in

dic

ato

r M

on

ito

rin

g

freq

uen

cy

Eff

ecti

ven

ess

&

furt

her

acti

on

s

need

ed

site

dis

pla

yed

at

site.

No

fa

tal

accid

ents

w

ere

re

cord

ed

durin

g

the

re

port

ing p

erio

d.

Found

ation

and

str

uctu

ral w

ork

N

uis

ance

of

no

ise

to

pub

lic

Constr

uction

activi

ties

that

cre

ate

he

avy

no

ise

w

ere

suspen

ded d

urin

g

da

ys

of

relig

ious

import

ance a

nd a

t n

ight

tim

e.

The p

roje

ct site is c

lose

to th

e a

ncie

nt

tem

ple

but sep

ara

ted w

ith t

he

buff

er

zone (

jung

le).

No

com

pla

ints

on n

ois

e

We

ek

ly

The p

roje

ct site is c

lose

to a

sett

lem

ent are

a. N

o

com

pla

ints

on n

ois

e

were

receiv

ed d

urin

g

the r

ep

ort

ing p

erio

d.

Sep

tag

e t

reatm

en

t p

lan

t (S

EP

/C&

P/0

6)

Site

cle

arin

g

and

excava

tion

work

s A

ccum

ula

tion

of

excava

ted

so

il at

site

le

adin

g

to

ero

sio

n

an

d

sedim

enta

tion of

nearb

y la

nds.

Genera

tion o

f dust.

Tim

ing

of

excava

tio

n

work

s

during

dry

perio

ds o

f th

e y

ear.

R

euse

of

soil

for

back

filli

ng w

ork

s.

The

pro

ject

site

was

spra

yed

with

wa

ter

durin

g i

ncid

ence o

f hig

h

dust cond

itio

ns.

Incid

ents

of

ero

ded s

oil

deposited

in

ne

arb

y la

nds.

Runn

ing

ch

art

of

the

wate

r bo

wser

use

d

for

spra

ying w

ate

r.

Weekly

W

eekly

The

am

ount

of

soil

excava

ted

was

not

suff

icie

nt

for

back f

illin

g

opera

tio

ns

he

nce

all

excava

ted

mate

rial

were

re

used

and

add

itio

na

l am

ount

of

soil

was tr

ansport

ed to

site.

No

pub

lic

com

pla

int

was

receiv

ed

on

dust

nuis

ance

duri

ng

the

re

port

ing p

erio

d.

Tra

nsport

ation

of

filli

ng m

ate

rial (s

oil)

G

enera

tion

of

dust

an

d

nois

e.

Coverin

g

of

mate

rial

when

tr

ansp

ort

ing

to

site.

Use

of

speed

limits

when

tr

ansp

ort

ing

m

ate

rial

thro

ug

h

settle

ment are

a.

Regu

lar

serv

ices

&

inspection o

f all

mate

rial

transport

veh

icle

s.

No.

vehic

les

transport

ing

mate

rial

with

out co

vers

. P

ub

lic

com

pla

ints

on

dust

and

nois

e

incid

ents

.

Weekly

W

eekly

The

contr

acto

r w

as

instr

ucte

d t

o s

tric

tly

use

cove

rs

when

tr

ansport

ing m

ate

ria

l to

site a

nd t

o ensure

that

speed

limits

are

m

ain

tain

ed

thro

ugh

settle

ment are

as.

Page 20: Environmental Management and Monitoring Report · PDF fileEnvironmental Management and Monitoring Report ... Excavation work for the foundations of aerator, ... filter and sump was

19

Co

nstr

ucti

on

acti

vit

y

En

vir

on

men

tal Im

pact

Mit

igati

on

M

easu

re/s

A

do

pte

d

Mo

nit

ori

ng

in

dic

ato

r M

on

ito

rin

g

freq

uen

cy

Eff

ecti

ven

ess

&

furt

her

acti

on

s

need

ed

Esta

blis

hm

ent

of

site

off

ice,

yard

a

nd

la

bour

cam

ps.

Accum

ula

tion

an

d

dis

posa

l of

MS

W.

Colle

ction

of

MS

W

in

bin

s

and

dis

posal

at

sites a

ppro

ved b

y lo

ca

l auth

ority

.

No.

of

ope

n

waste

dum

ps a

t site.

Weekly

C

ontr

acto

r has p

rovi

ded

bin

s a

t site o

ffic

e,

yard

and

cam

ps

and

the

MS

W

are

ta

ken

to

dis

posa

l sites a

ppro

ved

b

y th

e loca

l au

thori

ty.

Found

ation

and

str

uctu

ral w

ork

s.

Genera

tion o

f nois

e.

Accid

en

ts to w

ork

ers

.

Constr

uction w

ork

s t

hat

cre

ate

nois

e

nuis

ance

are

sto

ppe

d d

uri

ng d

ays

of

relig

ious

import

ance

and a

t n

igh

t tim

e.

All

work

ers

have

bee

n

pro

vid

ed w

ith P

PE

an

d

are

m

ade to

use th

em

at site

. A

firs

t aid

ro

om

is

ava

ilab

le a

t site

.

Pub

lic

com

pla

ints

on

nois

e.

No.

of

tool b

ox m

eetings

at site

. N

o. of

accid

ents

at site.

Weekly

M

onth

ly

Month

ly

The p

roje

ct

site is w

ith

in

a f

arm

land a

wa

y fr

om

settle

ments

. N

o

com

pla

ints

on

nois

e

were

re

ceiv

ed

duri

ng

th

e r

ep

ort

ing p

erio

d.

Contr

acto

r h

as

carr

ied

out

at

least

on

e t

oo

l b

ox

meeting p

er

month

. N

o.

serious

accid

ent

was r

ecord

ed a

t site.

Pu

blic t

oil

ets

(P

T/C

/14

)

Main

ten

ance

of

lab

our

cam

ps,

mate

rial

sto

res

and

m

obili

zation

of

work

ers

.

Accum

ula

tion

an

d

dis

posa

l of

MS

W.

Ris

k o

f fire

ha

zard

s.

Waste

bin

s

were

pro

vid

ed

at

site.

Dis

posa

l of

colle

cte

d

MS

W only

at

appro

ved

lo

cations.

All

flam

mable

m

ate

rial

was

lab

ele

d

at

sto

res

and w

arn

ing s

ignb

oard

s

were

pla

ce

d in

fr

ont

of

the s

tore

s.

Firefighting

eq

uip

ment

was

pla

ced

in

front

of

sto

res.

No.

of

ope

n

waste

dum

ps a

t site.

Incid

ents

of

fire

s

Weekly

M

onth

ly

The

contr

acto

r w

as

advis

ed

to

pro

vid

e

suff

icie

nt

no

. of

waste

bin

s at

site,

duri

ng th

e

firs

t fe

w

month

s

of

constr

uction a

ctivi

ties.

No

incid

ents

of

fire

s w

ere

re

cord

ed

at

site.

Ho

we

ver

the c

ontr

acto

r w

as

instr

ucte

d

to

main

tain

th

e

safe

ty

sta

ndard

s

stipu

late

d

at

site.

Found

ation

and

str

uctu

ral w

ork

s

Genera

tion o

f nois

e.

C

onstr

uction w

ork

s t

hat

cre

ate

nois

e

nuis

ance

P

ub

lic

com

pla

ints

on

nois

e.

Weekly

The

pro

ject

site

is

at

CT

B

Bus

sta

nd

. N

o

Page 21: Environmental Management and Monitoring Report · PDF fileEnvironmental Management and Monitoring Report ... Excavation work for the foundations of aerator, ... filter and sump was

20

Co

nstr

ucti

on

acti

vit

y

En

vir

on

men

tal Im

pact

Mit

igati

on

M

easu

re/s

A

do

pte

d

Mo

nit

ori

ng

in

dic

ato

r M

on

ito

rin

g

freq

uen

cy

Eff

ecti

ven

ess

&

furt

her

acti

on

s

need

ed

Washin

g o

f concre

te

mix

er

truck

s

outs

ide

th

e p

roje

ct site.

Accid

en

ts to w

ork

ers

. C

onta

min

ation

of

soil

and w

ate

r sourc

es near

such w

ashin

g locations.

are

sto

ppe

d d

uri

ng d

ays

of

relig

ious

import

ance

and a

t n

igh

t tim

e.

