    2014 by the Naonal Economic and Development Authority

    All rights reserved. Any part of this book may be used and reproduced, provided that proper acknowledgement is made.

    Eastern Visayas Updated Regional Development Plan 2014-2016 RESULTS MATRICES

    Published by:

    Naonal Economic and Development Authority

    Regional Oce VIII

    Government Center, Palo, Leyte

    Tel: +63 53 323 3092

    [email protected]

    hp://nro8.neda.gov.ph

  • 8/10/2019 Eastern Visayas RM

    3/74

    Eastern Visayas Updated Regional Development Plan2014-2016

    RESULTS MATRICES

  • 8/10/2019 Eastern Visayas RM

    4/74

    Foreword

    This Eastern Visayas Updated Regional Development Plan (RDP) 2014-2016 Results Matrices (RM) is a companion document of the

    Updated Regional Development Plan (RDP) of Eastern Visayas. This has been prepared based on the belief that a good plan is one that

    enables its users to know whether it is achieving the desired results. It should be inherent upon any plan to be accompanied by a tool for

    monitoring and evaluaon (M&E). Otherwise, the plan is just an ambiguous collecon of wishes.

    The RM then serves as a tool for periodic measurement of the results of the implementaon of the RDP. It will help us answer very

    important quesons in planning Are we achieving our goals and objecves? If yes, how far or near are we from the ideal condions we

    described in the RDP? Then, at the end of the Plan period, can we claim that our eorts have translated to a beer life for our people?

    This document is aligned with the Presidents Social Contract with the Filipino People and guided by the Updated Philippine

    Development Plan (PDP) 2014-2016. Hence, it also contains results/core indicators in the Updated PDP Results Matrices 2014-2016. This is

    necessary as the RDP is presupposed to contribute to the aainment of the naonal goals of poverty reducon and inclusive growth.

    Like the Updated RDP, this Updated RM is a product of collaborave eorts. A series of sectoral consultaons through interagency

    workshops and meengs were conducted, wherein technocrats from the dierent line agencies and private sector representaves had the

    opportunity to give their inputs. The baseline data and targets were inially provided by the authorized agencies. These were validated

    during the Sectoral Commiee (SecCom) meengs of the Regional Development Council (RDC) VIII. The RDC-SecCom endorsed RM was

    actually due for deliberaon by the Full Council of the RDC VIII in its last quarter meeng in 2013. Unfortunately, that meeng did not

    materialize when Supertyphoon Yolanda hit the region on November 8, 2013. Nevertheless, it was approved for adopon during the March

    10, 2014 RDC VIII Execuve Commiee meeng through RDC VIII ExCom Resoluon No. 5, s. 2014 and subsequently conrmed by the RDC

    VIII Full Council during its March 25, 2014 through RDC VIII Resoluon No. 11, s. 2014.

    The RM is not a stac document. In the course of the annual monitoring of RDP implementaon, it might be necessary to adjustsome of the targets. Hence, it will be subject to connuous updang and enhancement.

    The enthusiasc support shown by the ocers and members of the RDC Sectoral Commiees is hereby acknowledged, for without

    it, this RM would not have been made possible. However, we should remember that the RM is not an end in itself. It is just a tool for

    knowing whether or not we are in the right development path and how far or near are we from our target desnaon.

  • 8/10/2019 Eastern Visayas RM

    5/74

    It is hoped that the cooperaon of all stakeholders and keyplayers displayed during the preparaon of this document will be brought to a

    level of commitment so that the hard work by which it was produced will not be fule. The sustained cooperaon of everyone concerned is vital

    in pursuing our goals of reducing poverty and achieving inclusive growth.

    ATTY. BONIFACIO G. UY

    Regional Director, NEDA VIII and

    Vice-Chair/Acng Chair, RDC VIII

  • 8/10/2019 Eastern Visayas RM

    6/74

    Eastern Visayas

    Updated Regional

    Development Plan -

    RESULTS MATRICES

    2014-2016

    6

    Excerpts from the Minutes of the Regional Development Council VIII-Execuve Commiee (RDC VIII-ExCom) Meeng

    held on 10 March 2014 at Tierra de Milagros Resort, Brgy. Arado, Palo, Leyte

    RDC VIII-ExCom Resoluon No. 5, Series of 2014

    APPROVING AND ADOPTING THE UPDATED REGIONAL DEVELOPMENT PLAN - RESULTS MATRICES 2014-2016

    WHEREAS, the Results Matrices (RM) serve as an instrument designed to highlight the achievement of results at the dierent levels in the implementaon

    of the eight strategic development themed or chapters of the Updated Regional Development Plan (RDP) 2014-2016;

    WHEREAS, all the RDC VIII sectoral commiees acng as planning commiees jointly conducted a series of planning sessions/workshops parcipated

    in by interagency technical planning ocers to undertake the validaon process and jointly adopted and endorsed to the Full Council their respecve strategic

    outcomes or chapter results matrices of the updated RDP;

    WHEREAS, the revalidated RMs contain a statement of results to be achieved for each strategic theme/chapter of the updated RDP, indicators with

    baseline informaon and end-of-plan targets, and responsible agencies;

    WHEREAS, the updated RDP RMs also contain results indicators (or Core Indicators) of the updated Philippine Development Plan Results Matrices

    (PDP RMs) 2014-2016, which were adopted or mirrored in the region to track all development acvies in the region that shall contribute to the highest-order

    objecve that is linked to the Naonal Governments goal of Inclusive Growth and Poverty Reducon.

    NOW THEREFORE, be it RESOLVED, as it is hereby RESOLVED, to approve and adopt the updated Regional Development Plan - Results Matrices (RDP-

    RM) 2014-2016.

    UNANIMOUSLY APPROVED, this 10th day of March, Two Thousand and Fourteen, at Palo, Leyte, Philippines.

    Cerfed true and correct: Aested/Approved:

    ERNESTO T. OCTAVIANO DIRECTOR BONIFACIO G. UY

    RDC Acng Secretary RDC Vice-Chairperson and Presiding Ocer

    Republic of the Philippines

    REGIONAL DEVELOPMENT COUNCIL

    Eastern Visayas (Region VIII)

  • 8/10/2019 Eastern Visayas RM

    7/74

    Eastern Visayas

    Updated Regional

    Development Plan -

    RESULTS MATRICES

    2014-2016

    7

    Excerpts from the Minutes of the Regional Development Council (RDC) VIII Meeng

    held on 25 March 2014 at Tierra de Milagros Resort, Brgy. Arado, Palo, Leyte

    RDC VIII Resoluon No. 11-A, Series of 2014

    CONFIRMING THE APPROVAL OF THE UPDATED REGIONAL DEVELOPMENT PLAN - RESULTS MATRICES 2014-2016

    WHEREAS, the Results Matrices (RM) serve as an instrument designed to highlight the achievement of results at the dierent levels in the implementaon

    of the eight strategic development themed or chapters of the Updated Regional Development Plan (RDP) 2014-2016;

    WHEREAS, all the RDC VIII sectoral commiees acng as planning commiees jointly conducted a series of planning sessions/workshops parcipated

    in by interagency technical planning ocers to undertake the validaon process and jointly adopted and endorsed to the Full Council their respecve strategic

    outcomes or chapter results matrices of the updated RDP;

    WHEREAS, the revalidated RMs contain a statement of results to be achieved for each strategic theme/chapter of the updated RDP, indicators with

    baseline informaon and end-of-plan targets, and responsible agencies;

    WHEREAS, the updated RDP RMs also contain results indicators (or Core Indicators) of the updated Philippine Development Plan Results Matrices

    (PDP RMs) 2014-2016, which were adopted or mirrored in the region to track all development acvies in the region that shall contribute to the highest-order

    objecve that is linked to the Naonal Governments goal of Inclusive Growth and Poverty Reducon;

    WHEREAS, the RDC VIII-Execuve Commiee approved and adopted the updated Regional Development Plan - Results Matrices (RDP-RM) 2014-2016

    thru RDC VIII-ExCom Resoluon No. 5, Series of 2014.

    NOW THEREFORE, be it RESOLVED, as it is hereby RESOLVED, to approve and adopt the updated Regional Development Plan - Results Matrices (RDP-

    RM) 2014-2016.

    UNANIMOUSLY APPROVED, this 25th day of March, Two Thousand and Fourteen, at Palo, Leyte, Philippines.

    Cerfed true and correct: Aested/Approved:

    ERNESTO T. OCTAVIANO DIRECTOR BONIFACIO G. UY

    RDC Acng Secretary RDC Vice-Chairperson and Presiding Ocer

    Republic of the Philippines

    REGIONAL DEVELOPMENT COUNCIL

    Eastern Visayas (Region VIII)

  • 8/10/2019 Eastern Visayas RM

    8/74

    Eastern Visayas

    Updated Regional

    Development Plan -

    RESULTS MATRICES

    2014-2016

    8

    Foreword

    RDC VIII Resoluons

    List of Abbreviaons and Acronyms 9

    Execuve Summary 11

    Strategic Outcomes, Core and Crical Indicators, Assumpons, Risks, and Annual and End-of-Plan Targets

    Chapter 1: Macroeconomy 13

    Chapter 2: Compeve and Sustainable Agriculture and Fisheries 18

    Chapter 3: Compeve Trade, Industry, and Services 29

    Chapter 4: Accelerang Infrastructure Development 34

    Chapter 5: CreangProducve Human Resource 44

    Chapter 6: Good Governance and the Rule of Law 54

    Chapter 7: Peace and Security 61

    Chapter 8: Conservaon, Protecon and Rehabilitaon of the Environment and Natural Resources 66

    Table of Contents

  • 8/10/2019 Eastern Visayas RM

    9/74

    Eastern Visayas

    Updated Regional

    Development Plan -

    RESULTS MATRICES

    2014-2016

    9List of Abbreviations and Acronyms

    A & D Alienable and Disposable

    AFP Armed Forces of the Philippines

    AHFF Agriculture, Hunng, Fisheries and Forestry

    ALS Alternave Learning System

    BFAR Bureau of Fisheries and Aquac Resources

    BN Business Name

    BOD Biological Oxygen Demand

    BPLS Business Permit and Licensing System

    CAA Conict-Aected Area

    CAAP Civil Aviaon Authority of the Philippines

    CCT Condional Cash Transfer

    CHED Commission on Higher Educaon

    CICT Commission on Informaon and Communicaons

    Technology

    CIS Communal Irrigaon System

    CLEEP Connuing Labor and Employment EducaonProgram

    CMTS Cellular Mobile Telephone System

    CSE Crime Soluon Eciency

    DA Department of Agriculture

    DepEd Department of Educaon

    DILG Department of the Interior and Local Government

    DILP DOLE Integrated Livelihood Program

    DOLE Department of Labor and Employment

    DOST Department of Science and Technology

    DOT Department of Tourism

    DOTC Department of Transportaon andCommunicaons

    DPWH Department of Public Works and Highways

    DRR-CCA Disaster Risk Reducon and Climate Change

    Adaptaon

    DSWD Department of Social Welfare and Development

    DTI Department of Trade and Industry

    ECC Environmental Compliance Cercate

    EMB Environmental Management Bureau

    ERDB Ecosystems Research and Development Bureau

    EV Eastern Visayas

    FDP Full Disclosure Policy

    FMS Forest Management Services

    GIWR Gross Irrigaon Water Requirement

    GOCCs Government-Owned and Controlled Corporaons

    GRDP Gross Regional Domesc Product

    GVA Gross Value Added

    HH Household

    ICT-BPM Informaon and Communicaons Technology -

    Business Process Management

    ISO Internaonal Organizaon for Standardizaon

    KALAHI-CIDSS Kapit-bisig Laban sa Kahirapan-Comprehensive andIntegrated Delivery of Social Services

