Enhancing SmartConservation™ :Green Infrastructure Plan
Development
Robert CheethamAvencia Incorporated
Clare BillettNatural Lands Trust
Funding provided by William Penn Foundation
![Page 2: Enhancing SmartConservation ™ : Green Infrastructure Plan Development Robert Cheetham](https://reader035.vdocuments.mx/reader035/viewer/2022070410/5681464e550346895db35f39/html5/thumbnails/2.jpg)
Overall Objectives
Develop a green infrastructure plan for SE PA made up of hubs and corridors.
Develop a methodology to use in the site-to-site assessment to score SmartConservation™ sites based on their proximity to these hubs and corridors
– but we’ll defer this until the hubs and corridors are established.
![Page 3: Enhancing SmartConservation ™ : Green Infrastructure Plan Development Robert Cheetham](https://reader035.vdocuments.mx/reader035/viewer/2022070410/5681464e550346895db35f39/html5/thumbnails/3.jpg)
Hubs
1. Existing Protected Lands(gov & NGO - not ag. lands)
1. Lands with top 20% of region-wide SmartConservation mapped natural resources
2. All CNAI-PNDI Locations
![Page 4: Enhancing SmartConservation ™ : Green Infrastructure Plan Development Robert Cheetham](https://reader035.vdocuments.mx/reader035/viewer/2022070410/5681464e550346895db35f39/html5/thumbnails/4.jpg)
Protected Lands
![Page 5: Enhancing SmartConservation ™ : Green Infrastructure Plan Development Robert Cheetham](https://reader035.vdocuments.mx/reader035/viewer/2022070410/5681464e550346895db35f39/html5/thumbnails/5.jpg)
Conservation Resource Lands
![Page 6: Enhancing SmartConservation ™ : Green Infrastructure Plan Development Robert Cheetham](https://reader035.vdocuments.mx/reader035/viewer/2022070410/5681464e550346895db35f39/html5/thumbnails/6.jpg)
PNDI Lands
![Page 7: Enhancing SmartConservation ™ : Green Infrastructure Plan Development Robert Cheetham](https://reader035.vdocuments.mx/reader035/viewer/2022070410/5681464e550346895db35f39/html5/thumbnails/7.jpg)
Merged Hubs
Protected Lands
PNDI
Cons. Resource Locations
Merged Hubs
merge
Before merge
After merge
![Page 8: Enhancing SmartConservation ™ : Green Infrastructure Plan Development Robert Cheetham](https://reader035.vdocuments.mx/reader035/viewer/2022070410/5681464e550346895db35f39/html5/thumbnails/8.jpg)
Corridors - The Real Question
How can we connect the hubs?
Where should the corridors be?
How far is any corridor location from a hub?
![Page 9: Enhancing SmartConservation ™ : Green Infrastructure Plan Development Robert Cheetham](https://reader035.vdocuments.mx/reader035/viewer/2022070410/5681464e550346895db35f39/html5/thumbnails/9.jpg)
Distance vs. ‘Cost Distance’
• Distance ‘as-the-crow-flies’ is really not the distance that we want.
• We want to account for ‘barriers’ in the landscape as well as factors that overcome barriers.
• We also want to account for ‘density’ of nearby protected lands.
• We can use the concept of ‘travel cost’ to model this.
![Page 10: Enhancing SmartConservation ™ : Green Infrastructure Plan Development Robert Cheetham](https://reader035.vdocuments.mx/reader035/viewer/2022070410/5681464e550346895db35f39/html5/thumbnails/10.jpg)
Linear Distance
• Like spinning a ruler around a center
![Page 11: Enhancing SmartConservation ™ : Green Infrastructure Plan Development Robert Cheetham](https://reader035.vdocuments.mx/reader035/viewer/2022070410/5681464e550346895db35f39/html5/thumbnails/11.jpg)
What is Cost Distance ?
Concept: It costs more to travel through certain ‘cells’
Input: HubsFriction/Permeability/Cost Surface
Output: Represents Accumulated Least Costfrom source location (hub)to destination location (another hub)
![Page 12: Enhancing SmartConservation ™ : Green Infrastructure Plan Development Robert Cheetham](https://reader035.vdocuments.mx/reader035/viewer/2022070410/5681464e550346895db35f39/html5/thumbnails/12.jpg)
What is Cost Distance?
