eads ccq-new presentation

19
European Aeronautic Defense and Space Center 1

Upload: pinto-carlos

Post on 21-Oct-2015

86 views

Category:

Documents


1 download

DESCRIPTION

presentation

TRANSCRIPT

Page 1: EADS CCQ-New Presentation

European AeronauticDefense and Space Center

1

Page 2: EADS CCQ-New Presentation

4,910 (4.1%) Airbus Military

7,405 (6.3%) Headquarters & Others

Eurocopter 15,667 (13.2%)

Defence & Security

22,787 (19.2%)

EADS Astrium

13,674 (11.5%)

53,906 (45.5%) Airbus

About EADS Group

The European Aerospace Defence and Space Company (EADS) was founded in July 2000. It is today the second-largest group in the global aerospace and defence industry, with a unique range of products and services. The group includes Airbus , Eurocopter, Astrium and Cassidian.

• 140,405 Employees in 2012• 56,5 m€ Revenues in 2012

2

Page 3: EADS CCQ-New Presentation

AIRBUS is the leading commercial and military transport aircraft manufacturer, offering the most modern civil airliners in the market

CASSIDIAN is a worldwide leader in state state-of-the-art solutions for armed forces and civil security, and the major partner in the Eurofighter consortium.

ASTRIUM, the European leader in space programmes, is active in all space activities, from large-scale space systems to satellite services

EUROCOPTER is the world’s primary helicopter manufacturer in the civil sector, offering the largest civil and military helicopters in the world.

About EADS Group

3

Page 4: EADS CCQ-New Presentation

EADS Competence Center of Qatar QSTP-LLC

What we Share Make us Strong

Lab Presentation Rev.03 - 01 Dec 2013

Aeronautical

Maritime Chemistry

Oil & GasConstruction

4

Page 5: EADS CCQ-New Presentation

Lab Presentation Rev.03 - 01 Dec 2013

Organization Structure

GENERAL MANAGER-QATAR

ADMINISTRATIVE SUPPORT

EADS FRANCE

CHAIRMAN-

EADS MIDDLE EAST

RESEARCH &

DEVELOPMENT

TRAINING & CONSULTING

EADS CCQ LABORATORY

5

Page 6: EADS CCQ-New Presentation

OUR VISION

To be the leading National centre for the provision of state of the art solutions to the Qatari industries through research, knowledge creation and transfer as well as applications in line with the vision of the country whilst maintaining the highest integrity and environmental consciousness.

OUR MISSION

To address the challenges and opportunities facing the Qatari industries, and contribute to the development of Qatar in line with the 2030 vision.

Lab Presentation Rev.03 - 01 Dec 2013

VISION AND MISSION

6

Page 7: EADS CCQ-New Presentation

Established in 2007, EADS CCQ QSTP-LLC serves the Qatar industrial community with a wide range of high-quality, expedient and cost-competitive Research, consultancy, servicing and Training services with high degree of quality, performance and customer services

A state-of-the-art Mechanical and metallurgical testing laboratory accredited to ISO 17025:2005 by Dubai Accreditation Center (DAC), Dubai, a full member and MRA Signatory of the International Laboratory Accreditation Cooperation (ILAC). A Qatar Petroleum(QP) approved laboratoryAlso approved by Dolphin Energy, QCHEM, Qatargas, Rasgas etc.A 300m2 facility exclusively dedicated to the characterization of materials and assemblies.

