dursley neighbourhood development plan 2018 - 2031€¦ · image credits: p7:...

69
Dursley Neighbourhood Development Plan 2018 - 2031 Referendum Version October 2018

Upload: others

Post on 25-Aug-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Dursley Neighbourhood Development Plan 2018 - 2031€¦ · Image credits: p7: ©DDGE/BEXCOPTER.p62-3 Tim Taphouse; Graphic Design by Place Studio Ltd. Thank you Dursley Town Council

Dursley Neighbourhood Development Plan 2018 - 2031

Referendum Version October 2018

Page 2: Dursley Neighbourhood Development Plan 2018 - 2031€¦ · Image credits: p7: ©DDGE/BEXCOPTER.p62-3 Tim Taphouse; Graphic Design by Place Studio Ltd. Thank you Dursley Town Council

Dursley NDP - Oct 2018

This document can also be viewed via our website or as a hard copy on the Town Council Office or Library: www.dursleytowncouncil.gov.uk/neighbourhood-plan.html

Future Dursley NDP, c/o Dursley Town Council, Jacob’s House, Castle Street, Dursley, Glos. GL11 4BS

Tel: 01453 547758Email: [email protected]

Photo Credits: Dursley Neighbourhood Planning Steering Group (2017);Image credits: p7: ©DDGE/BEXCOPTER.p62-3 Tim Taphouse;

Graphic Design by Place Studio Ltd.

Thank youDursley Town Council would like to thank all those people, organisations and groups who have contributed to the development of the Future Dursley Neighbourhood Development Plan through participating in consultation events, meetings and surveys.

Particular thanks are due to the volunteer-led members of the Steering Group who have worked so hard during the last three years to produce this plan. They are Jonathan Bird, Krystyna Dembny, Sue Creswick, Mel Stennett, Wendy Thomas, Neil Grecian, Nick Organ, Gayle Collins, and Mike Johnson.

Stroud District Council for professional advice, specifically from Ricardo Rios and Simon Maher, Neighbourhood Planning Officers and Vince Warwick for producing many of the maps.

Gloucestershire Rural Community Council for the provision of expert advice in community engagement and evidence gathering.

Professional consultancy support from:Harris Ethical for Transport Research; Gloucestershire Environmental Record Centre for Environmental Research; White Consultants Ltd for Landscape Character Assessment and Advice; and Place Studio Ltd for Planning Advice.

And last but by no means least Locality for their grant funding to complement the financial support from the Town Council.

Page 3: Dursley Neighbourhood Development Plan 2018 - 2031€¦ · Image credits: p7: ©DDGE/BEXCOPTER.p62-3 Tim Taphouse; Graphic Design by Place Studio Ltd. Thank you Dursley Town Council

Dursley NDP - Oct 20181

Contents Page

Contents Page

1. Introduction 3 2. Vision for Dursley 7

3. Dursley Development Strategy 11

4. Dursley Town Centre 20 5. Planning Policies 22

6. Projects 60

7. Evidence Base 65

Figures

Figure 1: Dursley Designated Neighbourhood Plan Area Figure 2: Summary of Neighbourhood Plan Objectives (Part 1 & 2)Figure 3: Stroud District Level Spatial Strategy for DursleyFigure 4: NDP Development Strategy for DursleyFigure 5: Dursley Town Centre (including Character Areas from Dursley Urban Design Framework)Figure 6: Dursley Green Infrastructure MapFigure 7: St Modwen’s Development Masterplan for Littlecombe (2016)Figure 8: Dursley’s Ancient WoodlandsFigure 9: Dursley’s Landscape Character Assessment (2015) - extract.Figure 10: Dursley AONB and Parish BoundaryFigure 11: Dursley Local Landscape Character AreasFigure 12: Historic Assets in DursleyFigure 13: Community Facilities in DursleyFigure 14: Protected Outdoor PlayspacesFigure 15: Proposed Local Green Space DesignationsFigure 16: Dursley-Cam GreenwayFigure 17: Cotswold Way - Route through Dursley

Page 4: Dursley Neighbourhood Development Plan 2018 - 2031€¦ · Image credits: p7: ©DDGE/BEXCOPTER.p62-3 Tim Taphouse; Graphic Design by Place Studio Ltd. Thank you Dursley Town Council

2

Dursley NDP - Oct 2018

The words in the above title are all straightforward, except one: “Development”.

Yet “development” is the most significant word there. Development means growth and progress. Development is inevitable, otherwise decay results. But development may be good, bad or indifferent. The purpose of this document, worked on for over 3 years by local Dursley people and with wide community involvement, is to influence decisions about the use of Dursley land and property so that, over the near and more distant future (up to 20 years), Dursley develops into the sort of town that Dursley people want.

Dursley has seen huge changes over the last 20 years, not all of them welcome or seen as good developments. This Neighbourhood Development Plan has been formed so that future changes to our town can be guided by the evidence-

based wishes of the population of Dursley. It must fit within national and district plans and will give a local view of how Dursley can best do that.

This version of the plan has been found acceptable at examination, it is now for Dursley residents to decide in a referendum if this Neighbourhood Plan should be used, alongside the Stroud Local Plan, to determine planning applications in the town of Dursley. This is Government policy, set out in the “Localism Act 2011”, the aim of which was to involve local people in local decision making.

Dursley Town Council actively supported the setting up of a Steering Group in 2014; this group has consisted of interested local people, including some councillors. It has been grant-funded and the team has employed specialist consultants for more complex issues relating to traffic, landscape impact

and the final preparation of the NDP document. Community involvement has been assured by multiple meetings with small and large community groups, the local schools and street surveys (many Dursley residents will remember being approached at the Town Festivals or at Farmers Markets).

The NDP Group has met monthly and has received input in the form of letters, emails, social media and photos as well as informal chats with residents throughout its period of activity. We have met with the neighbouring parishes, especially Cam, of course.

We hope, therefore, that you will read this carefully, it concerns the real future for you, your family and for Dursley children yet to come. We hope you find the proposals acceptable, at least in broad terms. And, when the time to vote arrives, we hope that you will turn out in thousands to make

your wishes known on the overall acceptance of this Dursley NDP.

We would like to thank all those who have contributed time, thought, photos and expertise to this process.

Dr Jonathan Bird for the Dursley NDP Steering Group

Foreword by the Neighbourhood Development Plan Steering Group

Page 5: Dursley Neighbourhood Development Plan 2018 - 2031€¦ · Image credits: p7: ©DDGE/BEXCOPTER.p62-3 Tim Taphouse; Graphic Design by Place Studio Ltd. Thank you Dursley Town Council

3

1. Introduction

Page 6: Dursley Neighbourhood Development Plan 2018 - 2031€¦ · Image credits: p7: ©DDGE/BEXCOPTER.p62-3 Tim Taphouse; Graphic Design by Place Studio Ltd. Thank you Dursley Town Council

Dursley NDP - Oct 20184

Why produce a Neighbourhood Development Plan for Dursley?

A Neighbourhood Development Plan is a new type of document, introduced in the Localism Act 2011. It has legal weight and allows local people to say how they want to see the future development of their parish or town.

It sets out clear planning policies which will give guidance to developers and inform decision-making by a range of bodies including district and county councils.

A plan has to be in conformity with national planning policy and with the local authority’s own Local Plan. Our plan has been drawn up in accord with the National Planning Policy Framework and Stroud District Council’s Local Plan, which was adopted in 2015.

Our plan covers the same time frame as Stroud’s Local

Plan, ending in 2031. The area designated for our plan in 2014 was the whole of the Dursley parish, running from the boundary with Cam in the west and Uley in the east (see Figure 1).

Local people have been engaged from the beginning of the process, firstly identifying issues and subsequently participating in consultations on a wide range of topics.

This has led to the creation of the ‘evidence base’, a key requirement in satisfying the independent Examiner that our plan has been robustly developed and has community support.

The Dursley Neighbourhood Plan has been be subject to assessment by an independent Examiner.

This final version of the plan, will now be subject to a local referendum, that requires a simple

majority of voters to accept it in order for it to become a plan with legal status. It will then be used by Stroud District Council, alongside their Local Plan, to determine planning applications in the Town.

Introduction

Page 7: Dursley Neighbourhood Development Plan 2018 - 2031€¦ · Image credits: p7: ©DDGE/BEXCOPTER.p62-3 Tim Taphouse; Graphic Design by Place Studio Ltd. Thank you Dursley Town Council

Dursley NDP - Oct 20185

Consultation

What consultation has taken place so far?

A range of consultation activities and community events have been used to engage local people in the preparation of the Neighbourhood Development Plan including:

• Facilitated Public Workshop -28 January 2014

• Dursley Farmers Market - 10 May 2014

• Dursley Town Traders Meeting -8 July 2014

• Dursley Town Festival- 12 July 2014

• Tabernacle Family Café -16 July 2014

• Street Audit Meeting -16 July 2014

• Dursley Day Centre -1 August 2014

• Business Survey – August 2014

• Zumba Class -10 September 2014

• Transition Cam and Dursley Secret Garden Event -20 September 2014

• Meeting with surrounding parishes -26 November 2014

• Meeting with businesses based at Littlecombe – 20 March 2015

• Annual Town Meeting – 20 May 2015

• Dursley Town Festival – 27 June 2015

• Littlecombe Development Drop-in event – 9 July 2015

• Rednock School Students Focus Group Discussion – 10 July 2015

• Annual Assembly (Annual Town Meeting) – 24 May 2016

• Annual Town Festival – 25 June 2016

• Dursley Primary School - 1 & 8 July 2016

• Transition Cam and Dursley Flower & Produce Show- 3 September 2016

• Dursley Business Inclusive Meeting - 9 September 2016

• Dursley Farmers Market – 10 September 2016

• 4 April 2017 - Special Town Council meeting about the NDP

• March/April 2017 - Leaflet delivered to households across Dursley.

• Consultation on the early draft NDP and Local Green Space consultation.

• 15 July 2017 Dursley Carnival stall.

• Between November 2017 and January 2018, a formal Regulation 14 public consultation was held, and this version incorporates amendments from this process.

• Between July- August 2018, a formal Regulation 16 consultation was held by Stroud District Council, which informed the examination of the plan. Comments made at this stage were considered by the planning examiner

and this version incorporates amendments from the examination process.

Full details of all of the consultation activities and the feedback to the community on the plan todate are included in the Dursley NDP Consultation Statement, found alongside this report on our NDP webpage.

Page 8: Dursley Neighbourhood Development Plan 2018 - 2031€¦ · Image credits: p7: ©DDGE/BEXCOPTER.p62-3 Tim Taphouse; Graphic Design by Place Studio Ltd. Thank you Dursley Town Council

Need 4 photos here

Dursley NDP - Oct 20186

Dursley Neighbourhood Plan Area

Figure 1 - Designated Dursley Neighbourhood Development Plan Area

What is the Plan Area?

Dursley was designated as a Neighbourhood Area, for the purposes of creating a Neighbourhood Plan (by Stroud District Council), on 4th February 2014 under the Localism Act 2011. The Neighbourhood Plan area follows the Town Council area boundary as shown on Figure 1.

Much of the landscape surrounding Dursley is within an Area of Outstanding Natural Beauty which has the highest status of landscape protection under National Planning Policy.

¯

(C) Crown copyright and database rights 2016 Ordnance Survey 100019682

Dursley Neighbourhood Plan1:10,000Scale - 29/11/2016

0 410 820205 Meters

Dursley parish bounbary

Dursley Boundary

Page 9: Dursley Neighbourhood Development Plan 2018 - 2031€¦ · Image credits: p7: ©DDGE/BEXCOPTER.p62-3 Tim Taphouse; Graphic Design by Place Studio Ltd. Thank you Dursley Town Council

7

2. Vision for Dursley

Page 10: Dursley Neighbourhood Development Plan 2018 - 2031€¦ · Image credits: p7: ©DDGE/BEXCOPTER.p62-3 Tim Taphouse; Graphic Design by Place Studio Ltd. Thank you Dursley Town Council

Dursley NDP - Oct 20188

In 20 years’ time, Dursley will continue to retain its position as the prime market town serving the south of Stroud District capitalising on its rich landscape and its location on the Cotswold Way.

