Environmental and Social Monitoring Report Project Number: 50330-001 July 2019 INO: Rantau Dedap Geothermal Power Project (Phase 2) Semi-Annual Report (January to June 2019) Prepared by PT Supreme Energy Rantau Dedap (PT SERD) for Asian Development Bank This environmental and social monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. Your attention is directed to the “Terms of Use” section of this website. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.

Upload: others

Post on 26-Sep-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Environmental and Social Monitoring Report...2. Relevant Environmental Permits or Compliance Certificates 11 2.1 New Permit or Compliance Certificates Required and Obtained 11 2.2

Environmental and Social Monitoring Report

Project Number: 50330-001 July 2019

INO: Rantau Dedap Geothermal Power Project

(Phase 2)

Semi-Annual Report (January to June 2019)

Prepared by PT Supreme Energy Rantau Dedap (PT SERD) for Asian Development Bank

This environmental and social monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. Your attention is directed to the “Terms of Use” section of this website. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.

Page 2: Environmental and Social Monitoring Report...2. Relevant Environmental Permits or Compliance Certificates 11 2.1 New Permit or Compliance Certificates Required and Obtained 11 2.2

Rantau Dedap

Geothermal Power Project

Environment & Social Monitoring Report

RD

Issued on 29 July 2019

RD-RSH-RPT-IEE Rev 1

January-June 2019

Page 3: Environmental and Social Monitoring Report...2. Relevant Environmental Permits or Compliance Certificates 11 2.1 New Permit or Compliance Certificates Required and Obtained 11 2.2

Environment & Social Monitoring Report-1H18 Rev 1 Page 2

PT Supreme Energy Rantau Dedap

Menara Sentraya, 23rd

Floor, Jl. Iskandarsyah Raya No. 1A

Kebayoran Baru, Jakarta 12160, Indonesia

P +62-21-2788 2222

F +62-21-2788 2333

www.supreme-energy.com

COPYRIGHT:

The concepts and information contained in this document are the property of PT Supreme Energy Rantau Dedap.

Use or copying of this document in whole or in part without the written permission of PT Supreme Energy Rantau Dedap

constitutes an infringement of copyright.

The Supreme Energy project companies - SE Muara Laboh, SE Rajabasa and SE Rantau Dedap are independent companies

developing geothermal projects in Sumatra, Indonesia. Based on the agreement of the shareholders of the individual project

companies, the Supreme Energy companies are managed in an integrated way in order to maximize the synergies in terms

of use of resources and organization of their core and supporting processes. Consequently, important portions of the

documentation body developed and applied within each company (manuals, procedures, description of processes,

guidelines etc.) are common to all project companies. The applicability of each document to one or several project

companies is reflected in the reference of each document.

Any document applicable to SE Muara Laboh contains the characters “ML” in the document reference.

Any document applicable to the SE Rajabasa project company contains the characters “RB” in the document reference.

Any document applicable to the SE Rantau Dedap project company contains the characters “RD” in the document reference.

If a document applies to all three Supreme Energy companies, the term “Supreme Energy” may refer to any and all of these companies.

Page 4: Environmental and Social Monitoring Report...2. Relevant Environmental Permits or Compliance Certificates 11 2.1 New Permit or Compliance Certificates Required and Obtained 11 2.2

Environment & Social Monitoring Report-1H18 Rev 1 Page 3

Table of Contents

1. Project Information 6

1.1 6

1.2 7

1.3 8

Project Location

Project Summary

Contacts

2. Relevant Environmental Permits or Compliance Certificates 11

2.1 New Permit or Compliance Certificates Required and Obtained 112.2 Key Developments and Major Changes in Location and Design 112.3 Findings of Environmental and OHS Regulatory Inspections or Audits 122.4 Monitoring Table Permit / Consultation 13

3. Incidents of Environmental Safeguards Violations or Non-compliance 14

3.1 Summary of Incidents 142.3 Summary Table of Incidents 14

4. Incidents of Environmental, OHS Accidents 15

4.1 Environmental Incidents 154.2 Occupational / Community Health Incidents 154.3 Safety Incidents 174.4 Summary Table of Incidents 17

5. Social Safeguards Monitoring 29

5.1 Social Safeguards Monitoring General Overview 29

5.2 Status of Corrective Actions 30

5.3 Summary of Activities Carried Out, Issues and Challenges 305.4 Summary of Stakeholder Engagement Plan 315.5 Livelihood and Skill Development Opportunities to Affected Persons

through the ISDP of SERD 335.6 Forward Plan / Next steps (for the next 6 months) 335.7 Labour Hiring and Management 34

6. Environmental Capacity 35

6.1 Staff Capacities in Environmental Management 356.2 Degree of Awareness 356.3 Training Conducted 356.4 Needs Assessment of Environmental Management Capacity 486.5 Awareness Level of Contractors’ Field Personnel 48

7. Social Management Capacity 49

7.1 SERD’s Relations Team 497.2 Number and Adequacy of Staff to Monitor Labour and Working Conditions 49

Page 5: Environmental and Social Monitoring Report...2. Relevant Environmental Permits or Compliance Certificates 11 2.1 New Permit or Compliance Certificates Required and Obtained 11 2.2

Environment & Social Monitoring Report-1H18 Rev 1 Page 4

7.3 Training Conducted 497.4 Designation and Signature of person responsible 49

8. Issues, Status of Implementation of Mitigating Measures in the EnvironmentalManagement Plan 50

8.1 Pollution (Air Quality) Monitoring 508.2 Water Quality Monitoring 548.3 Wastes 568.4 Erosions 578.5 Water Flow 588.6 Aquatic Biota 598.7 Flora and Fauna 60

9. Permit Compliance 67

9.1 Compliance with AMDAL Document 679.2 Compliance with Environmental Permit 67

10. Biodiversity 68

687075

10.1 Biodiversity Action Plan Summary

10.2 Biodiversity (Endangered Species)10.3 Biodiversity Offset Strategy

11. Transmission Network 76

12. Information Disclosure 77

List of Attachments

Attachment 1 : Environmental Activities

Attachment 2 : Safety Health Activities

Attachment 3 : Social Activities

Attachment 4 : Form 4 Facilities Agreement

Page 6: Environmental and Social Monitoring Report...2. Relevant Environmental Permits or Compliance Certificates 11 2.1 New Permit or Compliance Certificates Required and Obtained 11 2.2

Environment & Social Monitoring Report-1H18 Rev 1 Page 5

Abbreviations

ADB Asia Development Bank

EPC Engineering, Procurement, and Construction

ERM Environmental Resources Management

ESAP Environmental and Social Action Plan

FC Financial Close

FEED Front End Engineering Design

ISDP Integrated Social Development Program

JBIC Japan Bank for International Cooperation

LAPI ITB Lembaga Afiliasi Penelitian dan Industri Institut Teknologi Bandung

LIPI Lembaga Ilmu Pengetahuan Indonesia (National Science Body)

OHS Occupational Health and Safety

PLN Perusahaan Listrik Negara (National Power Company)

PP Pembangunan Perumahan`

PPA Power Purchase Agreement

PRA Plumpang Raya Anugerah

Rekind Rekayasa Industri

RKL Rencana Pengelolaan Lingkungan (Environmental Management Plan)

RPL Rencana Pemantauan Lingkungan (Environmental Monitoring Plan)

RD Rantau Dedap

NEXI Nippon Export and Investment Insurance

PLN PT Perusahaan Listrik Negara (Persero)

SCAR Social Compliance Audit Report

SERD PT Supreme Energy Rantau Dedap

SEP Stakeholder Engagement Plan

SGS Steam Gathering System

SHE Safety Health Environment

Page 7: Environmental and Social Monitoring Report...2. Relevant Environmental Permits or Compliance Certificates 11 2.1 New Permit or Compliance Certificates Required and Obtained 11 2.2

Environment & Social Monitoring Report-1H18 Rev 1 Page 6

1. Project Information

1.1 Project Location

SERD Geothermal Power Plant Project is located in a mountainous area approximately 290 km by road

direction south west of Palembang, the capital city of South Sumatra in Indonesia. The road access to the

site is generally in good condition as asphalted main public road from river port and airport in Palembang

via provincial cities Muara Enim and Lahat.

A 20 km unsealed road, suitable for transportation and mobilization, exists as the last section of road

from village Kota Agung until the site entrance and geothermal project area.

The project site is located around 35 km south east of an active volcano and a risk assessment of an

eruption has been studied and hazards of ash fall identified.

The topography of the Rantau Dedap Geothermal field is best described as “rugged” – the bulk of it being

within a protected forest. Elevations of the steam production facilities range from 1752 metres above sea

level at Wellpad RD-B, to 1960 masl at the proposed power station site adjacent Wellpad RD-E, to 2564

masl at the future wellpad RD-L.

Picture 1 : Location of Rantau Dedap Geothermal Project in Sumatera

Page 8: Environmental and Social Monitoring Report...2. Relevant Environmental Permits or Compliance Certificates 11 2.1 New Permit or Compliance Certificates Required and Obtained 11 2.2

Environment & Social Monitoring Report-1H18 Rev 1 Page 7

Picture 2 : Site Overview and Power Plant

1.2 Project Summary

Under the Decrees of the Minister of Energy and Mineral Resource (MEMR) issued in 2008, PT Supreme

Following the tender award of the Rantau Dedap concession (WKP – Wilayah Kuasa Pertambangan) to

the Supreme Energy Consortium in late 2010, a mining license (IUP or Ijin Usaha Pertambangan) was

issued to the project company PT Supreme Energy Rantau Dedap (SERD). On 16 November 2017 the Third

Amendment of Power Purchase Agreement (PPA) between Perusahaan Listrik Negara (PLN) and SERD

was signed and the Ministry of Finance of the Republic Indonesia issued the Government Guarantee

Letter for the Rantau Dedap Geothermal Power Project on 04 April 2018.

On January 2013, civil construction works commenced to support drilling exploration activities and

finished the construction of access roads and wellpads in November 2014. A total of 4 wellpads RD-B, RD-

C, RD-E, RD-I and ± 42 km access roads from Kota Agung – Tunggul Bute – Rantau Dedap site.

The exploration well RD-B1 was SPUD-IN February 3, 2014 and exploration drilling continued until early

2015. In total 6 wells were completed which are RD-B1, RD-B2, RD-C1, RD-C2, RD-I1 and RD-I2, and

followed by an extensive well testing program, which was completed in August 2015. Based on the

drilling and well testing results, SERD’s subsurface team prepared the numerical model of the resource and issued the well field assumption.

GeothermEx, Inc. (GTX) as Lenders’ Resource Consultant has performed a due-diligence review on the

Page 9: Environmental and Social Monitoring Report...2. Relevant Environmental Permits or Compliance Certificates 11 2.1 New Permit or Compliance Certificates Required and Obtained 11 2.2

Environment & Social Monitoring Report-1H18 Rev 1 Page 8

assumption of the Rantau Dedap geothermal resource and issued the Final Resource Assessment report

in October 2015 and addendum October 2017. The Feasibility Study was carried out by AECOM as Owner

Engineer by end of 2015, followed by the FEED in 2016 and preparing the tender documents.

The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract was signed on 22 March 2018 and Notice to Proceed (NTP) issued

on 19 April 2018. Under the EPC Contract the Contractor is responsible for the procurement, installation,

testing and commissioning of the SGS system, the Power Plant and the Substation, as well as

interconnection to the PLN grid connection point, wellpads, access roads and accommodation complex.

1.3 Contacts

Company: PT Supreme Energy Rantau Dedap

Menara Sentraya, 23rd

Floor

Jl. Iskandarsyah Raya no. 1A, Kebayoran Baru, Jakarta 12160

Ph: +62-21 2788 2222 Fax: +62-21 2788 2333

Attn: Nisriyanto

Page 10: Environmental and Social Monitoring Report...2. Relevant Environmental Permits or Compliance Certificates 11 2.1 New Permit or Compliance Certificates Required and Obtained 11 2.2

Environment & Social Monitoring Report-1H18 Rev 1 Page 11

2. Relevant Environmental Permits or Compliance

Certificates

This Chapter discusses relevant environmental permits or compliance certificates as required by SERD,

including the latest permits or compliance certificates obtained until end of June 2019, key developments

and any major changes in location and design, and findings of any environmental and OHS regular

inspections audits.

2.1 New Permit or Compliance Certificates Required and Obtained

During January up to the end of Junly 2019, no new permit or extension of existing permits were

required.

2.2 Key Developments and Major Changes in Location and Design

No major changes to location and design were made.

The environmental activities done on site included:

Recruitment process of Site Safety Manager

Recruitment process of Site Safety Inspector

Continue coordination efforts with local forestry regarding the budgeting and activities offset

site

Continue wildlife monitoring by camera trap

Invasive species clearing

Regular joint forest patrol with province forestry officers and regency forestry officers

Conducted social census for PT SERD Biodiversity Offset locations

6 monthly RKL-RPL field sampling/survey has been conducted, final document was obtained on

the 8th of January, 2019

3 monthly monitoring of H2S & Noise at nearest receptors

PT SERD Nursery maintenance, expansion, relocation and revegetation program

Reviewing Contractor Site Specific SHE procedures

RD-PRD01-SHE-CPLN-1003 Rev C Environmental Management Plan

RD-PRD01-SHE-CPRO-1003 H2S Control and Monitoring Procedure

Contractor (Rekind)

The environmental activities done on site included:

Conducted assessment for wheel washing facility construction

Noise monitoring

Temperature monitoring

Installed SHE banners around project area

Installation/maintenance of Sediment Traps

Dust control/suppresion measures by way of water spraying truck.

Page 11: Environmental and Social Monitoring Report...2. Relevant Environmental Permits or Compliance Certificates 11 2.1 New Permit or Compliance Certificates Required and Obtained 11 2.2

Environment & Social Monitoring Report-1H18 Rev 1 Page 12

2.3 Findings of Environmental and OHS Regulatory Inspections or Audits

Findings of Environmental and OHS during Semester 1 of 2019

Note: no regulatory inspection or audits were conducted specifically for Environmental/OHS purposes

during the first semester of 2019. If any environmental/OHS inspections related matter were inspected,

they were conducted in conjunction with inspections for the fatality incident/drilling activities. No major

findings were encountered. Red flag items from the previous MMD/ADB inspections were being

addressed.

Update on LESC Red Flag Items

Documents revised:

- PT SERD Site Specific Environmental Management Plan

- RD-MSHE-ENM-PRO-0001 H2S Monitoring

- RD-PRD01-SHE-CPRO-1003_Rev.C_H2S Control

- RD-PRD01-SHE-CPLN-1003_Rev.E_Environmental Management Plan

- RD-PRD01-SHE-CPLN-1005_Rev.C_Traffic Management Plan

- RD-PRD01-SHE-CPRO-1003_Rev.C_H2S Control Monitoring Procedure

- Maintenance of Domestic

Waste Storage and area

- Drilling area housekeeping

- Drilling Camp Area

Page 12: Environmental and Social Monitoring Report...2. Relevant Environmental Permits or Compliance Certificates 11 2.1 New Permit or Compliance Certificates Required and Obtained 11 2.2

Environment & Social Monitoring Report-1H18 Rev 1 Page 13

(Environmental) Obtained /Not obtained Application Date: YYYY/MM/DD

Obtained Date: YYYY/MM/DD

Valid until: YYYY/MM/DD

Other environmental permits (if any permit obtained during the monitoring period)

Name of permit: Obtained Date:

YYYY/MM/DD

Valid until:

YYYY/MM/DD

*If obtained, please submit a copy of the permit together with this monitoring form.

Existing Permit obtained throughout SERD project

Environmental Permit was been obtained

Borrow Use Permit was obtained

Explosive Bunker permit was obtained

HazMat Waste storage permit was obtained

5 Year Protection and Security of Forestry area

Determination of Location in relation to Rehabilitation Program of MUSI Watersheds on behalf of PT SERD

Monitoring Item Monitoring Results during Reporting Period

Consultation Name of Consultation e.g. Consultation for XXX

Date/Venue YYYY/MM/DD at XX

Please summarize the main discussion points, and attach the minutes of meeting.

2.4 Monitoring Table Permit /Consultation

Monitoring Item Monitoring Results during Reporting Period

Permit Permit

Page 13: Environmental and Social Monitoring Report...2. Relevant Environmental Permits or Compliance Certificates 11 2.1 New Permit or Compliance Certificates Required and Obtained 11 2.2

Environment & Social Monitoring Report-1H18 Rev 1 Page 14

3. Incidents of Environmental Safeguards Violations or Non-

compliance

This Chapter discusses relevant incidents of environmental safeguards violations based on applicable

environmental standards and regulations along with the correctives actions, deadlines, identification of

responsible parties, and status of implementation of corrective action plan.

3.1 Summary of Incidents

No incidents of environmental safeguards, violations or non-compliance, and corrective actions

required.

No incidents with security forces

3.2 Summary Table of Incidents

There had been no issues found related to incidents of environmental safeguards, violations or non-

compliance, and hence no corrective actions were required.

Date /

Time

Responsible

Agency

Nature of Non-

compliance

Standard

s and

Regulatio

ns

Violated

Date &

Authorities

Recorded

Corrective Actions Status of

Corrective

Action

Implement

ation

Page 14: Environmental and Social Monitoring Report...2. Relevant Environmental Permits or Compliance Certificates 11 2.1 New Permit or Compliance Certificates Required and Obtained 11 2.2

Environment & Social Monitoring Report-1H18 Rev 1 Page 15

4. Incidents of Environmental, OHS Accidents

This Chapter discusses incident recorded dates and responsible agencies, the scale of damage and injury,

authorities in charge of investigation/ recording, media or community reactions and corrective actions,

deadlines, identification of responsible parties.

4.1 Environmental Incidents

There were 5 (five) environmental accident s were reported during the period.

Incident Number

& Date

Description Recommendation Action

Plan

Status

RD-IR-19-01

1 Jan 2019

Weather condition was rain from morning. Arround

01.00 PM the mud from WP-L area activity was

flowing to small stream at chainage 0+900. Mud also

contain woods and rock and cause the culvert

blocked. Time 01.30 PM the culvert crossing the road

sustain overflow to the road and filled up the road

with mud arround 50 cm.

1. Clean up the the road and

culvert from mud, wood

and boulder.

2. Environmental assessment

at well pad L area

1. Closed

2. Closed

RD-IR-19-02

03 Jan 2019

The rainfall start around 02.00 PM and mud from

well pad L area flowing down with other material

and blocked the culvert at chainage 0+900 time

10.00 PM.

1. Clean up the the road and

culvert from mud, wood

and boulder.

2. Apply of result assessment

for screening, install sand

bag, gabion basket.

1. Closed

2. Closed

RD-IR-19-13

19 Feb 2019

Water overflow at staging area [Environment]

Around 16.00 WIB, the weather was rainy. At Staging

area there was also the leaked pipe occured on 13.00

WIB. The water flow to the nearest drainage. The

potfal og the drainage was clogged by the sand and

soil and cause the water stagnate on the road.

1. Clean up the drainage with one

unit excavator.

1. Closed

RD-IR-19-14

19 Jan 2019

Culvert over flow at junction I [Environment]

Around 16.30 WIB, the weather was rainy. The slope

condition at new access Junction I STA 0+000 to STA

0+300 was land slide and still continue to clean up

the land slide from the hill and the drainage. Due to

water flow from the rain, the soil and the rock flew

to the STA 0+000 and clogged the culvert at STA

0+000. the clogged drainage cause the soil, mud and

rock overflow to the access.

Around 17.00, 1 unit long arm moved to the Junction

I and start to clean up the clogged material. Around

17.30 the drainage have been cleaned up and the

water flow became normal condition and the

material on the road have been cleaned up.

1. Clean up the drainage with

one unit long arm

excavator.

1. Closed

Page 15: Environmental and Social Monitoring Report...2. Relevant Environmental Permits or Compliance Certificates 11 2.1 New Permit or Compliance Certificates Required and Obtained 11 2.2

Environment & Social Monitoring Report-1H18 Rev 1 Page 16

RD-IR-19-20

01 Mar 2019

Minor Landslide Environment :

On Friday, 1 March 2019, around 20.00 WIB, the land

slide was occurred at public access Ch. 6+000. The

land slide was blocked at access but still able to be

passed by light vehicle. Around 20.30 WIB,

Contractor's Construction manager inform to the

road maintenance crew to recover the landslide. The

crew used the excavator which stands by for WAC2

activities (ch.4+000). Around 21.15 WIB, the

excavator has arrived in incident location and start to

recover the landslide. Around 23.27 the landslide has

completely recover and the access was open and the

traffic can operate in normal condition.

4.2 Occupational / Community Health Incidents

There were 3 (three) incident relate with security and community during the period.

Incident Number &

Date

Description Recommendation Action

Plan

Status

RD-IR-19-05

10 Jan 2019

1) PT.NMS Tool has stolen at well pad C Security On 10 January crew finished

work on 06.00PM. All tools (grinding

machine, grinding disc and others stored at

their toolbox made from steel plate and

locked. On 11 January time 07.00AM, crew

back to well pad C for continue activity and

found their toolbox was forcedly open

condition. After check by crew and witness

by drilling security, all grinding machine and

other tools has missing.

2. Report to SERD

representative

3. Prepared the theft report

2. Closed

3. Closed

RD-IR-19-06

19 Jan 2019

2) Mobilization (use trailer) stop by

community Community / security

issue On 19 January time 09.00AM site

support manager receive two guest from

Karang endah village. They are asking about

seven people who want to work at the

project. After discussion arround 01.15PM

the guest want statement lettter from SERD

regarding warranty can work but not

approved. At night time 10.30PM, they are

stop and not allowed the trailer pass the

road until get work at SERD project.

1. Communication with some

parties (Police,Army, Head

of village and Kota agung

head of distric)

1. Continue

(maintain

relation

community

communicati

on)

RD-IR-19-11

15 Feb 2019

3) Road blockage at Yayasan junction

[Security] Around 09.30 am. Security

personel received report regarding road

blockage by 2 (two) villages, Saaran

(Aremantai Village) and Salamudin (Segamit

Village). They block the road using 2 motor

cycle and 2 lenght wooden block.

SERD Security Supervisor and Jaga

Nusantara Seurity coordinator conduct first

approach and negotiate with the cultivator,

the cultivators still insist to continue

blocking the road.

11.20 - 12.20 SERD Security, Rekind

Comdev, Pustependo Comdev, SHE

1. Cultivators demanding abl

e to work within SERD wor

k area, short term solution f

acilitate by SERD Security a

nd Rekind Comdev was fullf

ill the cultivators demand. T

hey granted to work for PT.

Puspetindo.

2. EPC Contractors and their S

ub-Contractor must follow r

ecruitment policy as set out

by Relations and Agreemen

t with FOMAS.

1. Closed

2. Continue

Page 16: Environmental and Social Monitoring Report...2. Relevant Environmental Permits or Compliance Certificates 11 2.1 New Permit or Compliance Certificates Required and Obtained 11 2.2

Environment & Social Monitoring Report-1H18 Rev 1 Page 17

Pospetindo, Army Personel comencing a

meeting at Sadeli house( Yayasan Villager-

house owner) and attended as well from

FOMAS (Zulkarnain).

4.3 Safety Incidents

The safe working hours are:

Safe Working Hours Safe MH YTD

(to end of June 2018)

Safe MH since Last LTA

(since 13 December 2013)*

Employee and Temporary Workers 1 1 , 6 4 0 1 1 , 6 4 0

Contractors 4 8 4 , 9 3 6 4 8 4 , 9 3 6

For the period of January - June 2019, there were [20] property damage incident [9] near misses, [1]

HIPO (high potential) near miss, and [2] fatalities/lost time incidents.

4.4 Summary Table of Incidents

No. Type of Incident Date of Incident Follow Up Status

1.

Intensive rain causing

mud to flow down to a

small stream : New Access

Junction – I (STA 0+900)

01-01-2019

Clean up the small

stream with an

excavator

Conduct Environmental

Assessment to the

landslide at wellpad L

Close

2.

Slope failure due to

intensive rain: WAC-2

(STA 4+000)

15-02-2019

Slope already recovered

and gave compensation

to the land owner

Close

3.

Floaded road due to

drainage clogged: Staging

Area

19-02-2019

Clean up the drainage

using excavator

Rekind recovered the

clogged drainage

Close

4

Floaded road due to

drainage clogged:

Junction I (STA0+000)

19-02-2019

Clean up the drainage

using excavator

Rekind recovered the

clogged drainage

Close

5

Road blocked due to

landslide by heavy rain:

New Acess at Junction I to

Wellpad M and Wellpad L

16-04-2019

Clean up the road using

excavator, but SWS

pipeline is not yet in

position.

Clean up remaining

debris from STA 0+50,

STA 0+500, 0+1600,

0+1500, and

Relocate the slide at

SWS pipe line

Open

Page 17: Environmental and Social Monitoring Report...2. Relevant Environmental Permits or Compliance Certificates 11 2.1 New Permit or Compliance Certificates Required and Obtained 11 2.2

Environment & Social Monitoring Report-1H18 Rev 1 Page 18

ACTIVITY YTD DESCRIPTION CORRECTIVE ACTION PIC DATE OF

TARGET

STATUS

Number of Occupational

Fatality Incident

(Company and

Contractor)

2 1) RD-IR-19-031 : The rigger

fell down from the bed

trailer and struck by

spun piles

EBTKE CAP Report for Fatality on 10 April

EPC and

SERD

16 & 22 July

2019

Completed

2) RD-IR-19-036 : the water

truck driver caught in

between the truck cabin

and the ground at Yayasan

road on water filling point

112-KTPB Report to EBTKE.pdf

EPC & SERD 16 July & 14 Aug

2019

Completed

Number of Occupational

Lost Time Incident

(Company and

Contractor)

0 -

Number of Medically

Treated Incident

(Company and

Contractor)

0 -

Number of First Aid

Treatment (Company

and Contractor)

6

(1 case)

RD-IR-19-27: 27 Mar 2019:

Passenger Bus PT. PRA’s, tipped over at Short cut area First

Aid Treatment

On Wednesday, March 27, 2019

at 19.30 LT, PRA-09 crew bus

departed from drilling basecamp

(Pad C) transporting 23 rig

personnel (including driver). 23

personnel were going to Lahat

for their off-duty schedule and

crew bus was intended also to

pick up the incoming crew who

will relive those personnel. The

weather condition at that time

was drizzle after heavy rain in the

afternoon. At 19.50 LT, when the

crew bus passing Short Cut road

on the downhill road section, the

bus driver pushed the brake,

however, the brake did not

function properly. This resulted

in the crew bus slid and lost

control causing the bus slip into

the ditch and lean on the

concrete support of the water

pipe lines. There were 6 out of 23

personnel who needed first aid

treatment. 5 personnel were

transported to SOS medical clinic

and received first aid treatment

on their bruises. 1 unit personnel

was transported to Kota Agung

and continued to DKT hospital at

Lahat to check the hip strain, no

fracture or dislocation indication

observed, and it was confirmed

with X-Ray at the Hospital.

1. Do routine inspection for

all equipment

2. Prepare checklist for pre

trip inspection

3. Refresh training for all

drivers

4. Road maintenance

frequently

PRA

Project

April’19 Completed

ongoing

Number of High

Potential Serious

Incidents or High

1 RD-IR-19-033 : Wire rope at the

main hoist crane RT KATO 30 T

broken due to missing safety

1). Do routine pre use check

by the operator

Depriwangg

a

Completed

Page 18: Environmental and Social Monitoring Report...2. Relevant Environmental Permits or Compliance Certificates 11 2.1 New Permit or Compliance Certificates Required and Obtained 11 2.2

Environment & Social Monitoring Report-1H18 Rev 1 Page 19

ACTIVITY YTD DESCRIPTION CORRECTIVE ACTION PIC DATE OF

TARGET

STATUS

Potential Near

Misses/Near Hits

(Company and

Contractor)

latch/ wedge rope and

substandard service by the

operator on 27 April 2019

2). Report the anomaly as

soon as possible to the owner.

Depriwangg

a

Completed

Number of Near Misses

/ Near Hits (Company

and Contractor)

9 1) RD-IR-19-08 : 29 Jan 2019 :

Nearmiss Excavator

performing bundwall

installation at soil disposal

junction I area. When the

excavator enter the

disposal from other side

track of excavator was sink

at soft soil

1. Evacuation the

excavator

2. Conduct re-assessment

for access point

Stand down meeting at

disposal area

EPC Feb 2019 Completed

2) RD-IR-19-10 : 05 Feb 2019 :

Light vehicle engine

problem at shortcut road

[Nearmiss] At around

20.30 pm. The driver was

heading to the Pioneer

office from gate#1 throught

a Short Cut area, when he

was positioned uphill, the

car's engine had a problem

that was not functioning

and the car stopped at the

incline, when the diver tried

to restart the vehicle,

suddenly the vehicle rolled

back wards.

3) RD-IR-19-19 : 28 Feb 2019 :

Lowbed trailer hit the SWS

pipe near Junction I

[Nearmiss] Arround

15.00 Dump Truck number

23 moved from Staging

area to Gate#1. Arround

16.00 WIB when the dump

truck pass the ex security

post#2, one unit light

vehicle black colour moved

from gate#2 to the site

location. The light vehicle

take the middle side of the

road and cause the Dump

Truck steer to the left side

of the road and the left side

of the dump truck slip to

the edge of the road. The

condition of the edge of the

road is soft and cause slip.

4) RD-IR-19-25 : 21 Mar 2019 :

Water truck slip on the

edge of the road Near

Miss :

On Thursday, 21 March

2019, 1 unit water truck

Page 19: Environmental and Social Monitoring Report...2. Relevant Environmental Permits or Compliance Certificates 11 2.1 New Permit or Compliance Certificates Required and Obtained 11 2.2

Environment & Social Monitoring Report-1H18 Rev 1 Page 20

ACTIVITY YTD DESCRIPTION CORRECTIVE ACTION PIC DATE OF

TARGET

STATUS

(WT 03) continues to

conduct dust control from

gate 1 to Talang Pisang.

Around 12.30, the truck has

filled up the tank by using

the water in Habibi’s fish pond. The truck moved to

Talang pisang, but the

instruction for that time

was to spray the water to

Yayasan village. The driver

immediately turns around

the truck to Yayasan village.

During the turning process,

the driver did not notice the

condition of the road, and

cause the back side of the

truck slip into the drainage.

The Supervisor immediately

call the other water truck

(WT 02) to support the

evacuation. Around 14.00,

the water truck was able to

be evacuated by being

pulled out by WT 02. No

Injury to the driver, no

damage to the truck and no

spill during this case.

5) RD-IR-19-26 : 27 Mar 2019:

Dump truck mired on the

edge of the road Near

Miss :

On Wednesday March 27,

2019 around 15.30, 1 unit

TMC unloaded Aramco in

the north side of GPP. The

lifting area was taking a half

of the width of the existing

road. 1 unit dump truck

came from the pioneer

office direction to laydown

Gate 1. When passing the

lifting area, the truck looks

the right side of the road.

When the truck moved

beside the TMC, and due to

the poor condition of the

right side of the road, the

truck was slip. The

Supervisor at GPP

immediately instruct 1 unit

excavator to evacuate the

slip truck. The truck was

able to be evacuated and

continue to move to lay

down at gate 1. No damage

to the truck or the existing

SWS pipe.

Page 20: Environmental and Social Monitoring Report...2. Relevant Environmental Permits or Compliance Certificates 11 2.1 New Permit or Compliance Certificates Required and Obtained 11 2.2

Environment & Social Monitoring Report-1H18 Rev 1 Page 21

ACTIVITY YTD DESCRIPTION CORRECTIVE ACTION PIC DATE OF

TARGET

STATUS

6) RD-IR-19-28 : 28 Mar 2019:

Falling dead tree at CH

7+000 and block the public

road Near Miss

SERD got report from PT.

Rekayasa Industri (Rekind)

road maintenance crew that

there were a collapsed dead

tree at CH 7+000 and

blocked the road traffic.

The road maintenance

crews were taking direct

action to remove the

collapsed tree using

backhoe loader.

The road back to normal

condition after cleaning tree

debris.

7) RD-IR-19-30 : 07 April 2019

: Near Miss Dump Truck

flipped over at Short cut

area :

On Sunday, April 7, 2019

around 10.00, 1 Unit Dump

Truck containt split stone to

be transfered to GPP was

rolled over at Short cut. The

unit have been inspected at

Gate 1 by Rekind's HSE

Inspector and accepted to

enter to site location. When

passing to Short Cut. the

driver used 1st

transmission to movving up

the hil. due to the contour

of the road ( which not flat

and not good), the truck

was stop and make the

truck unable to moving up.

The driver immediately

steep on the break and pull

out the hand break to

prevent the truck from

moving backward. but the

truck still moving down and

slip to the right site of the

road. the truck hit the

existing SWS pipeline on the

right side and truck stop

because gabion, the truck

driver is in good condition.