    LEP Ladderized Educaon Program

    LGPMS Local Governance Performance Management

    System

    LGU Local Government Unit

    LTO Land Transportaon Oce

    LWUA Local Water Ulies Administraon

    MDG Millennium Development Goals

    MGB Mines and Geosciences Bureau

    MRF Materials Recovery Facility

    MSMEs Micro, Small and Medium EnterprisesMT metric ton

    NAPC Naonal An-Poverty Commission

    NAR Naonal Arterial Road

    NAT MPS Naonal Achievement Test Mean Percentage Score

    NEA Naonal Electricaon Administraon

  • 8/10/2019 Eastern Visayas RM

    10/74

    Eastern Visayas

    Updated Regional

    Development Plan -

    RESULTS MATRICES

    2014-2016

    10

    NGA Naonal Government Agency

    NHA Naonal Housing Authority

    NHIP Naonal Health Insurance Program

    NICCEP Naonal Industry Cluster Capacity Enhancement

    Program

    NIPAS Naonal Integrated Protected AreasNIS Naonal Irrigaon System

    NNC Naonal Nutrion Council

    NRW Non-Revenue Water

    NSCB Naonal Stascal Coordinaon Board

    NSR Naonal Secondary Road

    NWRB Naonal Water Resources Board

    OFW Overseas Filipino Workers

    OPAPP Oce of the Presidenal Adviser on Peace Process

    OPI Overall Performance Index

    OSH Occupaonal Safety and Health

    OSY Out-of-School YouthPAMANA Payapa at Masaganang Pamayanan Program

    PCA Philippine Coconut Authority

    PhilFIDA Philippine Fiber Industry and Development Authority

    PMO Port Management Oce

    PNP Philippine Naonal Police

    PopCom Populaon Commission

    PPA Philippine Ports Authority

    PWCZMS Protected Areas, Wildlife and Coastal Zone

    Management Services

    RBCO River Basin Control Oce

    RBO River Basin OrganizaonRDIP Regional Development Investment Program

    RDP Regional Development Plan

    RM Results Matrices

    RORO Roll-on/roll-o

    SHFC Social Housing Finance Corporaon

    SRA Sugar Regulatory Administraon

    SSF Shared-Service Facility

    SUCs State Universies and Colleges

    TAV Training and Advisory Visit

    TB Tubercle Bacillus (Tuberculosis)

    TSP Total Suspended Parcles

    TVET Technical and Vocaonal Educaon and Training

    WatSan Water and Sanitaon

  • 8/10/2019 Eastern Visayas RM

    11/74

    Eastern Visayas

    Updated Regional

    Development Plan -

    RESULTS MATRICES

    2014-2016

    11

    Executive Summary

    The Eastern Visayas Updated Regional Development Plan 2014-2016 Results Matrices, together with the Updated Regional Development

    Investment Program, are the two companion documents of the Updated RDP 2014-2016. As expressed in the updated Plan, the societal goal ofthe region is to aain a Beer Economy and Lessened Poverty through agri-business, tourism, and informaon and communicaons echnology

    development. All development acvies in the region shall contribute to the highest-order objecve that is linked to the naonal societal goal of

    Inclusive Growth, dened as sustained growth that create jobs, draws the majority into the economic and social mainstream, and connuously

    reduces mass poverty.

    The Updated RM has been designed so as to highlight the achievement of results at the dierent levels of implementaon of the eight

    strategic development themes or chapters of the Updated RDP. These are on macroeconomy; trade, industry and services; agriculture and

    sheries; infrastructure; human resource; peace and security; governance and the rule of law; and environment. As such, matrices describing

    the desired results for each of these themes/chapters are shown in this document. The matrices contain indicators with baseline data, annual

    and end-of-plan targets from 2014 to 2016, as well as the names of agencies responsible for the aainment of those targets. The statements

    of results contain the naonal societal goal, sector and/or subsector/intermediate outcomes that would allow for subsequent performance

    assessment and measurement.

    The progress of RDP implementaon will be monitored on the basis of target outputs and outcomes/impacts, indicated by year and value.

    The baseline data are also reected per indicator to establish the level of performance at which we started, thus provide a benchmark for changes

    before and aer the period of the Updated RDP. The responsible agency or agencies for each of the desired outcome and output are the ones

    responsible for reporng progress.

    This Updated RM covers the remaining three years of the Plan period 2014 to 2016. It also contains results indicators (dubbed as Core

    Indicators) of the Updated Philippine Development Plan Results Matrix (PDP-RM) 2014-2016 adopted or mirrored in the region. The rest of the

    result indicators (tagged as Crical Indicators) are solely or unique for Eastern Visayas Region.

    Development results, or simply results, are the outputs, outcomes, or impacts of a development intervenon. Outputsare the products,

    capital goods, and services that result from a development intervenon. Outcomesare the likely or achieved short-term or medium-term eects

    of those outputs. These are the observable behavioral and instuonal changes, usually resulng from coordinated short-term investments in

    individual and organizaonal capacity building for key development stakeholders. Impactsare the posive and negave primary and secondary

  • 8/10/2019 Eastern Visayas RM

    12/74

    Eastern Visayas

    Updated Regional

    Development Plan -

    RESULTS MATRICES

    2014-2016

    12

    long-term eects both intended and unintended, directly or indirectly of development intervenons. The transion of development results

    from outputs to outcomes, specically from the compleon of outputs to the achievement of impact, is then a change in developmental condion,

    as depicted in the results chain.1

    Results Chain2

    1 United Naons Development Program (UNDP), 2002. Results Based Management: Concepts and Methodology.

    2 Desarollo Internaonal Consult, Inc. 2012. Results-Based Monitoring and Evaluaon Workshop.

  • 8/10/2019 Eastern Visayas RM

    13/74

    Eastern Visayas

    Updated Regional

    Development Plan -

    RESULTS MATRICES

    2014-2016

    13

    1

    Macroeconomy

  • 8/10/2019 Eastern Visayas RM

    14/74

    Eastern Visayas

    Updated Regional

    Development Plan -

    RESULTS MATRICES

    2014-2016

    14

    Strategic Outcomes

    Sector Outcomes

    1. High and sustained economic growth achieved

    2. Employment increased3. Poverty incidence among populaon and families reduced

    Core and Crical Indicators and Annual and End-of-Plan Targets

    1. GRDP growth rate increased from 1.80% in 2011 to a range of 4.61%-5.61% in 2016

    2. Average real per capita GRDP growth in constant 2000 prices increased from PhP36,529 in 2011 to PhP40,802 in 2016

    3. AHFF sector growth rate in real terms increased to a range of 4.46% - 5.61% for the period 2014-2016

    4. Average industry output increased by PhP82.6 B for the period 2014-2016

    5. Industry sector growth rate in real terms increased to a range of 4.49% - 5.57% for the period 2014-2016

    6. Average services output increased by PhP67.1 B annually for the period 2014-2016

    7. Services sector growth rate in real terms increased to a range of 4.53% - 5.63% for the period 2014-2016

    8. Average value of exports increased by 5.0% annually from 2014-2016

    9. Employment generaon increased by 140,000 annually for the period 2014-2016

    10. Underemployment rate decreased to as low as 20% in 2016

    11. Average labor producvity increased by 4.2% annually for the period 2014-2016

    12. Poverty incidence among populaon reduced to 21.60% in 2016

    13. Annual family income increased from PhP160,000 in 2009 to PhP232,000 in 2016

    14. Inaon rate kept low and stable within a range of 3%-5% annual average for the period 2014-2016

    15. Gini-coecient maintained within a range of 0.3932-0.4076 in 2016

    Assumpons1. Good governance is pracced by local government units

    2. Polical stability that would aract investments is sustained

    3. Financial and real property posion of the region is strategic

    4. Manufacturing ventures are increasing

    5. Crucial infrastructure support to the agriculture and shery sector is established

    6. More IT parks are established and accredited

    7. Capacies of LGUs to build resilient communies and adapt to climate change are enhanced

    E t Vi

  • 8/10/2019 Eastern Visayas RM

    15/74

    Eastern Visayas

    Updated Regional

    Development Plan -

    RESULTS MATRICES

    2014-2016

    15

    Risks

    1. High vulnerability to disasters and climate change

    2. Lack of polical will

    3. Economic crisis

    *Dened as sustained growth that create jobs, draws the majority into the economic and social mainstream, and connuously reduces mass poverty.

