Planning and Environment Act 1987 Panel Report Stockyard Hill Wind Farm Revised Permits Pyrenees Planning Scheme Application to Amend Planning Permit PLSP/05/0548, New Planning Permit Applications PA1600101 and PA2499/16 Corangamite Planning Scheme New Planning Permit Application PA1600126 10 May 2017

Upload: others

Post on 07-Jul-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Environment Act 1987 - Planning - Planning · Management Plan incorporating mitigation measures and the provision of native vegetation offsets the final extent of native vegetation

Planning and Environment Act 1987 

Panel Report 

Stockyard Hill Wind Farm Revised Permits 

 

 

 

Pyrenees Planning Scheme 

Application to Amend Planning Permit PL‐SP/05/0548, New Planning Permit Applications PA1600101 and PA2499/16 

Corangamite Planning Scheme 

New Planning Permit Application PA1600126 

 

 

 

 

 

 

 

 

 

 

 

 

 

10 May 2017 

    

Page 2: Environment Act 1987 - Planning - Planning · Management Plan incorporating mitigation measures and the provision of native vegetation offsets the final extent of native vegetation

 

 

 

 

 

 

 

 

 

 

 

 

 

Planning and Environment Act 1987 

Panel Report pursuant to sections 153, 155 and 97E of the Act 

Stockyard Hill Wind Farm Revised Permits 

10 May 2017 

 

 

Lester Townsend, Chair 

   

Rod Gowans, Member  Adrian Vlok, Member 

 

Page 3: Environment Act 1987 - Planning - Planning · Management Plan incorporating mitigation measures and the provision of native vegetation offsets the final extent of native vegetation

Stockyard Hill Wind Farm Revised Permits  Panel Report  10 May 2017 

 

  

 

Contents   Page 

1  Introduction ................................................................................................................ 1 

1.1  The permit ............................................................................................................... 1 1.2  The Applications ...................................................................................................... 3 1.3  Summary of issues raised in submissions ............................................................... 4 

2  Planning context ......................................................................................................... 6 

2.1  Policy framework ..................................................................................................... 6 2.2  Planning scheme provisions .................................................................................. 13 

3  Noise ........................................................................................................................ 17 

3.1  Introduction ........................................................................................................... 17 3.2  Noise limits and the standard ............................................................................... 17 3.3  Noise assessment .................................................................................................. 22 3.4  Background noise monitoring ............................................................................... 28 3.5  Post‐construction compliance monitoring and management .............................. 31 

4  Health ....................................................................................................................... 38 

5  Landscape and visual impact ..................................................................................... 41 

5.1  Introduction ........................................................................................................... 41 5.2  Visual impact ......................................................................................................... 41 5.3  Mawallok ............................................................................................................... 47 5.4  Landscape mitigation ............................................................................................ 50 

6  Flora and native vegetation ...................................................................................... 51 

6.1  Introduction ........................................................................................................... 51 6.2  Removal of native vegetation ............................................................................... 53 

7  Fauna including avifauna .......................................................................................... 61 

7.1  Introduction ........................................................................................................... 61 7.2  Fauna including avifauna (other than Brolga) ....................................................... 61 7.3  Brolga ..................................................................................................................... 66 

8  Aviation .................................................................................................................... 74 

8.1  Introduction ........................................................................................................... 74 8.2  Hazard lighting ....................................................................................................... 75 8.3  Aviation safety ....................................................................................................... 76 8.4  Aerial firefighting ................................................................................................... 77 

9  Traffic and road asset management .......................................................................... 78 

9.1  Introduction ........................................................................................................... 78 9.2  Traffic management .............................................................................................. 78 

10  Quarry ...................................................................................................................... 81 

10.1  Introduction ........................................................................................................... 81 

Page 4: Environment Act 1987 - Planning - Planning · Management Plan incorporating mitigation measures and the provision of native vegetation offsets the final extent of native vegetation

Stockyard Hill Wind Farm Revised Permits  Panel Report  10 May 2017 

 

  

 

10.2  Submissions and evidence .................................................................................... 83 10.3  Hydrogeology and water impacts of the quarry ................................................... 85 10.4  Recommendation .................................................................................................. 87 

11  Other issues .............................................................................................................. 88 

11.1  Responsible authority ........................................................................................... 88 

 

Appendix A  Submitters to the Amendment 

Appendix B  Document list 

Appendix C  Parties to the Panel Hearing 

Appendix D  Preferred permits 

 

Page 5: Environment Act 1987 - Planning - Planning · Management Plan incorporating mitigation measures and the provision of native vegetation offsets the final extent of native vegetation

Stockyard Hill Wind Farm Revised Permits  Panel Report  10 May 2017 

 

  

 

List of Tables   Page 

Table 1:  Chronology of the Application ................................................................................ 2 

Table 2:  Zones of visual impact ........................................................................................... 43 

Table 3:  Changes to the Wind Energy Facility affecting vegetation ................................... 52 

Table 4:  Changes to external roadside and  intersection upgrades affecting vegetation .............................................................................................................. 52 

Table 5:  External overhead powerline – application for vegetation removal. ................... 53 

Table 6:  Estimated number of Brolga collisions .................................................................. 69  

List of Figures   Page 

Figure 1:  The subject site ........................................................................................................ 2 

Figure 2:  Noise contours ...................................................................................................... 26 

Figure 3:  Distances from turbines ........................................................................................ 44 

Figure 4:  Photomontage view of permitted wind farm ....................................................... 48 

Figure 5:  Photomontage view of amended wind farm ........................................................ 48 

Figure 6:  Section view of the proposed quarry .................................................................... 82 

 

Page 6: Environment Act 1987 - Planning - Planning · Management Plan incorporating mitigation measures and the provision of native vegetation offsets the final extent of native vegetation

Stockyard Hill Wind Farm Revised Permits  Panel Report  10 May 2017 

 

  

 

List of Abbreviations  

Abbreviation  Meaning 

BAM  Bat and Avifauna Management 

CASA  Civil Aviation Safety Authority 

CFA  Country Fire Authority 

dB  Decibels 

DEDJTR  Department of Economic Development, Jobs, Transport and Resources 

DELWP  Department of Environment, Land, Water and Planning 

DEPI  Department of Environment and Primary Industries (former) 

DSE  Department of Sustainability and Environment (former) 

DTPLI  Department of Transport, Planning and Local Infrastructure (former) 

EPA  Environment Protection Authority 

EPBC Act  Environment Protection and Biodiversity Conservation Act 1999 

ESO  Environmental Significance Overlay 

EVC  Ecological Vegetation Class 

FFG Act  Flora and Fauna Guarantee Act 1988 

FZ  Farming Zone 

LPPF  Local Planning Policy Framework 

MDA  Marshall Day Acoustics 

MRSD Act  Mineral Resources (Sustainable Development) Act 1990 

MSS  Municipal Strategic Statement 

NIRV  Noise from Industry in Regional Victoria 

P&E Act  Planning and Environment Act 1987 

RSA  Rotor swept area 

SLO  Significant Landscape Overlay 

SPPF  State Planning Policy Framework 

temperate volcanic grasslands EVC 

Natural Temperate Grassland of the Victorian Volcanic Plains EVC 

2010 Noise Standard  New Zealand Noise Standard NZS6808:2010  Acoustics – Wind Farm Noise 

VCAT  Victorian Civil and Administrative Tribunal 

VPO  Vegetation Protection Overlay 

VPP  Victoria Planning Provisions 

WEF  Wind Energy Facility 

WEF Guidelines  Policy and Planning Guidelines for Development of Wind Energy Facilities – January 2016 

   

Page 7: Environment Act 1987 - Planning - Planning · Management Plan incorporating mitigation measures and the provision of native vegetation offsets the final extent of native vegetation

Stockyard Hill Wind Farm Revised Permits  Panel Report  10 May 2017 

 

  

 

Overview  

Amendment summary    

The proposal  Pyrenees Planning Scheme 

Application to Amend Planning Permit PL‐SP/05/0548 

New Planning Permit Application PA1600101 (Native vegetation removal and road access for powerline) and PA2499/16 (Quarry) 

Corangamite Planning Scheme 

New Planning Permit Application PA1600126 (Native vegetation removal and road access for powerline)

Common name  Stockyard Hill Wind Farm Revised Permits 

Brief description  The Minister for Planning is considering an application to amend the planning permit for the Stockyard Hill Wind Farm.  The permit was issued by the Minister for Planning 

The Minister for Planning is also considering three new Planning Permit Applications 

Subject site  Stockyard Hill – the wind farm site is located within the Pyrenees Shire, approximately 150 kilometres west, north‐west of Melbourne and approximately 35 kilometres west of Ballarat.  Transmissions line are also proposed in Corangamite

Permit applicant  Origin Energy (the Proponent/Applicant) 

Responsible authority  The Minister for Planning represented by the Department of Environment, Land, Water and Planning (DELWP) 

Exhibition  First round of notice for all four applications between 4 October and 31 October 2016 

Second round of notice for amendments to applications PA1600126 and PA1600101 in November 2016. 

Submissions  Number of Submissions: 45   Opposed: 32   Letters of support: 13 

    

Page 8: Environment Act 1987 - Planning - Planning · Management Plan incorporating mitigation measures and the provision of native vegetation offsets the final extent of native vegetation

Stockyard Hill Wind Farm Revised Permits  Panel Report  10 May 2017 

 

  

 

 

Panel Process    

The Panel  Nick Wimbush (Chair), Rod Gowans and Adrian Vlok were appointed as the Panel on 29 September 2016.  On 23 November 2016, the appointment was cancelled as Mr Wimbush was unable to Chair this matter due to timing constraints and a potential conflict of interest, and Lester Townsend (Chair), Rod Gowans and Adrian Vlok were appointed as the Panel. 

Directions Hearing  Craig’s Royal Hotel, Ballarat, 9 November 2016 

Panel Hearing  Craig’s Royal Hotel, Ballarat 

6‐10, 13‐17 and 20 February 2017  

Site Inspections  Unaccompanied, on various dates during the Hearing 

Appearances  See Appendix C 

Date of this Report  10 May 2017 

 

Page 9: Environment Act 1987 - Planning - Planning · Management Plan incorporating mitigation measures and the provision of native vegetation offsets the final extent of native vegetation

Stockyard Hill Wind Farm Revised Permits  Panel Report  10 May 2017 

 

Page i 

 

Executive summary 

(i) Summary 

The Application in relation to the wind farm (WEF) has two components: 

an amendment to the size of the turbines and their layout 

changes to permit conditions. 

The  proposed  changes  to  the  size  and  layout  are  relatively  easy  to  understand  and  the changes to the permit clear: 

the wind energy facility must comprise no more than 149 157 wind turbines 

the overall maximum height of  the wind  turbines  (to  the  tip of  the  rotor blade when vertical) must not exceed 132 180 metres above natural ground level 

wind turbines must be mounted on a tubular tower with a hub height of no greater than 80 120 metres 

each wind turbine is to have not more than three rotor blades, with a rotor diameter each blade having a length of no greater than 52 142 metres 

the ground clearance from the bottom of the blades to the ground  level  is not less than 32 metres. 

The proposed changes to the conditions are less easy to understand.  The permit Application presented  the  changes  in  a neat  table.1   Over  the  course of  the Hearing  further  changes were proposed by DELWP.   These were presented as track changes, but these changes are confusing: 

the  automatic  numbering  has  not  been  turned  off  and  so  it  is  not  easy  to  cross reference conditions to the original permit 

some  conditions  have  been  replaced  in  total where  in  fact  only minor wording changes are proposed making it impossible to see what the actual changes are 

there  are  track  changes  on  top  of  other  changes,  rather  than  one  set  of  agreed changes. 

For these reasons the Panel has not included a preferred Panel version of the permit in this report because  it would potentially  imply Panel support for detailed changes that have not been  subject  to  submissions  and which  the Panel has not been  able  to  identify  from  the ‘track changes’. 

As stressed at the Directions Hearing it is important to recognise that the wind farm permit (Pyrenees Planning Scheme PL‐SP/05/0548)  is an amendment  to an existing permit, not a new application.   The  task of  the Panel  is  to  focus on changes  from  the existing approved project rather than undertaking a ‘first principles’ review. 

The  Panel  supports  the  approaches  of  the  2010  Panel,  and  concludes  in  relation  to  the permit amendment and three new permits: 

                                                       1  Submission in support of the application Appendix C. 

Page 10: Environment Act 1987 - Planning - Planning · Management Plan incorporating mitigation measures and the provision of native vegetation offsets the final extent of native vegetation

Stockyard Hill Wind Farm Revised Permits  Panel Report  10 May 2017 

 

Page ii 

 

the area does not warrant recognition as a high amenity noise environment to be referenced in conditions 

it is appropriate to ensure the Environmental Management Plan addresses changes to environmental management standards when it is reviewed 

the noise modelling  is  likely  to produce higher predicted noise  levels  than would occur  in  reality  for  the vast majority of atmospheric conditions and  therefore  the result is an appropriately conservative assessment 

irrespective of  the noise modelling assessment uncertainty,  the permit conditions provide a robust framework to ensure compliance with relevant standards 

while  reduced  turbine  spacing  (caused  by  increase  rotor  size)  could  result  in increased  sound  power  the  two  noise  assessments  undertaken  adequately  take these matters into account and in both cases noise compliance is predicted 

no  compelling  argument  has  been  made  to  justifying  the  amendment  or replacement of existing conditions  relating  to  the measuring of background noise except to reflect factual changes in the windfarm itself 

there are no compelling arguments to justifying the amendment or replacement of existing  conditions  around  complaints  except  to  reflect  factual  changes  in  the windfarm itself 

the  timely  and  proactive  forwarding  of  the  complaints  register  to  Council  is appropriate 

the  clear  positions  of  State  and  National  Health  Authorities  is  that  there  is  no evidence of direct health effects and the Panel has no evidence to depart from that view 

that while the turbines will be visible from further away, a comparison of the visual impact of the existing permit and the amendment permit, from a range of viewing distances, shows the impacts will be of a similar nature and magnitude 

the amended wind  farm preserves  the  views  identified by  the  current permit  for Mawallok Homestead 

native  vegetation  removal  for  the  amended  wind  farm  should  be  able  to  be managed to an acceptable level subject to the development of a Native Vegetation Management  Plan  incorporating mitigation measures  and  the  provision  of  native vegetation offsets 

the  final  extent  of  native  vegetation  removal  should  be  determined  following  a review of the need for a design requirement for internal track widths of 12.5 metres including  examination  of  the  adoption  of  a  minimal  disturbance  design  with narrower  track  widths  including  within  track  cabling,  to  the  satisfaction  of  the Minister 

the impacts on fauna and avifauna (including Brolga) should be able to be managed to  an  acceptable  level  subject  to  the  development  of  an  Environmental Management  Plan  and  the  incorporation  and  implementation  of  appropriate mitigation measures 

there  is a need  to co‐ordinate a strategic,  region wide  response  to Brolga habitat planning, restoration and management 

the existing permitted wind farm is substantial and represents a hazard to aviation; this remains similarly true for the amended wind farm 

Page 11: Environment Act 1987 - Planning - Planning · Management Plan incorporating mitigation measures and the provision of native vegetation offsets the final extent of native vegetation

Stockyard Hill Wind Farm Revised Permits  Panel Report  10 May 2017 

 

Page iii 

 

the amended wind  farm does not result  in a material change to aerial agricultural impacts.   The Panel agrees with the conclusions and recommendation of the 2010 Panel and it sees no reasonable justification to amend the current permit conditions or alter the layout of the amended wind farm 

the amended wind  farm does not result  in a material change  to aerial  firefighting impacts.   The Panel agrees with the conclusions and recommendation of the 2010 Panel and it sees no reasonable justification to amend the current permit conditions or alter the layout of the amended wind farm 

the Traffic Management Plan conditions to make  it clear that  it must also address the operation of the quarry 

the Quarry is unlikely to have an adverse impact on groundwater and these impacts can be monitored and controlled 

the effect of Clause 61 of  the Planning Scheme  together with  section 97H of  the Planning and Environment Act 1987  is that Council  is the responsible authority for enforcement.  This cannot be changed by altering the permit. 

Overall,  the Panel  supports  the proposed amendments  to  the permit and  the  issue of  the new permits.   Despite  the proposed  increase  in  turbine size,  the Panel concludes  that  the expected impacts are manageable. 

(ii) Recommendations 

Based on the reasons set out in this Report, the Panel recommends: 

1.  That Pyrenees Planning Scheme Planning Permit PL‐SP/05/0548 Stockyard Hill Wind Farm be amended generally as proposed in the version circulated by Department of Environment, Land, Water and Planning but with the following changes: 

1.1  Do  not  delete  “and  changes  to  environmental  management  standards”  in current condition 7. 

1.2  Retain current conditions 18, 19, 20, 21 and 22 making only minor amendments considering  changes  in  the windfarm  itself,  the  revised  New  Zealand  Noise Standard NZS 6808:2010 and minor points of clarification. 

1.3  Amend current condition 26(c) to read: “…the noise  compliance  testing plan must  include advice on  timing of  the assessment  including  defining  when  commissioning  of  the  wind  energy facility,  or  an  identified  stage  of  it, will  occur,  and when  the  compliance noise monitoring results will be provided to the Minister for Planning.  That time must not be more than 120 days after commissioning unless with the further consent of the Minister for Planning”. 

1.4  Amend current condition 26(e) to read: 

“…  the  noise  compliance  testing  must  be  carried  out  at  locations  in accordance  with  NZS  6808:2010,  that  is  where  practical,  as  identified  in Conditions 19 d) – e).” 

Page 12: Environment Act 1987 - Planning - Planning · Management Plan incorporating mitigation measures and the provision of native vegetation offsets the final extent of native vegetation

Stockyard Hill Wind Farm Revised Permits  Panel Report  10 May 2017 

 

Page iv 

 

1.5  Do  not  amend  current  conditions  27,  28,  29,  31  and  32,  except  for minor amendments  considering  changes  in  the  windfarm  itself,  the  New  Zealand Noise Standard NZS 6808:2010 and minor points of clarification. 

1.6  Revise the Environmental Management Plan Condition k(ii) to read: “The operator must make the register available for inspection by the public during  normal  working  hours  and  its  contents  must  be  reported  to  the Minister for Planning and Pyrenees Shire Council: •  on  a  quarterly  basis  from  the  date  that  the  first  wind  turbine  is 

commissioned •  on  an  annual  basis  from  the  date  two  years  after  the  last  turbine  is 

commissioned.” 

1.7  Do  not  amend  current  conditions  30  and  39,  except  for minor  amendments considering  changes  in  the windfarm  itself,  the  revised  New  Zealand  Noise Standard NZS 6808:2010 and minor points of clarification. 

1.8  Review the width of the proposed access tracks with a view to reducing their impact on vegetation removal. 

1.9  That the Bat and Avifauna Management Plan  incorporate a monitoring period of at least five years and require regular reporting. 

1.10  Amend  the  relevant  condition  to  require  the Bat  and Avifauna Management Plan to include a separate section on Brolga monitoring and compensation that describes  the  monitoring  requirements,  the  specific  accountabilities,  the compensation outcomes to be delivered based on a more conservative target than that predicted by the modelling, the interim milestones, and the schedule of public reporting over the expected life of the project (25 years). 

1.11  Update  the Traffic Management Plan conditions  to make  it clear  that  it must also address the operation of the quarry. 

2.  Issue Pyrenees Planning Scheme Planning Permit PA2499/16 as shown is Appendix D for the proposed quarry, subject to the following changes: 

2.1  Include  a  condition  requiring  a  comprehensive Groundwater Monitoring  and Management Plan that includes the development of a baseline on the site and at beneficial users, a regular operational groundwater monitoring plan, public reporting  and  a management  response  framework  to  ensure  incidents  and performance outcomes are achieved. 

3.  Issue Pyrenees Planning Scheme Planning Permit PA1600101 as shown in Appendix D for the proposed removal of native vegetation, noting the changes shown to: 

3.1  Clarify the wording in relation to vegetation offsets. 

4.  Issue  Corangamite  Planning  Scheme  Planning  Permit  PA1600126  as  shown  in Appendix  D  for  the  proposed  removal  of  native  vegetation,  noting  the  changes shown to: 

3.1  Clarify the wording in relation to vegetation offsets. 

Page 13: Environment Act 1987 - Planning - Planning · Management Plan incorporating mitigation measures and the provision of native vegetation offsets the final extent of native vegetation

Stockyard Hill Wind Farm Revised Permits  Panel Report  10 May 2017 

 

Page v 

 

(iii) Further recommendations 

The Panel makes the following further recommendations: 

5.  In  the  development  of  the  Native  Vegetation Management  Plan,  Department  of Environment, Land, Water and Planning  undertake an assessment of the impacts on Western  (Basalt)  Plains  Grasslands  in  areas where  temperate  volcanic  grasslands Ecological  Vegetation  Class  is  proposed  to  be  removed,  and  determine  the appropriate offset requirements. 

6.  Department  of  Environment,  Land, Water  and  Planning  undertake  an  evaluation program  to  assess  the  cumulative  effects  on  raptor  populations  and  other  native species that may be vulnerable to wind farm mortality and determine the need for mitigation measures. 

7.  Department of Environment, Land, Water and Planning co‐ordinate a strategic region wide response to Brolga habitat planning, restoration and management that includes the  identification and mapping of turbine free Brolga buffer areas and  incorporates individual wind farm Brolga offset obligations. 

 

Page 14: Environment Act 1987 - Planning - Planning · Management Plan incorporating mitigation measures and the provision of native vegetation offsets the final extent of native vegetation

Stockyard Hill Wind Farm Revised Permits  Panel Report  10 May 2017 

 

Page 1 

1 Introduction 

1.1 The permit 

Planning Permit PL‐SP/05/0548 was issued by the Minister for Planning on 26 October 2010 to allow for the use and development of the land for a wind farm. 

The  planning  permit  includes  conditions  relating  to  turbine  numbers,  overall  maximum turbine height, blade length and tower height.  The permit allows for up to 157 turbines, on‐site and overhead cables which transmit the energy from the turbines to up to five on‐site substations,  on‐site  access  tracks,  removal  of  native  vegetation,  and  the  creation  or alteration of access in a Road Zone (Category 1).  The planning permit conditions included a restriction of a 132 metre tip height, a 52 metre rotor blade length and a maximum 80 metre tower height.   The permitted wind farm site  is approximately 155 square kilometres.   With the  exception  of  entry  points  into  the  site  from  the  Road  Zone,  it  is  entirely within  the Farming Zone. 

This report deals with a request to amend that permit. 

In 2010, planning permits were also granted for an associated 132/500kV terminal station at Berrybank  and  for  the  removal  of  native  vegetation  associated with  a  transmission  line connection between  the project and  the  terminal  station.   However,  these aspects of  the original project will not be progressed. 

Following  the  granting  of  the  permit,  the  permitted  wind  farm  (and  associated  off‐site terminal  station  at  Berrybank  and  connecting  powerlines)  was  also  approved  by  the Commonwealth Minister for Environment under the Commonwealth Environment Protection and Biodiversity Conservation Act 1999 (EPBC Act) on 11 February 2011. 

The Stockyard Hill Wind Farm site, quarry and Pyrenees  transmission  line application sites are  located within  the  Pyrenees  Shire.    The  Corangamite  transmission  line  application  is located within the Corangamite Shire. 

Page 15: Environment Act 1987 - Planning - Planning · Management Plan incorporating mitigation measures and the provision of native vegetation offsets the final extent of native vegetation

Stockyard Hill Wind Farm Revised Permits  Panel Report  10 May 2017 

 

Page 2 

Figure 1:  The subject site 

 

Table 1:  Chronology of the Application 

Date  Event 

29 September 2008  The Minister for Planning determined that an Environment Effects Statement was not required for the project (subject to conditions) under the Environment Effects Act 1978 (Vic) and that the Planning and Environment Act 1987 (Vic) assessment process was appropriate for the project. 

13 February 2009  The planning permit application for the wind farm was lodged with the Minister for Planning. 

16 September 2009  The Application was called‐in. 

5 December 2009 – 

30 January 2010 

The wind farm Application was on public notice.  Submissions were received and these were provided to Planning Panels Victoria. 

7‐29 April and 17‐25 May 2010 

A Panel hearing was held to consider the planning permit Application for the wind farm (it also considered planning permit applications 2009/104 for a terminal Station and 2009/105 for native vegetation removal associated with transmission lines, both these permits have now lapsed and are not being considered by this Panel). 

August 2010  The Panel hearing report, dated August 2010, was provided to the Minister for Planning. 

Page 16: Environment Act 1987 - Planning - Planning · Management Plan incorporating mitigation measures and the provision of native vegetation offsets the final extent of native vegetation

Stockyard Hill Wind Farm Revised Permits  Panel Report  10 May 2017 

 

Page 3 

Date  Event 

26 October 2010  The Minister for Planning issued permit PL‐SP/05/0548 for a wind farm, allowing for 157 turbines to a maximum height of 132 metres and Planning Permit Nos. 2009/104 and 2009/105, for the removal of native vegetation associated with transmission lines and a terminal station. 

2012  Development commenced under the permit with the construction of six permanent anemometers (Stage 1). 

22 February 2013  Planning permit PP2012/152 was issued by Corangamite Shire Council for a Terminal Station associated with the wind farm.  Works must commence by 22 February 2018 for the permit to not lapse, unless the permit is extended. 

12 May 2016  The Applicant lodged its Amendment Application. 

16 August 2016  Having responded to requests for further information, the Applicant lodged the final version of its Application. 

4 October to 31 October 2016 

Public notice of all four Applications. 

November 2016  Public notice of amendments to applications PA1600126 and PA1600101. 

29 September 2016  Nick Wimbush (Chair), Rod Gowans and Adrian Vlok appointed as Panel. 

9 November 2016  Directions Hearing at Craig’s Royal Hotel, Ballarat. 

23 November 2016  Panel reconstituted as Lester Townsend (Chair), Rod Gowans and Adrian Vlok. 

6‐10, 13‐17 and 20 February 2017 

Panel Hearing at Craig’s Royal Hotel, Ballarat. 

1.2 The Applications 

The applications are: 

Stockyard Hill Wind Farm – application under section 97I of the Act to amend the existing permit (PL‐SP/05/0548) for the wind farm: 

Quarry – a new application (PA2499/16) 

Native vegetation removal and road access for power line – new applications: - Pyrenees Planning Scheme (PA1600101) - Corangamite Planning Scheme (PA1600126). 

The application to amend the existing permit 

The Applicant seeks to amend the current planning permit to allow for a reduced number of newer and more efficient wind turbines compared to the permitted wind farm, specifically to:    

Page 17: Environment Act 1987 - Planning - Planning · Management Plan incorporating mitigation measures and the provision of native vegetation offsets the final extent of native vegetation

Stockyard Hill Wind Farm Revised Permits  Panel Report  10 May 2017 

 

Page 4 

increase overall  turbine height  from 132  to  180 metres  (including  an  increase  to tower height and rotor diameter) 

reduce the number of turbines from 157 to 149 

change the layout 

reduce the number of substations/switchyards 

replace the micro‐siting condition 

delete  conditions  relating  to  additional  flora  and  fauna  surveys which have been undertaken and form part of the Amendment Application 

increase  the quantity of native  vegetation  removal  from  5.28 hectares  to  38.267 hectares and varying the offset requirements to accommodate the increase 

update the environmental management conditions 

replace and update noise prediction and compliance conditions 

offer voluntary landscape mitigation to residents within 4 kilometres of the nearest turbine and allowing required road upgrade works to be undertaken  in stages and allow for the payment of a bond to VicRoads if required.2 

The  original  approvals  in  2010  did  not  include  an  on‐site  quarry,  however  in  order  to minimise  impacts  to  the  local  community,  the Applicant proposes  to  source  crushed  rock from a dedicated, temporary quarry within the wind farm boundary,  in order to  internalise the source. 

The Applicant noted  that  the application  to amend  the planning permit  is a  result of  two consequences: 

Advances  in  wind  turbine  technology,  which  enable  larger  and  more  efficient turbines  to be  installed.   Accordingly,  if  the Amendment Application  is approved, energy output  from  the wind  farm will  increase by up  to 40 per  cent  from 1,350 GWh to 1,900 GWh.3  Adjustments are required to the wind farm layout to facilitate this. 

Application of New Zealand Standard NZS6808:2010   Acoustics – Wind Farm Noise compared to New Zealand Standard NZS6808:1998 (Acoustics – The Assessment and Measurement  of  Sound  from  Wind  Turbine  Generators)  and  the  methods  and procedures of calculating native vegetation offsets have been updated or replaced since the permit was issued, and regulation of wind farms has evolved. 

1.3 Summary of issues raised in submissions 

All submissions were referred to the Panel for consideration. 

The main issues identified in submissions were: 

Application  material  –  Application  can/will  not  be  assessed  properly  as  the application material was not exhaustive and of questionable quality. 

Noise – A general  increase of noise and noise monitoring should be carried out by neutral  bodies  not  engaged  by  the Applicant  (concern  that  there  is  currently  no 

                                                       2  DELWP submission p6. 3  Applicant Part A submission p3. 

Page 18: Environment Act 1987 - Planning - Planning · Management Plan incorporating mitigation measures and the provision of native vegetation offsets the final extent of native vegetation

Stockyard Hill Wind Farm Revised Permits  Panel Report  10 May 2017 

 

Page 5 

independent monitoring of noise).   Associated noise  impact on human health and well‐being. 

Health – Impact on the health of the community. 

Views  and  visual  amenity – Disruption of  landscape,  views  and  visual  amenity  as turbines would be taller than surrounding landscape and would impose themselves on neighbours. 

Built heritage – particular concern for heritage listed Mawallok Homestead. 

Birds and avifauna – Increased death of birds and avifauna. 

Fauna impacts – Particularly near Mt Emu Creek. 

Communications  disruption/interference  –  Disrupt/interfere  telecommunications and emergency communications. 

Shadow flicker – Increase due to larger turbines. 

Property prices – Decrease property prices and ability for residential development nearby. 

Aviation –  Impact of turbines on private airfields and aviation used  for agriculture and  business.    Decrease  the  ability  of  aviation  firefighting  capabilities.    Aviation lights will be seen from far away. 

Quarry – Concern with impact to groundwater due to close proximity to aquifer. 

Removal  of  native  vegetation  –  Concern  at  significant  increase  in  amount  to  be removed and quality of vegetation to be removed. 

Landscape mitigation – Inadequate and not enough. 

Timing of notice period  and panel – Not enough  time  to prepare  submissions or presentations / experts for panel. 

Transport  and  site  access  –  Concern  about  the  impact  the  project will  have  on roads. 

Page 19: Environment Act 1987 - Planning - Planning · Management Plan incorporating mitigation measures and the provision of native vegetation offsets the final extent of native vegetation

Stockyard Hill Wind Farm Revised Permits  Panel Report  10 May 2017 

 

Page 6 

2 Planning context 

2.1 Policy framework 

(i) State Planning Policy Framework 

DELWP submitted that the amendment is supported by the following clauses in the SPPF: 

Clause 10.04 (Integrated decision making) – this clause includes the following statement: 

Society  has  various  needs  and  expectations  such  as  land  for  settlement, protection  of  the  environment,  economic  well‐being,  various  social  needs, proper management of resources and  infrastructure.   Planning aims  to meet these by addressing aspects of economic, environmental and social well‐being affected by land use and development. 

DELWP  stated  that  conflicting  objectives  should  be  balanced  in  favour  of  net  community benefit and sustainable development for the benefit of present and future generations. 

Clause 11.07‐1  (Regional planning) –  this clause has  the objective “to develop  regions and settlements  which  have  a  strong  identity,  are  prosperous  and  are  environmentally sustainable”.  Relevant strategies include: 

Environmental  Health  and  Productivity  –  focused  on  rural  and  hinterland landscapes, it is encourages: 

…  avoiding  development  impacts  on  land  that  contains  high  biodiversity values,  landscape  amenity, water  conservation  values,  food  production  and energy  production  capacity,  extractable  resources  and  minerals,  cultural heritage and recreation values, assets and recognised uses. 

Ensure the capacity of major  infrastructure  (including highways, railways, airports, ports, communications networks and energy generation and distribution systems) is not impacted negatively by urban development in adjacent areas. 

Clause 11.08 (Central Highlands regional growth) – this clause is applicable to Pyrenees Shire and includes the following: 

Clause 11.06‐5 (A sustainable region) – this clause has the strategy “to support the productive use of energy, water, waste materials, agricultural and natural resource assets”. 

Clause 11.08‐6  (Integrated planning) –  this  clause has  the objective  “to  integrate planning for growth with the provision of infrastructure, and the strategy to support expansion  of  energy  supply  infrastructure  to  facilitate  the  establishment  of  new industry or the expansion of existing industry”. 

Clause 11.08–8 (Agricultural productivity) – this clause has the objective to support long term agricultural productivity.  It states that Planning must consider as relevant the Central Highlands Regional Growth Plan (2014).  Section 12.5 of the Plan states that  “the  region  is well positioned  to benefit  from  the  future growth of  the wind 

Page 20: Environment Act 1987 - Planning - Planning · Management Plan incorporating mitigation measures and the provision of native vegetation offsets the final extent of native vegetation

Stockyard Hill Wind Farm Revised Permits  Panel Report  10 May 2017 

 

Page 7 

energy  sector  due  to  its  excellent  wind  resources  and  the  Ballarat  to  Horsham transmission line”4.  The clause includes the following strategy: 

Support change and transition to maintain the viability and productivity of agricultural land. 

Clause 11.08–9 (Cultural heritage and landscapes) – this clause has the objective: 

…to  recognise  the  importance  of  cultural  heritage  and  landscapes  as economic  and  community  assets.    Strategies  include  protect  cultural heritage assets that are important for attracting tourists to the region. 

Clause 11.11 (Great South Coast Regional growth) (applicable to Corangamite Shire) 

Clause  11.11‐1  (A  diversified  economy)  –  this  clause  has  the  objective  “…to strengthen  the  region’s  economy  through  increased  industry  diversification, innovation and development”. 

Clause 11.11‐5  (Agricultural productivity) –  this clause  includes  the strategy  to “… facilitate changes  in agricultural activities over time, encourage diversification and value  adding,  and  provide  appropriately  timely  infrastructure  to  realise  these opportunities”. 

Clause  11.11‐6  (Environmental  assets)  –  this  clause  has  the  objective  “…to sustainably manage  natural,  cultural  and  environmental  assets”.    It  includes  the following strategies: 

Protect  significant  landscapes  and  provide  vegetation  corridors  between high value environmental assets. 