It will be a strong community and a place where people of all ages choose to live and work in a safe and accessible environment.

It will be a place where wildlife thrives and the natural environment and green spaces can be enjoyed by residents and visitors.

Vision for Dursley

An Introduction to Dursley

Dursley is a traditional market town in Stroud District of Gloucestershire.

Dursley acts as the main service town for the South of Stroud area and as such serves a number of smaller villages and communities (Cam, Uley, Stinchcombe, Slimbridge, Coaley and North Nibley) providing schools, shops, health and social services.

Dursley and Cam sit on the edge of the Cotswold Escarpment about half way between and well connected by both road and rail to the major cities of Bristol and Gloucester.

The town is surrounded by beautiful woodland and countryside and the Cotswold Way long distance trail passes through the Town Centre.

The area’s industrial heritage was dominated by the presence of several large manufacturing businesses in the town, which have all now either closed or moved out of the area. As a result the employment profile is undergoing a transformation, with many residents now commuting out of the town to find work.

The localities of Cam and Dursley are experiencing a period of rapid change, developing jointly as the second largest settlement in the district.

In recent years many new services have come into the town including a supermarket, hospital, secondary school building and library. New housing and employment is also on the way, at the Littlecombe site.

Topographically it comprises ancient hillside woodlands to the southern, western and partly eastern borders, below which

the areas have been designated as AONB. Farmland borders the north and east side of the boundary line.

Page 11: Dursley Neighbourhood Development Plan 2018 - 2031€¦ · Image credits: p7: ©DDGE/BEXCOPTER.p62-3 Tim Taphouse; Graphic Design by Place Studio Ltd. Thank you Dursley Town Council

Dursley NDP - Oct 20189

Objectives

What is the plan seeking to achieve?

The NDP sets out the strategy for Dursley, both as a whole and for the town centre (outlined in parts 3 and 4).

The Dursley Neighbourhood Plan is split into six key themes, which reflect the foci of sub-groups which made up the Neighbourhood Plan Steering Group. The six themes are:

• Environment and Sustainability• Housing• Economy• Design • Services and Facilities• Traffic and Transport

For each of the themes a number of objectives have been established which help to deliver the vision.

The policies and projects which follow in part 5 of the Neighbourhood Development Plan relate to these objectives.

In addition the strategy for the town as a whole and the town centre aspirations are outlined in parts 3 and 4.

Figure 2 Summary of Neighbourhood Plan Objectives (Part 1)

Environment & Sustainability Objectives

Protect and enhance wildlife

Protect and create multi-functional green infrastructure corridors that can support the movement of wildlife across Dursley

Housing Objectives

Identify suitable opportunities which would support a range of housing (including self-build, affordable housing and housing for older people)

Support a range of housing to maintain our mixed community (single, starter homes, growing families and life-time homes including affordable housing)

Economy Objectives

Retain town centre retail

Support appropriate change of use of existing properties to hotel and guesthouses

Support the local economy

Encourage new start-up businesses

Support local tourism and a new Tourist Information Centre

Safeguard existing employment sites and support viable mixed use development

Page 12: Dursley Neighbourhood Development Plan 2018 - 2031€¦ · Image credits: p7: ©DDGE/BEXCOPTER.p62-3 Tim Taphouse; Graphic Design by Place Studio Ltd. Thank you Dursley Town Council

Dursley NDP - Oct 201810

Figure 2 Summary of Neighbourhood Plan Objectives (part 2)

Design Objectives

Ensure that the design of new developments and re-developments reflects and fits the distinctive character of Dursley.

Services & Facilities Objectives

Protect local green spaces within Dursley from development

Increase the provision of green space including allotments

Protect the existing community facilities and assets

Traffic and Transport Objectives

Improve traffic management

Improve public transport

Improve connections for cyclists and pedestrians

Improve cycle parking

Improve Town Centre car parking (short and long-stay)

Page 13: Dursley Neighbourhood Development Plan 2018 - 2031€¦ · Image credits: p7: ©DDGE/BEXCOPTER.p62-3 Tim Taphouse; Graphic Design by Place Studio Ltd. Thank you Dursley Town Council

11

3. Dursley Development Strategy

Page 14: Dursley Neighbourhood Development Plan 2018 - 2031€¦ · Image credits: p7: ©DDGE/BEXCOPTER.p62-3 Tim Taphouse; Graphic Design by Place Studio Ltd. Thank you Dursley Town Council

Dursley NDP - Oct 201812

Dursley Development Strategy

Explanation

Stroud’s Local Plan (2015) sets a settlement hierarchy for Stroud, and it identifies both Dursley and Cam as “First Tier Local Service Centres”.

Dursley is one of the district’s main towns, and the Local Plan proposes that it should provide significant levels of residential and employment development over the plan period (to 2031).

Adjoining Cam is a focus for future strategic growth, with 450 dwellings and 12 hectares of employment land allocated there in the Stroud Local Plan (the North East Cam urban extension). Although this development is in Cam, it will impact on Dursley, with new residents likely to use the local facilities and services here.

The Littlecombe site on the northern edge of Dursley is an ongoing area of growth, providing mixed-use development. The

employment element of the Littlecombe site is specifically identified as an “out of town centre employment area”.

Dursley is constrained in terms of future development, with the urban area of Cam to the north, and the Cotswold Area of Outstanding Natural Beauty (AONB) surrounding the town to the east, south and west. The settlement boundary follows the built up area tightly to the east and west. Ancient Woodlands and trees on the skylines surround, providing an attractive green backdrop to the settlement.

Dursley has a number of brownfield sites within the settlement boundary where development will be supported in principle. This includes council house re-development which will further add to the local housing supply.

The land in the AONB adjoining Dursley is not currently needed to

meet housing requirements, and national policy gives AONB land the highest status of protection for its landscape and scenic beauty. The AONB and green setting of Dursley is a strong characteristic of the town which must be retained.

Therefore, planning permission for development in the AONB will continue to be refused, unless exceptional circumstances in the public interest can be demonstrated in line with National Planning Policy (NPPF para 172) and Stroud Local Plan policy ES7.

Dursley Development Strategy

Development proposals in Dursley should meet the guiding principles for strategic growth as set out in the Stroud District Spatial Strategy (as summarised on Figure 3).

Page 15: Dursley Neighbourhood Development Plan 2018 - 2031€¦ · Image credits: p7: ©DDGE/BEXCOPTER.p62-3 Tim Taphouse; Graphic Design by Place Studio Ltd. Thank you Dursley Town Council

Dursley NDP - Oct 201813

Dursley Development Strategy

DURSLEY

Key Diagram Adapted from the Stroud Local Plan Vision Diagram 1.3 (2015).

H

Figure 3: Stroud District Level Spatial Strategy for Dursley

Littlecombe Mixed Use Growth Area

First Tier Settlement

Local Service Centre (focus for retail, leisure, community facilities and employment).

Employment Area (outside town centre)

Hospital

Cam & Dursley Railway station (main line)

H

KeyStrategic Growth area (Cam)

Page 16: Dursley Neighbourhood Development Plan 2018 - 2031€¦ · Image credits: p7: ©DDGE/BEXCOPTER.p62-3 Tim Taphouse; Graphic Design by Place Studio Ltd. Thank you Dursley Town Council

Dursley NDP - Oct 201814

Figure 4: Dursley Neighbourhood Plan Strategy Overview

GF

2. Bus Station

3. Reliance House

1. Old Dairy/Prospect Place/11 May Lane

4. Cambridge House

4

2

5

1

3

6

DURSLEY

DURSLEY CPWoodmancote

(C) Crown copyright and database rights 2018 Ordnance Survey 100019682

Future Dursley NDP - Development Strategy Map1:10,000Scale - 14/09/2018

0 410 820205 Meters

Littlecombe site boundary

GF The Vale Community Hospital

2016 proposed cycle route (update to the local plan)

The Cam, Dursley and Uley Greenway

Dursley parish bounbary

Conservation Area

Settlement Development Limits

Protected oudoor playspace

Cotswold AONB

Local Green Space Designations1. Kingshill House Play Park

2. Highfields Play Park and Field

3. Cambridge Avenue Play Area

4. Land off Hardings Drive

5. Union Street Green

6. Holywell Orchard

Potential Areas for Enhancement1. Old Dairy/Propsect Place/11 May Lane

2. Bus Station

3. Reliance House

4. Cambridge House

¯

Page 17: Dursley Neighbourhood Development Plan 2018 - 2031€¦ · Image credits: p7: ©DDGE/BEXCOPTER.p62-3 Tim Taphouse; Graphic Design by Place Studio Ltd. Thank you Dursley Town Council

Dursley NDP - Oct 201815

Dursley Development Strategy

The overall development strategy and policy framework for Dursley is illustrated in Figure 4.

As part of the Neighbourhood Development plan process, local people have assessed the suitability of a number of sites in Dursley, to supplement Stroud’s Strategic Housing Land Availability Assessment (SHLAA, 2011) and Strategic Assessment of Land Availability (SALA, 2016). These local assessments have been shared with Stroud District Council.

Only a few of the SALA sites are within the settlement boundary, outside of the AONB, and are not proposed as Local Green Spaces, in the Neighbourhood Plan.

Development Context

The current development context is that there is requirement for major development ongoing at the Littlecombe site and support for windfall sites within the

settlement area coming forward for development (focused on previously developed and infill sites).

Sites located outside the settlement boundary, many of which are in the AONB, have been assessed as part of the Neighbourhood Plan process, but such development is not supported at the current time.

As long as development supports the policies within the NDP, together with national and Stroud level policies, development would be supported in principle on brownfield and infill sites.

The following pages include commentary on four potential areas for enhancement within Dursley. These are not site allocations, or part of the development plan. Some are projects and others are potential future development sites, subject to planning applications being made.

This commentary reflects the views of the community gathered as part of the Neighbourhood Plan process, and highlights relevant Neighbourhood Plan policies and projects.

Page 18: Dursley Neighbourhood Development Plan 2018 - 2031€¦ · Image credits: p7: ©DDGE/BEXCOPTER.p62-3 Tim Taphouse; Graphic Design by Place Studio Ltd. Thank you Dursley Town Council

Dursley NDP - Oct 201816

Potential Area for Enhancement 1

Old Dairy, Prospect Place and 11 May Lane

This area consists of land in three ownerships which have been included in the Stroud SALA 2016. Land could come together for re-development as a single proposal, or could be developed in individual parts, within an overall vision.

Community Views and links to NDP policies:

• This area is detrimental to the appearance of the town centre, and has remained semi-derelict for some years. Enhancements to the appearance of this area would be supported in principle. (policy D.1)

• There is potential for mixed uses to be introduced, including employment and residential given close proximity to the town centre (policy TC.1).

May Lane is a key street facing the library, entrances and activity onto this street would be welcomed (policy TC.1)

• Vehicle movement and access is already problematic, there are currently loading areas for shops, as well as access to residential properties, from May Lane. Improvements to the delivery operations of the supermarket loading area as accessed from the private lane would be supported.

• This location has an important Green Infrastructure role which should be retained, with due consideration given to protecting on site ecology (policy NE.1).

• Any new development must reflect the character of the location and sensitivities of the Conservation area and listed buildings (Policy D.1).

• There are major level changes through the site and the impact of any proposals on long views should be assessed (Policy ES.3).

• Pedestrian through access onto Parsonage Street should be retained, but there is scope to improve the route (policy TC.1, Project E).

• • There are a number of

residential and holiday let units in this location, proposals should not be detrimental to residential amenity.