    (PDP 2011-2016)

    *

    E t Vi

  • 8/10/2019 Eastern Visayas RM

    16/74

    Eastern Visayas

    Updated Regional

    Development Plan -

    RESULTS MATRICES

    2014-2016

    16

    Objecves/Results Indicators/UnitBaseline Targets Implemenng

    AgenciesYear Value 2014 2015 2016

    Societal Goal: Inclusive growth and poverty reducon

    Sector Outcomes:

    High and sustainedeconomic growth

    achieved

    GRDP growth rate (%) 2011 1.80 4.46 - 5.46 4.54 - 5.54 4.61 - 5.61 All governmentagencies, LGUs,

    private sector,

    and industry

    champions

    Average real per capita GRDP in

    constant 2000 prices (PhP)

    2011 36,529.00 40,802.00 40,802.00 40,802.00

    AHFF output (billion PhP) 2011 31.10 38.40 38.40 38.40

    AHFF growth rate in real terms (%) 2011 0.70 4.37 - 5.37 4.52 - 5.52 4.62 - 5.62

    Industry output (billion PhP) 2011 66.70 82.60 82.60 82.60

    Industry growth rate real terms (%) 2011 0.40 4.49 - 5.49 4.52 - 5.52 4.57 - 5.57Services output (billion PHP) 2011 54.10 67.10 67.10 67.10

    Services sector growth rate real

    terms (%)

    2011 4.10 4.53 - 5.53 4.59 - 5.59 4.63 - 5.63

    Value of exports (million US$) 2012 730.00 766.50 766.50 766.50

    Employment

    increased

    Employment generaon

    (magnitude)

    2012 143,700 140,000 140,000 140,000

    Underemployment rate (%) 2011 24.00 20.00 20.00 20.00

    Poverty incidence

    among populaonand families

    reduced

    Poverty incidence among

    populaon (%)

    2012 45.40 23.50 22.60 21.60

    Annual family income (PhP) 2009 160,000.00 220,000.00 232,000.00 244,000.00

    Gini coecient 2009 0.4841 0.3932-0.4074 0.3932-0.4074 0.3932-0.4076

    EasternVisayas

  • 8/10/2019 Eastern Visayas RM

    17/74

    Eastern Visayas

    Updated Regional

    Development Plan -

    RESULTS MATRICES

    2014-2016

    17

    Objecves/Results Indicators/UnitBaseline Targets Implemenng

    AgenciesYear Value 2014 2015 2016

    Labor producvity (PhP) 2011 88,268.00 91,975.00 91,975.00 91,975.00 All government

    agencies, LGUs,

    private sector,

    and industry

    champions

    Inaon rate (%) 2012 3.00 3.00-5.00 3.00-5.00 3.00-5.00

  • 8/10/2019 Eastern Visayas RM

    18/74

    2

    Competitive and

    Sustainable Agricultureand Fisheries

    EasternVisayas

  • 8/10/2019 Eastern Visayas RM

    19/74

    Eastern Visayas

    Updated Regional

    Development Plan -

    RESULTS MATRICES

    2014-2016

    19

    Strategic Outcomes

    Sector Outcomes

    1. Growth in agriculture and sheries (A&F) sector increased

    2. Food suciency aained3. Agriculture and sheries resilience to climate change increased

    4. Household income from agriculture and sheries increased

    Core and Crical Indicators and End-of-Plan Targets

    1. Food subsistence incidence decreased from 23% in 2012 to 11.7% in 2016

    2. Rice self-suciency rao increased from 96.56% in 2012 to 114% in 2016

    3. Yield of major commodies increased:

    Palay from 3.12 MT/ha in 2012 to 4.41 MT/ha in 2016

    Banana from 12.11 MT/ha in 2012 to 14.44 MT /ha in 2016

    Coconut from 1.26 MT /ha in 2012 to 2.19 MT /ha in 2016

    4. Volume of producon of major commodies increased:

    Palay from 1.014 MMT in 2012 to 1.295 MMT in 2016

    Banana from 0.190 MMT in 2012 to 0.232 MMT in 2016

    Coconut from 0.457 MMT in 2012 to 0.517 MMT in 2016

    5. Average income of families in the A&F sector increased to a range of 2%-4% for the period 2014-2016

    6. Net-prot cost rao for major commodies increased:

    Palay from 0.47% in 2012 to 0.71% in 2016

    Banana from 1.38% in 2012 to 1.64% in 2016

    Coconut from 0.93% in 2012 to 0.97% in 2016

    7. Net-prot cost rao for livestock and poultry increased:

    Hog from 0.13% in 2012 to 0.15% in 2016 Chicken from 0.16% in 2012 to 0.29% in 2016

    8. Value of A&F producon losses and damages due to weather and climate-related disaster reduced decreasing per year from 18% in 2010

    Eastern Visayas

  • 8/10/2019 Eastern Visayas RM

    20/74

    Eastern Visayas

    Updated Regional

    Development Plan -

    RESULTS MATRICES

    2014-2016

    20

    Assumpons

    1. Peace and order situaon is stable and connues to support the growth of the agriculture and sheries sector

    2. Industry clustering strategy and value chain development are implemented and supported by the naonal and local governments and the private

    sector

    3. Internaonal standards are complied with and crical export barriers are removed4. Farmers are adopng new technology innovaons and cooperate with the government on iniaves towards increasing and sustaining crop insurance

    coverage

    5. Naonal government eorts connue to be converged

    Risks

    1. High vulnerabilty to disasters and climate change

    2. Infestaon of diseases

    3. Socio-cultural factors among farmers and sherfolks

    Resistance to modern farming pracces

    Indolence

    Eastern Visayas

  • 8/10/2019 Eastern Visayas RM

    21/74

    y

    Updated Regional

    Development Plan -

    RESULTS MATRICES

    2014-2016

    21

    Eastern Visayas

  • 8/10/2019 Eastern Visayas RM

    22/74

    y

    Updated Regional

    Development Plan -

    RESULTS MATRICES

    2014-2016

    22

    Objecves/

    ResultsIndicators/Unit

    Baseline Targets Implemenng

    AgenciesYear Value 2014 2015 2016

    Societal Goal: Inclusive growth

    Regional Goals: Economic growth and poverty reducon

    Sector OutcomesGrowth in

    agriculture

    and sheries

    increased

    AHFF output (billion PhP) 2011 31.10 38.40 38.40 38.40 All government

    agencies, LGUs,

    private sector,

    and industry

    champions

    Food suciency

    aained

    Food subsistence incidence

    (%)

    2012

    (1st Semester)

    23.00 12.70 12.20 11.70

    Rice self-suciency index (%) 2012 96.56 105.00 109.00 114.00 DA

    Yield of major commodies

    (MT/ha)

    Palay DA

    Eastern Visayas 2012 3.52 4.21 4.31 4.41

    Leyte 2012 4.01 4.36 4.43 4.48

    Southern Leyte 2012 4.55 5.14 5.24 5.26

    Biliran 2012 4.55 4.78 4.92 4.97

    Samar 2012 2.60 3.29 3.41 3.54

    Eastern Samar 2012 2.70 4.07 4.16 4.31

    Northern Samar 2012 2.69 3.61 3.70 3.89

    Banana (Saba) DA

    Eastern Visayas 2012 12.11 13.22 13.81 14.44

    Leyte 2012 18.19 19.86 20.73 21.57

    Southern Leyte 2012 7.54 8.28 8.67 9.09

    Biliran 2012 11.96 13.05 13.63 14.24

    Samar 2012 28.31 30.99 32.40 33.93

    Eastern Samar 2012 3.53 3.83 4.00 4.17

    Northern Samar 2012 3.00 3.29 3.45 3.62

    Eastern Visayas

  • 8/10/2019 Eastern Visayas RM

    23/74

    Updated Regional

    Development Plan -

    RESULTS MATRICES

    2014-2016

    23

    Objecves/

    ResultsIndicators/Unit

    Baseline Targets Implemenng

    AgenciesYear Value 2014 2015 2016

    Coconut (Copra) PCA

    Eastern Visayas 2012 1.26 1.56 1.87 2.19

    Leyte 2012 1.22 1.45 1.68 1.92Southern Leyte 2012 1.14 1.47 1.81 2.16

    Biliran 2012 0.87 1.24 1.63 2.03

    Samar 2012 1.77 2.00 2.24 2.48

    Eastern Samar 2012 1.34 1.70 2.07 2.46

    Northern Samar 2012 1.22 1.50 1.79 2.09

    Sugarcane SRA

    Cane producon (ton cane/

    ha)

    2012 55 60 65 75

    Sugar producon (Lkg/ha) 2012 111.65 123.60 135.20 157.50

    Sugar producon (Lkg/ton

    cane)

    2012 2.03 2.06 2.08 2.10

    Corn 2012 1.58 1.78 1.88 1.98 DA

    Pineapple 2012 12.79 29.20 37.50 45.70 DA

    Mango 2012 38.55 40.11 40.91 5.10 DA

    Coee 2012 1.13 1.18 1.2 0.9 DA

    Cacao 2012 0.86 0.89 0.91 0.70 DA

    Vegetables DA

    Eggplant 2012 6.40 6.66 6.79 11.60

    Tomato 2012 6.55 6.81 6.95 13.80

    Cabbage 2012 6.68 12.30 15.20 18.00

    Cauliower 2012 5.46 9.20 11.00 12.90

    Volume of producon of

    major commodies (MT)

    Palay DA

    Eastern Visayas

  • 8/10/2019 Eastern Visayas RM

    24/74

    Updated Regional

    Development Plan -

    RESULTS MATRICES

    2014-2016

    24

    Objecves/

    ResultsIndicators/Unit

    Baseline Targets Implemenng

    AgenciesYear Value 2014 2015 2016

    Eastern Visayas 2012 1,014,122 1,222,818 1,254,400 1,294,977

    Leyte 2012 537,378 584,811 594,933 604,248

    Southern Leyte 2012 96,633 111,796 113,912 115,255

    Biliran 2012 67,597 71,122 73,222 74,425

    Samar 2012 143,468 188,952 196,846 205,492

    Eastern Samar 2012 57,024 103,598 106,510 115,470

    Northern Samar 2012 112,021 162,538 168,977 180,086

    Banana (Saba) DA

    Eastern Visayas 2012 190,845 210,384 220,902 231,947

    Leyte 2012 29,886 32,927 34,573 36,302

    Southern Leyte 2012 39,713 43,784 45,973 48,272

    Biliran 2012 11,252 12,405 13,025 13,676

    Samar 2012 99,760 109,985 115,484 121,258

    Eastern Samar 2012 2,502 2,758 2,896 3,041

    Northern Samar 2012 7,732 8,525 8,951 9,398

    Coconut (Copra) PCA

    Eastern Visayas 2012 457,487 487,487 502,488 517,488

    Leyte 2012 145,227 154,750 159,513 164,274

    Southern Leyte 2012 39,767 42,375 43,679 44,983

    Biliran 2012 21,391 22,793 23,495 24,196

    Samar 2012 64,333 68,552 70,661 72,770

    Eastern Samar 2012 94,734 100,946 104,052 107,159

    Northern Samar 2012 92,035 98,071 101,088 104,106

    Abaca PhilFIDA

    Eastern Visayas 2012 20,026 23,165 24,342 25,559

    Leyte 2012 7,427 8,579 9,027 9,479

    Southern Leyte 2012 3,502 4,054 4,257 4,469

    Eastern Visayas

  • 8/10/2019 Eastern Visayas RM

    25/74

    Updated Regional

    Development Plan -

    RESULTS MATRICES

    2014-2016

    25

    Objecves/

    ResultsIndicators/Unit

    Baseline Targets Implemenng

    AgenciesYear Value 2014 2015 2016

    Biliran 2012 127 147 154 162

    Samar 2012 1,375 1,591 1,671 1,754

    Eastern Samar 2012 400 463 486 511

    Northern Samar 2012 7,196 8,330 8,747 9,184

    Sugarcane SRA

    Cane producon (ton) 2012 478,500 534,000 585,000 675,000

    Sugar producon (Lkg) 2012 971,355 1,100,040 1,216,800 1,417,500

    Volume of producon in

    sheries (MT)