Protect waterways from the effects of urban and rural land use change and facilitate growth at established settlements where water and wastewater can be managed. 

Clause 12  (Environmental  and  landscape  values) –  this  clause  states  that planning  should help  to  protect  the  health  of  ecological  systems  and  the  biodiversity  they  support  and conserve areas with identified environmental and landscape values. 

Clause  12.01‐1  (Protection  of  biodiversity)  –  this  clause  has  the  objective  to  assist  the protection and conservation of Victoria’s biodiversity. 

Clause 12.04‐1  (Environmentally  sensitive areas) –  this clause has  the objective  to protect and conserve environmentally sensitive areas. 

Clause  12.04‐2  (Landscapes)  –  this  clause  has  the  objective  to  protect  landscapes  and significant open spaces that contribute to character, identity and sustainable environments.  Strategies include: 

Recognise  the  natural  landscape  for  its  aesthetic  value  and  as  a  fully functioning system. 

Ensure natural key features are protected and enhanced. 

                                                       4  DELWP submission p29. 

Page 21: Environment Act 1987 - Planning - Planning · Management Plan incorporating mitigation measures and the provision of native vegetation offsets the final extent of native vegetation

Stockyard Hill Wind Farm Revised Permits  Panel Report  10 May 2017 

 

Page 8 

Clause 13.04  (Environmental  risks  ‐ Noise and air) –  this  clause  includes Noise abatement which  has  the  objective  to  assist  the  control  of  noise  effects  on  sensitive  land  uses.    It includes the following strategy: 

Ensure  that  development  is  not  prejudiced  and  community  amenity  is  not reduced by noise emissions, using a range of building design, urban design and land use separation  techniques as appropriate  to  the  land use  functions and character of the area. 

Clause 14.02‐2 (Water quality) – this clause has the objective to protect water quality. 

Clause 14.03 (Resource exploration and extraction) – this clause has the objective: 

To encourage exploration and extraction of natural  resources  in accordance with acceptable environmental standards and to provide a planning approval process that is consistent with the relevant legislation. 

Clause  15.03‐1  (Heritage  conservation)  –  this  clause  has  the  objective  to  ensure  the conservation of places of heritage significance. 

Clause 15.03‐2 (Aboriginal cultural heritage) – this clause has the objective of ensuring the protection and conservation of places of Aboriginal cultural heritage significance. 

Clause 17 (Economic development) – this clause states: 

Planning  is  to  provide  for  a  strong  and  innovative  economy,  where  all sectors of the economy are critical to economic prosperity. 

Planning  is  to  contribute  to  the economic well‐being of  communities and the  State  as  a whole  by  supporting  and  fostering  economic  growth  and development  by  providing  land,  facilitating  decisions,  and  resolving  land use conflicts, so that each district may build on its strengths and achieve its economic potential. 

Clause 19.01‐1 (Provision of renewable energy) – this clause has the objective “to promote the provision of  renewable energy  in a manner  that ensures appropriate  siting and design considerations are met”.  The following strategies are relevant: 

Facilitate renewable energy development in appropriate locations. 

In  considering  proposals  for  renewable  energy,  consideration  should  be given  to  the  economic  and  environmental  benefits  to  the  broader community of renewable energy generation while also considering the need to  minimise  the  effects  of  a  proposal  on  the  local  community  and environment. 

In  planning  for wind  energy  facilities,  recognise  that  economically  viable wind energy  facilities are dependent on  locations with consistently strong winds over the year. 

This  clause  states  that  planning  must  consider  the  Policy  and  Planning  Guidelines  for Development of Wind Energy Facilities in Victoria (Department of Environment, Land, Water and Planning, January 2016). 

Page 22: Environment Act 1987 - Planning - Planning · Management Plan incorporating mitigation measures and the provision of native vegetation offsets the final extent of native vegetation

Stockyard Hill Wind Farm Revised Permits  Panel Report  10 May 2017 

 

Page 9 

(ii) Local Planning Policy Framework 

The wind  farm, quarry and Pyrenees transmission  line applications sites are  located within the  Pyrenees  Shire.    These  applications  are  considered  against  the  Pyrenees  Planning Scheme. 

The  Corangamite  transmission  line  application  is  located  within  the  Corangamite  Shire.  These applications are considered against the Corangamite Planning Scheme. 

The  Panel  is  required  to  make  its  recommendations  on  the  amended  application  in accordance with the Act and the Pyrenees Planning Scheme. 

Pyrenees Planning Scheme 

Clause 21.01 (Pyrenees Shire Key Influences and Issues) – this clause  includes the following key issues under Clause 21.01‐3: 

The need to generate further employment opportunities. 

The  protection  and  management  of  the  Shire’s  natural  resources  and environment. 

The  protection  and  management  of  agricultural  land  and  the  need  to encourage agricultural diversity. 

Clause 21.03  (Settlement, Built Environment and Heritage) – under clause 21.03 Heritage, this clause includes the objective, “To conserve and enhance individual places and precincts of  cultural  heritage  significance  in  relation  to  19th  and  20th  century  settlement  and associated development”. 

Clause  21.04‐1  (Natural  environment)  –  this  clause  includes  the  following  environmental objectives: 

To  minimise  the  potential  of  new  development  and  land  use  causing pollution of waterways, water storages and ground water  resources,  land degradation, fire hazards or other adverse environmental impacts. 

To  encourage  agriculture  and  other  industries  to  conserve  water  and minimise waste. 

To  protect  existing  native  vegetation  and  encourage  further  planting  of native  vegetation  particularly  on  land  which  has  a  high  degree  of environmental hazard and in areas with salinity problems. 

Clause 21.04‐2 (Protecting sensitive rural areas) – this clause lists the following objectives: 

To ensure appropriate management of constrained and sensitive land. 

To preserve and renew vegetation that contributes to biodiversity and the stability of sensitive landforms. 

Clause 21.04‐4 (Land use capability assessment) – this clause contains an assessment of the Pyrenees’s land use capability in order to: 

Identify the capability of different areas in the Shire to support various rural land uses. 

Identify areas of environmental sensitivity which have implications in terms of land management. 

Page 23: Environment Act 1987 - Planning - Planning · Management Plan incorporating mitigation measures and the provision of native vegetation offsets the final extent of native vegetation

Stockyard Hill Wind Farm Revised Permits  Panel Report  10 May 2017 

 

Page 10 

The land capability assessment has been used to develop the Shire’s planning objectives and strategies the Municipal Strategic Statement. 

Clause 21.05‐2 (Sustainable agricultural land use) – this clause lists the following objectives: 

To promote the effective management of rural land. 

To provide opportunities for sustainable agriculture. 

To support the diversification of agriculture. 

Clause  21.06  –  Local  Areas  includes  Clause  21.06‐1  (Beaufort)  which  has  the  following objectives: 

To maintain Beaufort’s  existing  function as  the  Shire’s principal  town  for urban development. 

To develop the town’s role as a highway service centre. 

To retain Beaufort’s character and sense of place. 

To manage environmental risks and land use conflicts. 

Clause 22.02 (Heritage) – this clause includes the following objectives: 

To  encourage  the  retention  of  individually  significant  and  contributory heritage places within Heritage Overlay areas. 

To conserve and enhance the natural or cultural features of an area or site and to ensure that any alterations or development complement their form and appearance. 

Clause 22.04 (Native vegetation protection) – this clause lists the following objectives: 

To  conserve  and  enhance  existing  vegetation  throughout  the  Shire wherever practicable. 

To  protect  significant  and  sensitive  areas  including  wetlands  from  the negative effects of vegetation clearance and modification. 

Corangamite Planning Scheme 

Clause  21.02  (Key  influences)  –  this  clause  in  its  “Environment”  section  states  that “environmental issues are increasingly playing a role in the management of rural holdings”. 

Clause  22.02‐4  (Biodiversity)  –  this  clause  has  a  Policy  basis  that  biological  diversity  is fundamental  to  the  quality  of  life,  landscape  and  economy  of  the  Shire.    It  includes  the objective “to ensure  that  the use and development of  land  takes  into account  the need  to protect and enhance biological diversity by promoting ecologically sustainable  land use and development”. 

Clause 22.03‐1 (Agriculture) – this clause states that agriculture is the single most important industry in the Shire, and its protection and enhancement is linked to the environmental and economic well‐being of the Shire.  Objectives to achieve this are: 

To  protect  the  natural  and  physical  resources  upon which  agricultural  industries rely. 

To  prevent  land  use  conflicts  between  agricultural  uses  and  sensitive  uses  and ensure  that  use  and  development  in  the  Shire  is  not  prejudicial  to  agricultural industries or the productive capacity of the land. 

Page 24: Environment Act 1987 - Planning - Planning · Management Plan incorporating mitigation measures and the provision of native vegetation offsets the final extent of native vegetation

Stockyard Hill Wind Farm Revised Permits  Panel Report  10 May 2017 

 

Page 11 

(iii) Other planning strategies or policies used in formulating the Amendment 

Policy and Planning Guidelines for Development of Wind Energy Facilities – January 2016 

These  guidelines  (the WEF Guidelines)  are  to  be  considered  as  a  decision  guideline  by  a responsible authority before determining a permit application for a wind energy facility. 

Section 5 outlines  the key criteria  for evaluation  for  the planning merits of a wind energy facility. 

Section  5.1.2  discusses  potential  impacts  a wind  energy  facility  can  cause  that  affect  the amenity of  the  surrounding area due  to noise, blade glint,  shadow  flicker, overshadowing and electromagnetic interference. 

The WEF Guidelines aim  to provide advice  for  responsible authorities, proponents and  the community regarding  the decision making  framework  that  relates  to wind  farm proposals.  The  intention  is  to  provide  a  framework  for  a  ‘consistent  and  balanced  approach’  to  the assessment of wind energy projects in Victoria, and set consistent operational performance standards. 

The  WEF  Guidelines  are  a  reference  document  in  all  planning  schemes  (including  the Pyrenees Planning Scheme). 

The  current  version  of  the WEF Guidelines  (most  recently  amended  in  January  2016)  are largely  unchanged  from  the  version  used  in  the  original  assessment  in  2010, which  the exception  of  structural  changes  and  the  inclusion  of  additional  detail.    Notable  changes include those to ‘Flora and fauna impacts assessment’ and a more detailed discussion of the noise requirements under the revised New Zealand Noise Standard NZS6808:2010 (the 2010 Noise Standard). 

The 2016 WEF Guidelines include a new policy in relation to significant landscapes, whereby: 

… an assessment of the degree of visual impact of a wind energy facility must take into account landscape values associated with nearby land included in the schedule  to Clause 52.32‐2”.5   This  includes  “…  specified areas of  landscape and  environmental  significance,  specified  coastal  locations  and  areas identified  to  accommodate  future  population  growth  of  regional  cities  and centres.6 

The Pyrenees Planning Scheme does not have any such listed places, as it does not contain a schedule to Clause 52.32‐2. 

Victoria’s Renewable Energy Roadmap 

In August 2015, the government released Victoria’s Renewable Energy Roadmap – Delivering jobs and a clean energy future.  The Roadmap includes the following statements: 

Climate change is one of the most critical issues facing our state … 

                                                       5  Proponent’s submission (Document 18) p11. 6  Proponent’s submission p11. 

Page 25: Environment Act 1987 - Planning - Planning · Management Plan incorporating mitigation measures and the provision of native vegetation offsets the final extent of native vegetation

Stockyard Hill Wind Farm Revised Permits  Panel Report  10 May 2017 

 

Page 12 

The Victorian Government is committed to sustainable development and to decreasing Victoria’s reliance on non‐renewable sources of energy … 

The Victorian government believes targets are critical for ensuring growth in renewable energy generation.  Therefore, as part of the Action Plan, the Victorian  Government  will  establish  two  targets  for  renewable  energy generation  in  this  state,  including  for  2020  and  2025.    The Government aims  to produce at  least  20 per  cent  of  the  state’s  electricity generation from renewable sources by 2020 …7 

Victoria’s Renewable Energy Auction Scheme 

In  June  2016,  the  Victorian  Government  committed  to  Victorian  renewable  energy generation  targets  of  25  per  cent  by  2020  and  40  per  cent  by  2025.    The  following statements are included in the consultation paper for the scheme: 

Based on current generation and demand forecasts, this would  involve the government auctioning up to 5,400 megawatts (MW) of additional capacity over the life of the scheme. 

The majority of auctions are proposed to be renewable energy technology neutral.    Based  on  current  technology  costs,  this would  see wind  as  the dominant  technology  under  the  scheme.    The  Government  intends  to auction a proportion of capacity for large‐scale solar projects.8 

Victoria’s Regional Statement 

In November 2015 the government released Victoria’s Regional Statement – your voice, your region,  your  state.    This  document  included  the  following  statements  relevant  to  the application: 

The Regional Jobs for a growing economy section states: 

Victoria’s economy would be nothing without our  regions.   From  food, fibre and wine  to  tourism,  innovation and  renewable energy,  its where the traditional and the new come together. 

Government and local communities need to work together to deliver the projects and services  that will bring more  jobs and  families  to  regional Victoria, so businesses can maximise opportunities and succeed. 

For Renewable Energy the document states: 

Victoria is taking the lead on climate change action and becoming a low‐carbon economy … 

The  Government’s  Renewable  Energy  Roadmap  sets  out  our  plan  for accelerating development of renewable energy generation in Victoria to reduce  emissions,  create  jobs  and  put  downward  pressure  on  energy prices; 

                                                       7  DELWP submission pp40‐41. 8  DELWP submission p41. 

Page 26: Environment Act 1987 - Planning - Planning · Management Plan incorporating mitigation measures and the provision of native vegetation offsets the final extent of native vegetation

Stockyard Hill Wind Farm Revised Permits  Panel Report  10 May 2017 

 

Page 13 

We will continue our leadership in this area, building a strong future for our  state  in  renewable  energy  that  will  deliver  benefits  for  regional Victoria. 

Under Protecting the quality of life in our regions the following statements are made: 

A sustainable environment means sustainable jobs … 

Victoria is taking the lead on climate change …9 

2.2 Planning scheme provisions 

(i) Zones 

The wind farm site is in the Farming Zone (FZ) and Road Zone, Category 1 (RDZ1). 

The quarry site is in the FZ. 

The transmission lines are located within the FZ and RDZ1. 

The  Applicant  stated  that  the  provisions  of  the  FZ  are  consistent  with  the  regime  that applied in 2010.  The purposes of the FZ include: 

Providing for the use of land for agriculture. 

Encouraging the retention of productive agricultural land. 

Ensuring  that non‐agricultural uses  (including dwellings) do not adversely affect the use of the land for agriculture. 

Encouraging the retention of employment and population. 

Encouraging use and development based on sustainable land management practices and provision of infrastructure. 

The purpose of the RDZ1 is: 

To identify significant existing roads. 

To identify land which has been acquired for a significant proposed road. 

(ii) Overlays 

The  amended  wind  farm  is  partly  affected  by  the  Environmental  Significance  Overlay (Schedule 1 – Designated Water Supply Areas) (ESO1), Vegetation Protection Overlay (VPO) (Schedule 1 – Roadside Grassland Protection and Conservation) and Bushfire Management Overlay (BMO or WMO). 

The southeast corner of the quarry site is affected by the ESO1. 

Part of the Pyrenees transmission line site is affected by the ESO1. 

The ESO1 environmental objectives to be achieved are: 

To ensure the protection and maintenance of water quality and water yield within the designated water supply catchments as detailed in Clause 21.05‐1.6. 

                                                       9  DELWP submission pp41‐42. 

Page 27: Environment Act 1987 - Planning - Planning · Management Plan incorporating mitigation measures and the provision of native vegetation offsets the final extent of native vegetation

Stockyard Hill Wind Farm Revised Permits  Panel Report  10 May 2017 

 

Page 14 

To maintain  and where  practicable  enhance  the  quality  and  quantity  of water produced within the catchments and in waterways. 

To protect the quality of surface and groundwater supplies within the Shire and the broader region. 

To  prevent  erosion  of  land,  pollution,  siltation  and  eutrophication  of waterways, water bodies, storages and drains. 

To ensure that catchment yield and environmental flows are maintained. 

To manage  the  impact of  incremental development on water quality and yield. 

The VPO1 vegetation protection objectives to be achieved are: 

To protect areas of significant native vegetation. 

To maintain habitat corridors for indigenous fauna. 

To ensure development minimises loss of indigenous vegetation. 

Part of the Corangamite transmission line site is affected by the VPO (Schedule 2, Roadside vegetation protection area) and BMO. 

(iii) Particular provisions 

The following Particular Provisions apply. 

Amended wind farm 

Clause 52.17 Native Vegetation 

Clause 52.29 Land Adjacent to A Road Zone, Category 1, Or A Public Acquisition Overlay for a Category 1 Road. 

Clause  52.32 Wind  Energy  Facility,  a  key  section  of  the  Scheme  to  assess  a  wind  farm application. 

Transmission lines 

Clause 52.17‐2 Native Vegetation 

Clause 52.29 Land Adjacent to a Road Zone, Category 1, or a Public Acquisition Overlay for a Category 1 Road. 

Quarry 

Clause 52.08‐1 (Earth and Energy Resources Industry), requires a permit to use and develop land for earth and energy resources10 unless an exemptions at Clause 52.08‐1 applies. 

Clause 52.08 states that the purpose of the Earth and Energy Resources  Industry particular provision is: 

To encourage land to be used and developed for exploration and extraction of earth and energy resources in accordance with acceptable environmental standards. 

                                                       10  Stone extraction is included in Earth and energy resources industry use under Clause 74. 

Page 28: Environment Act 1987 - Planning - Planning · Management Plan incorporating mitigation measures and the provision of native vegetation offsets the final extent of native vegetation

Stockyard Hill Wind Farm Revised Permits  Panel Report  10 May 2017 

 

Page 15 

To  ensure  that  mineral  extraction,  geothermal  energy  extraction, greenhouse gas sequestration and petroleum extraction are not prohibited land uses. 

To ensure  that planning controls  for  the use and development of  land  for the exploration and extraction of earth and energy resources are consistent with other legislation governing these land uses. 

Clause 52.09  (Stone Extraction and Extractive  Industry  Interest Areas) – specifically, Clause 52.09‐2 states a permit to use and develop  land for stone extraction will not be required  if the conditions in the table to Clause 52.08‐1 are met.  The application for a quarry does not meet the conditions of this table and hence a permit is required. 

Clause 52.17 – Native Vegetation 

The purpose of Clause 52.17 is “To ensure permitted clearing of native vegetation results in no  net  loss  in  the  contribution made  by  the  native  vegetation  to  Victoria’s  biodiversity”.  Pursuant to Clause 52.17‐2, a planning permit  is required to remove, destroy or  lop native vegetation, including dead native vegetation.  Clause 52.17‐6 lists offset requirements. 

Clause 52.32 – Wind Energy Facility 

Clause  52.32  has  undergone  changes  since  the  current  planning  permit was  granted  but submitted that these were not material to the Application.  The purpose of this clause is “to ‘facilitate the establishment and expansion’ of wind energy facilities in appropriate locations, with minimal impact on the amenity of the area”.  The decision guidelines include: 

The effect of the proposal on the surrounding area in terms of noise, blade glint, shadow flicker and electromagnetic interference. 

The  impact  of  the  development  on  significant  views  including  visual corridors and sight lines. 

The impact of the facility on the natural environment and natural systems. 

The impact of the facility on cultural heritage. 

The impact of the facility on aircraft safety. 

The [WEF Guidelines]. 

The [2010 Noise Standard11].12 

A  new  Clause  52.32‐3  requires  the written  consent  of  all  owners  and  dwellings  located within 1 kilometre of a proposed turbine.  However, this clause does not apply to the current Application because it does not propose to increase the number of turbines, and it does not seek to locate a turbine within one kilometre of a dwelling. 

A new Clause 52.32‐7 provides that: 

… applications to amend permits under section 72 of the Act are exempt from certain  decision  requirements  and  review  rights  under  the  Act  where  the application  does  not  seek  to  increase  the  number  of  turbines  or  locate  a 

                                                       11   Updated from the 1998 standard applicable at the time the current planning permit was granted 12  DELWP submission p10. 

Page 29: Environment Act 1987 - Planning - Planning · Management Plan incorporating mitigation measures and the provision of native vegetation offsets the final extent of native vegetation

Stockyard Hill Wind Farm Revised Permits  Panel Report  10 May 2017 

 

Page 16 

turbine closer  to an existing dwelling within one kilometre of a  turbine  than the closest permitted turbine to that dwelling.13 

The  Proponent  noted  that  provision  does  not  apply  to  it,  as  the  Application was  lodged under section 97I of the P&E Act. 

(iv) General provisions 

Clause 65 – Decision Guidelines 

The following decision guidelines apply to the application: 

The matters set out in section 60 of the Act. 

The  State  Planning  Policy  Framework  and  the  Local  Planning  Policy  Framework, including the Municipal Strategic Statement and local planning policies. 

The purpose of the zone, overlay or other provision. 

Any matter required to be considered in the zone, overlay or other provision. 

The orderly planning of the area. 

The effect on the amenity of the area. 

The proximity of the land to any public land. 

Factors  likely  to cause or contribute  to  land degradation, salinity or  reduce water quality. 

Whether the proposed development is designed to maintain or improve the quality of stormwater within and exiting the site. 

The extent and character of native vegetation and the likelihood of its destruction. 

Whether  native  vegetation  is  to  be  or  can  be  protected,  planted  or  allowed  to regenerate. 

The degree of flood, erosion or fire hazard associated with the location of the land and the use, development or management of the  land so as to minimise any such hazard. 

                                                       13  DELWP submission p10. 

Page 30: Environment Act 1987 - Planning - Planning · Management Plan incorporating mitigation measures and the provision of native vegetation offsets the final extent of native vegetation

Stockyard Hill Wind Farm Revised Permits  Panel Report  10 May 2017 

 

Page 17 

3 Noise 

3.1 Introduction 

A wind  farm creates noise.   The potential  impact depends on  the wind  farm,  location and sensitivity of  the  surrounding  land uses, existing background noise  levels,  topography and wind speed and direction. 

(i) Background 

The previous Panel  report  (August 2010) examined noise at  length and  in detail.   For  the most part this Panel has been confronted with the same contentious matters, including: 

high Amenity noise penalty 

application of NZS 6808:1998 and NZS 6808:2010 

indicative turbine and final turbine 

special audible characteristics 

background noise monitoring 

post‐construction compliance monitoring and management 

complaint management. 

The  2010  Panel’s  assessment,  conclusions  and  recommendations  were  given  effect  by conditions 6(k), 18 to 32 and 39 in the current permit. 

The 2010 Panel report represents a comprehensive, objective and reasoned assessment of noise  issues at the time.   Consideration of noise matters  in this report endeavours to build on the previous Panel report and to only (re)assess matters as they relate to the amended application, new information and changes in the planning policy framework. 

(ii) What changes are proposed 

The changes that have the potential to affect noise emissions include: 

using newer model turbines with increased height 

using larger turbine hub, gearbox and generator 

reducing the number of turbines from 157 to 149. 

Amendments to current permit conditions are also proposed. 

3.2 Noise limits and the standard 

(i) The appropriate standard 

What is the issue 

The Permit conditions require compliance with the 1998 Noise Standard.   Since the Permit was issued in 2010, the 2016 Policy and Planning Guidelines for Development of Wind Energy Facilities in Victoria (the WEF Guidelines) and Amendment VC124 (April 2015) to the Victoria Planning  Provisions  (VPP)  provides  for more  contemporary  noise  limits  (the  2010  Noise Standard) and example conditions.   Therefore, the noise assessment of the amended wind farm has been based on the WEF Guidelines and the 2010 Noise Standard. 

Page 31: Environment Act 1987 - Planning - Planning · Management Plan incorporating mitigation measures and the provision of native vegetation offsets the final extent of native vegetation

Stockyard Hill Wind Farm Revised Permits  Panel Report  10 May 2017 

 

Page 18 

The  Applicant  is  also  seeking  an  amendment14  to  existing  condition  7  (Environmental Management Plan) (EMP) to ensure the five yearly EMP review process does not result in a change to noise limits. 

Evidence and submissions 

In general, parties before the Panel did not contest the 2010 Noise Standard or argue for a more appropriate or conservative  standard.    In practice  the  concerns  raised by Mr Huson and others related  to  factors or circumstances  (for example wind shear and wake  induced turbulence) that they believe could significantly increase wind farm noise emissions, noise at dwellings, and  to  that extent  their concerns  related  to  the correct application of  the 2010  Noise Standard, rather than the adequacy of the standard as such. 

The 1998 Noise Standard includes: 

As a guide to the limits of acceptability, the sound level from the … windfarm … should not exceed, at any residential site, and at any of the nominated wind speeds, the background sound level (L95) by more than 5 dBA, or a level of 40 dBA L95, whichever is the greater. 

The 2010 Noise Standard includes: 

As a guide  to  the  limits of acceptability at a noise  sensitive  location, at any wind  speed  wind  farm  sound  levels  LA90(10min)  should  not  exceed  the background  sound  level  by more  than  5dB,  or  a  level  of  40  dB  LA90(10min), 

whichever is the greater. 

There are several changes that have been introduced in the 2010 Noise Standard, such as: 

the replacement of the L95 descriptor with the L90 descriptor to bring it in line with the descriptor used in most jurisdictions for wind farm noise 

the  introduction of High Amenity areas with more onerous noise  limits  in  special circumstances 

the  refinement  of  the  assessment  of  Special  Audible  Characteristics  (such  as tonality) during compliance monitoring 

an  improvement  to  the  recommended methodology  for  noise  predictions  as  the methodology used  in the 1998 Noise Standard, which underestimated the noise at residences, has been removed 

the  use  of wind  speeds  referenced  to  hub  height  rather  than  10 metres  above ground to better predict noise in stable meteorological conditions. 

In relation to the difference between the 1998 Noise Standard and the 2010 Noise Standard the 2010 Panel report stated: 

We conclude that although  [the 2010 Noise Standard]  is an  improvement on [the 1998 Noise Standard] in many ways, the difference that it makes in noise levels is probably small, and that difference is likely to only marginally reduce acceptable noise limits. 

                                                       14  Appendix C: Stockyard Hill Wind Farm, Environmental Noise Assessment, Sonus, May 2016. 

Page 32: Environment Act 1987 - Planning - Planning · Management Plan incorporating mitigation measures and the provision of native vegetation offsets the final extent of native vegetation

Stockyard Hill Wind Farm Revised Permits  Panel Report  10 May 2017 

 

Page 19 

Although  some  of  the methodology  has  changed,  the  overall  noise  limits  established  in accordance with  the  1998  Noise  Standard  and  the  2010  Noise  Standard  do  not  change significantly, as such  there  is a no significant change  to  the potential  impact at  residences resulting from the change in the Standard.  That is, the change from the L95 descriptor to the L90 descriptor has the potential to increase the noise limit by less than 1 dBA and therefore makes the 2010 Noise Standard slightly more conservative. 

Since  the  current  permit  was  issued  several  landowners  have  entered  commercial agreements  with  the  Applicant.    For  these  landowners,  in  accordance  with  the  current conditions, the wind  farm sound  levels LA90(10min) should not exceed the background sound level  by more  than  5  dB,  or  a  level  of  45  dB  LA90(10min), whichever  is  the  greater  at  their dwellings (‘participant dwellings’). 

Discussion and conclusion 

The  planning  policy  framework  seeks  to  facilitate  the  development  of wind  farms while ensuring  nearby  residents  are  protected  from  unreasonable  levels  of  noise,  and  most importantly night time indoor noise levels. 

In  that  regard,  a wind  farm must  comply with  noise  limits  in  2010 Noise  Standard  at  all times.  The 2010 Noise Standard specifies a general 40 dB LA90 limit, or the sound should not exceed  the background  sound  level by more  than  five decibels, whichever  is  the  greater.  This limit intends to provide reasonable protection against sleep disturbance in a dwelling or a  loss  of  amenity.    The  2010 Noise  Standard  is  based  on  The World Health Organisation Guidelines for Community Noise assumption of a 15 dB LA90 reduction from outside to inside a house with the windows partially open for ventilation.  Therefore, an indoor level of 30 dB LA90 equates to an outdoor noise  level of 45 dB LA90.   This approach  is consistent with the current  industry practice of using the recommendations outlined  in the final report by The European Working Group  on Noise  from Wind  Turbines  (ETSU‐R‐97) which  allows  for  an increased base noise limit of 45 dB LA90. 

Contrary  to  several  submissions  the  2010 Noise  Standard does  not  have  the  objective  of providing absolute protection; the standard does not provide that no audible wind turbine noise occurs under all wind speeds and locations or that the potential for sleep disturbance is completely mitigated.15 The proposition of inaudibility and no adverse noise effects is not practical.  There are no sound sources for which such a criterion is adopted in Australia, and in  this  respect,  there  is no evidence  to  suggest  sound  from wind  farms  should be  treated differently.  It would be contrary to accepted effects‐based assessment, and regulatory and policy approaches to impose an absolute criterion of inaudibility for wind farm sound or any other sound. 

It was  suggested  in  by  some  submissions  that wind  farms  should  only  be  located where there  is  an  exclusionary  buffer  suggested  to  be  up  to  10  kilometres.    This  Panel  and  the planning policy  framework does not  support  this  approach,  as  it  is  essentially  seeking  an inaudibility criterion.   Further exclusionary buffers do not consider the actual noise effects 

                                                       15  NZS 6808:2010, Section 1.2, p9. 

Page 33: Environment Act 1987 - Planning - Planning · Management Plan incorporating mitigation measures and the provision of native vegetation offsets the final extent of native vegetation

Stockyard Hill Wind Farm Revised Permits  Panel Report  10 May 2017 

 

Page 20 

of a wind farm, which depend on many factors, all of which are addressed in the 2010 Noise Standard. 

On  this basis,  this chapter addresses predicted compliance with NZS 6808:2010.   The next chapter addresses potential adverse health effects, submitted to the Panel as being noise‐related. 

In  relation  to  a  proposed  change16  to  existing  condition  7  (EMP)  to  guard  against  the possibility  that  five yearly EMP review process  leads  to a change  to noise  limits,  the Panel believes  that because noise  limits are expressly set  in  the noise  limit conditions  this  is not likely.    The  proposed  change  could  prevent  contemporary  standards  for  others matters being considered when the EMP is reviewed.  The Panel does not support this amendment. 

Recommendation 

The Panel recommends: 

Do not delete  ‘and changes to environmental management standards’  in current condition 7. 

(ii) High amenity areas 

What is the issue 

Clause  52.32‐4  of  the  Pyrenees  Planning  Scheme  (and  the  WEF  Guidelines)  specifically requires  the design  response  to  include  “an assessment of whether a high amenity noise limit is applicable, as assessed under Section 5.3 of the standard” (the 2010 Noise Standard). 

Section 5.3 of the 2010 Noise Standard states that: 

The wind farm noise limit of 40dB LA90(10min) in 5.2 is appropriate for protection of sleep, health and amenity of residents at most noise sensitive locations.  In special circumstances at some noise sensitive locations a more stringent noise limit may  be  justified  to  afford  a  greater  degree  of  protection  of  amenity during  evening  and  night  time.    A  high  amenity  noise  limit  should  be considered where a plan promotes a higher degree of protection of amenity related to the sound environment of a particular area ... 

Discussion 

The Victoria  Civil  and Administrative  Tribunal  (VCAT)  considered  the  applicability  of  ‘high amenity areas’ in the context of the Victorian planning framework in Cherry Tree Wind Farm Pty  Ltd  v Mitchell  Shire Council & Others  [2013] VCAT 521.    In  this  case VCAT  found  that “plan”  referred  to  in  section  5.3  of  the  2010 Noise  Standard  is  a  plan  as  defined  by  the Resources Management Act 1991 of New Zealand and that section 43AA of that Act defines ‘plan’  to mean  ‘a  regional plan or a district plan’.   No such plan explicitly exists under  the Victorian legislation; however, it could be considered to mean a planning scheme approved under P&E Act. 

                                                       16  Appendix C: Stockyard Hill Wind Farm, Environmental Noise Assessment, Sonus, May 2016. 

Page 34: Environment Act 1987 - Planning - Planning · Management Plan incorporating mitigation measures and the provision of native vegetation offsets the final extent of native vegetation

Stockyard Hill Wind Farm Revised Permits  Panel Report  10 May 2017 

 

Page 21 

Nevertheless, VCAT found the Mitchell Planning Scheme “did not anywhere expressly or by implication  ‘promote  a  higher  degree  of  protection  of  amenity  related  to  the  sound environment of a particular area’”.  This means that the Farming Zone (FZ), as is the case at Stockyard Hill, does not imply that a particularly quiet environment should be preserved.17 

The following points are noted about the FZ classification: 

The definition of FZ in the Pyrenees Planning Scheme is not considered to promote a higher degree of protection of amenity related to the sound environment. 

The Practice Note prepared by  the Department of Sustainability and Environment titled Applying the rural zones and dated March 2007 states the following: 

The Farming Zone is designed to encourage diverse farming practices, some of which  can  have  significant  off‐site  impacts.    For  this  reason,  the  level  of amenity that can be expected in this zone will usually not be compatible with sensitive uses, particularly housing. 

Regarding the properties in the Rural Living Zone (a cluster of properties to the south of the Beaufort township), predicted wind farm noise levels (as detailed in Appendix H of the Sonus Report) are below 35 dB LA90 and therefore, the test detailed in C5.3.1(a) of the 2010 Noise Standard, would not be met, that is: 

… there  is no need to consider noise sensitive  locations outside the predicted 35 dB LA90(10 min) wind farm sound level contour ... 

This Panel  is conscious that some submitters appeared to believe that the adoption of NZS 6808:2010 would carry with it acceptance of the area proposed for the Stockyard Hill Wind Farm as a high amenity area for noise.  A number referred to the quietness of the area and the  distance  at which  they  could  sometimes hear  noises.   Noise measurements  provided showed noise levels at times below 30 dBA.  Even so the Panel was not presented with any compelling evidence to show that the acoustic environment in the area is atypically low for land  in  the  FZ.   More  importantly,  it  has  not  been  presented with  any  evidence which indicates  the acoustic environment of  the area has  changed  since  the 2010 Panel Report, which found the high amenity noise limit was not justified. 

Conclusion 

The  Panel  is  not  persuaded  that  it  is  appropriate  to  recommend  a  high  amenity  noise environment be recognised in the area, or referenced in conditions. 