All

work

ers

have

bee

n

pro

vid

ed w

ith P

PE

an

d

are

m

ade to

use th

em

at site

. A

firs

t aid

ro

om

is

ava

ilab

le a

t site

. C

ontr

acto

r has

bee

n

str

ictly

instr

ucte

d n

ot

to

wash

an

y concre

te

mix

er

truck

s o

uts

ide

th

e

pro

ject site.

No.

of

tool b

ox m

eetings

at site

. N

o. of

accid

ents

at site.

No.

of

incid

ents

w

here

concre

te

mix

er

truck

s have

be

en

washed

outs

ide p

roje

ct site.

Month

ly

Month

ly

Month

ly

com

pla

ints

on

nois

e

were

re

ceiv

ed

duri

ng

th

e r

ep

ort

ing p

erio

d.

Contr

acto

r h

as

carr

ied

out

at

least

on

e t

oo

l b

ox

meeting p

er

month

. N

o.

serious

accid

ent

was r

ecord

ed a

t site.

Contr

acto

r w

as

instr

ucte

d

to

wash

the

m

ixer

truck

s

with

in

the

constr

uction s

ite.

Su

bp

roje

cts

in

Pu

ttala

m

Su

rfac

e w

ate

r in

tak

e (

Elu

wan

ku

lam

a,

Ach

ch

imo

lai

tan

ks a

nd

fe

ed

er

can

als

) (S

W/P

/01)

Site

cle

arin

g

and

excava

tion

work

s to

in

cre

ase

ca

pacity

of

tanks,

exis

ting

cana

l to

E

luw

ankula

ma

tank

and

ne

w

cana

l to

Achch

imola

i ta

nk

2

Dam

age to v

eg

eta

tion

A

ccum

ula

tion

of

excava

ted

so

il at

site

causin

g s

oil

ero

sio

n a

nd

sedim

enta

tion

durin

g

rain

y seaso

ns.

Cle

ari

ng

of

land

are

a

only

as

requ

ired

to

incre

ase

the

tank

capacity.

E

xcava

tio

n

work

s lim

ited

to

the

dry

perio

ds o

f th

e y

ear.

R

euse o

f excava

ted s

oil

for

bund

constr

uctio

n

and

dis

posin

g

access

am

ounts

and

spoil

mate

rial

at

appro

ved

sites o

f lo

ca

l au

thori

ty.

Pla

cin

g

a

toe

wall

Exte

nt

of

land

are

a

cle

are

d

be

yond

th

e

pro

ject site b

ou

ndary

. N

o.

of

excava

ted

so

il pile

s left

clo

se t

o n

earb

y canal

an

d w

ate

r b

odie

s

with

out

an

y to

e w

alls

.

Month

ly

Weekly

No a

dditio

na

l la

nd

are

a

has b

een

op

ene

d u

p b

y th

e c

on

tracto

r.

Site

cle

ari

ng

and

excava

tions w

ork

s w

ere

lim

ited t

o t

he d

ry p

eri

od

of

the

year.

A

nd

all

excess

soil

and

unusab

le

mate

rial

was

transport

ed

to

dis

posal

sites a

ppro

ved

by

local

auth

ority

.

2 A

ctiv

itie

s w

ere

ca

rrie

d o

ut

on

ly a

t E

luw

an

ku

lam

a t

an

k.

Page 22: Environmental Management and Monitoring Report · PDF fileEnvironmental Management and Monitoring Report ... Excavation work for the foundations of aerator, ... filter and sump was

21

Co

nstr

ucti

on

acti

vit

y

En

vir

on

men

tal Im

pact

Mit

igati

on

M

easu

re/s

A

do

pte

d

Mo

nit

ori

ng

in

dic

ato

r M

on

ito

rin

g

freq

uen

cy

Eff

ecti

ven

ess

&

furt

her

acti

on

s

need

ed

Genera

tion o

f dust.

aro

un

d s

tock p

iles.

Spra

ying

of

wate

r at

regula

r in

terv

als

at

all

constr

uction s

ites.

Enfo

rcin

g spee

ds lim

its

to

all

eart

h

excava

tio

n

and

eart

h

movi

ng

ve

hic

les.

Daily

ru

nnin

g

ch

art

of

the w

ate

r b

ow

ser.

N

o.

of

pub

lic c

om

pla

ints

on d

ust.

Weekly

N

o

com

pla

int

was

receiv

ed a

s t

he a

rea i

s

not p

opu

late

d.

Esta

blis

hm

ent

of

site

off

ice,

yard

a

nd

la

bour

cam

ps.

Accum

ula

tion

an

d

dis

posa

l of

Munic

ipa

l S

olid

Waste

(M

SW

).

Ris

k

of

acc

idents

an

d

hea

lth

ha

zard

s

to

work

ers

.

Colle

ction

of

MS

W

in

bin

s

and

dis

posal

at

sites a

ppro

ved b

y lo

ca

l auth

ority

. W

ork

ers

are

pro

vide

d

with

pro

per

accom

modation

w

ith

sanitary

fa

cili

ties

an

d

Pers

ona

l P

rote

ctio

n

Equ

ipm

ent (P

PE

) D

ispla

y of

safe

ty

an

d

warn

ing sig

n board

s at

site

Open

waste

d

um

ps

at

site.

No. of

work

ers

per

bill

et

Availa

bili

ty

of

pota

ble

w

ate

r at

site

N

o.

of

train

ings g

iven t

o

work

ers

on

health

and

safe

ty

No. of

accid

ents

at site

Weekly

M

onth

ly

Weekly

M

onth

ly

Month

ly

Contr

acto

r has s

up

plie

d

waste

b

ins

and

the

w

ork

ers

have

b

een

in

str

ucte

d

to

dum

p

waste

on

ly t

o th

e bin

s.

Colle

cte

d

MS

W

dis

pose

d

on

ly

at

appro

ved locations.

No b

illet

was observ

ed

w

ith

overc

row

ded

w

ork

ers

. A

ll w

ork

ers

have b

een s

up

plie

d w

ith

m

osquito

nets

and

pota

ble

w

ate

r is

ava

ilab

le.

Month

ly

aw

are

ness

train

ings a

re c

ond

ucte

d

by

the c

ontr

acto

r’s s

taff

.

Safe

ty

and

warn

ing

sig

nb

oard

s

have

been

dis

pla

yed

at

site.

No

fa

tal

accid

ents

w

ere

re

cord

ed

durin

g

the

re

port

ing p

erio

d.

Wate

r tr

eatm

en

t p

lan

t (W

TP

/P/0

4A

) E

xcava

tio

n

of

land

fo

r tr

eatm

ent

pla

nt

Accum

ula

tion

of

excava

ted

so

il at

site

P

lacin

g

exca

vate

d

soil

with

in t

he s

ite a

nd r

euse

C

han

ge

in

capacity

of

silt

tr

ap

and

sig

ns

of

Weekly

The

silt

tr

ap

was

fille

d

with

in 1

-2 w

eeks d

uring

Page 23: Environmental Management and Monitoring Report · PDF fileEnvironmental Management and Monitoring Report ... Excavation work for the foundations of aerator, ... filter and sump was

22

Co

nstr

ucti

on

acti

vit

y

En

vir

on

men

tal Im

pact

Mit

igati

on

M

easu

re/s

A

do

pte

d

Mo

nit

ori

ng

in

dic

ato

r M

on

ito

rin

g

freq

uen

cy

Eff

ecti

ven

ess

&

furt

her

acti

on

s

need

ed

foundations

and

str

uctu

res.

causin

g s

oil

ero

sio

n a

nd

sedim

enta

tion

durin

g

rain

y seaso

ns.

Genera

tion o

f dust.

N

uis

ance

of

no

ise

an

d

vibra

tion t

o p

ublic

.

the s

uitab

le m

ate

rial

for

back f

illin

g a

s m

uch a

s

possib

le.

Constr

uction

of

a

silt

tr

ap

at

the

fina

l dra

in

poin

t of

the l

an

d (

within

th

e s

ite b

oun

dary

).

Excess

excava

ted

m

ate

rial

was

dis

pose

d

at

sites

appro

ved

by

local

au

thori

ty

and

to

few

resid

ents

to f

ill t

he

ir

lan

ds.

Spra

ying o

f w

ate

r a

lon

g

the

access

road

and

w

ith

in t

he s

ite.

Regu

lar

serv

ices

an

d

inspection

of

constr

uction

veh

icle

s

and m

achin

ery

. A

void

ing

hea

vy

constr

uction

work

s durin

g d

ays

of

relig

ious

import

ance.

sedim

ent

deposited

on

th

e

dra

inage

ca

nal

outs

ide th

e p

roje

ct site.

