  • EASTERN UPPER PENINSULA 2008-2009 CEDS PROJECT LISTING

    Prepared by the Eastern U.P. Regional Planning & Development Commission with funding assistance from the U.S. Department of Commerce Economic Development Administration

  • TABLE OF CONTENTS

    Criteria for Selecting Priority Projects………………………………………………………………………... 3 Priority Projects By County – EUP 2008-09…………………………………………………………………. 4 Priority Project Descriptions – EUP 2008-09………………………………………………………………… 6 EUP Activities/Completed Projects 2008-09…………………………………………………………………. 19 EUP Projects that Need Funding……………………………………………………………………………... 20

    EUP Planned/Funded Projects………………………………………………………………………………... 23

    EUP Problems/Challenges……………………………………………………………………………………. 24

    EUP Transportation Projects 2008-2010……………………………………………………………………... 25 SPOC 12372 Regional Clearinghouse Review Projects……………………………………………………… 26

    Sault Ontario Economic Development Investments 2007-2008………………………………………………

    27

  • CRITERIA FOR SELECTING PRIORITY PROJECTS The questions listed below serve as the criteria to assist in the identification of priority projects and to determine the relative importance of each one. These criteria are purposefully broad to provide flexibility within the prioritization process, and to allow local input and permit subjective contributions. Based on project prioritization (see Table below) implementation plans have been established. Projects are given priority by the Regional Economic Development Advisory Committee based upon the following:

    1. Have matching funds for the listed project been obtained? Secured (Y/N), In-Process (Y/N), Lacking (Y/N)

    2. What is the state of preliminary engineering or site engineering for the project? (Completed, In-Process, Lacking)

    3. How many full time private sector jobs will be CREATED as a result of this project? 0-10 10-99 100+

    4. How many full time private sector jobs will be RETAINED as a result of this project? 0-10 10-99 100+

    5. Is the listed project in a comprehensive development plan, tax increment financing plan,

    previous CEDS report or similar planning document? YES or NO

    6. Have letters of commitment been secured from firm or firms? YES or NO

    7. What is the Status of the project? NF – Needs Funding P – Planned Project (fully or partially funded)

    The following pages list the top priority community and economic development projects, for the Eastern Upper Peninsula Region. Based on the above criteria, the “Priority Projects” were selected and listed on the following page. Details on the various priority projects can be found on the proceeding pages.

    2008-09 CEDS Project Listing 3

  • Project Title Local Government Total Cost Match Funds

    Prelim- Eng

    Job Creation

    Job Retention

    In Plan

    COMMIT Type

    Bay Mills Community College Administrative Building

    Bay Mills Indian Community

    $3,000,000 Yes Yes 10-99 10-99 Yes Yes P

    Bay Mills CC Child Development Center Bay Mills Indian Community

    $500,000 Yes Yes 10-99 10-99 Yes Yes NF

    Furlong Company - Building Rehab Chippewa County EDC $10,500,000 No I.P. 10-99 10-99 Yes Yes NFMascoma/FRR - Cellulosic Ethanol Chippewa County EDC $44,821,120 Yes Yes 100+ 100+ Yes Yes P

    Mascoma/FRR Electrical Upgrades Chippewa County EDC $15,000,000 No No 100+ 100+ No Yes PNorth Arrow Log Homes Business Expansion

    Chippewa County EDC $375,152 Yes Yes 10-99 10-99 Yes Yes NF

    DeTour Village Industrial Park DeTour Village $1,624,700 Yes Yes 10-99 0-10 Yes Yes NF

    Wastewater Treatment Plan Upgrades Kinross Charter Twp. $14,000,000 No I.P. 100+ 100+ Yes NF

    M-80 to I-75 Water Main Project Kinross Charter Twp. unknown No I.P. 10-99 10-99 Yes NF

    Sky McFly's Building Rehab Kinross Charter Twp. unknown No I.P. 10-99 0 No No NF

    Industrial Incubator Rehab Sault Ste. Marie, City of $300,000 I.P. I.P. 0-10 10-99 Yes NF

    Camp Lucas Infrastructure Sault Ste. Marie, City of $2,000,000 No I.P. 100+ NA Yes Yes NF

    Airport Industrial Park - SW Side Infrastructure

    Sault Ste. Marie, City of $1,500,000 I.P. No 100+ NA Yes NF

    Cannelton Superfund Site I f

    Sault Ste. Marie, City of $850,000 I.P. No 100+ NA Yes NF

    Speculative Building Construction Sault Ste. Marie, City of $2,000,000 I.P. No 100+ NA Yes NF

    Ashmun Bay Park Improvements Phase III (Linear Trail)

    Sault Ste. Marie, City of $575,000 Yes I.P. 10-99 NA Yes Yes P

    Airport Industrial Park - 14 Ave. Ext. Sault Ste. Marie, City of $680,000 I.P. No 10-99 NA Yes NF

    Smart Zone Breeder Building Sault Ste. Marie, City of $1,500,000 I.P. I.P. 10-99 NA Yes Yes NF

    Ashmun Streetscape Project Sault Ste. Marie, City of $2,000,000 I.P. I.P. 10-99 100+ Yes NF

    Project Title Local Government Total CostMatch Funds

    Prelim- Eng

    Job Creation

    Job Retention

    In Plan

    COMMIT Type

    Industrial Park Expansion Luce County EDC $2,920,000 Yes Yes 10-99 100+ Yes Yes NF

    Brownfield Redevelopment Luce County EDC $1,650,000 Yes Yes 0-10 0-10 Yes NFDowntown Newberry Revitalization Village of Newberry $2,866,000 No I.P. N.A. 0-10 Yes Yes

    Newberry Water System Upgrade Village of Newberry $10,000,000 Yes Yes 10-99 10-99 Yes Yes P

    Tahquamenon Area Civic Center Village of Newberry $2,500,000 Yes Yes 10-99 0-10 Yes NF

    CHIPPEWA COUNTY PRIORITY PROJECTS 2008-2009

    LUCE COUNTY PRIORITY PROJECTS 2008-2009

    2008-09 CEDS Project Listing 4

  • Project Title Local Government Total CostMatch Funds

    Prelim- Eng

    Job Creation

    Job Retention

    In Plan

    COMMIT Type

    South Borgstrom Road Project Hudson Twp. unknown No I.P. 10-99 100+ Yes NF

    Electrical Upgrades - Township Wide Hudson Twp. unknown No I.P. 10-99 10-99 Yes NF

    City of Mackinac Island Wastewater Upgrades

    Mackinac Island, City of $4,000,000 Yes Yes 10-99 100+ Yes Yes NF

    Pte. LaBarbe Water Line Extension Moran Twp. $275,000 Yes Yes 0-10 0-10 Yes Yes NF