(iii) Limits for ultrasound, infrasound and ground vibration 

Several  submitters  raised  concerns  in  relation  to  ultrasound,  infrasound  and  ground vibration. 

It  is not clear how  these emissions would be different with  the  revised  layout, but  in any case,  the  2010  Noise  Standard  does  not  require  applicants  to  predict  or  assess  these matters.  Section 5.5 of the 2010 Noise Standard states: 

                                                       17  Cherry Tree Wind Farm Pty Ltd v Mitchell SC & Ors [2013] VCAT 521 at para 107‐109. 

Page 35: Environment Act 1987 - Planning - Planning · Management Plan incorporating mitigation measures and the provision of native vegetation offsets the final extent of native vegetation

Stockyard Hill Wind Farm Revised Permits  Panel Report  10 May 2017 

 

Page 22 

Although  wind  turbines  may  produce  some  sound  at  (ultrasound  and infrasound) frequencies considered to be outside the normal range of human hearing  these  components  will  be  well  below  the  threshold  of  human perception. 

“Claims have been made  that  low  frequency  sound and vibration  from wind turbines have caused  illness and other adverse physiological effects among a very  few people worldwide  living near wind  farms.   The paucity of evidence does not  justify at  this stage, any attempt  to set a precautionary  limit more stringent”  than  the  background  sound  level  plus  5  dB,  or  a  level  of  40  dB LA90(10 min), whichever is the greater. 

No  recommendations  for  assessing  the  potential  impact  of  ground‐borne vibration  are  made  because  such  vibration  is  not  perceptible  beyond  the boundary of the wind farm. 

The  2010  Noise  Standard’s  approach  to  these  matters  is  supported  by  the  Victorian Environment Protection Authority (EPA) and Department of Health Technical Bulletin (April 2013) Wind farms, sound and health and  in a paper by Dr Stephen Chiles (Chairman of the NZS 6808:2010 Technical Committee) to the Journal of New Zealand Acoustics18. 

The Panel has not considered these matters further. 

3.3 Noise assessment 

(i) Sound power levels 

What is the issue 

Most submitters raised concerns regarding the increase in size of turbines and the proposed significant  increase  in  rotor  tip  speed  and  swept  area.    Intuitively  many  submitters contended  this must  result  in  a  proportional  and/or  significant  increase  in  turbine  sound power. 

Evidence and submissions 

The uncontested expert evidence of Mr Turnbull was the noise  from a wind turbine  is not proportional  to  the  size  of  the  blades  and  therefore  the  noise  does  not  increase proportionately with  an  increase  in  the  swept  area  of  the  blades.    On  the  contrary,  he indicated  that  the  size of blades has  increased considerably over  the years, without noise levels increasing significantly.  In 2002, he assessed a wind farm with a rotor diameter of 64 m, which had a sound power level of 109 dBA.  The Stockyard Hill noise assessment has been conducted based on three indicative turbines with rotor diameters ranging between 126 and 140 metres.  The highest sound power levels for these turbines range between 104 dBA and 106 dBA. 

Sound  power  levels  are  used  in  noise  models  such  as  that  used  in  the  Sonus  noise assessment  and  the Marshall  Day  Acoustics  (MDA)  peer  review.   Uncertainties  from  the 

                                                       18  New Zealand Acoustics, 2010, Vol.23/#2, p 20‐22. 

Page 36: Environment Act 1987 - Planning - Planning · Management Plan incorporating mitigation measures and the provision of native vegetation offsets the final extent of native vegetation

Stockyard Hill Wind Farm Revised Permits  Panel Report  10 May 2017 

 

Page 23 

IEC61400‐11 measurements  translate  into  uncertainties  in model  predictions.    The MDA peer  review  indicated  that  the  generally  accepted  uncertainty  with  the  IEC61400‐11 measurement  is ± 1 to 2 dBA and  if this uncertainty tolerances were  included  in the Sonus report  it would  likely  increase predicted noise  levels by 1 to 2 dBA.   This  is consistent with Mr Huson’s evidence where he  recommends an additional 2 dBA be applied  to  the sound power levels used in the Sonus noise modelling. 

In response, the Sonus noise assessment report states: 

These  sound  power  levels  are  the  specified  levels  provided  by  the manufacturer and therefore include a factor for uncertainty (in noise produced by different turbines of the same model) above measured sound power levels.  The manufacturers often note that an additional factor can be applied for the uncertainty  associated with measuring  sound  power  levels  (for  variation  in measurement  instruments  etc.).    This  additional  factor  has  not  been specifically  added  to  the  sound  power  levels  used  in  the  noise  modelling, although  the use of  the  Leq data  in  lieu of  the  L90  level  (as  specified by  [the 2010 Noise Standard]) effectively adds approximately 2 dB(A) to the predicted noise  levels.    It  is recommended that the sound power  levels and uncertainty be guaranteed by the manufacturer prior to procurement. 

To  compare  the  Sonus  results, MDA  in  their  peer  review  carried  out  a  noise  assessment using ISO 9613‐2:1996 as implemented in version 7.4 of SoundPLAN using the highest sound power level turbine (106.0 dB LWA at a hub height wind speed of 10 m/s).  The comparative study showed predictive noise levels: 

at all noise participating dwellings comply with the applicable base noise limit of 45 dB L90 using both the CONCAWE and ISO 9613‐2:1996; and 

using CONCAWE are more  conservative  (predicted higher noise  levels)  than using ISO 9613‐2:1996 at all assessed dwellings by up to 3 dBA. 

The net  result  is  that  the Sonus predictions are generally comparable with an assessment using  the  ISO 9613‐2:1996 prediction methodology  in conjunction with  sound power  level data which includes explicit consideration of uncertainty tolerances. 

Discussion and conclusion 

The Panel is satisfied that the noise assessment: 

using CONCAWE and  ISO 9613‐2:1996  result  in higher predicted noise  levels  than would occur  for  the vast majority of  the conditions and  therefore  the  result  is an appropriately conservative assessment 

by  Sonus using CONCAWE effectively  and  adequately  considers  the  sound power uncertainty matters raised by Mr Huson and others. 

The Panel is also reassured that irrespective of the noise modelling assessment uncertainty, the permit conditions provide a robust framework to ensure compliance with NZS 6808:2010 following  commissioning  and  during  operation.    Evidence  before  the  Panel  has  shown consistent alignment between predictive noise modelling and post‐construction monitoring for wind farms in Australia. 

Page 37: Environment Act 1987 - Planning - Planning · Management Plan incorporating mitigation measures and the provision of native vegetation offsets the final extent of native vegetation

Stockyard Hill Wind Farm Revised Permits  Panel Report  10 May 2017 

 

Page 24 

(ii) Turbine separation 

Mr Huson  in his evidence argues that the reduction  in wind turbine spacing combined with the increased rotor size may result in increased wake turbulence and wind shear, and result in  increased  sound pressure  levels, beating and directional effects enhancing propagation.  While he conceded that  it may be possible to  install  larger turbines having the same sound power  level  (measured  in  accordance  with  IEC61400‐11)  as  the  permitted  turbines,  he considered  there  will  be  a  significant  increase  in  sound  power  from  the  amended application. 

Mr Huson and others made frequent reference to the NSW Sustainable Energy Development Authority (SEDA) Wind Energy Handbook 2012 and the rule of thumb for spacing, that is: “A wind  farm  layout  must  take  into  account  that  turbines  have  substantial  ‘wakes’,  which interfere with  each  other  depending  on wind  direction  and  spacing.    The  general  rule  of thumb for spacing (the ‘5r‐8r rule’) is five times rotor diameter abreast and eight times rotor diameter downwind.”   The Panel accepts Mr Huson’s evidence  that  the average minimum spacing  between  turbine  towers  for  the  currently  approved wind  turbine  layout  and  the amended layout is 535 and 581 metres respectively.  Mr Huson argues because the spacing is less than that recommended as the minimum by SEDA, the amended Permit will increase wind turbine wake turbulence, noise emissions and will decrease the efficiency of the wind farm. 

Mr Huson argued that several variables such as turbulence, wind shear, inflow angle and air density may differ (and make the turbine louder) at an installed site compared to the simple sound power measurement results provided by turbine manufacturers using IEC 61400‐1119.  In summary, he concluded that the potential  for  increased sound power  levels  from  larger rotors  and  reduced  spacing  has  not  been  considered  in  the  Sonus  report  and  CONCAWE modelling. 

The Applicant in submissions maintained that the Panel should reject Mr Huson’s argument and any consideration of the SEDA policy outright. 

The Panel accepts the evidence and concerns of submitters that reduced spacing (caused by increased rotor size) could result in increased sound power, however the Panel also accepts the  evidence  of  Mr  Turnbull  and  MDA  that  the  two  noise  assessments  undertaken adequately take these matters into account and in both cases noise compliance is predicted. 

(iii) The indicative and final turbine 

It  is  normal  in  planning  applications  for  an  applicant  to  nominate  an  ‘indicative’  turbine model rather than specify the one which would be used.  The reason is that during the (often several) years between project approval and  commitment  to proceed  there  can be major changes  in utility  scale  turbine  types available on  the market.   The Panel understands  the Applicant’s reluctance to commit to a turbine model at this point. 

                                                       19  Sound power levels for wind turbines are measured in accordance with international standard IEC61400‐11. 

Page 38: Environment Act 1987 - Planning - Planning · Management Plan incorporating mitigation measures and the provision of native vegetation offsets the final extent of native vegetation

Stockyard Hill Wind Farm Revised Permits  Panel Report  10 May 2017 

 

Page 25 

The 2010 Panel and  this Panel’s position  is  that  it  is acceptable  that  the noise assessment presented by the Applicant uses three indicative turbines.  The predicted noise levels for the amended wind  farm  is based on  the General Electric GE3.2‐130,  the Vestas V136 3.45MW STE and the Senvion 3.4M‐140 at a hub height of 110 metres height and wind speeds of 11 m/s,  10 m/s  and  9 m/s  respectively.    Once  a  final  turbine model  is  selected,  the  noise assessment must  be  repeated  using  the  acoustic  characteristics  of  that  chosen model  to establish  compliance with NZS 6808:2010, and  its approval  then  can be  considered under secondary consent. 

It  is  not  possible  to  entirely  avoid  secondary  consent  processes.    However,  the  Panel  is satisfied that if, in the assessment of noise impact of the final turbine model, there is a direct comparison between it and the indicative ones used, then the process would be satisfactory. 

If  it can be demonstrated that no modelling of wind farm noise  is  justified (i.e. via use of a quieter final turbine model than the indicative models), the reassessment can be limited by providing that information to the Minister for Planning. 

The Applicant is not seeking to amend existing condition 25. 

(iv) Noise modelling 

The Applicant’s noise assessment20  includes an assessment of  the amended wind  farm by comparing predicted noise levels for three indicative turbine models against the noise limits of the 2010 Noise Standard. 

The assessment  indicates  that predicted noise  levels will be below  the noise  limits  for all participant and non‐participant dwellings for the three  indicative turbine models.   Figure 2 shows  the  noise  prediction  contour  for  the  highest  predicted  noise  level,  in  relation  to participant and non‐participant dwellings21. 

The Applicant concludes that the proposed amendment will not result in a material change in potential impact from noise and the wind farm is expected to comply with NZS 6808:2010 noise limits. 

                                                       20  Stockyard Hill Wind Farm, Environmental Noise Assessment, Sonus, May 2016. 21  A participant dwelling means a dwelling on land listed in the Address of the Land in the Permit or where the 

landowner has a written agreement relating to their land and dealing with noise from the permitted wind turbines.  A non‐participant dwelling means any dwelling that is not a participant dwelling. 

Page 39: Environment Act 1987 - Planning - Planning · Management Plan incorporating mitigation measures and the provision of native vegetation offsets the final extent of native vegetation

Stockyard Hill Wind Farm Revised Permits  Panel Report  10 May 2017 

 

Page 26 

Figure 2:  Noise contours 

 

Peer review of noise assessment 

MDA was commissioned by the Applicant to undertake a peer review of the Sonus report. 

MDA  found  that  the noise  impact assessment detailed  in  the  Sonus  report  is generally  in accordance with  relevant  guidance  documents,  namely  the  noise  Standard  and  the WEF Guidelines. 

Several technical and procedural matters were identified.  However, MDA found these issues to either have no significant consequence on the outcomes of the assessment, or relate to matters which  could be  suitably addressed at  later  stages of  the development.   The peer review supported the compliance conclusions of the Sonus report, namely that: 

The  assessment  indicates  that  the  amended  wind  farm  will  achieve  the environmental noise related requirements of the 2010 Noise Standard and the WEF Guidelines. 

(v) Criticisms of the assessment 

What is the issue 

The key question before this Panel is whether the noise assessment has been undertaken in accordance with  NZS  6808:2010.    If  predications  say  it will  comply,  can  the  Panel  have confidence in the predications and ultimately whether the wind farm is likely to comply once operational. 

Page 40: Environment Act 1987 - Planning - Planning · Management Plan incorporating mitigation measures and the provision of native vegetation offsets the final extent of native vegetation

Stockyard Hill Wind Farm Revised Permits  Panel Report  10 May 2017 

 

Page 27 

The Applicant has also sought relatively minor amendments to the existing noise modelling condition 23. 

Discussion 

Subject  to  areas of uncertainty  (for background noise monitoring) discussed elsewhere  in this  chapter,  the Panel  acknowledges  that  the noise  assessments by  Sonus  and MDA has been carried in accordance with NZS 6808:2010. 

The predictive modelling  is a technically complex  issue.    It  is an  important  issue because  it provides the initial assessment of sensitive locations, in this case non‐stakeholder dwellings that may be affected by wind turbine noise.   The Panel concludes that the 35 and 40 dBA noise contour  for wind  farm noise provides a  satisfactory  initial  identification of dwellings that may be affected noise from wind turbines. 

The Panel believes that the noise assessments provide a satisfactory assessment of the likely spatial impact of wind turbine noise. 

The Panel notes that any predicative noise assessment will have some degree of uncertainty and no matter how exhaustive or through some uncertainty will always exist; the question is whether this uncertainty is significant or not. 

The Panel heard evidence and  submissions which argue  the Applicant,  their consultant or turbine manufacturers, could intentionally or unintentionally underestimate noise emissions and predictions.  The Panel is reluctant to accept these claims for the following reasons: 

Regardless  of  any  noise  predictions,  a  compliance  assessment  using  sound measurements is required once a wind farm is operating.  Therefore, any significant errors in the predictions will be found during commissioning, and will be required to be rectified to achieve compliance with the noise limits. 

The 2010 Noise Standard suggests the use of the  ISO 9613‐2 or equivalent (that  is CONCAWE).    These  prediction  methods  have  been  in use  for  wind  farms  in Australia and  internationally  for over a decade.   This Panel  is not aware and was not made aware of any cases where significant errors have been  found.   This was Mr  Turnbull’s  uncontested  evidence  and  that  of  the  NZS  6808:2010  Technical Committee22.    In  practice,  predicative  noise  modelling  has  been  shown  to  be accurate. 

The Applicant, their consultant and/or the turbine manufacturer have an interest to ensure accurate wind  farm noise predications.    If  they are not accurate  this could significantly  impact  the viability of  the project, cause a major dispute, delays and expose  the  parties  to  significant  financial,  community,  political,  legal  and reputational risk. 

Even so the 2010 Panel report diligently identified areas which undermined their confidence in  the  previous  noise  assessment  (e.g.  adequacy  of  background  noise  monitoring  and assessment of  indicative turbine).    In response to concerns, they recommended conditions which  required  additional background noise monitoring,  additional noise modelling, noise 

                                                       22  Dr Stephen Chiles, 2010, Vol.23/#2, New Zealand Acoustics, p 20‐22. 

Page 41: Environment Act 1987 - Planning - Planning · Management Plan incorporating mitigation measures and the provision of native vegetation offsets the final extent of native vegetation

Stockyard Hill Wind Farm Revised Permits  Panel Report  10 May 2017 

 

Page 28 

compliance  testing, noise  compliance enforcement, management of noise  complaints  and the development of an active noise management system.   These recommended conditions were  accepted  and  imposed  by  the  Minister  for  Planning  and  importantly  require compliance for all turbines at all times. 

Conclusion 

The Panel concludes that the relatively minor amendments to the existing noise modelling conditions 23 are acceptable. 

3.4 Background noise monitoring 

(i) What is the issue 

The Application seeks removal of background noise measuring conditions. 

(ii) Discussion 

Establishing  the background noise  levels  is critical.   This  is  the  foundation upon which  the acceptable  noise  levels,  the modelled  compliance  assessment,  and  the  post‐construction compliance monitoring and enforcement rests. 

The approach is to establish the background noise levels at various locations in the absence of  the wind  farm, use  these  levels as  the basis  for a specified noise  increment, and hence determine  the  ‘acceptable noise  limit’.   This  limit  then defines  the maximum  level  for  the initial assessment of expected noise.   Vitally,  it  is the noise  limit that must be shown to be met for post‐construction monitoring and hence demonstration of compliance. 

The  2010  Panel  and  several  submitters  raised  concerns  regarding  aspects  of  background monitoring  taken at  the  time.   The 2010 Panel  considered  this matter  in  some detail and raised several valid concerns.   This Panel has been  interested to understand whether these concerns and the applicable Ministerial conditions have been subsequently addressed by the Applicant or not.  The 2010 Panel view on these matters is best reflected in the following23: 

The Applicant has submitted that the number of background noise monitoring sites,  the  predominant  use  of  stakeholder  dwellings,  the  use  of  the  single meteorological mast, and the estimation of wind speed data by extrapolation to hub height are all consistent with NZS 6808:1998.  We agree that this is so.  However,  given  recent well  publicised  concerns  about wind  farm  noise  and suggested health impacts we are disappointed that the Applicant has not gone beyond  technical  compliance  to  provide  background  noise monitoring  data that  provides  as  robust  and  comprehensive  information  as  possible.    This would  provide  a  firmer  foundation  for  assessing  noise  compliance  and reducing  the  likelihood  of  an  unsatisfactory  noise  outcome.   We  are  of  the view  that  the  background  noise monitoring  that  has  been  presented, while technically defensible in terms of NZS 6808:1998 requirements, does not have 

                                                       23  p184,  Stockyard  Hill  wind  farm  Pyrenees  and  Corangamite  planning  schemes permit  applications  PL‐

SP/05/0548, P2009/105 and P/2009/104, Panel Report, August 2010. 

Page 42: Environment Act 1987 - Planning - Planning · Management Plan incorporating mitigation measures and the provision of native vegetation offsets the final extent of native vegetation

Stockyard Hill Wind Farm Revised Permits  Panel Report  10 May 2017 

 

Page 29 

a  ’good  look’  in the present wind farm public  image.   The planning system  is best served by more comprehensive background noise monitoring. 

Further, we consider that the number of background noise measurement sites leads to some uncertainty in the characterisation of the noise background over such a large WEF site.  We therefore believe that more substantial background noise monitoring is needed prior to construction. 

The  2010  Panel  made  recommendations  in  relation  to  additional  background  noise monitoring and accordingly the Minister for Planning imposed conditions 18, 19, 20, 21 and 22  requiring  additional  background monitoring.    The Applicant  has  undertaken  additional background noise monitoring.    In evidence and submissions,  the Applicant argues  that  the background monitoring undertaken is extensive; this may be true.  In his evidence, Mr Huson accepted  that  the  number  of monitoring  locations was  not  unreasonable,  however  drew attention to the fact that additional monitoring has not been undertaken in full compliance with conditions 18, 19, 20, 21 and 22. 

The Panel appreciates the additional noise monitoring undertaken  is extensive, however  it agrees  with  Mr  Huson.    It  would  have  been  helpful  to  the  Panel  if  the  Applicant  had specifically  reflected  and  responded  to  the  concerns  of  the  2010  Panel more  fully  and demonstrated compliance with the conditions by tabling written clearance from the Minister for Planning. 

Instead  the Applicant has  chosen  to undertake additional background noise monitoring  in manner they choose and now seeks to replace condition 18 and delete conditions 19, 20, 21 and 22  to  achieve  retrospective  compliance on  the basis,  condition 18  is  replaced with  a “more contemporary condition” and conditions 19, 20, 21 and 22 is deleted because: 

These  measurements  have  now  been  conducted  and  are  summarised  in Appendix D.  Therefore, condition is no longer required.24 

This is not a satisfactory approach in the Panel’s view. 

The Panel understands the Applicant’s desire to ‘refresh’ several conditions  in  line with the guideline  ‘example’ permit  conditions, however  the Panel must be mindful of  the  specific circumstances of  the  Stockyard Hill Wind  Farm project  and  the  existing  environment  and community.   Furthermore,  it cannot  ignore the valid concerns of the previous Panel, actual Ministerial conditions and submit to example conditions. 

In principle, this Panel takes the view that the 2010 Panel report and the conditions imposed by  the Minister  remain valid.   Panels are not an audit or  compliance agency,  it  is not  the Panel’s  role  to  determine  if  an  Applicant  has  or  has  not  satisfactorily  complied  with Ministerial conditions.  The April 2016 Sonus report “Stockyard Hill Wind Farm, Background Noise Monitoring” makes no reference to these conditions (18 to 22) and the report has not put  forward  a  case  that  is  satisfies  these  conditions;  in  detail  or  intent.    Further  it  is disappointing that the MDA peer review excluded an evaluation of the Sonus Stockyard Hill Wind Farm, Background Monitoring Noise report. 

                                                       24  Appendix C: Stockyard Hill Wind Farm, Environmental Noise Assessment, Sonus, May 2016. 

Page 43: Environment Act 1987 - Planning - Planning · Management Plan incorporating mitigation measures and the provision of native vegetation offsets the final extent of native vegetation

Stockyard Hill Wind Farm Revised Permits  Panel Report  10 May 2017 

 

Page 30 

The main Sonus report25 on pages 8 and 9 contains critical commentary on conditions 18, 19 and 20, claiming  they are “impractical”, “ambiguous” or “cannot be achieved”.   This Panel does not share that view: 

Condition  18(d)  is  only  impractical  when  the  risk  of  non‐complying  wind  farm becoming compliant arises because the Applicant has collected insufficient data, as noted  in NZS 6808:2010 (Section 7.2.1): “The number of measurements made shall be  sufficient  to allow dependable  correlations  to be  obtained between  the  sound levels and  the wind  speeds  (see 7.4 and 7.5).”   Condition 20(d)  rightly  requires  a minimum  of  4,000  ten‐minute  data  pairs.    Again,  this  Panel  concurs  with  the assessment made by the 2010 Panel in relation to wind direction (Section 8.6.4) and supports existing conditions 18(d), 20(e), 21 and 22. 

Condition 19  is not ambiguous;  it  is common  for  specialists undertaking  technical assessments  to make  a written  statement  regarding  the  confidence,  uncertainty and limitations of results. 

The  Panel  accepts  that  condition  20(a)  cannot  be  achieved  if  the  national Association  of  Testing  Authorities  (NATA)  does  not  provide  an  approval  for  the signatory/author  of  the  background  noise  assessment.    The  intent  however  is reasonable and clear.  The condition intends that equipment needs to be calibrated and checked by a NATA accredited organisation, the Panel understands this occurs.  The  Panel  proposes  to  amend  this  condition  to  ensure  the  operation  of  the equipment is undertaken by a trained, qualified and experienced individual. 

In  summary,  the  Panel  is  concerned  that  the  Applicant  is  seeking  to  remove  existing Ministerial  conditions  that  in  evidence  they  have  not  complied  with  and  their  non‐compliance is at odds with the concerns and recommendations of the 2010 Panel.  The Panel does  not  accept  the  existing  background  noise  conditions  are  impractical,  ambiguous  or incapable of being met  to  the extent  they should be deleted.   The Panel  is concerned  the amendments proposed by the Applicant could weaken the background noise conditions.  As with  the 2010 Panel  this Panel maintains  the view  the  “planning  system  is best  served by more comprehensive background noise monitoring”. 

It would have been useful  to  the Panel  if  the Applicant  submitted  condition amendments which addressed matters of ambiguity and practicality, while still achieving  the  intent and substance of  the 2010 Panel and Ministerial  conditions.    In  conclusion,  the Panel  sees no compelling  reason  to  amend  these  conditions;  except  to  reflect  changes  in  the windfarm itself, the 2010 Noise Standard and minor points of clarification. 

(iii) Recommendation 

The Panel recommends: 

Retain current conditions 18, 19, 20, 21 and 22 making only minor amendments considering  changes  in  the  windfarm  itself,  the  revised  New  Zealand  Noise Standard NZS 6808:2010 and minor points of clarification. 

                                                       25  Stockyard Hill Windfarm, Environmental Noise Assessment, Sonus, May 2016. 

Page 44: Environment Act 1987 - Planning - Planning · Management Plan incorporating mitigation measures and the provision of native vegetation offsets the final extent of native vegetation

Stockyard Hill Wind Farm Revised Permits  Panel Report  10 May 2017 

 

Page 31 

3.5 Post‐construction compliance monitoring and management 

(i) Special audible characteristics 

The  assessment  of  the  special  audible  characteristics  of  a  wind  farm  is  an  important component  of  determining  noise  compliance.    The  Panel  understands  special  audible characteristics  to be  those distinct audible  sounds  that  can be  readily discerned  from  the more broadband noise  from  the wind  farm.   These sounds may be repetitive and of short duration or of a single frequency that may contribute little to the time averaged A–weighted noise measurement.  Their distinctive character can be annoying. 

Hence NZS 6808:2010 encourages wind farm design that ensures an absence of these special audible characteristics or, failing that, imposes a noise penalty. 

The  Panel  believes  that  the  assessment  of  special  audible  characteristics  requires  both objective,  where  possible,  and  subjective  assessment;  objective  to  measure  the characteristic and subjective to ensure that the wind farm is indeed the source. 

The  Panel  is  not  persuaded  that  it  is  reasonable  or  fair  to  apply  the  special  audible characteristic penalty, and  to do so  in  full, prior  to construction.   To simply  transfer some experiences from elsewhere to this proposal is, in its judgement, not responsible.  The Panel thinks it unlikely that a manufacturer would offer a turbine with known characteristics when the consequence could be a substantial noise penalty.  Similarly, the Panel thinks it unlikely that the Applicant would design a configuration with known special audible characteristics.  The  Panel  believes  that  design  will  seek  to  reduce  the  likelihood  of  special  audible characteristics  but  their  existence  is  essentially  unknown  until  a  post‐construction compliance  assessment  is made.    This  reinforces  its  position  that  it  is  not  appropriate  to apply the special audible characteristic penalty, and to do so in full, prior to construction. 

The Panel heard  submissions  suggesting  that  the  significant  change  in  turbine height  and rotor size could result  in various noise concerns that were not so evident before,  including special  audible  characteristics.    The  Panel  would  expect  changes  in  scale  would  be considered  in  the  design  of  the wind  farm  to minimise  the  likelihood  of  special  audible characteristics. 

The Panel believes that it is the best interests of all parties for special audible characteristics to be eliminated, as  far as possible, by design,  than have  it assessed and  controlled after commissioning. 

In conclusion, the Panel believes that a penalty for special audible characteristics should not be applied prior  to construction, and  that elimination or minimisation of  these potentially annoying acoustic characteristics should be achieved, wherever possible by design.  Even so the application of the penalty for special audible characteristics  is an aspect of compliance assessment.    The  Panel  is  therefore  satisfied  that  special  audible  characteristics  can  be managed by the existing permit conditions. 

(ii) Post‐construction compliance monitoring and management 

The Panel believes that the post‐construction assessment of the noise of the operating wind farm  is  a  critical  issue  that  requires  special  attention.    The  importance  of  a  robust  post‐

Page 45: Environment Act 1987 - Planning - Planning · Management Plan incorporating mitigation measures and the provision of native vegetation offsets the final extent of native vegetation

Stockyard Hill Wind Farm Revised Permits  Panel Report  10 May 2017 

 

Page 32 

construction monitoring  and management  framework  is  discussed  in  detail  in  the  2010 Stockyard Hill Wind Farm Panel report, the recent Environmental Effects Statement Inquiry into the Dundonnell Wind Farm and the Guidelines.  The focus of evidence and submissions to  it was on  the noise assessment by  the Applicant, and critiques of  that  from submitters, including the application of NZS 6808:2010  itself, rather than features of post‐construction noise  assessment  should  a permit be  issued.   While  the Panel  agrees,  this  is  a matter of critical  importance,  the  Panel  does  not  however  propose  to  recanvas  the  issues  in  this report. 

The Panel  is  reassured by  the  requirement  for noise compliance  testing, noise compliance enforcement and adaptive management in the existing permit conditions 26, 27, 28, 29, 31 and 32.   In this regard and as part of the amended Application the Applicant has sought to either amend or replace these conditions26.  The Panel will focus on the merits or otherwise of making these amendments or replacements. 

(iii) Provision of timely monitoring results 

The Applicant is seeking to remove the requirement to provide timely monitoring results to the  Minister  for  the  Planning  (26(c))  and  the  prescriptive  requirement  to  undertake compliance testing at the same location as the background noise monitoring (26(c)). 

The Panel agrees that “not more than 60 days” is probably unreasonable and may prejudice a proper assessment.  However, the Panel is not inclined to remove a timeframe completely.  The  Panel  believes  120  days  is  more  reasonable,  and  propose  condition  26(c)  read  as follows: 

…the  noise  compliance  testing  plan  must  include  advice  on  timing  of  the assessment including defining when commissioning of the wind energy facility, or  an  identified  stage  of  it,  will  occur,  and  when  the  compliance  noise monitoring  results will be provided  to  the Minister  for Planning.    That  time must not be more than 120 days after commissioning unless with the further consent of the Minister for Planning. 

Section  7.5.1 of  the  2010 Noise  Standard does  require, where practical post‐construction monitoring  to be undertaken at  the  same  locations where  the background measurements were  taken.    On  this  basis,  the  Panel  accepts  in  part  the  Applicant’s  amendment  and proposes that condition 26(e) read as follows: 

…the noise compliance testing must be carried out at  locations  in accordance with NZS 6808:2010, that is where practical as identified in Conditions 19 d) – e). 

(iv) Noise compliance plan 

Condition  27  requires  the  noise  compliance  plan  approved  by  the  Minister  to  be implemented, condition 28 requires that any penalty  for special acoustic characteristics be 

                                                       26  Appendix C: Stockyard Hill Wind Farm, Environmental Noise Assessment, Sonus, May 2016. 

Page 46: Environment Act 1987 - Planning - Planning · Management Plan incorporating mitigation measures and the provision of native vegetation offsets the final extent of native vegetation

Stockyard Hill Wind Farm Revised Permits  Panel Report  10 May 2017 

 

Page 33 

made,  condition  29  provides  a  prescriptive  process  to  bring  any  non‐compliance  into compliance and condition 31 and 32 provide for an active noise management system. 

The Applicant is seeking to replace all these conditions with the following: 

a.  Acoustic  compliance  reports  shall  be  prepared  by  a  suitably  qualified  and experienced  independent acoustic engineer to demonstrate compliance with the noise limits specified in the Standard. 

b.  Noise  assessment  positions  must  be  located  according  to  the  Standard,  and shown on a map.   The map shall clearly  identify each noise assessment position as either a participant or non‐participant dwellings. 

c.  An initial acoustic compliance report must be submitted within six months of the commissioning of  the  first  turbine, and at  six monthly  intervals  thereafter until full operation (following completion of construction and commissioning). 

d.  A final compliance report must be submitted to the responsible authority after a 12 month period following full operation of the facility. 

e.  Compliance reports should be publically available. 

f.  Following  facility  commissioning,  all  complaints  shall  be  managed  following procedures set out in the noise complaints management plan. 

The Panel acknowledges  these proposed conditions  reflect Attachment B  (Example permit conditions  to  be  applied  as  appropriate)  from  the Guidelines.    The  Panel  notes  they  are ‘example’ conditions and as such it regards them as a guide. 

Considering the critical importance of this issue, the findings of the 2010 Stockyard Hill Wind Farm  Panel  report,  submissions  and  the  intent  and  detail  in  the  existing  conditions,  the amendments proposed by  the Applicant  are  considered by  this Panel  as weakening post‐construction  compliance  and management  requirements.    Unless  existing  conditions  are demonstrably  deficient,  inadequate,  unreasonable  or  onerous,  the  Panel  is  reluctant  to accept  any  amendments  which  would  weaken  or  strengthen  existing  conditions.   Most notably none of the replacement conditions provide for same level enforceability as existing condition 29. 

In  conclusion,  the  Panel  sees  no  reason  and  has  received  no  compelling  argument  to justifying the amendment or replacement of existing conditions 27, 28, 29, 31 and 32; except to reflect factual changes  in the windfarm  itself, the 2010 Noise Standard and minor points of clarification. 

The Panel recommends: 

Amend current condition 26(c) to read: 

“the  noise  compliance  testing  plan  must  include  advice  on  timing  of  the assessment including defining when commissioning of the wind energy facility, or  an  identified  stage  of  it,  will  occur,  and  when  the  compliance  noise monitoring  results will  be  provided  to  the Minister  for  Planning.    That  time must not be more than 120 days after commissioning unless with the  further consent of the Minister for Planning”. 

Page 47: Environment Act 1987 - Planning - Planning · Management Plan incorporating mitigation measures and the provision of native vegetation offsets the final extent of native vegetation

Stockyard Hill Wind Farm Revised Permits  Panel Report  10 May 2017 

 

Page 34 

Amend current condition 26(e) to read: 

“the noise compliance  testing must be carried out at  locations  in accordance with NZS 6809:2010, that is where practical, as identified in Conditions 19 d) – e).” 

Do  not  amend  current  conditions  27,  28,  29,  31  and  32,  except  for  minor amendments considering changes  in the windfarm  itself, the New Zealand Noise Standard 6808:2010 and minor points of clarification. 

(v) Complaints 

As  contemplated  by  existing  conditions  26,  27,  28,  28,  29,  31  and  32  project  compliance should be achieved and maintained irrespective of complaints.  While complaints may arise in relation to actual non‐compliance they may not. 

Existing  conditions 6(k)  – Complaints Management Plan,  condition 30  – Noise Complaints and  condition 39 – Complaints made  to  the  responsible authority provide a  framework  to receive, respond to, manage and close out complaints. 

