eng ramy nabil 2016

9
Ramy Nabil Philip . Senior Construction Engineer Phone no .: +974/ 3065 -4760 …. / Email: [email protected] Profile Date Place of Birth : April 4, 1987 (Cairo) Nationality : Egyptian Gander : Male Age : 28 Marital Status : Married Military Status : Exempted Education 1992 - 2004 School: Modern Language School Egyptian High School Diploma ( 94.5 % ) 2004 - 2009 University: Faculty of Engineering Helwan University B.S. Civil Engineering Graduation 2009 Accumulative Grade ( Very Good 84 % ) Graduation Project ( Concrete Project ) Experience EGYPT ENCO 2009 - 2011 Engineering Consultant Office Project: Up Town Cairo (Golf Club House) Client : EMAAR MISR Budget: 45,000,000 EGP Working Duration: From October2009…. December 2009 From May 2010….. October 2011 Rule : Quality Control & Site Engineer For Concrete / Finishing Works During Project Stages. Project: Golden Pyramids City Stars (A8 Office Tower)

Upload: ramy-nabil

Post on 17-Feb-2017

55 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Eng Ramy Nabil 2016

Ramy Nabil Philip . Senior Construction Engineer

Phone no .: +974/ 3065 -4760 …. / Email: [email protected]

Profile Date Place of Birth : April 4, 1987 (Cairo)

Nationality : EgyptianGander : MaleAge : 28Marital Status : MarriedMilitary Status : Exempted

Education1992 - 2004

School: Modern Language School Egyptian High School Diploma ( 94.5 % )

2004 - 2009

University: Faculty of Engineering Helwan University B.S. Civil Engineering

Graduation 2009Accumulative Grade ( Very Good 84 % )Graduation Project ( Concrete Project )

Experience

EGYPT ENCO2009 - 2011

Engineering Consultant Office

Project: Up Town Cairo (Golf Club House)Client : EMAAR MISRBudget: 45,000,000 EGPWorking Duration: From October2009…. December 2009 From May 2010….. October 2011Rule : Quality Control & Site Engineer For Concrete / Finishing Works During Project Stages.

Project: Golden Pyramids City Stars (A8 Office Tower)Client: GPP (Golden Pyramids Plaza)Budget: 28,000,000 EGPWorking Duration: from December 2009….. May 2010Rule: Quality Control & Site Engineer for Remodeling Stages in Concrete / Finishing Works For Project.

Page 2: Eng Ramy Nabil 2016

IEC2009 - 2011

Industrial & Economical Consultant

Project: Shop Drawing / QS Engineer ( RadioTherapy Centers )Client : Egyptian MilitaryWorking Duration: From October 2011…. December 2011Rule : Reviewing Main Design Drawings for Applying Shop Drawing Details Making Structural and Concrete shop drawings Plumbing & Drainage Shop Drawings Reviewing MEP Drawings ( HVAC , Fire Alarm , Electrical , Fire Fighting , etc ) Invoices for Subcontractors Monitoring Bill of Quantities’ BOQ Following LPO ( Purchase Orders ) For Required Materials on Sites Working on Shop Drawing Submittals For Consultant / Client Approvals Working on MOS (Method of Statements ) Meeting Attendance Discussing Projects Time Schedule / Progress Charts Negotiation Skills with Client / Consultant on Project Items Details

Project: IMC ( International Medical Radio Therapy Center )Client : Egyptian MilitaryBudget : 32,000,000 EGP – True Beam Device : 2,500,000 USD Working Duration: from July 2013….. October 2014Rule : Senior Site Engineer

Reviewing Main Concrete / Structural Drawings Execution For Excavation Works / Preparing Foundation Levels Starting Foundation Concrete / Steel Works Finishing Construction Phase ( Columns , Slabs , Beams , etc ) Making Coordination Between MEP Works with Finishing Details Monitioring Subcontractors Scope of Works / Time For Works Execution Preparing Subcontractors Invoices / Contracts / DownPayments Estimating Items Costs / Budgets Inadvance Look for Materials Delivery avoiding any Works Dealy Material Submittals / Shop Drawing Submittals for Consultant Approval Dealing With Consultant For Inspections Approval Inspecting Subcontractors Works According to Standard Engineering Specifications ( Plaster , Masonary , Elect , Hvac , FF ,FA , Marble , Wooden Claddings , Paintings , Aluminium , Façade Claddings , Plumbings , Drainage , Wooden Cileling , False Ceiling , Furniture Installation , Device Installation/ Delivery , etc )