Page 19: Dursley Neighbourhood Development Plan 2018 - 2031€¦ · Image credits: p7: ©DDGE/BEXCOPTER.p62-3 Tim Taphouse; Graphic Design by Place Studio Ltd. Thank you Dursley Town Council

Dursley NDP - Oct 201817

Dursley Bus Station

• Adjoining the library and located near GP surgeries, the leisure centre and the town centre shops and services, the bus station is a key gateway to the town. There is an opportunity for a project to enhance the appearance and use of the Bus Station.

• Community Views and links to NDP policies:

• Improved boundary treatment to the rear of the site which abuts the pub - to better conceal the exposed delivery area would be supported

• Improved seating area and landscaping could improve the experience of using this bus station (Project E)

Potential Area for Enhancement 2

• Opportunities for evening car parking on the site (after the buses finish for the evening) could be explored (policy T.1)

• Opportunities for visitor coach parking, supporting tourism could be achieved (policy T.1; Project E)

• Opportunities for real time information on buses and for a shuttle to Cam & Dursley railway station would be supported (policy T.1; Project E)

Page 20: Dursley Neighbourhood Development Plan 2018 - 2031€¦ · Image credits: p7: ©DDGE/BEXCOPTER.p62-3 Tim Taphouse; Graphic Design by Place Studio Ltd. Thank you Dursley Town Council

Dursley NDP - Oct 201818

Potential Area for Enhancement 3

Reliance House, Long Street

A former newsprint production factory and office premises, with car parking.

This derelict site was purchased by Dursley Town Council in December 2017. A major project is now underway to convert the whole site into a long stay car park for businesses, residents and visitors to the town. It is centrally located and will provide access to the town centre, nearby arts facility, restaurants and takeaways in Long Street. .

Community Views and links to NDP policies:

• There is potential for long-stay car parking at this location. This would be supported (policy T.1)

Page 21: Dursley Neighbourhood Development Plan 2018 - 2031€¦ · Image credits: p7: ©DDGE/BEXCOPTER.p62-3 Tim Taphouse; Graphic Design by Place Studio Ltd. Thank you Dursley Town Council

Dursley NDP - Oct 201819

Cambridge House

Cambridge House currently consists of single storey sheltered accommodation for the vulnerable elderly, comprising 18 small, one bed flats.

As part of the housing stock review by Stroud District Council this site has been identified as no longer fit for purpose. Alternative provision for the elderly in the local area will be sought by Stroud District Council elsewhere.

Community Views and links to NDP policies:

• Residential development of the site should be high quality and support a mix of tenures (policy H.1 and H.2)

Potential Area for Enhancement 4

• A contribution should be made to the Cambridge Avenue Play area opposite the site, to enhance this local green space and support improved natural play (policies NE.1 and SF.2

• Sufficient car parking should be provided (policy T.2)

Page 22: Dursley Neighbourhood Development Plan 2018 - 2031€¦ · Image credits: p7: ©DDGE/BEXCOPTER.p62-3 Tim Taphouse; Graphic Design by Place Studio Ltd. Thank you Dursley Town Council

20

4. Dursley Town Centre

Page 23: Dursley Neighbourhood Development Plan 2018 - 2031€¦ · Image credits: p7: ©DDGE/BEXCOPTER.p62-3 Tim Taphouse; Graphic Design by Place Studio Ltd. Thank you Dursley Town Council

21

Dursley NDP - Oct 2018

Dursley Town Centre

Explanation

The purpose of the Town Centre Public Realm Improvements policy is to support proposals which help deliver the following enhancements to the Town Centre:

• Improved pedestrian links• Improved public spaces,

squares and pocket parks• Widened pavements• Improvements to signage and

street furniture • Heritage trails• Better placement of bus stops• Realise infill development

opportunities• Opportunities to refurbish

existing buildings or improve frontages

Dursley Town Centre has seen a number of improvements in recent years with a new supermarket and the development of the Sports Centre and swimming pool to a full Leisure Centre. We hope to

make future improvements as opportunities arise.

Planning Policy TC1: Town Centre Public Realm Improvements

Within the town centre as shown in Figure 5, development proposals which deliver improvements to the public realm will be supported.

Page 24: Dursley Neighbourhood Development Plan 2018 - 2031€¦ · Image credits: p7: ©DDGE/BEXCOPTER.p62-3 Tim Taphouse; Graphic Design by Place Studio Ltd. Thank you Dursley Town Council

Dursley NDP - Oct 201822

Figure 5: Dursley Town Centre Area (including Character Areas from Dursley Urban Design Framework)

Castle Street

Silver Street

Water Street

May Lane

Parsonage Street

Long Street

South of Parsonage Street to the Slade

Market Place

El

Pool

Broad Well

LB

PC

1

4

7

8

3

5

6

2

GP

PO

PW

PH

TCBESS

ClubHotel

Works

88.7m

77.7m

71.9m

55.2m

68.3m

74.7m

Bank

Car

Liby

Burial

to

Church

Surgery The Slade

Superstore

A4135

Car Park

Clinic

Court

Prospect Place

Bus Station

CLOSE

Cent

re

11

Broa

dwell

Terra

ce

LEGION

Tyndale

24

19

70

55

25

37

41

80

4650

56

20

30

38

48

63

2a

21

28

51

22 14

13

3127

34

12

40

32

6474

82

10

54

17

29

45

18

36

59

47

16

44

23

58

57

68

43

Heritage

St James's

Bank Ho

MAY

LAN

E

Hill C

ourt

SILVER STREETWATER STREET

CASTLE STREET

LONG STREET

Libr

ary

Terra

ce

BOULT

ON LANE

Henlo

w Ho

use

11a

35c

31c

21a

35h

100

37b

31a

19a

2 to 8

6 to

9

8 to 17

House

Crooked Cottage

Cam Peak View

(Defib)

30

2320

1012

30

27

38

24

Club

21

1

38

25

24

Car Park

48

12

ESS

3

40

16

8

13

Club

6

6

1

7

28

1

54

77.7m

20

22

17

4

21

13

LB5

1

14

40

1

4

17

6

10

19

22

PW

19

PC

24

12

ESS

Car Park

20

56

2

Club

7

13

¯

(C) Crown copyright and database rights 2018 Ordnance Survey 100019682

Dursley Town CentreCharacter Areas

1:1,800Scale - 19/09/2018

Page 25: Dursley Neighbourhood Development Plan 2018 - 2031€¦ · Image credits: p7: ©DDGE/BEXCOPTER.p62-3 Tim Taphouse; Graphic Design by Place Studio Ltd. Thank you Dursley Town Council

Dursley NDP - Oct 201823

5.General Planning Policies

Page 26: Dursley Neighbourhood Development Plan 2018 - 2031€¦ · Image credits: p7: ©DDGE/BEXCOPTER.p62-3 Tim Taphouse; Graphic Design by Place Studio Ltd. Thank you Dursley Town Council

Dursley NDP - Oct 201824

General Planning Policies

What is a Planning Policy?

The planning policies included in the Neighbourhood Plan will be used to help determine planning applications within the Dursley Neighbourhood area.

The planning policies will be the subject of an independent examination, followed by a community referendum.

Each planning policy has a unique reference number which can be quoted when comments are made on planning applications, and which will be referred to by planning officers.

These planning policies are shown within a box that looks like this:

Structure of this section

The following pages follow a common structure:

• Introduction to the theme• Table of objectives• Policies• Explanatory text• Maps and Plans• Photo pages

Planning Policy

Page 27: Dursley Neighbourhood Development Plan 2018 - 2031€¦ · Image credits: p7: ©DDGE/BEXCOPTER.p62-3 Tim Taphouse; Graphic Design by Place Studio Ltd. Thank you Dursley Town Council

Dursley NDP - Oct 201825

Environment and Sustainability

Planning Policy

Project KES1

Objectives

Protect Wildlife and Biodiversity

Protect and create green infrastructure corridors that can support the movement of wildlife across Dursley

Project (see section 6)

Project K

Dursley’s environmental setting makes the town attractive for residents and visitors alike.

The town is largely surrounded by ancient woodland on hillsides to the south, west and east borders. This woodland, like the grassed areas nearby, has been designated as an Area of Outstanding Natural Beauty, which requires protection. The woodlands have key wildlife status, and contain wildlife sites: Herimitage Wood, Gravelpits Wood and Dursley Woods. With only 11.5% of the UK covered by trees the woodlands of Dursley are a remarkable natural asset.

Additionally the grasslands along the perimeter are ideal for protected species including amphibians, reptiles and mammals, as identified by Gloucestershire Wildlife Trust.

The remaining borders of the town, which nestle in a narrow

valley, abut agricultural lands. It is important that links in the form of wildlife corridors be maintained between these areas. Retaining and enhancing tree plantation/hedgerows throughout any developments can provide these essential pathways (Dursley Biodiversity & Wildlife Report, 2014).

Dursley forms part of the Cotswold Way and is considered by local people to provide some of the best views along the entire route. The preservation of green spaces and wooded hillsides is key to retaining the town’s attractive vistas.

Preserving the green spaces within the town is also important, whether informal or designated play areas. There is national recognition that green spaces enhance well-being and are beneficial to health (Environment & Green Spaces Report; p5).

Environment & Sustainability theme

Page 28: Dursley Neighbourhood Development Plan 2018 - 2031€¦ · Image credits: p7: ©DDGE/BEXCOPTER.p62-3 Tim Taphouse; Graphic Design by Place Studio Ltd. Thank you Dursley Town Council

Dursley NDP - Oct 201826

The Dursley Environment and Landscape

Page 29: Dursley Neighbourhood Development Plan 2018 - 2031€¦ · Image credits: p7: ©DDGE/BEXCOPTER.p62-3 Tim Taphouse; Graphic Design by Place Studio Ltd. Thank you Dursley Town Council

Dursley NDP - Oct 201827

Environment and Sustainability

The Dursley Landscape Character Assessment 2015, together with the Environment & Green Spaces Report 2014 and the Biodiversity & Wildlife Report 2014 evidence the rich wildlife within the within the Neighbourhood Plan area. While there are strong protective policies within the Stroud Local Plan, there is an opportunity to highlight the existing green links through the town, and protect the surrounding countryside.

The Dursley NDP Report on Wildlife and Biodiversity further identifies green infrastructure connectivity of significance within Dursley and has informed the mapping of the Green Infrastructure corridors.

Gloucestershire Wildlife Trust has provided mapping to support this new local Green Infrastructure project, which is based on a synthesis of local environmental evidence (Figure 6).

The Littlecombe Masterplan includes green infrastructure corridors that link from the town into the wider countryside. These should be retained and enhanced in the future (see Figure 7).