The Applicant seeks to replace existing condition 30 and 39 with the following: 

Noise complaints evaluation 

For the purposes of complaints evaluation, the following requirements apply: 

a.  Post  installation  sound  levels  shall,  where  practical,  be  measured  at  a selection of locations where the background sound levels were determined (GPS coordinates and a map showing these locations is to be provided). 

b.  If  a  non‐compliance  is  detected,  or  an  acoustic  investigation  is  required under  the noise complaints plan, an  independent assessment  report must be prepared by a suitably qualified and experienced  independent acoustic engineer to: 

identify  the  weather  or  operational  conditions  associated  with  the complaint / breach 

analyse the uncertainty and confidence levels in the monitoring, and the steps taken 

to reduce uncertainty  target assessment to identify the cause and remediation actions 

submit  a  remediation  plan  to  the  satisfaction  of  the  responsible authority  outlining,  the  investigation  process,  complainant communications, actions and timelines to resolve the complaint/breach 

If  the  complaint  is  not  resolved  through  the  processes  outlined  above,  the responsible authority may request an  independent peer review at the cost of the permit holder and on/off shut down testing to resolve uncertainty. 

c.  Following  the  initial  post‐construction  reporting  process,  additional independent assessment may be requested by the responsible authority at any time, where complaints are received and are considered to reasonably warrant investigation. 

Page 48: Environment Act 1987 - Planning - Planning · Management Plan incorporating mitigation measures and the provision of native vegetation offsets the final extent of native vegetation

Stockyard Hill Wind Farm Revised Permits  Panel Report  10 May 2017 

 

Page 35 

d.  If  investigations  indicate  special  audible  characteristics  are  potentially occurring,  procedures  outlined  in  Appendix  B  of  the  Standard  should  be applied. 

Noise complaint response plan 

Before  the  first  turbine  is  commissioned,  the  permit  holder must  prepare  a noise  complaint  investigation  and  response  plan  to  the  satisfaction  of  the responsible authority. 

The plan shall include: 

a process of investigation to resolve a complaint 

a  requirement  that  all  complaints  will  be  recorded  in  an  incidents register 

how contact details will be communicated to the public 

a  toll  free  telephone  number  and  email  contact  for  complaints  and queries 

details of  the appropriate council contact  telephone number and email address (where available) 

a  table  outlining  complaint  information  for  each  complaint  received, including: 

the complainant’s name 

any applicable property reference number if connected to a background testing 

location  the complainant’s address 

a receipt number for each complaint which is to be communicated to the complainant 

the  time,  prevailing  conditions  and  description  of  the  complainant’s concerns 

including the potential incidence of special audible characteristics  the processes of investigation to resolve the complaint. 

A  report  including  a  reference  map  of  complaint  locations,  and  outlining complaints,  investigation  and  remediation  actions  is  to  be  provided  on  an annual basis to the satisfaction of the responsible authority. 

The  register and complaints  response process shall continue  for  the duration of the operation of the wind energy facility and must be made available to the responsible authority on request. 

The owner of  the wind energy  facility must  implement and  comply with  the Approved Noise Complaint,  Investigation and Response Plan  for  the duration of the operation of the wind energy facility. 

The Applicant supports DELWP’s approach for a single complaints management plan which means  the  removal  of  existing  condition  6(k).    Council  sought  changes  to  the  way  the complaints register was made public. 

Page 49: Environment Act 1987 - Planning - Planning · Management Plan incorporating mitigation measures and the provision of native vegetation offsets the final extent of native vegetation

Stockyard Hill Wind Farm Revised Permits  Panel Report  10 May 2017 

 

Page 36 

Environmental Management Plan Condition k(ii): 

The operator must make the register must be available  for  inspection by the public during normal working hours and its contents should be reported to the Minister for Planning: 

on  a  quarterly  basis  from  the  date  that  the  first  wind  turbine  is commissioned 

on  an  annual  basis  from  the  date  two  years  after  the  last  turbine  is commissioned 

with copies provided to Pyrenees Shire Council at the same time. 

Again, the Panel acknowledges these proposed conditions (with some minor amendments) reflect  Attachment  B  (Example  permit  conditions  to  be  applied  as  appropriate)  from  the Guidelines.  The Panel notes they are ‘example’ conditions and as such it regards them as a guide. 

The Panel considers the proposed replacement conditions put forward by the Applicant add no  significant  value and neither  strengthen or weaken  the existing  complaints  framework under the existing permit conditions. 

The  Panel  received  no  submissions  or  evidence  that  the  existing  conditions  dealing with noise  complaints  are  demonstrably deficient,  inadequate,  unreasonable  or  onerous.    In  a written  submission,  the  Pyrenees  Shire  Council  supports  the  current  permit  for  the Stockyard Hill Wind Farm nominating the Minister for Planning as the responsible authority in  relation  to  noise.    They  also  contend  that  the  Applicant’s  amendments  include inconsistences  as  to  who  the  responsible  authority  is  for  the  enforcement  of  several conditions, particularly those relating to noise monitoring and noise complaint handling. 

In  conclusion,  the  Panel  sees  no  reason  and  have  received  no  compelling  argument  to justifying  the  amendment  or  replacement  existing  conditions  6(k),  30  and  39;  except  to reflect factual changes  in the windfarm  itself, the 2010 Noise Standard and minor points of clarification. 

The Panel agrees  that  timely and proactive  forwarding of complaints  register  to Council  is appropriate. 

(vi) Recommendation 

The Panel recommends: 

Revise the Environmental Management Plan condition k(ii) to read: 

The  operator must make  the  register  available  for  inspection  by  the  public during normal working hours and its contents must be reported to the Minister for Planning and Pyrenees Shire Council: 

on  a  quarterly  basis  from  the  date  that  the  first  wind  turbine  is commissioned 

on  an  annual  basis  from  the  date  two  years  after  the  last  turbine  is commissioned. 

Page 50: Environment Act 1987 - Planning - Planning · Management Plan incorporating mitigation measures and the provision of native vegetation offsets the final extent of native vegetation

Stockyard Hill Wind Farm Revised Permits  Panel Report  10 May 2017 

 

Page 37 

Do  not  amend  current  conditions  30  and  39,  except  for  minor  amendments considering  changes  in  the  windfarm  itself,  the  New  Zealand  Noise  Standard 6808:2010 and minor points of clarification. 

Page 51: Environment Act 1987 - Planning - Planning · Management Plan incorporating mitigation measures and the provision of native vegetation offsets the final extent of native vegetation

Stockyard Hill Wind Farm Revised Permits  Panel Report  10 May 2017 

 

Page 38 

4 Health 

(i) What is the issue 

Concerns were raised about the health impacts of the amended wind farm. 

(ii) Evidence and submissions 

Submissions on health impacts allegedly caused by wind farms have been common in many Panel and VCAT hearings  in recent years and submissions to this project were no different.  Significant submissions on the  issue were provided and many other submissions raised the issue to some extent. 

Ms Laurie stated27: 

In my opinion, because of the existing failure of the [2010 Noise Standard] and the failure of the regulatory authorities  in Victoria, to protect the health, and related  human  rights  of  Victorian  residents  at  existing  wind  power developments  “to  enjoy  the  highest  standard  of  physical  health”,  which  is enshrined  in  six  of  the  seven  human  rights  Covenants  and  Conventions  to which  Australia  is  a  signatory  the  amendments  proposed  to  the  original planning permit for Stockyard Hill Wind Power Development will directly result in even more serious and widespread harm  to  the health of  the surrounding population  of  Stockyard  Hill  residents  over  the  lifetime  of  this  project, including wind turbine hosts and their families, than will inevitably occur if the original  permit  stands  and  the  already  approved  wind  turbines  are constructed. 

Some of  the  submitters put  it  to  the  Inquiry  that  their  lives have been directly  adversely affected  by  exposure  to  wind  farms,  and  particularly  infrasound,  or  sound  at  very  low frequencies  beyond  audibility.    Various  health  conditions  were  said  to  result  from  this exposure. 

Submitters also provided copies of submissions to the recent Australian Senate Inquiry Select Committee on Wind Turbines from various parties and extracts from the Committee’s report, all suggesting some level of health effects. 

(iii) Discussion and conclusions 

What do personal testimonies tell us? 

The purported health impacts were based on a number of propositions: 

The cause of the health impacts is: - audible sound - a characteristic of inaudible infrasound - vibrations 

                                                       27  Expert evidence paragraph 33. 

Page 52: Environment Act 1987 - Planning - Planning · Management Plan incorporating mitigation measures and the provision of native vegetation offsets the final extent of native vegetation

Stockyard Hill Wind Farm Revised Permits  Panel Report  10 May 2017 

 

Page 39 

the  onset  of  the  health  effects  does  not  necessarily  coincide  with  the commencement of the wind farm 

a mechanism of ‘sensitisation’ means that the symptoms are felt at other locations than the wind farm. 

There is no doubt that a number of people report adverse health impacts that they attribute to wind  farms.   The Panel does not doubt the personal testimony of  individual submitters, but cannot see clear evidence of a causal link with wind farms.  Indeed, the propositions that the  onset  of  conditions  can  be  delayed  and  then  manifest  themselves  at  a  variety  of locations suggests that wind farms are not the cause of people’s troubles.  The critical causal links that the ill effects follow immediately after the establishment of the wind farm and are only manifest when the sufferer is near the wind farm are broken. 

Evidence  of  adverse  health  impact  reported  by  people  near wind  farm  has  no  probative value without knowing what the incidence of such ailments are in the general population. 

Is there an expert body of knowledge? 

It was submitted that the Panel should not treat Ms Laurie as an expert.  It is not clear to the Panel that membership of, or indeed a management role in, an organisation that is seeking to  achieve  policy  change  automatically  rules  a  person  out  from  giving  expert  evidence.  Certainly, care must be taken in assessing such evidence, but it is at least conceivable, that a person seeks changes to policy based on an objective assessment of evidence, and that same assessment could be usefully presented to a panel, noting of course, that a person cannot be both a submitter and an expert for the same matter. 

The  Panel  does  not  think  the Ms  Laurie’s  position  as  the CEO  of  the Waubra  foundation automatically  rules her out  from  giving expert evidence.    The  issue  is not  that Ms  Laurie advocates for people’s health, the issue is there is no useful evidence to support the basis on which she does this. 

The Panel notes  the  analysis of  the  issue undertaken  in  a decision making  context  in  the Cherry Tree Wind Farm VCAT case.28   This case contains a comprehensive consideration of the health issue.  Some notable conclusions of the Tribunal are: 

NSW  and Victorian health  authorities expressly  state  there  is no evidence  to  link turbines and health and the views of public health authorities should be respected29 

no evidence was called that would enable a contrary conclusion to be drawn to that of the health authorities30 

the 2 kilometre buffer required by Clause 52.32 of the Mitchell Planning Scheme is precautionary in itself.31 

Significantly, the Tribunal in Cherry Tree also noted that it is likely a small proportion of the population around a wind farm do suffer health effects, albeit that: 

                                                       28  Cherry Tree Wind Farm Pty Ltd v Mitchell Shire Council SC [2013] VCAT 1939. 29  At para 43. 30  At para 44. 31  At para  45.    The Dundonnell Wind  Farm has been developed on  the  same  ‘2  kilometres’ basis  in place 

before Clause 52.32 was recently amended to make this distance 1 kilometre. 

Page 53: Environment Act 1987 - Planning - Planning · Management Plan incorporating mitigation measures and the provision of native vegetation offsets the final extent of native vegetation

Stockyard Hill Wind Farm Revised Permits  Panel Report  10 May 2017 

 

Page 40 

The  current  state  of  scientific  opinion  is  that  there  is  no  causal  link  of  a physiological nature between these effects and the turbine.32 

The Tribunal went on to conclude that even if it could be established that a small proportion of the community were adversely affected by a wind farm,  it was not clear that this would be  sufficient  to  refuse  an wind  farm  application  given  they  have  strong  planning  policy support.33 

The Panel can only conclude, as have other inquires and panel before it that: 

that there is currently no consistent evidence that wind farms cause adverse health effects in humans 

the clear positions from the State and National Health Authorities is that there is no evidence of direct health effects.34 

                                                       32  At para 46. 33  At para 47. 34  Including the National Health and Medical Research Council.  The Inquiry also notes, but does not rely on, 

additional research done by the South Australian EPA and Health Canada, for example, which also does not challenge the prevailing Authorities’ views. 

Page 54: Environment Act 1987 - Planning - Planning · Management Plan incorporating mitigation measures and the provision of native vegetation offsets the final extent of native vegetation

Stockyard Hill Wind Farm Revised Permits  Panel Report  10 May 2017 

 

Page 41 

5 Landscape and visual impact 

5.1 Introduction 

(i) Background 

The  2010  Panel  considered  the  visual  amenity  impacts  and  landscape  impacts  of  the permitted wind  farm,  as well  as  the  heritage  impacts  on  the  viewshed  of  the Mawallok Homestead. 

As  the  result  of  these  considerations  some  turbines  were  removed  from  the  original application and this is reflected in the fact the permitted wind farm has fewer turbines than were originally applied for. 

(ii) What changes are proposed 

The changes that have the potential to affect landscape and visual impact include: 

a rotor diameter of up to 142 metres (an increase from the permitted blade length of 52 metres / rotor diameter of up to 104 metres) 

a hub height of up to 120 metres (an increase from the permitted hub height of up to 80 metres) 

a ground clearance from the bottom of the blades to the ground level not less than 32 metres (not previously specified) 

a total blade tip height up to 180 metres (an increase from the permitted height of up to 132 metres). 

5.2 Visual impact 

(i) What is the issue 

Concerns  were  expressed  about  the  impact  of  the  amended  wind  farm  on  individual properties and the broader landscape. 

(ii) Evidence and submissions 

Allan  Wyatt  undertook  the  Landscape  and  Visual  Assessment  for  the  original  planning application  while  a  partner  at  ERM.    ERM  prepared  the  following  reports  pertaining  to landscape  and  visual  impacts  as  part  of  the  assessment  of  the  original  planning  permit application, specifically: 

Landscape and Visual Impact Assessment as part of the Planning Application Report dated 6th February 2009. 

Final Landscape and Visual  Impact Assessment dated October 2009 as part of  the Planning Permit Application. 

Presentation of ‘Allan Wyatt – Expert Witness Statement’ dated 25 March 2010 and presentation of evidence at Panel hearing. 

While  at  XURBAN,  Mr  Wyatt  undertook  a  ‘Landscape  &  Visual  Impact  Assessment  to accompany  an  Application  to  Amend  Planning  Permit  No.  PL‐SP/05/0548’  which  was prepared by ERM under his direction and dated 21 April 2016. 

Page 55: Environment Act 1987 - Planning - Planning · Management Plan incorporating mitigation measures and the provision of native vegetation offsets the final extent of native vegetation

Stockyard Hill Wind Farm Revised Permits  Panel Report  10 May 2017 

 

Page 42 

Since the submission of the Amendment Application Mr Wyatt prepared a letter of advice to Herbert Smith Freehills dated 12 August 2016 which in part found: 

The  level of  impact brought about by  the proposed Amendment Application and as  shown  in  the photomontages would not alter  the  impact  levels  that was  approved  by  Planning  Permit  No.  PL‐SP/05/0548.    The  proposed amendment  does  not  alter  the  quantum  of  the  impact,  that  is  the  impact would not change from low to medium, or from medium to high as a result of a change from 104 metre diameter to 140 metre diameter. 

Given  this analysis of a much greater change, a  further  increase  in  the  rotor diameter from 140 metre to 142 metre would be completely imperceptible. 

The proposed change  in  rotor diameter will not  result  in a change  in height.  The overall height will remain at maximum height of 180 m. 

The  ERM  assessment  found  that  the  proposed  alteration  in  wind  turbine diameter from 104 metre to 140 metre will result in a negligible alteration to the  level  of  visual  impact  that was  assessed  and  approved.    The  change  in wind  turbine  rotor  diameters  from  140 metre  to  142 metre  will make  no difference to this conclusion. 

Mr Wyatt’s assessment is based on assessing zones of visual impact as described in Table 2. 

It was  submitted  that  the  changes  in  turbine  size meant  that  some  turbines moved  ‘up a category’ and therefore had more visual impact that the original permit. 

Mr Wyatt  assessed  the  impact  of  the  larger  turbines  by  considering  a  number  of  typical views: 

Initially  three  locations  were  selected  within  the  public  domain  and  a photomontage was prepared  showing both  the  full extent of  the panoramic views as well as sheets which showed the changes in a 60° field of view. 

These  three  photomontages  were  prepared  by  ERM  under my  direction  in January 2016. 

NVP01 – Beaufort‐Carranballac Road 0.2 kilometres to nearest wind turbine 

NVP02 – Streathan‐Carngham Road 1.8 kilometres to nearest wind turbine 

NVP03 – Skipton Road 0.3 kilometres to nearest wind turbine 

Whilst preparing  this  report,  I also  revisited  the site on  the 23  January 2017 and prepared a fourth photomontage. 

NVP04 – Chepstowe Pittong Road 3.9 kilometres to nearest wind turbine 

Viewpoint NVP04 was prepared to show the difference in visual impact of the permitted turbines and the proposed amended turbines when viewed from the distance it is proposed to offer landscape mitigation to residential properties. 

Page 56: Environment Act 1987 - Planning - Planning · Management Plan incorporating mitigation measures and the provision of native vegetation offsets the final extent of native vegetation

Stockyard Hill Wind Farm Revised Permits  Panel Report  10 May 2017 

 

Page 43 

Table 2:  Zones of visual impact 

Visual impact Approved  layout (132 m)

Amended  layout (180 m)

Visually insignificant 

A very small element in the viewshed, which is difficult to discern and will be invisible in some lighting or weather circumstances.

>17 kilometres  >20 kilometres 

Potentially noticeable, but will not dominate the landscape

The degree of visual intrusion will depend on the landscape sensitivity and the sensitivity of the viewer, however the wind turbines do not dominate the landscape.

8.5 – 17 kilometres  10 – 20 kilometres 

Potentially noticeable and can dominate the landscape

The degree of visual intrusion will depend on the landscape sensitivity and the sensitivity of the viewer.

3 – 8.5 kilometres  4 – 10 kilometres 

Highly visible and will usually dominate the landscape 

The degree of visual intrusion will depend on the wind turbines’ placement within the landscape and factors such as foreground screening.

1.5 – 3 kilometres  2 – 4 kilometres 

Will be visually dominant in the landscape from most viewing locations

Dominates the landscape in which they are sited. 

<1.5 kilometres  <2 kilometres 

Source:  Wyatt evidence Table 2 Zones of visual impact 

Page 57: Environment Act 1987 - Planning - Planning · Management Plan incorporating mitigation measures and the provision of native vegetation offsets the final extent of native vegetation

Stockyard Hill Wind Farm Revised Permits  Panel Report  10 May 2017 

 

Page 44 

Figure 3:  Distances from turbines 

 

Mr Wyatt assessed  the potential  for changes  in  impact associated with  the Wind Farm on the basis of a  comparison between  the permitted and  the amended wind  farm.   The  key feature  in  this  analysis  is  the  proposed  increase  in  turbine  height  and  rotor  diameter compared to the currently permitted turbines. 

Mr Wyatt’s  evidence  concluded  that,  although  there  is  a  slight  change  in  the  degree  of impact,  the  difference  in  visual  impact  between  the  approved  layout  and  the  proposed amended layout is negligible: the real visual impact of the Wind Farm is the presence of the turbines themselves. 

The Applicant adopted Mr Wyatt’s evidence as the basis for its submissions. 

With regard to the limited question before the Panel, the Applicant submitted that: 

Page 58: Environment Act 1987 - Planning - Planning · Management Plan incorporating mitigation measures and the provision of native vegetation offsets the final extent of native vegetation

Stockyard Hill Wind Farm Revised Permits  Panel Report  10 May 2017 

 

Page 45 

The Panel should adopt the evidence of Mr Wyatt that the alteration of height and  rotor  diameter  will  have  a  negligible  visual  impact  above  that  of  the approved Wind Farm.  The Applicant further submits that these findings do not present  any  grounds  for  refusal  of  the  Amendment  Application.    To  the contrary,  it  is  submitted  that Mr Wyatt’s  evidence  demonstrates  that  the changes  sought  by  the  Applicant  are  strongly  supported  by  the  planning policies referred to earlier in these submissions. 

The  Applicant  submitted  that  the  WEF  Guidelines  include  additional  policy  regarding significant landscapes, requiring an assessment of visual impact to take account of landscape values associated with nearby land.  According to the WEF Guidelines, the determination of whether  a  proposal  is  acceptable  is  one  which  requires  consideration  of  the  planning scheme  objectives  for  the  landscape,  including  whether  the  land  is  subject  to  an Environment  Significance  Overlay,  Vegetation  Protection  Overlay,  Significant  Landscape Overlay or “relevant strategic study that is part of the relevant planning scheme”.35  Neither the Wind Farm site nor surrounding land is covered by a Significant Landscape Overlay.  No overlays with  landscape  protection  apply  to  the Wind  Farm  site.    The  land  is within  the Farming Zone, and this  is to be distinguished from other rural zones which have as part of their purposes a rural residential amenity expectation. 

The South West Victorian Landscape Assessment Study (2013) (SWVLAS) does not have the status of a document  ‘referenced  in the planning scheme’, as  identified  in section 2.2.2 of the WEF Guidelines. 

The Hawkers  and Carmel Callus presented photomontages of  the  amended wind  farm  as viewed from their properties.  These montages did not compare the amended wind farm to the permitted wind farm. 

(iii) Discussion 

As acknowledged in the WEF Guidelines, “wind energy facilities will have a degree of impact on the landscape”.  In relation to submissions that raised concerns that the increased turbine height and rotor diameter would result  in a significant visual  impact, the Panel agrees with Mr Wyatt that the comparative assessment of the permitted wind farm against the amended wind farm demonstrates that the level of difference is not significant. 

The Panel must consider the  impact of the additional height of the turbines, together with the reduced number of turbines when compared with the permitted wind farm and not the comparison with a ‘no turbines’ scenario. 

Photomontages  that  did  not  present  an  ‘approved’  and  ‘proposed’  view were  of  limited value  to  the  Panel:  the  issue  is  the  change  from  the  approved  permit,  not  the  existing landscape. 

The  issue  is whether the revised permit has such a different  impact on the  landscape that, either: 

                                                       35  Wind Energy Guidelines, p32. 

Page 59: Environment Act 1987 - Planning - Planning · Management Plan incorporating mitigation measures and the provision of native vegetation offsets the final extent of native vegetation

Stockyard Hill Wind Farm Revised Permits  Panel Report  10 May 2017 

 

Page 46 

the amendment should be refused 

some turbines should be deleted or moved. 

Wind  farms are obvious  features  in a  landscape.   The threshold  issue – determined by the permitted  wind  farm  –  is  whether  a  wind  farm  is  appropriate  in  this  landscape.    It  is conceivable that a change in the layout of a windfarm might introduce views of turbines into views or vistas where they were not previously visible.  This might be a ground for refusing the  Application  if  those  views  have  a  higher  policy  protection  than  the  views  originally impacted.  The Panel was not presented with any evidence that this was the case here. 

In terms of overall impact on the landscape values of the area, the Panel considers that the amended wind farm will have a similar impact to the permitted wind farm.  The Application certainly has the potential to be taller and therefore visible from a larger area, but the Panel does not  consider  that  this  change will be a qualitatively different  to  the permitted wind farm. 

The 2010 Panel made it clear that it recommended approval on the basis that the proposal would have a major impact on the landscape: 

In our view  the proposed WEF would have a major  landscape  impact within the  project  area.    In  some  directions  across  the  basalt  plain, mainly  to  the south  and  west,  it  would  be  clearly  visible  for  up  to  or  beyond  the  17 kilometres  distance  at which Mr Wyatt  considers  the  visual  impact  of wind turbines to be insignificant. 

Landscape effects in the public domain would be especially substantial in and around  the  central  sector of  the wind  farm  itself.   The  view  from  the public roads  near  the  Blacks  Creek Nature  Reserve … would  be  severely  impacted even under  the amended Application:  scores of  turbines  in both  the  central, northwest and southeast sectors would be visible in an interrupted 270 degree arc with the closest turbines being sited around 2 kilometres away. 

Impacts  on  the  waterbody‐based  landscapes  around  Lake  Goldsmith (recognised  in  the  planning  scheme)  and  Black  Lake  would  again  be substantial – with large numbers of turbines presenting at close range. 

We  have  noted  also  that  the wind  farm would  be  visible  from  parts  of  the Glenelg Highway which  is not consistently tree‐lined and from sections of the Skipton Rail Trail near Skipton. 

Views  from public places and  reserves  to  the north of  the site would be  less severely  impacted due to vegetation and topography.   Views from townships with the exception of the higher parts of Skipton south of the highway and the northern periphery – both inspected by the Panel – would not be significantly affected. 

… 

The  proposed  removal  by  the  Applicant  of  the  following  turbines  would, however,  somewhat  alleviate  the  high  level  visual  amenity  impacts  at  the most affected residences … 

Page 60: Environment Act 1987 - Planning - Planning · Management Plan incorporating mitigation measures and the provision of native vegetation offsets the final extent of native vegetation

Stockyard Hill Wind Farm Revised Permits  Panel Report  10 May 2017 

 

Page 47 

Despite  the  above  proposed  removals,  several  non‐participating  properties would  still experience  substantial  visual  impacts –  some due  to proximity of turbines and some due to numbers of turbines in wide viewscapes.  A number of other properties would also experience lesser degrees of visual impact that may not be considered desirable by them. 

… 

Our  overall  finding  is  that  subject  to  the  amendments  proposed  during  the hearing to remove turbines from the proposal and the further turbine removal recommended  in  Section 10,  the  landscape and  visual  impacts which would occur would be considerable but would not be such that the policy directive for them to be ‘read down’ should be set aside. 

Given the similar geographical extents of both the permitted and the amended wind farm, the  reduction  in  wind  turbine  numbers  would  lead  to  a  reduction  in  the magnitude  of landscape and visual change experienced by receptors.  This is offset by an increase in wind turbine height proposed by the Application. 

The Panel  agrees with  submissions  that  the major difference  from  a  visual perspective  is between the ‘no turbines’ scenario and the permitted turbines and not the amended when compared to the permitted turbines 

The Panel concludes that while the turbines will be visible from further away a comparison of the visual impact of the permitted and the amended wind farm, from a range of viewing distances, shows the impacts will be of the same nature. 

The Panel acknowledges that the Application will result in a minor increase in impacts upon landscape and visual receptors within the study area, relative to the permitted wind  farm, but  considers  that  the  potential  changes  in  the magnitude  of  visual  impact  between  the permits and the amended wind farm to be relatively insignificant. 

5.3 Mawallok 

(i) What is the issue 

The original permit  removed  turbines  to preserve  a  view  from  the Mawallok Homestead.  The issue is whether the view or views identified by the 2010 Panel are still preserved. 

(ii) Evidence and submissions 

Mr Wyatt assessed the changed impact from Mawallok as part of the “Landscape and Visual Impact  Assessment  to  accompany  an  Application  to  Amend  Planning  Permit  No.  PL‐SP/05/0548” and this reassessment showed a wireframe view of the permitted wind farm as well  as  a  wireframe  view  of  the  proposed  amended  wind  farm.    These  images  are reproduced below, and show there is no difference. 

Page 61: Environment Act 1987 - Planning - Planning · Management Plan incorporating mitigation measures and the provision of native vegetation offsets the final extent of native vegetation

Stockyard Hill Wind Farm Revised Permits  Panel Report  10 May 2017 

 

Page 48 

Figure 4:  Photomontage view of permitted wind farm 

 Source: Figure 13 Wireframe of permitted wind farm (Source ERM)

Figure 5:  Photomontage view of amended wind farm 

 Source: Figure 14 Wireframe of amended wind farm (Source ERM)

This assessment concluded that: 

The wireframe prepared  shows  that all  turbines  to  the north are not visible, including  the permitted wind  farm and  the amended wind  farm.   Therefore, the change in visual impact from “Mawallok” is assessed as Nil. 

The Mawallok Pastoral Company Pty Ltd engaged Mr Dennis Williamson of Scenic Spectrums Pty  Ltd  to  give  evidence  in  respect  of  visual  impacts  on  the Mawallok  Homestead.   Mr Patrick, also giving evidence  for Mawallok  relied on Mr Williamson’s photomontages.   Mr Wyatt will address issues raised by these statements in evidence.  Ultimately, the Panel will need  to make  its assessment of  the amended wind  farm  in accordance with  the guidance provided in the planning scheme, in particular with reference to Clause 52.32 and the Wind Energy Guidelines bearing in mind the already approved Wind Farm layout. 

Mr Williamson gave evidence that: 

Although  the 2010 analysis and Planning Panel decision regarding Mawallok hinged on the single photomontage view taken from the central terrace area, it  is  important  to  recognise  that  garden  visitors  and  the Mitchell  family  do explore all parts of the garden and the terrace.   Protection of the exemplary scene to the northerly  landscape should not be  limited exclusively to a single viewpoint, but consider that the photomontage positions are "representative" of what can be  seen  from particular areas of  the garden.   For  this  reason,  I would  suggest  that  not  only  should  equal  protection  be  given  to  the  views from VP2A, VP2B and VP2C, but other similar views possible from that portion of the garden where focal views to the northerly landscape are possible.  This extends  as  far  north  as  the  golf  putting  green  and  flag within  the  central garden area, as seen in the photomontage for VP2A or VP2B. 

Page 62: Environment Act 1987 - Planning - Planning · Management Plan incorporating mitigation measures and the provision of native vegetation offsets the final extent of native vegetation

Stockyard Hill Wind Farm Revised Permits  Panel Report  10 May 2017 

 

Page 49 

The  proposed  alterations  that  would  create  the  most  undesirable  visual impacts as seen  from the critical southern garden areas,  include Turbines Al, A2, A3 and A4, as well as the MET Tower.  I believe that the visual impacts that these alterations would  cause would have  the  same negative  impact on  the heritage  significance and visual quality of views as  those  turbines  that were previously not allowed by the Planning Panel during 2010.  Their impact would certainly not be "negligible" as described by  the ERM  report but moderately high  to  very high.    (Other  research  studies have demonstrated  that as wind turbines  become  larger,  their  visibility  and  relative  visual  impact  increases notably over that of smaller turbines viewed at the same distances.   28 29 3° 31 and 180 metre to 190 metre turbines are among the  largest and greatest visual magnitude in Australia.) 

(iii) Discussion 

The Panel was not  impressed by Mr Williamson’s evidence.   Under  cross examination he conceded that his photomontages omitted a number of approved turbines, thereby giving a completely misleading impression of the effect of the changes proposed.  He did not offer to furnish revised montages. 

It is not the role of this Panel to revisit the decision of the 2010 Panel.  The 2010 Panel made it clear that that central view was the key design element: 

Mr Lovell agreed under questioning that the northern vista was probably the key design element.   We are persuaded that this  is the case having regard to the  siting  of  the  house  itself  and  the  careful  framing  of  the  view  in  the Guilfoyle plan.  This view is not just any view from the Mawallok garden, as Mr Raworth said, but is: a fundamental design consideration in the generation of an important garden by an important designer. 

It is this key element of the garden design which would be affected by the 14 or so remaining turbines north of Toppers Lane – there would therefore be a substantial erosion of the significance of the place  in as much as the hitherto unaltered view  to a pastoral scene and natural  landscape would be severely intruded upon.36 

The 2010 Panel did not try to protect all views from the garden: 

We  recognise  that  as  one  moves  into  the  garden  a  wider  external  view becomes available in which peripheral turbines would be seen even if the ones in the terrace view were to be removed.   We think that new plantings should be considered as appropriate  to deal with  those  turbine views  (as  the views are  less  essential  to  the  significance  of  the  garden)  and  the  views  of  other turbines which may become available as ageing windbreaks die off and are removed.  We were advised that replanting of the older windbreaks is already occurring.   We  also  think  that  views  in  other  directions  from  the Mawallok 

                                                       36  p325. 

Page 63: Environment Act 1987 - Planning - Planning · Management Plan incorporating mitigation measures and the provision of native vegetation offsets the final extent of native vegetation

Stockyard Hill Wind Farm Revised Permits  Panel Report  10 May 2017 

 

Page 50 

property (some of which were referred to by Mr Peter Mitchell in his personal submission) which are less critical to its significance can also be dealt with by screen planting if require37 

The  Panel  is  satisfied  that  the  amendment  preserves  the  views  identified  by  the  current permit. 

5.4 Landscape mitigation 

The  current permit  requires  that offers of  landscape mitigation be made  to 3  kilometres.  Taking into account the changes proposed by amended wind farm, Mr Wyatt recommended that  the mitigation  be  extended  to  residential  properties within  4  kilometres  of  a  visible turbine.    In  his  view,  the  increase  in  height  and  blade  diameter  can  be  effectively ameliorated by extending the option for landscaping as suggested.  The Application includes an  alteration  to  the  landscape  mitigation  condition  which  gives  effect  to  Mr  Wyatt’s recommendation. 

The Panel supports this approach. 

                                                       37  p326. 

Page 64: Environment Act 1987 - Planning - Planning · Management Plan incorporating mitigation measures and the provision of native vegetation offsets the final extent of native vegetation

Stockyard Hill Wind Farm Revised Permits  Panel Report  10 May 2017 

 

Page 51 

6 Flora and native vegetation 

6.1 Introduction 

(i) Background 

The  current  permit  allows  for  the  removal  of  native  vegetation.    The  key  issues  that informed  the  current  permit were  the  impact  of  the  footprint  of  these works  on  listed threatened  vegetation  communities,  particularly  native  grasslands  and  impacts  on  listed threatened flora species. 

The  current  permit  provides  for  the  removal  of  5.28  hectares  (3.09  habitat  hectares)  of native  vegetation.    The  native  vegetation  offset  requirements  were  determined  in accordance with the Native Vegetation Management Framework (2002).38 

The existing permit also required that  further  field surveys be undertaken to ascertain the presence of areas of native grassland communities and the presence of threatened species of flora. 

The previous Panel considered Matters of National Environmental Significance (MNES) in its role  as  an  Advisory  Committee  under  the  P&E  Act.    In  consideration  of  this  proposed amendment,  the Applicant  is  responsible  for  the management  of  these matters with  the Commonwealth.  The Panel was advised that the proposed amendments have been referred to  the Commonwealth  for  assessment under  the  Environment Protection and Biodiversity Conservation  Act  1999  (EPBC  Act)  due  to  the  predicted  impacts  on MNES  (for  example, Natural Temperate Grassland of the Victorian Volcanic Plain (‘temperate volcanic grasslands EVC’), Striped Legless Lizard and Golden Sun Moth).  The decision of the Commonwealth will form part of the project approval. 

(ii) What changes are proposed 

The  key  construction  elements  associated with  the  proposed  amended  permit,  that  have implications for flora and native vegetation, are provided below.    In summary, the physical ground footprint for the proposed amended wind farm and associated components is larger. 