    Water System Upgrades Moran Twp. $507,595 Yes Yes 10-99 0-10 Yes NF

    Portage Twp. Sanitary Sewer System Development

    Portage Twp. $4,300,000 No Yes 0-10 10-99 Yes NF

    Museum of Ojibwa Culture Building Renovations

    St. Ignace, City of $209,544 I.P. Yes 10-99 10-99 Yes Yes NF

    City of St. Ignace Wastewater Treatment Plant Upgrades

    St. Ignace, City of $4,435,000 Yes I.P. 100+ 100+ Yes PNF

    Portage Street Sanitary Sewer Replacement

    St. Ignace, City of $2,000,000 Yes I.P. 0-10 0-10 Yes No PNF

    Bus Station Construction St. Ignace, City of $1,735,000 NA Yes 0-10 0-10 Yes Yes P

    Chambers Street Repaving St. Ignace, City of $70,000 Yes Yes 0-10 0-10 No No NF

    Little Bear East Facility Expansion St. Ignace, City of $10,000 Yes I.P. 0-10 0-10 Yes Yes P

    North Huron Scenic Pathway Construction

    St. Ignace/Drummond $57,000,000 I.P. Yes 10-99 100+ Yes NF

    Matching Funds Secured Lacking

    Engineering Completed Lacking

    Job Creation 0-10 10-99

    Job Retention 0-10 10-99

    Investment Policy Guidelines

    Project in plan or CEDS Yes NoLetters of Commitment Yes No

    Type P-Planned F-Funded

    100+Projects evaluated individually at time of application to

    EDA

    NF-Need Funding

    Criteria

    MACKINAC COUNTY PRIORITY PROJECTS 2008-2009

    In Process (I.P.)

    In Process (I.P.)

    100+

    2008-09 CEDS Project Listing 5

  • PRIORITY PROJECT DESCRIPTIONS – 2009 Bay Mills Community College Administrative Building - $3.0 million Submitting Agency: Bay Mills Indian Community Description: New construction of an Administrative building on the campus of the Bay Mills Community College. This facility will replace an outdated building on the campus of the Community College, which resides on the shores of Lake Superior west of Sault Ste. Marie. Matching Funds: secured (EDC RLF) Preliminary Engineering: Completed Job Creation: 10-99 Job Retention: 10-99 Investment Policy Guidelines: All In Plan: Yes (2008-09 CEDS) Commitment: N/A Type: Needs Funding

    Bay Mills CC Child Development Center - $500,000 Submitting Agency: Bay Mills Indian Community Description: Application for ICDBG funds to construct a new child development center to replace the current inadequate facility. Matching Funds: secured Preliminary Engineering: In Process Job Creation: 10-99 Job Retention: 10-99 Investment Policy Guidelines: Strong organizational leadership, Look beyond the immediate economic horizon In Plan: Yes (2008-09 CEDS) Commitment: N/A Type: Needs Funding

    Furlong Company – Superior Pellets - $10.5 million Submitting Agency: Chippewa County EDC Description: Rehabilitation of building #234 for location by Furlong Company – Superior Pellets. This company would manufacture wood pellets utilizing the existing building. Matching Funds: no Preliminary Engineering: In Process Job Creation: 10-99 Job Retention: 10-99 Investment Policy Guidelines: All In Plan: Yes Commitment: Yes Type: Needs Funding

    2008-09 CEDS Project Listing 6

  • Mascoma/FRR – Cellulosic Ethanol Refinery - $44.8 million Submitting Agency: Chippewa County EDC Description: Development of the Mascoma/FRR cellulosic ethanol refinery at the “Centers for Alternative Energy Excellence” renaissance zone in Kinross Charter Township. Including but not limited to: refinery construction, road, water, and sewer upgrades. Matching Funds: secured Preliminary Engineering: In Process Job Creation: 10-99 Job Retention: over 100 Investment Policy Guidelines: All In Plan: Yes Commitment: Yes Type: Needs Funding

    Mascoma/FRR – Electrical Upgrades - $15.0 million Submitting Agency: Chippewa County EDC Description: Upgrades to the current electrical grid to bring on the FRR Cellulosic Ethanol Refinery. These improvements would also allow FRR to release power to the Regional grid, as steam is a major by-product of the cellulosic ethanol refining process. Matching Funds: not-secured Preliminary Engineering: In process Job Creation: 10-00 Job Retention: over 100 Investment Policy Guidelines: All In Plan: No Commitment: Yes Type: Needs Funding

    North Arrow Log Homes Business Expansion - $375,152 Submitting Agency: Chippewa County EDC Description: Expand operations and diversify product line to include manufacture of wood pellets. Matching Funds: secured Preliminary Engineering: Completed Job Creation: 10-99 Job Retention: 10-99 Investment Policy Guidelines: All In Plan: Yes (2007-08 CEDS) Commitment: Yes Type: Needs Funding

    2008-09 CEDS Project Listing 7

  • DeTour Village Business/Industrial Park - $1.6 million Submitting Agency: DeTour Area EDC Description: Development of a business/industrial park on a 33 acre parcel of property owned by DeTour Village. The DeTour Area EDC proposes this development, including road, water, sewer, and utility construction, for nine (9) lots. The EDC is currently in the process of selling their first lot to a local business. Matching Funds: unknown Preliminary Engineering: Completed Job Creation: 10-99 Job Retention: 10-99 Investment Policy Guidelines: All In Plan: Yes (2007-08 CEDS) Commitment: Yes Type: Needs Funding

    Kinross Charter Township WWTP Upgrades - $14.0 million Submitting Agency: Kinross Charter Township Description: Improvements and upgrades to the Kinross Charter Township Waste Water Treatment Plant will be required in order for the Mascoma/FRR Cellulosic Ethanol Refinery to come on-line. The current system does not have the capacity required for this development to come “on-line”. Matching Funds: unknown Preliminary Engineering: In Process Job Creation: over 100 Job Retention: over 100 Investment Policy Guidelines: All In Plan: Yes (2008-09 CEDS) Commitment: Yes Type: Needs Funding

    M-80 to I-75 Water Main Project - $unknown Submitting Agency: Kinross Charter Township Description: Completion of a water line extension/main along M-80 to I-75 to increase the potential for business development along this heavily traveled corridor. Matching Funds: not-secured Preliminary Engineering: not completed Job Creation: 10-99 Job Retention: 10-99 Investment Policy Guidelines: 2 In Plan: Yes (2008-09 CEDS) Commitment: No Type: Needs Funding

    2008-09 CEDS Project Listing 8

  • Sky McFly’s Building Rehab Project - $unknown Submitting Agency: Kinross Charter Township Description: Building rehabilitation into a family style restaurant with a game room and possible other retail opportunities. Matching Funds: partially secured Preliminary Engineering: in process Job Creation: 10-99 Job Retention: none Investment Policy Guidelines: 2 In Plan: No Commitment: No Type: Needs Funding

    Industrial Incubator Rehabilitation - $300,000 Submitting Agency: Sault Ste. Marie EDC Description: Rehabilitation and site improvements to the City of Sault Ste. Marie’s Industrial Incubator building. Matching Funds: in process Preliminary Engineering: in process Job Creation: 0-10 Job Retention: 10-99 Investment Policy Guidelines: All In Plan: Yes (2007-08 CEDS) Commitment: unknown Type: Needs Funding