Cost: Barriers to travel
(including factors that might ‘reduce’ barriers)
Higher cost values means greater barrier
Examples: Roads
Wind
Railways
Salinity Gradient
Water
![Page 13: Enhancing SmartConservation ™ : Green Infrastructure Plan Development Robert Cheetham](https://reader035.vdocuments.mx/reader035/viewer/2022070410/5681464e550346895db35f39/html5/thumbnails/13.jpg)
What is Cost Distance?
![Page 14: Enhancing SmartConservation ™ : Green Infrastructure Plan Development Robert Cheetham](https://reader035.vdocuments.mx/reader035/viewer/2022070410/5681464e550346895db35f39/html5/thumbnails/14.jpg)
Cost Distance to Sample Site from other protected lands
How is it used? – an Example
![Page 15: Enhancing SmartConservation ™ : Green Infrastructure Plan Development Robert Cheetham](https://reader035.vdocuments.mx/reader035/viewer/2022070410/5681464e550346895db35f39/html5/thumbnails/15.jpg)
Least Cost Path from Sample Site to Protected Lands
How is it used? – an Example
![Page 16: Enhancing SmartConservation ™ : Green Infrastructure Plan Development Robert Cheetham](https://reader035.vdocuments.mx/reader035/viewer/2022070410/5681464e550346895db35f39/html5/thumbnails/16.jpg)
Green Infrastructure Development Method - TASKS
1. General Permeability Layer Development
2. Corridor Identification Methodology
3. Aquatic Corridor Development
![Page 17: Enhancing SmartConservation ™ : Green Infrastructure Plan Development Robert Cheetham](https://reader035.vdocuments.mx/reader035/viewer/2022070410/5681464e550346895db35f39/html5/thumbnails/17.jpg)
Task 1 Objectives
Develop a map layer that represents the degree of permeability for terrestrial movement of animals which migrate through the landscape
…but also encapsulates the size, shape and degree of protection for each hub
![Page 18: Enhancing SmartConservation ™ : Green Infrastructure Plan Development Robert Cheetham](https://reader035.vdocuments.mx/reader035/viewer/2022070410/5681464e550346895db35f39/html5/thumbnails/18.jpg)
Barriers
1. Roads Class2. Active Railways3. Higher Order Streams4. Water bodies
Barriers are 50% of Travel Cost
![Page 19: Enhancing SmartConservation ™ : Green Infrastructure Plan Development Robert Cheetham](https://reader035.vdocuments.mx/reader035/viewer/2022070410/5681464e550346895db35f39/html5/thumbnails/19.jpg)
Streets
![Page 20: Enhancing SmartConservation ™ : Green Infrastructure Plan Development Robert Cheetham](https://reader035.vdocuments.mx/reader035/viewer/2022070410/5681464e550346895db35f39/html5/thumbnails/20.jpg)
Active Railways
![Page 21: Enhancing SmartConservation ™ : Green Infrastructure Plan Development Robert Cheetham](https://reader035.vdocuments.mx/reader035/viewer/2022070410/5681464e550346895db35f39/html5/thumbnails/21.jpg)
Ordered Streams
![Page 22: Enhancing SmartConservation ™ : Green Infrastructure Plan Development Robert Cheetham](https://reader035.vdocuments.mx/reader035/viewer/2022070410/5681464e550346895db35f39/html5/thumbnails/22.jpg)
Water bodies
![Page 23: Enhancing SmartConservation ™ : Green Infrastructure Plan Development Robert Cheetham](https://reader035.vdocuments.mx/reader035/viewer/2022070410/5681464e550346895db35f39/html5/thumbnails/23.jpg)
Relative Travel CostRelative Travel Cost
0
20
40
60
80
100
120
Barrier
Co
st
![Page 24: Enhancing SmartConservation ™ : Green Infrastructure Plan Development Robert Cheetham](https://reader035.vdocuments.mx/reader035/viewer/2022070410/5681464e550346895db35f39/html5/thumbnails/24.jpg)
Combine Barriers
![Page 25: Enhancing SmartConservation ™ : Green Infrastructure Plan Development Robert Cheetham](https://reader035.vdocuments.mx/reader035/viewer/2022070410/5681464e550346895db35f39/html5/thumbnails/25.jpg)
Density
1. Roads2. Active Railways3. Higher Order Streams
Density is 50% of Travel Cost
![Page 26: Enhancing SmartConservation ™ : Green Infrastructure Plan Development Robert Cheetham](https://reader035.vdocuments.mx/reader035/viewer/2022070410/5681464e550346895db35f39/html5/thumbnails/26.jpg)
Density – 500m
• Density calculation done with a radius of 500 m.
