ECP 11-0515b Lucy HV Air Metering Unit 5 Limb Test Form
Lucy HV Air Metering Unit 5 Limb Test Form
Full Postal Address
Import MPAN
Export MPAN
Substation Name
Substation Number
Metering Unit Serial No
Metering Unit Make/Type
Lucy Sabre AMU
System Configuration
3-PHASE 3-WIRE
Current Transformer
L1
L2
L3
Location
METERING UNIT
METERING UNIT
METERING UNIT
Serial Number **
Burden (output VA) ***
VA
VA
VA
Accuracy Class
0.5
0.5
0.5
Make ***
Type
WOUND
WOUND
WOUND
Available Ratios
400/200/100/5A
400/200/100/5A
400/200/100/5A
Ratio Selected
A
A
A
Pole P1 Facing Distribution System?
YES / NO *
YES / NO *
YES / NO *
Voltage Transformer
L1
L2
L3
Location
METERING UNIT
METERING UNIT
METERING UNIT
Serial Number **
Burden (output VA) ***
VA
VA
VA
Accuracy Class
0.5
0.5
0.5
Make**
Type
3P
3P
3P
Available Ratios
11000/6600/110V
11000/6600/110V
11000/6600/110V
Ratio Selected
V
V
V
* Delete as applicable. ** Available from manufacturers test certificates. *** Available from nameplate.
Voltage Transformer Tests
VT Configuration Checks
Check metering multi-core cable disconnected
()
Check correct metering VT ratio selected (terminals 31 to 39) see TABLE 1 below
()
Ensure label on lid of terminal box matches VT voltage ratio selected
()
Check correct NPD VT Ratio selected (terminals 47 to 55) see TABLE 2 below
()
Check LV VT fuse ratings are correct (6A) and continuity (L1, L3 & N)
()
Check NPD fuse ratings are correct (2A) and continuity (da )
()
Check 110V auxiliary fuse ratings are correct (2A) and continuity
()
Check LV fuses and links are installed
()
Check HV links are closed in tank
()
TABLE 1 Metering VT Voltage Range Selection
Phase
Metering VT 11000/110V
Common Terminal
Metering VT 6600/110V
L1
E210 (33)
E11 (32)
E110 (31)
L2
E230 (36)
E31 (35)
E130 (34)
L3
E250 (39)
E51 (38)
E150 (37)
TABLE 2 NPD VT Voltage Range Selection
Phase
NPD VT 11000/110V
Common Terminal
NPD VT 6600/110V
L1
E510 (49)
E185 (48)
E410 (47)
L2
E530 (52)
E171 (51)
E430 (50)
L3
E550 (55)
E173 (54
E450 (53)
VT Resistance Tests
Check secondary earth links in place (terminal 46 and 58)
()
Measure the resistance of the VT L1 primary winding (L1 to Earth) *
k
Measure the resistance of the VT L2 primary winding (L2 to Earth) *
k
Measure the resistance of the VT L3 primary winding (L3 to Earth) *
k
Measure the resistance of the VT L1 to L2 primary winding *
k
Measure the resistance of the VT L2 to L3 primary winding *
k
Measure the resistance of the VT L3 to L1 primary winding *
k
* Measure from the HV bushing or busbar in HV metering unit to earth, the resistance of the star connected VT to earth is 1 to 2 kΩ and 2 to 4 kΩ between phases using a multi-meter
VT Insulation Resistance – 1kV Insulation Resistance Tester
Disconnect the secondary earth links (terminal 46 and 58)
()
Measure insulation resistance of metering VT secondary (across terminal 46)
M
Measure insulation resistance of NPD VT secondary (across terminal 58)
M
Reconnect the secondary earth links (terminal 46 and 58)
()
VT Phasing Check – Primary Injection
Remove fuses and links L1, L2, L3 and N also fuses da and cn
()
Check the metering circuit breaker is open
()
Apply 240/110V ac from an injection test set to the primary (HV) winding, measure each of the secondary (LV) winding voltages and compare to the values in the table below *
Primary (HV) Winding Voltage
HV
Secondary (LV) Winding Voltage (measured at fuse)
NPD da–cn**
L1 – L2
L2 – L3
L3 – L1
L1 L2
V
V (nominal)
V (< nominal)
V (< nominal)
L2 L3
V
V (< nominal)
V (nominal)
V (< nominal)
L3 L1
V
V (< nominal)
V (< nominal)
V (nominal)
Replace fuses L1, L2 and L3 (6A)
()
Replace fuses da and cn (2A)
()
* These voltages are for an injection test set and if a mains supply is used the results may differ.
