EMERGENCY OPERATIONS CENTRES
POLICY DOCUMENT
November, 2013
EOC Policy – Ver 2.0 Page 3 of 65
CONTENTS Authority ................................................................................................................................2
Document Control ..................................................................................................................2
Contents .................................................................................................................................3
Abbreviations .........................................................................................................................5
1 Introduction ....................................................................................................................6
2 Aim .................................................................................................................................6
3 Scope ..............................................................................................................................6
4 Key Requirements and Principles ....................................................................................7
4.1 Requirements ...........................................................................................................7
4.2 Principles ..................................................................................................................7
5 Establishment .................................................................................................................8
5.1 Identification of Possible Facilities ............................................................................8
5.2 Location ...................................................................................................................9
5.3 Physical Requirements .............................................................................................9
5.4 Capital Funding.........................................................................................................9
6 Activation .......................................................................................................................9
6.1 Authority to Activate ................................................................................................9
6.2 Reasons for Activation ..............................................................................................9
6.3 Levels of Activation ................................................................................................10
6.4 Decision to Close ....................................................................................................10
6.5 After Action Review ................................................................................................11
7 Operations ....................................................................................................................11
7.1 Governance and Operational Expenditure ..............................................................11
7.2 Procedures .............................................................................................................11
7.3 Communication ......................................................................................................12
7.4 Incident Control Systems ........................................................................................12
7.5 Situation Reports ....................................................................................................13
7.6 Impact Assessment .................................................................................................13
7.7 Public Information ..................................................................................................14
7.8 Information Management ......................................................................................14
7.9 Liaison Officers .......................................................................................................15
7.10 Structure (& Staffing) ..........................................................................................15
7.11 Key Roles and Responsibilities ............................................................................15
7.12 Recovery Arrangements ......................................................................................15
8 Maintenance ................................................................................................................16
8.1 Operational Readiness Audits .................................................................................16
8.2 Training and Exercising ...........................................................................................16
8.3 Review ...................................................................................................................16
Annexure 1 – EOC Layout Guidelines ....................................................................................17
Physical Facility .................................................................................................................17
Annexure 2 – EOC Operational Readiness Audit Template ....................................................23
EOC OPERATIONAL READINESS AUDIT REPORT .............................................................24
Annexure 3 - EOC Forms .......................................................................................................26
Annexure 4 - EOC Board Layouts ..........................................................................................34
Annexure 5 - EOC Key Roles & Responsibilities .....................................................................38
Emergency Operations Controller (EOCON) ......................................................................39
Emergency Management Officer ( EMO ) ..........................................................................40
EOC Policy – Ver 2.0 Page 4 of 65
Operations Officer ............................................................................................................41
Logistics Officer ................................................................................................................42
Planning Officer ................................................................................................................43
Liaison Officer ( LO ) ..........................................................................................................44
Annexure 6 – EOC Situation Report ......................................................................................45
Annexure 7 – Impact Assessment Template .........................................................................47
Annexure 8 – After Action Review ........................................................................................57
EOC Policy – Ver 2.0 Page 5 of 65
ABBREVIATIONS EMPLAN Emergency Management Plan EMO Emergency Management Officer EOC Emergency Operations Centre (generic term) EOCON Emergency Operations Controller (generic term) ICS Incident Control System IMT Incident Management Team LEOC Local Emergency Operations Centre LEOCON Local Emergency Operations Controller REOC Regional Emergency Operations Centre REOCON Regional Emergency Operations Controller SEMC State Emergency Management Committee SEOC State Emergency Operations Centre SEOCON State Emergency Operations Controller SERCON State Emergency Recovery Controller SERM Act State Emergency & Rescue Management Act 1989 SOP Standing Operating Procedure
EOC Policy – Ver 2.0 Page 6 of 65
1 INTRODUCTION
The New South Wales Government is committed to ensuring that the community is well prepared and that emergency services and government agencies are able to deliver effective emergency management, for events that affect the people of New South Wales, whether within state borders, interstate or overseas.
The impact of some emergencies may be of a scale and complexity that exceeds the capability of the combat agency to manage using their own resources, thereby placing demands on other Government services and agencies.
An Emergency Operations Centre (EOC) is a centre established under the State Emergency and Rescue Management Act at a State, regional or local level as a centre for communication, and as a centre for coordination of operations and support, during an emergency.
An EOC is a facility from which an Emergency Operations Controller can ensure the timely provision of support to affected communities by either: a. Planning for an impending event in the pre-impact phase, b. monitoring an operation, c. coordinating support to a Combat Agency, or d. controlling an emergency operation (where there is no combat agency or at the
combat agency’s request or when directed by the Minister).
An Emergency Operations Centre is ALWAYS a multi-agency facility. The State Emergency Operations Controller has a responsibility to establish and control a State Emergency Operations Centre. (SERM Act Par 20(1). Further, the Regional Emergency Operations Controllers and the Local Emergency Operations Controllers through them are subject to the direction of the State Emergency Operations Controller. This document will be maintained on behalf of the SEOCON, as the document owner, by the NSW Police Force Emergency Management Unit.
2 AIM
The aim of this policy is to provide direction and enhance existing emergency management arrangements for the establishment, activation, operation and maintenance of EOCs at State, Regional and Local levels.
3 SCOPE
This policy relates to EOCs established at State, Regional or Local level. It does not address the financial maintenance or physical construction of the facility.
EOC Policy – Ver 2.0 Page 7 of 65
Agency specific control centres or operations centres are not within the scope of this policy.
This policy takes an all hazards approach and outlines the key requirements, principles, authorities, responsibilities and mechanisms for the establishment, activation, operation and management of EOCs in New South Wales.
Whilst the SERM Act provides for the establishment of a State Emergency Operations Centre, Regional Emergency Operations Centres and Local Emergency Operations Centres, all of which should be identified and established as ‘preparation’ measures’, there will be occasions during emergency responses where an ad hoc EOC may be established as either a combined Regional/Local EOC or as an EOC across two or more Local areas to suit the circumstances of a particular event or combination of events. In all cases, EOCs are to comply with this Policy.
4 KEY REQUIREMENTS AND PRINCIPLES
4.1 Requirements
State, Regional and Local Emergency Operations Controllers are senior members of the NSW Police Force who are well versed in emergency management. These officers are appointed under provisions contained within the SERM Act. Emergency Operations Controllers (EOCONs) are responsible for establishing and controlling emergency operations centres from which to coordinate support to a combat agency or control response to an emergency where there is no combat agency, or where the combat agency has requested or agreed to the EOCON assuming that responsibility. [SERM Act S.19, S.25 & S31] The Local Emergency Operations Controller’s responsibility extends to where the emergency affects only that area or where he/she assumes responsibility [SERM Act S.25] The Regional Emergency Operations Controller’s responsibility extends to where the emergency affects more than one local government area in the Region, or where he/she assumes responsibility [SERM Act S.25. The State Emergency Operations Controller’s (SEOCON) responsibility extends to where the emergency affects more than one Region, or where he/she assumes responsibility [SERM Act S.19].
4.2 Principles
Notwithstanding the above requirements, the guiding principles to employ are: a. Control shall be established and maintained at the lowest effective level; and b. Flexibility to ensure ability to adequately staff and resource any EOC activated
during the emergency.
EOC Policy – Ver 2.0 Page 8 of 65
If coordinating support at the request of a combat agency, it is preferable to locate an EOC close to the combat agency’s Incident Management Team (IMT) to facilitate good communications with that agency and the Incident Controller.
If the combat agency IMT is controlling response to the emergency over more than one local area, the EOC will coordinate support to the same geographical area. In this case, the Regional Emergency Operations Controller (REOCON) will determine, in consultation with the affected Local Emergency Operations Controllers (LEOCON) and the Emergency Management Officer (EMO), whether the EOC shall be controlled by the REOCON or a particular LEOCON.
If an emergency for which there is no combat agency extends over more than one local area, the REOCON, in consultation with the affected LEOCONs and the EMO, shall determine: a. The appropriate location to establish the EOC. b. Whether the EOC shall be controlled by the REOCON or a LEOCON acting on his /
her behalf. The EOC shall be staffed by emergency service organisations or functional area liaison officers from State, Regional or Local level, or a combination, dependant upon the requirements of the situation and as determined by the relevant Emergency Operations Controller.
