An introduction to Earned Value Management

Simplex project managementEducation|Training|Mentoring|Coaching|Consulting

Page 2: Earned value management

www.simplexpm.co.uk

Introduction

• A short presentation to describe WHAT Earned Value is and HOW to calculate it

Page 3: Earned value management

www.simplexpm.co.uk

...some important definitions!

Price– The price for work to be undertaken by a contractor

Value– The amount of work carried out by the contractor in accordance with the

contract

Cost– The amount of money it cost the contractor to do the work

Contract Value– The agreed price for carrying out the work between client and contractor

Budget– The amount of money the client has set aside for the work

Cash-flow– The difference between payments received and expenses incurred

Page 4: Earned value management

www.simplexpm.co.uk

The justification for Earned Value

The issue with this graph• One sided view only – i.e. COST• Where are we in relation to schedule ?• Have we spent the money on the right work?

Page 5: Earned value management

www.simplexpm.co.uk

The justification for Earned Value (Cont’d)

•Integrated cost & schedule info•Predictions about future performance•Better management of budgets•Better decision making ability

Page 6: Earned value management

www.simplexpm.co.uk

Earned Value - History

• Basic form of EV traced back to 1800s, used on the factory floor

• 1967 – EVM introduced by US federal government agencies as part of Cost / Schedule Control Systems Criteria (C/SCSC)

• C/SCSC discarded by the end of 1996• PMI PMBoK simplified EVM terminology and formulas

Page 7: Earned value management

www.simplexpm.co.uk

Earned Value – PMI definition

A technique to measure performance of a project as it moves from project initiation to project closure.

It also provides a means to forecast future performance based on past performance.

(PMI PMBoK)

Page 8: Earned value management

www.simplexpm.co.uk

Earned Value – APM definition

“ Earned value management is a project control process based on a structured approach to planning, cost collection and performance measurement”

Page 9: Earned value management

www.simplexpm.co.uk

Benefits of Earned value

• Providing data to enable objective measurement of project status

• Providing a basis for estimating final cost• Predicting when the project will be complete• Supporting the effective management of resources• Providing a means of managing and controlling change

(APM EVM Guideline)

Page 10: Earned value management

www.simplexpm.co.uk

Earned Value Structure

Control Accounts

Work Breakdown Structure

Organisation Breakdown Structure

Scope of work

Work Packages

PlanningPackages

Source: Earned Value Management APM Guideline

Page 11: Earned value management

www.simplexpm.co.uk

Budget elements

Contract Price

Contract Budget Baseline Margin

Performance Measurement Baseline Management Reserve

Distributed Budget Undistributed Budget

Control Account Budgets

Work Packages

Planning Packages

Source: Earned Value Management APM Guideline

Page 12: Earned value management

www.simplexpm.co.uk

Getting the WBS right !

The further you go downthe more administrationrequired in terms of datagathering

!

Page 13: Earned value management

www.simplexpm.co.uk

Its about improving visibility

Client(Agreed Costs)

Contractor(Contractor costs that cannot be recovered from the client)

Contract

Page 14: Earned value management

www.simplexpm.co.uk

Earned Value application to construction

• Project type (large or complex)• Imposed by the Client!• Traditional way of delivering projects• Availability of skilled resources• Ability of organisations to embrace this technique• Attitude • Culture

Page 15: Earned value management

Earned Value Standards & Guidance

www.simplexpm.co.uk

Page 16: Earned value management

www.simplexpm.co.uk

Earned Value Guidance

Earned Value Management

PMI(Project

Management Institute)

DAU(Defense

Acquisition University)

APM(Association for

Project Management)