Page 30: Dursley Neighbourhood Development Plan 2018 - 2031€¦ · Image credits: p7: ©DDGE/BEXCOPTER.p62-3 Tim Taphouse; Graphic Design by Place Studio Ltd. Thank you Dursley Town Council

Dursley NDP - Oct 201828

Environment and SustainabilityFigure 6: Dursley Green Infrastructure Map

Page 31: Dursley Neighbourhood Development Plan 2018 - 2031€¦ · Image credits: p7: ©DDGE/BEXCOPTER.p62-3 Tim Taphouse; Graphic Design by Place Studio Ltd. Thank you Dursley Town Council

Dursley NDP - Oct 201829

Sp

Sp

Sp

BH

BH

BH

BH

Sap S

ap Sap

J1

J2

J3

J4

J5

J6

J7

GH

2

GH

1

J8

J9

Issu

es

Leap

16

18

Sta

Man

se

KINGSHILL

24

33

26

Path (um)

Hos

pita

l

3

17

El S

ub S

ta

Che

stal

Lod

ge

(Car

e C

entre

)

CLOSE

19

Swim

min

g

Hotel

40

Fells

wic

k

55

Supe

rsto

re

Cou

rts

WIN

DSO

R R

OA

D

24

Ban

k

A 4135

19a

43

The

FB

10

ALEXANDRA CLOSE

Path

(um)

SPRINGHIL

L

27

2

Wei

r

Park

3

Cam

Hou

se

Res

ervo

ir (c

over

ed)

30

15a

6

54

Gam

es

25

20

23

7

Path

(um

)

20

7

Hill

Squ

are 9

12

8

Hom

e Fa

rm

1 to 4

REDNOCK D

RIVE

27

Clinic

4

Clu

b

ESS

1

27

56

13

57

35c

7a

35b

SPRIN

GHILL

Cam

5

13

28

Cottage

19

35

34

12

20

1

32

Tank

Littlecombe Business Park

The

Hol

lies

1

221

a

1

21

Cou

rts

2

48

17TC

B

11 to

17

ESS

1 to 7

18

23

Stable

11

12

22b

Chu

rch

24

29

El S

ub S

ta

or OLD COURT

Com

mun

ity

CH

ESTA

L

Track Path (um)

Sprin

g

Filte

r Bed

ETL

PRIORY

1

Tenn

is

23

19

1a

THE KNAPP

12

63

41

45

1 to 10

1

13

Path (u

m)

22

15

26

Path (um)

16

30

LISTER ROAD

The

Tow

ers

Sprin

g

18

Pool

25

Post

s

1

6

18

20

21

Path

(um

)

22a

84

30

Terr

esto

n

3

1

19

3

8

Tow

nsen

d

Dra

in

Scho

ol

Sink

s ETL

5

1

33

Cro

oked

Cot

tage

25

Foot

ball

Pitc

h

35a

Car

Par

k

The

Prio

ry

35d

Pede

rsen C

l

1 to 12

15

FB

Play

grou

nd

20a

13

2825

4

Val

e

Car

Littl

ecom

be P

ark

11

19

PW

7

30

38

ElSu

b St

a

ESS

21

22

Rec

reat

ion

Gro

und

31

PW

7

21

El S

ub S

ta

VICTORIA CLOSE

8 to

17

LIST

ER R

OA

D

LIST

ER R

OA

D

LANE

KINGSH

ILL

LANE

Tree

10m

Tree

12m

MH

MH

MH

MH

MH

MH

MH

MH

GU

GU

GU

GU

SPSP

LP

LP

LP

TP

EPEP

EP

BT

BT

CO

CO

CO

EC

GAS

GAS

GAS

SV

SV

SV SV

WM

BS

bol

bol

bol

bol

bol

bol

bol

bol

bol

bol

bol

TL

96.22

95.57

94.13

92.27

92.50

62.12

59.20

70.53

70.90

70.62

70.12

69.87

69.11

69.45

69.55

70.20

69.03

70.12

63.32

63.21

63.25

70.05

70.45

70.85

73.69

73.53

73.70

73.62

73.97

73.89

73.73

73.34

73.26

73.25

73.25

73.37

73.85

73.77

73.64

73.59

73.77

73.83

73.80

73.88

73.58

73.79

73.74

73.68

73.61

73.49

73.32

73.21

73.37

73.54

74.09

72.75

72.86

72.82

72.80

72.96

73.35

73.72

73.93

74.17

74.30

74.38

74.68

74.34

74.28

74.41

74.16

74.58

75.01

74.70

75.64

74.91

75.10

74.96

74.85

74.48

74.18

73.88

73.91

74.08

74.27

74.08

73.88

73.68

73.59

73.35

73.18

73.07

73.28

73.56

73.56

73.48

73.74

74.02

74.24

73.98

73.69

73.36

74.53

72.13

74.45

74.45

74.32

74.09

SCR

UB

SCR

UB

RES

ERVO

IR

SHR

UBS

SHR

UBS

SHR

UBS

GR

ASS

GR

ASS

STE

PS

PA

VIL

LIO

N

PAVI

LLIO

N

PAVI

LLIO

N

TOIL

ETS

BOW

LIN

GG

REEN

PAVI

NG

BEDS

BEDS

GRA

VEL

STEP

S

GRA

SS

DR

AKE

LAN

E

SHR

UBS

SHR

UBS

SCR

UB

SCR

UB

TAN

KS

PRIN

TW

ORKS

LONG

STR

EET

SUB

STAT

ION

GR

ASS

CA

ST

LE S

TR

EE

T (

A 4

135)

TO

ILE

TS

CA

R P

AR

K

CAR

PAR

K

SCR

UB

WO

ODL

AND

1.8m high stone wall

09 091010

Affo

rdab

leA

fford

able

Affo

rdab

le

Affordable

Affordable

Affo

rdab

le

Affo

rdab

le

Affo

rdab

le

Affo

rdab

leAf

ford

able

Affo

rdab

le

Afford

able

Afford

able

Affordable

Affordable

Affo

rdab

le

Affo

rdab

le

Affo

rdab

le

1:5

1:5

1:21

1:21

1:28

N

NEAP13 no. 1B/2P

Flats

9 no. 1B/2P

Flats

5B5B

5B5B

5B

4B

4B4B

4B4B

4B

4B

4B

4B

4B

4B

4B4B4B4B

4B4B

4B4B

3B

3B

3B 3B

3B

3B

3B

3B

3B

3B 3B 3B3B

3B3B

3B

3B

2B2B

2B 2B 2B 3B 3B

2B 2B

2B

2B2B

2B

2B

2B

2B

2B2B

2B2B

2B

2B2B

2B2B

2B2B

2B2B

River access strip

Proposed Footpath

River access strip

Nett Developable

Area

3B3B

3B3B

3B

3B

3B

3B

5B

5B

2B

2B

2B 2B

2B2B

2B2B

4B4B

4B4B4B4B

14no. 1B/2P

Flats

3B

4B

5B

5B

2B2B

4B 4B 4B

2B 2B 2B 2B

3B

5B

3B

3B

3B3B

2B2B

2B2B

2B2B2B

2B

9 no. 1B/2P

Flats

5B3B 3B 3B 3B 3B 3B 3B 3B

3B

4B4B

4B4B

4B4B

3B

3B

3B

3B

3B

3B

3B

3B

3B

3B

3B

3B

3B

LAP

3B 2B2B

2B

3B

10

50

100

0

Metres at scale 1:100020

3040

This drawing, the works and concepts depicted are copyright of Stephen George & Partners and may not be reproduced or made use of, either directly or indirectly without express written consent. Do not scale off this drawing. All heights, levels, sizes and dimensions to be checked on site before any work is put to hand.

Ref: P oo5

Dursley, Littlecombe

Indicative Masterplan

PLANNING

7101-007P004b

t.l

I.Y

o7.2o14

1:1500 at A1

7101-007 P oo4 G

Drawing status:

CAD reference:

Drawn:

Team:

Date:

Scale:

Project no: Rev:Dwg no:

170 London RoadLeicester LE2 1ND

t: 0116 247 0557 f: 0116 254 1095

www.stephengeorge.co.uk

Notes:

To be read in conjunction with relevant consultantsdrawings.

Revision:

A t.l 31.o7.2o14zone K2/ extra care facility layouts added.B IY 09.12.2014Layout updated.C IY 15.12.2014Layout updated to Strouds comments.D t.l 12.01.2015Layout updated to revised site contours.E t.l o2.o2.2o15Layout updated to revised delkin position.F t.l o9.o2.2o15Minor increase to application boundary. K2 unit no.'samended to 58 no.G t.l 12.o2.2o15Zone K1 layout/ boundary updated/ Additionalreferences added.

Accommodation Schedule

Zone A1 +A274no. dwellings

Zone B

Zone C183no. dwellings

Zone F17no. dwellings

Zone K194no. dwellings

Zone K258no. dwellings

Total: 426no.

high quality/ value

moderate quality/ value

low quality/ value

little/ no value

Tree Condition Key

Zone A1

Zone A2

Zone A3

Zone B

Zone K2

Zone C

Zone F

Figure 7: St Modwen Development Masterplan for Littlecombe (2016) highlighting the key role of Green Infrastructure within the most recent phase of Dursley’s development

Environment and Sustainability

Page 32: Dursley Neighbourhood Development Plan 2018 - 2031€¦ · Image credits: p7: ©DDGE/BEXCOPTER.p62-3 Tim Taphouse; Graphic Design by Place Studio Ltd. Thank you Dursley Town Council

Dursley NDP - Oct 201831

(C) Crown copyright and database rights 2017 Ordnance Survey 100019682

Future Dursley NDP – Ancient Woodland1:10,000Scale - 10/04/2017

0 410 820205 Meters

Dursley parish bounbary

Ancient Woodland

¯

Figure 8: Dursley’s Ancient Woodlands

Environment and Sustainability

Page 33: Dursley Neighbourhood Development Plan 2018 - 2031€¦ · Image credits: p7: ©DDGE/BEXCOPTER.p62-3 Tim Taphouse; Graphic Design by Place Studio Ltd. Thank you Dursley Town Council

Dursley NDP - Oct 201832

Environment and Sustainability

Planning Policy ES1: Ancient Woodlands

Development resulting in loss or deterioration of irreplaceable habitats including Dursley’s Ancient Woodlands (as shown in Figure 8) and aged or veteran trees found outside ancient woodland, will not be supported, unless the need for, and benefits of, the development in that location clearly outweigh the loss.

Explanation

The Ancient Woodlands that surround Dursley are an important part of the character of the town and they provide a stunning wooded backdrop and access to woodland walks.

Although there is existing Stroud Local Plan protection in policy ES8 Trees, Hedgerows and Woodland, this policy adds local emphasis and supplements Stroud’s policy. The policy reflects national planning policy wording in para 175 of the National Planning Policy Framework.

The extent of the ancient woodland is shown in Figure 8, which highlights how the woodlands frame the settlement to the south and west.

Explanation

The landscape setting and views are an important part of the character and charm of Dursley. The Plan aims to protect the high quality views and landscape character of the Town.

This policy draws on the detailed Dursley Landscape Character Assessment 2015 completed as evidence to the Neighbourhood Plan. It is at a more detailed resolution than evidence completed for Stroud District Council. This policy will ensure that the visual impact of development proposals on views and landscape character is fully considered in the planning process.

This is particularly significant as much of Dursley is surrounded by the nationally designated Cotswolds Area of Outstanding Natural Beauty (see Figure 10).

Policy ES2: Key Views and Landscape

Planning applications proposing development which is ofa scale that could impact on thesurrounding landscape should demonstrate how the proposal enhances and protects the Cotswold Area of Outstanding Natural Beauty.

Development should respond sensitively to the key views and landscape character of Dursley, as identified in the Dursley Landscape Character Assessment, as summarised in Figure 9.

Views to the surrounding hills, from the town and roads, key landmarks and focal buildings should be retained.

Views to the wooded and grassed slopes and distinctive hills surrounding the town should be retained.

Page 34: Dursley Neighbourhood Development Plan 2018 - 2031€¦ · Image credits: p7: ©DDGE/BEXCOPTER.p62-3 Tim Taphouse; Graphic Design by Place Studio Ltd. Thank you Dursley Town Council

Dursley NDP - Oct 201833

Figure 9: Dursley Landscape Character Assessment (2015). Extract Identifying Important Landscape Features and Key Views

Page 35: Dursley Neighbourhood Development Plan 2018 - 2031€¦ · Image credits: p7: ©DDGE/BEXCOPTER.p62-3 Tim Taphouse; Graphic Design by Place Studio Ltd. Thank you Dursley Town Council

Dursley NDP - Oct 201834

(C) Crown copyright and database rights 2017 Ordnance Survey 100019682

Future Dursley NDP – AONB1:10,000Scale - 10/04/2017

0 410 820205 Meters

Dursley parish bounbary

Cotswold AONB

¯

Figure 10: Dursley Area of Outstanding Natural Beauty and Parish Boundary

Environment and Sustainability

Page 36: Dursley Neighbourhood Development Plan 2018 - 2031€¦ · Image credits: p7: ©DDGE/BEXCOPTER.p62-3 Tim Taphouse; Graphic Design by Place Studio Ltd. Thank you Dursley Town Council

Dursley NDP - Oct 201835

Housing

Dursley’s housing reflects its past history. There are over fifty listed buildings in and around the town centre dating from the 17th, 18th and 19th centuries, although settlement has existed since the medieval period.

