emms complete

Upload: supertramp249

Post on 08-Apr-2018

241 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/6/2019 eMMS Complete

    1/32

    DEPARTMENT OF RURAL DEVELOPMENT,

    GOVERNMENT OF ANDHRA PRADESH, HYDERABAD

    SELECTION OF TECHNOLOGY SERVICE PROVIDERS FOR THE

    DESIGN & IMPLEMENTATION OF ELECTRONIC MUSTER &

    MEASUREMENT SYSTEM (eMMS) IN THE MGNREGS-AP

    The Mahatma Gandhi National Rural Employment Guarantee Scheme

    Department of Rural Development, Govt. of A.P.

    2nd Floor, HUDA Hermitage Office Complex,

    Hill fort Road, Saifabad,

    Hyderabad-500004

    Last Date for Submission of RFP: 30.10.2010

  • 8/6/2019 eMMS Complete

    2/32

    EMMS PROJECT FOR MGNREGS-AP] October 21, 2010

    Dept of Rural Development, GoAP | Introduction 2

    Contents1. Introduction .................................................................................................................................................... 3

    1.1

    The MGNREGS ....................................................... ................................................................. ............ 3

    1.2 The eMMS project ........................................................................ ........................................................ 41.3 Scope of Work ...................................................................................................................................... 71.3.1 Software ........................................................ ................................................................. ....................... 71.3.2 Infrastructure ............................................................ ................................................................. ............ 71.3.3 MIS ....................................................................................................................................................... 81.3.4 Trainings, Operational Maintenance & Support ............................ ....................................................... 81.3.5 Contract Period ..................................................................................................................................... 81.3.6 Time frame for Deployment of solution .............................................................. .................................. 91.4 Eligibility Criteria ................................................................................................................................. 91.5 Enquiries & Clarifications .............................................................. ..................................................... 101.6 Time Table & Milestones ............................................................... ..................................................... 101.7 Important limits/ values related to Bid ................................................................ ................................ 11

    2. Submission of Bid ........................................................................................................................................ 112.1 Bidding Process ........................................................ ................................................................. .......... 112.2 Responsiveness of Bid ........................................................................................ ................................ 122.3 Technical Bid ........................................................... ................................................................. .......... 122.3.1 Submission of Cover 1 ..................................................................................................................... 122.3.2 Check List for Technical Bid ......................................................... ..................................................... 132.4 Technical Presentation & Demonstration ............................................................ ................................ 132.5 Financial Bid ............................................................ ................................................................. .......... 142.5.1 Submission of Cover-2 ........................................................ ................................................................ 142.5.2 Check list for financial bid ..................................................................................................... ............. 142.6 Bid Submission ................................................................................................... ................................ 14

    3. Fees & Deposits ...................................................... ................................................................. ..................... 153.1 Bid Processing Fee ......................................................................................................... ..................... 153.2 Bid Security......................................................................................................................................... 163.3 Performance Guarantee ................................................................. ...................................................... 16

    4. Documentation.............................................................................................................................................. 174.1 Exhibit-1 Format for Covering Letter ................................................................ ................................ 174.2 Exhibit-2: Formats for Technical Qualification .................................................................................. 194.3 Exhibit-3: Formats for Financial Qualification .............................................................. ..................... 25

    Annexure-1 .......................................................... ................................................................. ................................ 28Annexure-2 .......................................................... ................................................................. ................................ 29Annexure-3 .......................................................... ................................................................. ................................ 30Annexure-4 .......................................................... ................................................................. ................................ 31

  • 8/6/2019 eMMS Complete

    3/32

    EMMS PROJECT FOR MGNREGS-AP] October 21, 2010

    Dept of Rural Development, GoAP | Introduction 3

    1.Introduction

    1.1 The MGNREGS

    The Mahatma Gandhi National Rural Employment Guarantee Act (MGNREGA) is a

    legislation passed by the Indian Parliament guaranteeing wage employment to any adult

    who is willing to do unskilled manual work. The MGNREGS was started in Andhra Pradesh

    in the year 2006. The important objectives in the implementation of the scheme are:

    1. To enhance livelihood security in rural areas by providing at least 100 days of

    guaranteed wage employment in a financial year to every rural household willing to do

    manual unskilled work.

    2. Regenerating natural resource base and creating productive assets

    3. Strengthening grass root processes of democracy infusing transparency and

    accountability in governance

    The MGNREGS is being implemented in 21,858 Gram Panchayats, 1098 mandals and

    22districts in Andhra Pradesh, providing wage employment for 100days to more than 1

    crore labor every year across the state. The scheme is being implemented by more than

    21,000 Field Assistants at Gram Panchayat level, 3500 Technical assistants each

    handling 7 Gram Panchayats in a mandal, 2196 Computer Operators working at mandal

    level, 820 Engineering consultants each working at mandal level, 1098 Additional

    Programme Officers working at mandal level and 1098 Programme Officers heading the

    mandal team.

    The important processes involved in the implementation of the MGNREGS-AP are:

    1. Recording work inputs from field and generating work estimates by Technical Assistant.

    2. Recording daily Labor attendance using Muster rolls by Field Assistant.

    3. Conducting regular verification of musters by Programme Officer

    4. Recording group-wise measurements of the works taken up in the MGNREGS-AP by

    Technical Assistant.

    5. Conducting regular check measurements by Engineering consultants

    6. Generating pay orders by entering muster and measurement data using the

    MGNREGS-AP software

    7. Refer Annexures 1,2,3 for Scale of Operations, Work Flow, Process Flow in the

    MGNREGS-AP

  • 8/6/2019 eMMS Complete

    4/32

    EMMS PROJECT FOR MGNREGS-AP] October 21, 2010

    Dept of Rural Development, GoAP | Introduction 4

    In the past 4years, the MGNREGS-AP has taken up many initiatives in Information

    Communication and Technology, with the objective of achieving transparency, efficiency

    and accountability in the implementation of the programme. All the ICT initiatives have

    been designed around the following goals:

    1. Labour centred operations and MIS

    2. Capture ALL transactions in MIS

    3. Ensure open access to information to all stakeholders and citizens

    4. Ensure easy access of information to carry out Independent Social Audits by civil

    society organisations

    5. Ensure full fledged Transparency & Accountability in all processes

    6. Minimize financial leakages

    7. Ensure simplified and efficient programme implementation

    8. Enable transaction based reliable, timely and comparable information through Bottom-

    Up approach.