    Bangus BFAR

    Eastern Visayas 2013 13,560 14,238 14,950 15,697

    Leyte 2013 2,271 2,385 2,504 2,629

    Southern Leyte 2013 610 641 673 706

    Biliran 2013 29 30 31 33

    Samar 2013 5,146 5,403 5,674 5,957

    Eastern Samar 2013 4,892 5,137 5,394 5,664

    Northern Samar 2013 612 642 674 708

    Seaweeds BFAR

    Eastern Visayas 2012 40,733 58,406 67,211 76,018

    Leyte 2012 21,541.62 30,910.00 35,570.00 40,231.00

    Southern Leyte 2012 1.66 2.39 2.75 3.11

    Biliran 2012 0.10 0.17 0.20 0.23

    Samar 2012 6,560.68 9,390.00 10,805.00 12,221.00

    Eastern Samar 2012 12,326.83 17,671.00 20,336.00 23,000.00

    Northern Samar 2012 301.87 432.00 497.00 563.00

    Mussels 2012 6,809.70 7,507.69 7,883.08 8,277.23 BFAR

    Eastern Visayas

    U d dR i l

  • 8/10/2019 Eastern Visayas RM

    26/74

    Updated Regional

    Development Plan -

    RESULTS MATRICES

    2014-2016

    26

    Objecves/

    ResultsIndicators/Unit

    Baseline Targets Implemenng

    AgenciesYear Value 2014 2015 2016

    Invetory of livestock and

    poultry

    DA

    Hog (heads) DAEastern Visayas 2012 449,174 487,647 494,962 502,387

    Leyte 2012 256,596 307,905 312,524 317,212

    Southern Leyte 2012 34,890 31,207 31,675 32,150

    Biliran 2012 11,223 11,954 12,133 12,315

    Samar 2012 44,979 44,079 44,740 45,412

    Eastern Samar 2012 36,634 26,693 27,094 27,500

    Northern Samar 2012 64,852 65,809 66,796 67,798

    Carabao (heads) DA

    Eastern Visayas 2012 289,590 288,680 293,011 297,405

    Leyte 2012 155,043 154,401 156,717 159,068

    Southern Leyte 2012 17,648 16,771 17,023 17,278

    Biliran 2012 4,302 4,220 4,283 4,347

    Samar 2012 39,922 40,344 40,949 41,563

    Eastern Samar 2012 28,206 25,883 26,272 26,666

    Northern Samar 2012 44,469 47,061 47,767 48,483

    Cale (heads) DA

    Eastern Visayas 2012 21,168 23,284 23,632 23,987

    Leyte 2012 9,679 11,232 11,400 11,571

    Southern Leyte 2012 3,420 3,455 3,507 3,560

    Biliran 2012 1,492 1,740 1,766 1,793

    Samar 2012 795 811 823 835

    Eastern Samar 2012 2,776 2,753 2,794 2,836

    Northern Samar 2012 3,006 3,293 3,342 3,392

    Eastern Visayas

    Updated Regional

  • 8/10/2019 Eastern Visayas RM

    27/74

    Updated Regional

    Development Plan -

    RESULTS MATRICES

    2014-2016

    27

    Objecves/

    ResultsIndicators/Unit

    Baseline Targets Implemenng

    AgenciesYear Value 2014 2015 2016

    Goat (heads) DA

    Eastern Visayas 2012 56,847 55,252 56,082 56,923

    Leyte 2012 25,048 25,759 26,145 26,537Southern Leyte 2012 5,654 4,264 4,328 4,393

    Biliran 2012 14,019 12,512 12,700 12,890

    Samar 2012 2,186 2,265 2,299 2,334

    Eastern Samar 2012 5,166 5,357 5,438 5,519

    Northern Samar 2012 4,774 5,095 5,172 5,250

    Chicken (birds) DA

    Eastern Visayas 2012 2,208,850 3,717,896 3,773,665 3,830,269

    Leyte 2012 992,134 2,486,324 2,523,619 2,561,474

    Southern Leyte 2012 341,885 373,765 379,371 385,062Biliran 2012 129,255 122,648 124,488 126,355

    Samar 2012 342,727 308,053 312,674 317,364

    Eastern Samar 2012 138,500 151,190 153,458 155,759

    Northern Samar 2012 264,349 275,916 280,055 284,255

    Agriculture

    and sheries

    resilience to

    climate change

    increased

    Value of A&F producon

    losses and damages due to

    weather and climate-related

    disasters (%)

    2010 18.00 decreasing decreasing decreasing All government

    agencies,

    LGUs, SUCs,

    private sector,

    and industry

    championsIncomes in

    agriculture

    and sheries

    increased

    Average income of families

    in A&F (%)

    2009 17,582

    (in PhP)

    2.00-4.00 2.00-4.00 2.00-4.00 All government

    agencies, LGUs,

    private sector,

    and industry

    champions

    Eastern Visayas

    UpdatedRegional

  • 8/10/2019 Eastern Visayas RM

    28/74

    Updated Regional

    Development Plan -

    RESULTS MATRICES

    2014-2016

    28

    Objecves/

    ResultsIndicators/Unit

    Baseline Targets Implemenng

    AgenciesYear Value 2014 2015 2016

    Net prot cost rao for

    major commodies (%)

    Palay 2012 0.47 0.65 0.68 0.71 DA

    Banana 2012 1.38 1.48 1.56 1.64 DA

    Coconut 2012 0.93 0.91 0.93 0.97 PCA

    Sugarcane 2012 0.04 0.22 0.27 0.32 SRA

    Net prot cost rao for

    livestock and poultry (%)

    DA

    Hog 2012 0.13 0.14 0.15 0.15

    Chicken 2012 0.16 0.29 0.29 0.29

    Net prot cost rao for

    shery (%)

    BFAR

    Bangus (Cage) 2012 0.47 0.52 0.55 0.58

    Bangus (Pond) 2012 1.17 1.29 1.35 1.42

    Eastern Visayas

    Updated Regional

  • 8/10/2019 Eastern Visayas RM

    29/74

    Updated Regional

    Development Plan -

    RESULTS MATRICES

    2014-2016

    29

    3Competitive Trade,

    Industry andServices

    Eastern Visayas

    UpdatedRegional

  • 8/10/2019 Eastern Visayas RM

    30/74

    Updated Regional

    Development Plan -

    RESULTS MATRICES

    2014-2016

    30

    Strategic Outcomes

    Sector Outcomes

    1. Diversied and compeve agri-industry

    2. Highly developed tourism3. Viable ICT-BPM

    Core and Crical Indicators and End-of-Plan Targets

    1. Number of MSME jobs created increased from 10,334 in 2011 to 11,896 in 2016

    2. Number of LGUs with streamlined BPLS increased from 77 in 2012 to 143 in 2016

    3. Domesc sales of MSMEs increased from PhP293 M in 2011 to PhP420 M in 2016

    4. Number of business name (BN) registraons increased from 9,399 in 2011 to 10,000 in 2016

    5. Visitor arrivals increased from 207,417 in 2010 to 705,699 in 2016

    6. Visitor receipts increased:

    Foreign from PhP175 M in 2010 to PhP787 M in 2016 Local from PhP2,156 M in 2010) to PhP10,864 M in 2016

    7. Number of accredited primary (accommodaon) tourism establishments increased from 10 in 2012 to 97 in 2016

    8. ICT-BPM revenue increased from PhP355 M in 2010 to PhP3,580 M in 2016

    9. Number of ICT-BPM centers/facilies (parks) increased from 1 in 2010 to 3 in 2016

    10. Number of ICT-BPM jobs increased from 1,485 in 2010 to 21,000 in 2016

    Assumpons

    1. Polical climate is stable and supporve of the trade and markeng iniaves of the business sector

    2. Peace and order situaon is stable to promote private sector condence3. Naonal government connually supports research and development of new value-adding products and implementaon of major programs like the NICCEP

    4. Capacity building programs are sustained and the necessary infrastructure support to the development of tourism desnaon programs are provided

    5. LGUs and naonal government provide opportunies for capacity building and credit access to develop MSMEs

    6. Internaonal standards are complied with and export barriers are removed

    Eastern Visayas

    Updated Regional

  • 8/10/2019 Eastern Visayas RM

    31/74

    Updated Regional

    Development Plan -

    RESULTS MATRICES

    2014-2016

    31

    Risk

    1. Peace and order problem

    2. Inadequate supply of raw materials and other producon inputs

    3. Disaster vulnerability

    Eastern Visayas

    UpdatedRegional

  • 8/10/2019 Eastern Visayas RM

    32/74

    Updated Regional

    Development Plan -

    RESULTS MATRICES

    2014-2016

    32

    Objecves/Results Indicators/UnitBaseline Targets Implemenng

    AgenciesYear Value 2014 2015 2016

    Societal Goal: Inclusive growth

    Regional Goals: Economic growth and poverty reducon

    Sector Outcomes:Diversied and

    compeve agri-

    industry

    MSMEs jobs created

    (number)

    2011 10,334 10,199 11,015 11,896 DTI

    Business Name (BN)

    registraons (number)

    2011 9,399 9,500 9,785 10,000 DTI

    BN processing me

    (minutes)

    2011 15 15 15 15 DTI

    LGUs with streamlined

    BPLS (number)

    2012 77 99 121 143 DILG/DTI

    Domesc sales of MSMEs(PhP) 2011 293.16 360.29 389 420 DTI

    Assisted MSMEs (number) 2011 3,603 5,228 5,647 6,098 DTI

    Compliance to Fair Trade

    law (%)

    2011 99 99 99 99 DTI

    Consumer complaints

    resolved (%)

    2011 98 98 98 98 DTI

    Shared-service facility

    (number)

    2011 26 26 26 26 DTI

    Highly developed

    tourism

    Visitors/tourists arrivals:

    Foreign tourists 2010 16,069 41,255 44,040 47,013 DOT

    Local tourists 2010 191,348 569,982 612,731 658,686 DOT

    Visitors/tourists receipts:

    Foreign tourists (million

    PhP)

    2010 175.00 505.00 540.00 787.00 DOT

    Local tourists (million

    PhP)

    2010 2,156.00 6,879.00 7,395.00 10,864.00 DOT

    Eastern Visayas

    Updated Regional

  • 8/10/2019 Eastern Visayas RM

    33/74

    p g

    Development Plan -

    RESULTS MATRICES

    2014-2016

    33

    Objecves/Results Indicators/UnitBaseline Targets Implemenng

    AgenciesYear Value 2014 2015 2016

    Tourism establishments:

    Accommodaon

    establishments (number)

    2012 439 461 484 508 DOT

    Tourist transport

    (number)

    2012 2 2 3 3 DOT

    Travel & tours (number) 2012 10 11 12 13 DOT

    Frontliners (number) 2012 1 1 2 2 DOT

    Accredited primary tourism

    establishments (number)

    Accommodaon

    establishments (number)

    2012 10 88 92 97 DOT

    Tourist transport

    (number)

    2012 1 1 1 2 DOT

    Travel & tours (number) 2012 4 5 7 7 DOT

    Frontliners (number) 2012 0 1 2 2 DOT

    Other tourism

    establishments (number)