1. Conduct driver forum for

all driver

2. Conduct inspection for all

vendor trucks

EPC End of April’19 Completed

8) RD-IR-19-38 : 11 May 2019:

Near Miss the trailer of

GMK/PRA slipped on the

ditch and cause of flipped

to the left of road. This

accident happened when

the loader will give

assistant due to the rear

left tire was bogged

Page 21: Environmental and Social Monitoring Report...2. Relevant Environmental Permits or Compliance Certificates 11 2.1 New Permit or Compliance Certificates Required and Obtained 11 2.2

Environment & Social Monitoring Report-1H18 Rev 1 Page 22

ACTIVITY YTD DESCRIPTION CORRECTIVE ACTION PIC DATE OF

TARGET

STATUS

9) RD-IR-19-39: 15 May 2019 :

Near Miss Grader

slipped in to the ditch to

give away the other vehicle

even though the flagman

has stopped the car

1. Give the warning to

vehicle which not obey

the flagman instruction

EPC 17 May’19 Completed

Number of Incident /

Accident (Company and

Contractor)

19 1) RD-IR-19-03 : 07 Jan 2019 :

Property damage (Fire case)

On 08.40 AM one crew

camp maintenance smell the

rubber burn. Than he try to

find out the recource. He

found smoke came from one

room No.8A at mini camp at

rig site on well pad M. Fire

caused from heater at room

not turn off when the

worker left that room.

1. Socialization to all crew

regarding awareness for

"turn off electrical

appliances when left the

room

2. Install smoke detector and

function test frequently at

all rooms

3. Issued the 2nd warning

letter to involved person

4. Provide additional

hydrant/ fire pump at

mini camp

PRA End of Jan ‘19 Completed

2) RD-IR-19-04 : 7 Jan 2019 :

Property damage Arround 02.00PM wheel

loader pass the Anoa road

moving down to short cut

road. Wheel loader braking

system has problem. The

operator tried to reduce

speed by pressing the break

but braking system not

working properly and whell

loader continous moving

down. The operator steer up

the wheel loader to the right

hand side of the road and hit

the existing pipe. On 5

January this equipment

already inspected and need

follow up the finding.

1. Released the wheel

loader and operator.

2. Reposition the pipe

EPC End of Jan’19 Completed

3) RD-IR-19-07 : 21 Jan 2019 :

Property damage Time

03.50PM winch truck load

pipe box trip to well pad I

has failed when up the hill at

Ibis road near junction C.

The truck back off and hit

the pipe. Pipe fell down

from pipe slipper.

Conduct general heavy

equipment inspection and

general check.

PRA Feb’19 Completed

4) RD-IR-19-09 : 29 Jan 2019 :

Property damage Over

time work at well pad L

area. Several dump truck

used for hauling material

from staging area to well

pad L. Time 08.00PM one

dump truck slipped and

wheel keep spinning but

dump truck not moved due

to slippery surface condition.

The spinning wheel cause

1. Repair the damage glass

2. Inspection to dump

truck tire condition.

EPC Feb’19 Completed

Page 22: Environmental and Social Monitoring Report...2. Relevant Environmental Permits or Compliance Certificates 11 2.1 New Permit or Compliance Certificates Required and Obtained 11 2.2

Environment & Social Monitoring Report-1H18 Rev 1 Page 23

ACTIVITY YTD DESCRIPTION CORRECTIVE ACTION PIC DATE OF

TARGET

STATUS

the rock at road thrown to

the front glass cabin of

excavator and broken. No

injury to the excavator

operator.

5) RD-IR-19-12 : 19 Feb 2019 :

Leak HDPE fresh water pipe

at staging area [Property

damage] Around 13,30

WIB, 1 unit grader was

moved into the Staging area

to clean up the mud in the

access road. When the

grader clean the mud,

suddenly the water came

from inside the soil which

came from the HDPE 8"

which previosly buried for

water transfer for drilling

purpose. Constuction

Supervisor immediately

contact the SHE Rekind to

communicate to the owner.

6) RD-IR-19-15 : 20 Feb 2019 :

Leak HDPE fresh water pipe

at staging area [Property

damage] Activity on

staging area was taking the

stone and loading the stone

material into dump truck to

be transferred to Well Pad-L.

Around 15.30 WIB, 1 unit

excavator was instructed to

rapair the surface of the

road in front of staging area.

Excavator was clean up the

mud and rapair the surface

of the road by using the

bucket. Suddenly, the water

came from inside the soil

and found that the HDPE line

was leaked (the same HDPE

line which leaked on 19

February 2019 in different

location).

1. Repair the leaked HDPE

fresh water pipe.

2. Install signage along

HDPE pipe near staging

area

EPC End of Feb’19 Completed

7) RD-IR-19-16 : 24 Feb 2019 :

Light vehicle left rear side

fender collide with fuel

truck door of transporter

[Property damage] Time

05.30 AM, Fuel truck convoy

consist of 5 fuel trucks from

PT. Indra Angkola ( Licensed

Transporter ) will supply

diesel fuel for PT. PRA Rig#9

at well pad-M. The convoy

stopped at ch 15+500

approximately 2.5 km gpb

side of Talang Pisang due to

had a flat tyre. All five truck

carriage away of road

1. Socialization of parking

procedure and

breakdown equipment

parking – Refresh the

driver

2. Socialization and care

when passing public

road.

SERD End of Feb’19 Completed

Page 23: Environmental and Social Monitoring Report...2. Relevant Environmental Permits or Compliance Certificates 11 2.1 New Permit or Compliance Certificates Required and Obtained 11 2.2

Environment & Social Monitoring Report-1H18 Rev 1 Page 24

ACTIVITY YTD DESCRIPTION CORRECTIVE ACTION PIC DATE OF

TARGET

STATUS

section.

The LV number BG 1731 EH

intend to pass the parked

trucks. He passed truck no.5

(Flatted Tyre) and truck no.4

Driver 0f fuel truck no.3 (

Rahmad Ramadhan Siregar )

opened his door whilst LV

was passing. the door

collided with the back

pasanger fender ( Near fuel

tank cover) causing damage

to LV number BG 1731 EH.

8) RD-IR-19-17 : 28 Feb ’19: Lowbed trailer hit the SWS

pipe near Junction I

[Property damage] One

unit lowbed trailer number B

9615 JG, load the empty

mud tank/shaker tank,

mobilize the drilling

equipment from WP-I going

to WP-L. When passing

downhill road the trailler

had problem with brake

system (not fully working).

Time arround 10.30 AM. The

left side of trailler food steps

hit new SWS pipe. That

incident cause scratch new

SWS pipe

1. Conduct safety

standown meeting.

2. Inspection to all truck /

trailler.

3. All heavy load should be

provide wheel loader for

restrain the trailer.

PRA March’19 Completed

9) RD-IR-19-18 : 28 Feb’18 : Crawler crane occure boom

crack at Well pad L

[Property damage] Time

arround 04.00 PM the

crawler crane at well pad L

conduct to unload drilling

equipment activity. When

the crane setup position to

unload and crane operator

unkown touched boom

handle. Crane boom going

up and not seen by operator

or rigger because the

operator focus to moving

crane / not seen the boom

crane (boom angle 70

degree). The operator aware

when there is sound from

hook block hit the boom.

This event causes samson

boom crack.

1. Stand down meeting.

2. Inspection to the boom

crane and hydrolic spring

3. Operator review

4. Repair and reinspection

the crane

PRA/CHAS Mar’19 Completed

10) RD-IR-19-21 : 02 Mar 2019 :

Minor Landslide

Property Damage :

On Saturday, 2 March 2019,

Contractor just got the

information that the slope

at the well Pad M was

collapse and hit the fences

Page 24: Environmental and Social Monitoring Report...2. Relevant Environmental Permits or Compliance Certificates 11 2.1 New Permit or Compliance Certificates Required and Obtained 11 2.2

Environment & Social Monitoring Report-1H18 Rev 1 Page 25

ACTIVITY YTD DESCRIPTION CORRECTIVE ACTION PIC DATE OF

TARGET

STATUS

and cause several damages

on the fence. The weather

condition at 1 March 2019

was rain in the morning

(07.00 am - 09.00 am) and

the weather condition at 2

March 2019 was foggy in

the morning. Six (6)

columns were bending due

to the landslide.

11) RD-IR-19-22 : 08 Mar 2019

Excavator bucket hit the

dump truck Property

Damage :

On March 8 2019, around

11 am, 1 unit excavator

(KATO-Operator:Iip.S) was

performing stone spreading

(AP75) in the entrance point

of Well Pad-L. From the

behind, 1 unit dump truck

(DT 12-Driver: Ngukui

Sembiring ) drove from SS-1

to well pad L and stopped

behind the excavator. Civil

supervisor at well pad L call

the driver and operator for

coordination. the driver

turn off the truck and go to

the civil supervisor and the

Operator immediately go to

the civil supervisor without

turn off the excavator: after

coordination with the

supervisor, operator back to

the excavator, and once he

enter the cabin, the Jacket

worn by the operator

stacked on the panel which

cause the excavator swing

the right side direction and

the bucket hit the Dump

truck.

12) RD-IR-19-23 : 19 Mar 2019 :

Cross over, HT, SL box SC-

Pin Fell down to ground

and Damaging the pin

section while loading to

the trailer bed using

Forklift at warehouse.

Property Damage

Drilling Materialman

(Subakti) liaise with

warehouse assistant

(Agustian) and forklift

Loader operator PT. GMK

(Syamsudin) conduct

loading casing 20' and cross

over 20' at warehouse area

to Rig-07 Trailer drove by

Zulkifli.

Page 25: Environmental and Social Monitoring Report...2. Relevant Environmental Permits or Compliance Certificates 11 2.1 New Permit or Compliance Certificates Required and Obtained 11 2.2

Environment & Social Monitoring Report-1H18 Rev 1 Page 26

ACTIVITY YTD DESCRIPTION CORRECTIVE ACTION PIC DATE OF

TARGET

STATUS

The load consist of 6 length

casing 20'and 1 ea. cross

over 20"

After loading 6 length casing

20" and continue to load

cros over 20", the cross over

20" has been loaded to

trailer. And trailer driver

(Zulkifli) request to move

the cross over little bit

forward and allign with

casing 20" front section.

the forklift operator (

(Syamsudin) try to move the

cross over by using the fork

blade after lifted up

approximately 20 cm above

laid casing 20" on trailer,

the operator tilt to right

side the cross over

due to un-balance cross

over position on forklift

blade, the cross over slide

down and fall to ground

causing damage to pin

section.

(There was no injured

person on this incident)

13)

14) RD-IR-19-24 : 19 Mar 2019:

1 unit stone breaker fell

from low boy at Air Tupai

road Property Damage

Around 1 am, 1 unit stone

breaker was demobilized

from gate 1 to Blok 0. The

mobilization of the stone

breaker using 1 unit self-

loader and stone breaker

tied by usin 3 (three) lashing

made from metal chain and

fastened by using the lever

block. Around 01.30 am, the

self-loader passing Air Tupai

road (CH 12-000) which the

contour of the road is

descending with several

narrow area at the road

caused by the wooden

stakes installed by local

community. When the self-

loader passes the narrow

road, the left side of the self-

loader was slip to the

drainage to avoid the

wooden stakes, but the self-

loader still able to pass the

narrow road. When the left

sides of the loader slip into

the drainage, to condition of

the stone breaker tilted to

the left side and cause the

Page 26: Environmental and Social Monitoring Report...2. Relevant Environmental Permits or Compliance Certificates 11 2.1 New Permit or Compliance Certificates Required and Obtained 11 2.2

Environment & Social Monitoring Report-1H18 Rev 1 Page 27

ACTIVITY YTD DESCRIPTION CORRECTIVE ACTION PIC DATE OF

TARGET

STATUS

middle lashing point break

and the other 2 lashing

points was loose.

15) RD-IR-19- 29 : 06 April 2019

: Property Damage

Excavator windshield

broken when land clearing.

On April 6, 2019 around 10

o'clock, Pak Efratindo A, the

kato operator was carrying

out a clearing area with the

work of lowering the wood

that had been cut down at

well pad N, at that time

there were twigs that slid

and hit the front of the

excavator cabin caused the

windshield to break after

the incident, the clearing

activity was stopped and

the operator is in good

condition.

The next clearing activity is

cariied out using excavator

that have cab protection.

The excavator without FOPS

and cabin protector is not

allowed to operate for

clearing tasks

EPC April’19 Completed

16) RD-IR-19-32 : 16 April 2019 :

Property Damage On 16

April 2019, at 14.45 pm -

15.00 pm shortcut access

floating because culvert

blocked by wood and rock.

The incident happen impact

by big rain from the

upstream, and water at river

increase the level very past

after the culver blocked than

water passing to the road

surface toward to

downstream.

After water level low the

access road cleaning up from

mud and trees and installed

barricade and sign for

limitation safe road access

for operations, resulting the

road access sliding and

downstream(outlet) side

gabion was collapse 30

meter height, 12 meter long

and 5 meter length.

Also impact from this water

flood, 1 unit water pump

including Fuel tank floating,

1 unit dog house move

position

No injury In this accident

17)

1. Periodical Cleaning front

of culvert

2. Remove all the old wood

on river

3. Digging a river for water

flow

EPC & SERD Immediate Completed

17) RD-IR-19-34 : 27 April 2019:

Property Damage The

top roof of SERD office and

1. Remove the roof from

service

2. Remove the trees from

SERD End of April’19 Completed

Page 27: Environmental and Social Monitoring Report...2. Relevant Environmental Permits or Compliance Certificates 11 2.1 New Permit or Compliance Certificates Required and Obtained 11 2.2

Environment & Social Monitoring Report-1H18 Rev 1 Page 28

ACTIVITY YTD DESCRIPTION CORRECTIVE ACTION PIC DATE OF

TARGET

STATUS

Contractor office damaged

due to strong wind.

Around 11.00 am. Strong

wind at Pad-E office and GPP

area, reaching 80 - 90 km/s

actual measuring by

anemometer during incident

happen.

Rekind slipper camp roofing

flying by wind and continue

other roof SHE shelter also

flying, some report coming

from GPP area fot satelite

office roof flaying and tree

beside main road GPP was

falling. There was no injured

person by this accident

the road

3. Socializations about

“Stop the work when the weather is not good”

18) RD-IR-19-37 : 04 May 2019

: Property Damage LV

hit by water truck and

cause of damage at the rear

light cover and dent of the

rear left body. This accident

as a chain effect of fatality

above

Refresh driver to do not

parkedin the line of fire

SERD End of May’19 Completed

19) RD-IR-19-40 : 14 June 2019

Property Damage

Depriwangga’s LV went into

the ditch near junction WP-C

while he tried to reach the

radio handheld on the

corner road at the same

time.

Canceled the SIMPER driver

Refresh other drivers to do not

use hand held radio while

driving

SERD/ DW June’19 Completed

Page 28: Environmental and Social Monitoring Report...2. Relevant Environmental Permits or Compliance Certificates 11 2.1 New Permit or Compliance Certificates Required and Obtained 11 2.2

Environment & Social Monitoring Report-1H18 Rev 1 Page 29

5. Social Safeguards Monitoring

This Chapter discusses progress in implementation of the social safeguard compliance audit report and

corrective action plan, implementation of grievance mechanisms, resources for implementation of social

safeguards, forward plan of social safeguards, labour hiring and management.

5.1 Social Safeguards Monitoring General Overview

Based on the Livelihood Improvement Program, the Consultant starts to monitor the quality of the

coffee bean. The improvement of coffee training batch-2 starts on January 2019 and continue help

them with workshop for coffee processing and marketing. Based from the result of the training the

coffee farmers need some additional equipment such as : bean size grader to sort the bean and

refractometer to measure the water contains in coffee bean. The bean size grader was delivered in

February 2019 and plan to deliver the refractometer on Q2 2019. In the terms of delivery, SERD also

helps the farmer by providing the proper bag.

Along with 60 pcs been size grader distributions, the local champion also shares the use of it and

collecting the information regarding the improvement of their plantation. Although it was not in the

coffee harvest season, the farmers still continuing delivers the green bean to the off-taker and roasted

in Rumah Kopi Ranin in Bogor. The roasted bean was also ask by Supreme Energy Office and Marubeni

Office. Starting from Q1 2019, those offices starts using the Semendo Coffee.

The experts from Sriwijaya University also delivers another training on plantation maintenance and

coffee grading in February 2019. The Social Consultants also continues the physical quality and bean

profiling in March 2019. Monitoring of the coffee bean quality continues since then. Recently, the

farmers also starts to harvesting the luwak type which is have a hgher price in the market.

SERD social team continued monitoring the operation of the Community Committee that had been

established in 2018. Several CSR programs have been conducted in 1H2019, such as:

• Continued delivering the safety net program to the elder Vulnerable Affected People (every 3

months)

• Support Lahat Journalist Association Program

• Support Lahat Police Resort Program in Road Safety

• Support Lahat Military District Program

• Road repair in Batu Surau area – Karang Endah Village

• Distribution of Water Pump to Head of Yayasan Hamlet for immediate dust control

• Continue to support the development of new classroom at Islamic School in Yayasan Hamlet.

• Safari Ramadhan to villages surrounding project area.

• Support the fire victim in Danau Gerak Village.

• Support Tunggul Bute Women Organization event.

• Support LIP Program in Coffee Plantation Improvement, this month they try new varieties Arabica

Luwak and Robusta Luwak.

Coordination meeting with District Forum that consisted of Head of Sub district, Head of Sub district’s Police and Head of Sub district Military, and representatives from the Contractors.

Page 29: Environmental and Social Monitoring Report...2. Relevant Environmental Permits or Compliance Certificates 11 2.1 New Permit or Compliance Certificates Required and Obtained 11 2.2

Environment & Social Monitoring Report-1H18 Rev 1 Page 30

5.2 Status of Corrective Actions

Summary of corrective action status as follows:

Corrective Actions Completion status % Comment

Ensure all relevant permits are renewed.

SERD should provide update on the following

permits:

● Borrow and use permit of forest area

(IPPKH) for PLN transmission lines

● Extension of SERD’s water permit

90%

The PLN-led land acquisition process is

41% complete as of March 2019. The

proposals of IPPKH laredy in MoFE and

expected to have the permit by

September 2019.

SERD Obtained the Water Permit on 17

May 2019.

Most revisions have been accommodated

within the revised SEP, however the

following are still required to be addressed:

● Grievance log does not capture contact details, however, these details are recorded

in the grievance form.

● In addition, some of the stakeholder engagement activities in April 2019 were

meant to address previous grievances. SERD

are advised to also include the results of the

engagement to grievance log to tally both

documents and record outcomes for such

engagements.

100%

Outstanding grievance log has been updated.

Some of the pending grievances was

resolved. The outstanding grievance log

ststus has been submit to LESC.

5.3 Summary of Activities Carried Out, Issues and Challenges

During the period of Semester 1 of 2019, Relations Team continously participate activities as follows:

Land Acquisition/Change in land ownership and land tenure

1. Do changes in land ownership and land tenure (if any) for the project purpose cause conflict in communities? If yes, please describe the details and the measures.

Yes No No

2. Please describe on the land acquisition process during the monitoring period (if any). (e.g. land certificationprocess)

Latest land acquisition activity was to obtain the land for project accommodation block which has been settled before end of 2017

Livelihood Restoration 1. Please describe integrated Social Development Program, including CSR activities, which are conducted duringthe monitoring period.

ISDP program is being focused to the Livelihood Improvement Program (LIP) for DPAP. SERD & the Consultant starts to monitor the quality of the coffee bean. The improvement of coffee training batch-2 starts on January 2019 and continue help them with workshop for coffee processing and marketing. Based from the result of the training the coffee farmers need some additional equipment such as : bean size grader to sort the bean and refractometer to measure the water contains in coffee bean. The bean size grader was delivered in February 2019 and plan to deliver the refractometer on Q2 2019. In the terms of delivery, SERD also helps the farmer by providing the proper bag. Along with 60 pcs been size grader distributions, the local champion also shares the use of it and collecting the information regarding the improvement of their plantation. Although it was not in the coffee harvest season, the farmers still continuing delivers the green bean to the off-taker and roasted in Rumah Kopi Ranin in Bogor. The roasted bean was also ask by Supreme Energy Office and Marubeni Office. Starting from Q1 2019, those offices starts using the Semendo Coffee. The experts from Sriwijaya University also delivers another training on plantation maintenance and coffee grading in February 2019. The Social Consultants also continues the physical quality and bean profiling in March 2019. Monitoring of the coffee bean quality continues since then. Recently, the farmers also starts to harvesting the luwak type which is have a hgher price in the market. SERD social team continued monitoring the operation of the Community Committee that had been established in 2018. Several CSR programs have been conducted in 1H2019, such as:

• Continued delivering the safety net program to the elder Vulnerable Affected People (every 3 months)

Page 30: Environmental and Social Monitoring Report...2. Relevant Environmental Permits or Compliance Certificates 11 2.1 New Permit or Compliance Certificates Required and Obtained 11 2.2

Environment & Social Monitoring Report-1H18 Rev 1 Page 31

• Support Lahat Journalist Association Program• Support Lahat Police Resort Program in Road Safety • Support Lahat Military District Program• Road repair in Batu Surau area – Karang Endah Village

• Distribution of Water Pump to Head of Yayasan Hamlet for immediate dust control• Continue to support the development of new classroom at Islamic School in Yayasan Hamlet. • Safari Ramadhan to villages surrounding project area. • Support the fire victim in Danau Gerak Village.• Support Tunggul Bute Women Organization event.

Support LIP Program in Coffee Plantation Improvement, this month they try new varieties Arabica Luwak and Robusta Luwak. 2. Please provide with the monitoring of Livelihood Improvement Programs for Affected Households. Especially,

please describe in case any household whose livelihood has been worse than pre-project level. Discuss impacts on the vulnerable households, in a separate section.

This activity will be conducted after LIP program implementation

Grievances 1. Please provide us with the grievance log, if any receiving/on-going/closing grievances during the monitoringperiod, which includes the contents, receiving date, closing date, current situation, etc. of the grievance.

Please refer to grievances log (Attachment 5) Employment Opportunities

1. Please describe number and proportion of local workforce employed for the project. Please include the numbers of affected persons who have been engaged in the workforce.

Total local workforce employed for the project is around 142 persons (136 males ; 6 Females)

Community Income 1. Please describe if any changes can be quantitatively observed in the community income due to the project. (e.g. increasing income by working as local labor, doing small business, etc.)

Before SERD delivering the ISDP that helps the coffee farmers improves their livelihood, average coffee production was low. After get the training from local experts including the coffee taste quality expert from Bogor, their harvest shows significant changes. Previously the price of the coffee bean was below IDR 20,000 per kg, now it almost IDR 27,000 per kg.

Community Perception 1. Are there any negative perceptions towards the Project activities? If yes, please describe the details and mitigation measures.

Yes No No

Community Health 1. Are there any negative impacts on community health caused by the project? (eg increasing of infectiousdisease, problems at sanitation facilities, etc.) If yes, please describe the details and mitigation measures.

Yes No No

5.4 Summary of Stakeholder Engagement Plan

There were many stakeholder engagement activities have been carried out by SERD during the reporting

period in line with the project’s commitments in the stakeholder engagement plan. SERD always noting

every stakeholder engagement activities in the stakeholder engagement log book. Some of stakeholder

engagement activities are summarized in the following table:

Date of

Consultation Location Theme

Participants

(Number of

Participants)

Information

Disseminated Key Issues Raised

SERD Response and

Action Taken

5 March 2019 SERD Office

Talang Tige

Coordination Meeting

for Community

Committee

- SERD Team

- SERD

Contractor

Team

- Local

Authorities

Rep

- Local Comm

Reps

30 person

Meeting for

Committe to select

new member

committee 2019

Tripika will send new

member data for

committee 2019

position

SERD agreed on

proposed member

and inaugurated the

committee on April

2019

10 April 19 SERD Office

Talang Tige

Media Engagement Lahat Online Project progress Road Repair in Lahat

area

The road will be

repair in 2019

Page 31: Environmental and Social Monitoring Report...2. Relevant Environmental Permits or Compliance Certificates 11 2.1 New Permit or Compliance Certificates Required and Obtained 11 2.2

Environment & Social Monitoring Report-1H18 Rev 1 Page 32

Date of

Consultation Location Theme

Participants

(Number of

Participants)

Information

Disseminated Key Issues Raised

SERD Response and

Action Taken

18 May 2019 Kota Agung

Police Office

Iftaar dinner with local

representatives and

head of villages

20 persons Project progress &

plan

Geothermal project

benefits to local

people & country

SERD should conduct

similar disseminating

program during

Ramadhan month

28 June 2019 Talang

Pisang

Village

Hand over the CSR

programs

8 persons Handover Repairing

road and drainage

channel Talang

Pisang Head of

Hamlet and

Community

representative

Communication &

coordination with

village authorities

regarding the project

progress status

SERD will inform

periodically

Page 32: Environmental and Social Monitoring Report...2. Relevant Environmental Permits or Compliance Certificates 11 2.1 New Permit or Compliance Certificates Required and Obtained 11 2.2

Environment & Social Monitoring Report-1H18 Rev 1 Page 33

5.5 Livelihood and Skill Development Opportunities to Affected Persons

through the ISDP of SERD

The Implementation of ISDP components to affected persons during January – June 2019 were:

No Activity Target beneficiaries Status Remarks

1 Economic empowerment

Livelihood Improvement Program assessment &

monitoring

Coffee farmers of Direct Project

Affected People

Continued ISDP livelihood

improvement

program

continues

2 Education and Helth

Support the development of new classroom at

Islamic School in Yayasan Hamlet in Semende

Darat Ulu Sub-district, Muara Enim

Local Students Completed

3 Infrastructure improvements

Road Repair in Kota Agung Sub District Local Communities affected by the

project

Continues Support in kind

4 Donations and community relationship

Conducted the Ramadhan Safari during holy

month

The team were visiting Project

surroundings village

Continued An effective

channel to

disseminate the

project

progress

information to

the

Community.

5 Support for implementation of social development program

ISDP consultant for report and documentation Project Affected Household Continued Livelihood

Improvement

Program (LIP)

continues

conducted

Continues deliver the safety net program to the

elder Vulnerable Affected People (every 3 month)

Vulnerable Direct Project Affected

People

Continue To be

continued in

every three (3)

months

5.6 Forward Plan / Next Steps (for the next 6 months)

SERD has set a forward plan for the next 6 (six) months that consists of the following programs, i.

e:

Together with SERD’s social consultant will continue the implementation of Livelihood

Improvement Program.

Continue to implement the CSR programs to support affected community

Continue to conduct public disclosure and consultation with all key stakeholders.

Continue to maintain and improve good relationships with all key stakeholders, and improving

the grievance mechanism process and resolution.

Have a coordination meeting with PLN to discuss the progress of PLN led land acquisition for

transmission line.

Page 33: Environmental and Social Monitoring Report...2. Relevant Environmental Permits or Compliance Certificates 11 2.1 New Permit or Compliance Certificates Required and Obtained 11 2.2

Environment & Social Monitoring Report-1H18 Rev 1 Page 34

5.7 Labour Hiring and Management

Project procedures for hiring :

SERD, contractors and the Committee discussed the local labour recruitment and local

business opportunity.

All contractors should follow and obey SERD’s Hiring and Selection Procedures. The public consultations concerning drilling and mobilization activity were conducted to

inform the hiring process, number of local labours needed, and local business opportunity.

During the first work commencement in 1st

semester of 2018, the contractors also have

recruited local workers from the vicinity of the project area.

Grievance mechanism & procedures is always monitored and open to everybody for filing

complaint during this process.

Requirements on workers recruitment with information on origin of migrant or local workers,

position/work occupied, and with sex disaggregation (the Borrower and the contractors).

Please refer to section 5.3 employment opportunities. Complete table will be updated

through Project Monthly Report.

Tracking of recruitment of women personnel (the Borrower and the contractors)

Please refer to Section 5.3 Employment Opportunities. Complete table will be updated

through Project Monthly Report.

Compliance to core labor standards and compliance with national laws, based on workplace

inspection, observation and audit.

Procedure and the recruitment process was witnessed by local government officials and

SERD’s Human Resources Department for the sake of fairness, and compliance to nationalregulations.

Nature of labour dispute or grievance, including conflicts between groups

No labour grievance was found, potential dispute is only miscommunication between

labours or groups.

Legal requirements, permit conditions and renewal requirements related to labor

management (N/A)

Media, civil society /NGOs, or community reactions (if any)

Those stakeholders are still manageable.

Corrective actions, deadlines, identification of responsible parties

Please refer to table in Section 5.2 above.

Labour relations and living conditions for construction labour force

This premises are still under construction

Page 34: Environmental and Social Monitoring Report...2. Relevant Environmental Permits or Compliance Certificates 11 2.1 New Permit or Compliance Certificates Required and Obtained 11 2.2

Environment & Social Monitoring Report-1H18 Rev 1 Page 35

6. Environmental Capacity

This Chapter discusses staff capacities in environmental management, degree of awareness, training

conducted, needs assessment of environmental management capacity and awareness level of

contractors’ staff trained.

6.1 Staff Capacities in Environmental Management

During this period PT SERD currently employs 6 personels at site. An additional Site Safety Manager and

Inspector was added at site to support the team at site as to improve and cover a range of activities.

No. SERD Site SHE

Name Title Years of Experience

1. Hazariadi SHE Coordinator 10+ years

2. Marc Blondeel Site Safety Manager 20+ years

3. Rifqi Alfaizi Safety Officer 10+ years

4. Dian Amali Safety Officer 10+ years

5. Sepriandi Maulana Environmental Engineer 1 Year

6. Ariyanto SHE Supervisor/Inspector 7 years

SERD Corporate SHE

Name Title Years of Experience

1. M. Arief Tarunaprawira Senior Manager SHE 10+ years

2. Andreas Hartono Head of Environment 10+ years

3. Bima Yudhistiranto Environment Engineer 6 years

4. Akhmad Wahyudi Safety Engineer 10+ years

6.2 Degree of Awareness

The current personnel responsible for SHE management have sufficient knowledge of environmental

management, health and safety requirements, including environmental laws and regulations.

6.3 Training Conducted

SHE induction is conducted to all new workers and visitors. Various SHE trainings are conducted to SERD

employees and long-term contractor workers.