    9. Ensure Traceability of every rupee spent and every work taken up in the scheme

    The MGNREGS is releasing this RFP in view of increasing more transparency andreducing corruption by implementing the Electronic Muster and Measurement System

    (eMMS) using mobile technology.

    1.2 The eMMS project

    The Electronic Muster & Measurement System (eMMS) is a technology solution for

    achieving complete transparency in MGNREGS. It ensures day to day updation of progress

    of MGNREGS-AP works directly from worksite to the Web. Refer Annexure-4.

    Using mobile technology, the eMMS is envisaged to arrest distortions in the MGNREGS

    programme like Muster Fudging; Delays in Payments; Binami Wageseekers; Fake

    Measurements and Work Duplication.

    The eMMS project shall have the following components:

    Component Functions of Mobile Application Used by

    e-Muster The labor attendance in the musters is captured from the

    worksites on day to day basis.

    Field Assistant &

    Rozgar Sewak

  • 8/6/2019 eMMS Complete

    5/32

    EMMS PROJECT FOR MGNREGS-AP] October 21, 2010

    Dept of Rural Development, GoAP | Introduction 5

    The e-Muster application shall perform the following

    functions:

    1. Capture Attendance of the labor in the Mobile Nokia

    2700 &

    2. Upload data to the Server using GPRS everyday on

    minute to minute basis

    No.of Users:

    21,000

    Mobile Model:

    Nokia 2700

    e-Measurement Measurements are taken by TAs for each work and each

    labor group on weekly basis.

    The e-measurement application shall perform the following

    functions:

    1. Dynamically download the muster information into the

    TAs mobile for the ongoing works, from the Server

    using GPRS.

    2. Capture Measurement data in Nokia C5 Mobile

    3. Upload the measurement data, Image of work site &

    GPS coordinates to server directly from the worksite.

    Technical Assistant

    (TA)

    No.of Users: 3500

    Mobile Model:

    Nokia C5

    e-Check

    Measurement

    The check measurement is done for each measurement

    recorded, once in a week by the Engineering consultants

    The e-check measurement application shall do the

    following:1. Dynamically download all the measurements into the

    ECs mobile, using GPRS.

    2. Capture check measurement in the Mobile Nokia C5

    against every measurement, using GPS & GPRS

    enabled mobile.

    3. Uploads to server the Check Measurement Data &

    GPS coordinates of the worksite directly from the

    worksite.

    Engineering

    Consultant (EC)

    No.of Users: 820

    Mobile Model:

    Nokia C5

    e-Muster

    verification

    The muster verification is done on daily basis by the

    muster verification officers.

    1. Musters uploaded to the server are picked up

    randomly by software programme.

    2. This muster data shall be pushed into the mobiles of

    Muster Verification officers for monitoring purpose.

    The e-Muster Verification Application shall perform the

    following functions:

    Programme

    Officer/ Additional

    Programme Officer

    (APO)/ Assistant

    Project Director

    (APD)

    No.of Users: 2446

  • 8/6/2019 eMMS Complete

    6/32

    EMMS PROJECT FOR MGNREGS-AP] October 21, 2010

    Dept of Rural Development, GoAP | Introduction 6

    3. Captures Verification Data using Nokia C5

    4. Uploads the muster verification data and GPS

    coordinates directly from the worksite to the server.

    Mobile Model:

    Nokia C5

    e-Work Inputs The work inputs data is taken from the field for the

    Identification of new works.

    The e-work inputs mobile application shall do the following:

    1. Capture work inputs for generation of new work

    estimates.

    2. Uploads the work inputs data, Image of worksite and

    GPS coordinates from the worksite to the server.

    Technical Assistant

    No.of Users: 3500

    Mobile Model:

    Nokia C5

    e-Pay Order Pay Order generation is a part of the MGNREGS-AP

    Mandal level software. It is already implemented in all the

    mandals of AP.

    The e-Pay Order software shall do the following:

    1. Download e-muster and e-measurement for every

    work from the Server into the Mandal Computers.

    2. Generate Pay Orders at the Mandal computer center

    (MCC)

    Computer Operator

    No.of Operators:

    2196

    Image Processing The images of the worksite, uploaded to the server shall

    be processed, arranged as gallery for each work andintegrated with the Web Reports.

    The RD Dept &

    General Public

    MIS Reports The MIS reports shall be generated for:

    1. e-Musters

    2. e-Measurements

    3. e-Check Measurements

    4. e-Muster Verification

    5. e-Work Inputs

    6. e-Pay Order generation

    7. Exception Reports

    8. Citizens request

    The RD Dept &

    General Public

    GIS Reports The Semi GIS reports using the real time GPS data and

    Images from the field shall be generated for

    measurements and check measurements data.