The significant rise in industrialization throughout the 19th and 20th centuries saw an expansion in housing stock common in style to the period of build with a notable rise in 1930s style housing both detached, semi-detached and terrace. Each subsequent decade is reflected in the architecture of the town right up to the present day. Modern co-exists with old, however the height of buildings does not as a rule exceed three stories in order to preserve the landscape character of the town.

With the withdrawal of three major industrial employers the extensive sites have been used for housing. This has led to an influx of newcomers to the town from surrounding cities of Bristol, Bath,

Gloucester and Cheltenham, largely due to the affordability of properties, the scenic setting of the town and the establishment of rail transport links to these major employment providing centres.

In common with national trends, there is a perceieved demand for affordable family housing stock whether privately owned or rented (GRCC Dursley Housing Report, 2015). Over the past decade Dursley has seen a rise in house building with the provision of about a thousand new homes as industrial sites have been reconfigured.

Due to the town’s landscape constraints it is unlikely that further large scale development will be possible, however, the development of sites within the settlement boundary will still be open to consideration. - such as those identified in the NDP development strategy as potential areas for enhancement.

Planning Policy

n/aH1

Objectives

Support a range of housing to maintain our mixed community (single, starter homes, growing families and life-time homes including affordable housing)

Identify suitable opportunities which would support a range of housing (including self-build, affordable housing and housing for older people)

Project (see section 6)

n/aH2

Housing theme

Page 37: Dursley Neighbourhood Development Plan 2018 - 2031€¦ · Image credits: p7: ©DDGE/BEXCOPTER.p62-3 Tim Taphouse; Graphic Design by Place Studio Ltd. Thank you Dursley Town Council

Dursley NDP - Oct 201836

Housing Some examples of Dursley’s housing

Page 38: Dursley Neighbourhood Development Plan 2018 - 2031€¦ · Image credits: p7: ©DDGE/BEXCOPTER.p62-3 Tim Taphouse; Graphic Design by Place Studio Ltd. Thank you Dursley Town Council

Dursley NDP - Oct 201837

Housing

Planning Policy H1: Housing Development

The Neighbourhood Plan supports the development of a range of housing to maintain and meet the future needs of Dursley’s diverse community.

The Neighbourhood Plan supports the development of sites within the settlement boundary as defined in the Dursley Development Strategy, where:

i. Development has regard to the character and quality of the surrounding townscape; and

ii. New development reflects the form, pattern and grain of the existing development which contributes positively to the character of the town or otherwise high quality design which enhances local character.

Explanation

The Housing need for Dursley is being met by a combination of large scale development (Littlecombe) and a range of smaller infill and brownfield sites within the settlement boundary, as summarised in the Development Strategy and Town Centre sections of this plan.

Explanation

Dursley Town Council will continue to work with applicants to ensure high quality development is supported.The provision of high quality housing, that supports a mixed community in terms of tenure, and age profile is a key aim of the Plan.

Innovative models of housing such as starter homes, community land trusts and self-build are some of the methods of delivery that the Neighbourhood Plan would like to support, while always ensuring that design quality is high.

In addition adequate parking spaces for new housing is a common concern for local people.

Planning Policy H2: Housing Quality

Planning Applications that will deliver housing that achieves high qualities of design performance including Secure By Design Standards and high standards of energy efficiency and sustainable construction will be particularly supported and encouraged.

Page 39: Dursley Neighbourhood Development Plan 2018 - 2031€¦ · Image credits: p7: ©DDGE/BEXCOPTER.p62-3 Tim Taphouse; Graphic Design by Place Studio Ltd. Thank you Dursley Town Council

Dursley NDP - Oct 201838

Economy

The economic focus of Dursley has changed significantly in recent years, as established manufacturing companies have withdrawn from the town and agricultural activity has reduced.

The accompanying reduction in local skilled employment opportunities within the town has contributed to the demise of shops and businesses that were dependent on local support.

Nonetheless, Dursley has been fortunate to retain a small number of local traders which co-exist with the recently-established supermarket.

The town also hosts several specialist shops which although carrying out the majority of their trade through the internet also attract visitors to the town. A variety of small businesses, many of which operate from home offices, provide local and national services associated with

manufacture and design, transport and financial services.

The NDP recognises that developing new businesses to start-up and grow, whilst ensuring that established local businesses are able to thrive, is one of the key measures to help restore a healthy local economy.

A combination of policies and projects is proposed to support the Local Economy. Evidence for these policies is provided in the Dursley Neighbourhood Plan Economic Development Analysis (2016).

It is noted that in some cases permitted development rights will mean that planning permission is not always required, for change of use, however it is intended that the policies will be applied where a planning application is needed.

Planning Policy

n/a

n/a

B

E1

E3

E4

Economy Objectives

Support the Local Economy

Encourage New Start-Up Businesses

Retain town centre retail offer and provision

Support change of use from existing properties to hotel and guesthouses

Support local tourism and a new Tourist Information Centre

Safeguard existing employment sites and support viable mixed use development

Project (see section 6)

A

n/a

C

E2

E4

n/a

Economy theme

Page 40: Dursley Neighbourhood Development Plan 2018 - 2031€¦ · Image credits: p7: ©DDGE/BEXCOPTER.p62-3 Tim Taphouse; Graphic Design by Place Studio Ltd. Thank you Dursley Town Council

Dursley NDP - Oct 201839

Economy

Planning Policy E1: Safeguarding Employment Sites

Changes of use of existng business premises away from employment activity will be supported where:

i. it can be demonstrated that the existing use is no longer economically viable i.e. that the site has been appropriately marketed at a reasonable price for at least one year for that or any other suitable employment or service trade use; or

ii. The site is allocated as part of a mixed use development.

Explanation

Dursley has experienced significant reductions in the level of employment over the last five years, and has also seen a reduction in the total number of businesses, with manufacturing and education seeing the most dramatic losses.

There is a range of economic development policies contained in the Stroud local plan, the most directly relevant is DP EI1 – Key Employment sites. This states that “key employment sites listed will be retained for B Class Uses. Redevelopment for alternative uses or changes of use from employment use will not be permitted on these sites.” EK6 Littlecombe business park is identified as a key site, and is granted a great degree of protection from changes of use to non ‘B’ class uses (office, light industrial, industrial and warehouse and storage).’

Planning Policy E2: Encourage Start up and New Businesses

The provision of local employment, the expansion of Dursley’s small employers and the establishment of new start-up businesses will be supported in principle, subject to an assessment of the impact of the proposals on:

i. residential amenity; and

ii. the transport network and parking conditions; and

iii. biodiversity and the environment.

Proposals will be expected to be supported by proportionate and appropriate information to enable an assessment of these impacts to be undertaken.

Page 41: Dursley Neighbourhood Development Plan 2018 - 2031€¦ · Image credits: p7: ©DDGE/BEXCOPTER.p62-3 Tim Taphouse; Graphic Design by Place Studio Ltd. Thank you Dursley Town Council

Dursley NDP - Oct 201840

EconomySome of Dursley’s businesses

Page 42: Dursley Neighbourhood Development Plan 2018 - 2031€¦ · Image credits: p7: ©DDGE/BEXCOPTER.p62-3 Tim Taphouse; Graphic Design by Place Studio Ltd. Thank you Dursley Town Council

Dursley NDP - Oct 201841

Economy

Explanation

Local economic development policy at the Local Enterprise Partnership level recognises the need to focus on business growth with the ‘Growth Hub’ service and the Stroud District jobs and growth plan providing a further recognition for the need to focus on new business start up and the growth of existing companies.

Small businesses are the most significant sector within Dursley. Enabling their creation and expansion builds upon the economic trend evidence.

The focus on manufacturing, retail and tourism reflects community feedback and local economic analysis.

The Dursley Neighbourhood Development Plan Economic Development Analysis 2016 is included in the NDP evidence base.

Planning Policy E3: Town Centre

Proposals which seeks to maintain and enhance the vitality and viability of Dursley Town Centre, as shown on Figure 6, will be supported. As will proposals that support the existing range of uses and new uses such as local markets.

Development that widens the range of existing town centre uses including encouraging convenient and accessible shopping, services and employment facilities to meet the day to day needs to residents will be seen favourably.

Explanation

This policy reflects and reinforces Stroud Local Plan Policy.

Dursley’s function as a local centre and the importance of its retail offer is recognised with the following Stroud Local Plan policies:

CP12. A. Town centre retail uses will be allocated through a hierarchy where Stroud is the ‘primary’ town centre and will be given priority and Dursley is considered to be an ‘other’ town centre and will be considered secondarily after Stroud.

CP12.C .Provides policy for the provision of local centres that are not in easy walking distance of existing shops and services, but will need to be appropriate to the site so as not to draw away from exisiting provision.

CP12.D. ‘Other’ retail uses which include leisure, cultural and tourists uses will again be

considered in the hierachy below Stroud as long as they:

• are of a scale and nature that is appropriate to the size and function of the centre and

• would not lead to unsustainable trip generation from outside their catchments.

Page 43: Dursley Neighbourhood Development Plan 2018 - 2031€¦ · Image credits: p7: ©DDGE/BEXCOPTER.p62-3 Tim Taphouse; Graphic Design by Place Studio Ltd. Thank you Dursley Town Council

Dursley NDP - Oct 201842

Economy

Planning Policy E4: Visitor Accommodation

Proposals to convert existing properties in Dursley to hotel/guesthouse accommodation will be supported where the use and any associated development causes no adverse impact on existing residential amenity.

Explanation

This policy seeks to support the growth of tourism in Dursley, and the benefits to the local economy that this would bring.

Additional visitor accommodation would support the tourism and leisure industry and encourage visitors to stay longer. There is no readily available site for a hotel, so smaller scale hotels and guesthouses are encouraged in its place.

Page 44: Dursley Neighbourhood Development Plan 2018 - 2031€¦ · Image credits: p7: ©DDGE/BEXCOPTER.p62-3 Tim Taphouse; Graphic Design by Place Studio Ltd. Thank you Dursley Town Council

Dursley NDP - Oct 201843

Character & Design

A traditional and historic market town, Dursley features much 20th century development which has not always contributed positively to the town.

Dursley has a wide range of building styles from recognisably medieval to very modern. Each stage of the town’s growth is represented by the development of new styles to meet the evolving needs of residents. The photographs in the Neighbourhood Plan show changes in building character through the ages.

A variety of building materials has been used, the most common being locally quarried limestone and red brick, probably sourced from the works in Stonehouse, a few miles away. Render has been used as well as timber as an external design feature.

There are modest terraces of small cottages that front directly on to the street and other larger dwellings with altogether grander facades from the 18th century. Above street level in the town centre, there are interesting first floor windows and roof lines.

More recent developments have had a mixed reception from Dursley residents: the blocks of red brick apartments on Lister Road have not found approval, while the range of styles, sizes and materials on the old factory site on Uley Road are widely admired (Dursley NDP Consultation Report 2018).

The modern, glass fronted library has split opinion showing that while some residents are naturally conservative in their tastes, others will embrace innovation.

Planning Policy

I/JD1

Economy Objectives

Ensure that the design of new developments and re-developments reflects and fits the distinctive character of Dursley.