![Page 27: Enhancing SmartConservation ™ : Green Infrastructure Plan Development Robert Cheetham](https://reader035.vdocuments.mx/reader035/viewer/2022070410/5681464e550346895db35f39/html5/thumbnails/27.jpg)
Density – 1000m
• Density calculation done with a radius of 1000 m.
![Page 28: Enhancing SmartConservation ™ : Green Infrastructure Plan Development Robert Cheetham](https://reader035.vdocuments.mx/reader035/viewer/2022070410/5681464e550346895db35f39/html5/thumbnails/28.jpg)
Density – 1000m w/ CLASS NLT selected this one to use
• Density calculation done with a radius of 1000 m and using CLASS as calculation factor.
![Page 29: Enhancing SmartConservation ™ : Green Infrastructure Plan Development Robert Cheetham](https://reader035.vdocuments.mx/reader035/viewer/2022070410/5681464e550346895db35f39/html5/thumbnails/29.jpg)
Density – 2000m
• Density calculation done with a radius of 2000 m.
![Page 30: Enhancing SmartConservation ™ : Green Infrastructure Plan Development Robert Cheetham](https://reader035.vdocuments.mx/reader035/viewer/2022070410/5681464e550346895db35f39/html5/thumbnails/30.jpg)
Building the Corridors
Basic Principles:
• Corridors connect Hubs
• Corridors occupy the Least Cost Path between two hubs
• Corridor networks are calculated at different scales (regional/ subregional /local)
• When multiple corridors are available, the one that combines the best average conservation value, plus destination hub value, will prevail.
![Page 31: Enhancing SmartConservation ™ : Green Infrastructure Plan Development Robert Cheetham](https://reader035.vdocuments.mx/reader035/viewer/2022070410/5681464e550346895db35f39/html5/thumbnails/31.jpg)
Preliminary Impedance
![Page 32: Enhancing SmartConservation ™ : Green Infrastructure Plan Development Robert Cheetham](https://reader035.vdocuments.mx/reader035/viewer/2022070410/5681464e550346895db35f39/html5/thumbnails/32.jpg)
Hub Proximity Values• Merged
protected land sites with overlapping donut buffers of 1km and 2 km and values of 50% and 10 % respectively.