5 ESTABLISHMENT
5.1 Identification of Possible Facilities
Regional and Local Emergency Operations Controllers are responsible for establishing and controlling emergency operations centres. The Emergency Operations Controller, with the assistance of the Emergency Management Committee is to identify, in their area of responsibility, a range of facilities which may be utilised as emergency operations centres. It is suggested that possible EOCs be located close to combat agencies or co-located if sufficient space and other required resources are available for both the combat agency and the EOC to operate independently. This facilitates good communication between the combat agency and the EOC when providing support. It is preferable that identified facilities be publicly owned to ensure 24 hour access and the ability to set them up appropriately. More than one EOC should be identified in each area to ensure flexibility, dependant upon the type and location of the situation and the area(s) affected. This also provides for business continuity should a facility not be available at the time. If suitable facilities operated by an emergency service agency or other Government department (e.g. NSW Rural Fire Service, NSW State Emergency Service) are identified, consultation and negotiation should occur at the local level in the first
EOC Policy – Ver 2.0 Page 9 of 65
instance. Formal agreements may be developed between agencies as deemed appropriate.
5.2 Location
The physical location should be determined using the results of the emergency risk management process to ensure that the facility is located outside of the potential hazard impact area.
5.3 Physical Requirements
Refer to the EOC Facility Guidelines that supplement this policy, which details size, layouts, physical resource requirements, utilities and communication systems.
5.4 Capital Funding
Where suitable facilities are unable to be identified or additional equipment is needed to ensure they meet necessary standards, funding may be sourced through a number of State and Commonwealth initiatives. Additional information may be sourced from the Ministry for Police & Emergency Services in the first instance.
6 ACTIVATION
6.1 Authority to Activate
Authority to activate an EOC is vested in the Emergency Operations Controller. An EOC may be activated for an actual, imminent or potential emergency situation. The most appropriate EOC facility is to be activated taking into consideration the combat agency IMT location and to the geographical area over which operations need to be undertaken. It must be realised that the EOC’s area of interest/concern may: a. Vary or be greater than that of the IMT which might be narrow focussed such as
at a single impact site, b. Cover more than one Local Government Area (LGA).
6.2 Reasons for Activation
The Emergency Operations Controller may activate the EOC to: a. Monitor an incident or emergency operation; b. Coordinate support to the combat agency at their request; c. Control an emergency operation where there is no combat agency or where the
combat agency has requested or agreed to the Emergency Operations Controller assuming responsibility for control.
d. Plan and prepare for the effects of an imminent or potential emergency situation.
EOC Policy – Ver 2.0 Page 10 of 65
e. Provide a point of communication and reporting. f. When directed to do so by a higher EOCON. g. Conduct and prepare Impact Assessment following event. h. Provide or coordinate support to the recovery process at the request of the
person managing the recovery process.
6.3 Levels of Activation
Level Status Comment
White Monitor Normal use of facility, including for such activities as conference room, training, etc
Yellow Alert Heightened state of readiness Preparedness activities undertaken
Red Operational Commitment of EOC staff & resources to monitor, support or control emergency activities
Green Stand Down Process to return the centre to normal business (White)
6.4 Decision to Close Authority to close the EOC is vested in the EOCON. The EOCON will determine the need to maintain activation of the EOC to control or coordinate support for ongoing activities related to an emergency (actual or imminent) eg. conducting impact assessments or recovery operations. If the EOC has been activated in support of a combat agency the EOCON will consult with the Incident Controller prior to any decision to close the EOC. The EOCON should consider the following when making a decision to close the EOC:
a. The combat agency no longer requires support from the EOCON, and b. the support required can be controlled or coordinated without the need for an
EOC remaining at an 'operational (RED)' status, and c. the EOCON has determined that the coordination of any other ongoing support
to the response is no longer required, and d. the EOCON has determined that the coordination of initial and ongoing support
to recovery is no longer required, and e. demobilisation arrangements have been put in place to stand-down any
resources being controlled or coordinated by the EOCON or to hand over to an appropriate agency/agencies any resource/s and/or personnel that were coordinated or acquired by the EOC; or
i. when directed to do so by a higher EOCON.
EOC Policy – Ver 2.0 Page 11 of 65
6.5 After Action Review Following any activation of the LEOCON, including monitoring of an emergency operation, request for resources or other support and control or coordination of any part of an emergency event the LEOCON should review the actions and outcomes. Guidelines regarding the conduct of After Action Reviews and a Template for the production of a Report is provided as an Annex to this document.
7 OPERATIONS
7.1 Governance and Operational Expenditure
Whilst an EOC is active, the relevant EOCON is responsible for the overall direction and control of the centre including personnel working at the EOC.
Expenditure of funds by Emergency Service Organisations or Functional Areas involved in EOC functions during an emergency response and/or recovery operations is to be met in the first instance by the providers of resources from within their normal operating budgets. Should expenditure be of such a magnitude as to prevent the providing agencies/functional areas from continuing their normal operations for the remainder of the financial year, NSW Treasury may provide supplementation, however Departments cannot be guaranteed that funding will be provided. Urgent expenditure outside the scope of Emergency Service Organisations or Functional Areas may be directed to the State Emergency Operations Controller in consultation with NSW Treasury. In the event the EOC is activated in support of a Combat Agency then the Combat agency will meet any reasonable costs directly related with the operating costs of the EOC e.g. catering and expendable items. The Guidelines for Reimbursing Agency Expenditure Related to Disaster Emergency and Recovery Operations outlines the requirements for recovering and reporting certain expenditure incurred during emergency response and recovery operations. Agencies are advised to consult with NSW Treasury for additional advice.
7.2 Procedures
The EOCON is to ensure that Standing Operating Procedures (SOPs) are developed for the facility or facilities that are identified as suitable for utilisation as an EOC. These procedures may include (but not limited to) facility activation, rostering, management and reporting.
EOC Policy – Ver 2.0 Page 12 of 65
7.3 Communication
It is the responsibility of the EOCON and Combat Agency to maintain close liaison and communication from the earliest possible opportunity in an actual or emerging emergency situation. This will ensure situational awareness and assist in determining the need for an EOC to be activated. Should a determination be made to activate an EOC, the EOCON will ensure the following are advised at the earliest opportunity: a. Members of the relevant Emergency Management Committee, b. next higher EOCON, c. any lower level or neighbouring EOCONs that are or may be affected, d. Relevant Local and Regional Emergency Management Officer/s (EMO), e. next higher EOC, f. any lower EOCs that are active, and g. other stakeholders as appropriate. All involved emergency services, functional areas and stakeholders are required to ensure effective and timely communications are established and maintained with the EOC. In the event an EOC is activated in support of a Combat Agency, it is the responsibility of the Incident Controller to maintain close communication with, and provide regular briefings to, the EOCON. This may include, but not limited to, status of the operation, supporting requirements and prognosis. The EOCON will ensure this information is disseminated to members of the Emergency Management Committee and relevant stakeholders. Communication procedures and the systems that support communications should be tested regularly as part of the process to assess the operational readiness of the EOC.
7.4 Incident Control Systems
Incident Control Systems (ICS) are flexible, scalable response structures. They provide a common operating framework within which people can work together effectively to manage an incident. These people may be drawn from multiple agencies who do not routinely work together. When a team is developed under an Incident Control System, the team may be referred to as an Incident Management Team (IMT). Dependant on the scale and type of event, the personnel within the EOC may from time to time participate in activities which could be described as ICS functions i.e. Control, Planning, Operations, Logistics and Public Information. It is not axiomatic that these sections be established in EOCs for each event but rather the recognition that the functions exist and the inter-relationship between the functions where one or more individuals may at times be working in or across one or more of these ICS functions.
EOC Policy – Ver 2.0 Page 13 of 65
7.5 Situation Reports
EOCON’s are required to ensure that regular situation reports are developed and disseminated to appropriate parties using the template provided in the Annexures.
7.6 Impact Assessment
Impact assessment is an urgent, integrated, actively planned process of ongoing assessments that is a function of emergency management and assists in the development of situational awareness to inform both the response and recovery phases of an emergency. It involves the collection and interpretation of information about damage that has implications for the social, built, economic, natural and government environments. It also identifies the potential need for a longer-term recovery process. The EOCON is responsible for ensuring an Impact Assessment is initiated within 24 hours of the occurrence where such an assessment is required. The assessment should be regularly reviewed and updated as the situation evolves in order to eventually achieve a comprehensive assessment. Whilst this process is a responsibility of the EOCON, this will require input from the Combat Agency, who may also be undertaking their own form of impact assessment, and other involved stakeholders.
