Use of KPIs in an Integrated Decision Support System (IDSS) for Energy Efficient District Retrofitting. ECODISTR-ICT H2020 (FP7)Project Esra Bektas and Bart Luiten (TNO). Structure. Section 1: Background –the necessity for the IDSS and use of KPIs Section 2: - PowerPoint PPT PresentationTRANSCRIPT
Use of KPIs in an Integrated Decision Support System (IDSS) for Energy Efficient District Retrofitting
ECODISTR-ICT H2020 (FP7)Project
Esra Bektas and Bart Luiten (TNO)
Structure
Section 1:
Background –the necessity for the IDSS and use of KPIs
Section 2:
Modelling the Decision Process that the IDSS supports
Section 3:
Inclusion of KPIs in the IDSS supported decision process
1. BACKGROUND
Background: Complex Decision Process in Energy Efficient Urban Retrofitting
Multi-stakeholder, with a wide range of stakes and priorities
Is boosted due to incorporation of both selecting and using different
sustainability measures dealing with each stakeholder’s vision,
financial capacity, and different performance expectations.
Multiple decision levels
Multiple time horizons
Multiple KPIs
++++++
Not only rational decisions but intuitive
Dynamic process
ECODISTR-ICT project
ECODISTR-ICT aims to enable local authorities, architects and
urban planners planning in making decisions on retrofitting of
districts through a new open source software tool.
Called the Integrated Decision Support System (IDSS)
• The IDDS refers to a ‘software backbone’ that integrates
existing design and calculation modules rather than
developing a new ones.
• The IDSS facilitates decision making through credible input
for selection and incorporation of measures in design phase.
The IDDS Components
a) Graphical User Interface (GUI), b) the Dashboard, and c) The
Framework.
Critical Observations
When such complex, dynamic, iterative –sometimes intuitive process is mediated by computers. There is a probability
to end up with a rigid and prescriptive decision model, which does not
correspond to the stakeholders’ practices.
If/when included, to focus on KPIs scores rather than how can be
instrumented for the stakeholders in making choices.
--or– a clear decision model but the way missing the way that KPIs are
used.
The Need regarding the KPIs in the IDDS
There is a need to define decision model that the IDSS can support
yet to be dynamic, iterative, fit-to-the purpose.
There is a need to identify the use of KPIs that stakeholders require
and the way to support it through the IDSS.
There is a need to define the support via the integrated environment,
which synthesizes the calculation modules and assessment modules
for selected KPIs.
2. The Decision Model for
the IDDS
Decision Process: Why to model and plan?
Having higher chance to establish clear goals and ambition,
made a conscious and directed series of choices.
Providing a standard of measurement,
to direct whether decision maker go towards or further away from
the ambition.
Enabling to convert values to action iteratively
to advance the plan best
Clarifying the boundaries
To manage the commitments
Kepner et al. (1965)Steinitz (2013)Carpenter et al. (2009)
Decision Theories
Design steps in geo design context of Steinitz (2013)
Decision steps defined by Carpenter et al. (2009)
The Decision Process for the IDSS
ECODISTR-ICT Decision ProcessPhase A: Defining Ambition
Example:
Analyse problem
High level ambition : Flourished cities…
• Energy consumption is too high. • Buildings are deteriorated.
• Housing typology is not suitable anymore to the families.
• Maintenance is (poor and) expensive. • Vacant buildings are too many.
• There is insufficient greenery.
• There is insufficient facilities for inhabitants.
• Crime rate is too high.
District to be flourished!!
Collect data
Data collection modules
Analyse problem
Energy-efficiency neutrality Quality of buildings Comfort Flexibility Easy-Maintenance Maintenance cost Attractiveness Greenery Sufficiency of facilities Safety
Identify & Select KPIs
Assess AS-IS
Problem statementSelected KPIs
<District to be flourished>
• Energy consumption is too high. [City]
• Buildings are deteriorated. [Investors]
• Housing typology is not suitable anymore to the families. [Investors/Citizens]
• Maintenance is (poor and) expensive. [Housing Associations]
• Vacant buildings are too many. [City]
• There is insufficient greenery. [Citizens]
• There is insufficient facilities for inhabitants.[Citizens, Housing Associations]
• Crime rate is too high.[Citizens]
Identify stakeholders
Collect data
Data collection modules
AS-IS data to enable assessment
Districts scored XX in
aspect
KPI’s + AS-IS score
Gap between TO-BE and AS-IS KPI’s + valuesDefine
TO-BE ambition
Assess AS-IS
District flourishing; [Input to Program]- Create small-businesses and cultivating economic activities- Create attractiveness to the vacant office stock there - Improve housing stock’s quality (%)- …- …- …
Assessment modules
ECODISTR-ICT Decision Process Phase B: Selecting Best Alternative
3. Inclusion of KPIs in the
IDSS supported decision
process
user manually do elsewhere
user via the IDSS
ICT-ICT automatically(dahboard-framework &framework-module connections
The legend to read the IDSS supported actions in the decision process
KPI Inclusion in Defining Ambition Phase
Basic Step
Actions
Select & Manage KPIs
A1Analyse problem
A2Collect data
A3Assess AS-IS
Data colection prior to assesment
Visualization and KPI’s AS-IS
Calculation module
Run calculation module for assesing AS-IS scores
1. Capture the users /the stakeholders present; define geographical area; define the context of the problem
Definition of scores, prioritization of KPIs, selection of calculation modules.
2. Define and select KPIs by a)-selecting certified full KPI sets,b) choosing KPIs from sets,c) adding new KPIs
3. Management of the content of KPIs
Define theproblem & the
users
Show alert about the missing data
through modules
-or--Run calculation module outside of the IDSS and add values for acquiring scores of KPIs, when the calculation modules are not coupled to the IDSS.