Overlap region with cumulativeproximity values
![Page 33: Enhancing SmartConservation ™ : Green Infrastructure Plan Development Robert Cheetham](https://reader035.vdocuments.mx/reader035/viewer/2022070410/5681464e550346895db35f39/html5/thumbnails/33.jpg)
Conservation Resource Value
![Page 34: Enhancing SmartConservation ™ : Green Infrastructure Plan Development Robert Cheetham](https://reader035.vdocuments.mx/reader035/viewer/2022070410/5681464e550346895db35f39/html5/thumbnails/34.jpg)
Modified Impermeability
+Modified Impedance -= ( )Barriers Conservati
on ValueHub Proximity
![Page 35: Enhancing SmartConservation ™ : Green Infrastructure Plan Development Robert Cheetham](https://reader035.vdocuments.mx/reader035/viewer/2022070410/5681464e550346895db35f39/html5/thumbnails/35.jpg)
Modifying Impermeability Again• Adjust Cost Layer
by using Maximum Cost in 150m radius around each cell
• Create ‘Snowplow’ effect to encourage paths through areas with best average conservation value and least average
barrier costs -- across the entire corridor width of 300m (or 1100ft)
Least Cost Path w/o modification
2000 ft
300 ft
60 ft
Least Cost Path w/ modification
![Page 36: Enhancing SmartConservation ™ : Green Infrastructure Plan Development Robert Cheetham](https://reader035.vdocuments.mx/reader035/viewer/2022070410/5681464e550346895db35f39/html5/thumbnails/36.jpg)
Neighborhood Maximum
5 86
3 50
1 51
8
In Out
![Page 37: Enhancing SmartConservation ™ : Green Infrastructure Plan Development Robert Cheetham](https://reader035.vdocuments.mx/reader035/viewer/2022070410/5681464e550346895db35f39/html5/thumbnails/37.jpg)
Neighborhood Maximum
1 4 3 11
3 3 2 13
1 2 1 11
1 1 2 11
0 1 1 10
3 4 4 34
3 4 4 34
3 3 3 23
1 2 2 22
1 2 2 21
![Page 38: Enhancing SmartConservation ™ : Green Infrastructure Plan Development Robert Cheetham](https://reader035.vdocuments.mx/reader035/viewer/2022070410/5681464e550346895db35f39/html5/thumbnails/38.jpg)
Modifying Impermeability Again• Adjust Cost Layer
by using Maximum Cost in 150m radius around each cell
• Create ‘Snowplow’ effect to encourage paths through areas with best average conservation value and least average
barrier costs -- across the entire corridor width of 300m (or 1100ft)
Least Cost Path w/o modification
2000 ft
300 ft
60 ft
Least Cost Path w/ modification
![Page 39: Enhancing SmartConservation ™ : Green Infrastructure Plan Development Robert Cheetham](https://reader035.vdocuments.mx/reader035/viewer/2022070410/5681464e550346895db35f39/html5/thumbnails/39.jpg)
Preliminary Impedance
![Page 40: Enhancing SmartConservation ™ : Green Infrastructure Plan Development Robert Cheetham](https://reader035.vdocuments.mx/reader035/viewer/2022070410/5681464e550346895db35f39/html5/thumbnails/40.jpg)
Modified Impedance• Conservation
Resource Value, Protected Land ‘Zone of Influence’ values have been subtracted.
![Page 41: Enhancing SmartConservation ™ : Green Infrastructure Plan Development Robert Cheetham](https://reader035.vdocuments.mx/reader035/viewer/2022070410/5681464e550346895db35f39/html5/thumbnails/41.jpg)
Building the Green Infrastructure Network
Basic Principles:• Adjacent and overlapping hubs should be treated as a single hub
• ‘Travel Cost’ between hubs is a function of both the barrier types and the density of the barriers.
• Barriers have different relative impact values depending on their impermeability (e.g. relative amount of traffic or similar measure such as width, etc.)
• Density and Barrier type impact value each comprise 50% of the total corridor cost.
• Density is calculated at using a 1000m search radius
• Corridor Cost is reduced by 2 factors:– Conservation Resource Value– Proximity to Hubs
• Corridor Cost is based on the average cost and values for the entire 300m corridor width, (not just one cell width and then buffered as with other least cost path green infrastructure processes (e.g. TCF, MNRD, etc)).
