Page 1: Electricity Security of Supply European System Adequacy Forecast XV Florence Forum, 24-25. November 2008

Electricity Security of Supply

European System Adequacy Forecast

XV Florence Forum, 24-25. November 2008

Page 2: Electricity Security of Supply European System Adequacy Forecast XV Florence Forum, 24-25. November 2008

2 Electricity Security of Supply

Highlights

Background, objectives, necessary improvements

10 years network development statement

Outlook

Page 3: Electricity Security of Supply European System Adequacy Forecast XV Florence Forum, 24-25. November 2008

3 Electricity Security of Supply

Background & History

The XIV Florence Forum (24-26 September 2007) has invited Regulators to continue work on security of supply together with ETSO and other stakeholders

The results of those discussions and work are presented here

Workshops already in 2007 with Nordel and UCTE Two workshops and several meetings with ETSO in 2008

A list of current practices’ drawbacks and possible improvements has been established

Identified necessary actions Agree on objectives Complete the list of possible improvements Identify barriers to implementation – cost/benefit analysis Identify possible common actions and establish an action plan

Page 4: Electricity Security of Supply European System Adequacy Forecast XV Florence Forum, 24-25. November 2008

4 Electricity Security of Supply

Objectives for further SAF Development

… to provide market participants with information on demand, generation and grid developments and enhance thus market opportunities

… to highlight the possibility of synergies between countries

… to provide authorities an assessment of system adequacy

Timeframes: 3-5/10 years, seasonal (summer/winter), annual

Perimeter: applicable for the whole EU, but possibly starting with some geographical areas (regions) if that is more feasible

Comply with the existing (Dir. 2003/54/EC, 2005/89/EC) and anticipated new (Third Package) legal framework

Page 5: Electricity Security of Supply European System Adequacy Forecast XV Florence Forum, 24-25. November 2008

5 Electricity Security of Supply

Key Necessary Improvements Identified

Harmonization of data & information that must be made available to each TSO, in order to get the knowledge of system status and prospects

Enhanced methodology and system modelling

Scenarios and probabilistic approach

Page 6: Electricity Security of Supply European System Adequacy Forecast XV Florence Forum, 24-25. November 2008

6 Electricity Security of Supply

Key Necessary Improvements Identified (details)

ETSO to identify the differences between present forecasting and the approach which is anticipated to emerge from the 3rd Legislative Package.

Different timescales, seasonal statements, accuracy of data

Test and ensure compatibility of data & information acquisition methods used in MS

Interregional issues to be addressed

Consider increased reliance on interconnections

Page 7: Electricity Security of Supply European System Adequacy Forecast XV Florence Forum, 24-25. November 2008

7 Electricity Security of Supply

Key Necessary Improvements Identified (details) (cont’d)

Consider scenarios and be transparent on data / assumptions behind them

Take into account the effect of environmental impact assessment in the new projects

Consider impact of renewables

Consider socio-economic impacts in scenarios

Use a bottom-up approach with increased cooperation between TSOs

Start a debate, meetings and consultation of stakeholders, with an expectation to produce the 1st report in June 2010

Page 8: Electricity Security of Supply European System Adequacy Forecast XV Florence Forum, 24-25. November 2008

8 Electricity Security of Supply

The Future Framework to fit in:3rd Legislative Package Requirements

Art. 12g of the “new” Electricity Directive (10-year MSs plan)1. TSO NRA 10-year plan, annually, measures for adequacy & security2. Indication of transmission projects, list of investments, timeframe3. Generation, supply, consumption, exchanges assumptions other EU-networks4. Regulators: to consult all network users 5. Regulators: check consistency with EU 10-year plan6. Regulators: monitor and evaluate implementation7. Regulators’ obligation for measures (8.) if TSO does not execute investment8. Measures …

Art. 2c.1.b of the “new” Electricity Regulation (10-year EU plan)b) 10-year plan, including a generation adequacy outlook, every two yearse) Annual summer / winter generation adequacy outlook

Art. 2c.1.c of the “new” Electricity RegulationGeneration adequacy outlook: current and projected adequacy, 5y & 5-15y

Page 9: Electricity Security of Supply European System Adequacy Forecast XV Florence Forum, 24-25. November 2008

10 Year Network Development Statement

Draft

Florence Forum

Draft 13 November 2008

Page 10: Electricity Security of Supply European System Adequacy Forecast XV Florence Forum, 24-25. November 2008

10

Objectives of the Report• Previously long-term system adequacy assessment focused on

generation adequacy

• The EU economy needs a comprehensive picture of power system development as a whole