List Training Record SERD Jan –Jun 2019:

Site : Rantau Dedap

No. Training Name Dept Company Date

of Training Location

Number of

Participant

JANUARY 1376

1 Refresh training for driver - DDC refreshment Subsurface Defriwangga 01-Jan-19 Office Project 10

2 SCBA Drilling SERD & PRA #9 01-Jan-19 RD-M1 2

3 SCBA Drilling SERD & PRA #9 02-Jan-19 RD-M1 3

Page 35: Environmental and Social Monitoring Report...2. Relevant Environmental Permits or Compliance Certificates 11 2.1 New Permit or Compliance Certificates Required and Obtained 11 2.2

Environment & Social Monitoring Report-1H18 Rev 1 Page 36

4 Drop Object Drilling SERD & PRA #9 03-Jan-19 RD-M1 18

5 H2S Drill Drilling SERD & PRA #9 03-Jan-19 RD-M1 52

6 Rescue Team Drilling SERD & PRA #9 04-Jan-19 RD-M1 16

7 Oil Spill & Chemical Handling Drilling SERD & PRA #9 05-Jan-19 RD-M1 21

8 First Aid & CPR Drilling SERD & PRA #9 05-Jan-19 RD-M1 21

9 Medivac Evacuation Drill Drilling SERD & PRA #9 06-Jan-19 RD-M1 15

10 Noise Awareness Drilling SERD & PRA #9 06-Jan-19 RD-M1 61

11 BOP Drill Drilling SERD & PRA #9 07-Jan-19 RD-M1 7

12 Trip Drill Drilling SERD & PRA #9 07-Jan-19 RD-M1 7

13 SCBA Drilling SERD & PRA #9 08-Jan-19 RD-M1 4

14 First Aid & CPR Drilling SERD & PRA #9 09-Jan-19 RD-M1 11

15 SCBA Drilling SERD & PRA #9 11-Jan-19 RD-M1 5

16 Fire Drill Drilling SERD & PRA #9 11-Jan-19 RD-M1 6

17 BOP Drill Drilling SERD & PRA #9 11-Jan-19 RD-M1 7

18 Trip Drill Drilling SERD & PRA #9 11-Jan-19 RD-M1 7

19 First Aid & CPR Drilling SERD & PRA #9 12-Jan-19 RD-M1 33

20 3 contact point, Hazard Analysis & SWA Drilling SERD & PRA #9 13-Jan-19 RD-M1 75

21 H2S Drill Drilling SERD & PRA #9 15-Jan-19 RD-M1 66

22 Rescue Team Drilling SERD & PRA #9 18-Jan-19 RD-M1 13

23 Medivac Evacuation Drill Drilling SERD & PRA #9 19-Jan-19 RD-M1 7

24 Chemical hazard Drilling SERD & PRA #9 20-Jan-19 RD-M1 68

25 Lifting Operation Drilling SERD & PRA #9 23-Jan-19 RD-M1 32

26 Basic Electrical Safety EPC-C PT. Rekayasa Industri 02-Jan-19 Office Rekind 22

27 Basic Electrical Safety EPC-C PT. Rekayasa Industri 03-Jan-19 Office Rekind 2

28 Basic Electrical Safety EPC-C PT. Rekayasa Industri 04-Jan-19 Office Rekind 28

29 Basic Electrical Safety EPC-C PT. Rekayasa Industri 07-Jan-19 Office Rekind 9

30 Basic Electrical Safety EPC-C PT. Rekayasa Industri 13-Jan-19 Office Rekind 3

31 Basic Electrical Safety EPC-C PT. Rekayasa Industri 14-Jan-19 Office Rekind 18

32 Basic Electrical Safety EPC-C PT. Rekayasa Industri 17-Jan-19 Office Rekind 12

33 Basic Electrical Safety EPC-C PT. Rekayasa Industri 21-Jan-19 Office Rekind 6

34 Basic Electrical Safety EPC-C PT. Rekayasa Industri 23-Jan-19 Office Rekind 3

35 Basic Electrical Safety EPC-C PT. Rekayasa Industri 26-Jan-19 Office Rekind 8

36 Basic Electrical Safety EPC-C PT. Rekayasa Industri 31-Jan-19 Office Rekind 2

37 Safety observation card EPC-C PT. Rekayasa Industri 02-Jan-19 Office Rekind 22

38 Safety observation card EPC-C PT. Rekayasa Industri 03-Jan-19 Office Rekind 2

39 Safety observation card EPC-C PT. Rekayasa Industri 04-Jan-19 Office Rekind 28

40 Safety observation card EPC-C PT. Rekayasa Industri 08-Jan-19 Office Rekind 3

41 Safety observation card EPC-C PT. Rekayasa Industri 10-Jan-19 Office Rekind 2

42 Safety observation card EPC-C PT. Rekayasa Industri 13-Jan-19 Office Rekind 3

43 Safety observation card EPC-C PT. Rekayasa Industri 14-Jan-19 Office Rekind 16

44 Safety observation card EPC-C PT. Rekayasa Industri 17-Jan-19 Office Rekind 13

45 Safety observation card EPC-C PT. Rekayasa Industri 21-Jan-19 Office Rekind 5

46 Safety observation card EPC-C PT. Rekayasa Industri 24-Jan-19 Office Rekind 8

47 Safety observation card EPC-C PT. Rekayasa Industri 25-Jan-19 Office Rekind 4

48 Safety observation card EPC-C PT. Rekayasa Industri 28-Jan-19 Office Rekind 4

49 Safety observation card EPC-C PT. Rekayasa Industri 29-Jan-19 Office Rekind 3

Page 36: Environmental and Social Monitoring Report...2. Relevant Environmental Permits or Compliance Certificates 11 2.1 New Permit or Compliance Certificates Required and Obtained 11 2.2

Environment & Social Monitoring Report-1H18 Rev 1 Page 37

50 Safety observation card EPC-C PT. Rekayasa Industri 30-Jan-19 Office Rekind 6

51 Safety observation card EPC-C PT. Rekayasa Industri 31-Jan-19 Office Rekind 2

52 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 02-Jan-19 Office Rekind 22

53 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 03-Jan-19 Office Rekind 2

54 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 04-Jan-19 Office Rekind 28

55 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 07-Jan-19 Office Rekind 6

56 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 08-Jan-19 Office Rekind 2

57 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 13-Jan-19 Office Rekind 3

58 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 14-Jan-19 Office Rekind 16

59 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 18-Jan-19 Office Rekind 4

60 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 19-Jan-19 Office Rekind 3

61 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 21-Jan-19 Office Rekind 5

62 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 25-Jan-19 Office Rekind 5

63 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 26-Jan-19 Office Rekind 6

64 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 29-Jan-19 Office Rekind 6

65 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 30-Jan-19 Office Rekind 6

66 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 31-Jan-19 Office Rekind 2

67 Introduce to PTW EPC-C PT. Rekayasa Industri 02-Jan-19 Office Rekind 20

68 Introduce to PTW EPC-C PT. Rekayasa Industri 03-Jan-19 Office Rekind 2

69 Introduce to PTW EPC-C PT. Rekayasa Industri 04-Jan-19 Office Rekind 28

70 Introduce to PTW EPC-C PT. Rekayasa Industri 08-Jan-19 Office Rekind 4

71 Introduce to PTW EPC-C PT. Rekayasa Industri 13-Jan-19 Office Rekind 3

72 Introduce to PTW EPC-C PT. Rekayasa Industri 14-Jan-19 Office Rekind 16

73 Introduce to PTW EPC-C PT. Rekayasa Industri 17-Jan-19 Office Rekind 8

74 Introduce to PTW EPC-C PT. Rekayasa Industri 18-Jan-19 Office Rekind 4

75 Introduce to PTW EPC-C PT. Rekayasa Industri 19-Jan-19 Office Rekind 3

76 Introduce to PTW EPC-C PT. Rekayasa Industri 21-Jan-19 Office Rekind 5

77 Introduce to PTW EPC-C PT. Rekayasa Industri 24-Jan-19 Office Rekind 5

78 Introduce to PTW EPC-C PT. Rekayasa Industri 25-Jan-19 Office Rekind 3

79 Introduce to PTW EPC-C PT. Rekayasa Industri 30-Jan-19 Office Rekind 6

80 Introduce to PTW EPC-C PT. Rekayasa Industri 31-Jan-19 Office Rekind 2

81 PPE Awareness EPC-C PT. Rekayasa Industri 02-Jan-19 Office Rekind 22

82 PPE Awareness EPC-C PT. Rekayasa Industri 03-Jan-19 Office Rekind 2

83 PPE Awareness EPC-C PT. Rekayasa Industri 04-Jan-19 Office Rekind 28

84 PPE Awareness EPC-C PT. Rekayasa Industri 07-Jan-19 Office Rekind 7

85 PPE Awareness EPC-C PT. Rekayasa Industri 08-Jan-19 Office Rekind 3

86 PPE Awareness EPC-C PT. Rekayasa Industri 12-Jan-19 Office Rekind 2

87 PPE Awareness EPC-C PT. Rekayasa Industri 17-Jan-19 Office Rekind 12

88 PPE Awareness EPC-C PT. Rekayasa Industri 21-Jan-19 Office Rekind 9

89 PPE Awareness EPC-C PT. Rekayasa Industri 25-Jan-19 Office Rekind 33

90 PPE Awareness EPC-C PT. Rekayasa Industri 26-Jan-19 Office Rekind 8

91 PPE Awareness EPC-C PT. Rekayasa Industri 28-Jan-19 Office Rekind 3

92 PPE Awareness EPC-C PT. Rekayasa Industri 30-Jan-19 Office Rekind 44

93 Enviromental Awareness EPC-C PT. Rekayasa Industri 02-Jan-19 Office Rekind 22

94 Enviromental Awareness EPC-C PT. Rekayasa Industri 03-Jan-19 Office Rekind 2

95 Enviromental Awareness EPC-C PT. Rekayasa Industri 04-Jan-19 Office Rekind 28

Page 37: Environmental and Social Monitoring Report...2. Relevant Environmental Permits or Compliance Certificates 11 2.1 New Permit or Compliance Certificates Required and Obtained 11 2.2

Environment & Social Monitoring Report-1H18 Rev 1 Page 38

96 Enviromental Awareness EPC-C PT. Rekayasa Industri 09-Jan-19 Office Rekind 5

97 Enviromental Awareness EPC-C PT. Rekayasa Industri 13-Jan-19 Office Rekind 3

98 Enviromental Awareness EPC-C PT. Rekayasa Industri 14-Jan-19 Office Rekind 17

99 Enviromental Awareness EPC-C PT. Rekayasa Industri 17-Jan-19 Office Rekind 12

100 Enviromental Awareness EPC-C PT. Rekayasa Industri 21-Jan-19 Office Rekind 9

101 Enviromental Awareness EPC-C PT. Rekayasa Industri 23-Jan-19 Office Rekind 9

102 Enviromental Awareness EPC-C PT. Rekayasa Industri 25-Jan-19 Office Rekind 4

103 Enviromental Awareness EPC-C PT. Rekayasa Industri 26-Jan-19 Office Rekind 8

104 Enviromental Awareness EPC-C PT. Rekayasa Industri 29-Jan-19 Office Rekind 7

105 Enviromental Awareness EPC-C PT. Rekayasa Industri 30-Jan-19 Office Rekind 8

106 Defensive Driving EPC-C PT. Rekayasa Industri 04-Jan-19 Office Rekind 9

107 Defensive Driving EPC-C PT. Rekayasa Industri 09-Jan-19 Office Rekind 2

108 Defensive Driving EPC-C PT. Rekayasa Industri 18-Jan-19 Office Rekind 5

109 Defensive Driving EPC-C PT. Rekayasa Industri 22-Jan-19 Office Rekind 1

110 Defensive Driving EPC-C PT. Rekayasa Industri 24-Jan-19 Office Rekind 3

111 Defensive Driving EPC-C PT. Rekayasa Industri 26-Jan-19 Office Rekind 1

112 Working at height EPC-C PT. Rekayasa Industri 18-Jan-19 Office Rekind 3

113 Hazmat & Refuiling Operation EPC-C PT. Rekayasa Industri 22-Jan-19 Office Rekind 12

114 Basic first aid EPC-C PT. Rekayasa Industri 24-Jan-19 Office Rekind 7

FEBRUARY 608

115 Safety observation card EPC-C PT. Rekayasa Industri 02-Feb-19 Office Rekind 5

116 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 02-Feb-19 Office Rekind 2

117 Introduce to PTW EPC-C PT. Rekayasa Industri 02-Feb-19 Office Rekind 2

118 PPE Awareness EPC-C PT. Rekayasa Industri 02-Feb-19 Office Rekind 2

119 Enviromental Awareness EPC-C PT. Rekayasa Industri 02-Feb-19 Office Rekind 2

120 Basic Electrical Safety EPC-C PT. Rekayasa Industri 02-Feb-19 Office Rekind 2

121 Diabetes Mellitus Awareness Drilling PRA/SERD 02-Feb-19 RD-M2 38

122 Diabetes Mellitus Awareness Drilling PRA/SERD 03-Feb-19 RD-M2 29

123 Safety observation card EPC-C PT. Rekayasa Industri 04-Feb-19 Office Rekind 3

124 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 04-Feb-19 Office Rekind 3

125 Introduce to PTW EPC-C PT. Rekayasa Industri 04-Feb-19 Office Rekind 3

126 PPE Awareness EPC-C PT. Rekayasa Industri 04-Feb-19 Office Rekind 3

127 Enviromental Awareness EPC-C PT. Rekayasa Industri 04-Feb-19 Office Rekind 3

128 Basic Electrical Safety EPC-C PT. Rekayasa Industri 04-Feb-19 Office Rekind 3

129 Safety observation card EPC-C PT. Rekayasa Industri 05-Feb-19 Office Rekind 3

130 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 05-Feb-19 Office Rekind 3

131 Introduce to PTW EPC-C PT. Rekayasa Industri 05-Feb-19 Office Rekind 3

132 PPE Awareness EPC-C PT. Rekayasa Industri 05-Feb-19 Office Rekind 3

133 Enviromental Awareness EPC-C PT. Rekayasa Industri 05-Feb-19 Office Rekind 3

134 Basic Electrical Safety EPC-C PT. Rekayasa Industri 05-Feb-19 Office Rekind 3

135 Flagman Training EPC-C PT. Rekayasa Industri 05-Feb-19 Office Rekind 4

136 Safety observation card EPC-C PT. Rekayasa Industri 06-Feb-19 Office Rekind 1

137 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 06-Feb-19 Office Rekind 1

138 Introduce to PTW EPC-C PT. Rekayasa Industri 06-Feb-19 Office Rekind 1

139 PPE Awareness EPC-C PT. Rekayasa Industri 06-Feb-19 Office Rekind 1

140 Enviromental Awareness EPC-C PT. Rekayasa Industri 06-Feb-19 Office Rekind 1

Page 38: Environmental and Social Monitoring Report...2. Relevant Environmental Permits or Compliance Certificates 11 2.1 New Permit or Compliance Certificates Required and Obtained 11 2.2

Environment & Social Monitoring Report-1H18 Rev 1 Page 39

141 Basic Electrical Safety EPC-C PT. Rekayasa Industri 06-Feb-19 Office Rekind 1

142 SCBA Training (10 Minutes) Drilling PRA/SERD 06-Feb-19 RD-M2 5

143 Safety observation card EPC-C PT. Rekayasa Industri 07-Feb-19 Office Rekind 3

144 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 07-Feb-19 Office Rekind 3

145 Introduce to PTW EPC-C PT. Rekayasa Industri 07-Feb-19 Office Rekind 3

146 PPE Awareness EPC-C PT. Rekayasa Industri 07-Feb-19 Office Rekind 3

147 Enviromental Awareness EPC-C PT. Rekayasa Industri 07-Feb-19 Office Rekind 3

148 H2s Drill Drilling PRA/SERD 07-Feb-19 RD-M2 All

149 Basic Electrical Safety EPC-C PT. Rekayasa Industri 07-Feb-19 Office Rekind 3

150 Safety observation card EPC-C PT. Rekayasa Industri 09-Feb-19 Office Rekind 5

151 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 09-Feb-19 Office Rekind 5

152 Introduce to PTW EPC-C PT. Rekayasa Industri 09-Feb-19 Office Rekind 5

153 PPE Awareness EPC-C PT. Rekayasa Industri 09-Feb-19 Office Rekind 5

154 Enviromental Awareness EPC-C PT. Rekayasa Industri 09-Feb-19 Office Rekind 5

155 Basic Electrical Safety EPC-C PT. Rekayasa Industri 09-Feb-19 Office Rekind 5

156 Sinusitis Drilling PRA/SERD 09-Feb-19 RD-M2 All

157 Safety observation card EPC-C PT. Rekayasa Industri 11-Feb-19 Office Rekind 7

158 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 11-Feb-19 Office Rekind 7

159 Introduce to PTW EPC-C PT. Rekayasa Industri 11-Feb-19 Office Rekind 7

160 PPE Awareness EPC-C PT. Rekayasa Industri 11-Feb-19 Office Rekind 7

161 Enviromental Awareness EPC-C PT. Rekayasa Industri 11-Feb-19 Office Rekind 7

162 Basic Electrical Safety EPC-C PT. Rekayasa Industri 11-Feb-19 Office Rekind 7

163 Flagman Training EPC-C PT. Rekayasa Industri 11-Feb-19 Office Rekind 6

164 Confined Space EPC-C PT. Rekayasa Industri 11-Feb-19 Office Rekind 6

165 SCBA Training (10 Minutes) Drilling PRA/SERD 11-Feb-19 RD-M2 4

166 Safety observation card EPC-C PT. Rekayasa Industri 12-Feb-19 Office Rekind 21

167 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 12-Feb-19 Office Rekind 21

168 Introduce to PTW EPC-C PT. Rekayasa Industri 12-Feb-19 Office Rekind 21

169 PPE Awareness EPC-C PT. Rekayasa Industri 12-Feb-19 Office Rekind 21

170 Enviromental Awareness EPC-C PT. Rekayasa Industri 12-Feb-19 Office Rekind 21

171 Basic Electrical Safety EPC-C PT. Rekayasa Industri 12-Feb-19 Office Rekind 21

172 Safety observation card EPC-C PT. Rekayasa Industri 13-Feb-19 Office Rekind 5

173 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 13-Feb-19 Office Rekind 5

174 Introduce to PTW EPC-C PT. Rekayasa Industri 13-Feb-19 Office Rekind 5

175 PPE Awareness EPC-C PT. Rekayasa Industri 13-Feb-19 Office Rekind 5

176 Enviromental Awareness EPC-C PT. Rekayasa Industri 13-Feb-19 Office Rekind 5

177 Basic Electrical Safety EPC-C PT. Rekayasa Industri 13-Feb-19 Office Rekind 5

178 Working at height EPC-C PT. Rekayasa Industri 13-Feb-19 Office Rekind 16

179 Safety observation card EPC-C PT. Rekayasa Industri 14-Feb-19 Office Rekind 1

180 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 14-Feb-19 Office Rekind 1

181 Introduce to PTW EPC-C PT. Rekayasa Industri 14-Feb-19 Office Rekind 1

182 PPE Awareness EPC-C PT. Rekayasa Industri 14-Feb-19 Office Rekind 1

183 Enviromental Awareness EPC-C PT. Rekayasa Industri 14-Feb-19 Office Rekind 1

184 Basic Electrical Safety EPC-C PT. Rekayasa Industri 14-Feb-19 Office Rekind 1

185 Safety observation card EPC-C PT. Rekayasa Industri 17-Feb-19 Office Rekind 2

186 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 17-Feb-19 Office Rekind 2

Page 39: Environmental and Social Monitoring Report...2. Relevant Environmental Permits or Compliance Certificates 11 2.1 New Permit or Compliance Certificates Required and Obtained 11 2.2

Environment & Social Monitoring Report-1H18 Rev 1 Page 40

187 Introduce to PTW EPC-C PT. Rekayasa Industri 17-Feb-19 Office Rekind 2

188 PPE Awareness EPC-C PT. Rekayasa Industri 17-Feb-19 Office Rekind 2

189 Enviromental Awareness EPC-C PT. Rekayasa Industri 17-Feb-19 Office Rekind 2

190 Basic Electrical Safety EPC-C PT. Rekayasa Industri 17-Feb-19 Office Rekind 2

191 Safety observation card EPC-C PT. Rekayasa Industri 19-Feb-19 Office Rekind 8

192 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 19-Feb-19 Office Rekind 8

193 Introduce to PTW EPC-C PT. Rekayasa Industri 19-Feb-19 Office Rekind 8

194 PPE Awareness EPC-C PT. Rekayasa Industri 19-Feb-19 Office Rekind 8

195 Enviromental Awareness EPC-C PT. Rekayasa Industri 19-Feb-19 Office Rekind 8

196 Basic Electrical Safety EPC-C PT. Rekayasa Industri 19-Feb-19 Office Rekind 8

197 Safety observation card EPC-C PT. Rekayasa Industri 20-Feb-19 Office Rekind 2

198 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 20-Feb-19 Office Rekind 2

199 Introduce to PTW EPC-C PT. Rekayasa Industri 20-Feb-19 Office Rekind 2

200 PPE Awareness EPC-C PT. Rekayasa Industri 20-Feb-19 Office Rekind 2

201 Enviromental Awareness EPC-C PT. Rekayasa Industri 20-Feb-19 Office Rekind 2

202 Basic Electrical Safety EPC-C PT. Rekayasa Industri 20-Feb-19 Office Rekind 2

203 SCBA TRaining (5 Minutes) Drilling PRA/SERD 21-Feb-19 RD-M2 4

204 Stretcher & Evacuation Drill Drilling PRA/SERD 22-Feb-19 RD-M2 7

205 Safety observation card EPC-C PT. Rekayasa Industri 23-Feb-19 Office Rekind 6

206 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 23-Feb-19 Office Rekind 6

207 Introduce to PTW EPC-C PT. Rekayasa Industri 23-Feb-19 Office Rekind 6

208 PPE Awareness EPC-C PT. Rekayasa Industri 23-Feb-19 Office Rekind 6

209 Enviromental Awareness EPC-C PT. Rekayasa Industri 23-Feb-19 Office Rekind 6

210 Basic Electrical Safety EPC-C PT. Rekayasa Industri 23-Feb-19 Office Rekind 6

211 Trip & BOP Drill Drilling PRA/SERD 23-Feb-19 RD-M2 4

212 H2S Drill Drilling PRA/SERD 23-Feb-19 RD-M2 All

213 SCBA Training (30 Minutes) Drilling PRA/SERD 24-Feb-19 RD-M2

214 Safety observation card EPC-C PT. Rekayasa Industri 26-Feb-19 Office Rekind 5

215 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 26-Feb-19 Office Rekind 5

216 Introduce to PTW EPC-C PT. Rekayasa Industri 26-Feb-19 Office Rekind 6

217 PPE Awareness EPC-C PT. Rekayasa Industri 26-Feb-19 Office Rekind 5

218 Enviromental Awareness EPC-C PT. Rekayasa Industri 26-Feb-19 Office Rekind 5

219 Basic Electrical Safety EPC-C PT. Rekayasa Industri 26-Feb-19 Office Rekind 5

220 DDC EPC-C PT. Rekayasa Industri 26-Feb-19 Office Rekind 1

221 Trip & BOP Drill Drilling PRA/SERD 26-Feb-19 RD-M2ST 4

222 Safety observation card EPC-C PT. Rekayasa Industri 27-Feb-19 Office Rekind 8

223 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 27-Feb-19 Office Rekind 8

224 Introduce to PTW EPC-C PT. Rekayasa Industri 27-Feb-19 Office Rekind 8

225 PPE Awareness EPC-C PT. Rekayasa Industri 27-Feb-19 Office Rekind 8

March 524

226 DDC EPC-C PT. Rekayasa Industri 04-Mar-19 Office Rekind 1

227 Site Induction EPC-C PT. Rekayasa Industri 05-Mar-19 Office Rekind 1

228 safety observation card EPC-C PT. Rekayasa Industri 05-Mar-19 Office Rekind 1

229 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 05-Mar-19 Office Rekind 1

230 Introduce to PTW EPC-C PT. Rekayasa Industri 05-Mar-19 Office Rekind 1

231 PPE Awareness EPC-C PT. Rekayasa Industri 05-Mar-19 Office Rekind 1

Page 40: Environmental and Social Monitoring Report...2. Relevant Environmental Permits or Compliance Certificates 11 2.1 New Permit or Compliance Certificates Required and Obtained 11 2.2

Environment & Social Monitoring Report-1H18 Rev 1 Page 41

232 Enviromental Awareness EPC-C PT. Rekayasa Industri 05-Mar-19 Office Rekind 1

233 Basic Electrical Safety EPC-C PT. Rekayasa Industri 05-Mar-19 Office Rekind 1

234 Spill Response EPC-C PT. Rekayasa Industri 05-Mar-19 Office Rekind 11

235 Site Induction EPC-C PT. Rekayasa Industri 07-Mar-19 Office Rekind 10

236 safety observation card EPC-C PT. Rekayasa Industri 07-Mar-19 Office Rekind 10

237 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 07-Mar-19 Office Rekind 10

238 Introduce to PTW EPC-C PT. Rekayasa Industri 07-Mar-19 Office Rekind 10

239 PPE Awareness EPC-C PT. Rekayasa Industri 07-Mar-19 Office Rekind 10

240 Enviromental Awareness EPC-C PT. Rekayasa Industri 07-Mar-19 Office Rekind 10

241 Basic Electrical Safety EPC-C PT. Rekayasa Industri 07-Mar-19 Office Rekind 3

242 Site Induction EPC-C PT. Rekayasa Industri 09-Mar-19 Office Rekind 2

243 safety observation card EPC-C PT. Rekayasa Industri 09-Mar-19 Office Rekind 2

244 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 09-Mar-19 Office Rekind 2

245 Introduce to PTW EPC-C PT. Rekayasa Industri 09-Mar-19 Office Rekind 2

246 PPE Awareness EPC-C PT. Rekayasa Industri 09-Mar-19 Office Rekind 2

247 Enviromental Awareness EPC-C PT. Rekayasa Industri 09-Mar-19 Office Rekind 2

248 Basic Electrical Safety EPC-C PT. Rekayasa Industri 09-Mar-19 Office Rekind 2

249 Spill Response EPC-C PT. Rekayasa Industri 09-Mar-19 Office Rekind 5

250 DDC EPC-C PT. Rekayasa Industri 09-Mar-19 Office Rekind 2

251 Site Induction EPC-C PT. Rekayasa Industri 11-Mar-19 Office Rekind 3

252 safety observation card EPC-C PT. Rekayasa Industri 11-Mar-19 Office Rekind 3

253 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 11-Mar-19 Office Rekind 3

254 Introduce to PTW EPC-C PT. Rekayasa Industri 11-Mar-19 Office Rekind 3

255 PPE Awareness EPC-C PT. Rekayasa Industri 11-Mar-19 Office Rekind 3

256 Enviromental Awareness EPC-C PT. Rekayasa Industri 11-Mar-19 Office Rekind 3

257 Basic Electrical Safety EPC-C PT. Rekayasa Industri 11-Mar-19 Office Rekind 3

258 Site Induction EPC-C PT. Rekayasa Industri 12-Mar-19 Office Rekind 1

259 safety observation card EPC-C PT. Rekayasa Industri 12-Mar-19 Office Rekind 1

260 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 12-Mar-19 Office Rekind 1

261 Introduce to PTW EPC-C PT. Rekayasa Industri 12-Mar-19 Office Rekind 1

262 PPE Awareness EPC-C PT. Rekayasa Industri 12-Mar-19 Office Rekind 1

263 Enviromental Awareness EPC-C PT. Rekayasa Industri 12-Mar-19 Office Rekind 1

264 Basic Electrical Safety EPC-C PT. Rekayasa Industri 12-Mar-19 Office Rekind 1

265 Spill Response EPC-C PT. Rekayasa Industri 12-Mar-19 Office Rekind 1

266 DDC EPC-C PT. Rekayasa Industri 12-Mar-19 Office Rekind 1

267 DDC EPC-C PT. Rekayasa Industri 13-Mar-19 Office Rekind 1

268 Site Induction EPC-C PT. Rekayasa Industri 15-Mar-19 Office Rekind 4

269 safety observation card EPC-C PT. Rekayasa Industri 15-Mar-19 Office Rekind 6

270 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 15-Mar-19 Office Rekind 6

271 Introduce to PTW EPC-C PT. Rekayasa Industri 15-Mar-19 Office Rekind 6

272 PPE Awareness EPC-C PT. Rekayasa Industri 15-Mar-19 Office Rekind 6

273 Enviromental Awareness EPC-C PT. Rekayasa Industri 15-Mar-19 Office Rekind 6

274 Basic Electrical Safety EPC-C PT. Rekayasa Industri 15-Mar-19 Office Rekind 6

275 DDC EPC-C PT. Rekayasa Industri 15-Mar-19 Office Rekind 3

276 Site Induction EPC-C PT. Rekayasa Industri 16-Mar-19 Office Rekind 2

277 safety observation card EPC-C PT. Rekayasa Industri 16-Mar-19 Office Rekind 2

Page 41: Environmental and Social Monitoring Report...2. Relevant Environmental Permits or Compliance Certificates 11 2.1 New Permit or Compliance Certificates Required and Obtained 11 2.2

Environment & Social Monitoring Report-1H18 Rev 1 Page 42

278 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 16-Mar-19 Office Rekind 2

279 Introduce to PTW EPC-C PT. Rekayasa Industri 16-Mar-19 Office Rekind 2

280 PPE Awareness EPC-C PT. Rekayasa Industri 16-Mar-19 Office Rekind 1

281 Enviromental Awareness EPC-C PT. Rekayasa Industri 16-Mar-19 Office Rekind 2

282 Basic Electrical Safety EPC-C PT. Rekayasa Industri 16-Mar-19 Office Rekind 1

283 DDC EPC-C PT. Rekayasa Industri 16-Mar-19 Office Rekind 1

284 Site Induction EPC-C PT. Rekayasa Industri 18-Mar-19 Office Rekind 34

285 safety observation card EPC-C PT. Rekayasa Industri 18-Mar-19 Office Rekind 34

286 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 18-Mar-19 Office Rekind 34

287 Introduce to PTW EPC-C PT. Rekayasa Industri 18-Mar-19 Office Rekind 34

288 PPE Awareness EPC-C PT. Rekayasa Industri 18-Mar-19 Office Rekind 34

289 Enviromental Awareness EPC-C PT. Rekayasa Industri 18-Mar-19 Office Rekind 34

290 Basic Electrical Safety EPC-C PT. Rekayasa Industri 18-Mar-19 Office Rekind 34

291 Site Induction EPC-C PT. Rekayasa Industri 19-Mar-19 Office Rekind 2

292 Safety observation card EPC-C PT. Rekayasa Industri 19-Mar-19 Office Rekind 2

293 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 19-Mar-19 Office Rekind 2

294 Introduce to PTW EPC-C PT. Rekayasa Industri 19-Mar-19 Office Rekind 2

295 PPE Awareness EPC-C PT. Rekayasa Industri 19-Mar-19 Office Rekind 2

296 Enviromental Awareness EPC-C PT. Rekayasa Industri 19-Mar-19 Office Rekind 2

297 Basic Electrical Safety EPC-C PT. Rekayasa Industri 19-Mar-19 Office Rekind 2

298 Site Induction EPC-C PT. Rekayasa Industri 20-Mar-19 Office Rekind 1

299 safety observation card EPC-C PT. Rekayasa Industri 20-Mar-19 Office Rekind 2

300 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 20-Mar-19 Office Rekind 2

301 Introduce to PTW EPC-C PT. Rekayasa Industri 20-Mar-19 Office Rekind 2

302 PPE Awareness EPC-C PT. Rekayasa Industri 20-Mar-19 Office Rekind 2

303 Enviromental Awareness EPC-C PT. Rekayasa Industri 20-Mar-19 Office Rekind 2

304 Basic Electrical Safety EPC-C PT. Rekayasa Industri 20-Mar-19 Office Rekind 2

305 Site Induction EPC-C PT. Rekayasa Industri 22-Mar-19 Office Rekind 8

306 safety observation card EPC-C PT. Rekayasa Industri 22-Mar-19 Office Rekind 10

307 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 22-Mar-19 Office Rekind 8

308 Introduce to PTW EPC-C PT. Rekayasa Industri 22-Mar-19 Office Rekind 8

309 PPE Awareness EPC-C PT. Rekayasa Industri 22-Mar-19 Office Rekind 10

310 Enviromental Awareness EPC-C PT. Rekayasa Industri 22-Mar-19 Office Rekind 10

311 Basic Electrical Safety EPC-C PT. Rekayasa Industri 22-Mar-19 Office Rekind 5

312 Basic Rigger Subsurface Defriwangga 10-12 Mar

2019

Warehouse 10

313 BOP & Trip Drill Drilling SERD & PRA #9 01-Mar-19 RD-M2ST 4

314 First Aid Training Drilling SERD & PRA #9 02-Mar-19 RD-M 10

315 Fire Prevention Training Drilling SERD & PRA #9 03-Mar-19 RD-M 24

316 Line of Fire Training Drilling SERD & PRA #9 03-Mar-19 RD-M 24

317 SCBA & Evacuation Training Drilling SERD & PRA #9 27-Mar-19 RD-M

318 H2S & Medivac Drill Drilling SERD & PRA #9 27-Mar-19 RD-M

319 BOP & Trip Drill Drilling SERD & PRA #9 28-Mar-19 RD-M3

APRIL 712

320 Training SCBA 30 menit Drilling PT. PRA-7 02-Apr-19 Rig Supt

Officer

4

Page 42: Environmental and Social Monitoring Report...2. Relevant Environmental Permits or Compliance Certificates 11 2.1 New Permit or Compliance Certificates Required and Obtained 11 2.2

Environment & Social Monitoring Report-1H18 Rev 1 Page 43

321 Training SCBA 30 menit Drilling PT. PRA-7 04-Apr-19 H2S Unit 4

322 H2S Drill Drilling PT. PRA-7 07-Apr-19 RD-L1 30

323 Training SCBA 10 menit Drilling PT. PRA-7 07-Apr-19 Unit EXLOG

and Unit ADA

6

324 Training SCBA 5 menit Drilling PT. PRA-7 11-Apr-19 Mud Tank 3

325 H2S Drill Drilling PT. PRA-7 11-Apr-19 Lokasi RD-L1 35

326 Training SCBA 10 menit Drilling PT. PRA-7 04-Apr-19 Unit ADA dan

Unit NOV

4

327 Training SCBA 30 menit Drilling PT. PRA-7 04-Apr-19 H2S Unit 3

328 Training SCBA 5 menit Drilling PT. PRA-7 04-Apr-19 Tank 3

329 H2S Drill Drilling PT. PRA-7 04-Apr-19 Lokasi RD-L1 34

330 Training SCBA 5 menit Drilling PT. PRA-7 04-Apr-19 Tank 3

331 Training SCBA 30 menit Drilling PT. PRA-7 04-Apr-19 H2S Unit 5

332 Devensive Driving Training Drilling PT. PRA-7 04-Apr-19 Meeting

Room

6

333 H2S Drill Drilling PT. PRA-7 04-Apr-19 Rig Site RD L2 27

334 Training SCBA 30 menit Drilling PT. PRA-7 04-Apr-19 H2S Unit 3

335 Site Induction EPC-C PT. Rekayasa Industri 06-Apr-19 Office Rekind 1

336 Site Induction EPC-C PT. Rekayasa Industri 08-Apr-19 Office Rekind 3

337 Site Induction EPC-C PT. Rekayasa Industri 09-Apr-19 Office Rekind 9

338 Site Induction EPC-C PT. Rekayasa Industri 10-Apr-19 Office Rekind 6

339 Site Induction EPC-C PT. Rekayasa Industri 19-Apr-19 Office Rekind 3

340 Site Induction EPC-C PT. Rekayasa Industri 20-Apr-19 Office Rekind 7

341 Site Induction EPC-C PT. Rekayasa Industri 22-Apr-19 Office Rekind 23

342 Site Induction EPC-C PT. Rekayasa Industri 23-Apr-19 Office Rekind 13

343 safety observation card EPC-C PT. Rekayasa Industri 06-Apr-19 Office Rekind 1