![Page 42: Enhancing SmartConservation ™ : Green Infrastructure Plan Development Robert Cheetham](https://reader035.vdocuments.mx/reader035/viewer/2022070410/5681464e550346895db35f39/html5/thumbnails/42.jpg)
Discussion Points - This Afternoon
P1: Road Class Barrier Cost (value)
P2: Railway Barrier Cost (value)
P3: Ordered Stream Barrier Cost (value)
P4: Water Body Barrier Cost (value)
![Page 43: Enhancing SmartConservation ™ : Green Infrastructure Plan Development Robert Cheetham](https://reader035.vdocuments.mx/reader035/viewer/2022070410/5681464e550346895db35f39/html5/thumbnails/43.jpg)
Green Infrastructure Development Method - Next Steps
1. General Permeability Layer Development
2. Corridor Identification Methodology
3. Aquatic Corridor Development
![Page 44: Enhancing SmartConservation ™ : Green Infrastructure Plan Development Robert Cheetham](https://reader035.vdocuments.mx/reader035/viewer/2022070410/5681464e550346895db35f39/html5/thumbnails/44.jpg)
Task 2 Objective
Establish corridors between connecting hubs based on hub size
classes
![Page 45: Enhancing SmartConservation ™ : Green Infrastructure Plan Development Robert Cheetham](https://reader035.vdocuments.mx/reader035/viewer/2022070410/5681464e550346895db35f39/html5/thumbnails/45.jpg)
Hubs
![Page 46: Enhancing SmartConservation ™ : Green Infrastructure Plan Development Robert Cheetham](https://reader035.vdocuments.mx/reader035/viewer/2022070410/5681464e550346895db35f39/html5/thumbnails/46.jpg)
Conceptual Corridor Network
![Page 47: Enhancing SmartConservation ™ : Green Infrastructure Plan Development Robert Cheetham](https://reader035.vdocuments.mx/reader035/viewer/2022070410/5681464e550346895db35f39/html5/thumbnails/47.jpg)
Create a Network of Corridors using the following parameters:
1. For each Hub > 1000 acres, select all other hubs within 30 miles
2. Draw ‘least cost path’ to each3. Create a Cost Corridor4. A = Corridor Conservation Value5. B = Hub Conservation Value6. C = Length, Cost Length7. Corridor Value = Average (A + B)8. Select Top 39. Repeat
Connect Large Hubs
![Page 48: Enhancing SmartConservation ™ : Green Infrastructure Plan Development Robert Cheetham](https://reader035.vdocuments.mx/reader035/viewer/2022070410/5681464e550346895db35f39/html5/thumbnails/48.jpg)
Create a Network of Corridors using the following parameters:
1. For each Hub > 500 acres, select all other hubs within 15 miles
2. Draw ‘least cost path’ to each3. Create a Cost Corridor4. A = Corridor Conservation Value. 5. B = Hub Conservation Value6. Corridor Value = Average(A + B)7. Select Top 58. Repeat
Connect Medium Hubs
![Page 49: Enhancing SmartConservation ™ : Green Infrastructure Plan Development Robert Cheetham](https://reader035.vdocuments.mx/reader035/viewer/2022070410/5681464e550346895db35f39/html5/thumbnails/49.jpg)
Create a Network of Corridors using the following parameters:
1. For each Hub > 100 acres, select all other hubs within 3 miles
2. Draw ‘least cost path’ to each3. Create a Cost Corridor4. A = Corridor Conservation Value. 5. B = Hub Conservation Value6. Corridor Value = Average (A + B)7. Select Top 58. Repeat
Connect Small Hubs
![Page 50: Enhancing SmartConservation ™ : Green Infrastructure Plan Development Robert Cheetham](https://reader035.vdocuments.mx/reader035/viewer/2022070410/5681464e550346895db35f39/html5/thumbnails/50.jpg)
Least Cost Path - ExampleLeast cost path -- between source & destination hubs
![Page 51: Enhancing SmartConservation ™ : Green Infrastructure Plan Development Robert Cheetham](https://reader035.vdocuments.mx/reader035/viewer/2022070410/5681464e550346895db35f39/html5/thumbnails/51.jpg)
Least Cost Path - ExampleLeast cost path -- between source & destination hubs
![Page 52: Enhancing SmartConservation ™ : Green Infrastructure Plan Development Robert Cheetham](https://reader035.vdocuments.mx/reader035/viewer/2022070410/5681464e550346895db35f39/html5/thumbnails/52.jpg)
Cost Weighted Corridor - Example
• Corridor calculation using the cost weighted method with minimum extent radius of 10 cost units
Cost Corridor between source & destination hubs
![Page 53: Enhancing SmartConservation ™ : Green Infrastructure Plan Development Robert Cheetham](https://reader035.vdocuments.mx/reader035/viewer/2022070410/5681464e550346895db35f39/html5/thumbnails/53.jpg)