EOC Policy – Ver 2.0 Page 14 of 65
7.7 Public Information
When a combat agency is controlling the response to an emergency, the combat agency is responsible for the management of public information. However the combat agency may request the EOC to undertake some public information management duties through the Public Information Functional Area Coordinator (PIFAC).
Responsibility for management of public information rests with the EOC when the EOCON is controlling an emergency situation.
7.8 Information Management
Information management is the ability to control information in and out of the EOC. Systems are to be established and implemented to ensure effective information collection, collation, interpretation and dissemination and storage.
Electronic Medium - needs to ensure information can be entered, analysed and disseminated in real time or with limited time delays. Intranet or web based information transfer and storage software best facilitates this with hard copy/paper based systems utilised for continuity purposes when electronic systems fail or falter. Security of Information – Some records and information created and utilised in an EOC can be sensitive in nature. The management of records and files related to the EOC functioning requires a secure environment for retaining data and the ability to ensure backup of information files. Processes, systems and guidelines need to be established to ensure that all records in all formats are managed and retained with access and security issues in mind. Information Proprietor - All records created within the EOC environment remain the property of the EOCON of which retention, security and management may be delegated to the Emergency Management Officer. This includes any information, including emails and other electronic information transmitted on agency’s computer systems when working in the EOC. Copies of any such emails and transmissions should be downloaded, printed and/or copied to the EOC for retention by the EOC in accordance with the Information Retention requirements. Information Retention – All information collected, created and processed within an EOC environment is to be retained as per the NSW Police Force record authority (Functional Retention and Disposal Authority DA220), including where documents are retained by local government at local level on behalf of a LEOCON.
EOC Policy – Ver 2.0 Page 15 of 65
7.9 Liaison Officers
A Liaison Officer is a person, nominated or appointed by an organisation or functional area, to represent that organisation or functional area at a control centre, emergency operations centre, coordination centre or site control point (Refer Annexure 5). A liaison officer maintains communications with and conveys directions/requests to their organisation or functional area, and provides advice on the status, capabilities, actions and requirements of their organisation or functional area. [Source – State EMPLAN 2012] In the case of liaison between the Combat Agency and the EOC, the EOCON and Incident Controller will determine the appropriate location/s for Liaison Officer/s to facilitate effective communication.
7.10 Structure (& Staffing)
The EOCON will determine staffing and which agencies are to provide Liaison Officers to the EOC. Refer to sample organisation chart above and reference to guidelines.
7.11 Key Roles and Responsibilities
These are outlined in Annexure 6 - EOC Key Roles and Responsibilities that supplement this policy.
7.12 Recovery Arrangements
To ensure the most appropriate recovery structure is established, the SEOCON and Combat Agency Controller, in consultation with the State Emergency Recovery Controller (SERCON), will agree on the most effective arrangements for commencing recovery processes during the response phase. The SERCON may, in consultation with the Combat Agency Controller and/or EOCON, deploy a Liaison Officer to the appropriate EOC to scope potential need for recovery. An EOC may remain activated and staffed appropriately to support the immediate actions and functions of a Recovery Committee. This should be considered by the relevant EOCON and Emergency Management Committee when determining the need for coordinated recovery. Where an EOC is activated to support both response and recovery operations, the EOCON and Recovery staff will liaise closely to ensure appropriate coordination of resources and avoid duplication.
EOC Policy – Ver 2.0 Page 16 of 65
8 MAINTENANCE
8.1 Operational Readiness Audits
To ensure the operational readiness of EOCs, quarterly audits are to be undertaken of identified facilities. These audits are the responsibility of the EOCON and are to be conducted with members of relevant Emergency Management Committees. Audits are to be conducted utilising the template which supplements this policy and are to be completed and submitted as below by the end of January, April, July and October. The results of Local EOC audits are to be forwarded to the respective REOCON and those for the Regional EOC audits are to be forwarded to NSW Police Emergency Management Unit.
8.2 Training and Exercising
The capability of the EOC to respond effectively to response and recovery operations depends upon the maintenance of sufficient and appropriately trained personnel and the regular testing of the facility, systems through the conduct of exercises. An EOC is always a multi-agency facility. Agencies that deploy personnel to perform roles within an EOC are to ensure such personnel are appropriately trained in working in a multi-agency EOC environment. Ministry for Police & Emergency Services and Emergency Management Australia (EMA) provide a range of courses that meet the skills and qualifications required for working within an EOC environment. Under the direction of the EOCON the relevant level emergency management committee is to ensure that exercising of the EOC functions and agency staff supporting those functions is undertaken annually to ensure maintenance of EOC capability.
8.3 Review
This policy is to be reviewed every two years or as directed by the SEOCON.
EOC Policy – Ver 2.0 Page 17 of 65
ANNEXURE 1 – EOC LAYOUT GUIDELINES
Physical Facility
The Emergency Operations Controller must ensure that any facility identified as a possible EOC is capable of complying with Occupational Health and Safety legislation and regulations. Consideration should be given to ensuring adequate facilities are available.. Physical Resources The physical resources required to support operations in an EOC include but are not limited to the following: a. Display Boards eg. White boards/SMART boards/display boards b. Stationery c. Computers d. Audio / visual equipment e. Plans and Manuals f. Printers/Scanners ( Black/White and Colour ) Communications Systems An EOC is a centre of communication which provides the ability to communicate and confer between individuals and agencies involved in an emergency operation. Communications systems and processes are used to support the primary business needs of an EOC. These include: Telecommunication (Landline & Facsimile ) Telecommunications systems are better serviced if operated through direct exchange connection (Public Switched Telephone Network (PSTN)) rather than through individual agency switchboard systems. When planning for the deployment of PSTN telecommunications lines ensure that ADSL (internet) and facsimile machines (where required) are allocated a dedicated line first, the remaining lines may then be deployed for voice communications. Internet Connectivity This requires high capacity download rates as well as multiple data capability such as broadband over ADSL or optic fibre. Dial-up connections, which should be avoided, reduce capability and efficiency through download time delays and time-out errors. Email Managing information electronically should be independent of personal identity and be able to transcend shift changes or personnel availability. Implementation of a range of generic email addresses that have access permissions and auto forwards allows for information management and security principles to be applied more efficiently. Ideally email facilities should be available to a multitude of agencies and not limited to those from any particular agency, specifically, any email addresses established should be for generic positions such as the EOCON, EMO, media or the EOC itself. Further, having email addresses accessible through a web-based browser allows users to be able to access such emails without being
EOC Policy – Ver 2.0 Page 18 of 65
connected through any agency system and allows for redundancy if the EOC needs to change locations. Geographic Information Systems GIS data provides operational information layers and graphical display of information. It is a capability that provides better ability to analyse information when data is available. This capability does require suitable resources to ensure it is utilised to its fullest, such as : a. Plotter / A3 Colour Printer b. Dedicated GIS computer/s and software Workplace Design In the past, Emergency Operations Centre designs and layouts have been developed by less than idealistic constraints and concerns. The size and shape of space that is available has influenced the EOC layout and therefore its ability to implement business needs and execute responsibilities. EOC layouts can be described in terms of a few basic layouts or designs which afford cohesion to the coordination or management principles of such centres. Whichever design is constructed, it should ensure that it enhances the principles of communication flow and the ability to facilitate command and control as well as support functions. Internationally, layout designs are built around numerous profiles, all specifically created to influence the communication and control elements played out in an EOC as required by the governing agency. 1. Boardroom Centre staff amass around a single table, u-shaped or oval-shaped assembly of workstations. The focus of this layout is with participants facing towards each other for enhancement of communication and direct interaction. This layout is specifically suited to small management teams with the control element located within the boardroom layout or within close proximity. Access and visibility to displays restricted to direct forward display for sections of the management team or where movement of participants is required for complete information appreciation. This layout is predominately used in areas with limited space or are for other administrative functions of an organisation to which an Emergency Operations Centre utilise the space through default due to limited options. This layout historically supports a paper based communication and management system.
EOC Policy – Ver 2.0 Page 19 of 65
Fig 1: Boardroom Example 1 Fig 2: Boardroom Example 2 Strengths As a layout for the purpose of ensuring collaboration through discussion and interactions, it forces the focus onto the information sharing and team focus on solution finding. The control element is part of the integrated layout but can be reinforced through continued presence and participation. Weaknesses The layout allows little tolerance for the management of conversational space or privacy. The constant exposure to noise, imposition on personal space and shared desk areas can lead to not only physical discomfort but also distraction to productive mental processing. 2. Stadium Staff are located along the walls, forming an outer ring facing inward toward the table. The central open area is sometimes the central point for information display or management and affords a more ‘friendly’ environment to modular/focused discussions or task orientated groups.