                                                       38  Native Vegetation Management: A Framework for Action (DNRE 2002). 

Page 65: Environment Act 1987 - Planning - Planning · Management Plan incorporating mitigation measures and the provision of native vegetation offsets the final extent of native vegetation

Stockyard Hill Wind Farm Revised Permits  Panel Report  10 May 2017 

 

Page 52 

Table 3:  Changes to the Wind Energy Facility affecting vegetation 

Parameter  Permitted  Amendment sought  Change 

Number and size of turbines. 

157 turbines. 

132 metres above natural ground level. 

149 turbines. 

180 metres above natural ground level. 

Reduced number of turbines.  Larger size and larger footings (50 metres x 70 metres compared with 40 metres x 25 metres). 

Length and width of access tracks. 

Approximately 116 kilometres.  Width 5 metres. 

Approximately 110 kilometres.  Width of access tracks 12.5 metres.  Trunk road width 13.5 metres. 

Reduced length of track.  Revised design results in an increase in track width.  Original assessment did not report any requirement for native vegetation clearance for access tracks. 

Underground cabling. 

Approximately 142 kilometres. 

Approximately 138 kilometres.  3 metre wide clearance for cabling. 

Revised design assumes cabling outside access track footprint.  Original assessment assumed cabling within the access track and did not report any requirement for native vegetation clearance for underground cabling. 

Internal overhead powerlines. 

Approximately 42 kilometres. 

Approximately 11 kilometres. 

Reduction of 31 kilometres.  Sections of internal powerline replaced by external powerline.  Original assessment did not report any requirement for native vegetation clearance for internal powerlines. 

Table 4:  Changes to external roadside and intersection upgrades affecting vegetation 

Parameter  Permitted Amendment sought  Change 

External road works/intersections impact area. 

Impact area not quantified.  Permit required further vegetation surveys be undertaken. 

Impact area 47.4 hectares including existing roads. 

Original assessment did not report any requirement for native vegetation clearance for external roadworks. 

Page 66: Environment Act 1987 - Planning - Planning · Management Plan incorporating mitigation measures and the provision of native vegetation offsets the final extent of native vegetation

Stockyard Hill Wind Farm Revised Permits  Panel Report  10 May 2017 

 

Page 53 

Table 5:  External overhead powerline – application for vegetation removal. 

Parameter  Permitted  Amendment sought  Change 

Length of external overhead 132kV powerline. 

Length 58 kilometres, connecting to Berrybank.  Clearance widths not specified. 

Permit required further vegetation surveys be undertaken. 

Length 75 kilometres connecting to south of Lismore. 

10 metre wide vegetation ground clearance.  30 metre wide aerial clearance of vegetation above 3 metres. 

Vegetation clearance requirements specified.  Increased external powerline length replacing sections of internal powerline. 

Original estimate of vegetation clearance 0.03 hectares approximately. 

The Application  includes a permit application  for a quarry.   This  is a new application as a quarry is not included as part of the current permit. 

The original assessment of native vegetation for the approved permit was carried out under the Native Vegetation Management Framework39 which was the native vegetation policy at the  time.   That  framework has  since been  superseded by  the Permitted clearing of native vegetation  –  Biodiversity  assessment  guidelines.40  The  Application  to  amend  the  current permit and the proposal to remove native vegetation was assessed under the current policy. 

The  role  of  the  Panel,  in  considering  the  proposal  to  amend  the  approved  permit,  is  to review  the effect on native vegetation and  listed  flora and vegetation communities under the Flora and Fauna Guarantee Act 1998 (FFG Act), as a result of the proposed changes to the  approved  permit  (that  is  a  larger  ground  footprint)  and  to  examine  appropriate offsetting of potential losses consistent with the relevant policy. 

6.2 Removal of native vegetation 

(i) Evidence and submissions 

Submitters raised concerns about the increase in the extent and quality of native vegetation to be removed.41 

Wind Energy Facility (internal access tracks and turbine locations) 

Ten Ecological Vegetation Classes (EVC) ranging from poor to good condition were recorded in  the  WEF  footprint.    Remnant  vegetation  is  largely  restricted  to  road  reserves  and intersections and small degraded areas on private land.  Of the ten EVCs recorded, nine will be impacted by the amended wind farm footprint.42 

                                                       39  Native Vegetation Management: A Framework for Action (DNRE 2002). 40  Permitted clearing of native vegetation –Biodiversity assessment guidelines.  DEPI.  2013. 41  Submissions 4, 18, 23, 25, 26, 27, 34 and 36. 42  Biodiversity  Assessment  to  Accompany  an  Application  to  Amend  Planning  Permit  No.  PL‐SP/05/0548, 

Stockyard Hill.  Ecology and Heritage Partners Pty Ltd.  May 2016.  p21. 

Page 67: Environment Act 1987 - Planning - Planning · Management Plan incorporating mitigation measures and the provision of native vegetation offsets the final extent of native vegetation

Stockyard Hill Wind Farm Revised Permits  Panel Report  10 May 2017 

 

Page 54 

In his Statement of Expert Evidence43, Mr Organ indicated that the proposed amended wind farm footprint would result  in the removal of 34.415 hectares of native vegetation (32.657 hectares  of  remnant  patch  and  25  scattered  trees)  and  a  comparison  of  the  impacts  on vegetation  clearance  and offset  requirements between  the permitted  and  amended wind farm is provided.  Three scenarios were provided for comparison as follows: 

Native  vegetation  impacted  by  the  permitted wind  farm  footprint  based  on  the original design assumptions. 

Native  vegetation  impacted  by  the  permitted wind  farm  footprint,  based  on  the current design assumptions (i.e. larger footprint). 

Native  vegetation  impacted  by  the  amended wind  farm  footprint  based  on  the current design assumptions (i.e. larger footprint). 

Mr Organ44 advised that: 

While the total extent of remnant native vegetation proposed to be removed is greater than the area in the former assessment (BL&A 2009), given the highly modified  nature  of  the  patches  of  vegetation  and  subsequent  low  habitat score  (i.e  the majority  of  the  patches  have a habitat  score  of  0.23  or  less), along with the low Strategic Biodiversity Score (i.e. 0.296) this has led to a very similar offset requirement for the amended wind farm footprint. 

He proposed that the  increased extent  in vegetation removal with the amended wind farm footprint may be due to: 

An underestimation based on ground conditions at the time of the original surveys and/or difference  in assessment methodologies, noting however  that a  review of native  vegetation  mapped  in  the  original  survey  in  2009,  revealed  that  it  was broadly consistent with the extent of remnant vegetation mapped more recently. 

Differences  in design assumptions applied  for access  tracks.   An eight metre  (sic) impact area proposed previously compared with a 12.5 metre wide area for smaller access tracks and 13.5 metre for trunk access roads. 

The biodiversity  assessment45 provides  a  comparison of  the  impacts  to  significant  species and communities between the permitted and the amended wind farm footprint  indicating, among other matters,  that  the  amended wind  farm  footprint has  reduced  the  impact on native grasslands, has avoided populations of a number of threatened flora species and has avoided several hectares of remnant vegetation and scattered trees. 

During  targeted  surveys,  Natural  Temperate  Grasslands  of  the  Victorian  Volcanic  Plains (‘temperate volcanic grasslands EVC’) was recorded and will be impacted (0.06 hectares) by the amended wind farm46.  The state equivalent the Western (Basalt) Plain grassland floristic 

                                                       43  Mr  Organ.    Statement  of  Expert  Evidence  (Ecology):  Stockyard  Hill  Wind  Farm,  Ecology  and  Heritage 

Partners Pty Ltd.  January 2017.  p11. 44  Ibid.  p12. 45  Biodiversity  Assessment  to  Accompany  an  Application  to  Amend  Planning  Permit  No.  PL‐SP/05/0548, 

Stockyard Hill.  Ecology and Heritage Partners Pty Ltd.  May 2016.  p7. 46  Mr  Organ.    Statement  of  Expert  Evidence  (Ecology):  Stockyard  Hill  Wind  Farm,  Ecology  and  Heritage 

Partners Pty Ltd.  January 2017.  p12. 

Page 68: Environment Act 1987 - Planning - Planning · Management Plan incorporating mitigation measures and the provision of native vegetation offsets the final extent of native vegetation

Stockyard Hill Wind Farm Revised Permits  Panel Report  10 May 2017 

 

Page 55 

community (FFG Act listed) occurs on public land within the study area and all the Heavier‐soils Grassland EVC recorded in the study area, including temperate volcanic grasslands EVC, are  part  of  the  FFG  Act  listed  community.47    No  other  FFG  Act  listed  community  was identified as being impacted by the amended wind farm. 

The  current  permit  required  that  targeted  flora  surveys  be  undertaken  for  both  native grassland communities and Spiny Rice flower.  These surveys have been undertaken and the assessment reports are provided in Appendix V of the planning application.48 No specimens of  Spiny  Rice  flower  (EPBC  Act,  FFG  Act)  were  detected  in  targeted  surveys  across  the proposed amended wind  farm  footprint.   The  targeted surveys did detect other significant species  including Matted  Flax‐lily  (EPBC Act,  FFG Act), White  Sunray  (EPBC Act,  FFG Act), Plump Wallaby Grass (FFG Act), Golden Cowslips (DSE, 2005)49, Arching Flax‐lily (DSE, 2005), Slender Bind Weed (DSE, 2005).   With the  implementation of appropriate protocols during construction, the only species that will be  impacted  is Golden Cowslips, with the  loss of 13 plants.50 

External roadside and intersection upgrades 

Condition  35  of  the  current  permit  anticipated  that  a  further  permission  for  native vegetation removal may be required once the traffic routes were finalised to accommodate works.  An assessment was undertaken for the proposed WEF amendment.51 

With the roadside and intersection upgrades, Mr Organ52 advised that 157 patches of native vegetation were mapped and assessed as having a low to moderate condition score.  Five of the ten EVCs recorded in the study area will be impacted.  The proposed works will result in the  clearing of  remnant  vegetation at  several  locations  along  roadsides.   A  total of 3.852 hectares (2.587 remnant patch, 18 scattered trees) of native vegetation will be removed by the roadworks.  Plump Wallaby Grass which is listed under the FFG Act was recorded during the  assessment.    It  is  suggested  that  as  only  a  few  individuals were  recorded  it may  be possible  to  avoid  this  area  through  detailed  design  and micro‐siting.    No  other  FFG  Act species will be impacted. 

The proposed works will  result  in  the  removal of 0.02 hectares of  the  temperate volcanic grasslands EVC community. 

                                                       47  Biodiversity  Assessment  to  Accompany  an  Application  to  Amend  Planning  Permit  No.  PL‐SP/05/0548, 

Stockyard Hill.  Ecology and Heritage Partners Pty Ltd.  May 2016.  p24. 48  Ibid.  Appendices D and E. 49  DSE  (2005).    Advisory  List  of  rare  or  threatened  plants  in  Victoria.    Department  of  Sustainability  and 

Environment 2005. 50  Mr  Organ.    Statement  of  Expert  Evidence  (Ecology):  Stockyard  Hill  Wind  Farm,  Ecology  and  Heritage 

Partners Pty Ltd.  January 2017.  p13. 51  Biodiversity Assessment  of  the  Roadside  and  Intersection Upgrades,  Stockyard Hill Wind  Farm, Victoria.  

Ecology and Heritage Partners Pty Ltd.  April 2016. 52  Statement of Expert Evidence (Ecology): Stockyard Hill Wind Farm, Ecology and Heritage Partners Pty Ltd.  

January 2017.  p13. 

Page 69: Environment Act 1987 - Planning - Planning · Management Plan incorporating mitigation measures and the provision of native vegetation offsets the final extent of native vegetation

Stockyard Hill Wind Farm Revised Permits  Panel Report  10 May 2017 

 

Page 56 

Mr Organ53 indicated that in his view the Applicant has avoided and minimised the proposed removal of remnant native vegetation and areas supporting listed species and communities, by  locating  the WEF  footprint  in  areas  devoid  of  ecological  values.   Additional mitigation measures will be implemented through the Environmental Management Plan. 

To satisfy native vegetation offsets, Mr Organ54  indicated  that  the offset  requirements  for the  amended  wind  farm  footprint  (including  the  proposed  roadside  and  intersection upgrades) can be  secured  through existing credits  registered  through an over  the counter scheme. 

DELWP55  provided  advice  of  the  consolidated  views  of  the  Environment  portfolio.   With respect  to  the  Stockyard  Hill Wind  Farm  proposed  permit  amendment,  the  Department advised that  it had only considered matters associated with the proposed changes and had not re‐examined matters associated with  the original permit application.   The Department noted  that  under  the  amended wind  farm  and  associated  roadworks  an  area  of  38.267 hectares of native vegetation is to be removed.  While this is greater than the area allowed in  the  permitted  wind  farm  of  5.28  hectares,  the  Department  accepted  the  rationale provided by the Applicant, including: 

Differences in definitions of native vegetation between Victoria’s Native Vegetation Management  –  A  Framework  for  Action  and  the  Permitted  clearing  of  Victoria’s Native Vegetation: Biodiversity Assessment Guidelines.56 

Additional  areas  of  native  vegetation  removal  not  previously  considered  (i.e.  increase in access track widths and additional road side works); and 

Potential underestimation of ground conditions at the time of the original surveys and/or differences in assessment methodologies. 

The Department agreed with the statements concerning the avoidance of ecological impacts and  indicated  that  it  had  no  objection  subject  to  conditions  relating  to  the  protection  of native vegetation, offset requirements and construction management. 

External overhead powerline – application for vegetation removal 

A detailed flora assessment within the footprint of 18 alignment options was undertaken.57 The total disturbance footprint  is approximately 82.5 hectares.58   The assessment  indicates that  based  on  the  survey  findings  the  alignment  of  the  powerline was  revised  to  reduce impacts  on  flora.    A  subsequent  assessment  was  undertaken  in  October  2016.59  This assessment  was  based  on  a  cleared  ground  footprint  of  10 metres  wide  and  an  aerial 

                                                       53  Mr Organ.  Statement of Expert Evidence (Ecology): Stockyard Hill Windfarm, Ecology and Heritage Partners 

Pty Ltd.  January 2017.  p16. 54  Ibid.  p18. 55  Document 11. 56  Permitted clearing of native vegetation ‐ Biodiversity assessment guidelines.  DEPI.  2013. 57  Detailed  Flora  and  Fauna Assessment  of  the  Current Overhead  Powerline  Corridor,  Stockyard Hill Wind 

Farm, Victoria.  Ecology and Heritage Partners Pty Ltd.  May 2016.  p3. 58  Ibid.  p13. 59  Addendum Report Planning and Environment Act 1987: Detailed Flora and Fauna Assessment of the Current 

Overhead Powerline Corridor, Stockyard Hill Wind Farm, Victoria.   Ecology and Heritage Partners Pty Ltd.  October 2016.  p7. 

Page 70: Environment Act 1987 - Planning - Planning · Management Plan incorporating mitigation measures and the provision of native vegetation offsets the final extent of native vegetation

Stockyard Hill Wind Farm Revised Permits  Panel Report  10 May 2017 

 

Page 57 

footprint of 30 metres wide cleared of vegetation over 3 metres tall, to comply with relevant codes  and  standards  relating  to  safe  management  of  powerlines.    It  was  assumed  in undertaking  the  flora assessment  that all vegetation would be removed within  the ground footprint and all trees greater than 3 metres would be removed in the aerial footprint. 

Mr Organ60 advised that a total of 4.829 hectares (1.945 hectares of remnant patches and 41 scattered  trees) of native vegetation of  low  to moderate  condition will be  required  to be removed for the construction of the overhead powerline.  The powerline will impact on five EVCs  and  will  impact  on  0.128  hectares  of  temperate  volcanic  grasslands  EVC.    The addendum report61 indicates that 0.70 hectares of Heavier‐soils Plains Grassland EVC will be removed (FFG Act listed community).  No FFG Act species are proposed to be impacted.  The addendum  report  indicates  that  during  detailed  design  and  construction  there  may  be further  opportunities  to  avoid  impact  on  vegetation  and  that  scattered  trees  in  the depression of Mt Emu Creek may not be required to be impacted.62 

Mr  Organ63  advised  that  in  his  opinion  the  Applicant  has  avoided  and  minimised  the proposed removal of native vegetation and areas supporting listed species and communities.  Additional  measures  to  further  avoid  and  minimise  impacts  to  ecological  values  will implemented through an Environmental Management Plan. 

With  regard  to  offsets, Mr  Organ64  advised  that  the  relevant  offset  obligations  can  be secured through an over the counter scheme without any difficulty. 

DELWP65  indicated  that  it had no objection  subject  to  conditions  relating  to protection of native vegetation, offset requirements and construction management. 

Quarry 

Mr  Organ66  advised  the  proposed  quarry  site  does  not  contain  any  features  (vegetation community,  flora  and  fauna  habitats)  of  conservation  significance  and  therefore  no ecological  impacts are expected.   The proposed quarry area has been altered as a result of land  clearing  for  agriculture.    All  areas  that  qualify  as  remnant  patch  and  the  scattered indigenous tree will be avoided and no formal offsets are required.67 

                                                       60  Mr Organ.  Statement of Expert Evidence (Ecology): Stockyard Hill Windfarm, Ecology and Heritage Partners 

Pty Ltd.  January 2017.  p21. 61  Addendum Report Planning and Environment Act 1987: Detailed Flora and Fauna Assessment of the Current 

Overhead Powerline Corridor, Stockyard Hill Wind Farm, Victoria.   Ecology and Heritage Partners Pty Ltd.  October 2016.  p9. 

62  Stockyard  Hill  Wind  Farm.    Submission  to  Support  Planning  Permit  Application  (External  Overhead Powerlines) Addendum Report.  Jacobs.  November 2016.  p15. 

63  Mr Organ.  Statement of Expert Evidence (Ecology): Stockyard Hill Windfarm, Ecology and Heritage Partners Pty Ltd.  January 2017.  p22. 

64  Ibid.  p22. 65  Document 11.  p5. 66  Ibid.  p24. 67  Stockyard Hill Wind Farm: Detailed Flora and Fauna Surveys of  the Proposed Quarry Site, Stockyard Hill.  

Ecology and Heritage Partners Pty Ltd.  July 2013. 

Page 71: Environment Act 1987 - Planning - Planning · Management Plan incorporating mitigation measures and the provision of native vegetation offsets the final extent of native vegetation

Stockyard Hill Wind Farm Revised Permits  Panel Report  10 May 2017 

 

Page 58 

DELWP68 noted that the subject land is highly modified and native vegetation remnants will be protected and thus it advised it did not object to the draft work plan for the quarry. 

(ii) Discussion 

The Panel notes that the Application seeks permission to removal substantially more native vegetation than in the approved permit (5.28 hectares compared with 34.415 hectares).  The scenario presented to it of the permitted wind farm with the current design assumptions as a basis  for  suggesting  that  the permitted  footprint and  the amended wind  farm  footprint require similar general offsets is unhelpful.  To upscale the permitted wind farm without any reconfiguration is not a realistic basis for a comparison. 

It is evident that the footprint for the amended wind farm will be larger.  It is not clear how the various components of  the WEF  influence  the removal of native vegetation.   From Mr Organ’s evidence he suggests that the  increase  in vegetation to be removed relates to the design increase in the width of the access tracks to 12.5 metres and trunk roads 13.5 metres.  The approved permit considered tracks of 5 metres  in width (not 8 metres as suggested by Mr Organ).  The approved permit also assumed internal cabling would be undertaken within the verge of the access track.  The amended permit is now seeking a 3 metre wide easement for internal cabling in addition to the increase in track width.  The Panel sought advice from the Applicant on the rationale for the change in the design requirements and the departure from  a  minimal  disturbance  design.    The  Panel  was  advised69  that  the  Applicant  had determined  that  the  width  of  the  access  tracks  originally  assessed  were  optimistic  and preferred  to  adopt more  conservative  parameters.   While  noting DELWP’s  advice  on  this matter, the Panel considers that the Applicant’s rationale for the more conservative design width for the internal access tracks and internal cabling placement should be re‐examined. 

Condition 35 of the current permit anticipated that permission for native vegetation removal may be required once the traffic routes were finalised.   The Panel notes that  in support of the proposed amended permit, an assessment70 has been undertaken by the Applicant that identifies  the  need  for  the  removal  of  3.852  hectares  of  native  vegetation  that was  not identified  originally.    The  Panel  considers  that  the  requirement  for  native  vegetation clearance was underestimated in the original assessment. 

The  cleared  area  based  on  the  ground  and  aerial  footprint  required  for  the  external powerline predetermines to a large extent the spatial impact on vegetation of the powerline alignment.    The  panel  notes  that  alternative  alignments  were  assessed  and  that  during detailed  design  and  construction  there may  be  further  opportunities  to  avoid  impact  on vegetation  by micro‐siting  of  the  powerline  poles  and/or  access  tracks  through  adopting specific construction techniques for ecological sensitive areas. 

Where  there were  references  to  the  impacts on  temperate volcanic grasslands EVC  in  the assessment reports, it was not always clear what implications this had for the FFG Act listed 

                                                       68  Document 11.  p5. 69  Document 18.  p7. 70  Biodiversity  Assessment  of  the  Roadside  and  Intersection  Upgrades,  Stockyard  Hill Windfarm,  Victoria. 

Ecology and Heritage Partners.  April 2016. 

Page 72: Environment Act 1987 - Planning - Planning · Management Plan incorporating mitigation measures and the provision of native vegetation offsets the final extent of native vegetation

Stockyard Hill Wind Farm Revised Permits  Panel Report  10 May 2017 

 

Page 59 

Western  (Basalt)  Plains  Grassland  Community.    It  is  likely  given  the  different  condition thresholds,  areas  of  temperate  volcanic  grasslands  EVC  also  qualify  as Western  (Basalt) Plains Grassland Community.  Either as a referral authority or in the assessment of a permit (public land) application, DELWP will need to consider these impacts in the development of a Native Vegetation Management Plan and the provision of native vegetation offsets. 

The Panel notes that DELWP has no objection to the native vegetation documentation and considers  that  the Applicant has undertaken  the assessment of  the  vegetation  impacts  in accordance with Permitted Clearing of Native Vegetation Guidelines.  The Panel accepts the advice of the Applicant that native vegetation offsets can be secured and notes that these are required to be established prior to removal of native vegetation.  The Panel also accepts the advice of the Applicant that the impact on the one listed FFG Act species (Plump Swamp Wallaby  Grass)  recorded  during  the  assessment  can  be  avoided  and  that  appropriate protocols are required to be implemented to prevent the inadvertent loss of significant flora species and communities. 

However,  the Panel notes  that of  the  ten EVCs  recorded  in  the  study  area,  seven have  a bioregional conservation status of endangered.  Nine EVCs will be impacted by the WEF and six are considered endangered.  Roadside works will impact on five EVCs, four of which are endangered.  The external powerline will impact on five EVCs, all of which are endangered.  All three construction activities will impact on Plains Grassland an EVC listed under the FFG Act.   Notwithstanding  that  the vegetation assessment was undertaken under  the  relevant policy  involving  with  an  offset  regime,  the  Panel  observes  that  further  depletion  of endangered EVCs and a listed grassland community will occur. 

The Panel accepts that the development of the quarry will not impact on native vegetation. 

MNES were not  considered by  the Panel.    It  is expected  that  the Applicant will obtain all necessary approvals under the Commonwealth legislation. 

(iii) Conclusion and recommendation 

Native vegetation removal for the amended wind farm and transmission lines should be able to be managed  to an acceptable  level  subject  to  the development of a Native Vegetation Management Plan incorporating mitigation measures and the provision of native vegetation offsets. 

The Applicant suggested a clarification of wording for the transmission permits.   The Panel agrees this is clear and supports it.  This is reflected in the Permits in Appendix D. 

The final extent of native vegetation removal be determined following a review of the need for a design requirement  for  internal track widths of 12.5 metres  including examination of the  adoption  of minimal  disturbance  design with  narrower  track widths  including within track cabling, to the satisfaction of the Minister. 

The Panel recommends: 

Amend the permits for the transmission lines to clarify the wording in relation to vegetation offsets. 

Page 73: Environment Act 1987 - Planning - Planning · Management Plan incorporating mitigation measures and the provision of native vegetation offsets the final extent of native vegetation

Stockyard Hill Wind Farm Revised Permits  Panel Report  10 May 2017 

 

Page 60 

In the development of the Native Vegetation Management Plan, the Department of  Environment,  Land,  Water  and  Planning  undertake  an  assessment  of  the impacts on Western (Basalt) Plains Grasslands in areas where temperate volcanic grasslands Ecological Vegetation Class is proposed to be removed, and determine the appropriate offset requirements. 

Review  the width  of  the  proposed  access  tracks with  a  view  to  reducing  their impact on vegetation removal. 

Page 74: Environment Act 1987 - Planning - Planning · Management Plan incorporating mitigation measures and the provision of native vegetation offsets the final extent of native vegetation

Stockyard Hill Wind Farm Revised Permits  Panel Report  10 May 2017 

 

Page 61 

7 Fauna including avifauna 

7.1 Introduction 

(i) Background 

The key issues considered in the permitted wind farm were the impact on fauna as a result of  habitat  loss  from  the  construction  of  the WEF  and  collision  of  avifauna with  turbines.  Species  of  interest  included  Striped  Legless  Lizard, Golden  Sun Moth  and  birds  and  bats (including migratory  species  listed  under  the Commonwealth  Environment  Protection  and Biodiversity  Conservation  Act  1999  (EPBC  Act))  particularly  Brolga.    Targeted  surveys  for Striped Legless Lizard and Golden Sun Moth were required to be undertaken as a condition of the current permit. 

As described in Chapter 6.1 of this report the Panel is not considering MNES under the EPBC Act,  and  these  matters  are  being  managed  directly  by  the  Applicant  with  the Commonwealth. 

(ii) What changes are proposed 

Chapter 6 describes the key construction elements proposed in the amendment relevant to fauna.  In summary, the physical ground footprint for the WEF is larger (e.g.  wider internal access  tracks,  bigger  hardstand  areas  and  foundations,  separate  easement  for  internal cabling).   The aerial  footprint has  increased with  larger  turbine dimensions  (180 metres  in total  height  with  a  rotor  diameter  of  142  metres)  with  potential  impacts  on  avifauna.  Additional  vegetation  removal,  required  as  a  result  of  the  larger  ground  footprint, may potentially impact on fauna habitat. 

7.2 Fauna including avifauna (other than Brolga) 

(i) Evidence and submissions 

Submitters raised a number of issues as follows: 

This  impact  of wind  farms  on  raptors  is  not  being  recognised  and mitigation  for raptors  and  other  native  birds  should  be  undertaken  particularly  with  larger turbines proposed (Submission 1). 

The  larger turbines with  increased rotor swept area will have a greater  impact on avifauna mortality (Submission 18). 

Mt Emu Creek is home to many vulnerable fauna species which will be impacted by turbines (Submission 11). 

Page 75: Environment Act 1987 - Planning - Planning · Management Plan incorporating mitigation measures and the provision of native vegetation offsets the final extent of native vegetation

Stockyard Hill Wind Farm Revised Permits  Panel Report  10 May 2017 

 

Page 62 

Ground fauna 

As required in the current permit, targeted surveys for Striped Legless Lizard (EPBC Act, FFG Act) and Golden Sun Moth (EPBC Act, FFG Act) were undertaken and the assessment reports are provided in Appendix V of the planning application71. 

All suitable habitat within the study area were surveyed for the Golden Sun Moth.   Golden Sun Moths were detected in high numbers from within one privately owned property.  The property  supports approximately 10 hectares of high quality grassland habitat  suitable  for the species.   Mr Organ72 advised that there will be removal of approximately 1.57 hectares of confirmed Golden Sun Moth habitat  for the proposed amended wind  farm  footprint.   A number of management measures  to minimise  the  impact were  identified  in  the  targeted survey report73 including proposed management of the property to facilitate the persistence of the resident Golden Sun Moth population within the operating wind farm. 

Targeted  surveys  recorded  Striped  Legless  Lizards  in  the  wind  farm  study  area  in  the Stockyard  Hill  Road  reserve  (public  land)  and  Dunnets  Road.    Habitat  assessments were undertaken during the targeted survey period and the extent and quality of habitat for the species was  assessed.74  The wind  farm  study  area  is modified  due  to  previous  land  use practices, however areas supporting suitable habitat in the form of modified grasslands are present at several sites.   Mr Organ75 advised that the amended wind farm footprint would result  in  the  removal of 0.03 hectares of known Striped  Legless  Lizard habitat.   However, elsewhere in the documentation it is indicated that approximately 2.5 hectares of modified grassland  habitat  where  the  species  has  been  detected  along  Stockyard  Hill  Road  and Dunnets Road  is proposed  to be  removed.76 Mr Organ77 also  indicated  that  the amended proposal would  result  in  impacts on  39.63 hectares of medium quality habitat  and  18.64 hectares of low quality habitat (areas where the species has not been detected).  Mitigation measures are provided  in the targeted survey report78.   Among the actions outlined  in that report,  is  that  the  Stockyard  Hill  Road  reserve, which  is  known  to  support  a  significant population of Striped Legless Lizard, should be excluded from construction activities as far as practicable.    Furthermore  it  was  recommended  that  medium  quality  habitat  should  be 

                                                       71  Biodiversity  Assessment  to  Accompany  an  Application  to  Amend  Planning  Permit  No.  PL‐SP/05/0548, 

Stockyard Hill.  Ecology and Heritage Partners Pty Ltd.  May 2016.  Appendices F, G and I. 72  Mr  Organ.    Statement  of  Expert  Evidence  (Ecology):  Stockyard  Hill Wind  Farm.    Ecology  and  Heritage 

Partners.  January 2017.  p10. 73  Targeted Golden Sun Moth Synemon plana Surveys for the 2011/12 and 2012/2013 at Stockyard Hill Wind 

Farm, Stockyard Hill, Victoria.  Ecology and Heritage Partners Pty Ltd.  January 2014.  p17. 74  Targeted Striped Legless Lizard Surveys of the Stockyard Hill Wind Farm, Stockyard Hill, Victoria.   Ecology 

and Heritage Partners Pty Ltd.  March 2012.  p23. 75  Mr  Organ.    Statement  of  Expert  Evidence  (Ecology):  Stockyard  Hill Wind  Farm.    Ecology  and  Heritage 

Partners.  January 2017.  p12. 76  Biodiversity Assessment  of  the  Roadside  and  Intersection Upgrades,  Stockyard Hill Wind  Farm, Victoria.  

Ecology and Heritage partners.  April 2016.  p27. 77  Mr  Organ.    Statement  of  Expert  Evidence  (Ecology):  Stockyard  Hill Wind  Farm.    Ecology  and  Heritage 

Partners.  January 2017.  p12. 78  Targeted Striped Legless Lizard Surveys of the Stockyard Hill Wind Farm, Stockyard Hill, Victoria.   Ecology 

and Heritage Partners Pty Ltd.  March 2012.  p29. 

Page 76: Environment Act 1987 - Planning - Planning · Management Plan incorporating mitigation measures and the provision of native vegetation offsets the final extent of native vegetation

Stockyard Hill Wind Farm Revised Permits  Panel Report  10 May 2017 

 

Page 63 

subject to micro‐siting to avoid Striped Legless Lizard habitat.  Mr Organ advised that under the EPBC Act  the proposal  to  remove of an area of medium quality Striped Legless Lizard habitat will require an Offset Management Plan/Conservation Management Plan.79 

DELWP (Document 11) did not provide specific comment on these FFG listed fauna. 

Mr Organ80,  in responding to a submission, advised that no  impacts are expected to  fauna habitats along Mount Emu Creek and all infrastructure has been sited within areas devoid of ecological values. 

Avifauna not including Brolga 

Mr Smales81 indicated that his assessment of all listed threatened and migratory bird and bat species for the amended wind farm had been undertaken as a desktop evaluation  in which the potential impacts of the amended wind farm have been considered and compared with the permitted wind farm.  This had involved: 

consideration and review of current  information on species of birds and bats from publicly available records up until late 2015. 

reviewing  changes  to  policy  statements,  listed  species,  listing  requirements  and threatening processes. 

the differences in the number and specifications of turbines between the permitted and amended wind farm. 

field inspection and discussions with DELWP. 

For the purposes of his assessment, Mr Smales considered species listed under the FFG Act and/or  included on the Department of Environment and Primary  Industries  (DEPI –  former department) advisory list.82  There are no records of listed bat species for the study area.  In assessing significant impact Mr Smales relied on the relevant EPBC Act policy statements and guidelines  as  there  are no published  guidelines  for  assessing  significant  impact under  the FFG Act or the DEPI advisory list. 

After  reviewing  threatened  species  records,  their  habitat  preferences  and  the  likely occurrence in the study area, Mr Smales83 concluded that the proposed amended Stockyard Hill Wind Farm will not result  in any significant  impact on populations of any species  listed under the FFG Act or included on the DEPI advisory list. 

In  responding  to  submitters  and  the  impact  of  larger  turbines  on  raptor  mortality, Mr Smales84 indicated there are four raptor species listed under the FFG Act (Grey Falcon, Grey Goshawk,  Square‐tailed  Kite,  White‐bellied  Sea‐eagle).    The  habitat  preferences  and distribution of these species are such that none of them is at risk of significant impact from 

                                                       79  Mr  Organ.    Statement  of  Expert  Evidence  (Ecology):  Stockyard  Hill Wind  Farm.    Ecology  and  Heritage 

Partners.  January 2017.  p18. 80  Mr  Organ.    Statement  of  Expert  Evidence  (Ecology):  Stockyard  Hill Wind  Farm.    Ecology  and  Heritage 

Partners.  January 2017.  p26. 81  Biosis.  Stockyard Hill Wind Farm.  Bird and Bat Impact Assessment.  May 2016.  p11. 82  Advisory list of threatened vertebrate fauna in Victoria.  DEPI.  2013. 83  Expert Witness Statement of Ian John Smales.  Stockyard Hill Wind Farm.  2017.  p5. 84  Expert Witness Statement of Ian John Smales.  Stockyard Hill Wind Farm.  2017.  Annexure C.  p1. 

Page 77: Environment Act 1987 - Planning - Planning · Management Plan incorporating mitigation measures and the provision of native vegetation offsets the final extent of native vegetation

Stockyard Hill Wind Farm Revised Permits  Panel Report  10 May 2017 

 

Page 64 

the  amended wind  farm.   Database  records  of  listed  threatened  species  from within  ten kilometres of the wind farm include no raptor species.  Nevertheless, Mr Smales agreed that there  is the potential  for mortalities  for non‐threatened raptor species and other common bird species. 