Dashboard connects automatically to the calculation modules
registered to the IDSS
1.Visualize AS-IS scores as reference point prior to KPI target values
2. Define TO-BE ambition
++ Check the consistency/ sufficiency of the data uploaded
1. Create contexts
2. Inform which data (in which level of detail) is needed for calculation
3. Enable uploading the data for calculation
A4Define TO-BE
AmbitionDefine the gap between
AS-ISand TO-BE Ambition
Basic Step
Actions
B1Develop
alternatives
Designing modules in fixed context
B2Asses alternatives
B3 Select best alternative
Calculation modules with different context
Best alternative and the chosen context
Providing a ‘scoreboard’ as a
summary that the final decision can be
made.
Sense making between KPI scores and target values
and decide
1. Run calculation Modules for each selected variant
2. Visualize the scores of AS-IS, TO-BE Ambition and the scores, the context and the alternative used in each variant.
1. Inform the user about the list of measures in relation with the selected KPIs
2. Administer alternatives; choose /modify contexts (if necessary), and make variants
3. Upload data/design models
--When possible--4. Access to design Modules
KPI Inclusion in Defining Ambition Phase
Conclusions & Discussions on
Does the modelled and ‘rationalized’ decision process seem
recognizable?
How can we ensure the balance should be in proposing rationalized
decision process and ‘irrationality’ of the decision makers which is
natural and can play great role in making choices?
How can we improve our decision model and make applicable for
other contexts?
THANK YOU.
Example:
Analyse problem
High level ambition : Flourished cities…
• Energy consumption is too high. • Buildings are deteriorated.
• Housing typology is not suitable anymore to the families.
• Maintenance is (poor and) expensive. • Vacant buildings are too many.
• There is insufficient greenery.
• There is insufficient facilities for inhabitants.
• Crime rate is too high.
District to be flourished!!
Collect data
Analyse problem
Energy-efficiency neutrality Quality of buildings Comfort Flexibility Easy-Maintenance Maintenance cost Attractiveness Greenery Sufficiency of facilities Safety
Identify & Select KPIs
Assess AS-IS
Problem statementSelected KPIs
<District to be flourished>
• Energy consumption is too high. [City]
• Buildings are deteriorated. [Investors]
• Housing typology is not suitable anymore to the families. [Investors/Citizens]
• Maintenance is (poor and) expensive. [Housing Associations]
• Vacant buildings are too many. [City]
• There is insufficient greenery. [Citizens]
• There is insufficient facilities for inhabitants.[Citizens, Housing Associations]
• Crime rate is too high.[Citizens]
Identify stakeholders
Collect data
Inclusion of KPIs in Analyzing the Problem
1. Capture the users of the IDSS, the stakeholders present; define
geographical area; define the context of the problem,
2. Define and select KPIs by a)-selecting certified full KPI sets, b)
choosing KPIs from sets, c) adding new KPIs.
3. Management of the content of KPIs, definition of scores,
prioritization of KPIs, selection of calculation Modules.
User makes a sub-set of KPIs depending on the problem & high-level ambition.
a) Choose a certified full KPI set (i.e., from BREEAM, Open House, and Super Buildings);
b) Select KPIs from existing sets;c) Adding new KPIs (when existing KPIs do not
satisfy the specific needs of the stakeholders for the specific case).
Inclusion of KPIs in Collecting Data
1. Inform the user about which data (in which level of detail) is needed for
the assessing AS-IS,
2. Create contexts
3. Enable the user to upload the data that will be used for the calculation
and check the consistency/sufficiency of the data uploaded.
User explores what data is needed for the selected KPIs
Inclusion of KPIs in Assessing AS-IS situation
Figure 1 The inclusion of KPIs in Assessing AS-IS (step A3)
1. Run calculation Module via Dashboard for assessing AS-IS,
2. Run calculate elsewhere (i.e. separate Module) and manually add
values to KPIs which are created/defined in the IDSS but not either
automatically or directly calculated via the IDSS.
User runs calculation Modules and gathers scores for each KPI
Figure 1 Prioritizing and define target values for KPIs (step A4)
1. Visualize AS-IS scores as reference point prior to KPI target values
2.(Re) Prioritize and define target values of KPI's based on AS-IS scores and
boundary conditions of the stakeholders.
--When necessary--
Re-select KPIs/ KPI Modules, run calculation and get new results, then
(re)define TO-BE ambition .
User re-evaluates priorities, and, if necessary, re-do Phase A of the decision process.
Inclusion of KPIs in Defining TO-BE Ambition
Figure 1 Developing alternatives (step B1)
1. Inform the user about the list of measures in relation with the
selected KPIs
2. Administer alternatives; choose /modify contexts (if necessary),
and make variants
3. Upload data/design models
--When possible--
4. Access to design Modules
User develops alternative
solutions to meet the TO-BE
ambition
Inclusion of KPIs in Developing Alternatives
Figure 1 The alternatives are assessed against the AS-IS and TO-BE situation (step B2)
1. Run calculation Modules for each selected variant
2. Visualize the scores of AS-IS, TO-BE Ambition and the scores, the
context and the alternative used in each variant. User asses design
alternatives and make
adjustment.
Inclusion of KPIs in Assessing Alternatives
Figure 1 The best alternative is selected (step B3)
1. Providing a ‘scoreboard’ as a summary that the final
decision can be made. User evaluates the alternatives
by the score of the KPIs.
Inclusion of KPIs in Selecting the Best Alternative
Decision Levels