    Camp Lucas Infrastructure - $2.0 million Submitting Agency: Sault Ste. Marie EDC Description: Development of road, water, sewer and utilities to complete the infrastructure for the Camp Lucas site for future development in the City of Sault Ste. Marie. Matching Funds: not-secured Preliminary Engineering: In Process Job Creation: over 100 Job Retention: none Investment Policy Guidelines: All In Plan: Yes (2007-08 CEDS) Commitment: Yes Type: Needs Funding

    2008-09 CEDS Project Listing 9

  • Airport Industrial Park Infrastructure - $1.5 million Submitting Agency: Sault Ste. Marie EDC Description: Placement of needed road, water, sewer and utilities to develop the southwest side of the Airport Industrial Park in Sault Ste. Marie. Matching Funds: In Process Preliminary Engineering: Not completed Job Creation: over 100 Job Retention: none Investment Policy Guidelines: 2 In Plan: Yes (2007-08 CEDS) Commitment: unknown Type: Needs Funding

    Cannelton Superfund Site Infrastructure - $850,000 Submitting Agency: Sault Ste. Marie EDC Description: Placement of road, water, sewer and utilities to the Cannelton Superfund site (former Tannery). This would allow for this area to be redeveloped for public or private uses. Matching Funds: In Process Preliminary Engineering: Not completed Job Creation: over 100 Job Retention: none Investment Policy Guidelines: All In Plan: Yes (2007-08 CEDS) Commitment: Type: Needs Funding

    Speculative Building Construction - $2.0 million Submitting Agency: Sault Ste. Marie EDC Description: Construction of a speculative building for use in the LSSU/SSM Smart Zone. Matching Funds: In process Preliminary Engineering: In process Job Creation: over 100 Job Retention: none Investment Policy Guidelines: All In Plan: Yes (2007-08 CEDS) Commitment: Yes Type: Needs Funding

    2008-09 CEDS Project Listing 10

  • Ashmun Bay Park Improvements Phase III (Linear Trail) - $575,000 Submitting Agency: Sault Ste. Marie EDC Description: Phase III of the Ashmun Bay park improvements plan, which includes the development of a linear trail to connect into the Soo/Strongs rail trail. Matching Funds: secured (MDNRTF) Preliminary Engineering: Completed Job Creation: 10-99 Job Retention: none Investment Policy Guidelines: 2 In Plan: Yes (2007-08 CEDS) Commitment: Yes Type: Needs Funding

    Airport Industrial Park – 14th Ave. Extension - $680,000 Submitting Agency: Sault Ste. Marie EDC Description: Extension of 14th Ave. into the Airport Industrial Park, including road improvements, water, sewer and utilities. Matching Funds: In process Preliminary Engineering: Not completed Job Creation: 10-99 Job Retention: none Investment Policy Guidelines: 2 In Plan: Yes (2007-08 CEDS) Commitment: unknown Type: Needs Funding

    Smart Zone Breeder Building Construction – $1.5 million Submitting Agency: Sault Ste. Marie EDC Description: Construction of a Smart Zone Breeder Building in the Airport Industrial Park. Matching Funds: In process Preliminary Engineering: In Process Job Creation: 10-99 Job Retention: none Investment Policy Guidelines: 5 In Plan: Yes Commitment: Yes Type: Needs Funding

    2008-09 CEDS Project Listing 11

  • Ashmun Streetscape Project - $2.0 million Submitting Agency: Sault Ste. Marie EDC Description: Construction of a new Ashmun Streetscape including both underground and above ground improvements along the existing Ashmun Street between Easterday Avenue and Sheridan Drive Matching Funds: no Preliminary Engineering: In Process Job Creation: 10-99 Job Retention: over 100 Investment Policy Guidelines: 3 In Plan: Yes Commitment: unknown Type: Needs Funding

    Luce County Industrial Park Expansion - $2.35 million Submitting Agency: Luce County EDC Description: The Luce County Industrial Park is at capacity. It is imperative that Luce County have adequate infrastructure in place for future industrial development. 143 acres has been rezoned to industrial to expand the industrial park. The current industrial park employs approximately 100 people and an expansion of the park is expected to produce approx. 150 new jobs for the community. The new companies that we will attract to the park will also be high volume rail users. The expansion of the Luce County Industrial Park is listed as a priority project in the Eastern Upper Peninsula Comprehensive Economic Development Strategy (CEDS). This project addresses two the goals and objectives in the CEDS. 1) Infrastructure improvements and expansions in communities with growth potential. 2) Continued support of projects that will lead to increased usage of existing railways and rail systems. Matching Funds: secured Preliminary Engineering: Completed Job Creation: 10-99 Job Retention: over 100 Investment Policy Guidelines: All In Plan: Yes (2007-08 CEDS) Commitment: Yes Type: Needs Funding

    Luce County Brownfield Redevelopment - $1.65 million Submitting Agency: Luce County EDC Description: Redevelopment of large Brownfield site in Luce County, resulting development could produce business/industrial jobs. Matching Funds: secured (EDC RLF) Preliminary Engineering: Completed Job Creation: 0-10 Job Retention: 0-10

    2008-09 CEDS Project Listing 12

  • Investment Policy Guidelines: All In Plan: Yes (2007-08 CEDS) Commitment: unknown Type: Needs Funding

    Downtown Newberry Revitalization Project - $2.87 million Submitting Agency: Village of Newberry Description: Renovation of Old Bank building, two new apartment units, business expansion with coffee shop, acquisition of blighted property, additional parking, greenspace and farmers market. Improvement of the entrance into downtown district of the Village of Newberry. Matching Funds: Not secured Preliminary Engineering: In process Job Creation: 0-10 Job Retention: 10-99 Investment Policy Guidelines: 3 In Plan: Yes (2007-08 CEDS) Commitment: Yes Type: Needs Funding

    Newberry Water System Upgrade - $10.0 million Submitting Agency: Village of Newberry Description: Continued improvements and upgrades to the Village’s Water distribution system. Matching Funds: Secured Preliminary Engineering: Completed Job Creation: 10-99 Job Retention: 10-99 Investment Policy Guidelines: All In Plan: Yes (2007-08 CEDS) Commitment: Yes Type: Needs Funding

    Tahquamenon Area Civic Center - $2.5 million Submitting Agency: Tahquamenon Area Recreation Authority Description: Construction of a Civic Center in McMillan Township, which will include a hockey rink, recreational facilities, conference/meeting space. Matching Funds: secured Preliminary Engineering: Completed Job Creation: 10-99 Job Retention: 0-10 Investment Policy Guidelines: 3 In Plan: Yes (2007-08 CEDS) Commitment: Yes Type: Needs Funding