No.

of

appro

ved

dis

posa

l sites

op

era

ted

b

y th

e c

ontr

acto

r.

Daily

ru

nnin

g

ch

art

of

the w

ate

r b

ow

ser.

N

o.

of

pub

lic c

om

pla

ints

on d

ust.

P

ub

lic

com

pla

ints

on

nois

e

and

vib

ration

in

cid

ents

.

Month

ly

Weekly

W

eekly

perio

ds of

he

avy

rain

s.

There

fore

the c

ontr

acto

r w

as

instr

ucte

d

to

incre

ase t

he c

ap

acity

of

the s

ilt t

rap.

Contr

acto

r w

as

advis

ed

to

carr

y out

turf

ing

where

possib

le a

s a

means o

f re

ducin

g

the

exposed

soil

surf

aces.

The

excess

and

unsuitab

le m

ate

rial

has

been

transport

ed

to

appro

ved d

isp

osal

sites

(2 N

os).

N

o

com

pla

ints

w

ere

re

ceiv

ed d

ue t

o d

ust.

C

onstr

uction

vehic

les

are

serv

ice

d at

serv

ice

sta

tio

ns

outs

ide

the

pro

ject site.

Esta

blis

hm

ent

of

site

off

ice,

yard

a

nd

la

bour

cam

ps.

Accum

ula

tion

an

d

dis

posa

l of

MS

W.

Colle

ction

of

MS

W

in

bin

s

and

dis

posal

at

sites a

ppro

ved b

y lo

ca

l auth

ority

.

Open

waste

d

um

ps

at

site.

Weekly

Contr

acto

r h

as c

ut

a p

it

to

colle

ct

all

MS

W.

Ho

we

ver

the contr

acto

r w

as i

nstr

ucte

d t

o p

lace

w

aste

bin

s

at

eve

ry

bill

et

an

d kitchen

are

a.

Als

o i

t w

as i

nstr

ucte

d t

o

fence

off

th

e

waste

Page 24: Environmental Management and Monitoring Report · PDF fileEnvironmental Management and Monitoring Report ... Excavation work for the foundations of aerator, ... filter and sump was

23

Co

nstr

ucti

on

acti

vit

y

En

vir

on

men

tal Im

pact

Mit

igati

on

M

easu

re/s

A

do

pte

d

Mo

nit

ori

ng

in

dic

ato

r M

on

ito

rin

g

freq

uen

cy

Eff

ecti

ven

ess

&

furt

her

acti

on

s

need

ed

Work

ers

are

pro

vide

d

with

pro

per

accom

modation

w

ith

sanitary

facili

ties a

nd

Pers

ona

l P

rote

ctio

n

Equ

ipm

ent (P

PE

).

Dis

pla

y of

safe

ty

an

d

warn

ing sig

n board

s at

site.

No. of

work

ers

per

bill

et

Availa

bili

ty

of

pota

ble

w

ate

r at

site.

No.

of

train

ings g

iven t

o

work

ers

on

health

and

safe

ty.

N

o. of

accid

ents

at site.

Month

ly

Weekly

M

onth

ly

Month

ly

colle

ction

p

it

to

avoid

an

y w

ild

and

dom

estic

anim

als

attra

ction

to

the

M

SW

. N

o bill

et

was observ

ed

w

ith

overc

row

ded

w

ork

ers

. M

onth

ly

aw

are

ness

train

ings a

re c

ond

ucte

d

by

the c

ontr

acto

r’s s

taff

.

Safe

ty

and

warn

ing

sig

nb

oard

s

have

been

dis

pla

yed

at

site.

No

fa

tal

accid

ents

w

ere

re

cord

ed

durin

g

the

re

port

ing p

erio

d.

Sto

rage

of

fuel

oil,

gre

ase

and

oth

er

chem

icals

fo

r constr

uction

activitie

s

Accid

en

tal

spill

s

or

conta

min

ation w

ith s

torm

w

ate

r causin

g

surf

ace

and

gro

un

d

wa

ter

pollu

tion

. R

isk of

fire

ha

zard

an

d

accid

ents

.

Pla

cin

g

of

all

fuel,

oil

and oth

er

chem

icals

in

a s

tore

with i

mperv

ious

floor,

roofing

an

d p

roper

ven

tila

tion.

Pla

cin

g

of

warn

ing

sig

nb

oard

s

ne

ar

all

flam

mable

chem

icals

.

Cond

uctin

g

regu

lar

safe

ty

train

ing

pro

gra

mm

es

for

the

w

ork

ers

. P

lacin

g

of

pro

per

fire

fightin

g

eq

uip

ment

and

mate

rial

near

sto

res.

Vis

ua

l in

spection o

f an

y sig

ns o

f chem

ical

sp

ills

in t

he s

tore

s.

Availa

bili

ty

of

pro

per

warn

ing s

ignb

oard

s a

nd

in

str

uctio

ns

near

mate

rial sto

res.

Availa

bili

ty

of

pro

per

fire

fightin

g

equ

ipm

ent

near

mate

rial sto

res.

Weekly

M

onth

ly

Once

in

6

month

s

No

incid

en

ts

of

chem

icals

spill

s

record

ed

and

th

e

contr

acto

r has

pla

ced

all

ch

em

icals

w

ithin

an

enclo

se

d s

tore

s.

Pro

per

sig

nb

oard

s w

ere

ava

ilab

le a

t site

. R

egu

lar

tra

inin

g

pro

gra

mm

es

on

safe

ty

have

bee

n

carr

ied

out

by

the c

ontr

acto

r.

Firefighting

equ

ipm

ent

is

ava

ilable

at

site.

Ho

we

ver

the contr

acto

r w

as a

dvis

ed t

o c

arr

y out

tim

ely

refilli

ng o

f all

fire

Page 25: Environmental Management and Monitoring Report · PDF fileEnvironmental Management and Monitoring Report ... Excavation work for the foundations of aerator, ... filter and sump was

24

Co

nstr

ucti

on

acti

vit

y

En

vir

on

men

tal Im

pact

Mit

igati

on

M

easu

re/s

A

do

pte

d

Mo

nit

ori

ng

in

dic

ato

r M

on

ito

rin

g

freq

uen

cy

Eff

ecti

ven

ess

&

furt

her

acti

on

s

need

ed

Pro

vid

ing

firs

t aid

fa

cili

ties a

t site

Availa

bili

ty o

f a f

irst

aid

ro

om

with e

qu

ipm

ent.

Once

in

3

month

s

exting

uis

hers

befo

re

the

y exp

ire.

N

o f

ata

l accid

en

ts w

ere

re

cord

ed

at

site.

Tw

o

work

ers

re

ceiv

ed

tr

eatm

ent

for

min

or

accid

ents

. F

ound

ation

and

str

uctu

ral w

ork

s

Genera

tion o

f nois

e.

Accid

en

ts to w

ork

ers

.

Constr

uction w

ork

s t

hat

cre

ate

nois

e

nuis

ance

are

sto

ppe

d d

uri

ng d

ays

of

relig

ious

import

ance

and a

t n

igh

t tim

e.

All

work

ers

have

bee

n

pro

vid

ed w

ith P

PE

an

d

are

m

ade to

use th

em

at site

. A

firs

t aid

ro

om

is

ava

ilab

le a

t site

.

Pub

lic

com

pla

ints

on

nois

e.

No.

of

tool b

ox m

eetings

at site

. N

o. of

accid

ents

at site.

Weekly

M

onth

ly

Month

ly

The p

roje

ct

site i

s a

wa

y fr

om

settle

ments

. N

o

com

pla

ints

on

nois

e

were

re

ceiv

ed

duri

ng

th

e r

ep

ort

ing p

erio

d.

Contr

acto

r h

as

carr

ied

out

at

least

on

e t

oo

l b

ox

meeting p

er

month

. N

o.

serious

accid

ent

was r

ecord

ed a

t site.

Dis

trib

uti

on

pip

e l

ine (

PIP

ES

/P/0

9)

Excava

tio

n

of

trenches

Tem

pora

ry

loss

of

access to p

ub

lic.

Ris

k

of

accid

ents

to

pub

lic,

work

ers

and

anim

als

.

Pro

vid

e

tem

pora

ry

cove

r sla

bs

ove

r tr

anches.

Back f

ill t

he t

renches a

s

soon a

s t

he p

ipe l

ayi

ng

is

com

ple

ted.