• Consequently the 3rd Package requires a 10-Year Statement to cover the following aspects

• load development• scenarios of generation development and generation additions • important transmission extensions of European interest

• The report can provide an expert assessment of:• future power system development• transmission and generation adequacy • impact of transmission extensions for interconnections between

regions/countries• impact of internal reinforcements affecting transmission capacity

Page 11: Electricity Security of Supply European System Adequacy Forecast XV Florence Forum, 24-25. November 2008

11

Approach to Dealing with Uncertainties

• Future electricity market development is uncertain:• Actions of EU/national legislators

• Regulatory environment

• Actions of market participants

• External factors (e.g. global economic climate)

Different scenarios will be used to deal with these uncertainties

• The scenarios themselves contain significant variables:• Amount, location, timescales of generation projects

• Differing timescales to complete generation/transmission projects

Grid development must be robust, yet flexible

Page 12: Electricity Security of Supply European System Adequacy Forecast XV Florence Forum, 24-25. November 2008

12

Scenarios• The report will focus on at least the following scenarios:

- Scenario “Best Estimate”:- Considers additional new generation considered certain or likely- Load development “business as usual”

- Scenario “EU 2020”:- Considers the targets for renewables set by the EU- 20 % renewable, +20 % energy efficiency, 20 % CO2-reduction- Load development will include efficiency gains

• The report will provide scenarios with an expert assessment based on the information available to TSOs

• Investors have to make their decisions based on their own analysis of market development

Page 13: Electricity Security of Supply European System Adequacy Forecast XV Florence Forum, 24-25. November 2008

13

Overview “End Product”• The Ten Year Network Development Statement will be a

considerable step beyond existing System Adequacy reporting

• It will be easy to comprehend – especially for people who are not grid experts

• The assumptions, developments, deductions and results will be easy to follow

• The report will give an overview of the situation in Europe

• “In depth” approach for countries and regions where more detailed information is required

Page 14: Electricity Security of Supply European System Adequacy Forecast XV Florence Forum, 24-25. November 2008

14

Example: Overview System Adequacy

Dependent upon imports over the whole summer under normal conditions

Some imports may be required under normal conditions

No specific issues identified under severe conditions

Imports will be required under severe conditions

Potential requirement for imports under certain conditions

HU

BPL

DE

CH

NL

EPT

SLOCro

Ser

FYROMAL

BG

ROM

GB

IRL

LT

EST

LV

N

SE

GR

BA

SK

A

FIN

CY

DK

F

I

CZ

Mon

CY

Example

Page 15: Electricity Security of Supply European System Adequacy Forecast XV Florence Forum, 24-25. November 2008

15

Example: Network Extensions

Excerpt from UCTE Transmission Plan 2008

Example

Page 16: Electricity Security of Supply European System Adequacy Forecast XV Florence Forum, 24-25. November 2008

16

Cooperation ETSO-CEER• How can the regulators help to ensure the quality of the

report?

• TSOs should be in the position to get high quality data from market participants

• In some countries the regulators already started consultation processes with market participants to develop a view of the future load and generation scenarios. The results should be made available to the TSOs.

• Clarifying likely policy developments within energy ministries of Member States will be an important issue

• Data quality for a long term prognosis depends on two factors

• Today's best available input data• Taking as many views into consideration while developing scenarios to

ensure a broad view on the future development

Page 17: Electricity Security of Supply European System Adequacy Forecast XV Florence Forum, 24-25. November 2008

17

Conclusions and Next Steps• The 10-Year Network Development Statement is a very ambitious

project – a significant step beyond current System Adequacy reporting

• The statement will be based on different supply and demand scenarios and planned transmission grid extensions

• Regulators can play an important role:

• ensuring availability of high quality input data

• giving input on scenario development via consultation with stakeholders.

• CEER and ETSO will continue their information exchange and identify the next steps to ensure high data quality

• ENTSO-E will publish a first report in 2010 with a working draft in 2009

Page 18: Electricity Security of Supply European System Adequacy Forecast XV Florence Forum, 24-25. November 2008

18 Electricity Security of Supply

Outlook

To clarify, involving the EC Impact of and relation to the 3rd Legislative Package Expectations at the EU level vs. regional focus

To clarify and define involving stakeholders Goal / information to be available for the stakeholders Role of regulators in the process Role of other stakeholders (e.g. generators) in the process

Action plan Resolve outstanding issues and start work on definition and implementation of

enhanced pan-EU SAF by Q1/2009 Adjust methodology and produce the first “real” SAF according to the new

methodology by 06/2010