344 safety observation card EPC-C PT. Rekayasa Industri 08-Apr-19 Office Rekind 3

345 safety observation card EPC-C PT. Rekayasa Industri 09-Apr-19 Office Rekind 1

346 safety observation card EPC-C PT. Rekayasa Industri 10-Apr-19 Office Rekind 6

347 safety observation card EPC-C PT. Rekayasa Industri 19-Apr-19 Office Rekind 27

348 safety observation card EPC-C PT. Rekayasa Industri 20-Apr-19 Office Rekind 7

349 safety observation card EPC-C PT. Rekayasa Industri 21-Apr-19 Office Rekind 14

350 safety observation card EPC-C PT. Rekayasa Industri 23-Apr-19 Office Rekind 13

351 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 06-Apr-19 Office Rekind 1

352 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 08-Apr-19 Office Rekind 3

353 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 09-Apr-19 Office Rekind 1

354 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 10-Apr-19 Office Rekind 6

355 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 19-Apr-19 Office Rekind 3

356 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 20-Apr-19 Office Rekind 7

357 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 22-Apr-19 Office Rekind 14

358 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 23-Apr-19 Office Rekind 1

359 Introduce to PTW EPC-C PT. Rekayasa Industri 06-Apr-19 Office Rekind 1

360 Introduce to PTW EPC-C PT. Rekayasa Industri 08-Apr-19 Office Rekind 3

361 Introduce to PTW EPC-C PT. Rekayasa Industri 09-Apr-19 Office Rekind 1

362 Introduce to PTW EPC-C PT. Rekayasa Industri 10-Apr-19 Office Rekind 6

Page 43: Environmental and Social Monitoring Report...2. Relevant Environmental Permits or Compliance Certificates 11 2.1 New Permit or Compliance Certificates Required and Obtained 11 2.2

Environment & Social Monitoring Report-1H18 Rev 1 Page 44

363 Introduce to PTW EPC-C PT. Rekayasa Industri 19-Apr-19 Office Rekind 3

364 Introduce to PTW EPC-C PT. Rekayasa Industri 20-Apr-19 Office Rekind 7

365 Introduce to PTW EPC-C PT. Rekayasa Industri 22-Apr-19 Office Rekind 14

366 Introduce to PTW EPC-C PT. Rekayasa Industri 23-Apr-19 Office Rekind 13

367 PPE Awareness EPC-C PT. Rekayasa Industri 06-Apr-19 Office Rekind 1

368 PPE Awareness EPC-C PT. Rekayasa Industri 08-Apr-19 Office Rekind 3

369 PPE Awareness EPC-C PT. Rekayasa Industri 09-Apr-19 Office Rekind 1

370 PPE Awareness EPC-C PT. Rekayasa Industri 10-Apr-19 Office Rekind 6

371 PPE Awareness EPC-C PT. Rekayasa Industri 19-Apr-19 Office Rekind 3

372 PPE Awareness EPC-C PT. Rekayasa Industri 20-Apr-19 Office Rekind 7

373 PPE Awareness EPC-C PT. Rekayasa Industri 22-Apr-19 Office Rekind 14

374 PPE Awareness EPC-C PT. Rekayasa Industri 23-Apr-19 Office Rekind 13

375 Enviromental Awareness EPC-C PT. Rekayasa Industri 06-Apr-19 Office Rekind 1

376 Enviromental Awareness EPC-C PT. Rekayasa Industri 08-Apr-19 Office Rekind 3

377 Enviromental Awareness EPC-C PT. Rekayasa Industri 09-Apr-19 Office Rekind 1

378 Enviromental Awareness EPC-C PT. Rekayasa Industri 10-Apr-19 Office Rekind 6

379 Enviromental Awareness EPC-C PT. Rekayasa Industri 19-Apr-19 Office Rekind 3

380 Enviromental Awareness EPC-C PT. Rekayasa Industri 20-Apr-19 Office Rekind 7

381 Enviromental Awareness EPC-C PT. Rekayasa Industri 22-Apr-19 Office Rekind 14

382 Enviromental Awareness EPC-C PT. Rekayasa Industri 23-Apr-19 Office Rekind 13

383 Basic Electrical Safety EPC-C PT. Rekayasa Industri 06-Apr-19 Office Rekind 1

384 Basic Electrical Safety EPC-C PT. Rekayasa Industri 08-Apr-19 Office Rekind 3

385 Basic Electrical Safety EPC-C PT. Rekayasa Industri 09-Apr-19 Office Rekind 1

386 Basic Electrical Safety EPC-C PT. Rekayasa Industri 10-Apr-19 Office Rekind 6

387 Basic Electrical Safety EPC-C PT. Rekayasa Industri 19-Apr-19 Office Rekind 3

388 Basic Electrical Safety EPC-C PT. Rekayasa Industri 20-Apr-19 Office Rekind 7

389 Basic Electrical Safety EPC-C PT. Rekayasa Industri 22-Apr-19 Office Rekind 14

390 Basic Electrical Safety EPC-C PT. Rekayasa Industri 23-Apr-19 Office Rekind 3

391 DDC EPC-C PT. Rekayasa Industri 08-Apr-19 Office Rekind 2

392 DDC EPC-C PT. Rekayasa Industri 25-Apr-19 Office Rekind 4

393 WAH EPC-C PT. Rekayasa Industri 24-Apr-19 Office Rekind 3

394 First Aid Training Subsurface Defriwangga 22-Apr-19 Office E 8

395 Stretcher drill Drilling PT. PRA-9 01-Apr-19 Rig site PRA-9

396 Medivac Dril Drilling PT. PRA-9 01-Apr-19 Rig site PRA-9

397 Fire Drill Drilling PT. PRA-9 02-Apr-19 Rig site PRA-9

398 SCBA Drilling PT. PRA-9 02-Apr-19 Rig site PRA-9

399 Trip Drill Drilling PT. PRA-9 02-Apr-19 Rig site PRA-9

400 BOP Drill Drilling PT. PRA-9 02-Apr-19 Rig site PRA-9

401 Fire Drill Drilling PT. PRA-9 07-Apr-19 Rig site PRA-9

Page 44: Environmental and Social Monitoring Report...2. Relevant Environmental Permits or Compliance Certificates 11 2.1 New Permit or Compliance Certificates Required and Obtained 11 2.2

Environment & Social Monitoring Report-1H18 Rev 1 Page 45

402 H2S Drill Drilling PT. PRA-9 07-Apr-19 Rig site PRA-9

403 SCBA Drilling PT. PRA-9 09-Apr-19 Rig site PRA-9

404 DDC - Low gear Drilling PT. PRA-9 09-Apr-19 Rig site PRA-9

405 H2S Drill Drilling PT. PRA-9 13-Apr-19 Rig site PRA-9

406 Urine Indicator Drilling PT. PRA-9 13-Apr-19 Rig site PRA-9

407 TOP Dril Drilling PT. PRA-9 15-Apr-19 Rig site PRA-9

408 BOP Drill Drilling PT. PRA-9 15-Apr-19 Rig site PRA-9

409 BOP Drill Drilling PT. PRA-9 16-Apr-19 Rig site PRA-9

410 Stretcher drill Drilling PT. PRA-9 17-Apr-19 Rig site PRA-9

411 Medivac Dril Drilling PT. PRA-9 17-Apr-19 Rig site PRA-9

412 H2S Drill Drilling PT. PRA-9 20-Apr-19 Rig site PRA-9

413 Lifting and Rigging Drilling PT. PRA-9 21-Apr-19 Rig site PRA-9

414 SCBA Drilling PT. PRA-9 23-Apr-19 Rig site PRA-9

415 Fire Drill Drilling PT. PRA-9 24-Apr-19 Rig site PRA-9

416 Trip Drill Drilling PT. PRA-9 25-Apr-19 Rig site PRA-9

417 BOP Drill Drilling PT. PRA-9 25-Apr-19 Rig site PRA-9

418 DDC Drilling PT. PRA-9 25-Apr-19 Rig site PRA-9

419 SCBA Drilling PT. PRA-9 25-Apr-19 Rig site PRA-9

420 SCBA Drilling PT. PRA-9 26-Apr-19 Rig site PRA-9

421 SCBA Drilling PT. PRA-9 28-Apr-19 Rig site PRA-9

422 H2S Prevention Drilling PT. PRA-9 28-Apr-19 Rig site PRA-9

423 H2S Drill Drilling PT. PRA-9 29-Apr-19 Rig site PRA-9

424 SCBA Drilling PT. PRA-9 30-Apr-19 Rig site PRA-9

425 Stretcher drill Drilling PT. PRA-9 30-Apr-19 Rig site PRA-9

426 Medivac Dril Drilling PT. PRA-9 30-Apr-19 Rig site PRA-9

427 Training SCBA 30 Menit Drilling PRA 7/SERD 2-Apr-19 RD - L1 4

428 Training SCBA 30 Menit Drilling PRA 7/SERD 4-Apr-19 RD - L1 4

429 H2S DRILL Drilling PRA 7/SERD 7-Apr-19 RD - L1 30

430 Training SCBA 10 Menit Drilling PRA 7/SERD 7-Apr-19 RD - L1 6

431 Training SCBA 05 Menit Drilling PRA 7/SERD 11-Apr-19 RD - L1 3

432 H2S DRILL Drilling PRA 7/SERD 11-Apr-19 RD - L1 35

433 Training SCBA 10 Menit Drilling PRA 7/SERD 13-Apr-19 RD - L1 4

434 Training SCBA 30 Menit Drilling PRA 7/SERD 16-Apr-19 RD - L1 3

435 Training SCBA 05 Menit Drilling PRA 7/SERD 18-Apr-19 RD - L1 3

436 H2S DRILL Drilling PRA 7/SERD 20-Apr-19 RD - L1 34

437 Training SCBA 05 Menit Drilling PRA 7/SERD 21-Apr-19 RD - L1 3

438 Training SCBA 30 Menit Drilling PRA 7/SERD 26-Apr-19 RD - L2 5

439 Defensive Driving Training Drilling PRA 7/SERD 26-Apr-19 RD-L2 6

440 H2S Drill Drilling PRA 7/SERD 27-Apr-19 RD - L2 27

Page 45: Environmental and Social Monitoring Report...2. Relevant Environmental Permits or Compliance Certificates 11 2.1 New Permit or Compliance Certificates Required and Obtained 11 2.2

Environment & Social Monitoring Report-1H18 Rev 1 Page 46

441 Training SCBA 30 Menit Drilling PRA 7/SERD 28-Apr-19 RD - L2 3

MAY 613

442 Site Induction EPC-C PT. Rekayasa Industri 01-Mei-19 Office Rekind 6

443 Site Induction EPC-C PT. Rekayasa Industri 02-Mei-19 Office Rekind 2

444 Site Induction EPC-C PT. Rekayasa Industri 04-Mei-19 Office Rekind 5

445 Site Induction EPC-C PT. Rekayasa Industri 06-Mei-19 Office Rekind 1

446 Site Induction EPC-C PT. Rekayasa Industri 07-Mei-19 Office Rekind 11

447 Site Induction EPC-C PT. Rekayasa Industri 08-Mei-19 Office Rekind 3

448 Site Induction EPC-C PT. Rekayasa Industri 09-Mei-19 Office Rekind 4

449 Site Induction EPC-C PT. Rekayasa Industri 13-Mei-19 Office Rekind 16

450 Site Induction EPC-C PT. Rekayasa Industri 14-Mei-19 Office Rekind 7

451 Site Induction EPC-C PT. Rekayasa Industri 15-Mei-19 Office Rekind 11

452 Site Induction EPC-C PT. Rekayasa Industri 16-Mei-19 Office Rekind 18

453 safety observation card EPC-C PT. Rekayasa Industri 01-Mei-19 Office Rekind 6

454 safety observation card EPC-C PT. Rekayasa Industri 02-Mei-19 Office Rekind 2

455 safety observation card EPC-C PT. Rekayasa Industri 04-Mei-19 Office Rekind 5

456 safety observation card EPC-C PT. Rekayasa Industri 06-Mei-19 Office Rekind 1

457 safety observation card EPC-C PT. Rekayasa Industri 07-Mei-19 Office Rekind 11

458 safety observation card EPC-C PT. Rekayasa Industri 08-Mei-19 Office Rekind 6

459 safety observation card EPC-C PT. Rekayasa Industri 09-Mei-19 Office Rekind 4

460 safety observation card EPC-C PT. Rekayasa Industri 13-Mei-19 Office Rekind 10

461 safety observation card EPC-C PT. Rekayasa Industri 14-Mei-19 Office Rekind 7

462 safety observation card EPC-C PT. Rekayasa Industri 15-Mei-19 Office Rekind 11

463 safety observation card EPC-C PT. Rekayasa Industri 16-Mei-19 Office Rekind 1

464 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 01-Mei-19 Office Rekind 6

465 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 02-Mei-19 Office Rekind 2

466 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 04-Mei-19 Office Rekind 5

467 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 06-Mei-19 Office Rekind 1

468 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 07-Mei-19 Office Rekind 11

469 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 08-Mei-19 Office Rekind 6

470 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 09-Mei-19 Office Rekind 4

471 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 13-Mei-19 Office Rekind 16

472 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 14-Mei-19 Office Rekind 7

473 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 15-Mei-19 Office Rekind 11

474 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 16-Mei-19 Office Rekind 18

475 Introduce to PTW EPC-C PT. Rekayasa Industri 01-Mei-19 Office Rekind 6

476 Introduce to PTW EPC-C PT. Rekayasa Industri 02-Mei-19 Office Rekind 2

477 Introduce to PTW EPC-C PT. Rekayasa Industri 04-Mei-19 Office Rekind 5

478 Introduce to PTW EPC-C PT. Rekayasa Industri 06-Mei-19 Office Rekind 1

Page 46: Environmental and Social Monitoring Report...2. Relevant Environmental Permits or Compliance Certificates 11 2.1 New Permit or Compliance Certificates Required and Obtained 11 2.2

Environment & Social Monitoring Report-1H18 Rev 1 Page 47

479 Introduce to PTW EPC-C PT. Rekayasa Industri 07-Mei-19 Office Rekind 11

480 Introduce to PTW EPC-C PT. Rekayasa Industri 08-Mei-19 Office Rekind 6

481 Introduce to PTW EPC-C PT. Rekayasa Industri 09-Mei-19 Office Rekind 4

482 Introduce to PTW EPC-C PT. Rekayasa Industri 13-Mei-19 Office Rekind 16

483 Introduce to PTW EPC-C PT. Rekayasa Industri 14-Mei-19 Office Rekind 8

484 Introduce to PTW EPC-C PT. Rekayasa Industri 15-Mei-19 Office Rekind 11

485 Introduce to PTW EPC-C PT. Rekayasa Industri 16-Mei-19 Office Rekind 15

486 PPE Awareness EPC-C PT. Rekayasa Industri 01-Mei-19 Office Rekind 6

487 PPE Awareness EPC-C PT. Rekayasa Industri 02-Mei-19 Office Rekind 2

488 PPE Awareness EPC-C PT. Rekayasa Industri 04-Mei-19 Office Rekind 5

489 PPE Awareness EPC-C PT. Rekayasa Industri 06-Mei-19 Office Rekind 1

490 PPE Awareness EPC-C PT. Rekayasa Industri 07-Mei-19 Office Rekind 11

491 PPE Awareness EPC-C PT. Rekayasa Industri 08-Mei-19 Office Rekind 6

492 PPE Awareness EPC-C PT. Rekayasa Industri 09-Mei-19 Office Rekind 5

493 PPE Awareness EPC-C PT. Rekayasa Industri 13-Mei-19 Office Rekind 16

494 PPE Awareness EPC-C PT. Rekayasa Industri 14-Mei-19 Office Rekind 7

495 PPE Awareness EPC-C PT. Rekayasa Industri 15-Mei-19 Office Rekind 11

496 PPE Awareness EPC-C PT. Rekayasa Industri 16-Mei-19 Office Rekind 18

497 Enviromental Awareness EPC-C PT. Rekayasa Industri 01-Mei-19 Office Rekind 6

498 Enviromental Awareness EPC-C PT. Rekayasa Industri 02-Mei-19 Office Rekind 2

499 Enviromental Awareness EPC-C PT. Rekayasa Industri 04-Mei-19 Office Rekind 5

500 Enviromental Awareness EPC-C PT. Rekayasa Industri 06-Mei-19 Office Rekind 1

501 Enviromental Awareness EPC-C PT. Rekayasa Industri 07-Mei-19 Office Rekind 11

502 Enviromental Awareness EPC-C PT. Rekayasa Industri 08-Mei-19 Office Rekind 6

503 Enviromental Awareness EPC-C PT. Rekayasa Industri 09-Mei-19 Office Rekind 5

504 Enviromental Awareness EPC-C PT. Rekayasa Industri 13-Mei-19 Office Rekind 16

505 Enviromental Awareness EPC-C PT. Rekayasa Industri 14-Mei-19 Office Rekind 7

506 Enviromental Awareness EPC-C PT. Rekayasa Industri 15-Mei-19 Office Rekind 11

507 Enviromental Awareness EPC-C PT. Rekayasa Industri 16-Mei-19 Office Rekind 18

508 Basic Electrical Safety EPC-C PT. Rekayasa Industri 01-Mei-19 Office Rekind 6

509 Basic Electrical Safety EPC-C PT. Rekayasa Industri 02-Mei-19 Office Rekind 2

510 Basic Electrical Safety EPC-C PT. Rekayasa Industri 04-Mei-19 Office Rekind 5

511 Basic Electrical Safety EPC-C PT. Rekayasa Industri 06-Mei-19 Office Rekind 1

512 Basic Electrical Safety EPC-C PT. Rekayasa Industri 07-Mei-19 Office Rekind 11

513 Basic Electrical Safety EPC-C PT. Rekayasa Industri 08-Mei-19 Office Rekind 6

514 Basic Electrical Safety EPC-C PT. Rekayasa Industri 09-Mei-19 Office Rekind 4

515 Basic Electrical Safety EPC-C PT. Rekayasa Industri 13-Mei-19 Office Rekind 16

516 Basic Electrical Safety EPC-C PT. Rekayasa Industri 14-Mei-19 Office Rekind 7

517 Basic Electrical Safety EPC-C PT. Rekayasa Industri 15-Mei-19 Office Rekind 11

Page 47: Environmental and Social Monitoring Report...2. Relevant Environmental Permits or Compliance Certificates 11 2.1 New Permit or Compliance Certificates Required and Obtained 11 2.2

Environment & Social Monitoring Report-1H18 Rev 1 Page 48

6.4 Needs Assessment of Environmental Management Capacity

SERD currently employs consultants (PT Radiant Utama, ERM Siam, PT Arindhita, and experts from

University of Sriwijaya Palembang) to support for biodiversity assessment and environmental

monitoring/advices.

When needed External supports are available through existing consultants such as ERM Siam, as

well as experts from local universities, Forestry offices, and NGOs.

No additional need is currently required at this stage. If the need to improve the capacity comes, it

will be done accordingly.

6.5 Awareness Level of Contractors’ Field Personnel

On the job training has been conducted in the form of direct coaching, pre-job meeting, use of

display boards, and banners.

EPC and Drilling contractors have SHE induction and training courses conducted by their internal

SHE personnel.

EPC Personel are also expected to adhere to the B-15 and B-16 documents as stated in their

contract. The B-15 and B-16 documents are guidelines for both national as well as

international standards for all contractors to follow.

518 Basic Electrical Safety EPC-C PT. Rekayasa Industri 16-Mei-19 Office Rekind 18

519 DDC EPC-C PT. Rekayasa Industri 07-Mei-19 Office Rekind 11

520 DDC EPC-C PT. Rekayasa Industri 08-Mei-19 Office Rekind 2

521 DDC EPC-C PT. Rekayasa Industri 13-Mei-19 Office Rekind 4

522 DDC EPC-C PT. Rekayasa Industri 14-Mei-19 Office Rekind 1

523 Confined Space EPC-C PT. Rekayasa Industri 08-Mei-19 Office Rekind 2

524 Confined Space EPC-C PT. Rekayasa Industri 09-Mei-19 Office Rekind 4

525 Working at height EPC-C PT. Rekayasa Industri 08-Mei-19 Office Rekind 1

526 First Aid Training Subsurface Defriwangga 18-Mei-19 Office E 5

JUNE

Excavation & Trenching Safety, Permit to

Work

FODD &

Project

SERD 27 June 19 Rec Room 8

Excavation & Trenching Safety, Permit to

Work

FODD &

Projec

SERD 28 June 19 Rec Room 6

Page 48: Environmental and Social Monitoring Report...2. Relevant Environmental Permits or Compliance Certificates 11 2.1 New Permit or Compliance Certificates Required and Obtained 11 2.2

Environment & Social Monitoring Report-1H18 Rev 1 Page 49

7. Social Management Capacity

This Chapter discusses staff capacities in social management, degree of awareness, training conducted,

needs assessment of social management capacity and awareness level of contractors’ staff trained.

7.1 SERD’s Relations Team

7.2 Number and Adequacy of Staff to Monitor Labour and Working Conditions

To monitor labour and working conditions, SERD employs 1 (one) experienced managerial levels (Site

Support Manager) and 2 (two) Site Representatives.

7.3 Training Conducted

Training will be selected on as needed basis. Benchmark is conducted to other Supreme Energy’s site.

7.4 Designation and Signature of Person Responsible

Head of Community Relation and Affair is responsible for preparing the social safeguards monitoring

reports, while Manager of Field Relations and Business Relations Manager are the responsible persons

for reviewing the reports.

Page 49: Environmental and Social Monitoring Report...2. Relevant Environmental Permits or Compliance Certificates 11 2.1 New Permit or Compliance Certificates Required and Obtained 11 2.2

Environment & Social Monitoring Report-1H18 Rev 1 Page 50

8. Issues, Status of Implementation of Mitigating Measures

in the Environmental Management Plan

This Chapter discusses status of implementation of mitigating measures in the environmental

management plan, and if such issues arise, corrective actions and recommendations, would be act upon.

See attachment for latest laboratory analysis results. The samples were taken by consultant experts and

analysis was conducted in a laboratory approved by the Ministry of Environment and Forestry (MoEF /

KLHK).

8.1 Pollution monitoring

Summary of Air Quality Monitoring as follows:

Measurement Period A. [Construction Phase]

Two Times for:

Noise

Ambient Air Quality

B. [Operation Phase]

1. Every 6 months for:

Noise

Air Ambient Quality

Odor

Emission for Geothermal Power Plant

2. Yearly (Every One Year) for:

GHG emissions

Excess of standard for

Contract (Yes/No)

If yes, please describe the

outline of planned

mitigation measures.

Air and noise quality has for

the most part has been in

good condition at SERD. 24

hour H2S monitoring at

sensitive receptor areas are

implemented on a 3

monthly basis (as agreed

with MMD) as well as 48 hr

noise monitoring is also

implemented. The results

also show that the closest

receptors are relatively

unaffected. PM2,5 and PM10

however, had a slight

exceedance at AQN-7. This

can be attributed to the

construction work that was

taking place at wellpads L

and N during the time of

monitoring.

Measurement Method Indonesian National Standards (SNI) guidelines or other standards as

follows:

Noise : Measurement method and equipment used are based on

Decree of MoE No. 48/1996

Emission of Geothermal Power Plant : Measurement method and

equipment used are based on Decree of MoE No. 21/2008

Green House Gas

Odor Standard: Measurement method and equipment used are

based on Decree of MoE No. 50/1996

Parameter Measurement Method Equipment

Ammonia (NH3) indophenol method spectrophotometer

Methyl

Mercaptan

(CH3SH)

gas absorption gas

chromatography

Hydrogen Sulfide

(H2S) a. mercury thiocyanate

b. gas absorption

spectrophotometer

Page 50: Environmental and Social Monitoring Report...2. Relevant Environmental Permits or Compliance Certificates 11 2.1 New Permit or Compliance Certificates Required and Obtained 11 2.2

Environment & Social Monitoring Report-1H18 Rev 1 Page 51

Methyl Sulfide

((CH3)2)S gas absorption

gas

chromatography

Styrene

(C6H8CHCH2) gas absorption

gas

chromatography

Ambient Air Quality: Measurement method and equipment used are

based on Government Regulation PP No. 41/1999

Parameter Analysis Method Equipment

SO2 (Sulfur Dioxide) Pararosanalin Spectrophotometer

CO (Carbon Monoxide) NDIR NDIR Analyzer

NO2 (Nitrogen Dioxide) Saltzman Spectrophotometer

O3 (Oxide) Chemiluminescent Spectrophotometer

HC (Hydrocarbon) Flamed Ionization Chromatography Gas

PM10

(Particle < 10 μm) Gravimetric Hi-Vol.

PM2,5

( Particle < 2.5 μm) Gravimetric Hi-Vol.

TSP (Dust) Gravimetric Hi-Vol.

Pb (Lead) Gravimetric Hi-Vol.

Measurement Points No Code Location LONG/LAT

1 AQN-1 Sukarami Village 103’25”52,90/4’4” 04,90

2 AQN-2 Padang Panjang 103’26”12,01/4’6” 41,01

3 AQN-3 Tunggul Bute

Village 103’26”12,01/4’9” 49,05

4 AQN-4 Yayasan Village 103’27”16,07/4’12” 20,40

5 AQN-5 Wellpad B 103’24”31,20/4’12” 39,01

6 AQN-6 Wellpad E 103’22”59,05/4’12” 26,07

7 AQN-7

Representative of

New well pad (L,

X, N)

103’22”49,30/4’14”22,80

No Emissions From Geothermal Power Plant due to Project being still in pre-construction phase

Measurement Point Parameter Unit Measured Result

National Standard*1

Power Plant Cooling Tower Stack

Hidrogen Sulfide (H2S) mg/Nm3 N/A 35 mg/Nm3

Ammonia (NH3) mg/Nm3 N/A 0.5 mg/Nm3

Notes : NA= Not Applicable During Pre-Construction

No GHG emission due to still in pre-construction phase

Measurement Point Parameter Unit Measured Result

Power Plant Cooling Tower Stack CO2 tones of CO2 /year N/A

CH4 tones of CO2 equivalent /year N/A

Notes: NA= Not Applicable During Pre-Construction

Page 51: Environmental and Social Monitoring Report...2. Relevant Environmental Permits or Compliance Certificates 11 2.1 New Permit or Compliance Certificates Required and Obtained 11 2.2

Environment & Social Monitoring Report-1H18 Rev 1 Page 52

Odor Measurement base on Indonesia Ministry of Environment Decree No. 50/1996

NO PARAMETER UNIT TLV *)

Ds.

Tunggul

Bute

Kp.

Yayasan

Well

Pad I

Well

Pad C

Well

Pad B

Well

Pad E

Well

Pad L, X,

N

Power

Plant

Access

Road

1 Amonia (NH3) **) ppm 2,0 0,1 0,1 0,07 0,05 0,05 0,09 0,05 0,06

2 Metil Merkaptan (CH3SH) ppm 0,02 <0,003 <0,003 <0,003 <0,003 <0,003 <0,003 <0,003 <0,003

3 Hidrogen Sulfida (H2S) **) ppm 2 <0,0017 <0,0017 <0,0017 <0,0017 <0,0017 <0,0017 <0,0017 <0,0017

4 Metil Sulfida (CH3)2S ppm 0,01 <0,0008 <0,0008 <0,0008 <0,0008 <0,0008 <0,0008 <0,0008 <0,0008

5 Styrene (C6H5CHCH2) **) ppm 0,1 <0,02 <0,02 <0,02 <0,02 <0,02 <0,02 <0,02 <0,02

Notes : Location for odour testing may vary each semester depending on project activity 24 hours H2S Measurement Based on WHO Standard

NO. PARAMETER WHO

Threshold UNIT

1 Hidrogen Sulfida (H2S) **) 2 ppm

Reference: WHO Air Quality Guidelines for Europe, 2000

0,00

0,20

0,40

0,60

0,80

1,00

1,20

1 2 3 4 5 6 7 8 9 10 11 12 13

H2

S R

esu

lts

H2S Results

PT SERD Monitoring (Pad I)

H2S Average of 24 Hours

Period of June 2019

0

0,005

0,01

0,015

0,02

0,025

0,03

0,035

1 3 5 7 9 11 13 15 17 19 21 23

H2

S R

esu

lts

H2S Average Results of 24 hr Period

at New Accomodation camp Period

of April2019

0

0,02

0,04

0,06

1 3 5 7 9 11 13 15 17 19 21 23

H2

S R

esu

lts

H2S Results

PT SERD Monitoring Point 1

(Desa Yayasan)

H2S Average of 24 Hours

Period of February 2019

0

0,1

0,2

1 3 5 7 9 11 13 15 17 19 21 23

H2

S R

esu

lts

H2S Results

PT SERD Monitoring Point 4

(Around Wellpad C)

H2S Average of 24 Hours

Period of February 2019

Page 52: Environmental and Social Monitoring Report...2. Relevant Environmental Permits or Compliance Certificates 11 2.1 New Permit or Compliance Certificates Required and Obtained 11 2.2

Environment & Social Monitoring Report-1H18 Rev 1 Page 53

Ambient Air Measurement Results

8 PARAMETER TLV *) IFC UNIT AQN-1 AQN-2 AQN-3 AQN-4 AQN-5 AQN-6 AQN-7

1 SO2 900 500 µg/Nm3 28 24 25 26 25 26 33

2 CO 30.000 NR µg/Nm3 3.723 3.593 3.666 3.738 3.616 3.685 4.120

3 NO2 400

200

guideline µg/Nm3 26 22 23 24 23 25 30

4 O3 235 100 µg/Nm3 26 31 32 26 33 32 25

5 HC 160 NR µg/Nm3 9 7 7 9 9 7 11

6 TSP -

25,000

(1 yr) µg/Nm3 62 65 59 103 89 156 46

7 PM10 (Particle < 10

µm) - 50 µg/Nm3 34 25 22 24 26 30 59

8 PM2,5 (Particle < 2,5

µm) - 25 µg/Nm3 18 14 12 13 14 16 31

9 Pb - NR µg/Nm3 <0,1 <0,1 <0,1 <0,1 <0,1 <0,1 <0,1

Reference: IFC EHS General Guidelines, dated 30 April 2007; Baku Mutu Kualitas Udara Ambien PP 41 Tahun 1999

Summary of Noise Monitoring Results:

No. Criteria Kebisingan Pada Area Pengambilan Sampe dB(A)

Threshold AQ-1 AQ-2 AQ-3 AQ-4 AQ-5 AQ-6 AQ-7

1. Working Area - - - 48 46 45 - 70

2. Settlement Area 47 48 48 - - - 46 55

Additional Noise Monitoring (48 Hrs)

Closest Settlement area Near Tunggul Bute

Date Interval Noise (dB (A))

Leq LAFmax LAFmin LCpk LAeq T. LAE

05-Jul

L1 07 00 73,5 36,7 90,8 50,8 78,7

54,6 L2 10 00 84,7 35,2 98,7 58,9 86,7

L3 15 00 85,3 30,5 107,1 63,4 91,3

L4 20 00 61,2 27,3 87,1 41,5 69,3

L5 23 00 58,5 27,5 76,3 41,4 69,2

40,3

06-Jul

L6 01 00 71,2 28,9 85,2 44,7 72,6

L7 04 00 59,5 26,7 84,4 34,8 62,6

L1 07 00 76,2 32,5 96,1 53,1 80,9

51,1 L2 10 00 85,0 35,4 112,6 55,4 83,4

L3 15 00 76,9 30,6 90,6 50,6 78,6

L4 20 00 59,7 35,6 78,6 45,3 73,2

L5 23 00 64,1 46,4 87,1 50,1 78,1

48,9 07-Jul

L6 01 00 81,0 25,5 99,5 47,2 75,0

L7 04 00 80,7 25,7 101,6 49,5 77,4

Closest Settlement area Near Tunggul Bute

Date Interval Noise (dB (A))

Leq LAFmax LAFmin LCpk LAeq T. LAE

14-Mar

L1 07 00 86,7 44,0 101,6 63,2 91,0

61,4 L2 10 00 79,5 35,9 100,6 60,9 88,7

L3 15 00 86,8 52,1 101,5 66,4 94,2

L4 20 00 78,1 39,3 101,6 55,2 83,1

Page 53: Environmental and Social Monitoring Report...2. Relevant Environmental Permits or Compliance Certificates 11 2.1 New Permit or Compliance Certificates Required and Obtained 11 2.2

Environment & Social Monitoring Report-1H18 Rev 1 Page 54

L5 23 00 77,1 37,0 96,0 49,6 77,9

49,2

15-Mar

L6 01 00 64,8 35,9 84,0 41,6 69,4

L7 04 00 78,3 33,1 91,0 56,3 84,2

L1 07 00 87,1 42,8 106,2 65,6 93,4

57,7 L2 10 00 88,1 35,5 105,0 66,3 94,1

L3 15 00 77,2 34,3 99,8 56,8 84,6

L4 20 00 59,5 37,0 75,6 42,1 69,9

L5 23 00 69,1 37,1 85,1 42,9 70,7

44,5 16-Mar

L6 01 00 65,0 37,4 79,3 43,2 71,0

L7 04 00 77,6 37,3 94,9 47,4 75,4

8.2 Water Quality

Summary of Water Quality Monitoring as follows:

Measurement Period A. [Construction Phase] Two Times for:

Surface Water Quality

Domestic Waste

B. [Operation & Post Operation Phase]

Every 6 months for: Surface Water Quality

Active Water Pond (Produced Water) Community Shallow Ground Water

Domestic Waste

Excess of national standard (Yes/No)

If yes, please describe the outline of planned mitigation measures.