Pla

cin

g

of

barr

icad

e

tape

an

d

sig

nb

oard

s

alo

ng t

he tre

nches.

No.

of

pub

lic c

om

pla

ints

re

late

d

to

loss

of

access.

No.

of

accid

ents

re

cord

ed

du

e

to

open

tr

enches.

Once a

month

O

nce a

month

Contr

acto

r has p

rovi

ded

te

mpora

ry

cover

pla

nts

as

means

of

pro

vid

ing

access.

No

public

com

pla

int

was r

eceiv

ed

durin

g

the

report

ing

perio

d.

No

accid

en

t w

as

record

ed

durin

g

the

re

port

ing peri

od due to

open

tre

nch

es.

Rem

ova

l and

dam

age t

o

veg

eta

tio

n

Mark

ing

of

trees

that

need

to

be

rem

ove

d

and

rem

ovi

ng

thro

ug

h

Tim

ber

Corp

ora

tion.

No.

of

tre

es c

ut

without

mark

ing

Weekly

O

nly

th

e

mark

ed

trees

have

be

en

rem

ove

d

from

the s

ite.

Page 26: Environmental Management and Monitoring Report · PDF fileEnvironmental Management and Monitoring Report ... Excavation work for the foundations of aerator, ... filter and sump was

25

Co

nstr

ucti

on

acti

vit

y

En

vir

on

men

tal Im

pact

Mit

igati

on

M

easu

re/s

A

do

pte

d

Mo

nit

ori

ng

in

dic

ato

r M

on

ito

rin

g

freq

uen

cy

Eff

ecti

ven

ess

&

furt

her

acti

on

s

need

ed

Gro

un

d R

ese

rvo

ir a

t K

all

ad

iya (

WT

P/P

/04A

) S

ite

cle

arin

g,

excava

tion

work

s and

transp

ort

of

mate

rial

Nuis

ance

of

dust.

S

pra

ying

of

wa

ter

aro

un

d t

he c

onstr

uctio

n

site.

Use o

f pro

perl

y serv

ice

d

and

main

tain

ed

equ

ipm

ent and

vehic

les.

Enfo

rcin

g

sp

ee

d

limits

to

all

constr

uctio

n

veh

icle

s m

ovi

ng o

n t

he

pub

lic access ro

ad (1

0

km

ph)

No.

of

pub

lic c

om

pla

ints

re

gard

ing d

ust.

S

erv

ice

and

m

ain

tenance

record

s o

f all

constr

uction v

eh

icle

s.

Weekly

O

nce

in

3

month

s

No

pu

blic

com

pla

ints

w

ere

re

ceiv

ed

during

th

e r

eport

ing p

eri

od,

but

the

contr

acto

r w

as

advis

ed t

o c

om

ple

te t

he

site

cle

ari

ng

work

s w

ith

in

a

min

imum

possib

le t

ime p

eriod.

All

equ

ipm

ent

and

m

achin

ery

ha

ve

been

serv

iced

at

serv

ice

sta

tio

ns

outs

ide

th

e

pro

ject site.

Esta

blis

hm

ent

of

site

off

ice,

yard

a

nd

la

bour

cam

p.

Mob

iliza

tion

of

work

ers

.

Accum

ula

tion

an

d

dis

posa

l of

Munic

ipa

l S

olid

Waste

(M

SW

).

Ris

k

of

acc

idents

an

d

hea

lth

ha

zard

s

to

work

ers

.

Colle

ction

of

MS

W

in

bin

s

and

dis

posal

at

sites a

ppro

ved b

y lo

ca

l auth

ority

. W

ork

ers

are

pro

vide

d

with

pro

per

accom

modation

w

ith

sanitary

fa

cili

ties

an

d

Pers

ona

l P

rote

ctio

n

Equ

ipm

ent (P

PE

)

Open

waste

d

um

ps

at

site.

No. of

work

ers

per

bill

et

Availa

bili

ty

of

pota

ble

w

ate

r at

site

N

o.

of

train

ings g

iven t

o

Weekly

M

onth

ly

Weekly

M

onth

ly

Contr

acto

r has s

up

plie

d

waste

b

ins

and

the

w

ork

ers

have

b

een

in

str

ucte

d

to

dum

p

waste

on

ly t

o th

e bin

s.

Colle

cte

d

MS

W

dis

pose

d

on

ly

at

appro

ved locations.

No b

illet

was observ

ed

w

ith

overc

row

ded

w

ork

ers

. A

ll w

ork

ers

have b

een s

up

plie

d w

ith

m

osquito

nets

and

pota

ble

w

ate

r is

ava

ilab

le.

Month

ly

aw

are

ness

Page 27: Environmental Management and Monitoring Report · PDF fileEnvironmental Management and Monitoring Report ... Excavation work for the foundations of aerator, ... filter and sump was

26

Co

nstr

ucti

on

acti

vit

y

En

vir

on

men

tal Im

pact

Mit

igati

on

M

easu

re/s

A

do

pte

d

Mo

nit

ori

ng

in

dic

ato

r M

on

ito

rin

g

freq

uen

cy

Eff

ecti

ven

ess

&

furt

her

acti

on

s

need

ed

Ris

k o

f ele

phan

t att

acks

Dis

pla

y of

safe

ty

an

d

warn

ing sig

n board

s at

site

P

lacin

g

an

ele

ctr

ic

fence a

roun

d th

e s

ite

work

ers

on

health

and

safe

ty

No. of

accid

ents

at site

N

o.

of

ele

phan

t attacks

to s

ite

Month

ly

Month

ly

train

ings a

re c

ond

ucte

d

by

the c

ontr

acto

r’s s

taff

.

Safe

ty

and

warn

ing

sig

nb

oard

s

have

been

dis

pla

yed

at

site.

No

fa

tal

accid

ents

w

ere

re

cord

ed

durin

g

the

re

port

ing p

erio

d.

No e

lep

hant

att

ack w

as

record

ed

durin

g

the

re

port

ing p

erio

d.

Sep

tag

e t

reatm

en

t p

lan

t (S

EP

/P/0

6)

Site

cle

arin

g

and

excava

tion

work

s.

Accum

ula

tion

of

excava

ted

so

il at

site

le

adin

g

to

ero

sio

n

an

d

sedim

enta

tion of

nearb

y la

nds.

Genera

tion o

f dust.

Tim

ing

of

excava

tio

n

work

s

during

dry

perio

ds o

f th

e y

ear.

R

euse

of

soil

for

back

filli

ng w

ork

s.

The

pro

ject

site

was

spra

yed

with

wa

ter

durin

g i

ncid

ence o

f hig

h

dust cond

itio

ns.

Incid

ents

of

ero

ded s

oil

deposited

in

ne

arb

y la

nds.

Runn

ing

ch

art

of

the

wate

r bo

wser

use

d

for

spra

ying w

ate

r.

Weekly

W

eekly

Excava

ted m

ate

ria

l w

as

reused a

t site.

The s

ite

has b

een

fenced o

ff b

y th

e c

on

tracto

r.

No

pub

lic

com

pla

int

was

receiv

ed

on

dust

nuis

ance

duri

ng

the

re

port

ing p

erio

d.

Esta

blis

hm

ent

of

site

off

ice,

yard

a

nd

la

bour

cam

ps.

Accum

ula

tion

an

d

dis

posa

l of

MS

W.

Colle

ction

of

MS

W

in

bin

s

and

dis

posal

at

sites a

ppro

ved b

y lo

ca

l auth

ority

.

No.

of

ope

n

waste

dum

ps a

t site.

Weekly

C

ontr

acto

r has p

rovi

ded

bin

s a

t site o

ffic

e,

yard

and

cam

ps

and

the

MS

W

are

ta

ken

to

dis

posa

l sites a

ppro

ved

b

y th

e loca

l au

thori

ty.

Found

ation

and

str

uctu

ral w

ork

s.

Genera

tion o

f nois

e.

Accid

en

ts to w

ork

ers

.

Constr

uction w

ork

s t

hat

cre

ate

nois

e

nuis

ance

are

sto

ppe

d d

uri

ng d

ays

of

relig

ious

import

ance

and a

t n

igh

t tim

e.

All

work

ers

have

bee

n

pro

vid

ed w

ith P

PE

an

d

Pub

lic

com

pla

ints

on

nois

e.

No.

of

tool b

ox m

eetings

at site

.

Weekly

M

onth

ly

The

pro

ject

site

is

far

aw

ay

from

re

sid

ential

are

a.