    The RD Dept &

    General Public

    Citizens Interface The Citizens Interface shall ensure that the LIVE muster

    data in any GP can be further accessed by any citizen

    using any mobile, by sending a simple SMS

    General Public

  • 8/6/2019 eMMS Complete

    7/32

    EMMS PROJECT FOR MGNREGS-AP] October 21, 2010

    Dept of Rural Development, GoAP | Introduction 7

    1.3 Scope of Work

    1.3.1Softwarei. The solution provider shall Design, Develop, Deploy, Maintain and Enhance

    the software for all the eMMS project components mentioned in section 1.2

    ii. The proposed solution shall have features such as pre-loading of master

    data of the entire GP, which includes Names of the labor, Job card IDs of

    labor, Work IDs etc.

    iii. The solution shall use advanced data compression techniques for storing

    data in the mobile and uploading data to the server.

    iv. The solution shall have the capability to transfer the data using the 3 modesof wireless communication: SMS, GPRS and Bluetooth

    v. In the areas of No-signal connectivity in a village, the solution shall store the

    entire muster data for a week and transfer the data into the computers at

    mandal, using Bluetooth.

    vi. The solution shall capture and upload text, image, date & time and GPS data

    from mobiles to the server.

    vii. The latitudes, longitudes, date and time should be captured from a real time

    GPS system.

    viii. The solution shall capture group photographs of the labor ,process the

    images and do the head count of the number of labor present in the image

    ix. The solution shall have the capability to validate the image of each labor with

    preloaded image in the server using facial recognition techniques.

    x. The mis-match of the images shall arise only in case of Binami labor or fake

    attendance. There should be no mis-match due to technical inefficiencies

    xi. The solution shall interact with other MGNREGS application software like

    RAGAS for the generation of pay orders.

    xii. Refer Annexure-4.

    1.3.2 Infrastructure

    i. The bidder shall provide all the Infrastructure support for the implementation

    of the eMMS project with the scale of transactions as mentioned in

    Annexure-5.

  • 8/6/2019 eMMS Complete

    8/32

    EMMS PROJECT FOR MGNREGS-AP] October 21, 2010

    Dept of Rural Development, GoAP | Introduction 8

    ii. The bidder shall provide infrastructure like Application servers, gateways,

    software licenses etc for data processing and storage on hire basis.

    iii. The mobiles for all the field staff shall be procured by the Department.

    iv. The solution provider shall completely maintain the entire infrastructure

    required for the eMMS project.

    v. The solution provider shall completely maintain the Data Center

    1.3.3 MIS

    i. The web-based reporting system has to be developed as approved by the

    MGNREGS-AP as indicated in section 1.2

    ii. The exception MIS reports and SMS alerts shall be generated in case of any

    discrepancy in the eMMS data after Verification.

    1.3.4 Trainings, Operational Maintenance & Support

    i. The bidder shall conduct and impart the trainings to all the MGNREGS field

    staff mentioned in section 1.1

    ii. The bidder shall also provide technical support and trouble shooting at

    district level to provide operational support to the MGNREGS field staff.

    iii. The bidder shall provide 1 District Resource Person (DRP) and 2 Assistantsfor technical support in each district.

    iv. The District Resource Person shall be a well qualified BTech or MCA

    graduate. The Assistants to the DRPs shall have basic qualification of

    graduation in BSc or BCA or BSc Computers or B-Com Computers.

    1.3.5 Contract Period

    i. The contract period is for 3years from the date of award of the contract.

    ii. The bidder should quote separately for each year of the contract period in the

    financial bid.

    iii. The Commissioner, RD will objectively evaluate the performance of the

    technology solution provider. If dissatisfied with the performance of the

    solution provider, the Commissioner, RD can withdraw from the contract at

    any point of time, with a notice period of 1month.

    iv. The Commissioner, RD reserves the right to withdraw from the contract at

    any point of time for any reason what-so-ever and is not obliged to cite thereasons for the same.

  • 8/6/2019 eMMS Complete

    9/32

    EMMS PROJECT FOR MGNREGS-AP] October 21, 2010

    Dept of Rural Development, GoAP | Introduction 9

    1.3.6 Time frame for Deployment of solution

    The solutionshall go live within 45days from the date of signing the contract. The

    solution provider shall have the complete solution for all the components

    mentioned; establish the entire infrastructure required for eMMS; deploy all the

    personnel on the field and conduct trainings to the entire MGNREGS field staff

    during this timeframe of 45days.

    1.4 Eligibility Criteria

    General Criteria

    1. The firms specialized in Development & Deployment of Mobile based software

    applications, are eligible for bidding.

    2. The firms should be registered in India and in operation for atleast 2years.

    3. The firm should have at least two years of experience in development and deployment

    of Mobile based software applications using data compression, image processing

    technology and GIS.

    4. The firm should have an experience of at least three (3) projects till date in the

    development and deployment of Mobile based software applications for public or private

    sector organisations.

    5. The firm should have an experience of atleast one (1) project involving image processing

    and GIS interface.

    6. The bidder should have its an existing software development staff strength of atleast 25

    personnel

    7. The bidder should submit the evidence of submitting Income Tax returns for the last two

    financial years. (2008-09 and 2009-10)

    Detailed documents such as written confirmations from the authorised signatories to be provided for

    the above 1-7 eligibility criteria

    Any bidder not furnishing any of the above 7 items along with evidence shall be summarily rejected.

  • 8/6/2019 eMMS Complete

    10/32

    EMMS PROJECT FOR MGNREGS-AP] October 21, 2010

    Dept of Rural Development, GoAP | Introduction 10

    Specific Technical Criteria

    The following need to be demonstrated LIVE during the technical demonstrations by the

    bidders using a low end mobile phone (like Nokia 2700)

    1. The solution provider should demonstrate storing of the master data for a Mobile based

    software application project.

    2. The solution provider should demonstrate transfer data and images from mobile to the

    server using SMS, GPRS and Bluetooth

    3. The solution provider should demonstrate SIM-Less data transfers using only Bluetooth.

    4. The solution provider should demonstrate dynamic updation of mobile application and

    Master data in the mobile database using SMS.

    5. The solution provider should demonstrate using one of his existing projects, the

    integrated image interface with GIS.

    1.5 Enquiries & Clarifications

    Enquiries and clarifications, if any, shall be addressed to:

    The Commissioner,

    Department of Rural Development, Govt. of A.P.