. Project: RadioTherapy Modular Center ( Hurghada – Arish – Suez)Client : Egyptian MilitaryBudget : 27,000,000 EGP / each – Modular Bt.Scan/ Linear Device : 2,300,000 USD Working Duration: from December 2011….. July 2013Rule : Construction Manager

Reviewing Main Concrete / Structural Drawings Planning For Excavation Works / Preparing Foundation Levels Starting Foundation Concrete / Reinforced Steel Works Monitioring Finalizing Construction Phase ( Columns , Slabs , Beams , etc ) Applying Coordination Meeting Between MEP Works with Finishing Details Monitioring Subcontractors Scope of Works / Time For Works Execution Reviewing Subcontractors Invoices / Contracts / DownPayments Estimating Project Cost / Controlling Master Project Time Schedule Inadvance Look / Following Materials Delivery avoiding any Works Dealy Preparing Material Submittals / Shop Drawing Submittals for Consultant Approval Pushing Subcontractors Works / Time Schedule Works Preparing / Dealing with Material Suppliers Handling SubContractors Agreement / Prices Negotiations

Page 3: Eng Ramy Nabil 2016

Inspecting Subcontractors Works According to Standard Engineering

Specifications…..( Plaster , Masonary , Elect , Hvac , FF ,FA , Marble , Wooden Claddings , Paintings , Aluminium , Façade Claddings , Plumbings , Drainage , Wooden Cileling , False Ceiling , Furniture Installation , Device Installation/ Delivery , etc )

Project: Cairo Festival City ( Barclays Bank ) New CairoClient : Al Futtaim GroupBudget : 18,000,000 EGP Working Duration: from July 2013….. December 2014Rule : Construction Manager

Reviewing Main Concrete / Structural Drawings For Existing Place Planning For Finishing Works Procedures Starting Masonary / Plaster Works Monitioring Finalizing Internal Finishing Works Applying Coordination Meeting Between MEP Works with Finishing Details Monitioring Subcontractors Scope of Works / Time For Works Execution Reviewing Subcontractors Invoices / Contracts / DownPayments Estimating Project Cost / Controlling Master Project Time Schedule Inadvance Look / Following Materials Delivery avoiding any Works Dealy Preparing Material Submittals / Shop Drawing Submittals for Consultant Approval Pushing Subcontractors Works / Time Schedule Works Preparing / Dealing with Material Suppliers Handling SubContractors Agreement / Prices Negotiations Inspecting Subcontractors Works According to Standard Engineering Specification ( Plaster , Gyp Partitions , Gyp Claddings , False Ceiling Wooden Doors , Bank Safe Installation , Wooden Counters Shutter Doors , Glass Partitions , Teller Glass Glass Film Installation , Data Room Racks , UPS Device Paintings , CCTV Camera , Intrusion Sys , Data Points Etc )

QATAR

Bluu Gulf Redco ElMana Construction Company2015 – Now Bluu Gulf Qatar ( Interior Designs / Fitout Works )

Project: MEC ( Ministry of Economy & Commerce New Building ) Lusail City , Doha Qatar Ministry Main OfficeClient : Ministry Of Economy & CommerceBudget: 60,000,000 QRWorking Duration: From December 2014…. November 2015 Rule : Senior Site Engineer

Reviewing Main Internal Design DWG Execution For Gyp Wall Office Partitions / Ceiling Works Starting Gyp Partitions / Mep Works Finishing Establishing MEP Sys / False Cieling Making Coordination Between MEP Works with Finishing Details Monitioring Subcontractors Scope of Works / Time For Works Execution Preparing Subcontractors Invoices / Contracts / DownPayments Estimating Items Costs / Budgets Inadvance Look for Materials Delivery avoiding any Works Dealy Material Submittals / Shop Drawing Submittals for Consultant Approval

Page 4: Eng Ramy Nabil 2016

Dealing With Consultant For Inspections Approval Inspecting Subcontractors Works According to Standard Engineering Specifications ( Plaster , Masonary , Elect , Hvac , FF ,FA , Marble , Wooden