No c

om

pla

ints

on

nois

e

were

re

ceiv

ed

durin

g

the

report

ing

perio

d.

Contr

acto

r h

as

carr

ied

out

at

least

on

e t

oo

l b

ox

Page 28: Environmental Management and Monitoring Report · PDF fileEnvironmental Management and Monitoring Report ... Excavation work for the foundations of aerator, ... filter and sump was

27

Co

nstr

ucti

on

acti

vit

y

En

vir

on

men

tal Im

pact

Mit

igati

on

M

easu

re/s

A

do

pte

d

Mo

nit

ori

ng

in

dic

ato

r M

on

ito

rin

g

freq

uen

cy

Eff

ecti

ven

ess

&

furt

her

acti

on

s

need

ed

are

m

ade to

use th

em

at site

. A

firs

t aid

ro

om

is

ava

ilab

le a

t site

.

No. of

accid

ents

at site.

Month

ly

meeting p

er

month

. N

o.

serious

accid

ent

was r

ecord

ed a

t site.

Pu

blic t

oil

ets

(P

T/P

/15)

Main

ten

ance

of

site

off

ice,

yard

, la

bour

cam

ps

and

lab

our

forc

e

Accum

ula

tion

an

d

dis

posa

l of

MS

W.

Colle

ction

of

MS

W

in

bin

s

and

dis

posal

at

sites a

ppro

ved b

y lo

ca

l auth

ority

.

No.

of

ope

n

waste

dum

ps a

t site.

Weekly

C

ontr

acto

r has p

rovi

ded

bin

s a

t site o

ffic

e,

yard

and

cam

ps

and

the

MS

W

are

ta

ken

to

dis

posa

l sites a

ppro

ved

b

y th

e loca

l au

thori

ty.

Constr

uction

of

str

uctu

res

Genera

tion

of

dust

an

d

nois

e.

The

pro

ject

site

was

fenced o

ff t

o a

void

dust

blo

win

g

out

of

constr

uction a

rea.

Constr

uction

work

w

as

not

carr

ied

out

durin

g

nig

ht

tim

e and da

ys of

relig

ious im

port

ance.

Incid

ents

of

ero

ded s

oil

deposited

in

ne

arb

y la

nds

an

d

dra

inage

canals

. P

ub

lic

com

pla

ints

on

dust nu

isance.

Weekly

W

eekly

The

contr

acto

r has

dis

pose

d e

xcessiv

e s

oil

and

oth

er

debris o

nly

at

appro

ved d

isposa

l sites.

No

sig

ns

of

sedim

enta

tion

were

observ

ed

in

cana

ls

outs

ide th

e p

roje

ct site.

No

com

pla

int

was

receiv

ed

fo

r dust

and

nois

e n

uis

ance.

Su

bp

roje

cts

in

Ma

nn

ar

Dis

trib

uti

on

pip

e l

ine (

PIP

ES

/M/1

1)

Excava

tio

n

of

trenches

Tem

pora

ry

loss

of

access to p

ub

lic.

Pro

vid

e

tem

pora

ry

cove

r sla

bs

ove

r tr

anches.

Back f

ill t

he t

renches a

s

soon a

s t

he p

ipe l

ayi

ng

is

com

ple

ted.

No.

of

pub

lic c

om

pla

ints

re

late

d

to

loss

of

access.

Once a

month

Contr

acto

r has p

rovi

ded

te

mpora

ry

access

with

out

dis

turb

ing

the

pub

lic/

veh

icle

m

ove

ment.

No

pu

blic

com

pla

int

was r

eceiv

ed

Page 29: Environmental Management and Monitoring Report · PDF fileEnvironmental Management and Monitoring Report ... Excavation work for the foundations of aerator, ... filter and sump was

28

Co

nstr

ucti

on

acti

vit

y

En

vir

on

men

tal Im

pact

Mit

igati

on

M

easu

re/s

A

do

pte

d

Mo

nit

ori

ng

in

dic

ato

r M

on

ito

rin

g

freq

uen

cy

Eff

ecti

ven

ess

&

furt

her

acti

on

s

need

ed

Ris

k

of

accid

ents

to

pub

lic,

work

ers

and

anim

als

.

Pla

cin

g

of

barr

icad

e

tape

an

d

sig

nb

oard

s

alo

ng t

he tre

nches.

No.

of

accid

ents

re

cord

ed

du

e

to

open

tr

enches.

Once a

month

durin

g

the

report

ing

perio

d.

No

accid

en

t w

as

record

ed

durin

g

the

re

port

ing peri

od due to

open

tre

nch

es.

Rem

ova

l and

dam

age t

o

veg

eta

tio

n

Mark

ing

of

trees

that

need

to

be

rem

ove

d

and

rem

ovi

ng

thro

ug

h

Tim

ber

Corp

ora

tion.

No.

of

tre

es c

ut

without

mark

ing

Weekly

O

nly

th

e

mark

ed

trees

have

be

en

rem

ove

d

from

the s

ite.

Su

rfac

e s

tora

ge t

an

k (

ST

RU

/M/1

2)

Site

cle

arin

g,

excava

tion

work

s and

transp

ort

of

mate

rial

Nuis

ance

of

dust.

S

pra

ying

of

wa

ter

aro

un

d t

he c

onstr

uctio

n

site.

Use o

f pro

perl

y serv

ice

d

and

main

tain

ed

equ

ipm

ent and

vehic

les.

Enfo

rcin

g

sp

ee

d

limits

to

all

constr

uctio

n

veh

icle

s m

ovi

ng o

n t

he

pub

lic access ro

ad (1

0

km

ph).

R

euse o

f excava

ted s

oil

as m

uch a

s p

ossib

le.

No.

of

pub

lic c

om

pla

ints

re

gard

ing d

ust.

S

erv

ice

and

m

ain

tenance

record

s o

f all

constr

uction v

eh

icle

s.

No.

of

excava

ted

so

il heap

ed a

t site.

Weekly

O

nce

in

3

month

s M

onth

ly

No

pu

blic

com

pla

ints

w

ere

re

ceiv

ed

during

th

e r

ep

ort

ing p

erio

d.

All

equ

ipm

ent

and

m

achin

ery

ha

ve

been

serv

iced

at

serv

ice

sta

tio

ns

outs

ide

th

e

pro

ject site.

All

exca

vate

d

soil

has

been

used

for

back

filli

ng w

ork

s.

Esta

blis

hm

ent

of

site

off

ice,

yard

a

nd

la

bour

cam

p.

And

m

obili

zation

of

work

ers

.

Accum

ula

tion

an

d

dis

posa

l of

Munic

ipa

l S

olid

Waste

(M

SW

).

Colle

ction

of

MS

W

in

bin

s

and

dis

posal

at

sites a

ppro

ved b

y lo

ca

l auth

ority

.

Open

waste

d

um

ps

at

site.

Weekly

Contr

acto

r has s

up

plie

d

waste

b

ins

and

the

w

ork

ers

have

b

een

in

str

ucte

d

to

dum

p

waste

on

ly t

o th

e bin

s.

Colle

cte

d

MS

W

dis

pose

d

on

ly

at

appro

ved locations.

Page 30: Environmental Management and Monitoring Report · PDF fileEnvironmental Management and Monitoring Report ... Excavation work for the foundations of aerator, ... filter and sump was

29

Co

nstr

ucti

on

acti

vit

y

En

vir

on

men

tal Im

pact

Mit

igati

on

M

easu

re/s

A

do

pte

d

Mo

nit

ori

ng

in

dic

ato

r M

on

ito

rin

g

freq

uen

cy

Eff

ecti

ven

ess

&

furt

her

acti

on

s

need

ed

Ris

k

of

acc

idents

an

d

hea

lth

ha

zard

s

to

work

ers

.

Work

ers

are

pro

vide

d

with

pro

per

accom

modation

w

ith

sanitary

fa

cili

ties

an

d

Pers

ona

l P

rote

ctio

n

Equ

ipm

ent (P

PE

) D

ispla

y of

safe

ty

an

d

warn

ing sig

n board

s at

site

No. of

work

ers

per

bill

et

Availa

bili

ty

of

pota

ble

w

ate

r at

site

N

o.

of

train

ings g

iven t

o

work

ers

on

health

and

safe

ty

No. of

accid

ents

at site

Month

ly

Weekly

M

onth

ly

Month

ly

No b

illet

was observ

ed

w

ith

overc

row

ded

w

ork

ers

. A

ll w

ork

ers

have b

een s

up

plie

d w

ith

m

osquito

nets

and

pota

ble

w

ate

r is

ava

ilab

le.