    2008-09 CEDS Project Listing 13

  • City of Mackinac Island WWTP - $10.3 million Submitting Agency: City of Mackinac Island DPW Description: Most of the equipment in the Mackinac Island Wastewater Treatment Plant (WWTP) was installed in the 1970s. The equipment is still in working condition, but rather worn out after 20 to 30 years of operation. The proposed WWTP improvements will upgrade equipment to improve operational reliability and efficiency. A minor capacity increase of approximately 30,000 gallons per day (gpd) will occur with flow equalization improvements. Notable upgrades are:

    • A flow equalization tank • New building containing new mechanical screens and grit removal • Primary clarifier internals replacement • Enlarge the sludge holding tank • Sludge handling and pumping improvements • Flow monitoring improvements

    Matching Funds: secured Preliminary Engineering: Completed Job Creation: 10-99 Job Retention: over 100 Investment Policy Guidelines: All In Plan: Yes (2007-08 CEDS) Commitment: Yes Type: Needs Funding

    South Borgstrom Road Improvements - $unknown Submitting Agency: Hudson Township Description: Completion of the South Borgstrom Road project would produce connectivity between H-40 and US-2, and also produce an alternate route to M-28. This road is used extensively by loggers and the surface is in deplorable condition. The substrate is also incapable of handling the tonnage allowed by the State of Michigan. Matching Funds: not-secured Preliminary Engineering: incomplete Job Creation: 10-99 Job Retention: over 100 Investment Policy Guidelines: 2 In Plan: Yes (2008-09 CEDS) Commitment: unknown Type: Needs Funding

    Hudson Township Electrical Upgrades - $unknown Submitting Agency: Hudson Township Description: Upgrades to the townships electrical grid, to help the Township’s potential for wind energy systems and to provide alternative/clean energy to other areas of the State. Matching Funds: unknown

    2008-09 CEDS Project Listing 14

  • Preliminary Engineering: Incomplete Job Creation: 10-99 Job Retention: 10-99 Investment Policy Guidelines: 3 In Plan: Yes (2008-09 CEDS) Commitment: unknown Type: Needs Funding

    Pte. LeBarbe Road Water Line Extension - $275,000 Submitting Agency: Moran Township Description: Extension of a water line along Pte. LeBarbe Road, an area of problematic wells in the past. This extension could also serve future business needs along US-2. Matching Funds: secured (EDC RLF) Preliminary Engineering: Completed Job Creation: 10-99 Job Retention: 0-10 Investment Policy Guidelines: 2 In Plan: Yes (2007-08 CEDS) Commitment: Yes Type: Needs Funding

    Moran Township Water System Upgrades - $507,595 Submitting Agency: Moran Township Description: Capacity enhancements and upgrades to the Township’s water distribution system. Matching Funds: in process Preliminary Engineering: Completed Job Creation: 10-99 Job Retention: 0-10 Investment Policy Guidelines: 2 In Plan: Yes (2007-08 CEDS) Commitment: unknown Type: Needs Funding

    Portage Township Sanitary Sewer Development - $4.3 million Submitting Agency: Portage Township Description: Development of a sanitary sewer system within the downtown district of Curtis in Portage Township to alleviate historical pollution and capacity problems. Matching Funds: not-secured Preliminary Engineering: Completed Job Creation: 0-10 Job Retention: 10-99 Investment Policy Guidelines: All In Plan: Yes (2007-08 CEDS) Commitment: unknown

    2008-09 CEDS Project Listing 15

  • Type: Needs Funding

    Museum of Ojibwa Culture Building Renovations - $209,544 Submitting Agency: City of St. Ignace DDA Description: Building renovations to the Museum of Ojibwa Culture, located in Downtown St. Ignace. This City-owned museum and park portray a vivid picture of life in the Straits of Mackinac over 300 years ago when Ojibwa, Huron, Odawa and French lifestyles met at this protected bay. Matching Funds: In process Preliminary Engineering: Completed Job Creation: 10-99 Job Retention: 10-99 Investment Policy Guidelines: Market Driven, Looks Beyond the Immediate Economic Horizon, Strong Organizational Leadership. In Plan: Yes (2007-08 CEDS) Commitment: Yes – UDSA Rural Development Loan Type: Planned/Funded

    City of St. Ignace Waste Water Treatment Plant Upgrades - $4.4 million Submitting Agency: City of St. Ignace DPW Description: Capacity enhancements and treatment upgrades to the City of St. Ignace waste water treatment plant. Matching Funds: secured (SRF) Preliminary Engineering: In Process Job Creation: over 100 Job Retention: over 100 Investment Policy Guidelines: 2 In Plan: Yes (2007-08 CEDS) Commitment: Yes Type: Needs Funding

    Portage Street Sanitary Sewer Replacement - $2.0 million Submitting Agency: City of St. Ignace DDA Description: Replacement of the sanitary sewer system that services the area along Portage Street in the City of St. Ignace. Matching Funds: Secured Preliminary Engineering: In process Job Creation: 10-99 Job Retention: 10-99 Investment Policy Guidelines: Market Driven, Looks Beyond the Immediate Economic Horizon, Strong Organizational Leadership.

    2008-09 CEDS Project Listing 16

  • In Plan: Yes (2007-08 CEDS) Commitment: No Type: Needs Funded

    Bus Station Construction - $1.735 million Submitting Agency: City of St. Ignace/Michigan Department of Transportation (MDOT) Description: Construction of a state of the art bus station facility in downtown St. Ignace. The public area of the building will include a lobby, ticket office, and restrooms. The rest of the structure includes an office, a common area and sleeping rooms for drivers, restrooms, kitchen, laundry area, freight room, and storage

    Matching Funds: Secured Preliminary Engineering: Completed Job Creation: 0-10 Job Retention: 0-10 Investment Policy Guidelines: Market Driven, Looks Beyond the Immediate Economic Horizon, Strong Organizational Leadership. In Plan: Yes (2007-08 CEDS) Commitment: Yes – MDOT Type: Planned/Funded

    Chambers Street Repaving Project - $70,000 Submitting Agency: City of St. Ignace Description: Repaving of Chambers St. in downtown St. Ignace Matching Funds: Secured Preliminary Engineering: Completed Job Creation: 10-99 Job Retention: 10-99 Investment Policy Guidelines: Looks Beyond the Immediate Economic Horizon, Strong Organizational Leadership. In Plan: No Commitment: No Type: Needs Funding

    Little Bear East Facility Expansion - $10,000 Submitting Agency: City of St. Ignace Description: Expansion of the current Little Bear East facility, a full scale conference, convention and recreation center, featuring a hockey arena and fitness center. The proposed expansion would house the expanded fitness center. Matching Funds: Secured Preliminary Engineering: In Process Job Creation: 0-10 Job Retention: 0-10 Investment Policy Guidelines: Market Driven, Looks Beyond the Immediate Economic Horizon, Strong Organizational Leadership.

