ECE 333 Renewable Energy Systems
Lecture 6: Power System Operations
Prof. Tom Overbye
Dept. of Electrical and Computer Engineering
University of Illinois at Urbana-Champaign
![Page 2: ECE 333 Renewable Energy Systems Lecture 6: Power System Operations Prof. Tom Overbye Dept. of Electrical and Computer Engineering University of Illinois](https://reader036.vdocuments.mx/reader036/viewer/2022062320/56649d205503460f949f4133/html5/thumbnails/2.jpg)
Announcements
• Be reading Chapter 3; also read Prof. Sauer's article on course website explaining reactive power
• Quiz today on HW 2• HW 3 is posted; it will be covered by an in-class quiz on
Thursday Feb 12– Material from Power Systems history and operations will be
covered on exams (such as true/false)
• Talk by Jana Sebestik, "SparkingInterest in Smart Grid Stuff", Friday Feb 6 at 1pm in NCSA Auditorium
2
![Page 3: ECE 333 Renewable Energy Systems Lecture 6: Power System Operations Prof. Tom Overbye Dept. of Electrical and Computer Engineering University of Illinois](https://reader036.vdocuments.mx/reader036/viewer/2022062320/56649d205503460f949f4133/html5/thumbnails/3.jpg)
In the News: Pakistan Blackout
• On Sunday Jan 25, 2015 Pakistan had a nationwide blackout, the worst in their history, with 80% of the country out– Service was restored to major
cities later in the day– Blackout was tied to rebels
blowing up two 220 kV transmission lines betweenGuddu-Quetta
– Caused a cascade that took outmost of the rest of their grid
3
Sources: http://www.nytimes.com/2015/01/26/world/asia/widespread-blackout-in-pakistan-deals-another-blow-to-government.html?_r=0; http://www.geni.org/globalenergy/library/national_energy_grid/pakistan/pakistaninationalelectricitygrid.shtml
![Page 4: ECE 333 Renewable Energy Systems Lecture 6: Power System Operations Prof. Tom Overbye Dept. of Electrical and Computer Engineering University of Illinois](https://reader036.vdocuments.mx/reader036/viewer/2022062320/56649d205503460f949f4133/html5/thumbnails/4.jpg)
Natural Gas Boom, Bust and Boom
Source: EIA4
![Page 5: ECE 333 Renewable Energy Systems Lecture 6: Power System Operations Prof. Tom Overbye Dept. of Electrical and Computer Engineering University of Illinois](https://reader036.vdocuments.mx/reader036/viewer/2022062320/56649d205503460f949f4133/html5/thumbnails/5.jpg)
2007 Illinois Electricity Crisis
• Two main electric utilities in Illinois are ComEd and Ameren
• Restructuring law had frozen electricity prices for ten years, with rate decreases for many.
• Prices rose on January 1, 2007 as price freeze ended; price increases were especially high for electric heating customers who had previously enjoyed rates as low as 2.5 cents/kWh
• 2014 average residential rate (in cents/kWh) is 11.42 in IL, 11.27 IN, 13.94 WI, 20.13 NY, 8.77 WA, 16.22 in CA, 37.59 in HI, 12.53 US average
5
![Page 6: ECE 333 Renewable Energy Systems Lecture 6: Power System Operations Prof. Tom Overbye Dept. of Electrical and Computer Engineering University of Illinois](https://reader036.vdocuments.mx/reader036/viewer/2022062320/56649d205503460f949f4133/html5/thumbnails/6.jpg)
The Rise of Renewables: Wind
Source: AWEA Wind Power Outlook 4th Qtr, 2014 (released 1/28/15)
While2014 additionswere a jump from,2013 they were still muchbelow 2012 values
6
![Page 7: ECE 333 Renewable Energy Systems Lecture 6: Power System Operations Prof. Tom Overbye Dept. of Electrical and Computer Engineering University of Illinois](https://reader036.vdocuments.mx/reader036/viewer/2022062320/56649d205503460f949f4133/html5/thumbnails/7.jpg)
Recent Growth in Solar
• Solar is growing rapidly in the US,but its growth if being fueled bylow cost imported panels primarilyfrom China.