Month

ly

aw

are

ness

train

ings a

re c

ond

ucte

d

by

the c

ontr

acto

r’s s

taff

.

Safe

ty

and

warn

ing

sig

nb

oard

s

have

been

dis

pla

yed

at

site.

No

fa

tal

accid

ents

w

ere

re

cord

ed

durin

g

the

re

port

ing p

erio

d.

Sep

tag

e t

reatm

en

t p

lan

t (S

EP

/M/0

7)

Site

cle

arin

g

and

excava

tion

work

s.

Accum

ula

tion

of

excava

ted

so

il at

site

le

adin

g

to

ero

sio

n

an

d

sedim

enta

tion of

nearb

y la

nds.

Genera

tion o

f dust.

Tim

ing

of

excava

tio

n

work

s

during

dry

perio

ds o

f th

e y

ear.

R

euse

of

soil

for

back

filli

ng w

ork

s.

The

pro

ject

site

was

spra

yed

with

wa

ter

durin

g i

ncid

ence o

f hig

h

dust cond

itio

ns.

Incid

ents

of

ero

ded s

oil

deposited

in

ne

arb

y la

nds.

Runn

ing

ch

art

of

the

wate

r bo

wser

use

d

for

spra

ying w

ate

r.

Weekly

W

eekly

Excava

ted m

ate

ria

l w

as

reused a

t site.

The s

ite

has b

een

fenced o

ff b

y th

e c

on

tracto

r.

No

pub

lic

com

pla

int

was

receiv

ed

on

dust

nuis

ance

duri

ng

the

re

port

ing p

erio

d.

Esta

blis

hm

ent

of

site

off

ice,

yard

a

nd

la

bour

cam

ps.

Accum

ula

tion

an

d

dis

posa

l of

MS

W.

Colle

ction

of

MS

W

in

bin

s

and

dis

posal

at

sites a

ppro

ved b

y lo

ca

l auth

ority

.

No.

of

ope

n

waste

dum

ps a

t site.

Weekly

C

ontr

acto

r has p

rovi

ded

bin

s a

t site o

ffic

e,

yard

and

cam

ps

and

the

MS

W

are

ta

ken

to

dis

posa

l sites a

ppro

ved

b

y th

e loca

l au

thori

ty.

Found

ation

and

str

uctu

ral w

ork

s.

Genera

tion o

f nois

e.

Constr

uction w

ork

s t

hat

cre

ate

nois

e

nuis

ance

are

sto

ppe

d d

uri

ng d

ays

Pub

lic

com

pla

ints

on

nois

e.

Weekly

The p

roje

ct

site is w

ith

in

a f

arm

land a

wa

y fr

om

settle

ments

. N

o

Page 31: Environmental Management and Monitoring Report · PDF fileEnvironmental Management and Monitoring Report ... Excavation work for the foundations of aerator, ... filter and sump was

30

Co

nstr

ucti

on

acti

vit

y

En

vir

on

men

tal Im

pact

Mit

igati

on

M

easu

re/s

A

do

pte

d

Mo

nit

ori

ng

in

dic

ato

r M

on

ito

rin

g

freq

uen

cy

Eff

ecti

ven

ess

&

furt

her

acti

on

s

need

ed

Washin

g o

f concre

te

mix

er

truck

s

outs

ide

th

e p

roje

ct site.

Accid

en

ts to w

ork

ers

. C

onta

min

ation

of

soil

and w

ate

r sourc

es near

such w

ashin

g locations.

of

relig

ious

import

ance

and a

t n

igh

t tim

e.

All

work

ers

have

bee

n

pro

vid

ed w

ith P

PE

an

d

are

m

ade to

use th

em

at site

. A

firs

t aid

ro

om

is

ava

ilab

le a

t site

. C

ontr

acto

r has

bee

n

str

ictly

instr

ucte

d n

ot

to

wash

an

y concre

te

mix

er

truck

s o

uts

ide

th

e

pro

ject site.

No.

of

tool b

ox m

eetings

at site

. N

o. of

accid

ents

at site.

No.

of

incid

ents

w

here

concre

te

mix

er

truck

s have

be

en

washed

outs

ide p

roje

ct site.

Month

ly

Month

ly

Month

ly

com

pla

ints

on

nois

e

were

re

ceiv

ed

duri

ng

th

e r

ep

ort

ing p

erio

d.

Contr

acto

r h

as

carr

ied

out

at

least

on

e t

oo

l b

ox

meeting p

er

month

. N

o.

serious

accid

ent

was r

ecord

ed a

t site.

Contr

acto

r w

as

instr

ucte

d

to

wash

the

m

ixer

truck

s

with

in

the

constr

uction s

ite.

Pu

blic t

oil

ets

(P

T/M

/17

) C

om

ple

ted a

nd h

an

ded

over

to th

e local auth

orities o

n J

anu

ary

, 201

4

Su

bp

roje

cts

in

Vavu

niy

a

Su

rfac

e w

ate

r in

tak

e (

Pe

r A

ru r

ese

rvo

ir)

(SW

/V/0

2)

Site

cle

arin

g

and

excava

tion

work

s alo

ng dam

axis

and

in

take a

rea.

Loss

and

dam

age

to

veg

eta

tio

n.

Loss

of

habita

ts

of

fauna.

Accum

ula

tion

of

excava

ted

so

il at

site

causin

g s

oil

ero

sio

n a

nd

sedim

enta

tion

durin

g

rain

y seaso

ns.

Tota

l cle

ari

ng

of

fore

st

are

a l

imited

to

the

are

a

inu

ndate

d a

t H

igh F

loo

d

Level of

the r

eserv

oir.

E

xecuting a

bio

div

ers

ity

rescue p

rogra

mm

e.

Excava

tio

n

work

s lim

ited

to

the

dry

perio

ds o

f th

e y

ear.

R

euse o

f excava

ted s

oil

for

bund

constr

uctio

n

Exte

nt

of

land

are

a

cle

are

d

be

yond

th

e

pro

ject site b

ou

ndary

N

o.

of

flora

an

d

fauna

tr

ans-locate

d

No.

of

sto

ck

pile

s

locate

d

outs

ide

the

pro

ject bou

ndary

.

Month

ly

Month

ly

Month

ly

Durin

g

the

report

ing

perio

d

only

th

e

land

are

a

req

uire

d

for

the

dam

axis

and

inta

ke

was c

leare

d.

Tra

ns-location of

fauna

and

flora

has

been

sta

rted

in

June,

2013

and T

hre

e s

pecie

s h

ave

been

tra

ns-loca

ted.

N

o

sto

ckpile

w

as

observ

ed

outs

ide

the

pro

ject are

a.

Page 32: Environmental Management and Monitoring Report · PDF fileEnvironmental Management and Monitoring Report ... Excavation work for the foundations of aerator, ... filter and sump was

31

Co

nstr

ucti

on

acti

vit

y

En

vir

on

men

tal Im

pact

Mit

igati

on

M

easu

re/s

A

do

pte

d

Mo

nit

ori

ng

in

dic

ato

r M

on

ito

rin

g

freq

uen

cy

Eff

ecti

ven

ess

&

furt

her

acti

on

s

need

ed

Genera

tion o

f dust.

and

excessiv

e

mate

ria

l and m

ate

rial th

at

cann

ot

be u

sed

are

pill

ed w

ithin

th

e r

eserv

oir a

rea.

Spra

ying

of

wate

r at

regula

r in

terv

als

at

all

constr

uction s

ites.

Enfo

rcin

g spee

ds lim

its

to

all

eart

h

excava

tio

n

and

eart

h

movi

ng

ve

hic

les.

Daily

ru

nnin

g

ch

art

of

the w

ate

r b

ow

ser.

Weekly

Althou

gh

spra

ying

of

wate

r to

su

ppre

ss dust

was carr

ied out

at

site

th

ere

are

no

settle

ments

clo

se t

o t

he

constr

uction a

rea.

Esta

blis

hm

ent

of

site

off

ice,

yard

a

nd

la

bour

cam

ps.

Accum

ula

tion

an

d

dis

posa

l of

Munic

ipa

l S

olid

Waste

(M

SW

).

Ris

k

of

acc

idents

an

d

hea

lth

ha

zard

s

to

work

ers

.

