emergency response the first 72 hours presented by frederick j. krishon, p.e. senior vice president...

26
Emergency Response The First 72 Hours Presented by Frederick J. Krishon, P.E. Senior Vice President Director of Facilities Service LAW Engineering and Environmental Services

Upload: pamela-bailey

Post on 03-Jan-2016

216 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Emergency Response The First 72 Hours Presented by Frederick J. Krishon, P.E. Senior Vice President Director of Facilities Service LAW Engineering and

Emergency ResponseThe First 72 Hours

Presented by

Frederick J. Krishon, P.E.Senior Vice President

Director of Facilities ServiceLAW Engineering and Environmental Services

Page 2: Emergency Response The First 72 Hours Presented by Frederick J. Krishon, P.E. Senior Vice President Director of Facilities Service LAW Engineering and

Disaster Preparation

Sudden Events (no warning)•Fire

•Tornado

•Earthquake

Time to Prepare•Flood

•Hurricane

•Explosion, Accident, Collapse

Page 3: Emergency Response The First 72 Hours Presented by Frederick J. Krishon, P.E. Senior Vice President Director of Facilities Service LAW Engineering and

ER OrganizationPredetermined Assignments

• Incident Commander

• Functional Experts

• Technical Resources

Be redundant...back-ups

for all assignments

Page 4: Emergency Response The First 72 Hours Presented by Frederick J. Krishon, P.E. Senior Vice President Director of Facilities Service LAW Engineering and

Planning Considerations Emergency Team Organization Evacuation and Personal Safety Site Stabilization Communications Security Hazard Assessment Damage Surveys Tenant Relations Legal Ramifications

Page 5: Emergency Response The First 72 Hours Presented by Frederick J. Krishon, P.E. Senior Vice President Director of Facilities Service LAW Engineering and

When Disaster StrikesHealth and Safety FirstUse predetermined egress & rally points

Account for all occupants call-ins & head count

Secure the area soon after the Event

Rescue operations to search for victims

Page 6: Emergency Response The First 72 Hours Presented by Frederick J. Krishon, P.E. Senior Vice President Director of Facilities Service LAW Engineering and

Zero Hour + OneStabilize the site & contact technical resourcesSet up Command Post ; assemble ER TeamDocument status reports & make assignmentsSet Schedule for Frequent Meeting Mobilize Technical Team

Page 7: Emergency Response The First 72 Hours Presented by Frederick J. Krishon, P.E. Senior Vice President Director of Facilities Service LAW Engineering and

Command Post

Get OrganizedOrg chart with contact info(cell, home and other)Coordination meeting schedule (frequent at first)Develop activity board with assignmentsDesignate assignments by activity and locationCommunications proceduresDesignate Media

spokesperson Est. Tenant Relations TeamFrequent status updates

Page 8: Emergency Response The First 72 Hours Presented by Frederick J. Krishon, P.E. Senior Vice President Director of Facilities Service LAW Engineering and

Communications

Internal to the Team

– Cell phones, radios

External to Tenants– Information Hotline– Call Center– Frequent Bulletins

External to the Media – Single Point of Contact– Involve general council

Page 9: Emergency Response The First 72 Hours Presented by Frederick J. Krishon, P.E. Senior Vice President Director of Facilities Service LAW Engineering and

Security

Secure the Area

Set up Authorization Procedures

Health & Safety of the Security Team

Protection of Personal & Business Property

Escort tenant for belonging retrieval

Provide security for valuables in building

during clean-up activities

Page 10: Emergency Response The First 72 Hours Presented by Frederick J. Krishon, P.E. Senior Vice President Director of Facilities Service LAW Engineering and

Tenant Relations

Single Point of Contact

Keep them informed

Be considerate, let them vent

Restrict tenants enter site until safe and clear

Make arrangements for retrieval of personal valuables and business continuity items (if practical)

Page 11: Emergency Response The First 72 Hours Presented by Frederick J. Krishon, P.E. Senior Vice President Director of Facilities Service LAW Engineering and

Hazard Assessment • Environmental issues: asbestos, chemicals,

bio-hazards, airborne contaminants, etc.