    2nd Floor, HUDA Hermitage Office Complex,

    Hill fort Road, Saifabad,

    Hyderabad-500004

    Email:[email protected]

    1.6 Time Table & Milestones

    S.No. Milestone Envisaged Schedule

    1 Request for Proposal Document made available to the

    Bidding Entities

    21.10.2010 to 30.10.2010

    2 Pre-bid meeting at Conference Hall,

    O/o Commissioner, RD, Hyderabad

    28.10.2010 3.00 PM

    3 Last Date & for receipt of Bids (containing Covers 1& 2) 30.10.2010 at 11:00AM

    4 Opening of Technical Cover (Cover-1) 30.10.2010 at 12:00PM

    5 Demonstration of Technical solution to the Commissioner,

    RD by qualified bidders

    O/o Commissioner, RD, Hyderabad

    30.10.2010

    1:00PM to 4:00PM

    6 Opening of Financial Cover of selected bidders (Cover-2) 30.10.2010 at 5:00 PM

    mailto:[email protected]:[email protected]:[email protected]:[email protected]
  • 8/6/2019 eMMS Complete

    11/32

    EMMS PROJECT FOR MGNREGS-AP] October 21, 2010

    Dept of Rural Development, GoAP | Submission of Bid 11

    In order to meet the target dates, Bidding Entities are requested to respond expeditiously for

    clarifications, if any, requested during the evaluation process. The Commissioner, RD will

    adhere to the above schedule to the extent possible. The Commissioner, RD, however,

    reserves the right to modify the same. Intimation to this effect will be notified on the website

    only.

    1.7 Important limits/ values related to Bid

    Item Description

    Bid Processing Fee

    (Non Refundable)

    Rs 10,000 non-refundable fee in the form of

    Demand Draft in favour of Commissioner,

    Rural Development, Hyderabad

    Bid Security (Earnest Money Deposity-EMD)

    (Refundable)

    Rs 1.00lakh in the form of Bank Guarantee

    Bid Validity Period 45days from the date of opening the bid

    Performance Security Value 1% Contract Value

    Period for furnishing performance security Within fifteen (15) working days of notice of

    award of the contract or prior to signing of

    contract whichever is earlier

    Performance Security Validity Period 3 months beyond contract period

    Period of signing the contract Within 7 working days from the date of

    receipt of notification of award

    Contract Period 3 years

    2.Submission of Bid

    2.1 Bidding Process

    The Bids received would be processed, subject to a responsiveness check followed by a

    step-wise evaluation procedure as described below:

    1) Technical Evaluation (Cover-1: Technical Proposal)

    2) Financial Evaluation (Cover-2: Financial Proposal)

  • 8/6/2019 eMMS Complete

    12/32

    EMMS PROJECT FOR MGNREGS-AP] October 21, 2010

    Dept of Rural Development, GoAP | Submission of Bid 12

    2.2 Responsiveness of Bid

    The Bids submitted by Bidding Entities shall be initially scrutinized to establish

    "Responsiveness". A Bid may be deemed "Non-responsive" if it does not satisfy any of the

    following conditions:

    It is not received within the time and date specified.

    It does not include sufficient information for evaluation and/or is not in the formats

    specified or incomplete in any respect.

    It is not signed and / or sealed in the manner and to the extent indicated in section

    2.6

    It is not accompanied by the requisite Bid Processing Fee and/or the valid Bid

    Security

    Each page is not signed by the Authorized Signatory.

    If GPA by way of a Resolution of the Company authorizing the authorized signatory is

    not submitted.

    If not complied with instructions contained in Instructions to Bidding Entities -

    General Conditions RFP Document.

    2.3 Technical Bid

    All the technical details provided in Exhibit 2 of Section 4.2 shall be properly filled and

    signed duly enclosing Photostat copies of all the required documents. The bidders are liable

    for necessary action for any false information. This cover A shall contain clear To and

    From addresses and properly sealed with lacca.

    2.3.1 Submission of Cover 1

    The Bidding Entity shall place one (1) original (marked as original) + one (1) copy of

    the Technical Proposal in a sealed envelope, which shall be inscribed as under:

    Bid for: eMMS project for the MGNREGS-AP in Andhra Pradesh

    Cover-1 -Technical ProposalSubmitted by: __________________________. (Name of the Bidding Entity with

    Full Postal Address)

  • 8/6/2019 eMMS Complete

    13/32

    EMMS PROJECT FOR MGNREGS-AP] October 21, 2010

    Dept of Rural Development, GoAP | Submission of Bid 13

    2.3.2 Check List for Technical Bid

    Bidding Entities are required to submit the following information along with Cover-1(Technical

    Proposal).

    i) Covering Letter as per the format given in Exhibit-1, Section 4.1.ii) A Demand Draft for Bid Processing Fee

    iii) Bank Guarantee as Bid security fee.

    iv) Formats for Technical Qualification as per format furnished in Exhibit-2, Section 4.2

    v) Copy of the Certificate of Registration of the Firm / Company / Society etc.

    vi) Copy of PAN.

    vii) Copy of Service / Professional Tax Registration Certificate.

    viii) Copy of the Company Profile.

    ix) Copy of Staff Profile

    x) Franchise Arrangements such as MoUs / Agreements, if any.

    xi) Copies of the MOUs/Work Orders, or any other proof of handling projects on mobile

    technology

    xii) Copies of Annual Audited & Certified Financial Statements certified by CA.

    xiii) Copies of Income tax returns for the current & previous years and audited financial

    statements duly certified by CA

    2.4 Technical Presentation & Demonstration

    The bidders satisfying the general eligibility criteria, as mentioned in Section 1.4 shall be

    called to give a Technical presentation to the Commissioner, RD.

    The presentation and demonstration of the technical solution shall be completed within

    10minutes. The following need to be demonstrated LIVE during the technical demonstrations

    by the bidders using a low end mobile phone (like Nokia 2700)

    1. The solution provider should demonstrate storing of the master data for a Mobile based

    software application project.