    2012 0 5 7 7 DOT

    Highly Developed

    Tourism

    Arrivals of excursionists/

    day visitors:

    Foreign visitors (number) 2011 7,284 8,860 9,458 10,096 DOT

    Local visitors (number) 2011 157,134 195,207 209,848 225,587 DOT

    Viable ICT-BPM ICT-BPM revenue (million

    PhP)

    2010 355 3,580

    ICT-BPM parks (number) 2010 1 3 DOST, DTI

    ICT-BPM locators (number) 2010 9 11 DOST, DTI

    In ICT Park 2010 7 9

    Outside ICT Park 2010 2 2

    ICT-BPM jobs (number) 2010 1,485 21,000

  • 8/10/2019 Eastern Visayas RM

    34/74

    4Accelerating

    InfrastructureDevelopment

    Eastern Visayas

    Updated Regional

  • 8/10/2019 Eastern Visayas RM

    35/74

    Development Plan -

    RESULTS MATRICES

    2014-2016

    35

    Strategic Outcomes

    Intermediate Outcomes

    1. Performance of agri-business, tourism and ICT improved

    2. Access to social goods and services improved3. Environmental quality improved

    4. Resilience to climate change and disaster risk vulnerability decreased

    Sector Outcome

    Quality, adequacy and accessibility of infrastructure facilies and services

    Core and Crical Indicators and End-of-Plan Targets

    1. Percentage of paved naonal arterial roads (NAR) increased from 99.4% in 2012 to 100% in 2014

    2. Percentage of paved naonal secondary roads (NSR) increased from 88.22% in 2012 to 100% in 20163. Percentage of permanent bridges along NAR increased from 98.53% in 2012 to 100% in 2014

    4. Percentage of permanent bridges in good condion along NAR increased from 56.53% in 2012 to 100% in 2016

    5. Cargo throughput increased from 1.942 MMT in 2012 to 2.625 MMT in 2016

    6. Number of passengers increased from 2.667 M in 2012 to 3.549 M in 2016

    7. Number of vessels increased from 12,614 in 2012 to 14,519 in 2016

    8. Passenger seang capacity in port terminal buildings increased from 1,890 in 2012 to 2,000 in 2016

    9. Annual domesc passenger trac increased from 1.255 M in 2012 to 1.823 M in 2016

    10. Annual domesc cargo trac increased from 7.605 M kg in 2012 to 11.042 M kg in 2016

    11. Annual domesc ights increased from 16,854 in 2012 to 24,470 in 2016

    12. Proporon of populaon with access to potable water (Levels I and II) increased from 49% in 2011 to 88% by end of 2015 (MDG target)

    13. Percentage of populaon with access to basic sanitaon (e.g. sanitary toilets) increased from 65% in 2011 to 90% in 201614. Percentage of irrigated farmlands over total area of irrigable farmlands increased from 56% in 2012 to 62% in 2016

    Eastern Visayas

    Updated Regional

  • 8/10/2019 Eastern Visayas RM

    36/74

    Development Plan -

    RESULTS MATRICES

    2014-2016

    36

    15. Cropping intensity (based on 2 cropping seasons per crop year) improved:

    Naonal Irrigaon Systems (NIS) from 180% in 2012 to 192% in 2016

    Communal irrigaon Systems (CIS) from 115% in 2012 to 150% in 2016

    16. Rice suciency index increased from 96.56% in 2012 to 114% in 2016

    17. Palay yield per hectare increased from 3.45 MT/ha to 4.42 MT/ha in 2016

    18. Distribuon loss maintained at a level not exceeding the ERC-approved distribuon systems loss cap:

    Transmission

  • 8/10/2019 Eastern Visayas RM

    37/74

    Development Plan -

    RESULTS MATRICES

    2014-2016

    37

    Eastern Visayas

    Updated Regional

    D l t Pl

  • 8/10/2019 Eastern Visayas RM

    38/74

    Development Plan -

    RESULTS MATRICES

    2014-2016

    38

    Objecves/Results Indicators/UnitsBaseline Targets Implemenng

    AgenciesYear Value 2014 2015 2016

    Societal Goal: Inclusive growth

    Regional Goals: Economic growth and poverty reducon

    Intermediate Outcomes:

    Performance of agri-

    business, tourism and

    ICT improved

    Refer to Chapter 2: Compeve and

    Sustainable Agriculture and Fisheries,

    and Chapter 3: Compeve Trade,

    Industry, and Services

    Access to social goods

    and services improved

    Refer to Chapter 5: Creang Producve

    Human Resource

    Environmental quality

    improved

    Refer to Chapter 8: Conservaon,

    Protecon and Rehabilitaon of the

    Environment and Natural Resources

    Resilience to climate

    change increased

    and disaster risk

    vulnerability

    decreased

    Refer to Chapter 8: Conservaon,

    Protecon and Rehabilitaon of theEnvironment and Natural Resources

    Sector Outcome

    Quality, adequacy

    and accessibility

    of infrastructure

    facilies and services

    enhanced

    TRANSPORT

    Average travel me in key corridors byroad/RORO (hours)

    Phil-Japan Friendship Highway

    (Maharlika Highway), along Tacloban-

    Allen-Matnog Route

    2012 9 8 7 7 DPWH/DOTC/

    PPA

    Phil-Japan Friendship Highway

    (Maharlika Highway), along Tacloban-

    San Ricardo-Lipata, Surigao Route

    2012 7 6.5 6 6 DPWH/DOTC/

    PPA

    Eastern Visayas

    Updated Regional

    Development Plan

  • 8/10/2019 Eastern Visayas RM

    39/74

    Development Plan -

    RESULTS MATRICES

    2014-2016

    39

    Objecves/Results Indicators/UnitBaseline Targets Implemenng

    AgenciesYear Value 2014 2015 2016

    Tacloban-Ormoc-Cebu City Route 2012 8 7.5 7 7 DPWH/DOTC/

    PPA

    Tacloban-Palompon-Bogo, Cebu Route 2012 7 6.5 6 6 DPWH/DOTC/

    PPA

    Tacloban-Sogod-Bato-Jubay, Bohol

    Route

    2012 7 6.5 6 6 DPWH/DOTC/

    PPA

    Water Transport

    Average service me of vessel by PMO

    (hours)

    Tacloban PMO 2012 22 22 20 18 PPA

    Ormoc PMO 2012 28 24 22 20 PPA

    Cargo throughput (million MT per

    annum)

    Philippine Ports Authority (PPA) Ports 2012 1.942 2.147 2.374 2.625 PPA

    Passengers (number in million) 2012 2.677 2.941 3.231 3.549 PPA

    Vessels (number in thousand) 2012 12.614 13.219 13.854 14.519 PPA

    Passenger capacity in port terminal

    buildings (number)

    2012 1890 2000 2000 2000 PPA

    Ports cered to ISO standards on

    selected process (number)

    2012 0 0 0 1 PPA

    Ports handling foreign vessels with

    minimum dra of (-)10m (number)

    2012 0 0 0 1 PPA

    Land TransportAverage travel me to key towns/cies

    (hours)

    Tacloban City-Naval, Biliran 2012 3.5 3 2.5 2.5 DPWH

    Tacloban City-Ormoc City 2012 3 2.5 2 2 DPWH

    Tacloban City-Baybay City 2012 3 2.5 2 2 DPWH

    Eastern Visayas

    Updated Regional

    Development Plan

  • 8/10/2019 Eastern Visayas RM

    40/74

    Development Plan -

    RESULTS MATRICES

    2014-2016

    40

    Objecves/Results Indicators/UnitBaseline Targets Implemenng

    AgenciesYear Value 2014 2015 2016

    Tacloban City-Maasin City via Sogod,

    Southern Leyte

    2012 4.5 4 3.5 3.5 DPWH

    Tacloban City-Catbalogan City 2012 3 2.5 2 2 DPWH

    Tacloban City-Calbayog City 2012 5 4 3.5 3.5 DPWH

    Tacloban City-Catarman, Northern

    Samar via San Isidro

    2012 7 6.5 6 6 DPWH

    Tacloban City-Catarman, Northern

    Samar via Lope de Vega

    2012 6 5.5 5 5 DPWH

    Tacloban City-Borongan City via South

    Samar Coastal Road

    2012 6 5 4.5 4 DPWH

    Tacloban City-Borongan City via Buray-

    Ta Road

    2012 6 5 4.5 4 DPWH

    Naonal Roads and Bridges

    Road density (kilometer/sq. kilometer) 2012 0.107 0.107 0.107 0.107 DPWH

    Total length of naonal roads

    (kilometer)

    2012 2,453.530 2,453.530 2,453.530 2,453.530 DPWH

    Length of paved naonal arterial road

    (kilometer)

    2012 1,413.79 1,422.37 1,422.37 1,422.37 DPWH

    Length of paved naonal secondary

    road (kilometer)

    2012 909.70 950.20 990.70 1,031.16 DPWH

    Length of permanent bridges along

    naonal arterial roads (linear meter)

    2012 33,588 34,089 34,089 34,089 DPWH

    Number of permanent bridges in goodcondion along naonal arterial roads 2012 489 685 775 865 DPWH

    Motor Vehicle Registered

    Number of Registered Motor Vehicle

    For-Hire vehicles (number in

    thousand)

    2012 16.348 18.390 19.126 19.890 LTO

    Private vehicles (number in thousand) 2012 139.627 151.021 157.063 163.344 LTO

    Eastern Visayas

    Updated Regional

    Development Plan -

  • 8/10/2019 Eastern Visayas RM

    41/74

    Development Plan

    RESULTS MATRICES

    2014-2016

    41

    Objecves/Results Indicators/UnitBaseline Targets Implemenng

    AgenciesYear Value 2012 2015 2016

    Air Transport

    Annual domesc passenger trac

    (number in thousand)

    2012 1,255.701 1,506.841 1,657.525 1,823.277 CAAP

    Weight of annual domesc cargo trac

    (million kilogram)

    2012 7.605 9.126 10.038 11.042 CAAP

    Annual domesc ights (number in

    thousand)

    2012 16.854 20.224 22.246 24.470 CAAP

    WATER RESOURCES

    River basin organizaons (RBOs)

    instuonalized proporonal to the

    number of priority basins (number)

    2010 0 0 0 1 NWRB/DENR/

    RBCO

    River basin master plans developed

    (number)

    2010 0 0 0 1 NWRB/DENR/

    RBCO/DPWH

    Water Supply

    Populaon with access to potable water

    (Levels I & II) (%)*

    2011 49 86 88 88 NAPC/DOH/

    DILG/ LGUs/

    DSWD

    Households Level III connecon

    (number)

    2010 85,064 93,900 96,250 98,660 LWUA/WDs/

    LGUs

    Households with 24/7 water supply

    service (number)