Research & Consultancy

Training & Outreach

Servicing

About EADS CCQ QSTP-LLC

7

Page 8: EADS CCQ-New Presentation

Polytec (EU)

NI (MENA)

R-Tech and Metamet (UK)

K-KEM (Saudi Arabia)

Resato (Holland)

MTC (UK, UAE)

QACPE (Qatar)

Williams F1

ApsysLab Presentation Rev.03 - 01 Dec 2013

Our PARTNERSHIPS

Currently, EADS CCQ partners with various companies across the world in the field of Research, Testing and Consulting. Some of our major partners are:

8

Page 9: EADS CCQ-New Presentation

MAJOR PROJECTS & CLIENTS

RESEARCH

NPRP project on Cathodic Disbonding Project on Cookwares for QGOSM

LABORATORY

GSF project in Mesaieed and Dukhan Non-destructive testing for Musherib project, Doha. Barzan project in Ras Laffan (Ongoing) Destructive testing services for QATARGAS PMP project for TCJV at Ras Laffan Industrial city Kempe Qatar for QATALUM Al Jaber for Lusail project Target Rotary for CP10 New Doha International Airport Procedure &Welder qualifications for GASCO Destructive testing services for DOPET, QCON, TRAGS, NKOM, MADINA, AMMICO, Galfar Al Misnad etc. Replica Metallography on-site for various shutdowns and projects for Qchem, Qatargas and Qatar Petroleum.

9

Page 10: EADS CCQ-New Presentation

Development of a non-intrusive hydrates detection and localisation system for offshore pipelinesThe use of Ohmic heating in the food processing industry

Coatings in corrosive media

Renewable energy on gas platforms

Drug delivery to central nervous system

Human factors engineering of systems of systems: multimodal multi-agent interfacesDust loading and air pollution management

RESEARCH & DEVELOPMENT

10

Page 11: EADS CCQ-New Presentation

Mechanical Testing

1. Universal Tensile machine

2. Bending machine

3. Impact test machine (Charpy)

4. Hardness testing machine

Metallurgical Testing

5. Macro /Micro examination

6. Chemical analysis

Corrosion Testing

7. Potentiostat / galvnostat

8. Salt Spray test

9. Cathodic Disbondment test

Non Destructive Testing

Sample Preparation Area

Lab Presentation Rev.03 - 01 Dec 2013

SERVICE PROVISION

11

Page 12: EADS CCQ-New Presentation

A state-of-the-art Mechanical and metallurgical testing laboratory accredited to ISO 17025:2005 by Dubai Accreditation Center (DAC), Dubai, a full member and MRA Signatory of the International Laboratory Accreditation Cooperation (ILAC). A Qatar Petroleum(QP) approved laboratoryAlso approved by Dolphin Energy, QCHEM, Qatargas, Rasgas etc.A 300m2 facility exclusively dedicated to the characterization of materials and assemblies. Our capabilities include:

• Mechanical Testing-

Impact, Bend, Rebend, Tensile, Hardness• Metallographic testing-

Sample cross sectioning, mounting, grinding, polishing, etching, macro/microstructural analysis, weld/material analysis

• Corrosion testing• Chemical analysis of metallic materials• Failure Analysis• In-situ Metallographic replica analysis• Non-destructive testing

Lab Presentation Rev.03 - 01 Dec 2013

EADS CCQ Laboratory

12

Page 13: EADS CCQ-New Presentation

1. HARDNESS TEST Hardness is a measure of how resistant solid matter is to various kinds of permanent shape change when a force is zpplied. Indentation hardness measures the resistance of a sample to material deformation due to a constant compression load from a sharp object.

Test Method: Vickers, Brinell & Rockwell Hardness Test Test Range : Vickers : 5-10-20-30-50-100Kgf Brinell : 187,5Kgf

Rockwell : 60-100-150Kgf, Preload 10Kgf

2. TENSILE/BEND TEST Tensile testing, also known as tension testing, is a fundamental material science test in which a sample is subjected to a controlled tension until failure. The results from the test are commonly used to select a material for an application and to predict how a material will react under other type of forces.Bend test is used to evaluate both the ductility and soundness of a material. It is often used as a quality control test for Butt-welded joints.Test Method : Tensile, Bend, and Compression testTest Range : 0 to 400 Kilo Newton

Lab Presentation Rev.03 - 01 Dec 2013

Scope of TESTS

13

Page 14: EADS CCQ-New Presentation

3. CHARPY IMPACT TEST Charpy Impact Test is a standardized high strain-rate test which determines the amount of energy absorbed by a material during fracture. It is used in many industries for testing materials used in the construction of pressure vessels and bridges and to determine how storms will affect materials used in them.Test temperature: -1960C to Normal room temperatureTest Range : 0 to 300 Joules