    2. The solution provider should demonstrate transfer data and images from mobile to theserver using SMS, GPRS and Bluetooth

    3. The solution provider should demonstrate SIM-Less data transfers using only Bluetooth.

    4. The solution provider should demonstrate dynamic updation of mobile application and

    Master data in the mobile database using SMS.

    5. The solution provider should demonstrate using one of his existing projects, the

    integrated image interface with GIS.

  • 8/6/2019 eMMS Complete

    14/32

    EMMS PROJECT FOR MGNREGS-AP] October 21, 2010

    Dept of Rural Development, GoAP | Submission of Bid 14

    2.5 Financial Bid

    The bidders shall properly quote the rate both in words and figures in Exhibit-3 of

    Section 4.3. The rate shall be inclusive of all the taxes. The rates shall be inclusive of all the

    related incidental costs, of the above deliverables. This cover B shall contain clear To and

    From addresses and properly sealed with lacca.

    Evaluation of Cover-2-Financial Bids of those bidding entities who have been declared

    qualified in the Technical demonstration shall only be opened in the financial round. The

    financial bids of those entities who have not qualified in technical round will be returned

    unopened along with the Bid Security.

    In the Financial Evaluation, Each bidding entity for each of the courses will be ranked

    separately as L1, L2, L3. etc from lowest commercial offer the highest commercial offer

    respectively as offered by them in their financial bid.

    L1 bidder would be called to finalize the deliverables, timelines and general terms of

    MoU/Work order.

    2.5.1 Submission of Cover-2

    The Bidding Entity shall place one (1) original copy of the Financial Bid in a sealed envelope, which

    shall be inscribed as under:

    Bid for: eMMS project for the MGNREGS-AP in Andhra Pradesh.

    Cover-2 - Financial Bid

    Submitted by: ___________________________. (Name of the Bidding Entity with Postal Address)

    2.5.2 Check list for financial bid

    Bidding Entities are required to submit the information in Exhibit-3, Section 4.3 along with

    Cover-2(Financial Proposal).

    2.6 Bid Submission

    The Two Covers of the Bid organized as above, shall be placed in a sealed outer envelope

    with the following inscription:

    Bid for ______________________ (Name of the Programm

    Selection of Technology Service Providers for the Design & Implementation of

    Electronic Muster & Measurement System (eMMS) in the MGNREGS-AP

    Name of the Bidding Entity with Complete Address: ____________________________

  • 8/6/2019 eMMS Complete

    15/32

    EMMS PROJECT FOR MGNREGS-AP] October 21, 2010

    Dept of Rural Development, GoAP | Fees & Deposits 15

    The cover should be addressed to:

    The Commissioner,

    Department of Rural Development, Govt. of A.P.

    2nd Floor, HUDA Hermitage Office Complex,

    Hill fort Road, Saifabad,Hyderabad-500004, email:[email protected]

    The Bidding Entity can submit the Bid by registered post / courier or submit the Bid in person, so as to

    reach the designated address by the time and date stipulated in Section 1.6 . The Commissioner,

    RD shall not be responsible for any delay in submission of the Bids. Any Bid received by the

    Commissioner, RD after the deadline for submission of the Bids stipulated in Section-1.6 shall not be

    opened.

    2.7 Declaration

    The Commissioner, RD in its sole discretion and without incurring any obligation or liability

    reserves the right, at any time to:

    A) Suspend and/or Cancel the bidding process and/or amend and/or supplement the bidding

    process or modify the dates or other terms and conditions relating there to,

    B) Consult with any bidding entity in order to receive clarity or further information,

    C) Retain an information and/or evidence submitted to the Commissioner, RD by any bidding

    entity, and/or

    D) Independently verify, Disqualify, reject and/or accept any or all the submissions or other

    information and/or evidence submitted by bidding entity.

    3.Fees & Deposits

    3.1 Bid Processing Fee

    Bidding Entities are requested to pay a non-refundable Bid Processing Fee of Rs.10,000

    (Rupees Ten Thousand only). This will be paid in the form of a Demand Draft Payable to

    The Commissioner Rural Development, Hyderabad payable at Hyderabad, drawn on

    any scheduled commercial bank and must accompany Covering Letter in Cover-1 of the Bid

    Document.

    Bids that are not accompanied by the above Bid Processing Fee shall be rejected by the

    Commissioner, RD as non-responsive.

    mailto:[email protected]:[email protected]:[email protected]:[email protected]
  • 8/6/2019 eMMS Complete

    16/32

    EMMS PROJECT FOR MGNREGS-AP] October 21, 2010

    Dept of Rural Development, GoAP | Fees & Deposits 16

    3.2 Bid Security

    Bidding Entities are required to submit a Bid Security in shape of Demand Draft or Bank

    Guarantee for an amount equal to Rs1 lakh (Rupees One Lakh only) valid for 1 year from

    the last date for submission of the RFP and shall accompany Cover-1 of the Bid Document.

    The Bid Security shall be in the form of a Bank Guarantee from any Scheduled Bank or

    Demand Draft in favour of The Commissioner, Rural Development, Hyderabad.

    Bids, which are not accompanied by the above bid security, shall be rejected by the

    Commissioner, RD as non- responsive.

    The Commissioner, RD reserves the right to forfeit the Bid Security (by invoking the Bank

    Guarantee) under the following circumstances:

    (a) If the Bidding Entity withdraws the Bid at any time during the stipulated period of Bid

    validity (or) as may be extended.(b) If the Bidding Entity, for the period of Bid validity:

    (i) In the Commissioner, RD opinion, commits a material breach of any of the

    terms and / or conditions contained in the RFP Document and / or

    subsequent communication from the Commissioner RD in this regard and / or

    (ii) Fails or refuses to execute the Letter of Award (in the event of the award of

    the Programme to it) and/ or

    (iii) Fails or refuses to furnish the Performance Guarantee within the stipulated

    time (viz. 30 days from the issue of the Letter of Award to it).In the event that any Bidding Entity is declared Technically Evaluated Non Responsive, then

    the Bid Security (i.e. Bank Guarantee) of such Bidding Entities can cease to be in force upon

    return of the unopened Cover-2 of their Bid upon request.