Fig 3: Stadium Example 1 Fig 4: Stadium Example 2 Strengths The ability for tasking for solution finding and collaboration for task actions can be better facilitated while also affording some privacy and noise control through distancing.
EOC Policy – Ver 2.0 Page 20 of 65
Weaknesses The layout allows little consolidation of effort and larger team collaboration is harder to facilitate. The special environment that this type of layout is set up in often means that staff creates ‘silos’ in which they work. When this layout is used as a default, with specific tables allocated to agencies or functional areas, there is a tendency for liaison officers at those tables to unconsciously have expectation of others to move to them rather than consolidate discussion and solution finding groups. 3. Mission Control This model lends itself to a more comparative style of information management based around technology as the key transfer and visual mediums utilised. This is due to the effect monitors have on blocking forward communications across a room and directs staff to sideways communications. Staff are located in rows and module style side-by-side facing toward an area accommodating visual displays for generic information sharing. The direction of the curved model can also influence the sense of focus bearing external output versus inter-personal collaboration. This model, more appropriate for technological based information management, needs to also be supported by appropriate space and area that encompass multiple personnel gatherings in an arena that encourages discussion.
Fig 5: Mission Control Example 1 Fig 6: Mission Control Example 2 Strengths As a layout for the purpose of ‘monitoring’, it forces the focus onto the information collection and display. The control element is part of the integrated layout but can be reinforced through obligatory withdrawal for briefings and modular discussions. Weaknesses The tendency of staff, located in this layout, is to interact less by face-to-face and have more reliance upon the technology to communicate information. This can lead to singular intellectual processing of information that the decision making process is based on rather than collaborative or team processing and analysis. This layout exemplifies the tactical or tasked based actions related to information and less on the collaborative approach for planning and problem solving.
EOC Policy – Ver 2.0 Page 21 of 65
The tendency may be for the display of information to override the overall analysis and integration of the information into the decision making process. Due to this a strong control function needs to ensure collaboration, analysis and validation of information to ensure it is incorporated into the decision making process rather than dictating to it. 4. Marketplace The marketplace model is basically a collection of small Boardroom-style tables scattered across a large space. Each table has a specialized function, and coordination is accomplished by communicating (frequently by getting up and walking) between tables. This allows workgroup dynamics to be utilised with the decision makers defining management by physical movement around the space/area. It and also lends itself to collaboration of personnel as well as between workgroups The layout can compliment both paper based and electronic mediums which creates versatility This layout has similar strengths and weakness to the Stadium layout. 5. Bulls Eye The Bull's Eye model elaborates the Boardroom design with more extensive staff support at tables laid out in an approximation of concentric circles around the main table. Each staff section is seated behind their representatives at the main table. The Bulls Eye model takes a lot of floor space and the use of visual displays must be afforded duplicity for ease of visual capture.
Fig 7: Marketplace Example Fig: Bulls Eye example 6. Integrated The Integrated model utilises the reality of the restrictions posed for most emergency managers in New South Wales - the availability of personnel to physically locate at an EOC. Telephone, computer and video conferencing by staff contribute to the virtual location of an EOC. These arrangements are not considered ideal by default but do allow and recognise the difficulty
EOC Policy – Ver 2.0 Page 22 of 65
in supporting the staffing of a centre in often time critical environments or with restriction of movement of staff due to access issues. Integrated layouts should be included into any of the other layout options as a contingency for business continuity in adverse constraints, providing the ability to: a. Ensure participation of all necessary parties into the makeup of the Emergency Operations
Centre team. b. Potential to include Site Controllers, other Emergency Operations Centres and Agency
Headquarters directly in discussions and briefings. c. Allow a more phased process of staff participation for activation and closure.
EOC Policy – Ver 2.0 Page 23 of 65
ANNEXURE 2 – EOC OPERATIONAL READINESS AUDIT TEMPLATE
EOC Policy – Ver 2.0 Page 24 of 65
EOC OPERATIONAL READINESS AUDIT REPORT
Location : Month / Year
Conducted By :
RESOURCE / ISSUE INDICATOR or
COMMENT
Availability and access Immediate access available on a 24 hour basis.
Key holder details confirmed.
Alternate EOC Alternate facility identified.
Audio Visual equipment
Commercial and/or Subscription Television available.
Commercial Radio available.
Data Projector available.
Smart Boards available.
Back Up power Emergency generator available.
UPS attached to computers.
Bathroom facilities Toilets and washing available.
Clock 24 hours clock clearly visible to all within EOC.
Communications
devices
Appropriate number of telephones handset available.
Facsimile available.
Contact lists Current and located within EOC.
EOC SOPs Current and located within EOC.
Furniture Quantities adequate for expected personnel numbers.
In good and working condition.
Information Technology
Appropriate number of computers available.
Printer network available.
Internet and email connectivity available and tested.
Photocopier available.
Kitchen facilities Kitchen area offering refrigeration, light meal cooking and
EOC Policy – Ver 2.0 Page 25 of 65
RESOURCE / ISSUE INDICATOR or
COMMENT
tea/coffee facilities available.
Maps & GeoSpatial
Large laminated map/s of Local Government Area(s)
available.
Dedicated Geospatial Information System ( GIS ) computer
/ system available.
Plotter / A3 Printer networked to GIS system.
Meal area Suitable area available for staff to consume meals.
Meeting / debrief area
available Discrete area available for meetings and debrief.
Occupational Health &
Safety
Risk assessment undertaken to ensure safe working
environment.
Parking Secure parking available.
All weather parking available.
Plans Current hardcopies located in EOC.
Electronic versions available through website.
Rest area Discrete area available to allow for staff stand down.
Security Security of EOC able to be facilitated.
Stationery Sufficient supplies available for each work station.
Tabards Access to full set of appropriate tabards for position
holders and agency liaison officers.
Whiteboards Sufficient whiteboards to depict information.
EOC Policy – Ver 2.0 Page 26 of 65
ANNEXURE 3 - EOC FORMS
Record of Conversation
Task / Resource Request Form
Operations Log
Attendance Register
Document Register
Facsimile Message
EOC File Cover
White original: To registry for filing in EOC Pink copy: For action Yellow copy:To be kept by Originator PLEASE PRINT CLEARLY
Emergency Operations Centre
RECORD OF CONVERSATION Location: Date / Time:
FROM
Name: Title / Agency: Phone
TO
Name: Title / Agency: Phone:
SUBJECT
DETAILS
ACTION DETAILS
Register No.
White original: To registry for filing in EOC Pink copy: For action Yellow copy:To be kept by Originator PLEASE PRINT CLEARLY
Emergency Operations Centre
TASK / RESOURCE REQUEST FORM Location: Request No:
PERSON MAKING REQUEST
Name: Title / Agency: Phone:
REQUEST DETAILS (Detailed description of task or resource)
Location (Destination – where the task or resource is to be completed or delivered)
Target Date & Time (Time for completion of task / delivery of resource)
Contact Person (The name of the person taking delivery of the task / resource)
Name: Title / Agency: Phone:
ACTION DETAILS
Referred to (The person who will take action on the request) Name: Title / Agency: Phone:
Referred on: (date) at: (time)
Estimated Cost: $
Recommended by Name: Title / Agency: Phone:
Approved by: Name: Title / Agency: Phone:
COMPLETION DETAILS
Name: Title / Agency: Phone:
Completed on: (date) at: (time)
Final Cost: $
Register No.
White original: To registry for filing in EOC PLEASE PRINT CLEARLY
OPERATIONS LOG Multi Agency Emergency Operations Centre at ………………………………………………………….. Single Agency Operations Centre at …………………………………………………………………... Event:.............................................................................................................................................................................................. Date: ........../........../.......... Name of Operator: ............................................................................................... Position / Agency: ................................................................................................................
No. TIME PARTICULARS ACTION / COMMENT COMPLETED
Page ___ of ___
White original: To registry for filing in EOC PLEASE PRINT CLEARLY
ATTENDANCE REGISTER Emergency Operations Centre Location: Event: Event No: Date:
DATE START
TIME IN
NAME (Print)
ORGANISATION PASS No.