While no complex chemicals were found within the water bodies surrounding the project, parameters such as: pH, BOD, COD and DO suffered a bit of a decline. This is most probably due to the accumulation of both natural occurences such as high movement of particles due to high rainfall rate as well as impact from construction activity. During the first half of 2019, a case of minor landslide and mudflow caused some disturbance in turbidity. PT SERD has since closed out all cases involving slope failures. High rainfall rate in SERD area is a very recurring issue. Thus, SERD aims to improve on stabilizing and preventing landslides and issues as such.

Measurement Method Indonesian National Standards (SNI) guidelines or other standards

Measurement Points

Surface Water s

Water Ponds (Active Water Ponds)

Domestic Waste Water Outlet Location

Code Location Coordinat E Coordinat NS

SW-1 Cawang Kiri River 103°24’ 41.80” 4°12’ 42.30”

SW-2 Asahan River 103°25’ 40.10” 4°12’ 08.80”

SW-3 Deduruk Lake 103°26’ 30.10” 4°12’ 09.40”

SW-4 Cawang Tengah River 103°24’ 43.90” 4°12’ 34.80”

SW-5 Endikat River 103°27’ 40.40” 4°12’ 03.50”

Quality of Surface Water Results as follows: No Paremeter Unit T.L.V SW-1 SW-2 SW-3 SW-4 SW-5

A. Physical

1 Temperature 0C Dev 3 26 25 20 25 27

2 Total Dissolved Solids mg/L 1,000 27 20 16 20 30

3 Total Suspended Solids mg/L 50 37 <2 4 15 <2

B. Chemical

1 pH - 6 - 9 5,9 5 5 5,6 5,7

2 BOD **) mg/L 2 14 9 9 10 9

3 COD **) mg/L 10 54 47 46 42 43

4 Dissolved Oxygen (DO) **) mg/L 6 2,7 3,1 4 3 3

5 Total Phosphate sbg P **) mg/L 0.2 0,08 0,06 0,05 0,05 0,06

Page 54: Environmental and Social Monitoring Report...2. Relevant Environmental Permits or Compliance Certificates 11 2.1 New Permit or Compliance Certificates Required and Obtained 11 2.2

Environment & Social Monitoring Report-1H18 Rev 1 Page 55

No Paremeter Unit T.L.V SW-1 SW-2 SW-3 SW-4 SW-5

6 Nitrate (NO -N) **) mg/L 10 0,09 0,1 0,07 0,1 0,06

7 Amonia (NH -N) **) mg/L 0.5 <0,01 <0,01 <0,01 0,07 0,08

8 Arsenic (As) mg/L 0.05 <0,005 <0,005 <0,005 <0,005 <0,005

9 Cobalt (Co) **) mg/L 0.2 <0,0007 0,004 <0,0007 0,0008 0,001

10 Barium (Ba) **) mg/L 1 0,004 0,002 0,003 0,005 0,006

11 Boron (B) **) mg/L 1 <0,02 <0,02 <0,02 <0,02 <0,02

12 Selenium (Se) mg/L 0.01 <0,002 <0,002 <0,002 <0,002 <0,002

13 Cadmium (Cd) **) mg/L 0.1 <0,0006 <0,0006 0,002 0,0008 <0,0006

14 Chromion Hexavalent (Cr VI) **) mg/L 0.05 <0,01 <0,01 <0,01 <0,01 <0,01

15 Cooper (Cu) **) mg/L 0.02 <0,005 <0,005 <0,005 <0,005 <0,005

16 Iron (Fe) **) mg/L 0.3 0,4 0,02 0,1 0,1 0,1

17 Lead (Pb) **) mg/L 0.3 <0,009 <0,009 <0,009 <0,009 <0,009

18 Manganese (Mn) **) mg/L 0.1 0,002 <0,0007 0,001 0,001 0,002

19 Mercury (Hg) mg/L 0.001 <0,0005 <0,0005 <0,0005 <0,0005 <0,0005

20 Seng (Zn) **) mg/L 0.05 0,002 0,003 0,002 0,001 <0,0006

21 Chloride (Cl) **) mg/L 600 3 1 1 1 1

22 Cyanide (CN) **) mg/L 0.02 <0,005 <0,005 <0,005 <0,005 <0,005

23 Floride (F) **) mg/L 0.5 <0,01 <0,01 <0,01 <0,01 <0,01

24 Nitrite (NO -N) **) mg/L 0.06 <0,004 <0,004 <0,004 <0,004 <0,004

25 Sulphate (SO ) **) mg/L 400 2 0,3 0,8 0,7 0,6

26 Chlorine (Cl ) **) mg/L 0.03 0,01 0,01 0,01 0,04 <0,01

27 Oil & Fat @g/L 1.000 0,2 0,2 0,2 0,2 0,2

28 Detergent (MBAS) **) @g/L 200 0,01 0,01 0,01 0,01 0,01

29 Phenol **) @g/L 1 0,001 0,001 0,001 0,001 0,001

30 Sulphide (H S) **) mg/L 0.002 <0,002 <0,002 <0,002 <0,002 <0,002

C. Microbiological

1 Fecal Coliform **) MPN/100mL 100 700 1.200 3.300 3.100 3.300

2 Total Coliform MPN/100 mL 1.000 940 1.500 4.600 4.300 4.600

Summary of Geothermal Produced Water Results as follows:

NO PARAMETER Unit T.L.V. Waterpond Mudpond

RD-B RD-C RD-E RD-I RD-L RD-M RD-C RD-E RD-I RD-L RD-M

1 Dissolved Sulfide as H2S mg/L 1 <0,002 <0,002 <0,002 <0,002 <0,002 <0,002 <0,002 <0,002 <0,002 <0,002 0,1

2 Ammonia as NH3-N mg/L 10 0,3 0,2 <0,01 0,07 <0,01 <0,01 4 2 <0,01 2 0,4

3 Total Mercury (Hg) mg/L 0,005 <0,0005 <0,0005 0,0008 0,001 <0,0005 <0,0005 <0,0005 <0,0005 <0,0005 0,007 <0,0005

4 Total Arsenic (As) mg/L 0,5 <0,005 <0,005 <0,005 <0,005 <0,005 <0,005 <0,005 <0,005 <0,005 <0,005 <0,005

5 Temperature ˚C 45 29 35 28 30 26 22 21 29 29 29 30

6 pH (insitu) **) - 6-9 6,5 8 7 7 6,2 6,4 6,4 7 6,5 9,7 11

7 Boron (B) mg/L - <0,02 68 0,3 72 0,3 2 0,9 16 20 0,5 0,04

8 Total Organic Carbon (TOC) mg/L - 5 255 44 6 25 6 3 12 15 130 9

9 Zat Padat Terlarut (TDS) mg/L - 31 3.300 775 3.180 915 94 98 976 1.262 1.581 3.640

10 Salinitas o/oo - 0 3 0,8 3 0,9 0,1 0,1 1 1 2 4

11 Minyak dan lemak mg/L - <1,8 <1,8 <1,8 <1,8 <1,8 <1,8 <1,8 <1,8 <1,8 <1,8 <1,8

12 BOD5 mg/L - 7 7 50 7 13 6 11 12 27 212 536

13 COD mg/L - 34 32 166 33 53 28 49 57 95 664 1.533

Summary of Community Shallow Ground Water Wells as follows:

Monitoring Point

Community Shallow ground water wells

Code Location Coordinat E Coordinat NS

Page 55: Environmental and Social Monitoring Report...2. Relevant Environmental Permits or Compliance Certificates 11 2.1 New Permit or Compliance Certificates Required and Obtained 11 2.2

Environment & Social Monitoring Report-1H18 Rev 1 Page 56

Monitoring Point

GW-1 Kampung Yayasan 103°27’ 21.11” 4°12’ 18.70”

GW-2 Tunggul Bute Village 103°26’ 12.63” 4°9’ 44.43”

GW-3 Camp Area SERD/ Drilling

Camp 103°25’ 56.16” 4°11’ 37.65”

Ground Water Monitoring Result

NO. PARAMETER UNIT T.L.V *) GW-1 GW-2 GW-3

A. Physics

1 Odor **) - Odorless Odorless Odorless Odorless

2 Total Suspended Solid (TDS) **) mg/L 500 29 17 42

3 Turbidity **) NTU 5 <1 2 5

4 Taste **) - Tasteless Tasteless Tasteless Tasteless

5 Temperature (insitu) **) 0C air temperature

+3 23 23 23

6 Color **) TCU 15 <1 <1 2

B. Chemical

1 Mercury (Hg) mg/L 0,001 <0,005 <0,005 <0,005

2 Arsenic (As) mg/L 0,01 <0,005 <0,005 <0,005

3 Iron (Fe) **) mg/L 0,3 <0,004 <0,004 0,02

4 Flouride (F) **) mg/L 1,5 <0,01 <0,01 <0,01

5 Cadmium (Cd) **) mg/L 0,003 0,0007 <0,0006 <0,0006

6 Calcium carbonate (CaCO3) **) mg/L 500 29 10 17

7 Chloride (Cl) **) mg/L 250 3 2 7

8 Chromium hexavalent (Cr VI) **) mg/L 0,05 <0,0006 <0,0006 <0,0006

9 Manganese (Mn) **) mg/L 0,4 0,02 0,01 0,2

10 Nitrate(NO3-N) **) mg/L 50 0,9 8 21

11 Nitrite (NO2-N) **) mg/L 3 <0,002 <0,002 <0,002

12 pH (insitu) **) - 6,5 - 8,5 6,48 6,4 6,7

13 Selenium (Se) mg/L 0,01 <0,002 <0,002 <0,002

14 Zinc (Zn) **) mg/L 3 0,003 0,02 0,02

15 Cyanide (CN) **) mg/L 0,07 <0,005 <0,005 <0,005

16 Sulphate (SO4) **) mg/L 250 6 0,6 1

17 Lead (Pb) **) mg/L 0,01 <0,009 <0,009 <0,009

18 Detergent (MBAS) **) mg/L 0,05 <0,01 <0,01 <0,01

19 Potassium permanganate (KMnO4) **) mg/L 10 2 3 4

C. Microbiology

1 Total Coliform **) MPN/100ml 0 0 0 0

8.3 Wastes

Summary of Waste monitoring as follows:

Measurement Period [Construction Phase]

Two times

[Operation & Post Operation Phase]

Every 6 months

Any concerns and measures taken:

No concerns.

Measurement Method Calculation of Waste quantity:

Liquid Domestic Waste

Based on Ministry of Environment and Forestry Regulation No. 68/2016

Page 56: Environmental and Social Monitoring Report...2. Relevant Environmental Permits or Compliance Certificates 11 2.1 New Permit or Compliance Certificates Required and Obtained 11 2.2

Environment & Social Monitoring Report-1H18 Rev 1 Page 57

Solid Waste

Solid Industrial Waste quantity

Solid Domestic Waste quantity

Hazardous Waste sent to Licensed Hazardous Waste Treatment Facility Company

Measurement Points 1. Outlets of Domestic Waste Water Treatment from accommodation area

2. Solid Waste

-Solid Industrial Waste Collection Area

-Solid Domestic Waste Collection Area

3. Temporary Storage of Hazardous Waste

Summary of Solid Waste Monitoring as follows:

Type Type of Waste Parameter/ Unit Measurement Result Remarks

Solid Industrial

Waste Collecting

Area

Metal Industrial

Waste Weight/Tones 20 (estimated)

Metal industrial waste is

kept in warehouse open

yard area. As per

information from Site

Support, it will be auctioned

in the end of perforated

drilling pipes.

Non Metal Industrial

Waste Weight/Kg 100 (estimated)

Non metal industrial waste

mostly produced during

office moved and

accomodation camp

construction. Most of it still

can be reused for another

purpose, like build the

storage, shelter etc.

Solid Domestic

Waste Collecting

Area Domestic Waste

Sent to Government

Facility/ Trip 20

Domestic waste of PT SERD

is sent to TPA (final disposal)

Lahat every week. February

until June = 20 trip.

Summary of Hazardous Waste Monitoring as follows:

Type Parameter/Unit Measurement Result Remarks Waste Oil / Oily Waste Quantity/Kg 2000

On 24 July 2019, all hazardous waste at

SERD site were already transported by

certified transporter to be annihilated

(see attached)

Used oil filter Quantity/Kg 170 Used Accu Quantity/Kg 120

Used pain can Quantity/Kg 18

Medical Waste Quantity/Kg 4

8.4 Erosions

Summary of Erosions Monitoring as follows:

Measurement Period [Construction Phase] Two Times

[Operation Phase]

Any concerns and measures taken:

The first half of 2019 still had a high rate of rainfall. High rainfall activity caused erosion and landslide to occur during the month

Page 57: Environmental and Social Monitoring Report...2. Relevant Environmental Permits or Compliance Certificates 11 2.1 New Permit or Compliance Certificates Required and Obtained 11 2.2

Environment & Social Monitoring Report-1H18 Rev 1 Page 58

Every 6 months of January. Rekind-FE’s failure to provide proper mitigation efforts caused some problems with regards to mud control/water turbidity. As of now corrective actions have been in place and is continuously being implemented.

Measurement Method Land erosion measurement using small square method,

Rainfall measurement

Measurement Points Areas prone to erosion along access road, wellpad, and geothermal power plant area

8.5 Water Flow

Summary of Water Flow Monitoring as follows:

Measurement Period [Construction Phase] Two Times

[Post Operation Phase] Every 6 months

Any concerns and measures taken:

Water flow is maintained regularly. Use of drainage systems, sediment traps, settling ponds and cloth screen are regularly implemented to preserve water flow and quality. Despite some issues with high rainfall activity resulting in difficulties in turbidity/mud control, SERD and EPC-C continued their efforts to improve water flow.

No issues were encountered with domestic waste water monitoring.

Measurement Method Sediment charge sampling in inlet and outlet of the catch pond, and laboratory analysis for Total Suspended Solids (TSS) using SNI 06-6989.3-2004 method, as well as determine the effectiveness of catch ponds.

Measurement Points Please attach map(s) showing monitoring points including following locations:

Sediment loads from well pads of PLTP project sites,

Inlet and outlet of the catchpond, representing sediment that can be managed.

Page 58: Environmental and Social Monitoring Report...2. Relevant Environmental Permits or Compliance Certificates 11 2.1 New Permit or Compliance Certificates Required and Obtained 11 2.2

Environment & Social Monitoring Report-1H18 Rev 1 Page 59

Summary of Domestic Waste Water Monitoring as follows:

No. Parameter Unit Threshold* Results from WTP Outlet

A. Physical

1 Turbidity NTU 25 2

2 Color Pt-Co 50 7

3 TDS mg/L 1.000 9

4 Temperature (insitu) °C Temperature ± 3

°C 24

5 Taste - No Taste No Taste

6 Odour (insitu) - No Odour No Odour

B. Chemical

1 pH (insitu) - 6,5 – 8,5 7,3

2 Fe mg/L 1 0,04

3 F mg/L 1,5 <0,01

4 CaCO3 mg/L 500 4

5 Mn mg/L 0,5 <0,0007

6 NO3-N mg/L 10 <0,05

7 NO2-N mg/L 1 <0,004

8 CN mg/L 0,1 <0,005

9 MBAS mg/L 0,05 0,01

10 Hg mg/L 0,001 <0,0005

11 As mg/L 0,05 <0,005

12 Cd mg/L 0,005 <0,0006

13 Cr VI mg/L 0,05 <0,01

14 Se mg/L 0,01 <0,002

15 Zn mg/L 15 0,003

16 SO4 mg/L 400 0,7

17 Pb mg/L 0,05 <0,009

18 KMnO4 mg/L 10 4

C. Microbiological

1 Total Coliform CFU/100 mL 50 35

2 E. coli CFU/100 mL 0 0

Peraturan Menteri Kesehatan RI No. 32 Tahun 2017 Lampiran I Bab II A

8.6 Aquatic Biota

Summary of Aquatic Biota Monitoring as follows:

Measurement Period [Construction Phase] Two times

[Operation & Post Operation Phase] Every 6 months

Any concerns and measures taken:

No concerns, plesase see results of Aquatic biota survey below.

Measurement Method Data analysis of number of types, composition, abundance, and diversity of plankton and benthos

Measurement Points

1. Code Location Coordinat E Coordinat NS

SW-1 Cawang Kiri River 103°24’ 41.80” 4°12’ 42.30”

SW-2 Asahan River 103°25’ 40.10” 4°12’ 08.80”

SW-3 Deduruk Lake 103°26’ 30.10” 4°12’ 09.40”

SW-4 Cawang Tengah River 103°24’ 43.90” 4°12’ 34.80”

SW-5 Endikat River 103°27’ 40.40” 4°12’ 03.50”

Page 59: Environmental and Social Monitoring Report...2. Relevant Environmental Permits or Compliance Certificates 11 2.1 New Permit or Compliance Certificates Required and Obtained 11 2.2

Environment & Social Monitoring Report-1H18 Rev 1 Page 60

Phytohoplankton:

SW-1 SW-2 SW-3 SW-4 SW-5

Density (Ind/m2) 32 30 6 32 32

Number of taxon 7 6 3 5 11

Diversity index 2,60 2,21 1,58 1,67 3,25

Uniformity index 0,93 0,85 1,00 0,72 0,94

Zooplankton: SW-1 SW-2 SW-3 SW-4 SW-5

Density (Ind/m2) 22 28 28 26 32

Number of taxon 8 9 6 5 11

Diversity index 2,91 3,04 2,45 1,99 3,33

Uniformity index 0,97 0,96 0,95 0,86 0,96

Benthos: SW-1 SW-2 SW-3 SW-4 SW-5

Density (Ind/m2) 29 29 290 58 29

Number of taxon 1 1 4 1 1

Diversity index 0,00 0,00 1,76 0,00 0,00

Uniformity index 0,00 0,00 0,88 0,00 0,00

8.7 Flora / Fauna

Summary of Flora / Fauna Monitoring as follows:

Measurement Period [Construction Phase] Two times

[Post operation Phase] Every 6 months

Any concerns and measures taken:

Flora and fauna monitoring is done on a regular basis. Camera traps, fauna sightings, and and flora inventory is done prior to land clearing for wellpads. Currently regular monitoring is done by installation of camera traps as well as 6 monthly study by PT Radiant Utama (RKL-RPL consultant).

Measurement Method Data collection method through Inventory /direct observation of the area to be cleared and re-vegetated.

Data analysis through vegetation analysis.

Measurement Points

1. Code Location Coordinat E Coordinat NS

FF-1 PLTP Facility Area 103°25’ 28.50” 4°11’ 42.87”

FF-2 Wellpad B 103°24’ 25.42” 4°12’ 36.82”

FF-3 Shortcuts Area 103°24’ 33.94” 4°11’ 35.38”

FF-4 Wellpad D 103°23’ 25.25” 4°12’ 8.31”

FF-5 IP-1 103°24’ 11.74” 4°10’ 37.12”

FF-6 Wellpad I 103°21’ 39.43” 4°13’ 42.91”

Table of Land Cover at Sampling Location

No Tutupan lahan Lokasi

FF-1 FF-2 FF-3 FF-4 FF-5 FF-6

1 Forest + + + + +

Page 60: Environmental and Social Monitoring Report...2. Relevant Environmental Permits or Compliance Certificates 11 2.1 New Permit or Compliance Certificates Required and Obtained 11 2.2

Environment & Social Monitoring Report-1H18 Rev 1 Page 61

2 Moor/ field +

3 Mixed Garden + +

4 Coffe Plantation + + +

5 Scrub + + + + +

Table Flora Inventarization Result in All Area Semester 1 Year 2018

No Latin Name FF-1 FF-2 FF-3 FF-4 FF-5 FF-6 IUCN

1 Quercus sp ++ + + + + LC

2 Quercus sundaica + LC

3 Ficus gibbosa + LC

4 Dilleniaceae + ++ ++ + -

5 Dacrycarpus imbricatus ++ ++ +++ + LC

6 Cinnamomum spp + VU

7 Litsea spp + + VU

8 Podocarpus neriifolia + LC

9 Schima spp ++ ++ ++ ++ ++ LC

10 Litsea spec + VU

11 Neolamaerckia spp ++ ++ -

12 Scorodocarpus ++ -

13 Toona spp + LC

14 Cyathea contaminans ++ + ++ LC

15 Exbucklandia sp + + -

16 Ochthocharis bornensis + -

17 Litsea sp + + LC

18 Alstonia spp + + + LC

19 Santiria spp ++ LC

20 Myrtaceae + -

21 Mimosa + ++ LC

22 Lantana camara ++ LC

23 Macaranga + + + VU

24 Piper spp + -

25 Melastoma ++ LC

26 Glichenia linearis ++ + ++ -

27 Imperata cylindrica ++ ++ ++ -

28 Dillenia + -

29 Bambusa ++ LC

30 Mollotus + + -

31 Vatica + ++ ++ -

32 Vitex pubescens + -

33 Hopea + VU

34 Intsia + VU

35 Cassia alata + -

36 Litsea + LC

37 Artocarpus elastica + + -

38 Dryobalanops + ++ + LC

39 Dioscorea + LC

40 Hopea sp + VU

41 Cyperus + LC

42 Eugenia + -

43 Peronema canescens + -

44 Hibiscus sp + -

45 Lagerstroemia speciosa + -

46 Pithecellobium jiringa + -

47 Syzygium zolingeriana + -

48 Cofea spp + +++ -

49 Musa spp + ++ LC

50 Cocos nucifera + + -

51 Mangifera spp + LC

52 Albizia chinensis + + LC

Page 61: Environmental and Social Monitoring Report...2. Relevant Environmental Permits or Compliance Certificates 11 2.1 New Permit or Compliance Certificates Required and Obtained 11 2.2

Environment & Social Monitoring Report-1H18 Rev 1 Page 62

No Latin Name FF-1 FF-2 FF-3 FF-4 FF-5 FF-6 IUCN

53 Cordyline + -

54 Manihot esculenta + + -

55 Hibiscus tiliaceus + + -

56 Disambiguasi + -

57 Pterospermum sp + -

358 Nephelium lappaceum + LC

549 Antidesma neurocarpum + -

605 Litsea spathulata + -

616 Casuarina spp + ++ + ++ -

62 Litsea ++ ++ ++ ++ LC

63 Pennisetum purpureum +++ ++ LC

64 Moducha spp + + -

65 Meliaceae + -

66 Cinnamomum spp + -

67 Styrax + LC

68 Eugenia sp + + + -

69 Lithocarpus + + + + + -

70 Syzygium + -

71 Neobalanocarpus + -

72 Pogostemon cablin + -

73 Litsea firma + LC

74 Macaranga spp + VU

75 Ficus spp ++ ++ VU

76 Schima ++ + ++ -

Table Ecological value of plant communities in the PT SERD work area in semester 1 of 2018

No Ecology Value FF-1 FF-2 FF-3 FF-4 FF-5 FF-6

Tree Sapling Tree Sapling Tree Sapling Tree Sapling Tree Sapling Tree Sapling

1 Number of Type 9 14 18 21 13 13 12 16 12 16 5 9

2 Number of Individu 15 26 37 48 30 30 26 25 21 25 8 19

3 Density 93,75 650 231,25 1200 187,5 750 75 625 131,25 625 50 475

4 Diversity 2,14 2,37 2,69 2,56 2,42 2,36 2,32 2,60 2,40 2,68 1,77 2,17

5 Uniformity 0,97 0,90 0,93 0,84 0,94 0,92 0,93 0,94 0,97 0,97 1,09 0,99

Vegetation analysis at PLTP locations (FF1)

N

o Local Name latin Name

Tree sapling

FR KR DR NP FR KR DR NP

1 Medang cabe Litsea spp 8,70 6,67 7,10 22,47 8,33 16,67 5,78 30,78

2 Medang

putih

Litsea sp 13,0

4 10,0 10,25 33,29 4,17 3,33 2,10 9,60

3 Pasang babi Quercus sp 4,35 10,0 5,20 19,55 4,17 3,33 1,80 9,30

4 Lengkanai Dacrycarpus

imbricatus

13,0

4 13,33 30,10 56,47 8,33 6,67 15,15 30,15

5 Kapas Exbucklandia

sp 4,35 6,67 7,25 18,27

6 Seru Schima spp 17,3

9 13,33 9,25 39,97 12,5 13,33 12,30 38,13

7 Kelat Dilleniaceae 13,0

4 13,33 9,75 36,12 12,5 10,0 9,10 31,60

8 Kapur Dryobalanops 4,35 6,67 4,15 15,17 4,17 3,33 6,35 13,85

9 Medang

cantik

Litsea spp 4,35 6,67 2,75 13,77 8,33 6,67 25,17 40,17

10 Pasang Quercus

sundaica 4,35 3,33 4,10 11,78 4,17 3,33 2,75 10,25

11 Temalun Hopea sp 4,17 3,33 3,10 10,16

12 Pakis tiang Cyathea 12,5 10,0 6,20 28,70

Page 62: Environmental and Social Monitoring Report...2. Relevant Environmental Permits or Compliance Certificates 11 2.1 New Permit or Compliance Certificates Required and Obtained 11 2.2

Environment & Social Monitoring Report-1H18 Rev 1 Page 63

contaminans

13 Medang

perangwas - 4,35 3,33 3,25 10,93

14 Cemara

gunung - 4,35 3,33 3,75 11,43

15 Sapat - 8,33 13,33 9,15 30,81

16 Kirinyuh - 8,33 6,67 1,05 16,05

17 Asam-asam - 4,35 3,33 3,10 10,78

Notes:

FR = Relative Frequency;

KR= Relative Density;

DR= Relative Dominance;

NP: Important Value

Vegetation analysis at Wellpad B (FF-2)

No Local Name Latin Name Tree sapling

FR KR DR NP FR KR DR NP

1 Kelat Dilleniaceae 6,67 9,52 27,10 43,29 5,0 4,0 3,10 12,10

2 Kelat arang/medang Sp-1 20,0 14,29 18,15 52,44 5,0 8,0 4,70 17,70

3 Pasang Quercus sundaica 6,67 9,52 5,70 21,89 5,0 8,0 6,60 19,60

4 Bekegung Sp-2 13,33 14,29 5,10 32,72 5,0 4,0 5,10 14,10

5 Pasang babi Quercus sp 6,67 4,76 3,15 14,58 5,0 4,0 4,75 13,75

6 Medang sirei Litsea spec 6,67 4,76 6,75 18,18 5,0 4,0 3,80 12,80

7 Punggung kijang Scorodocarpus 6,67 4,76 6,28 17,71 5,0 4,0 4,45 13,45

8 Jambu-jambu Myrtaceae 6,67 4,76 3,10 14,53 5,0 4,0 10,15 19,75

9 Seru Schima spp 6,67 19,05 13,15 38,87

10 Seru berubah/medang gatalSchima Schima Litsea 6,67 4,76 5,10 16,53

11 Jabon Neolamaerckia spp 5,0 12,0 4,15 21,15

12 Cengkelung/angrum/cendelung Sp-3 15,0 12,0 18,50 45,50

13 Sapat Vatica 10,0 8,0 11,69 29,69

14 Mahang d kecil Macaranga 6,67 4,76 3,20 14,63 5,0 4,0 4,12 13,12

15 Sengon Albizia Chinensis 6,67 4,76 3,22 14,65 10,0 8,0 6,10 24,10

16 Sikejut - 5,0 4,0 4,79 13,79

17 Anggrum - 5,0 8,0 4,25 17,25

18 Tilam - 5,0 4,0 3,15 12,15

Notes:

FR = Relative Frequency;

KR= Relative Density;

DR= Relative Dominance;

NP: Important Value

Vegetation analysis at Shortcut (FF-3)

No Local Name Latin Name Tree sapling

FR KR DR NP FR KR DR NP

1 Kelat Dilleniaceae 20,00 20,00 12,5 52,5 5,00 3,85 9,30 18,15

2 Pasang putih Quercus sundaica 20,00 20,00 28,18 68,18

3 Surian - 5,67 5,67 12,10 10,55 15,00 15,38 8,15 48,53

4 Bekulung Sp-1 5,67 5,67 10,55 21,89 10,00 7,69 5,25 22,94

5 Cemara gunung Casuarina spp 20,00 20,00 18,15 58,15 5,00 7,69 10,20 22,89

6 Pasang babi Quercus sp 5,67 5,67 8,10 19,44

7 Medang basah Litsea 5,67 5,67 4,70 16,04

8 Cendelung Sp-2 5,67 5,67 3,28 14,62 15,00 11,54 19,70 46,24

9 Seru Schima spp 5,67 5,67 2,65 13,99 5,00 7,69 9,15 21,84

10 Medang cabe Litsea spp 5,00 3,85 3,10 11,95

11 Sapat Vatica 15,00 15,38 25,30 55,68

12 Pisang - 5,00 7,69 2,15 14,84

13 Anggrum - 10,00 11,54 3,15 24,69

14 Merdeka - 10,00 7,69 3,45 21,14

Page 63: Environmental and Social Monitoring Report...2. Relevant Environmental Permits or Compliance Certificates 11 2.1 New Permit or Compliance Certificates Required and Obtained 11 2.2

Environment & Social Monitoring Report-1H18 Rev 1 Page 64

Notes:

FR = Relative Frequency;

KR= Relative Density;

DR= Relative Dominance;

NP: Important Value

Vegetation analysis at Wellpad D (FF-4)

No Local Name Latin Name Tree sapling

FR KR DR NP FR KR DR NP

1 Kelat Dilleniaceae 5,26 7,69 9,35 22,3 5,26 4,0 8,10 17,36

2 Seru Schima spp 15,79 15,38 15,10 46,27 5,26 8,0 7,20 20,46

3 Lengkanai Dacrycarpus imbricatus 15,79 15,38 12,05 43,22 5,26 8,0 8,40 21,16

4 Pasang babi Quercus sp 10,53 11,54 11,05 33,12 5,26 4,0 3,50 12,76

5 Cemara gunung Casuarina spp 5,26 3,85 4,60 13,71 5,26 4,0 4,15 13,41

6 Medang putih Litsea sp 10,53 19,23 23,75 53,51 5,26 4,0 2,10 11,36

7 Kelat arang Sp-1 10,53 7,69 4,80 23,02 5,26 4,0 1,18 10,44

8 Punggung

kijang

Scorodocarpus 5,26 3,85 3,70 12,81 10,53 8,0 8,10 26,63

9 Balam Palaquium 5,26 3,85 3,80 12,91

10 Bernai Antidesma

neurocarpum

5,26 3,85 4,20 13,31

11 Sapat Vatica 10,53 12,0 30,25 52,78

12 Paku tiang Sp-3 10,53 20,0 10,20 40,73

13 Tilam Sp-4 5,26 4,0 2,60 11,86

14 Medang cabe Litsea spp 5,26 3,85 3,50 12,61 5,26 4,0 2,10 11,38

15 Pasang Quercus sundaica 5,26 3,85 4,10 13,21 5,26 4,0 2,25 11,51

16 Asam-asam Santiria spp 5,26 4,0 1,85 11,11

17 Kirinyuh - 5,26 4,0 3,12 12,38

18 Balik angin - 5,26 4,0 4,90 14,16

Notes:

FR = Relative Frequency;

KR= Relative Density;

DR= Relative Dominance;

NP: Important Value

Vegetation analysis at IP-1 (FF-5)

No Local Name Latin Name Tree sapling

FR KR DR NP FR KR DR NP

1 Cemara gunung Casuarina spp 14,29 12,50 25,75 52,54

2 Seru Schima spp 28,52 37,53 25,15 91,25 13,33 10,53 15,75 39,61

3 Pasang Quercus sundaica 28,52 25,20 20,25 73,62 6,67 5,26 5,15 17,08

4 Cendelung Sp-1 6,67 15,79 17,25 39,71

5 Semantung Sp-2 13,33 10,53 20,10 43,96

6 Bamboo betung Bambusa 6,67 5,26 5,10 17,03

7 Kayu manis - 13,33 15,79 10,75 39,87

8 Cempedak - 14,29 12,50 18,75 45,54

9 Kirinyuh - 13,33 10,53 10,15 34,01

10 Anggrum - 13,33 15,79 7,12 36,17

11 Lengkanai - 14,29 12,50 15,10 41,89

12 Mahang daun

kecil -

13,33 10,53 8,70 32,56

Notes:

FR = Relative Frequency;

KR= Relative Density;

DR= Relative Dominance;

NP: Important Value

Vegetation analysis at Wellpad I (FF-6)

Page 64: Environmental and Social Monitoring Report...2. Relevant Environmental Permits or Compliance Certificates 11 2.1 New Permit or Compliance Certificates Required and Obtained 11 2.2

Environment & Social Monitoring Report-1H18 Rev 1 Page 65

No Local

Name Latin Name

Tree sapling

FR KR DR NP FR KR DR NP

1 Kelat Dilleniaceae 3,70 5,41 4,25 13,36 3,23 2,08 3,75 9,06

2 Kenari Canarium

ovatum

14,81 13,51 17,98 46,3 3,23 2,08 5,10 10,41

3 Lengkanai Dacrycarpus

imbricatus

14,81 13,51 22,15 51,47 3,23 8,33 9,20 20,76

4 Seru Schima spp 11,11 18,92 22,48 52,51 9,68 25,00 15,30 49,98

5 Medang

cabe

Litsea spp 3,70 2,70 2,10 8,50 12,90 8,33 3,15 24,38

6 Punggung

kijang

Scorodocarpus 7,41 5,41 4,15 16,97 6,45 4,17 7,10 17,72

7 Medang

cantik

Litsea 3,70 2,70 1,13 7,53 6,45 14,58 10,15 31,18

8 Cemara

gunung

Casuarina spp 3,70 2,70 1,18 7,58 3,23 2,08 3,10 8,41

9 Simpur Dillenia 3,70 5,41 5,10 14,21 6,45 4,17 6,75 17,37

10 Asam-

asam

Santiria spp 3,70 5,41 1,75 10.86 3,23 2,08 4,10 9,41

11 Medang

pelawas

Cinnamomum

spp

3,70 2,70 2,10 8,50 3,23 2,08 3,15 8,46

12 Pasang Quercus sundaica 3,70 2,70 1,25 7,65 3,23 2,08 4,10 9,41

13 Kayu aro Ficus gibbosa 3,70 2,70 2,30 8,70 3,23 2,08 3,25 8,56

14 Pasang

babi

Quercus sp 3,70 2,70 3,55 9,96 3,23 2,08 2,15 7,46

15 Medang

putih

Litsea sp 3,70 5,41 2,18 11,29 3,23 2,08 2,30 7,61

16 Balam Sp-1 3,70 2,70 3,35 9,75

17 Cengal Dipterocarpaceae 3,70 2,70 2,75 9,15

18 Kapur Dryobalanops 3,70 2,70 2,63 9,03 3,23 2,08 2,10 7,41

19 Balik

angin

Mollotus 6,45 4,17 2,35 12,97

20 Jabon Neolamaerckia

spp

6,45 4,17 2,75 13,37

21 Pakis

tiang

Sp-3 3,23 2,08 2,85 8,16

22 Sikejut - 3,23 2,08 3,70 9,01

23 Mahang - 3,23 2,08 3,60 8,41

Notes:

FR = Relative Frequency;

KR= Relative Density;

DR= Relative Dominance;

NP: Important Value

Important Value Index distribution> 15% at the level of trees and saplings

No Local name Spacies Latin Name

FF-1 FF-2 FF-3 FF-4 FF-5 FF-6

tree saplin

g tree sapling tree sapling tree

saplin

g tree

saplin

g tree sapling

1 Medang cabe Litsea spp 6 5 3

2 Medang putih Litsea sp 1 4 3

3 Pasang babi Quercus sp 6 2 7 6

4 Lengkanai Dacrycarpus imbricatus 3 3 1 3 1 4

5 Kapas Exbucklandia sp 3 6

6 Seru Schima spp 6 1 2 1 4 2 1 2 1 4 5

7 Kelat Dilleniaceae 3 5 5 5 4 5 1

8 Kapur Dryobalanops 9 8

9 Medang cantik Litsea sp 2 9 2

10 Pasang Quercus sundaica 1 5 8

11 Pakis tiang Sp-1 2 - 6

12 Sapat Vatica 1 1 - 7 1

Page 65: Environmental and Social Monitoring Report...2. Relevant Environmental Permits or Compliance Certificates 11 2.1 New Permit or Compliance Certificates Required and Obtained 11 2.2

Environment & Social Monitoring Report-1H18 Rev 1 Page 66

No Local name Spacies Latin Name

FF-1 FF-2 FF-3 FF-4 FF-5 FF-6

tree saplin

g tree sapling tree sapling tree

saplin

g tree

saplin

g tree sapling

13 Kelat arang Syzygium 6 2

14 Beke Sp-2 5 3 7

15 Punggung kijang Scorodocarpus 7 3 4 5 5

16 Medang sirei Litsea spec 5

17 Kelat gulandah Syzygium 6

18 Seru berubah Schima spp 6

19 Cengkelung/angrum/bangkirai Sp-3 2 3 2

20 Sengon Albizia chinensis 3

21 jabon Neolamaerckia spp 4

22 Mahang d kecil Macaranga 6

23 Cemara gunung Casuarina spp 2 4 2 7 6

24 Simpur Dillenia 4

25 Surian Disambiguasi 4 3

26 Medang basah Litsea 7

27 Semantung Sp-4 1

28 Bamboo betung Bambusa 4

Page 66: Environmental and Social Monitoring Report...2. Relevant Environmental Permits or Compliance Certificates 11 2.1 New Permit or Compliance Certificates Required and Obtained 11 2.2

Environment & Social Monitoring Report-1H18 Rev 1 Page 67

9. Permit Compliance

9.1. Compliance with AMDAL Documents

Summary of AMDAL Document compliance as follows:

Monitoring Item Monitoring Results during Report Period

Conditions attached to AMDAL

approval (Conditions shown in

the Articles of AMDAL Approval

letter dated 15 March 2017)

1. Please confirm if you have achieved all conditions attached to AMDAL approval. : [Yes / No]

2. Describe the situation and measures taken if delays/complications in implementation of the

conditions/obligations are identified.

AMDAL Approval has been obtained.

9.2. Compliance with Environmental Permit

Summary of environmental permit compliance as follows:

Name Competent Authority Status

Permit for B3 Waste

Temporary Storage (Izin

Tempat Penyimpanan

Sementara Limbah B3)

Regent of Muara Enim

(Bupati Muara Enim)

Has the permit been approved/ issued? : Yes / No

If "Yes", please provide the approved/issued date (17/Nov/2014). Please

also submit a copy of the permit together with this monitoring form. (See :

Attachment : PT SERD Surat Izin TPS B3)

If "No", please provide the expected approval/issuance date

(DD/MM/YYYY).

Any issues regarding

Monitoring Item mentioned

above

Reasons/Background

Information

No

Measures: -

Page 67: Environmental and Social Monitoring Report...2. Relevant Environmental Permits or Compliance Certificates 11 2.1 New Permit or Compliance Certificates Required and Obtained 11 2.2

Environment & Social Monitoring Report-1H18 Rev 1 Page 68

10.Biodiversity Action Plan Summary

Summary of Biodiversity Action Plan as follows:

Monitoring & Action Item Monitoring Results during Report Period

Completion of Biodiversity Action PlanHas Biodiversity Action Plan (BAP)(including Supplemental Report) been completed? : Yes/No

If "Yes", please provide the information of the completion date. (9 Jan 2018)

Please submit a copy of the final BAP together with this monitoring form and share the

information about the modified contents from the draft plan that is issued on 16 January 2018.

If "No", please provide the expected completion date of the final BAP: MM/YYYY.

For each action item detail the actions taken and the current status and outcomes.

BAP document has been finalized in 2018. Please see the table below for action plan status.

Impacts on biodiversity in/around the

project siteAre there any problems regarding impacts on biodiversity pointed out by the National / Local

authority? Yes/No

If yes, please describe the outline of the problems and measures taken.

Any issues regarding Monitoring Item

mentioned above

・Reasons / Background Information Mitigation Measures

No any issue - -

10.1 Biodiversity Action Plan Details

BAP actions Status

No Action Plan Status Date

1 Appoint a Site Support Manager to supervise SHE aspects at site

Franky Tungka has been

apointed as a Site Support

Manager

During Pre-construction

phase (as KTPB 30 Nov 2017).

To be replaced by Ridha

Mulia.

2 Implement adaptive management measure Establishing site specific

procedure

Site Specific Procedures are

constantly updated (as

necessary).

3 Develop protocols for the management of injured wildlife Done -

4 Establish an incident reporting mechanism Done -

5 Identification of Wildlife Crossing Points

Installation of Camera

traps and hourly

manpower to observe

Upon discovery, none have

been identified so far

6 Assess the need for the installation of artificial crossing for

endangered arboreal mammals

No wildlife crossing has

been identified to

intersect with project

roads

-

7 Conduct a flora and fauna survey prior to construction of wellpad Done by Rekind and

Sriwijaya University

6 times during pre-

construction before land

clearing

8 Wildlife shepherding activities Have already been

socialized to company -

Page 68: Environmental and Social Monitoring Report...2. Relevant Environmental Permits or Compliance Certificates 11 2.1 New Permit or Compliance Certificates Required and Obtained 11 2.2

Environment & Social Monitoring Report-1H18 Rev 1 Page 69

employees

9 Ensure clearing has been limited to the identified area Done by project and EPC

Contractor -

10 Brief all involved personnel on wildlife shepherding activities

Procedure has been

socialized to company

employees

During induction of

employees

11 Establish a site nursery Established near Wellpad

C area

Since exploration phase

12 Develop a comprehensive Offsite Biodiversity Offset Design Done by ERM -

13 Conduct a water extraction pre-feasiblity assessment Conducted by FODD -

14 Collect native flora seed before land clearance Conducted by Site SHE

Prior to land clearing (Seeds

used for nursery

establishment and

revegetation programs)

15 Local community engagement to raise awareness of the conservation

value of forest

Socialization on forestry

management protection

(signs, campaign, etc.)

On a regular basis (installation

of signs, community outreach

and campaigns are done as

necessary)

16 Undertake daily monitoring of PT SERD access roads to secure them

from poaching activity

Joint patrols with local

forestry police -

17 Company drivers to receive internal defensive driving training Done on a regular basis On a regular basis (See

schedule in attachment 5)

18 Conduct speed check Done on a regular basis On a regular basis (See

attachment 2)

19 Lighting management

Will be conducted during

drilling/construction

activities

Will be conducted during

drilling/construction activities

20 Ensure night works will not disturb wildlife

SERD SHE and Re-FE SHE

have been conducting

surveys, socialisation with

workers and nearby

settlers, creating signs,

award campaigns,

discussions, etc. to ensure

the sucess of

Conducted and monitored by

Site SHE on a regular basis

21 Conduct regular monitoring of flora and fauna in Project areas

22 All construction personnel and PT SERD staff will undertake

biodiversity awareness training

23 Put up and maintain information posters and literature on ecological

awareness

24 Monitor compliance with PT SERD environmental protection policy

25 Monitor construction areas for signs of potential wildlife conflict,

illegal logging and poaching

26 Workers to be trained in noise-reduction behaviours

A number of workers and

SHE personel equiped

with Noise detectors

Conducted and monitored by

Site SHE on a regular basis

27 Crossing points/ arboreal crossing bridge is retained in good functional

condition

Will be installed if

necessary. None wildlife

crossing has been

identified.

If necessary. Will be

reassessed

28 Measure long term population changes and trends for key species

Camera traps and fauna

sightings have been

recorded for future

habitat databse mapping

In progress. Will be reassesed

with experts in the future

29 Consultation relevant stakeholders to determine the composition and

type of planting to be achieved

Consultation with local

and provincial forestry

agencies

On a regular basis (The

approval process requires

input from the forestry

agency)

30 Develop a community based forest restoration project

Community will be

engaged during forestry

restoration project

-

31 Install warning signs regarding hunting and poaching at the border of

the buffer area of the Protection Forest.

Several have been

installed. Will be a

continuous effort and

additional signs will be

added if necessary

-

32 Establish a communication system with the local forestry office and PT SERD has a routine -

Page 69: Environmental and Social Monitoring Report...2. Relevant Environmental Permits or Compliance Certificates 11 2.1 New Permit or Compliance Certificates Required and Obtained 11 2.2

Environment & Social Monitoring Report-1H18 Rev 1 Page 70

report illegal hunting / logging. patrol not only with local

forestry agency but also

with Provincial forestry

agency

33 Develop and update habitat mapping database Will be conducted every 3

years -

34 Construct security gates to restrict access of vehicle

Already installed in several

areas: Near Warehouse

and after shortcut area

-

35 Conduct regular patrols of the project boundary

Regularly conducted by PT

SERD security, and often

accompanied by local and

provincial forestry agency

On a regular basis (latest

being in April 2019)

36 Conduct regular drone flight On a regular basis On a weekly basis

37 Conduct invasive species survey of WP-L,M,N and X and injection brine

pipeline route.

Has been conducted prior

land clearing -

38 Educate local people and restrict clearing by local people

PT SERD has routine

socialization not only with

local forestry agency but

also with provincial

forestry agency

Is done as necessary. Regular

consultations are done

between PT SERD Biodiversity

manager with local forestry

on a daily/weekly basis.

39 Interviews with local people on their ecosystem service use within

Project Area and AoI Has been Done by ERM -

40 Monitor land clearing and assess feasibility of providing alternative

income

Not Necessary due to the

project’s location being

within protection forest

and no one is technically

allowed to settle in the

area. However, upon

reports, social team will

support and assess the

situation.

Will be assessed by for social

census for the offset program

10.2 Biodiversity (endangered species) Summary of Biodiversity (endangered species) Monitoring as follows:

Measurement Period [Construction Phase] Regularly (At least every 3 years)

[Operation Phase] Regularly (At least every 3 years)

Any concerns and measures taken:

Plenty of actions are taken on such as Direct Observations by workers at SERD project area and recording them, camera trap installation and data

logging on a monthly basis, as well as surveys prior to land clearing for wellpad purposes. Measurement Method Direct observation

Camera Trap

Measurement Points Number of locations will be determined later based on analysis of the observation data. The below are the previous

locations during biodiversity study.

Fauna Monitoring Result Semester 2 Year 2018

No Local Name Scientific Name

Location

Status IUCN

WP-B Power

Station WP-I

Access

Road WP-D IP-i Shortcut

A MAMALIA

1 Bear Helarctos malayanus + - - + - - P VU

2 Deer Cervidae unicolor + - + - - P VU

3 Monkey Macaca fascicularis + + + + + - LC

4 Beruk Macaca nemestrina + + + - - VU

Page 70: Environmental and Social Monitoring Report...2. Relevant Environmental Permits or Compliance Certificates 11 2.1 New Permit or Compliance Certificates Required and Obtained 11 2.2

Environment & Social Monitoring Report-1H18 Rev 1 Page 71

No Local Name Scientific Name

Location

Status IUCN

WP-B Power

Station WP-I

Access

Road WP-D IP-i Shortcut

5 Chimpanzee Presbytis melalophos + + - + - + P EN

6 Boar Sus scrofa + + + + + + LC

7 Siamang Symphalangus

syndactylus.

+ + + + + P EN

8 Weasel Mustela nivalis + - - + - - LC

9 Mountain Cat Felis (Prionaliurus)

spp

+ - + - - - P LC

10 Bat + - + - - - LC

B HERPETOFAUNA

1 Lizard Mabouya sp + + + + + + LC

2 Monitor Lizard Varanus salvator + - - - - - LC

3 Ular sendok Naja sp + + + + - - LC

4 Ular tikus - - + - - - LC

C AVES

1 Cinenen gunung Orthotomus cuculatus + + + + - + LC

2 Prenjak Prinia atrogularis + - + - + + LC

3 Tekukur Streptopelia chinensis + - - - + - LC

4 Layang-layang Hirundo tahitica + + + + + + LC

5 Butbut Centropus sinensis + + - + - - LC

6 Cekakak Todirhamphus chloris + + + + - + P LC

7 Burung madu

belukar

Hypogramma sp + - + - - - P LC

8 Srigunting Dicrurus + - + + - + LC

9 Elang hitam Ictinaetus malayensis + - + - - + P LC

10 Cabecabean Dicaeum spp + + - + - - LC

11 Kijoan Chloropsis sp + - - - - - LC

12 Punai Treron sp + - - + - - LC

13 Kutilang Pygnonotus - - - - + - LC

14 Walet dada putih Colocalia linchi + + + + + + LC

15 Sriti Colocalia esculenta - + - - - - LC

16 Elang putih Elanus caerulens + - - + - + P LC

17 Percici Trichoglos sp + - - - - + LC

18 Elang brontok Spizaetus cirrhatus. + - - - - + P LC

19 Rangkong/

Kangkareng hitam

Anthracoceros

malayanus

+ - + + - - P VU

Jumlah 29 13 19 20 8 14

Notes : P = Protected

Species Monitoring by Camera Trap Summary

Note: See Lender’s Monthly Report for each month for detailed camera trap results Camera Trap 3

Forest area around Well Pad L

4°14'23.97"S 103°21'44.95"E

Marbled Cat (June 2019) Common Squirrel (June 2019)

Page 71: Environmental and Social Monitoring Report...2. Relevant Environmental Permits or Compliance Certificates 11 2.1 New Permit or Compliance Certificates Required and Obtained 11 2.2

Environment & Social Monitoring Report-1H18 Rev 1 Page 72

Unidentified Bird (June 2019)

Camera Trap 4

Forest area around Well Pad M

4°14'35.53"S 103°22'12.73"E

Common Rat (June 2019) Unidentified Bird (June 2019)

Marbled Cat (June 2019) Endangered: Palm Civet (June 2019)

Wild Boar (June 2019) Endangered: Arctictis Binturong (May 2019)

Camera Trap 2

Forest area around Well Pad C

4°13'20.66"S 103°22'51.15"E

Page 72: Environmental and Social Monitoring Report...2. Relevant Environmental Permits or Compliance Certificates 11 2.1 New Permit or Compliance Certificates Required and Obtained 11 2.2

Environment & Social Monitoring Report-1H18 Rev 1 Page 73

Unidentified Bird (June 2019) Common Squirrel (June 2019)

Common Squirrel (June 2019) Endangered: Tapir (May 2019)

Wild cat (February 2019)

Camera Trap 5

Forest area around labour camp of EPC contractor

4°12'3.35"S 103°22'54.53"E

Endangered: Dhole/Cuon Alpinus (June 2019) Deer/Cervidae (June 2019)

Page 73: Environmental and Social Monitoring Report...2. Relevant Environmental Permits or Compliance Certificates 11 2.1 New Permit or Compliance Certificates Required and Obtained 11 2.2

Environment & Social Monitoring Report-1H18 Rev 1 Page 74

Wild Boar (June 2019) Palm Civet (June 2019)

Golden Cat (May 2019) Brown Bear (January 2019)

Endangered: Tapir (January 2019) Golden Cat (January 2019)

Endangered Species Encounter during January – June 2019 Reporting Period

Species Name Scientific Name IUCN CITES Indonesia Encounter Observation Method

Dhole Cuon alpinus EN II P √ Camera Trap

Sumatran Tiger Panthera tigris sumatrae EN I P X -

Asian Elephant Elephas maximus EN I P X -

Sunda Pangolin Manis javanica EN II P X -

Smoky Flying

Squirrel

Pteromyscus

pulverulentus EN P X -

Agile Gibbon Hylobates agilis EN II P Sight

Sumatran Surili Presbytis melalophos EN P √ Sight

Siamang Symphalangus

syndactylus EN I P √ Sight

Note: IUCN: EN = Endangered, CR = Critical Endangered, CITES: I = Appendix I, II = Appendix II, Indonesia: P = Protected

Page 74: Environmental and Social Monitoring Report...2. Relevant Environmental Permits or Compliance Certificates 11 2.1 New Permit or Compliance Certificates Required and Obtained 11 2.2

Environment & Social Monitoring Report-1H18 Rev 1 Page 75

Status of BOS as follows:

• Submitted final draft of Biodiversity Offset Management Plan (BOMP) in April 2019 to ADB

• Recruited one (1) biodiversity officer, provided light vehicle, office space and work equipment

• Continue discussions with Forestry of South Sumatera, KPHD Semendo, DAS Musi, Muara Enim district

• Socilization to farmers is postponed to maintain conducive situation for national election and Ied Fitri

• Monitor pilot project of planting endemic seed at WP-C

10.3 Biodiversity Offset Strategy (BOS)

Page 75: Environmental and Social Monitoring Report...2. Relevant Environmental Permits or Compliance Certificates 11 2.1 New Permit or Compliance Certificates Required and Obtained 11 2.2

Environment & Social Monitoring Report-1H18 Rev 1 Page 76

11. Transmission Network

PLN is in progress to obtain environmental permit for the transmission line.

Page 76: Environmental and Social Monitoring Report...2. Relevant Environmental Permits or Compliance Certificates 11 2.1 New Permit or Compliance Certificates Required and Obtained 11 2.2

Environment & Social Monitoring Report-1H18 Rev 1 Page 77

12.Information Disclosure

Are the results of environmental and social safeguards monitoring

disclosed? ( Yes / No )

If yes, please provide URL or Monitoring reports.

・URL :

Environmental documents such as AMDAL/RKL-RPL reports are

disclosed for the public (should they want to review the

documents, they are available at the local environment office

and Supreme Energy office). The ESHIA are submitted to the

lender and are disclosed by them in their websites.

JBIC,ADB, and NEXI will disclose URL or Monitoring reports on

their websites, unless disagreement expressed.

Page 77: Environmental and Social Monitoring Report...2. Relevant Environmental Permits or Compliance Certificates 11 2.1 New Permit or Compliance Certificates Required and Obtained 11 2.2

Environment & Social Monitoring Report-1H18 Rev 1 Page 78

ATTACHMENTS

Attachment 1 : Environmental Activities

Attachment 2 : Safety Health Activities

Attachment 3 : Social Activities

Attachment 4 : Form 4 Facilities Agreement

Attachment 5 : Environmental & Biodiversity Monitoring Maps

Attachment 6 : Grievance Log

Attachment 7 : Environmental Monitoring Trends

Page 78: Environmental and Social Monitoring Report...2. Relevant Environmental Permits or Compliance Certificates 11 2.1 New Permit or Compliance Certificates Required and Obtained 11 2.2

Environment & Social Monitoring Report-1H18 Rev 1 Page 79

ATTACHMENT 1 – ENVIRONMENTAL ACTIVITIES

Dust Control

Wheel Wash Facility Maintenance Camera Trap Monitoring

Page 79: Environmental and Social Monitoring Report...2. Relevant Environmental Permits or Compliance Certificates 11 2.1 New Permit or Compliance Certificates Required and Obtained 11 2.2

Environment & Social Monitoring Report-1H18 Rev 1 Page 80

Gabion Installation for Intake Monitoring Housekeeping

Invasive Species Clearing

Page 80: Environmental and Social Monitoring Report...2. Relevant Environmental Permits or Compliance Certificates 11 2.1 New Permit or Compliance Certificates Required and Obtained 11 2.2

Environment & Social Monitoring Report-1H18 Rev 1 Page 81

Revegetation

Maintenance of silt/sediment traps

Noise Monitoring H2S monitoring

Soil Erosion/Landslide Prevention

Page 81: Environmental and Social Monitoring Report...2. Relevant Environmental Permits or Compliance Certificates 11 2.1 New Permit or Compliance Certificates Required and Obtained 11 2.2

Environment & Social Monitoring Report-1H18 Rev 1 Page 82

Housekeeping & Maintenance at domestic waste storage area

Joint Forestry Patrol/ Socialization Nursery maintenance and inventory update

Pilot Program for Biodiversity Offset Preparation for extension of nursery storage at

WP-C

Page 82: Environmental and Social Monitoring Report...2. Relevant Environmental Permits or Compliance Certificates 11 2.1 New Permit or Compliance Certificates Required and Obtained 11 2.2

Environment & Social Monitoring Report-1H18 Rev 1 Page 83

EPC-C Turbidity Monitoring Prepare main nursery area near

explosive bunker area

Page 83: Environmental and Social Monitoring Report...2. Relevant Environmental Permits or Compliance Certificates 11 2.1 New Permit or Compliance Certificates Required and Obtained 11 2.2

Environment & Social Monitoring Report-1H18 Rev 1 Page 84

ATTACHMENT 2 - SAFETY HEALTH ACTIVITIES

SHE Induction Toolbox meeting

Weekly Saf et y Talks Mon it o r ing o f Const ruct ion Act ivit ies

Coord inat ion w it h Con t ract o rs H2S Mon it o r ing

SHE reward for EPC crew Ind uct ion

Page 84: Environmental and Social Monitoring Report...2. Relevant Environmental Permits or Compliance Certificates 11 2.1 New Permit or Compliance Certificates Required and Obtained 11 2.2

Environment & Social Monitoring Report-1H18 Rev 1 Page 85

Conduct mustering H2S drill at WP-C Hazmat handling inspection

Light bus pre-mobilization inspection Safety traffic sign maintenance

Page 85: Environmental and Social Monitoring Report...2. Relevant Environmental Permits or Compliance Certificates 11 2.1 New Permit or Compliance Certificates Required and Obtained 11 2.2

Environment & Social Monitoring Report-1H18 Rev 1 Page 86

ATTACHMENT 3 - SOCIAL ACTIVITIES

Coffee Training

CSR Programs & Grievance Mechanism

Page 86: Environmental and Social Monitoring Report...2. Relevant Environmental Permits or Compliance Certificates 11 2.1 New Permit or Compliance Certificates Required and Obtained 11 2.2

Environment & Social Monitoring Report-1H18 Rev 1 Page 87

ATTACHMENT 4 – FORM 4 FACILITIES AGREEMENT

Name of Project Rantau Dedap Geothermal Power Plant Project

Completion Date of This Form 2019/07/29

Monitoring Period (From)2019/01/01 (To)2019/06/30

Progress of Project Construction Phase / Operational Phase

Progress of Project Category required by JBIC

Construction Phase ESIA and Environmental Permits / Ecosystem and biota

Operational Phase ESIA and Environmental Permits / Ecosystem and biota

Notes ( e.g. Any comments made by the relevant authorities, and grievances from local people/NGO)

None

ESIA and Environmental Permits

Compliance with ESIA Conditions

Monitoring Item Monitoring Results during Report Period

Conditions attached to the

ESIA( AMDAL) approval

( Conditions shown in the

Third Article and

Fourth Article of AMDAL

Approval letter dated 15

March 2017 )

1. Please confirm if you have achieved all conditions attached to the ESIA (AMDAL) approval. : [Yes / No]

2. Describe the situation and measures taken if delays/complications in implementation of the conditions/obligations are

identified.

Monitor the compliance of AMDAL is conducted regularly and reported every 6 months to the parties through RKL/RPL

reports. So far there is no feedback that have been received from the government.

Monitor the E&S compliance of ESIA is reported monthly (monthly E&S report) and MMD as LESC conducts a site visit every

6 months and submits a 6-monthly report to Lenders.

If there was any delay / complication in implementation, it will be reported, a corrective action plan is developed and followed

up to completion.

Ecosystem and biota

Monitoring Item Monitoring Results during Report Period

Status of several documents

related to the

Biodiversity※

Critical Habitat Assessment

(CHA),

Biodiversity Action Plan

(BAP),

Biodiversity Offset Strategy

(BOS),

Biodiversity Offset

Management Plan (BOMP)

Have the documents related to the biodiversity been completed? : Yes / No

If "Yes", please submit a copy of the final version of the report together with this monitoring form and share the information

about the modified contents from the draft plan.

If "No", please share the information about the current status.

The CHA, BAP, BOS have been completed.

- Critical Habitat Assessment (CHA) v13, dated 16 January 2018

- Biodiversity Action Plan (BAP) v6, dated 16 January 2018

- Biodiversity Offset Strategy (BOS) v5, dated 16 January 2018

Draft of Biodiversity Offset Management Plan (BOMP) has been composed by ERM and submitted to Lenders (v 2.2, dated 7

May 2019).

Status of the Forest

Management Plan

( Conditions attached to the

IPPKH 115 ha )

Has the Forest Management Plan been completed and approved by Forestry Office of South Sumatra Government? : Yes / No

If "Yes", please provide the information of the completion date (DD/MM/YYYY).

If "No", please provide the expected completion date of the final report and current status.

Approved on 21 September 2018.

Approval Letter no : 522.053.331/3326-III/Hut

Impacts on biodiversity in/

around the project site

Please share the current status of the ecosystem conservation activities from the viewpoint of forest management and

biodiversity.

The location for biodiversity offset has been approved by Ministry of KLHK on 11 October 2019. Approval Letter no. SK

7155/Menlhk-PDASHL/KTA/DAS.1/10/2018. The location is adjacent to project facilities, the status is Protection Forest but has

been degraded as coffee farms. Currently in progress to free the land form farmers, with provincial forestry acting as the

Coordinator. The last public consultation was conducted on 16 July 2019 in Muara Enim district, attended by approximately 100

participants from farmers, local leaders, NGO, Deputy District Head, local government officers, and forestry officers.

Page 87: Environmental and Social Monitoring Report...2. Relevant Environmental Permits or Compliance Certificates 11 2.1 New Permit or Compliance Certificates Required and Obtained 11 2.2

Environment & Social Monitoring Report-1H18 Rev 1 Page 88

Are there any problems regarding impacts on biodiversity pointed out by the National/Local authority? Yes / No

If "Yes", please describe the outline of the problems and measures taken.

Any issues regarding

Monitoring Item mentioned

above

・ Reasons/ Background Information ・ Mitigation Measures

Information Disclosure

Are the results of environmental

monitoring disclosed? ( Yes / No )

If yes, please provide URL or Monitoring reports.

・ URL :

Environmental Monitoring reports are not disclosed in any URLs but can be disclosed by request. Should a copy of the

document be needed, the requestor may obtain the report directly from Governmental Environmental Office. Latest

monitoring report is for First Semester of 2019.

JBIC will disclose URL or Monitoring reports on our website, unless disagreement expressed.

ASIA-DOCS\10129473.14

Page 88: Environmental and Social Monitoring Report...2. Relevant Environmental Permits or Compliance Certificates 11 2.1 New Permit or Compliance Certificates Required and Obtained 11 2.2

Environment & Social Monitoring Report-1H18 Rev 1 Page 89

ATTACHMENT 5 - ENVIRONMENTAL & BIODIVERSITY MONITORING MAPS

Code Location's Name

Coordinate

Remarks

E S

Camera Trap 3 Around Well Pad L 103°21'44.95"E 4°14'23.97"S

Camera Trap 2 Around Well Pad C 103°22'51.15"E 4°13'20.66"S

Page 89: Environmental and Social Monitoring Report...2. Relevant Environmental Permits or Compliance Certificates 11 2.1 New Permit or Compliance Certificates Required and Obtained 11 2.2

Environment & Social Monitoring Report-1H18 Rev 1 Page 90

Camera Trap 5 Around the labour camp

of EPC contractor

103°22'54.53"E 4°12'3.35"S

Page 90: Environmental and Social Monitoring Report...2. Relevant Environmental Permits or Compliance Certificates 11 2.1 New Permit or Compliance Certificates Required and Obtained 11 2.2

Environment & Social Monitoring Report-1H18 Rev 1 Page 91

Page 91: Environmental and Social Monitoring Report...2. Relevant Environmental Permits or Compliance Certificates 11 2.1 New Permit or Compliance Certificates Required and Obtained 11 2.2

Environment & Social Monitoring Report-1H18 Rev 1 Page 92

Biodiversity Monitoring (Camera Trap Placement)

Page 92: Environmental and Social Monitoring Report...2. Relevant Environmental Permits or Compliance Certificates 11 2.1 New Permit or Compliance Certificates Required and Obtained 11 2.2

Environment & Social Monitoring Report-1H18 Rev 1 Page 93

ATTACHMENT - 6 GRIEVANCE LOG

No. Complaint Date

reported

Complaint

Description

Proposed Corrective

Action

Date of Proposed

Corrective Action

Response Sent to

Complianant

Complaint

Closed Out

Date

Response of

Complainant

after Complaint

Closed Out

1 7 January 2019

Dedy Mukaram

complaint that he

has received wage

from H.Syarifudin

to build a home

until finish at

Hellypad but SERD

stop his work

SERD explain that the

status of Hellypad still

dispute so no one can

build anything there

9 January 2019

They dont want to

break the law and

they will stop build a

house and hope they

can work at SERD or

SERD's contractors

15 January

2019

Construction of

house was

stopped

2 7 January 2019

Gunawan Afrianto

complaint to SERD

that his Land at Air

Kelat has been

released by SERD

with an agreement

that he/his family

will be priority to

work when SERD

operation, but until

now he still waiting

without any

certainty

SERD noticed all

landowner whose

land has been

released, and

proposed their name

to the committee and

Maincont

10 January 2019

Still waiting labor

requirement from

contractor

31 January

2019

Still waiting for

job vacancy, his

name and all

landowner

been registered

in the lottery

system

2 7 January 2019

Siragar and Anwar

ever been

imprioned by

Rekind for illegal

levies at Endikat

river, when Rekind

released them

Rekind promised

for recruit Siragar

and Anwar, and

they must get

recommended

letter from SERD

SERD will do

clarification with

Rekind

10 January 2019

They must follow

procedure of

recruitment

31 January

2019

Anwar CS are

not landowner.