Page 12: Emergency Response The First 72 Hours Presented by Frederick J. Krishon, P.E. Senior Vice President Director of Facilities Service LAW Engineering and

Hazard Assessment • Structural Issues: damage to structure,

windows, curtain walls, suspended objects and other falling hazards

• Other Hazards: fallen debris, electrical hazards, broken water

lines

Page 13: Emergency Response The First 72 Hours Presented by Frederick J. Krishon, P.E. Senior Vice President Director of Facilities Service LAW Engineering and

Hazard AssessmentKey ConsiderationsMust be organized, systematic, thorough

and documented. Must include:– identification– containment – mitigation

Documentation should include:– who, what, when and where – mitigation- how and when

Page 14: Emergency Response The First 72 Hours Presented by Frederick J. Krishon, P.E. Senior Vice President Director of Facilities Service LAW Engineering and

Damage Assessment

Detailed Condition Assessment

Use trained, licensed professionals

Maintain detailed documentation

Move the deciders/experts to the site

Document findings consistently (forms, calculations, drawings, photos, video)

Page 15: Emergency Response The First 72 Hours Presented by Frederick J. Krishon, P.E. Senior Vice President Director of Facilities Service LAW Engineering and

Damage AssessmentEnsure compliance with local

laws/standards

Interface with regulatory agencies frequently

Collect adequate amount of data quickly

Do not shortcut data collection, and

plan for more than anticipated.

Remedial designs/repairs can be done on-site

Page 16: Emergency Response The First 72 Hours Presented by Frederick J. Krishon, P.E. Senior Vice President Director of Facilities Service LAW Engineering and

Mitigation ActivitiesKey Elements to Be Addressed

Continuous SecurityAccommodate tenant needsRegulatory agencies approvalsVendors & contractors Contractor coordination

Page 17: Emergency Response The First 72 Hours Presented by Frederick J. Krishon, P.E. Senior Vice President Director of Facilities Service LAW Engineering and

Mitigation Activities

Key Elements to Be AddressedCollect sufficient dataHave a plan of action for next stepsDevelop methods for cleanup and repairCoordination of cleanup and repair operation

Page 18: Emergency Response The First 72 Hours Presented by Frederick J. Krishon, P.E. Senior Vice President Director of Facilities Service LAW Engineering and

Remedation & Repair

Prioritize sites/facilities early

Perform surveys on critical

facilities first

Begin planning concurrently

with damage surveys

Document, document, document

Page 19: Emergency Response The First 72 Hours Presented by Frederick J. Krishon, P.E. Senior Vice President Director of Facilities Service LAW Engineering and

Lessons Learned

Emergency Response Requirements

Organization is key to effective Emergency Response

Define roles of the Consultant, Property Manager and Owner ASAP

Security, tenant issues and public relations must be constantly addressed by designated personnel

Page 20: Emergency Response The First 72 Hours Presented by Frederick J. Krishon, P.E. Senior Vice President Director of Facilities Service LAW Engineering and

Lessons Learned• Move all deciders to the scene including

representatives of the Owner, property manager, consultants and contractors.

Collect a lot of data early

Use proper technical specifications & contract documents. They serve as valuable documentation of the process.

Use qualified contractors

Monitor recovery activities and document

Prepare record documentation of all activities

Page 21: Emergency Response The First 72 Hours Presented by Frederick J. Krishon, P.E. Senior Vice President Director of Facilities Service LAW Engineering and

Legal Ramifications After the event , building Owners and

Managers can be the target of legal action related to:

Financial losses of the occupants Clean-up methods and schedule Fear of latent health-related issues

Page 22: Emergency Response The First 72 Hours Presented by Frederick J. Krishon, P.E. Senior Vice President Director of Facilities Service LAW Engineering and

Legal RamificationsMinimize risk by….. Use standard methods, codes and procedures

for repair, cleanup and remediation

Involve legal advisors in all decisions related to reporting, tenant relations and the media.

Expedite the business resumption process

Be comprehensive and thorough in assessment and remediation activities.

Document, document, document everything

Page 23: Emergency Response The First 72 Hours Presented by Frederick J. Krishon, P.E. Senior Vice President Director of Facilities Service LAW Engineering and

Media InterfaceTV, Newspapers, Periodicals

• Television: the most hype, influence and innuendo

• Periodicals: the most accurate; often allow you to review

When Interviewed

• Don't talk down to interviewer,or too much.

• Choose words carefully, and use layman's terms.

• Be patient and polite, no frustration or emotion and have a thick skin.

Remember, they have the last word.They are not accountable for they say or print.You can't win, but you can minimize damage.

Page 24: Emergency Response The First 72 Hours Presented by Frederick J. Krishon, P.E. Senior Vice President Director of Facilities Service LAW Engineering and

Be Prepared

Before a Disaster StrikesIdentify your ER TeamPrepare a PlanCommunicate to TenantsWhen disaster strikes, Work the Plan

Page 25: Emergency Response The First 72 Hours Presented by Frederick J. Krishon, P.E. Senior Vice President Director of Facilities Service LAW Engineering and

Be Prepared

Page 26: Emergency Response The First 72 Hours Presented by Frederick J. Krishon, P.E. Senior Vice President Director of Facilities Service LAW Engineering and

F. Krishon -Relevant Experience

• One Allen Center - Houston

• AMFAC Hotel - San Francisco

• Cal State University - Northridge

• Manhattan Projects - Current