    2010 85,065 93,900 96,250 98,660 LWUA/WDs

    Non-revenue water (%) 2012 38.00 32.00 29.00 25.00 LWUA/WDs

    Sanitaon, Sewerage, & Septage

    Populaon with access to basic

    sanitaon, i.e. sanitary toilets (%)*

    2011 65.00 80.00 83.80 90.00 DOH/ DILG/

    LGUs

    Households praccing septage

    management (%)

    2011 65.00 80.00 84.00 90.00 DOH/ DILG/

    LGUs

    Irrigaon

    Irrigated farmlands over total area of

    irrigable farmlands (%)

    2012 56.00 58.00 60.00 62.00 DA/NIA

    *MDG Target

    Eastern Visayas

    Updated Regional

    Development Plan -

  • 8/10/2019 Eastern Visayas RM

    42/74

    Development Plan

    RESULTS MATRICES

    2014-2016

    42

    Objecves/Results Indicators/UnitBaseline Targets Implemenng

    AgenciesYear Value 2014 2015 2016

    Cropping intensity (based on 2 cropping

    seasons per crop year)

    Naonal Irrigaon Systems (%) 2012 180.00 185.00 190.00 192.00 DA/NIA

    Communal Irrigaon Systems (%) 2012 115.00 138.00 145.00 150.00 DA/NIA

    Gross Irrigaon Water Requirement for

    palay (cu. m/ha/year)

    2012 36,288 31,104 27,648 22,464 DA/NIA

    Irrigated farmlands over total area of

    irrigable farmlands (%)

    2012 56.00 58.00 60.00 62.00 DA/NIA

    ENERGY

    Capacity (MW) 2012 588 588 588 588 DOE

    Transmission loss (%) 2012

  • 8/10/2019 Eastern Visayas RM

    43/74

    p

    RESULTS MATRICES

    2014-2016

    43

    Objecves/Results Indicators/UnitBaseline Targets Implemenng

    AgenciesYear Value 2014 2015 2016

    LGUs with Stage 1 web/Internet

    presence (%)

    Cies 2012 71.43 85.71 100.00 100.00 LGUs

    Provinces 2012 66.67 83.33 100.00 100.00 LGUs

    Municipalies 2012 20.00 50.00 75.00 100.00 LGUs

    SUCs with Stage 1 web/Internet

    presence

    (%) 2012 100.00 100.00 100.00 100.00 SUCs

    SOCIAL INFRASTRUCTURE

    Solid Waste Management

    Material Recovery Facilies established

    (number)

    2010 10.00 17.00 19.00 21.00 LGUs/EMB

    Solid waste diversion rate (%) 2010 33.00 45 48 50 NSWMCEducaon

    Public schools with ideal classroom-to-

    populaon rao of 1:45 (%)

    Elementary 2012 81.26

    (2,961)

    87.51

    (3,189)

    93.77

    (3,417)

    100.00

    (3,644)

    DepEd

    Secondary 2012 43.44

    (212)

    62.30

    (304)

    81.15

    (396)

    100.00

    (488)

    DepEd

    Public schools with ideal WATSAN

    facilies to schoolchildren rao of 1:50

    (% and number)Elementary and Secondary 2012 24.18

    (999)

    62.12

    (2,043)

    74.73

    (3,088)

    100.00

    (4,132)

    DepEd

  • 8/10/2019 Eastern Visayas RM

    44/74

    5Creating Productive

    Human Resource

    Eastern Visayas

    Updated Regional

    Development Plan -

  • 8/10/2019 Eastern Visayas RM

    45/74

    RESULTS MATRICES

    2014-2016

    45

    Strategic Outcomes

    Sector Outcome

    Producve human resource in support of agri-business, tourism, and ICT developed

    Sub-sector Outcomes

    1. Access to quality health and nutrion services improved

    2. Access to quality educaon and training improved

    3. Access to quality shelter and social protecon services improved

    Core and Crical Indicators and End-of-Plan Targets

    1. Maternal mortality rate per 100,000 livebirths decreased from 79% in 2011 to 50% in 2016

    2. Infant mortality rate per 1,000 livebirths decreased from 40% in 2011 to 17% in 2016

    3. TB mortality rate per 100,000 populaon decreased from 24.13% in 2011 to

  • 8/10/2019 Eastern Visayas RM

    46/74

    RESULTS MATRICES

    2014-2016

    46

    Assumpons

    1. Access to quality health and nutrion services is improved

    2. Families/households cooperate in the implementaon of health programs

    3. Access to quality educaon and training is improved

    4. Business environment is stable5. Investments are increasing

    Risks

    1. Emergence of new diseases/new strain of exisng diseases

    2. Polical instability

    3. Economic crisis

    Eastern Visayas

    Updated Regional

    Development Plan -

  • 8/10/2019 Eastern Visayas RM

    47/74

    RESULTS MATRICES

    2014-2016

    47

    Eastern Visayas

    Updated Regional

    Development Plan -

    S S C S

  • 8/10/2019 Eastern Visayas RM

    48/74

    RESULTS MATRICES

    2014-2016

    48

    Objecves/Results Indicators/UnitBaseline Targets

    Implemenng AgenciesYear Value 2014 2015 2016

    Societal Goal: Inclusive growth

    Regional Goals: Economic growth and poverty reducon

    Sector Outcome: Producve human resource in support of agri-business, tourism and ICT developed

    Sub-sector Outcomes:

    Access to quality

    health and nutrion

    services improved

    Maternal mortality rate

    (per 100,000 livebirths)

    2011 79 59 52 50 DOH, PHIC, LGUs, and

    private sector

    Pregnant women with 4

    pre-natal check-ups (%)

    2011 77.30 80.00 85.00 90.00 DOH, PHIC, LGUs, and

    private sector

    Under-ve mortality

    (per 1,000 livebirths)

    2011 53 28 26.7 25.5 DOH, NNC, LGUs, and

    private sector

    Infant mortality rate

    (per 1,000 livebirths)

    2011 40 20 19 17 DOH, NNC, LGUs, and

    private sector

    HIV prevalence rate

    among 15-22 years old

    (%)

    2011 0.259 0.259 0.259 0.259 DOH, POPCOM, LGUs,

    and private sector

    TB prevalence rate (per

    100,000)

    2011 181 168 163 159 DOH, LGUs, and private

    sector

    TB case detecon rate

    (%)

    2011 58.75 85.00 85.00 85.00 DOH, LGUs, and private

    sector

    TB cure rate (%) 2011 84.00 85.00 100.00 100.00 DOH, LGUs, and private

    sector

    Contracepve

    prevalence rate in allmethods (%)

    2011 27.00 35.00 45.00 65.00 DOH, POPCOM,

    LGUs, and privatesector

    Proporon of

    populaon HH with

    access to safe water (%)

    2011 71.30 81.00 86.50 88.00 DOH, LGUs, and private

    sector

    Eastern Visayas

    Updated Regional

    Development Plan -

    RESULTSMATRICES

  • 8/10/2019 Eastern Visayas RM

    49/74

    RESULTS MATRICES

    2014-2016

    49

    Objecves/Results Indicators/UnitBaseline Targets

    Implemenng AgenciesYear Value 2014 2015 2016

    Proporon of

    populaon HH with

    access to sanitary toilets

    facilies (%)

    2011 65.00 80.00 83.80 90.00 DOH, LGUs, and private

    sector

    Prevalence of

    underweight children

    under 5 years of age (%)

    2009 21.00 11.40 10.50 9.50 NNC

    Prevalence of

    underweight

    preschoolers (%)

    2010 15.70 11.40 10.90 9.50 NNC

    Prevalence of

    underweight school

    children (%)

    2009 16.90 11.06 9.78 8.50 NNC

    Proporon of

    households with per

    capita intake below

    100% dietary energy

    requirement (%)

    2008 66.70 41.33 37.10 32.87 NNC

    Access to quality

    educaon and

    training improved

    Simple literacy rate (%) 2008 93.60 96.80 100.00 100.00 DepEd

    Funconal literacy rate

    (%)

    2008 72.90 74.90 75.90 76.90 DepEd

    Rao of literate females

    to males 15-20 years old

    2008 1.03 1.03 1.00 1.00 DepEd

    Total enrolment in

    kindergarten (number)

    2012-

    2013

    105,626 106,506 107,386 108,266 DepEd

    Total enrolment in

    elementary (number)

    2012-

    2013

    725,501 731,547 737,593 743,639 DepEd

    Total enrolment in

    secondary (number)

    2012-

    2013

    337,506 340,319 343,132 345,945 DepEd

  • 8/10/2019 Eastern Visayas RM

    50/74

    Eastern VisayasUpdated Regional

    Development Plan -

    RESULTSMATRICES

  • 8/10/2019 Eastern Visayas RM

    51/74

    RESULTS MATRICES

    2014-2016

    51

    Objecves/Results Indicators/UnitBaseline Targets

    Implemenng AgenciesYear Value 2014 2015 2016

    TVET enrollees

    (number)

    2012 41,524 42,776 44,059 46,262 TESDA

    TVET graduates

    (number)

    2012 36,713 38,498 39,650 41,636 TESDA

    TVET graduates

    assessed (number)

    2012 29,584 30,176 31,081 32,635 TESDA

    TVET graduates cered

    (number)

    2012 27,901 26,555 27,351 28,719 TESDA

    Cercaon rate in

    TVET graduates (%)

    2012 94 88 88 88 TESDA

    New programs/

    qualicaons created/

    registered relevant

    to the industry needs

    (number)

    2012 43 43 43 43 TESDA

    Faculty in higher

    educaon with Masters

    Degree (%)

    2009 35.04 100.00 100.00 100.00 CHED

    Higher educaon

    instuons with

    ladderized educaon

    program (%)

    2012 90.00 90.00 90.00 90.00 CHED/TESDA

    DOST scholarship

    examinees (number)

    2012 2,517 2,915 3,206 3,527 DOST

    DOST scholarshipqualiers (number)

    2013 139 172 181 190 DOST

    Municipalies with

    DOST scholarship

    applicants (number)

    2013 88 92 97 102 DOST

    Access to shelter

    security improved

    Housing targets 2010 22.4 20.15 21.4 22.78 NHA and SHFC

    Eastern Visayas

    Updated Regional

    Development Plan -

    RESULTSMATRICES

  • 8/10/2019 Eastern Visayas RM

    52/74

    RESULTS MATRICES

    2014-2016

    52

    Objecves/Results Indicators/UnitBaseline Targets Implemenng

    AgenciesYear Value 2014 2015 2016

    Share of socialized

    housing to housing

    target (%)

    2010 18.58 71.6 73.2 74.78 NHA and SHFC

    Access to qualitysocial protecon

    services improved

    Poor householdscovered by CCT

    (number)

    2012 298,773 298,773 298,773 298,773 DSWD

    CCT beneciaries

    (number)

    2012 221,550 221,550 221,550 221,550 DSWD

    Completed sub-projects

    under KALAHI-CIDSS

    (number)