Colle

ction

of

MS

W

in

bin

s

and

dis

posal

at

sites a

ppro

ved b

y lo

ca

l auth

ority

. W

ork

ers

are

pro

vide

d

with

pro

per

accom

modation

w

ith

sanitary

fa

cili

ties

an

d

Pers

ona

l P

rote

ctio

n

Equ

ipm

ent (P

PE

) D

ispla

y of

safe

ty

an

d

warn

ing sig

n board

s at

site

Open

waste

d

um

ps

at

site.

No. of

work

ers

per

bill

et

Availa

bili

ty

of

pota

ble

w

ate

r at

site

N

o.

of

train

ings g

iven t

o

work

ers

on

health

and

safe

ty

No. of

accid

ents

at site

Weekly

M

onth

ly

Weekly

M

onth

ly

Month

ly

Contr

acto

r has s

up

plie

d

waste

b

ins

and

the

w

ork

ers

have

b

een

in

str

ucte

d

to

dum

p

waste

on

ly t

o th

e bin

s.

Colle

cte

d

MS

W

dis

pose

d

on

ly

at

appro

ved locations.

No b

illet

was observ

ed

w

ith

overc

row

ded

w

ork

ers

. A

ll w

ork

ers

have b

een s

up

plie

d w

ith

m

osquito

nets

and

pota

ble

w

ate

r is

ava

ilab

le.

Month

ly

aw

are

ness

train

ings a

re c

ond

ucte

d

by

the c

ontr

acto

r’s s

taff

.

Safe

ty

and

warn

ing

sig

nb

oard

s

have

been

dis

pla

yed

at

site.

No

fa

tal

accid

ents

w

ere

re

cord

ed

durin

g

the

re

port

ing p

erio

d.

Fill

ing

of

bun

d

axis

, C

han

ge

in

surf

ace

C

onstr

uction

of

a

Cre

ation o

f ne

w s

tream

M

onth

ly

Contr

acto

r is

Page 33: Environmental Management and Monitoring Report · PDF fileEnvironmental Management and Monitoring Report ... Excavation work for the foundations of aerator, ... filter and sump was

32

Co

nstr

ucti

on

acti

vit

y

En

vir

on

men

tal Im

pact

Mit

igati

on

M

easu

re/s

A

do

pte

d

Mo

nit

ori

ng

in

dic

ato

r M

on

ito

rin

g

freq

uen

cy

Eff

ecti

ven

ess

&

furt

her

acti

on

s

need

ed

constr

uction

of

spill

gate

s

hyd

rolo

gy

inclu

din

g

do

wn

str

eam

flow

re

gim

e.

div

ers

ion c

anal

to a

llow

unin

terr

upte

d

str

eam

flow

. C

onstr

uction

activi

ties

tim

ed f

or

dry

seaso

n t

o

min

imiz

e e

rosio

n.

Com

pacting

the

em

bankm

ent

slo

pes

to

min

imiz

e r

ill e

rosio

n.

flow

p

ath

s

within

th

e

constr

uction a

rea.

Incid

ents

of

rill

ero

sio

n

observ

ed

alo

ng

bund

axis

.

Month

ly

constr

ucting

the

div

ers

ion c

anal

to a

llow

th

e

str

eam

to

flow

w

ith

out

an

y in

terr

uptio

n.

Contr

acto

r w

as a

dvis

ed

to

use

pro

per

com

pacting

m

eth

ods

and

equ

ipm

ent

to

min

imiz

e

such

ero

sio

n

eve

nts

. F

ound

ation

and

str

uctu

ral w

ork

s

Genera

tion

of

dust

an

d

nois

e.

Accid

en

ts to w

ork

ers

.

Constr

uction

site

has

been

fenced o

ff.

Spra

ying of

wate

r o

ver

exposed s

oil

surf

aces.

Constr

uction w

ork

s t

hat

cre

ate

nois

e

nuis

ance

are

sto

ppe

d d

uri

ng d

ays

of

relig

ious

import

ance

and a

t n

igh

t tim

e.

All

work

ers

have

bee

n

pro

vid

ed w

ith P

PE

an

d

are

m

ade to

use th

em

at site

. A

firs

t aid

ro

om

is

ava

ilab

le a

t site

.

Pub

lic

com

pla

ints

on

nois

e.

Daily

ru

nnin

g

ch

art

of

the w

ate

r b

ow

ser.

N

o.

of

pub

lic c

om

pla

ints

on n

ois

e.

No.

of

tool b

ox m

eetings

at site

. N

o. of

accid

ents

at site.

Weekly

M

onth

ly

Month

ly

No c

om

pla

ints

on n

ois

e

were

re

ceiv

ed

duri

ng

th

e r

ep

ort

ing p

erio

d.

Contr

acto

r h

as

carr

ied

out

at

least

on

e t

oo

l b

ox

meeting p

er

month

. N

o.

serious

accid

ent

was r

ecord

ed a

t site.

Wate

r tr

eatm

en

t p

lan

t (W

TP

/V/0

5)

Cle

ari

ng

of

lan

d a

nd

soil

excava

tio

n.

Dam

age

and

loss

of

veg

eta

tio

n c

over.

Cle

ari

ng

of

lan

d l

imited

to

are

a r

equ

ired f

or

the

w

ate

r tr

ea

tment

pla

nt,

site

off

ice,

yard

an

d

work

er

cam

ps.

Exte

nt

of

land

are

a

cle

are

d

be

yond

th

e

pro

ject site b

ou

ndary

.

Month

ly

The

Contr

acto

r has

fenced

off

th

e

pro

ject

site

and

la

nd

cle

ari

ng

has

no

t g

one

b

eyo

nd

th

is b

oun

dary

. A

ll tr

ees

to

be

rem

ove

d

has

been

mark

ed

and

Page 34: Environmental Management and Monitoring Report · PDF fileEnvironmental Management and Monitoring Report ... Excavation work for the foundations of aerator, ... filter and sump was

33

Co

nstr

ucti

on

acti

vit

y

En

vir

on

men

tal Im

pact

Mit

igati

on

M

easu

re/s

A

do

pte

d

Mo

nit

ori

ng

in

dic

ato

r M

on

ito

rin

g

freq

uen

cy

Eff

ecti

ven

ess

&

furt

her

acti

on

s

need

ed

Accum

ula

tion

of

excava

ted

so

il at

site

causin

g s

oil

ero

sio

n a

nd

sedim

enta

tion

durin

g

rain

y seaso

ns.

Genera

tion

of

dust

an

d

nois

e n

uis

ance.

Excava

ted

soil

has

been

p

iled

within

th

e

site

for

reuse

for

back

filli

ng.

Tim

ing

of

excava

tio

n

work

to

be

com

ple

ted

durin

g d

ry s

eason o

f th

e

year.

S

pra

ying o

f w

ate

r on a

ll exposed s

oil

surf

aces a

t site.

Regu

lar

serv

ices

an

d

inspection

of

constr

uction

veh

icle

s

and m

achin

ery

. A

void

ing

hea

vy

constr

uction

work

s durin

g d

ays

of

relig

ious

import

ance.

No.

of

excava

ted

so

il pile

s

left

outs

ide

th

e

pro

ject site.

Daily

ru

nnin

g

ch

art

of

the w

ate

r b

ow

ser.

N

o.

of

pub

lic c

om

pla

ints

on d

ust.

P

ub

lic

com

pla

ints

on

nois

e

and

vib

ration

in

cid

ents

.

Weekly

W

eekly

W

eekly

hand

ed

ove

r to

tim

ber

Corp

ora

tion

. N

o

tem

pora

ry

sto

ck

pile

s w

ere

p

lace

d ne

ar

the

road

or

can

al.

Ho

we

ver

the c

ontr

acto

r w

as

instr

ucte

d

to

imm

edia

tely

d

ispose

an

y excava

ted m

ate

rial

that ca

nnot

be r

eused.

There

has n

ot

bee

n a

ny

com

pla

int o

n d

ust.

N

o c

om

pla

ints

rece

ived

on n

ois

e.

Esta

blis

hm

ent

of

site

off

ice,

yard

a

nd

la

bour

cam

ps.

Accum

ula

tion

an

d

dis

posa

l of

MS

W.

Colle

ction

of

MS

W

in

bin

s

and

dis

posal

at

sites a

ppro

ved b

y lo

ca

l auth

ority

. W

ork

ers

are

pro

vide

d

with

pro

per

accom

modation

w

ith

Open

waste

d

um

ps

at

site.