SERD,

contractor and

committee still

focus on

recruiting

landowner

3 9 January 2019

Mardan staking on

the road and

complaint that

there are some

vacancy for driver

but as landowner

he never get

chance to be a

driver

SERD noticed all

landowner who their

land has been

released, and

proposed their name

to the committee and

Maincont

14 January 2019

Still waiting labor

requirement for

contractor

31 January

2019

Waiting

requirement

labor from

contractor

3 19 January 2019

12 Landowner

staking the road

and complaint to

SERD to recruit

them

SERD noticed all

landowner who their

land has been

released, and

proposed their name

to the committee and

Maincont

21 January 2019

Make an agreement

between SERD and

Rekind to priority

them when there are

labor requirement

31 January

2019

One by One of

them starts to

work

4 1 February2019

Paslun from

Matang Gerubing

complaint due to

road repairing,

they can't access

their land by motor

cycle and asking

SERD to install

culvert

SERD team check to

the location 4 February 2019

Submit a culvert

request to project

team

March 2019

Closed, Rekind

has repair it

with putting log

in that access

so they can pass

through

4 11 February 2019

Untung from

Aramantai

complaint that if

summer come

coffee his plant

become dusty

SERD team survey to

the Untung Farm 14 February 2019

Proposed to Rekind

to do regular

watering

17 February

2019

5 18 February 2019 Irawan Saputra

Landowner at

SERD accomodate

complaints from 20 February 2019

SERD propose his

name to committee

28 February

2019

Closed, work at

PT. YIN start on

Page 93: Environmental and Social Monitoring Report...2. Relevant Environmental Permits or Compliance Certificates 11 2.1 New Permit or Compliance Certificates Required and Obtained 11 2.2

Environment & Social Monitoring Report-1H18 Rev 1 Page 94

Pengentaan

complaint he never

work at SERD he

ask be priority

when hiring

Irawan Saputra to be recorded July 2019

5 21 February 2019

Suprianto

landowner at

Explosive bunker

ask SERD recruit

him for any work

SERD accomodate

complaints from

Suprianto

20 February 2019

SERD propose his

name to committee

to be recorded

28 February

2019

Closed, work at

PT. YIN start on

July 2019

6 21 February 2019

Syarif Hidayat as

landowner

complaint that he

hasn't work until

now whereas he

has applied

repeatedly

SERD accomodate

complaints from

Suprianto

20 February 2019

SERD propose his

name to committee

to be recorded

28 February

2019

Closed, work at

PT. Puspetindo

start on May

2019

6 22 February 2019

Syawaludin

landowner at

Padang Panjang Ilir

complaint there is

landslide on the

road at his land,

and he ask SERD

recruit him

SERD survey at his

Syawaludin land 25 February 2019

SERD still being

considered

28 February

2019

Closed, work at

SERD daily

worker Talang

Pisang office

7 6 March 2019

Basoni Syatori

Sondata from

Aramantai ask

realization of SERD

promise to recruit

landowner as labor

he will repund and

block the road

SERD cross checking

with the recruitment

process and

documentation

8 March 2019

Record all landowner

and will recruit

gradually

7 6 March 2019

Ali Sadikin from

Yayasan ask

realization of SERD

promise to recruit

landowner as labor

he will repund and

block the road

SERD cross checking

with the recruitment

process and

documentation

8 March 2019

Record all landowner

and will recruit

gradually

8 6 March 2019

Kamri DKK from

Padang Panjang Ilir

ask realization of

SERD promise to

recruit landowner

as labor they will

block the road

SERD cross checking

with the recruitment

process and

documentation

8 March 2019

Record all landowner

and will recruit

gradually

8 6 March 2019

Sandri DKK from

Pandan Arang Ulu

ask realization of

SERD promise to

recruit landowner

as labor they will

block the road

SERD cross checking

with the recruitment

process and

documentation

8 March 2019

Record all landowner

and will recruit

gradually

9 6 March 2019

Arizon from

Pandan Arang Ulu

ask realization of

SERD promise to

recruit landowner

as labor

SERD cross checking

with the recruitment

process and

documentation

8 March 2019

Record all landowner

and will recruit

gradually

9 8 March 2019

Taslim DKK from

Padang Panjang

Ulu ask realization

of SERD promise to

recruit landowner

as labor

SERD cross checking

with the recruitment

process and

documentation

10 March 2019

Record all landowner

and will recruit

gradually

10 10 March 2019

Santo from Batu

Surau ask SERD

build cediment trap

at Santo land to

reduce material

which build up in

irrigation Batu

SERD do surrvey

location 11 March 2019

Survey to location

with project team

and proposed 1

month for close-out

after 01-April-2019

Page 94: Environmental and Social Monitoring Report...2. Relevant Environmental Permits or Compliance Certificates 11 2.1 New Permit or Compliance Certificates Required and Obtained 11 2.2

Environment & Social Monitoring Report-1H18 Rev 1 Page 95

Surau Ulu

10 26 March 2019

Hendro DKK

complaint just 3

people from their

team who already

work at SERD

SERD cross checking

with the recruitment

process and

documentation

26 March 2019

They will work at

SERD as daily labor

for 3 months

alternately

31-Mar-19 They start to

work

11 26 March 2019

Diri complaint

"Kuncang" system

for recruitment not

fair

SERD cross checking

with the recruitment

process and

documentation

26 March 2019

SERD explains the

process and

encourgae the job

seeker to actively

monitor the process

27-Mar-19

Complainant

understand the

process

11 26 March 2019

Rahadian

complaint for

irrigation Batu

Surau Ulu damage

ask SERD to

repairing the

channel

SERD do surrvey

location 29 March 2019

SERD already survey

the locations and do

calculation for repair

12 07-Apr-19

Rumli from Ayek

Mayan (Sukarami)

villager complaint

about crack house

due to mobilization

Relation SERD survey

to Ayek Mayan

villagers home

09-Apr-19

Record all landowner

and will recruit

gradually (Log book

April No 10)

10-Apr-19

Closed, can't

repair because

on public road

(belong to

government)

12 07-Apr-19

Rasmani Ayek

Mayan (Sukarami)

villager complaint

about crack house

due to mobilization

Relation SERD survey

to Ayek Mayan

villagers home

08-Apr-19

Record all landowner

and will recruit

gradually (Log book

April No 10)

10-Apr-19

Closed, can't

repair because

on public road

(belong to

government)

13 05-Apr-19

Complaint Batu

Surau Ulu villager

regarding drainage

damage due to

mobilization

Relation SERD survey

to location drainage 08-Apr-19

Record all landowner

and will recruit

gradually (Log book

April No 11)

10-Apr-19

Closed,

repaired on July

2019

13 03-Mei-19

Munawir complaint

about dust due to

local Dump Truck

that often speeding

Discuss in meeting

with project and she 04-Mei-19

SERD will put speed

bump in some area 19-Mei-19

Complaint

closed because

Speed bump

are ready install

in Yayasan,

Pengentaan and

Talang Pisang

and SERD also

distribute water

machine and

hose to

community

14 31-Mei-19

Complaint from

Kota Agung Villager

regarding

recruitment only

few worker from

Kota Agung

Relation explain that

all recruitment is

authority of the

committee

31-Mei-19

Committee will

announce vacancy

and also result of

test accordance with

agreed rules

02-Jun-19

Kota Agung

villagers will

wait while

monitoring

committee

performance

14 15 June 2019

Nopran DKK visit

site to complaint

about

disconnection of

power cable on 13

june 2019 due to

mobilization, 30

electicity befall the

chili and coffee

plants and total

power failure

Relation SERD survey

to location to see how

much loss is caused,

all complianant

attended survey and

SERD relation with all

complianants do

negotiation

15 June 2019

Management ask

Rekind and GMK to

pay for the

reparation and

distribute to them

immediately

20 June

2019

Complaint

closed, SERD

handover the

damage fees to

complainers

and they repair

power cable

15 24 June 2019

Yika from Talang

Pisang put the rock

and wood on the

road she complaint

that speeding by

local DT, a lot of

dust is feared

cause tuberculosis,

his husband ask

watering and put

two speed bumps

Relation SERD ask to

management to put

speed bump and do

regular watering at

that area

29 June 2019

Speedbump

installation has been

approved and still

waiting heavy

equipment, and we

still waiting water

tank operation

permit

Still Waiting

Page 95: Environmental and Social Monitoring Report...2. Relevant Environmental Permits or Compliance Certificates 11 2.1 New Permit or Compliance Certificates Required and Obtained 11 2.2

Environment & Social Monitoring Report-1H18 Rev 1 Page 96

there

15 28 June 2019

Junandar

complaint about

the damage of

irrigation channel

at Batu Surau due

to mobilization he

put the wood and

rock as protest

action, causing

disturbance in

mobilization

Relation SERD and

security every

mobilization

dismantle wood and

rock, Relation SERD

will repair that area

30 June 2019

SERD starts

repairing, all material

for been sent to

location and some

worker ready to

work

On process

16 29 June 2019

Sulastri and

Hulman put power

pole, rock and

wood as protest

action regarding

construction dust

might affect them

(tuberculosis), and

worrying about

high-speed DT

might cause

accident

Relation SERD and

security every

mobilization

dismantle wood and

rock, Relation SERD

also ask to

management to put

speed bump and do

regular watering at

that area

30 June 2019

Still waiting heavy

equipment, and

water tank operation

permit

On process

Page 96: Environmental and Social Monitoring Report...2. Relevant Environmental Permits or Compliance Certificates 11 2.1 New Permit or Compliance Certificates Required and Obtained 11 2.2

Environment & Social Monitoring Report-1H18 Rev 1 Page 97

ATTACHMENT 7 – ENVIRONMENTAL MONITORING TRENDS

Note: Results are taken from the last 4 RKL-RPL Monitoring results

Ambient Air

Consentration Variation of SO2

Reference: Baku Mutu = Legal Threshold

Page 97: Environmental and Social Monitoring Report...2. Relevant Environmental Permits or Compliance Certificates 11 2.1 New Permit or Compliance Certificates Required and Obtained 11 2.2

Environment & Social Monitoring Report-1H18 Rev 1 Page 98

Consentration Variation of NO2

Reference: Baku Mutu = Legal Threshold

Measurement results for ambient air quality parameters such as Sulfur Dioxide (SO2), Carbon Monoxide

(CO), Nitrogen Dioxide (NO2), Oxidant (O3), Hydrocarbons (HC), Total Suspended Particulate (TSP), PM10,

and PM2,5 overall have results that still meet the required quality standards. However, PM10, and PM2.5

had a slight exceedance, possibly due to the ongoing construction of wellpads (L & N). Thus it can be

concluded that ambient air quality parameters is not in critical value in the monitoring of Semester 1 of

2019.

Page 98: Environmental and Social Monitoring Report...2. Relevant Environmental Permits or Compliance Certificates 11 2.1 New Permit or Compliance Certificates Required and Obtained 11 2.2

Environment & Social Monitoring Report-1H18 Rev 1 Page 99

Surface Water

Concentration variation TSS

Reference: Baku Mutu = Legal Threshold; Periode Pemantauan = Monitoring Period

y = 0,5x2 - 2,7143x + 6,1429

0

10

20

30

40

50

60

Sem 1-15 Sem 2-15 Sem 1-17 Sem 2-17 Sem 1-18 Sem 2-18 Sem 1-19

TS

S (

mg

/L

)

Periode pemantauan

Kecenderungan konsentrasi TSS di Sungai Endikat

TSS Baku Mutu Trend TSS

y = 1,1405x2 - 9,2914x + 17,664

0

10

20

30

40

50

60

Sem 1-15 Sem 2-15 Sem 1-16 Sem 2-16 Sem 1-17 Sem 2-17 Sem 1-18 Sem 2-18 Sem 1-19

TS

S (

mg

/L

)

Periode pemantauan

Kecenderungan konsentrasi TSS di Sungai Cawang

Tengah

TSS Baku Mutu Trend TSS

y = 0,1048x2 - 1,4176x + 7,4262

0

10

20

30

40

50

60

Sem 1-15 Sem 2-15 Sem 1-16 Sem 2-16 Sem 1-17 Sem 2-17 Sem 1-18 Sem 2-18 Sem 1-19

TS

S (

mg

/L

)

Periode pemantauan

Kecenderungan konsentrasi TSS di Sungai Asahan

TSS Baku Mutu Trend TSS

y = -0,1266x2 + 0,8496x + 3,1619

0

10

20

30

40

50

60

Sem 1-15 Sem 2-15 Sem 1-16 Sem 2-16 Sem 1-17 Sem 2-17 Sem 1-18 Sem 2-18 Sem 1-19

TS

S (

mg

/L

)

Periode pemantauan

Kecenderungan konsentrasi TSS di Sungai Cawang Kiri

TSS Baku Mutu Trend TSS

y = -0,1429x2 + 0,2371x + 3,82

0

10

20

30

40

50

60

Sem 1-17 Sem 2-17 Sem 1-18 Sem 2-18 Sem 1-19

TS

S (

mg

/L

)

Periode pemantauan

Kecenderungan konsentrasi TSS di Danau Deduruk

TSS Baku Mutu Trend TSS

Page 99: Environmental and Social Monitoring Report...2. Relevant Environmental Permits or Compliance Certificates 11 2.1 New Permit or Compliance Certificates Required and Obtained 11 2.2

Environment & Social Monitoring Report-1H18 Rev 1 Page 100

Concentration variation BOD

Reference: Baku Mutu = Legal Threshold; Periode Pemantauan = Monitoring Period

y = 0,0639x2 - 0,7552x + 8,3095

0

3

6

9

12

15

18

Sem 1-15 Sem 2-15 Sem 1-16 Sem 2-16 Sem 1-17 Sem 2-17 Sem 1-18 Sem 2-18 Sem 1-19

BO

D5

(mg

/L

)

Periode pemantauan

Kecenderungan konsentrasi BOD5 di Sungai Asahan

BOD5 Baku Mutu Trend BOD5

y = 0,4881x2 - 3,5119x + 10

0

3

6

9

12

15

18

Sem 1-15 Sem 2-15 Sem 1-17 Sem 2-17 Sem 1-18 Sem 2-18 Sem 1-19

BO

D5

(mg

/L

)

Periode pemantauan

Kecenderungan konsentrasi BOD5 di Sungai Endikat

BOD5 Baku Mutu Trend BOD5

y = 0,0325x2 + 0,0087x + 7,2619

0

3

6

9

12

15

18

Sem 1-15 Sem 2-15 Sem 1-16 Sem 2-16 Sem 1-17 Sem 2-17 Sem 1-18 Sem 2-18 Sem 1-19

BO

D5

(mg

/L

)

Periode pemantauan

Kecenderungan konsentrasi BOD5 di Sungai Cawang

Tengah

BOD5 Baku Mutu Trend BOD5

y = -0,0227x2 + 0,2106x + 6,6667

0

3

6

9

12

15

18

Sem 1-15 Sem 2-15 Sem 1-16 Sem 2-16 Sem 1-17 Sem 2-17 Sem 1-18 Sem 2-18 Sem 1-19

BO

D5

(mg

/L

)

Periode pemantauan

Kecenderungan konsentrasi BOD5 di Sungai Cawang

Kiri

BOD5 Baku Mutu Trend BOD5

y = 0,0714x2 + 0,2714x + 4,6

0

3

6

9

12

15

18

Sem 1-17 Sem 2-17 Sem 1-18 Sem 2-18 Sem 1-19

BO

D5

(mg

/L

)

Periode pemantauan

Kecenderungan konsentrasi BOD5 di Danau Deduruk

BOD5 Baku Mutu Trend BOD5

Page 100: Environmental and Social Monitoring Report...2. Relevant Environmental Permits or Compliance Certificates 11 2.1 New Permit or Compliance Certificates Required and Obtained 11 2.2

Environment & Social Monitoring Report-1H18 Rev 1 Page 101

Concentration variation DO

Reference: Baku Mutu = Legal Threshold; Periode Pemantauan = Monitoring Period

y = 0,0136x2 - 0,0997x + 4,1

0

2

4

6

8

Sem 1-15 Sem 2-15 Sem 1-16 Sem 2-16 Sem 1-17 Sem 2-17 Sem 1-18 Sem 2-18 Sem 1-19

DO

(mg

/L

)

Periode pemantauan

Kecenderungan konsentrasi DO di Sungai Cawang

Tengah

DO Baku Mutu Trend DO

y = 0,0219x2 - 0,1753x + 4,2952

0

2

4

6

8

Sem 1-15 Sem 2-15 Sem 1-16 Sem 2-16 Sem 1-17 Sem 2-17 Sem 1-18 Sem 2-18 Sem 1-19

DO

(mg

/L

)

Periode pemantauan

Kecenderungan konsentrasi DO di Sungai Cawang Kiri

DO Baku Mutu Trend DO

y = 0,0231x2 - 0,1789x + 4,3976

0

2

4

6

8

Sem 1-15 Sem 2-15 Sem 1-16 Sem 2-16 Sem 1-17 Sem 2-17 Sem 1-18 Sem 2-18 Sem 1-19

DO

(mg

/L

)

Periode pemantauan

Kecenderungan konsentrasi DO di Sungai Asahan

DO Baku Mutu Trend DO

y = -0,05x2 + 0,3929x + 3,9143

0

2

4

6

8

Sem 1-15 Sem 2-15 Sem 1-17 Sem 2-17 Sem 1-18 Sem 2-18 Sem 1-19

DO

(mg

/L

)

Periode pemantauan

Kecenderungan konsentrasi DO di Sungai Endikat

DO Baku Mutu Trend DO

y = -0,3714x2 + 2,2486x + 1,58

0

2

4

6

8

Sem 1-17 Sem 2-17 Sem 1-18 Sem 2-18 Sem 1-19

DO

(mg

/L

)

Periode pemantauan

Kecenderungan konsentrasi DO di Danau Deduruk

DO Baku Mutu Trend DO

Page 101: Environmental and Social Monitoring Report...2. Relevant Environmental Permits or Compliance Certificates 11 2.1 New Permit or Compliance Certificates Required and Obtained 11 2.2

Environment & Social Monitoring Report-1H18 Rev 1 Page 102

Concentration variation Nitrate

Reference: Baku Mutu = Legal Threshold; Periode Pemantauan = Monitoring Period

y = -0,004x2 + 0,0217x + 0,1665

0

0,2

0,4

0,6

0,8

Sem 1-15 Sem 2-15 Sem 1-16 Sem 2-16 Sem 1-17 Sem 2-17 Sem 1-18 Sem 2-18 Sem 1-19

Nit

rat

(mg

/L

)

Periode pemantauan

Kecenderungan konsentrasi Nitrat di Sungai Cawang

Tengah

Nitrat Trend Nitrat Baku Mutu = 10 mg/L

y = -0,0099x2 + 0,0845x + 0,0398

0

0,2

0,4

0,6

0,8

Sem 1-15 Sem 2-15 Sem 1-16 Sem 2-16 Sem 1-17 Sem 2-17 Sem 1-18 Sem 2-18 Sem 1-19

Nit

rat

(mg

/L

)

Periode pemantauan

Kecenderungan konsentrasi Nitrat di Sungai Cawang

Kiri

Nitrat Trend Nitrat Baku Mutu = 10 mg/L

y = -0,0018x2 + 0,0088x + 0,1024

0

0,2

0,4

0,6

0,8

Sem 1-15 Sem 2-15 Sem 1-16 Sem 2-16 Sem 1-17 Sem 2-17 Sem 1-18 Sem 2-18 Sem 1-19

Nit

rat

(mg

/L

)

Periode pemantauan

Kecenderungan konsentrasi Nitrat di Sungai Asahan

Nitrat Trend Nitrat Baku Mutu = 10 mg/L

y = 0,0036x2 - 0,0306x + 0,132

0

0,2

0,4

0,6

0,8

Sem 1-15 Sem 2-15 Sem 1-17 Sem 2-17 Sem 1-18 Sem 2-18 Sem 1-19

Nit

rat

(mg

/L

)

Periode pemantauan

Kecenderungan konsentrasi Nitrat di Sungai Endikat

Nitrat Trend Nitrat Baku Mutu = 10 mg/L

y = -0,0014x2 + 0,0062x + 0,0556

0

0,2

0,4

0,6

0,8

Sem 1-17 Sem 2-17 Sem 1-18 Sem 2-18 Sem 1-19

Nit

rat

(mg

/L

)

Periode pemantauan

Kecenderungan konsentrasi Nitrat di Danau Deduruk

Nitrat Trend Nitrat Baku Mutu = 10 mg/L

Page 102: Environmental and Social Monitoring Report...2. Relevant Environmental Permits or Compliance Certificates 11 2.1 New Permit or Compliance Certificates Required and Obtained 11 2.2

Environment & Social Monitoring Report-1H18 Rev 1 Page 103

Concentration variation Phosphate

Reference: Baku Mutu = Legal Threshold; Periode Pemantauan = Monitoring Period

y = 0,0016x2 - 0,011x + 0,051

0

0,05

0,1

0,15

0,2

0,25

Sem 1-15 Sem 2-15 Sem 1-16 Sem 2-16 Sem 1-17 Sem 2-17 Sem 1-18 Sem 2-18 Sem 1-19

Fo

sfa

t(m

g/

L)

Periode pemantauan

Kecenderungan konsentrasi Fosfat di Sungai Cawang

Tengah

Fosfat Baku Mutu Trend Fosfat

y = 8E-05x2 + 0,0013x + 0,0462

0

0,05

0,1

0,15

0,2

0,25

Sem 1-15 Sem 2-15 Sem 1-16 Sem 2-16 Sem 1-17 Sem 2-17 Sem 1-18 Sem 2-18 Sem 1-19

Fo

sfa

t(m

g/

L)

Periode pemantauan

Kecenderungan konsentrasi Fosfat di Sungai Cawang

Kiri

Fosfat Baku Mutu Trend Fosfat

y = -7E-05x2 + 0,0022x + 0,0279

0

0,05

0,1

0,15

0,2

0,25

Sem 1-15 Sem 2-15 Sem 1-16 Sem 2-16 Sem 1-17 Sem 2-17 Sem 1-18 Sem 2-18 Sem 1-19

Fo

sfa

t(m

g/

L)

Periode pemantauan

Kecenderungan konsentrasi Fosfat di Sungai Asahan

Fosfat Baku Mutu Trend Fosfat

y = -0,0058x2 + 0,0486x - 0,0166

0

0,05

0,1

0,15

0,2

0,25

Sem 1-15 Sem 2-15 Sem 1-17 Sem 2-17 Sem 1-18 Sem 2-18 Sem 1-19

Fo

sfa

t(m

g/

L)

Periode pemantauan

Kecenderungan konsentrasi Fosfat di Sungai Endikat

Fosfat Baku Mutu Trend Fosfat

y = -0,0006x2 + 0,003x + 0,0476

0

0,05

0,1

0,15

0,2

0,25

Sem 1-17 Sem 2-17 Sem 1-18 Sem 2-18 Sem 1-19

Fo

sfa

t(m

g/

L)

Periode pemantauan

Kecenderungan konsentrasi Fosfat di Danau Deduruk

Fosfat Baku Mutu Trend Fosfat

Page 103: Environmental and Social Monitoring Report...2. Relevant Environmental Permits or Compliance Certificates 11 2.1 New Permit or Compliance Certificates Required and Obtained 11 2.2

Environment & Social Monitoring Report-1H18 Rev 1 Page 104

Concentration variation pH

Reference: Baku Mutu = Legal Threshold; Periode Pemantauan = Monitoring Period

Page 104: Environmental and Social Monitoring Report...2. Relevant Environmental Permits or Compliance Certificates 11 2.1 New Permit or Compliance Certificates Required and Obtained 11 2.2

Environment & Social Monitoring Report-1H18 Rev 1 Page 105

Concentration variation Oil & Fat

Reference: Baku Mutu = Legal Threshold; Periode Pemantauan = Monitoring Period

Based on the monitoring carried out on river water quality in 5 locations, it is known that the organic

matter content in river water (shown in BOD5 and COD values) in the first semester of 2019 slightly

exceeds the limit. The high organic matter is suspected because river water has been polluted by dead

plants and into the river, coliform bacteria originating from the feces of wild animals and carcasses of

decaying wild animals and carried by river currents from upstream to downstream areas of the river.

While no complex chemicals were found within the water bodies surrounding the project, parameters

such as: pH, BOD, COD and DO suffered a bit of a decline. This is most probably due to the accumulation

of both natural occurences such as high movement of particles due to high rainfall rate as well as impact

from construction activity. During the first half of 2019, a case of minor landslide and mudflow caused

some disturbance in turbidity. PT SERD has since closed out all cases involving slope failures. High rainfall

y = 0,0003x2 - 0,0024x + 0,1933

0

0,2

0,4

0,6

0,8

1

1,2

Sem 1-15 Sem 2-15 Sem 1-16 Sem 2-16 Sem 1-17 Sem 2-17 Sem 1-18 Sem 2-18 Sem 1-19

Min

ya

k d

an

le

ma

k (

mg

/L

)

Periode pemantauan

Kecenderungan konsentrasi Minyak dan lemak di

Sungai Cawang Tengah

Minyak dan Lemak Baku Mutu Trend Minyak dan Lemak

y = 0,0003x2 - 0,0024x + 0,1933

0

0,2

0,4

0,6

0,8

1

1,2

Sem 1-15 Sem 2-15 Sem 1-16 Sem 2-16 Sem 1-17 Sem 2-17 Sem 1-18 Sem 2-18 Sem 1-19

Min

ya

k d

an

le

ma

k (

mg

/L

)

Periode pemantauan

Kecenderungan konsentrasi Minyak dan lemak di

Sungai Cawang Kiri

Minyak dan Lemak Baku Mutu Trend Minyak dan Lemak

y = 0,0003x2 - 0,0024x + 0,1933

0

0,2

0,4

0,6

0,8

1

1,2

Sem 1-15 Sem 2-15 Sem 1-16 Sem 2-16 Sem 1-17 Sem 2-17 Sem 1-18 Sem 2-18 Sem 1-19

Min

ya

k d

an

le

ma

k (

mg

/L

)

Periode pemantauan

Kecenderungan konsentrasi Minyak dan lemak di

Sungai Asahan

Minyak dan Lemak Baku Mutu Trend Minyak dan Lemak

y = 0,0006x2 - 0,0037x + 0,1943

0

0,2

0,4

0,6

0,8

1

1,2

Sem 1-15 Sem 2-15 Sem 1-17 Sem 2-17 Sem 1-18 Sem 2-18 Sem 1-19

Min

ya

k d

an

le

ma

k (

µg

/L

)

Periode pemantauan

Kecenderungan konsentrasi Minyak dan lemak di

Sungai Endikat

Minyak dan Lemak Baku Mutu Trend Minyak dan Lemak

y = 0,0014x2 - 0,0066x + 0,196

0

0,2

0,4

0,6

0,8

1

1,2

Sem 1-17 Sem 2-17 Sem 1-18 Sem 2-18 Sem 1-19

Min

ya

k d

an

le

ma

k (

mg

/L

)

Periode pemantauan

Kecenderungan konsentrasi Minyak dan lemak di

Danau Deduruk

Minyak dan Lemak Baku Mutu Trend Minyak dan Lemak

Page 105: Environmental and Social Monitoring Report...2. Relevant Environmental Permits or Compliance Certificates 11 2.1 New Permit or Compliance Certificates Required and Obtained 11 2.2

Environment & Social Monitoring Report-1H18 Rev 1 Page 106

rate in SERD area is a very recurring issue. Thus, SERD aims to improve on stabilizing and preventing

landslides and issues as such.