4. CHEMICAL ANALYSIS (SPECTROSCOPY) In Optical Emission Spectroscopy technique,

atoms in a sample are excited by energy that comes from a spark formed between sample and electrode. The energy of the spark causes the electrons in the sample to emit light which is converted into a spectral pattern. By measuring the intensity of the peaks in this spectrum, OES analyzers can produce qualitative and quantitative metal analysis of the material composition with uncompromising accuracy.

Material Range : Steels (SS & CS), Copper & Aluminium

Lab Presentation Rev.03 - 01 Dec 2013

Scope of TESTS

14

Page 15: EADS CCQ-New Presentation

5. SALT SPRAY TEST The salt spray test (Fog Test) is a standardized test method used to check corrosion resistance of coated samples. It is an accelerated corrosion test used to evaluate the relative corrosion resistance materials exposed to a salt spray or salt fog at an elevated temperatureTest temperature: -1960C to Normal room temperatureTest Range : 0 to 300 Joules

6. METALLOGRAPHIC REPLICA TEST In-situ Replica Metallography is an on-site,

non-destructive technique employed for observing and documenting the microstructural integrity of many engineering metal parts, castings, forgings, welds and brazed joints, equipment, components and steel structures. It is a portable mobile technique that can be taken anywhere-“Take the Laboratory to the Problem and not the Problem to the Laboratory”

Test Temperature : Normal Room Temperature Specification : ASTM E1351

Lab Presentation Rev.03 - 01 Dec 2013

Scope of TESTS

15

Page 16: EADS CCQ-New Presentation

METALLURGICAL FAILURE ANALYSIS

Metallurgical failure analysis is the process by which a metallurgist determines the mechanism that has caused a metal component to fail. Typical failure modes involve various types of corrosion and mechanical damage. The end goal of failure analysis is to provide a determination of the root cause and a solution to any underlying problems to prevent future failures. Analysis of a failed part can be done using destructive testing or Non-destructive testing. Destructive testing involves removing a metal component from service and sectioning the component for analysis. Non destructive testing is a test method that allows certain physical properties of metal to be examined without taking the samples completely out of service. NDT is generally used to detect failures in components before the component fails catastrophically.

Lab Presentation Rev.03 - 01 Dec 2013

SERVICING

16

Page 17: EADS CCQ-New Presentation

PROGRAMS DURATION

Financial Risk Management & Compliance 5 Days

Feasibility study & business planning 5 Days

Safety In Industrial Plants 5 Days

Accident Investigation & Root Cause Analysis 5 Days

Certified International Professional Trainer(CIPT) 5 Days

Human Resources Management skills 4 Days

Supervisory Management Skills 3Days

Management Skills for Engineers 5 Days

Safety on Electrical Power Distribution Systems 5 Days

Strategic Management 2 Days

Training Programs in DOHA

Lab Presentation Rev.03 - 01 Dec 2013 17

Page 18: EADS CCQ-New Presentation

PROGRAMS  DURATION

Strategic Management 2 Days

Performance Appraisal Management 3 Days

Crisis Management 2 Days

Professional Mini-MBA 10 Days

Leadership, Creativity & peak Performance 3 Days

Managing change for executives 2 Days

Secretarial Skills 3 Days

Certified Quality Manager (CQM) 2 Days

Business & Tech. Reports Writing 3 Days

Problem solving 3 Days

Certified Team Leader 5 Days

Leadership Communication Skills 5 Days

Developing the next generation of leaders 5 Days

Advanced Finance for Non Finance 5 Days

Lab Presentation Rev.03 - 01 Dec 2013

Training Programs in DOHA

18

Page 19: EADS CCQ-New Presentation

Lab Presentation Rev.03 - 01 Dec 2013

Certificate of Accreditation

19