    In respect of the Technically Evaluated Responsive Bidding Entities, the Bid Security of the

    unsuccessful Bidding Entities (after opening of Cover-2) can cease to be in force after 45

    days following the Award of the eMMS project to the Successful Bidding Entity.

    The Bid Security of the Successful Bidding Entity shall be refunded on submission of

    Performance Guarantee.

    3.3 Performance Guarantee

    The successful Bidding Entity shall submit a Performance Guarantee at the time of signing

    the Agreement / MOU for selection, in the form of a Bank Guarantee for an amount equal

    to 1% of the Monetary Value of the eMMS project to be awarded and as specified in the

    MOU / Agreement. Details of the Performance Guarantee will be provided at the time of

    giving Letter of Award.

    The Performance Guarantee shall remain valid from the date of MOU / Agreement for a

    period of 3months more than the contract period of 3years.

  • 8/6/2019 eMMS Complete

    17/32

    EMMS PROJECT FOR MGNREGS-AP] October 21, 2010

    Dept of Rural Development, GoAP | Documentation 17

    4.Documentation

    (The Covering Letter is to be submitted by the Bidding Entity along with the Cover-1 of the Bid -

    Printed on their respective Letter Heads)

    4.1 Exhibit-1 Format for Covering Letter

    Date:

    Place:

    The Commissioner,

    Department of Rural Development, Govt. of A.P.

    2nd Floor, HUDA Hermitage Office Complex,

    Hill fort Road, Saifabad,

    Hyderabad-500004

    email:[email protected]

    Dear Sir,

    Sub: Selection of Mobile Technology Service provider for the design & implementation of Electronic

    Muster & Measurement System (eMMS) project for the MGNREGS in Andhra Pradesh-Reg

    Please find enclosed one (1) Original + one (1) Copy of our Bid in respect of the eMMS project for

    the MGNREGS-AP in Andhra Pradesh, in response to the Request for Proposal (RFP) Document

    issued by the Commissioner, Rural Development, Department of Rural Development, Govt. of A.P.,

    dated__________________.

    We hereby confirm the following:

    1. The Bid is being submitted by ___________________________ (name of the Bidding Entity) who

    is the Bidding Entity, in accordance with the conditions stipulated in the RFP.

    2. We have examined in detail and have understood the terms and conditions stipulated in the RFP

    Document issued by the Commissioner RD and in any subsequent communication sent by the

    Commissioner, RD, We agree and undertake to abide by all these terms and conditions. Our Bid

    is consistent with all the requirements of submission as stated in the RFP or in any of the

    subsequent communications from the Commissioner, RD.

    mailto:[email protected]:[email protected]:[email protected]:[email protected]
  • 8/6/2019 eMMS Complete

    18/32

    EMMS PROJECT FOR MGNREGS-AP] October 21, 2010

    Dept of Rural Development, GoAP | Documentation 18

    3. The information submitted in our Bid is complete, is strictly as per the requirements as stipulated

    in the RFP, and is correct to the best of our knowledge and understanding. We would be solely

    responsible for any errors or omissions in our Bid.

    4. The Bidding Entity satisfies the legal requirements and meets all the eligibility criteria laid down in

    the RFP.

    5. This bid is unconditional and we hereby undertake to abide by the terms and conditions of the

    RFP.

    6. We, as the Bidding Entity designate Mr./Ms._______________________ (mention name,

    designation, contact address, phone no., fax no., mobile no., email id etc.), as our Authorized

    Representative and Signatory who is authorized to perform all tasks including, but not limited to

    providing information, responding to enquiries, entering into contractual commitments etc. on

    behalf of the us in respect of the Programme. The Board Resolution authorizing the said person is

    enclosed.

    7. We acknowledge the right of the Commissioner, RD to reject our bid without assigning any

    reasons or other-wise and hereby waive to the fullest extent permitted by law, our right to

    challenge the same on any account whatsoever

    For and on behalf of: (Company Seal)

    Signature :

    Name :

    Designation :

    (Authorized Representative and Signatory)

    Name of the Person :

    Designation :

    Signature :

  • 8/6/2019 eMMS Complete

    19/32

    EMMS PROJECT FOR MGNREGS-AP] October 21, 2010

    Dept of Rural Development, GoAP | Documentation 19

    4.2 Exhibit-2: Formats for Technical Qualification

    Table 1-TQ Basic Information

    Name and Details of the Bidding Entity and Authorized Representative:

    Name of Organization / Institution

    Regd.. / Head Office Address:

    Phones

    Fax

    Mobile

    Email

    Website

    Addresses of Branch Offices /Franchisees (If any?):(Attach additional sheets if necessary)

    Phone

    Fax

    Mobile Nos.Email IDs

    Dates of Establishment

    Authorized Representative

    Designation

    Mobile

    Email

    Table 2-TQ : Legal Constitution of Bidding entity

    Legal Constitution of Bidding Entity:

    (Public Limited/Private Limited/Partnership/Proprietorship etc)

    1. Status / Constitution of the Firm:

    2. Registration No.:

    3. Date of Registration:

    4. Place of Registration:

    5. PAN card number

  • 8/6/2019 eMMS Complete

    20/32

    EMMS PROJECT FOR MGNREGS-AP] October 21, 2010

    Dept of Rural Development, GoAP | Documentation 20

    Table 3-TQ: Documentation for Bidding Entity & Financial Standing

    EntitySubstantiating Documents Required

    Proprietorship Firm Certificate of the Proprietorship duly certified by a Chartered Accountant.