Claddings , Paintings , Aluminium , Façade Claddings , Plumbings , Drainage , Wooden Cileling , False Ceiling , Furniture Installation , , etc )

Project : Al Jaish Stadium ( Qatar University ) , Doha , QatarClient: Al Jaish Footbal ClubBudget: 42,000,000 QRWorking Duration: from November 2015….. NowRule: Construction Manager

Phase 1 Reviewing Main Internal Design DWG

Execution For Gyp Wall Office Partitions / Ceiling Works Starting Gyp Partitions / Mep Works Finishing Establishing MEP Sys / False Cieling Making Coordination Between MEP Works with Finishing Details Monitioring Subcontractors Scope of Works / Time For Works Execution Preparing Subcontractors Invoices / Contracts / DownPayments Estimating Items Costs / Budgets Inadvance Look for Materials Delivery avoiding any Works Dealy Material Submittals / Shop Drawing Submittals for Consultant Approval Dealing With Consultant For Inspections Approval Inspecting Subcontractors Works According to Standard Engineering Specifications ( Plaster , Masonary , Elect , Hvac , FF ,FA , Marble , Wooden

Claddings , Paintings , Aluminium , Façade Claddings , Plumbings , Drainage , Wooden Cileling , False Ceiling , Furniture Installation , , etc ) Applying Quality Control Plan & Ensuring High Quality Works

Phase 2 Reviewing Stadiums Structural Design / Concrete Works Planning For Excavation / Back filling Works for Foundation Levels Execution for Foundation Levels / Concrete Piles Exceution for Drainage / Irrigation Sys For Stadiums Arena Reviewing Landscape / Soft Scape levels Working on Shop Drawing Detais For Diff Formation Levels

Finishing Establishing MEP Sys / False Cieling Making Coordination Between MEP Works with Finishing Details Monitioring Subcontractors Scope of Works / Time For Works Execution Preparing Subcontractors Invoices / Contracts / DownPayments Estimating Items Costs / Budgets Inadvance Look for Materials Delivery avoiding any Works Dealy Material Submittals / Shop Drawing Submittals for Consultant Approval Dealing With Consultant For Inspections Approval Inspecting Subcontractors Works According to Standard Engineering Specifications ( Plaster , Masonary , Elect , Hvac , FF ,FA , Marble , Wooden

Claddings , Paintings , Aluminium , Façade Claddings , Plumbings , Drainage , Wooden Cileling , False Ceiling , Furniture Installation , , etc ) Applying Quality Control Plan & Ensuring High Quality Works

Page 5: Eng Ramy Nabil 2016

Training

OCI Orascom For Construction Industries2007

Project: MobiNil Building – Smart Village Cairo Client : MobiNilBudget: 58,000,000 EGPTraining Duration: From July 2007…. Sep 2007 Rule : Training Engineer

Participation in MobiNil Building Construction during Foundation stage and Ground Floor Ceiling

EGYCO EGYCO Construction Company2008

Project: Residential Compounds – Obour City Cairo Client : Obour CityBudget: 14,000,000 EGPTraining Duration: From July 2008…. Sep 2008 Rule : Training Engineer

Participation in Residential Building Construction during Foundation stage and Ground Floor Slab

Courses

YAT YAT Educational Center2007

Course: Civil Engineering Diploma

AutoCAD 2D Sap Primavera P3 MS Office MS Excel Revit

SkillsCivil Engineering backgroundDeep understanding of the Reinforced Concrete bases, walls , slabs , columns ,Foundations and Beams.Deep understanding of the Reinforced Concrete bases in the Coverage of Halls as (Theaters, Stadiums,….etc ) and Tanks. Structural Analysis Concepts.Architectural Engineering Background / Interior Designs ConceptShop Drawing ExperienceCoordinator Between Project Items Along Project DurationGreat Experience & Accuracy In Finishing Details

Page 6: Eng Ramy Nabil 2016

Negotiation SkillsWorking Efficiency Under Pressure For Handing Over Time Schedule

SkillsArabic : Mother tongueEnglish : Very Good.French : Fair.

I am looking forward to become a member in a leading company, where mytechnical skills will be enhanced and developed as being ready to work toEnhance myself and my Capabilities

References & supporting documents: Available on request.

Diploma 1Diploma 2Diploma 3

Advanced

Advanced

Medium