SIGNATURE IN
DATE FINISH
TIME OUT
SIGNATURE OUT
DOCUMENT REGISTER Emergency Operations Centre Location: Event: Event No: Date:
Message No.
TIME TO FROM SUBJECT COMPLETED
To register all Records of Conversation, Task / Resource Requests, Facsimiles, Sitreps and other written documents received by or disseminated from the EOC. Page ____ of _____
Emergency Operations Centre
FAX MESSAGE EOC Location: Date / Time:
TO
Name: Title / Agency: Fax No:
FROM
Name: Title / Agency: Phone No: Fax No:
SUBJECT URGENT □
ROUTINE □
Number of Pages (Including this sheet)
MESSAGE
Register No.
EOC FILE COVER
Incident No. /
INCIDENT / EVENT NAME
SUPPORT
CONTROL
LOCATION
ACTIVATION
GREEN [TIME DAYMONTHYEAR]
RED [TIME DAYMONTHYEAR]
YELLOW [TIME DAYMONTHYEAR]
FOLIO BRIEF DESCRIPTION
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
EOC Policy – Ver 2.0 Page 34 of 65
ANNEXURE 4 - EOC BOARD LAYOUTS
Situation Board
Contact Board
Resources Board
Access Board
Significant Events Board
Task Allocation Board
Victim Status Board
Situation Board
Essential Services Board
EOC Policy – Ver 2.0 Page 35 of 65
Situation Board Correct as at: [dd/mm/yyyy HH:mm]
EVENT
What happened and when
LOCATION
Exact location
Give boundaries if over a large area (Display overview map of area)
CONTROL/COMMAND
Who is in charge
Where located
What means of communication
Liaison Officer locations
SUMMARY
Overview
Specific threats/hazards
What has been done
What needs to be done
What is planned to be done
Other problems
SUPPORT SERVICES OPERATING
List supporting Organisations
Contact Board Correct as at: [dd/mm/yyyy HH:mm]
ORGANISATION/ PERSON/RESOURCE
PHONE/S FACSIMILE EMAIL REMARKS
Resources Board Correct as at: [dd/mm/yyyy HH:mm]]
RESOURCE
TYPE QTY AVAILABILITY LOCATION
ALLOCATION/REVIEW/
REMARKS
CONTROL
EOC Policy – Ver 2.0 Page 36 of 65
Access Board Correct as at: [dd/mm/yyyy HH:mm]
ROAD/RAIL/AIR/WATER OPEN /
CLOSED
DETOUR or
ALTERNATE
REMARKS (incl. when
expect to re-open)
Significant Events Board Correct as at: [dd/mm/yyyy HH:mm]
SERIAL DATE/TIME
ALLOCATED
EVENT
RESPONSIBILITY COMPLETED REMARKS
Task Allocation Board Correct as at: [dd/mm/yyyy HH:mm]
TASK PRIORITY ALLOCATED
TO
ACTION
FINISHED
Victim Status Board Correct as at: [dd/mm/yyyy HH:mm]
LOCATION TYPE REMARKS
# DECEASED
# INJURED
# Red (immediate life threatening
injuries)
# Orange (Less serious)
# Green (Walking injured)
# TRAPPED
# EVACUEES
# HOMELESS
# UNACCOUNTED FOR
Comments re
movements actions etc
EOC Policy – Ver 2.0 Page 37 of 65
Essential Services Board Correct as at: [dd/mm/yyyy HH:mm]
SERVICE REMARKS
Electricity
Water Gas Sewerage Fuel Communications
EOC Policy – Ver 2.0 Page 38 of 65
ANNEXURE 5 - EOC KEY ROLES & RESPONSIBILITIES
Emergency Operations Controller
Emergency Management Officer
Operations Officer
Logistics Officer
Planning Officer
Liaison Officer
EOC Policy – Ver 2.0 Page 39 of 65
Emergency Operations Controller (EOCON) 1. The EOCON is responsible (where required), for: 2. Monitoring single service operations, where control and support coordination
remains with the responsible combat agency, to ensure an effective response in the event that resource support is required.
3. Coordinating external support and resources on behalf of the responsible combat agency.
4. Controlling emergency operations where : a. the EOCON is designated as controller in EMPLAN ; or b. there is no designated combat agency ; or c. the combat agency hands over control to the EOCON ( with the approval of
the combat agency head and SEOCON )
5. In performing these tasks, the EOCON may issue directions to government / non government agencies which have functions in connection with responses to emergencies for the purpose of controlling the allocation of resources, and for providing support.
6. The functions of the EOCON may be exercised without the need for the declaration of a State of Emergency.
7. To assist in the performance of these duties, the EOCON is to establish and control an Emergency Operations Centre.
8. In performing these duties, the EOCON is responsible to the next higher level of responsibility eg. Local, Regional, State.
EOC Policy – Ver 2.0 Page 40 of 65
Emergency Management Officer (EMO) 1. The Emergency Management Officer is the executive officer to the EOCON. The
role of the EMO is to advise, support and assist the EOCON to monitor, control and coordinate emergency response operations as necessary.
2. The EMO is responsible for:
a. providing executive support and operational advice to the EOCON as required ;
b. the ongoing management of the EOC and its facilities including administrative measures relative to the EOC ;
c. providing an ongoing monitoring service to ensure that the EOCON is aware of incidents with the potential to develop into emergencies ;
d. arranging and coordinating formal operational debriefs ; e. preparation of post emergency report(s).
3. In performing these duties, the EMO is responsible to the EOCON.
EOC Policy – Ver 2.0 Page 41 of 65
Operations Officer 1. Operations are the ‘doers’ in the organisation, where the objectives of the incident
are accomplished. 2. The Operations Officer is charged with carrying out control direction. The
Operations function is normally the first delegated. 3. Responsibilities include:
a. achieving control objectives ; b. directing tactical operations ; c. participating in the planning process ; d. modifying Action Plans to meet contingencies ; e. providing intelligence to Planning and Control ; and f. maintaining discipline and accountability.
EOC Policy – Ver 2.0 Page 42 of 65
Logistics Officer 1. The Logistics Officer provides services required to manage the incident and to keep
the ‘organisation’ going, such as personnel, equipment, communications, food services, ground support, facilities, finance etc.
2. It is important to note that once human, technical, and mechanical resources are
obtained, the management of those resources is turned over to the Planning and Operations functions.
EOC Policy – Ver 2.0 Page 43 of 65
Planning Officer 1. The Planning Officer provides past, present, and future information about the
incident, including both resource and situation status on a real-time basis.
2. Responsibilities include: a. maintaining accurate resource status ; b. gathering and analysing situation data ; c. providing displays of situation status ; d. estimating future probabilities ; e. preparing alternative strategies ; f. conducting planning meetings ; and g. compiling and distributing approved Action Plans.
3. The Planning Officer must communicate with the other members of the Incident
Management Team.
EOC Policy – Ver 2.0 Page 44 of 65
Liaison Officer (LO) 1. Liaison Officers (LO) represent emergency service organisations, functional areas
and other agencies active in the emergency operation. LOs are only called for duty in the EOC as required. Their role is to provide advice to and accept tasking directions from the EOCON.
2. Liaison Officers are to :
a. Advise on the operational capabilities, resources, and operating procedures of the agency or functional area represented ;
b. Provide operational information and intelligence from the agency or functional area represented ;
c. Convey EOCONs tasking directions and priorities to the agency or functional area represented for implementation ;
d. Clarify EOCONs intentions as necessary ; e. Obtain the latest information from the agency or functional area represented
in regard to the current operation situation and requirements ; f. Keep EOC staff informed on the agency or functional area deployment status,
resources available for tasking, support required and future intentions ; g. Maintain communications links between the EOC and the agency operations
centre or functional area coordination centre, as well as the equivalent LOs at higher and/or lower EOCs ;
h. Comply with the EOC SOPs in regard to message recording, distribution and filing.
3. Before ceasing duty, the LO is to brief the incoming LO on the current operational
situation, particularly any problems encountered, actions taken, and any action still outstanding.