    2008-09 CEDS Project Listing 17

  • In Plan: Yes (2007-08 CEDS) Commitment: Yes Type: Planned/Funded

    North Huron Scenic Pathway Development - $57 million Submitting Agency: City of St. Ignace DDA Description: Proposed non-motorized pathway from St. Ignace to Drummond Island. Recent studies have shown that individuals are now choosing “place” over “job” when looking at employment opportunities, one the amenities that makes a community marketable is its connectivity, in terms of multi-modal transportation. Matching Funds: In Process Preliminary Engineering: Completed Job Creation: 0-10 Job Retention: 0-10 Investment Policy Guidelines: Looks Beyond the Immediate Economic Horizon, Strong Organizational Leadership, High Level of Commitment In Plan: Yes (2007-08 CEDS) Commitment: unknown Type: Needs Funding

    2008-09 CEDS Project Listing 18

  • ACTIVITIES/COMPLETED PROJECTS - 2009 Local Government Total Cost Funding SourcesGreat Lakes Composites Institute Construction Bay Mills Community College $923,000 EDA, BMIC, LocalMackinac Trail rail crossing, approaches and signals replaced Chippewa County EDC Unknown MDOT, LocalUpdated Recreation Plan Clark Twp. Unknown LocalDrainage project completed for baseball diamond Clark Twp. Unknown LocalCarmeuse Limestone Operations - Equipment/Facility upgrades Clark Twp. $14,000,000 PrivateRail crossing upgrade/reconstruction Dafter Township Unknown MDOTDemolition of Wood Forest Building to allow for expansion of area available for commercial development along M-80 Kinross Charter Twp. Unknown Local

    Demolition of old movie theater on Water Tower Dr. to allow for expansion of commerical development in the business district Kinross Charter Twp. Unknown LocalRepaving of Tilson Rd. from Welch Rd. to Twp. Line Kinross Charter Twp. Unknown LocalRepaving of Tone Road/M-80 in business district Kinross Charter Twp. Unknown LocalSmart Zone Designation - LSSU/City of SSM LSSU, City of Sault Ste. Marie Unknown MEDC, LocalNorthern Wings Business Location Luce County EDC Unknown LocalFritz Forest products business location Luce County EDC Unknown LocalBanks Hardwoods Closed - 17 jobs lost Luce County EDC Unknown LocalAshmun St. resurfacing project Sault Ste. Marie, City of Unknown MDOT, LocalMeridian St. overlay (Easterday to 8th Ave.) Sault Ste. Marie, City of $300,000 LocalEasterday Ave. resurfacing/sidewalk improvements Sault Ste. Marie, City of $481,640 MDOT, LocalEconomic Visioning Project Sault Ste. Marie, City of $100,000 LocalExterior renovations - Pullar Stadium Sault Ste. Marie, City of $50,000 LocalMinneapolis Woods clean up Sault Ste. Marie, City of $7,000 LocalSherman Park Beach Phase I (Beach accessibility upgrades) Sault Ste. Marie, City of $460,000 MNRTF, Local

    West Portage ReconstructionSault Ste. Marie, City of

    $2,800,000TEDF, HPP, TEA LU, Local

    New township hall construction Trout Lake Township $477,000 USDARD, LocalUpgraded wiring in Township Park Trout Lake Twp. Unknown LocalNew Pavilion at Township Park Trout Lake Twp. Unknown USDA-RD, LocalSewer Extension and replacement St. Ignace, City of Unknown unknownLift station construction St. Ignace, City of Unknown unknownSewer Plant expansion St. Ignace, City of Unknown unknownBus Station Construction St. Ignace, City of $1,300,000 MDOT, LocalM-123 road resurfacing project Whitefish Twp. Unknown MDOT

    2008-09 CEDS Project Listing 19

  • PROJECTS THAT NEED FUNDING - 2009 Local Government Project Cost Funding Sources

    Cultural Center Construction Bay Mills Indian Community unknown ICDBG, BIA, SHPO, Private, Tribe

    Child Development Center Bay Mills Indian Community unknownICDBG, BIA, DOE, USDARD, Tribe

    Tribal Administration Complex Bay Mills Indian Community unknown ICDBG, BIA, Private, Tribe

    Community College Administrative Building Bay Mills Indian Community unknown ICDBG, BIA, Private, Tribe

    Brevort Twp. Community Center construction Brevort Twp. $680,000 USDARD, ARRA, LocalBrevort Twp. Sewer upgrades Brevort Twp. $640,000 USDARD, ARRA, LocalTownship Playground Construction Bruce Twp. $110,850 MNRTF, LocalDunbar Park Playground Upgrades Bruce Twp. $70,000 MNRTF, LocalBoat Launch Construction Bruce Twp. $500,000 MDNR, LocalLes Cheneaux Performing Arts Center Cedarville $3,100,000 MCA, USDA, Private, LocalM-80 Rail Crossing Replacement Chippewa Co. EDC $396,307 MDOT, TEDF, CDBG, Local

    North Huron Scenic Pathway Chippewa/Mackinac Counties $57,000,000MDOT, FHWA, Byways, MEDC, EDA, Private, Local

    Fire Hall Construction Clark Twp. unknown USDA, DHS, LocalDowntown District Revitalization Project Clark Twp. unknown EDA, MEDC, MDOT, LocalHessel Marina Expansion Clark Twp. unknown MDNR, MDEQ, USDA, LocalYouth Center Construction Clark Twp. unknown USDA, Private, LocalRecycling opportunities Clark Twp. unknown MDEQ, USDA, Private, LocalGovernment Island Stewardship Clark Twp. unknown MDNR, Private, LocalClark Township Park Clark Twp. Unknown USDA, MDNR, Private, LocalCedarville-Hessel Bike Path Clark Twp. Unknown MDOT, NPS, LocalLes Cheneaux Library - Phase II Clark Twp. Unknown USDA, Private, LocalWatershed Management Plan Clark Twp. Unknown CMI, MDNR, MDEQ, LocalMaritime Museum Restoration Clark Twp. Unknown MSHPO, Private, LocalLes Cheneaux Performing Arts Center Cedarville $3,100,000 MCACA, Private, LocalWelcome Center Construction Clark Twp. Unknown MDOT, FWHA, LocalClark Township Street Sign Upgrade Clark Twp. Unknown MDOT, DHS, LocalWater Pump for Fire Truck Clark Twp. Unknown USDA, DHS, LocalCemetary upgrades Clark Twp. Unknown USDA-RD, LocalCommunity Center Finishing Project Clark Twp. unknown USDA-RD, LocalDafter Twp. Fire Safety Dafter Twp. $250,000 USDA-RD, DHS, Local

    Water Plant Improvements DeTour Village $220,000 USDA-RD, ARRA, EDA, CDBG, Local

    South Borgstrom Road Project Hudson Twp. unknown MDOT, MCRC, LocalFire Truck Purchase Kinross Charter Twp. $250,000 USDA-RD, DHS, LocalFire/Ambulance Building Construction Kinross Charter Twp. unknown USDA-RD, DHS, LocalUpgrades/improvements to Dukes Lake Rec area Kinross Charter Twp. unknown MDNR, Private, LocalUpgrades/Repairs to Kinross Rec Center Kinross Charter Twp. unknown USDA-RD, MDNR, Private, LocalAquatic Research Laboratory & Educational Center Renoavtion Lake Superior State Univ. $9,000,000 ARRA, Private, Local