Cost Weighted Corridor - Example
• Corridor calculation using the cost weighted method with minimum extent radius of 10 cost units
Cost Corridor between source & destination hubs
![Page 54: Enhancing SmartConservation ™ : Green Infrastructure Plan Development Robert Cheetham](https://reader035.vdocuments.mx/reader035/viewer/2022070410/5681464e550346895db35f39/html5/thumbnails/54.jpg)
Discussion Points - This Afternoon
CI 1: Network scales
Network Scale
Hub Size Search Radius # of Corridors per hub
Large >1000 acres
30 miles 3
Medium >500 acres
10 miles 3
Small >250 acres
5 miles 3
![Page 55: Enhancing SmartConservation ™ : Green Infrastructure Plan Development Robert Cheetham](https://reader035.vdocuments.mx/reader035/viewer/2022070410/5681464e550346895db35f39/html5/thumbnails/55.jpg)
Green Infrastructure Development Method - Next Steps
1. General Permeability Layer Development
2. Corridor Identification Methodology
3. Aquatic Corridor Development
![Page 56: Enhancing SmartConservation ™ : Green Infrastructure Plan Development Robert Cheetham](https://reader035.vdocuments.mx/reader035/viewer/2022070410/5681464e550346895db35f39/html5/thumbnails/56.jpg)
Task 3 Objectives
Create
special aquatic corridors
that connect hubs using riparian corridors
![Page 57: Enhancing SmartConservation ™ : Green Infrastructure Plan Development Robert Cheetham](https://reader035.vdocuments.mx/reader035/viewer/2022070410/5681464e550346895db35f39/html5/thumbnails/57.jpg)
Aquatic Corridors are built from…
1. Ordered Streams2. Water bodies3. Floodplains4. Wetlands5. Hydric Soils
![Page 58: Enhancing SmartConservation ™ : Green Infrastructure Plan Development Robert Cheetham](https://reader035.vdocuments.mx/reader035/viewer/2022070410/5681464e550346895db35f39/html5/thumbnails/58.jpg)
Stream Order 1-2
![Page 59: Enhancing SmartConservation ™ : Green Infrastructure Plan Development Robert Cheetham](https://reader035.vdocuments.mx/reader035/viewer/2022070410/5681464e550346895db35f39/html5/thumbnails/59.jpg)
Stream Order 3-5
![Page 60: Enhancing SmartConservation ™ : Green Infrastructure Plan Development Robert Cheetham](https://reader035.vdocuments.mx/reader035/viewer/2022070410/5681464e550346895db35f39/html5/thumbnails/60.jpg)
Stream Order 6-12
![Page 61: Enhancing SmartConservation ™ : Green Infrastructure Plan Development Robert Cheetham](https://reader035.vdocuments.mx/reader035/viewer/2022070410/5681464e550346895db35f39/html5/thumbnails/61.jpg)
Flood Plains
![Page 62: Enhancing SmartConservation ™ : Green Infrastructure Plan Development Robert Cheetham](https://reader035.vdocuments.mx/reader035/viewer/2022070410/5681464e550346895db35f39/html5/thumbnails/62.jpg)
Wetlands
![Page 63: Enhancing SmartConservation ™ : Green Infrastructure Plan Development Robert Cheetham](https://reader035.vdocuments.mx/reader035/viewer/2022070410/5681464e550346895db35f39/html5/thumbnails/63.jpg)
Hydric Soils
![Page 64: Enhancing SmartConservation ™ : Green Infrastructure Plan Development Robert Cheetham](https://reader035.vdocuments.mx/reader035/viewer/2022070410/5681464e550346895db35f39/html5/thumbnails/64.jpg)
Water Bodies
![Page 65: Enhancing SmartConservation ™ : Green Infrastructure Plan Development Robert Cheetham](https://reader035.vdocuments.mx/reader035/viewer/2022070410/5681464e550346895db35f39/html5/thumbnails/65.jpg)
Sample Corridor
![Page 66: Enhancing SmartConservation ™ : Green Infrastructure Plan Development Robert Cheetham](https://reader035.vdocuments.mx/reader035/viewer/2022070410/5681464e550346895db35f39/html5/thumbnails/66.jpg)
Sample Corridor
![Page 67: Enhancing SmartConservation ™ : Green Infrastructure Plan Development Robert Cheetham](https://reader035.vdocuments.mx/reader035/viewer/2022070410/5681464e550346895db35f39/html5/thumbnails/67.jpg)
Choosing Aquatic Corridors
The best Aquatic Corridors have:
• Fewest Barriers
• Highest Aquatic Value
![Page 68: Enhancing SmartConservation ™ : Green Infrastructure Plan Development Robert Cheetham](https://reader035.vdocuments.mx/reader035/viewer/2022070410/5681464e550346895db35f39/html5/thumbnails/68.jpg)
Aquatic Barriers are ...