EOC Policy – Ver 2.0 Page 45 of 65
ANNEXURE 6 – EOC SITUATION REPORT
EOC Policy – Ver 2.0 Page 46 of 65
SITUATION REPORT [#] [Name] Emergency Operations Centre
Covering [LGA's covered by the EOC] LGA [dd/mm/yyyy]
Issued: [24 hr time - HH:mm]
SITUATION [Explain the authority/reason the EOC has been activated] [Provide a brief summary of overall threat/situation and specific identification of areas] [Continue to add dot points as required or situation changes/escalates] [Identify if an Operation/incident Action Plan has been developed by either the EOC or Combat Agency] IMPACT ISSUES Short outline identifiying any consequences on the four environments of people, built, economic or environment. When multiple issue/s start to be identiifed then an Impact Assessment MUST be completed] [When an Impact Assessment is produced then this section refers the reader to the latest Impact Assessment by indicating the date and number of the Impact Assessment] CURRENT ACTIVITY [Achievements to date? What activity is currently occurring? What is known? What is not known? Who/what resources are involved? Is there any local media/political interest?] ACTIONS REQUIRED [What actions have been requested of the EOC? Status of actions? List other actions being considered or discussed. Strategies developed/identified. What are the timeframes? What additional resources are required? etc] ACTIONS OUTSTANDING [Descriptors of what is being done to complete outstanding actions? Timeframes? What actions have not commenced? etc] FUTURE CONSIDERATIONS [Use a risk management approach to dot point considerations/consequences in probable scenarios/circumstances]
Prepared By: Approved By: [Name] [Name] [Position] [Local or Region] Emergency Operations Controller
EOC Policy – Ver 2.0 Page 47 of 65
ANNEXURE 7 – IMPACT ASSESSMENT TEMPLATE
EOC Policy – Ver 2.0 Page 48 of 65
[NAME]
Emergency Management Region [INSERT NAME] Emergency Operations Centre
IMPACT ASSESSMENT [#] as at [Day, dd month yyyy, HH:mm]
e.g. Monday, 11 November 2013, 17:11
EOC Location EOC Status
Type of Event
Local Govt Areas Involved
Combat Agency (CA) Date Event Commenced
dd / mm / yyyy
CA Event Name
The impact statement will evolve over time as the operational picture becomes clearer. This is a statement of what has been observed or reported Delete tables not required for this reporting period
SOCIAL
Total Qty
Originating Location
Hospitalised Injury Types Validation
Fatalities # Location Name # Location Name
Confirmed by [Agency] or Reported by [Agency]
Serious Injuries
# Location Name # Location Name # Location Name
# Hospital Name # Hospital Name
Confirmed by [Agency] or Reported by [Agency]
Minor Injuries
# Location Name # Location Name # Location Name
# Hospital Name # Hospital Name
Confirmed by [Agency] or Reported by [Agency]
Enter additional paragraphs of information if required.
DISPLACED
Location/Area Qty Displaced at: Relocated to: Estimated Displacement Period
Insert rows as required
Date & Time Days, Hours, Weeks
Date & Time Days, Hours, Weeks
(Delete and complete as appropriate) This information was confirmed by [Agency] / reported by [Agency] / estimated by [Agency] or This information is unknown / unconfirmed / assumed Enter additional paragraphs of information if required
EOC Policy – Ver 2.0 Page 49 of 65
INCONVENIENCED
Location/Area Qty Reason Estimated Displacement Period
Insert rows as required
i.e. transport, utility failure Days, Hours, Weeks
i.e. transport, utility failure Days, Hours, Weeks
(Delete and complete as appropriate) This information was confirmed by [Agency] / reported by [Agency] / estimated by [Agency] or This information is unknown / unconfirmed / assumed Enter additional paragraphs of information if required
EVACUATIONS
Status Evacuation Centre Location
Address Est. Capacity
Potential Numbers
# at Centre / # DVR
Open or Closed
Insert rows as required
# / #
Open or Closed
# / #
(Delete and complete as appropriate) This information was confirmed by [Agency] / reported by [Agency] / estimated by [Agency] or This information is unknown / unconfirmed / assumed Enter additional paragraphs of information if required
ACCOMMODATION REQUIREMENTS
Current Location/Area LGA Short Term
Medium Term
Long Term
Insert rows as required Qty Qty Qty
Qty Qty Qty
(Delete and complete as appropriate) This information was confirmed by [Agency] / reported by [Agency] / estimated by [Agency] or This information is unknown / unconfirmed / assumed Enter additional paragraphs of information if required
ISOLATIONS
LGA Location No People
Commenced Estimated Isolation Period
Insert rows as required
Date & Time Days, Hours, Weeks
Date & Time Days, Hours, Weeks
(Delete and complete as appropriate) This information was confirmed by [Agency] / reported by [Agency] / estimated by [Agency]
EOC Policy – Ver 2.0 Page 50 of 65
or This information is unknown / unconfirmed / assumed Enter additional paragraphs of information if required
DOMESTIC ANIMALS
Total Qty Originating Location Types Requiring Accommodation
Fatalities # Location Name # Location Name
# Type # Type
Injured # Location Name # Location Name
# Type # Type
# Type # Type
Displaced # Location Name # Location Name
# Type # Type
# Type # Type
(Delete and complete as appropriate) This information was confirmed by [Agency] / reported by [Agency] / estimated by [Agency] or This information is unknown / unconfirmed / assumed Enter additional paragraphs of information if required
PROPERTY HOMES including public housing stock and relocatable homes
Location Damage Types and Qty Portion Uninhabitable
Township, Suburb or Locality ##Type of damage ##Type of damage
# Inhabitable / Total # damaged
Insert more rows as required
(Delete and complete as appropriate) This information was confirmed by [Agency] / reported by [Agency] / estimated by [Agency] or This information is unknown / unconfirmed / assumed Enter additional paragraphs of information if required BUSINESSES
Location Damage Types and Qty Business Types
Township, Suburb or Locality ##Type of damage ##Type of damage
## Type ## Type
Insert more rows as required
(Delete and complete as appropriate) This information was confirmed by [Agency] / reported by [Agency] / estimated by [Agency] or This information is unknown / unconfirmed / assumed Enter additional paragraphs of information if required STOCK Goods and Animals
Location Damage Types and Qty Stock Type
Township, Suburb or Locality ##Type of damage ##Type of damage
## Type ## Type
EOC Policy – Ver 2.0 Page 51 of 65
Insert more rows as required
(Delete and complete as appropriate) This information was confirmed by [Agency] / reported by [Agency] / estimated by [Agency] or This information is unknown / unconfirmed / assumed Enter additional paragraphs of information if required CROPS Including forestry
Location Damage Types and Qty Crop Type
Township, Suburb or Locality ##Type of damage ##Type of damage
## Type ## Type
Insert more rows as required
(Delete and complete as appropriate) This information was confirmed by [Agency] / reported by [Agency] / estimated by [Agency] or This information is unknown / unconfirmed / assumed Enter additional paragraphs of information if required OTHER STRUCTURES Fences, Sheds, Garages, Barns, Animal Shelters etc
Location Damage Types and Qty Type
Township, Suburb or Locality ##Type of damage ##Type of damage
## Type ## Type
Insert more rows as required
(Delete and complete as appropriate) This information was confirmed by [Agency] / reported by [Agency] / estimated by [Agency] or This information is unknown / unconfirmed / assumed Enter additional paragraphs of information if required MOTOR VEHICLES
Location Damage Types and Qty
Township, Suburb or Locality ##Type of damage ##Type of damage
Insert more rows as required
(Delete and complete as appropriate) This information was confirmed by [Agency] / reported by [Agency] / estimated by [Agency] or This information is unknown / unconfirmed / assumed Enter additional paragraphs of information if required
INFRASTRUCTURE ELECTRICITY
Location No of Consumers & Type Estimated Reconnection
Township, Suburb, Locality, Street
## - Domestic ## - Commercial ## - Industrial
Insert more rows as required
(Delete and complete as appropriate)
EOC Policy – Ver 2.0 Page 52 of 65
This information was confirmed by [Agency] / reported by [Agency] / estimated by [Agency] or This information is unknown / unconfirmed / assumed Enter additional paragraphs of information if required
WATER SUPPLY
Location No of Consumers effected Estimated Reconnection
Township, Suburb, Locality, Street
Insert more rows as required
(Delete and complete as appropriate) This information was confirmed by [Agency] / reported by [Agency] / estimated by [Agency] or This information is unknown / unconfirmed / assumed Enter additional paragraphs of information if required
SEWERAGE
Location No of Consumers effected Estimated Reconnection
Township, Suburb, Locality, Street
Insert more rows as required
(Delete and complete as appropriate) This information was confirmed by [Agency] / reported by [Agency] / estimated by [Agency] or This information is unknown / unconfirmed / assumed Enter additional paragraphs of information if required