The Panel was provided with reports85 from the Macarthur Wind Farm bat and bird mortality monitoring for 201486 and 201587.  The results for 2015 show native birds accounted for 24.7 per  cent of all bird mortality at  the wind  farm.   The annual mortality of native birds was estimated at 3.31 ± 0.78 per  turbine, equating to a  total annual mortality of 464 ± 109.20 birds  over  the wind  farm.    Raptors  accounted  for  33  per  cent  of  native  bird mortalities averaging 1.11± 0.28  fatalities per  turbine equating  to a  total mortality of 154.88 ± 39.20 raptors for the entire wind farm.  The 2015 report88 states that: 

‘Raptors are believed  to be at higher  risk of collision with blades of  turbines possibly due to a combination of factors such as the altitude they mostly fly at, the proportion of time spent flying and flying behaviour.  Raptors tend to glide slowly and are  constantly  looking downward  for potential prey,  rather  than flying  in  a  single  direction  and  looking where  they  are  heading.    This may increase their risk of flying through the rotor swept area of turbines.’ 

The 2015 report89 estimated bat mortality at 3.08 ± 1.68 bats per turbine, equating to 431 ± 235.20 bats over all turbines. 

DELWP  (Document  11)  advised  that  following  the  review  of  documentation  on  listed threatened and migratory bird and bat species, other than Brolga: 

… it agreed that any potential impacts of the amended wind farm on relevant species  would  be  low  to  negligible  and  that  this  is  unchanged  from  the permitted to the amended wind farm. 

(ii) Discussion 

Ground fauna 

Both Golden  Sun Moth  and  Striped  Legless  lizard  are  listed  under  the  FFG Act  and  both species have an Action Statement under that Act.  While the focus in Mr Organ’s evidence is on  satisfying  EPBC  Act  requirements, DELWP  need  to  ensure  that  they  are  satisfied  that impacts on these species are appropriately mitigated. 

As the recorded Golden Sun Moths are on private land, DELWP will have a role as a referral authority for an application to remove FFG listed native grassland and habitat for the Golden Sun  Moth.    The  Panel  considers  that  the  DELWP  should  ensure  that  the  Applicant  in 

                                                       85  Attachments to Submission 1. 86  Macarthur Wind Farm, Bat and Avifauna Mortality Monitoring, March 2013  to February 2014, Australian 

Ecological Research Services, 2014. 87  Macarthur Wind Farm, Bat and Avifauna Mortality monitoring, March 2014  to February 2015, Australian 

Ecological Research Services, 2015. 88  Ibid. p35. 89  Ibid. p34. 

Page 78: Environment Act 1987 - Planning - Planning · Management Plan incorporating mitigation measures and the provision of native vegetation offsets the final extent of native vegetation

Stockyard Hill Wind Farm Revised Permits  Panel Report  10 May 2017 

 

Page 65 

satisfying  the  EPBC Act  requirements  in  the development of  a  conservation management offset  plan,  that  appropriate measures  from  the  Action  Statement  are  incorporated,  and impacts on Golden Sun Moth habitat are minimised. 

The total area of known Striped Legless Lizard habitat within the Stockyard Hill Road reserve that may be impacted is unclear.  However, if habitat removal is proposed within the public land reserve, a permit under the FFG Act will be required.  The Panel supports the position that the Stockyard Hill Road reserve should be excluded from construction activities as far as practicable  and micro‐siting  of windfarm  infrastructure  to  avoid  habitat  areas  should  be undertaken.  The Panel also considers that if it is not feasible to avoid areas of know habitat, DELWP  should  determine whether  a  salvage  protocol  for  relocation  is  appropriate  in  the circumstances.  DELWP should also ensure that in satisfying the EPBC Act requirements, the Applicant  incorporates  the  appropriate measures  from  the Action  Statement  to minimise impacts  on  the  species.    Noting  that Mr  Organ  advised  that  39.63  hectares  of medium quality Striped Legless will be  impacted, the Panel agrees with the proposal that wind farm infrastructure  should  be  subject  to micro‐siting  in medium  quality  habitat  areas.    As  an Offset Management Plan / Conservation Management Plan will be required  for the  impact on medium quality habitat, DELWP  should  ensure  the Applicant  incorporates  appropriate measures to minimise impacts on the species. 

Avifauna not including Brolga 

The Panel accepts  the approach  taken by Mr Smales  to assess  the  impact on bird and bat species  for  the proposed  amended wind  farm and  the use of EPBC Act  significant  impact guidelines in the absence of published guidelines under the FFG Act or the DEPI advisory list.  These guidelines focus on the effects on the viability of populations rather than individuals in a population.  The Panel agrees with the advice that proposed amended wind farm will not result  in any  significant  impact on populations of any  species  listed under  the  FFG Act or included on the DEPI advisory  list.   The Panel notes that there are no records of  listed bat species for the study area and the focus of Mr Smales’ assessment was for listed bird species and his assessment of their likely occurrence in the study area. 

The Guidelines for the Development of Wind Energy Facilities90  indicate that  in addition to impacts on listed species, consideration should be given to: 

the sensitivity of any protected species to disturbance. 

measures to minimise the impacts on any native species. 

The mortality studies from Macarthur Wind Farm provide an assessment of the scale of bird and bat mortality at the wind farm, with raptors making up approximately 30 per cent of the native birds killed.   The Panel notes  the  suggestions about  raptor behaviour  that possibly make  them more  susceptible.   No empirical  information was provided  to  the Panel about whether increased turbine size (higher turbines, bigger rotor blade length, larger rotor swept area) would result  in  increased raptor mortality  (or other bird and bat species).   However, this  is  a  matter  that  should  be  examined  through  implementation  of  a  bird  and  bat 

                                                       90  Policy and Planning Guidelines for Development of Wind Energy Facilities in Victoria.  2016.  p33. 

Page 79: Environment Act 1987 - Planning - Planning · Management Plan incorporating mitigation measures and the provision of native vegetation offsets the final extent of native vegetation

Stockyard Hill Wind Farm Revised Permits  Panel Report  10 May 2017 

 

Page 66 

monitoring plan  that  incorporates monitoring  for at  least  five  years and  requires periodic reporting. 

The Panel notes the advice of Mr Smales that there are no  listed raptor species that are at risk  from  the wind  farm.   However,  the Guidelines  for  the Development  of Wind  Energy Facilities clearly provide for consideration of native species other than listed species that, for example, might be sensitive to disturbance. 

The Panel agrees with  submitters  that  the  impact of wind  farms on  raptor mortality  is an area that requires evaluation.  If the mortality rates at Macarthur Wind Farm were repeated at  all  the wind  farms  that  have  been  constructed  and  are  progressively  constructed,  the cumulative impact on regional populations may be significant and go undetected.  The Panel considers that the cumulative impact on regional raptor populations is a matter that requires investigation  and  that  DELWP  should  undertake  an  evaluation  program  to  assess  the cumulative effects on raptor populations and other native species that may be vulnerable to wind farm mortality and determine the need for mitigation measures. 

(iii) Conclusion and recommendation 

That the impacts on fauna and avifauna (not including Brolga) should be able to be managed to an acceptable  level subject  to  the development of an Environmental Management Plan and the incorporation and implementation of appropriate mitigation measures. 

Planning permit conditions are recommended in Appendix D accordingly. 

The Panel recommends: 

The  Department  of  Environment,  Land,  Water  and  Planning  undertake  an evaluation program  to  assess  the  cumulative effects on  raptor populations  and other  native  species  that  may  be  vulnerable  to  wind  farm  mortality  and determine the need for mitigation measures. 

That the Bat and Avifauna Management Plan  incorporate a monitoring period of at least five years and require regular reporting. 

7.3 Brolga 

(i) Evidence and submissions 

Submitters raised the following issues: 

The  larger  turbines with  increase  rotor  swept  area will have a greater  impact on Brolga mortality (Submission 18, 43). 

The larger turbines will pose a greater impact Brolga and the Applicant’s modelling cannot be relied on (Submission 3). 

Because of the extra height and span, turbines H6 and H7 protrude into recognised Brolga flight path between Lake Goldsmith and Lake Wongan (Document 51). 

The Biosis collision risk model is flawed and provides inaccurate predictions on bird mortality and should not be relied on (Document 33). 

The  collision  risk model  based  on  the  ‘dart  through  the  fan’  theory  is  the most conservative  risk and angle  that a bird can have  through a  turbine and  is a more accurate (Document 33). 

Page 80: Environment Act 1987 - Planning - Planning · Management Plan incorporating mitigation measures and the provision of native vegetation offsets the final extent of native vegetation

Stockyard Hill Wind Farm Revised Permits  Panel Report  10 May 2017 

 

Page 67 

The  Biosis  collision  risk  model  does  not  take  account  of  all  the  Brolga  flight behaviours (Document 33). 

Brolga mitigation measures must be mandatory and measured to demonstrate that they are successful (Document 33). 

Mr Smales91 indicated that while there was a previous Brolga collision risk assessment at the time of  the original permit application,  following  the  issue of a permit  in October 2010  to enable  the development of Stockyard Hill Wind Farm  for 157  turbines,  there had been no documented  assessment  of  Brolga  collision  risk  as  permitted.    Consequently,  in  order  to consider the potential impacts of the proposed amended wind farm it was first necessary to consider the impacts of the permitted wind farm in light of current information.  Mr Smales advised92 that in making his assessment of Brolga he gave particular attention to the Brolga Guidelines.93 

The Brolga Guidelines describe a three step assessment approach: 

Level one assessment:  Initial Risk Assessment (Desktop studies of known potential habitat, site inspection, community consultation and landowner surveys). 

Level  two  assessment:  Impact  Assessment  (Breeding  and  non‐breeding  season surveys  potentially  incorporating  aerial  surveys,  roaming  surveys  and  flight behaviour surveys). 

Level  three  assessment:  Mitigation  and  Offset  (Avoid  impacts,  Collision  Risk Analysis, Population Viability Analysis, compensation strategies). 

In summary, the Brolga Guidelines aim to: 

Remove all significant  impacts from flocking and nesting sites through turbine free buffers. 

Develop a site specific collision risk model for Brolgas. 

Model the risk to the Brolga population through Population Viability Analysis. 

Mitigate  the estimated Brolga  loss  to produce a  zero net  impact on  the Victorian population. 

With  the  exception  of  aerial  survey,  Mr  Smales94  advised  that  all  the  Levels  1  and  2 assessments were  fulfilled prior  to  issue of  the planning  approval  for  the permitted wind farm. 

Aerial survey was not a requirement at the time of planning approval for the permitted wind farm  and  subsequently DELWP  have  advised  in  2015  that  an  aerial  survey would  not  be required  for  the assessment of  the amended wind  farm, because of  the dry conditions of most potential breeding wetlands. 

                                                       91  Expert Witness Statement of Ian John Smales.  Stockyard Hill Wind Farm.  2017.  p 2. 92  Ibid.  p3. 93  Interim Guidelines for assessment, avoidance, mitigation and offsetting of potential wind farm impacts on 

the Victorian Brolga Population 2011 (DSE 2012). 94  Biosis.  Stockyard Hill Wind Farm.  Bird and Bat Impact Assessment.  May 2016.  p26. 

Page 81: Environment Act 1987 - Planning - Planning · Management Plan incorporating mitigation measures and the provision of native vegetation offsets the final extent of native vegetation

Stockyard Hill Wind Farm Revised Permits  Panel Report  10 May 2017 

 

Page 68 

To  ensure  that  information was  current  for  the  assessment  of  the  amended wind  farm, information  on  the  distribution,  breeding  and  flocking  of  Brolgas  in  the  local  area  was obtained up to and including 2015.  Mr Smales advised that: 

A review of data for Brolgas in the zone within 10 kilometres of the [proposed wind  farm]  includes  31  records  of  the  species  submitted  since  2009.    These indicate that Brolgas used no breeding or flocking sites that were not already known and used to inform collision risk modelling for the species in the original planning permit application.95 

Furthermore, Mr Smales advised that: 

All  zones  designated  as  turbine  free  buffer  areas  around  wetlands  in  the permitted wind  farm  remain  free  of  turbines  in  the  layout  of  the  amended wind farm.96 

The Panel was  advised  that  the  focus of  the Brolga  assessment was  concentrated on  the potential  risk  to  Brolgas  colliding  with  turbines  in  particular  and  the  internal  overhead powerline because  these  risks were  those  in which  the proposed amended  Stockyard Hill Wind  Farm  is most  likely  to  represent  different  potential  for  impacts  from  those  of  the permitted  wind  farm.    The  Biosis  Deterministic  Collision  Risk  Model  was  used  in  the assessment. 

As an attachment to the Bird and Bat Impact Assessment report, Mr Smales provided a copy of a refereed paper97 describing the Biosis model.   The paper describes key aspects of the model including: 

its capacity to evaluate risk from multidirectional flights by its calculation of a mean presented area of a turbine; 

its use of bird flight data to determine the annual flux of movements; 

a mathematical solution to a typical number of turbines that might be encountered in  a  given  bird  flight;  capacity  to  assess wind  farm  configurations  ranging  from turbines scattered in the landscape to linear rows of turbines; 

and  the  option  of  assigning  different  avoidance  rates  to  structural  elements  of turbines that pose more or less risk. 

In modelling  the  risk  assessment,  a  description  of  the  variables  that  are  specific  to  the Stockyard Hill WEF and for Brolgas from the vicinity of the wind farm are provided in the Bird and Bat Impact Assessment report.98 

The following is taken from that report: 

The  numbers  of  Brolga  flights  below  rotor  height  and  for which  just  the  lower portion of turbine towers present a collision risk. 

                                                       95  Biosis.  Stockyard Hill Wind Farm.  Bird and Bat Impact Assessment.  May 2016.  p34. 96  Expert Witness Statement of Ian John Smales.  Stockyard Hill Wind Farm.  January 2017.  p5. 97  A Description of  the Biosis Model  to Assess Risk of Bird Collisions with Wind Turbines.   Wildlife  Society 

Bulletin 37(1):59‐65.  March 2013. 98  Biosis.  Stockyard Hill Wind Farm.  Bird and Bat Impact Assessment.  May 2016.  p31. 

Page 82: Environment Act 1987 - Planning - Planning · Management Plan incorporating mitigation measures and the provision of native vegetation offsets the final extent of native vegetation

Stockyard Hill Wind Farm Revised Permits  Panel Report  10 May 2017 

 

Page 69 

The numbers of Brolga  flights at heights within  the  zone  swept by  turbine  rotors and  for which the upper portion of towers, nacelles and rotors present a collision risk. 

The mean area  (square metres per turbine), of tower nacelle and stationary rotor blades  of  a  wind  generator  that  present  a  risk  to  birds.    Thus,  the mean  area presented by a turbine is between the maximum (where the direction of the bird is perpendicular  to  the  plane  of  the  rotor  sweep)  and  the  minimum  (where  the direction  of  the  bird  is  parallel  to  the  plane  of  the  rotor  sweep).    The  mean presented  area  is  determined  from  turbine  specifications  supplied  to  Biosis  for specific make and model of turbine.  It represents the average area presented to an incoming flight from any direction. 

The  additional  area  (square metres  per  turbine)  presented  by  the movement  of rotors  during  the  potential  flight  through  a  turbine.    This  is  determined  via  a calculation  involving  species‐specific,  independent parameters of  flight  speed and body length and supplied turbine specifications. 

The model assumes all turbines in the WEF represent equal risk. 

A calculation of the average number of turbines, a Brolga is likely to encounter in a given  flight  through  the WEF.    This  is  based  on  the  scattered  configuration  of turbines in the landscape and the total number of turbines proposed for the WEF. 

The rationale and  input values used  for  the modelled assessments are also provided.99 Mr Smales advised that there is no empirical data currently available for some inputs to the risk modelling  such  as  capacity  for Brolgas  to  avoid  collisions with  turbines.    Turbine  collision avoidance  rates  used  were  within  the  range  of  rates  applied  to  such  situations internationally.100   The results are presented for three possible avoidance rates (95, 98 and 99 per cent). 

A summary of the results of the collision risk assessment provided by Mr Smales101 for a 95 per cent avoidance rate is presented in the following table. 

Table 6:  Estimated number of Brolga collisions 

  Estimated number of Brolga collisions 

 

Permitted  (157 turbines) 

95% avoidance 

Amended  (149 turbines) 

95% avoidance 

Annual average collisions total (turbines)  0.057  0.080 

Annual average collisions total (internal overhead powerlines) 

0.029  0.013 

Annual average combined total  0.086  0.093 

                                                       99  Ibid.  p34‐44. 100  Expert Witness Statement of Ian John Smales.  Stockyard Hill Wind Farm.  January 2016.  p3. 101  Document 13.  p10 and 11. 

Page 83: Environment Act 1987 - Planning - Planning · Management Plan incorporating mitigation measures and the provision of native vegetation offsets the final extent of native vegetation

Stockyard Hill Wind Farm Revised Permits  Panel Report  10 May 2017 

 

Page 70 

Mr  Smales102  advised  that  the  difference  between  these  results  is  so  small  that  the population viability analysis cannot discern any difference  in potential effects between the permitted and amended wind farm on the Victorian population of Brolga.  There is very little difference  in  the risks between  the permitted and proposed amended Stockyard Hill Wind Farm and that based on the assumptions used this could be compensated by production and survival of one additional  fledgling every  ten years.   Mr Smales advised  that measures  to achieve this could be readily implemented and this would meet the requirements for a zero net impact of the Stockyard Hill Wind Farm on the Victorian Brolga Population. 

The potential for mortality due to collisions with the proposed external overhead powerline was  assessed.    The  report103  found  that  there was  potential  for  a  very  low  impact.    The modelled estimate was for an average of 0.020 Brolga collisions.  The report concluded that the mitigation offset measures proposed  for  the WEF and  internal powerlines would  fully address any effects of likely collisions with the external powerline. 

DELWP104  advised  that  it was  satisfied  that  the  Brolga  assessment  had  been  carried  out according  to  the  Brolga  Guidelines  and  that  it  concurred with  the  assessment  outcome.  Furthermore,  it  advised  that  after  reviewing  bat  and  avifauna  documentation  associated with the proposed amended wind farm it considered that: 

The  application  documentation  provided  adequate  identification  of  the risks posed to bird (sic) and bats; 

There did not appear  to be any key uncertainties, gaps or  inaccuracies  in the information provided; 

Any  residual  risk  posed  by  the  project  on  bird  (sic)  and  bats  could  be accommodated through the provision of a bird and bat management plan via a condition on the permit (if granted). 

In modelling the collision risk for the proposed amended wind farm, Mr Smales considered a turbine with  a  height below  rotor  sweep  of  38 metres.    The  permit  being  sought  by  the Applicant indicates that the bottom blade tip height would be not less than 32 metres above natural ground  level.   The Panel sought advice on what effect  the  lowering of  the bottom blade  tip  height  would  have  on  the  estimated  annual  number  of  Brolga  collisions.   Mr Smales105  provided  an  assessment which  showed  that,  for  the  amended wind  farm,  the estimated  annual  average  total  collisions would  change  from  0.093  to  0.096.   Mr  Smales advised  that  such  minor  modifications  in  turbine  dimensions  would  not  change  the assessment conclusions. 

Submitters expressed concern that the  increase  in turbine size represented an 86 per cent increase  in  the  rotor  swept area per  turbine and a 77 per cent  increase  in  the  total  rotor swept area for the proposed amended wind farm, this would have a proportionally greater impact on Brolga.    In providing  information on  the Biosis model, Mr Smales  indicated  that 

                                                       102  Expert Witness Statement of Ian John Smales.  Stockyard Hill Wind Farm.  January, 2017.  p5. 103  Document 65.  p4.  (Stockyard Hill Wind Farm.  Impact Assessment.  Risks of Brolga collisions with external 

powerline.  Biosis.  March 2016.) 104  Document 11.  p3. 105  Document 63.  p2. 

Page 84: Environment Act 1987 - Planning - Planning · Management Plan incorporating mitigation measures and the provision of native vegetation offsets the final extent of native vegetation

Stockyard Hill Wind Farm Revised Permits  Panel Report  10 May 2017 

 

Page 71 

the model does not  treat  the  rotor swept area as a solid plane, but  in  the model,  turbine components are aggregated  into a mean presented area.106 The model requires calculation of  the mean static area  (square metres per  turbine) of  tower, nacelle and stationary rotor blades that present a risk to birds for a specific make and model of turbine.   An additional dynamic area (square metres per turbine) presented by the movement of rotors during the potential  flight  through  a  turbine  is  also  calculated.   At  the  request of  the Panel,  turbine specification parameters utilised in calculating these areas were provided.107 

The Panel was provided with information (Documents 25, 26, 27, 28, 29, 30, 31, 32 and 33) relating to several wind farms to support a criticism that the Biosis collision risk model was flawed and had provided  inaccurate predictions on bird mortality at other wind  farms and could not be relied on.  An alternative ‘dart through the fan’ model was suggested as a more conservative approach. 

In responding Mr Smales stated: 

The  submission  contends  that  Biosis  modelling  of  collision  risk  has  been demonstrated  to be  flawed  for Yaloak South, Woolnorth  (i.e Bluff Point and Studland Bay wind  farms  combined), Macarthur and Cattle Hill wind  farms.  This contention  is not correct.   Yaloak South and Cattle Hill wind  farms have not  been  built  to  date.    Biosis  never  undertook  collision  risk modelling  for Macarthur Wind Farm.  Validation results for eagle species at Bluff Point and Studland Bay wind  farms  suggest  that projections of  the collision  risk model were accurate.108 

Furthermore, Mr Smales addressed the criticism about the predictive capacity of the Biosis model by reference to Bluff Point and Studland Bay wind farms in Tasmania: 

… where  empirical  data  (for  two  eagle  species)  for  long  term  averages  of documented collisions over ten and five years, respectively, equate closely to the model’s projections at 95 per cent avoidance rate.109 

With respect  to Brolga, Mr Smales conceded  that  there was no empirical validation of  the Biosis model available to date because no wind farms for which the model has been used for that species has yet been built.110 

(ii) Discussion 

The  Panel  is  satisfied  that  the  assessment  has  been  undertaken  in  accordance with  the Brolga Guidelines.  It accepts the desk top approach and notes the advice that Brolgas used no breeding or flocking sites that were not already known and used to  inform collision risk modelling for the species  in the original planning permit application.   The Panel also notes 

                                                       106  Biosis.  Stockyard Hill Wind Farm.  Bird and Bat Impact Assessment.  May 2016.  p31. 107  Document 63.  p3. 108  Document 63.  p5. 109  Document 63.  p5. 110  Document 63.  p5. 

Page 85: Environment Act 1987 - Planning - Planning · Management Plan incorporating mitigation measures and the provision of native vegetation offsets the final extent of native vegetation

Stockyard Hill Wind Farm Revised Permits  Panel Report  10 May 2017 

 

Page 72 

the  advice  from  DELWP  that  there  did  not  appear  to  be  any  uncertainties,  gaps  or inaccuracies in the information provided. 

The Panel notes that the zones designated as turbine free buffer areas around wetlands  in the permitted wind  farm  remain  free of  turbines  in  the  layout of  the amended wind  farm and will not be encroached upon by the larger turbines proposed in the amendment. 

The Panel  recognises  that  there  is no empirical data on  the behaviour of Brolga and  their avoidance  of  turbines.    Avoidance  rates  from  overseas  studies  have  informed  the  Biosis collision risk modelling.   The Panel  is aware of the  information provided by the Macarthur Wind Farm monitoring studies that show Brolga utilise the wind farm site for foraging under favourable wetland  conditions  and  attempted  breeding  although  no  chicks were  fledged.  The results also  included observations of Brolga demonstrating a capacity to avoid turbines and that no Brolga mortalities from turbines have been recorded.  However, this was from a small sample of birds and more complete data  is required to develop an understanding of Brolga avoidance rates. 

The Panel understands that the approximation of real world behaviours of Brolga in a model, may raise concerns about the accuracy of the predictions particularly when the model has not been validated for Brolga at an operating wind farm.   The Panel also considered that  it would have wider acceptance  if all aspects of  the model were available  for  review  rather than a black box approach.  However, the Biosis model is a coherent approach that has been widely applied in assessments of potential wind energy developments in Australia, unlike an alternative model  suggested  to  the  Panel,  and  the  approach  has  been  accepted  in  the published scientific literature.  The Panel is satisfied that the collision risk modelling applied in  assessing  the  amended  wind  farm  meets  the  requirements  outlined  in  the  Brolga Guidelines.   However, uncertainty about the predictions will remain until the model can be validated. 

The Panel notes  that  the difference between  the  results of  the collision  risk modelling  for both the permitted and amended wind farm is so small that the population viability analysis cannot discern any difference in potential effects between the permitted and amended wind farm on the Victorian population of Brolga.  The compensation required to achieve zero net impact  is  the  survival of one  additional  fledging  every  ten  years  and  this will need  to be incorporated in a Brolga compensation plan.  However, until the model is validated, a more conservative  compensation  target  would  be  appropriate  based  on  a  more  conservative avoidance rate say five birds for each 10 years. 

The Panel agrees with submitters that mitigation measures to offset Brolga mortality should be measurable.  The Panel also heard that achieving Brolga breeding success is difficult.  To give greater certainty  that  zero net  impact  is being achieved, a compensation plan  should clearly  define  accountabilities,  the  outcomes  to  be  delivered,  interim  milestones, incorporate  regular monitoring  and  require public  reporting over  the expected  life of  the project  (25  years).    The  Panel  also  considers  that  Regional  scale  programs  of  habitat restoration  for  Brolga,  coordinated  by  DELWP,  incorporating  individual wind  farm  offset obligations, would be a more effective mechanism for delivery of Brolga offsets. 

Page 86: Environment Act 1987 - Planning - Planning · Management Plan incorporating mitigation measures and the provision of native vegetation offsets the final extent of native vegetation

Stockyard Hill Wind Farm Revised Permits  Panel Report  10 May 2017 

 

Page 73 

(iii) Conclusion 

That the impacts on Brolga should be able to be managed to an acceptable level subject to the  development  of  an  Environmental  Management  Plan  and  the  incorporation  and implementation of appropriate mitigation measures. 

(iv) Recommendations 

The Panel recommends: 

Amend the relevant condition to require the Bat and Avifauna Management Plan to  include  a  separate  section  on  Brolga  monitoring  and  compensation  that describes  the  monitoring  requirements,  the  specific  accountabilities,  the compensation  outcomes  to  be  delivered  based  on  a more  conservative  target than that predicted by the modelling, the interim milestones, and the schedule of public reporting over the expected life of the project (25 years). 

The  Department  of  Environment,  Land,  Water  and  Planning  co‐ordinate  a strategic  region  wide  response  to  Brolga  habitat  planning,  restoration  and management that  includes the  identification and mapping of turbine free Brolga buffer areas and incorporates individual wind farm Brolga offset obligations. 

Page 87: Environment Act 1987 - Planning - Planning · Management Plan incorporating mitigation measures and the provision of native vegetation offsets the final extent of native vegetation

Stockyard Hill Wind Farm Revised Permits  Panel Report  10 May 2017 

 

Page 74 

8 Aviation 

8.1 Introduction 

(i) Background 

The  height  of wind  farm  turbines  can  be  substantial,  resulting  in  potential  impacts  upon nearby air fields and air navigation.  Applicants are required to address aircraft safety issues by considering the proximity of the site to airports, aerodromes, or landing strips. 

The 2010 Panel report considered aviation issues in detail and the main issues related to: 

Hazard lighting (Section 7) 

Aviation safety (Section 17.6) 

Aerial agriculture (Section 17.5) 

Aerial firefighting (Section 14). 

In summary, the 2010 Panel concluded or recommended that: 

there be no aviation hazard lighting 

there will be no impact on protected airspace 

there is no legal requirement for land use on adjoining properties to provide for the ongoing operation (aerial agricultural flights) of a private airstrip on a property 

the removal of turbines T54, T47, and T34 will alleviate the problems relating to the conduct of aerial agriculture operations at the Hawker property 

while not critical the micro‐siting of T40 and T52 (now J5 and J6) could benefit the operation of the private airstrip on the Hawker property 

wind  farms  did  not  significantly  increase  fire  risk  or  unacceptably  prejudice  the fighting of fires using aerial operations. 

The Minister for Planning imposed conditions that: 

Prohibited aviation safety lighting on any turbine – condition 4e. 

Require a Fire Prevention and Emergency Response Plan prepared  in consultation with  and  to  the  satisfaction  of  the  Country  Fire  Authority,  the  Department  of Sustainability and Environment, and Pyrenees Shire – condition 6e. 

Various  CFA  conditions  requiring  access,  infrastructure,  water  supply  and fuel/vegetation management – conditions 43, 44, and 45. 

(ii) What changes are proposed 

Amended wind farm 

The wind farm amendments which have the potential to affect aviation issues include: 

Increasing  the maximum  tip  height  from  132  to  180 metres,  the maximum  hub height  from 80  to 120 metres,  and  replacing  a blade  length of 52 metres with  a rotor diameter of no greater than 142 metres. 

Reduction in turbines from 157 to 149. 

The Applicant is not seeking amendments to any conditions which relate to aviation issues. 

Page 88: Environment Act 1987 - Planning - Planning · Management Plan incorporating mitigation measures and the provision of native vegetation offsets the final extent of native vegetation

Stockyard Hill Wind Farm Revised Permits  Panel Report  10 May 2017 

 

Page 75 

The  existing  permitted wind  farm  is  substantial  and  represents  a  hazard  to  aviation;  this remains similarly true for the amended wind farm. 

Applicable policy 

The  2010  Panel  considered  aviation  issues  in  relation  to  the  September  2009  Policy  and planning guidelines  for development of wind energy  facilities  in Victoria.   The current WEF Guidelines are not significantly different and are consistent with  the decision guidelines  in Clause 52.32 (Wind Energy Facility). 

This Panel  is not tasked with undertaking a ‘first principles’ review of the potential  impacts or  the  2010  Panel  report.    Even  so  this  Panel  is  satisfied  that  the  2010  Panel  report represents a comprehensive, objective and reasoned assessment of aviation  issues.   As per the Directions Hearing of 14 November 2016 all parties, including this Panel “should focus on changes  from  the  existing  approved  project  rather  than  undertaking  a  ‘first  principles’ review”. 

The Panel has accepted submissions, evidence and cross examination that probably overlaps into  a  ‘first principles’  review of  aviation matters.   However,  the Panel has  taken  a more disciplined and brief assessment approach with respect to this report.  That is, with respect to aviation  the planning policy  framework has not changed,  the amendments  to  the wind farm from an aviation impact assessment perspective are arguably minor. 

8.2 Hazard lighting 

The Panel notes the ongoing concern of the Shire and several other submitters regarding the potential for aviation hazard lighting to be installed. 

Notwithstanding  the  prohibition  of  lighting  in  the  current  permit  conditions,  the  Civil Aviation Safety Authority (CASA) recommends aviation hazard lighting, as per Section 9.4 of the CASA Manual of Standards Part 139, if wind farm proponents wish to make the turbines more conspicuous. 

The Panel understands CASA  lacks the authority to mandate aviation hazard  lighting where the obstacle  is beyond the aerodrome Obstacle Limitation Surface and does not penetrate the  Procedures  for  Air  Navigation  Services  (PANS‐OPS)  surfaces,  Lowest  Safe  Altitudes (LASALT) or any other prescribed airspace.  It was Mr Jennings’s evidence that the wind farm does not infringe any of these areas. 

In submissions,  the Applicant argued  that night  lighting  is not an appropriate  requirement and  refers  to  section  7.2  of  assessment  report  at  Appendix  Z  (Stockyard Hill Wind  Farm Aeronautical Impact Assessment Aviation Impact Statement Qualitative Risk Assessment and Obstacle Lighting Review 180 metre turbines) of the Application and Mr Jennings’s evidence which explains why hazard  lighting  is not considered necessary.   Specifically,  the Obstacle Lighting Review concluded that,  in  line with the National Airports Safeguarding Framework Guideline D and  the  findings of  the Quantified Risk Assessment  , aviation safety  lighting  is not  considered  necessary  as  the  assessed  risk  is  ‘low’  and  no  additional  mitigation  is required.  This argument and evidence was uncontested by other parties. 

In  conclusion,  this  Panel  does  not  believe  the  amended wind  farm  results  in  a material change  to  aviation  hazard  lighting  impacts.    The  Panel  agrees with  the  conclusions  and 

Page 89: Environment Act 1987 - Planning - Planning · Management Plan incorporating mitigation measures and the provision of native vegetation offsets the final extent of native vegetation

Stockyard Hill Wind Farm Revised Permits  Panel Report  10 May 2017 

 

Page 76 

recommendation of the 2010 Panel and the Panel see no reasonable justification to amend the existing permit conditions or alter the Application. 

8.3 Aviation safety 

(i) General safety 

Clause 52.32 (Wind Energy Facility) requires the Panel consider the “impact of the facility on aircraft  safety”  and  the Guidelines  indicate  consideration  of  “the  proximity  of  the  site  to airports,  aerodromes  or  landing  strips,  and  ensure  that  any  aircraft  safety  issues  are identified and addressed appropriately”. 

The potential change  in  impacts has been documented by the Applicant  in Aviation  Impact Statement, Aeronautical  Impact Assessment, Qualitative Risk Assessment and an Obstacle Lighting Review (Ambidji, April 2016), contained in Appendix Z of the Submission to Support Application to Amend Planning Permit No. PL‐SP/05/0548 (Jacobs, May 2016).  Mr Jennings, the author of the Ambidji report provided an expert witness statement and appeared before the  Panel.    The weight  of  evidence  reveals  that  level  of  risk  to  aviation  safety  from  the amended wind  farm  is  low and therefore does not present a significant hazard to aviation safety or change the potential impact on aircraft safety, compared to the approved permit. 

The Panel notes  that Mr Hawker and Mr Mitchell, and experts Mr Wheeler and Mr Foster called by Mr Hawker did not undertake a review of the Ambidji report or present compelling evidence  to  the  contrary.   The matters  they did  raise  are addressed  in  the  following  two sections. 

In  conclusion,  this  Panel  does  not  consider  the  amended wind  farm  results  in  a material change  to  aviation  safety  impacts.    The  Panel  agrees  with  the  conclusions  and recommendation of the 2010 Panel and the Panel sees no reasonable justification to amend the current permit conditions or alter the layout of the amended wind farm. 