Project (see section 6)

Design theme

Page 45: Dursley Neighbourhood Development Plan 2018 - 2031€¦ · Image credits: p7: ©DDGE/BEXCOPTER.p62-3 Tim Taphouse; Graphic Design by Place Studio Ltd. Thank you Dursley Town Council

Dursley NDP - Oct 201844

Characteristics of Dursley’s Built and Natural Environment

Character & Design

Page 46: Dursley Neighbourhood Development Plan 2018 - 2031€¦ · Image credits: p7: ©DDGE/BEXCOPTER.p62-3 Tim Taphouse; Graphic Design by Place Studio Ltd. Thank you Dursley Town Council

Dursley NDP - Oct 201845

Character and Design

Planning Policy D1: Character and Design

New development and re-development within Dursley should reflect the positive characteristics of the place and must be locally distinctive.

Within each of the Dursley Landscape and Town Character Areas identified - shown in Figure 11 - planning applications should respond to positive characteristics described in the local evidence.

Within Dursley Town Centre development should respond to the positive characteristics of the Town Centre Character Areas - shown in Figure 5.

Development should protect and enhance Dursley’s historic assets including the Town Centre and Woodmancote Conservation Areas, Listed Buildings and the Scheduled Ancient Monument (as shown in Figure 12).

Explanation

Dursley Town Council has undertaken character assessment work in the form of the Dursley Landscape Character Assessment, 2015 and the Dursley Urban Design Framework, 2007, the latter being supported by Stroud District Council. Once made, the NDP policies will be supported by an evidence base.

The Dursley Urban Design Framework, 2007 established 8 character areas in the Town Centre, outlining the key traits and attributes of these areas and proposing areas for improvement in terms of development opportunities and public realm enhancements.

The Dursley Landscape Character Assessment 2015, includes both a settlement characterisation and a more in depth landscape character assessment. It follows a landscape sensitivity approach,

highlighting areas unlikely to be suitable for development and describing the landscape characteristics of each area. It adds additional detail to the broad landscape characterisation undertaken by Stroud District Council.

Page 47: Dursley Neighbourhood Development Plan 2018 - 2031€¦ · Image credits: p7: ©DDGE/BEXCOPTER.p62-3 Tim Taphouse; Graphic Design by Place Studio Ltd. Thank you Dursley Town Council

Dursley NDP - Oct 201846

Figure 11: Dursley Local Landscape Character Areas

Character and Design

Page 48: Dursley Neighbourhood Development Plan 2018 - 2031€¦ · Image credits: p7: ©DDGE/BEXCOPTER.p62-3 Tim Taphouse; Graphic Design by Place Studio Ltd. Thank you Dursley Town Council

Dursley NDP - Oct 201847

Figure 12: Historic Assets in Dursley

Character and Design

Page 49: Dursley Neighbourhood Development Plan 2018 - 2031€¦ · Image credits: p7: ©DDGE/BEXCOPTER.p62-3 Tim Taphouse; Graphic Design by Place Studio Ltd. Thank you Dursley Town Council

Dursley NDP - Oct 201848

Services and Facilities

Dursley has an excellent range of community facilities and services. The local population and surrounding villages have access to a good choice of health, leisure and well-being amenities in the town.

Residents are provided with services they may need at all stages of life. A children’s centre offers pre-school childcare and is situated on the same large site as the town’s primary school. Secondary education, up to the age of 18, is delivered to students at the recently built secondary school.

Health and medical services are available at the Doctors Surgery (which incorporates two practices) and the Vale Community Hospital which opened in 2011. A library, swimming pool and new gym and dance studio contribute to the well-being of the local community.

Further valuable services are available to residents due to the substantial contribution

from volunteers who run toddler groups, a family café, lunch clubs, the day centre and other local clubs. Many of these are run from the numerous public meeting spaces in Dursley, some of which are under-used and others would benefit from being upgraded.

A survey of different types of outdoor play spaces within the Parish revealed that the provision of play spaces is insufficient for the population size, with the overall play space provision being 30% lower than the national guideline requirement (Dursley Outdoor Play Space Survey – Revised September 2016).

Comments made by residents during consultation on the NDP have confirmed that residents are appreciative of the wealth of local services and facilities. They would like to ensure that these continue to meet the future needs for Dursley’s growing population (NDP Consultation Report).

Planning Policy

D

n/a

n/a

n/a

SF1

SF2

Objectives

Increase the provision of green space including allotments

Improve and protect the existing community facilities and assets

Protect local green spaces within Dursley from development.

Project (see section 6)

Community Facilit ies

Page 50: Dursley Neighbourhood Development Plan 2018 - 2031€¦ · Image credits: p7: ©DDGE/BEXCOPTER.p62-3 Tim Taphouse; Graphic Design by Place Studio Ltd. Thank you Dursley Town Council

Dursley NDP - Oct 201849

Services and Facilities

Planning Policy SF1: Community Facilities

Development which involves the loss of the following community facilities (also identified in Figure 13) will not be supported unless, the criteria below are satisfied:

i. there is no prospect of continued community use (which is evidenced; and

ii. there are adequate similar use facilities within Dursley or adjoining areas which cater for the needs of the local population and they are accessible by walking or cycling (within 800m); and

iii. the current or previous use is no longer viable demonstrated by audited financial and marketing evidence over an agreed reasonable period.

Community Facilities:1. Allotments behind DursleyCemetery

2. Library, May Lane3. Archway Dental PracticeParsonage Lane4. Castlegate Dental PracticeParsonage Lane5. Walnut Medical Practice, May Lane6. Acorn Medical Practice, May Lane7. The Vale Community Hospital8. Chantry Centre, Long Street9. Kingshill House, Kingshill Lane10. Town Hall, Market Place11. Community Centre, Rednock Drive12. Methodist Church Rooms, Castle Street13. The Vibe Youth Centre, Parsonage Street14. The Tabernacle Church, Parsonage Street15. Acacia Drive Play Park16. Maple Close Play Area17. The Mill Ponds Play Area, Riversmill18. Jehovah’s Witness, Kingshill Road19. Dursley Tabernacle United Reform Church,Parsonage St- Dominic’s Presbytery Catholic

20. Dominic’s Presbytery Catholic Church, Jubilee Road Dursley21. Methodist Church, Castle Street22. St James the Great C of E Church, Silver Street23. St Marks C of E Church, Woodmancote24. Dursley Police Station, Kingshill Road25. Dursley Academy Primary School26. Rednock Secondary School27. Post Office, Parsonage Street28. Dursley Sports CentreRednock Drive29. The Pulse, Gym, Pool and Studio30. Kingshill Cemetery

Page 51: Dursley Neighbourhood Development Plan 2018 - 2031€¦ · Image credits: p7: ©DDGE/BEXCOPTER.p62-3 Tim Taphouse; Graphic Design by Place Studio Ltd. Thank you Dursley Town Council

Dursley NDP - Oct 201850

Explanation

While the Stroud Local Plan includes policies to protect community facilities it does not specify what these are within Dursley. This policy supplements the Stroud Local Plan by identifying the key local facilities and services. In practice there are sometimes permitted development rights that allow changes of use without planning permission, however, this policy applies where planning permission is needed.

Parish Plan responses in 2012 provides evidence of the importance of retaining a good range of services and facilities to local residents. This research also identified that access to facilities and services in Dursley is good, above County average (Dursley Facilities and Services Research, 2014; Dursley Infrastructure Information Report, 2014).

Figure 14 highlights outdoor play space protected by the Stroud Local Plan.

Page 52: Dursley Neighbourhood Development Plan 2018 - 2031€¦ · Image credits: p7: ©DDGE/BEXCOPTER.p62-3 Tim Taphouse; Graphic Design by Place Studio Ltd. Thank you Dursley Town Council

Dursley NDP - Oct 201851

Figure 13: Community Facilities in Dursley

Services and Facilities

") ")#

#

GGG

G

XY

XYXY

XY

XY

XY

"/

XY

"/

"/

"/!(

"/

"/

"/

"/

"/

!(

!(

!(

!(

!(

&:

!(

!(

$+!(!(

!(

!(!(

!(

XY

G

XY

XY

DURSLEY

Woodmancote

R

O

R

C

M

A

C

K

R

C

E

T

R

A

T

V

I

I

K

W

E

G

E

I

E

R

T

C

T

D

I

I

S

D

R

A

W

G

U

V

I

T

A

U

E

K

O

L

D

L

E

D

G

O

C

S

S

D

E

L

S

S

T

C

N

W

T

D

A

U

R

E

V

N

D

R

N

B

B

E

S

P

R

A

L

S

A

G

N

C

L

S

O

O

L

S

D

E

U

A

L

V

A

H C

K

L

E

R

H

B

R

E

E

SW

N

V

L

L

L

G

E

N

O

R

H

I

R

A

E

D

E

L

E

L

A

D

S

D

E

O

E

E

I

R

I

T

S

KA

E

O

S

A

S

O

T

D

O

R

E

I

L

L

V

L

L R

I

A

E

E

G

Y

E

L

A

R

P

O

K

N

Y

A

N

E

D

N

O

M

HR

Y

A

E

R

A

P

L

F

A

N

A

A

D

O

N

O

U

D

R

L

P

S

A

B

C

E

R

I

O

O

E

I

N

E

E

R

U

E

C

L

L

E

Y

E

R

M

R

S

H

DR

L

R

N

I

V

W

I

F

T

P

N

K

H

F

R

I

H

M

O

D

K

C

D

R

C

R

I

C

E

L

V

R

E

H

X

U

N

V

I

G

E

E

O

L

T

V

R

L

G

L

F

R

C

G

S

O

T

I

W

H

H

A

O

L

R

'

A

Y

E

T

E

R

D

E

S

A

L

I

V

W

A

S

O

H

T

M

N

E

E

N

A

D

L

E

U

E

H

L

A

I

W

L

I

N

O

O

E

A

A

N

C

G

C

A

E

V

C

G

I

R

A

G

I

N

N

'

D

G

L

SB

E

R

P

D

H

O

E

A

A

T

L

V

D

N

E

S

K

R

U

D

A

A

I

S

'

O

C

D

C

S

V

A

E

O

S

R

N

T

I

N

I

E

D

E

G

R

L

D

I

N

S

I

L

S

L

R

DE

V

A

R

S

H

N

U

Y

W

A

U

M

I

O

DE

M

T

M

R

V

S

T

T

A

U

T

I

S

O

S

P

I

P

A

N

E

N

N

B

K

E

U

I

B

P

P

A

E

B

P

R

E

H

H

E

I

V

R

O

N

R

E

D

G

T

Y

L

S

E

D

S

K

A

D

G

A

T

O

D

V

W

F

E

A

Y

H

E

S

LI

G

R

H

N

E

E

V

DL

E

H

E

F

R

E

I

Y

O

V

H

A

G

D

B

L

D

R

L

R

E

D

K

T

L

A

A

C

S

E

B

D

T

E

A

N

M

N

W

S

A

R

I

R

W

C

P

O

E

I

E

N

N

E

O

H

E

O

I

I

N

N

T

C

J

L

S

T

S

E

T

L

E

I

A

D

C

D

E

A

U

T

D

Y

L

E

N

L

L

E

A

EE

W

A

S

D

C

A

WT

R

O

E

Y

Y

C

R

E

O

P

A

O

T

C

B

W

L

S

E

D

S

H

U

U

W

G

K

D

R

E

R

L

B

H

R

S

H

S

R

I

L

T

G

O

L

C

L

IM

D

E

E

R

R

O

E

V

L

B

V

F

A

L

E

AO

H

W

R

R

E

O

S

T

O

N

N

P

N

R

I

K

E

U

E

E

O

D

E

V

E

U

T

G

R

E

TK

A

L

L

S

V

E

S

S

R

A

R

D

B

S

H

E

R

E

E

DURSLEY

Woodmancote

¯

(C) Crown copyright and database rights 2018 Ordnance Survey 100019682

Dursley Neighbourhood community facilities1:6,000Scale - 14/09/2018

0 240 480120 Meters

") Allotments

") Library

# Dental practices

G Kingshill Cemetery

G Medical Facilities

XY Meeting Space

"/ Outdoor Play Space

!( Places of Worship

&: Police Station

$+ Post Office

!( Schools

!( Sports Facilities

Page 53: Dursley Neighbourhood Development Plan 2018 - 2031€¦ · Image credits: p7: ©DDGE/BEXCOPTER.p62-3 Tim Taphouse; Graphic Design by Place Studio Ltd. Thank you Dursley Town Council

Dursley NDP - Oct 201852

(C) Crown copyright and database rights 2017 Ordnance Survey 100019682

Protected Outdoor Playspace and TPO Areas

31/03/20170 250 500125 Meters

Protected oudoor playspace

Settlement Development Limits

Cotswold AONB

Dursley Parish

TPO Areas

¯

Figure 14: Protected Outdoor Playspace (Stroud Local Plan) and Protected Trees

Services and Amenities

Page 54: Dursley Neighbourhood Development Plan 2018 - 2031€¦ · Image credits: p7: ©DDGE/BEXCOPTER.p62-3 Tim Taphouse; Graphic Design by Place Studio Ltd. Thank you Dursley Town Council

Dursley NDP - Oct 201853

Services and Amenities

Planning Policy SF2: Local Green Space Designations

The Plan proposes that the local green spaces , as shown on Figure 15, and listed below, be designated in accordance with the provisions of Paragraph 100 of the National Planning Policy Framework.