No. of

work

ers

per

bill

et.

A

vaila

bili

ty

of

pota

ble

Weekly

M

onth

ly

Weekly

Contr

acto

r h

as c

ut

a p

it

to

colle

ct

all

MS

W.

Ho

we

ver

the contr

acto

r w

as i

nstr

ucte

d t

o p

lace

w

aste

bin

s

at

eve

ry

bill

et

an

d kitchen

are

a.

Als

o i

t w

as i

nstr

ucte

d t

o

fence

off

th

e

waste

colle

ction

p

it

to

avoid

an

y w

ild

and

dom

estic

anim

als

attra

ction

to

the

M

SW

. N

o bill

et

was observ

ed

w

ith

overc

row

ded

w

ork

ers

.

Page 35: Environmental Management and Monitoring Report · PDF fileEnvironmental Management and Monitoring Report ... Excavation work for the foundations of aerator, ... filter and sump was

34

Co

nstr

ucti

on

acti

vit

y

En

vir

on

men

tal Im

pact

Mit

igati

on

M

easu

re/s

A

do

pte

d

Mo

nit

ori

ng

in

dic

ato

r M

on

ito

rin

g

freq

uen

cy

Eff

ecti

ven

ess

&

furt

her

acti

on

s

need

ed

sanitary

facili

ties a

nd

Pers

ona

l P

rote

ctio

n

Equ

ipm

ent (P

PE

).

Dis

pla

y of

safe

ty

an

d

warn

ing sig

n board

s at

site.

wate

r at

site.

No.

of

train

ings g

iven t

o

work

ers

on

health

and

safe

ty.

No. of

accid

ents

at site.

Month

ly

Month

ly

Month

ly

aw

are

ness

train

ings a

re c

ond

ucte

d

by

the c

ontr

acto

r’s s

taff

.

Safe

ty

and

warn

ing

sig

nb

oard

s

have

been

dis

pla

yed

at

site.

No

fa

tal

accid

ents

w

ere

re

cord

ed

durin

g

the

re

port

ing p

erio

d.

Sto

rage

of

fuel

oil,

gre

ase

and

oth

er

chem

icals

fo

r constr

uction

activitie

s

Accid

en

tal

spill

s

or

conta

min

ation w

ith s

torm

w

ate

r causin

g

surf

ace

and

gro

un

d

wa

ter

pollu

tion

. R

isk of

fire

ha

zard

an

d

accid

ents

.

Pla

cin

g

of

all

fuel,

oil

and oth

er

chem

icals

in

a s

tore

with i

mperv

ious

floor,

roofing

an

d p

roper

ven

tila

tion.

Pla

cin

g

of

warn

ing

sig

nb

oard

s

ne

ar

all

flam

mable

chem

icals

.

Cond

uctin

g

regu

lar

safe

ty

train

ing

pro

gra

mm

es

for

the

w

ork

ers

. P

lacin

g

of

pro

per

fire

fightin

g

eq

uip

ment

and

mate

rial

near

sto

res.

Pro

vid

ing

firs

t aid

fa

cili

ties a

t site

Vis

ua

l in

spection o

f an

y sig

ns o

f chem

ical

sp

ills

in t

he s

tore

s.

Availa

bili

ty

of

pro

per

warn

ing s

ignb

oard

s a

nd

in

str

uctio

ns

near

mate

rial sto

res.

Availa

bili

ty

of

pro

per

fire

fightin

g

equ

ipm

ent

near

mate

rial sto

res.

Availa

bili

ty o

f a f

irst

aid

ro

om

with e

qu

ipm

ent.

Weekly

M

onth

ly

Once

in

6

month

s O

nce

in

3

month

s

No

incid

en

ts

of

chem

icals

spill

s

record

ed

and

th

e

contr

acto

r has

pla

ced

all

ch

em

icals

w

ithin

an

enclo

se

d s

tore

s.

Pro

per

sig

nb

oard

s w

ere

ava

ilab

le a

t site

. R

egu

lar

tra

inin

g

pro

gra

mm

es

on

safe

ty

have

bee

n

carr

ied

out

by

the c

ontr

acto

r.

Firefighting

equ

ipm

ent

is

ava

ilable

at

site.

Ho

we

ver

the contr

acto

r w

as a

dvis

ed t

o c

arr

y out

tim

ely

refilli

ng o

f all

fire

exting

uis

hers

befo

re

the

y exp

ire.

N

o f

ata

l accid

en

ts w

ere

re

cord

ed

at

site.

Fe

w

work

ers

have

re

ceiv

ed

tr

eatm

ent

for

min

or

accid

ents

.

Page 36: Environmental Management and Monitoring Report · PDF fileEnvironmental Management and Monitoring Report ... Excavation work for the foundations of aerator, ... filter and sump was

35

Co

nstr

ucti

on

acti

vit

y

En

vir

on

men

tal Im

pact

Mit

igati

on

M

easu

re/s

A

do

pte

d

Mo

nit

ori

ng

in

dic

ato

r M

on

ito

rin

g

freq

uen

cy

Eff

ecti

ven

ess

&

furt

her

acti

on

s

need

ed

Dis

trib

uti

on

pip

e l

ine (

V/P

IPE

S/1

0,

PIP

ES

/V&

M/1

9)

Excava

tio

n

of

trenches.

T

em

pora

ry

loss

of

access to p

ub

lic.

Ris

k

of

accid

ents

to

pub

lic,

work

ers

and

anim

als

.

Pro

vid

e

tem

pora

ry

cove

r sla

bs

ove

r tr

anches.

Back f

ill t

he t

renches a

s

soon a

s t

he p

ipe l

ayi

ng

is

com

ple

ted.

Pla

cin

g

of

barr

icad

e

tape

an

d

sig

nb

oard

s

alo

ng t

he tre

nches.

No.

of

pub

lic c

om

pla

ints

re

late

d

to

loss

of

access.

No.

of

accid

ents

re

cord

ed

du

e

to

open

tr

enches.

Once a

month

O

nce a

month

Contr

acto

r has p

rovi

ded

te

mpora

ry

cover

pla

nts

as

means

of

pro

vid

ing

access.

No

public

com

pla

int

was r

eceiv

ed

durin

g

the

report

ing

perio

d.

No

accid

en

t w

as

record

ed

durin

g

the

re

port

ing peri

od due to

open

tre

nch

es.

Rem

ova

l and

dam

age t

o

veg

eta

tio

n

Mark

ing

of

trees

that

need

to

be

rem

ove

d

and

rem

ovi

ng

thro

ug

h

Tim

ber

Corp

ora

tion.

No.

of

tre

es c

ut

without

mark

ing

Weekly

O

nly

th

e

mark

ed

trees

have

be

en

rem

ove

d

from

the s

ite.

T

ransport

ing m

ate

rial

Excava

ted

so

il is

use

d

for

filli

ng.

If t

here

is a

ny

need

, th

e

mate

rial

is

cove

red

w

he

n

transport

ing

No.

of

truck

s

movi

ng

with m

ate

ria

l u

ncovere

d.

Month

ly

All

mate

rial

transport

tr

ucks h

ave

ad

here

d t

o

this

req

uirem

ent.

Pu

blic t

oil

ets

(P

T/V

/16)

Com

ple

ted a

nd h

an

ded

over

to th

e local auth

orities o

n J

uly

, 2

014

Page 37: Environmental Management and Monitoring Report · PDF fileEnvironmental Management and Monitoring Report ... Excavation work for the foundations of aerator, ... filter and sump was

36

Page 38: Environmental Management and Monitoring Report · PDF fileEnvironmental Management and Monitoring Report ... Excavation work for the foundations of aerator, ... filter and sump was

37

4. Status of environmental licenses and permits for rock blasting and

plants All contractors were instructed to obtain all necessary approvals and licenses such as Environmental

Protection License (EPL).

5. Public complaints Grievance Redress Committees (GRCs) have been established to look into any public complaints

during the commencement of construction works. All contractors are maintaining a public complaint

register.

6. Conclusion and further actions Most of the subprojects are in the initial stages of their construction and mobilization of worker force.

All contractors have submitted their Environmental Method Statements (EMS). It is important that

the contractor of Per Aru reservoir project carry out the habitat enrichment programme and maintain

the vegetation established under the subproject. It is also important that all contractors maintain the

health and safety standards to avoid any fatal accident at site.

The next monitoring report is for the period from January to June, 2015 and it is anticipated that

some of the subprojects will be completed and handed to the client.