    Audited Financial Statements of the firm for the previous financial years. (max of

    last three years as proof for turnover)

    Partnership Firm Registered Partnership Deed / Certificate of the Partnership duly certified by a

    Chartered Accountant.

    Audited Financial Statements of the firm for the previous financial years. (max of

    last three years as proof for turnover)

    Private Limited

    Company

    Registration Certificate and Memorandum & Articles of Association.

    Financial Statements of the company for the previous financial years. (max of last

    three years as proof for turnover)

    Public Limited

    Company

    Registration Certificate and Memorandum & Articles of Association.

    Audited Financial Statements of the company for the previous financial years.

    (max of last three years as proof for turnover)

    Society / Trust /

    Association

    Registration Certificate & Bylaws of Society / Trust / Association.

    Audited Financial Statements of the company for the previous financial years.

    (max of last three years as proof for turnover)

    (i) Financial Statements are Balance Sheets and Profit & Loss Statements duly certified by CA.

    (ii) The Audited Financial Statements etc. are for the year 2008-09, 2009-10 (Proofs submitted to

    satisfy/meet the requirements of Eligibility criteria Section 1.4 ) .

    Table 4-TQ - Turnover Details

    Last Two Years Annual Turnover of the Bidding Entity:

    (As per the Audited Balance Sheet / Annual Reports to be enclosed duly certified by CA copies of Income

    tax returns as proof including current year)

    Financial

    Year

    Turnover of operations in

    Application Development

    in Mobile Technology

    Turnover in Other

    Software Development

    Operations

    Total Turnover Net

    Profit

    Global India AP Global India AP Global India AP

    2008-09

    2009-10

  • 8/6/2019 eMMS Complete

    21/32

    EMMS PROJECT FOR MGNREGS-AP] October 21, 2010

    Dept of Rural Development, GoAP | Documentation 21

    Table 5-TQ- Experience & Track Record

    A description of the companys qualifications demonstrating prior successful deployments in

    either private sector or public sector showing:

    1. Systems/solutions comparable in size and scope to the requirements of this RFP;

    2. Deployment of resources/manpower sufficient to respond to statewide

    implementation within the timeframes in this RFP

    The details to be provided:

    Name of the Assignment

    Name of the Client

    Location of the Project and Country

    Start Date & End Date

    Project Description

    No.of users of the application developed

    Value of services (annual)

    Describe Support/Maintenance Obligations (if

    applicable)

    Manpower dedicated and supporting this project

    Table 6-TQ: Client Reference List

    The bidder shal submit the references of atleast 3 private companies or government organisations for

    which it has provided services of comparable scale and complexity as outline in this RFP.

    The details to be providedDetail Organisation-1 Organisation-2 Organisation-3 Organisation-4

    Name of

    Organisation

    Location

    Project

    Description

  • 8/6/2019 eMMS Complete

    22/32

    EMMS PROJECT FOR MGNREGS-AP] October 21, 2010

    Dept of Rural Development, GoAP | Documentation 22

    Modules in the

    Application

    Scale of

    Operations

    No.of Users

    Reference

    Website

    Contact Person ,

    Designation

    Contact address,

    telephone

    number, email

    Other Relevant

    information

    Table 7-TQ: Details of Professional Staff

    Provide the following details as on 31.03.2010

    S.No Category Total Staff Staff in AP Office

    1 Project Management

    2 System Programmers

    3 Domain Experts

    4 Any Other

    Total

  • 8/6/2019 eMMS Complete

    23/32

    EMMS PROJECT FOR MGNREGS-AP] October 21, 2010

    Dept of Rural Development, GoAP | Documentation 23

    TABLE-8 TQ Documentation for Proposed solution for eMMS

    The bidder shall a document on the following topics:

    TABLE -9 TQ Technical Specifications for implementation of the eMMS project

    S.N

    o

    Component Specification Details

    1 Software

    Development

    required for eMMS

    project

    2 Software Licenses

    required for eMMS

    project

    3 Infrastructure

    required for eMMS

    project

    (on annual hire

    basis)

    1. Note on understanding of the purpose, objective and scope of the eMMS project

    (Not exceeding 1500 words)

    2. Overview of proposed solution

    3. Overall architecture

    4. Technical Architecture

    5. Security Architecture

    6. Network Architecture

    7. Bills of material of all components

    8. Image Processing

    9. User friendliness

    10. Implementation strategy, project plan and schedule

    11. Project Team structure, size and capability

    12. Training plan

    13. Support and maintenance strategy

    14. Quality Assurance

    15. Risk Assessment Methodology

    16. Workflow

  • 8/6/2019 eMMS Complete

    24/32

    EMMS PROJECT FOR MGNREGS-AP] October 21, 2010

    Dept of Rural Development, GoAP | Documentation 24

    4 Maintenance and

    support for the

    infrastructure

    required for eMMS

    project

    5 Man Power

    required for eMMS

    project

    Project Manager (1 Number)

    Software Programmers (6

    Number)

    Domain Experts (4 Number)

    District Resource Persons (22

    Number)Assistants to District Resource

    Persons (44 Number)

    6 Internet Bandwidth

    & Gateways

    required for eMMS

    project

    Internet

    SMS gateways

    GPRS Gateways

    Advanced SMS Gateway

    7 Others if any,

    required for eMMS

    project

    TOTAL

  • 8/6/2019 eMMS Complete

    25/32

    EMMS PROJECT FOR MGNREGS-AP] October 21, 2010

    Dept of Rural Development, GoAP | Documentation 25

    4.3 Exhibit-3: Formats for Financial Qualification

    The Financial Bid should be provided in the following format

    Date :

    Place :

    The Commissioner,

    Department of Rural Development, Govt. of A.P.

    2nd Floor, HUDA Hermitage Office Complex,

    Hill fort Road, Saifabad,

    Hyderabad-500004

    Email:[email protected]

    Dear Sir,

    Sub: Selection of Mobile Technology Service provider for the design and implementation of Electronic

    Muster & Measurement System (eMMS) project for the MGNREGS in Andhra Pradesh-Reg

    I/We, the undersigned offer to provide the services for the above mentioned Assignment in

    accordance with the terms and conditions contained in the RFP Document supplied to us.