1. Kingshill House Play Park2. Highfields Play Park and Field3. Cambridge Avenue Play Area4. Land off Hardings Drive5. Union Street Green6. Holywell Orchard

Explanation

Neighbourhood Plans can designate Local Green Spaces that are demonstrably special to the community, to protect them from development in line with paragraph 100 of the National Planning Policy Framework. This designation protects these green spaces for the long term, and development on these is then possible only in exceptional circumstances.

The Dursley Infrastructure Information Report, 2014 includes resident survey results that highlight the importance of local green spaces to the community. Striud District Outdoor Play Space Study 2013, demonstrates the under supply of green space in Dursley, which emphasises the importance of retaining green spaces within the town.

The Environment & Green Spaces Report 2014, includes a photos of each of the green spaces within Dursley and outlines their size and dimensions.

For each of the Local Green Spaces landowners have been notified and a proforma has been completed to demonstrate that each of the green spaces meets the national planning requirements and is eligible for designation.

A small number of Local Green Spaces are proposed, noting that this designation cannot be used as a blanket protection for green spaces and that the designation is not suitable for most green spaces, as confirmed in national policy.

A Local Green Space Designation Evidence Report 2017, has been prepared to support the proposed designation of local green spaces.

Page 55: Dursley Neighbourhood Development Plan 2018 - 2031€¦ · Image credits: p7: ©DDGE/BEXCOPTER.p62-3 Tim Taphouse; Graphic Design by Place Studio Ltd. Thank you Dursley Town Council

Dursley NDP - Oct 201854

Figure 15: Proposed Local Green Space Designations in Dursley

4

2

5

1

3

6

DURSLEY

DURSLEY CPWoodmancote

O

R

M

A

C

K

R

C

E

T

R

A

V

II

K

W

E

G

E

C

E

R

T

T

D

I

I

SD

R

A

W

G

UV

I

T

A

U

E

K

O

L

D

O

L

E

D

G

O

S

S

E

L

S

S

T

C

N

W

T

D

U

R

E

N

D

R

N

B

B

S

E

S

P

R

AL

S

A

N

G

C

L

S

O

O

D

L

S

D

E

U

A

L

V

H

A

H

C

K

L

E

R

H

R

E

E

S

V

L

L

L

G

E

N

O

R

H

I

R

R

A

E

D

E

L

E

L

A

E

D

S

D

E

E

E

I

R

I

T

S

K

A

E

O

S

A

S

O

T

D

O

R

E

I

L

V

L

L

R

I

A

E

E

G

Y

E

L

A

R

P

I

O

Y

K

N

A

N

E

D

N

O

L

M

H

R

Y

A

E

R

A

P

L

F

A

N

A

A

D

O

N

U

D

L

P

S

A

C

E

R

I

O

O

E

E

E

R

U

E

C

L

E

Y

E

R

M

R

S

H

D

R

L

R

N

I

V

A

IF

T

P

N

K

H

F

R

I

H

O

D

K

C

D

C

I

C

E

L

V

R

E

H

U

N

V

G

R

I

E

E

O

L

T

V

R

L

G

L

F

R

C

O

L

S

G

T

W

H

H

A

O

L

'

A

Y

T

E

R

E

S

A

L

I

V

A

S

O

H

T

M

N

E

E

N

D

L

E

U

E

H

L

A

I

W

L

I

N

O

O

E

A

A

N

G

C

A

E

V

C

G

I

R

A

I

G

N

'

D

G

L

S

D

B

E

R

P

D

H

O

E

A

A

T

V

D

N

E

S

K

R

G

U

A

D

A

I

'

O

C

D

C

S

V

A

E

O

S

R

N

T

I

N

I

E

E

G

R

I

N

SI

L

N

R

L

E

V

R

S

LH

N

U

A

A

U

R

N

M

I

O

D

M

TM

R

V

S

T

T

A

U

T

I

S

O

I

P

A

E

N

N

N

B

K

E

U

I

B

P

P

A

B

E

R

H

H

E

R

I

V

O

R

D

G

T

Y

L

S

E

D

S

K

A

D

A

T

D

V

W

F

E

A

Y

E

S

L

G

R

AE

H

E

H

V

R

D

L

E

H

E

F

R

E

Y

O

V

A

G

O

D

B

R

LD

R

L

R

E

D

K

T

L

A

C

S

EB

D

T

N

M

NW

S

A

R

I

R

N

L

W

C

P

N

O

E

I

E

O

N

E

O

H

E

O

I

N

T

J

L

S

T

S

E

L

E

C

D

D

E

A

U

D

Y

L

L

E

E

W

A

S

D

W

O

E

S

H

Y

Y

A

P

T O

C

B

W

S

E

H

K

N

N

W

K

D

R

L

B

R

O

R

L

O

I

L

L

I

D

E

O

R

L

N

N

F

N

TA

N

L

E

H

W

AU

E

E

S

T

R

D

R

O

I

R

U

E

H

E

D

I

P

E

U

T

G

R

E

T

K

A

L

E

S

S

A

S

H

O

E

R

E

E

DURSLEY

DURSLEY CPWoodmancote

(C) Crown copyright and database rights 2018 Ordnance Survey 100019682

Future Dursley NDP Local Green Space Designations

1:7,500Scale - 0 300 600150 Meters

Dursley parish bounbary

Local Green Space Designations1. Kingshill House Play Park

2. Highfields Play Park and Field

3. Cambridge Avenue Play Area

4. Land off Hardings Drive

5. Union Street Green

6. Holywell Orchard

¯

Date: 12/09/2018

Page 56: Dursley Neighbourhood Development Plan 2018 - 2031€¦ · Image credits: p7: ©DDGE/BEXCOPTER.p62-3 Tim Taphouse; Graphic Design by Place Studio Ltd. Thank you Dursley Town Council

Dursley NDP - Oct 201855

Traffic and Transport

Policies and projects in Dursley’s Neighbourhood Development Plan will work to make it easier for residents, businesses and visitors to move around Dursley, whether by car, public transport, cycle or on foot.

Dursley is growing in population and the marked increase in usage at the Cam & Dursley Rail Station reflects this. Rail patronage increased by nearly 30% between 2009 and 2014 (Cam and Dursley Station Travel Survey Reporting and Recommendations - Final Report, 2015) . Many of these users are travelling to work or education. This reflects the changing demographic of Dursley’s residents who now increasingly commute out of the town for work.

Dursley’s town centre is thriving with independent shops as well as national stores. The town has an effectively pedestrianised high street and acceptable walking

routes into the town centre, but there is room for improvement, especially along the narrow pavements of Silver Street. Key transport issues for Dursley are: the lack of an integrated bus service to meet trains; lack of parking in the town centre and at the train station;decreased bus provision and a need to improve cycling routes (e.g. the Greenway), as well as safer routes for pedestrians.

The implementation of transport projects will require working closely with Cam Parish Council, as well as Stroud District Council, Gloucestershire County Council and local community groups.

Planning Policy

H

E

G

n/a

n/a

T2

Traffic and Transport Objectives

Improve public transport

Improve Town Centre car parking (short and long-stay)

Improve traffic management

Improve connections for cyclists and pedestrians

Improve cycle parking

Project (see section 6)

n/a

G

T1

T2

Traffic and Transport theme

Page 57: Dursley Neighbourhood Development Plan 2018 - 2031€¦ · Image credits: p7: ©DDGE/BEXCOPTER.p62-3 Tim Taphouse; Graphic Design by Place Studio Ltd. Thank you Dursley Town Council

Dursley NDP - Oct 201856

Traffic and Transport

Figure 16:Dursley-Cam Greenway Route (Indicative)

¯

(C) Crown copyright and database rights 2017 Ordnance Survey 100019682

Cam, Dursley & Uley Greenway: Proposed Route (For illustrative purposes only) 1:9,607Scale -

05/04/2017

Dursley Parish

Cam, Dursley & Uley Greenway: Proposed Route (For illustrative purposes only)

Page 58: Dursley Neighbourhood Development Plan 2018 - 2031€¦ · Image credits: p7: ©DDGE/BEXCOPTER.p62-3 Tim Taphouse; Graphic Design by Place Studio Ltd. Thank you Dursley Town Council

Dursley NDP - Oct 201857

Traffic and Transport

Planning Policy T1: Car Parking

Development which supports provision of car parking, especially development which provides higher levels of car parking than mandated in the Stroud Local Plan, will be supported.

Improvements to the supply and quality of short and long stay car parking to support the town centre will be supported.

Explanation

The Neighbourhood Plan can only encourage increased provision of car parking linked to private development. National Planning Policy states that Neighbourhood Plans have no power to impose local parking provision unless there is clear and compelling justification that it is necessary to manage the local road network.

Dursley’s Neighbourhood Plan supports local projects and community groups working to improve car parking, particularly in the Town Centre. The town has high level of car ownership and a vital but limited public transport network, which is rural by nature.

The plan also supports opportunities to improve the town centre car parking offer, which has been an issue raised as part of the public consultation.

Page 59: Dursley Neighbourhood Development Plan 2018 - 2031€¦ · Image credits: p7: ©DDGE/BEXCOPTER.p62-3 Tim Taphouse; Graphic Design by Place Studio Ltd. Thank you Dursley Town Council

Dursley NDP - Oct 201858

Traffic and Transport

Policy T2: Improve Connections for Cyclists and Pedestrians

Development proposals which include, where possible, footpath and cycle links to improve access to green space, the town centre, wider countryside amd Cam and Dursley train station will be supported.

Explanation text

Where development proposals can include improvements for pedestrians and cyclists within the scheme or directly related to the scheme these will be sought. Improvements are not only sought to better connect to the town centre, but also to the wider countryside.

Improvements will need to be proportionate and related to the development proposal is scale and kind.

Page 60: Dursley Neighbourhood Development Plan 2018 - 2031€¦ · Image credits: p7: ©DDGE/BEXCOPTER.p62-3 Tim Taphouse; Graphic Design by Place Studio Ltd. Thank you Dursley Town Council

Dursley NDP - Oct 201859

Cotswold Way - Dursley Route

Date Created: 17-8-2016 | Map Centre (Easting/Northing): 375757 / 198057 | Scale: 1:8089 | © Crown copyright and database right. All rights reserved (100050612) 2016 © Contains Ordnance Survey Data : Crown copyright and database right 2016

Dursley CP

Figure 17: Cotswold Way

Cotswolds Way route

Page 61: Dursley Neighbourhood Development Plan 2018 - 2031€¦ · Image credits: p7: ©DDGE/BEXCOPTER.p62-3 Tim Taphouse; Graphic Design by Place Studio Ltd. Thank you Dursley Town Council

Dursley NDP - Oct 201860

6. Projects

Page 62: Dursley Neighbourhood Development Plan 2018 - 2031€¦ · Image credits: p7: ©DDGE/BEXCOPTER.p62-3 Tim Taphouse; Graphic Design by Place Studio Ltd. Thank you Dursley Town Council

Dursley NDP - Oct 201861

Project A: Encourage Start up and New Busineses

The Town Council will also work with other agencies including the Local Enterprise Partnership Growth Hub Team and Stroud District Council to reverse losses in employment and strengthen the town’s employment opportunities for local people particularly in the manufacturing, retail and leisure/tourism sectors.