    School of Business, Economics and Legal Study building renovations/replacement Lake Superior State Univ. $20,000,000 ARRA, Private, Local

    New Community Building for McMillan Twp. Luce County EDC unknown USDA-RD, LocalLow Income Housing in Lakefield Twp Luce County EDC unknown USDA-RD, MSHDA, Local

    Broadband - county wide Luce County EDC unknown USDA-RD, EDA, MEDC, Private, Local

    Tourism Industry Expansion Cooperative Moran Twp. / Sault Tribe of Chipp. Ind. unknown ICDBG, Local, Private, Tribe

    Newberry Water System Improvement Project Phase 1D Newberry, Village of unknown USDARD, EDA, CDBGNewberry Sidewalk Replacement Newberry, Village of unknown MDOT-TE, FHWA, LCRC, LocalAtlas Park Improvements Newberry, Village of unknown MNRTF, Local

    2008-09 CEDS Project Listing 20

  • PROJECTS THAT NEED FUNDING - 2009 Local Government Project Cost Funding SourcesDowntown Revitalization Project Newberry, Village of $2,866,000 MSHDA, DEQ, Local, PrivatePortage Twp. Fire/Ambulance Barn Portage Twp. USDA-RD, LocalNorth Rd. Bypass construction Portage Twp. unknown MCRC, MDOT, LocalSewer System Upgrades - Main St. Curtis Portage Twp. $4,300,000 USDARD, Private, LocalHistorical Society Museum Construction Rudyard Twp. $96,000 HAL, Private, LocalNew DPW Building Construction Sault Ste. Marie, City of $6,300,000 USDARD, LocalNew Fire Station Construction Sault Ste. Marie, City of $2,000,000 USDARD, TIFA III, LocalCannelton Superfund Development Infrastructure Sault Ste. Marie, City of $850,000 EDA, USDARD, CDBG, LocalAshmun Bay Park Phase III (Linear trail) Sault Ste. Marie, City of $575,000 MNRTF, TEA LU, LocalWest Portage Bike Path Sault Ste. Marie, City of $400,000 TEA LU, Local

    Meridian Street Reconstruction (Easterday to 8th Ave. W) Sault Ste. Marie, City of $1,300,000 TEDF, Local

    Fort Street Bridge Re-Assembly Sault Ste. Marie, City of $1,270,000 TEA LU, FHWA, MSHPO, LocalNew Police Station construction Sault Ste. Marie, City of $1,400,000 LocalOld Central Bank - Masonic Buildings Rehabilitation Sault Ste. Marie, City of $5,600,000 MSHDA (CDBG), PrivateFaçade Improvement Initiative 2008 Sault Ste. Marie, City of $330,000 MSHDA (CDBG), PrivateNew Medical Office Building support Sault Ste. Marie, City of $5,000,000 USDARD, EDA, private, LocalPermanent Music Stage-Shelter Sault Ste. Marie, City of $100,000 TIFA IICamp Lucas Infrastructure Sault Ste. Marie, City of $2,000,000 CDBG, TEDFIndustrial Incubator Rehabilitation Sault Ste. Marie, City of $300,000 EDA, LocalSherman Park Phase II (campground) Sault Ste. Marie, City of $450,000 MNRTF, LocalAshmun Creek Bio-Reserve Sault Ste. Marie, City of unknown MNRTF, Local, PrivateAshmun Street Streetscape and resurfacing (Power Canal to Easterday) Sault Ste. Marie, City of $2,000,000 MDOT, Special Assessment

    Baraga House Roof Replacement Sault Ste. Marie, City of $20,130 Local

    Multi-purpose trail segment (I-75 tunnel to Business Spur) Sault Ste. Marie, City of $300,000 MNRTF, TEA LU, Local

    Multi-purpose trail segment (Power Canal Segment) Sault Ste. Marie, City of $300,000 MNRTF, TEA LU, LocalRennovation of old Airport Hanger for Manufacturing Space Sault Ste. Marie, City of $150,000 MAC, TIFA III

    Airprot Parallel Taxiway Extension Sault Ste. Marie, City of $290,000 MAC, TIFA IIIEnvironmental Asssessment and Wetland Mitigation Plan for Hangar Expansion Sault Ste. Marie, City of $250,000 MAC, TIFA III

    Airport Industrial Park - 14th ave. Extension Sault Ste. Marie, City of $680,000 CDBG, TIFA IIIAirport Industrial Park - SW Side Infrastructure Sault Ste. Marie, City of $1,500,000 CDBG, TIFA IIIHistoric Homes completion Sault Ste. Marie, City of $1,500,000 UnknownSeymour Street (Marquette to 5th Ave. West) Sault Ste. Marie, City of $900,000 TEDF, LocalLower Rivers Islands Phase I Sault Ste. Marie, City of $1,300,000 MNRTF, CZM, TEA LU, LocalLower Rivers Islands Phase II Sault Ste. Marie, City of $700,000 MNRTF, CZM, TEA LU, LocalMeridian Street Upgrades Sault Ste. Marie, City of $1,200,000 MNRTF, CZM, TEA LU, LocalWaterfront Walkway Section 3 Corps Park Sault Ste. Marie, City of $100,000 MNRTF, CZM, LocalWaterfront Walkway Section 4 Brady Park Sault Ste. Marie, City of $370,000 MNRTF, LocalWaterfront Walkway Section 5 Maritime Area Sault Ste. Marie, City of $420,000 MNRTF, LocalWaterfront Walkway Section 6 Alford Park Sault Ste. Marie, City of $520,000 MNRTF, CZM, LocalCompletion of SE Corner lot project Sault Ste. Marie, City of $230,000 Unknown

    SSM CSO Phase C-2 (East Island Area) Sault Ste. Marie, City of $7,000,000 EDA, USDARD, DEQ, MDOT, CDBG, MEDC, Local

    SSM CSO Phase C-3 (West Island Area) Sault Ste. Marie, City of $8,000,000 EDA, USDARD, DEQ, MDOT, CDBG, MEDC, LocalLittle Bear East Facility Expansion St. Ignace, City of $10,000 SSMTCI, LocalNew Fire Hall Construction St. Ignace, City of $300,000 USDA RD, LocalSanitary Sewer Improvements St. Ignace, City of $1,000,000 USDA RD, EDA, LocalNew Fire Hall construction St. Ignace, City of $1,500,000 USDARD, Local, PrivateNew Fire/Rescue truck St. Ignace, City of $280,000 USDARD, Local, PrivateWawatam Park Development St. Ignace, City of $210,000 MNRTF, Private, Local

    2008-09 CEDS Project Listing 21

  • PROJECTS THAT NEED FUNDING - 2009 Local Government Project Cost Funding SourcesSt. Ignace History of Transportation Museum St. Ignace, City of $250,000 ISTEA, MDOT, FHWA, Local