Page 17: Earned value management

www.simplexpm.co.uk

Earned Value terminology

Abbreviation Description New terminology Abbreviation

BCWS Budgeted Cost for Work Scheduled Planned Value PV

BCWP Budgeted Cost of Work Performed Earned Value EV

ACWP Actual Cost of Work Performed Actual Cost AC

Page 18: Earned value management

www.simplexpm.co.uk

Page 19: Earned value management

Measuring actual performance

www.simplexpm.co.uk

Page 20: Earned value management

www.simplexpm.co.uk

Measurement of work

Milestones

•Roof completion•Groundwork completion

Deliverables

•Nr of drawings•Nr of reports

Split %

•50/50•20/80•0/100•Etc

% Compl

ete

Ways of measuring work

Page 21: Earned value management

Earned Value – Worked Example

www.simplexpm.co.uk

Page 22: Earned value management

www.simplexpm.co.uk

Worked Example – Base data

Page 23: Earned value management

www.simplexpm.co.uk

Worked Example - Work Breakdown Structure

Page 24: Earned value management

www.simplexpm.co.uk

Worked Example – Schedule & Cost

Page 25: Earned value management

www.simplexpm.co.uk

Worked Example – Performance in week 3

Page 26: Earned value management

www.simplexpm.co.uk

Worked Example – Earned Value Graph

Page 27: Earned value management

www.simplexpm.co.uk

Earned ValueReport

Page 28: Earned value management

Earned Value Metrics

www.simplexpm.co.uk

Page 29: Earned value management

www.simplexpm.co.uk

CPI (Cost Performance Index) & SPI (Schedule Performance Index)

Page 30: Earned value management

www.simplexpm.co.uk

CPI / SPI Index

Page 31: Earned value management

www.simplexpm.co.uk

Cost Variance

Page 32: Earned value management

www.simplexpm.co.uk

Schedule Variance

Page 33: Earned value management

www.simplexpm.co.uk

EAC (Estimate At Completion)

Page 34: Earned value management

www.simplexpm.co.uk

VAC (Variance At Completion)

Page 35: Earned value management

www.simplexpm.co.uk

TCPI (To Complete Performance Index)

Page 36: Earned value management

www.simplexpm.co.uk

The EV graph & metrics

Page 37: Earned value management

Earned Value Management - Summary

www.simplexpm.co.uk

Page 38: Earned value management

www.simplexpm.co.uk

Earned Value Management

“it is a concept that integrates project scope, schedule and cost in terms of monetary value thus allowing performance to be measured and understood”

Page 39: Earned value management

www.simplexpm.co.uk

The essential ingredients

Earned Value

Schedule

Scope (WBS)

Costs

Page 40: Earned value management

www.simplexpm.co.uk

How it fits all together!

Project Scope

Schedule Cost Profile Performance Measurement

Changes to introduced

here

Reflected in Schedule

Reflected in Costs

Taken into account when measuring performance

Page 41: Earned value management

www.simplexpm.co.uk

The overall aim

In theory, ACWP and BCWP should be as near enough to the BCWS as possible

Page 42: Earned value management

www.simplexpm.co.uk

Challenges with using Earned Value

1. Client is not familiar with the method

2. The project team is not familiar with the method

3. Too many different organisations delivering the project

4. Lack of common understanding of what needs to be done

5. ‘Too many chiefs!’

6. Seen as cumbersome and an administration burden

7. Requires training

8. Takes too long before the benefits can be seen

9. Used as a weapon by senior management!

Page 43: Earned value management

www.simplexpm.co.uk

...some words of advice!

• Understand the contract• Know your obligations• Take time to develop and create a structure• Keep it simple• Try to obtain data from the source• Don’t aim for 100% accuracy that’s NOT the objective

Page 44: Earned value management

www.simplexpm.co.uk

Useful WebsitesWeb Address Organisation

www.dau.mil/default.aspx Defense Acquisition University

www.acoste.org.uk Association of Cost Engineers

www.apm.org.uk Association for Project Management

www.pmi.org Project Management Institute

www.aacei.org/ The Association for the Advancement of Cost Engineering

Page 45: Earned value management

www.simplexpm.co.uk