Source: Wall Street Journal, Sept 10, 2012 7
![Page 8: ECE 333 Renewable Energy Systems Lecture 6: Power System Operations Prof. Tom Overbye Dept. of Electrical and Computer Engineering University of Illinois](https://reader036.vdocuments.mx/reader036/viewer/2022062320/56649d205503460f949f4133/html5/thumbnails/8.jpg)
The Smart Grid
• The term “Smart Grid” dates officially to the 2007 “Energy Independence and Security Act”, Title 13 (“Smart Grid”)• Use of digital information and control techniques• Dynamic grid optimization with cyber-security• Deployment of distributed resources including • Customer participation and smart appliances• Integration of storage including PHEVs• Development of interoperability standards
8
![Page 9: ECE 333 Renewable Energy Systems Lecture 6: Power System Operations Prof. Tom Overbye Dept. of Electrical and Computer Engineering University of Illinois](https://reader036.vdocuments.mx/reader036/viewer/2022062320/56649d205503460f949f4133/html5/thumbnails/9.jpg)
Smart Grid Perceptions (Some of Us Like the Term “Smarter”)
9
![Page 10: ECE 333 Renewable Energy Systems Lecture 6: Power System Operations Prof. Tom Overbye Dept. of Electrical and Computer Engineering University of Illinois](https://reader036.vdocuments.mx/reader036/viewer/2022062320/56649d205503460f949f4133/html5/thumbnails/10.jpg)
Illinois 2012: Municipal Aggregation
• Urbana and Champaign residents started seeing substantially lower electric bills as a result of municipal aggregation• This was approved by a 2-1 margin in 3/2012 referendum
• Municipal aggregation means all residents of a community get their electricity from a third party supplier chosen by the city (as opposed to the local utility) unless they specifically opt out. .
• They still get bills from Ameren, and do pay an electricity delivery charge (about 30 to 40% of total bill)
• Recently Ameren rates have dropped, making third party options less attractive 10
![Page 11: ECE 333 Renewable Energy Systems Lecture 6: Power System Operations Prof. Tom Overbye Dept. of Electrical and Computer Engineering University of Illinois](https://reader036.vdocuments.mx/reader036/viewer/2022062320/56649d205503460f949f4133/html5/thumbnails/11.jpg)
Source: http://www.dsireusa.org/
Renewable Portfolio Standards Set by States
11
![Page 12: ECE 333 Renewable Energy Systems Lecture 6: Power System Operations Prof. Tom Overbye Dept. of Electrical and Computer Engineering University of Illinois](https://reader036.vdocuments.mx/reader036/viewer/2022062320/56649d205503460f949f4133/html5/thumbnails/12.jpg)
Power System Operations:One-line Diagrams
• Most power systems are balanced three phase systems.
• A balanced three phase system can be modeled as a single (or one) line.
• One-lines show the major power system components, such as generators, loads, transmission lines.
• Components join together at a bus.
12
![Page 13: ECE 333 Renewable Energy Systems Lecture 6: Power System Operations Prof. Tom Overbye Dept. of Electrical and Computer Engineering University of Illinois](https://reader036.vdocuments.mx/reader036/viewer/2022062320/56649d205503460f949f4133/html5/thumbnails/13.jpg)
Substation Bus
13
![Page 14: ECE 333 Renewable Energy Systems Lecture 6: Power System Operations Prof. Tom Overbye Dept. of Electrical and Computer Engineering University of Illinois](https://reader036.vdocuments.mx/reader036/viewer/2022062320/56649d205503460f949f4133/html5/thumbnails/14.jpg)
Power System Time Frames
14Image source: P.W. Sauer, M.A. Pai, Power System Dynamics and Stability, 1997, Fig 1.2, modified
Next few slides will consider the power flow (quasi-steady)time frame
![Page 15: ECE 333 Renewable Energy Systems Lecture 6: Power System Operations Prof. Tom Overbye Dept. of Electrical and Computer Engineering University of Illinois](https://reader036.vdocuments.mx/reader036/viewer/2022062320/56649d205503460f949f4133/html5/thumbnails/15.jpg)
PowerWorld Simulator Three Bus System
Bus 2 Bus 1
Bus 3Home Area
204 MW
102 MVR
150 MW
150 MW 37 MVR
116 MVR
102 MW 51 MVR
1.00 PU
-20 MW 4 MVR
20 MW -4 MVR
-34 MW 10 MVR
34 MW-10 MVR
14 MW -4 MVR
-14 MW
4 MVR
1.00 PU
1.00 PU
106 MW 0 MVR
100 MWAGC ONAVR ON
AGC ONAVR ON
Load with
green
arrows
indicating
amount
of MW
flow
Used
to control
output of
generator Direction of arrow is used to indicate
direction of real power (MW) flow
Note the