1. Dams (>5ft): 5 points
2. Bridges/CulvertsStream Order 1-2: 3 pointsStream Order 3-5: 2 pointsStream Order 6+: 1 points
![Page 69: Enhancing SmartConservation ™ : Green Infrastructure Plan Development Robert Cheetham](https://reader035.vdocuments.mx/reader035/viewer/2022070410/5681464e550346895db35f39/html5/thumbnails/69.jpg)
Bridges/Culverts 1-2• Bridges 1-2 were
defined by extracting intersection points of roads and streams of order 1-2
![Page 70: Enhancing SmartConservation ™ : Green Infrastructure Plan Development Robert Cheetham](https://reader035.vdocuments.mx/reader035/viewer/2022070410/5681464e550346895db35f39/html5/thumbnails/70.jpg)
Bridges/Culverts 3-5• Bridges 3-5 were
defined by extracting intersection points of roads and streams of order 3-5
![Page 71: Enhancing SmartConservation ™ : Green Infrastructure Plan Development Robert Cheetham](https://reader035.vdocuments.mx/reader035/viewer/2022070410/5681464e550346895db35f39/html5/thumbnails/71.jpg)
Bridges/Culverts 6-12• Bridges 6-12
were defined by extracting intersection points of roads and streams of order 6-12
![Page 72: Enhancing SmartConservation ™ : Green Infrastructure Plan Development Robert Cheetham](https://reader035.vdocuments.mx/reader035/viewer/2022070410/5681464e550346895db35f39/html5/thumbnails/72.jpg)
Dams
![Page 73: Enhancing SmartConservation ™ : Green Infrastructure Plan Development Robert Cheetham](https://reader035.vdocuments.mx/reader035/viewer/2022070410/5681464e550346895db35f39/html5/thumbnails/73.jpg)
Aquatic Conservation Value
![Page 74: Enhancing SmartConservation ™ : Green Infrastructure Plan Development Robert Cheetham](https://reader035.vdocuments.mx/reader035/viewer/2022070410/5681464e550346895db35f39/html5/thumbnails/74.jpg)
Hub Proximity Values• Merged
protected land sites with overlapping donut buffers of 1km and 2 km and values of 50% and 10 % respectively.
Overlap region with cumulativeproximity values
![Page 75: Enhancing SmartConservation ™ : Green Infrastructure Plan Development Robert Cheetham](https://reader035.vdocuments.mx/reader035/viewer/2022070410/5681464e550346895db35f39/html5/thumbnails/75.jpg)
Basic Principles:
Aquatic Corridors are Special and the best ones should be highlighted
The Travel Cost approach is not appropriate for aquatic corridors due to the limited number of possible routes
Aquatic corridors are made up from combinations of:- Ordered Streams- Water bodies- Floodplains- Wetlands- Hydric Soils
Aquatic corridor “barriers” are Dams and Bridges/Culverts
The best aquatic corridors are:- Less impeded by dams and other barriers- Have higher aquatic conservation value- Lead to hubs of high conservation value
Highlighting Special Aquatic Corridors
![Page 76: Enhancing SmartConservation ™ : Green Infrastructure Plan Development Robert Cheetham](https://reader035.vdocuments.mx/reader035/viewer/2022070410/5681464e550346895db35f39/html5/thumbnails/76.jpg)
Discussion Points - This Afternoon
AQ1: Aquatic Corridor Value Formula
Input Layers Value Factor Maximum
Conservation Value Layers
Aquatic Conservation Value 0 - 10 2 20
Hub Proximity 0 – 10 2 20
Barrier Layers
Dams 5 # of dams
20
Bridges/Culverts 1-3 # of bridges/culverts