GAS
Location No of Consumers effected Estimated Reconnection
Township, Suburb, Locality, Street
Insert more rows as required
(Delete and complete as appropriate) This information was confirmed by [Agency] / reported by [Agency] / estimated by [Agency] or This information is unknown / unconfirmed / assumed Enter additional paragraphs of information if required
TELECOMMUNICATIONS
Location No of Consumers effected
Estimated Reconnection
Service Type
Township, Suburb, Locality, Street
Landline, Mobile, Tower etc
EOC Policy – Ver 2.0 Page 53 of 65
Insert more rows as required
(Delete and complete as appropriate) This information was confirmed by [Agency] / reported by [Agency] / estimated by [Agency] or This information is unknown / unconfirmed / assumed
TRANSPORT
Transport Type Location Cause Estimated Reinstatement
Road, Rail, Water, Aviation Township, Suburb, Locality, Street
Date & Time
Insert more rows as required
(Delete and complete as appropriate) This information was confirmed by [Agency] / reported by [Agency] / estimated by [Agency] or This information is unknown / unconfirmed / assumed Enter additional paragraphs of information if required
FOOD SUPPLY Includes supply lines
Location Type No of Consumers
Estimated Reinstatement
Township, Suburb, Locality, Street
List
Date & Time
Insert more rows as required
(Delete and complete as appropriate) This information was confirmed by [Agency] / reported by [Agency] / estimated by [Agency] or This information is unknown / unconfirmed / assumed Enter additional paragraphs of information if required
EDUCATION FACILITIES including public housing stock and relocatable homes
Facility Name Location Facility Type Damage Type
Township, Suburb, Locality, Street
Public/private/special needs school, TAFE, University
Insert more rows as required
(Delete and complete as appropriate) This information was confirmed by [Agency] / reported by [Agency] / estimated by [Agency] or This information is unknown / unconfirmed / assumed Enter additional paragraphs of information if required
FUEL SUPPLIES
Location Supplier Type Damage Type
Retail or Depot
Insert more rows as required
EOC Policy – Ver 2.0 Page 54 of 65
(Delete and complete as appropriate) This information was confirmed by [Agency] / reported by [Agency] / estimated by [Agency] or This information is unknown / unconfirmed / assumed Enter additional paragraphs of information if required
COMMUNITY ASSETS
Asset Type Location Affecting No People
Estimated Reinstatement
Hall, spoting facility, cultural asset etc
Township, Suburb, Locality, Street
Date & Time
Insert more rows as required
(Delete and complete as appropriate) This information was confirmed by [Agency] / reported by [Agency] / estimated by [Agency] or This information is unknown / unconfirmed / assumed Enter additional paragraphs of information if required
ECONOMY INDIVIDUALS (microeconomic) Identify changes to spending patterns and employment following the emergency, what are the anticipated or measured changes to discretionary expenditure
BUSINESSES
Asset Type Changes in Demand
Changes in Access
Changes to Distribution Systems
Changes to Supply Chains
Notes
Primary Production
Yes or No Yes or No Yes or No Yes or No
Retail Yes or No Yes or No Yes or No Yes or No
Industrial Yes or No Yes or No Yes or No Yes or No
Manufacturing Yes or No Yes or No Yes or No Yes or No
Small Business Yes or No Yes or No Yes or No Yes or No
Tourism Yes or No Yes or No Yes or No Yes or No
Mining Yes or No Yes or No Yes or No Yes or No
Local Government Yes or No Yes or No Yes or No Yes or No
CENTRAL GOVERNMENT (macroeconomic) Impact of central government decisions on confidence
ENVIRONMENT NATURAL RESOURCES (Damage to resources such as arable land, quarries, mines or water supplies) Enter information as required (Delete and complete as appropriate) This information was confirmed by [Agency] / reported by [Agency] / estimated by [Agency] or
EOC Policy – Ver 2.0 Page 55 of 65
This information is unknown / unconfirmed / assumed
BIODIVERSITY AND ECOSYSTEMS (Such as habitat or foodstuff loss, destruction of plants and animals, changes in pest population dynamics) Enter information as required (Delete and complete as appropriate) This information was confirmed by [Agency] / reported by [Agency] / estimated by [Agency] or This information is unknown / unconfirmed / assumed
WATERWAYS Enter information as required (Delete and complete as appropriate) This information was confirmed by [Agency] / reported by [Agency] / estimated by [Agency] or This information is unknown / unconfirmed / assumed
NATIVE ANIMALS Enter information as required (Delete and complete as appropriate) This information was confirmed by [Agency] / reported by [Agency] / estimated by [Agency] or This information is unknown / unconfirmed / assumed
NATIVE VEGETATION Enter information as required (Delete and complete as appropriate) This information was confirmed by [Agency] / reported by [Agency] / estimated by [Agency] or This information is unknown / unconfirmed / assumed
WASTE AND POLLUTION (Such as debris, garbage and spills) Enter information as required (Delete and complete as appropriate) This information was confirmed by [Agency] / reported by [Agency] / estimated by [Agency] or This information is unknown / unconfirmed / assumed
AMENITY VALUES AND CULTURAL HERITAGE (Such as scenic lookouts, riverside walkways, conservation estate and culturally significant sites) Enter information as required (Delete and complete as appropriate) This information was confirmed by [Agency] / reported by [Agency] / estimated by [Agency] or This information is unknown / unconfirmed / assumed
RECOVERY ISSUES Identify if there is likely to be a requirement for ongoing Recovery arrangements. If so, why?
EOC Policy – Ver 2.0 Page 56 of 65
RECOVERY REQUIREMENTS
Type Required Established Notes
Recovery Centres Yes or No Location if already established
Recovery Committee
Yes or No Regularity of meeting if already established
Recovery Coordinator
Yes or No Local or District Appointed
Enter additional paragraphs of information if required
FUTURE REPORTING This is the FINAL REPORT to be issued from this EOC or The next report will be issued at DATE AND TIME Prepared by: Name, Position Released by: Name, Position
ATTACHMENTS Maps and / or Diagrams
EOC Policy – Ver 2.0 Page 57 of 65
ANNEXURE 8 – AFTER ACTION REVIEW
EOC Policy – Ver 2.0 Page 58 of 65
AFTER ACTION REVIEW
The purpose of an After Action Review is to:
create a record of actions of Agencies involved
review legislation, plans, policies and procedures
credit recognition
diffuse misinformation
identify and report on what went well and things that can be improved
record of who did what, when, how and why and to use this information to identify what was done well and those things (if any) that could have been done differently so that next time they can be done better
Record observations or insights that might be worthy of capturing for the purpose of ‘Lessons Learned’ from the event
IN CONFIDENCE – RESTRICTED RELEASE should be added to the footer of each page of the document
REOCON COMMENTS The Regional Emergency Operations Controller will provide comment on the report and forward via the relevant Regional Emergency Management Officer to the State Emergency Operations Controller via NSWPF – Emergency Management Unit.
DISTRIBUTION OF THE AFTER ACTION REVIEW REPORT In addition to those that the LEOCON or REOCON decides should receive a copy of the After Action Review Report, the following MUST be sent a copy (preferably electronically):
Regional Emergency Operations Controller
Chairperson of the Local Emergency Management Committee
Local Emergency Management Officer
Respective Regional Emergency Management Officer
SEOCON via NSWPF Emergency Management Unit
[TEMPLATE]
AUTHORITY The After Action Review (AAR) was convened by [LEOCON Name] in accordance with the provisions of Section 111 of the State EMPLAN.
[Location]
[Time / Date]
Each Agency involved has had the opportunity to conduct its own debrief prior to this AAR and brings only those issues that affect the future operation of the EOC or organisational issues that cannot be dealt with internally.
The Chair of the After Action Review was [LEOCON Name]
PURPOSE
The purpose of this After Action Review is to:
create a record of actions of Agencies involved
review legislation, plans, policies and procedures
credit recognition
diffuse misinformation
identify and report on what went well and things that can be improved
EOC Policy – Ver 2.0 Page 59 of 65
record of who did what, when, how and why and to use this information to identify what was done well and those things (if any) that could have been done differently so that next time they can be done better
Record observations or insights that might be worthy of capturing for the purpose of ‘Lessons Learned’ from the event
SCOPE The Scope of this After Action Review is limited to the [Name of Operation] operation, support to the Combat Agency, [agency name], and the operation of the [Name] Emergency Operations Centre or the activities otherwise managed by the LEOCON, including interaction with other agencies.