power
balance at
each bus
15
![Page 16: ECE 333 Renewable Energy Systems Lecture 6: Power System Operations Prof. Tom Overbye Dept. of Electrical and Computer Engineering University of Illinois](https://reader036.vdocuments.mx/reader036/viewer/2022062320/56649d205503460f949f4133/html5/thumbnails/16.jpg)
Power Flow
• A common power system analysis tool is the power flow – It shows how real and reactive power flows through a network,
from generators to loads
• Solves sets of non-linear equations enforcing "conservation of power" at each bus in the system (a consequence of KCL)– Loads are usually assumed to be constant power – Used to determine if any transmission lines or transformers are
overloaded and system voltages
• Educational version PowerWorld tool available at– http://www.powerworld.com/gloversarmaoverbye
16
![Page 17: ECE 333 Renewable Energy Systems Lecture 6: Power System Operations Prof. Tom Overbye Dept. of Electrical and Computer Engineering University of Illinois](https://reader036.vdocuments.mx/reader036/viewer/2022062320/56649d205503460f949f4133/html5/thumbnails/17.jpg)
Metro Chicago Electric Network
17
![Page 18: ECE 333 Renewable Energy Systems Lecture 6: Power System Operations Prof. Tom Overbye Dept. of Electrical and Computer Engineering University of Illinois](https://reader036.vdocuments.mx/reader036/viewer/2022062320/56649d205503460f949f4133/html5/thumbnails/18.jpg)
Power Balance Constraints
• Power flow refers to how the power is moving through the system.
• At all times in the simulation the total power flowing into any bus MUST be zero!
• This is know as Kirchhoff’s law. And it can not be repealed or modified.
• Power is lost in the transmission system.
18
![Page 19: ECE 333 Renewable Energy Systems Lecture 6: Power System Operations Prof. Tom Overbye Dept. of Electrical and Computer Engineering University of Illinois](https://reader036.vdocuments.mx/reader036/viewer/2022062320/56649d205503460f949f4133/html5/thumbnails/19.jpg)
Power Balance Constraints
• Power flow refers to how the power is moving through the system.
• At all times in the simulation the total power flowing into any bus MUST be zero!
• This is know as Kirchhoff’s law. And it can not be repealed or modified.
• Power is lost in the transmission system.
19
![Page 20: ECE 333 Renewable Energy Systems Lecture 6: Power System Operations Prof. Tom Overbye Dept. of Electrical and Computer Engineering University of Illinois](https://reader036.vdocuments.mx/reader036/viewer/2022062320/56649d205503460f949f4133/html5/thumbnails/20.jpg)
Basic Power Flow Control
• Opening a circuit breaker causes the power flow to instantaneously (nearly) change.
• No other way to directly control power flow in a transmission line.
• By changing generation we can indirectly change this flow.
20
![Page 21: ECE 333 Renewable Energy Systems Lecture 6: Power System Operations Prof. Tom Overbye Dept. of Electrical and Computer Engineering University of Illinois](https://reader036.vdocuments.mx/reader036/viewer/2022062320/56649d205503460f949f4133/html5/thumbnails/21.jpg)
Transmission Line Limits
• Power flow in transmission line is limited by heating considerations.
• Losses (I^2 R) can heat up the line, causing it to sag.
• Each line has a limit; Simulator does not allow you to continually exceed this limit. Many utilities use winter/summer limits.
21
![Page 22: ECE 333 Renewable Energy Systems Lecture 6: Power System Operations Prof. Tom Overbye Dept. of Electrical and Computer Engineering University of Illinois](https://reader036.vdocuments.mx/reader036/viewer/2022062320/56649d205503460f949f4133/html5/thumbnails/22.jpg)
Overloaded Transmission Line
22
![Page 23: ECE 333 Renewable Energy Systems Lecture 6: Power System Operations Prof. Tom Overbye Dept. of Electrical and Computer Engineering University of Illinois](https://reader036.vdocuments.mx/reader036/viewer/2022062320/56649d205503460f949f4133/html5/thumbnails/23.jpg)
Interconnected Operation
• Power systems are interconnected. Most of North America east of the Rockies is one system, with most of Texas and Quebec being exceptions
• Interconnections are divided into smaller portions, called balancing authority areas (previously called control areas)
• Balancing authorities sometimes correspond to a single utility, but increasingly they include a large number of utilities.