Produced Water

Concentration variation Dissolved Sulphate (H2S)

Reference: Baku Mutu = Legal Threshold; Periode Pemantauan = Monitoring Period

y = 0,0019

0

0,0005

0,001

0,0015

0,002

Sem 1-15Sem 2-15Sem 1-16Sem 2-16Sem 1-17Sem 2-17Sem 1-18Sem 2-18Sem 1-19

H2S

(m

g/

L)

Periode pemantauan

Kecenderungan konsentrasi sulfida terlarut (H2S) di

Water Pond Well Pad RD-E

Sulfida Terlarut (H2S) Trend H2S BM = 1 mg/L

y = - 7E-18x + 0,0019

0

0,0005

0,001

0,0015

0,002

Sem 1-16 Sem 2-16 Sem 1-17 Sem 2-17 Sem 1-18 Sem 2-18 Sem 1-19

H2S

(m

g/

L)

Periode pemantauan

Kecenderungan konsentrasi sulfida terlarut (H2S) di

Water Pond Well Pad RD-C

Sulfida Terlarut (H2S) Trend H2S BM = 1 mg/L

y = - 7E-18x + 0,0019

0

0,0005

0,001

0,0015

0,002

Sem 1-16 Sem 2-16 Sem 1-17 Sem 2-17 Sem 1-18 Sem 2-18 Sem 1-19

H2S

(m

g/

L)

Periode pemantauan

Kecenderungan konsentrasi sulfida terlarut (H2S) di

Water Pond Well Pad RD-B

Sulfida Terlarut (H2S) Trend H2S BM = 1 mg/L

y = - 7E-18x + 0,0019

0

0,0005

0,001

0,0015

0,002

Sem 1-15 Sem 2-15 Sem 1-16 Sem 2-16 Sem 1-18 Sem 2-18 Sem 1-19

H2S

(m

g/

L)

Periode pemantauan

Kecenderungan konsentrasi sulfida terlarut (H2S) di

Water Pond Well Pad RD-I

Sulfida Terlarut (H2S) Trend H2S BM = 1 mg/L

Page 106: Environmental and Social Monitoring Report...2. Relevant Environmental Permits or Compliance Certificates 11 2.1 New Permit or Compliance Certificates Required and Obtained 11 2.2

Environment & Social Monitoring Report-1H18 Rev 1 Page 107

Concentration variation Dissolved Ammonia

Reference: Baku Mutu = Legal Threshold; Periode Pemantauan = Monitoring Period

y = 0,0061x2 - 0,0465x + 0,1506

0

0,1

0,2

0,3

0,4

0,5

Sem 1-16 Sem 2-16 Sem 1-17 Sem 2-17 Sem 1-18 Sem 2-18 Sem 1-19

NH

3-N

(m

g/L

)

Periode pemantauan

Kecenderungan konsentrasi amoniak total (NH3-N) di

Water Pond Well Pad RD-C

Amoniak Total (NH3-N) Trend Amoniak BM = 10 mg/L

y = -0,0012x2 - 0,0039x + 0,1612

0

0,1

0,2

0,3

0,4

0,5

Sem 1-15 Sem 2-15 Sem 1-16 Sem 2-16 Sem 1-17 Sem 2-17 Sem 1-18 Sem 2-18 Sem 1-19

NH

3-N

(m

g/

L)

Periode pemantauan

Kecenderungan konsentrasi amoniak total (NH3-N) di

Water Pond Well Pad RD-E

Amoniak Total (NH3-N) Trend Amoniak BM = 10 mg/L

y = 0,0247x2 - 0,2165x + 0,5363

0

0,1

0,2

0,3

0,4

0,5

Sem 1-16 Sem 2-16 Sem 1-17 Sem 2-17 Sem 1-18 Sem 2-18 Sem 1-19

NH

3-N

(m

g/

L)

Periode pemantauan

Kecenderungan konsentrasi amoniak total (NH3-N) di

Water Pond Well Pad RD-B

Amoniak Total (NH3-N) Trend Amoniak BM = 10 mg/L

y = 0,0256x2 - 0,1242x + 0,3749

0

0,5

1

1,5

2

2,5

Sem 1-15 Sem 2-15 Sem 1-16 Sem 2-16 Sem 1-18 Sem 2-18 Sem 1-19

NH

3-N

(m

g/

L)

Periode pemantauan

Kecenderungan konsentrasi amoniak total (NH3-N) di

Water Pond Well Pad RD-I

Amoniak Total (NH3-N) Trend Amoniak BM = 10 mg/L

Page 107: Environmental and Social Monitoring Report...2. Relevant Environmental Permits or Compliance Certificates 11 2.1 New Permit or Compliance Certificates Required and Obtained 11 2.2

Environment & Social Monitoring Report-1H18 Rev 1 Page 108

Concentration variation Mercury

Reference: Baku Mutu = Legal Threshold; Periode Pemantauan = Monitoring Period

y = 0,0005

0

0,002

0,004

0,006

Sem 1-15 Sem 2-15 Sem 1-16 Sem 2-16 Sem 1-17 Sem 2-17 Sem 1-18 Sem 2-18 Sem 1-19

Hg

(mg

/L

)

Periode pemantauan

Kecenderungan konsentrasi air raksa (Hg) di Water Pond

Well Pad RD-E

Air Raksa (Hg) Baku Mutu Trend Hg

y = 2E-19x2 - 9E-19x + 0,0005

0

0,002

0,004

0,006

Sem 1-16 Sem 2-16 Sem 1-17 Sem 2-17 Sem 1-18 Sem 2-18 Sem 1-19

Hg

(m

g/

L)

Periode pemantauan

Kecenderungan konsentrasi air raksa (Hg) di Water Pond

Well Pad RD-B

Air Raksa (Hg) Baku Mutu Trend Hg

y = 2E-19x2 - 9E-19x + 0,0005

0

0,002

0,004

0,006

Sem 1-16 Sem 2-16 Sem 1-17 Sem 2-17 Sem 1-18 Sem 2-18 Sem 1-19

Hg

(m

g/

L)

Periode pemantauan

Kecenderungan konsentrasi air raksa (Hg) di Water Pond

Well Pad RD-C

Air Raksa (Hg) Baku Mutu Trend Hg

y = 2E-19x2 - 9E-19x + 0,0005

0

0,002

0,004

0,006

Sem 1-15 Sem 2-15 Sem 1-16 Sem 2-16 Sem 1-18 Sem 2-18 Sem 1-19

Hg

(mg

/L

)

Periode pemantauan

Kecenderungan konsentrasi air raksa (Hg) di Water Pond

Well Pad RD-I

Air Raksa (Hg) Baku Mutu Trend Hg

Page 108: Environmental and Social Monitoring Report...2. Relevant Environmental Permits or Compliance Certificates 11 2.1 New Permit or Compliance Certificates Required and Obtained 11 2.2

Environment & Social Monitoring Report-1H18 Rev 1 Page 109

Concentration variation Arsenic

Reference: Baku Mutu = Legal Threshold; Periode Pemantauan = Monitoring Period

y = - 3E-17x + 0,0049

0

0,002

0,004

0,006

0,008

0,01

Sem 1-16 Sem 2-16 Sem 1-17 Sem 2-17 Sem 1-18 Sem 2-18 Sem 1-19

As

(mg

/L)

Periode pemantauan

Kecenderungan konsentrasi arsen (As) di Water Pond

Well Pad RD-C

Arsen (As) Trend As BM = 0,5 mg/L

y = - 3E-17x + 0,0049

0

0,002

0,004

0,006

0,008

0,01

Sem 1-16 Sem 2-16 Sem 1-17 Sem 2-17 Sem 1-18 Sem 2-18 Sem 1-19

As

(mg

/L

)

Periode pemantauan

Kecenderungan konsentrasi arsen (As) di Water Pond

Well Pad RD-B

Arsen (As) Trend As BM = 0,5 mg/L

y = 2E-18x2 - 2E-17x + 0,0049

0

0,002

0,004

0,006

0,008

0,01

Sem 1-15 Sem 2-15 Sem 1-16 Sem 2-16 Sem 1-17 Sem 2-17 Sem 1-18 Sem 2-18 Sem 1-19

As

(mg

/L

)

Periode pemantauan

Kecenderungan konsentrasi arsen (As) di Water Pond

Well Pad RD-E

Arsen (As) Trend As BM = 0,5 mg/L

y = - 3E-17x + 0,0049

0

0,002

0,004

0,006

0,008

0,01

Sem 1-15 Sem 2-15 Sem 1-16 Sem 2-16 Sem 1-18 Sem 2-18 Sem 1-19

As

(mg

/L)

Periode pemantauan

Kecenderungan konsentrasi arsen (As) di Water Pond

Well Pad RD-I

Arsen (As) Trend As BM = 0,5 mg/L

Page 109: Environmental and Social Monitoring Report...2. Relevant Environmental Permits or Compliance Certificates 11 2.1 New Permit or Compliance Certificates Required and Obtained 11 2.2

Environment & Social Monitoring Report-1H18 Rev 1 Page 110

Concentration variation pH

Reference: Baku Mutu = Legal Threshold; Periode Pemantauan = Monitoring Period

Based on monitoring conducted on produced water in the water pond and Well Pad RD-B mud pond, RD-

C, RD-E, RD-I, and RD-L in the first semester of 2019, it is known that most parameters of produced water

quality parameters meet the quality standards so it is not in a critical condition. The water contained in

the six wells are all stormwater that immediately runs off around it. This was because the well testing has

been completed since the second semester of 2016 and the mud and water produced in the ponds have

been removed and cleaned. While when sampling was carried out, drilling activity had not yet proceeded,

namely still in its main preparation at the location of the Well Pad RD-C and RD-I.

y = -0,0416x2 + 0,3356x + 7,1048

0

3

6

9

12

Sem 1-15 Sem 2-15 Sem 1-16 Sem 2-16 Sem 1-17 Sem 2-17 Sem 1-18 Sem 2-18 Sem 1-19

pH

Periode pemantauan

Kecenderungan nilai pH di Water Pond Well Pad RD-E

pH Baku Mutu Baku Mutu Trend pH

y = -0,0655x2 + 0,106x + 9,5286

0

3

6

9

12

Sem 1-16 Sem 2-16 Sem 1-17 Sem 2-17 Sem 1-18 Sem 2-18 Sem 1-19

pH

Periode pemantauan

Kecenderungan nilai pH di Water Pond Well Pad RD-B

pH Baku Mutu Baku Mutu Trend pH

y = 0,2119x2 - 1,9667x + 11,7

0

3

6

9

12

Sem 1-16 Sem 2-16 Sem 1-17 Sem 2-17 Sem 1-18 Sem 2-18 Sem 1-19

pH

Periode pemantauan

Kecenderungan nilai pH di Water Pond Well Pad RD-C

pH Baku Mutu Baku Mutu Trend pH

y = -0,1833x2 + 1,2595x + 6,5571

0

3

6

9

12

Sem 1-15 Sem 2-15 Sem 1-16 Sem 2-16 Sem 1-18 Sem 2-18 Sem 1-19

pH

Periode pemantauan

Kecenderungan nilai pH di Water Pond Well Pad RD-I

pH Baku Mutu Baku Mutu Trend pH

Page 110: Environmental and Social Monitoring Report...2. Relevant Environmental Permits or Compliance Certificates 11 2.1 New Permit or Compliance Certificates Required and Obtained 11 2.2

Environment & Social Monitoring Report-1H18 Rev 1 Page 111

Aquatic Biota

Phytoplankton Abundance Variation

Reference: Kelimpahan = Abundance; Trendline Kelimpahan = Abundance Trendline

y = -0,8452x2 + 7,0833x + 8,5714

0

5

10

15

20

25

30

35

Ke

lim

pa

ha

n (

Ind

/L

)

Periode Pemantauan

Kelimpahan fitoplankton di Sungai Endikat

Kelimpahan (Ind/L) Trendline kelimpahan

y = -0,4848x2 + 3,2152x + 12,833

0

5

10

15

20

25

30

35

Ke

lim

pa

ha

n (

Ind

/L

)

Periode Pemantauan

Kelimpahan fitoplankton di Sungai Asahan

Kelimpahan (Ind/L) Trendline kelimpahan

y = -0,1786x2 + 1,769x + 10,143

0

5

10

15

20

25

30

35

Ke

lim

pa

ha

n (

Ind

/L

)

Periode Pemantauan

Kelimpahan fitoplankton di Sungai Cawang

Tengah

Kelimpahan (Ind/L) Trendline kelimpahan

y = -0,1926x2 + 0,8597x + 17,69

0

5

10

15

20

25

30

35

Ke

lim

pa

ha

n (

Ind

/L

)

Periode Pemantauan

Kelimpahan fitoplankton di Sungai Cawang Kiri

Kelimpahan (Ind/L) Trendline kelimpahan

y = -2,2857x2 + 15,114x - 8

0

5

10

15

20

25

30

35

Sem 1-17 Sem 2-17 Sem 1-18 Sem 2-18 Sem 1-19

Ke

lim

pa

ha

n (

Ind

/L

)

Periode Pemantauan

Kelimpahan fitoplankton di Danau Deduruk

Kelimpahan (Ind/L) Trendline kelimpahan

Page 111: Environmental and Social Monitoring Report...2. Relevant Environmental Permits or Compliance Certificates 11 2.1 New Permit or Compliance Certificates Required and Obtained 11 2.2

Environment & Social Monitoring Report-1H18 Rev 1 Page 112

Phytoplankton Taxon Variation

Reference: Jumlah Taksa = Number of Taxon; Trendline Jumlah Taksa = Number of Taxon Trendline

y = -0,5x2 + 2,9x + 3,4

0

2

4

6

8

10

12

14

Sem 1-17 Sem 2-17 Sem 1-18 Sem 2-18 Sem 1-19

Jum

lah

ta

ksa

Periode Pemantauan

Jumlah taksa fitoplankton di Danau Deduruk

Jumlah taksa Trendline jumlah taksa

y = -0,0823x2 + 0,4225x + 7,0476

0

2

4

6

8

10

12

14

Jum

lah

ta

ksa

Periode Pemantauan

Jumlah taksa fitoplankton di Sungai Asahan

Jumlah taksa Trendline jumlah taksa

y = -0,1504x2 + 1,0877x + 5,2143

0

2

4

6

8

10

12

14

Jum

lah

ta

ksa

Periode Pemantauan

Jumlah taksa fitoplankton di Sungai Cawang Tengah

Jumlah taksa Trendline jumlah taksa

y = -0,1569x2 + 0,8859x + 7,4286

0

2

4

6

8

10

12

14

Jum

lah

ta

ksa

Periode Pemantauan

Jumlah taksa fitoplankton di Sungai Cawang Kiri

Jumlah taksa Trendline jumlah taksa

y = -0,3452x2 + 2,5833x + 4,2857

0

2

4

6

8

10

12

14

Jum

lah

ta

ksa

Periode Pemantauan

Jumlah taksa fitoplankton di Sungai Endikat

Jumlah taksa Trendline jumlah taksa

Page 112: Environmental and Social Monitoring Report...2. Relevant Environmental Permits or Compliance Certificates 11 2.1 New Permit or Compliance Certificates Required and Obtained 11 2.2

Environment & Social Monitoring Report-1H18 Rev 1 Page 113

Phytoplankton Diversity Index Variation

Reference: Indeks Keragaman = Diversity Index; Trendline Indeks Keragaman = Diversity Index Trendline

Rendah = Low; Sedang = Medium; Tinggi = High

y = -0,07x2 + 0,5329x + 1,8414

0

2

4

6

8

10

12

Ind

ek

s k

era

ga

ma

n

Periode Pemantauan

Indeks keragaman fitoplankton di Sungai Endikat

Rendah (0 - 2,302) Sedang (2,302 - 6,907)Tinggi (>6,907) Indeks keragamanTrendline indeks keragaman

y = -0,0758x2 + 0,5208x + 2,2145

0

2

4

6

8

10

12

Ind

ek

s k

era

ga

ma

n

Periode Pemantauan

Indeks keragaman fitoplankton di Sungai Cawang

Kiri

Rendah (0 - 2,302) Sedang (2,302 - 6,907)

Tinggi (>6,907) Indeks keragaman

Trendline indeks keragaman

y = -0,0132x2 + 0,0705x + 2,475

0

2

4

6

8

10

12

Ind

ek

s k

era

ga

ma

n

Periode Pemantauan

Indeks keragaman fitoplankton di Sungai Asahan

Rendah (0 - 2,302) Sedang (2,302 - 6,907)Tinggi (>6,907) Indeks keragamanTrendline indeks keragaman

y = -0,0734x2 + 0,5759x + 1,585

0

2

4

6

8

10

12

Ind

ek

s k

era

ga

ma

n

Periode Pemantauan

Indeks keragaman fitoplankton di Sungai Cawang

Tengah

Rendah (0 - 2,302) Sedang (2,302 - 6,907)

Tinggi (>6,907) Indeks keragaman

Trendline indeks keragaman

y = -0,035x2 + 0,143x + 2,422

0

2

4

6

8

10

12

Sem 1-17 Sem 2-17 Sem 1-18 Sem 2-18 Sem 1-19

Ind

ek

s k

era

ga

ma

n

Periode Pemantauan

Indeks Keragaman fitoplankton di Danau Deduruk

Rendah (0 - 2,302) Sedang (2,302 - 6,907)

Tinggi (>6,907) Indeks keragaman

Trendline indeks keragaman

Page 113: Environmental and Social Monitoring Report...2. Relevant Environmental Permits or Compliance Certificates 11 2.1 New Permit or Compliance Certificates Required and Obtained 11 2.2

Environment & Social Monitoring Report-1H18 Rev 1 Page 114

Phytoplankton Uniformity Index Variation

Reference: Indeks Keseragaman = Uniformity Index; Trendline Indeks Keseragaman = Uniformity Index Trendline

Rendah = Low; Sedang = Medium; Tinggi = High

y = -0,005x2 + 0,0436x + 0,8129

0,0

0,2

0,4

0,6

0,8

1,0

1,2

Ind

ek

s k

ese

rag

am

an

Periode Pemantauan

Indeks keseragaman fitoplankton di Sungai Endikat

Rendah (0 - 0,4) Sedang (0,4 - 0,6)Tinggi (>0,6) Indeks keseragamanTrendline indeks keragaman

y = -0,0285x2 + 0,2167x + 0,6464

0,0

0,2

0,4

0,6

0,8

1,0

1,2

Ind

ek

s k

ese

rag

am

an

Periode Pemantauan

Indeks keseragaman fitoplankton di Sungai Cawang

Kiri

Rendah (0 - 0,4) Sedang (0,4 - 0,6)Tinggi (>0,6) Indeks keseragamanTrendline indeks keragaman

y = 0,0002x2 + 0,0174x + 0,8436

0,0

0,2

0,4

0,6

0,8

1,0

1,2

Ind

ek

s k

ese

rag

am

an

Periode Pemantauan

Indeks keseragaman fitoplankton di Sungai Asahan

Rendah (0 - 0,4) Sedang (0,4 - 0,6)Tinggi (>0,6) Indeks keseragamanTrendline indeks keragaman

y = -0,0286x2 + 0,2314x + 0,5417

0,0

0,2

0,4

0,6

0,8

1,0

1,2

Ind

ek

s k

ese

rag

am

an

Periode Pemantauan

Indeks keseragaman fitoplankton di Sungai Cawang

Tengah

Rendah (0 - 0,4) Sedang (0,4 - 0,6)Tinggi (>0,6) Indeks keseragamanTrendline indeks keragaman

y = 0,0264x2 - 0,1556x + 1,118

0,0

0,2

0,4

0,6

0,8

1,0

1,2

Sem 1-17 Sem 2-17 Sem 1-18 Sem 2-18 Sem 1-19

Ind

ek

s k

ese

rag

am

an

Periode Pemantauan

Indeks keseragaman fitoplankton di Danau Deduruk

Rendah (0 - 0,4) Sedang (0,4 - 0,6)

Tinggi (>0,6) Indeks keseragaman

Trendline indeks keragaman

Page 114: Environmental and Social Monitoring Report...2. Relevant Environmental Permits or Compliance Certificates 11 2.1 New Permit or Compliance Certificates Required and Obtained 11 2.2

Environment & Social Monitoring Report-1H18 Rev 1 Page 115

Zooplankton Abundance Variation

Reference: Kelimpahan = Abundance; Trendline Kelimpahan = Abundance Trendline

y = -0,8571x2 + 4x + 20,857

0

10

20

30

40

50

Ke

lim

pa

ha

n (

Ind

/L

)

Periode Pemantauan

Kelimpahan zooplankton di Sungai Endikat

Kelimpahan (Ind/L) Trendline kelimpahan

y = -0,7424x2 + 6,5242x + 11,333

0

10

20

30

40

50

Ke

lim

pa

ha

n (

Ind

/L

)

Periode Pemantauan

Kelimpahan zooplankton di Sungai Cawang Tengah

Kelimpahan (Ind/L) Trendline kelimpahan

y = -0,5519x2 + 4,9861x + 13,548

0

10

20

30

40

50

Ke

lim

pa

ha

n (

Ind

/L

)

Periode Pemantauan

Kelimpahan zooplankton di Sungai Cawang Kiri

Kelimpahan (Ind/L) Trendline kelimpahan

y = -0,3528x2 + 2,6948x + 15,476

0

10

20

30

40

50

Ke

lim

pa

ha

n (

Ind

/L

)

Periode Pemantauan

Kelimpahan zooplankton di Sungai Asahan

Kelimpahan (Ind/L) Trendline kelimpahan

y = -2,4286x2 + 12,771x + 4,4

0

10

20

30

40

50

Sem 1-17 Sem 2-17 Sem 1-18 Sem 2-18 Sem 1-19

Ke

lim

pa

ha

n (

Ind

/L

)

Periode Pemantauan

Kelimpahan zooplankton di Danau Deduruk

Kelimpahan (Ind/L) Trendline kelimpahan

Page 115: Environmental and Social Monitoring Report...2. Relevant Environmental Permits or Compliance Certificates 11 2.1 New Permit or Compliance Certificates Required and Obtained 11 2.2

Environment & Social Monitoring Report-1H18 Rev 1 Page 116

Zooplankton Taxon Variation

Reference: Jumlah Taksa = Number of Taxon; Trendline Jumlah Taksa = Number of Taxon Trendline

y = -0,6429x2 + 2,9571x + 4,8

0

2

4

6

8

10

12

Sem 1-17 Sem 2-17 Sem 1-18 Sem 2-18 Sem 1-19

Jum

lah

ta

ksa

Periode Pemantauan

Jumlah taksa zooplankton di Danau Deduruk

Jumlah taksa Trendline jumlah taksa

y = -0,1396x2 + 0,9794x + 6,1905

0

2

4

6

8

10

12

Jum

lah

ta

ksa

Periode Pemantauan

Jumlah taksa zooplankton di Sungai Asahan

Jumlah taksa Trendline jumlah taksa

y = -0,1937x2 + 1,8539x + 3,3095

0

2

4

6

8

10

12

Jum

lah

ta

ksa

Periode Pemantauan

Jumlah taksa zooplankton di Sungai Cawang Tengah

Jumlah taksa Trendline jumlah taksa

y = -0,0963x2 + 0,7799x + 6,5952

0

2

4

6

8

10

12

Jum

lah

ta

ksa

Periode Pemantauan

Jumlah taksa zooplankton di Sungai Cawang Kiri

Jumlah taksa Trendline jumlah taksa

y = -0,3095x2 + 1,6905x + 5,7143

0

2

4

6

8

10

12

Jum

lah

ta

ksa

Periode Pemantauan

Jumlah taksa zooplankton di Sungai Endikat

Jumlah taksa Trendline jumlah taksa

Page 116: Environmental and Social Monitoring Report...2. Relevant Environmental Permits or Compliance Certificates 11 2.1 New Permit or Compliance Certificates Required and Obtained 11 2.2

Environment & Social Monitoring Report-1H18 Rev 1 Page 117

Zooplankton Diversity Index Variation

Reference: Indeks Keragaman = Diversity Index; Trendline Indeks Keragaman = Diversity Index Trendline

Rendah = Low; Sedang = Medium; Tinggi = High

y = -0,1051x2 + 0,6077x + 1,9643

0

2

4

6

8

10

12

Ind

ek

s k

era

ga

ma

n

Periode Pemantauan

Indeks keragaman zooplankton di Sungai Endikat

Rendah (0 - 2,302) Sedang (2,302 - 6,907)

Tinggi (>6,907) Indeks keragaman

Trendline indeks keragaman

y = -0,0405x2 + 0,3569x + 1,8593

0

2

4

6

8

10

12

Ind

ek

s k

era

ga

ma

n

Periode Pemantauan

Indeks keragaman zooplankton di Sungai Asahan

Rendah (0 - 2,302) Sedang (2,302 - 6,907)

Tinggi (>6,907) Indeks keragaman

Trendline indeks keragaman

y = -0,0498x2 + 0,4972x + 1,4817

0

2

4

6

8

10

12

Ind

ek

s k

era

ga

ma

n

Periode Pemantauan

Indeks keragaman zooplankton di Sungai Cawang

Tengah

Rendah (0 - 2,302) Sedang (2,302 - 6,907)Tinggi (>6,907) Indeks keragamanTrendline indeks keragaman

y = -0,0189x2 + 0,2035x + 2,106

0

2

4

6

8

10

12

Ind

ek

s k

era

ga

ma

n

Periode Pemantauan

Indeks keragaman zooplankton di Sungai Cawang

Kiri

Rendah (0 - 2,302) Sedang (2,302 - 6,907)

Tinggi (>6,907) Indeks keragaman

Trendline indeks keragaman

y = -0,0864x2 + 0,2116x + 2,542

0

2

4

6

8

10

12

Sem 1-17 Sem 2-17 Sem 1-18 Sem 2-18 Sem 1-19

Ind

ek

s k

era

ga

ma

n

Periode Pemantauan

Indeks keragaman zooplankton di Danau Deduruk

Rendah (0 - 2,302) Sedang (2,302 - 6,907)

Tinggi (>6,907) Indeks keragaman

Trendline indeks keragaman

Page 117: Environmental and Social Monitoring Report...2. Relevant Environmental Permits or Compliance Certificates 11 2.1 New Permit or Compliance Certificates Required and Obtained 11 2.2

Environment & Social Monitoring Report-1H18 Rev 1 Page 118

Zooplankton Uniformity Index Variation

Reference: Indeks Keseragaman = Uniformity Index; Trendline Indeks Keseragaman = Uniformity Index Trendline

Rendah = Low; Sedang = Medium; Tinggi = High

y = -0,0017x2 + 0,0098x + 0,9029

0,0

0,2

0,4

0,6

0,8

1,0

1,2

Ind

ek

s k

ese

rag

am

an

Periode Pemantauan

Indeks keseragaman zooplankton di Sungai Endikat

Rendah (0 - 0,4) Sedang (0,4 - 0,6)

Tinggi (>0,6) Indeks keseragaman

Trendline indeks keseragaman

y = -0,0014x2 + 0,0353x + 0,7526

0,0

0,2

0,4

0,6

0,8

1,0

1,2

Ind

ek

s k

ese

rag

am

an

Periode Pemantauan

Indeks keseragaman zooplankton di Sungai Asahan

Rendah (0 - 0,4) Sedang (0,4 - 0,6)

Tinggi (>0,6) Indeks keseragaman

Trendline indeks keseragaman

y = -0,0004x2 + 0,0194x + 0,8298

0,0

0,2

0,4

0,6

0,8

1,0

1,2

Ind

ek

s k

ese

rag

am

an

Periode Pemantauan

Indeks keseragaman zooplankton di Sungai Cawang

Tengah

Rendah (0 - 0,4) Sedang (0,4 - 0,6)Tinggi (>0,6) Indeks keseragamanTrendline indeks keseragaman

y = 0,001x2 + 0,0075x + 0,814

0,0

0,2

0,4

0,6

0,8

1,0

1,2

Ind

ek

s k

ese

rag

am

an

Periode Pemantauan

Indeks keseragaman zooplankton di Sungai Cawang

Kiri

Rendah (0 - 0,4) Sedang (0,4 - 0,6)Tinggi (>0,6) Indeks keseragamanTrendline indeks keseragaman

y = 0,0479x2 - 0,2741x + 1,198

0,0

0,2

0,4

0,6

0,8

1,0

1,2

Sem 1-17 Sem 2-17 Sem 1-18 Sem 2-18 Sem 1-19

Ind

ek

s k

ese

rag

am

an

Periode Pemantauan

Indeks keseragaman zooplankton di Danau Deduruk

Rendah (0 - 0,4) Sedang (0,4 - 0,6)Tinggi (>0,6) Indeks keseragamanTrendline indeks keseragaman

Page 118: Environmental and Social Monitoring Report...2. Relevant Environmental Permits or Compliance Certificates 11 2.1 New Permit or Compliance Certificates Required and Obtained 11 2.2

Environment & Social Monitoring Report-1H18 Rev 1 Page 119

Benthos Abundance Variation

Reference: Kelimpahan = Abundance; Trendline Kelimpahan = Abundance Trendline

y = 1,8571x2 - 13,943x + 72,4

0

20

40

60

80

100

Sem 1-17 Sem 2-17 Sem 1-18 Sem 2-18 Sem 1-19

Ke

pa

da

tan

(In

d/

m2)

Periode Pemantauan

Kepadatan benthos di Danau Deduruk

Kepadatan (Ind/m2) Trendline kepadatan

y = -0,6082x2 - 8,5844x + 157,74

0

50

100

150

200

250

Ke

pa

da

tan

(In

d/m

2)

Periode Pemantauan

Kepadatan benthos di Sungai Cawang Tengah

Kepadatan (Ind/m2) Trendline kepadatan

y = 0,4156x2 - 31,623x + 255,62

0

50

100

150

200

250

Ke

pa

da

tan

(In

d/

m2)

Periode Pemantauan

Kepadatan benthos di Sungai Cawang Kiri

Kepadatan (Ind/m2) Trendline kepadatan

y = 3,5628x2 - 50,994x + 280,93

0

100

200

300

400

500

Ke

pa

da

tan

(In

d/

m2)

Periode Pemantauan

Kepadatan benthos di Sungai Asahan

Kepadatan (Ind/m2) Trendline kepadatan

y = -0,0952x2 - 20,881x + 173,43

0

50

100

150

200

250

Ke

pa

da

tan

(In

d/m

2)

Periode Pemantauan

Kepadatan benthos di Sungai Endikat

Kepadatan (Ind/m2) Trendline kepadatan

Page 119: Environmental and Social Monitoring Report...2. Relevant Environmental Permits or Compliance Certificates 11 2.1 New Permit or Compliance Certificates Required and Obtained 11 2.2

Environment & Social Monitoring Report-1H18 Rev 1 Page 120

Benthos Taxon Variation

Reference: Jumlah Taksa = Number of Taxon; Trendline Jumlah Taksa = Number of Taxon Trendline

y = -0,0206x2 - 0,2444x + 4,7619

0

2

4

6

8

Jum

lah

ta

ksa

Periode Pemantauan

Jumlah taksa benthos di Sungai Cawang Tengah

Jumlah taksa Trendline jumlah taksa

y = -0,1169x2 + 0,7688x + 2,8571

0

2

4

6

8

Jum

lah

ta

ksa

Periode Pemantauan

Jumlah taksa benthos di Sungai Cawang Kiri

Jumlah taksa Trendline jumlah taksa

y = -0,0703x2 + 0,4201x + 3,5714

0

2

4

6

8

Jum

lah

ta

ksa

Periode Pemantauan

Jumlah taksa benthos di Sungai Asahan

Jumlah taksa Trendline jumlah taksa

y = 0,0238x2 - 0,5476x + 4,1429

0

2

4

6

8

Jum

lah

ta

ksa

Periode Pemantauan

Jumlah taksa benthos di Sungai Endikat

Jumlah taksa Trendline jumlah taksa

y = 0,1429x2 - 0,8571x + 3,2

0

2

4

6

8

Sem 1-17 Sem 2-17 Sem 1-18 Sem 2-18 Sem 1-19

Jum

lah

ta

ksa

Periode Pemantauan

Jumlah taksa benthos di Danau Deduruk

Jumlah taksa Trendline jumlah taksa

Page 120: Environmental and Social Monitoring Report...2. Relevant Environmental Permits or Compliance Certificates 11 2.1 New Permit or Compliance Certificates Required and Obtained 11 2.2

Environment & Social Monitoring Report-1H18 Rev 1 Page 121

Benthos Diversity Index Variation

Reference: Indeks Keragaman = Diversity Index; Trendline Indeks Keragaman = Diversity Index Trendline

Rendah = Low; Sedang = Medium; Tinggi = High

y = 0,0246x2 - 0,3911x + 2,1443

0

2

4

6

8

10

12

Ind

ek

s k

era

ga

ma

n

Periode Pemantauan

Indeks keragaman benthos di Sungai Endikat

Rendah (0 - 2,302) Sedang (2,302 - 6,907)

Tinggi (>6,907) Indeks keragaman

Trendline indeks keragaman

y = -0,0539x2 + 0,3962x + 1,2443

0

2

4

6

8

10

12

Ind

ek

s k

era

ga

ma

n

Periode Pemantauan

Indeks keragaman benthos di Sungai Asahan

Rendah (0 - 2,302) Sedang (2,302 - 6,907)Tinggi (>6,907) Indeks keragamanTrendline indeks keragaman

y = -0,0296x2 + 0,0239x + 2,0724

0

2

4

6

8

10

12

Ind

ek

s k

era

ga

ma

n

Periode Pemantauan

Indeks keragaman benthos di Sungai Cawang Tengah

Rendah (0 - 2,302) Sedang (2,302 - 6,907)

Tinggi (>6,907) Indeks keragaman

Trendline indeks keragaman

y = -0,0696x2 + 0,4663x + 1,1519

0

2

4

6

8

10

12

Ind

ek

s k

era

ga

ma

n

Periode Pemantauan

Indeks keragaman benthos di Sungai Cawang Kiri

Rendah (0 - 2,302) Sedang (2,302 - 6,907)Tinggi (>6,907) Indeks keragamanTrendline indeks keragaman

y = 0,0943x2 - 0,6017x + 1,756

0

2

4

6

8

10

12

Sem 1-17 Sem 2-17 Sem 1-18 Sem 2-18 Sem 1-19

Ind

ek

s k

era

ga

ma

n

Periode Pemantauan

Indeks keragaman benthos di Danau Deduruk

Rendah (0 - 2,302) Sedang (2,302 - 6,907)Tinggi (>6,907) Indeks keragamanTrendline indeks keragaman

Page 121: Environmental and Social Monitoring Report...2. Relevant Environmental Permits or Compliance Certificates 11 2.1 New Permit or Compliance Certificates Required and Obtained 11 2.2

Environment & Social Monitoring Report-1H18 Rev 1 Page 122

Benthos Uniformity Index Variation

Reference: Indeks Keseragaman = Uniformity Index; Trendline Indeks Keseragaman = Uniformity Index Trendline

Rendah = Low; Sedang = Medium; Tinggi = High

The community structure of aquatic biota in the first semester of 2019 is in a condition of low - moderate

diversity (for phytoplankton and zooplankton) and low (for benthos). Based on the uniformity index

value, the zooplankton community has an even distribution of species abundance. While the

phytoplankton and benthos communities have uneven distribution of abundance and density types.

Although the distribution of phytoplankton abundance and benthos density is not evenly distributed, it is

not in a critical condition. The dominance of certain species in several locations is because in these

locations only one type of phytoplankton or benthos is found with abundance and low density.

y = 0,0083x2 - 0,1195x + 1,1086

0,0

0,2

0,4

0,6

0,8

1,0

1,2

Ind

ek

s k

ese

rag

am

an

Periode Pemantauan

Indeks keseragaman benthos di Sungai Endikat

Rendah (0 - 0,4) Sedang (0,4 - 0,6)Tinggi (>0,6) Indeks keseragamanTrendline indeks keseragaman

y = -0,0309x2 + 0,2494x + 0,5624

0,0

0,2

0,4

0,6

0,8

1,0

1,2

Ind

ek

s k

ese

rag

am

an

Periode Pemantauan

Indeks keseragaman benthos di Sungai Asahan

Rendah (0 - 0,4) Sedang (0,4 - 0,6)Tinggi (>0,6) Indeks keseragamanTrendline indeks keseragaman

y = -0,0339x2 + 0,2203x + 0,6952

0,0

0,2

0,4

0,6

0,8

1,0

1,2

Ind

ek

s k

ese

rag

am

an

Periode Pemantauan

Indeks keseragaman benthos di Sungai Cawang

Tengah

Rendah (0 - 0,4) Sedang (0,4 - 0,6)Tinggi (>0,6) Indeks keseragamanTrendline indeks keseragaman

y = -0,0354x2 + 0,2509x + 0,5921

0,0

0,2

0,4

0,6

0,8

1,0

1,2

Ind

ek

s k

ese

rag

am

an

Periode Pemantauan

Indeks keseragaman benthos di Sungai Cawang Kiri

Rendah (0 - 0,4) Sedang (0,4 - 0,6)Tinggi (>0,6) Indeks keseragamanTrendline indeks keseragaman

y = 0,0557x2 - 0,4243x + 1,426

0,0

0,2

0,4

0,6

0,8

1,0

1,2

Sem 1-17 Sem 2-17 Sem 1-18 Sem 2-18 Sem 1-19

Ind

ek

s k

ese

rag

am

an

Periode Pemantauan

Indeks keseragaman benthos di Danau Deduruk

Rendah (0 - 0,4) Sedang (0,4 - 0,6)

Tinggi (>0,6) Indeks keseragaman