(If there was NO combat agency for the event this After Action Review deals ONLY with the operation of the Emergency Operations Centre or the activities otherwise managed by the LEOCON, including interaction with other agencies).
DISTRIBUTION This report is [restricted/not restricted ] for distribution outside of the emergency management environment unless otherwise authorised by the Regional Emergency Operations Controller.
IN CONFIDENCE – RESTRICTED RELEASE should be added to the footer of each page of the document.
ATTENDENCE
Attendance list as a table or attached as an Annex.
INTRODUCTION
What type of emergency was it?
Where did it happen and what caused it to occur?
When did it happen and over what period?
EXECUTIVE SUMMARY Provide series of paragraphs that outline a summary of the findings/recommendations/lessons learned and how implementing the recommendations would maintain or improve capability.
This summary should also include anything that was identified as going well and is to be maintained as best practice.
RECOMMENDATIONS Provide summary list of the recommendations developed as a result of the AAR process.
Example:
RECOMMENDATION 1
Text
RECOMMENDATION 2
Text
Etc.
OVERVIEW Provide a brief overview of the event. A chronological history of the event should inserted in to the report or as an Annex, where appropriate, and should be referenced in the overview.
OPERATIONAL ELEMENTS STRUCTURE
Who was the Combat Agency for the event (if appropriate)? If there was no Combat Agency, who was in Control of the event? What control structure was used? Local, Regional or State
EOC Policy – Ver 2.0 Page 60 of 65
control or what was controlled at each level (use a diagram or organisation chart if necessary)
Which agencies (Liaison Officers) attended the EOC. Who was required but not in attendance and why. Which LOs worked at the EOC and which retained remote participation? Were these arrangements appropriate?
Was a Site Control established? Was it required?
EOC proximity to IMT. Beneficial or hindrance to support to combat agency?
What was the link between the Combat Agency Operations Centre and the EOC?
What plans/procedures were implemented?
AREA MANAGEMENT Overview of area, or areas, affected
Exclusion zones (when, where, size)
Site control / s – location and organisation
Command Posts – who, where and when
Can be reported by use of a map as an Annex.
PROBLEM DEFINITION In relation to the circumstances that prompted action by the LEOCON
When it was first noticed there was a problem?
Who first noticed it?
What were the initial problems/issues? How did these change as the event unfolded?
Was the Combat Agency able to give LEOCON an idea of “How big…How long”?
Were potential and actual casualties/victims reported/recognised within appropriate timeframes?
Was potential property/infrastructure damage recognised within appropriate timeframes?
Was interruption to community activity managed appropriately?
COMMUNICATION What were the communication links between:
o The Combat Agency Operations Centre and the EOC?
o The Site and the EOC?
o The Combat Agency and the Community?
o The EOC and the Community?
Were these links effective?
RESOURCE MANAGEMENT Who managed what and how?
Were resources required from outside the local area?
How were these accessed?
Were they accessed/obtained within reasonable timeframes?
POLITICAL ISSUES Level of support / involvement of Local, State, Federal politicians
Was engagement appropriate to meet needs/interest?
EOC Policy – Ver 2.0 Page 61 of 65
Need for Legislative changes to improve operational capability?
INFORMATION MANAGEMENT How/when was the LEOCON informed that there was a situation?
How was the Community warned?
How the Community was kept informed? What Strategies were used? Were they timely and effective
Was anyone NOT informed who should have been?
FINANCE MANAGEMENT Record keeping
Costs associated with running the EOC
o Met by Combat Agency?
o Met by Council?
o Reimbursement?
EMERGENCY OPERATIONS CENTRE FACILITY
Located at (insert name of building and address)?
This is / is not the nominated EOC. If the nominated EOC not used explain why.
EOC ACTICATION LEVELS
The EOC was at the following levels for the corresponding times:
Status From (Date/Time) To (Date/Time)
White
Yellow
Red
Green
EOC ACTIVATION
The EOC was activated for the following Reasons:
Status From To
Monitor
Support other Agency
Control Operation
Other (provide detail)
EOC ACTIVATION DETAILS Who made the decision to activate?
Was the decision made in consultation with combat agency (if there was one)?
What information was used to make the decision?
Personnel was determined by the LEOCON (yes / no)
EOC Policy – Ver 2.0 Page 62 of 65
Time called
Significant delay issues if any
Was the activation of the EOC communicated to all including the community?
Were appropriate people called?
o EOC support staff
o Emergency Service Organisations
o Agencies in Functional Areas
Were people advised?
o What had happened
o Where to go to
o How long expected to be at the EOC
o What to bring
o What route to take
Shift management
o Were shifts staggered to allow for continuity within the EOC
o Did everyone get appropriate breaks and relief
EOC Equipment
o Equipment/resources appropriate for the level of operation?
o Did anything need to be improvised due to unavailability/unsuitability?
o What equipment/resources are needed to improve functionality in the future?
LIAISON OFFICERS Were LOs aware of their role in the EOC?
Did LOs bring appropriate information and equipment?
Was the LO role adequately supported by their parent agencies?
EOC INFORMATION MANAGEMENT Did everyone clearly understand the purpose of the EOC and activities undertaken?
Boards and Displays effective/appropriate?
Liaison Officer input/consultation?
Planning meetings effective/adequate?
Briefings effective/adequate? Was everyone in the EOC aware of what was happening (or proposed to happen) at any given time?
File management and administration procedures understood and adhered to?
Warnings
o Who held the responsibility?
o Strategies used for warnings issued by EOC
Media Releases
o Who to and how?
EOC Policy – Ver 2.0 Page 63 of 65
SITREPS
o Were they timely and submitted as required?
o New template used. Did it meet the needs?
Impact Assessments
o Was there sufficient information?
o Was an Information Collection plan required?
o Did Liaison Officers contribute to the process effectively? Did they assist in determining what the problems were, where they were and what needed to be done?
Was the decision to CLOSE the EOC communicated to all including the community?
Was a “hot” debrief held to capture issues and set up for a more formal After Action Review
RECOVERY Was the need for a formal Recovery process identified?
How was the process determined?
To whom was the need communicated?
What process was established?
Provide comment and Observations regarding these processes.
RECOMMENDATIONS
Any recommendations identified should be entered within the topic area in which it is identified.
All recommendations should be listed sequentially through the document and then summarised in sequential order in the recommendation section after the executive summary.
Example:
RECOMMENDATION # Text describing the recommendation blocked in by lines and grey shading
SIGNATURE The Local Emergency Operations Controller signs the After Action Review Report and authorises the Local Emergency Management Officer to distribute it. Provide a List of the Recipients of the Report.
ANNEXES to REPORT List the any Annexes to the Report and provide as attachments including the following;
ATTENDENCE SHEET Template Attached
ISSUES REGISTER Fill in the After Action Review Issues Register (P: with all the matters that need to be
completed, followed up or actioned as a result of the After Action Review
Include those matters where Recommendations have been made to others
Template Attached
EOC Policy – Ver 2.0 Page 64 of 65
ATTENDANCE (Sample of Attendance Register)
AFTER ACTION REVIEW ATTENDANCE REGISTER
Operation
Date/s of Operation
EOC
Date of Review
Name
Position
Agency
Signature
EOC Policy – Ver 2.0 Page 65 of 65
ISSUES REGISTER
AFT
ER A
CTI
ON
REV
IEW
REP
OR
T –
Iss
ues
Re
gist
er
Re
solu
tio
n D
ue
Ide
nti
fy a
dat
e o
r
occ
urr
en
ce
Re
spo
nsi
ble
Off
ice
r /
Age
ncy
Po
siti
on
rat
her
th
an
ind
ivid
ual
Dat
e/s
of
Op
erat
ion
Dat
e o
f R
evi
ew
Can
Iss
ue
Be
dea
lt
wit
h a
t Lo
cal L
eve
l -
Y
/N
Is I
ssu
e In
tern
al
wit
hin
an
Age
ncy
Y
/N
Act
ion
s to
be
take
n
Sho
rt s
um
mar
y
Ob
serv
atio
ns
/ D
esc
rip
tio
n
Sho
rt s
um
mar
y in
clu
din
g
wh
o/a
gen
cy id
enti
fyin
g is
sue
OP
ERA
TIO
N
EOC
Cat
ego
ry A
rea
Rel
atin
g to
Su
bje
ct/o
per
atio
nal
ar
eas
i.e. p
lan
s, p
roce
du
res,
equ
ipm
ent,
res
ou
rcin
g, t
rain
ing
etc.
Ite
m