(ii) Aerial agriculture 

The Panel  found most of  the material presented  to  it on  this matter was not pertinent  to changes proposed by  the  amended wind  farm  and  the  task before  the Panel.    The Panel therefore  has  not  (re)canvassed  the  various  submissions  and  arguments;  suffice  to  say  it refers all parties to the 2010 Panel report. 

Having said that, the Panel notes the submission of Mr Hawker, the evidence of Mr Wheeler and Mr  Foster  and  the  argument  that  larger  turbines may produce more  turbulence  and therefore will  increase  the hazard  and  risk posed  to  aircraft.    The Panel did not  find  this argument convincing, for the following reasons: 

Turbulence  whether  generated  by  a  wind  farm,  convection,  adverse  weather conditions,  terrain  or  obstacles  is  one  of  numerous  hazards  a  responsible  pilot needs  to  consider and manage when planning and operating an aircraft, e.g Civil Aviation Regulation (CAR) CAR 157 – Low Flying and CAR 92 – Use of Aerodromes. 

Rightly, Mr  Foster  under  questioning  by  the  Panel  indicated  they  (Woorayl  Air Services)  have  a  one  kilometre  buffer  policy  from  wind  farms  when  they  are undertaking aerial spraying,  irrespective of  their size and even so could still spray Mr Hawker’s property east–west. 

Page 90: Environment Act 1987 - Planning - Planning · Management Plan incorporating mitigation measures and the provision of native vegetation offsets the final extent of native vegetation

Stockyard Hill Wind Farm Revised Permits  Panel Report  10 May 2017 

 

Page 77 

No  assessment was  provided  regarding  the  quantitative  difference  in  turbulence between the permitted and the amended wind farm, this may have been useful to the  Panel.    The  Panel  is  left  having  to  speculate  whether  that  difference  is significant or not. 

In relation to Mr Wheeler’s evidence the UK guidelines do not apply in Australia and if  they  did  it would most  likely  be  in  relation  to  authorised,  certified  or military aerodromes  and  not  an  uncertified  Aeroplane  Landing  Area  like  Mr  Hawker’s landing strip. 

In  conclusion,  this  Panel  does  not  consider  the  amended wind  farm  results  in  a material change  to  aerial  agricultural  impacts.    The  Panel  agrees  with  the  conclusions  and recommendation  of  the  2010  Panel  and  it  sees  no  reasonable  justification  to  amend  the current permit conditions or alter the layout of the amended wind farm. 

8.4 Aerial firefighting 

This Panel was not persuaded  that  the amended Applicant would  result  in any  significant change in the ability to fight fires using aircraft, compared to the existing permitted project. 

Under questioning by  the Panel Mr Foster provided expert evidence  that  it would not be possible  to  fly  firefighting  aircraft  between  turbines  and  there  would  be  no  practical difference  if  they were  142  or  180 metres  high.    The  Panel  also  notes  the  Country  Fire Authority has no opposition to the amended wind farm and has previously advised the 2010 Panel that wind farms do not create a tactical disadvantage in firefighting. 

The Panel  found most of  the material presented  to  it on  this matter was not pertinent  to changes proposed by the amended wind farm and the task before the Panel.  The Panel has not (re)canvassed the various submissions and arguments; suffice to say  it refers all parties to the 2010 Panel report. 

In  conclusion,  this  Panel  does  not  consider  the  amended wind  farm  results  in  a material change  to  aerial  firefighting  impacts.    The  Panel  agrees  with  the  conclusions  and recommendation  of  the  2010  Panel  and  it  sees  no  reasonable  justification  to  amend  the current permit conditions or alter the layout of the amended wind farm. 

Page 91: Environment Act 1987 - Planning - Planning · Management Plan incorporating mitigation measures and the provision of native vegetation offsets the final extent of native vegetation

Stockyard Hill Wind Farm Revised Permits  Panel Report  10 May 2017 

 

Page 78 

9 Traffic and road asset management 

9.1 Introduction 

(i) What changes are proposed 

Condition 35 of the Wind Farm Permit requires the preparation of a traffic management plan (TMP), in consultation with Pyrenees Shire Council, Corangamite Shire Council and VicRoads to the satisfaction of the Minister for Planning.  The condition includes a number of specific requirements for the TMP, including an existing conditions survey; recommendations on the need for road and intersection upgrades, a program to rehabilitate roads; and if required by Pyrenees or Corangamite Shire Council,  the payment of a security deposit(s) or bond(s)  in respect of  roadworks covered by  the TMP.   Condition 35  requires  the  traffic management and  road upgrade  and maintenance works  associated with  the wind energy  facility  to be carried  out  in  accordance  with  the  traffic  management  plan  to  the  satisfaction  of  the responsible authority.    It also  requires  the cost of such works  to be at  the expense of  the wind energy facility operator. 

9.2 Traffic management 

(i) What is the issue 

The WEF Guidelines require an application to include an assessment of the traffic impacts of a proposal during the construction and delivery of materials and the impact on roads. 

(ii) Evidence and submissions 

GHD prepared a Traffic  Impact Assessment  (TIA) which accompanied  the Application.   The TIA assessed the traffic  impacts of the proposed amendments to the Wind Farm compared to  the  permitted  Wind  Farm.    These  two  scenarios  were  further  broken  down  into comparisons with and without the on‐site quarry.  In summary, the TIA concluded that: 

The  amended wind  farm with  the  on‐site  quarry  generated  the  least  amount  of daily  and  peak  hour  traffic.    For  heavy  vehicle  traffic,  there would  be  14  fewer vehicles per hour and 136 fewer vehicles per day compared to proceeding with the Wind Farm as currently approved without the on‐site quarry. 

The provision of the on‐site quarry would reduce the number of heavy vehicle trips on the extended public road network considerably.   For the permitted Wind Farm, the  reduction was  estimated  to  be  30,664  fewer  two way  trips whereas  for  the amended wind farm the reduction is 29,225 fewer two way trips, or approximately 70 vehicles per day.  Further, the TIA identified that 35 percent of the quarry traffic necessary  to  construct  the  turbines  can  occur  via  internal  access  tracks,  thereby avoiding the public road network. 

The  surrounding  road  network  has  ample  spare  capacity  to  accommodate  the construction traffic associated with the Wind Farm with negligible  impact  in terms of congestions and delays.  The TIA determined that this was the case for all of the scenarios it assessed, even without the benefit of an on‐site quarry. 

Page 92: Environment Act 1987 - Planning - Planning · Management Plan incorporating mitigation measures and the provision of native vegetation offsets the final extent of native vegetation

Stockyard Hill Wind Farm Revised Permits  Panel Report  10 May 2017 

 

Page 79 

The site access intersections currently have very little traffic and would not warrant upgrade  in  terms  of  capacity,  although  some  changes  may  be  necessary  to accommodation the swept path requirements of some heavy and over‐dimensional vehicles. 

A number of submissions have raised concerns about traffic impacts, including in relation to damage to roads and the associated repair costs.   Concerns were also raised  in relation to school bus routes. 

The Applicant submitted that the TIA supports the conclusion that the traffic impacts of the Wind Farm can be appropriately addressed through the existing condition, and the TMP that must be prepared under  it.   These establish  that  the  responsibility  for  repairing damaged roads, and the costs of those repairs, is borne by the Applicant. 

The Applicant  submitted  that  the  current  conditions  ensure  that  any  necessary works  or upgrades arising due to the project are identified and funded by the Applicant.  Additionally, the Applicant and DELWP now propose  that  the Pyrenees Shire Council  (and VicRoads  for Category  1  roads)  have  the  ultimate  responsibility  for  endorsement  of  the  TMP.    An amended form of condition 35 reflecting this change has now been tabled with the Panel for consideration.  The Applicant submits that this change will further ensure that the Pyrenees Shire  Council  has  an  integral  role  in  ensuring  traffic  impacts  are managed  for  their  local community. 

In  relation  to ensuring an  integrated approach  to  traffic across  the permits,  the proposed quarry permit includes the condition 11: 

Traffic from the quarry shall at all times operate in accordance with any Traffic Management  Plan  endorsed  under  planning  permit  PL‐SP/05/0548,  unless varied with the written consent of the relevant road authority. This does not apply to establishment and rehabilitation of the quarry which  is regulated by the Traffic Management Plan required by condition 10 of this permit below 

Council submitted that: 

Either of the following two approaches would be acceptable to Council: 

The same TMP is integrated across both the quarry and wind farm permits.  

The Wind Farm TMP  is conditional on  the Quarry TMP, meaning  that  the Wind  Farm  TMP will  not  be  approved  by  Council  until  such  time  as  the Quarry TMP has been approved. 

The Applicant agreed with the intent of Council’s approach. 

Council sought changes to the Traffic and Asset Management Plan condition to ensure roads were maintained at a certain condition rather than rehabilitated to an agreed condition: 

a program of regular  inspections to be carried out during the construction period  in  line  with  the  requirements  of  the  relevant  road  authority  to identify maintenance works necessary as a result of construction traffic. 

a program to rehabilitate maintain roads to at the condition  identified by the surveys required under condition 34(a). 

Page 93: Environment Act 1987 - Planning - Planning · Management Plan incorporating mitigation measures and the provision of native vegetation offsets the final extent of native vegetation

Stockyard Hill Wind Farm Revised Permits  Panel Report  10 May 2017 

 

Page 80 

a program to rehabilitate roads after construction to ensure the condition of  roads  is  sufficient  to accommodate  traffic movements associated with the ongoing operation of the wind energy facility after it is constructed. 

Council  also  sought  changes  to  ensure  the  traffic  management  and  road  upgrade  and maintenance works associated must be carried out ‘using approved road materials’. 

(iii) Discussion 

The 2010 Panel concluded in its report that: 

We have also considered the requirement  in the draft permit conditions for a Traffic Management Plan and its specified components.  We consider these to cover the central matters for attention. 

Specifically  we  find  that  …  [t]he  road  network  within  and  accessing  the Stockyard Hill WEF area can accommodate the additional traffic loads and the types of  traffic  (from private  vehicles  through  to Over‐Dimensional  vehicles) that  will  need  to  access  the  area  during  the  construction  and  operational phases. 

The project as assessed in 2010 did not include the provision of an on‐site quarry.  With this included as part of the project, the traffic impacts associated with construction of the Wind Farm are predicted to be significantly reduced. 

It  is  important  that  the  traffic  management  plan  for  the  quarry  and  wind  farm  are coordinated. 

It  is not clear  to  the Panel  that  it  is possible or practical  to maintain  the  roads during  the construction  phase.    Certainly,  the  roads will  need  to  be  kept  in  a  safe  and  serviceable condition, but  it  is not clear  that  it  is practical to maintain  the roads at current conditions during  construction.    It  may  be  that  the  case  that  the  roads  do  suffer  wear  during construction but provided  they are  rehabilitated  in a  timely  fashion  the Panel agrees  this could be a problem.   

The Panel understands  that  this was  a  significant  issue  at Macarthur where,  according  to some  reports,  roads  became  practically  unusable  during  construction  for  normal  light vehicles.  The Traffic and asset management plan should address this issue. 

The road upgrade and maintenance works associated must be carried out to the satisfaction of  Pyrenees  Shire  Council  and  VicRoads  and  the  Panel  presumes  that  his  includes  the standards of material used.  The Panel does not see the need to specify this explicitly. 

(iv) Recommendation 

The Panel recommends: 

Update the Traffic Management Plan conditions to make it clear that it must also address the operation of the quarry. 

Page 94: Environment Act 1987 - Planning - Planning · Management Plan incorporating mitigation measures and the provision of native vegetation offsets the final extent of native vegetation

Stockyard Hill Wind Farm Revised Permits  Panel Report  10 May 2017 

 

Page 81 

10 Quarry 

10.1 Introduction 

A quarry  is now proposed to be  located within the boundary of the wind farm.   The quarry will  produce  an  estimated  total  of  1,200,000  tonnes  of  crushed  rock  to  be  used  for construction  of  internal  access  roads,  turbine  hardstands,  power  pole  hardstands  and concrete  aggregate.    In  addition,  general  and  bulk  fill  may  be  required  to  upgrade  or remediate local public roads which need to be upgraded to facilitate the construction of the wind farm or which sustain wear beyond normal use during the construction. 

The quarry will enable potential impacts on the local community, including roads, traffic and local material  supplies  to  be minimised.    The movement  of  aggregate material  from  the proposed  quarry  to  construction  sites  will  be  predominantly  be  via  internal  haul  roads established as part of the construction. 

The Applicant has provided the following information in relation to the key characteristics of the quarry: 

The quarry is proposed to be in the centre of the site (Lot 2 PS 604 561). 

No natural surface water courses or groundwater springs were identified at the site. 

The proposed excavation  is  an  approximately  rectangular  area measuring  around 450 metres x 350 metres, having an area of approximately 157,500 square metres (15.75 ha). 

The excavation floor has a grade of 1 in 100, which will allow natural drainage and prevent water ponding in the excavation during or after extraction. 

Surface run‐off from the quarry pit will be directed to the outlet at the north‐west of  the  quarry  and  will  drain  naturally  (via  gravity)  into  a  water  dam  to  be constructed to the west. 

The north‐western side of the quarry  is at current grade  level (~372 metres AHD), and cuts  into the hill to the south‐east.   At the deepest part of the quarry pit,  i.e.  the  south‐eastern end,  the  total depth of extraction will be approximately 8  to 9 metres  below  the  existing  topography  (~376 metres  AHD).    The  outline  of  the proposed quarry in a sectional view is shown in Figure 6 below. 

Page 95: Environment Act 1987 - Planning - Planning · Management Plan incorporating mitigation measures and the provision of native vegetation offsets the final extent of native vegetation

Stockyard Hill Wind Farm Revised Permits  Panel Report  10 May 2017 

 

Page 82 

Figure 6:  Section view of the proposed quarry 

 

Note:  North‐west  to  south‐east  positioned  cross‐section  across  the  site  (Groundwater elevations estimated based on July 2013 and December 2016 gauging results). 

It is noted: 

No groundwater extraction is proposed. 

Water will be carted to site if necessary for site use to supplement the water to be collected in the water dam and rainwater tanks associated with site buildings. 

Sewerage from the site will be treated by septic tanks on site. 

Diesel  fuel  for use on site will be stored  in a bunded, above ground storage  tank.  Oils,  lubricants and diesel  fuel will be stored appropriately  in a suitable area.   No explosives or detonators will be stored at the quarry. 

The quarry is intended to operate for approximately 3 years, during construction of the wind farm. 

Post  extraction,  the  quarry  will  be  remediated  and  returned  to  farmland.    The batter slopes will be no steeper than 5H:1V, which will be consistent with the gently undulating nature of the existing terrain. 

Post extraction the water dam will be filled using the material previously excavated as part of its construction and the quarry floor will be covered with a layer of topsoil and seeded with pasture grasses. 

The Applicant regards a key benefit of the quarry is that construction material for the wind farm  foundations  can  be  sourced  on  site  rather  than  requiring  additional  transport movements to bring material to site.  This approach is expected to minimise the amount of truck movements  on  the  public  road  network,  a  proposition  supported  by  the  Shire  and VicRoads. 

Page 96: Environment Act 1987 - Planning - Planning · Management Plan incorporating mitigation measures and the provision of native vegetation offsets the final extent of native vegetation

Stockyard Hill Wind Farm Revised Permits  Panel Report  10 May 2017 

 

Page 83 

Approvals and Planning Policy Framework 

The planning policies and objectives with respect to the quarry are outlined in Section 2.  In addition, approval is required for the use and development of the quarry via a work plan and Work Authority  under  the Mineral Resources  (Sustainable Development) Act  1990  (MRSD Act)  and  a  planning  permit  under  the  Pyrenees  Planning  Scheme.    A  separate  planning permit application has been lodged for the quarry with the Shire of Pyrenees. 

As  part  of  a  Work  Authority  process,  a  draft  work  plan  (WA1518)  was  prepared  and endorsed  by  the  Department  of  State  Development  and  Business  Innovation,  now  the Department of Economic Development, Jobs, Transport and Resources under the MRSD Act on 5 May 2014.  The endorsed work plan will be finalised following the issue of the planning permit to ensure consistency.. 

Additionally, a voluntary Cultural Heritage Management Plan (12648) was prepared for the quarry, and approved by Wathaurung Aboriginal Corporation on 14 May 2014. 

Self‐assessments under  the Environment Effects Act 1978 and Environment Protection and Biodiversity  Conservation  Act  1999  have  been  undertaken  and  the  Applicant  considers referrals under these Acts are not required, as the quarry will not have a significant  impact on the environment. 

10.2 Submissions and evidence 

The  Applicant  has  provided  a  Submission  to  Support  Planning  Permit  Application  for Extractive Industry, Jacobs, May 2016.  This document contains several technical appendices and plans, including: 

Endorsed Work Plan 

Air and Noise Modelling Assessment 

Environmental Management Plan 

Effects of Blasting Assessment 

Flora and Fauna Surveys 

Stakeholder and Community Engagement Plan 

Landscape and Visual Assessment 

Traffic Assessment and Framework Management Plan 

Traffic Impact Assessment 

Social Impact Assessment 

Approval for Voluntary Cultural Heritage Management Plan. 

Written objections and submissions before the Panel raised two main potential impacts with respect to the proposed quarry, that is: 

traffic  impacts –  increased heavy  truck movements, risk of accidents and conflicts and premature deterioration of road pavements 

hydrogeology and water. 

Other matters addressed by the Applicant in their documentation will not be assess further as  they  are  not  considered  to  have  unacceptable  impacts  and/or  can  be  adequately managed  through  enforceable  conditions  pursuant  to  the  MRSD  Act  and  the  permit conditions. 

Page 97: Environment Act 1987 - Planning - Planning · Management Plan incorporating mitigation measures and the provision of native vegetation offsets the final extent of native vegetation

Stockyard Hill Wind Farm Revised Permits  Panel Report  10 May 2017 

 

Page 84 

Traffic impacts 

Traffic  impacts  from the amended Application and the quarry application are addressed  in an integrated way in Chapter 9 of this report.  There will be a single Traffic Management Plan for the project (wind farm, transmission  infrastructure and quarry), which will be endorsed by Council and VicRoads as the responsible authority.  Traffic is not considered further in this section. 

Hydrogeology and water 

The  Panel  found  some  of  the material  presented  to  it was  not  pertinent  to  the  quarry Application and was a  re‐prosecution of potential  impacts already considered by  the 2010 Panel, covered by existing permit conditions and for which no significant change is proposed by the Applicant.   Even so and because water  is such a vital  issue  in rural communities the Panel provides the following summary. 

The  2010 Panel  considered  in detail potential  impacts on hydrogeology  and  groundwater from  the  construction  of  turbine  foundations,  operation  of  concrete  batching  plants, track/road construction, dust suppression, water  requirements  (60‐70ML) and surface and groundwater  contamination  (e.g.   possible  turbidity and  siltation).   The 2010 Panel  found that: 

the project water requirements were relatively small when considered on a regional scale and groundwater pumping for construction would not be sustained over the long  term  and  therefore  would  be  insufficient  in  volume  and  longevity  to significantly impact other water users 

the hard surface area created by the turbines and associated infrastructure (roads, tracks, hard stand areas and the  like) covers a very small proportion of the project area  and  any  run‐off  from  foundation  and  tracks  will  continue  to  access groundwater 

turbine foundation construction to a depth is unlikely to create any hydrogeological impact on the bedrock 

any potential threat to surface or ground waters (e.g.  because of possible siltation) during  the  operation  could  be  managed  in  accordance  with  an  approved Environmental Management Plan 

the  potential  for  construction  or  operation  to  impact  local  springs  fed  from  the Newer Volcanics (stony rises) areas was not considered significant. 

Accordingly,  the Minister  for Planning  imposed  the  following conditions  to protect surface and groundwater: 

Environmental Management Plan – condition 6 

Construction and Site Works Management Plan – conditions 6a 

Sediment, Erosion and Water Quality Management Plan ‐ condition 6b. 

For these reasons the following section  is confined to the hydrogeology and water matters applicable to the quarry. 

Page 98: Environment Act 1987 - Planning - Planning · Management Plan incorporating mitigation measures and the provision of native vegetation offsets the final extent of native vegetation

Stockyard Hill Wind Farm Revised Permits  Panel Report  10 May 2017 

 

Page 85 

10.3 Hydrogeology and water impacts of the quarry 

(i) Evidence and submissions 

In  preparing  her  expert  evidence  Ms  Krusic‐Hrustanpasic  reviewed  the  Groundwater Assessment Report (Golder, 2014) and Addendum (Golder, 2017) and provided the following evidence: 

Groundwater is inferred to flow westerly and south‐westerly from the site.  There is the  potential  for  groundwater  flow  from  the  northern  part  of  the  site  towards Wangatta and Water Sump springs  located to the west of the site.   However,  it  is unlikely for groundwater to flow from the site towards Horse Spring and Mawallok Home Spring located to the north‐west of the site. 

The depth  to groundwater beneath  the  site was between about 10.7 metres and 24.4 metres when measured in December 2016. 

The water  table  beneath  the  site  is  a  subdued  reflection  of  the  ground  surface topography  (see Figure 6), as would be expected  for  shallow groundwater within the basalt of the Newer Volcanics. 

Discharge  of  groundwater  at  the  ground  surface  (manifested  as  springs)  occurs locally in these low lying landscapes where there is a break in slope. 

Based on the quarry floor elevation and slope, the groundwater table in December 2016 was between  approximately 13 metres  and  16 metres below  the proposed base  of  the  quarry.   Water  levels  from December  2016 would  be  relatively  high following  a wet  Spring  season  in  2016, which  is  supported  by  results  of  gauging undertaken in 2013 and 2016. 

Ms  Krusic‐Hrustanpasic  concluded  that  the  quarrying  activities  are  not  likely  to  have  a significant impact on local and regional groundwater levels, groundwater flows and quality; based on the following: 

The  depth  to  groundwater  of  approximately  13 metres  to  16 metres  being well below the proposed base of the quarry as measured in December 2016 and after a wet spring.  It  is unlikely that groundwater could  interact with the quarry pit floor.  This  also means  that  it  is  unlikely  that  evapotranspiration  from  the  quarry  could alter the local salinity and hence water quality of the groundwater. 

Changes  in groundwater recharge rates, and hence discharge rates at springs, due to quarry operations.  The unlikely potential for interaction of groundwater with the quarry  pit  floor  means  that  even  if  groundwater  from  the  site  flows  towards Wangatta  and Water  Sump  springs,  it  is not  likely  to noticeably  affect  the water flow from the springs.   Considering the total area of the excavation  in comparison to  the  total  spring  catchment  area,  any  change  in  flow  dynamics  is  likely  to  be minor.  Additionally, any changes in groundwater recharge would be further limited by  presence  of  low  permeability  fresh  basalt  horizons  above  the water  bearing aquifer zone.  Based on the inferred westerly and south‐westerly groundwater flow direction,  the Mawallok  Home  Spring  and  Horse  Spring  are  outside  the  quarry groundwater flow path. 

Potential  contamination  impacts  resulting  from  storage,  use  and  handling  of chemicals  and  fuels.    This  risk  was  assessed  in  the  EMP  as  low,  assuming  the 

Page 99: Environment Act 1987 - Planning - Planning · Management Plan incorporating mitigation measures and the provision of native vegetation offsets the final extent of native vegetation

Stockyard Hill Wind Farm Revised Permits  Panel Report  10 May 2017 

 

Page 86 

implementation of mitigation measures including bunded storage of chemicals and fuels  within  hardstand  areas,  refuelling  of  plant  to  take  place  within  hardstand areas,  and  limited  volume  of  chemical  and  fuel  storage  on  site.    Impacts  on groundwater  from  the  storage,  use  and  handling  of  chemicals  and  fuels  at  the quarry  would  be  further  reduced  by  presence  of  low  permeability  fresh  basalt horizons above the water bearing aquifer zone. 

Potential contamination impacts resulting from use of blasting explosives within the quarry.    The  EMP  recommends  use  of  low  composition  ammonium  nitrate explosives as a mitigation measure to reduce risk of nitrate impact to groundwater quality.   This product  is similar  in nitrate composition  to agricultural  fertilisers, so would  not  greatly  change  the  risk  to  groundwater  from  that  presented  by  the current  agricultural  land  use,  considering  the  existing  nitrate  impacts  in groundwater. 

Potential damage  to  the  aquifer properties  from blasting within  the quarry.   The Terrock  (2013)  report,  indicated  that blasting will be undertaken  to break enough rock  to  be  excavated  and  fracturing  is  not  likely  to  propagate more  than  a  few metres beyond  the quarry.    Terrock  also  concluded  that  the  aquifer  (and nearby groundwater wells) will not be damaged by blast vibration. 

Condition  4  requires  that  the  quarry  operates  in  accordance with  the  Approved Work  Plan.    The  EMP  is  an  appendix  to  the  work  plan;  relevant  groundwater pollution  prevention  and monitoring  requirements  are  contained  in  the  EMP.    If results  of  groundwater  monitoring  suggest  that  a  protected  beneficial  use  of groundwater  may  be  impacted  then  contingency  measures  will  be  developed, incorporated into the EMP and implemented. 

Additionally, if groundwater is intercepted during quarry operation, excavation will cease  until  relevant  permits  are  obtained,  contingency measures  are  developed, incorporated into the EMP and implemented. 

Mr  Stuckey  also  provided  expert  hydrogeological  evidence  to  the  Panel.    With  some exceptions,  the  Panel  found Mr  Stuckey’s  expert witness  statement  and  evidence  to  be consistent with Ms Krusic‐Hrustanpasic evidence. 

(ii) Discussion 

One of the matters of some contention related to groundwater flow direction and whether any  flow under  the quarry moves  to northwest  towards Mawallok property.    In his expert witness  statement  Mr  Stuckey  presented  inferred  groundwater  contours  based  on groundwater data collected at bores at different times, and given the responsive nature of the  aquifer  this  is  not  considered  acceptable  by  the  Panel.    To make matters worse Mr Stuckey presented this same  figure  in the hearing  (via PowerPoint) overlayed with straight groundwater flow direction lines, which were not perpendicular to his inferred groundwater contours.  Notwithstanding the questionable inferred groundwater contours of Mr Stuckey, Ms  Krusic‐Hrustanpasic  provided  the  Panel with  a  figure  correctly  showing  groundwater direction  lines perpendicular  to  the  inferred contours provided by Mr Stuckey.   This  figure indicated  groundwater  flow  under  the  site  moving  west  and  not  northwest  towards Mawallok. 

Page 100: Environment Act 1987 - Planning - Planning · Management Plan incorporating mitigation measures and the provision of native vegetation offsets the final extent of native vegetation

Stockyard Hill Wind Farm Revised Permits  Panel Report  10 May 2017 

 

Page 87 

Either way the Panel regards the direction of groundwater flow a moot point, because the Panel  is  satisfied  that  the  quarry will  not  significantly  impact  the  quantity  or  quality  of groundwater flow, a point not contested by Mr Stuckey. 

On the other hand, Mr Stuckey does contest that there  is potential  for turbine  footings to intersect and reduce groundwater flow and the physical reduction in groundwater flow due to  groundwater  extraction  for  construction  of  turbine  footings.    As  discussed  above  the Panel notes  that neither of  these matters are  relevant  to  the Panel’s consideration of  the quarry Application because they have been considered by the 2010 Panel. 

Given the number of concerns raised with respect to hydrogeology and water the Applicant in  submissions  is  prepared  to  accept  a  condition  that  provides  submitters  with  greater certainty around management of  impacts to groundwater.   They propose such a condition could require the following: 

Monitoring to be undertaken prior to commencement of development to establish a  groundwater  quality  baseline,  setting  out  the  existing  beneficial  uses  of  the groundwater  in  accordance  with  the  State  Environment  Protection  Policy (Groundwaters of Victoria). 

During  operation,  biannual monitoring  of  the  quality  of  the  groundwater  at  the quarry site to ensure that the beneficial uses of the groundwater as established  in the baseline report are maintained. 

If  any  existing  beneficial  use  from  the  baseline  study  is  impacted  then  a groundwater  monitoring  and  management  plan  must  be  developed  and implemented to the responsible authority’s satisfaction. 

The Panel supports a condition of this nature. 

10.4 Recommendation 

The Panel recommends that: 

Include  on  any  permit  for  the  quarry,  a  condition  requiring  a  comprehensive Groundwater Monitoring and Management Plan that includes the development of a baseline on the site and at beneficial users, a regular operational groundwater monitoring  plan,  public  reporting  and  a  management  response  framework  to ensure incidents and performance outcomes are achieved. 

Page 101: Environment Act 1987 - Planning - Planning · Management Plan incorporating mitigation measures and the provision of native vegetation offsets the final extent of native vegetation

Stockyard Hill Wind Farm Revised Permits  Panel Report  10 May 2017 

 

Page 88 

11 Other issues 

11.1 Responsible authority 

Pyrenees  Shire  Council's  proposed  amendments  include  a  change  that  provides  that  the Minister  is  the  responsible  authority  for  administration  and  enforcement  of  the  planning permit, rather than Council. 

Under  the provisions of Clause 61.01‐1 of  the Pyrenees Planning Scheme,  the Minister  for Planning is the responsible authority for a WEF, except for permits for a WEF issued before 2 April 2015 under Division 6 of Part 4 of the Planning and Environment Act 1987 (P&E Act) for which Council is responsible authority for endorsement, administration and enforcement of a WEF planning permit, subject to the operation of section 97H of the P&E Act which deals with: 

any matters which the permit specifies to be done by, approved by or done to the satisfaction of the Minister 

any extension of time under section 69 in relation to the permit 

the correction of any error 

the amendment of the permit. 

Based on the operation of Section 97H of the P&E Act, and as the current planning permit states  that  the Minister  for Planning  is  responsible  for approving and endorsing extensive secondary consent matters. 

The effect of Clause 61 of the Planning Scheme together with section 97H of the P&E Act is that  Council  is  the  responsible  authority  for  enforcement.    This  cannot  be  changed  by altering the permit. 

The Panel has some sympathy  for Council but does not see how  it  is an  issue  that can be effectively addressed by the Application.  The Panel’s understanding is that it would require changes to the planning scheme. 