    North Huron Scenic Pathway Development - St. Ignace St. Ignace, City of $5,715,775 MDOT, MNRTF, FHWA, Local, PrivateFire Hall Construction St. Ignace, City of unknown USDARD, Private, LocalStreet rehabilitation St. Ignace, City of unknown MDOT, MCRC, LocalStreetscape expansion (lighthpoles, etc.) St. Ignace, City of unknown MDOT-TE, MCRC, FHWA, LocalNew Fire Hall ConstructionBridge across the Carp River Trout Lake Twp. unknown USDARD, Private, LocalNew Snowmobile Trail (off Huckleberry Rd.) Trout Lake Twp. unknown MDOT, FHWA, CCRC, LocalNew ORV Trail System Trout Lake Twp. unknown MDOT, CCRC, FHWA, Local

    Trees for Township Park Trout Lake Twp. unknown MNRTF, FHWA, MDOT, Private, LocalUpdated Road Signage Trout Lake Twp. unknown MNRTF, Private, LocalNational Scenic Byways Grant - land acquisition for Welcome Center/signage Trout Lake Twp. unknown MDOT, FHWA, Local

    Visual Enhancement of business district Whitefish Twp. unknown MDOT, FHWA, CCRC, Local

    2008-09 CEDS Project Listing 22

  • PLANNED/FUNDED PROJECTS - 2009 Local Government Project Cost Funding SourcesConley Point Boat Launch Bruce Twp. Unknown MDNR, LocalM-134 Heritage Route Designation Clark Township Unknown MDOT, LocalCedarville Township Park Clark Twp. Unknown USDA, MDNR, Private, LocalCormorant Management Program Clark Twp. Unknown MDNR, MDEQ, USDA-FWProperty Acquistion - Recreational DeTour Village $495,000 MNRTF, LocalEUPTNA Signage Plan EUP Unknown PAL, MDNR, MDOT, LocalTone Road Streetscape Project Kinross Charter Twp. $336,000 MDOT, Local

    Mascoma/FRR Cellulosic Ethanol Refinery Kinross Charter Twp.EDA, DOE, MEDC, Private, Local

    Tone Rd./M-80 Streetscape Project Kinross Charter Twp. Unknown MDOT, LocalWatertower Dr. improvements (curb/gutter) Kinross Charter Twp. Unknown CCRC, LocalProperty Acquisition - new business location Kinross Charter Twp. $250,000 USDA-RD, Private, LocalSky McFly's building renovations Kinross Charter Twp. Unknown USDA-RD, Private, LocalDrainage Problem - base housing Kinross Charter Twp. Unknown CCRC, LocalSewer repairs - Clubhouse Dr. area Kinross Charter Twp. Unknown LocalLuce County Industrial Park Expansion Luce County EDC $2,350,000 EDA, CDBG, LocalExtension of water main from M-28 to Miller Rd. Luce County EDC Unknown EDA, CDBG, USDA, LocalCut River Bridge Deck Replacement MDOT $2,947,433 MDOTUS-2 Road Preservation Project MDOT $1,194,227 MDOTM-28 Resurfacing Projects (Chippewa Co.) MDOT $4,300,000 MDOT

    Newberry Water System Improvements Project Phase 1C Newberry, Village of $1,000,000 USDA, CDBG, LocalThree Lakes Charter Academy - School Portage Township $160,000 MI Dept. of EducationRehab New City Hall (Federal Bldg.) Sault Ste. Marie, City of $4,500,000 LocalAshmun Bay Dredging Project Sault Ste. Marie, City of $284,000 EPA, DEQ, LocalWetlands Master Plan Development Sault Ste. Marie, City of Unknown LocalRotary Park Development Sault Ste. Marie, City of $370,000 MNRTF, LocalAshmun Bay Park Trail Parcel Acquisition Sault Ste. Marie, City of $48,000 MNRTF, LocalAshmun Bay Park Entrance Parcel Acquisition Sault Ste. Marie, City of $139,000 MNRTF, LocalLittle Italy Neighborhood Improvements Sault Ste. Marie, City of $500,000 MSHDA, Local

    Ashmun-Portage Park-Farmer's Market Development Sault Ste. Marie, City of Unknown USDARD, MEDC, Private, LocalSt. Ignace Welcome Center Construction St. Ignace, City of Unknown MDOTChambers St. replacement St. Ignace, City ofPortage St. sewer replacements St. Ignace, City ofLighthouse Park construction St. Ignace, City ofBus Station completion St. Ignace, City of

    Mackinac County Hospital Construction St. Ignace/Private $36,800,000 USDA, USDARD, Local, PrivateUpgrade of Huckleberry Road Trout Lake Twp. Unknown MDOT, CCRC, LocalConstruction of new Emergency Services Building Whitefish Twp. Unknown USDARD, DHS, LocalRennovation of the Community Center Whitefish Twp. Unknown USDARD, Local

    2008-09 CEDS Project Listing 23

  • PROBLEMS/CHALLENGES - 2007 Local GovernmentLack of recreational opportunities (fishing or boat launch rampts at the 3 inland lakes on the island) Bois Blanc Twp.More piers for transient mooring at the main dock in Lake Huron Bois Blanc Twp.Lack of dust control on the county road (has become a traffic hazard in the summer) Bois Blanc Twp.Decreased economy throughout the State is negatively impacting all sectors of public and private enterprise, commercial, industrial, recreation and tourism Chippewa Co. EDCContinual challenge of finding new jobs City of Sault Ste. MarieFunding for a large array of projects, cso, new city bldg's, several road projects City of Sault Ste. MarieLoss of busineses City of St. IgnaceDownturn in economy City of St. IgnaceNever enough money to repair roads Garfield Twp.Loss of businesses/tax base Hulbert Twp.Timber industry is struggling Luce County EDCTourism is down Luce County EDCLayoffs at Louisiana Pacific Luce County EDCCommunity is facing economic hardship and experiencing ramifications of the major job loss in lower Michigan Luce County EDCReduced Road Funding, cost of building roads increasing Mackinc Co. Road CommissionGood road for residnets to connect with I-75 as there is no exchange on M48 at I-75 Marquette Twp.Declining tourism due to depressed State and Regional Economic Conditions Moran Twp.Loss of local tax revenues due to successfil Property Tax Appeals by pipelines/powerlines Moran Twp.Any expansion of business opportunities and job creation will require new sewer system expansion along the US-2 corridor Moran Twp.Tourism in general is lagging Portage Twp.Some roads still badly in need or repair/upgrading Portage Twp.Deteriorating Roads and sepctic systems. Portage Twp.Business failures due to declining tourism - gas prices and weather Portage Twp.Deteriorating road and struggling economy St. Ignace, City ofLoss of tax base Village of NewberryLack of Cultual opportunities Village of NewberryAgain water and sewer systems Village of NewberryDeteriorating sidewalks Village of Newberry