** The NPD voltage measured should be in the order of 0.5 to 2V.
VT Primary (HV) Rated Voltage
VT Nominal Secondary (LV) Winding Voltage with 240/110V applied to the Primary (HV) Winding
240V
110V
11kV
2.4V
1.1V
6.6kV
4.0V
1.8V
Current Transformer Tests
CT Insulation Resistance – 1kV Insulation Resistance Tester
CTs isolated or HV dead
()
Disconnect CT star point earth (terminal 20)
()
Measure the insulation resistance (D70 – D90 at terminal 20)
M
Reconnect CT star point earth (terminal 20)
()
CT Ratio Check – Primary Injection or Prevailing Load*
Phase
CT RatioPrimary Current
CT Ratio Secondary Current
Injected Primary Current*
Calculated Secondary Current
Measured Secondary Current
Ratio Correct
[A]
[B]
[C]
[D = B / A * C]
[E]
[E = D]
L1
100A
5A
50 / 100A
A
A
A
()
L2
100A
5A
50 / 100A
A
A
A
()
L3
100A
5A
50 / 100A
A
A
A
()
L1
200A
5A
50 / 100A
A
A
A
()
L2
200A
5A
50 / 100A
A
A
A
()
L3
200A
5A
50 / 100A
A
A
A
()
L1
400A
5A
50 / 100A
A
A
A
()
L2
400A
5A
50 / 100A
A
A
A
()
L3
400A
5A
50 / 100A
A
A
A
()
On completion of test ensure correct CT ratio 3 (100A), ratio 2 (200A) or ratio 1 (400A) as specified by designer is selected
()
* Delete as applicable.
CT Polarity – Flick Test
Check L1 phase CT polarity – secondary CT connection D11 (+ve) to D70 (-ve)
()
Check L2 phase CT polarity – secondary CT connection D31 (+ve) to D70 (-ve)
()
Check L3 phase CT polarity – secondary CT connection D51 (+ve) to D70 (-ve)
()
CT Relationship to VT Output
L1 CT associated with L1 voltage **
()
L2 CT associated with L2 voltage **
()
L3 CT associated with L3 voltage **
()
** If all CT and VT tests are correct the CT relationship to the VT is proven and the above can be ticked
CT Burden
Maximum CT burden per phase at metering unit terminal box
0.5
VA
Maximum CT burden per phase at meter terminal box [footnoteRef:1] [1: The maximum CT burden is based on 20 metres of 12-core 2.5mm2 or 40 metres of 19-core 2.5mm2 copper cable with a resistance of 0.0068 Ω/m at 20oC and a CT rated secondary current of 5A.]
7.5
VA
Final Checks
Reconnect metering multi-core cable (if disconnected)
()
If metering multi-core cable is not connected leave CTs shorted (D11, D31,D51, D70)
()
Check all covers are secured and appropriate lock fitted to lid
()
Complete asset data form and submit to ART
()
Test Equipment
Purpose/Make/Type
Serial Number
Calibration Expiry Date
Certification
CT and VT calibration certificates attached
()
All tests completed satisfactorily
()
Comments
Organisation
Test Operative Name
Date of Tests
Test Operative Signature
A copy of the completed test form together with the CT/VT calibration certificates shall be placed in a plastic wallet in the metering unit terminal box.
A copy of the completed test forms and the CT/VT calibration certificates shall be sent to the ART mailbox ([email protected], [email protected], [email protected]).
A copy of the completed test form and the CT/VT calibration certificates shall also be attached to the relevant operation on the work order or the relevant PO in the contractor portal.
This page is left intentionally blank.
THIS IS AN UNCONTROLLED DOCUMENT, THE READER MUST CONFIRM ITS VALIDITY BEFORE USE
Document Number: ECP 11-0515b
Version: 4.0
Date: 27/06/2018
Lucy HV Air Metering Unit 5 Limb Test Form
Document Number: ECP 11-0515b
Version: 4.0
Date: 27/06/2018
© UK Power Networks 2018 All rights reserved 6 of 6
Figure 1 – Lucy Air Metering Unit
Figure 2 – Lucy AMU Legend and Wiring Diagram on Rear of Terminal Box Cover
Figure 3 – Lucy AMU Terminal Box Cover with Selected VT and CT Ratios (example only)
Figure 4 – Lucy AMU Terminal Box with Cover Removed