 

Page 102: Environment Act 1987 - Planning - Planning · Management Plan incorporating mitigation measures and the provision of native vegetation offsets the final extent of native vegetation

Stockyard Hill Wind Farm Revised Permits  Panel Report  10 May 2017 

 

Page 89 

Appendix A  Submitters to the Amendment  

No.  Submitter 

1  Hamish Cumming 

2  David and Robyn Gerrard 

3  Mawallok Pastoral Company Pty Ltd 

4  Andrew and Pat Gabb 

5  Lynette Heenan 

6  Peter Mitchell 

7  Philip Hawker 

8  Noel Dean 

9  Ann Gardner 

10  Cassie Franzose 

11  Jenny Bruty 

12  Andrew Gardner 

13  Neil Blain 

14  John and Helen Roxburgh 

15  Venita Driden 

16  The Stockyard Hill Community Guardians 

17  Caroline Forbes 

18  The Stockyard Hill Community Guardians 

19  Rod and Rebecca McErvale 

20  Bill Mulcahy 

21  John Kilpatrick 

22  Colin Fraser 

23  Megan and Warwick Read 

24  Andrew and Heather Millar 

25  Ewan and Tracey Read/Millar 

26  Myles and Joanne Read 

27  Ewan and Tracey Read/Millar 

28  Melissa Ware 

29  Jason and Merrewyn Chapman 

30  Pyrenees Shire Council 

Page 103: Environment Act 1987 - Planning - Planning · Management Plan incorporating mitigation measures and the provision of native vegetation offsets the final extent of native vegetation

Stockyard Hill Wind Farm Revised Permits  Panel Report  10 May 2017 

 

Page 90 

No.  Submitter 

31  Steven and Wendy Crick 

32  Lake Goldsmith Pastoral Co Pty Ltd 

33  Paul and Romana Huckstepp 

34  Anne and Colin Fraser 

35  Adrian and Jillian Franc 

36  Hancock Victorian Plantations Pty Ltd 

37  Craig Wilson 

38  Bernard Kehoe 

39  Wind Industry Reform Victoria Inc. 

40  Donald Thomas 

41  Nicholas Franc 

42  Serena Mitchell 

43  David Jackson 

44  B D and E A Kirby 

45  Rodney and Margaret Read 

 

Page 104: Environment Act 1987 - Planning - Planning · Management Plan incorporating mitigation measures and the provision of native vegetation offsets the final extent of native vegetation

Stockyard Hill Wind Farm Revised Permits  Panel Report  10 May 2017 

 

Page 91 

Appendix B  Document list 

No.  Date  Description  Tabled by 

1  6/02/2017  Submission on behalf of Minister for Planning  Hugh Griggs (DELWP) 

2  6/02/2017  Draft permit conditions with track changes and comments 

Hugh Griggs (DELWP) 

3  6/02/2017  White & Case Main Submission Part A Origin Energy  Michelle Quigley 

4  6/02/2017  Map and table of project and dwelling locations by Origin Energy 

Michelle Quigley 

5  6/02/2017  Environmental Noise PowerPoint presentation  Chris Turnbull 

6  6/02/2017  Paper by Hansen C What's our ethical responsibility?  Tony Edney 

7  6/02/2017  Photo of wind turbines showing dust wake in the background 

Tony Edney 

8  7/02/2017  AO Photomontages printed out  Allan Wyatt 

9  7/02/2017  Photomontage from Mawallok Homestead terrace  Allan Wyatt 

10  7/02/2017  Figure 5: Visual magnitude thresholds graph from NSW guidance 

Stephen Mitchell 

11  7/02/2017  Submission on behalf of DELWP Environment Portfolio (ecology) 

Stewart Dekker (DELWP) 

12  7/02/2017  Ecology PowerPoint presentation  Aaron Organ (Ecology and Heritage Partners) 

13  8/02/2017  Stockyard Hill Wind Farm Bird and Bat Impact Assessment PowerPoint presentation 

Ian Smales (Biosis) 

14  8/02/2017  Quarry groundwater impact PowerPoint presentation  Irena Krusic‐Hrustanpasic (Golder) 

15  8/02/2017  Rainfall graph  Irena Krusic‐Hrustanpasic (Golder) 

16  8/02/2017  Water flow direction analysis slide  Irena Krusic‐Hrustanpasic (Golder) 

17  9/02/2017  4x Additional Groundwater slides  Irena Krusic‐Hrustanpasic (Golder) 

18  9/02/2017  White & Case Main Submission Part B Origin Energy  Michelle Quigley 

Page 105: Environment Act 1987 - Planning - Planning · Management Plan incorporating mitigation measures and the provision of native vegetation offsets the final extent of native vegetation

Stockyard Hill Wind Farm Revised Permits  Panel Report  10 May 2017 

 

Page 92 

No.  Date  Description  Tabled by 

19  10/02/2017  Draft permit conditions with track changes and comments from Pyrenees Council 

Maria Marshall (Maddocks) 

20  10/02/2017  Summary of Pyrenees Council submission  Maria Marshall (Maddocks) 

21  10/02/2017  Written submission and Wind energy facility map  John McMahon (Wind Energy Reform Victoria) 

22  13/02/2017  Environmental noise PowerPoint presentation  Les Huson  

23  14/02/2017  Hydrogeology PowerPoint presentation  Mark Stuckey (Environmental Earth Sciences) 

24  15/02/2017  Email for Les Huson on turbine separation calculations  Les Huson  

25  15/02/2017  Email 1 from Hamish Cumming with attachments  Hamish Cumming 

26  15/02/2017  Email 2 from Hamish Cumming with attachments  Hamish Cumming 

27  15/02/2017  Email 3 from Hamish Cumming with attachments  Hamish Cumming 

28  15/02/2017  Email 4 from Hamish Cumming with attachments  Hamish Cumming 

29  15/02/2017  Email 5 from Hamish Cumming with attachments  Hamish Cumming 

30  15/02/2017  Email 6 from Hamish Cumming with attachments  Hamish Cumming 

31  15/02/2017  Email 7 from Hamish Cumming with attachments  Hamish Cumming 

32  15/02/2017  Email 8 from Hamish Cumming with attachments  Hamish Cumming 

33  15/02/2017  Written submission by Hamish Cumming  Hamish Cumming 

34  15/02/2017  Peter Watts (Heritage) errata  Peter Watts 

35  15/02/2017  Dennis Williamson (Visual) errata  Dennis Williamson 

36  15/02/2017  Attachment to document 37, correspondence from Origin Energy and letter from Hart Aviation 

Sarah and Philip Hawker 

37  15/02/2017  Written submission Sarah and Philip Hawker  Sarah and Philip Hawker 

Page 106: Environment Act 1987 - Planning - Planning · Management Plan incorporating mitigation measures and the provision of native vegetation offsets the final extent of native vegetation

Stockyard Hill Wind Farm Revised Permits  Panel Report  10 May 2017 

 

Page 93 

No.  Date  Description  Tabled by 

38  15/02/2017  Photomontages x 2  Sarah and Philip Hawker 

39  16/02/2017  Written submission by Megan and Warwick Read  Megan and Warwick Read 

40  16/02/2017  Copy of Council minutes of 19 March 2013  Megan and Warwick Read 

41  16/02/2017  Written submission by Patricia Gabb  Patricia Gabb 

42  16/02/2017  Video "Origin of Evil"  Andrew Gabb 

43  16/02/2017  Written submission by Andrew Gabb and 21 attachments  Andrew Gabb 

44  16/02/2017  Written submission by Peter R Mitchell and 7 attachments 

Peter R Mitchell 

45  17/02/2017  Various Documents from Wind Refugees as part of Andrew Gabb submission 

Andrew Gabb 

46  17/02/2017  Department of Economic Development, Jobs, Transport and Resources PowerPoint presentation 

Bessie Abbott  

47  17/02/2107  Visual effects at Mawallok Homestead PowerPoint presentation 

Dennis Williamson 

48  17/02/2017  Figure A4‐2 Mawallok Viewpoint 2  Dennis Williamson 

49  17/02/2017  Expert witness statement (with errata track changes 15/2/2017) ‐ Visual effects Mawallok Homestead 

Dennis Williamson 

50  17/02/2017  Written submission by Stephen Mitchell  Stephen Mitchell 

51  17/02/2017  Written submission by John H Chapman and 1 attachment 

John H Chapman 

52  17/02/2017  Written submission by David C Jackson  David C Jackson 

53  17/02/2017  Written submission by Carmel Callus  Carmel Callus 

54  17/02/2017  Photomontages x 2  Carmel Callus 

55  20/02/2017  Written submission by Donald Thomas  Donald Thomas 

56  20/02/2017  Written submission by Ann Gardner and 10 attachments  Ann Gardner 

57  20/02/2017  Written submission by Andrew Gardner and 2 attachments 

Andrew Gardner 

58  20/02/2017  Written submission by Venita Dridan  Venita Dridan 

59  20/02/2017  Origin contract with participants  Michelle Quigley 

60  20/02/2017  Final written submission by Applicant  Michelle Quigley 

61  20/02/2017  BMC Neuroscience ‐ acoustic reflex paper  Michelle Quigley 

Page 107: Environment Act 1987 - Planning - Planning · Management Plan incorporating mitigation measures and the provision of native vegetation offsets the final extent of native vegetation

Stockyard Hill Wind Farm Revised Permits  Panel Report  10 May 2017 

 

Page 94 

No.  Date  Description  Tabled by 

62  20/02/2017  Assoc of Aust Acoustical Consultants letter to Select Committee on Wind Turbines re Cape Bridgewater Testing 

Michelle Quigley 

63  21/02/2017  Biosis letter to Origin re submission by Mr H Cumming, Biosis letter to Origin re minor change to turbine dimensions, Paper by Ian Smales on modelling collision risk and populations 

Michelle Quigley 

64  22/02/2017  Map of comparison of powerlines  Michelle Quigley 

65  23/02/2017  Biosis report Risks of Brolga collisions with external powerline 

Michelle Quigley 

66  24/02/2017  Letter from Hon Richard Wynne re referral under the Environment Effects Act 1978 

Michelle Quigley 

67  25/02/2017  Email from CFA on permit and emergency management guidelines for wind energy facilitates 

Michelle Quigley 

68  26/02/2017  AIP Australia advisory on Hawker runway  Michelle Quigley 

69  27/02/2017  Information on Waubra Foundation and Wind Industry Reform Victoria 

Michelle Quigley 

70  20/02/2017  Draft permit (PL‐SP/05/0548) conditions with track changes and comments 

Michelle Quigley 

71  20/02/2017  Draft permit (PL‐SP/05/0548) conditions with track changes and comments 

Megan Reed (Guardians) 

72  20/02/2017  Draft permit conditions (noise)  Megan Reed (Guardians) 

73  20/02/2017  Draft permit (PL‐SP/05/0548) conditions with track changes and comments 

Maria Marshall (Maddocks) 

74  20/02/2017  Draft Permit conditions (quarry) with track changes and comments 

Maria Marshall (Maddocks) 

75  20/02/2017  Draft Permit conditions (quarry) with track changes and comments 

Megan Reed (Guardians) 

76  20/02/2017  Additional information  Waubra Foundation 

 

Page 108: Environment Act 1987 - Planning - Planning · Management Plan incorporating mitigation measures and the provision of native vegetation offsets the final extent of native vegetation

Stockyard Hill Wind Farm Revised Permits  Panel Report  10 May 2017 

 

Page 95 

Appendix C  Parties to the Panel Hearing 

Submitter  Represented by 

Minister for Planning represented by the Department of Environment, Land, Water and Planning 

Represented by Hugh Griggs and Stuart Dekker 

Stockyard Hill Wind Farm Pty Ltd  Stockyard Hill Wind Farm Pty Ltd represented by Michelle Quigley briefed by White and Case Lawyers and calling evidence in: 

‐ Acoustics (Chris Turnbull) 

‐ Landscape (Allan Wyatt) 

‐ Flora and Fauna (Aaron Organ) 

‐ Avifauna (Ian Smales) 

‐ Aviation (Ian Jennings) 

‐ Groundwater (Irena Krusic‐Hrustanpasic) 

Pyrenees Shire Council  Maria Marshall of Maddocks Lawyers with Traffic and Road Management issues presented by Douglas Gowans, Pyrenees Shire Council 

Wind Industry Reform Victoria  John McMahon 

Stockyard Hill Community Guardians  Represented by Tony Edney with Megan Read, Stephen Mitchell and Hamish Cummings and calling evidence in: 

‐ Health (Sarah Laurie) 

‐ Acoustics (Les Huson) 

‐ Hydrology (Mark Stuckey) 

Sarah Hawker calling evidence in: 

‐ Acoustics (Les Huson) 

 

Phillip Hawker calling evidence in: 

‐ Wind turbulence from turbines and its impact on aviation operations (Stephen Wheeler via video link from the UK) 

‐ Aerial agriculture, firefighting and Hawkwood Airstrip (Barry Foster) 

 

Megan and Warwick Read   

Tarnawa Pastoral Company  Represented by Andrew and Patricia Gabb, Andrew Lang and other advocates who shared their experiences living near wind farms 

Peter Mitchell   

Page 109: Environment Act 1987 - Planning - Planning · Management Plan incorporating mitigation measures and the provision of native vegetation offsets the final extent of native vegetation

Stockyard Hill Wind Farm Revised Permits  Panel Report  10 May 2017 

 

Page 96 

Submitter  Represented by 

Department of Economic Development, Jobs, Transport and Resources (in relation to the approval process for the quarry) 

Bessie Abbott of the Department of Economic Development, Jobs, Transport and Resources  

Mawallok Pastoral Company Pty Ltd   Mawallok Pastoral Company Pty Ltd represented by Jason Pennell of counsel calling evidence in: 

‐ Landscape and heritage impacts (Dennis Williamson) 

‐ Landscape and heritage impacts (Peter Watts) 

‐ Landscape and heritage impacts (John Patrick) 

John and Merrewyn Chapman   

David Jackson   

Philip Bennett   

Carmel Callus   

HVP Plantations   Represented by Warwick Williams, Corporate Counsel 

Donald Thomas   

Ann Gardner   

Andrew Gardner   

Venita Dridan   

 

Page 110: Environment Act 1987 - Planning - Planning · Management Plan incorporating mitigation measures and the provision of native vegetation offsets the final extent of native vegetation

Stockyard Hill Wind Farm Revised Permits  Panel Report  10 May 2017 

 

Page 97 

Appendix D  Preferred permits 

   

Page 111: Environment Act 1987 - Planning - Planning · Management Plan incorporating mitigation measures and the provision of native vegetation offsets the final extent of native vegetation

Stockyard Hill Wind Farm Revised Permits  Panel Report  10 May 2017 

 

Page 98 

Appendix D1  Quarry  

 

 

PLANNING PERMIT 

 

   

Permit No.: PA2499/16 

 

Planning Scheme: Pyrenees 

 

Responsible Authority: Minister of Planning 

 

ADDRESS OF THE LAND: 

 

   

Stockyard Hill‐Wangatta Road, Stockyard Hill (Lot 2 PS604561R) 

THE PERMIT ALLOWS:     The  use  and  development  of  the  land  for  stone extraction. 

 

Development plans 1. Before the development starts, development plans must be prepared to the 

satisfaction of the Minister for Planning.  When approved, the plans will be endorsed by the Minister for Planning and will then form part of this permit.  The plans must be fully dimensioned, drawn to a scale and three copies must be provided to the Minister for Planning.  The plans must be generally in accordance with the ‘Quarry Indicative Layout Plan’, but modified (where required) to show:  a) Demountable buildings; b) Truck wash areas; c) Hardstand and/or work areas; d) Car parking areas; e) Stockpiling areas; and f) Road treatments.  

2. The use and development as shown on the endorsed plan(s) must not be altered without the prior written consent of the Minister for Planning.  

Works permit 3. The use and development of the subject land must not commence until a Work 

Authority and Approved Work Plan is granted for the quarry in accordance with the requirements of the Mineral Resources (Sustainable Development) Act 1990 (MRSDA). 

Page 112: Environment Act 1987 - Planning - Planning · Management Plan incorporating mitigation measures and the provision of native vegetation offsets the final extent of native vegetation

Stockyard Hill Wind Farm Revised Permits  Panel Report  10 May 2017 

 

Page 99 

Department of Economic Development, Jobs, Transport and Resources (DEDJTR) condition 4. The use and development must operate at all times in accordance with the Work 

Authority and Approved Work Plan.  No amendment and or variation to either the Work Authority or Work Plan is permitted unless in accordance with MRSDA.  

Materials extracted 5. All materials extracted must only be used for the development of the 

Stockyard Hill Wind Farm as approved by planning permit PL‐SP/05/0548 and development associated with planning permits PA1600101 and PA1600126.  

6. Materials extracted shall not be for sale to any other party. 

Hours of operation 7. The quarry must only operate between the following hours, unless varied by 

the written consent of the Minister for Planning: a) 7am to 6pm, from Monday to Friday. b) 7am to 1pm on Saturdays. 

Drainage and Water Storage Management Plan 8. Before development starts, a Drainage and Water Storage Management Plan 

must be submitted to and approved by the Minister for Planning.  The plans must be in accordance with the Approved Work Plan, but must also include:  a) The management and disposal of waste waters generated from the 

site, in particular from the truck wash and demountable buildings; b) The management of surface water generated on the site, with 

particular reference to land used for demountable buildings and hardstand areas; and 

c) The location of a septic tank and effluent disposal fields required to manage wastewater generated on site. 

Groundwater quality 9. Before  commencement of development,  groundwater monitoring  shall be 

undertaken  from  the  existing  bores  at  the  quarry  site  to  establish  a groundwater quality baseline, in particular setting out the existing beneficial uses  of  the  groundwater  in  accordance  with  the  State  Environment Protection  Policy  (Groundwaters  of  Victoria).    The  groundwater  quality baseline  shall be  set out  in a  report  to  the  satisfaction of  the Minister  for Planning.    During  operation,  biannual  monitoring  of  the  quality  of  the groundwater  at  the  quarry  site  shall  be  undertaken.    If  any  existing beneficial  use  from  the  baseline  study  is  impacted  then  a  groundwater management plan (including contingency measures) must be developed and implemented to the satisfaction of the Minister for Planning. 

   

Page 113: Environment Act 1987 - Planning - Planning · Management Plan incorporating mitigation measures and the provision of native vegetation offsets the final extent of native vegetation

Stockyard Hill Wind Farm Revised Permits  Panel Report  10 May 2017 

 

Page 100 

Ground water monitoring 

Include a condition  requiring a comprehensive Groundwater Monitoring and Management Plan that includes the development of a baseline on the site and at beneficial users, a regular operational  groundwater monitoring  plan,  public  reporting  and  a management  response framework to ensure incidents and performance outcomes are achieved. 

Interception of groundwater 10. During operation if groundwater is intercepted on the site the permit holder 

must: a) Immediately cease excavation; b) Immediately contact the Minster for Planning and the relevant water 

authority; and c) not recommence excavation until: 

i. The relevant water authority has advised that a groundwater licence is not required, or any necessary groundwater licence has been acquired; or 

ii. The operation is modified to the satisfaction of the relevant water authority and the Minister for Planning. 

Accordance with wind farm permit (PL‐SP/05/0548) Traffic Management Plan 11. Traffic from the quarry shall at all times operate in accordance with any 

Traffic Management Plan endorsed under planning permit PL‐SP/05/0548, unless varied with the written consent of the Minister for Planning.  This does not apply to establishment and rehabilitation of the quarry which is regulated by the Traffic Management Plan required by condition 10 of this permit below. 

Traffic Management Plan – establishment and rehabilitation 12. Before the development starts, a Traffic Management Plan must be 

submitted to and approved by Pyrenees Shire Council for the establishment and rehabilitation of the quarry.  When approved, the plan will be endorsed and will then form part of the permit.  The plan must be prepared by a suitably qualified traffic engineer in consultation with VicRoads and Pyrenees Shire Council and must: a) identify proposed haul routes to and from the quarry site; b) include an existing conditions survey of public roads proposed as haul 

routes (including details of the suitability, design, condition and construction standard of the roads); 

c) identify vehicle access points to the quarry site which ensure safe sight distances, turning movements and which avoid potential traffic conflicts; 

d) identify measures to manage traffic impacts associated with the establishment and rehabilitation of the quarry on surrounding public roads, including but not limited to: i.  the designation of operating hours, ii.  speed limits, iii. avoidance  of  school  bus  routes  and/or  school  bus  times  where 

relevant, and 

Page 114: Environment Act 1987 - Planning - Planning · Management Plan incorporating mitigation measures and the provision of native vegetation offsets the final extent of native vegetation

Stockyard Hill Wind Farm Revised Permits  Panel Report  10 May 2017 

 

Page 101 

iv. road safety signage; e) include a program of regular inspections to be carried out during the 

establishment and rehabilitation phases to identify maintenance works necessary as a result of quarry establishment and rehabilitation traffic; and 

f) Include a program to rehabilitate existing public roads to the condition identified in the surveys carried out under condition 9(b). 

 

Establishment and Rehabilitation 13. All traffic required to establish and rehabilitate the quarry shall be restricted 

to the haul routes identified in the endorsed traffic management plan unless the prior written consent of VicRoads and the Shire of Pyrenees (as relevant) is obtained.  

14. Rehabilitation must commence in accordance with the Work Authority following the completion of extraction of material necessary for the Stockyard Hill Wind Farm. 

Other conditions 15. The use must be managed so that the amenity of the area is not 

detrimentally affected, through the: a) transport of materials, goods or commodities to or 

from the land b) appearance of any building, works or materials c) emission of noise, artificial light, vibration.  smell, fumes, smoke, vapour, 

steam, soot, ash, dust, waste water, waste products, grit or oil d) presence of vermin. 

16. Noise levels emanating from the land must comply with the requirements of the Environment Protection Authority's Noise from Industry in Regional Victoria guideline (EPA publication 1411). 

17. Provision must be made on the land for the storage and collection of garbage and other solid waste.  This area must be graded and drained and screened from public view to the satisfaction of the Minister for Planning. 

18. All roads/storage areas/external stockpiles/vacant or grazed areas must be maintained to avoid dust nuisance to the satisfaction of the Minister for Planning. 

19. No polluted and/or sediment laden run‐off is to be discharged directly or indirectly into Councils drains or watercourses.  To this end, pollution or litter traps must be provided on site. 

20. All works must be undertaken in a manner that minimises soil erosion, and any exposed areas of soil must be stabilised to prevent soil erosion, to the satisfaction of the Minister for Planning. 

21. Soil erosion control measures must be employed throughout the construction stage of the development to the satisfaction of the Minister for Planning.  All cleared areas for vehicle use must be stabilised, drained and 

Page 115: Environment Act 1987 - Planning - Planning · Management Plan incorporating mitigation measures and the provision of native vegetation offsets the final extent of native vegetation

Stockyard Hill Wind Farm Revised Permits  Panel Report  10 May 2017 

 

Page 102 

surfaced to prevent soil erosion to the satisfaction of the Minister for Planning. 

22. The area approved by this permit and subject to the extraction is to be rehabilitated, on completion of the removal of quarried material, to the satisfaction of the Minister for Planning. 

23. All topsoil to be removed during the earthworks must be stockpiled, maintained in a weed‐free condition, re‐spread on disturbed ground after completion of the earthworks and re‐vegetated to prevent erosion, all to the satisfaction of the Minister for Planning. 

24. No environmental weeds may be planted on or allowed to invade the site. 25. Access to the site shall only be at the nominated crossing shown on the 

endorsed plan.  The crossing and road pavement works are to be constructed to the satisfaction of the Pyrenees Shire Council. 

26. The loading and unloading of goods from vehicles must only be carried out on the land at all times. 

Expiry 

27. This permit will expire if one of the following circumstances applies: 

a) the development is not started within five years of the date of this permit 

b) the development is not completed within ten years of the date of this permit. c) the Work Authority and Approved Work Plan for the use issued under the 

provisions of the MRSDA is no longer in force in accordance with this MRSDA. 

d) The development of the Stockyard Hill Wind Farm as approved by planning permit PL‐SP/05/0548 and development associated with planning permits PA1600101 and PA1600126 is completed. 

 

28. The Minister for Planning may extend the permit if a request is made in writing: 

a) prior to the expiry of the permit, or 

b) within six months after the permit expires. 

Page 116: Environment Act 1987 - Planning - Planning · Management Plan incorporating mitigation measures and the provision of native vegetation offsets the final extent of native vegetation

Stockyard Hill Wind Farm Revised Permits  Panel Report  10 May 2017 

 

Page 103 

Appendix D2:  Corangamite: vegetation removal for power line 

 

 

PLANNING PERMIT 

 

   

Permit No.: PA1600126 

 

Planning Scheme: Corangamite  

 

Responsible Authority: Minister of Planning 

 

ADDRESS OF THE LAND: 

 

   

Volume 9997 Folio 742 Lot 1 PS305525 

Volume 9302 Folio 593 Lot 1 TP192787 

Volume 3459 Folio 739 Lot 19 LP5333 

Volume  7430  Folio  896  Allotment  29  Parish  of Lismore 

Volume 10217 Folio 695 Lot 3 PS326875 

Volume  10184  Folio  769  Allotment  4  Section  19 Parish of Borriyalloak 

Volume  6313  Folio  544  Allotment  5A  Section  7 Parish of Skipton 

Volume  742  Folio  377  Allotment  9C  Section  15A Parish of Skipton 

Volume  1944  Folio  740 Allotment 9A  Section 15A Parish of Skipton 

Volume  6588  Folio  408  Allotment  5  Section  12 Parish of Skipton 

Allotment 7A Section 7 Parish of Skipton 

Allotment 2010 Parish of Nanimia 

Volume  6313  Folio  544  Allotment  2A  Section  8 Parish of Skipton 

Volume 11632 Folio 324 Lot 19 TP863482 

Volume 11632 Folio 324 Lot 20 TP863482 

Volume 11632 Folio 324 Lot 21 TP863482 

Page 117: Environment Act 1987 - Planning - Planning · Management Plan incorporating mitigation measures and the provision of native vegetation offsets the final extent of native vegetation

Stockyard Hill Wind Farm Revised Permits  Panel Report  10 May 2017 

 

Page 104 

Volume 11622 Folio 934 Lot 13 TP863437 

Volume 9979 Folio 620 Lot 2 PS300705 

Volume 3480 Folio 837 Lot 2 LP5333 

Allotment 2005 Parish of Galla 

Allotment 2014 Parish of Skipton 

Unused  Government  Road  ‐  Between  parcels Allotment 2A Section 8 Parish of Skipton and Lot 10 TP863437 

Unused  Government  Road  –  Between  parcels Allotment 1A Section 12A Parish of Skipton Lot 10 TP863482 and parcel Lot 13 TP863437 

Unused Government  Road  –  Between  parcels  Lot 13 TP863437 and Lot 11 TP863482 

Hamilton Highway 

Bradshaws Road 

Mount Bute Road 

Rokewood‐Skipton Road 

Spring Hill Road 

Glenelg Highway 

 

THE PERMIT ALLOWS: 

   

Removal of  native  vegetation  and  create  and  alter access to roads within the Road Zone Category 1 

 

 

THE FOLLOWING CONDITIONS APPLY TO THIS PERMIT 

 

Development plans 

1. The development as shown on the endorsed plans must not be altered or modified  without the written consent of the Minister for Planning. 

Vegetation removal  

2. This permit allows for the removal of up to 1.422 hectares of remnant patch native vegetation and 4 scattered indigenous trees, unless varied with the written consent from the Minister for Planning. 

DELWP Environment portfolio conditions  

Notification of Permit Conditions 

Page 118: Environment Act 1987 - Planning - Planning · Management Plan incorporating mitigation measures and the provision of native vegetation offsets the final extent of native vegetation

Stockyard Hill Wind Farm Revised Permits  Panel Report  10 May 2017 

 

Page 105 

3. Before works start, the permit holder must advise all persons undertaking the vegetation removal or works on site of all relevant permit conditions and associated statutory requirements or approvals. 

Protection of Native Vegetation 

4. Before any permitted clearing of native vegetation starts, a report  to the satisfaction of the Minister for Planning must be submitted to and approved by the Minister for Planning detailing  the measures to be implemented to protect the native vegetation to be retained during construction works, and the person/s responsible for implementation and compliance. 

Protection of Remnant Vegetation and Trees 

5. Before works start, a native vegetation protection fence must be erected around all remnant patches and trees to be retained on site. This fence must be erected around the remnant patch at a minimum distance of 15 metres from retained native vegetation. The fence must be constructed to the satisfaction of the Minister for Planning. The fence must remain in place until all works are completed. 

Except with  the written  consent of  the Minister  for Planning within  the  area of native vegetation to be retained and any tree protection zone associated with the permitted use and/or development, the following is prohibited: 

a) vehicular or pedestrian access; b) trenching or soil excavation; c) storage or dumping of any soils, materials, equipment, vehicles, machinery 

or waste products; d) entry and exit pits for underground services; or e) any other actions or activities that may result in adverse impacts to 

retained native vegetation.  

Protection of Scattered Trees 

6. Before the works start, a fence must be erected around all scattered trees to be retained on site. This fence will protect the tree by demarcating the tree protection zone and must be erected at a radius of 12 x the diameter at a height of 1.3 metres to a maximum of 15 metres but no less than 2 metres from the base of the trunk of the tree. The fence must be constructed of star pickets, flagging or similar to the satisfaction of the Minister for Planning. The fence must remain in place until all works are completed to the satisfaction of the Minister for Planning.  

Offset requirement 

7. To offset the removal of native vegetation the permit holder must secure a native vegetation offset,  in accordance with the Permitted clearing of native vegetation ‐ Biodiversity assessment guidelines (DEPI 2013) and Native vegetation gain scoring manual (DEPI 2013) as specified below: 

7.1 General Offset 

Page 119: Environment Act 1987 - Planning - Planning · Management Plan incorporating mitigation measures and the provision of native vegetation offsets the final extent of native vegetation

Stockyard Hill Wind Farm Revised Permits  Panel Report  10 May 2017 

 

Page 106 

A general offset of 0.311 general biodiversity equivalence units with the following attributes: 

a) be located within the Corangamite / Glenelg Hopkins Catchment Management Authority boundary or Corangamite Shire Council municipal district  

b) have a strategic biodiversity score of at least 0.312.  

7.2 Offset evidence and timing 

Before any native vegetation is removed, evidence that the required offset for the project has been secured must be provided to the satisfaction of the Minister for Planning.  

7.3 The offset evidence can be: 

a) a security agreement signed by both parties, to the required standard, for the offset site or sites, including a 10 year offset management plan; and/or 

b) an allocated credit extract from the Native Vegetation Credit Register. 

A  copy  of  the  offset  evidence must  be  provided  and  will  be  endorsed  by  the Minister for Planning and form part of this permit. Within 30 days of endorsement of the offset evidence by the Minister for Planning, a copy of the endorsed offset evidence must be provided  to  the Department of Environment, Land, Water and Planning. At the conclusion of the project, offset requirements can be reconciled with agreement by the Minister for Planning and referral authority.  

7.4 Varying offsets 

The offset may be varied with the written consent of the Minister for Planning. 

The offsets may be varied with the written consent of the Minister for Planning, if the Minister for Planning is satisfied that:  

following detailed design the extent of native vegetation removal will be less than described in this condition; or 

upon the completion of development an audit of the final quantity of native vegetation removed identifies that it is less than the amount already secured. 

VicRoads Conditions 

8. All access crossovers to RDZ1 must be generally in accordance with the attached drawing Truck Access to Rural Properties Type B (VicRoads Standard Drawing SD 2065) to the satisfaction of VicRoads.  

9. The developer shall ensure that all relevant approvals have been sought prior to any works being undertaken in the road reserve. 

Expiry 

10. This permit will expire if one of the following circumstances applies: 

a) the development is not started within five years of the date of this permit 

Page 120: Environment Act 1987 - Planning - Planning · Management Plan incorporating mitigation measures and the provision of native vegetation offsets the final extent of native vegetation

Stockyard Hill Wind Farm Revised Permits  Panel Report  10 May 2017 

 

Page 107 

b) the development is not completed within ten years of the date of this permit.   

The Minister for Planning may extend the permit if a request is made in writing: 

c) prior to the expiry of the permit, or 

d) within six months after the permit expires. 

Page 121: Environment Act 1987 - Planning - Planning · Management Plan incorporating mitigation measures and the provision of native vegetation offsets the final extent of native vegetation

Stockyard Hill Wind Farm Revised Permits  Panel Report  10 May 2017 

 

Page 108 

Appendix D3:  Pyrenees: vegetation removal for power line  

Permit No.: PA1600101 

Planning Scheme: Pyrenees 

Responsible Authority: Minister of Planning 

ADDRESS OF THE LAND: 

Volume 8178 Folio 460 Lot 1 TP242371 

Volume 11111 Folio 284 Lot 1 TP571312 

Volume 11166 Folio 19 Lot 1 TP761464 

Volume 11166 Folio 20 Lot 2 TP761464 

Volume 8350 Folio 829 Allotment 5B Section A Parish of Nanimia 

Volume 5826 Folio 143 Lot 1 Section 1 Parish of Enuc 

Unused Government Road ‐ Between parcels Lot 1 TP571312 and Lot 3 TP406280 

Oddies Road 

Dunnets Road 

Skipton Road 

Mount Emu Settlement Road 

Nanimia Pit Road 

THE PERMIT ALLOWS: 

Removal  of  native  vegetation  and  create  and  alter  access  to  roads within  the  Road  Zone Category 1 

THE FOLLOWING CONDITIONS APPLY TO THIS PERMIT 

Development plans 

1. The development as shown on the endorsed plans must not be altered or modified  without the written consent of the Minister for Planning. 

Vegetation removal 

2. This permit allows for the removal of up to 0.523 hectares of remnant patch native vegetation and 37 scattered indigenous trees, unless varied with the written consent from the Minister for Planning. 

DELWP Environment portfolio conditions 

Notification of Permit Conditions 

3. Before works start, the permit holder must advise all persons undertaking the vegetation removal or works on site of all relevant permit conditions and associated statutory requirements or approvals. 

Page 122: Environment Act 1987 - Planning - Planning · Management Plan incorporating mitigation measures and the provision of native vegetation offsets the final extent of native vegetation

Stockyard Hill Wind Farm Revised Permits  Panel Report  10 May 2017 

 

Page 109 

Protection of Native Vegetation 

4. Before any permitted clearing of native vegetation starts, a report to the satisfaction of the Minister for Planning must be submitted to and approved by the Minister for Planning detailing the measures to be implemented to protect the native vegetation to be retained during construction works, and the person/s responsible for implementation and compliance. 

Protection of Remnant Vegetation and Trees 

5. Before the works start, a native vegetation protection fence must be erected around all remnant patches and trees to be retained on site.  This fence must be erected around the remnant patch at a minimum distance of 15 metres from retained native vegetation.  The fence must be constructed to the satisfaction of the Minister for Planning.  The fence must remain in place until all works are completed. 

Except with  the written  consent of  the Minister  for Planning within  the  area of native vegetation to be retained and any tree protection zone associated with the permitted use and/or development, the following is prohibited: 

f) vehicular or pedestrian access; g) trenching or soil excavation; h) storage or dumping of any soils, materials, equipment, vehicles, machinery or 

waste products; i) entry and exit pits for underground services; or j) any other actions or activities that may result in adverse impacts to retained 

native vegetation. 

Protection of Scattered Trees 

6. Before the works start, a fence must be erected around all scattered trees to be retained on site.  This fence will protect the tree by demarcating the tree protection zone and must be erected at a radius of 12 x the diameter at a height of 1.3 metres to a maximum of 15 metres but no less than 2 metres from the base of the trunk of the tree.  The fence must be constructed of star pickets, flagging or similar to the satisfaction of the Minister for Planning.  The fence must remain in place until all works are completed to the satisfaction of the Minister for Planning. 

Offset requirement 

7. To offset the removal of native vegetation the permit holder must secure a native vegetation offset, in accordance with the Permitted clearing of native vegetation ‐ Biodiversity assessment guidelines (DEPI 2013) and Native vegetation gain scoring manual (DEPI 2013) as specified below: 

7.3 General Offset 

A general offset of 0.105 general biodiversity equivalence units with the following attributes: 

Page 123: Environment Act 1987 - Planning - Planning · Management Plan incorporating mitigation measures and the provision of native vegetation offsets the final extent of native vegetation

Stockyard Hill Wind Farm Revised Permits  Panel Report  10 May 2017 

 

Page 110 

c) be located within the Glenelg Hopkins Catchment Management Authority boundary or Pyrenees Shire Council municipal district 

d) have a strategic biodiversity score of at least 0.205  

7.4 Specific Offset 

A  specific  offset  of  0.602  specific  biodiversity  equivalence  units  for  Button Wrinklewort, Rutidosis leptorhynchoides. 

7.5 Offset evidence and timing 

Before any native vegetation is removed, evidence that the required offset for the project has been secured must be provided to the satisfaction of the Minister for Planning.  The offset evidence can be: 

c) a security agreement signed by both parties, to the required standard, for the offset site or sites, including a 10 year offset management plan; and/or 

d) an allocated credit extract from the Native Vegetation Credit Register. 

A  copy of  the offset evidence must be provided  to  and will be endorsed by  the Minister for Planning and form part of this permit.  Within 30 days of endorsement of the offset evidence by the Minister for Planning, a copy of the endorsed offset evidence must be provided  to  the Department of Environment, Land, Water and Planning.  At the conclusion of the project, offset requirements can be reconciled with agreement by the Minister for Planning and referral authority. 

7.4 Varying offsets 

The offset may be varied with the written consent of the Minister for Planning. 

The offsets may be varied with the written consent of the Minister for Planning, if the Minister for Planning is satisfied that:  

following detailed design the extent of native vegetation removal will be less than described in this condition; or 

upon the completion of development an audit of the final quantity of native vegetation removed identifies that it is less than the amount already secured. 

VicRoads Conditions 

8. The access crossover to Skipton Road, adjacent to Lot 1, TP242371, shall be constructed generally in accordance with the attached drawing Truck Access to Rural Properties Type B (VicRoads Standard Drawing SD 2065). 

9. The access crossover to lot 1, TP571312 may be constructed to the applicant’s design. 

10. The developer shall ensure that all relevant approvals have been sought prior to any works being undertaken in the road reserve. 

Expiry 

11. This permit will expire if one of the following circumstances applies: 

Page 124: Environment Act 1987 - Planning - Planning · Management Plan incorporating mitigation measures and the provision of native vegetation offsets the final extent of native vegetation

Stockyard Hill Wind Farm Revised Permits  Panel Report  10 May 2017 

 

Page 111 

e) the development is not started within five years of the date of this permit 

f) the development is not completed within ten years of the date of this permit. 

The Minister for Planning may extend the permit if a request is made in writing: 

g) prior to the expiry of the permit, or 

h) within six months after the permit expires.