.

Project B: Leisure and Tourism

To support the development of the town’s visitor economy, Dursley Town Council will:

i. support the development of new tourist attractions, of appropriate scale and in accordance with the policies of the development plan and that have no adverse impact on the residential amenity, the existing economy or the environment.

ii. actively work with other agencies to create a new Tourist Information Centre within the town centre.

Project C: Potential Projects to support the Local Economy

Dursley Town Council will consider projects to support the Local Economy, such as:

(i) Dursley Business Inclusive to work with both the area Federation of Small Business (FSB) and Chambers of Commerce, to develop retail support partnership. Delivering marketing campaign and events to promote the retail and tourism offer of Dursley.

(ii) Direct marketing campaign of Growth Hub to businesses across Dursley, via Town Council website, social media and membership organisations. Potentially hosting Growth Hub officer at town council offices, providing drop in advice and guidance sessions for local business.

Projects

The projects defined in this Neighbourhood Plan are actions that the Neighbourhood Plan would like to achieve. They are not planning policies as they refer to issues that cannot be controlled via planning consent.

For example a number of traffic and transport projects do not require any planning consent, but require key agencies to work together to deliver improvements.

These projects are not subject to independent examination or referendum, but are included as they are important issues for the community. Their inclusion also makes the plan more holistic.

Page 63: Dursley Neighbourhood Development Plan 2018 - 2031€¦ · Image credits: p7: ©DDGE/BEXCOPTER.p62-3 Tim Taphouse; Graphic Design by Place Studio Ltd. Thank you Dursley Town Council

Dursley NDP - Oct 201862

(iii) Link with local colleges and schools to promote apprenticeships to local businesses, via direct marketing activity and events. (iv) Developing the local economy by encouraging business start up and growth in established businesses, working with the LEP Growth Hub team and economic development officers within Stroud District Council.

(v) Facilitate temporary uses of empty retail units, e.g. pop-up shops and art spaces.

Project E: Improving Traffic Management

Dursley Town Council will work together with the Highway Authority, public transport providers, community groups, local schools and developers to develop a long term sustainable strategy for improvements to the highway network and the management of traffic in and around Dursley to reduce the impact of traffic on the community.

Projects

Project D:Access to green space and allotments

Dursley Town Council will actively seek to increase access to green spaces and areas for allotments and will encourage active use of land for this purpose. In addition, improvements to the quality and usability of existing green spaces for the community will be sought.

Project F:Improve Public Transport

Dursley Town Council will work together with the Highway Authority, public transport providers, local groups and developers to develop a long term sustainable strategy to:

• Encourage better access to and increased use of public transport;

• Ensure that new development takes place adjacent to the built up areas where there are good travel choices;

• Improve links within the existing built-up area for cycling and bus provision; and

• Ensure other vehicular traffic keeps to appropriate routes.

Page 64: Dursley Neighbourhood Development Plan 2018 - 2031€¦ · Image credits: p7: ©DDGE/BEXCOPTER.p62-3 Tim Taphouse; Graphic Design by Place Studio Ltd. Thank you Dursley Town Council

Dursley NDP - Oct 201863

Project G: Improve Cycle Parking

Dursley Town Council will work with Gloucestershire County Council, local businesses, community groups and other agencies to improve the amount and quality of secure cycle parking in Dursley. This will encourage cycling as an alternative to car use.

Projects

Project H: Improve Connections for Cyclists and Pedestrians

The Town Council will work with Stroud District Council, Gloucestershire County Council and other agencies to improve green routes and connections for pedestrians and cyclists within Dursley and between the town centre, Rednock School and leisure facilities.

This could include working with the Highways Agency and Local Transport Team to include reallocating street space to cyclists.

Access to and signage for the Cotswold Way will also be supported as part of the local tourism offer.

Project I: Valuing our Conservation Areas

The Town Council will work with Stroud District Council, Historic England and local residents to carry out a review of existing conservation areas - Dursley Town Centre and Woodmancote.

Project J: Looking After our Heritage Assets

The Town Council will work with Stroud District Counci, Historic England and local residents to create a list of non-designated heritage assets of local significance.

Page 65: Dursley Neighbourhood Development Plan 2018 - 2031€¦ · Image credits: p7: ©DDGE/BEXCOPTER.p62-3 Tim Taphouse; Graphic Design by Place Studio Ltd. Thank you Dursley Town Council

Dursley NDP - Oct 201864

Project K: Green Infrastructure

Dursley Town Council will work with the community to establish a Green Infrastructure Plan in order to better protect and enhance green connections for people and wildlife.

This work will draw on the recommendations from the examiners report, to make sure that the network is better defined and that it is clearer exactly how development will be expected to respond to the Green Infrastructure network. The intention is that this evidence will allow a new policy to be included in a future version of the Dursley Neighbourhood Development Plan. It can also inform local wildlife and land stewardship projects.

Projects

Page 66: Dursley Neighbourhood Development Plan 2018 - 2031€¦ · Image credits: p7: ©DDGE/BEXCOPTER.p62-3 Tim Taphouse; Graphic Design by Place Studio Ltd. Thank you Dursley Town Council

6565

7. Evidence Base

Page 67: Dursley Neighbourhood Development Plan 2018 - 2031€¦ · Image credits: p7: ©DDGE/BEXCOPTER.p62-3 Tim Taphouse; Graphic Design by Place Studio Ltd. Thank you Dursley Town Council

Dursley NDP - Oct 201866 66

Dursley NDP Local Evidence Base Documents by topic:

ConsultationDursley NDP Consultation Statement (March 2018)(This contains links to write-ups and comments made at all consultation events)

Business & EconomyDursley Neighbourhood Plan Economic Development Analysis (Place Studio 2016)Dursley Main Employers (2014)Dursley NDP Business Survey – Counts and Percentages (2014)Dursley NDP Business Survey Final (2014)Tourism Development in Dursley – (Hidden Britain 2014)Economy Topic Highlights of Evidence (Oct 2014)Littlecombe Flyer (March 2015)NDP Littlecombe Business Meeting (March 2015)Dursley External Marketing Audit Summary – (Hidden Britain 2014)

Evidence Base

Town Centre Survey (2015)Town Centre Survey (2016)

DesignDursley Urban Design Framework (Roger Evans Associates 2007) – including update note (March 2017)Housing Design Evidence SummaryFerney Character Review (2017)

Ecology, Landscape and Environment Dursley Landscape Character Assessment (White Consultants 2015)Environment and Green Spaces Report (2014)Dursley Biodiversity & Wildlife Report (2014)Landscape Character Assessment (Stroud District Council 2016)Local Green Space Designation Evidence Report (2017)Explanatory note for Green Infrastructure in Dursley (Gloucestershire Wildlife Trust 2017)

Gloucestershire Local Nature Partnership – Strategic Framework for Green Infrastructure and Cotswold Scarp Nature Improvement AreaKey Wildlife Sites www.gcer.co.uk

HousingHousing Needs Assessment Stroud District Council (June 2010)Dursley Housing Report (Gloucestershire Rural Community Council 2015)Gloucestershire Strategic Housing Market Assessment (2014)Stroud District Council Housing Strategy (2015-2019) Housing Permissions and Proposals ( 2014)Housing Research (Jan Burdge 2014)NDP Estate Agent Survey (2014)Estate Agent Survey – (Gayle Collins 2015) Self-Building and the Dursley NDP (Tracy Organ 2016)Strategic Housing Land Availability

Assessment for Stroud (Stroud District Council 2011)https://www.stroud.gov.uk/environment/planning-and-building-control/planning-strategy/evidence-base/housing-evidence/strategic-housing-land-availability-shlaaStrategic Assessment of Land Availability (Stroud District Council 2016)https://www.stroud.gov.uk/environment/planning-and-building-control/planning-strategy/evidence-base/housing-evidence/strategic-assessment-of-land-availability-sala

Services and InfrastructureDursley Infrastructure Information Report (2014)Stroud District Outdoor Play Space Study (2013)Dursley Outdoor Play Space Survey Revised (2016)

Site AssessmentsList of proposed development sites

Page 68: Dursley Neighbourhood Development Plan 2018 - 2031€¦ · Image credits: p7: ©DDGE/BEXCOPTER.p62-3 Tim Taphouse; Graphic Design by Place Studio Ltd. Thank you Dursley Town Council

Dursley NDP - Oct 201867

Site Assessment Checklist – Site Assessment Checklist – The Old Dairy/Land off Prospect Place Site Assessment Checklist – 11/11a May LaneSite Assessment Checklist – Bus Station Site Assessment Checklist – Fields at the back of Shakespeare Road Site Assessment Checklist – Fields at Spring Farm Site Assessment Checklist – Castle Stream Farm Site Assessment Checklist – Triangle at the back of Sandpits clinic now Kingdom Hall Site Assessment Checklist – Starkey’s Woodmancote Site Assessment Checklist – Mill Farm, Uley Road Site Assessment Checklist – Land at Sheephouse Farm Site Assessment Checklist – Land off Acacia Drive Site Assessment Checklist – Land with garages at the bottom of Kingsway

Evidence Base

Site Assessment Checklist – Blackboys FarmSite Assessment Checklist – Land off Hardings DriveSite Assessment Checklist – Land behind the Old Bell and the DilrajSite assessment Checklist – Henlow House RedevelopmentSite Assessment Checklist – Reliance House (former Gazette Office, Long Street)Site Assessment Checklist – Cambridge House (Sheltered Accommodation – SDC Review)

TransportNDP Traffic and Transport Evidence Base and Issues Report (2014)NDP Summary of Transport ‘Needs’ in Dursley (2014)NDP Parking Survey (2014) NDP Executive Summary – Dursley Parking Behaviour and Needs (2014)Cam & Dursley Station – Travel Survey & Site Assessment (2014) Cam and Dursley Station

Travel Survey Reporting and Recommendations, Final Report (Harris Ethical Ltd 2015)Gloucestershire Local Transport Plan 2015-2031 www.gloucestershire.gov.uk/transport/gloucestershires-local-transport-plan-2015-2031/connecting-places-strategies-cps/Gloucestershire County Council’s public rights of way map – www.gloucestershire.gov.uk/prow

Maps Dursley Designated Neighbourhood Plan AreaStroud District Level Spatial Strategy for DursleyNDP Development Strategy for DursleyTown centre Urban Design Framework – Townscape AnalysisTown Centre Urban Design Framework – Summary DiagramDursley Green Infrastructure MapSt Modwen’s Development Masterplan for Littlecombe (2016)Dursley’s Ancient Woodlands

Dursley’s Landscape Character Assessment (2015) – extractDursley AONB and Parish BoundaryDursley Local Landscape Character AreasDursley Town Centre Character AreasHistoric Assets in DursleyCommunity Facilities in DursleyProtected Outdoor Play SpacesProposed local Green Space DesignationsDursley-Cam GreenwayCotswold Way – Route through Dursley

Page 69: Dursley Neighbourhood Development Plan 2018 - 2031€¦ · Image credits: p7: ©DDGE/BEXCOPTER.p62-3 Tim Taphouse; Graphic Design by Place Studio Ltd. Thank you Dursley Town Council

68