    2012 276 415 415 415 DSWD

    Informal sector workers,

    unemployed persons,

    minimum wage earners,

    and OFWs and familieswith capacity building

    services for livelihood

    under the DILP

    (number)

    2012 3,118 1,550 1,600 1,650 DOLE

    Jobseekers placed

    in local employment

    (number)

    2012 18,548 12,760 14,036 15,440 DOLE

    Workers, jobseekers/

    students reached

    through CLEEP, TAV, OSH

    and other producvity

    trainings (number)

    2012 12,271 8,503 9,353 10,289 DOLE

    Poor senior cizens

    covered by social

    pension under the

    Senior Cizen's Law

    (number)

    2012 14,294 29,239 34,239 39,239 DSWD and LGUs

    Eastern VisayasUpdated Regional

    Development Plan -

    RESULTSMATRICES

  • 8/10/2019 Eastern Visayas RM

    53/74

    RESULTS MATRICES

    2014-2016

    53

    Objecves/Results Indicators/UnitBaseline Targets Implemenng

    AgenciesYear Value 2014 2015 2016

    Poor families covered

    by the Naonal Health

    Insurance Program (%)

    2008 53.00 100.00 100.00 100.00 PHIC and LGUs

    Enrolment rate of poorfamilies covered by the

    NHIP (%)

    2010 74.00 100.00 100.00 100.00 PHIC and LGUs

    6G d G

  • 8/10/2019 Eastern Visayas RM

    54/74

    6Good Governance

    and the Rule of Law

    Eastern VisayasUpdated Regional

    Development Plan -

    RESULTS MATRICES

  • 8/10/2019 Eastern Visayas RM

    55/74

    2014-2016

    55

    Strategic Outcomes

    Sector Outcome

    1. Eecve, transparent, parcipave and accountable governance pracced

    2. Access to jusce enhanced

    Sub-sector Outcomes

    1. Public services delivered eecvely with greater transparency and accountability

    2. Business-friendly environment enhanced

    3. Democrac instuons strengthened

    4. Rule of law strengthened

    Core and Crical Indicators and End-of-Plan Targets

    1. Number of LGUs with streamlined Business Permits and Licensing System increased from 77 in 2012 to 143 in 20162. Number of LGUs with Seal of Good Housekeeping increased:

    Provinces from 3 in 2011 to 6 in 2016

    Cies from 2 in 2011 to 7 in 2016

    Municipalies from 24 in 2011 to 136 in 2016

    3. Number of LGUs reaching the benchmark rang of 4 (High) on the state of local governance per performance area increased:

    Administrave Governance

    Provinces from 3 in 2011 to 6 in 2016

    Cies from 7 in 2011 to 7 in 2016

    Municipalies from 42 in 2011 to 109 in 2016

    Social Governance

    Provinces from 3 in 2011 to 6 in 2016 Cies from 3 in 2011 to 7 in 2016

    Municipalies from 72 in 2011 to 130 in 2016

    Economic Governance

    Provinces from 5 in 2011 to 6 in 2016

    Cies from 4 in 2011 to 6 in 2016

    Municipalies from 44 in 2011 to 79 in 2016

    Environmental Governance

    Eastern VisayasUpdated Regional

    Development Plan -

    RESULTS MATRICES

  • 8/10/2019 Eastern Visayas RM

    56/74

    2014-2016

    56

    Provinces from 4 in 2011 to 6 in 2016

    Cies from 5 in 2011 to 7 in 2016

    Municipalies from 88 in 2011 to 109 in 2016

    Valuing Fundamentals of Good Governance

    Provinces from 5 in 2011 to 6 in 2016

    Cies from 4 in 2011 to 7 in 2016

    Municipalies from 89 in 2011 to 109 in 20164. Number of LGUs compliant to Full Disclosure Policy maintained/increased:

    Provinces from 6 in 2012 to 6 in 2016 (maintained)

    Cies from 6 in 2012 to 7 in 2016

    Municipalies from 135 in 2012 to 136 in 2016

    5. Number of LGUs with OPI of 4 valuing fundamentals of government under LGPMS increased:

    Provinces from 5 in 2012 to 6 in 2016

    Cies from 6 in 2012 to 7 in 2016

    Municipalies from 102 in 2012 to 109 in 2016

    6. Speedy resoluon of cases:

    Number of cases disposed within the reglementary period (meliness) increased from 218 in 2012 to 290 in 2016

    Percentage of cases disposed increased by an average of 10% from 2014 to 2016

    Assumpons

    1. Duty bearers have high integrity to implement and sustain reforms for the performance area in administrave governance and development in

    economic, social and environment sectors

    2. Stability of budgetary revenue and expenditure shares to provide state entlements to claim holders is maintained

    3. LGUs and regulatory NGAs adopt measures to reduce signatories/procedural steps in the issuance of permits and other government transacons

    4. Cizens and state have high respect for instuons that govern them to eect the rule of law and control of corrupon (e.g. judiciary, auding,

    police, etc.)

    5. Stakeholders have a collecve voice through involvement in planning and delivery of services in order to promote parcipaon and transparency6. Government agencies and instrumentalies dufully adhere to the requirements of RA 9184 or the Government Procurement Reform Act

    Risks

    1. Government agencies are indierent to the length and complexity of public transacons

    2. Loss of condence by the public in the government

    3. An-corrupon programs/measures are ignored or circumvented by unscrupulous public ocials

    Eastern VisayasUpdated Regional

    Development Plan -

    RESULTS MATRICES

  • 8/10/2019 Eastern Visayas RM

    57/74

    2014-2016

    57

    Eastern VisayasUpdated Regional

    Development Plan -

    RESULTS MATRICES

  • 8/10/2019 Eastern Visayas RM

    58/74

    2014-2016

    58

    Objecves/Results Indicators/UnitBaseline Targets Implemenng

    AgenciesYear Value 2014 2015 2016

    Societal Goal : Inclusive growth

    Regional Goals: Economic growth and poverty reducon

    Sector Outcome: Eecve, transparent, parcipave and accountable governance pracced

    Sub-sector Outcomes:

    Public services delivered

    eecvely with greater

    transparency and

    accountability

    LGUs compliant to FDP

    (number)

    DILG

    Provinces (number) 2012 6 6 6 6

    Cies (number) 2012 6 7 7 7

    Municipalies (number) 2012 135 136 136 136

    LGUs with OPI of 4 on Valuing

    Fundamentals of Governance

    under LGPMS

    2012 DILG

    Provinces (number) 2012 5 5 6 6

    Cies (number) 2012 6 6 7 7

    Municipalies (number) 2012 102 104 106 109

    Business-friendly

    environment and

    democrac instuons

    strenghtened

    LGUs with streamlined BPLS

    (number)

    2012 77 99 121 143 DILG/DTI

    Agencies with CSC Seal of

    Excellence (number)

    2012 33 33 33 33 CSC

    LGUs reaching the benchmark

    rang of 4 (High) on the

    state of local governance

    per performance area under

    LGPMS (number)

    Eastern VisayasUpdated Regional

    Development Plan -

    RESULTS MATRICES

    2014 2016

  • 8/10/2019 Eastern Visayas RM

    59/74

    2014-2016

    59

    Objecves/Results Indicators/UnitBaseline Targets Implemenng

    AgenciesYear Value 2014 2015 2016

    Administrave Governance DILG and

    LGUs

    Provinces (number) 2011 3 4 5 6

    Cies (number) 2011 7 7 7 7

    Municipalies (number) 2011 42 50 84 109

    Social Governance DILG and

    LGUs

    Provinces (number) 2011 3 4 5 6

    Cies (number) 2011 3 4 5 7

    Municipalies (number) 2011 72 86 120 130

    Economic Governance DILG and

    LGUs

    Provinces (number) 2011 5 5 6 6

    Cies (number) 2011 4 4 5 6

    Municipalies (number) 2011 44 45 54 79

    Environmental Governance DILG and

    LGUs

    Provinces (number) 2011 4 4 5 6

    Cies (number) 2011 5 5 6 7

    Municipalies (number) 2011 88 90 100 109

    Valuing Fundamentals of

    Good Governance

    DILG and

    LGUs

    Provinces (number) 2011 5 6 6 6

    Cies (number) 2011 4 5 6 7

    Municipalies (number) 2011 89 90 108 109

    LGUs with Seal of Good

    Housekeeping (number)

    DILG

    Provinces (number) 2011 3 4 5 6

    Eastern VisayasUpdated Regional

    Development Plan -

    RESULTS MATRICES

    2014 2016

  • 8/10/2019 Eastern Visayas RM

    60/74

    2014-2016

    60

    Objecves/Results Indicators/UnitBaseline Targets Implemenng

    AgenciesYear Value 2014 2015 2016

    Cies (number) 2011 2 3 5 7

    Municipalies (number) 2011 24 32 104 136

    Sector Outcome: Access to jusce enhancedRule of law strengthened Speedy disposion of cases:

    Cases disposed within the

    reglementary period (number)

    2012 218 240 264 290 Ombudsman

    Cases disposed (%) 2012 * 10.00 10.00 10.00 Ombudsman

    *No baseline value since Ombudsman started raing cases only in 2012

    Eastern VisayasUpdated Regional

    Development Plan -

    RESULTS MATRICES

    2014 2016

    7P d

  • 8/10/2019 Eastern Visayas RM

    61/74

    2014-2016

    61

    7Peace and

    Security

    Eastern VisayasUpdated Regional

    Development Plan -

    RESULTS MATRICES

    2014 2016

  • 8/10/2019 Eastern Visayas RM

    62/74

    2014-2016

    62

    Strategic Outcomes

    Sector Outcome

    Peaceful, just and safe environment conducive for local economic development

    Sub-sector Outcomes

    1. Sustained peace and order condion with reduced crime incidence and increased police-to-populaon rao

    2. Armed conict eecvely addressed and peace and social cohesion strengthened

    3. Concerns of women and children in armed conict eecvely addressed

    Core and Crical Indicators and End-of-Plan Targets

    1. Crime volume reduced by 60% in 2016 from the 2012 level

    2. Crime soluon eciency (CSE) rate increased from 35.81% in 2012 to 70% in 2016

    3. Police-to-populaon rao improved from 1:668 in 2012 to 1:500 in 20164. Strength and capability of insurgents reduced to 25% in 2016 from the 2011 level

    5. CAAs reduced from 136 barangays in 2011 to 0 in 2016

    6. Number of conict-aected areas (CAAs) granted support through PAMANA increased from 0 in 2011 to 136 in 2016

    7. Number of (CAAs) with abused women and children reduced from 136 in 2011 to 0 in 2016

    Assumpons

    1. Naonal and local governments are commied to pursue peace and development eorts

    2. Naonal and local governments have the sustained capacity to implement the peace and development agenda

    3. The military and law enforcers maintain integrity and enjoy the trust and condence of the people

    4. Respect for ceasere on the sides of the government and the CPP-NPA-NDF is present while peace negoaon is ongoing5. Local stakeholders are supporve of the peace process and peace building acvies