    2008-09 CEDS Project Listing 24

  • Project Description MunicipalityEstimated

    Cost Funding Sources Stauts

    Mackinac Tr. From Gaines Hwy. to M-80Chippewa County Road Comm. $500,000 MDOT Small Urban, Local Planned '09

    M-48 (Chippewa County) from M-129 to M-134 MDOT $137,000 MDOT, ARRA, STIP Planned '09M-28 from Luce CL to M-123 MDOT $2,798,000 MDOT, ARRA, STIP Planned '09M-28 from Borgstrom Rd. to Luce CL MDOT $1,681,000 MDOT, ARRA, STIP Planned '09M-134 from I-75 to Hessel - resurface with 5ft. Shoulder MDOT $3,700,000 MDOT, ARRA, STIP Planned '09M-123 CL to Eckerman HMA Shoulder Paving MDOT $3,500,000 MDOT, ARRA, FHWA Planned '09M-80 to 10 Mile Road - HMA Crush and Shape MDOT $4,200,000 MDOT, ARRA, FHWA Planned '09M-129 south of M-80 to N. of 10 Mile Road MDOT $4,200,000 MDOT, ARRA, STIP Planned '09US-2 East of Brevort Lk. Rd. to Martin Lk. Rd. MDOT $3,750,000 MDOT, ARRA, STIP Planned '09

    Ashmun Street reconstruction (10 Ave to Ashmun St. Bridge) MDOT MDOT, Local Planned '09I-75 BL from I-75 to High St. MDOT MDOT, Local Planned '09US-2 from Borgstrom Rd. to Hiawatha Tr. MDOT MDOT, Local Planned '09US-2 from M-117 to Naubinway MDOT MDOT, Local Planned '09Johnston Street bridge deck repair Sault Ste. Marie, City of $261,500 Local Planned '09Johnston Street mill and fill blacktop overlay Sault Ste. Marie, City of $60,500 Local CompletedW. 8th Ave. resurfacing from Ryan to Davitt Sault Ste. Marie, City of $36,340 Local Planned '09W. 10th Ave. reconstruction from W. 3rd to Ryan Ave. Sault Ste. Marie, City of $366,384 MDOT, Local Planned '09E. 20th Ave. Reconstruction btw. M-129 and Minneapolis Sault Ste. Marie, City of $500,000 MDOT, ARRA, STIP unknownW. 26 Ave. drainage improvement Sault Ste. Marie, City of $114,441 MDOT, Local Planned '09Pine Street from Leroy to Sheridan Dr. Sault Ste. Marie, City of $158,194 Local Planned '09LED Traffic Signal replacement at Easterday and Ryan Sault Ste. Marie, City of $6,500 MDOT, Local Planned '09Easterday Ave. resurfacing project Sault Ste. Marie, City of $481,640 MDOT, Local CompletedAshmun Streetscape Design/Bridge/Easterday Sault Ste. Marie, City of $90,000 MDOT, Local Planned '09RoundaBout Construction (Mack Tr./3 Mile/I-75 BS) Sault Ste. Marie, City of $1,720,000 MDOT, ARRA, Local Planned '10E. 9th Ave. Street Improvement Sault Ste. Marie, City of $38,661 Local Planned '09Armory Place road reconstruction Sault Ste. Marie, City of $450,000 MDOT, ARRA, STIP, Local unknownOak Street reconstruction Sault Ste. Marie, City of $200,000 MDOT, ARRA, STIP, Local Planned '10Easterday Ave. Bridge Improvemetns Sault Ste. Marie, City of $1,000,000 MDOT, ARRA, STIP, Local unknownW. Easterday Ave. to I-75 Sault Ste. Marie, City of $457,600 MDOT Small Urban, Local Planned '10Riverside Drive Bridge Sault Ste. Marie, City of $1,250,000 MDOT, Local Need Funding

    EASTERN UP TRANSPORTATION PROJECTS - 2008-2010

    2008-09 CEDS Project Listing 25

  • Date Applicant ProjectFunding Source Total Cost Fed $ State$ Local$

    2/22/2008 Superior Twp.Wheels of History Park Improvement MDNR $60,000 $30,000 $30,000

    5/29/2008 CLM CAA Inc.Early Head Start and Head Start Program refunding DHHS/ACF $3,622,662 $2,898,130 $724,532

    5/29/2008 Old Mission Bank Commercial Lending USDA-RD $2,238,300 $1,461,850 $776,450

    9/9/2008 Sault TribeSt. Ignace Tribal Subdivision Water System Improvements USDA-RD $800,000 $600,000 $200,000

    9/17/2008 CLM CAA Inc. Head Start/Child Care Equipment USDA-RD $110,000 $50,000 $60,000

    10/20/2008 DeTour Area EDC DeTour Business Park RBEG USDA-RD $250,000 $250,000 $0

    2/25/2009 Luce County EDC Luce County Industrial Park EDA $2,350,000 $1,645,000 $705,000

    3/26/2009Chippewa County Health Department

    Addressing Youth Access to Alcohol/Drugs/Tobacco HHS $250,000 $125,000 $125,000

    3/30/2009 Northern Initiatives USDA RBOG USDA-RD $50,000 $50,000

    3/30/2009 City of Sault Ste. Marie Sherman Park Picnic Shelter MDNR $56,300 $42,200 $14,100

    4/3/2009 City of St. Ignace Police Cars purchase USDA-RD $42,650 $42,650

    4/21/2009 City of St. Ignace Purchase of Patrol Vehicles USDA-RD $42,650 $42,650

    4/28/2009 Brimley Area School Indian Education (EASIE) DED $67,520 $67,520

    $7,232,800 $2,635,082

    SPOC 12372 REGIONAL CLEARINGHOUSE REVIEW PROJECTSSpecial

    Conditions/Terms

    2008-09 CEDS Project Listing 26

  • Name Investment

    Essar Global (purchase of Algoma Steel) $500.0 million +

    New Sault Ste. Marie District Hospital $408.0 million

    Prince Windmill Project $400.0 million

    Pod Generating Group $360.0 million

    Algoma Steel Cogeneration Plan $135.0 million

    East End Sewer Treatment Plan $55.0 million

    New Retail Development Investments $51.0 million +

    Algoma Tubes (steel) Investment $30.0 million

    Steelback Centre Construction (state-of-the-art Events centre) $25.0 million

    Truck Route Development $20.0 million

    Agawa Canyon Tour Train $12.0 million

    New multimodal (Purvis) facility $4.5 million

    Black Loon Millworks International Manufacturing Facility $4.5 million

    200 new homes built over the past two years

    Six new residential subdvisions built

    Total $2.005 billion

    SAULT ONTARIO ECONOMIC DEVELOPMENT INVESTMENTS 2007-2009

    2008-09 CEDS Project Listing 27

    2009 Projects Listing_2.pdfby COUNTYcriteriaActivitiesNeed Funding Planned-FundedProblemsSPOC 12372Ontario