• NERC Reliability Coordinators are charged with overseeing the reliable operation of the grid
23
![Page 24: ECE 333 Renewable Energy Systems Lecture 6: Power System Operations Prof. Tom Overbye Dept. of Electrical and Computer Engineering University of Illinois](https://reader036.vdocuments.mx/reader036/viewer/2022062320/56649d205503460f949f4133/html5/thumbnails/24.jpg)
NORTH AMERICAN INTERCONNECTIONS
24
![Page 25: ECE 333 Renewable Energy Systems Lecture 6: Power System Operations Prof. Tom Overbye Dept. of Electrical and Computer Engineering University of Illinois](https://reader036.vdocuments.mx/reader036/viewer/2022062320/56649d205503460f949f4133/html5/thumbnails/25.jpg)
NERC Reliability Coordinators
Illinois issplit, withthe ComEdpart in PJM,with the rest of the state in MISO
Source: http://www.nerc.com/page.php?cid=5%7C67%7C20625
![Page 26: ECE 333 Renewable Energy Systems Lecture 6: Power System Operations Prof. Tom Overbye Dept. of Electrical and Computer Engineering University of Illinois](https://reader036.vdocuments.mx/reader036/viewer/2022062320/56649d205503460f949f4133/html5/thumbnails/26.jpg)
Balancing Authority (BA) Areas
• Transmission lines that join two areas are known as tie-lines.
• The net power out of an area is the sum of the flow on its tie-lines.
• The flow out of an area is equal to
total gen - total load - total losses
= tie-flow
26
![Page 27: ECE 333 Renewable Energy Systems Lecture 6: Power System Operations Prof. Tom Overbye Dept. of Electrical and Computer Engineering University of Illinois](https://reader036.vdocuments.mx/reader036/viewer/2022062320/56649d205503460f949f4133/html5/thumbnails/27.jpg)
North American Balancing Authorities
Source: http://www.nerc.com/AboutNERC/keyplayers/Pages/default.aspx 27
![Page 28: ECE 333 Renewable Energy Systems Lecture 6: Power System Operations Prof. Tom Overbye Dept. of Electrical and Computer Engineering University of Illinois](https://reader036.vdocuments.mx/reader036/viewer/2022062320/56649d205503460f949f4133/html5/thumbnails/28.jpg)
Area Control Error (ACE)
•The area control error is the difference between the actual flow out of an area, and the scheduled flow.•Ideally the ACE should always be zero.•Because the load is constantly changing, each utility must constantly change its generation to “chase” the ACE.
https://www.misoenergy.org/MarketsOperations/RealTimeMarketData/Pages/ACEChart.aspx
MISO ACE|(in MW) from 9/19/12. Atthe time the MISO loadwas about 65GW
28
![Page 29: ECE 333 Renewable Energy Systems Lecture 6: Power System Operations Prof. Tom Overbye Dept. of Electrical and Computer Engineering University of Illinois](https://reader036.vdocuments.mx/reader036/viewer/2022062320/56649d205503460f949f4133/html5/thumbnails/29.jpg)
Automatic Generation Control
• BAs use automatic generation control (AGC) to automatically change their generation to keep their ACE close to zero.
• Usually the BA control center calculates ACE based upon tie-line flows; then the AGC module sends control signals out to the generators every couple seconds.
29
![Page 30: ECE 333 Renewable Energy Systems Lecture 6: Power System Operations Prof. Tom Overbye Dept. of Electrical and Computer Engineering University of Illinois](https://reader036.vdocuments.mx/reader036/viewer/2022062320/56649d205503460f949f4133/html5/thumbnails/30.jpg)
Three Bus Case on AGC
Bus 2 Bus 1
Bus 3Home Area
266 MW
133 MVR
150 MW
250 MW 34 MVR
166 MVR
133 MW 67 MVR
1.00 PU
-40 MW 8 MVR
40 MW -8 MVR
-77 MW 25 MVR
78 MW-21 MVR
39 MW-11 MVR
-39 MW
12 MVR
1.00 PU
1.00 PU
101 MW 5 MVR
100 MWAGC ONAVR ON
AGC ONAVR ON
30