    I/We agree to the terms that the project cost includes the software development costs, cost of

    software licenses, infrastructure costs, internet, man power costs etc. This amount also includes

    service tax, all other taxes applicable, other contingency expenses concerning the Assignment

    S.No Component Description Specific

    Details

    Total Cost (Rupees)

    (Inclusive of All Taxes)

    Year 1 Year 2 Year 3 TOTAL

    (Year 1+ Year

    2+ Year 3)

    1 Software

    Development

    required for

    eMMS project

    2 Software

    Licenses

    required for

    eMMS project

    3 Infrastructure

    required for

    eMMS project

    mailto:[email protected]:[email protected]:[email protected]:[email protected]
  • 8/6/2019 eMMS Complete

    26/32

    EMMS PROJECT FOR MGNREGS-AP] October 21, 2010

    Dept of Rural Development, GoAP | Documentation 26

    (on annual hire

    basis)

    4 Maintenance

    and support forthe

    infrastructure

    required for

    eMMS project

    5 Man Power

    required for

    eMMS project

    Project Manager

    (1)

    Software

    Programmers

    (6)

    Domain Experts

    (4)District

    Resource

    Persons (22)

    Assistants to

    District

    Resource

    Persons (44)

    6 Internet

    Bandwidth &

    Gateways

    required foreMMS project

    Internet

    SMS gateways

    GPRS

    Gateways

    Advanced SMS

    Gateway

    7 Others if any,

    required for

    eMMS project

    TOTAL

    This proposal and all other details furnished by us shall constitute a part of our offer. We

    understand that you are not bound to accept the lowest or any bid you receive.

    We agree that our offer shall remain valid for a period of 1year from the last date prescribed for

    submission of proposal.

    We have carefully read the entire set of RFP Documents and accept all the terms and conditions

    therein are submitting herewith.

    We confirm our acceptance for the following Payment Terms with the Commissioner, RD.

  • 8/6/2019 eMMS Complete

    27/32

    EMMS PROJECT FOR MGNREGS-AP] October 21, 2010

    Dept of Rural Development, GoAP | 27

    Payment Terms:

    The payments shall be made on quarterly basis and at the end of each quarter from the date of

    signing the MoU.

    We agree to bind by this offer if we are the selected Bidding Entity.

    For and on behalf of :

    Signature :

    Name :

    Designation with Seal :(Authorized Representative and Signatory of the Bidding Entity

  • 8/6/2019 eMMS Complete

    28/32

    EMMS PROJECT FOR MGNREGS-AP] October 21, 2010

    Dept of Rural Development, GoAP | Annexure-1 28

    Annexure-1

    MGNREGS Overview

    Total No of Districts under EGS 22

    Total No of Mandals 1,098

    Total No of Grampanchayats 21,858

    Total No of Habitations 68,983

    Total No of Jobcards Issued 1,19,34,068

    Total No of Adult members enrolled in JobcardsIssued

    2,82,89,398

    2006-07 2007-08 2008-09 2009-10 2010-11*

    Total Expenditure (Rs inCrores) 680.2 2083.7 2963.9 4509.2 3085.8

    Households Employment provided (In Lakhs) 21.7 46.8 57.1 61.6 56.3

    Individuals employment Provided (In Lakhs) 31.7 74 99.88 116.1 104.1

    Total No of Person days generated (In Crores) 6.6 20 22.7 40.1 24

    Average Wage rate per day per person (Rs.) 82.47 83.85 83.61 90.35 98.82

    Average No of days employment provided perHousehold

    30.13 42.68 39.86 65.1 42.6

    Total No of Households completed 100 Days of

    Wage Employment 67,242 4,10,517 4,81,004 13,93,734 5,27,756

  • 8/6/2019 eMMS Complete

    29/32

    EMMS PROJECT FOR MGNREGS-AP] October 21, 2010

    Dept of Rural Development, GoAP | Annexure-2 29

    Annexure-2

    The MGNREGS Process Flow

    Application for

    Job card

    Issuing

    Job Card

    Application for

    Work

    Allocation of

    work

    Muster roll at

    worksite

    Opening Post office

    Accounts

    Generation of

    Pay Order

    Distribution of

    Pay slip

    Payment of

    wages

    (Fortnightly)

  • 8/6/2019 eMMS Complete

    30/32

    EMMS PROJECT FOR MGNREGS-AP] October 21, 2010

    Dept of Rural Development, GoAP | Annexure-3 30

    Annexure-3

    Pay Order Generation

  • 8/6/2019 eMMS Complete

    31/32

    EMMS PROJECT FOR MGNREGS-AP] October 21, 2010

    Dept of Rural Development, GoAP | Annexure-4 31

    Annexure-4

    eMMS Process Flow

    Measurement

    Muster

    Server-

    -

    MCC

    TA

    FA

    E-muster

    E-measurement

    E-muster verification

    E-check measurement

    E-Pay OrderGeneration

    Web- ExceptionReports

    E-muster

    E-measurement

  • 8/6/2019 eMMS Complete

    32/32

    EMMS PROJECT FOR MGNREGS-AP] October 21, 2010

    Annexure-5

    Scale of transactions:

    S.No Application No.of Clients No.of transactions

    (in a day in the

    MGNREGS peak season)

    1 e-Muster 21000 1,05,000

    2 e-Measurement 4000 40,000

    3 e-Muster Verification 2000 4000

    4 e-Check Measurement 1000 12000

    5 e-Work Inputs 4000 60,000

    6 Image processing 4000 40,000 images

    Note: All the above mentioned applications will run simultaneously on any single day and

    the infrastructure shall be planned to carry out all the transactions simultaneously.