    6. Pursuit of law and order is sustained by the police

    7. Ex-combatants enjoy infrastructure support, social services and livelihood

    8. Implemenng partners that can provide technical and nancial assistance on sustainable agriculture-based livelihood and enterprise/skills development

    are present

    9. Eorts of the DepEd to include peace concepts and iniaves in school curricula are sustained

    10. Full commitment and support of LGUs and disaster response mechanisms are present

    Eastern VisayasUpdated Regional

    Development Plan -

    RESULTS MATRICES

    2014-2016

  • 8/10/2019 Eastern Visayas RM

    63/74

    2014-2016

    63

    Risks

    1. Emergence of new diseases/new strain of exisng diseases

    2. Peace and development eorts are not successfully pursued by government, causing dissasfacon among groups involved in the peace process and

    leading to recurrence of conict and absence of peace and order

    3. Fiscal dicules that will constrain government (agencies and LGUs) from providing resources for peace and development eorts

    4. Abuse of human rights by uniformed personnel, which will diminish civilian trust in and cooperaon with the military and the police5. Connued violent and destrucve conicts, even if peaceful negoated selement of conicts is being pursued

    6. Polical dierences among key actors (LGUs and target communies), which may hamper peace building acvies

    7. Funding constraints that will hinder police visibility, mobility, and communicaon, thereby resulng in rise of criminality

    8. Ex-combatants rejoin armed groups (despite provision of infrastructure support, social services and economic stability) due to polical climate or

    ideology

    9. Fiscal and security factors hindering the involvement of implemenng partners

    10. Fiscal constraints posing as a constraint in the provision of materials and trainings needed to mainstream peace concepts and iniaves in school

    curricula, which will result in non-inclusion of peace concepts from the lowest level of educaon

    11. Fiscal dicules that may reduce LGU and agency assistance and support

    Eastern VisayasUpdated Regional

    Development Plan -

    RESULTS MATRICES

    2014-2016

  • 8/10/2019 Eastern Visayas RM

    64/74

    2014 2016

    64

    Eastern VisayasUpdated Regional

    Development Plan -

    RESULTS MATRICES

    2014-2016

  • 8/10/2019 Eastern Visayas RM

    65/74

    2014 2016

    65

    Objecves/Results Indicators/UnitBaseline Targets Implemenng

    AgenciesYear Value 2014 2015 2016

    Societal Goal: Inclusive Growth

    Regional Goals: Economic growth and poverty reducon

    Sector Outcome: Peaceful, just and safe environment conducive for local economic developmentSub-sector Outcomes:

    Sustained peace and

    order condion with

    reduced crime incidence

    and increased police-to-

    populaon rao

    Crime incidence (%) 2012 4,420

    (number)

    60% 50% 40% PNP

    Crime soluon eciency rate (%) 2012 35.81 50.00 60.00 70.00 PNP

    Police-to-populaon rao 2012 1:668 1:600 1:550 1:500 PNP

    Armed conicts eecvely

    addressed and peaceand social cohesion

    strengthened

    Barangays/CAAs (number) 2011 136 51 26 0 AFP

    Barangays/CAAs granted support

    through PAMANA (number of

    barangays)

    2011 0 26 51 136 AFP, OPAPP

    Concerns of women and

    children in armed conict

    eecvely addressed

    CAAs with abused women and

    children (number)

    2011 136 51 26 0 AFP

    8Conservation

  • 8/10/2019 Eastern Visayas RM

    66/74

    8Conservation,

    Protection and

    Rehabilitation ofEnvironment and

    Natural Resources

    Eastern VisayasUpdated Regional

    Development Plan -

    RESULTS MATRICES

    2014-2016

  • 8/10/2019 Eastern Visayas RM

    67/74

    67

    Strategic Outcomes

    Sector Outcome

    Environmental sustainability

    Sub-sector Outcomes

    1. Healthy ecosystems sustained

    2. Environmental quality improved

    3. Climate change and disaster risk vulnerability reduced

    Core and Crical Indicators and Annual and End-of-Plan Targets

    1. Proporon of land area covered by forest increased from 12% (514,261 has) in 2010 to 21% (785,828 has) in 2016

    2. Forest producon areas rehabilitated and maintained increased from 9,353 has in 2011 to 19,018 has in 2016

    3. Mangrove areas rehabilitated and maintained increased from 400 has in 2011 to 500 has. in 20164. Exncon of threatened species of wild ora and fauna prevented by 50% in 2016

    5. BOD level according to usage of other priority rivers already within the water quality criteria of DENR increased by 5 rivers yearly unl 2016

    6. Water quality of priority river systems under the Linis Estero/Adopt-a-Waterbody Program improved by 21 waterbodies yearly unl 2016

    7. Total suspended parculates (TSP) level below 90 ug/Ncm in Tacloban City sustained unl 2016

    8. Number of MRFs established increased from 10 in 2010 to 21 in 2016

    9. LGUs capacitated on climate change adaptaon:

    Number of LGUs with geo-hazard maps indicang landslide and ood-prone areas increased from 8 in 2010 to 16 yearly unl 2016

    10. Climate change-resilient, eco-ecient and environment-friendly industries and services and sustainable towns and cies developed, promoted and

    sustained through 120 projects issued with ECCs yearly unl 2016

    Assumpons1. Naonal and local government support to environmental preservaon goals is sustained

    2. Civil society organizaons are acvely parcipang in environmental preservaon and conservaon

    3. Exisng environmental laws and policies are strictly enforced

    4. Sucient technical experts (e.g. geologists, foresters, etc.) to carry out the mandates of the DENR and its aached agencies are present and provision

    of adequate equipment and paraphernalia for environmental management capacity building programs on Disaster Risk Reducon (DRR) and Climate

    Change Adaptaon (CCA) are sustained

  • 8/10/2019 Eastern Visayas RM

    68/74

    Eastern VisayasUpdated Regional

    Development Plan -

    RESULTS MATRICES

    2014-2016

  • 8/10/2019 Eastern Visayas RM

    69/74

    69

    Eastern VisayasUpdated Regional

    Development Plan -

    RESULTS MATRICES

    2014-2016

  • 8/10/2019 Eastern Visayas RM

    70/74

    70

    Objecves/Results Indicators/UnitBaseline Target Implemenng

    AgenciesYear Value 2014 2015 2016

    Societal Goal: Inclusive Growth

    Regional Goals: Economic growth and poverty reducon

    Sector Outcome: Environmental sustainability

    Sub-sector Outcomes:

    Healthy ecosystems

    sustained

    Proporon of land area

    covered by forest (%

    and ha)

    2010 12%

    (514,261)

    14%

    (585,378)

    18%

    (675,844)

    21%

    (785,828)

    DENR-FMS

    Forest producon

    areas rehabilitated and

    maintained (ha)

    2011 9, 353 19, 159 18, 750 19, 018 DENR-FMS

    Mangrove areas

    rehabilitated and

    maintained (ha)

    2011 400 2, 061 599 500 DENR-FMS

    Populaon ofthreatened species

    (number):

    DENR -PAWCZMS

    Philippine Eagle

    (number)

    2010 2 2 2 2

    Philippine Cockatoo

    (number)

    2010 10 10 10 10

    Tarsier (number) 2010 20 20 20 20

    Eastern VisayasUpdated Regional

    Development Plan -

    RESULTS MATRICES

    2014-2016

  • 8/10/2019 Eastern Visayas RM

    71/74

    71

    Objecves/Results Indicators/UnitBaseline Targets Implemenng

    AgenciesYear Value 2014 2015 2016

    Terrestrial, inland

    water, coastal and

    marine areas important

    for biodiversity and

    ecosystem services

    eecvely and equitably

    managed through

    NIPAS and other

    eecve area-based

    conservaon measures

    or modalies

    DENR -

    PAWCZMS

    Terrestrial areas

    eecvely managed

    through NIPAS

    Sites (number) 2010 5 5 5 5Area (ha) 2010 347,496 347,396 347,496 347,496

    Marine areas

    eecvely managed

    through NIPAS

    Sites (number) 2010 3 3 3 3

    Area (ha) 2010 106,440 106,440 106,440 106,440

    Crical habitat

    eecvely managed

    pursuant to the

    Wildlife Act (number)

    2010 3 3 3 3

    Enforcement of

    environmental laws

    DENR/EMB/

    MGB/FMS/

    PAWCZMS

    Noce of Violaon

    issued (number)

    2010 50 55 55 55

    Eastern VisayasUpdated Regional

    Development Plan -

    RESULTS MATRICES

    2014-2016

    2

  • 8/10/2019 Eastern Visayas RM

    72/74

    72

    Objecves/Results Indicators/UnitBaseline Targets Implemenng

    AgenciesYear Value 2014 2015 2016

    Cease and Desist

    Orders issued

    (number)

    2010 5 10 10 10

    Cases led (number) 2010 10 12 13 14Beneciaries with

    secured land tenure in

    public agricultural A&D

    land (number)

    2010 12, 500 11, 422 11, 422 11, 422 DENR-LMS

    Beneciaries with

    secured land tenure

    in residenal land

    (number)

    2010 6, 627 6, 627 7, 621 8, 764 DENR-LMS

    Environmental

    quality improved

    Rivers monitored for

    BOD level (number)

    2010 5 5 5 5 DENR - EMB

    LGUs monitored with

    increased solid waste

    diversion rate (number)

    2010 9 14 14 14 DENR - EMB

    Beach resorts and

    marine resource

    management projects

    with ECCs/CNCs and

    other clearances issued

    (number of projects)

    2010 3 12 13 14 DENR - EMB/

    BFAR

    Water bodies monitored

    under the Linis Estero/Adopt of Waterbody

    Program (number)

    2011 12 21

    (17 exisng and 4new adopted)

    21 21 EMB / LGUs

    Bathing beaches

    frequently visited

    by local and foreign

    tourists monitored

    (number)

    2010 5 5 5 5 EMB / LGUs

    Eastern VisayasUpdated Regional

    Development Plan -

    RESULTS MATRICES

    2014-2016

    73

  • 8/10/2019 Eastern Visayas RM

    73/74

    73

    Objecves/Results Indicators/UnitBaseline Targets Implemenng

    AgenciesYear Value 2014 2015 2016

    Total suspended

    parculates (TSP) level

    in Tacloban (ug/Ncm)

    2010

  • 8/10/2019 Eastern Visayas RM

    74/74

    Eastern Visayas Updated Regional Development Plan 2014-2016

    RESULTS MATRICES

    Published by:

    Naonal Economic and Development Authority

    Regional Oce VIII

    Government Center, Palo, LeyteTel: +63 53 323 3092

    [email protected]

    hp://nro8.neda.gov.ph